Upload
johnathan-gilmore
View
212
Download
0
Embed Size (px)
Citation preview
Technology Proposal
Created and designed by Wendi Callaway
For Etec 579 and Terrell High SchoolJune 24, 2002
Mission Statement
• The Terrell High School Fine Arts department, in conjunction with TISD, believes that technology can assist the Fine Arts department in preparing today’s students for tomorrow’s world.
Technology
• Can provide the following:– Reinforcement of basic artistic skills– Ways to integrate digital media with various
subject areas– Increased student ability to function in society– Raise scores on standardized tests– Provide enrichment for teachers, students and
the community.
Goal 1
• Enhance the quality of instruction in the individual Fine Arts classes as well as other classes who opt to use the lab, by ensuring that all personnel have access to the technology sources.
Goal 2
• Enhance the quality of instruction by ensuring that software purchases and upgrades can be integrated into the learning environment, in multiple ways.
Goal 3
• The Fine arts department will secure and protect TISD’s in technology resources.
Goal 4
• Enhance the staff development program to ensure effective use of emerging technologies with emphasis on instructional applications.
Goal 5
• Provide several opportunities to develop parent and community awareness of the instructional and production technology resources in the Fine Arts department– by conducting workshops– by publicizing student use of technology
Budget Summary
Budget schedule
TIF Funds Local funds Total
A. Contractual services
$19,000 $19,000
B. Supplies and Materials
$18,000 $2,000 $20,000
C. Equipment
$39,700 $7,000 $46,700
Total direct expenses
$76,700 $9,000 $85,700
Budget—Schedule B
• Twenty percent of the total funds will be used for staff development. Training will be conducted through Region 10 ESC at a cost of $19,000.
Budget—Schedule D
• The purchase of software will total a cost of $20,000, and will consist of the following:– Operating System license--$1,050.00– Web Server--$2,800.00– Anti-virus—$240.00– Application software--$13,910.00
Application Software
• This cost will include the following software applications:– Novanet– Adobe products—PhotoShop, Illustrator, Premiere,
After Effects, PageMaker– HyperStudio 4– AutoCad 2000i– Corel Draw! 10– Macromedia products--Dreamweaver, Fireworks, and
Flash
Budget—Schedule E
• Necessary Network hardware will include:– 2 hubs– 4 network drops– 1 file server– 1 fiber optics– 24 patch cables
The cost of these will total $3,848.00.
Additional hardware
• Additional hardware will include the following:– 1 Smart Board– 1 Video Production Lab
The total cost for these $11,500.00, $7,000.00 of which is being secured by local funds.
Computer hardware
• Computer hardware to be purchased will consist of the following:– 5 CD burners– 18 PC workstations– 2 Laptops– 15 Zip drives
These will cost a total of $22,452.00.
Other equipment
• Other equipment to be purchased will consist of the following:– 2 digital cameras– 2 flatbed scanners– 2 Network printers– 1 presentation monitor– 1 projector– 1 digital camcorder
Other equipment continued
– 2 televisions– 2 VCRs– 20 Sensiva drawing pads
The total cost of this equipment will be $8,900.00.
All of the equipment together will total $46,700, which includes $7,000.oo in local funds.