Technip USALong-Term Solid Partner

David Dickson, Senior Vice President North America

Investor MeetingMay 4, 2009

Page 2: Technip USA Long-Term Solid Partner - …media.corporate-ir.net/media_files/irol/11/110877/presentations/... · Technip USA Long-Term Solid Partner ... dock during spool up ... Fabrication

Technip USA at a glance

Contents

I.

Key Project HighlightsII.

2

Key Project HighlightsII.

New Technologies and Differentiating Attributes

III.

Annex

Page 3: Technip USA Long-Term Solid Partner - …media.corporate-ir.net/media_files/irol/11/110877/presentations/... · Technip USA Long-Term Solid Partner ... dock during spool up ... Fabrication

Technip USA at a glanceI. Technip USA at a glance

3

I.

Page 4: Technip USA Long-Term Solid Partner - …media.corporate-ir.net/media_files/irol/11/110877/presentations/... · Technip USA Long-Term Solid Partner ... dock during spool up ... Fabrication

Houston

Claremont

Monterrey(Mexico)

Mobile

2008 Employees1

Total Group: 23,000

Channelview

Technip USA Revenues

~10% Technip’s Total

Calgary St. John’s

Tech

nip

US

A

Presence in the Americasand the Rest of the Group

4

Regional Headquarters Satellite operating centersSpoolbaseManufacturing plant (umbilical)

Total Group: 23,000

11%Technip USA

89%Rest of the Group

Caracas

1 December 31, 2008

Rio de Janeiro

Vitória

Barra do Riacho

Bogota

Tech

nip

US

A

Page 5: Technip USA Long-Term Solid Partner - …media.corporate-ir.net/media_files/irol/11/110877/presentations/... · Technip USA Long-Term Solid Partner ... dock during spool up ... Fabrication

Highly Skilled Employees

Highly skilled employees

2008 USA1

Employees: 2,500

PhD

5%5%

MBA

5

Others20%

30% MS Engineers

Note: Headcount at the end of the year (Dec 31st).

40% BS Engineers

1 December 31, 2008

Page 6: Technip USA Long-Term Solid Partner - …media.corporate-ir.net/media_files/irol/11/110877/presentations/... · Technip USA Long-Term Solid Partner ... dock during spool up ... Fabrication

A Diversified and Well-Balanced Portfolio of Businesses

Pipelay Installation Flexible Pipes Umbilicals

Subsea

Topsides & Fixed PlatformsFloaters

DeepwaterEngineering

Onshore

6

Hydrogen FurnacesRefining

Offshore

Page 7: Technip USA Long-Term Solid Partner - …media.corporate-ir.net/media_files/irol/11/110877/presentations/... · Technip USA Long-Term Solid Partner ... dock during spool up ... Fabrication

Key Operating Assets for the Region

Deep Blue Mobile Spoolbase Duco Umbilical Plant

7

Deep Blue►Versatile and highly capable pipelay and construction vessel

►Cost effective solution for the installation of flexible and rigid risers (reeled and J-Lay), flowlines and umbilicals in deep and ultra-deep waters

►Operating in North America since 2001

Mobile Spoolbase►Short transit to the deepwater fields

►Reduced vessel time at the dock during spool up

– Two independent welding lines to allow parallel work

– High storage capacity

– Long pipe stalk racks

►Operating since 2001

Duco Umbilical Plant►Manufacture and supply of steel tube umblilicals, flying leads, and termination hardware

►Umbilical qualification testing facilities

►Industry leading radiographic inspection equipment

►Operating since 1996

Page 8: Technip USA Long-Term Solid Partner - …media.corporate-ir.net/media_files/irol/11/110877/presentations/... · Technip USA Long-Term Solid Partner ... dock during spool up ... Fabrication

II. Key Project Highlights

8

II. Key Project Highlights

Page 9: Technip USA Long-Term Solid Partner - …media.corporate-ir.net/media_files/irol/11/110877/presentations/... · Technip USA Long-Term Solid Partner ... dock during spool up ... Fabrication

Shell PerdidoPaving the way for future ultra-deepwater

lower tertiary fields in the U.S. Gulf of Mexico – Part I

Development SystemDeepest Spar hub in the World

Contracts►EPC for Spar hull and mooring system►Fabrication and installation of oil re-

circulation flowline►EP for the umbilicals

Fabrication Transportation

Hull installation Flowline install.

9

Challenges►World record water depth (7,817 ft)►Harsh environment►New and unique reservoir►Isolated location (200 miles from coast).►New riser system design with direct

vertical access to the wells

StatusSpar hull, moorings and topsides installed.On schedule. No Lost Time Incident for more than 2 million manhours

Topside install. Today

Page 10: Technip USA Long-Term Solid Partner - …media.corporate-ir.net/media_files/irol/11/110877/presentations/... · Technip USA Long-Term Solid Partner ... dock during spool up ... Fabrication

Petrobras / Cascade & ChinookPaving the way for future ultra-deepwater

lower tertiary fields in the U.S. Gulf of Mexico – Part II

Buoyancy cans

Flexible pipesDevelopment SystemFirst FPSO in the USA

Contracts►EPCI for 5 Free Standing Hybrid Risers►EPI for gas export flowline►EP for 5 flexible jumpers

Challenges

10

Suction piles

Challenges►8,200 ft – 8,660 ft of water►Harsh environment►High-pressure dynamic flexible pipes►5 buoyancy cans. 700 te net uplift ►Installation before arrival of the FPSO►Multi-vessel installation►Fast track: 28 months from award to completion

StatusOngoing On schedule. No recordable for more than 200,000 man-hours

Page 11: Technip USA Long-Term Solid Partner - …media.corporate-ir.net/media_files/irol/11/110877/presentations/... · Technip USA Long-Term Solid Partner ... dock during spool up ... Fabrication

ExxonMobil / Environmental ProjectsBuilding processing plants to meet

the world’s growing demand for cleaner energy – Part I

ProjectsEnvironmentally driven emissions reduction projects (primarily flare gas and NOx)

Contracts►Part of frame agreement with ExxonMobil►EP or EPCM for 7 U.S. Refineries

Challenges

H2S Treating Selective Catalytic Reduction

Ammonia Area SCR Module

11

Challenges►“Out of sequence” execution to reduce overall time to operation►Large module and component installation in congested/operating existing process units

►Status6 of the 7 sites have new installations in operation, with 2 sites under construction

Vent Gas Compressor

Page 12: Technip USA Long-Term Solid Partner - …media.corporate-ir.net/media_files/irol/11/110877/presentations/... · Technip USA Long-Term Solid Partner ... dock during spool up ... Fabrication

Air Product / Valero Port ArthurBuilding processing plants to meet

the world’s growing demand for cleaner energy – Part II

ProjectIntegrated hydrogen/cogeneration plant

Contracts►Part of H2 Global Alliance with Air Product►EP with construction support

Challenges►Triple play: power, hydrogen and steam,

12

►Triple play: power, hydrogen and steam, everything that the nearby Valero refinery (300,000 bbl/d) needs to produce cleaner-burning gasoline and low-sulfur diesel fuel ►High reliability design, each section (hydrogen and power) capable of operating independently►High pressure hydrogen and export steam.►Modular construction to optimize cost and schedule

StatusCompleted, currently in-operation

Page 13: Technip USA Long-Term Solid Partner - …media.corporate-ir.net/media_files/irol/11/110877/presentations/... · Technip USA Long-Term Solid Partner ... dock during spool up ... Fabrication

Other Group Entities Working with Technip USA

Pori

Le TraitAberdeen

Paris

Kuala

Oslo

Abu DhabiHouston

Monterrey(Mexico)

Calgary

Mobile

Channelview

Tech

nip

US

A Claremont

13

PetrobrasCanapu

MurphyKikeh

Perth

Kuala Lumpur

KoniamboXstrata / Suncor

Luanda

LagosCaracas

Vitória

Rio de Janeiro

Tech

nip

US

A

Regional HeadquartersOperating centersConstruction yardManufacturing plant (flexible pipes)Large multi-offices projects involving North America

Page 14: Technip USA Long-Term Solid Partner - …media.corporate-ir.net/media_files/irol/11/110877/presentations/... · Technip USA Long-Term Solid Partner ... dock during spool up ... Fabrication

III.New Technologies andDifferentiating Attributes

14

III.Differentiating Attributes

Page 15: Technip USA Long-Term Solid Partner - …media.corporate-ir.net/media_files/irol/11/110877/presentations/... · Technip USA Long-Term Solid Partner ... dock during spool up ... Fabrication

Catamaran FloatoverNew Pipelay Vessel Flexible Pipes Drill Spar

New Technological Solutions for the Deeper Water

Highly capable deepwater pipelay vessel for water depths

Expand the deepwater frontier of the flexible risers with offshore

Topside installation using two lateral barges. Load transfer

Reduced drilling, completion and workover costs.

15

Towards 3,000 meters (9,840 ft) and beyond

vessel for water depths up to 3,000 m (9,840 ft).

Large storage capacity (twin 2,800 ton reels).

Minimized intercontinental transits (20 knots speed).

Currently under construction. Delivery in 2010.

risers with offshore testing:

– Pressure capability for water depth up to 3,000 m (9,840 ft).

– Internal diameter up to 11”.

Potential applications in the USA and Brazil as soon as the pipe is available (by 2010).

barges. Load transfer achieved through ballasting and deballasting operations.

Benefits: a/ costs, b/ schedule and c/ safety.

4,000 ton topside installed in 2007.

Soon available for heavier structures.

workover costs.

Field-proven solution (Genesis, Diana, Holstein, Mad Dog and Perdido).

Next generation drilling Spar integrates 6th generation MODU drilling systems into a Spar production platform.

Page 16: Technip USA Long-Term Solid Partner - …media.corporate-ir.net/media_files/irol/11/110877/presentations/... · Technip USA Long-Term Solid Partner ... dock during spool up ... Fabrication

OthersBio-Oil

New Technological Solutions for Cleaner Energy

Technip USA is currently helping develop a new NOx and benzene reduction

16

Technip USA is currently helping develop a new technology to convert biomass to bio-oil through fast pyrolysis.

A Pilot Demonstration Unit (PDU) using Technip’s Dorr-Oliver FluoSolids® has been built to verify and validate the new bio-oil technology.

Small quantity of bio-oil have already been produced.

Full testing of the new bio-oil technology pending.

NOx and benzene reduction

Coal and heavy oil gasification

Gas processing

Off-gas treatment plants

KTI selective catalytic reduction

CO2 capture and sequestration

Page 17: Technip USA Long-Term Solid Partner - …media.corporate-ir.net/media_files/irol/11/110877/presentations/... · Technip USA Long-Term Solid Partner ... dock during spool up ... Fabrication

Technip USA’s Differentiating Attributes

Strong reputation and proven track-record

Long-term relationship and repeat business with

our Clients

Engineering and project management skills

17

Technip USA is a Long-Term Solid Partner

Optimization of resources across our segments

Vertically integrated Subsea services

Portfolio of differentiating assets and proprietary

technologies

Page 18: Technip USA Long-Term Solid Partner - …media.corporate-ir.net/media_files/irol/11/110877/presentations/... · Technip USA Long-Term Solid Partner ... dock during spool up ... Fabrication

Safe Harbor

This presentation contains both historical and forward-looking statements. These forward-looking statements are not based on historicalfacts, but rather reflect our current expectations concerning future results and events and generally may be identified by the use offorward-looking words such as “believe”, “aim”, “expect”, “anticipate”, “intend”, “foresee”, “likely”, “should”, “planned”, “may”,“estimates”, “potential” or other similar words. Similarly, statements that describe our objectives, plans or goals are or may be forward-looking statements. These forward-looking statements involve known and unknown risks, uncertainties and other factors that may causeour actual results, performance or achievements to differ materially from the anticipated results, performance or achievements expressedor implied by these forward-looking statements. Risks that could cause actual results to differ materially from the results anticipated in theforward-looking statements include, among other things: our ability to successfully continue to originate and execute large servicescontracts, and construction and project risks generally; the level of production-related capital expenditure in the oil and gas industry aswell as other industries; currency fluctuations; interest rate fluctuations; raw material (especially steel) as well as maritime freight pricefluctuations; the timing of development of energy resources; armed conflict or political instability in the Arabian-Persian Gulf, Africa orother regions; the strength of competition; control of costs and expenses; the reduced availability of government-sponsored exportfinancing; losses in one or more of our large contracts; U.S. legislation relating to investments in Iran or elsewhere where we seek to dobusiness; changes in tax legislation, rules, regulation or enforcement; intensified price pressure by our competitors; severe weatherconditions; our ability to successfully keep pace with technology changes; our ability to attract and retain qualified personnel; theevolution, interpretation and uniform application and enforcement of International Financial Reporting Standards (IFRS), according towhich we prepare our financial statements as of January 1, 2005; political and social stability in developing countries; competition; supplychain bottlenecks; the ability of our subcontractors to attract skilled labor; the fact that our operations may cause the discharge ofhazardous substances, leading to significant environmental remediation costs; our ability to manage and mitigate logistical challenges due

18

chain bottlenecks; the ability of our subcontractors to attract skilled labor; the fact that our operations may cause the discharge ofhazardous substances, leading to significant environmental remediation costs; our ability to manage and mitigate logistical challenges dueto underdeveloped infrastructure in some countries where are performing projects.

Some of these risk factors are set forth and discussed in more detail in our Annual Report. Should one of these known or unknown risksmaterialize, or should our underlying assumptions prove incorrect, our future results could be adversely affected, causing these results todiffer materially from those expressed in our forward-looking statements. These factors are not necessarily all of the important factors thatcould cause our actual results to differ materially from those expressed in any of our forward-looking statements. Other unknown orunpredictable factors also could have material adverse effects on our future results. The forward-looking statements included in thisrelease are made only as of the date of this release. We cannot assure you that projected results or events will be achieved. We do notintend, and do not assume any obligation to update any industry information or forward looking information set forth in this release toreflect subsequent events or circumstances.

****

This presentation does not constitute an offer or invitation to purchase any securities of Technip in the United States or any otherjurisdiction. Securities may not be offered or sold in the United States absent registration or an exemption from registration. Theinformation contained in this presentation may not be relied upon in deciding whether or not to acquire Technip securities.

This presentation is being furnished to you solely for your information, and it may not be reproduced, redistributed or published, directlyor indirectly, in whole or in part, to any other person. Non-compliance with these restrictions may result in the violation of legalrestrictions of the United States or of other jurisdictions.

Page 19: Technip USA Long-Term Solid Partner - …media.corporate-ir.net/media_files/irol/11/110877/presentations/... · Technip USA Long-Term Solid Partner ... dock during spool up ... Fabrication

Technip

ISIN: FR0000131708

19

Bloomberg: TEC FP Reuters: TECF.PA SEDOL: 4874160

Page 21: Technip USA Long-Term Solid Partner - …media.corporate-ir.net/media_files/irol/11/110877/presentations/... · Technip USA Long-Term Solid Partner ... dock during spool up ... Fabrication

Subsea Offshore Onshore Recent Project Examples

√ ►Onshore environmental projects

√ √ ►Perdido, Princess

√ √ √ ►Thunderhorse

√ √ √ ►Tahiti

Technip USA has Strong Relationships with the Majors and Large Refiners

√ √ √ ►Cascade/Chinook

√ √ ►Shenzi

√ ►Mirage

√ ►Bass Lite

√ ►St Charles, Port Arthur

√ ►Baton Rouge, Garyville

21

Page 22: Technip USA Long-Term Solid Partner - …media.corporate-ir.net/media_files/irol/11/110877/presentations/... · Technip USA Long-Term Solid Partner ... dock during spool up ... Fabrication

New Pipelay Vessel

Top Tension450 Te

Crane150 Te

Twin Reels2,800 Te each Max Transit Speed

20 Knots

22

Delivery in 2010

Overall Length194 m / 636 ft