Your IT Partner
Technical Training Mysore KSRTC ITS
Tata Consultancy Services Limited Intelligent Transport System – Technical Training
Agenda:
Project Scope
In-bus equipments: Specifications, configurations, data capturing
Data Centre: Network architecture, Server_ services & overview
Application - Functioning of ETA, pts, MIS Reports, Commuter portal, SMS etc.
Disaster Recovery Set up
Complete Infrastructure and technical functionalities
Daily reports and checklist
Tata Consultancy Services Limited Intelligent Transport System – Technical Training
Project Scope and daily reports Mysore KSRTC ITS project is first of its kind in India, Proving IT
solution for urban transport sector to track buses on real time with Passenger Information services, Funded by World bank and MOUD. Project Scope involves 500 VMU’s, 167 LED display at different locations of the bus shelters, 26 LCD display boards in 6 TTMC and main bus stand.
Intelligent Transport System – Technical Training
Intelligent Transport System – Technical Training
Leased line Airtel/TTSL
Router
Wan Switch
Firewall
Switch
Communication Server
Data Base server
Application server IVRS/SMS Server
Display Server EMS/Backup policy
GPS Satellite
VMU GSM/GPRS Network
In bus equipment:
Main equipment’s used In-Bus.
Vehicle Mounted Unit
Power Supply Unit
Internal Bus Display, Data cable
Antenna
Amplifier, power cable, Din Connector
Speaker, Speaker Cable
Timer-Relay, Relay Base.
Intelligent Transport System – Technical Training
Specification/Wiring diagram. Samsung Processor
5.6” Resistive Touch Screen
5V, 3A DC voltage
Having 2GB Nand flash (8 Hours Data packets storing capacity)
2/4 GB external Memory
500MB RAM
GPS/GPRS enabled
Power supply voltage range: 9 to 36V
Intelligent Transport System – Technical Training
Vehicle Mounted Unit/Tracking unit is electronic embedded unit designed by TCS for fleet management system (named as Nirdeshak) as per the client requirements.
VMU is enabled with GPS and GPRS modules, which helps us to locate the exact location of the bus.
For each 10 Sec interval (Configurable), VMU is capturing the Lat/Long, Velocity, VMU ID, Driver/Conductor, Schedule/Route information and preparing the data packet and saving the data into internal memory.
Once in 10 Sec intervals through GPRS VMU saved data packets is sending to communication server.
VMU ID/IP/URL configurations, Configurations/Diagnosis parameters.
GPS/Carrier/CPU/Display board.
Intelligent Transport System – Technical Training
Intelligent Transport System – Technical Training
Intelligent Transport System – Technical Training
Schedule
Intelligent Transport System – Technical Training
VMU ACK
Once the routes are created system will create automated ORI/ORL files for the related route (Based on the route ID which is unique for each route) These updated route ORI/ORL files should be copied into the VMU. While sending any schedule to the VMU, VMU will verify any modifications in the available data in the VMU master, if any changes it will reject the schedule and sends the “No” Ack to server.
Master (VMU) – Slave Concept (Server) Routes and Route ID’s Schedule and Schedule ID’s Bus Stop, Bus Stop Code and Bus Stop ID Sequence Number in Route’s
Intelligent Transport System – Technical Training
VMU Master File:
File copy list – To identify file list to select from the disk
Bus stop master – Bus stop names, Lat-long
Driver master – Driver and conductor ID’s and names
Route master – Route ID and Route description
Current schedule master – Allotted schedule
Information text -
Slogan master – Slogans for internal display
VMU Rx Msg – Preconfigured data and codes
VMU Tx Msg - Preconfigured data and codes
Voice call - Pre-configured numbers
ORI/ORL file – I - internal display, L – Lat/Long
Intelligent Transport System – Technical Training
Data Centre: Network architecture, Server_ services & overview
Sl
No Server Details Qty RAM Hardisk OS
1 Web Server 1 1 16GB RAM 2x146GB HDD SUSE Linux Enterprise Server 11 (x86_64)
PATCHLEVEL
1
2 Web Server 2 1 16GB RAM 2x146GB HDD SUSE Linux Enterprise Server 11 (x86_64)
PATCHLEVEL
2
3 Database Servers 2 48GB RAM 2x146GB HDD SUSE Linux Enterprise Server 11 (x86_64)
PATCHLEVEL
2
4 Application/Report Server 2 16GB RAM 2x146GB HDD SUSE Linux Enterprise Server 11 (x86_64)
PATCHLEVEL
1
5 Directory Server - LDAP 1 1 16GB RAM 2x146GB HDD SUSE Linux Enterprise Server 11 (x86_64)
PATCHLEVEL
1
6 Directory Server - LDAP 2 - SMS
Server 1
16GB RAM 2x146GB HDD SUSE Linux Enterprise Server 11 (x86_64)
PATCHLEVEL
2
7 Communication Server 2 16GB RAM 2x146GB HDD SUSE Linux Enterprise Server 11 (x86_64)
PATCHLEVEL
1
8 GIS Server 2 16GB RAM 2x146GB HDD SUSE Linux Enterprise Server 11 (x86_64)
PATCHLEVEL
1
9 Backup Server - CommVault 1 16GB RAM 2x146GB HDD Windows Server 2008 Enterprise Edition R2
10 2, 4 Line/ 10, 16 Line display board
Server 2
16GB RAM 2x146GB HDD
Microsoft Windows Server 2003 Enterprise
Edition Service Pack 2
11 IVRS Server 1 16GB RAM 2x146GB HDD
Microsoft Windows Server 2003 Enterprise
Edition Service Pack 2
12 Storage - NetApp 1 - 300GB X 6 - -
13 Tape Library 1 - 1.2TB X 5 - -
14 CA - Access Control 1 4GB RAM 2x300GB HDD
Microsoft Windows Server 2003 Enterprise
Edition Service Pack 2
15 CA - e-health 1 8GB RAM 2x600GB HDD
Microsoft Windows Server 2003 Enterprise
Edition Service Pack 2
16 CA - Site Minder - Local DB Server 1 4GB RAM 2x300GB HDD SUSE Linux Enterprise Server 11 (x86_64)
PATCHLEVEL
2
17 CA - Service Manager 1 4GB RAM 2x300GB HDD Microsoft Windows Server 2003 Standard Edition Service Pack 2
18 CA - Spectrum 1 16GB RAM 2x300GB HDD
Microsoft Windows Server 2003 Enterprise
Edition Service Pack 2
19 CA - Service Desk 1 8GB RAM 2x600GB HDD
Microsoft Windows Server 2003 Enterprise
Edition Service Pack 2
20 CA - TIM 1 4GB RAM 2x600GB HDD Red Hat Enterprise Linux Server release 5.5 -
21 CA - CEM 1 4GB RAM 2x600GB HDD Red Hat Enterprise Linux Server release 5.5 -
Intelligent Transport System – Technical Training
SMS/IVR server
Application server-1
Application server-2
Ldap server-1
Ldap Server-2
Service Desk
CEM
CA Tim
Service minder
Spectrum
L2 Switch - 7
Router - 1
Router - 2
KVM Switch
Access control server
One click server
Ehealth server
IVRS/Access control Hardware
L2 Switch - 7
L2 Switch - 7
L2 Switch - 7
L2 Switch - 7
L2 Switch - 7
Communication server - 01
Communication server - 02
GIS - 01
GIS - 02
Web Server - 01
Database server-01
Database server-02
Display Server -01
Display Server -02
CommVault
Power Vault TL 2000
Web Server - 01
KVM Switch
Q Logic
Netapp Storage
Network Architecture:
Intelligent Transport System – Technical Training
Intelligent Transport System – Technical Training
VMU
P_bus_break_acc_from_cs
P_bus_route_violation_from_cs
P_bus_speed_violation_from_cs
P_busstop_crossed_data_from_cs
P_gps_status_from_cs
P_Positional_data_from_cs
P_Route_data_from_cs
P_Trip_data_from_cs
Sto
red
Pro
ced
ure
Tran
sacti
on
Tab
les
Co
mm
un
icati
on
Server
Data flow from VMU to Database:
Intelligent Transport System – Technical Training
Application
(GUI) *Scheduling
*Re-schedule
*Route files
*Coded messages
Data base
*T_sent_cmd_status
Stored Procedure
Communication Server
VMU/PIS
Data flow from Application to VMU/PIS:
Database architecture:
Intelligent Transport System – Technical Training
Databases/Schemas:
Eta_db_test : Mainly used for ETA transaction to LED display server.
Its_myq : main database used for all MIS/Application/ETA
Information_schema
Mysql
Performance_schema
Purge_its_myq : Total 25 purge tables
Test_schema
Scheduled procedures: Total 36 events
Backup process:
Daily backup
Purge Backup
Intelligent Transport System – Technical Training
Intelligent Transport System – Technical Training
Application Platform
Apache-tomcat-7.0.27
Java -version: java version "1.7.0"
Java(TM) SE Runtime Environment (build 1.7.0-b147)
Java Hotspot(TM) 64-Bit Server VM (build 21.0-b17, mixed mode)
Jdk-7-linux-x64.
MIS reports and tables
MIS 01 Bunching Of Buses
MIS 02 Schedule Adherence
MIS 03 Bus Break Down
MIS 04 Route Deviation
MIS 05 Missed trip
MIS 06 Schedule Departure
MIS 07 Schedule Arrival punctuality
MIS 08 Daily departure punctuality
MIS 09 Daily arrival punctuality
MIS 10 Schedule Performance
MIS 11 Daily Operation summary
MIS 12 Control Chart
MIS 13 Arrival Departure
Commuter portal:
Commuter portal code is deployed in Application server one and two,
Fare details in the commuter portal is fetching data from m_bus_fare_dtl
Bus stop details data is fetching from m_stop
Route data is fetching data from m_route
GIS server
Contains GIS Map, shape files and other GIS layers related to Mysuru.
Shape file Creation, testing and deployment
Intelligent Transport System – Technical Training
Web server
A Web server is a program that uses HTTP (Hypertext Transfer Protocol) to serve the files that form Web pages to users, in response to their requests, which are forwarded by their computers' HTTP clients.
Load balancer for Pis applications (http://mitra.ksrtc.in/pis/ and http://mitra.ksrtc.in/ ) are configured in web server which will share the load equally to both the PIS application server.
SMS Server
Hourly break down
Hourly Departures
Duplicate Schedule
SMS Web services
SMS messaging service
Intelligent Transport System – Technical Training
LCD Display: HARDWARE REQUIREMENTS:
NETWORK BOX
DISPLAY BOARD
DATA CARD OR LAN CONNECTION
Set PLNO= 0 and mentioned Without as highlighted “URL = http://110.234.121.161/WebAppForSwings/Display_WithOut_PlatForm.jsp?ID=10” if it is used for without Platform and ID should be according to locations where it is installed.
And Set PLNO= 1 and mentioned With as highlighted “URL = http://110.234.121.161/WebAppForSwings/Display_With_PlatForm.jsp?ID=10” if it is used for with Platform and ID should be according to locations where it is installed.
NOL = 10
PLNO =1
STD = 0 LCD Display configuration file
TER = 1
Intelligent Transport System – Technical Training
LED display concept and equipment’s used, working mechanism
To provide the expected time of arrival/departure into LED display boards, dedicated server is provided, in which ODBC database connection is established.
Each display board is configured using IMEI No, comport No and stop ID, these details are unique and configured in display board URL “http://localhost/gled/settings/index.php ”
using VB script, data is pulled from the database and pushed into “http://localhost/gled/settings/index.php”, Mserver console will fetch the data from “http://localhost/gled/settings/index.php” and pushed into the LED display board.
LED Display server active services (2/4/8 line)
Gmultirun.bat
Mserver console
Abbysweb server
How to send default/Kannada/English Instant msg’s
Kannada
English
Intelligent Transport System – Technical Training
Intelligent Transport System – Technical Training
Airtel IP
Tata Tele IP
DNS
Leased lines and DNS configurations There are two service providers providing internet infra to the project. Airtel – 5MBPS Vodafone– 5MBPS To enable the smooth service in the service, TCS implemented DNS concept, if any failure in one of the internet service, automatically DNS (Domain Name System) will switchover the line to secondary configured IP
Disaster Recovery Setup
Intelligent Transport System – Technical Training
What are the scenarios we are going to declare the disaster, for eg,
Both the Internet links are down
Generator failed to start within 45 Mins from power failure
Both the following servers and applications installed in these servers are down
Storage unavailability due to hardware issues
Both the UPS are down
Disaster Recovery Setup Server Configuration
Servers in Virtualized Environment
Sl No Application
CPU (No. of
Cores)
Memory
(GB)
Disk Space
(GB)
Operating
System
1
Data Base
Server 8 48 200 SUSE Linux
2
Application
Server 4 16 100 SUSE Linux
3 GIS Server 2 8 100 SUSE Linux
4
Communicat
ion Server 4 16 100 SUSE Linux
5 Web Server 2 8 50 SUSE Linux
6
Display
board Server 4 8 100
Windows
2003 SP2
7
Storage
space for DB 1000
Intelligent Transport System – Technical Training
Central Control Centre
UPS – 20*2KVA
DG set – 83.5KVA
A/C – 16 Ton (8 Ton in DC, 4 Ton in CCS)
Helpdesk systems: 4 No’s of helpdesk system with active windows 7 OS and supporting software’s configured.
Video wall – Christy 2*2
IVRS - 18004255220
Access control – 4 Doors with Proximity cards
Application test setup and importance of physical security, protection to equipment.
Test Drill: 6 months once changing services from primary server to secondary server
Intelligent Transport System – Technical Training
Daily Checklist reports
Daily Incident Report 14-Mar-17
Daily Check List 16-3-17
its_myq tables Mar-2017
Intelligent Transport System – Technical Training