Seminar on Maintenance of Asphalt Pavements

Crack Sealing

Alan L. Gesford, P.E.Technology Transfer Specialist

Michigan’s Local TechnicalAssistance Program

Page 2: Technology Transfer Specialist - Michigan LTAP

ALG

Agenda1. Importance of Crack Sealing

Road Enemy #1 - ‘Water’2. FHWA/SHRP/LTPP

Studies & Results Manual of PracticeLTPPBind Software

Page 3: Technology Transfer Specialist - Michigan LTAP

ALG

Agenda3. Crack Sealing Program

MaterialsEquipmentPreparationSealingSafety

4. Saw and Seal Program

Page 4: Technology Transfer Specialist - Michigan LTAP

ALG

Video

US Army Corps of EngineersCold Regions Research &

Engineering Laboratory (CRREL) Hanover, NH

“Crack Sealing Flexible Asphalt Pavement”

Page 5: Technology Transfer Specialist - Michigan LTAP

ALG

Importance of Crack Sealing

One of the best early Preventive Maintenance Techniques to prolong the life of your roadsCost Effective!

Page 6: Technology Transfer Specialist - Michigan LTAP

ALG

Factors Affecting Road Life

Traffic Loads

Subgrade Quality

Water

Quality of

MaintenanceProgram

Construction &Road Materials

Road Life

Water

Age

Traffic Loads

Page 7: Technology Transfer Specialist - Michigan LTAP

ALG

4 8 12 16YEARS

VERYGOOD

GOOD

FAIR

POOR

VERYPOOR

40% Quality Drop

40% Quality Drop

75% Time

17% Time

Deterioration / RehabilitationRelationship

Page 8: Technology Transfer Specialist - Michigan LTAP

If left go, a single crack will only continue to deteriorate, resulting in more severe distress with more work to repair along with additional costs.

Page 9: Technology Transfer Specialist - Michigan LTAP

Crack Sealing

Types of Cracks

BlockReflection

EdgeLongitudinalTransverse

Page 10: Technology Transfer Specialist - Michigan LTAP

ALG

Caution!Alligator/Fatigue Cracking

Recommended Treatment: Base Repair

DO NOT CRACK SEAL

Page 11: Technology Transfer Specialist - Michigan LTAP

ALG

Caution!Alligator/Fatigue Cracking

Recommended Treatment: Base Repair

DO NOT CRACK SEAL

Page 12: Technology Transfer Specialist - Michigan LTAP

ALG

FHWA / SHRP / LTPP

Strategic Highway Research Program

SS

RRHH

PP

Long Term Pavement Performance

LLTTPPPP

Federal Highway Administration

Page 13: Technology Transfer Specialist - Michigan LTAP

ALG

SHRP Studies

H-105 Innovative Materials & Equipment for Pavement surface RepairH-106 Innovative Materials Development & TestingFHWA Long-Term Monitoring (LTM) of Pavement Maintenance Materials Test Sites

Final Report: LTPP Pavement Maintenance Materials: SHRP Crack Treatment Experiment, Final Report. FHWA-RD-99-142

TechBrief: Sealing and Filling Cracks in Asphalt Pavements

http://www.fhwa.dot.gov/pavement/pub_listing.cfm?areas=LTPP

Page 14: Technology Transfer Specialist - Michigan LTAP

ALG

SHRPManual of Practice

Materials and Procedures for Sealing and Filling

Cracks in Asphalt-Surfaced

Pavements

FHWA Report No. FHWA-RD-99-147http://www.fhwa.dot.gov/pavement/pub_listing.cfm?areas=LTPP

Page 15: Technology Transfer Specialist - Michigan LTAP

ALG

Crack Treatment

Method depends on crack density and edge deterioration

Surface TreatmentRepairSealingFilling

Page 16: Technology Transfer Specialist - Michigan LTAP
Page 17: Technology Transfer Specialist - Michigan LTAP

ALG

Crack Sealing vs Filling

Crack Sealing: Placement of specialized materials above or into working cracks using unique configurations to prevent water intrusion.Crack Filling: Placement of ordinary treatment materials into non-workingcracks to prevent water intrusion

Page 18: Technology Transfer Specialist - Michigan LTAP

ALG

Working vs Non-working Cracks

Working Cracks: Horizontal movement of 0.1 inches or greater, usually transverseNon-working Cracks: Horizontal movement less than 0.1 inch, usually longitudinal

Page 19: Technology Transfer Specialist - Michigan LTAP
Page 20: Technology Transfer Specialist - Michigan LTAP

ALG

Materials for Sealing vs Filling

Minimal movement permits use of less expensive, less specialized crack-filler materialsIf existing cracks are both working and non-working, using a material appropriate for the most demanding crack type may be desirable

Page 21: Technology Transfer Specialist - Michigan LTAP

ALG

Factors Effecting Sealants

ClimateTrafficWeather Conditions during SealingPavement DesignPavement AgeDrainage Profile

Page 22: Technology Transfer Specialist - Michigan LTAP

ALG

Factors Effecting Sealants

Material Preparation Material Type (& manufacturer)Material ConfigurationCrack MovementCrack DeteriorationCrack Preparation

Page 23: Technology Transfer Specialist - Michigan LTAP

ALG

Sealant Distresses

Adhesion Failure*Cohesion FailureWeathering/AgingExtrusion, Tracking, PulloutsIntrusion of Incompressibles

Page 24: Technology Transfer Specialist - Michigan LTAP

ALG

*Adhesion Failure

Sealant MaterialImproper ConfigurationInadequate Crack PreparationIncorrect Installation Procedures

Page 25: Technology Transfer Specialist - Michigan LTAP

ALG

Desirable Sealant Characteristics

Short preparation timeQuick & easy to placeShort cure timeAdhesivenessCohesiveness

Page 26: Technology Transfer Specialist - Michigan LTAP

ALG

Desirable Sealant Characteristics

Resistance to softening & flowFlexibilityElasticityResistance to aging & weatheringAbrasion resistance

Page 27: Technology Transfer Specialist - Michigan LTAP

ALG

Types of Sealants

1. Cold-Applied Thermoplastic2. Hot-Applied Thermoplastic3. Thermosetting Chemically

Cured

Page 28: Technology Transfer Specialist - Michigan LTAP

ALG

Types of Sealants

Cold-Applied Thermoplastic»Set by release of solvents

(cutbacks) or breaking of emulsions

»Applied at ambient temps or heated to 120-140o F

Page 29: Technology Transfer Specialist - Michigan LTAP

ALG

Types of Sealants

Hot-Applied Thermoplastic»Soft upon heating»Harden on cooling»No change in chemical

composition

Page 30: Technology Transfer Specialist - Michigan LTAP

ALG

Types of Sealants

Thermosetting Chemically-Cured»Cure through chemical reaction»High cost

Page 31: Technology Transfer Specialist - Michigan LTAP

ALG

Sealant UsesNon-working cracks (crack filling)» asphalt emulsions» asphalt cement» fiberized asphaltWorking cracks (crack sealing)» polymer-modified liquid asphalt » asphalt rubber» rubberized asphalt» low-modulus rubberized asphalt» self-leveling silicone

Page 32: Technology Transfer Specialist - Michigan LTAP

p12

Page 33: Technology Transfer Specialist - Michigan LTAP

p12

Page 34: Technology Transfer Specialist - Michigan LTAP

ALG

Configurations

Flush FillReservoir (routed)Overband (band-aid)Combination

Page 35: Technology Transfer Specialist - Michigan LTAP

ALG p13-14

Page 36: Technology Transfer Specialist - Michigan LTAP

ALG p13-14

Page 37: Technology Transfer Specialist - Michigan LTAP

p13-14See Figure 6: Material Placement Configurations

Page 38: Technology Transfer Specialist - Michigan LTAP

ALG

SHRP Crack Treatment Experiment, Final Report Recommendations

1. Establishing a Program» Assessment prior to action

–Type & orientation of cracks –Climatic conditions, pavement structure,

traffic, future rehabilitation plans» Determine crack movement expected» Determine appropriateness of short,

medium, or long-term treatment

Page 39: Technology Transfer Specialist - Michigan LTAP

ALG

SHRP Crack Treatment Experiment, Final Report Recommendations

2. Working Cracks» Short-term 1-3 years

–Rubberized asphalt in simple band-aid configuration

» Medium-term 3-5 years–Rubberized asphalt in standard

recessed band-aid configuration–Modified rubberized asphalt in simple

band-aid configuration

Page 40: Technology Transfer Specialist - Michigan LTAP

ALG

SHRP Crack Treatment Experiment, Final Report Recommendations

2. Working Cracks (continued)» Long-term 5-8 years

–Modified rubberized asphalt in standard recessed band-aid configuration

–Modified rubberized asphalt in shallow recessed band-aid configuration

Page 41: Technology Transfer Specialist - Michigan LTAP

ALG

SHRP Crack Treatment Experiment, Final Report Recommendations

3. Non-working Cracks» Short-term 1-3 years

–Asphalt cement in flush fill configuration» Long-term 5-8 years

–Asphalt rubber or rubberized asphalt in flush fill or overband configuration

–Fiberized asphalt in overband configuration

Page 42: Technology Transfer Specialist - Michigan LTAP

ALG

SHRP Crack Treatment Experiment, Final Report Recommendations

4. Other considerations» Use of hot-lance to clean, dry and

warm cracks appears cost effective» Self-leveling silicone looks

promising, more study needed

Page 43: Technology Transfer Specialist - Michigan LTAP

ALG

Innovation! LTPPBindLTPPBind: A Software Tool for Selecting Cost-Effective Superpave Asphalt Binder Performance Grades» Database of high & low temps for 7,835 U.S. &

Canandian weather stations» Allows user to select PGs based on actual

temperature conditions at their siteProduct Brief in Handout

So why is this important to crack sealing?????

Page 44: Technology Transfer Specialist - Michigan LTAP

ALG

Using LTPPBind to Improve Crack Sealing

Sealants with different properties are needed in different climatesWarm climates require stiff sealants, colder climates require softer, more flexible sealantsSealants must function over the range of temperatures from summer to winterInstallation methods also vary by climateThe same pavement temperatures identified by LTPPBind can be used in selecting crack sealant materials and procedures

Page 45: Technology Transfer Specialist - Michigan LTAP

ALG

Using LTPPBind to Improve Crack Sealing

Using LTPPBind, sealant properties at anticipated high and low temperatures can be evaluated or comparedThe LTPPBind temperature range also indicates expected crack movement aiding in reservoir-widening (routing) decisionsSee Handout: Using LTPPBind V2.1 to Improve Crack Sealing in Asphalt Concrete Pavements FHWA-RD-03-080

Page 46: Technology Transfer Specialist - Michigan LTAP

ALG

Crack Sealing Program

MaterialsEquipmentPreparation

SealingSafety

Basic Elements of Crack Sealing

Page 47: Technology Transfer Specialist - Michigan LTAP

ALG

Crack Sealing ProgramMaterials

Materials:Recommend Prepackaged MaterialsDo not recommend field mixingnot

Page 48: Technology Transfer Specialist - Michigan LTAP

ALG

Crack Sealing ProgramMaterials

If you are field mixing:

» Asphalt & PDR : 2 lbs rubber per gallon asphalt

» Asphalt & fibers: 5% fibers by weight of asphalt (10 lb bag per 25 gallons asphalt)

Page 49: Technology Transfer Specialist - Michigan LTAP

ALG

Crack Sealing ProgramMaterials

Problems with field mixing:Proper KettleProper proportionsUniform mix

Page 50: Technology Transfer Specialist - Michigan LTAP

ALG

Prepackaged Materials: Right proportions, uniform mix

Page 51: Technology Transfer Specialist - Michigan LTAP

ALG

Crack Sealing ProgramMaterials

Temperature of sealant is critical Follow manufacturer’s recommendations

Page 52: Technology Transfer Specialist - Michigan LTAP

ALG

Crack Sealing ProgramMaterials

Two important temperatures»Recommended application

temperature»Safe Heating Temperature

(generally 20o-30oF higher than application temp)

Page 53: Technology Transfer Specialist - Michigan LTAP

ALG

Crack Sealing ProgramEquipment

EquipmentRouterAir CompressorHot LanceHeating Kettle with pump & agitator

(See Table 7: Types & Recommendations)

p19

Page 54: Technology Transfer Specialist - Michigan LTAP

ALG

Crack Sealing ProgramEquipment

Routing/CuttingVertical-spindle routerRotary-impact routerRandom-crack saw

Page 55: Technology Transfer Specialist - Michigan LTAP

ALG

Routing Caution!

Routing may NOT be suitable for:Older, aged asphalt pavements (above 6 yrs old)Thin asphalt pavements (less than 2” thick)

Routing not needed if pavement is to be overlayed within 2 years

Page 56: Technology Transfer Specialist - Michigan LTAP

ALG

Routing

Advantages:Opens small cracks to allow greater penetrationProvides a reservoir for sealantProduces uniform edges for better adhesion

Disadvantages:Very labor intensive, thus extra costCan be difficult to follow meandering crackMay damage older or thin asphalt pavementsLonger exposure of workers to traffic

Page 57: Technology Transfer Specialist - Michigan LTAP

ALG

Crack Sealing ProgramEquipment

Air CompressorTo clean dust & debrisPressure: 100 psi minFlow: 150 cfm minVelocity: 3250 fps min

Page 58: Technology Transfer Specialist - Michigan LTAP

ALG

Crack Sealing ProgramEquipment

Hot LanceHeats & dries crackVelocity: 2000 fps minTemperature: 2500o F min

Page 59: Technology Transfer Specialist - Michigan LTAP

Hot lance heats and dries crack

Page 60: Technology Transfer Specialist - Michigan LTAP

ALG

Crack Sealing ProgramEquipment

Heating KettleDirect heatingIndirect heating (double boiler)

Type must be correct for material being used!

Page 61: Technology Transfer Specialist - Michigan LTAP

ALG

Direct Heat Indirect Heat

Page 62: Technology Transfer Specialist - Michigan LTAP

Indirect Heating KettleDouble boiler with separate temp controls & gauges for oil & melting chamberMechanical full-sweep agitatorHeating range to 450o F

60 gal.capacity

200 gal. capacity

Page 63: Technology Transfer Specialist - Michigan LTAP

ALG Indirect Heat, Air-Baffled

Page 64: Technology Transfer Specialist - Michigan LTAP

ALG

Crack Sealing ProgramPreparation

PreparationA clean, dry crack is criticalDirt, dust, cold, and dampness can be disastrous

Compressed airor…….

Page 65: Technology Transfer Specialist - Michigan LTAP

ALG

Hot-Air Lance

Page 66: Technology Transfer Specialist - Michigan LTAP

ALG

Crack Sealing ProgramPreparation

Routed cracks also need to be clean & dry

Page 67: Technology Transfer Specialist - Michigan LTAP

ALG

Cracks ¼” to 1"

Crack Sealing

Temperature (air & surface)» 40oF. min» 90oF. max

Page 68: Technology Transfer Specialist - Michigan LTAP

ALG

Crack Sealing ProgramSealing

SealingTemp above 40o FWait 24 hours after rainfallCracks 1/4” to 1”Material at proper temperature

Page 69: Technology Transfer Specialist - Michigan LTAP

ALG

Winter & Summer NOT the Right Time for Joint and Crack SealingWinter

Don’t Pour

Spring or Fall

Pour Joint

Summer

Don’t Pour

Compression

Summer

Tension

Winter

Compression (minimum)

Summer

Tension (minimum)

Winter

Page 70: Technology Transfer Specialist - Michigan LTAP

ALG

Crack Sealing ProgramSealing

SealingKettle with pump & wand preferred

Page 71: Technology Transfer Specialist - Michigan LTAP

ALG

Crack Sealing ProgramSealing

Pour pots & buckets» Higher safety

risks» Difficult to

maintain temperature

Page 72: Technology Transfer Specialist - Michigan LTAP

ALG

Crack Sealing ProgramSealing

Apply the sealant INTO the cracks with the sealant wand.

Slightly overfill to squeegee for bandaidconfiguration

Page 73: Technology Transfer Specialist - Michigan LTAP

ALG

Crack Sealing ProgramSealing

Band-aid configurations» Squeegee or special nozzle head» Keep squeegee free of material buildup

Page 74: Technology Transfer Specialist - Michigan LTAP

ALG

Crack Sealing ProgramSealing

Band-aid configurations» Keep squeegee or special head

centered over crack» Operate squeegee closely behind wand

Page 75: Technology Transfer Specialist - Michigan LTAP

ALG

Crack Sealing ProgramSealing

Sealant Configuration:» Standard Reservoir

with band-aid

» Width = 3”

» No build-up!

A “Wipe”

Page 76: Technology Transfer Specialist - Michigan LTAP

ALG

Page 77: Technology Transfer Specialist - Michigan LTAP

ALG

Crack Sealing ProgramSealing

Consistently maintaining application temperatureMaintaining sufficient supply of heated material in kettleProperly dispensing right amount of material into crack

3 important items:

Page 78: Technology Transfer Specialist - Michigan LTAP

ALG

Crack Sealing ProgramSealing

Blotting»Prevents tracking»Fine sand, limestone dust,

talcum powder, toilet paper»Apply immediately after

finishing

toilet paper

Page 79: Technology Transfer Specialist - Michigan LTAP

ALG

Crack Sealing ProgramSafety

SafetyTraffic - Proper work zone traffic controlCompressed airHot materials

Page 80: Technology Transfer Specialist - Michigan LTAP

ALG

Crack Sealing ProgramSafety

SafetyFace shield and/or gogglesHeat resistant coveralls & glovesNo direct heat applied to hosesTraining for entire crew

Page 81: Technology Transfer Specialist - Michigan LTAP

ALG

Crack Sealing ProgramSafety

Hot Asphalt First AidDO NOT attempt to remove asphalt from the skinSubmerge affected area in ice waterSeek medical attention

Page 82: Technology Transfer Specialist - Michigan LTAP

ALG

Crack Sealing ProgramSummary

Cracks Clean & DryProper Material & Configuration

Correct TemperatureProper Equipment

Safety

See Table 8: Crew requirements & production rates

p26

Page 83: Technology Transfer Specialist - Michigan LTAP

ALG

SAW and SEAL

Page 84: Technology Transfer Specialist - Michigan LTAP

ALG

Sawing & Sealing Joints in Asphalt Pavement to Control Cracking

Page 85: Technology Transfer Specialist - Michigan LTAP

ALG

Saw & Seal

An option for controlling cracks»New Asphalt Pavements»Asphalt Overlays on Jointed

Concrete Pavements (JCP)»Asphalt Overlays on Asphalt

Pavement

Page 86: Technology Transfer Specialist - Michigan LTAP

ALG

Saw & SealShould not be used:» Overlays on JCP with high frequency of

midpanel cracks or badly deteriorated cracks

» Overlays on JCP with badly deteriorated joints or joint patching

» Overlays on asphalt pavements with meandering transverse cracks

» Overlays on asphalt pavements with severe load related distress - alligator cracking, potholes, etc.

Page 87: Technology Transfer Specialist - Michigan LTAP

ALG

Would you rather have this, …

Page 88: Technology Transfer Specialist - Michigan LTAP

ALG

...or This!

Page 89: Technology Transfer Specialist - Michigan LTAP

ALG

Page 90: Technology Transfer Specialist - Michigan LTAP

ALG

Page 91: Technology Transfer Specialist - Michigan LTAP

ALG

Page 92: Technology Transfer Specialist - Michigan LTAP

ALG

Page 93: Technology Transfer Specialist - Michigan LTAP

ALG

Page 94: Technology Transfer Specialist - Michigan LTAP

ALG

Page 95: Technology Transfer Specialist - Michigan LTAP

ALG

Page 96: Technology Transfer Specialist - Michigan LTAP

ALG

Page 97: Technology Transfer Specialist - Michigan LTAP

ALG

Page 98: Technology Transfer Specialist - Michigan LTAP

ALG

Page 99: Technology Transfer Specialist - Michigan LTAP

ALG

Page 100: Technology Transfer Specialist - Michigan LTAP

ALG

RecommendationsJoints spaced 30-50 feet apart. Most recommended is 40 feet.Depth of deep cut to be 1/3 asphalt thickness or 2 ½”, whichever is greater.Sawing done in one pass.Reservoir filled properly to achieve good bond & long sealant lifeSpecification MnDOT 3720