TENDERER: "TERA GRUP" OOD PLOVDIV: " "
EMPLOYER: "SIEMENS":"SIEMENS"
TENDER BILL OF QUANTITY
ITEM Description of Work . Unit
Anti static rubber flooring
2 m2
1 120 3 kg
2
3
4
5 20 .
6 20 Concrete 20 for beams
7 20 Concrete 20 reinforced concrete girdles
8 20 Concrete 20 in columns with concrete pump
9 20 Concrete 20 in walls with concrete pump
10 20 Concrete 20 in floor slabs with concrete pump
11
12
13
14
15
16 Concrete for foundations and shafts
17 Concrete for foundation slabs
18 18/35 Kerbs 18/35 m
19
20 Fans pcs
21 100/18/35 Visible concrete kerbs 100/18/35 m
22 18/35 Visisble concrete kerbs 18/35 m
23 18/35 Visible concrete kerbs 18/35 m
24 PVC flooring 2 m2
25 Roof drainage pipes m
26 Dewatering of excavations by pumping
27
28 10 24 Dewatering 10 x 24 hours pcs
29 Roof collecting drainage wells 2 m2
30 100/210 Door 100/210 pcs
31 100/210 PVC door 100/210cm pcs
32 100/210 PVC door 100/210cm 2 m2
33 70/200 PVC door 70/200cm 2 m2
Reinforcement - 120m3 tank
25 - 20 , 6
Concrete pavement B25, 20 cm thick,reinforced, designated for roads , joints atintervals of 6m
3 m3
25- 20 , 6/6
Concrete pavement B25 -reinforced, 20 cmthick, jointed 6/6m, designated for road
3 m3
25- 20 , 6/6
Concrete pavement B25, 20 cm thick,reinforced, designated for roads , joints atintervals of 6m/6m
3 m3
Concrete 20 in staircases and and slopingsurfaces
3
m3
3 m3
3 m3
3 m3
3 m3
3 m3
25 -
Concrete 25 in machine foundations with withconcrete pump-gas generator
3 m3
25 -
Concrete 25 in machine foundations withconcrete pump-steam generator
3 m3
25 25 , - 60 KN
Concrete B25 for pavement reinforced and 25cm thick for bearing of concentrated load
60kN
2 m2
25 600 .
Concrete 25 for foundation reinforcementbelow 600t boiler
3 m3
- 1203
Concrete for foundation of 120m3 tank for softwater
3 m3
3 m3
3 m3
Rolling of crushed stone for making of base forconcrete pavement designated for roads
3 m3
machineshift
Dewatering with submerged pump for mudwaters
machineshift
8/8/2019 Technical Trans La Ton BG - En
2/3
. 2 3
ITEM Description of Work . Unit
Anti static rubber flooring
2 m2
34 Steel Door pcs
35 120/210 Steel door 120/210 pcs
36 120/220 Steel doors 120/220 cm pcs
37
38 pcs
39 - Temporary traffic sign - barrier pcs
40 Temporary circle traffic sign pcs
41 pcs
42 55/55 Temporary traffic sign - ordinary 55/55 pcs
43 Temporary triangle traffic sign - ordinary pcs
44 pcs
45 pcs
46 Temporary guide sign board pcs
47 pcs
48 pcs
49 pcs
50 . VIII. TOTAL under item VIII.
51 Entrance box 2 m2
52 Restoration of crushed stone pavement
53
54 m
55 2
56 2
57 2 m2
58 5 External termal insolation 5 cm on walls 2 m2
59 Lime-cement plaster on internal brick walls 2 m2
60 Gypsum stopping on walls 2 m2
61 50/20/8 Garden concrete kerbs 50/20/8 cm m
62 Granitogress 2 m2
63 kg
64 Removal of visible concrete kerbs m
65 m
66 Demolition of sidewalk made of basalt tiles
67
68
69 pcs
60 210/260
Steel doors - fire resistant 60 minutes 210/260cm
60 100/210
Steel doors - fire resistant 60 minutes 100/210cm
Temporary circle ordinary traffic sign forregulation of the internal transport in the plant
Temporary triangle ordinary traffic sign forregulation of the internal transport in the plant
Temporary triangle ordinary traffic sign forregulation of the internal transport in the plant
Temporary guide sign board for regulation of
the internal transport in the plant
Temporary barrier for regulation of the internaltransport in the plant
Temporary barrier for regulation of the internaltransport in the plant
2 m2
Restoration of ballast prism from crushedstone of railway road section
3 m3
..
Restoration of railway section from railwayroad
External waterproofing on external walls forfoundation of Steam Generator
External mineral plaster on walls and footingswith installed waterdropping shaped profile
External mineral plaster on walls and footingswith installed waterdropping shaped profile
St A I &St A III
Delivery and installation of reinforcement St A I& St A III
..
Disassemblage of railway road on reiforcedconcrete sleepers
2 m2
-
Forming and leveling of excavation bed -manually
3 m3
500
Delivery and installation of troughshapedelements for heating main 500
3 m3
Delvery and installation of steel shed for gasstation