4
1/4 DOMESTIC BUILDER (LIMITED TO ROOF TILING) TECHNICAL REFEREE REPORT This report must be completed by the referee and accompanies the domestic builder (limited to roof tiling work) registration application form. To be a referee you should be a registered domestic builder (unlimited) or be registered in the class of building work for which the applicant is applying. You must have directly supervised the applicant carrying out the work listed in the reference. Use this form to tell us about domestic building work that the applicant carried out under your supervision. The VBA uses your referee report to help determine whether an applicant should be registered as a building practitioner. We may contact you to confirm the information in this reference. PART A ABOUT YOU (THE TECHNICAL REFEREE) Title: Mr Mrs Ms Miss Other_____________________________ First name Middle name Surname Date of birth / / Your registration number Your contact number If you are not a registered building practitioner, were you the applicant’s: Site supervisor Construction manager Your email address PART B EMPLOYER DETAILS Name of company that employed the applicant during supervision period ABN Address Street no. and name Suburb State Postcode Employer contact number Employer email address

Technical Referee Report - Domestic Builder Limited - Roof ...€¦ · out of that component other than engaging a competent practitioner to do so ; however, they as the manager/supervisor

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Technical Referee Report - Domestic Builder Limited - Roof ...€¦ · out of that component other than engaging a competent practitioner to do so ; however, they as the manager/supervisor

1/4

DOMESTIC BUILDER (LIMITED TO ROOF TILING)

TECHNICAL REFEREE REPORT

This report must be completed by the referee and accompanies the domestic builder (limited to roof tiling work) registration application form.

To be a referee you should be a registered domestic builder (unlimited) or be registered in the class of building work for which the applicant is applying. You must have directly supervised the applicant carrying out the work listed in the reference.

Use this form to tell us about domestic building work that the applicant carried out under your supervision.

The VBA uses your referee report to help determine whether an applicant should be registered as a building practitioner. We may contact you to confirm the information in this reference.

PART A

ABOUT YOU (THE TECHNICAL REFEREE)Title: ☐Mr ☐Mrs ☐Ms ☐Miss ☐Other_____________________________First name Middle name Surname Date of birth

/ /

Your registration number Your contact number

If you are not a registered building practitioner, were you the applicant’s: ☐ Site supervisor ☐ Construction manager

Your email address

PART B

EMPLOYER DETAILSName of company that employed the applicant during supervision period

ABN

Address Street no. and name Suburb State Postcode

Employer contact number Employer email address

Page 2: Technical Referee Report - Domestic Builder Limited - Roof ...€¦ · out of that component other than engaging a competent practitioner to do so ; however, they as the manager/supervisor

2/4 Domestic builder (limited to roof tiling) - Technical Referee Report SD-TRR-044 V2.0

PART C

APPLICANT DETAILS (FOR WHOM YOU ARE PROVIDING THIS REPORT)First name Surname

PART D

EXPERIENCE Supervised building experience (for up to three projects) Please complete detail for the applicant’s domestic building project experience that you supervised.

Applicant’s role (e.g. Project manager, Supervisor,

Subcontractor, or other)

Period of supervision: From – To (mm/yyyy)

Project site address From To

Project 1

Project 2

Project 3

0BExplanation of terms

Please indicate the components of building work that the applicant either assisted, carried out or managed under your supervision (may be one project only). Did the applicant assist or manage any of the following components of building work per project?

Component of building workProject 1 Project 2 Project 3

Assisted Managed Assisted Managed Assisted Managed

Prel

imin

ary

wor

k

Area of Experience (AoE) 1 - Apply for a building permit for the work

Determined requirement for building permit ☐ ☐ ☐ ☐ ☐ ☐

Obtained building permit/or approvals from other authorities ☐ ☐ ☐ ☐ ☐ ☐

Area of Experience (AoE) 2 – Enter into and administer appropriate contracts and insurances

Prepared contracts for the building work ☐ ☐ ☐ ☐ ☐ ☐

Managed and administered contracts ☐ ☐ ☐ ☐ ☐ ☐

Assisted Is when the applicant has assisted a competent and qualified practitioner in the carrying out of a particular component of building work.

Carried out The actual hands-on carrying out of building work. It refers to when the applicant has been solely responsible for that component of building work.

Managed The management of building work. It refers to when the applicant was not involved in the actual carrying out of that component other than engaging a competent practitioner to do so; however, they as the manager/supervisor were responsible for the quality and compliance of that component of work.

/ - /

/ - /

/ - /

Page 3: Technical Referee Report - Domestic Builder Limited - Roof ...€¦ · out of that component other than engaging a competent practitioner to do so ; however, they as the manager/supervisor

3/4 Domestic builder (limited to roof tiling) - Technical Referee Report End of report

Did the applicant assist or manage any of the following components of building work per project?

Component of building workProject 1 Project 2 Project 3

Assisted Managed Assisted Managed Assisted Managed

Prel

imin

ary

wor

k co

ntin

ued

Area of Experience (AoE) 2 – cont. Enter into and administer appropriate contracts and insurances

Managed contract variations and defects ☐ ☐ ☐ ☐ ☐ ☐

Arranged/attended mandatory inspections ☐ ☐ ☐ ☐ ☐ ☐

Completed handover including certificates of compliance ☐ ☐ ☐ ☐ ☐ ☐

Managed the building work from start to finish ☐ ☐ ☐ ☐ ☐ ☐

Area of Experience (AoE) 3 - Produce cost estimates and apply business financial management skills

Conducted business and financial aspects for projects ☐ ☐ ☐ ☐ ☐ ☐

Prepared cost estimates and quotations for project/part of project ☐ ☐ ☐ ☐ ☐ ☐

Site

supe

rvisi

on

Area of Experience (AoE) 4 - Co-ordinate onsite construction worksDeveloped and monitored progress schedules for the work ☐ ☐ ☐ ☐ ☐ ☐

Provided on-site day to day supervision of the project ☐ ☐ ☐ ☐ ☐ ☐

Supervised subcontractors/trades to ensure work was conducted safely & to standard ☐ ☐ ☐ ☐ ☐ ☐

Area of Experience (AoE) 5 - Ensure works are planned and conducted safely

Managed site safety throughout the project ☐ ☐ ☐ ☐ ☐ ☐

Did the applicant assist, carry out or manage any of the following components of building work per project?

Component of building work

Project 1 Project 2 Project 3 Assisted Carried

out Managed Assisted Carried

out Managed Assisted Carried

out Managed

Area of Experience (AoE) 6 – Domestic building work that the applicant carried out

Established the construction site ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐

Installed sarking to roof frames ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐

Set-out & fixed timber tiling battens ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐

Installed concrete/terra-cotta roof tiles ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐

Cut roof tiles to suit roof hips & valleys ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐

Page 4: Technical Referee Report - Domestic Builder Limited - Roof ...€¦ · out of that component other than engaging a competent practitioner to do so ; however, they as the manager/supervisor

4/4 Domestic builder (limited to roof tiling) - Technical Referee Report End of report

Did the applicant assist, carry out or manage any of the following components of building work per project?

Component of building work

Project 1 Project 2 Project 3 Assisted Carried

out Managed Assisted Carried

out Managed Assisted Carried

out Managed

Area of Experience (AoE) 6 – cont. Domestic building work that the applicant carried out

Installed capping tiles to roof hips & ridges ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐

Completed bedding & pointing roof hips/valleys & ridges ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐

Installed concrete/terra-cotta roof tiles to additions on existing buildings ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐

Removed tiles from existing buildings ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐

Re-roofed existing buildings ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐

PART E

REFEREE DECLARATIONThe information provided in this form must be true and correct. It is an offence under section 246 of the Building Act 1993 to give false or misleading information in relation to an application for registration, and this offence carries a maximum penalty of 120 penalty units.

☐ I declare that the information contained in this form is true and correct to the best of my knowledge.

☐ I understand that the VBA may make enquiries to verify the information I have provided, and I consent for thisinformation to be shared with any other third party for that purpose.

Referee name

Referee signature: Date of signature:

/ /(must be handwritten)

To see how the VBA uses and discloses your personal information view the full VBA Privacy Policy.