Upload
hoangthuan
View
257
Download
1
Embed Size (px)
Citation preview
Go vertical. HERRENKNECHT VERTICAL [email protected]
TECHNOLOGY GOING DEEP.
HERRENKNECHT VERTICAL.
GERMAN TECHNOLOGY FOR THE TURKISH MARKET
Jürgen Binder
General Manager
AGENDA
Company
Herrenknecht in Turkey
Technology going deep
Geothermal Projects in Germany
Track Records
Summary
Jürgen Binder
General Manager
Herrenknecht Group- More than 3000 employes- Almost one billion turnover- Over 30 years of engineering
and know how- Market leader in
tunnel boring business
100% subsidiaryHerrenknecht Vertical GmbH
COMPANY
Jürgen Binder
General Manager COMPANY – EMPLOYEES AND OPERATING PERFORMANCE
1518 16651849
2915
2345
0
500
1000
1500
2000
2500
3000
3500
2004 2005 2006 2007 2008
Employeesaverage peryear
459
594680
874
1013
0
200
400
600
800
1000
1200
2004 2005 2006 2007 2008
Total operatingperformance inMio. EUR
Jürgen Binder
General Manager
USA
VENEZUELA
SPAINFRANCE
NETHERLANDSUK UKRAINE
RUSSIA
ITALY
THAILAND
CHINA
AUSTRALIA
MALAYSIASINGAPORE
SUBSIDIARIES
REPRESENTATIVES
INDIA
IRAN
DUBAI
GERMANYSWITZERLAND
CANADA
MEXICO
BRAZIL
SAUDI ARABIA
HERRENKNECHT GLOBAL
Jürgen Binder
General Manager HERRENKNECHT IN TURKEY – PROJECTS SINCE 1997
2009 S- 506/505 Kadikoy Kartal Metro Project 6.540 m
2007 S-391 Melen 7 Istanbul 6.110 m – beneath the
Bosporus
2007 S-369 Bogazkoy Atiksu Tunelleri
2007 S-363/360 Istanbul Metro 6.540 m
2006 S-330 Uluabat 4.990 m
2005 S-325 Istanbul Metro Otogar 6.490 m
2005 S-324 Ankara Metro 5.890 m
2000 S-166 Tarabya Waste Water Tunnel 2.870 m
1997 S-114 Light Rail Transit System Izmir 6.520m
Jürgen Binder
General Manager METRO ISTANBUL.
Jürgen Binder
General Manager
S-325 | Metro Otogar | Istanbul | Turkey
EPB ShieldDiameter: 6.490 mmCutterhead power: 630 kWTunnel length: 2x 3.000 mGeology: silty clay, silty sandContractor: Gülermak Dogus; Adi Ortakligi
HERRENKNECHT IN TURKEY
Jürgen Binder
General Manager
S-360 and S-363 | Istanbul Metro Kadiköy Lo1 | Turkey
2 x EPB ShieldDiameter: 6,540mmTunnel length: 2x 8,662m
Customer: Dogus Insaat A.S.; BelenInsaat Ltd. Sti; Yuksel Insaat A.S.; Yapi Merkezi A.S.; Yenigun InsaatA.S.
HERRENKNECHT IN TURKEY
Jürgen Binder
General Manager
8.8km of new metro tunnelby October 2009
HERRENKNECHT IN TURKEY – A GERMAN TURKISH SUCCESS STORY
Jürgen Binder
General Manager
S-391 Melen 7 | Istanbul
EPB Shield
Diameter 6,110mm
Water tunnel
Breakthrough April 13, 2009
The first connection of twocontinents driven by machine
HERRENKNECHT IN TURKEY – 135 METERS BENEATH THE BOSPORUS.
Jürgen Binder
General Manager
Istanbul | Turkey
TBM2500XH
Geologiy: Rock
Diameter: 3.065 mm
Length: 4.241 m
Customer: Depar Insaat Ltd. Sti.
HERRENKNECHT IN TURKEY – WATER LINE TO THE GOLDEN HORN
Jürgen Binder
General Manager
COMPANY
Herrenknecht Headquarter in Schwanau, Germany.
Jürgen Binder
General Manager
COMPANY
Supplier of safe and modern deepdrilling rigs with drilling depth up to 6000m
Founded: March 2005
Employees: 125
(Status January 2010)
Herrenknecht Vertical:
Jürgen Binder
General Manager
TECHNOLOGY GOIND DEEP
Hook Load: 350 mtDrilling Depth up to: 6000mTripping speed: 500 m/hHoist power: 1600 kWHoist stroke: 22mSubstructure: Box-on-BoxPipehandling: Semi-automated
Range doubles
TERRA INVADER 350T
Jürgen Binder
General Manager
TECHNOLOGY GOING DEEP
Less transport units → less transport costs
Less space requirement → less space costs
Less human-resource allocation → less personnel costs
Minimize risk while drilling → less drilling costs
High human safety factor → less personnel costs
Main Advantges:
Jürgen Binder
General Manager
TECHNOLOGY GOING DEEP
Drill Site:
Jürgen Binder
General Manager
TECHNOLOGY GOING DEEP
1
2
3 4
Easy Rig-up without heavy crane:
Jürgen Binder
General Manager
TI 350 Slingshot Substructure,
Mast and Substructure erected:
TECHNOLOGY GOING DEEP – RIGS EASY TO MOBILIZE
Jürgen Binder
General Manager TECHNOLOGY GOING DEEP – DESIGNED FOR REMOTE AREAS
TI 350 Slingshot Substructure.
Mast extended to drillingposition.
Jürgen Binder
General Manager
TECHNOLOGY GOING DEEP
Pipe Handling System:
Jürgen Binder
General Manager
TECHNOLOGY GOING DEEP.
Casing in detail
Jürgen Binder
General Manager
TECHNOLOGY GOING DEEP
Horizontal Pipe Rack
Almost unlimited set back area
Fits for different tubular sizes
Horizontal make up / break out unit saves importantoperations time.
Low noise level because of elimination of monkeyboard
No need for dangerous work of Derrickmen
Characteristics of Pipehandling:
Jürgen Binder
General Manager
TECHNOLOGY GOING DEEP
Semi – automated pipehandlerIron roughneckHydraulic powerslipsSemi – automated catwalkSafe and comfortable driller’s cabin
Jürgen Binder
General Manager
GEOTHERMAL PROJECTS
Rig: TI-350 (B-002, InnovaRig)Two wells: GT1 4393m MD
GT2 4530m MDCustomer: SGGOperator: Angers und Söhne
DÜRRNHAAR, GERMANY
Jürgen Binder
General Manager
GEOTHERMAL PROJECTS IN GERMANY.
approx. 2000m
Jürgen Binder
General Manager
GEOTHERMAL PROJECTS IN GERMANY
MD Borehole Casing
0m - 45m: Conductor pipe 26"45m – 953m: 23" Casing 18 5/8"953m – 2180m: 16" Casing 13 3/8"2180m – 3726m: 12 1/4" Liner 9 5/8"3726m – 4393m: 8 1/2" Liner 7"
45m
953m
2180m
3726m
4393m
Jürgen Binder
General Manager
GEOTHERMAL PROJECTS IN GERMANY
140°C hot steam from more than 4000 m below the surface is being produced.
Jürgen Binder
General Manager
GEOTHERMAL PROJECTS IN GERMANY
B-002: GENESYS, HANOVER1 well, 3901mGeothermal heat.Noise protection very important due to drilling to urban area, close to BGR.
Project Genesys:
Jürgen Binder
General Manager
Jürgen Binder
General Manager
GEOTHERMAL PROJECTS IN GERMANY
Kirchstockach (B-004) GT1:0
500
1000
1500
2000
2500
3000
3500
4000
4500
5000
0 30 60 90 120
days
mea
sure
d de
pth
[m]
23" Drilling
Casing 18 5/8"
16" Drilling
Casing 13 3/8"
12 1/4" Drilling
Casing 9 5/8"
Kirchstockach Well 1 (planned)
Kirchstockach Well 1 (101 days)
Kirchstockach Well 2 (81 days)
Jürgen Binder
General Manager SUMMARY – WHAT DISTINGUISHES HERRENKNECHT
More than 30 years of engineering know-how
New Generation Technology
Focus on Safety and Automation
Rigs are easy to mobilize
Less Personell needed
Experience in working in Turkey
Track record in Geothermal Projects
Jürgen Binder
General Manager
THANKS FOR YOUR ATTENTIONTHANKS FOR YOUR ATTENTION.