Upload
chandeshwor-shah
View
229
Download
0
Embed Size (px)
Citation preview
8/12/2019 Technical Proposal Formats in Words Doc
1/17
Technical Proposal Format
Personnel
Equipment
Site Organization
Method Statement
Mobilization Schedule
Construction Schedule
Others
8/12/2019 Technical Proposal Formats in Words Doc
2/17
Personnel
Form PER 1 Proposed PersonnelBidders should provide the names of suitably qualified personnel to meet the specified requirements foreach of the positions listed in Section 3 (Evaluation and Qualification Criteria). The data on theireperience should be supplied usin! the "orm belo# for each candidate.
1! Title o" position
#ame
$! Title o" position%
#ame
&! Title o" position%
#ame
'! Title o" position%
#ame
(! Title o" position%
#ame
%)s listed in Section & *E+aluation and ,uali"ication Criteria-!
8/12/2019 Technical Proposal Formats in Words Doc
3/17
Form PER $ Resume o" Proposed PersonnelThe Bidder shall provide all the information requested belo#. "ields #ith asteris$ (%) shall be used forevaluation.
Position%
Personnelin"ormation
#ame .ate o" birth
Pro"essional quali"ications
Presentemplo/ment
#ame o" emplo/er
)ddress o" emplo/er
Telephone Contact *manager 0 personnel o""icer-
Fa E2mail
3ob title 4ears 5ith present emplo/er
Summari&e professional eperience o+er the last t5ent/ /earsin reverse chronolo!ical order. 'ndicate
particular technical and mana!erial eperience relevant to the proect.
From% To% Compan/6 Pro7ect6 Position and Rele+ant Technical and ManagementEperience%
8/12/2019 Technical Proposal Formats in Words Doc
4/17
8/12/2019 Technical Proposal Formats in Words Doc
5/17
Equipment
The Bidder shall provide adequate information to demonstrate clearly that it has the capability to meet therequirements for the $ey equipment listed in Section 3 (Evaluation and Qualification Criteria). separate"orm shall be prepared for each item of equipment listed* or for alternative equipment proposed by theBidder. The Bidder shall provide all the information requested belo#* to the etent possible. "ields #ithasteris$ (%) shall be used for evaluation.
T/pe o" Equipment%
Equipment8n"ormation
#ame o" manu"acturer Model and po5er rating
Capacit/% 4ear o" manu"acture
CurrentStatus
Current location
.etails o" current commitments
Source 8ndicate source o" the equipment
O5ned Rented 9eased Speciall/ manu"actured
The follo#in! information shall be provided only for equipment not o#ned by the Bidder.
O5ner #ame o" o5ner
)ddress o" o5ner
Telephone Contact name and title
Fa Tele
)greements .etails o" rental 0 lease 0 manu"acture agreements speci"ic to the pro7ect
8/12/2019 Technical Proposal Formats in Words Doc
6/17
8/12/2019 Technical Proposal Formats in Words Doc
7/17
Site Organization
Method Statement
Mobilization Schedule
Construction Schedule
Others
8/12/2019 Technical Proposal Formats in Words Doc
8/17
:idder;s ,uali"ication
To establish its qualifications to perform the contract in accordance #ith Section 3 (Evaluation andQualification Criteria) the Bidder shall provide the information requested in the correspondin!'nformation Sheets included hereunder.
Form E98 1 :idder;s 8n"ormation Sheet
:idder;s 8n"ormation
:idder;s legal name
8n case o" 3
8/12/2019 Technical Proposal Formats in Words Doc
9/17
Form E98 2 $ 3< 8n"ormation Sheet
Each member of a /0 must fill in this form
3< 0 Specialist Subcontractor 8n"ormation
:idder;s legal name
3< Partner;s orSubcontractor;s legalname
3< Partner;s or
Subcontractor;s countr/ o"constitution
3< Partner;s orSubcontractor;s /ear o"constitution
3< Partner;s orSubcontractor;s legaladdress in countr/ o"constitution
3< Partner;s orSubcontractor;s authorizedrepresentati+e in"ormation
(name* address* telephonenumbers* fa numbers* e+mailaddress)
)ttached are copies o" the "ollo5ing original documents!
,. rticles of incorporation or constitution of the le!al entity named above* in accordance #ith 'TB -., and -..
. uthori&ation to represent the firm named above* in accordance #ith 'TB 1..
3. 'n the case of !overnment+o#ned entity* documents establishin! le!al and financial autonomy and compliance #ith
commercial la#* in accordance #ith 'TB -.2.
8/12/2019 Technical Proposal Formats in Words Doc
10/17
Form 98T 2 1 Pending 9itigation
Each Bidder or member of a /0 must fill in this form
Pending 9itigation
#o pending litigation in accordance 5ith Criteria $!$ o" Section & *E+aluation and ,uali"ication Criteria-
Pending litigation in accordance 5ith Criteria $!$ o" Section & *E+aluation and ,uali"ication Criteria-
4ear Matter in .ispute
8/12/2019 Technical Proposal Formats in Words Doc
11/17
Form F8# 2 1 Financial Situation
Each pplicant or member of a /0 must fill in this form
Financial .ata "or Pre+ious & 4ears >in #RS?
4ear 1 4ear $ 4ear &
8n"ormation "rom :alance Sheet
Total )ssets
Total 9iabilities
#et =orth
Current )ssets
Current 9iabilities
8n"ormation "rom 8ncome Statement
Total Re+enues
Pro"its :e"ore Taes
Pro"its )"ter Taes
ttached are copies of financial statements (balance sheets includin! all related notes* and incomestatements) for the last three or above years* as indicated above* complyin! #ith the follo#in!conditions.
ll such documents reflect the financial situation of the pplicant or partner to a /0* and not sister or
parent companies.
4istoric financial statements must be audited by a certified accountant.
4istoric financial statements must be complete* includin! all notes to the financial statements.
4istoric financial statements must correspond to accountin! periods already completed and audited
(no statements for partial periods shall be requested or accepted).
8/12/2019 Technical Proposal Formats in Words Doc
12/17
Form F8# 2 $ )+erage )nnual Construction Turno+er
Each Bidder or member of a /0 must fill in this form
The information supplied should be the nnual Turnover of the Bidder or each member of a /0 in termsof the amounts billed to clients for each year for #or$ in pro!ress or completed to #RSat the end of the
period reported.
)nnual Turno+er .ata "or the 9ast 1@ 4ears*Construction onl/-
4ear)mount
Currenc/
!2)+erage )nnual Construction Turno+er
8/12/2019 Technical Proposal Formats in Words Doc
13/17
Form F8# & Financial Resources
Speci"/ proposed sources o" "inancing6 such as liquid assets6 unencumbered real assets6 lines o"credit6 and other "inancial means6 net o" current commitments6 a+ailable to meet the totalconstruction cash "lo5 demands o" the sub7ect contract or contracts as indicated in Section &*E+aluation and ,uali"ication Criteria-
Financial Resources
#o! Source o" "inancing )mount *in #RS-
,
3
#ote
The letter from the Ban$ must be unconditional.
Form F8#2 ' Current Contract Commitments 0 =orAs in Progress
:idders and each partner to a 3< should pro+ide in"ormation on their current commitments on allcontracts that ha+e been a5arded6 or "or 5hich a letter o" intent or acceptance has been recei+ed6or "or contracts approaching completion6 but "or 5hich an unquali"ied6 "ull completion certi"icatehas /et to be issued!
Current Contract Commitments
#o!
#ameo"Contract
#ameo"the
Contractor0s
Emplo/erBsContract
)ddress6Tel6Fa1
Contract)mount
Contract.ate
Contract.uration