TECHNICAL MEMORANDIUM REVISION 2(511109) To: Doug Halley, Director of Public Health, Town of Acton From: Engineering Department, Town of Acton Date: April 6, 2009 Regarding: Spencer/Tuttle/Flint Low Pressure Sewer The following technical memorandum details the conceptual layout and preliminary engineering design requirements for the Spencer, Tuttle, and Flint low pressure sewer extension project. The project entails connecting 127 houses to the gravity sewer main on Prospect Street. The Woodard & Curran, ‘Feasibility Study and Conceptual Design Technical Memorandum” dated March 26, 2008 states that there is currently sufficient capacity at the Acton Wastewater Treatment Plant to receive flow from this project. 1.0 Low Pressure Sewer A low pressure sewer system uses mechanical means to transport residential waste verses the traditional gravitational method. Houses discharge wastewater to a pump that grinds the waste to a fine slurry and pumps it through a small diameter lateral pipe. The lateral pipes are connected to a main line located in the roadway where individual pumps work collectively to transport the wastewater to its ultimate destination. There are many advantages of a low pressure system. A low pressure sewer system is able to be installed along the contours of the road, which can dramatically reduce construction costs in hilly areas. Because the system is pressurized, a low pressure sewer system is not subject to infiltration from ground water, and, because the system is sealed, there are no open pipes or manholes for storm water to enter and cause an increase in treatable flows. 2.0 Vendor Selection Initially, the pump manufacture was researched to determine the most compatible product with this preliminary design. Many companies offer grinder pumps and most were eliminated through market research. Upon further study, two manufactures were contacted for further information, GRINDER PUHP IAIUNUNE —1—

TECHNICAL MEMORANDIUM REVISION 2(511109)

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: TECHNICAL MEMORANDIUM REVISION 2(511109)

TECHNICAL MEMORANDIUM — REVISION 2(511109)

To: Doug Halley, Director of Public Health, Town of Acton

From: Engineering Department, Town of Acton

Date: April 6, 2009

Regarding: Spencer/Tuttle/Flint Low Pressure Sewer

The following technical memorandum details the conceptual layout and preliminary engineeringdesign requirements for the Spencer, Tuttle, and Flint low pressure sewer extension project. Theproject entails connecting 127 houses to the gravity sewer main on Prospect Street. The Woodard& Curran, ‘Feasibility Study and Conceptual Design Technical Memorandum” dated March 26,2008 states that there is currently sufficient capacity at the Acton Wastewater Treatment Plant toreceive flow from this project.

1.0 Low Pressure Sewer

A low pressure sewer system uses mechanical means to transport residential waste verses thetraditional gravitational method. Houses discharge wastewater to a pump that grinds the waste toa fine slurry and pumps it through a small diameter lateral pipe. The lateral pipes are connected toa main line located in the roadway where individual pumps work collectively to transport thewastewater to its ultimate destination.

There are many advantages of a low pressure system. A low pressure sewer system is able to beinstalled along the contours of the road, which can dramatically reduce construction costs in hillyareas. Because the system is pressurized, a low pressure sewer system is not subject toinfiltration from ground water, and, because the system is sealed, there are no open pipes ormanholes for storm water to enter and cause an increase in treatable flows.

2.0 Vendor Selection

Initially, the pump manufacture was researched to determine the most compatible product with thispreliminary design. Many companies offer grinder pumps and most were eliminated throughmarket research. Upon further study, two manufactures were contacted for further information,

GRINDERPUHP IAIUNUNE

—1—

Page 2: TECHNICAL MEMORANDIUM REVISION 2(511109)

Hydromatic and eOne. After a review of their products and consultation with their localrepresentatives, eOne was selected as the most advantageous for this preliminary design and costestimate.

3M Preliminary Design

The initial step in designing a low pressure sewer system is developing a layout. The EngineeringDepartment drafted a preliminary design using guidance documents and recommendationsprovided by eOne’s local representative, FR Mahony. Some of the points to consider for thisproject were the elevation differences, the number of houses to connect to a pump, and thepossibility of loops1 in the system. The system was designed using one house per external pump,however adjacent residents could combine their discharges if they so choose. A plan view of theproject was developed and a copy can be found in Attachment A.

FR Mahony reviewed the system design and provided consultation for the pump and pipe sizing.The DHO71-93 pump was selected as the most suitable for the project conditions, which is acomplete package that includes the grinder pump, check valve, high density polyethylene (HDPE)tank, and external controls. In addition, zones2 were developed that most efficiently utilize themechanical characteristics of the pumps and mainline pipe sizes, which ranged from 1 4 to 3inches in diameter with 1 ¼ inch diameter laterals. Attachment B contains cut sheets for the pumpand panel

The mainline and lateral pipes were designed using HDPE material because of it’s flexibility, easeof installation, and durability. The flexibility of the pipe will enable it to be easily guided aroundexisting utilities as needed. The pipe is installed using a hot iron to melt or fuse sections together,which creates a seamless weld that encourages error-free assembly. HDPE pipe is a plasticmaterial that is very smooth, which helps to prevent buildup of solids and ensures a long life.

Mainline Pipe

For this preliminary design, the mainline pipe is designated along the centerline of the road at aminimum depth of 4+ feet and will have a bedding and cover of crushed stone. However, in thefinal design this depth and layout may vary to avoid conflicts with other utilities, which is anadvantage of this system type. A gravity system does not have this flexibility due to sloperequirements. General backfill will comprise the majority of the trench, covered with layers ofgravel and processed gravel prior to asphalt patching. All backfill materials will be installed andcompacted in lifts.

Manholes will be installed throughout the project to protect the various valves and components andprovide access for future maintenance. Isolation valves may be included at key points throughoutthe system to provide the ability to isolate sections of the mainline for servicing or repairs. Airrelease valve are designed in high points of the system, which allow trapped air to be released andimprove efficiency. Clean outs are designed throughout the system to provide an ability to

Loops in the system must be avoided as they lead to unpredictable and uneven distribution of flow.2 Assignment of individual zones follows from the relationship between the accumulating total number ofpumps to the predicted number that will periodically operate simultaneously.

-2-

Page 3: TECHNICAL MEMORANDIUM REVISION 2(511109)

routinely clean sections of the system. Attachment C contains details of a typical manhole thathouses typical piping and valves.

Lateral Connections

The location of the lateral connections were designed based on best assumptions and can bemodified to meet the requirements of the individual lots or homeowners. They will be constructedin a similar manner as the mainline pipe and will run from the mainline to the grinder unit andinclude a saddle tap3, corporation stop4, and curb stop5. The grinder unit will be encased inconcrete to prevent upheaval from ground water and installed on a bed of gravel in an excavatedhole such that the top of the unit is flush with the surface. Attachment C also contains a detail of atypical lateral installation as well as a lateral assembly.

4.0 Construction Estimation

The estimated project costs were split into two components, 1) work within the public right of way,and 2) work on individual lots. The work within the public right of way includes installing themainline pipe and various valves and manholes as well as a section of the lateral piping. Thissection is from the mainline to 2 feet within the property line and includes the saddle tap,corporation stop, curb box, and capping the end. The work on individual lots includesdecommission the existing septic system, connecting to the capped lateral, installing the remainderof the lateral piping and grinder pump, and performing the appropriate electrical work to completethe installation.

Providing an estimate that is as accurate as possible was one of the primary goals of this effort. Toaccomplish this task, the materials and labor to complete the project were quantified using thepreliminary design and construction details. The quantity calculations can be found in AttachmentD.

Ledge excavation and groundwater dewatering have the potential to significantly increasing thecost of construction, To gain a better understanding of these quantities, exploratory excavationswere performed in areas where ledge or groundwater is suspected. Soil borings were dug to adepth of 8 feet or until ledge was encountered and monitoring wells were installed such that thedepth to groundwater can be measured, The soil boring and monitoring well installation logs aswell as a summary table for each can be found in Attachment E.

Using the soil boring logs, an estimated quantity of ledge excavation was calculated for the workwithin the public right of way. The volumes were calculated using the average end method andthese ledge quantity calculations can be found in Attachment F.

Multiple construction sources were then cited to develop an accurate unit cost for each of thequantified items, which were adjusted to best represent this preliminary design. These sourcesincluded the water main replacement project in Indian Village that occurred during the summer of

A saddle tap is a device used to drill into a pipe.A corporation stop is a valve attached to a saddle tap to prevent discharge during drilling.A curb stop is a valve that allows the flow to be shut off.

-3-

Page 4: TECHNICAL MEMORANDIUM REVISION 2(511109)

2008, the local representative of eOne pumps, and the industry accepted resource AS MeansHeavy Construction Cost Data (2008).

The quantity calculations and referenced materials used to derive the Acton Water District’s IndianVillage Water Main replacement estimate can be found in Attachment G. These materials includethe quantities and unit prices for the work within the right of way as well as the typical costs for thework on individual lots. In addition, the attachment includes the calculations used to determine theunit prices that were derived from the project’s bid tabulation, which can also be found in thisattachment.

Attachment H contains the quantity calculations and referenced materials used to determine theestimate based on FR Mahony’s submittal. These materials include the quantities and unit pricesfor the work within the right of way as well as the work on individual lots. In addition, theattachment includes the calculations used to determine the unit prices that were derived from thesubmittal, which can also be found in this attachment.

The quantity calculations used to derive the RS Means estimate can be found in Attachment I.These materials include the quantities and unit prices for the work within the right of way as well asthe typical costs for the work on the individual lots. For this estimate, the unit prices from the ASMeans Heavy Construction Cost Data 2008 were used.

The supporting material for the Indian Village and AS Means estimates did not include the work onthe individual lots. Therefore, a proposal to furnish and install the individual lot work was used tocompensate these estimates and can be found in Attachment J. The Town of Acton Milling andPaving cost was provided by the Highway Department and can be found in Attachment K. Thiswork will be completed one year after the project’s completion and performed under the Town’sPaving Contract.

The individual estimates were compiled into the Construction Estimate Breakdown table, which canbe found at the end of this memo, and averaged to develop an overall estimate for the preliminarydesign. Each of the estimates included a cost for the engineering work, at 25% of the project cost,and a contingency, at 10% of the project cost. Both of these costs were exclusive of the millingand paving work.

This preliminary design estimate is subject to change due to changes in the calculated quantities orchanges in the unit prices. Factors that may affect the cost estimate for the work within the publicright of way include quantity changes for ledge, utility damages, dewatering, or removal anddisposal of hazardous or contaminated waste. Factors that may affect the cost estimate for thework on individual lots are outlined in the individual lot work proposal found in Attachment J. Thispreliminary design estimate also assumes that the grinder pump will be purchased at the onset ofthe project, during which a discount will be offered. However, pumps may be purchased at a laterdate at a single unit cost.

Additional cost saving measures may also be available through the installation of an indoor pumpor by sharing a pump with adjacent neighbors. Indoor pumps may offer greater installationflexibility and eliminate some of the required excavation work. Information regarding indoor versesoutdoor pumps can be found in Attachment L.

-4-

Page 5: TECHNICAL MEMORANDIUM REVISION 2(511109)

Pump sharing amongst adjacent neighbors may provide additional savings, however complexitiesarise, Initially, the responsibility of operation, maintenance, and repairs should be pre-determined,which is especially true in the case of a foreign object entering the system and causing damage.Further, the waste streams generated from the houses drain by gravity to the tank. This makespump sharing more difficult because the tank must be sited such that the piping meets the sloperequirements.

-5-

Page 6: TECHNICAL MEMORANDIUM REVISION 2(511109)

CON

STRU

CTIO

NES

TIM

ATE

BREA

KD

OW

N—

REV

ISIO

N1

(412

7109

)

PUBL

ICRO

WRO

WIN

DIVI

DUAL

LOT

LOT

ESTI

MA

TESO

UR

CE

ROW

MIL

L&

WO

RKSU

BTO

TAL

PAV

ELO

TSSI

TEW

ORK

TOTA

LW

ORK

TOTA

LPE

RLO

T

Indi

anVi

llage

Wat

erm

ain

Cost

Dat

a$1

,371

,545

$556

,997

$1,9

28,5

4212

7$1

5,18

5$7

,990

$23,

175

RS

Mea

nsC

ost D

ata

$1,5

22,3

32$5

56,9

97$2

,079

,329

127

$16,

373

$7,9

90$2

4,36

3

eOne

Rep

rese

ntat

ive

Cos

tDat

a$1

,646

,564

$556

,997

$2,2

03,5

6112

7$1

7,35

1$9

,069

$26,

420

PER

LOT

CO

STA

VER

AG

E$2

4,65

3

TOTA

LPR

OJE

CT

CO

ST=

$24,

653

x12

7=

$3,1

30,9

31

-6-

Page 7: TECHNICAL MEMORANDIUM REVISION 2(511109)

Attachment A

Plan View

jmarshall
Typewritten Text
jmarshall
Typewritten Text
Please click here for Plan View: http://www.acton-ma.gov/DocumentView.aspx?DID=580
jmarshall
Typewritten Text
jmarshall
Typewritten Text
jmarshall
Typewritten Text
jmarshall
Typewritten Text
jmarshall
Typewritten Text
jmarshall
Typewritten Text
jmarshall
Typewritten Text
jmarshall
Typewritten Text
jmarshall
Typewritten Text
jmarshall
Typewritten Text
jmarshall
Typewritten Text
Page 8: TECHNICAL MEMORANDIUM REVISION 2(511109)

Attachment B

Cut Sheets

Page 9: TECHNICAL MEMORANDIUM REVISION 2(511109)

(

___

c, =,77=SE R ES

jJ©L,) uJ /©L3) g

Patent Numberrs 5,752,3155,562,254 5439,180

* Dischargeda includes lossthrough chc valve, which isminimal.

General FeaturesThe model DHO71 orDRO7l grinderpump station is a complete unit thatincludes: the grinder pump, checkvalve, HDPE (high density polyethylene) tank and controls. The DHO71 orDRO7I is packaged into a singlecomplete unit, ready for installation.

The DHO71 is the “hardwired,” or“wired,” model where a cable connectsthe motor controls to the level controlsthrough watertight penetrations.

The DRO7I is the “radio frequencyidentification” (RFID), or “wireless,”model that uses wireless technologyto communicate between the levelcontrols and the motor controls.

All solids are ground into fine particles,allowing them to pass easily throughthe pump, check valve and smalldiameter pipelines. Even objects notnormally found in sewage, such asplastic, rubber, fiber, wood, etc., areground into fine particles.

The 1.25-inch discharge connection isadaptable to any piping materials,thereby allowing us to meet your localcode requirements.

The tank is made of tough corrosion-resistant HDPE. The optimum tankcapacity of 70 gallons is based oncomputer studies of water usagepattems.Asingie DHO71 orDRO7l isideal for one, average single-familyhome

I

_____

This model can accommodateflows of 700 GPD.

The internal check valve assembly,located in the grinder pump, is custom-designed for non-clog, trouble-freeoperation.

The grinder pump is automaticallyactivated and runs infrequently for veryshort periods. The annual energyconsumption is typically that of a 40-watt light bulb.

Units are available for indoor andouttloor installations. Outdoor unitsare designed to accommodate a widerange of burial depths.

Operational Information

Motor1 hp, 1,725 rpm, high torque, capacitor start, thermally protected, 120/240V, 60 Hz, 1 phase

Inlet Connections4-inch inlet grommet standard forDWV pipe. Other inlet configurationsavailable from the factory.

Discharge ConnectionsPump discharge terminates in 1.25-inch NPT female thread. Can easily beadapted to 1 .25-inch PVC pipe or anyother material required by local codes.

Discharge *

15 gpm at 0 psig

11 gpm at4O psig

7.8 gpm at 80 psig

Overload CapacityThe maximum pressure that the pumpcan generate is limited by the motorcharacteristics. The motor generates apressure well below the rating of thepiping and appurtenances. The automatic reset feature does not requiremanual operation following overload.

f

NAOO5OPO1

Page 10: TECHNICAL MEMORANDIUM REVISION 2(511109)

i-i,r DISCHARGE(304 S.S.)

CHECK VALVE(NORYL)

ANTI-SIPHON VALVE(NQRYL)

CONCRETE BALLAST MAY BE REQUIREDSEE INSTALLATION INSTRUCTIONS

FOR DETAILS

AD CH 07/12/07 A

DR BY CHK’D DATE ISSUE SCALE

SIEWFEI SY8TES

MODEL DHO71 / DRO71DETAIL SHEET

(HARD WIREDOPTiONS : El DHO71 LEVEL CONTROLS)

(WIRELESSEl D R 07 1 LEVEL CONTROLS)

GASKETED LID, FRP

FIELD JOINT REQUIREDFOR MODELS

DHO71-129 / DRO71-129&

DHO71-160 / 0R071-160

ELECTRICAL QUICK DISCONNECTNEMA 6P (EQD)

QUICK DISCONNECT ASSY.(304 s.s.)

S.S. CAST BALL VALVE

STRAIN RELIEF CORDCONNECTOR

PROTECTIVE CABLE SHROUD(HDPE)

INTERNAL WELL VENT2.O DIA.

DISCHARGE1-1/4 FPT

INLET, GROMMETTO ACCEPT 4.5O O.D.PVC PIPE (STANDARD).DUST COVER SUPPLIED

FOR SHIPMENT (NOTSUITABLE FOR BURIAL)

LINE

41.6 in1057 mm

TO DISCHARGE

HOPE TANKDUAL WALL, CORRUGATED

70 GALLON CAPACITY

29.5 DIA in749 mm

SEMI-POSITIVE DISPLACEMENT TYPE PUMP.EACH DIRECTLY DRIVEN BY A 1 HP MOTOR S

NAOO5OPO2

Page 11: TECHNICAL MEMORANDIUM REVISION 2(511109)

w

Page 12: TECHNICAL MEMORANDIUM REVISION 2(511109)

=,rsi=ic, iL

L/©r®Alarm Panel — Basic Package

DescriptionThe EIOne Sentry panels are custom designed for use with Environment Onegrinder pump stations. They can be configured to meet the needs of yourapplication, from basic alarm indication to advanced warning of pending servicerequirements.

E/One Sentry panels are supplied with audible and visual high level alarms. Theyare easily installed in accordance with relevant national and local codes.Standard panels are approved by UL, CSA, CE and NSF to ensure high qualityand safety.

The panel features a corrosion-proof, NEMA4X-rated, thermoplastic enclosure. Apadlock is provided to prevent unauthorized entry (safety front).

Features

Circuit breakers, 240 or 120 VAC service

Terminal blocks and ground lugs

Audible alarm with manual silence

Manual run feature and run indicator

Redundant “Start” function with high level alarm

Safety front—authorized personnel only when locked

Conformal-coated alarm board (both sides)

Alarm board overload protection

Please consult factory for special applications.

NAOO74POI Rev. —

Page 13: TECHNICAL MEMORANDIUM REVISION 2(511109)

SIMPLEXSENTRYREDUNDANT RUN (HIGH LEVEL)EXTERNAL VISUAL & AUDIBLE ALARMEXTERNAL LATCHING MANUAL SILENCEMANUAL RUNPUMP RUN INDICATORCONFORMAL COATED CIRCUIT BOARDPADLOCKNEMA 4X ENCLOSURE ASSEMBLY

CORROSION PROOF THERMOPLASTICPOLYESTER APPROVED BY UL FORELECTRICAL CONTROL ENCLOSURE

OPTIONS:

\LARM CONTACTS

HOUR METER

GENERATOR RECPT

UPC®ASI4E A112.3.4

SILB4cEswrroi

OPTIONALREMOTE SENTRY

24 DC MAX2 AMP MAX

0

EEJL_J

OPTIONALALARM POWERED

REMOTEOUTPUT POWER

BETWEENLi & NEUTRAL

II IIPOWER SOURCE

OPTIONALALARM DRYCONTACTS2 A MAX

— — — 9PLIED BY OThERSSI.PPLY CABLE (FROM PUP)POSSIBLE OPTIONFACTORY WIRED

CONTROL CABLE:TYPE TC: DIRECT BURIAL. 12AWG,SIX CONDUCTOR

CE SIMPLEX SENTRY,WITH GENERATOR

240V 60Hz.RECEPTACLE

ESD 06-0003

Page 14: TECHNICAL MEMORANDIUM REVISION 2(511109)

Attachment C

Construction Details

Page 15: TECHNICAL MEMORANDIUM REVISION 2(511109)

water supp’y and pal.uhop co:niroi eQfl•fli

tel. 781.982.9300fax. 781.982.1056

[email protected]

____

IPS PVC TRUEBALL VALVE

KORAN-SEALLINK SE:AL (TYP,)PIPE PENETRAT IONS

____

DIA. HDPFORCE MAIN

Typical Cleanout Detail(Optional AirNacuum Valve shown —right)

I.

1’-O’ GRAVELBEDDING REF.

CONCRETE PIPE SUPPORTWI PIPE ANCHOR STRAP

TYPICAL ELEV VIE\/

____HDPE

TEE ‘il/THREAD ADAPTER IPS

Cleanout detail can be modified to match typical installation needs. Inline shut offsmay be added to isolate flow direction. Image shown is flow through cleanout.These structures can be terminal end of line cleanouts, or junction cleanouts as maybe required. Optional air and vacuum relief valves may be added when required.

136A Stickney Hill RoadUnion, CT 06076tel. 860.684.0393fax 860.851.9752

30 DuPaul StreetSouthbridge, MA 01550tel. 508.765.0051fax 508.765.1244

41 Bayberry Hill RoadW.Townsend, MA 01474tel. 978.597.0703fax 978.597.0704

273 Waymouth Strea Rocklc,nd, MA 02370

M.H. FRAME & COVER

M.H.

QUICK

*

*

• ,44

Page 16: TECHNICAL MEMORANDIUM REVISION 2(511109)

TY

PIC

AL

LA

TE

RA

LIN

STA

LL

AT

ION

Sen

try

Ala

rmP

anel

En

vir

on

men

tO

neE

nv

iro

nm

ent

On

e::

tera

lK

itD

HO

7IS

tati

on

-

BELO

W-

--

MINI

MUM

--

FRO

STD

EPTh

4-ft

.fl

exdi

scha

rge

-:

-

with

coup

lin-

-.

-

LPSS

MAI

N

CO

RPO

RA

nON

srO

P-

-

PEA

GR

AV

EL

”SA

DD

LETA

PPE

AGR

AVEL

::

-

-:c:

-

:

CRU

SHED

STON

ECR

USH

EDST

ONE

:.-

.-

:‘-

:-:

:-

-

--

:::

::;

:::-.

i:’-

:-:

._-_

-_-I_•.

•‘...

--

-

;E::

:th::

::;.

-

envir

on

mento

ne

frm

aL

ll4

CC

UR

PU

RA

TI

Page 17: TECHNICAL MEMORANDIUM REVISION 2(511109)

VALVE CURB STOP WITH FEMALE PIPE THREADSAND RATCHETING VALVE HANDLE

MATERIAL POLYPROPYLENE

SFG

CHK’D

PRESSURE RATING: 150 psi

ASSEMBLY TO BE USED WITH 1-1/4” SDR 11 PIPE ONLY

TO ORDER LATERAL ASSEMBLY SHOWN,USE PART NUMBER PC0645G21.

ORDER CURB BOX SEPERATE; SEE ABOVE.

iI

PLASTIC LATERAL ASSEMBLY1-1/4” SDR 11 HDPE PIPE ARCH PATTERN

PA997PO

ASTCLA11EA ASSEMY

D/499DPE FPFPFE

AC PAflIEERN

EXTENSION TYPE CURB BOX WITH ARCH PATTERN BASEMATERIAL ABS

AVAILABLE LENGTHS...... 18-30”30-42”36-54”

PART NUMBERPBO930007PB0930008PBO930009PBO93001OPBO930011PB0930G12

42-66”48-78”60-102”

REDUCERCOUPLING

ORDERED SEPARATELY USING PART NUMBER FROM ABOVE

COMPRESSION ADAPTER FITTINGMATERIAL POLYPROPYLENE

COMPRESSION ADAPTER FITTINGMATERIAL: POLYPROPYLENE

1-1/4 MPT

COMPRESSION ADAPTERFITTING

MATERIAL POLYPROPYLENE

CHECK VALVEMATERIAL: GLASS FILLED PVC

TO PUMP

1-1/4” SDR 11POLYETHYLENE PIPE

(SUPPLIED BY OTHERS)

Page 18: TECHNICAL MEMORANDIUM REVISION 2(511109)

Attachment D

Quantity Calculations

Page 19: TECHNICAL MEMORANDIUM REVISION 2(511109)

Low Pressure SewerQuantity Calculations

DescriptionMainline Piping

1.5-Inch DiameterMallard RoadFlint RoadDurkee RoadLothrop RoadWayside LaneTuttle DriveTorrington Lane

46034018021080

210180

1,660

2.0 Inch DiameterMallard RoadFlint RoadDurkee RoadLothrop RoadWayside LaneTuttle DriveTorrington Lane

3.0-Inch DiameterSpencer RoadTuttle Drive

Sawcutting= Mainline Piping x 2

Trench Excavation, Haul, Backfill, & Compaction= Mainline Piping

Asphalt Patching (7 Wide)= 11,420 LFx7 LF/9

3- to 2-Inch ReducerFlint RoadDurkee RoadLothrop RoadTuttle Drive

2- to 1 .5-Inch ReducerMallard RoadFlint RoadDurkee RoadLothrop RoadWayside LaneTuttle DriveTorrington Lane

760 LF1,890 LF860 LF

2,100 LF340 LF

1,280 LF360 LF

7,590 LF

1,200 LF970 LF

2,170 LF

22,840 LF

11,420 LF

8,882 SY

2 EA1 EA1 EA1 EA5 EA

2 EA2 EA1 EA1 EA1 EA1 EA1 EA9 EA

Quantity Unit

LFLFLFLFLFLFLFLF

Page 1 of 3

Page 20: TECHNICAL MEMORANDIUM REVISION 2(511109)

Low Pressure SewerQuantity Calculations

Description Quantity Unit

2-Inch TeeFlint Road 2 EATuttle Drive 2 EA

4 EA

3-Inch TeeSpencer Road 3 EA

Terminal Cleanouts (Located At Pipe Ends)Manhole 9 EA1 .5-Inch Gate Valve 9 EA

Intersection Cleanouts (Located At Pipe Intersections)Manhole 7 EA2-Inch Tee 7 EA2- to 1 .5-Inch Reducer 7 EA1 .5-Inch Pipe (4’ Each) 28 LF1 .5-Inch Gate Valve 7 EA

In-Line Cleanouts (Located Midway of Lothrop Road)Manhole 1 EA2-Inch Tee 1 EA2- to 1.5-Inch Reducer 1 EA1.5-Inch Pipe (4 Each) 4 LF1 .5-Inch Gate Valve 1 EA

AirNacuum Release Valve (Located Within Cleanout Manholes)2-Inch Tee 2 EA2- to 1 .5-Inch Reducer 2 EA1.5-Inch Pipe (4’ Each) 8 LFAirNacuum Release Valve 2 EA

Lateral Piping (Assumed 50 ROW)1 .25-Inch Diameter (From Mainline To Property Line)

=127EAx25LF 3,175 LF

Sawcutting (From Mainline To Edge Of Pavement)=127EAx12.5LFx2 3,175 LF

Trench Excavation, Haul, Backfill, & Compaction=Lateral Piping 3,175 LF

Asphalt Patching (7’ Wide)=127EAx 12.5 LFx7LF/9 1,235 SY

Corporation StopsAt Each Connection 127 EA

Gate ValvesAt Each Connection 127 EA

Page2of3

Page 21: TECHNICAL MEMORANDIUM REVISION 2(511109)

Low Pressure SewerQuantity Calculations

Description Quantity Unit

Gate BoxesAt Each Connection 127 EA

Topsoil (7 Wide)127EAx12.5LFx7LF/9 1,235 SY

Seed= Topsoil 1,235 SY

OtherBoulder Excavation 100 CYGravel Borrow 250 CYGravel Subbase 1,000 CYOrdinary Borrow 200 CYExcavation of Unsuitable Material 100 CYExploratory Excavation 25 CYCalcium Chloride 25 50-lb BGHay Bales and Silt Fence 360 LFPolice Details 1,200 HR

Page3of3

Page 22: TECHNICAL MEMORANDIUM REVISION 2(511109)

Attachment E

Soil Boring and Monitoring Well Installation Logs

Page 23: TECHNICAL MEMORANDIUM REVISION 2(511109)

Soil Boring Summary

Number Street Depth Description

B 1 Tuttle Drive 8’ Full Depth

B 2 Tuttle Drive 8’ Full Depth

B 3 Tuttle Drive 8’ Full Depth

B 4 Tuttle Drive 8’ Full Depth

B 5 Tuttle Drive 7’ Refusal

B 6 Tuttle Drive 36” Refusal

B 7 Tuttle Drive 8’ Full Depth

B 8 Tuttle Drive 4’ Refusal

B 9 Torrington Lane 4’ Refusal

B 10 Torrington Lane 3’ Refusal

B 11 Torrington Lane 4’ Refusal

B 12 Lothrop Road 8’ Full Depth

B 14 Lothrop Road 8’ Full Depth

B 15 Durkee Road 8’ Full Depth

B 16 Flint Road 6’ Refusal

B 17 Flint Road 8’ Full Depth

B 18 Mallard Road 8’ Full Depth

B 19 Lothrop Road 7’ Refusal

B 20 Tuttle Road 3’6” Rufusal

Page 24: TECHNICAL MEMORANDIUM REVISION 2(511109)

TEST BORING LOG SHEET 1Soil Exploration Corp.

Town of ActonGeotechnical Drilling BORING B—i

Groundwater Monitor Well Site: Proposed Sewer Lines148 Pioneer Drive

Acton, MA PROJECT NO. 09-0427Leoniinster, MA 01453

978 840-0391 DATE: May 1, 2009

Ground Elevation: GROU1’lDWATER OBSERVATIONSDate Started: April 30, 2009 EDEPTHCASGSTABILITION

Date Finished: April 30, 2009

Driller: MC

Soil Eer/GeoIogist:Depth Casing Sample Visual Identification

Ft. butt No. PenlRec Depth Blows/6” Strata of Soil and I or Rock Sample6” Asphalt

1 0-16” 12-100/6”Dry, very dense, fine to medium sand and fine to coarse gravel,

1 some inorganic silt, trace cobbles and boulders.

30”

____________________________________________________

5 2 5’0”-7’0” 9-6-1 2-17 Dry, medium dense, fine to coarse sand and fine to coarse gravel,some inorganic silt, cobbles and boulders.

8’O”

____________________________________________________

10 Endofboringat8’O”.No water encountered upon completion.1st attempt refusal with hollow stem auger at 2’O”.Moved boring forward.2” attempt end of boring at 8’O”.

15

20

25

30

35

39

Notes: Hollow Stem Auger Size - 4-1/4” with automatic hammer

Cohesionless: 0 -4 V. Loose, 4 - 10 Loose, Trace 0 to 10% CASING SAMPLE CORE TYPE10 -30 M Dense, 30 -50 Dense, 50+ V Dense. Little 10 to 20% ID SIZE (IN) SS

Cohesive: 0 -2 V Soft, 2 -4 Soft, 4 -8 M Stiff Some 20 to 35% HAMMER WGT (LB) 140 lb.8 -15 Stiff, 15 -30 V. Stiff, 30 + Hard. And 35% to 50% HAMMER FALL (IN) 30”

Page 25: TECHNICAL MEMORANDIUM REVISION 2(511109)

TEST BORING LOG SHEET 2Soil Exploration Corp.

Town of ActonGeotechnical Drilling BORING B—2

Groundwater Monitor Well Site: Proposed Sewer Lines148 Ptoneer Drive

Acton, MA PROJECT NO. 09-0427Leorninster, MA 01453

978 840-0391 DATE: May 1, 2009

Ground Elevation: GROUNDWATER OBSERVATIONSDate Started: April 30, 2009 I DATE I DEPTH CASING I STABILIZATION

Date Finished: April 30, 2009 I I IDriller: MC I I f I

Soil EpperIGeologist: I I IDepth Casing Sample Visual Identification

Ft. bl/ft No. PeslRec Depth Blows/6” Strata of Soil and / or Rock Sample

6” Asphalt1 6”-2’6” 23-12-16-15

Dry, medium dense, fine to medium sand and fine to coarse1 gravel, some inorganic silt, trace cobbles and boulders (fill).

3’6”

____________________________________________________

5 2 50-70” 17-15-19-19 Dry, dense, fine to medium sand, some inorganic silt, trace fineto coarse gravel, cobbles and boulders.

80”

____________________________________________________

10 End of boring at 8’O”.No water encountered upon completion.

15

20

25

30

35

39

Notes: Hollow Stem Auger Size - 4-1/4”with automatic hammer

Cohesionless: 0 -4 V. Loose, 4 - 10 Loose, Trace 0 to 10% CASING SAMPLE CORE TYPE10 -30 M Dense, 30 -50 Dense, 50+ V Dense. Little 10 to 20% ID SIZE (IN) SSCohesive: 0 -2 V Soft, 2 -4 Soft, 4 -8 M Stiff Some 20 to 35% HAMMER WGT (LB) 140 lb.8 -15 Stiff, 15 -30 V. Stiff 30 + Hard. And 35% to 50% HAMMER FALL (IN) 30”

Page 26: TECHNICAL MEMORANDIUM REVISION 2(511109)

TEST BORING LOG SHEET 3Soil Exploration Corp. Town of Acton

Gcotechnical Drilling BORING B—3Groundwater Monitor Well Site: Proposed Sewer Lines

148 Pioneer Drive

Leorninster, MA 01453 Acton, MA PROJECT NO. 09-0427

978 840-0391 DATE: May 1, 2009

Ground Elevation: I GROUNDWATER OBSERVATIONS

Date Started: April 30, 2009 I DATE I DEPTH I CAS1NG I STABILIZATION

Date Finished: April 30, 2009 I IDriller: MC I I I

Soil Eer/Geologist: I I IDepth Casing Sample Visual IdentifIcation

Ft. bl/ft No. PenilS.ec Depth Blows/6” Strata of Soil and I or Rock Sample6”

1 6”-2’6” 15-9-9-8Dry, medium dense, fine to medium sand and fine to coarse

1 gravel, some inorganic silt, cobbles, boulders (fill).

30”

_________________________________________________

5 2 5’0”-7’0” 31-26-44-47 Dry, very dense, fine to coarse sand and fine to coarse gravel,trace inorganic silt, cobbles and boulders.

8’O”

_________________________________________________

10 End of boring at 8’O”.No water encountered upon completion.

15

20

25

30

35

39

Notes: Hollow Stem Auger Size - 4-l/4”with automatic hammer

Cohesionless: 0 -4 V. Loose, 4 - 10 Loose, Trace 0 to 10% CASING SAMPLE CORE TYPE

10 -30 M Dense, 30 -50 Dense, 50+ V Dense. Little 10 to 20% ID SIZE (IN) SS

Cohesive: 0 -2 V Soft, 2 -4 Soft, 4 -8 M Stiff Some 20 to 35% HAMMER WGT (LB) 140 lb.

8-15 Stiff, 15 -30 V. Stiff, 30 + Hard. And 35% to 50% HAMMER FALL (IN) 30”

Page 27: TECHNICAL MEMORANDIUM REVISION 2(511109)

TEST BORING LOG SHEET 4Soil Exploration Corp. Town of Acton

Geoteehnical Drilling BORING B-4Groundwater Monitor Well Site: Proposed Sewer Lines

148 Pioneer Drive

Leorninster, MA 01453 Acton, MA PROJECT NO. 09-0427

978 840-0391 DATE: May 1, 2009

Ground Elevation: GROUNDWATER OBSERVATIONS

Date Started: April 30, 2009 EDEPTiipASNGSTILIZATENDate Finished: April 30, 2009

Driller: MC

Soil Eer/Geologist:Depth Casing Sample Visual Identification

Ft. hI/ft No. Pen/Rev Depth Blows/6” Strata of Soil and / or Rock Sample6” Asohalt

1 6-26” 11-19-11-16Dry, medium dense, fine to medium sand and fine to coarsegravel, trace inorganic silt (fill) cobbles.

3’O”

5 2 50-65” 27-39-100/5” Dry, very dense, fine to medium sand and fine to coarse gravel,some inorganic silt, cobbles.

80”

____________________________________________________

10 End of boring at 8’O”.No water encountered upon completion.

15

20

25

30

35

39

Notes: Hollow Stem Auger Size - 4-114”with automatic hammer

Cohesionless: 0 -4 V. Loose, 4 - 10 Loose, Trace 0 to 10% CASING SAMPLE CORE TYPE

10 -30 M Dense, 30 -50 Dense, 50+ V Dense. Little 10 to 20% ID SIZE (IN) SS

Cohesive: 0 -2 V Soft, 2 -4 Soft, 4 -8 M Stiff Some 20 to 35% HAMMER WGT (LB) 140 lb.

8-15 Stiff, 15 -30 V. Stiff, 30 + Hard. And 35% to 50% HAMMER FALL (IN) 30”

Page 28: TECHNICAL MEMORANDIUM REVISION 2(511109)

TEST BORING LOG SHEET 5

Soil Exploration Corp.Town of Acton

Geotechnical Drilling BORING B—5Groundwater Monitor Well Site: Proposed Sewer Lines

14$ Pioneer DriveActon, MA PROJECT NO. 09-0427

Leorninster, MA 01453

978 840-0391 DATE: May 1, 2009Ground Elevation: I GROUNDWATER OBSERVATIONS

Date Started: April 30, 2009 I DATE I DEPTH CASING I STABiLIZATIONDate Finished: April 30, 2009 I I I

Driller: MC I I ISoil Eer/Geologist: I I I

Depth Casing Sample Visual IdentificationFt. butt No. PenJRec Depth Blows/6” Strata of Soil and / or Rock Sample

6” Asohalt1 6-26” 10-14-17-17

Dry, dense, fine to medium sand and fine to medium gravel, trace1 inorganic silt, cobbles.

3’O”

____________________________________________________

5 2 5’0”-7’0” 19-27-43-89 Dry, very dense, fine to coarse sand and fine to coarse gravel,trace inorganic silt, cobbles.

70”

____________________________________________________

Refusal with hollow stem auger at 7’O”.10 No water encountered upon completion.

15

20

25

30

35

39

Notes: Hollow Stem Auger Size - 4-l/4”with automatic hammer

Cohesionless: 0 -4 V. Loose, 4- 10 Loose, Trace 0 to 10% CASING SAMPLE CORE TYPE

10 -30 M Dense, 30 -50 Dense, 50+ V Dense. Little 10 to 20% ID SIZE (IN) SSCohesive: 0 -2 V Soft, 2 -4 Soft, 4 -8 M Stiff Some 20 to 35% HAMMER WGT (LB) 140 lb.8 -15 Stiff, 15 -30 V. Stiff, 30 + Hard. And 35% to 50% HAMMER FALL (IN) 30”

Page 29: TECHNICAL MEMORANDIUM REVISION 2(511109)

Visual Identificationof Soil and / or Rock Sample

Dry, medium dense, fine to coarse sand and fine to coarse gravel,trace inorganic silt, cobbles and boulders.

Refusal with hollow stem auger at 3’6”.No water encountered upon completion.

TEST BORING LOG SHEET 6Soil Exploration Corp. Town of Acton

Geotechnical Drilling BORING B6Groundwater Monitor Well Site: Proposed Sewer Lines

148 Pioneer DriveActon, MA PROJECT NO. 09-0427Leorninster, MA 01453

978 840-0391 DATE: May 1, 2009

Ground Elevation: GROUNDWATER OBSERVATIONSDate Started: April 29, 2009 DATE DEPTH CASNG STABILIZATION

Date Finished: April 29, 2009

Driller: MC

1

I I

5

10

15

20

25

30

35

39

Notes: Hollow Stem Auger Size - 4-l/4”with automatic hammer

Cohesionless: 0 -4 V. Loose, 4- 10 Loose, Trace 0 to 10% CASING SAMPLE CORE TYPE

10 -30 M Dense, 30 -50 Dense, 50+ V Dense. Little 10 to 20% ID SIZE (IN) SSCohesive: 0 -2 V Soft, 2 -4 Soft, 4 -8 M Stiff Some 20 to 35% HAMMER WGT (LB) 140 lb.

8-15 Stiff, 15 -30 V. Stiff, 30 + Hard. And 35% to 50% HAMMER FALL (IN) 30

Page 30: TECHNICAL MEMORANDIUM REVISION 2(511109)

TEST BORING LOG SHEET 7Soil Exploration Corp.

Town of ActonGeotechnical Drilling BORING B—7

Groundwater Monitor Well Site: Proposed Sewer Lines148 Pioneer Drive

Leominster, MA 01453 Acton, MA PROJECT NO. 09-0427

978 840-0391 DATE: May 1, 2009

Ground Elevation: GROUNDWATER OBSERVATIONSDate Started: April 29, 2009

Date Finished: April 29, 2009

Driller: MC

Soil Eer/Geologist:Depth Casing Sample Visual Identification

Ft. bl/ft No. Pen/Rec Depth Blows/6” Strata of Soil and / or Rock Sample

39

Notes: Hollow Stem Auger Size - 4-1/4”with automatic hammer

Cohesionless: 0 -4 V. Loose, 4 - 10 Loose, Trace 0 to 10% CASING SAMPLE CORE TYPE10 -30 M Dense, 30 -50 Dense, 50+ V Dense. Little 10 to 20% ID SIZE (IN) SSCohesive: 0 -2 V Soft, 2 -4 Soft, 4 -8 M Stiff Some 20 to 35% HAMMER WGT (LB) 140 lb.8-15 Stiff, 15 -30 V. Stiff, 30 + Hard. And 35% to 50% HAMMER FALL (IN) 30”

2

Asnhalt6”-2’6”

5’0”-7’0”

13-13-18-22

19-25-24-22

6”

40”

80”

Dry, medium dense, fine to coarse sand and fine to coarse gravel,some inorganic silt, trace cobbles and boulders.

Dry, dense, fine to coarse sand and fine to coarse gravel, traceinorganic silt, cobbles.

I

5

10

15

20

25

30

35

End of boring at 8’O”.No water encountered upon completion.

Page 31: TECHNICAL MEMORANDIUM REVISION 2(511109)

TEST BORING LOG SHEET 8Soil Exploration Corp. Town of Acton

Geotechnical Drilling BORING B-8Groundwater Monitor Well Site: Proposed Sewer Lines

148 Pioneer DriveActon, MA PROJECT NO. 09-0427

Leominster, MA 01453

978 840-0391 DATE: May 1, 2009

Ground Elevation: I GROUNDWATER OBSERVATIONSDate Started: April 29, 2009 DATE I DEPTH CASING I STABILIZATION

Date Finished: April 29, 2009 I IDriller: MC I I I

Soil Engineer/Geologist: I I IDepth Casing Sample Visual Identification

Ft. hi/ft No. P&Rec Depth Blows/6” Strata of Soil and / or Rock Sample6” Asohalt

1 6-26” 8-14-27-23

1 Dry, dense, fine to coarse sand and fine to coarse gravel, traceinorganic silt, trace cobbles and boulders.

40”

_______________________________________________

5Refusal with hollow stem auger at 4’O”.No water encountered upon completion.

10

15

20

25

30

35

39

Notes: Hollow Stem Auger Size - 4-1/4” with automatic hammer

Cohesionless: 0 -4 V. Loose, 4- 10 Loose, Trace 0 to 10% CASING SAMPLE CORE TYPE

10 -30 M Dense, 30 -50 Dense, 50+ V Dense. Little 10 to 20% ID SIZE (IN) SS

Cohesive: 0 -2 V Soft, 2 -4 Soft, 4 -8 M Stiff Some 20 to 35% HAMMER WGT (LB) 140 lb.

8 -15 Stiff, 15 -30 V. Stiff, 30 + Hard. And 35% to 50% HAMMER FALL (IN) 30’

Page 32: TECHNICAL MEMORANDIUM REVISION 2(511109)

TEST BORING LOG SHEET 9Soil Exploration Corp.

Town of ActonGeolechnical Drilling BORING B-9

Groundwater Monitor Well Site: Proposed Sewer Lines148 Pioneer Drive

Acton, MA PROJECT NO. 09-0427Leoniinster, MA 01453

978 840-0391 DATE: May 1, 2009

GROUNDWATER OBSERVATIONSGround Elevation:Date Started: April 30, 2009 ASSTILIZAON

Date Finished: April 30, 2009

Driller: MCSoil Eer/Geologist:

Depth Casing Sample Visual IdentificationFt. hI/ft No. Pen/Rec Depth Blows/6” Sfrata of Soil and / or Rock Sample

4” Asphalt1 6-26” 10-12-24-22

Dry, dense, fine to coarse sand and fine to coarse gravel, traceI inorganic silt, cobbles and boulders.

4’O”5 Refusal with hollow stem auger at 4’O”.

No water encountered upon completion.

10

15

20

25

30

35

39

Notes: Hollow Stem Auger Size - 4-1/4” with automatic hammer

Cohesionless: 0 -4 V. Loose, 4- 10 Loose, Trace 0 to 10% CASING SAMPLE CORE TYPE

10 -30 M Dense, 30 -50 Dense, 50+ V Dense. Little 10 to 20% ID SIZE (IN) SS

Cohesive: 0 -2 V Soft, 2 -4 Soft, 4 -8 M Stiff Some 20 to 35% HAMMER WGT (LB) 140 lb.

8 -15 Stiff, 15 -30 V. Stiff, 30 + Hard. And 35% to 50% HAMMER FALL (IN) 30”

Page 33: TECHNICAL MEMORANDIUM REVISION 2(511109)

TEST BORING LOG SHEET 10Soil Exploration Corp.

Town of ActonGeotechnical Drilling BORING B10

Groundwater Monitor Well Site: Proposed Sewer Lines148 Pioneer Drive

Acton, MA PROJECT NO. 09-0427Leorninster, MA 01453

978 840-0391 DATE: May 1, 2009

Ground Elevation: GROUNDWATER OBSERVATIONDate Started: April 30, 2009 EDEPTHCASNGSTILATIoN

Date Finished: April 30, 2009

Driller: MC

Soil Eer/Geologist:Depth Casing Sample Visual Identification

Ft. bl/ft No. Pen/Rec Depth Blows/6” Strata of Soil and / or Rock Sample4” Asphalt

1 6”-2’6” 12-19-40-35Dry, dense, fine to coarse sand and fine to coarse gravel, trace

1 inorganic silt, cobbles and boulders.

3’O”

____________________________________________________

5 Refusal with hollow stem auger at 3’O”.No water encountered upon completion.

10

15

20

25

30

35

39

Notes: Hollow Stem Auger Size - 4-1/4” with automatic hammer

Cohesionless: 0 -4 V. Loose, 4 - 10 Loose, Trace 0 to 10% CASING SAMPLE CORE TYPE

10 -30 M Dense, 30 -50 Dense, 50+ V Dense. Little 10 to 20% ID SIZE (IN) SSCohesive: 0 -2 V Soft, 2 -4 Soft, 4 -8 M Stiff Some 20 to 35% HAMMER WGT (LB) 140 lb.8 -15 Stiff, 15 -30 V. Stiff, 30 + Hard. And 35% to 50% HAMMER FALL (iN) 30”

Page 34: TECHNICAL MEMORANDIUM REVISION 2(511109)

TEST BORING LOG SHEET iiSoil Exploration Corp.

Town of ActonGeotechnical Drilling BORING B4 1

Groundwater Monitor Well Site: Proposed Sewer Lines148 Pioneer Drive

Acton, MA PROJECT NO. 09-0427Leominster, MA 01453

978 840-0391 DATE: May 1, 2009

GROUNDWATER OBSERVATIONSGround Elevation:Date Started: April 30, 2009

Date Finished: April 30, 2009Driller: MC

Soil Ejer/Geologist:Depth Casing Sample Visual Identification

Ft. blift No. Pen/Rec Depth Blows/6” Strata of Soil and/or Rock Sample4” Asphalt

1 6-26” 15-21-44-53

1 Dry, very dense, fine to coarse sand and fine to coarse gravel,trace inorganic silt, cobbles and boulders.

40”

_________________________________________________

5Refusal with hollow stem auger at 4’O”.No water encountered upon completion.

10

15

20

25

30

35

39

Notes: Hollow Stem Auger Size - 4-1/4” with automatic hammer

Cohesionless; 0 -4 V. Loose, 4 - 10 Loose, Trace 0 to 10% CASING SAMPLE CORE TYPE

10 -30 M Dense, 30 -50 Dense, 50+ V Dense. Little 10 to 20% ID SIZE (iN) SS

Cohesive: 0 -2 V Soft, 2 -4 Soft, 4 -8 M Stiff Some 20 to 35% HAMMER WGT (LB) 140 lb.

8 -15 Stiff, 15 -30 V. Stiff, 30 + Hard. And 35% to 50% HAMMER FALL (IN) 30”

Page 35: TECHNICAL MEMORANDIUM REVISION 2(511109)

TEST BORING LOG SHEET 12

Soil Exploration Corp.Town of Acton

Geotechnical Drilling BORING B12Groundwater Monitor Well Site: Proposed Sewer Lines

14$ Pioneer DriveActon, MA PROJECT NO. 09-0427

Leorninster, MA 01453

978 840-0391 DATE: May 1, 2009

Ground Elevation: I GROUNDWATER OBSERVATIONSDate Started: April 29, 2009 DATE I DEPTH CASING I STABILIZATION

Date Finished: April 29, 2009 I I IDriller: MC I I I

Soil Eer/Geologist: I I IDepth Casing Sample Visual Identification

Ft. bI/ft No. PealRec Depth Blows!6” Strata of Soil and! or Rock Sample6” Asphalt

1 6”-2’6’ 7-7-9-12

I Dry, medium dense, fine to medium sand, some fine to coarsegravel, trace organic silt, cobbles.

4’O”

_______________________________________________

5 2 50-70” 6-6-10-12Dry, medium stiff inorganic silt, trace fine sand, trace fine tomedium gravel, trace clay.

80”

____________________________________________________

10 End of boring at 8’O”.No water encountered upon completion.

15

20

25

30

35

39

Notes: Hollow Stem Auger Size - 4-1/4” with automatic hammer

Cohesionless: 0 -4 V. Loose, 4 - 10 Loose, Trace 0 to 10% CASING SAMPLE CORE TYPE10 -30 M Dense, 30 -50 Dense, 50+ V Dense. Little 10 to 20% ID SIZE (IN) SS

Cohesive: 0 -2 V Soft, 2 -4 Soft, 4 -8 M Stiff Some 20 to 35% HAMMER WGT (LB) 140 lb.

8-15 Stiff, 15 -30 V. Stiff, 30 + Hard. And 35% to 50% HAMMER FALL (IN) 30’

Page 36: TECHNICAL MEMORANDIUM REVISION 2(511109)

TEST BORING LOG SHEET 13Soil Exploration Corp. Town of Acton

Geotechnical Drilling BORING B—i 4Groundwater Monitor Well Site: Proposed Sewer Lines

148 Pioneer Drive

Leorninster, MA 01453 Acton, MA PROJECT NO. 09-0427

978 840-0391 DATE: May 1, 2009

Ground Elevation: I GROUNDWATER OBSERVATIONSDate Started: April 29, 2009 I DATE I DEPTH CASING I STABILIZATION

Date Finished: April 29, 2009 I I IDriller: MC I I I

Soil Engineer/Geologist: IDepth Casing Sample Visual Identification

Ft. bl/ft No. PenlRec Depth Blows/6” Strata of Soil and / or Rock Sample6” Asphalt

1 6”-2’6” 7-1 1-9-9

I Dry, medium dense, fine to coarse sand, some fine to mediumgravel, trace organic silt, cobbles.

40”

_________________________________________________

5 2 5’0”-7’0” 7-9-9-11Dry, medium stiff, inorganic silt, trace fine sand, trace fine tomedium gravel, trace clay.

80”

____________________________________________________

10 End of boring at 8’O”.No water encountered upon completion.

15

20

25

30

35

39

Notes: Hollow Stem Auger Size - 4-1/4” with automatic hammer

Cohesionless: 0 -4 V. Loose, 4 - 10 Loose, Trace 0 to 10% CASING SAMPLE CORE TYPE

10 -30 M Dense, 30 -50 Dense, 50+ V Dense. Little 10 to 20% ID SIZE (IN) SS

Cohesive: 0 -2 V Soft, 2 -4 Soft, 4 -8 M Stiff Some 20 to 35% HAMMER WGT (LB) 140 lb.

8 -15 Stiff, 15 -30 V. Stiff, 30 + Hard. And 35% to 50% HAMMER FALL (IN) 30”

Page 37: TECHNICAL MEMORANDIUM REVISION 2(511109)

TEST BORING LOG SHEET 14Soil Exploration Corp. Town of Acton

Geotechnical Drilling BORII”TG B—i 5Groundwater Monitor Well Site: Proposed Sewer Lines

14$ Pioneer Drive

Leominster, MA 01453 Acton, MA PROJECT NO. 09-0427

978 840-0391 DATE: May 1, 2009

Ground Elevation: I GROUNDWATER OBSERVATIONSDate Started: April 29, 2009 I DATE I DEPTH CASING I STABILIZATION

Date Finished: April 29, 2009 I I IDriller: MC I I I

Soil Eer/Geologist: I I IDepth Casing Sample Visual Identification

Ft. bl/ft No. Pen/Rec Depth Blows/6” Strata of Soil and / or Rock Sample6” Asphalt

1 6-26” 10-11-11-13

1 Dry, medium dense, fine to coarse sand and fine to coarse gravel,trace inorganic silt, cobbles (fill).

3’O”

_________________________________________________

5 2 5’0”-6’4” 26-42-100/4” Dry, very dense, fine to coarse sand and fine to coarse gravel,trace inorganic silt, cobbles and boulders.

80”

_________________________________________________

10 End of boring at 8’O”.No water encountered upon completion.

15

20

25

30

35

39

Notes: Hollow Stem Auger Size - 4-1/4” with automatic hammer

Cohesionless: 0 -4 V. Loose, 4 - 10 Loose, Trace 0 to 10% CASiNG SAMPLE CORE TYPE

10 -30 M Dense, 30 -50 Dense, 50+ V Dense. Little 10 to 20% ID SIZE (IN) SS

Cohesive: 0 -2 V Soft, 2 -4 Soft, 4 -8 M Stiff Some 20 to 35% HAMMER WGT (LB) 140 lb.

8 -15 Stiff, 15 -30 V. Stiff, 30 + Hard. And 35% to 50% HAMMER FALL (IN) 30”

Page 38: TECHNICAL MEMORANDIUM REVISION 2(511109)

TEST BORING LOG SHEET isSoil Exploration Corp. Town of Acton

Geolechnieal Drilling BORING B—i 6Groundwater Monitor Well Site: Proposed Sewer Lines

148 Pioneer DriveActon, MA PROJECT NO. 09-0427

Leorninster, MA 01453

978 840-0391 DATE: May 1, 2009Ground Elevation: I GROUNDWATER OBSERVATIONS

Date Started: April 29, 2009 DATE I DEPTH CASING I STABILIZATIONDate Finished: April 29, 2009 I I I

Driller: MC I I ISoil Eer/Geologist: I I I

Depth Casing Sample Visual IdentifIcationFt. bl/t’c No. Pen/Rec Depth Blows/6” Strata of Soil and / or Rock Sample

6” Asphalt1 6-26” 11-14-23-31

Dry, dense, fine to coarse sand and fine to coarse gravel, trace1 inorganic silt, cobbles (fill).

36”

____________________________________________________

Dry, very dense, fine to coarse sand and fine to coarse gravel,5 2 50-58” 8-100/2” trace inorganic silt, cobbles and boulders.

60”

_________________________________________________

Refusal with hollow stem auger at 6’O”.No water encountered upon completion.

10

15

20

25

30

35

39

Notes: Hollow Stem Auger Size - 4-1/4” with automatic hammer

Cohesionless: 0 -4 V. Loose, 4- 10 Loose, Trace 0 to 10% CASING SAMPLE CORE TYPE

10 -30 M Dense, 30 -50 Dense, 50+ V Dense. Little 10 to 20% ID SIZE (IN) SS

Cohesive: 0 -2 V Soft, 2 -4 Soft, 4 -8 M Stiff Some 20 to 35% HAMMER WGT (LB) 140 lb.

8-15 Stiff, 15 -30 V. Stiff, 30 + Hard. And 35% to 50% HAMMER FALL (IN) 30”

Page 39: TECHNICAL MEMORANDIUM REVISION 2(511109)

TEST BORING LOG SHEET 16Soil Exploration Corp. Town of Acton

Geotcchnical Drilling BORING B—i 7Groundwater Monitor Well Site: Proposed Sewer Lines

148 Pioneer Drive

Leominster, MA 01453 Acton, MA PROJECT NO. 09-0427

978 840-0391 DATE: May 1, 2009

GROUNDWATER OBSERVATIONSGround Elevation:

Date Started: April 29, 2009 EPTHCASNGSTABILIZAONDate Finished: April 29, 2009

Driller: MC

Soil Eer/Geologist:Depth Casing Sample Visual Identification

Ft. blJft No. Pen/Rec Depth Blows/6” Strata of Soil and / or Rock Sample6” Asphalt

1 6-26” 12-21-19-24Dry, dense, fine to medium sand, some fine to coarse gravel,trace inorganic silt, trace coarse sand, cobbles.

30”

5 2 5’0”-7’0” 6-6-5-6Dry, medium dense, very fine sand, some inorganic silt.

8’O”

10 End of boring at 8’O”.No water encountered upon completion.

15

20

25

30

35

39

Notes: Hollow Stem Auger Size - 4-1/4” with automatic hammer

Cohesionless: 0 -4 V. Loose, 4- 10 Loose, Trace 0 to 10% CASING SAMPLE CORE TYPE

10 -30 M Dense, 30 -50 Dense, 50+ V Dense. Little 10 to 20% ID SIZE (IN) SS

Cohesive: 0 -2 V Soft, 2 -4 Soft, 4 -8 M Stiff Some 20 to 35% HAMMER WGT (LB) 140 lb.

8-15 Stiff, 15 -30 V. Stiff, 30 + Hard. And 35% to 50% HAMMER FALL (IN) 30”

Page 40: TECHNICAL MEMORANDIUM REVISION 2(511109)

TEST BORING LOG SHEET 17Soil Exploration Corp.

Town of ActonGeoteehnical Drilling BORING B—i 8

Groundwater Monitor Well Site: Proposed Sewer Lines148 Pioneer Drive

Leon,inster, MA 01453 Acton, MA PROJECT NO. 09-0427

978 840-0391 DATE: May 1, 2009

Ground Elevation: GROU1’DWATER OBSERVATIONSDate Started: April 29, 2009 EDEPTHCASNGSTILATION

Date Finished: April 29, 2009

Driller: MC

Soil Eer/GeoIogist:Depth Casing Sample Visual Identification

Ft. bl/ft No. Pen/Rec Depth Blows/6” Strata of Soil and! or Rock Sample6” Asphalt

1 6-26” 11-15-12-15Dry, medium dense, fine to medium sand, some inorganic silt,trace fine to coarse gravel, cobbles (fill).

3’O”

____________________________________________________

5 2 50-70” 10-12-1 1-14 Wet, medium dense, fine to coarse sand and fine to coarse gravel,trace inorganic silt, cobbles.

8’O”

____________________________________________________

10 End of boring at 8’O”.No water encountered upon completion.

15

20

25

30

35

39

Notes: Hollow Stem Auger Size - 4-1/4” with automatic hammer

Cohesionless: 0 -4 V. Loose, 4 - 10 Loose, Trace 0 to 10% CASING SAMPLE CORE TYPE

10 -30 M Dense, 30 -50 Dense, 50+ V Dense. Little 10 to 20% ID SIZE (IN) SS

Cohesive: 0 -2 V Soft, 2 -4 Soft, 4 -8 M Stiff Some 20 to 35% HAMMER WGT (LB) 140 lb.

8-15 Stiff, 15 -30 V. Stiff, 30 + Hard. And 35% to 50% HAMMER FALL (IN) 30”

Page 41: TECHNICAL MEMORANDIUM REVISION 2(511109)

TEST BORING LOG SHEET 18Soil Exploration Corp.

Town of ActonGeotechnical Drilling BORING B—19

Groundwater Monitor Well Site: Proposed Sewer Lines148 Pioneer Drive

Acton, MA PROJECT NO. 09-0427Leorninster, MA 01453

978 840-0391 DATE: May 1, 2009

Ground Elevation: I GROUNDWATER OBSERVATIONS

Date Started: April 29, 2009 I DATE I DEPTH CASING I STABILIZATION

Date Finished: April 29, 2009 I IDriller: MC I I I

Soil Eer/Geologist: I IDepth Casing Sample Visual Identification

Ft. bl!ft No. Pen/Rc Depth Blows/6” Strata of Soil and! or Rock Sample2” Asphalt

1 6-26” 6-9-12-10Dry, medium dense, fine to coarse sand, some fine to coarse

1 gravel, trace inorganic silt, cobbles.

36”

_________________________________________________

5 2 50-62” 13-16-100/2” Dry, very dense, fine sand and inorganic silt, trace fine tomedium gravel, cobbles.

70”

____________________________________________________

Refusal with hollow stem auger at 7’O”.10 No water encountered upon completion.

15

20

25

30

35

39

Notes: Hollow Stem Auger Size - 4-1/4” with automatic hammer

Cohesionless: 0 -4 V. Loose, 4 - 10 Loose, Trace 0 to 10% CASING SAMPLE CORE TYPE

10 -30 M Dense, 30 -50 Dense, 50+ V Dense. Little 10 to 20% ID SIZE (IN) SS

Cohesive: 0 -2 V Soft, 2 -4 Soft, 4 -8 M Stiff Some 20 to 35% HAMMER WGT (LB) 140 lb.

8 -15 Stiff, 15 -30 V. Stiff, 30 + Hard. And 35% to 50% HAMMER FALL (IN) 30”

Page 42: TECHNICAL MEMORANDIUM REVISION 2(511109)

TEST BORING LOG SHEET 19Soil Exploration Corp.

Town of ActonGeotechnical Drilling BORING B20

Groundwater Monitor Well Site: Proposed Sewer Lines148 Pioneer Dri e

Leorninster, MA 01453 Acton, MA PROJECT NO. 09-0427

978 840-0391 DATE: May 1, 2009

GROUNDWATER OBSERVATIONSGround Elevation:

Date Started: April 30, 2009

Date Finished: April 30, 2009

Driller: MC

Soil Eer!GeoIogist:Depth Casing Sample Visual Identification

Ft. bIJft No. Pea/Rec Depth Blows!6” Strata of Soil and! or Rock Sample6” Asphalt

1 6”-2’6” 21-25-34-50Dry, very dense, fine to medium sand and fine to coarse gravel,

1 some inorganic silt, cobbles and boulders.

36”

_________________________________________________

5 Refusal with hollow stem auger at 3’6”.No water encountered upon completion.

10

15

20

25

30

35

39

Notes: Hollow Stem Auger Size - 4-1/4” with automatic hammer

Cohesionless: 0 -4 V. Loose, 4- 10 Loose, Trace 0 to 10% CASING SAMPLE CORE TYPE10 -30 M Dense, 30 -50 Dense, 50+ V Dense. Little 10 to 20% ID SIZE (iN) SSCohesive: 0 -2 V Soft, 2 -4 Soft, 4 -s M Stiff Some 20 to 35% HAMMER WGT (LB) 140 lb.8-15 Stiff, 15 -30 V. Stiff, 30 + F-lard. And 35% to 50% HAMMER FALL (IN) 30”

Page 43: TECHNICAL MEMORANDIUM REVISION 2(511109)

Monitoring Well Summary

Number Street Depth Description

MW 1 Flint Road 12’ Water at 5’

MW 2 Spencer Road 12’ Water at 7’

MW 3 Tuttle Road 9’ Water at 7’6”

MW 4 Lothrop Road 8’ Water at 2’

Page 44: TECHNICAL MEMORANDIUM REVISION 2(511109)

TEST BORING LOG SHEET 20Soil Exploration Corp.

Town of ActonGeotechnical Drilling BORING IVIW 1

Groundwater Monitor well Site: Proposed Sewer Lines148 Pioneer Drive

Acton, MA PROJECT NO. 09-0427Leorninster, MA 01453

978 840-0391 DATE: May 1, 2009

Ground Elevation: GROUNDWATER OBSERVATIONSDate Started: April 29, 2009 DEPTHCG STABILIZATION

Date Finished: April 29, 2009

Driller: MC

Soil Eer/Geologist:Depth Casing Sample Visual Identification

Ft. bI/ft No PenlRec Depth Blows/6” Strata of Soil and / or Rock Sample

Dry, very loose, fine sand, some inorganic silt, trace root matter.1 1 1-1-2-3

3’O”

____________________________________________________

5 2 5’0”-7’0” 1-1-1-1Wet, very soft black peat, some organics.

80”

____________________________________________________

10 3 1 0’O”-l 20” 2-2-3-3 Wet, soft inorganic silt, trace very fine sand, trace root matter.

120”

_______________________________________________

End of boring at 12’O”.15 Set well point at 10’O”.

Water encountered at 5’0”.

20

25

30

35

39

Notes: Hollow Stem Auger Size - 4-1/4” with automatic hammer

Cohesionless: 0 -4 V. Loose, 4 - 10 Loose, Trace 0 to 10% CASING SAMPLE CORE TYPE

10 -30 M Dense, 30 -50 Dense, 50+ V Dense. Little 10 to 20% ID SIZE (IN) SS

Cohesive: 0 -2 V Soft, 2 -4 Soft, 4 -8 M Stiff Some 20 to 35% HAMMER WGT (LB) 140 lb.

8-15 Stiff, 15 -30 V. Stiff, 30 + Hard. And 35% to 50% HAMMER FALL (IN) 30”

Page 45: TECHNICAL MEMORANDIUM REVISION 2(511109)

TEST BORING LOG SHEET 21Soil Exploration Corp.

Town of ActonGeotechnical Drilling BORiNG MW’2

Groundwater Monitor Well Site: Proposed Sewer Lines148 Pioneer Drive

Acton, MA PROJECT NO. 09-0427Leominster. MA 01453

978 840039l DATE: May 1, 2009

Ground Elevation: GROUNDWATER OBSERVATIONSDate Started: April 30, 2009 TEDTHSNGSTABILIZATJ

Date Finished: April 30, 2009

Driller: MC

SoilE1er/Geologist:Depth Casing Sample Visual Identification

Ft. hI/ft No. l’en/Rec Depth Blows/6” Strata of Soil and / or Rock Sample

Dry, very soft organic to inorganic silt, trace fine sand.1 1 0-20 1-1-2-2

20”

_________________________________________________

5 2 5’0”-7’0” 6-8-9-9

Wet, medium dense, very fine to fine sand, some inorganic silt.

10 3 10’0”-12’0” 4-6-6-7

120”

_______________________________________________

End of boring at I2’O”.15 Set well point at l0’O”.

Water encountered at 7’O”.

20

25

30

35

39

Notes: Hollow Stem Auger Size - 4-1/4” with automatic hammer

Cohesionless: 0 -4 V. Loose, 4 - 10 Loose, Trace 0 to 10% CASING SAMPLE CORE TYPE10 -30 M Dense, 30 -50 Dense, 50+ V Dense. Little tO to 20% ID SIZE (IN) SSCohesive: 0 -2 V Soft, 2 -4 Soft, 4 -8 M Stiff Some 20 to 35% HAMMER WGT (LB) 140 lb.8-15 Stiff, 15 -30 V. Stiff, 30 + Hard. And 35% to 50% HAMMER FALL (IN) 30”

Page 46: TECHNICAL MEMORANDIUM REVISION 2(511109)

TEST BORING LOG SHEET 22Soil Exploration Corp.

Town of ActonGeotechnical Drilling BORING MW—3

Groundwater Monitor Well Site: Proposed Sewer Lines148 Pioneer Drive

Acton, MA PROJECT NO. 09-0427Leorninster, MA 01453

978 840-0391 DATE: May 1, 2009

Ground Elevation: I GROUNDWATER OBSERVATIONSDate Started: April 30, 2009 DATE I DEPTH CASING I STABILIZATION

Date Finished: April 30, 2009 I I IDriller: MC I I

Soil Engineer/Geologist: I I IDepth Casing Sample Visual Identification

Ft. bl/ft No. Pen/Sec Depth Blows!6” Strata of Soil and! or Rock Sample

Dry, very loose, fine to medium sand, some inorganic silt, trace1 0-20’ 1-2-1-1 root matter, trace organic silt, cobbles.

30’

____________________________________________________

5 2 5’0”-7’0” 31-35-35-43Dry, very dense, fine to medium sand, some inorganic silt, tracefine to coarse gravel, cobbles.

9’O’

____________________________________________________

10Reftisal with hollow stem auger at 9’O.Set well point at 9’O”.Water encountered at 7’6”.

15

20

25

30

35

39

Notes: Hollow Stem Auger Size - 4-1/4” with automatic hammer.

Cohesionless: 0 -4 V. Loose, 4 - 10 Loose, Trace 0 to 10% CASING SAMPLE CORE TYPE10 -30 M Dense, 30 -50 Dense, 50+ V Dense. Little 10 to 20% ID SIZE (IN) SS

Cohesive: 0 -2 V Soft, 2 -4 Soft, 4 -8 M Stiff Some 20 to 35% HAMMER WOT (LB) 140 lb.

8 -15 Stiff, 15 -30 V. Stiff, 30 + Hard. And 35% to 50% HAMMER FALL (IN) 30”

Page 47: TECHNICAL MEMORANDIUM REVISION 2(511109)

TEST BORING LOG SHEET 23Soil Exploration Corp.

Town of ActonGeotechnical Drilling BORING MW.4

Groundwater Monitor Well Site: Proposed Sewer Lines148 Pioneer Drive

Acton, i& PROJECT NO. 09-0427Leorninster, MA 01453

978 840-0391 DATE: May 1, 2009

Ground Elevation: I GROUNDWATER OBSERVATIONSDate Started: April 30, 2009 I DATE I DEPTH CASING I STABILIZATION

Date Finished: April 30, 2009 I IDriller: MC I I I

Soil Engineer/Geologist: I I IDepth Casing Sample Visual Identification

Ft. bi/fi No. PlRec Depth BlowsI6” Strata of Soil and! or Rock Sample

Dry, loose, topsoil, root matter, forest material.I I 0-20” 3-3-3-2

2’O”

____________________________________________________

5 2 5’0”-7’0” 8-1-1-1 Wet, very soft black organics, root matter, roots.

80”

____________________________________________________

End of boring at 8’O.10 Set well point at 8’O”.

Water encountered at 2’O”.

15

20

25

30

35

39

Notes: Hollow Stem Auger Size - 4-1/4” with automatic hammer.

Cohesionless: 0 -4 V. Loose, 4- 10 Loose, Trace 0 to 10% CASING SAMPLE CORE TYPE

10 -30 M Dense, 30 -50 Dense, 50+ V Dense. Little 10 to 20% ID SIZE (IN) SS

Cohesive: 0 -2 V Soft, 2 -4 Soft, 4 -8 M Stiff Some 20 to 35% HAMMER WGT (LB) 140 lb.

8 -15 Stiff, 15 -30 V. Stiff, 30 + Hard. And 35% to 50% HAIvIMER FALL (IN) 30”

Page 48: TECHNICAL MEMORANDIUM REVISION 2(511109)

Attachment F

Ledge Quantity Calculations

Page 49: TECHNICAL MEMORANDIUM REVISION 2(511109)

LOW PRESSURE SEWERLEDGE QUANTITIES

LOCATION DEPTH1 WIDTH AREA LENGTH2 VOLUME3[FT] {FT] [SF] [FT] [CY]

MAINLINE

FLINT ROAD

B17 0 2.5 0

119 5.5B16 1 2.5 2.5

100 9.3B16÷100 1 2.5 2.5

__________

SUM= 14.8

TUTTLE DRIVE

B8+100 3 2.5 7.5

100 27.8B8 3 2.5 7.5

105 14.6B7 0 2.5 0

96 15.6B 6 3.5 2.5 8.75

104 16.9B5 0 2.5 0

__________

SUM 74.9

Bi 0 2.5 0

101 16.4B 20 3.5 2.5 8.75

100 32.4B 20 ÷ 100 3.5 2.5 8.75

____________

SUM = 48.8

TORRINGTON LANE

TUTTLE DRIVE 3.5 2.5 8.75

164 49.4B9 3 2.5 7.5

24 7.8BlO 4 2.5 10

189 61.3Bil 3 2.5 7.5

155 43.1END 3 2.5 7.5

____________

SUM= 161.6

MAINLINE SUBTOTAL (14.8 + 74.9 ÷ 48.8 + 161.6) = 300.1

LATERALS

1) Depth = 7 - Depth of Refusal2) Length = Length between locations3) Volume = (Average of Area) x Length / 27

Page 50: TECHNICAL MEMORANDIUM REVISION 2(511109)

LOW PRESSURE SEWERLEDGE QUANTITIES

LOCATION DEPTH1 WIDTH AREA LENGTH2 VOLUME3[FT] [FT] [SF] [FT] [CY]

FLINT ROAD

HOUSE #49 1 2.5 2.5 25 2.3HOUSE #48 1 2.5 2.5 25 2.3HOUSE #47 0.5 2.5 1.25 25 1.2HOUSE #50 0.5 2.5 1.25 25 1.2HOUSE #51 0.5 2.5 1.25 25 1.2

SUM= 8.2

TUTTLE ROAD

HOUSE #17 1.75 2.5 4.375 25 4.1HOUSE #21 1.75 2.5 4.375 25 4.1HOUSE #34 3 2.5 7.5 25 6.9HOUSE #29 1.75 2.5 4.375 25 4.1

SUM= 19.2

TORRINGTON LANE

HOUSE #7 4 2.5 10 25 9.3HOUSE #3 3 2.5 7.5 25 6.9HOUSE #5 3 2.5 7.5 25 6.9HOUSE #6 3 2.5 7.5 25 6.9HOUSE #4 3 2.5 7.5 25 6.9HOUSE #2 3 2.5 7.5 25 6.9

SUM = 43.8

LATERAL SUBTOTAL ( 8.2 + 19.2 ÷ 43.8) = 71.2

GRAND TOTAL(300.1 ÷71.2)= 371.3

1) Depth = 7 - Depth of Refusal2) Length = Length between locations3) Volume = (Average of Area) x Length /27

Page 51: TECHNICAL MEMORANDIUM REVISION 2(511109)

Attachment G

Indian Village Estimate

Page 52: TECHNICAL MEMORANDIUM REVISION 2(511109)

LOW PRESSURE SEWERESTIMATE BASED ONAWD INDIAN VILLAGE

Indian VillageDescription Quantity Unit Average Unit Price

Unit Price Total AmountWORK WITHIN THE RIGHT OF WAY

2 Inch PVC Pipe’ 11,420 LF $36.20 $413,404.00

2 Inch Gate Valve’ 16 EA $332.43 $5,318.88Manholes 16 EA $3,175.00 $50,800.00

Boulder Excavation2 100 CY $61.36 $6,136.00

Ledge Rock Excavation2 371 CY $120.00 $44,520.00

Gravel Borrow2 250 CY $16.67 $4,167.50

Gravel Subbase2 1,000 CY $16.94 $16,940.00

Ordinary Borrow2 200 CV $14.00 $2,800.00

Excavation of Unsuitable Material2 100 CV $16.60 $1,660.00

Exploratory Excavation2 25 CV $47.86 $1,196.50

Calcium Chloride2 25 50lb-Bag $45.70 $1,142.50Hay Bales and Silt Fence 360 LF $7.59 $2,732.40Trench Binder Pavement 13,008 LF $10.99 $142,957.92

Restoration of Growth2 1,000 SY $9.58 $9,580.0011/2 inch Corporation Stops 127 EA $711.78 $90,396.0611/2 Inch Service Pipe (25’ EA) 3,175 LF $33.20 $105,410.001 1/2 Inch Curb Stops and Boxes 127 EA $494.47 $62,797.69Police Details 1,200 HR $45.00 $54,000.00

SUM $1,015,959.45

ENGINEERING ($1,015,959.45 x 25%) $253,989.86

CONTINGENCY($1 015,959.45 x 10%) $101,595.95

SUBTOTAL ( $1,015,959.45 + $253,989.86 + $101,595.95) $1,371,545.26

TOWN OF ACTON MILLING AND PAVING $556,997.07

TOTAL ($1,371,545.26 + $556,997.07) $1,928,542.33

COST PER LOT ( $1,928,542.33 / 127) $15,185.37

WORK ON INDIVIDUAL LOTSFurnish and Install 1 EA $7,990.00 $7,990.00

COST PER LOT $7,990.00

TOTAL COST PER LOT ( $15,185.37 ÷ $7,990.00) $23,175.37

1 Adjusted the average and low unit prices by reducing the material cost from 6” ductile iron to 2’ PVC.2 Adjusted the average and low unit prices by excluding the unrealistically low bids

Page 53: TECHNICAL MEMORANDIUM REVISION 2(511109)

Low Pressure SewerAWD Unit Prices

Description2” PVC Pipe

11,420 LFPrice adjusted from ductile iron to pvc

PS Means 8’ Dl (331113.153040) $15.40RS Means 2’ PVC (33 1113.25 2120) $0.87

Difference $14.53

Unit Price = $50.73 - $14.53 = $36.20

2” Gate Valves and Boxes45 EA

Price adjusted from ductile iron to pvcRS Means 6’ Dl (33 12 16.10 3814) $650.00RS Means 2” PVC (22 05 23.60 3290) $103.00

Difference $547.00

Unit Price = $889.43 - $547 $342.43

Manholes16 EA

RS Means used for unit priceRS Means (G3030 210 1940) $3,475.00

Unit Price = $3,475.00

Boulder Excavation100 CY

Price adjusted to exclude low bids(90 + 50 + 50 + 50 + 50 + 50+ 50 + 100 + 60 + 50 + 75 ) /11

Unit Price = $61.36

Ledge Rock Excavation50 CY

The most conservative price (highest) was selected

Unit Price = $120.00

Gravel Borrow250 CY

Price adjusted to exclude low bids(10 + 15 + 15 + 22 + 14 + 14 + 10)/6

Unit Price = $16.67

Page 1 of 3

Page 54: TECHNICAL MEMORANDIUM REVISION 2(511109)

Low Pressure SewerAWD Unit Prices

DescriptionGravel Subbase

1,000 CYPrice adjusted to exclude low bids

(15+8+15+20+15+12+l0+11+l0+15+15+15+25+20+20+20+41+18)/is

Unit Price $16.94

Ordinary Borrow200 CY

Price adjusted to exclude low bids(10+10+10+20+20+ 14)16

Unit Price = $14.00

Excavation of Unsuitable Materials100 CY

Price adjusted to exclude low bids(15 + 20 + 15 + 23 + 10 )/5

Unit Price $16.60

Exploratory Excavation25 CY

Price adjusted to exclude low bids(75 + 20 + 50 + 25 + 25 + 20 + 100 + 25 + 10 + 120 + 100 + 15+ 10 + 75 ) / 14

Unit Price = $47.86

Calcium Chloride25 50-lb BG

Price adjusted to exclude low bids(20 + 50 + 50 + 75 + 25 + 25 + 20 + 50 + 100 + 35 + 45 + 50+i00+50+50+24+20+30+50+75+50+17+40)/23

Unit Price = $45.70

Trench Binder Pavement13,008 LF

Unit Price = $10.99

Restoration of Growth1,000 SY

Price adjusted to exclude low bids(10+5+5+6+11.70+8+6.50+15+ 19)/9

Unit Price = $9.58

Page 2 of 3

Page 55: TECHNICAL MEMORANDIUM REVISION 2(511109)

Low Pressure SewerAWD Unit Prices

Description1.5-Inch Corporation Stops

127 EAUse 2-Inch corportation stop

Unit Price = $71 1.78

1 .5-Inch Lateral Pipe3,175 LF

Use 2-Inch piping

Unit Price $33.20

1.5-Inch Curb Stops127 EA

Use 2-Inch curb stops

Unit Price = $494.47

Police Detail1,200 HR

Unit Price = $45.00

Page 3 of 3

Page 56: TECHNICAL MEMORANDIUM REVISION 2(511109)

BID

TA

BU

LA

TIO

NIN

DIA

NV

ILL

AG

EW

AT

ER

MA

INR

EP

LA

CE

ME

NT

AC

TO

NW

AT

ER

DIS

TR

ICT

AC

TO

N,

MA

BID

DA

TE

:M

AR

CH

19,

2008

Proi

aC

onst

ruct

ion

Inc.

CN

Cor

pR

icci

ardi

Bro

s.,

INC

.T

omar

eC

onst

ruct

ion

Cor

p.C

edro

neT

ruck

ing

Inc.

Ncc

dham

,M

AA

sson

et,

MA

Wor

cest

cr,

MA

Wat

erto

wn,

MA

Nor

thB

illcr

ica,

MA

BA

SE

BLD

No.

1N

o.2

No.

3N

o.4

No.

5he

n,A

vera

geU

nit

Tot

alU

nit

Tot

alU

nit

Tot

alU

nit

Tot

alU

nit

Tot

alN

a.D

escr

ipti

onQ

uant

ils’

Uni

tP

rice

Pri

ceA

mou

ntPr

ice

Am

ount

Pri

ceA

mou

ntP

rice

Am

ount

Pri

ceA

mou

ntIa

8’D

l.Pi

pe6,

200

LF.

550.

73S3

8.00

S23

5,60

000

$42.

00$2

60,4

00.0

0S5

5.00

S34

1,00

0.00

S50.

00S3

10,0

00.0

0S

54.5

0S

337,

900.

00lb

6”D

I.Pi

pe25

0L

.F.

544.

23$3

4.00

S8,

500.

00Sl

OO

.00

S25

,000

.00

Sl5

.00

S3,

750.

00S3

5.00

S8,

750.

00S3

’.OO

$8,0

00.0

02a

8”G

ate

Val

vean

dB

oxes

26BA

$1,1

30.6

7$8

50.0

0$2

2,10

0.00

$1,1

00.0

0$2

8,60

0.00

$825

.00

$21,

450.

00$9

50.0

0$2

4,70

0.00

$900

.00

S23

,400

.00

21,

6”G

ate

Val

vean

dB

oxes

ILE

A$8

89.4

3$6

50.0

0$7

,t50

.00

$800

.00

S8,

800.

00$6

00.0

0$6

,600

.00

$650

.00

S7,

t50.

00$6

50.0

0$7

,I50

.00

3oH

ydra

ntII

EA

$2,5

64.1

7$2

,100

.01’

$23,

100.

00$2

,400

.00

$26,

400.

00$1

,600

.00

$17,

600.

00$2

,725

.00

$29,

975.

00$2

,000

.00

$22,

000.

003b

Hyd

rant

Rem

oval

6E

A$2

75.1

0$0

.01

S0.0

6$3

00.0

0$1

,800

.00

$1.0

0$6

.00

$100

.00

$600

.00

$150

.00

$900

.00

4C

otsc

rete

Thr

ust

Blo

cks

50C

.Y.

$14.

04$0

.01

$0.5

0$0

.01

$0.5

0$0

.01

$0.5

0$0

.01

$0.5

0$0

.01

$0.5

05a

Bou

lder

Exe

avat

ion

100

C.Y

.$2

5.24

$0.0

1$1

.00

$0.0

1$1

.00

$0.0

1$1

.00

$30.

00$3

,000

.00

$0.0

1S

loe

SbL

edge

Roc

kE

xcav

atio

n25

0C

.Y.

$18.

07$6

0.00

S15,

000.

00$0

.01

$2.5

0$0

.01

$2.5

0$0

.01

$2.5

0$0

.01

$2.5

06a

Gra

vel

Bor

row

250

CV

.$3

.37

$0.0

1$2

.50

$0.0

1$2

.50

$0.0

1$2

.50

$0.0

1$2

.50

$10.

00S2

,500

.08

ohG

rave

lSu

bbas

e1,

000

C.Y

.$1

0.20

$15.

00$1

5,00

0.00

$0.0

1$1

0.00

$0.0

1$1

0.00

$0.0

1$1

0.00

$8.0

0$8

,000

.08

7O

rdin

ary

Bor

row

200

CV

.$2

.87

$0.0

1$2

.00

S0.O

l$2

.00

$0.0

1$2

.00

$0.0

1$2

.00

$0.0

1$2

.08

8E

xcav

alio

nofU

nsui

tabl

eMat

eria

l10

0C

V.

$2.8

4$0

.01

$1.0

0$0

.01

$1.0

0$0

.01

$1.0

0$0

.01

$1.0

0$0

.01

$1.0

89

Exp

lora

tory

Exc

avat

ion

25C

V.

$22.

54$0

.01

$0.2

5$0

.01

$0.2

5$0

.01

$0.2

5$0

.01

$0.2

5$0

.01

$0.2

510

Cal

cium

Chl

orid

e25

SOIb

-Bag

$36.

08$2

0.00

$500

.00

$50.

00$1

,250

.00

$0.0

1$0

.25

$50.

00$1

,250

.00

$75.

00$1

,875

.00

11H

ayB

ales

and

Silt

Fenc

e36

0L

,F.

$7.5

9$4

.00

Sl,

440.

00$4

.00

$1,4

40.0

0$6

.00

$2,1

60.0

0$6

.00

$2,1

60.0

0$6

.00

$2,1

60.0

012

Tre

nch

Bin

der

Pav

emen

t7,

000

L,F.

$10.

99$8

.00

S56,

000.

0t’

$6.5

0$4

5,50

0.00

$8.0

0$5

6,00

0.01

’$8

.50

$59,

500.

00S

ttO

O$7

7,00

0.00

13R

esto

rati

onof

Gro

wth

1,00

0S.

Y.

$3.6

6$1

.00

Sl,0

00.0

OSO

Ot

SlO

.00

S3.0

0S3

,ttO

O.0

0$0

.01

SlO

.00

Soot

Sl0

.00

t4a

I-in

chC

opor

atio

nSt

ops

71EA

S466

.33

$150

.00

SlO

,650

.00

$1,2

00.0

0$8

5,20

0.00

S50.

00S3

,550

.00

S300

.00

$21,

300.

00S5

25.O

0$3

7,27

5.00

l4b

1-iti

chSe

rvic

ePi

pe1,

500

L.F.

$20.

17$2

1.00

$31,

500.

00SO

Ot

Sl5.

OO

S18.

00$2

7,00

0.00

S20.

O0

$30,

000.

00$5

.00

$750

0011

14c

I-in

chC

urb

Stop

and

Box

71E

AS2

23.7

8$1

50.0

0Sl

O,6

50.0

0SO

Ot

S0.7

1$1

00.0

0$7

,100

.00

SI5O

.00

$10,

650.

0051

75.0

0S1

2,42

5.00

ISa

0-m

elt

Cor

pora

tion

Stop

sI

BA

$711

.78

$250

.00

S250

.00

Sl,2

00.O

0S

t,200

.00

$150

.00

Sl5

0.00

$300

.00

S300

.O0

S700

.O0

S700

.O0

151

2-its

clt

Serv

ice

Pipe

20L.

F.$3

3.20

$25.

00S5

00.0

O$0

.01

SO.2

0S

2500

S500

.00

$25.

00$5

00.0

0$5

.00

$100

.00

ISo

2-m

elt

Cur

bSt

opan

dB

oxI

EA

$494

.47

S250

.00

S250

.00

SOO

tSO

Ot

$250

.00

S250

.00

S250

.OO

$250

.00

$350

.00

$350

.00

16a

4-it

tclt

Ten

spor

aryB

ypas

s6,

000

L.F.

$6.9

0S5

.00

$30,

000.

00$5

.00

S30

,000

.00

$7.0

0$4

2,00

0.00

$4.5

0S2

7,00

0.O

OS3

.00

$18,

000.

00

tOb

2-in

cit

Tem

pora

ryB

ypas

s6,

000

L.F.

$4.7

4S3

.00

$180

0001

’$4

.00

S24,

000.

00S5

.OO

S30,

000.

00S4

.50

S27,

000.

O0

S2.0

0S

l2,0

00.0

0

LiSi

ltSa

cks

31E

AS9

0.99

$70.

00S2

,170

.0O

SOO

tS0

.31

$80.

00S2

,480

.00

S75.

00S2

,325

.OO

S75.

00S2

,325

.08

18Po

lice

Det

ails

1,20

0H

rs.

S45.

00$4

5.00

S54,

000.

O0

S45.

0O$5

4,00

0.00

S45.

OO

S54,

000.

00S4

5.00

$54,

000.

00S

45.0

0$5

4,00

0.08

BID

TO

TA

L$5

43,3

6731

8593

635

98$6

1861

600

$620

4387

586

35,5

7725

Ihe

reby

cert

ify

that

thin

isan

accu

rate

repr

esen

tati

on

of

the

bids

rece

ived

for

this

proj

ect:

Tño

mas

5.M

’añ

ann

a,IP

.IE.

3/21

/08

Tho

mao

3.M

ahan

na,

P.E

.D

ate

uidT

ahol

atio

nF

om,u

I,3/

2112

008

ST

AN

TE

Cta

g,

tu

6

Page 57: TECHNICAL MEMORANDIUM REVISION 2(511109)

Ih

ereb

yce

rtif

\jth

atth

isis

anac

cura

tere

pre

sen

tati

on

of

the

bid

sre

ceiv

edfo

rth

isp

roje

ct:

‘Tilo

mas

y._5

81ala

nna,_

!P.!

E.

_______

BED

TA

BU

LA

TIO

N

IND

IAN

VIL

LA

GE

WA

TE

RM

AIN

RE

PL

AC

EM

EN

TA

CT

ON

WA

TE

RD

IST

RIC

T

AC

TO

N,

MA

No.

6

BID

DA

TE

:M

AR

CH

19,

2008

N.

Gra

nese

&So

nsIn

c.SB

Gen

eral

Con

trac

ting

C.J

.D

oher

ty,

Inc.

Tom

Gio

ioso

Csn

st.

Inc.

DeF

elic

eC

orp.

Mar

bleh

ead,

MA

Wal

pole

,M

AM

edfo

rd,

MA

Roc

klan

d,M

AD

racs

t,M

AB

AS

EB

IDN

o.10

No.

7N

o.8

No.

9It

emA

vera

geU

nit

Tot

alU

nit

Tot

alU

nit

Tot

alU

nit

Tot

alU

nit

Tota

lN

o.D

escr

ipti

onQ

uant

iti’

Uni

tPr

ice

Pri

ceA

mou

ntP

rice

Am

ount

Pri

ceA

mou

ntP

rice

Am

ount

Pric

aA

mou

ntIa

8”D

.I.Pi

pe6,

200

LF.

$50.

73S4

9.00

S30

3,80

0.00

S49.

00S

303,

800.

00S

46.0

0S

285,

200.

00S4

900

S30

3,80

000

$58.

80S

364,

560

00lb

6”D

.l.

Pipe

250

L.F

.$4

4.23

$50.

00S

12,5

00.0

0S4

5.00

S1l

,250

.00

S50

.00

S12

,500

.00

$45.

00S

ll.2

50

.00

St5

.00

$3,7

50.0

02a

8”G

ate

Val

vean

dB

oxes

26E

A$1

,130

.67

Sl,

800.

00S

46,8

00.0

0$9

00.0

0$2

3,40

0.00

S820

.00

S2l

,320

.00

$975

.00

$25,

350.

00$8

00.0

0$2

0,80

0.00

2b“

Gat

eV

alve

and

Box

esII

PA$8

89.4

3$1

,200

.00

Sl3

,200

.00

$650

.00

$7,1

50.0

0S6

00,0

0$6

,600

.00

$725

.00

$7,9

75.0

0$2

,500

.00

$27,

500.

003a

Hyd

rant

IIE

A$2

,564

.17

$3,0

00.0

0S

33,0

00.0

9$2

,600

.00

$28,

600

$3,0

00.0

0$3

3,00

0.00

$2,1

00.0

0$2

3,10

0.00

$4,0

00.0

0$4

4,00

0.00

3bH

ydra

ntR

emov

al6

PA$2

75.1

0$5

0.00

$300

.00

$300

.00

$1,8

00.

$0.0

1$0

.06

$200

.00

$1,2

00.0

’)$5

0.00

$300

.00

4C

oncr

ete

Thr

ust

Blo

cks

50C

.Y.

$14.

04$0

.01

$0.5

0$0

.0$0

.$0

.01

$0.5

0$0

.0$0

.50

$0.0

$0.5

05a

Bou

lder

Exc

avat

ion

100

CV

.$2

5.24

$0.0

1$1

.00

$90.

00$9

,000

.$1

0.00

$1,0

00.0

0$5

0.00

$5,0

00.0

0$2

0.00

$2,0

00.0

0Sb

Led

geR

ock

Exc

avat

ion

250

CV

.$1

8.07

$0.0

1$2

.50

$0.0

1$2

.$8

0.00

$20,

000.

00$0

.01

$2.5

0S0

.0$2

.50

6aG

rave

lB

orro

w25

0C

V.

$3.3

7$1

0.00

$2,5

00.0

0$0

.01

$2.

$15.

00$3

,750

.00

$0.0

1$2

.50

$0.0

$2.5

06b

Gra

vel

Stib

base

1,00

0C

.Y.

$10.

20$1

5.00

$15,

000.

00$2

0.00

$20,

000.

$15.

00$1

5,00

0.00

$12.

00$1

2,00

0.00

S0.0

$10.

007

Ord

inar

yB

orro

w20

0C

.Y.

$2.8

7$1

0.00

$2,0

00.0

0$0

.01

$2.

$10.

00$2

,000

.00

$0.0

1$2

.00

$0.0

$2.0

08

Exc

avat

ion

ofU

nsai

tabl

eM

ater

ial

100

C.Y

.$2

.84

$0.0

1$1

.00

$0.0

1$1

.$1

5.00

$1,5

00.0

0$0

.01

$1.0

0$0

.0$1

.00

9E

xplo

rato

ryE

xcav

atio

n25

C.Y

.$2

2.54

$0.0

1$0

.25

$75.

00$1

,875

$20.

00S5

00.O

0$5

0.00

$1,2

50.0

0$5

.00

$125

.00

10C

alci

unt

Cltl

orid

e25

SOIb

-Bag

$36.

08$3

0.00

$750

.00

$25.

00$6

25.

$25.

00$6

25.0

0$0

.0$0

.25

$20.

00$5

00.0

0II

Hay

Bal

esan

dSi

ltFe

nce

360

L.F.

$7.5

9$7

.00

$2,5

20.0

0$6

.00

$2,1

60.

$5.0

0S

l,800

.00

$5.0

0$1

,800

.00

$5.2

5$1

,890

.00

12T

renc

hB

inde

rPa

vem

ent

7,00

0L

.F.

$10.

99$7

.00

S49

,000

.00

$8.0

0$5

6,00

0.$8

.00

$56,

000.

00$9

.00

$63,

000.

00$6

.00

$42,

000.

0013

Res

tora

tion

ofG

row

tt,

1,00

0S.

Y.

$3.6

6$1

.50

$1,5

00.0

0S0

.01

$10.

00$1

0.00

$10,

000.

00S0

.01

$10.

00S0

.Ol

SI0

.00

l4a

‘-in

chC

opor

atio

nSt

ops

71E

A$4

66.3

3S7

00.0

OS

49,7

00.0

0$3

50.0

0$2

4,85

0.00

S350

.00

S24

,850

.00

S90

0.00

S63

,900

.00

$850

.00

S60

,350

.00

14b

I-in

chSe

rvic

ePi

pe1,

500

L.F.

$20.

17S0

.50

$750

.00

$15.

00S2

2,50

0.00

$20.

00$3

0,00

0.09

S10,

00$1

5,00

0.00

$1.0

0$1

,500

.00

l4c

I-in

chC

urb

Stop

and

Box

71PA

$223

.78

$100

.00

$7,1

00.0

0$1

50.0

0S

l0,6

50.0

0S4

00.0

0$2

8,40

0.09

S250

.00

$17,

750.

00S

l50.

00S

l0,6

50.0

0IS

a2-

inch

Cor

pora

tion

Stop

s1

LA

$711

.78

S900

.00

S900

.00

$700

.00

$700

.00

Sl,

000.

00$1

,000

.00

S1,

500.

00S

l,50

0.00

$500

.00

$500

.00

l5b

2-in

chSe

rvic

ePi

pe20

LF

.$3

3.20

$2.0

0$4

0.00

$30.

00$6

00.0

0$4

5.00

$900

.00

$30.

00$6

00.0

0$2

.00

$40.

00IS

o2-

inch

Cur

bSt

opan

dB

oxI

EA$4

94.4

7$3

00.0

0$3

00.0

0$3

00.0

0S3

00.0

0$9

00.0

0$9

00.0

0S5

00.0

0S5

00.0

0$2

00.0

0$2

00.0

016

a4-

met

sT

empo

rary

Byp

ass

6,00

0L

.F.

$6.9

0$8

.00

S48

,000

.00

$7.0

0S4

2,00

0.00

$3.5

0$2

1,00

0.00

S7.0

0S4

2,00

0.00

S5.0

0S3

0,00

0.00

l6b

2-in

chT

entp

orat

yB

ypas

s6,

000

LF

.$4

.74

$0.0

1$6

0.00

$5.0

0S

30,0

00.0

0$3

.50

$21,

000.

00S2

,00

$12,

000.

00S0

.Ol

S60.

0017

Sil

tSac

ks31

PA

$90.

99S6

0.00

$1,8

60.0

0$0

.01

S0.

3l$0

.01

S0.3

1S5

0,00

$1,5

50.0

0S

l.00

S3l

.00

18Po

lice

Det

ails

1,20

0H

is.

$45.

00$4

5.00

$54,

000.

00$4

5.00

$54,

000.

00S4

5.00

$54,

000.

00S

45.0

0$5

4,00

0.00

S45

.00

$54,

000.

00

BID

TO

TA

L$6

4558

525

8651

278

81$6

5284

$87

$664

543

7586

6478

450

Thom

asJ.

Mah

ann

a,P

.E.

3/21

/08

Dat

e

Oid

Tab

olat

,uo

For

mat

s3/

2)12

0u5

ST

AN

TE

CPa

ge2

of6

Page 58: TECHNICAL MEMORANDIUM REVISION 2(511109)

BID

TA

BU

LA

TIO

N

IND

IAN

VIL

LA

GE

WA

TE

RM

AIN

RE

PL

AC

EM

EN

TA

CT

ON

WA

TE

RD

IST

RIC

TA

CT

ON

,M

A

Ven

tres

ca,

Inc.

Spin

elli

Dev

elop

men

tC

orp.

Ston

eham

,M

AN

orth

boro

ugh,

MA

‘.14

‘5

Ihe

reby

cert

i1i

that

this

isan

accu

rate

repr

esen

tatio

no

fthe

bids

rece

ived

for

this

proj

ect:

Tho

mas

5.9ta

lian

na,

fE..

3/21

/08

Dat

e

InD

l.P

ine

BtD

DA

TE

:M

AR

CH

19,

2008

C.J

.P.

&So

nsC

onst

.C

o.,

Inc.

Oli

veir

aC

onst

ruct

ion,

Inc.

Car

acas

Con

si.

Cor

p.

Mili

s,M

ASo

mer

set

Lud

low

,M

AB

ASE

BID

No.

11N

o.12

No.

13

6200

t,-1

$50.

73$4

9.13

$303

,800

.$4

8.00

$297

,600

.00

$47.

00$2

9140

0.00

$57.

50S

356,

500.

0054

8.00

5297

,600

.00

—A

rera

geU

izit

Tot

alU

nit

Tot

alU

nit

Tot

alN

o.D

,’rc

ripl

ion

2ua,

zrjtv

U,

—P

rice

Pri

ce.-l

m,,u

ntl’

rice

Am

ount

Pri

ceA

mou

nt

tb6”

Dl.

Pipe

250

LF

$44.

2355

000

$12,

500

$1.0

0$2

50.0

0$3

5.00

$8,7

50.0

0$4

9.00

$12,

250.

00$5

0.00

$12,

500.

002x

8”G

ate

Val

vean

dB

oxes

26E

AS

1,13

0.67

S900

.l10

S23,

400

Sl,

450.

00S

37,7

00.0

0S

I,40

0.00

S36

,400

.00

S975

.00

S25

,350

.00

S1,

200.

00S

31,2

00.0

02b

6”G

ate

Val

vean

dB

oxes

IIE

AS8

89.4

3S8

00.0

0$8

,800

.S

725.

00$7

,975

.00

Sl,

000.

00SI

1,00

0.0’

)S

800.

00$8

,800

.00’

$1,0

00.0

1$1

1,00

0.00

3aH

ydra

ntII

EA

$2,5

64.1

7$2

,200

.00

S24,

200.

S2,

400.

00$2

6,40

0.00

S2,

600.

00S

28,6

00.0

0$2

,700

.00

$29,

700.

00S

3,00

0.00

$33,

000.

003b

Hyd

rant

Rem

oval

6E

A$2

75.1

0S

400.

00$2

,400

.00

S1.0

0S6

.00

$350

.00

$2,1

00.0

0$2

00.0

0$1

,200

.00

S40

0.00

S2,

400.

004

Con

crct

eThr

astB

lock

s50

CV

.$1

4.04

SOO

t$0

.50

S0.

0l$0

.50

$0.0

S0.5

0$1

.00

$50.

00SO

Ot

$0.5

05a

Bou

lder

Exc

avat

ion

tOO

CV

.$2

5.24

$0.0

1$1

.00

$0.0

1$1

.00

$50.

00$5

,000

.00

$1.0

0$1

00.0

0$0

.01

$1.0

0Sb

Led

geR

ock

Exc

avat

ion

250

CV

.$1

8.07

$0.0

1$2

.50

So

ol

$2.5

0$0

.0S2

.50

$1.0

0$2

50.0

0S

120.

00$3

0,00

0.01

)

6aG

rave

lB

orro

w25

0C

V.

$3.3

7$0

.01

$2.5

0S0

.Ol

$2.5

0$0

.0S2

,50

St.

00$2

50.0

0$0

.01

$2.5

06b

Gra

vel

Sub

base

1,00

0C

V.

$10.

20$1

0.00

$10,

000.

00$1

1.00

$11,

000.

00S0

.0S1

0,00

$1.0

0S

1,00

0.00

SO.O

lSl

0.O

O7

Ord

inar

yBor

row

200

C.Y

.$2

.87

$0.0

S2.0

0S

0.0l

S2.O

OS0

.0S2

.00

$1.0

0S

200.

00$1

0.00

$2,0

00.0

0

8_

Exc

avat

ion

ofU

nsai

tabl

eM

ater

ial

100

CV

.$2

.84

$0.0

$1.0

0S

0.0I

$1.0

0$2

0.00

$2,0

00.0

’)S

I.$1

00.0

0S0

.Ol

$1.0

9‘)

xplo

rato

iyE

xcav

atio

n25

C.Y

.$2

2.54

$0.0

$0.2

5$0

.01

S0.2

5$2

5.00

$625

.00

$25.

$625

.00

$0.0

1$0

.2

10C

alci

umC

hlor

ide

2550

1b-B

ag$3

6.08

$50.

00$1

,250

.00

$100

.00

$2,5

00.0

0$3

5.00

$875

.00

SI.

$25.

00$0

.01

$0.2

ItH

ayB

ales

and

Silt

Fenc

e36

0L

.F.

$7.5

9$6

.00

$2,1

60.0

0$6

.00

$2,1

60.0

0$1

1.00

$3,9

60.0

0S

t.$2

,880

.00

$20.

00$7

,200

.0

12T

renc

hB

inde

rPav

emen

t7,

000

L.F

.$1

0.99

S9.5

0$6

6,50

0.00

$12.

00$8

4,00

0.01

)$1

3.00

$91,

000.

0’)

$8.0

$56,

000.

00$1

4.00

598,0

000

13R

esto

ratio

nof

Gro

wth

1,00

0S.

V.

$3.6

6$5

.00

$5,0

00.0

0$1

.00

$1,0

00.0

0$5

.00

$5,0

00.0

051

.51

,000

.00

$0.0

1$1

0.0

14a

1-in

chC

opor

atio

nSt

ops

71E

A$4

66.3

3$5

50.0

0$3

9,05

0.00

$700

.00

$49,

700.

00$1

70.0

0$1

2,07

0.00

$450

.$3

1,95

0.00

$300

.00

$21,

300.

0

t4b

I-in

chSe

rvic

eP

ipe

1,50

0L

.F.

$20.

17$1

8.00

$27,

000.

00$0

.50

$750

.00

$17.

00$2

5,50

0.00

$18.

$27,

000.

00$2

0.00

$30,

000.

0

t4c

1-in

chC

urb

Stop

and

Box

71E

A$2

23.7

8$3

50.0

0$2

4,85

0.00

$50.

00$3

,550

.00

$275

.00

$19,

525.

00$1

00-

0$7

,100

.00

$300

.00

$21,

300.

00

iSa

2-in

chC

orpo

ratio

nSt

ops

1E

A$7

11.7

8$7

50.0

0$7

50.0

0$1

,000

.00

$1,0

00.0

0$4

20.0

0$4

20.0

0$1

,000

.$1

,000

.00’

$0.5

0$0

.5

tsb

2-in

chSe

rvic

eP

ipe

20L

.F.

$33.

20$2

5.00

$500

.00

$2.0

0$4

0.00

$50.

00$1

,000

.0’)

$25.

$500

.00

$50.

00$1

,000

.0

l5c

2-in

chC

urb

Stop

and

Box

1E

A$4

94.4

7$4

50.0

0$4

50.0

0$2

50.0

052

50.0

0$6

50.0

0$6

50.0

0$3

25.

$325

.00

$400

.02

$400

.0I6

a4-

incl

iTem

pora

ryB

ypas

s6,

000

L.F

.$6

.90

S6.0

0$3

6,00

0.00

$9.0

0$5

4,00

0.00

$7.0

0$4

2,00

0.00

56.

S36,

000.

O0

$3.0

0$1

8,00

0.00

16b

2-io

chT

empo

raiy

Byp

ass

6,00

0L

.F.

$4.7

4S5

.0O

$30,

000.

00$7

.00

$42,

000.

00$5

.00

$30,

000.

00$5

.00

$30,

000.

00$3

.00

$t8,

000.

00

17Si

ltSa

cks

31E

A$9

0.99

$70.

00$2

,170

.00

510.

00$3

10.0

0S

t50.

00$4

,650

.00

$45.

00$1

,395

.00

$3.5

8$1

10.9

8t8

Polic

eD

etai

ls1,

200

Hrs

.$4

5.00

$45.

00$5

4,00

0.00

545,

00$5

4,00

0.00

$45.

00$5

4,00

0.00

$45.

00$5

4,00

0.00

$45.

00$5

4,00

0.00

BID

TO

TA

L$6

7478

975

$676

200

75$6

7654

250

5685

550

00$6

8903

700

Tho

mas

J.M

ahan

na,

P.E

.

ai,t

T,b

ula

tta,

I’orm

.xI,

3/21

/200

8S

TA

NT

EC

Pat

e3

of6

Page 59: TECHNICAL MEMORANDIUM REVISION 2(511109)

Ihe

reby

cert

ify

that

this

isan

accu

rate

repr

esen

tati

on

of

She

bids

rece

ived

for

this

proj

ect:

¶lii

omas

9._9

i1añ

amna

,_P

.E.

_______

BID

TA

BU

LA

TIO

NIN

DIA

NV

ILL

AG

EW

AT

ER

MA

INR

EP

LA

CE

ME

NT

AC

TO

NW

AT

ER

DIS

TR

ICT

AC

TO

N,

MA

BID

DA

TE

:M

AR

CH

19,

2008

Frei

tas

Con

stru

ctio

n,In

c.B

lum

eC

onst

ruct

ion

Inc.

A.

And

reas

si&

Son,

tan.

N.

Cib

olti

,In

c.Fi

veO

aks

Con

st.

Co.

,In

c.Lu

dlow

Wal

pole

,M

AN

orw

ood,

MA

Bra

intrc

c,M

AG

roto

n,M

AB

AS

EB

IDN

o.16

No.

17N

o.18

No.

19N

o.20

Item

Ave

rage

Uni

tT

otal

Uni

tT

otal

Uni

tT

orn!

Uni

tT

otal

Uni

tT

otal

Ma.

Dcc

ript

ion

Qua

ntit

yU

nit

Pri

ceP

rice

Am

ount

Pri

ceA

mou

ntP

rice

Am

ount

Pri

ceA

mou

ntP

rice

Am

ount

Ia8”

DI.

Pip

e6,

200

LF

$50.

73S5

400

S334

,800

.0O

S50.

0OS

310,

000

00S5

5.0O

S34

l,550

.0O

S45.

0OS

279,

000.

00$4

9.00

S303

,800

.0O

lb6”

Dl.

Pip

e25

0L

.F.

$44.

23S5

0.00

Sl2

,500

.00

S50.

00S

l2,5

00.0

0S

l00.

00S

25,0

50.s

0S4

5.00

Sll

,25

0.0

0S

l2.0

0$3

,000

.00

2a5”

Gat

eV

alve

and

Box

es26

BA

$1,1

30.6

7$1

,250

.00

$32,

500.

00S8

00.0

0$2

0,80

0.00

Sl,

550.

00$2

6,00

0.00

$1,0

00.0

0$2

6,00

0.00

$2,0

00.0

0$5

2,00

0.00

2b6

Gat

oV

alve

and

Box

esII

EA

$889

.43

$800

.00

$8,8

00.0

0$6

00.0

0$6

,600

.00

$800

.00

ss,so

o.oo

$1,0

00.0

0S

t1,

000.

00$1

,500

.00

$16,

500.

003a

Hyd

rant

IIB

A$2

,564

.17

$2,8

00.0

0$3

0,80

0.00

$2,5

00.0

0$2

7,50

0.00

$2,5

00.0

3$2

7,50

0.00

$2,5

00.0

0$2

7,50

0.00

$3,0

00.0

0$3

3,00

0.00

3bH

ydra

ntR

emov

al6

BA$2

75.1

0$3

00.0

0$1

,800

.00

$100

.00

$600

.00

$200

.00

$1,2

00.0

0$1

00.0

0$6

00.0

0$3

00.0

0$1

,800

.00

4C

oncr

ete

Thr

ust

Blo

cks

50C

V.

$14.

04$0

.01

$0.5

0$0

.01

$0.5

0$0

.01

$0.5

0$0

.01

$0.5

0$0

.01

$0.5

0Sa

Bou

lder

Bxc

avat

ion

100

C.Y

.$2

5.24

$0.0

1$1

.00

$50.

00S

5,00

0.00

$0.0

1$1

.00

$0.0

1$1

.00

$50.

00$5

,000

.00

SbL

edge

Roc

kE

xcav

atio

n25

0C

V.

$18.

07$0

.01

$2.5

0$5

0.00

$12,

500.

00$0

.01

$2.5

0$0

.01

$2.5

0$0

.01

$2.5

06a

Gra

vel

Bor

row

250

CV

.$3

.37

$0.0

1$2

.50

$0.0

1$2

.50

$0.0

1$2

.50

$0.0

1$2

.50

$0.0

1$2

.50

6bG

rave

lS

ubba

se1,

000

CV

.$1

0.20

$0.0

1$1

0.00

$0.0

1$1

0.00

$10.

00$1

0,00

0.00

$15.

00$1

5,00

0.00

$15.

00$1

5,00

0.00

7O

rdin

ary

Bor

row

200

C.Y

.$2

.87

$0.0

1$2

.00

$0.0

1$2

.00

$0.0

1$2

.00

SOO

t$2

.00

$0.0

1$2

.00

8E

xcav

atio

nof

Uns

uita

ble

Mat

eria

l10

0C

V.

$2.8

4$0

.01

$1.0

0$0

.01

$1.0

0$0

.01

$1.0

0$0

.01

$1.0

0$0

.01

$1.0

09

“]sp

lora

tary

Exc

avat

ion

25C

.Y.

$22.

54$2

0.00

$500

.0$1

00.0

0$2

,500

.00

$0.0

150

.25

$25.

00$6

25.0

0$0

.01

$0.2

510

Cal

cinr

nC

hlor

ide

25SO

Ib-B

ag$3

6.08

$45.

00$1

,125

’]$5

0.$1

,250

.00

$100

.$2

,500

.03

$50.

00S

l,2

50

00

$50.

00$1

,250

.00

IIH

ayB

ales

and

Silt

Fcttc

c36

0L

.F.

$7.5

9$8

.50

$3,0

60.0

$10.

$3,6

00.0

$6.

$2,1

60.0

$7.

$2,5

20’]

$6.5

0$2

,340

.00

12T

renc

hB

inde

rP

avem

ent

7,00

0L.

F.$1

0.99

$15.

00S

l05,

000.

0$1

2.$8

4,00

0.0

S9.

$63,

000.

0$1

1.$8

0,50

0.0

$10.

00$7

0,00

0.00

13R

esto

ratio

nof

Gro

wtls

1,00

0S.

Y.

$3.6

6S3

.00

S3,0

00.0

SO.

$10.

0S2

.S2

,000

.0SO

.$1

0.0

$2.0

0$2

,000

.00

l4a

1-iti

cli

Cop

orat

ion

Stop

s71

EA

$466

.33

$150

.00

S10

,650

,0S5

00.

S35

,500

,0$4

00.

S28

,400

.0S5

00.

$35,

500.

0$8

00.0

0S

56,8

00.0

014

bI-

inch

Serv

ice

Pip

e1,

500

L.F

.$2

0.17

$23.

00$3

4,50

0.0

$10.

$15,

000.

0S2

0.$3

0,00

0.0

$25.

S37

,550

.0S

10.0

0$1

5,00

0.00

14c

I-in

chC

urb

Stop

and

Box

71E

A$2

23.7

8$2

50.0

0$1

7,75

0.0

$100

.$7

,100

.0$5

00.

$35,

500.

0$3

00.

$21,

300.

0$1

00.0

0$7

,100

.00

ISa

2-in

chC

orpo

rati

onS

tops

IE

A$7

11.7

8$2

50.0

0S2

50.0

$800

.S8

00.0

$1,0

00.

$1,0

00.0

SlO

b.

$1,0

00.0

$1,0

00.0

0S

1,00

0.00

lsb

2-in

chSe

rvic

eP

ipe

20L

.F.

$33.

20$4

5.00

$900

.0$5

0.$1

,000

.0$5

0.$1

,000

.052

5.$5

00.0

$20.

00$4

00.0

0

15c

2-io

chC

arb

Stop

and

Box

iEA

$494

.47

$600

.00

$600

.0$5

0R$5

00.0

$1,0

00.

$1,0

00.0

$500

$500

.0$3

00.0

0S

300.

00lO

u4-

inch

Tcn

tpor

aiy

Byp

ass

6,00

0L

.F.

$6.9

0$4

.50

$27,

000.

0S8

.S

48,0

00,0

$3.

$18,

000.

0$9

.$5

4,00

0.0

$9.0

0S5

4,00

0.00

16b

2-in

chT

empo

rary

Byp

ass

6,00

0L

.F.

$4.7

4S2

.00

S12

,000

.0S

i.S

42,0

00,0

S3.

$18,

000.

0S7

.S

42,0

00.0

S2.0

0S

12,0

00.0

0

17Si

ltSa

cks

31E

A$9

0.99

S75.

00S

2,32

5.00

$200

.00

$6,2

00.0

0$1

00.0

0$3

,100

.00

$100

.00

$3,1

00.0

0$5

0.00

Sl,

550,

0018

Pol

ice

Det

ails

1,20

0H

rs.

$45.

00$4

5.00

S54

,000

.00

S45.

00$5

4,00

0.00

S45.

00$5

4,00

0.00

$45.

00S

54,0

00.0

0$4

5.00

S54

,000

,00

BID

TO

TA

L$6

9387

950

$696

976

00$6

9916

975

$704

664

50$7

0784

875

Tho

mas

J.M

ahan

na,

P.E

.

3/2

1/0

8

Dat

e

t3id

Tab

alat

ios

For

m.s

ls31

2t12

000

ST

AN

TE

CP

ag,4

at6

Page 60: TECHNICAL MEMORANDIUM REVISION 2(511109)

BID

TA

BU

LA

TIO

NIN

DIA

NV

ILL

AG

EW

AT

ER

MA

INR

EP

LA

CE

ME

NT

AC

TO

NW

AT

ER

DIS

TR

ICT

AC

TO

N,

MA

BID

DA

TE

:M

AR

CH

19,

2008

Blu

eD

iam

ond

Equ

ip.

Co.

LL

C.

Gre

ener

Exc

avat

iong

LL

CC

ape

Ann

Equ

ipm

ent,

LL

C.

J.A

.P

olit

o&

Sons

Inc.

I.E.A

mor

ello

Inc.

Foxb

oro,

MA

Low

ell,

MA

Nor

thA

ndov

er,

MA

Shre

wsb

ury,

MA

Wor

cest

er,

MA

BA

SE

BID

No.

21N

o.22

No.

23N

o.24

No.

25D

ent

Ave

rage

UnI

tT

otal

U,u

tT

otal

UnI

tT

otal

Uni

tT

otal

flitI

tT

otal

No.

Des

crip

tion

Qua

nti0

’U

nit

Pri

cePr

ice

Am

ount

Pri

ceA

mou

ntP

rice

A,n

oul

Pri

ceA

mou

ntP

rice

Am

ount

Ia“

Dl.

Pipe

6,20

0L

.F.

$50.

73S4

2.00

S260

,400

.’)53

9.00

S24

1,80

0S5

1.O

OS

3l6,

200

$45.

00S2

79,0

00.O

OS5

9.O

0S3

65,8

00.O

Olb

‘D

l.Pi

pe25

0L

.F.

$44.

23S

40.0

0$1

0,00

0.0

$38.

00S9

,500

.$4

0.00

S10

,000

.S4

0.O

OSl

O,0

00.0

’)S

25.0

0$6

,250

.01

2a“

Gat

eV

alve

and

Box

es26

EA

$1,1

30.6

7S

900.

00S

23,4

00.0

S900

.0O

S23,

400.

$1,6

00.0

054

1,60

0.S

l,00

0.00

S26

,000

.00

$1,0

75.0

0$2

7,95

0.00

2b“

Gat

eV

alve

and

Box

esIt

EA

$889

.43

$700

.00

S7,7

00.0

$750

.00

$8,2

50.

Sl,

300.

00S

l4,3

00.

$700

.00

57.7

0000

$825

.00

S9,

075.

003a

Hyd

rant

IIE

A$2

,564

.17

S2,

000.

00S

22,0

00.0

S2,

200.

00S2

4,20

0.$3

,000

.00

S33

,000

.$2

,200

.00

$24,

200.

00S

2.50

0.00

S27

,500

.00

3bH

ydra

ntR

emov

al6

EA

$275

.10

S500

.00

S3,0

00.l)

SI,

500.

00$9

,000

.S

t,00

0.00

$6,0

00.

StO

O.0

OS6

00.0

0S

t.00

$6.0

04

Con

cret

eT

hrus

tB

lock

s50

C.Y

.S1

4.04

S0.

0l$0

.5SI

10.0

055

,500

.SO

Ot

SO.

$0.0

1$0

.50

$0.0

1$0

.50

5aB

onld

erE

xcav

atio

n10

0C

.Y.

$25.

24$5

0.00

$5,0

00.0

$20.

00$2

,000

.$5

0.00

$5,0

00.

$100

.00

$10,

000.

00$6

0.00

$6,0

00.0

0Sb

Led

geR

ock

Exc

avat

ion

250

C.Y

.$1

8.07

$50.

00$1

2,50

0.0

S40.

O0

$10,

000.

$0.0

1$2

.$5

0.00

$12,

500.

00$0

.01

$2.5

06a

Gra

vel

Bor

row

250

C.Y

.$3

.37

$15.

00$3

,750

.0$2

2.00

$5,5

00.

$0.0

1$2

$0.0

1S2

.50

$14.

00$3

,500

.00

6b(‘

rave

lSu

bbas

e1,

000

C.Y

.$1

0.20

$15.

00$1

5,00

0.0

$25.

00$2

5,00

0.$2

0.00

$20,

000.

$0.0

1$1

0.00

$0.0

1$1

0.00

7O

rdin

aryB

orro

w20

0C

V.

$2.8

7$0

.0$2

.0$2

0.00

$4,0

00.

$0.0

1$2

.$0

.01

$2.0

0$1

.00

$200

.00

8E

xcav

atio

nofU

nsui

tabl

eMat

eria

l10

0C

V.

$2.8

4$1

5.00

$1,5

00.0

0$2

3.00

$2,3

00.0

0$0

.01

$1.0

0$0

.01

$1.0

0$1

.00

$100

.00

9E

xplo

rato

ryE

xcav

atio

n25

CV

.$2

2.54

$10.

00$2

50.0

0$1

20.0

0$3

,000

.00

$100

.00

$2,5

00.0

0$0

.01

$0.2

5$1

.00

$25.

0010

Cal

cium

Chl

orid

e25

501b

-Bag

$36.

08$0

.01

$0.2

5$2

4.00

$600

.00

$20.

00S5

00,0

0$3

0.00

$750

.00

$50.

00$1

,250

.00

11H

ayB

ales

and

Silt

Fenc

e36

0L

.F.

$7.5

9$1

0.00

$3,6

00.0

0$6

.00

$2,1

60.0

0$9

.00

$3,2

40.0

0$7

.50

$2,7

00.0

0$8

.00

$2,8

80.0

012

Tre

nch

Bin

der

Pav

cmca

t7,

000

L.F.

$10.

99S9

.0O

$63,

000.

00$1

6.00

$112

,000

.00

$15.

00$1

05,0

00.0

0$1

9.00

$133

,000

.00

$13.

25$9

2,75

0.00

13R

esto

rati

onof

Gro

wth

1,00

0S.

Y.

$3.6

6S6

.0O

56,0

00.0

0SI

1.70

$11,

700.

00S8

.O0

58,0

00.0

0S6

.50

$6,5

00.0

0$4

.00

S4,0

00.0

O14

a1-

inch

Cop

oral

ion

Stop

s71

EA

$466

.33

$500

.00

$35,

500.

0053

00.0

0$2

1,30

0.00

$350

.00

S24,

850.

0O$3

00.0

0$2

1,30

0.00

S725

.O0

SS

t,475

.0O

14b

1-in

chSe

rvic

ePi

pe1,

500

L.F

.S2

0.17

$10.

00$1

5,00

0.00

S45.

O0

S67.

500.

OO

$45.

00S6

7,50

0.O

fl$4

0.00

S6O

,000

.O’l

$21.

00$3

1,50

0.01

14e

I-in

chC

urb

Stop

and

Box

71E

A$2

23.7

8$5

00.0

0$3

5,50

0.05

$300

.00

$21,

300.

01$3

00.0

0$2

1,30

0.00

$300

.00

$21,

300.

01$1

50.0

0$1

0,65

0.00

ISu

‘-in

chC

orpo

rati

onS

lops

IE

AS7

11.7

8$5

00.0

0S5

00.0

O$5

75.0

0S5

75.O

0S4

00.0

OS4

00.0

O$5

00.0

0S5

00.0

O$7

00.0

0S7

00.O

015

b2-

inch

Serv

ice

Pipe

20L

.F.

$33.

20$5

0.00

$1,0

00.0

0$7

5.00

S1,5

00.O

0$3

0.00

S600

.OO

S40.

OO

S800

.0O

S60.

0OSI

,200

.OO

ISc

2-in

chC

urb

Stop

and

Box

IE

A$4

94.4

7SI

,000

.O0

SI00

0.00

S650

.0O

$650

.00

S300

.0O

$300

.00

S500

.OO

$500

.00

$800

.00

$800

.00

lOu

4-in

chT

empo

rary

Byp

ass

6,00

0L

.F.

$6.9

0$1

0.00

$60,

000.

00$6

.50

$39,

000.

00S6

.00

$36,

000.

00$8

.50

$51,

000.

00$8

.00

$48,

000.

0016

b2-

inch

Tem

pora

ryB

ypas

s6,

000

L.F.

$4.7

4$1

0.00

$60,

000.

0056

.00

536,

000.

0050

.01

$60.

00$7

.50

$45,

000.

00$7

.00

$42,

000.

0017

Sil

tSa

cks

31E

A$9

0.99

$600

.00

$18,

600.

00S2

00.0

O$6

,200

.00

5001

$0.3

110

0.00

$3,1

00.0

0$9

0.00

$2,7

90.0

018

Pol

ice

Det

ails

1,20

0B

ra.

$45.

00$4

5.00

$54,

000.

00$4

5.00

$54,

000.

00$4

5.00

$54,

000.

00$4

5.00

$54,

000.

00$4

5.00

$54,

000.

00

BID

TO

TA

L—

$718

,202

.7$7

47,9

35.0

$170

,358

.8$7

70,4

66.2

$790

,414

01

Iher

eby

cert

ify

that

thin

inan

accu

rate

repr

esen

latio

nof

the

bids

rece

ived

for

this

proj

ecl:

2il

om

tzsj

.9i(

añan

na,

fI’.

E.

3/2

1/0

8

Tho

mas

J.M

ahan

na,

P.E

.D

ate

fl,d

tabu

loii

onF

oros

sIs

312

1120

n8S

TA

NT

EC

Fogs

5of

6

Page 61: TECHNICAL MEMORANDIUM REVISION 2(511109)

BID

TA

BU

LA

TIO

NIN

DIA

NV

ILL

AG

EW

AT

ER

MA

INR

EP

LA

CE

ME

NT

AC

TO

NW

AT

ER

DIS

TR

ICT

AC

TO

N,

MA

BID

DA

TE

:M

AR

CH

19,

2008

FE

DC

orp.

Mor

iart

y&

Sons

,In

c.Jo

seph

P.G

ardi

llo

&So

n.In

c.V

.P. H

oman

Con

st.,

Inc.

J.C

ougl

er,

Inc.

Ded

ham

,M

AN

orth

And

over

,M

AW

akef

ield

,M

AL

eom

inst

er,

MA

Wor

cest

er,

MA

BA

SE

BID

No.

26N

o.27

No.

28N

o.29

No.

30H

emA

vera

geU

nit

Tot

alU

nit

Tot

alU

nit

Tot

alU

nit

Tot

alU

nit

Tot

alM

a.D

escr

iptio

nQ

iU

nit

Pri

cePr

ice

Am

ount

Pri

ceA

mou

ntP

rice

Am

ount

Pric

eA

mou

ntP

rice

Am

ount

Ia8”

DI.

Pipe

6,20

0L

F.$5

0.73

S53

00S3

28,6

00.O

0S7

0.00

5434

,000

.00

$70.

00S4

34,0

00.0

0$4

3.00

S266

,600

.00

S56.

0OS3

47,2

00.O

0lb

6”D

.l.Pi

pe25

0L,

F.$4

4.23

S68,

00S1

7,00

0.00

S50.

00$1

2,50

0.00

$30.

00S7

,500

.00

$83.

00S2

0,75

0.00

S50.

00$1

2,50

0.00

2a8”

Gat

eV

alve

and

Box

es26

BA

$1,1

30.6

7$1

,100

.00

$28,

600.

00S

l,200

.00

$31,

200.

00$1

,500

.00

$39,

000.

00$1

,500

.00

$39,

000.

00S

l,25

0.0t

$32,

500.

002b

6”G

ate

Val

vean

dB

oxes

IIE

A$8

89.4

3$7

80.0

0S8

,580

.00

$1,0

00.0

0$1

1,00

0.00

$1,0

00.0

0$1

1,00

0.00

$578

.00

S6,3

58.0

0$1

,000

.00

$11,

000.

083a

Hyd

rant

ItB

A$2

,564

.17

$3,0

00.0

0$3

3,00

0.00

$2,5

00.0

0$2

7,50

0.00

$3,0

00.0

0$3

3,00

0.00

$2,0

00.0

0$2

2,00

0.00

$2,8

00.0

0$3

0,80

0.00

3bH

ydra

ntR

emov

al6

BA

$275

.10

$300

.00

$1,8

00.0

0$2

50.0

0$1

,500

.00

SOO

t$0

.06

$900

.00

S5,4

00.0

0$2

00.0

0$1

,200

.00

4C

oncr

ete

Thr

ost

Blo

cks

50C

.Y.

$14.

04$1

20.0

0S6

,000

.00

$0.0

1$0

.50

SOO

t$0

.50

$140

.00

$7,0

00.0

0$5

0.00

$2,5

00.0

05a

Bou

lder

Exc

avat

ion

100

CV

.$2

5.24

$50.

00$5

,000

.00

$0.0

1$1

.00

$75.

0057

,500

0$1

.00

$100

.0$0

.01

$1.0

0Sb

Led

geR

ockE

xcav

atio

n25

0C

V.

$18.

07$9

0.00

$22,

500.

00$0

.01

S2.5

0$0

.01

$2.5

$1.0

0$2

50.0

$0.0

1$2

.50

6aG

rave

lB

orro

w25

0C

.Y.

$3.3

7$0

.01

$2.5

0$0

.01

$2.5

0$0

.01

$2.5

$14.

00$3

,500

.0$0

.01

$2.5

06b

Gra

vel

Sabb

ase

1,00

0C

.Y.

$10.

20$2

0.00

$20,

000.

00$2

0.00

$20,

000.

00$0

.01

$10.

0$4

1.00

$41,

000.

0$1

8.00

$18,

000.

007

Ord

inar

yB

orro

w20

0C

V.

$2.8

7$0

.01

$2.0

0$0

.01

$2.0

0$2

0.00

$4,0

00.0

$14.

00$2

,800

.0$0

.01

$2.0

08

Exc

avat

ion

ofU

nsui

tabl

eM

ater

ial

IOU

C.Y

.$2

.84

$0.0

1$1

.00

$0.0

1$1

.00

$0.0

1$1

.0$1

0.00

$1,0

00.0

$0.0

1$1

.00

9E

xplo

rato

ryE

xcav

atio

n25

CV

.$2

2.54

$15.

00$3

75.0

0$0

.01

$0.2

5$0

.01

$0.2

$10.

00$2

50.0

$75.

00$1

,875

.00

10C

alci

umC

hlor

ide

25SO

lb-B

ag$3

6.08

$75.

00$1

,875

.00

SS0.

00$1

,250

.00

$0.5

0$1

2.5

$17.

00$4

25.0

$40.

00$1

,000

.00

II-la

yB

ales

and

Silt

Fenc

e36

0L.

F.$7

.59

$10.

00$3

,600

.01

$10.

00$3

,600

.00

$0.0

1$3

.6$9

.00

$3,2

400

$15.

00$5

,400

.00

12T

renc

hB

inde

rPa

vent

ent

7,00

0L.

F.$1

0.99

$12.

50$8

7,50

0.00

$10.

00$7

0,00

0.00

$8.0

0$5

6,00

0.0

$21.

00$1

47,0

00.0

$12.

00$0

4,00

0.00

13R

esto

ratio

nof

Gro

wth

1,00

0S.

Y.

$3.6

6.

S15.

00$1

5,00

0.00

So

ot

$10.

00$1

.00

Sl,0

00.0

$19.

00S1

9,00

0.0

S4.0

0$4

,000

.00

l4a

I-in

chC

opor

atio

nSt

ops

71E

A$4

66.3

3S2

75.0

0$1

9,52

5.00

S500

.00

$35,

500.

00$5

00.0

0S3

5,S0

0.00

S45.

0053

,195

.00

$600

.00

S42,

600.

0014

bI-

inch

Serv

ice

Pipe

1,50

0L.

F.$2

0.17

S33.

00$4

9,50

0.00

S15.

00$2

2,50

0.00

$20.

00S3

0,00

0.00

$64.

00$9

6,00

0.00

$40.

00$6

0,00

0.00

14e

‘-in

clt

Csr

bSt

opan

dB

ox71

BA

$223

.78

S275

.00

$19,

525.

00$2

50.0

0$1

7,75

0.00

$500

.00

S35,

500.

00S

l85.

00$1

3,13

5.00

$3.5

0$2

48.5

0IS

a7-

inch

Cor

pora

tion

Stop

s1

EA

$711

.78

S475

.00

$475

.00

$1,5

00.0

0$1

,500

.00

$1,0

00.0

0$1

,000

.00

$483

.00

S483

.00

S800

.00

$800

.00

lSb

7-in

chSe

rvic

ePi

pe20

L.F

.$3

3.20

$40.

00$8

00.0

0$0

.01

$0.2

0$5

0.00

$1,0

00.0

0$7

0.00

$1,4

00.0

0$5

0.00

$1,0

00.0

0

ISe

2.-in

chC

urb

Stop

and

Box

IB

A$4

94.4

7$6

00.0

0S6

00.0

0S

1,00

0.00

$1,0

00.0

0$1

,000

.00

$1,0

00.0

0$3

59.0

0$3

59.0

0S3

50.0

0S3

50.0

016

a4-

inch

Ten

tpor

aty

Byp

ass

6,00

0L

F.

$6.9

0S7

.00

$42,

000.

00$8

.00

S48,

000.

00S8

.00

$48,

000.

00S7

.S0

S45,

000.

00S

l8.0

0S

t08,

000.

00l6

b2-

inch

Ten

tpor

ary

Byp

ass

6,00

0L.

F.$4

.74

S5.0

0S

30,0

00.0

0S5

.00

S30,

000.

00S5

.00

S30,

000.

00$5

.80

$34,

800.

00S1

6.0O

$96,

000.

00

17Si

ltSa

cks

31E

A$9

0.99

StO

O,0

0S3

,lOO

.00

Sl0

0.00

$3,1

00.0

0SO

Ot

$0.3

1S7

5,00

$2,3

25.0

0$2

50.0

0$7

,750

.00

18Po

lice

Det

ails

1,20

0H

rs.

$45.

00S4

5.00

$54,

000.

00$4

5.00

S54,

000.

00S4

5.O

0S

54,0

00.0

0S4

5.00

$54,

000.

00$4

5.00

$54,

000.

00

BID

TO

TA

L57

9896

050

$825

919

95$8

2903

322

5836

370

00$9

2273

250

Iher

eby

cert

ify

that

this

isan

accu

rale

rep

rese

nla

tio

n

of

lhe

bid

sre

ceiv

edfo

rth

iap

roje

ct:

¶Tho

,nas

9.13

1 all

anna,

tP.E

.3

/21

/08

Th

om

asJ.

Mah

ann

a,P

.E.

Dat

e

Bid

Tab

nl,t

onF

on

osI

s1/

21/2

008

ST

AN

TE

CP

ogoS

of6

Page 62: TECHNICAL MEMORANDIUM REVISION 2(511109)

Attachment H

FR Mahony Estimate

Page 63: TECHNICAL MEMORANDIUM REVISION 2(511109)

LOW PRESSURE SEWERESTIMATE BASED ON

FR MAHONY

DESCRIPTION QUANTITY UNIT COST TOTALWORK WITHIN THE RIGHT OF WAY

PIPING1.25 Inch Pipe (25 Length) 3,175 LF $55.00 $174,625.001.50 Inch Pipe 1,807 LF $65.00 $117,455.002.00 Inch Pipe 7,829 LF $65.00 $508,885.003.00 Inch Pipe 2,189 LF $65.00 $142,285.00

VALVES

AirNacuum Release Valve 2 EA $1,053.00 $2,106.00In Line Clean Out 9 EA $2,500.00 $22,500.00Terminal Clean Out 7 EA $2,500.00 $17,500.00Corp Stop 127 EA $55.00 $6,985.00Lateral Kit 127 EA $227.00 $28,829.00

SUM $1,021,170.00

CONTRACTOR OVERHEAD ($1,021,170.00 x 5%) $51,058.50

SUBTOTAL ( $1,021,170.00 + $51,058.50) $1,072,228.50

OTHERBoulder Excavation 100 CY $61.36 $6,136.00Ledge Rock Excavation 371 CY $120.00 $44,520.00Gravel Borrow 250 CY $15.00 $3,750.00Gravel Subbase 1,000 CY $16.94 $16,940.00Ordinary Borrow 200 CY $14.00 $2,800.00Excavation of Unsuitable Material 100 CY $16.60 $1,660.00Exploratory Excavation 25 CY $167.50 $4,187.50Calcium Chloride 25 501b-Bag $45.70 $1,142.50Hay Bales and Silt Fence 360 LF $7.59 $2,732.40Restoration of Growth 1,000 SY $9.58 $9,580.00Police Details 1,200 HR $45.00 $54,000.00

SUM $147,448.40

SUBTOTAL ( $1,072,228.50 + $147,448.40) $1,219,676.90

ENGINEERING ($1,219,676.90 x25%) $304,919.23

CONTINGENCY ( $1,219,676.90 x 10%) $121,967.69

SUBTOTAL ( $1,219,676.90 + $304,919.23 + $121,967.69) $1,646,563.82

TOWN OF ACTON MILLING AND PAVING $556,997.07

TOTAL ( $1,646,563.82 + $556,997.07) $2,203,560.89

COST PER LOT ($2,203,560.89 / 127) $17,350.87

WORK ON INDIVIDUAL LOTS1.25 Inch Pipe (100’ Length) 12,700 LF $45.00 $571,500.00Pump: DHO71-93 127 EA $3,069.00 $389,763.00Pump/Panel Installation 127 LS $1,500.00 $190,500.00

SUM $1,151,763.00

COST PER LOT ($1,151,763.00! 127) $9,069.00

TOTAL COST PER LOT ($17,350.87 + $9,069.00) $26,419.87

Page 64: TECHNICAL MEMORANDIUM REVISION 2(511109)

Low Pressure SewerFR Mahony

Description1 .25-Inch Pipe

3,175 LF(45 + 65 ) /2

Unit Price $55.00

Contractor Overhead5 Percent

FR Mahony: 83,734 / ( 49,091 + 894,842 + 768,625 ) = 4.89%

Page 1 of 1

Page 65: TECHNICAL MEMORANDIUM REVISION 2(511109)

Budgetary Low Pressure Sewer System Costs

Town of Acton MA(one home per station)

March 30, 2009

Unit Cost Installation

$65.00

$65.00

$65.00

0,00 $389,763.00

0,00 $190,500.00

$28,829.00

$285,750.00

$894,842.0

0,00 $117,455.00

00o $508,885,00

0,00 $142,2850&:

$7M.62$.O0

Other 0 Contractor Overhead $0.00 0,00 583,734.70

0 Contingencies $0.00 0,00 $167,469.40

$251 .204,14)

Number of ConnectionsTo(al Per Connection $jj44.7 Total (w/o other) >>>>>>>>>>>> $1 ,71 2,55*.flêGrand Total Per Connection $1462.69 Grand Total (including other)>>>>>>>>>>>> $l.963’.76214

Note, The System Costs above are based on piping sized for, and Grinder Pumps manufactured by Environment One Corporation.

Page i C:\Documents and Settings\Owner\My Documents\My Documents\EONE\PROJEGTS AND PLAN REVIE’

_

SubTotal

O.00 $6,985.00

o.oor 52,106:001

000 $l7,500.00

$39,091.00

2ti1y cr p on

____

Valves 127 , Corp Stop $55.00

2 Air/Vacuum Release Valve 51,053.00

9 In Line Clean Out $2,500.00

7 Terminal Clean Out $2,500.00

Pumps 127 DHO71-.93 53,069,00

127 Pump/Panel Installation 51,50000

127 Lateral Kit (i.e.. curb stop assembly) $22700

6 10 LF of I lateral ppe 545 00

Piping 1,807 1,50” Pipe

7,829 2,00” Pipe

2,189 3,00” Pipe

0,00

0.00’

Page 66: TECHNICAL MEMORANDIUM REVISION 2(511109)

Attachment I

RS Means Estimate

Page 67: TECHNICAL MEMORANDIUM REVISION 2(511109)

LOW PRESSURE SEWER

TERMINAL CLEAN OUTS

ESTIMATE BASED ONRS MEANS

SUM $1,127,653.00

Engineering (25%)

Contingency (10%)

ENGINEERING ($1,127,653.00 x 25%)

CONTINGENCY($1,127,653.00 x 10%)

$281,913.25

$112,765.30

SUBTOTAL ($1,127,653.00 + $281,913.25 + $112,765.30) $1,522,331.55

Reference Number Quantity Unit Unit Price Total AmountDescription

WORK WITHIN THE RIGHT OF WAYMAINLINE PIPING

1.5-inch Pipe2-inch Pipe3-inch Pipe

Sawing Asphalt PavementTrench Excavation, Haul, Backfill, Compaction

Asphalt Patching (7’ Wide)

3-to 2-inch Reducer2-to 1.5-inch ReducerTees

LATERAL PIPING1.25-inch Pipe (25 Length)

Sawing Asphalt PavementTrench Excavation, Haul, Backfill, Compaction

Asphalt Patching (7’ Wide)

Corporation StopsCurb StopsBoxesTopsoil (7’ Wide)

Seed

1,6607,590

2,17022,84011,4208,882

5

87

3,175

3,1753,1751,235127127

1271,235

11

LFLFLF

LFLFSY

EAEAEA

LF

LFLFSYEA

EAEASY

MSF

2211 13.74 44202211 13.7444602211 13.744470

0401 20.20 0050G1030 805 1430321216.131050

2211 13.7649522211 13.7649503311 13.25 8100

2211 13.74 4410

0401 20.20 0050G1030 805 1430321216.131050331213.1579003311 13.45 7140

3311 13.4572003291 19.1307003292 19.14 5400

G3030 210 1940

2305 23.30 2200

G3030 210 19402211 13.76 02902211 13.76 4950

2211 13.74 44202305 23.30 2200

2211 13.76 02902211 13.76 4950

2211 13.74 44202205 23.20 5680

$1.42

$1.99

$5.05$3.54

$11.63$48.50$42.50$29.50

$122.00

$1.42$3.54

$11.63

$48.50$615.00$198.00

$203.00$4.24

$74.00

$3,475.00$565.00

$3,475.00

$96.00$29.50$17.50

$565.00

$96.00$29.50$17.50

$780.00

$61.36$120.00

$15.00$16.94

$14.00$16.60

$167.50

$45.70$7.59

$45.00

$2,357.20

$15,104.10$10,958.50

$80,853.60

$132,814.60$430,787.78

$212.50$236.00$854.00

$4,508.50$11,239.50$36,925.25

$59,884.03$78,105.00

$25,146.00$25,781.00

$5,235.22$822.33

$31,275.00

$5,085.00

$24,325.00

$672.00$206.50$490.00

$3,955.00

$192.00$59.00

$140.00$1,560.00

$6,136.00$44,520.00

$3,750.00$16,940.00$2,800.00$1,660.00$4,187.50$1,142.50

$2,732.40$54,000.00

Manhole1.5-inch Gate Valves

IN-LINE CLEANOUTSManhole

2-inch Tees2-to 1.5-inch Reducer

1.5-inch Pipe (4’ Each)

1.5-inch Gate Valves

AirNacuum Release Valve

2-inch Tees2- to 1.5-inch Reducer

1.5-inch Pipe (4’ Each)AirNacuum Release Valve

OTHERBoulder Excavation

Ledge Rock Excavation

Gravel Borrow

Gravel Subbase

Ordinary BorrowExcavation of Unsuitable Material

Exploratory Excavation

Calcium Chloride

Hay Bales and Silt Fence

Police Details

9 EA

9 EA

7 EA7 EA7 EA

28 LF7 EA

2 EA2 EA

8 LF2 EA

100371250

1,000

200

10025

25360

1,200

CYCYCYCY

CYCYCY

5Olb-Bag

LFHR

Page 1 of 2

Page 68: TECHNICAL MEMORANDIUM REVISION 2(511109)

LOW PRESSURE SEWERESTIMATE BASED ON

RS MEANS

Description Reference Number Quantity Unit Unit Price Total Amount

Town of Acton Milling and Paving TOWN OF ACTON MILLING AND PAVING $556,997.07

TOTAL ( $1,522,331.55 + $556,997.07) $2,079,328.62

COST PER LOT ( $2,079,328.62! 127) $16,372.67

WORK ON INDIVIDUAL LOTSFurnish and Install 1 EA $7,990.00 $7,990.00

COST PER LOT $7,990.00

TOTAL COST PER LOT ( $16,372.67 + $7,990.00) $24,362.67

Page 2 of 2

Page 69: TECHNICAL MEMORANDIUM REVISION 2(511109)

Attachment J

Individual Lot Work Proposal

Page 70: TECHNICAL MEMORANDIUM REVISION 2(511109)

James Fenton & Son General Contracting, Inc.P.O. Box 985 Acton, MA 01720 978-266-9751

Proposal

Proposal Submitted to: March 24, 2009Town of ActonBoard of Health472 Main StreetActon, MA 01720

Job Location: Spencer, Tuttle, Flint, Torrington Roads, Acton

Proposal for material and labor to tie-into existing Town of Acton wastewater collection system, to include:

- Pump, crush and fill 126 existing septic tanks- Install 126 E-One DHO7I units at previous septic tank location; connect to

existing plumbing- Install generator switch- Wire E-One DHO7I to electric panel; includes permit and inspection fees- Excavate and backfill 100’ trench; install 1 %“ SDR back to street- Loam and seed all disturbed areas- Materials, labor, equipment rental- Town of Acton permit and inspection fees

Total per House: $ 7,990.00

Note: The following items are not included and, if encountered, will be subject to additional charges:

- Asphalt patching- Additional electrician time required for finished basements- Removal of ledge or boulders greater than 1 cubic yard- Additional tanks to be crushed (i.e., pump chamber or second septic tank)- Relocation of play areas, sandboxes, sheds, planting beds- Removal of trees larger than 2” in diameter- Repairs to irrigation systems- Removal of hazardous or contaminated waste

We Propose hereby to furnish material and labor -- complete in accordance with above specification for thesum of: Seven Thousand Nine Hundred Ninety dollars per house ($ 7,990.00 oer house)Payment to be made per separate contract.

Authorized Signature: JOfl/fe?#it2’n/Note: This proposal may be withdrawn by us if not accepted within 60 days

All material is guaranteed to be as specified. All work to be completed in a workmanlike manner according to standard practices. Any alteration ordeviation from above specifications involving extra costs will be executed only upon written order and will become an extra charge over and abovethe estimate. All agreements contingent upon strikes, accidents or delays beyond our control. Owner to carry fire, tomado and other necessaryinsurance. Our workers are fully covered by Workmen’s Compensation insurance.

Page 71: TECHNICAL MEMORANDIUM REVISION 2(511109)

Attachment K

Milling and Paving Estimate

Page 72: TECHNICAL MEMORANDIUM REVISION 2(511109)

Las

tre

surf

aced

Dur

kee

Roa

d

Fund

Roa

dL

othr

opR

oad

Mal

lard

Roa

d

Spe

ncer

Roa

dT

orri

ngto

nL

ane

Tut

tleD

rive

Tor

ring

ton

Lna

eW

aysi

deL

ane

2000

1999

1997

#20

toT

uttle

Rd

1999

Spe

ncer

RD

to#2

019

92

1996

1979

2005

Pro

spec

tSt

toT

orri

ngto

nLn

1997

1999

SUM

$5

33

19

30

7

DR

AIN

AG

EB

ASI

NS

(68

x$3

50/E

A)

$23

,800

.00

1)M

ILL

=SQ

UA

RE

YA

RD

Sx

$1.8

7/SY

2>T

ON

S=

SQU

AR

EY

AR

DS

xT

HIC

KN

ESS

x0.

056

(TN

/SY

*IN

)3)

CO

ST=

TO

NS

x$7

2.00

/TN

TO

WN

OF

AC

TO

NH

IGH

WA

YD

EPA

RT

ME

NT

MIL

LIN

GA

ND

PAV

ING

2009

SQU

AR

EY

AR

DS

ST

RE

ET

LE

NG

TH

WID

TH

Flin

tR

d.2,

475

25M

alla

rdR

d1,

369

25D

urke

eR

d.1,

124

25L

othr

opR

d.2,

460

25W

aysi

deC

ir.33

025

Tut

tleR

d.2,

550

25T

orri

ngto

nLn

.52

325

Spe

ncer

Rd.

1,17

925

BIN

DE

RC

OU

RS

E

TH

ICK

NE

SS(I

N)

=

TO

NS

2

2

CO

ST

36,

875

3,80

3

3,12

26,

833

917

7,08

31,

453

3,27

5

MIL

L1

$12

,856

.25

$7,

111.

61

$5,

838.

14

$12

,777

.71

$1,

714.

79

$13

,245

.21

$2,

717.

11

$6,

124.

25

WE

AR

ING

CO

UR

SE

TH

ICK

NE

SS(I

N)

=1.

5

TO

NS

2C

OS

T3

770

$55

,440

.00

426

$30

,672

.00

350

$25

,200

.00

765

$55

,080

.00

103

$7,

416.

0079

3$

57,0

96.0

016

3$

11,7

36.0

036

7$

26,4

24.0

0

TO

TA

L

578

$41

,616

.00

319

$22

,968

.00

262

$18

,864

.00

574

$41

,328

.00

77$

5,54

4.00

595

$42

,840

.00

122

$8,

784.

00

275

$19

,800

.00

$ $ $ $ $ $ $ $

109,

912.

2560

,751

.61

49,9

02.1

410

9,18

5.71

14,6

74.7

911

3,18

1.21

23,2

37.1

152

,348

.25

BE

RM

(Sil

o/T

N)

$

SID

EW

AL

K($

40/F

r)$

TO

TA

L($

533,

193.

07+

$23,

800.

00)

$55

6,99

3.07

Page 73: TECHNICAL MEMORANDIUM REVISION 2(511109)

Attachment L

Indoor verses Outdoor Pumps

Page 74: TECHNICAL MEMORANDIUM REVISION 2(511109)

Homeowners have many options when itcomes to selecting the proper grinder pumpfor their home. F. R. Mahony & Associates,Inc. can help with this selection. Thefollowing general guidance may help youmake the proper selection.

There are a number of factors to beconsidered. The existing conditions of thehome and the lot play a major role in thisselection. The Environment One products,developed nearly 40 years ago, were initiallyintended for indoor use. Not all homescould modify plumbing or make the internalchanges required in existing homes. Thisprompted the development of the outdooraccessway stations. Many E/Oneapplications have been for connection ofregions with failing septic systems withexisting homes. This made the morecommon installation fit the outdoor stations.

INDOOR PUMP Benefits and Options:

Indoor stations may fit approximately 25% ofcurrent and new home constructionapplications. Generally new homes canplan the building plumbing to betteraccommodate an indoor pump.

Regions with basements are more likely toconsider indoor pump stations. Thesestations can aide in “whole house plumbing”to collect drains from basement fixturesadjacent to family rooms or walk outbasement uses.

The indoor stations can result in a savings ofinstallation by avoiding excavation in difficultterrain. Interior plumbing and electricalconnections are relatively easy to make.

30 DuPaul StreetSouthbridge, MA 01550

tel. 508.765.0051fax 508.765.1244

=/jb4J

=-., =,77=S S 5 S S

The station cost is reduced by eliminatingthe top accessway extension and associatedexcavation to place the station outdoors.Depending on the location one can expect atotal installed cost savings of as much as$1,500.00.

(Model IHO91 Shown Below)

These stations are provided with a 60-monthwarranty. The basin can be installed on thefloor (shown above) or in the slab (shownbelow) to accommodate basementplumbing.

41 Bayberry Hill RoadW. Townsend, MA 01474

tel. 978.597.0703fax 978.597.0704

r tel. 781.982.9300

I f.r. mahony & ossociales, inc. fax. 781.982.1056

f [email protected]

I I I I I woter supply ond pdIuton control equipment www.frmahony.com

273 Weymouth SfreeL.Rocktand, MA 02370

____ ____

Which pump should I use?Do I use an indoor pump or an outdoorpump?

®

Page 75: TECHNICAL MEMORANDIUM REVISION 2(511109)

tel. 781.982.9300

I.r. mahony &os.

fax. 781.982.1056

rt”ii [email protected] supply and poliuton control equoment www.frmahony.com

273 Weyniouth Street.Rocktand, MA 02370

OUTDOOR PUMP Benefits and Options:(Model DHO7I Shown Below)

The typicaloutdoorpump modelfor singlefamily homesis theDHO7I -93shown to theleft. Thisstationoperates inthe samemanner asthe indoorstation. Thepumppackagecomescomplete,ready forinstallation inthe ground.

Standardheightstations areprovided toprovide a

gravity drain from the home. Deeperstations can be provided to accommodatedeeper building drains.

These stations are best used when theexisting plumbing can not be changed andthe best option is to connect existingbuilding drains outside of the home.

The outdoor unit may be more suited tocustomers who prefer that service andaccess be out of doors. Service providerscan service these units without entering thehome provided the alarm panel is alsooutside and accessible.

Outdoor models come in a variety of sizes toaccommodate larger flow demands.

30 DuPaul StreetSouthbridge, MA 01550

tel. 508.765.0051fax 508.765.1244

Alarm panels for both stations are providedusing the same basic platform. The Sentry®panel provides the ability to monitor theoperation of the pump unit. Basic alarmsinclude a light and buzzer with silencer.

OPTIONAL ITEMS INCLUDE:

Alarm Activated Dry ContactsAlarm Activated Powered TerminalGenerator Receptacle and Auto TransferRemote Sentry Indoor Alarm ModuleRun-timelHour MeterEvent/Cycle Counter

Protection Package, consisting of:Brownout Protection w/ Trouble IndicationRun Dry Protection w/ Trouble lndicatiohHigh System Pressure Protection w/ TroubleIndication.

For more information contact:

41 Bayberry Hill RoadW. Townsend, MA 01474

tel. 978.597.0703fax 978.597.0704

F. R. Mahony & Associates, Inc.

800-791-6132 Toll Free781-982-9300 Rockland, MA978-597-0703 West Townsend, MA781-820-5808 Westborough, MA