17
Technology Proposal Created and designed by Wendi Callaway For Etec 579 and Terrell High School June 24, 2002

Technology Proposal Created and designed by Wendi Callaway For Etec 579 and Terrell High School June 24, 2002

Embed Size (px)

Citation preview

Page 1: Technology Proposal Created and designed by Wendi Callaway For Etec 579 and Terrell High School June 24, 2002

Technology Proposal

Created and designed by Wendi Callaway

For Etec 579 and Terrell High SchoolJune 24, 2002

Page 2: Technology Proposal Created and designed by Wendi Callaway For Etec 579 and Terrell High School June 24, 2002

Mission Statement

• The Terrell High School Fine Arts department, in conjunction with TISD, believes that technology can assist the Fine Arts department in preparing today’s students for tomorrow’s world.

Page 3: Technology Proposal Created and designed by Wendi Callaway For Etec 579 and Terrell High School June 24, 2002

Technology

• Can provide the following:– Reinforcement of basic artistic skills– Ways to integrate digital media with various

subject areas– Increased student ability to function in society– Raise scores on standardized tests– Provide enrichment for teachers, students and

the community.

Page 4: Technology Proposal Created and designed by Wendi Callaway For Etec 579 and Terrell High School June 24, 2002

Goal 1

• Enhance the quality of instruction in the individual Fine Arts classes as well as other classes who opt to use the lab, by ensuring that all personnel have access to the technology sources.

Page 5: Technology Proposal Created and designed by Wendi Callaway For Etec 579 and Terrell High School June 24, 2002

Goal 2

• Enhance the quality of instruction by ensuring that software purchases and upgrades can be integrated into the learning environment, in multiple ways.

Page 6: Technology Proposal Created and designed by Wendi Callaway For Etec 579 and Terrell High School June 24, 2002

Goal 3

• The Fine arts department will secure and protect TISD’s in technology resources.

Page 7: Technology Proposal Created and designed by Wendi Callaway For Etec 579 and Terrell High School June 24, 2002

Goal 4

• Enhance the staff development program to ensure effective use of emerging technologies with emphasis on instructional applications.

Page 8: Technology Proposal Created and designed by Wendi Callaway For Etec 579 and Terrell High School June 24, 2002

Goal 5

• Provide several opportunities to develop parent and community awareness of the instructional and production technology resources in the Fine Arts department– by conducting workshops– by publicizing student use of technology

Page 9: Technology Proposal Created and designed by Wendi Callaway For Etec 579 and Terrell High School June 24, 2002

Budget Summary

Budget schedule

TIF Funds Local funds Total

A. Contractual services

$19,000 $19,000

B. Supplies and Materials

$18,000 $2,000 $20,000

C. Equipment

$39,700 $7,000 $46,700

Total direct expenses

$76,700 $9,000 $85,700

Page 10: Technology Proposal Created and designed by Wendi Callaway For Etec 579 and Terrell High School June 24, 2002

Budget—Schedule B

• Twenty percent of the total funds will be used for staff development. Training will be conducted through Region 10 ESC at a cost of $19,000.

Page 11: Technology Proposal Created and designed by Wendi Callaway For Etec 579 and Terrell High School June 24, 2002

Budget—Schedule D

• The purchase of software will total a cost of $20,000, and will consist of the following:– Operating System license--$1,050.00– Web Server--$2,800.00– Anti-virus—$240.00– Application software--$13,910.00

Page 12: Technology Proposal Created and designed by Wendi Callaway For Etec 579 and Terrell High School June 24, 2002

Application Software

• This cost will include the following software applications:– Novanet– Adobe products—PhotoShop, Illustrator, Premiere,

After Effects, PageMaker– HyperStudio 4– AutoCad 2000i– Corel Draw! 10– Macromedia products--Dreamweaver, Fireworks, and

Flash

Page 13: Technology Proposal Created and designed by Wendi Callaway For Etec 579 and Terrell High School June 24, 2002

Budget—Schedule E

• Necessary Network hardware will include:– 2 hubs– 4 network drops– 1 file server– 1 fiber optics– 24 patch cables

The cost of these will total $3,848.00.

Page 14: Technology Proposal Created and designed by Wendi Callaway For Etec 579 and Terrell High School June 24, 2002

Additional hardware

• Additional hardware will include the following:– 1 Smart Board– 1 Video Production Lab

The total cost for these $11,500.00, $7,000.00 of which is being secured by local funds.

Page 15: Technology Proposal Created and designed by Wendi Callaway For Etec 579 and Terrell High School June 24, 2002

Computer hardware

• Computer hardware to be purchased will consist of the following:– 5 CD burners– 18 PC workstations– 2 Laptops– 15 Zip drives

These will cost a total of $22,452.00.

Page 16: Technology Proposal Created and designed by Wendi Callaway For Etec 579 and Terrell High School June 24, 2002

Other equipment

• Other equipment to be purchased will consist of the following:– 2 digital cameras– 2 flatbed scanners– 2 Network printers– 1 presentation monitor– 1 projector– 1 digital camcorder

Page 17: Technology Proposal Created and designed by Wendi Callaway For Etec 579 and Terrell High School June 24, 2002

Other equipment continued

– 2 televisions– 2 VCRs– 20 Sensiva drawing pads

The total cost of this equipment will be $8,900.00.

All of the equipment together will total $46,700, which includes $7,000.oo in local funds.