TECHNICAL MEMORANDIUM — REVISION 2(511109)
To: Doug Halley, Director of Public Health, Town of Acton
From: Engineering Department, Town of Acton
Date: April 6, 2009
Regarding: Spencer/Tuttle/Flint Low Pressure Sewer
The following technical memorandum details the conceptual layout and preliminary engineeringdesign requirements for the Spencer, Tuttle, and Flint low pressure sewer extension project. Theproject entails connecting 127 houses to the gravity sewer main on Prospect Street. The Woodard& Curran, ‘Feasibility Study and Conceptual Design Technical Memorandum” dated March 26,2008 states that there is currently sufficient capacity at the Acton Wastewater Treatment Plant toreceive flow from this project.
1.0 Low Pressure Sewer
A low pressure sewer system uses mechanical means to transport residential waste verses thetraditional gravitational method. Houses discharge wastewater to a pump that grinds the waste toa fine slurry and pumps it through a small diameter lateral pipe. The lateral pipes are connected toa main line located in the roadway where individual pumps work collectively to transport thewastewater to its ultimate destination.
There are many advantages of a low pressure system. A low pressure sewer system is able to beinstalled along the contours of the road, which can dramatically reduce construction costs in hillyareas. Because the system is pressurized, a low pressure sewer system is not subject toinfiltration from ground water, and, because the system is sealed, there are no open pipes ormanholes for storm water to enter and cause an increase in treatable flows.
2.0 Vendor Selection
Initially, the pump manufacture was researched to determine the most compatible product with thispreliminary design. Many companies offer grinder pumps and most were eliminated throughmarket research. Upon further study, two manufactures were contacted for further information,
GRINDERPUHP IAIUNUNE
—1—
Hydromatic and eOne. After a review of their products and consultation with their localrepresentatives, eOne was selected as the most advantageous for this preliminary design and costestimate.
3M Preliminary Design
The initial step in designing a low pressure sewer system is developing a layout. The EngineeringDepartment drafted a preliminary design using guidance documents and recommendationsprovided by eOne’s local representative, FR Mahony. Some of the points to consider for thisproject were the elevation differences, the number of houses to connect to a pump, and thepossibility of loops1 in the system. The system was designed using one house per external pump,however adjacent residents could combine their discharges if they so choose. A plan view of theproject was developed and a copy can be found in Attachment A.
FR Mahony reviewed the system design and provided consultation for the pump and pipe sizing.The DHO71-93 pump was selected as the most suitable for the project conditions, which is acomplete package that includes the grinder pump, check valve, high density polyethylene (HDPE)tank, and external controls. In addition, zones2 were developed that most efficiently utilize themechanical characteristics of the pumps and mainline pipe sizes, which ranged from 1 4 to 3inches in diameter with 1 ¼ inch diameter laterals. Attachment B contains cut sheets for the pumpand panel
The mainline and lateral pipes were designed using HDPE material because of it’s flexibility, easeof installation, and durability. The flexibility of the pipe will enable it to be easily guided aroundexisting utilities as needed. The pipe is installed using a hot iron to melt or fuse sections together,which creates a seamless weld that encourages error-free assembly. HDPE pipe is a plasticmaterial that is very smooth, which helps to prevent buildup of solids and ensures a long life.
Mainline Pipe
For this preliminary design, the mainline pipe is designated along the centerline of the road at aminimum depth of 4+ feet and will have a bedding and cover of crushed stone. However, in thefinal design this depth and layout may vary to avoid conflicts with other utilities, which is anadvantage of this system type. A gravity system does not have this flexibility due to sloperequirements. General backfill will comprise the majority of the trench, covered with layers ofgravel and processed gravel prior to asphalt patching. All backfill materials will be installed andcompacted in lifts.
Manholes will be installed throughout the project to protect the various valves and components andprovide access for future maintenance. Isolation valves may be included at key points throughoutthe system to provide the ability to isolate sections of the mainline for servicing or repairs. Airrelease valve are designed in high points of the system, which allow trapped air to be released andimprove efficiency. Clean outs are designed throughout the system to provide an ability to
Loops in the system must be avoided as they lead to unpredictable and uneven distribution of flow.2 Assignment of individual zones follows from the relationship between the accumulating total number ofpumps to the predicted number that will periodically operate simultaneously.
-2-
routinely clean sections of the system. Attachment C contains details of a typical manhole thathouses typical piping and valves.
Lateral Connections
The location of the lateral connections were designed based on best assumptions and can bemodified to meet the requirements of the individual lots or homeowners. They will be constructedin a similar manner as the mainline pipe and will run from the mainline to the grinder unit andinclude a saddle tap3, corporation stop4, and curb stop5. The grinder unit will be encased inconcrete to prevent upheaval from ground water and installed on a bed of gravel in an excavatedhole such that the top of the unit is flush with the surface. Attachment C also contains a detail of atypical lateral installation as well as a lateral assembly.
4.0 Construction Estimation
The estimated project costs were split into two components, 1) work within the public right of way,and 2) work on individual lots. The work within the public right of way includes installing themainline pipe and various valves and manholes as well as a section of the lateral piping. Thissection is from the mainline to 2 feet within the property line and includes the saddle tap,corporation stop, curb box, and capping the end. The work on individual lots includesdecommission the existing septic system, connecting to the capped lateral, installing the remainderof the lateral piping and grinder pump, and performing the appropriate electrical work to completethe installation.
Providing an estimate that is as accurate as possible was one of the primary goals of this effort. Toaccomplish this task, the materials and labor to complete the project were quantified using thepreliminary design and construction details. The quantity calculations can be found in AttachmentD.
Ledge excavation and groundwater dewatering have the potential to significantly increasing thecost of construction, To gain a better understanding of these quantities, exploratory excavationswere performed in areas where ledge or groundwater is suspected. Soil borings were dug to adepth of 8 feet or until ledge was encountered and monitoring wells were installed such that thedepth to groundwater can be measured, The soil boring and monitoring well installation logs aswell as a summary table for each can be found in Attachment E.
Using the soil boring logs, an estimated quantity of ledge excavation was calculated for the workwithin the public right of way. The volumes were calculated using the average end method andthese ledge quantity calculations can be found in Attachment F.
Multiple construction sources were then cited to develop an accurate unit cost for each of thequantified items, which were adjusted to best represent this preliminary design. These sourcesincluded the water main replacement project in Indian Village that occurred during the summer of
A saddle tap is a device used to drill into a pipe.A corporation stop is a valve attached to a saddle tap to prevent discharge during drilling.A curb stop is a valve that allows the flow to be shut off.
-3-
2008, the local representative of eOne pumps, and the industry accepted resource AS MeansHeavy Construction Cost Data (2008).
The quantity calculations and referenced materials used to derive the Acton Water District’s IndianVillage Water Main replacement estimate can be found in Attachment G. These materials includethe quantities and unit prices for the work within the right of way as well as the typical costs for thework on individual lots. In addition, the attachment includes the calculations used to determine theunit prices that were derived from the project’s bid tabulation, which can also be found in thisattachment.
Attachment H contains the quantity calculations and referenced materials used to determine theestimate based on FR Mahony’s submittal. These materials include the quantities and unit pricesfor the work within the right of way as well as the work on individual lots. In addition, theattachment includes the calculations used to determine the unit prices that were derived from thesubmittal, which can also be found in this attachment.
The quantity calculations used to derive the RS Means estimate can be found in Attachment I.These materials include the quantities and unit prices for the work within the right of way as well asthe typical costs for the work on the individual lots. For this estimate, the unit prices from the ASMeans Heavy Construction Cost Data 2008 were used.
The supporting material for the Indian Village and AS Means estimates did not include the work onthe individual lots. Therefore, a proposal to furnish and install the individual lot work was used tocompensate these estimates and can be found in Attachment J. The Town of Acton Milling andPaving cost was provided by the Highway Department and can be found in Attachment K. Thiswork will be completed one year after the project’s completion and performed under the Town’sPaving Contract.
The individual estimates were compiled into the Construction Estimate Breakdown table, which canbe found at the end of this memo, and averaged to develop an overall estimate for the preliminarydesign. Each of the estimates included a cost for the engineering work, at 25% of the project cost,and a contingency, at 10% of the project cost. Both of these costs were exclusive of the millingand paving work.
This preliminary design estimate is subject to change due to changes in the calculated quantities orchanges in the unit prices. Factors that may affect the cost estimate for the work within the publicright of way include quantity changes for ledge, utility damages, dewatering, or removal anddisposal of hazardous or contaminated waste. Factors that may affect the cost estimate for thework on individual lots are outlined in the individual lot work proposal found in Attachment J. Thispreliminary design estimate also assumes that the grinder pump will be purchased at the onset ofthe project, during which a discount will be offered. However, pumps may be purchased at a laterdate at a single unit cost.
Additional cost saving measures may also be available through the installation of an indoor pumpor by sharing a pump with adjacent neighbors. Indoor pumps may offer greater installationflexibility and eliminate some of the required excavation work. Information regarding indoor versesoutdoor pumps can be found in Attachment L.
-4-
Pump sharing amongst adjacent neighbors may provide additional savings, however complexitiesarise, Initially, the responsibility of operation, maintenance, and repairs should be pre-determined,which is especially true in the case of a foreign object entering the system and causing damage.Further, the waste streams generated from the houses drain by gravity to the tank. This makespump sharing more difficult because the tank must be sited such that the piping meets the sloperequirements.
-5-
CON
STRU
CTIO
NES
TIM
ATE
BREA
KD
OW
N—
REV
ISIO
N1
(412
7109
)
PUBL
ICRO
WRO
WIN
DIVI
DUAL
LOT
LOT
ESTI
MA
TESO
UR
CE
ROW
MIL
L&
WO
RKSU
BTO
TAL
PAV
ELO
TSSI
TEW
ORK
TOTA
LW
ORK
TOTA
LPE
RLO
T
Indi
anVi
llage
Wat
erm
ain
Cost
Dat
a$1
,371
,545
$556
,997
$1,9
28,5
4212
7$1
5,18
5$7
,990
$23,
175
RS
Mea
nsC
ost D
ata
$1,5
22,3
32$5
56,9
97$2
,079
,329
127
$16,
373
$7,9
90$2
4,36
3
eOne
Rep
rese
ntat
ive
Cos
tDat
a$1
,646
,564
$556
,997
$2,2
03,5
6112
7$1
7,35
1$9
,069
$26,
420
PER
LOT
CO
STA
VER
AG
E$2
4,65
3
TOTA
LPR
OJE
CT
CO
ST=
$24,
653
x12
7=
$3,1
30,9
31
-6-
Attachment A
Plan View
Attachment B
Cut Sheets
(
___
c, =,77=SE R ES
jJ©L,) uJ /©L3) g
Patent Numberrs 5,752,3155,562,254 5439,180
* Dischargeda includes lossthrough chc valve, which isminimal.
General FeaturesThe model DHO71 orDRO7l grinderpump station is a complete unit thatincludes: the grinder pump, checkvalve, HDPE (high density polyethylene) tank and controls. The DHO71 orDRO7I is packaged into a singlecomplete unit, ready for installation.
The DHO71 is the “hardwired,” or“wired,” model where a cable connectsthe motor controls to the level controlsthrough watertight penetrations.
The DRO7I is the “radio frequencyidentification” (RFID), or “wireless,”model that uses wireless technologyto communicate between the levelcontrols and the motor controls.
All solids are ground into fine particles,allowing them to pass easily throughthe pump, check valve and smalldiameter pipelines. Even objects notnormally found in sewage, such asplastic, rubber, fiber, wood, etc., areground into fine particles.
The 1.25-inch discharge connection isadaptable to any piping materials,thereby allowing us to meet your localcode requirements.
The tank is made of tough corrosion-resistant HDPE. The optimum tankcapacity of 70 gallons is based oncomputer studies of water usagepattems.Asingie DHO71 orDRO7l isideal for one, average single-familyhome
I
_____
This model can accommodateflows of 700 GPD.
The internal check valve assembly,located in the grinder pump, is custom-designed for non-clog, trouble-freeoperation.
The grinder pump is automaticallyactivated and runs infrequently for veryshort periods. The annual energyconsumption is typically that of a 40-watt light bulb.
Units are available for indoor andouttloor installations. Outdoor unitsare designed to accommodate a widerange of burial depths.
Operational Information
Motor1 hp, 1,725 rpm, high torque, capacitor start, thermally protected, 120/240V, 60 Hz, 1 phase
Inlet Connections4-inch inlet grommet standard forDWV pipe. Other inlet configurationsavailable from the factory.
Discharge ConnectionsPump discharge terminates in 1.25-inch NPT female thread. Can easily beadapted to 1 .25-inch PVC pipe or anyother material required by local codes.
Discharge *
15 gpm at 0 psig
11 gpm at4O psig
7.8 gpm at 80 psig
Overload CapacityThe maximum pressure that the pumpcan generate is limited by the motorcharacteristics. The motor generates apressure well below the rating of thepiping and appurtenances. The automatic reset feature does not requiremanual operation following overload.
f
NAOO5OPO1
i-i,r DISCHARGE(304 S.S.)
CHECK VALVE(NORYL)
ANTI-SIPHON VALVE(NQRYL)
CONCRETE BALLAST MAY BE REQUIREDSEE INSTALLATION INSTRUCTIONS
FOR DETAILS
AD CH 07/12/07 A
DR BY CHK’D DATE ISSUE SCALE
SIEWFEI SY8TES
MODEL DHO71 / DRO71DETAIL SHEET
(HARD WIREDOPTiONS : El DHO71 LEVEL CONTROLS)
(WIRELESSEl D R 07 1 LEVEL CONTROLS)
GASKETED LID, FRP
FIELD JOINT REQUIREDFOR MODELS
DHO71-129 / DRO71-129&
DHO71-160 / 0R071-160
ELECTRICAL QUICK DISCONNECTNEMA 6P (EQD)
QUICK DISCONNECT ASSY.(304 s.s.)
S.S. CAST BALL VALVE
STRAIN RELIEF CORDCONNECTOR
PROTECTIVE CABLE SHROUD(HDPE)
INTERNAL WELL VENT2.O DIA.
DISCHARGE1-1/4 FPT
INLET, GROMMETTO ACCEPT 4.5O O.D.PVC PIPE (STANDARD).DUST COVER SUPPLIED
FOR SHIPMENT (NOTSUITABLE FOR BURIAL)
LINE
41.6 in1057 mm
TO DISCHARGE
HOPE TANKDUAL WALL, CORRUGATED
70 GALLON CAPACITY
29.5 DIA in749 mm
SEMI-POSITIVE DISPLACEMENT TYPE PUMP.EACH DIRECTLY DRIVEN BY A 1 HP MOTOR S
NAOO5OPO2
w
=,rsi=ic, iL
L/©r®Alarm Panel — Basic Package
DescriptionThe EIOne Sentry panels are custom designed for use with Environment Onegrinder pump stations. They can be configured to meet the needs of yourapplication, from basic alarm indication to advanced warning of pending servicerequirements.
E/One Sentry panels are supplied with audible and visual high level alarms. Theyare easily installed in accordance with relevant national and local codes.Standard panels are approved by UL, CSA, CE and NSF to ensure high qualityand safety.
The panel features a corrosion-proof, NEMA4X-rated, thermoplastic enclosure. Apadlock is provided to prevent unauthorized entry (safety front).
Features
Circuit breakers, 240 or 120 VAC service
Terminal blocks and ground lugs
Audible alarm with manual silence
Manual run feature and run indicator
Redundant “Start” function with high level alarm
Safety front—authorized personnel only when locked
Conformal-coated alarm board (both sides)
Alarm board overload protection
Please consult factory for special applications.
NAOO74POI Rev. —
SIMPLEXSENTRYREDUNDANT RUN (HIGH LEVEL)EXTERNAL VISUAL & AUDIBLE ALARMEXTERNAL LATCHING MANUAL SILENCEMANUAL RUNPUMP RUN INDICATORCONFORMAL COATED CIRCUIT BOARDPADLOCKNEMA 4X ENCLOSURE ASSEMBLY
CORROSION PROOF THERMOPLASTICPOLYESTER APPROVED BY UL FORELECTRICAL CONTROL ENCLOSURE
OPTIONS:
\LARM CONTACTS
HOUR METER
GENERATOR RECPT
UPC®ASI4E A112.3.4
SILB4cEswrroi
OPTIONALREMOTE SENTRY
24 DC MAX2 AMP MAX
0
EEJL_J
OPTIONALALARM POWERED
REMOTEOUTPUT POWER
BETWEENLi & NEUTRAL
II IIPOWER SOURCE
OPTIONALALARM DRYCONTACTS2 A MAX
— — — 9PLIED BY OThERSSI.PPLY CABLE (FROM PUP)POSSIBLE OPTIONFACTORY WIRED
CONTROL CABLE:TYPE TC: DIRECT BURIAL. 12AWG,SIX CONDUCTOR
CE SIMPLEX SENTRY,WITH GENERATOR
240V 60Hz.RECEPTACLE
ESD 06-0003
Attachment C
Construction Details
water supp’y and pal.uhop co:niroi eQfl•fli
tel. 781.982.9300fax. 781.982.1056
____
IPS PVC TRUEBALL VALVE
KORAN-SEALLINK SE:AL (TYP,)PIPE PENETRAT IONS
____
DIA. HDPFORCE MAIN
Typical Cleanout Detail(Optional AirNacuum Valve shown —right)
I.
1’-O’ GRAVELBEDDING REF.
CONCRETE PIPE SUPPORTWI PIPE ANCHOR STRAP
TYPICAL ELEV VIE\/
____HDPE
TEE ‘il/THREAD ADAPTER IPS
Cleanout detail can be modified to match typical installation needs. Inline shut offsmay be added to isolate flow direction. Image shown is flow through cleanout.These structures can be terminal end of line cleanouts, or junction cleanouts as maybe required. Optional air and vacuum relief valves may be added when required.
136A Stickney Hill RoadUnion, CT 06076tel. 860.684.0393fax 860.851.9752
30 DuPaul StreetSouthbridge, MA 01550tel. 508.765.0051fax 508.765.1244
41 Bayberry Hill RoadW.Townsend, MA 01474tel. 978.597.0703fax 978.597.0704
273 Waymouth Strea Rocklc,nd, MA 02370
M.H. FRAME & COVER
M.H.
QUICK
*
*
• ,44
TY
PIC
AL
LA
TE
RA
LIN
STA
LL
AT
ION
Sen
try
Ala
rmP
anel
En
vir
on
men
tO
neE
nv
iro
nm
ent
On
e::
tera
lK
itD
HO
7IS
tati
on
-
BELO
W-
--
MINI
MUM
--
FRO
STD
EPTh
4-ft
.fl
exdi
scha
rge
-:
-
with
coup
lin-
-.
-
LPSS
MAI
N
CO
RPO
RA
nON
srO
P-
-
PEA
GR
AV
EL
”SA
DD
LETA
PPE
AGR
AVEL
::
-
-:c:
-
:
CRU
SHED
STON
ECR
USH
EDST
ONE
:.-
.-
:‘-
:-:
:-
-
--
:::
::;
:::-.
i:’-
:-:
._-_
-_-I_•.
•‘...
--
-
;E::
:th::
::;.
-
envir
on
mento
ne
frm
aL
ll4
CC
UR
PU
RA
TI
VALVE CURB STOP WITH FEMALE PIPE THREADSAND RATCHETING VALVE HANDLE
MATERIAL POLYPROPYLENE
SFG
CHK’D
PRESSURE RATING: 150 psi
ASSEMBLY TO BE USED WITH 1-1/4” SDR 11 PIPE ONLY
TO ORDER LATERAL ASSEMBLY SHOWN,USE PART NUMBER PC0645G21.
ORDER CURB BOX SEPERATE; SEE ABOVE.
iI
PLASTIC LATERAL ASSEMBLY1-1/4” SDR 11 HDPE PIPE ARCH PATTERN
PA997PO
ASTCLA11EA ASSEMY
D/499DPE FPFPFE
AC PAflIEERN
EXTENSION TYPE CURB BOX WITH ARCH PATTERN BASEMATERIAL ABS
AVAILABLE LENGTHS...... 18-30”30-42”36-54”
PART NUMBERPBO930007PB0930008PBO930009PBO93001OPBO930011PB0930G12
42-66”48-78”60-102”
REDUCERCOUPLING
ORDERED SEPARATELY USING PART NUMBER FROM ABOVE
COMPRESSION ADAPTER FITTINGMATERIAL POLYPROPYLENE
COMPRESSION ADAPTER FITTINGMATERIAL: POLYPROPYLENE
1-1/4 MPT
COMPRESSION ADAPTERFITTING
MATERIAL POLYPROPYLENE
CHECK VALVEMATERIAL: GLASS FILLED PVC
TO PUMP
1-1/4” SDR 11POLYETHYLENE PIPE
(SUPPLIED BY OTHERS)
Attachment D
Quantity Calculations
Low Pressure SewerQuantity Calculations
DescriptionMainline Piping
1.5-Inch DiameterMallard RoadFlint RoadDurkee RoadLothrop RoadWayside LaneTuttle DriveTorrington Lane
46034018021080
210180
1,660
2.0 Inch DiameterMallard RoadFlint RoadDurkee RoadLothrop RoadWayside LaneTuttle DriveTorrington Lane
3.0-Inch DiameterSpencer RoadTuttle Drive
Sawcutting= Mainline Piping x 2
Trench Excavation, Haul, Backfill, & Compaction= Mainline Piping
Asphalt Patching (7 Wide)= 11,420 LFx7 LF/9
3- to 2-Inch ReducerFlint RoadDurkee RoadLothrop RoadTuttle Drive
2- to 1 .5-Inch ReducerMallard RoadFlint RoadDurkee RoadLothrop RoadWayside LaneTuttle DriveTorrington Lane
760 LF1,890 LF860 LF
2,100 LF340 LF
1,280 LF360 LF
7,590 LF
1,200 LF970 LF
2,170 LF
22,840 LF
11,420 LF
8,882 SY
2 EA1 EA1 EA1 EA5 EA
2 EA2 EA1 EA1 EA1 EA1 EA1 EA9 EA
Quantity Unit
LFLFLFLFLFLFLFLF
Page 1 of 3
Low Pressure SewerQuantity Calculations
Description Quantity Unit
2-Inch TeeFlint Road 2 EATuttle Drive 2 EA
4 EA
3-Inch TeeSpencer Road 3 EA
Terminal Cleanouts (Located At Pipe Ends)Manhole 9 EA1 .5-Inch Gate Valve 9 EA
Intersection Cleanouts (Located At Pipe Intersections)Manhole 7 EA2-Inch Tee 7 EA2- to 1 .5-Inch Reducer 7 EA1 .5-Inch Pipe (4’ Each) 28 LF1 .5-Inch Gate Valve 7 EA
In-Line Cleanouts (Located Midway of Lothrop Road)Manhole 1 EA2-Inch Tee 1 EA2- to 1.5-Inch Reducer 1 EA1.5-Inch Pipe (4 Each) 4 LF1 .5-Inch Gate Valve 1 EA
AirNacuum Release Valve (Located Within Cleanout Manholes)2-Inch Tee 2 EA2- to 1 .5-Inch Reducer 2 EA1.5-Inch Pipe (4’ Each) 8 LFAirNacuum Release Valve 2 EA
Lateral Piping (Assumed 50 ROW)1 .25-Inch Diameter (From Mainline To Property Line)
=127EAx25LF 3,175 LF
Sawcutting (From Mainline To Edge Of Pavement)=127EAx12.5LFx2 3,175 LF
Trench Excavation, Haul, Backfill, & Compaction=Lateral Piping 3,175 LF
Asphalt Patching (7’ Wide)=127EAx 12.5 LFx7LF/9 1,235 SY
Corporation StopsAt Each Connection 127 EA
Gate ValvesAt Each Connection 127 EA
Page2of3
Low Pressure SewerQuantity Calculations
Description Quantity Unit
Gate BoxesAt Each Connection 127 EA
Topsoil (7 Wide)127EAx12.5LFx7LF/9 1,235 SY
Seed= Topsoil 1,235 SY
OtherBoulder Excavation 100 CYGravel Borrow 250 CYGravel Subbase 1,000 CYOrdinary Borrow 200 CYExcavation of Unsuitable Material 100 CYExploratory Excavation 25 CYCalcium Chloride 25 50-lb BGHay Bales and Silt Fence 360 LFPolice Details 1,200 HR
Page3of3
Attachment E
Soil Boring and Monitoring Well Installation Logs
Soil Boring Summary
Number Street Depth Description
B 1 Tuttle Drive 8’ Full Depth
B 2 Tuttle Drive 8’ Full Depth
B 3 Tuttle Drive 8’ Full Depth
B 4 Tuttle Drive 8’ Full Depth
B 5 Tuttle Drive 7’ Refusal
B 6 Tuttle Drive 36” Refusal
B 7 Tuttle Drive 8’ Full Depth
B 8 Tuttle Drive 4’ Refusal
B 9 Torrington Lane 4’ Refusal
B 10 Torrington Lane 3’ Refusal
B 11 Torrington Lane 4’ Refusal
B 12 Lothrop Road 8’ Full Depth
B 14 Lothrop Road 8’ Full Depth
B 15 Durkee Road 8’ Full Depth
B 16 Flint Road 6’ Refusal
B 17 Flint Road 8’ Full Depth
B 18 Mallard Road 8’ Full Depth
B 19 Lothrop Road 7’ Refusal
B 20 Tuttle Road 3’6” Rufusal
TEST BORING LOG SHEET 1Soil Exploration Corp.
Town of ActonGeotechnical Drilling BORING B—i
Groundwater Monitor Well Site: Proposed Sewer Lines148 Pioneer Drive
Acton, MA PROJECT NO. 09-0427Leoniinster, MA 01453
978 840-0391 DATE: May 1, 2009
Ground Elevation: GROU1’lDWATER OBSERVATIONSDate Started: April 30, 2009 EDEPTHCASGSTABILITION
Date Finished: April 30, 2009
Driller: MC
Soil Eer/GeoIogist:Depth Casing Sample Visual Identification
Ft. butt No. PenlRec Depth Blows/6” Strata of Soil and I or Rock Sample6” Asphalt
1 0-16” 12-100/6”Dry, very dense, fine to medium sand and fine to coarse gravel,
1 some inorganic silt, trace cobbles and boulders.
30”
____________________________________________________
5 2 5’0”-7’0” 9-6-1 2-17 Dry, medium dense, fine to coarse sand and fine to coarse gravel,some inorganic silt, cobbles and boulders.
8’O”
____________________________________________________
10 Endofboringat8’O”.No water encountered upon completion.1st attempt refusal with hollow stem auger at 2’O”.Moved boring forward.2” attempt end of boring at 8’O”.
15
20
25
30
35
39
Notes: Hollow Stem Auger Size - 4-1/4” with automatic hammer
Cohesionless: 0 -4 V. Loose, 4 - 10 Loose, Trace 0 to 10% CASING SAMPLE CORE TYPE10 -30 M Dense, 30 -50 Dense, 50+ V Dense. Little 10 to 20% ID SIZE (IN) SS
Cohesive: 0 -2 V Soft, 2 -4 Soft, 4 -8 M Stiff Some 20 to 35% HAMMER WGT (LB) 140 lb.8 -15 Stiff, 15 -30 V. Stiff, 30 + Hard. And 35% to 50% HAMMER FALL (IN) 30”
TEST BORING LOG SHEET 2Soil Exploration Corp.
Town of ActonGeotechnical Drilling BORING B—2
Groundwater Monitor Well Site: Proposed Sewer Lines148 Ptoneer Drive
Acton, MA PROJECT NO. 09-0427Leorninster, MA 01453
978 840-0391 DATE: May 1, 2009
Ground Elevation: GROUNDWATER OBSERVATIONSDate Started: April 30, 2009 I DATE I DEPTH CASING I STABILIZATION
Date Finished: April 30, 2009 I I IDriller: MC I I f I
Soil EpperIGeologist: I I IDepth Casing Sample Visual Identification
Ft. bl/ft No. PeslRec Depth Blows/6” Strata of Soil and / or Rock Sample
6” Asphalt1 6”-2’6” 23-12-16-15
Dry, medium dense, fine to medium sand and fine to coarse1 gravel, some inorganic silt, trace cobbles and boulders (fill).
3’6”
____________________________________________________
5 2 50-70” 17-15-19-19 Dry, dense, fine to medium sand, some inorganic silt, trace fineto coarse gravel, cobbles and boulders.
80”
____________________________________________________
10 End of boring at 8’O”.No water encountered upon completion.
15
20
25
30
35
39
Notes: Hollow Stem Auger Size - 4-1/4”with automatic hammer
Cohesionless: 0 -4 V. Loose, 4 - 10 Loose, Trace 0 to 10% CASING SAMPLE CORE TYPE10 -30 M Dense, 30 -50 Dense, 50+ V Dense. Little 10 to 20% ID SIZE (IN) SSCohesive: 0 -2 V Soft, 2 -4 Soft, 4 -8 M Stiff Some 20 to 35% HAMMER WGT (LB) 140 lb.8 -15 Stiff, 15 -30 V. Stiff 30 + Hard. And 35% to 50% HAMMER FALL (IN) 30”
TEST BORING LOG SHEET 3Soil Exploration Corp. Town of Acton
Gcotechnical Drilling BORING B—3Groundwater Monitor Well Site: Proposed Sewer Lines
148 Pioneer Drive
Leorninster, MA 01453 Acton, MA PROJECT NO. 09-0427
978 840-0391 DATE: May 1, 2009
Ground Elevation: I GROUNDWATER OBSERVATIONS
Date Started: April 30, 2009 I DATE I DEPTH I CAS1NG I STABILIZATION
Date Finished: April 30, 2009 I IDriller: MC I I I
Soil Eer/Geologist: I I IDepth Casing Sample Visual IdentifIcation
Ft. bl/ft No. PenilS.ec Depth Blows/6” Strata of Soil and I or Rock Sample6”
1 6”-2’6” 15-9-9-8Dry, medium dense, fine to medium sand and fine to coarse
1 gravel, some inorganic silt, cobbles, boulders (fill).
30”
_________________________________________________
5 2 5’0”-7’0” 31-26-44-47 Dry, very dense, fine to coarse sand and fine to coarse gravel,trace inorganic silt, cobbles and boulders.
8’O”
_________________________________________________
10 End of boring at 8’O”.No water encountered upon completion.
15
20
25
30
35
39
Notes: Hollow Stem Auger Size - 4-l/4”with automatic hammer
Cohesionless: 0 -4 V. Loose, 4 - 10 Loose, Trace 0 to 10% CASING SAMPLE CORE TYPE
10 -30 M Dense, 30 -50 Dense, 50+ V Dense. Little 10 to 20% ID SIZE (IN) SS
Cohesive: 0 -2 V Soft, 2 -4 Soft, 4 -8 M Stiff Some 20 to 35% HAMMER WGT (LB) 140 lb.
8-15 Stiff, 15 -30 V. Stiff, 30 + Hard. And 35% to 50% HAMMER FALL (IN) 30”
TEST BORING LOG SHEET 4Soil Exploration Corp. Town of Acton
Geoteehnical Drilling BORING B-4Groundwater Monitor Well Site: Proposed Sewer Lines
148 Pioneer Drive
Leorninster, MA 01453 Acton, MA PROJECT NO. 09-0427
978 840-0391 DATE: May 1, 2009
Ground Elevation: GROUNDWATER OBSERVATIONS
Date Started: April 30, 2009 EDEPTiipASNGSTILIZATENDate Finished: April 30, 2009
Driller: MC
Soil Eer/Geologist:Depth Casing Sample Visual Identification
Ft. hI/ft No. Pen/Rev Depth Blows/6” Strata of Soil and / or Rock Sample6” Asohalt
1 6-26” 11-19-11-16Dry, medium dense, fine to medium sand and fine to coarsegravel, trace inorganic silt (fill) cobbles.
3’O”
5 2 50-65” 27-39-100/5” Dry, very dense, fine to medium sand and fine to coarse gravel,some inorganic silt, cobbles.
80”
____________________________________________________
10 End of boring at 8’O”.No water encountered upon completion.
15
20
25
30
35
39
Notes: Hollow Stem Auger Size - 4-114”with automatic hammer
Cohesionless: 0 -4 V. Loose, 4 - 10 Loose, Trace 0 to 10% CASING SAMPLE CORE TYPE
10 -30 M Dense, 30 -50 Dense, 50+ V Dense. Little 10 to 20% ID SIZE (IN) SS
Cohesive: 0 -2 V Soft, 2 -4 Soft, 4 -8 M Stiff Some 20 to 35% HAMMER WGT (LB) 140 lb.
8-15 Stiff, 15 -30 V. Stiff, 30 + Hard. And 35% to 50% HAMMER FALL (IN) 30”
TEST BORING LOG SHEET 5
Soil Exploration Corp.Town of Acton
Geotechnical Drilling BORING B—5Groundwater Monitor Well Site: Proposed Sewer Lines
14$ Pioneer DriveActon, MA PROJECT NO. 09-0427
Leorninster, MA 01453
978 840-0391 DATE: May 1, 2009Ground Elevation: I GROUNDWATER OBSERVATIONS
Date Started: April 30, 2009 I DATE I DEPTH CASING I STABiLIZATIONDate Finished: April 30, 2009 I I I
Driller: MC I I ISoil Eer/Geologist: I I I
Depth Casing Sample Visual IdentificationFt. butt No. PenJRec Depth Blows/6” Strata of Soil and / or Rock Sample
6” Asohalt1 6-26” 10-14-17-17
Dry, dense, fine to medium sand and fine to medium gravel, trace1 inorganic silt, cobbles.
3’O”
____________________________________________________
5 2 5’0”-7’0” 19-27-43-89 Dry, very dense, fine to coarse sand and fine to coarse gravel,trace inorganic silt, cobbles.
70”
____________________________________________________
Refusal with hollow stem auger at 7’O”.10 No water encountered upon completion.
15
20
25
30
35
39
Notes: Hollow Stem Auger Size - 4-l/4”with automatic hammer
Cohesionless: 0 -4 V. Loose, 4- 10 Loose, Trace 0 to 10% CASING SAMPLE CORE TYPE
10 -30 M Dense, 30 -50 Dense, 50+ V Dense. Little 10 to 20% ID SIZE (IN) SSCohesive: 0 -2 V Soft, 2 -4 Soft, 4 -8 M Stiff Some 20 to 35% HAMMER WGT (LB) 140 lb.8 -15 Stiff, 15 -30 V. Stiff, 30 + Hard. And 35% to 50% HAMMER FALL (IN) 30”
Visual Identificationof Soil and / or Rock Sample
Dry, medium dense, fine to coarse sand and fine to coarse gravel,trace inorganic silt, cobbles and boulders.
Refusal with hollow stem auger at 3’6”.No water encountered upon completion.
TEST BORING LOG SHEET 6Soil Exploration Corp. Town of Acton
Geotechnical Drilling BORING B6Groundwater Monitor Well Site: Proposed Sewer Lines
148 Pioneer DriveActon, MA PROJECT NO. 09-0427Leorninster, MA 01453
978 840-0391 DATE: May 1, 2009
Ground Elevation: GROUNDWATER OBSERVATIONSDate Started: April 29, 2009 DATE DEPTH CASNG STABILIZATION
Date Finished: April 29, 2009
Driller: MC
1
I I
5
10
15
20
25
30
35
39
Notes: Hollow Stem Auger Size - 4-l/4”with automatic hammer
Cohesionless: 0 -4 V. Loose, 4- 10 Loose, Trace 0 to 10% CASING SAMPLE CORE TYPE
10 -30 M Dense, 30 -50 Dense, 50+ V Dense. Little 10 to 20% ID SIZE (IN) SSCohesive: 0 -2 V Soft, 2 -4 Soft, 4 -8 M Stiff Some 20 to 35% HAMMER WGT (LB) 140 lb.
8-15 Stiff, 15 -30 V. Stiff, 30 + Hard. And 35% to 50% HAMMER FALL (IN) 30
TEST BORING LOG SHEET 7Soil Exploration Corp.
Town of ActonGeotechnical Drilling BORING B—7
Groundwater Monitor Well Site: Proposed Sewer Lines148 Pioneer Drive
Leominster, MA 01453 Acton, MA PROJECT NO. 09-0427
978 840-0391 DATE: May 1, 2009
Ground Elevation: GROUNDWATER OBSERVATIONSDate Started: April 29, 2009
Date Finished: April 29, 2009
Driller: MC
Soil Eer/Geologist:Depth Casing Sample Visual Identification
Ft. bl/ft No. Pen/Rec Depth Blows/6” Strata of Soil and / or Rock Sample
39
Notes: Hollow Stem Auger Size - 4-1/4”with automatic hammer
Cohesionless: 0 -4 V. Loose, 4 - 10 Loose, Trace 0 to 10% CASING SAMPLE CORE TYPE10 -30 M Dense, 30 -50 Dense, 50+ V Dense. Little 10 to 20% ID SIZE (IN) SSCohesive: 0 -2 V Soft, 2 -4 Soft, 4 -8 M Stiff Some 20 to 35% HAMMER WGT (LB) 140 lb.8-15 Stiff, 15 -30 V. Stiff, 30 + Hard. And 35% to 50% HAMMER FALL (IN) 30”
2
Asnhalt6”-2’6”
5’0”-7’0”
13-13-18-22
19-25-24-22
6”
40”
80”
Dry, medium dense, fine to coarse sand and fine to coarse gravel,some inorganic silt, trace cobbles and boulders.
Dry, dense, fine to coarse sand and fine to coarse gravel, traceinorganic silt, cobbles.
I
5
10
15
20
25
30
35
End of boring at 8’O”.No water encountered upon completion.
TEST BORING LOG SHEET 8Soil Exploration Corp. Town of Acton
Geotechnical Drilling BORING B-8Groundwater Monitor Well Site: Proposed Sewer Lines
148 Pioneer DriveActon, MA PROJECT NO. 09-0427
Leominster, MA 01453
978 840-0391 DATE: May 1, 2009
Ground Elevation: I GROUNDWATER OBSERVATIONSDate Started: April 29, 2009 DATE I DEPTH CASING I STABILIZATION
Date Finished: April 29, 2009 I IDriller: MC I I I
Soil Engineer/Geologist: I I IDepth Casing Sample Visual Identification
Ft. hi/ft No. P&Rec Depth Blows/6” Strata of Soil and / or Rock Sample6” Asohalt
1 6-26” 8-14-27-23
1 Dry, dense, fine to coarse sand and fine to coarse gravel, traceinorganic silt, trace cobbles and boulders.
40”
_______________________________________________
5Refusal with hollow stem auger at 4’O”.No water encountered upon completion.
10
15
20
25
30
35
39
Notes: Hollow Stem Auger Size - 4-1/4” with automatic hammer
Cohesionless: 0 -4 V. Loose, 4- 10 Loose, Trace 0 to 10% CASING SAMPLE CORE TYPE
10 -30 M Dense, 30 -50 Dense, 50+ V Dense. Little 10 to 20% ID SIZE (IN) SS
Cohesive: 0 -2 V Soft, 2 -4 Soft, 4 -8 M Stiff Some 20 to 35% HAMMER WGT (LB) 140 lb.
8 -15 Stiff, 15 -30 V. Stiff, 30 + Hard. And 35% to 50% HAMMER FALL (IN) 30’
TEST BORING LOG SHEET 9Soil Exploration Corp.
Town of ActonGeolechnical Drilling BORING B-9
Groundwater Monitor Well Site: Proposed Sewer Lines148 Pioneer Drive
Acton, MA PROJECT NO. 09-0427Leoniinster, MA 01453
978 840-0391 DATE: May 1, 2009
GROUNDWATER OBSERVATIONSGround Elevation:Date Started: April 30, 2009 ASSTILIZAON
Date Finished: April 30, 2009
Driller: MCSoil Eer/Geologist:
Depth Casing Sample Visual IdentificationFt. hI/ft No. Pen/Rec Depth Blows/6” Sfrata of Soil and / or Rock Sample
4” Asphalt1 6-26” 10-12-24-22
Dry, dense, fine to coarse sand and fine to coarse gravel, traceI inorganic silt, cobbles and boulders.
4’O”5 Refusal with hollow stem auger at 4’O”.
No water encountered upon completion.
10
15
20
25
30
35
39
Notes: Hollow Stem Auger Size - 4-1/4” with automatic hammer
Cohesionless: 0 -4 V. Loose, 4- 10 Loose, Trace 0 to 10% CASING SAMPLE CORE TYPE
10 -30 M Dense, 30 -50 Dense, 50+ V Dense. Little 10 to 20% ID SIZE (IN) SS
Cohesive: 0 -2 V Soft, 2 -4 Soft, 4 -8 M Stiff Some 20 to 35% HAMMER WGT (LB) 140 lb.
8 -15 Stiff, 15 -30 V. Stiff, 30 + Hard. And 35% to 50% HAMMER FALL (IN) 30”
TEST BORING LOG SHEET 10Soil Exploration Corp.
Town of ActonGeotechnical Drilling BORING B10
Groundwater Monitor Well Site: Proposed Sewer Lines148 Pioneer Drive
Acton, MA PROJECT NO. 09-0427Leorninster, MA 01453
978 840-0391 DATE: May 1, 2009
Ground Elevation: GROUNDWATER OBSERVATIONDate Started: April 30, 2009 EDEPTHCASNGSTILATIoN
Date Finished: April 30, 2009
Driller: MC
Soil Eer/Geologist:Depth Casing Sample Visual Identification
Ft. bl/ft No. Pen/Rec Depth Blows/6” Strata of Soil and / or Rock Sample4” Asphalt
1 6”-2’6” 12-19-40-35Dry, dense, fine to coarse sand and fine to coarse gravel, trace
1 inorganic silt, cobbles and boulders.
3’O”
____________________________________________________
5 Refusal with hollow stem auger at 3’O”.No water encountered upon completion.
10
15
20
25
30
35
39
Notes: Hollow Stem Auger Size - 4-1/4” with automatic hammer
Cohesionless: 0 -4 V. Loose, 4 - 10 Loose, Trace 0 to 10% CASING SAMPLE CORE TYPE
10 -30 M Dense, 30 -50 Dense, 50+ V Dense. Little 10 to 20% ID SIZE (IN) SSCohesive: 0 -2 V Soft, 2 -4 Soft, 4 -8 M Stiff Some 20 to 35% HAMMER WGT (LB) 140 lb.8 -15 Stiff, 15 -30 V. Stiff, 30 + Hard. And 35% to 50% HAMMER FALL (iN) 30”
TEST BORING LOG SHEET iiSoil Exploration Corp.
Town of ActonGeotechnical Drilling BORING B4 1
Groundwater Monitor Well Site: Proposed Sewer Lines148 Pioneer Drive
Acton, MA PROJECT NO. 09-0427Leominster, MA 01453
978 840-0391 DATE: May 1, 2009
GROUNDWATER OBSERVATIONSGround Elevation:Date Started: April 30, 2009
Date Finished: April 30, 2009Driller: MC
Soil Ejer/Geologist:Depth Casing Sample Visual Identification
Ft. blift No. Pen/Rec Depth Blows/6” Strata of Soil and/or Rock Sample4” Asphalt
1 6-26” 15-21-44-53
1 Dry, very dense, fine to coarse sand and fine to coarse gravel,trace inorganic silt, cobbles and boulders.
40”
_________________________________________________
5Refusal with hollow stem auger at 4’O”.No water encountered upon completion.
10
15
20
25
30
35
39
Notes: Hollow Stem Auger Size - 4-1/4” with automatic hammer
Cohesionless; 0 -4 V. Loose, 4 - 10 Loose, Trace 0 to 10% CASING SAMPLE CORE TYPE
10 -30 M Dense, 30 -50 Dense, 50+ V Dense. Little 10 to 20% ID SIZE (iN) SS
Cohesive: 0 -2 V Soft, 2 -4 Soft, 4 -8 M Stiff Some 20 to 35% HAMMER WGT (LB) 140 lb.
8 -15 Stiff, 15 -30 V. Stiff, 30 + Hard. And 35% to 50% HAMMER FALL (IN) 30”
TEST BORING LOG SHEET 12
Soil Exploration Corp.Town of Acton
Geotechnical Drilling BORING B12Groundwater Monitor Well Site: Proposed Sewer Lines
14$ Pioneer DriveActon, MA PROJECT NO. 09-0427
Leorninster, MA 01453
978 840-0391 DATE: May 1, 2009
Ground Elevation: I GROUNDWATER OBSERVATIONSDate Started: April 29, 2009 DATE I DEPTH CASING I STABILIZATION
Date Finished: April 29, 2009 I I IDriller: MC I I I
Soil Eer/Geologist: I I IDepth Casing Sample Visual Identification
Ft. bI/ft No. PealRec Depth Blows!6” Strata of Soil and! or Rock Sample6” Asphalt
1 6”-2’6’ 7-7-9-12
I Dry, medium dense, fine to medium sand, some fine to coarsegravel, trace organic silt, cobbles.
4’O”
_______________________________________________
5 2 50-70” 6-6-10-12Dry, medium stiff inorganic silt, trace fine sand, trace fine tomedium gravel, trace clay.
80”
____________________________________________________
10 End of boring at 8’O”.No water encountered upon completion.
15
20
25
30
35
39
Notes: Hollow Stem Auger Size - 4-1/4” with automatic hammer
Cohesionless: 0 -4 V. Loose, 4 - 10 Loose, Trace 0 to 10% CASING SAMPLE CORE TYPE10 -30 M Dense, 30 -50 Dense, 50+ V Dense. Little 10 to 20% ID SIZE (IN) SS
Cohesive: 0 -2 V Soft, 2 -4 Soft, 4 -8 M Stiff Some 20 to 35% HAMMER WGT (LB) 140 lb.
8-15 Stiff, 15 -30 V. Stiff, 30 + Hard. And 35% to 50% HAMMER FALL (IN) 30’
TEST BORING LOG SHEET 13Soil Exploration Corp. Town of Acton
Geotechnical Drilling BORING B—i 4Groundwater Monitor Well Site: Proposed Sewer Lines
148 Pioneer Drive
Leorninster, MA 01453 Acton, MA PROJECT NO. 09-0427
978 840-0391 DATE: May 1, 2009
Ground Elevation: I GROUNDWATER OBSERVATIONSDate Started: April 29, 2009 I DATE I DEPTH CASING I STABILIZATION
Date Finished: April 29, 2009 I I IDriller: MC I I I
Soil Engineer/Geologist: IDepth Casing Sample Visual Identification
Ft. bl/ft No. PenlRec Depth Blows/6” Strata of Soil and / or Rock Sample6” Asphalt
1 6”-2’6” 7-1 1-9-9
I Dry, medium dense, fine to coarse sand, some fine to mediumgravel, trace organic silt, cobbles.
40”
_________________________________________________
5 2 5’0”-7’0” 7-9-9-11Dry, medium stiff, inorganic silt, trace fine sand, trace fine tomedium gravel, trace clay.
80”
____________________________________________________
10 End of boring at 8’O”.No water encountered upon completion.
15
20
25
30
35
39
Notes: Hollow Stem Auger Size - 4-1/4” with automatic hammer
Cohesionless: 0 -4 V. Loose, 4 - 10 Loose, Trace 0 to 10% CASING SAMPLE CORE TYPE
10 -30 M Dense, 30 -50 Dense, 50+ V Dense. Little 10 to 20% ID SIZE (IN) SS
Cohesive: 0 -2 V Soft, 2 -4 Soft, 4 -8 M Stiff Some 20 to 35% HAMMER WGT (LB) 140 lb.
8 -15 Stiff, 15 -30 V. Stiff, 30 + Hard. And 35% to 50% HAMMER FALL (IN) 30”
TEST BORING LOG SHEET 14Soil Exploration Corp. Town of Acton
Geotechnical Drilling BORII”TG B—i 5Groundwater Monitor Well Site: Proposed Sewer Lines
14$ Pioneer Drive
Leominster, MA 01453 Acton, MA PROJECT NO. 09-0427
978 840-0391 DATE: May 1, 2009
Ground Elevation: I GROUNDWATER OBSERVATIONSDate Started: April 29, 2009 I DATE I DEPTH CASING I STABILIZATION
Date Finished: April 29, 2009 I I IDriller: MC I I I
Soil Eer/Geologist: I I IDepth Casing Sample Visual Identification
Ft. bl/ft No. Pen/Rec Depth Blows/6” Strata of Soil and / or Rock Sample6” Asphalt
1 6-26” 10-11-11-13
1 Dry, medium dense, fine to coarse sand and fine to coarse gravel,trace inorganic silt, cobbles (fill).
3’O”
_________________________________________________
5 2 5’0”-6’4” 26-42-100/4” Dry, very dense, fine to coarse sand and fine to coarse gravel,trace inorganic silt, cobbles and boulders.
80”
_________________________________________________
10 End of boring at 8’O”.No water encountered upon completion.
15
20
25
30
35
39
Notes: Hollow Stem Auger Size - 4-1/4” with automatic hammer
Cohesionless: 0 -4 V. Loose, 4 - 10 Loose, Trace 0 to 10% CASiNG SAMPLE CORE TYPE
10 -30 M Dense, 30 -50 Dense, 50+ V Dense. Little 10 to 20% ID SIZE (IN) SS
Cohesive: 0 -2 V Soft, 2 -4 Soft, 4 -8 M Stiff Some 20 to 35% HAMMER WGT (LB) 140 lb.
8 -15 Stiff, 15 -30 V. Stiff, 30 + Hard. And 35% to 50% HAMMER FALL (IN) 30”
TEST BORING LOG SHEET isSoil Exploration Corp. Town of Acton
Geolechnieal Drilling BORING B—i 6Groundwater Monitor Well Site: Proposed Sewer Lines
148 Pioneer DriveActon, MA PROJECT NO. 09-0427
Leorninster, MA 01453
978 840-0391 DATE: May 1, 2009Ground Elevation: I GROUNDWATER OBSERVATIONS
Date Started: April 29, 2009 DATE I DEPTH CASING I STABILIZATIONDate Finished: April 29, 2009 I I I
Driller: MC I I ISoil Eer/Geologist: I I I
Depth Casing Sample Visual IdentifIcationFt. bl/t’c No. Pen/Rec Depth Blows/6” Strata of Soil and / or Rock Sample
6” Asphalt1 6-26” 11-14-23-31
Dry, dense, fine to coarse sand and fine to coarse gravel, trace1 inorganic silt, cobbles (fill).
36”
____________________________________________________
Dry, very dense, fine to coarse sand and fine to coarse gravel,5 2 50-58” 8-100/2” trace inorganic silt, cobbles and boulders.
60”
_________________________________________________
Refusal with hollow stem auger at 6’O”.No water encountered upon completion.
10
15
20
25
30
35
39
Notes: Hollow Stem Auger Size - 4-1/4” with automatic hammer
Cohesionless: 0 -4 V. Loose, 4- 10 Loose, Trace 0 to 10% CASING SAMPLE CORE TYPE
10 -30 M Dense, 30 -50 Dense, 50+ V Dense. Little 10 to 20% ID SIZE (IN) SS
Cohesive: 0 -2 V Soft, 2 -4 Soft, 4 -8 M Stiff Some 20 to 35% HAMMER WGT (LB) 140 lb.
8-15 Stiff, 15 -30 V. Stiff, 30 + Hard. And 35% to 50% HAMMER FALL (IN) 30”
TEST BORING LOG SHEET 16Soil Exploration Corp. Town of Acton
Geotcchnical Drilling BORING B—i 7Groundwater Monitor Well Site: Proposed Sewer Lines
148 Pioneer Drive
Leominster, MA 01453 Acton, MA PROJECT NO. 09-0427
978 840-0391 DATE: May 1, 2009
GROUNDWATER OBSERVATIONSGround Elevation:
Date Started: April 29, 2009 EPTHCASNGSTABILIZAONDate Finished: April 29, 2009
Driller: MC
Soil Eer/Geologist:Depth Casing Sample Visual Identification
Ft. blJft No. Pen/Rec Depth Blows/6” Strata of Soil and / or Rock Sample6” Asphalt
1 6-26” 12-21-19-24Dry, dense, fine to medium sand, some fine to coarse gravel,trace inorganic silt, trace coarse sand, cobbles.
30”
5 2 5’0”-7’0” 6-6-5-6Dry, medium dense, very fine sand, some inorganic silt.
8’O”
10 End of boring at 8’O”.No water encountered upon completion.
15
20
25
30
35
39
Notes: Hollow Stem Auger Size - 4-1/4” with automatic hammer
Cohesionless: 0 -4 V. Loose, 4- 10 Loose, Trace 0 to 10% CASING SAMPLE CORE TYPE
10 -30 M Dense, 30 -50 Dense, 50+ V Dense. Little 10 to 20% ID SIZE (IN) SS
Cohesive: 0 -2 V Soft, 2 -4 Soft, 4 -8 M Stiff Some 20 to 35% HAMMER WGT (LB) 140 lb.
8-15 Stiff, 15 -30 V. Stiff, 30 + Hard. And 35% to 50% HAMMER FALL (IN) 30”
TEST BORING LOG SHEET 17Soil Exploration Corp.
Town of ActonGeoteehnical Drilling BORING B—i 8
Groundwater Monitor Well Site: Proposed Sewer Lines148 Pioneer Drive
Leon,inster, MA 01453 Acton, MA PROJECT NO. 09-0427
978 840-0391 DATE: May 1, 2009
Ground Elevation: GROU1’DWATER OBSERVATIONSDate Started: April 29, 2009 EDEPTHCASNGSTILATION
Date Finished: April 29, 2009
Driller: MC
Soil Eer/GeoIogist:Depth Casing Sample Visual Identification
Ft. bl/ft No. Pen/Rec Depth Blows/6” Strata of Soil and! or Rock Sample6” Asphalt
1 6-26” 11-15-12-15Dry, medium dense, fine to medium sand, some inorganic silt,trace fine to coarse gravel, cobbles (fill).
3’O”
____________________________________________________
5 2 50-70” 10-12-1 1-14 Wet, medium dense, fine to coarse sand and fine to coarse gravel,trace inorganic silt, cobbles.
8’O”
____________________________________________________
10 End of boring at 8’O”.No water encountered upon completion.
15
20
25
30
35
39
Notes: Hollow Stem Auger Size - 4-1/4” with automatic hammer
Cohesionless: 0 -4 V. Loose, 4 - 10 Loose, Trace 0 to 10% CASING SAMPLE CORE TYPE
10 -30 M Dense, 30 -50 Dense, 50+ V Dense. Little 10 to 20% ID SIZE (IN) SS
Cohesive: 0 -2 V Soft, 2 -4 Soft, 4 -8 M Stiff Some 20 to 35% HAMMER WGT (LB) 140 lb.
8-15 Stiff, 15 -30 V. Stiff, 30 + Hard. And 35% to 50% HAMMER FALL (IN) 30”
TEST BORING LOG SHEET 18Soil Exploration Corp.
Town of ActonGeotechnical Drilling BORING B—19
Groundwater Monitor Well Site: Proposed Sewer Lines148 Pioneer Drive
Acton, MA PROJECT NO. 09-0427Leorninster, MA 01453
978 840-0391 DATE: May 1, 2009
Ground Elevation: I GROUNDWATER OBSERVATIONS
Date Started: April 29, 2009 I DATE I DEPTH CASING I STABILIZATION
Date Finished: April 29, 2009 I IDriller: MC I I I
Soil Eer/Geologist: I IDepth Casing Sample Visual Identification
Ft. bl!ft No. Pen/Rc Depth Blows/6” Strata of Soil and! or Rock Sample2” Asphalt
1 6-26” 6-9-12-10Dry, medium dense, fine to coarse sand, some fine to coarse
1 gravel, trace inorganic silt, cobbles.
36”
_________________________________________________
5 2 50-62” 13-16-100/2” Dry, very dense, fine sand and inorganic silt, trace fine tomedium gravel, cobbles.
70”
____________________________________________________
Refusal with hollow stem auger at 7’O”.10 No water encountered upon completion.
15
20
25
30
35
39
Notes: Hollow Stem Auger Size - 4-1/4” with automatic hammer
Cohesionless: 0 -4 V. Loose, 4 - 10 Loose, Trace 0 to 10% CASING SAMPLE CORE TYPE
10 -30 M Dense, 30 -50 Dense, 50+ V Dense. Little 10 to 20% ID SIZE (IN) SS
Cohesive: 0 -2 V Soft, 2 -4 Soft, 4 -8 M Stiff Some 20 to 35% HAMMER WGT (LB) 140 lb.
8 -15 Stiff, 15 -30 V. Stiff, 30 + Hard. And 35% to 50% HAMMER FALL (IN) 30”
TEST BORING LOG SHEET 19Soil Exploration Corp.
Town of ActonGeotechnical Drilling BORING B20
Groundwater Monitor Well Site: Proposed Sewer Lines148 Pioneer Dri e
Leorninster, MA 01453 Acton, MA PROJECT NO. 09-0427
978 840-0391 DATE: May 1, 2009
GROUNDWATER OBSERVATIONSGround Elevation:
Date Started: April 30, 2009
Date Finished: April 30, 2009
Driller: MC
Soil Eer!GeoIogist:Depth Casing Sample Visual Identification
Ft. bIJft No. Pea/Rec Depth Blows!6” Strata of Soil and! or Rock Sample6” Asphalt
1 6”-2’6” 21-25-34-50Dry, very dense, fine to medium sand and fine to coarse gravel,
1 some inorganic silt, cobbles and boulders.
36”
_________________________________________________
5 Refusal with hollow stem auger at 3’6”.No water encountered upon completion.
10
15
20
25
30
35
39
Notes: Hollow Stem Auger Size - 4-1/4” with automatic hammer
Cohesionless: 0 -4 V. Loose, 4- 10 Loose, Trace 0 to 10% CASING SAMPLE CORE TYPE10 -30 M Dense, 30 -50 Dense, 50+ V Dense. Little 10 to 20% ID SIZE (iN) SSCohesive: 0 -2 V Soft, 2 -4 Soft, 4 -s M Stiff Some 20 to 35% HAMMER WGT (LB) 140 lb.8-15 Stiff, 15 -30 V. Stiff, 30 + F-lard. And 35% to 50% HAMMER FALL (IN) 30”
Monitoring Well Summary
Number Street Depth Description
MW 1 Flint Road 12’ Water at 5’
MW 2 Spencer Road 12’ Water at 7’
MW 3 Tuttle Road 9’ Water at 7’6”
MW 4 Lothrop Road 8’ Water at 2’
TEST BORING LOG SHEET 20Soil Exploration Corp.
Town of ActonGeotechnical Drilling BORING IVIW 1
Groundwater Monitor well Site: Proposed Sewer Lines148 Pioneer Drive
Acton, MA PROJECT NO. 09-0427Leorninster, MA 01453
978 840-0391 DATE: May 1, 2009
Ground Elevation: GROUNDWATER OBSERVATIONSDate Started: April 29, 2009 DEPTHCG STABILIZATION
Date Finished: April 29, 2009
Driller: MC
Soil Eer/Geologist:Depth Casing Sample Visual Identification
Ft. bI/ft No PenlRec Depth Blows/6” Strata of Soil and / or Rock Sample
Dry, very loose, fine sand, some inorganic silt, trace root matter.1 1 1-1-2-3
3’O”
____________________________________________________
5 2 5’0”-7’0” 1-1-1-1Wet, very soft black peat, some organics.
80”
____________________________________________________
10 3 1 0’O”-l 20” 2-2-3-3 Wet, soft inorganic silt, trace very fine sand, trace root matter.
120”
_______________________________________________
End of boring at 12’O”.15 Set well point at 10’O”.
Water encountered at 5’0”.
20
25
30
35
39
Notes: Hollow Stem Auger Size - 4-1/4” with automatic hammer
Cohesionless: 0 -4 V. Loose, 4 - 10 Loose, Trace 0 to 10% CASING SAMPLE CORE TYPE
10 -30 M Dense, 30 -50 Dense, 50+ V Dense. Little 10 to 20% ID SIZE (IN) SS
Cohesive: 0 -2 V Soft, 2 -4 Soft, 4 -8 M Stiff Some 20 to 35% HAMMER WGT (LB) 140 lb.
8-15 Stiff, 15 -30 V. Stiff, 30 + Hard. And 35% to 50% HAMMER FALL (IN) 30”
TEST BORING LOG SHEET 21Soil Exploration Corp.
Town of ActonGeotechnical Drilling BORiNG MW’2
Groundwater Monitor Well Site: Proposed Sewer Lines148 Pioneer Drive
Acton, MA PROJECT NO. 09-0427Leominster. MA 01453
978 840039l DATE: May 1, 2009
Ground Elevation: GROUNDWATER OBSERVATIONSDate Started: April 30, 2009 TEDTHSNGSTABILIZATJ
Date Finished: April 30, 2009
Driller: MC
SoilE1er/Geologist:Depth Casing Sample Visual Identification
Ft. hI/ft No. l’en/Rec Depth Blows/6” Strata of Soil and / or Rock Sample
Dry, very soft organic to inorganic silt, trace fine sand.1 1 0-20 1-1-2-2
20”
_________________________________________________
5 2 5’0”-7’0” 6-8-9-9
Wet, medium dense, very fine to fine sand, some inorganic silt.
10 3 10’0”-12’0” 4-6-6-7
120”
_______________________________________________
End of boring at I2’O”.15 Set well point at l0’O”.
Water encountered at 7’O”.
20
25
30
35
39
Notes: Hollow Stem Auger Size - 4-1/4” with automatic hammer
Cohesionless: 0 -4 V. Loose, 4 - 10 Loose, Trace 0 to 10% CASING SAMPLE CORE TYPE10 -30 M Dense, 30 -50 Dense, 50+ V Dense. Little tO to 20% ID SIZE (IN) SSCohesive: 0 -2 V Soft, 2 -4 Soft, 4 -8 M Stiff Some 20 to 35% HAMMER WGT (LB) 140 lb.8-15 Stiff, 15 -30 V. Stiff, 30 + Hard. And 35% to 50% HAMMER FALL (IN) 30”
TEST BORING LOG SHEET 22Soil Exploration Corp.
Town of ActonGeotechnical Drilling BORING MW—3
Groundwater Monitor Well Site: Proposed Sewer Lines148 Pioneer Drive
Acton, MA PROJECT NO. 09-0427Leorninster, MA 01453
978 840-0391 DATE: May 1, 2009
Ground Elevation: I GROUNDWATER OBSERVATIONSDate Started: April 30, 2009 DATE I DEPTH CASING I STABILIZATION
Date Finished: April 30, 2009 I I IDriller: MC I I
Soil Engineer/Geologist: I I IDepth Casing Sample Visual Identification
Ft. bl/ft No. Pen/Sec Depth Blows!6” Strata of Soil and! or Rock Sample
Dry, very loose, fine to medium sand, some inorganic silt, trace1 0-20’ 1-2-1-1 root matter, trace organic silt, cobbles.
30’
____________________________________________________
5 2 5’0”-7’0” 31-35-35-43Dry, very dense, fine to medium sand, some inorganic silt, tracefine to coarse gravel, cobbles.
9’O’
____________________________________________________
10Reftisal with hollow stem auger at 9’O.Set well point at 9’O”.Water encountered at 7’6”.
15
20
25
30
35
39
Notes: Hollow Stem Auger Size - 4-1/4” with automatic hammer.
Cohesionless: 0 -4 V. Loose, 4 - 10 Loose, Trace 0 to 10% CASING SAMPLE CORE TYPE10 -30 M Dense, 30 -50 Dense, 50+ V Dense. Little 10 to 20% ID SIZE (IN) SS
Cohesive: 0 -2 V Soft, 2 -4 Soft, 4 -8 M Stiff Some 20 to 35% HAMMER WOT (LB) 140 lb.
8 -15 Stiff, 15 -30 V. Stiff, 30 + Hard. And 35% to 50% HAMMER FALL (IN) 30”
TEST BORING LOG SHEET 23Soil Exploration Corp.
Town of ActonGeotechnical Drilling BORING MW.4
Groundwater Monitor Well Site: Proposed Sewer Lines148 Pioneer Drive
Acton, i& PROJECT NO. 09-0427Leorninster, MA 01453
978 840-0391 DATE: May 1, 2009
Ground Elevation: I GROUNDWATER OBSERVATIONSDate Started: April 30, 2009 I DATE I DEPTH CASING I STABILIZATION
Date Finished: April 30, 2009 I IDriller: MC I I I
Soil Engineer/Geologist: I I IDepth Casing Sample Visual Identification
Ft. bi/fi No. PlRec Depth BlowsI6” Strata of Soil and! or Rock Sample
Dry, loose, topsoil, root matter, forest material.I I 0-20” 3-3-3-2
2’O”
____________________________________________________
5 2 5’0”-7’0” 8-1-1-1 Wet, very soft black organics, root matter, roots.
80”
____________________________________________________
End of boring at 8’O.10 Set well point at 8’O”.
Water encountered at 2’O”.
15
20
25
30
35
39
Notes: Hollow Stem Auger Size - 4-1/4” with automatic hammer.
Cohesionless: 0 -4 V. Loose, 4- 10 Loose, Trace 0 to 10% CASING SAMPLE CORE TYPE
10 -30 M Dense, 30 -50 Dense, 50+ V Dense. Little 10 to 20% ID SIZE (IN) SS
Cohesive: 0 -2 V Soft, 2 -4 Soft, 4 -8 M Stiff Some 20 to 35% HAMMER WGT (LB) 140 lb.
8 -15 Stiff, 15 -30 V. Stiff, 30 + Hard. And 35% to 50% HAIvIMER FALL (IN) 30”
Attachment F
Ledge Quantity Calculations
LOW PRESSURE SEWERLEDGE QUANTITIES
LOCATION DEPTH1 WIDTH AREA LENGTH2 VOLUME3[FT] {FT] [SF] [FT] [CY]
MAINLINE
FLINT ROAD
B17 0 2.5 0
119 5.5B16 1 2.5 2.5
100 9.3B16÷100 1 2.5 2.5
__________
SUM= 14.8
TUTTLE DRIVE
B8+100 3 2.5 7.5
100 27.8B8 3 2.5 7.5
105 14.6B7 0 2.5 0
96 15.6B 6 3.5 2.5 8.75
104 16.9B5 0 2.5 0
__________
SUM 74.9
Bi 0 2.5 0
101 16.4B 20 3.5 2.5 8.75
100 32.4B 20 ÷ 100 3.5 2.5 8.75
____________
SUM = 48.8
TORRINGTON LANE
TUTTLE DRIVE 3.5 2.5 8.75
164 49.4B9 3 2.5 7.5
24 7.8BlO 4 2.5 10
189 61.3Bil 3 2.5 7.5
155 43.1END 3 2.5 7.5
____________
SUM= 161.6
MAINLINE SUBTOTAL (14.8 + 74.9 ÷ 48.8 + 161.6) = 300.1
LATERALS
1) Depth = 7 - Depth of Refusal2) Length = Length between locations3) Volume = (Average of Area) x Length / 27
LOW PRESSURE SEWERLEDGE QUANTITIES
LOCATION DEPTH1 WIDTH AREA LENGTH2 VOLUME3[FT] [FT] [SF] [FT] [CY]
FLINT ROAD
HOUSE #49 1 2.5 2.5 25 2.3HOUSE #48 1 2.5 2.5 25 2.3HOUSE #47 0.5 2.5 1.25 25 1.2HOUSE #50 0.5 2.5 1.25 25 1.2HOUSE #51 0.5 2.5 1.25 25 1.2
SUM= 8.2
TUTTLE ROAD
HOUSE #17 1.75 2.5 4.375 25 4.1HOUSE #21 1.75 2.5 4.375 25 4.1HOUSE #34 3 2.5 7.5 25 6.9HOUSE #29 1.75 2.5 4.375 25 4.1
SUM= 19.2
TORRINGTON LANE
HOUSE #7 4 2.5 10 25 9.3HOUSE #3 3 2.5 7.5 25 6.9HOUSE #5 3 2.5 7.5 25 6.9HOUSE #6 3 2.5 7.5 25 6.9HOUSE #4 3 2.5 7.5 25 6.9HOUSE #2 3 2.5 7.5 25 6.9
SUM = 43.8
LATERAL SUBTOTAL ( 8.2 + 19.2 ÷ 43.8) = 71.2
GRAND TOTAL(300.1 ÷71.2)= 371.3
1) Depth = 7 - Depth of Refusal2) Length = Length between locations3) Volume = (Average of Area) x Length /27
Attachment G
Indian Village Estimate
LOW PRESSURE SEWERESTIMATE BASED ONAWD INDIAN VILLAGE
Indian VillageDescription Quantity Unit Average Unit Price
Unit Price Total AmountWORK WITHIN THE RIGHT OF WAY
2 Inch PVC Pipe’ 11,420 LF $36.20 $413,404.00
2 Inch Gate Valve’ 16 EA $332.43 $5,318.88Manholes 16 EA $3,175.00 $50,800.00
Boulder Excavation2 100 CY $61.36 $6,136.00
Ledge Rock Excavation2 371 CY $120.00 $44,520.00
Gravel Borrow2 250 CY $16.67 $4,167.50
Gravel Subbase2 1,000 CY $16.94 $16,940.00
Ordinary Borrow2 200 CV $14.00 $2,800.00
Excavation of Unsuitable Material2 100 CV $16.60 $1,660.00
Exploratory Excavation2 25 CV $47.86 $1,196.50
Calcium Chloride2 25 50lb-Bag $45.70 $1,142.50Hay Bales and Silt Fence 360 LF $7.59 $2,732.40Trench Binder Pavement 13,008 LF $10.99 $142,957.92
Restoration of Growth2 1,000 SY $9.58 $9,580.0011/2 inch Corporation Stops 127 EA $711.78 $90,396.0611/2 Inch Service Pipe (25’ EA) 3,175 LF $33.20 $105,410.001 1/2 Inch Curb Stops and Boxes 127 EA $494.47 $62,797.69Police Details 1,200 HR $45.00 $54,000.00
SUM $1,015,959.45
ENGINEERING ($1,015,959.45 x 25%) $253,989.86
CONTINGENCY($1 015,959.45 x 10%) $101,595.95
SUBTOTAL ( $1,015,959.45 + $253,989.86 + $101,595.95) $1,371,545.26
TOWN OF ACTON MILLING AND PAVING $556,997.07
TOTAL ($1,371,545.26 + $556,997.07) $1,928,542.33
COST PER LOT ( $1,928,542.33 / 127) $15,185.37
WORK ON INDIVIDUAL LOTSFurnish and Install 1 EA $7,990.00 $7,990.00
COST PER LOT $7,990.00
TOTAL COST PER LOT ( $15,185.37 ÷ $7,990.00) $23,175.37
1 Adjusted the average and low unit prices by reducing the material cost from 6” ductile iron to 2’ PVC.2 Adjusted the average and low unit prices by excluding the unrealistically low bids
Low Pressure SewerAWD Unit Prices
Description2” PVC Pipe
11,420 LFPrice adjusted from ductile iron to pvc
PS Means 8’ Dl (331113.153040) $15.40RS Means 2’ PVC (33 1113.25 2120) $0.87
Difference $14.53
Unit Price = $50.73 - $14.53 = $36.20
2” Gate Valves and Boxes45 EA
Price adjusted from ductile iron to pvcRS Means 6’ Dl (33 12 16.10 3814) $650.00RS Means 2” PVC (22 05 23.60 3290) $103.00
Difference $547.00
Unit Price = $889.43 - $547 $342.43
Manholes16 EA
RS Means used for unit priceRS Means (G3030 210 1940) $3,475.00
Unit Price = $3,475.00
Boulder Excavation100 CY
Price adjusted to exclude low bids(90 + 50 + 50 + 50 + 50 + 50+ 50 + 100 + 60 + 50 + 75 ) /11
Unit Price = $61.36
Ledge Rock Excavation50 CY
The most conservative price (highest) was selected
Unit Price = $120.00
Gravel Borrow250 CY
Price adjusted to exclude low bids(10 + 15 + 15 + 22 + 14 + 14 + 10)/6
Unit Price = $16.67
Page 1 of 3
Low Pressure SewerAWD Unit Prices
DescriptionGravel Subbase
1,000 CYPrice adjusted to exclude low bids
(15+8+15+20+15+12+l0+11+l0+15+15+15+25+20+20+20+41+18)/is
Unit Price $16.94
Ordinary Borrow200 CY
Price adjusted to exclude low bids(10+10+10+20+20+ 14)16
Unit Price = $14.00
Excavation of Unsuitable Materials100 CY
Price adjusted to exclude low bids(15 + 20 + 15 + 23 + 10 )/5
Unit Price $16.60
Exploratory Excavation25 CY
Price adjusted to exclude low bids(75 + 20 + 50 + 25 + 25 + 20 + 100 + 25 + 10 + 120 + 100 + 15+ 10 + 75 ) / 14
Unit Price = $47.86
Calcium Chloride25 50-lb BG
Price adjusted to exclude low bids(20 + 50 + 50 + 75 + 25 + 25 + 20 + 50 + 100 + 35 + 45 + 50+i00+50+50+24+20+30+50+75+50+17+40)/23
Unit Price = $45.70
Trench Binder Pavement13,008 LF
Unit Price = $10.99
Restoration of Growth1,000 SY
Price adjusted to exclude low bids(10+5+5+6+11.70+8+6.50+15+ 19)/9
Unit Price = $9.58
Page 2 of 3
Low Pressure SewerAWD Unit Prices
Description1.5-Inch Corporation Stops
127 EAUse 2-Inch corportation stop
Unit Price = $71 1.78
1 .5-Inch Lateral Pipe3,175 LF
Use 2-Inch piping
Unit Price $33.20
1.5-Inch Curb Stops127 EA
Use 2-Inch curb stops
Unit Price = $494.47
Police Detail1,200 HR
Unit Price = $45.00
Page 3 of 3
BID
TA
BU
LA
TIO
NIN
DIA
NV
ILL
AG
EW
AT
ER
MA
INR
EP
LA
CE
ME
NT
AC
TO
NW
AT
ER
DIS
TR
ICT
AC
TO
N,
MA
BID
DA
TE
:M
AR
CH
19,
2008
Proi
aC
onst
ruct
ion
Inc.
CN
Cor
pR
icci
ardi
Bro
s.,
INC
.T
omar
eC
onst
ruct
ion
Cor
p.C
edro
neT
ruck
ing
Inc.
Ncc
dham
,M
AA
sson
et,
MA
Wor
cest
cr,
MA
Wat
erto
wn,
MA
Nor
thB
illcr
ica,
MA
BA
SE
BLD
No.
1N
o.2
No.
3N
o.4
No.
5he
n,A
vera
geU
nit
Tot
alU
nit
Tot
alU
nit
Tot
alU
nit
Tot
alU
nit
Tot
alN
a.D
escr
ipti
onQ
uant
ils’
Uni
tP
rice
Pri
ceA
mou
ntPr
ice
Am
ount
Pri
ceA
mou
ntP
rice
Am
ount
Pri
ceA
mou
ntIa
8’D
l.Pi
pe6,
200
LF.
550.
73S3
8.00
S23
5,60
000
$42.
00$2
60,4
00.0
0S5
5.00
S34
1,00
0.00
S50.
00S3
10,0
00.0
0S
54.5
0S
337,
900.
00lb
6”D
I.Pi
pe25
0L
.F.
544.
23$3
4.00
S8,
500.
00Sl
OO
.00
S25
,000
.00
Sl5
.00
S3,
750.
00S3
5.00
S8,
750.
00S3
’.OO
$8,0
00.0
02a
8”G
ate
Val
vean
dB
oxes
26BA
$1,1
30.6
7$8
50.0
0$2
2,10
0.00
$1,1
00.0
0$2
8,60
0.00
$825
.00
$21,
450.
00$9
50.0
0$2
4,70
0.00
$900
.00
S23
,400
.00
21,
6”G
ate
Val
vean
dB
oxes
ILE
A$8
89.4
3$6
50.0
0$7
,t50
.00
$800
.00
S8,
800.
00$6
00.0
0$6
,600
.00
$650
.00
S7,
t50.
00$6
50.0
0$7
,I50
.00
3oH
ydra
ntII
EA
$2,5
64.1
7$2
,100
.01’
$23,
100.
00$2
,400
.00
$26,
400.
00$1
,600
.00
$17,
600.
00$2
,725
.00
$29,
975.
00$2
,000
.00
$22,
000.
003b
Hyd
rant
Rem
oval
6E
A$2
75.1
0$0
.01
S0.0
6$3
00.0
0$1
,800
.00
$1.0
0$6
.00
$100
.00
$600
.00
$150
.00
$900
.00
4C
otsc
rete
Thr
ust
Blo
cks
50C
.Y.
$14.
04$0
.01
$0.5
0$0
.01
$0.5
0$0
.01
$0.5
0$0
.01
$0.5
0$0
.01
$0.5
05a
Bou
lder
Exe
avat
ion
100
C.Y
.$2
5.24
$0.0
1$1
.00
$0.0
1$1
.00
$0.0
1$1
.00
$30.
00$3
,000
.00
$0.0
1S
loe
SbL
edge
Roc
kE
xcav
atio
n25
0C
.Y.
$18.
07$6
0.00
S15,
000.
00$0
.01
$2.5
0$0
.01
$2.5
0$0
.01
$2.5
0$0
.01
$2.5
06a
Gra
vel
Bor
row
250
CV
.$3
.37
$0.0
1$2
.50
$0.0
1$2
.50
$0.0
1$2
.50
$0.0
1$2
.50
$10.
00S2
,500
.08
ohG
rave
lSu
bbas
e1,
000
C.Y
.$1
0.20
$15.
00$1
5,00
0.00
$0.0
1$1
0.00
$0.0
1$1
0.00
$0.0
1$1
0.00
$8.0
0$8
,000
.08
7O
rdin
ary
Bor
row
200
CV
.$2
.87
$0.0
1$2
.00
S0.O
l$2
.00
$0.0
1$2
.00
$0.0
1$2
.00
$0.0
1$2
.08
8E
xcav
alio
nofU
nsui
tabl
eMat
eria
l10
0C
V.
$2.8
4$0
.01
$1.0
0$0
.01
$1.0
0$0
.01
$1.0
0$0
.01
$1.0
0$0
.01
$1.0
89
Exp
lora
tory
Exc
avat
ion
25C
V.
$22.
54$0
.01
$0.2
5$0
.01
$0.2
5$0
.01
$0.2
5$0
.01
$0.2
5$0
.01
$0.2
510
Cal
cium
Chl
orid
e25
SOIb
-Bag
$36.
08$2
0.00
$500
.00
$50.
00$1
,250
.00
$0.0
1$0
.25
$50.
00$1
,250
.00
$75.
00$1
,875
.00
11H
ayB
ales
and
Silt
Fenc
e36
0L
,F.
$7.5
9$4
.00
Sl,
440.
00$4
.00
$1,4
40.0
0$6
.00
$2,1
60.0
0$6
.00
$2,1
60.0
0$6
.00
$2,1
60.0
012
Tre
nch
Bin
der
Pav
emen
t7,
000
L,F.
$10.
99$8
.00
S56,
000.
0t’
$6.5
0$4
5,50
0.00
$8.0
0$5
6,00
0.01
’$8
.50
$59,
500.
00S
ttO
O$7
7,00
0.00
13R
esto
rati
onof
Gro
wth
1,00
0S.
Y.
$3.6
6$1
.00
Sl,0
00.0
OSO
Ot
SlO
.00
S3.0
0S3
,ttO
O.0
0$0
.01
SlO
.00
Soot
Sl0
.00
t4a
I-in
chC
opor
atio
nSt
ops
71EA
S466
.33
$150
.00
SlO
,650
.00
$1,2
00.0
0$8
5,20
0.00
S50.
00S3
,550
.00
S300
.00
$21,
300.
00S5
25.O
0$3
7,27
5.00
l4b
1-iti
chSe
rvic
ePi
pe1,
500
L.F.
$20.
17$2
1.00
$31,
500.
00SO
Ot
Sl5.
OO
S18.
00$2
7,00
0.00
S20.
O0
$30,
000.
00$5
.00
$750
0011
14c
I-in
chC
urb
Stop
and
Box
71E
AS2
23.7
8$1
50.0
0Sl
O,6
50.0
0SO
Ot
S0.7
1$1
00.0
0$7
,100
.00
SI5O
.00
$10,
650.
0051
75.0
0S1
2,42
5.00
ISa
0-m
elt
Cor
pora
tion
Stop
sI
BA
$711
.78
$250
.00
S250
.00
Sl,2
00.O
0S
t,200
.00
$150
.00
Sl5
0.00
$300
.00
S300
.O0
S700
.O0
S700
.O0
151
2-its
clt
Serv
ice
Pipe
20L.
F.$3
3.20
$25.
00S5
00.0
O$0
.01
SO.2
0S
2500
S500
.00
$25.
00$5
00.0
0$5
.00
$100
.00
ISo
2-m
elt
Cur
bSt
opan
dB
oxI
EA
$494
.47
S250
.00
S250
.00
SOO
tSO
Ot
$250
.00
S250
.00
S250
.OO
$250
.00
$350
.00
$350
.00
16a
4-it
tclt
Ten
spor
aryB
ypas
s6,
000
L.F.
$6.9
0S5
.00
$30,
000.
00$5
.00
S30
,000
.00
$7.0
0$4
2,00
0.00
$4.5
0S2
7,00
0.O
OS3
.00
$18,
000.
00
tOb
2-in
cit
Tem
pora
ryB
ypas
s6,
000
L.F.
$4.7
4S3
.00
$180
0001
’$4
.00
S24,
000.
00S5
.OO
S30,
000.
00S4
.50
S27,
000.
O0
S2.0
0S
l2,0
00.0
0
LiSi
ltSa
cks
31E
AS9
0.99
$70.
00S2
,170
.0O
SOO
tS0
.31
$80.
00S2
,480
.00
S75.
00S2
,325
.OO
S75.
00S2
,325
.08
18Po
lice
Det
ails
1,20
0H
rs.
S45.
00$4
5.00
S54,
000.
O0
S45.
0O$5
4,00
0.00
S45.
OO
S54,
000.
00S4
5.00
$54,
000.
00S
45.0
0$5
4,00
0.08
BID
TO
TA
L$5
43,3
6731
8593
635
98$6
1861
600
$620
4387
586
35,5
7725
Ihe
reby
cert
ify
that
thin
isan
accu
rate
repr
esen
tati
on
of
the
bids
rece
ived
for
this
proj
ect:
Tño
mas
5.M
’añ
ann
a,IP
.IE.
3/21
/08
Tho
mao
3.M
ahan
na,
P.E
.D
ate
uidT
ahol
atio
nF
om,u
I,3/
2112
008
ST
AN
TE
Cta
g,
tu
6
Ih
ereb
yce
rtif
\jth
atth
isis
anac
cura
tere
pre
sen
tati
on
of
the
bid
sre
ceiv
edfo
rth
isp
roje
ct:
‘Tilo
mas
y._5
81ala
nna,_
!P.!
E.
_______
BED
TA
BU
LA
TIO
N
IND
IAN
VIL
LA
GE
WA
TE
RM
AIN
RE
PL
AC
EM
EN
TA
CT
ON
WA
TE
RD
IST
RIC
T
AC
TO
N,
MA
No.
6
BID
DA
TE
:M
AR
CH
19,
2008
N.
Gra
nese
&So
nsIn
c.SB
Gen
eral
Con
trac
ting
C.J
.D
oher
ty,
Inc.
Tom
Gio
ioso
Csn
st.
Inc.
DeF
elic
eC
orp.
Mar
bleh
ead,
MA
Wal
pole
,M
AM
edfo
rd,
MA
Roc
klan
d,M
AD
racs
t,M
AB
AS
EB
IDN
o.10
No.
7N
o.8
No.
9It
emA
vera
geU
nit
Tot
alU
nit
Tot
alU
nit
Tot
alU
nit
Tot
alU
nit
Tota
lN
o.D
escr
ipti
onQ
uant
iti’
Uni
tPr
ice
Pri
ceA
mou
ntP
rice
Am
ount
Pri
ceA
mou
ntP
rice
Am
ount
Pric
aA
mou
ntIa
8”D
.I.Pi
pe6,
200
LF.
$50.
73S4
9.00
S30
3,80
0.00
S49.
00S
303,
800.
00S
46.0
0S
285,
200.
00S4
900
S30
3,80
000
$58.
80S
364,
560
00lb
6”D
.l.
Pipe
250
L.F
.$4
4.23
$50.
00S
12,5
00.0
0S4
5.00
S1l
,250
.00
S50
.00
S12
,500
.00
$45.
00S
ll.2
50
.00
St5
.00
$3,7
50.0
02a
8”G
ate
Val
vean
dB
oxes
26E
A$1
,130
.67
Sl,
800.
00S
46,8
00.0
0$9
00.0
0$2
3,40
0.00
S820
.00
S2l
,320
.00
$975
.00
$25,
350.
00$8
00.0
0$2
0,80
0.00
2b“
Gat
eV
alve
and
Box
esII
PA$8
89.4
3$1
,200
.00
Sl3
,200
.00
$650
.00
$7,1
50.0
0S6
00,0
0$6
,600
.00
$725
.00
$7,9
75.0
0$2
,500
.00
$27,
500.
003a
Hyd
rant
IIE
A$2
,564
.17
$3,0
00.0
0S
33,0
00.0
9$2
,600
.00
$28,
600
$3,0
00.0
0$3
3,00
0.00
$2,1
00.0
0$2
3,10
0.00
$4,0
00.0
0$4
4,00
0.00
3bH
ydra
ntR
emov
al6
PA$2
75.1
0$5
0.00
$300
.00
$300
.00
$1,8
00.
$0.0
1$0
.06
$200
.00
$1,2
00.0
’)$5
0.00
$300
.00
4C
oncr
ete
Thr
ust
Blo
cks
50C
.Y.
$14.
04$0
.01
$0.5
0$0
.0$0
.$0
.01
$0.5
0$0
.0$0
.50
$0.0
$0.5
05a
Bou
lder
Exc
avat
ion
100
CV
.$2
5.24
$0.0
1$1
.00
$90.
00$9
,000
.$1
0.00
$1,0
00.0
0$5
0.00
$5,0
00.0
0$2
0.00
$2,0
00.0
0Sb
Led
geR
ock
Exc
avat
ion
250
CV
.$1
8.07
$0.0
1$2
.50
$0.0
1$2
.$8
0.00
$20,
000.
00$0
.01
$2.5
0S0
.0$2
.50
6aG
rave
lB
orro
w25
0C
V.
$3.3
7$1
0.00
$2,5
00.0
0$0
.01
$2.
$15.
00$3
,750
.00
$0.0
1$2
.50
$0.0
$2.5
06b
Gra
vel
Stib
base
1,00
0C
.Y.
$10.
20$1
5.00
$15,
000.
00$2
0.00
$20,
000.
$15.
00$1
5,00
0.00
$12.
00$1
2,00
0.00
S0.0
$10.
007
Ord
inar
yB
orro
w20
0C
.Y.
$2.8
7$1
0.00
$2,0
00.0
0$0
.01
$2.
$10.
00$2
,000
.00
$0.0
1$2
.00
$0.0
$2.0
08
Exc
avat
ion
ofU
nsai
tabl
eM
ater
ial
100
C.Y
.$2
.84
$0.0
1$1
.00
$0.0
1$1
.$1
5.00
$1,5
00.0
0$0
.01
$1.0
0$0
.0$1
.00
9E
xplo
rato
ryE
xcav
atio
n25
C.Y
.$2
2.54
$0.0
1$0
.25
$75.
00$1
,875
$20.
00S5
00.O
0$5
0.00
$1,2
50.0
0$5
.00
$125
.00
10C
alci
unt
Cltl
orid
e25
SOIb
-Bag
$36.
08$3
0.00
$750
.00
$25.
00$6
25.
$25.
00$6
25.0
0$0
.0$0
.25
$20.
00$5
00.0
0II
Hay
Bal
esan
dSi
ltFe
nce
360
L.F.
$7.5
9$7
.00
$2,5
20.0
0$6
.00
$2,1
60.
$5.0
0S
l,800
.00
$5.0
0$1
,800
.00
$5.2
5$1
,890
.00
12T
renc
hB
inde
rPa
vem
ent
7,00
0L
.F.
$10.
99$7
.00
S49
,000
.00
$8.0
0$5
6,00
0.$8
.00
$56,
000.
00$9
.00
$63,
000.
00$6
.00
$42,
000.
0013
Res
tora
tion
ofG
row
tt,
1,00
0S.
Y.
$3.6
6$1
.50
$1,5
00.0
0S0
.01
$10.
00$1
0.00
$10,
000.
00S0
.01
$10.
00S0
.Ol
SI0
.00
l4a
‘-in
chC
opor
atio
nSt
ops
71E
A$4
66.3
3S7
00.0
OS
49,7
00.0
0$3
50.0
0$2
4,85
0.00
S350
.00
S24
,850
.00
S90
0.00
S63
,900
.00
$850
.00
S60
,350
.00
14b
I-in
chSe
rvic
ePi
pe1,
500
L.F.
$20.
17S0
.50
$750
.00
$15.
00S2
2,50
0.00
$20.
00$3
0,00
0.09
S10,
00$1
5,00
0.00
$1.0
0$1
,500
.00
l4c
I-in
chC
urb
Stop
and
Box
71PA
$223
.78
$100
.00
$7,1
00.0
0$1
50.0
0S
l0,6
50.0
0S4
00.0
0$2
8,40
0.09
S250
.00
$17,
750.
00S
l50.
00S
l0,6
50.0
0IS
a2-
inch
Cor
pora
tion
Stop
s1
LA
$711
.78
S900
.00
S900
.00
$700
.00
$700
.00
Sl,
000.
00$1
,000
.00
S1,
500.
00S
l,50
0.00
$500
.00
$500
.00
l5b
2-in
chSe
rvic
ePi
pe20
LF
.$3
3.20
$2.0
0$4
0.00
$30.
00$6
00.0
0$4
5.00
$900
.00
$30.
00$6
00.0
0$2
.00
$40.
00IS
o2-
inch
Cur
bSt
opan
dB
oxI
EA$4
94.4
7$3
00.0
0$3
00.0
0$3
00.0
0S3
00.0
0$9
00.0
0$9
00.0
0S5
00.0
0S5
00.0
0$2
00.0
0$2
00.0
016
a4-
met
sT
empo
rary
Byp
ass
6,00
0L
.F.
$6.9
0$8
.00
S48
,000
.00
$7.0
0S4
2,00
0.00
$3.5
0$2
1,00
0.00
S7.0
0S4
2,00
0.00
S5.0
0S3
0,00
0.00
l6b
2-in
chT
entp
orat
yB
ypas
s6,
000
LF
.$4
.74
$0.0
1$6
0.00
$5.0
0S
30,0
00.0
0$3
.50
$21,
000.
00S2
,00
$12,
000.
00S0
.Ol
S60.
0017
Sil
tSac
ks31
PA
$90.
99S6
0.00
$1,8
60.0
0$0
.01
S0.
3l$0
.01
S0.3
1S5
0,00
$1,5
50.0
0S
l.00
S3l
.00
18Po
lice
Det
ails
1,20
0H
is.
$45.
00$4
5.00
$54,
000.
00$4
5.00
$54,
000.
00S4
5.00
$54,
000.
00S
45.0
0$5
4,00
0.00
S45
.00
$54,
000.
00
BID
TO
TA
L$6
4558
525
8651
278
81$6
5284
$87
$664
543
7586
6478
450
Thom
asJ.
Mah
ann
a,P
.E.
3/21
/08
Dat
e
Oid
Tab
olat
,uo
For
mat
s3/
2)12
0u5
ST
AN
TE
CPa
ge2
of6
BID
TA
BU
LA
TIO
N
IND
IAN
VIL
LA
GE
WA
TE
RM
AIN
RE
PL
AC
EM
EN
TA
CT
ON
WA
TE
RD
IST
RIC
TA
CT
ON
,M
A
Ven
tres
ca,
Inc.
Spin
elli
Dev
elop
men
tC
orp.
Ston
eham
,M
AN
orth
boro
ugh,
MA
‘.14
‘5
Ihe
reby
cert
i1i
that
this
isan
accu
rate
repr
esen
tatio
no
fthe
bids
rece
ived
for
this
proj
ect:
Tho
mas
5.9ta
lian
na,
fE..
3/21
/08
Dat
e
InD
l.P
ine
BtD
DA
TE
:M
AR
CH
19,
2008
C.J
.P.
&So
nsC
onst
.C
o.,
Inc.
Oli
veir
aC
onst
ruct
ion,
Inc.
Car
acas
Con
si.
Cor
p.
Mili
s,M
ASo
mer
set
Lud
low
,M
AB
ASE
BID
No.
11N
o.12
No.
13
6200
t,-1
$50.
73$4
9.13
$303
,800
.$4
8.00
$297
,600
.00
$47.
00$2
9140
0.00
$57.
50S
356,
500.
0054
8.00
5297
,600
.00
—
—A
rera
geU
izit
Tot
alU
nit
Tot
alU
nit
Tot
alN
o.D
,’rc
ripl
ion
2ua,
zrjtv
U,
—P
rice
Pri
ce.-l
m,,u
ntl’
rice
Am
ount
Pri
ceA
mou
nt
tb6”
Dl.
Pipe
250
LF
$44.
2355
000
$12,
500
$1.0
0$2
50.0
0$3
5.00
$8,7
50.0
0$4
9.00
$12,
250.
00$5
0.00
$12,
500.
002x
8”G
ate
Val
vean
dB
oxes
26E
AS
1,13
0.67
S900
.l10
S23,
400
Sl,
450.
00S
37,7
00.0
0S
I,40
0.00
S36
,400
.00
S975
.00
S25
,350
.00
S1,
200.
00S
31,2
00.0
02b
6”G
ate
Val
vean
dB
oxes
IIE
AS8
89.4
3S8
00.0
0$8
,800
.S
725.
00$7
,975
.00
Sl,
000.
00SI
1,00
0.0’
)S
800.
00$8
,800
.00’
$1,0
00.0
1$1
1,00
0.00
3aH
ydra
ntII
EA
$2,5
64.1
7$2
,200
.00
S24,
200.
S2,
400.
00$2
6,40
0.00
S2,
600.
00S
28,6
00.0
0$2
,700
.00
$29,
700.
00S
3,00
0.00
$33,
000.
003b
Hyd
rant
Rem
oval
6E
A$2
75.1
0S
400.
00$2
,400
.00
S1.0
0S6
.00
$350
.00
$2,1
00.0
0$2
00.0
0$1
,200
.00
S40
0.00
S2,
400.
004
Con
crct
eThr
astB
lock
s50
CV
.$1
4.04
SOO
t$0
.50
S0.
0l$0
.50
$0.0
S0.5
0$1
.00
$50.
00SO
Ot
$0.5
05a
Bou
lder
Exc
avat
ion
tOO
CV
.$2
5.24
$0.0
1$1
.00
$0.0
1$1
.00
$50.
00$5
,000
.00
$1.0
0$1
00.0
0$0
.01
$1.0
0Sb
Led
geR
ock
Exc
avat
ion
250
CV
.$1
8.07
$0.0
1$2
.50
So
ol
$2.5
0$0
.0S2
.50
$1.0
0$2
50.0
0S
120.
00$3
0,00
0.01
)
6aG
rave
lB
orro
w25
0C
V.
$3.3
7$0
.01
$2.5
0S0
.Ol
$2.5
0$0
.0S2
,50
St.
00$2
50.0
0$0
.01
$2.5
06b
Gra
vel
Sub
base
1,00
0C
V.
$10.
20$1
0.00
$10,
000.
00$1
1.00
$11,
000.
00S0
.0S1
0,00
$1.0
0S
1,00
0.00
SO.O
lSl
0.O
O7
Ord
inar
yBor
row
200
C.Y
.$2
.87
$0.0
S2.0
0S
0.0l
S2.O
OS0
.0S2
.00
$1.0
0S
200.
00$1
0.00
$2,0
00.0
0
8_
Exc
avat
ion
ofU
nsai
tabl
eM
ater
ial
100
CV
.$2
.84
$0.0
$1.0
0S
0.0I
$1.0
0$2
0.00
$2,0
00.0
’)S
I.$1
00.0
0S0
.Ol
$1.0
9‘)
xplo
rato
iyE
xcav
atio
n25
C.Y
.$2
2.54
$0.0
$0.2
5$0
.01
S0.2
5$2
5.00
$625
.00
$25.
$625
.00
$0.0
1$0
.2
10C
alci
umC
hlor
ide
2550
1b-B
ag$3
6.08
$50.
00$1
,250
.00
$100
.00
$2,5
00.0
0$3
5.00
$875
.00
SI.
$25.
00$0
.01
$0.2
ItH
ayB
ales
and
Silt
Fenc
e36
0L
.F.
$7.5
9$6
.00
$2,1
60.0
0$6
.00
$2,1
60.0
0$1
1.00
$3,9
60.0
0S
t.$2
,880
.00
$20.
00$7
,200
.0
12T
renc
hB
inde
rPav
emen
t7,
000
L.F
.$1
0.99
S9.5
0$6
6,50
0.00
$12.
00$8
4,00
0.01
)$1
3.00
$91,
000.
0’)
$8.0
$56,
000.
00$1
4.00
598,0
000
13R
esto
ratio
nof
Gro
wth
1,00
0S.
V.
$3.6
6$5
.00
$5,0
00.0
0$1
.00
$1,0
00.0
0$5
.00
$5,0
00.0
051
.51
,000
.00
$0.0
1$1
0.0
14a
1-in
chC
opor
atio
nSt
ops
71E
A$4
66.3
3$5
50.0
0$3
9,05
0.00
$700
.00
$49,
700.
00$1
70.0
0$1
2,07
0.00
$450
.$3
1,95
0.00
$300
.00
$21,
300.
0
t4b
I-in
chSe
rvic
eP
ipe
1,50
0L
.F.
$20.
17$1
8.00
$27,
000.
00$0
.50
$750
.00
$17.
00$2
5,50
0.00
$18.
$27,
000.
00$2
0.00
$30,
000.
0
t4c
1-in
chC
urb
Stop
and
Box
71E
A$2
23.7
8$3
50.0
0$2
4,85
0.00
$50.
00$3
,550
.00
$275
.00
$19,
525.
00$1
00-
0$7
,100
.00
$300
.00
$21,
300.
00
iSa
2-in
chC
orpo
ratio
nSt
ops
1E
A$7
11.7
8$7
50.0
0$7
50.0
0$1
,000
.00
$1,0
00.0
0$4
20.0
0$4
20.0
0$1
,000
.$1
,000
.00’
$0.5
0$0
.5
tsb
2-in
chSe
rvic
eP
ipe
20L
.F.
$33.
20$2
5.00
$500
.00
$2.0
0$4
0.00
$50.
00$1
,000
.0’)
$25.
$500
.00
$50.
00$1
,000
.0
l5c
2-in
chC
urb
Stop
and
Box
1E
A$4
94.4
7$4
50.0
0$4
50.0
0$2
50.0
052
50.0
0$6
50.0
0$6
50.0
0$3
25.
$325
.00
$400
.02
$400
.0I6
a4-
incl
iTem
pora
ryB
ypas
s6,
000
L.F
.$6
.90
S6.0
0$3
6,00
0.00
$9.0
0$5
4,00
0.00
$7.0
0$4
2,00
0.00
56.
S36,
000.
O0
$3.0
0$1
8,00
0.00
16b
2-io
chT
empo
raiy
Byp
ass
6,00
0L
.F.
$4.7
4S5
.0O
$30,
000.
00$7
.00
$42,
000.
00$5
.00
$30,
000.
00$5
.00
$30,
000.
00$3
.00
$t8,
000.
00
17Si
ltSa
cks
31E
A$9
0.99
$70.
00$2
,170
.00
510.
00$3
10.0
0S
t50.
00$4
,650
.00
$45.
00$1
,395
.00
$3.5
8$1
10.9
8t8
Polic
eD
etai
ls1,
200
Hrs
.$4
5.00
$45.
00$5
4,00
0.00
545,
00$5
4,00
0.00
$45.
00$5
4,00
0.00
$45.
00$5
4,00
0.00
$45.
00$5
4,00
0.00
BID
TO
TA
L$6
7478
975
$676
200
75$6
7654
250
5685
550
00$6
8903
700
Tho
mas
J.M
ahan
na,
P.E
.
ai,t
T,b
ula
tta,
I’orm
.xI,
3/21
/200
8S
TA
NT
EC
Pat
e3
of6
Ihe
reby
cert
ify
that
this
isan
accu
rate
repr
esen
tati
on
of
She
bids
rece
ived
for
this
proj
ect:
¶lii
omas
9._9
i1añ
amna
,_P
.E.
_______
BID
TA
BU
LA
TIO
NIN
DIA
NV
ILL
AG
EW
AT
ER
MA
INR
EP
LA
CE
ME
NT
AC
TO
NW
AT
ER
DIS
TR
ICT
AC
TO
N,
MA
BID
DA
TE
:M
AR
CH
19,
2008
Frei
tas
Con
stru
ctio
n,In
c.B
lum
eC
onst
ruct
ion
Inc.
A.
And
reas
si&
Son,
tan.
N.
Cib
olti
,In
c.Fi
veO
aks
Con
st.
Co.
,In
c.Lu
dlow
Wal
pole
,M
AN
orw
ood,
MA
Bra
intrc
c,M
AG
roto
n,M
AB
AS
EB
IDN
o.16
No.
17N
o.18
No.
19N
o.20
Item
Ave
rage
Uni
tT
otal
Uni
tT
otal
Uni
tT
orn!
Uni
tT
otal
Uni
tT
otal
Ma.
Dcc
ript
ion
Qua
ntit
yU
nit
Pri
ceP
rice
Am
ount
Pri
ceA
mou
ntP
rice
Am
ount
Pri
ceA
mou
ntP
rice
Am
ount
Ia8”
DI.
Pip
e6,
200
LF
$50.
73S5
400
S334
,800
.0O
S50.
0OS
310,
000
00S5
5.0O
S34
l,550
.0O
S45.
0OS
279,
000.
00$4
9.00
S303
,800
.0O
lb6”
Dl.
Pip
e25
0L
.F.
$44.
23S5
0.00
Sl2
,500
.00
S50.
00S
l2,5
00.0
0S
l00.
00S
25,0
50.s
0S4
5.00
Sll
,25
0.0
0S
l2.0
0$3
,000
.00
2a5”
Gat
eV
alve
and
Box
es26
BA
$1,1
30.6
7$1
,250
.00
$32,
500.
00S8
00.0
0$2
0,80
0.00
Sl,
550.
00$2
6,00
0.00
$1,0
00.0
0$2
6,00
0.00
$2,0
00.0
0$5
2,00
0.00
2b6
Gat
oV
alve
and
Box
esII
EA
$889
.43
$800
.00
$8,8
00.0
0$6
00.0
0$6
,600
.00
$800
.00
ss,so
o.oo
$1,0
00.0
0S
t1,
000.
00$1
,500
.00
$16,
500.
003a
Hyd
rant
IIB
A$2
,564
.17
$2,8
00.0
0$3
0,80
0.00
$2,5
00.0
0$2
7,50
0.00
$2,5
00.0
3$2
7,50
0.00
$2,5
00.0
0$2
7,50
0.00
$3,0
00.0
0$3
3,00
0.00
3bH
ydra
ntR
emov
al6
BA$2
75.1
0$3
00.0
0$1
,800
.00
$100
.00
$600
.00
$200
.00
$1,2
00.0
0$1
00.0
0$6
00.0
0$3
00.0
0$1
,800
.00
4C
oncr
ete
Thr
ust
Blo
cks
50C
V.
$14.
04$0
.01
$0.5
0$0
.01
$0.5
0$0
.01
$0.5
0$0
.01
$0.5
0$0
.01
$0.5
0Sa
Bou
lder
Bxc
avat
ion
100
C.Y
.$2
5.24
$0.0
1$1
.00
$50.
00S
5,00
0.00
$0.0
1$1
.00
$0.0
1$1
.00
$50.
00$5
,000
.00
SbL
edge
Roc
kE
xcav
atio
n25
0C
V.
$18.
07$0
.01
$2.5
0$5
0.00
$12,
500.
00$0
.01
$2.5
0$0
.01
$2.5
0$0
.01
$2.5
06a
Gra
vel
Bor
row
250
CV
.$3
.37
$0.0
1$2
.50
$0.0
1$2
.50
$0.0
1$2
.50
$0.0
1$2
.50
$0.0
1$2
.50
6bG
rave
lS
ubba
se1,
000
CV
.$1
0.20
$0.0
1$1
0.00
$0.0
1$1
0.00
$10.
00$1
0,00
0.00
$15.
00$1
5,00
0.00
$15.
00$1
5,00
0.00
7O
rdin
ary
Bor
row
200
C.Y
.$2
.87
$0.0
1$2
.00
$0.0
1$2
.00
$0.0
1$2
.00
SOO
t$2
.00
$0.0
1$2
.00
8E
xcav
atio
nof
Uns
uita
ble
Mat
eria
l10
0C
V.
$2.8
4$0
.01
$1.0
0$0
.01
$1.0
0$0
.01
$1.0
0$0
.01
$1.0
0$0
.01
$1.0
09
“]sp
lora
tary
Exc
avat
ion
25C
.Y.
$22.
54$2
0.00
$500
.0$1
00.0
0$2
,500
.00
$0.0
150
.25
$25.
00$6
25.0
0$0
.01
$0.2
510
Cal
cinr
nC
hlor
ide
25SO
Ib-B
ag$3
6.08
$45.
00$1
,125
’]$5
0.$1
,250
.00
$100
.$2
,500
.03
$50.
00S
l,2
50
00
$50.
00$1
,250
.00
IIH
ayB
ales
and
Silt
Fcttc
c36
0L
.F.
$7.5
9$8
.50
$3,0
60.0
$10.
$3,6
00.0
$6.
$2,1
60.0
$7.
$2,5
20’]
$6.5
0$2
,340
.00
12T
renc
hB
inde
rP
avem
ent
7,00
0L.
F.$1
0.99
$15.
00S
l05,
000.
0$1
2.$8
4,00
0.0
S9.
$63,
000.
0$1
1.$8
0,50
0.0
$10.
00$7
0,00
0.00
13R
esto
ratio
nof
Gro
wtls
1,00
0S.
Y.
$3.6
6S3
.00
S3,0
00.0
SO.
$10.
0S2
.S2
,000
.0SO
.$1
0.0
$2.0
0$2
,000
.00
l4a
1-iti
cli
Cop
orat
ion
Stop
s71
EA
$466
.33
$150
.00
S10
,650
,0S5
00.
S35
,500
,0$4
00.
S28
,400
.0S5
00.
$35,
500.
0$8
00.0
0S
56,8
00.0
014
bI-
inch
Serv
ice
Pip
e1,
500
L.F
.$2
0.17
$23.
00$3
4,50
0.0
$10.
$15,
000.
0S2
0.$3
0,00
0.0
$25.
S37
,550
.0S
10.0
0$1
5,00
0.00
14c
I-in
chC
urb
Stop
and
Box
71E
A$2
23.7
8$2
50.0
0$1
7,75
0.0
$100
.$7
,100
.0$5
00.
$35,
500.
0$3
00.
$21,
300.
0$1
00.0
0$7
,100
.00
ISa
2-in
chC
orpo
rati
onS
tops
IE
A$7
11.7
8$2
50.0
0S2
50.0
$800
.S8
00.0
$1,0
00.
$1,0
00.0
SlO
b.
$1,0
00.0
$1,0
00.0
0S
1,00
0.00
lsb
2-in
chSe
rvic
eP
ipe
20L
.F.
$33.
20$4
5.00
$900
.0$5
0.$1
,000
.0$5
0.$1
,000
.052
5.$5
00.0
$20.
00$4
00.0
0
15c
2-io
chC
arb
Stop
and
Box
iEA
$494
.47
$600
.00
$600
.0$5
0R$5
00.0
$1,0
00.
$1,0
00.0
$500
$500
.0$3
00.0
0S
300.
00lO
u4-
inch
Tcn
tpor
aiy
Byp
ass
6,00
0L
.F.
$6.9
0$4
.50
$27,
000.
0S8
.S
48,0
00,0
$3.
$18,
000.
0$9
.$5
4,00
0.0
$9.0
0S5
4,00
0.00
16b
2-in
chT
empo
rary
Byp
ass
6,00
0L
.F.
$4.7
4S2
.00
S12
,000
.0S
i.S
42,0
00,0
S3.
$18,
000.
0S7
.S
42,0
00.0
S2.0
0S
12,0
00.0
0
17Si
ltSa
cks
31E
A$9
0.99
S75.
00S
2,32
5.00
$200
.00
$6,2
00.0
0$1
00.0
0$3
,100
.00
$100
.00
$3,1
00.0
0$5
0.00
Sl,
550,
0018
Pol
ice
Det
ails
1,20
0H
rs.
$45.
00$4
5.00
S54
,000
.00
S45.
00$5
4,00
0.00
S45.
00$5
4,00
0.00
$45.
00S
54,0
00.0
0$4
5.00
S54
,000
,00
BID
TO
TA
L$6
9387
950
$696
976
00$6
9916
975
$704
664
50$7
0784
875
Tho
mas
J.M
ahan
na,
P.E
.
3/2
1/0
8
Dat
e
t3id
Tab
alat
ios
For
m.s
ls31
2t12
000
ST
AN
TE
CP
ag,4
at6
BID
TA
BU
LA
TIO
NIN
DIA
NV
ILL
AG
EW
AT
ER
MA
INR
EP
LA
CE
ME
NT
AC
TO
NW
AT
ER
DIS
TR
ICT
AC
TO
N,
MA
BID
DA
TE
:M
AR
CH
19,
2008
Blu
eD
iam
ond
Equ
ip.
Co.
LL
C.
Gre
ener
Exc
avat
iong
LL
CC
ape
Ann
Equ
ipm
ent,
LL
C.
J.A
.P
olit
o&
Sons
Inc.
I.E.A
mor
ello
Inc.
Foxb
oro,
MA
Low
ell,
MA
Nor
thA
ndov
er,
MA
Shre
wsb
ury,
MA
Wor
cest
er,
MA
BA
SE
BID
No.
21N
o.22
No.
23N
o.24
No.
25D
ent
Ave
rage
UnI
tT
otal
U,u
tT
otal
UnI
tT
otal
Uni
tT
otal
flitI
tT
otal
No.
Des
crip
tion
Qua
nti0
’U
nit
Pri
cePr
ice
Am
ount
Pri
ceA
mou
ntP
rice
A,n
oul
Pri
ceA
mou
ntP
rice
Am
ount
Ia“
Dl.
Pipe
6,20
0L
.F.
$50.
73S4
2.00
S260
,400
.’)53
9.00
S24
1,80
0S5
1.O
OS
3l6,
200
$45.
00S2
79,0
00.O
OS5
9.O
0S3
65,8
00.O
Olb
‘D
l.Pi
pe25
0L
.F.
$44.
23S
40.0
0$1
0,00
0.0
$38.
00S9
,500
.$4
0.00
S10
,000
.S4
0.O
OSl
O,0
00.0
’)S
25.0
0$6
,250
.01
2a“
Gat
eV
alve
and
Box
es26
EA
$1,1
30.6
7S
900.
00S
23,4
00.0
S900
.0O
S23,
400.
$1,6
00.0
054
1,60
0.S
l,00
0.00
S26
,000
.00
$1,0
75.0
0$2
7,95
0.00
2b“
Gat
eV
alve
and
Box
esIt
EA
$889
.43
$700
.00
S7,7
00.0
$750
.00
$8,2
50.
Sl,
300.
00S
l4,3
00.
$700
.00
57.7
0000
$825
.00
S9,
075.
003a
Hyd
rant
IIE
A$2
,564
.17
S2,
000.
00S
22,0
00.0
S2,
200.
00S2
4,20
0.$3
,000
.00
S33
,000
.$2
,200
.00
$24,
200.
00S
2.50
0.00
S27
,500
.00
3bH
ydra
ntR
emov
al6
EA
$275
.10
S500
.00
S3,0
00.l)
SI,
500.
00$9
,000
.S
t,00
0.00
$6,0
00.
StO
O.0
OS6
00.0
0S
t.00
$6.0
04
Con
cret
eT
hrus
tB
lock
s50
C.Y
.S1
4.04
S0.
0l$0
.5SI
10.0
055
,500
.SO
Ot
SO.
$0.0
1$0
.50
$0.0
1$0
.50
5aB
onld
erE
xcav
atio
n10
0C
.Y.
$25.
24$5
0.00
$5,0
00.0
$20.
00$2
,000
.$5
0.00
$5,0
00.
$100
.00
$10,
000.
00$6
0.00
$6,0
00.0
0Sb
Led
geR
ock
Exc
avat
ion
250
C.Y
.$1
8.07
$50.
00$1
2,50
0.0
S40.
O0
$10,
000.
$0.0
1$2
.$5
0.00
$12,
500.
00$0
.01
$2.5
06a
Gra
vel
Bor
row
250
C.Y
.$3
.37
$15.
00$3
,750
.0$2
2.00
$5,5
00.
$0.0
1$2
$0.0
1S2
.50
$14.
00$3
,500
.00
6b(‘
rave
lSu
bbas
e1,
000
C.Y
.$1
0.20
$15.
00$1
5,00
0.0
$25.
00$2
5,00
0.$2
0.00
$20,
000.
$0.0
1$1
0.00
$0.0
1$1
0.00
7O
rdin
aryB
orro
w20
0C
V.
$2.8
7$0
.0$2
.0$2
0.00
$4,0
00.
$0.0
1$2
.$0
.01
$2.0
0$1
.00
$200
.00
8E
xcav
atio
nofU
nsui
tabl
eMat
eria
l10
0C
V.
$2.8
4$1
5.00
$1,5
00.0
0$2
3.00
$2,3
00.0
0$0
.01
$1.0
0$0
.01
$1.0
0$1
.00
$100
.00
9E
xplo
rato
ryE
xcav
atio
n25
CV
.$2
2.54
$10.
00$2
50.0
0$1
20.0
0$3
,000
.00
$100
.00
$2,5
00.0
0$0
.01
$0.2
5$1
.00
$25.
0010
Cal
cium
Chl
orid
e25
501b
-Bag
$36.
08$0
.01
$0.2
5$2
4.00
$600
.00
$20.
00S5
00,0
0$3
0.00
$750
.00
$50.
00$1
,250
.00
11H
ayB
ales
and
Silt
Fenc
e36
0L
.F.
$7.5
9$1
0.00
$3,6
00.0
0$6
.00
$2,1
60.0
0$9
.00
$3,2
40.0
0$7
.50
$2,7
00.0
0$8
.00
$2,8
80.0
012
Tre
nch
Bin
der
Pav
cmca
t7,
000
L.F.
$10.
99S9
.0O
$63,
000.
00$1
6.00
$112
,000
.00
$15.
00$1
05,0
00.0
0$1
9.00
$133
,000
.00
$13.
25$9
2,75
0.00
13R
esto
rati
onof
Gro
wth
1,00
0S.
Y.
$3.6
6S6
.0O
56,0
00.0
0SI
1.70
$11,
700.
00S8
.O0
58,0
00.0
0S6
.50
$6,5
00.0
0$4
.00
S4,0
00.0
O14
a1-
inch
Cop
oral
ion
Stop
s71
EA
$466
.33
$500
.00
$35,
500.
0053
00.0
0$2
1,30
0.00
$350
.00
S24,
850.
0O$3
00.0
0$2
1,30
0.00
S725
.O0
SS
t,475
.0O
14b
1-in
chSe
rvic
ePi
pe1,
500
L.F
.S2
0.17
$10.
00$1
5,00
0.00
S45.
O0
S67.
500.
OO
$45.
00S6
7,50
0.O
fl$4
0.00
S6O
,000
.O’l
$21.
00$3
1,50
0.01
14e
I-in
chC
urb
Stop
and
Box
71E
A$2
23.7
8$5
00.0
0$3
5,50
0.05
$300
.00
$21,
300.
01$3
00.0
0$2
1,30
0.00
$300
.00
$21,
300.
01$1
50.0
0$1
0,65
0.00
ISu
‘-in
chC
orpo
rati
onS
lops
IE
AS7
11.7
8$5
00.0
0S5
00.0
O$5
75.0
0S5
75.O
0S4
00.0
OS4
00.0
O$5
00.0
0S5
00.0
O$7
00.0
0S7
00.O
015
b2-
inch
Serv
ice
Pipe
20L
.F.
$33.
20$5
0.00
$1,0
00.0
0$7
5.00
S1,5
00.O
0$3
0.00
S600
.OO
S40.
OO
S800
.0O
S60.
0OSI
,200
.OO
ISc
2-in
chC
urb
Stop
and
Box
IE
A$4
94.4
7SI
,000
.O0
SI00
0.00
S650
.0O
$650
.00
S300
.0O
$300
.00
S500
.OO
$500
.00
$800
.00
$800
.00
lOu
4-in
chT
empo
rary
Byp
ass
6,00
0L
.F.
$6.9
0$1
0.00
$60,
000.
00$6
.50
$39,
000.
00S6
.00
$36,
000.
00$8
.50
$51,
000.
00$8
.00
$48,
000.
0016
b2-
inch
Tem
pora
ryB
ypas
s6,
000
L.F.
$4.7
4$1
0.00
$60,
000.
0056
.00
536,
000.
0050
.01
$60.
00$7
.50
$45,
000.
00$7
.00
$42,
000.
0017
Sil
tSa
cks
31E
A$9
0.99
$600
.00
$18,
600.
00S2
00.0
O$6
,200
.00
5001
$0.3
110
0.00
$3,1
00.0
0$9
0.00
$2,7
90.0
018
Pol
ice
Det
ails
1,20
0B
ra.
$45.
00$4
5.00
$54,
000.
00$4
5.00
$54,
000.
00$4
5.00
$54,
000.
00$4
5.00
$54,
000.
00$4
5.00
$54,
000.
00
BID
TO
TA
L—
$718
,202
.7$7
47,9
35.0
$170
,358
.8$7
70,4
66.2
$790
,414
01
Iher
eby
cert
ify
that
thin
inan
accu
rate
repr
esen
latio
nof
the
bids
rece
ived
for
this
proj
ecl:
2il
om
tzsj
.9i(
añan
na,
fI’.
E.
3/2
1/0
8
Tho
mas
J.M
ahan
na,
P.E
.D
ate
fl,d
tabu
loii
onF
oros
sIs
312
1120
n8S
TA
NT
EC
Fogs
5of
6
BID
TA
BU
LA
TIO
NIN
DIA
NV
ILL
AG
EW
AT
ER
MA
INR
EP
LA
CE
ME
NT
AC
TO
NW
AT
ER
DIS
TR
ICT
AC
TO
N,
MA
BID
DA
TE
:M
AR
CH
19,
2008
FE
DC
orp.
Mor
iart
y&
Sons
,In
c.Jo
seph
P.G
ardi
llo
&So
n.In
c.V
.P. H
oman
Con
st.,
Inc.
J.C
ougl
er,
Inc.
Ded
ham
,M
AN
orth
And
over
,M
AW
akef
ield
,M
AL
eom
inst
er,
MA
Wor
cest
er,
MA
BA
SE
BID
No.
26N
o.27
No.
28N
o.29
No.
30H
emA
vera
geU
nit
Tot
alU
nit
Tot
alU
nit
Tot
alU
nit
Tot
alU
nit
Tot
alM
a.D
escr
iptio
nQ
iU
nit
Pri
cePr
ice
Am
ount
Pri
ceA
mou
ntP
rice
Am
ount
Pric
eA
mou
ntP
rice
Am
ount
Ia8”
DI.
Pipe
6,20
0L
F.$5
0.73
S53
00S3
28,6
00.O
0S7
0.00
5434
,000
.00
$70.
00S4
34,0
00.0
0$4
3.00
S266
,600
.00
S56.
0OS3
47,2
00.O
0lb
6”D
.l.Pi
pe25
0L,
F.$4
4.23
S68,
00S1
7,00
0.00
S50.
00$1
2,50
0.00
$30.
00S7
,500
.00
$83.
00S2
0,75
0.00
S50.
00$1
2,50
0.00
2a8”
Gat
eV
alve
and
Box
es26
BA
$1,1
30.6
7$1
,100
.00
$28,
600.
00S
l,200
.00
$31,
200.
00$1
,500
.00
$39,
000.
00$1
,500
.00
$39,
000.
00S
l,25
0.0t
$32,
500.
002b
6”G
ate
Val
vean
dB
oxes
IIE
A$8
89.4
3$7
80.0
0S8
,580
.00
$1,0
00.0
0$1
1,00
0.00
$1,0
00.0
0$1
1,00
0.00
$578
.00
S6,3
58.0
0$1
,000
.00
$11,
000.
083a
Hyd
rant
ItB
A$2
,564
.17
$3,0
00.0
0$3
3,00
0.00
$2,5
00.0
0$2
7,50
0.00
$3,0
00.0
0$3
3,00
0.00
$2,0
00.0
0$2
2,00
0.00
$2,8
00.0
0$3
0,80
0.00
3bH
ydra
ntR
emov
al6
BA
$275
.10
$300
.00
$1,8
00.0
0$2
50.0
0$1
,500
.00
SOO
t$0
.06
$900
.00
S5,4
00.0
0$2
00.0
0$1
,200
.00
4C
oncr
ete
Thr
ost
Blo
cks
50C
.Y.
$14.
04$1
20.0
0S6
,000
.00
$0.0
1$0
.50
SOO
t$0
.50
$140
.00
$7,0
00.0
0$5
0.00
$2,5
00.0
05a
Bou
lder
Exc
avat
ion
100
CV
.$2
5.24
$50.
00$5
,000
.00
$0.0
1$1
.00
$75.
0057
,500
0$1
.00
$100
.0$0
.01
$1.0
0Sb
Led
geR
ockE
xcav
atio
n25
0C
V.
$18.
07$9
0.00
$22,
500.
00$0
.01
S2.5
0$0
.01
$2.5
$1.0
0$2
50.0
$0.0
1$2
.50
6aG
rave
lB
orro
w25
0C
.Y.
$3.3
7$0
.01
$2.5
0$0
.01
$2.5
0$0
.01
$2.5
$14.
00$3
,500
.0$0
.01
$2.5
06b
Gra
vel
Sabb
ase
1,00
0C
.Y.
$10.
20$2
0.00
$20,
000.
00$2
0.00
$20,
000.
00$0
.01
$10.
0$4
1.00
$41,
000.
0$1
8.00
$18,
000.
007
Ord
inar
yB
orro
w20
0C
V.
$2.8
7$0
.01
$2.0
0$0
.01
$2.0
0$2
0.00
$4,0
00.0
$14.
00$2
,800
.0$0
.01
$2.0
08
Exc
avat
ion
ofU
nsui
tabl
eM
ater
ial
IOU
C.Y
.$2
.84
$0.0
1$1
.00
$0.0
1$1
.00
$0.0
1$1
.0$1
0.00
$1,0
00.0
$0.0
1$1
.00
9E
xplo
rato
ryE
xcav
atio
n25
CV
.$2
2.54
$15.
00$3
75.0
0$0
.01
$0.2
5$0
.01
$0.2
$10.
00$2
50.0
$75.
00$1
,875
.00
10C
alci
umC
hlor
ide
25SO
lb-B
ag$3
6.08
$75.
00$1
,875
.00
SS0.
00$1
,250
.00
$0.5
0$1
2.5
$17.
00$4
25.0
$40.
00$1
,000
.00
II-la
yB
ales
and
Silt
Fenc
e36
0L.
F.$7
.59
$10.
00$3
,600
.01
$10.
00$3
,600
.00
$0.0
1$3
.6$9
.00
$3,2
400
$15.
00$5
,400
.00
12T
renc
hB
inde
rPa
vent
ent
7,00
0L.
F.$1
0.99
$12.
50$8
7,50
0.00
$10.
00$7
0,00
0.00
$8.0
0$5
6,00
0.0
$21.
00$1
47,0
00.0
$12.
00$0
4,00
0.00
13R
esto
ratio
nof
Gro
wth
1,00
0S.
Y.
$3.6
6.
S15.
00$1
5,00
0.00
So
ot
$10.
00$1
.00
Sl,0
00.0
$19.
00S1
9,00
0.0
S4.0
0$4
,000
.00
l4a
I-in
chC
opor
atio
nSt
ops
71E
A$4
66.3
3S2
75.0
0$1
9,52
5.00
S500
.00
$35,
500.
00$5
00.0
0S3
5,S0
0.00
S45.
0053
,195
.00
$600
.00
S42,
600.
0014
bI-
inch
Serv
ice
Pipe
1,50
0L.
F.$2
0.17
S33.
00$4
9,50
0.00
S15.
00$2
2,50
0.00
$20.
00S3
0,00
0.00
$64.
00$9
6,00
0.00
$40.
00$6
0,00
0.00
14e
‘-in
clt
Csr
bSt
opan
dB
ox71
BA
$223
.78
S275
.00
$19,
525.
00$2
50.0
0$1
7,75
0.00
$500
.00
S35,
500.
00S
l85.
00$1
3,13
5.00
$3.5
0$2
48.5
0IS
a7-
inch
Cor
pora
tion
Stop
s1
EA
$711
.78
S475
.00
$475
.00
$1,5
00.0
0$1
,500
.00
$1,0
00.0
0$1
,000
.00
$483
.00
S483
.00
S800
.00
$800
.00
lSb
7-in
chSe
rvic
ePi
pe20
L.F
.$3
3.20
$40.
00$8
00.0
0$0
.01
$0.2
0$5
0.00
$1,0
00.0
0$7
0.00
$1,4
00.0
0$5
0.00
$1,0
00.0
0
ISe
2.-in
chC
urb
Stop
and
Box
IB
A$4
94.4
7$6
00.0
0S6
00.0
0S
1,00
0.00
$1,0
00.0
0$1
,000
.00
$1,0
00.0
0$3
59.0
0$3
59.0
0S3
50.0
0S3
50.0
016
a4-
inch
Ten
tpor
aty
Byp
ass
6,00
0L
F.
$6.9
0S7
.00
$42,
000.
00$8
.00
S48,
000.
00S8
.00
$48,
000.
00S7
.S0
S45,
000.
00S
l8.0
0S
t08,
000.
00l6
b2-
inch
Ten
tpor
ary
Byp
ass
6,00
0L.
F.$4
.74
S5.0
0S
30,0
00.0
0S5
.00
S30,
000.
00S5
.00
S30,
000.
00$5
.80
$34,
800.
00S1
6.0O
$96,
000.
00
17Si
ltSa
cks
31E
A$9
0.99
StO
O,0
0S3
,lOO
.00
Sl0
0.00
$3,1
00.0
0SO
Ot
$0.3
1S7
5,00
$2,3
25.0
0$2
50.0
0$7
,750
.00
18Po
lice
Det
ails
1,20
0H
rs.
$45.
00S4
5.00
$54,
000.
00$4
5.00
S54,
000.
00S4
5.O
0S
54,0
00.0
0S4
5.00
$54,
000.
00$4
5.00
$54,
000.
00
BID
TO
TA
L57
9896
050
$825
919
95$8
2903
322
5836
370
00$9
2273
250
Iher
eby
cert
ify
that
this
isan
accu
rale
rep
rese
nla
tio
n
of
lhe
bid
sre
ceiv
edfo
rth
iap
roje
ct:
¶Tho
,nas
9.13
1 all
anna,
tP.E
.3
/21
/08
Th
om
asJ.
Mah
ann
a,P
.E.
Dat
e
Bid
Tab
nl,t
onF
on
osI
s1/
21/2
008
ST
AN
TE
CP
ogoS
of6
Attachment H
FR Mahony Estimate
LOW PRESSURE SEWERESTIMATE BASED ON
FR MAHONY
DESCRIPTION QUANTITY UNIT COST TOTALWORK WITHIN THE RIGHT OF WAY
PIPING1.25 Inch Pipe (25 Length) 3,175 LF $55.00 $174,625.001.50 Inch Pipe 1,807 LF $65.00 $117,455.002.00 Inch Pipe 7,829 LF $65.00 $508,885.003.00 Inch Pipe 2,189 LF $65.00 $142,285.00
VALVES
AirNacuum Release Valve 2 EA $1,053.00 $2,106.00In Line Clean Out 9 EA $2,500.00 $22,500.00Terminal Clean Out 7 EA $2,500.00 $17,500.00Corp Stop 127 EA $55.00 $6,985.00Lateral Kit 127 EA $227.00 $28,829.00
SUM $1,021,170.00
CONTRACTOR OVERHEAD ($1,021,170.00 x 5%) $51,058.50
SUBTOTAL ( $1,021,170.00 + $51,058.50) $1,072,228.50
OTHERBoulder Excavation 100 CY $61.36 $6,136.00Ledge Rock Excavation 371 CY $120.00 $44,520.00Gravel Borrow 250 CY $15.00 $3,750.00Gravel Subbase 1,000 CY $16.94 $16,940.00Ordinary Borrow 200 CY $14.00 $2,800.00Excavation of Unsuitable Material 100 CY $16.60 $1,660.00Exploratory Excavation 25 CY $167.50 $4,187.50Calcium Chloride 25 501b-Bag $45.70 $1,142.50Hay Bales and Silt Fence 360 LF $7.59 $2,732.40Restoration of Growth 1,000 SY $9.58 $9,580.00Police Details 1,200 HR $45.00 $54,000.00
SUM $147,448.40
SUBTOTAL ( $1,072,228.50 + $147,448.40) $1,219,676.90
ENGINEERING ($1,219,676.90 x25%) $304,919.23
CONTINGENCY ( $1,219,676.90 x 10%) $121,967.69
SUBTOTAL ( $1,219,676.90 + $304,919.23 + $121,967.69) $1,646,563.82
TOWN OF ACTON MILLING AND PAVING $556,997.07
TOTAL ( $1,646,563.82 + $556,997.07) $2,203,560.89
COST PER LOT ($2,203,560.89 / 127) $17,350.87
WORK ON INDIVIDUAL LOTS1.25 Inch Pipe (100’ Length) 12,700 LF $45.00 $571,500.00Pump: DHO71-93 127 EA $3,069.00 $389,763.00Pump/Panel Installation 127 LS $1,500.00 $190,500.00
SUM $1,151,763.00
COST PER LOT ($1,151,763.00! 127) $9,069.00
TOTAL COST PER LOT ($17,350.87 + $9,069.00) $26,419.87
Low Pressure SewerFR Mahony
Description1 .25-Inch Pipe
3,175 LF(45 + 65 ) /2
Unit Price $55.00
Contractor Overhead5 Percent
FR Mahony: 83,734 / ( 49,091 + 894,842 + 768,625 ) = 4.89%
Page 1 of 1
Budgetary Low Pressure Sewer System Costs
Town of Acton MA(one home per station)
March 30, 2009
Unit Cost Installation
$65.00
$65.00
$65.00
0,00 $389,763.00
0,00 $190,500.00
$28,829.00
$285,750.00
$894,842.0
0,00 $117,455.00
00o $508,885,00
0,00 $142,2850&:
$7M.62$.O0
Other 0 Contractor Overhead $0.00 0,00 583,734.70
0 Contingencies $0.00 0,00 $167,469.40
$251 .204,14)
Number of ConnectionsTo(al Per Connection $jj44.7 Total (w/o other) >>>>>>>>>>>> $1 ,71 2,55*.flêGrand Total Per Connection $1462.69 Grand Total (including other)>>>>>>>>>>>> $l.963’.76214
Note, The System Costs above are based on piping sized for, and Grinder Pumps manufactured by Environment One Corporation.
Page i C:\Documents and Settings\Owner\My Documents\My Documents\EONE\PROJEGTS AND PLAN REVIE’
_
SubTotal
O.00 $6,985.00
o.oor 52,106:001
000 $l7,500.00
$39,091.00
2ti1y cr p on
____
Valves 127 , Corp Stop $55.00
2 Air/Vacuum Release Valve 51,053.00
9 In Line Clean Out $2,500.00
7 Terminal Clean Out $2,500.00
Pumps 127 DHO71-.93 53,069,00
127 Pump/Panel Installation 51,50000
127 Lateral Kit (i.e.. curb stop assembly) $22700
6 10 LF of I lateral ppe 545 00
Piping 1,807 1,50” Pipe
7,829 2,00” Pipe
2,189 3,00” Pipe
0,00
0.00’
Attachment I
RS Means Estimate
LOW PRESSURE SEWER
TERMINAL CLEAN OUTS
ESTIMATE BASED ONRS MEANS
SUM $1,127,653.00
Engineering (25%)
Contingency (10%)
ENGINEERING ($1,127,653.00 x 25%)
CONTINGENCY($1,127,653.00 x 10%)
$281,913.25
$112,765.30
SUBTOTAL ($1,127,653.00 + $281,913.25 + $112,765.30) $1,522,331.55
Reference Number Quantity Unit Unit Price Total AmountDescription
WORK WITHIN THE RIGHT OF WAYMAINLINE PIPING
1.5-inch Pipe2-inch Pipe3-inch Pipe
Sawing Asphalt PavementTrench Excavation, Haul, Backfill, Compaction
Asphalt Patching (7’ Wide)
3-to 2-inch Reducer2-to 1.5-inch ReducerTees
LATERAL PIPING1.25-inch Pipe (25 Length)
Sawing Asphalt PavementTrench Excavation, Haul, Backfill, Compaction
Asphalt Patching (7’ Wide)
Corporation StopsCurb StopsBoxesTopsoil (7’ Wide)
Seed
1,6607,590
2,17022,84011,4208,882
5
87
3,175
3,1753,1751,235127127
1271,235
11
LFLFLF
LFLFSY
EAEAEA
LF
LFLFSYEA
EAEASY
MSF
2211 13.74 44202211 13.7444602211 13.744470
0401 20.20 0050G1030 805 1430321216.131050
2211 13.7649522211 13.7649503311 13.25 8100
2211 13.74 4410
0401 20.20 0050G1030 805 1430321216.131050331213.1579003311 13.45 7140
3311 13.4572003291 19.1307003292 19.14 5400
G3030 210 1940
2305 23.30 2200
G3030 210 19402211 13.76 02902211 13.76 4950
2211 13.74 44202305 23.30 2200
2211 13.76 02902211 13.76 4950
2211 13.74 44202205 23.20 5680
$1.42
$1.99
$5.05$3.54
$11.63$48.50$42.50$29.50
$122.00
$1.42$3.54
$11.63
$48.50$615.00$198.00
$203.00$4.24
$74.00
$3,475.00$565.00
$3,475.00
$96.00$29.50$17.50
$565.00
$96.00$29.50$17.50
$780.00
$61.36$120.00
$15.00$16.94
$14.00$16.60
$167.50
$45.70$7.59
$45.00
$2,357.20
$15,104.10$10,958.50
$80,853.60
$132,814.60$430,787.78
$212.50$236.00$854.00
$4,508.50$11,239.50$36,925.25
$59,884.03$78,105.00
$25,146.00$25,781.00
$5,235.22$822.33
$31,275.00
$5,085.00
$24,325.00
$672.00$206.50$490.00
$3,955.00
$192.00$59.00
$140.00$1,560.00
$6,136.00$44,520.00
$3,750.00$16,940.00$2,800.00$1,660.00$4,187.50$1,142.50
$2,732.40$54,000.00
Manhole1.5-inch Gate Valves
IN-LINE CLEANOUTSManhole
2-inch Tees2-to 1.5-inch Reducer
1.5-inch Pipe (4’ Each)
1.5-inch Gate Valves
AirNacuum Release Valve
2-inch Tees2- to 1.5-inch Reducer
1.5-inch Pipe (4’ Each)AirNacuum Release Valve
OTHERBoulder Excavation
Ledge Rock Excavation
Gravel Borrow
Gravel Subbase
Ordinary BorrowExcavation of Unsuitable Material
Exploratory Excavation
Calcium Chloride
Hay Bales and Silt Fence
Police Details
9 EA
9 EA
7 EA7 EA7 EA
28 LF7 EA
2 EA2 EA
8 LF2 EA
100371250
1,000
200
10025
25360
1,200
CYCYCYCY
CYCYCY
5Olb-Bag
LFHR
Page 1 of 2
LOW PRESSURE SEWERESTIMATE BASED ON
RS MEANS
Description Reference Number Quantity Unit Unit Price Total Amount
Town of Acton Milling and Paving TOWN OF ACTON MILLING AND PAVING $556,997.07
TOTAL ( $1,522,331.55 + $556,997.07) $2,079,328.62
COST PER LOT ( $2,079,328.62! 127) $16,372.67
WORK ON INDIVIDUAL LOTSFurnish and Install 1 EA $7,990.00 $7,990.00
COST PER LOT $7,990.00
TOTAL COST PER LOT ( $16,372.67 + $7,990.00) $24,362.67
Page 2 of 2
Attachment J
Individual Lot Work Proposal
James Fenton & Son General Contracting, Inc.P.O. Box 985 Acton, MA 01720 978-266-9751
Proposal
Proposal Submitted to: March 24, 2009Town of ActonBoard of Health472 Main StreetActon, MA 01720
Job Location: Spencer, Tuttle, Flint, Torrington Roads, Acton
Proposal for material and labor to tie-into existing Town of Acton wastewater collection system, to include:
- Pump, crush and fill 126 existing septic tanks- Install 126 E-One DHO7I units at previous septic tank location; connect to
existing plumbing- Install generator switch- Wire E-One DHO7I to electric panel; includes permit and inspection fees- Excavate and backfill 100’ trench; install 1 %“ SDR back to street- Loam and seed all disturbed areas- Materials, labor, equipment rental- Town of Acton permit and inspection fees
Total per House: $ 7,990.00
Note: The following items are not included and, if encountered, will be subject to additional charges:
- Asphalt patching- Additional electrician time required for finished basements- Removal of ledge or boulders greater than 1 cubic yard- Additional tanks to be crushed (i.e., pump chamber or second septic tank)- Relocation of play areas, sandboxes, sheds, planting beds- Removal of trees larger than 2” in diameter- Repairs to irrigation systems- Removal of hazardous or contaminated waste
We Propose hereby to furnish material and labor -- complete in accordance with above specification for thesum of: Seven Thousand Nine Hundred Ninety dollars per house ($ 7,990.00 oer house)Payment to be made per separate contract.
Authorized Signature: JOfl/fe?#it2’n/Note: This proposal may be withdrawn by us if not accepted within 60 days
All material is guaranteed to be as specified. All work to be completed in a workmanlike manner according to standard practices. Any alteration ordeviation from above specifications involving extra costs will be executed only upon written order and will become an extra charge over and abovethe estimate. All agreements contingent upon strikes, accidents or delays beyond our control. Owner to carry fire, tomado and other necessaryinsurance. Our workers are fully covered by Workmen’s Compensation insurance.
Attachment K
Milling and Paving Estimate
Las
tre
surf
aced
Dur
kee
Roa
d
Fund
Roa
dL
othr
opR
oad
Mal
lard
Roa
d
Spe
ncer
Roa
dT
orri
ngto
nL
ane
Tut
tleD
rive
Tor
ring
ton
Lna
eW
aysi
deL
ane
2000
1999
1997
#20
toT
uttle
Rd
1999
Spe
ncer
RD
to#2
019
92
1996
1979
2005
Pro
spec
tSt
toT
orri
ngto
nLn
1997
1999
SUM
$5
33
19
30
7
DR
AIN
AG
EB
ASI
NS
(68
x$3
50/E
A)
$23
,800
.00
1)M
ILL
=SQ
UA
RE
YA
RD
Sx
$1.8
7/SY
2>T
ON
S=
SQU
AR
EY
AR
DS
xT
HIC
KN
ESS
x0.
056
(TN
/SY
*IN
)3)
CO
ST=
TO
NS
x$7
2.00
/TN
TO
WN
OF
AC
TO
NH
IGH
WA
YD
EPA
RT
ME
NT
MIL
LIN
GA
ND
PAV
ING
2009
SQU
AR
EY
AR
DS
ST
RE
ET
LE
NG
TH
WID
TH
Flin
tR
d.2,
475
25M
alla
rdR
d1,
369
25D
urke
eR
d.1,
124
25L
othr
opR
d.2,
460
25W
aysi
deC
ir.33
025
Tut
tleR
d.2,
550
25T
orri
ngto
nLn
.52
325
Spe
ncer
Rd.
1,17
925
BIN
DE
RC
OU
RS
E
TH
ICK
NE
SS(I
N)
=
TO
NS
2
2
CO
ST
36,
875
3,80
3
3,12
26,
833
917
7,08
31,
453
3,27
5
MIL
L1
$12
,856
.25
$7,
111.
61
$5,
838.
14
$12
,777
.71
$1,
714.
79
$13
,245
.21
$2,
717.
11
$6,
124.
25
WE
AR
ING
CO
UR
SE
TH
ICK
NE
SS(I
N)
=1.
5
TO
NS
2C
OS
T3
770
$55
,440
.00
426
$30
,672
.00
350
$25
,200
.00
765
$55
,080
.00
103
$7,
416.
0079
3$
57,0
96.0
016
3$
11,7
36.0
036
7$
26,4
24.0
0
TO
TA
L
578
$41
,616
.00
319
$22
,968
.00
262
$18
,864
.00
574
$41
,328
.00
77$
5,54
4.00
595
$42
,840
.00
122
$8,
784.
00
275
$19
,800
.00
$ $ $ $ $ $ $ $
109,
912.
2560
,751
.61
49,9
02.1
410
9,18
5.71
14,6
74.7
911
3,18
1.21
23,2
37.1
152
,348
.25
BE
RM
(Sil
o/T
N)
$
SID
EW
AL
K($
40/F
r)$
TO
TA
L($
533,
193.
07+
$23,
800.
00)
$55
6,99
3.07
Attachment L
Indoor verses Outdoor Pumps
Homeowners have many options when itcomes to selecting the proper grinder pumpfor their home. F. R. Mahony & Associates,Inc. can help with this selection. Thefollowing general guidance may help youmake the proper selection.
There are a number of factors to beconsidered. The existing conditions of thehome and the lot play a major role in thisselection. The Environment One products,developed nearly 40 years ago, were initiallyintended for indoor use. Not all homescould modify plumbing or make the internalchanges required in existing homes. Thisprompted the development of the outdooraccessway stations. Many E/Oneapplications have been for connection ofregions with failing septic systems withexisting homes. This made the morecommon installation fit the outdoor stations.
INDOOR PUMP Benefits and Options:
Indoor stations may fit approximately 25% ofcurrent and new home constructionapplications. Generally new homes canplan the building plumbing to betteraccommodate an indoor pump.
Regions with basements are more likely toconsider indoor pump stations. Thesestations can aide in “whole house plumbing”to collect drains from basement fixturesadjacent to family rooms or walk outbasement uses.
The indoor stations can result in a savings ofinstallation by avoiding excavation in difficultterrain. Interior plumbing and electricalconnections are relatively easy to make.
30 DuPaul StreetSouthbridge, MA 01550
tel. 508.765.0051fax 508.765.1244
=/jb4J
=-., =,77=S S 5 S S
The station cost is reduced by eliminatingthe top accessway extension and associatedexcavation to place the station outdoors.Depending on the location one can expect atotal installed cost savings of as much as$1,500.00.
(Model IHO91 Shown Below)
These stations are provided with a 60-monthwarranty. The basin can be installed on thefloor (shown above) or in the slab (shownbelow) to accommodate basementplumbing.
41 Bayberry Hill RoadW. Townsend, MA 01474
tel. 978.597.0703fax 978.597.0704
r tel. 781.982.9300
I f.r. mahony & ossociales, inc. fax. 781.982.1056
I I I I I woter supply ond pdIuton control equipment www.frmahony.com
273 Weymouth SfreeL.Rocktand, MA 02370
____ ____
Which pump should I use?Do I use an indoor pump or an outdoorpump?
®
tel. 781.982.9300
I.r. mahony &os.
fax. 781.982.1056
rt”ii [email protected] supply and poliuton control equoment www.frmahony.com
273 Weyniouth Street.Rocktand, MA 02370
OUTDOOR PUMP Benefits and Options:(Model DHO7I Shown Below)
The typicaloutdoorpump modelfor singlefamily homesis theDHO7I -93shown to theleft. Thisstationoperates inthe samemanner asthe indoorstation. Thepumppackagecomescomplete,ready forinstallation inthe ground.
Standardheightstations areprovided toprovide a
gravity drain from the home. Deeperstations can be provided to accommodatedeeper building drains.
These stations are best used when theexisting plumbing can not be changed andthe best option is to connect existingbuilding drains outside of the home.
The outdoor unit may be more suited tocustomers who prefer that service andaccess be out of doors. Service providerscan service these units without entering thehome provided the alarm panel is alsooutside and accessible.
Outdoor models come in a variety of sizes toaccommodate larger flow demands.
30 DuPaul StreetSouthbridge, MA 01550
tel. 508.765.0051fax 508.765.1244
Alarm panels for both stations are providedusing the same basic platform. The Sentry®panel provides the ability to monitor theoperation of the pump unit. Basic alarmsinclude a light and buzzer with silencer.
OPTIONAL ITEMS INCLUDE:
Alarm Activated Dry ContactsAlarm Activated Powered TerminalGenerator Receptacle and Auto TransferRemote Sentry Indoor Alarm ModuleRun-timelHour MeterEvent/Cycle Counter
Protection Package, consisting of:Brownout Protection w/ Trouble IndicationRun Dry Protection w/ Trouble lndicatiohHigh System Pressure Protection w/ TroubleIndication.
For more information contact:
41 Bayberry Hill RoadW. Townsend, MA 01474
tel. 978.597.0703fax 978.597.0704
F. R. Mahony & Associates, Inc.
800-791-6132 Toll Free781-982-9300 Rockland, MA978-597-0703 West Townsend, MA781-820-5808 Westborough, MA