32
EN TECHNICAL MANUAL ARTOSI

TECHNICAL MANUAL ARTOSI...PG 037 6-016278-0000 50 Cup-head bolt M10x20, A2, ISO 7380-2 PG 044 6-016385-0000 60 End section - (split) PG 064 3-03263-PU11 position item name business

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: TECHNICAL MANUAL ARTOSI...PG 037 6-016278-0000 50 Cup-head bolt M10x20, A2, ISO 7380-2 PG 044 6-016385-0000 60 End section - (split) PG 064 3-03263-PU11 position item name business

EN

TECHNICAL MANUAL

ARTOSI

Page 2: TECHNICAL MANUAL ARTOSI...PG 037 6-016278-0000 50 Cup-head bolt M10x20, A2, ISO 7380-2 PG 044 6-016385-0000 60 End section - (split) PG 064 3-03263-PU11 position item name business

2

A brand that represents many years of tradition, incalculable investments into own development, use of high-quality

materials, technological advancement, competent work of hundreds of employees, and many other parameters constituting

a composite whole – the final ISOTRA product.

Contents

ARTOSI 3Basic product specification 4Measurement and assembly 13Control, maintenance, safety instructions 27

Page 3: TECHNICAL MANUAL ARTOSI...PG 037 6-016278-0000 50 Cup-head bolt M10x20, A2, ISO 7380-2 PG 044 6-016385-0000 60 End section - (split) PG 064 3-03263-PU11 position item name business

PERGOLAS

2 3

Pergola is manufactured with high precision Possibility to place the poles up to 1 metre away from the

pergola corner inwards Low building height of the roof section incl. slat opening –

25 cm in total Possibility to divide the pergola roof slats into several

independent sections with individual control Pure and elegant design Simple slat assembly/disassembly and variability of pergola

constitution Slat opening angle 130° Slope of the slats 16 mm Possibility to install a LED strip along the pergola extension sides

(warm / cold shade of white) Possibility to integrate external screen roller blinds Wind resistance class 6 Own development

ARTOSI

Page 4: TECHNICAL MANUAL ARTOSI...PG 037 6-016278-0000 50 Cup-head bolt M10x20, A2, ISO 7380-2 PG 044 6-016385-0000 60 End section - (split) PG 064 3-03263-PU11 position item name business

PERGOLAS

4

ARTOSI Basic product specification

Design variants

Type A

Type B

Type C

Page 5: TECHNICAL MANUAL ARTOSI...PG 037 6-016278-0000 50 Cup-head bolt M10x20, A2, ISO 7380-2 PG 044 6-016385-0000 60 End section - (split) PG 064 3-03263-PU11 position item name business

PERGOLAS

4 5

ControlIt is used to open, tilt and close the aluminium slats in the pergola roof.Motor – Somfy WT/IO

Standard dimensions

Pergola Version Length (extension, mm) Width S (mm) Passage heightHeight ,,H‘‘(mm)

Guaranteed area (m2)

min. max. min. max. max. max.ARTOSI motor 1440 7000* 1000 4500** 3000 28Standard colours

RAL 7016 anthracite greyRAL 8014 brownRAL 7016S anthracite grey structured

RAL 9006 light silverRAL 9007 silverRAL 9010 white

Other RAL colours upon request for an extra charge*The pergola has 6 poles from the extension of 6 121 mm. From 5400mm extension pergola is divided into at least 2 sections (min. 2 pcs of engines).** Up to a width of 4000 mm, the load capacity of the slats is up to 116 kg / m2. From a width of 4000 mm, the load capacity of the slats is up to 90 kg / m2.

Slat orientation

Passage height determination

View direction ‚‘A‘‘ View direction ‚‘B‘‘

Pass

age

heig

ht

Snow areas corresponding to the load-bearing capacity of the shading surface of the pergola(a) Snow cannot be prevented from slipping down the pergo-la shading surfaceLength of the pergola 4500 4000 3500 3000Slat length 4280 3780 3280 2780Pn 0,98 1,23 1,59 1,88Snow area II III III IV

Snow areas corresponding to the load-bearing capacity of the shading surface of the pergolab) at the edge of shading area of the pergola there are obstacles that cause snow to pile up on the shading area.The pergola is attached to a higher vertical wall or walls.Length of the pergola 4500 4000 3500 3000Slat length 4280 3780 3280 2780Pn 0,98 1,23 1,59 1,88Snow area Inconvenient I I II

Details of the calculations used in the protocol are archived by the testing laboratory.

In case of snow and icing, the manufacturer recommends the position of the slats in the vertical plane (open slats), in order not to overload the load-bearing capacity of the roof and to prevent damage to the sealing element of the pergola slats.

Page 6: TECHNICAL MANUAL ARTOSI...PG 037 6-016278-0000 50 Cup-head bolt M10x20, A2, ISO 7380-2 PG 044 6-016385-0000 60 End section - (split) PG 064 3-03263-PU11 position item name business

PERGOLAS

6

ARTOSITechnical specification

Pergola functions

Sun protection Sun protection and cooling Rain protection

Slat orientationLight transmission through the pergola with respect to the slat position and sun position.

In the rain, the pergola can also serve as a protection against rain. Each of the slats is equipped with a sealing element along its entire length. However, the product may not always be 100% waterproof.

130°45°

Slat orientationSlat tilting 0°

Slat tilting 45°

Slat tilting 90°

Slat tilting 130°

View direction

„A“

View direction

„A“

View direction

„A“

View direction

„A“

View direction

„B“

View direction

„B“

View direction

„B“

View direction

„B“

Page 7: TECHNICAL MANUAL ARTOSI...PG 037 6-016278-0000 50 Cup-head bolt M10x20, A2, ISO 7380-2 PG 044 6-016385-0000 60 End section - (split) PG 064 3-03263-PU11 position item name business

PERGOLAS

6 7

3-03408-PU11EAVES SECTION(split)

3-03242-PU11COVER SECTION(split)

3-03366-PU11BRACKET SECTION (split)

2-01529-XXXX

3-03258-0000DRAWBAR SECTION(split)

1. Perimeter frame (A1-A3)

1

3

4

5

2

6

ARTOSITechnical specification

Page 8: TECHNICAL MANUAL ARTOSI...PG 037 6-016278-0000 50 Cup-head bolt M10x20, A2, ISO 7380-2 PG 044 6-016385-0000 60 End section - (split) PG 064 3-03263-PU11 position item name business

PERGOLAS

8

2-01529-XXXX

position item name business name drawing number10 Bracket section (split) 3-03366-PU1120 Eaves section (split) 3-03408-PU1130 Diffuser for LED section; frosted, telescopic, 2 m PG 050 6-015510-000040 Eaves cover - Left - RAL 3-03265-PU1150 Eaves cover - Right - RAL 3-03266-PU1160 Adjusting cube PG 043 3-03434-000070 Connecting corner – left 2-01552-PU1180 Connecting corner – right 2-01553-PU1190 Nut M10, self-locking, with collar, DIN 6926, A2 PG 051 6-016383-0000

100 Screw 3,5x9,5, DIN 7504 K, A2, 6hr. PG 039 6-016381-0000110 Screw 3,5x16, A2 Torx, ISO 14586 C 6-016281-0000120 Cover section - (split) 3-03242-PU11130 Motor base 7-303262-0000140 Motor 6-XXXXXX-XXXX150 GEARBOX, metallic 8:1, in. 7 mm, out. 13 mm, 20 Nm PG 055 6-016303-0000160 Gearbox bracket 7-303261-0000170 Motor–gearbox shaft PG 057 3-03423-0000180 Round cap PG 053 6-011167-0023190 Drive 7-303249-0000200 Drawbar section - (split) 3-03258-0000210 Shaft PG 016 3-03244-PU22220 Short sleeve PG 048 3-03250-9004230 Tilter A PG 047 3-03246-9004240 Tilter B PG 058 3-03397-9004250 Driver PG 045 3-03241-9004260 Spacer shim 20x28 H=0,5mm DIN 988 PG 059 6-016282-0000270 Screw 5x10, A2 Torx, KN6041 PG 060 6-016294-0000280 Screw 5x14, A2 Torx, KN1039 PG 061 6-016283-0000290 Washer M5, DIN 125-1A, A2 PG 062 6-002355-0000

position item name business name drawing number10 Bracket section (split) 3-03366-PU1120 Eaves section (split) 3-03408-PU1130 Cover section - (split) 3-03242-PU1140 Connecting corner - left - RAL 2-01552-PU1150 Connecting corner - right - RAL 2-01553-PU1160 Diffuser for LED section; frosted, telescopic, 2 m PG 050 6-015510-000070 Eaves cover - Left - RAL 3-03265-PU1180 Eaves cover - Right - RAL 3-03266-PU1190 Adjusting cube 3-03434-0000

100 Screw 3,5x16, A2 Torx, ISO 14586 C 6-016281-0000110 Nut M10, self-locking, with collar, DIN 6926, A2 6-016383-0000120 Screw 3,5x9,5, DIN 7504 K, A2, 6hr. PG 039 6-016381-0000130 Long sleeve 3-03385-9004

2. Perimeter frame (C1-C3)

Page 9: TECHNICAL MANUAL ARTOSI...PG 037 6-016278-0000 50 Cup-head bolt M10x20, A2, ISO 7380-2 PG 044 6-016385-0000 60 End section - (split) PG 064 3-03263-PU11 position item name business

PERGOLAS

8 9

position item name business name drawing number10 Bracket section (split) 3-03366-PU1120 Screw 3,5x9,5, DIN 7504 K, A2, 6hr. PG 039 6-016381-000030 Corner connector - RAL 3-03433-PU1140 Screw 6,3x38, DIN 7504 K, A2, 6hr. PG 037 6-016278-000050 Cup-head bolt M10x20, A2, ISO 7380-2 PG 044 6-016385-000060 End section - (split) PG 064 3-03263-PU11

position item name business name drawing number10 Bracket section (split) 3-03366-PU1120 End section - (split) PG 064 3-03263-PU1120 End section - B01 - (split) 3-03464-PU1120 End section - B02 - (split) 3-03465-PU1130 Corner connector 3-03433-PU1140 Screw 6,3x38, DIN 7504 K, A2, 6hr. PG 037 6-016278-000050 Cup-head bolt M10x20, A2, ISO 7380-2 PG 044 6-016385-000060 Screw 3,5x9,5, DIN 7504 K, A2, 6hr. PG 039 6-016381-0000

3-03263-PU11END SECTION (split)

3-03464-PU11END SECTION - B01(split)

3-03465-PU11END SECTION - B02(split)

4. Perimeter frame (A1-C1)

3. Perimeter frame (A3-C3)

2-01529-XXXX

2-01540-XXXX

Page 10: TECHNICAL MANUAL ARTOSI...PG 037 6-016278-0000 50 Cup-head bolt M10x20, A2, ISO 7380-2 PG 044 6-016385-0000 60 End section - (split) PG 064 3-03263-PU11 position item name business

PERGOLAS

10

6. Concealed foot with down-drain

2-01529-XXXX

position item name business name drawing number10 Slat section 7-303573-000020 Sealing section PG 031/1 7-303537-900430 Slat side board – driving PG 084 7-303268-000040 Slat side board - Non-driving PG 085 7-303269-000050 Short pin R PG 008/1 7-303532-000060 Medium pin PG 007/1 7-303533-000070 Long pin PG 092/L 7-303462-000080 Nut M8 self-locking DIN 985, A2 6-016289-000090 Screw 4,8x32, A2 Torx, ISO 14585 C 6-016280-0000

100 Drip mould of slat R PG 035 3-03424-9004110 Drip mould of slat L PG 036 3-03425-9004120 Slat fastener PG 033 3-03388-9004130 Slat fastener, double 3-03529-9004

2-01541-XXXX

position item name business name drawing number10 Adjustable foot - hidden - RAL PG 025 2-01554-PU1110 Adjustable foot - visible PG 026 2-01558-PU1120 Pole section - 5100 mm PG 042/5100 7-303443-510020 Pole section - 6100 mm PG 042/6100 7-303443-610030 Sleeve nut PG 015 3-03419-PU2240 Countersunk Allen head screw M8x20 A2 DIN 7991 PG 028 6-016393-000050 Hem - without drain - 01 - RAL 3-03418-PU1160 Funnel PG 013 3-03394-0000

5. Slat – assembly

Page 11: TECHNICAL MANUAL ARTOSI...PG 037 6-016278-0000 50 Cup-head bolt M10x20, A2, ISO 7380-2 PG 044 6-016385-0000 60 End section - (split) PG 064 3-03263-PU11 position item name business

PERGOLAS

10 11

NÁVOD NA VYMĚŘENÍ A MONTÁŽ

Platnost návodu: 06. 11. 2019 11

MONTÁŽ NA STĚNU - VARIANTA B – obrázky k výše popsaným činnostem

B3 - detail

Funnel 3-03394-0000

Adjustable foot - hidden 2-01554-PU11

Scheme of regulated water drainage - piping is not included in deliveryWater drain with optional stand/stands. We recommend draining the water with two stands.

Cable outlet

Pole

Pole section 7-303443-XXXX

Hem - without drain 3-03418-PU11

Adjustable foot - visible 2-01558-PU11

Fixing points for type B

Page 12: TECHNICAL MANUAL ARTOSI...PG 037 6-016278-0000 50 Cup-head bolt M10x20, A2, ISO 7380-2 PG 044 6-016385-0000 60 End section - (split) PG 064 3-03263-PU11 position item name business

PERGOLAS

12

Approximate pergola weight (kg)S/L 1400 1620 1800 1980 2160 2340 2520 2700 2880 3060 3240 3420 3600 3780 3960 41402500 192 207 217 232 248 258 273 288 298 314 329 339 354 370 379 3952800 201 217 228 245 261 272 289 305 316 333 349 360 377 393 404 4213100 210 228 239 257 275 286 304 322 334 352 370 381 399 417 429 4473400 219 238 250 269 289 301 320 340 352 371 390 402 422 441 453 4723700 228 248 261 282 303 315 336 357 369 390 411 423 444 465 478 4984000 237 259 272 294 316 330 352 374 387 409 431 445 467 489 502 524

S/L 4320 4500 4680 4860 5040 5220 5400 5580 5760 5940 6120 6300 6480 6660 6840 70002500 410 420 435 451 461 476 491 501 517 532 574 589 604 614 630 6442800 437 448 465 481 492 509 525 536 553 569 612 628 645 656 672 6893100 465 476 494 512 523 541 559 571 589 607 650 668 686 697 715 7333400 492 504 523 543 555 574 593 605 625 644 688 707 726 738 758 7773700 519 532 552 573 586 607 627 640 661 681 726 746 767 780 801 8214000 546 560 582 604 617 639 661 675 697 719 764 786 808 821 843 865

Position of LED lights: Possible options: warm and cold white

Number of slats acc. to extension – typA and typCL 1440 1620 1800 1980 2160 2340 2520 2700 2880 3060 3240 3420 3600 3780 3960 4140ks 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

L 4320 4500 4680 4860 5040 5220 5400 5580 5760 5940 6120 6300 6480 6660 6840 7000ks 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 37

Number of slats acc. to extension – typBL 1380 1560 1740 1920 2100 2280 2460 2640 2820 3000 3180 3360 3540 3720 3900 4080ks 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

L 4260 4440 4620 4800 4980 5160 5340 5520 5700 5880 6060 6240 6420 6600 6780 6960 7000ks 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 38

Page 13: TECHNICAL MANUAL ARTOSI...PG 037 6-016278-0000 50 Cup-head bolt M10x20, A2, ISO 7380-2 PG 044 6-016385-0000 60 End section - (split) PG 064 3-03263-PU11 position item name business

PERGOLAS

12 13

ARTOSI Pergola Measurement

Always take measurements of the outer profiles of the structure. The following must be stated: total width (S), total extension (l) (indicated as height in the order form), and passage height (H) for each individual pole.

When taking the measurements, it is also necessary to specify optional accessories such as lighting, rain sensor, etc. In the order form. It is also suitable to specify construction readiness for the subsequent installation of the whole pergola system (anchor points, water outflow, motor placement, electricity connections, integration of the pergola to the house, etc.). When the pergola is mounted properly, slats dropping is made in direction from the motor to the other side. Water drainage has to be thus always on the opposite side of the motor. There always has to be at least one drainage groove in a pergola.

Measurements will be described in detail for each variant of the pergola types.The supply includes a dimensional sketch of the actual order with electricity connections and water outflow points.Manipulation space is necessary for the installation – see the cross-hatched area (red) in the figures below.

Variant A

Variant B

Page 14: TECHNICAL MANUAL ARTOSI...PG 037 6-016278-0000 50 Cup-head bolt M10x20, A2, ISO 7380-2 PG 044 6-016385-0000 60 End section - (split) PG 064 3-03263-PU11 position item name business

PERGOLAS

14

Variant C

Page 15: TECHNICAL MANUAL ARTOSI...PG 037 6-016278-0000 50 Cup-head bolt M10x20, A2, ISO 7380-2 PG 044 6-016385-0000 60 End section - (split) PG 064 3-03263-PU11 position item name business

PERGOLAS

14 15

1. Introduction

Read this installation manual carefully prior to installing the pergola structure. This structure has been designed solely as protection from sun, rain, and wind, and cannot be considered water-tight.Incorrect use or incorrect installation may result in the termination of the guarantee.Anchoring materials must be selected with respect to the structure in which the pergola is to be attached. It is necessary to consider various circumstances: texture and external insulation, rigidity, and surface appearance.

2. LIST OF NECESSARY AND RECOMMENDED TOOLS• Two ladders adjustable according to the pergola height, telescopic lifting appliance, mobile scaffold;• Water level, tape measure, tool for measuring the wall’s right angle, flatness, and verticality, plumb line;• Socket-wrench set with 30 cm extension (socket 5.5 mm), spanners, Allen keys, hammer drill, drill set, angle grinder +

diamond-wheel for tiles;• Flat-blade screwdriver, T15 Torx screwdriver, vacuum cleaner;• Suitable sealing compound (polymer/polyurethane caulk, silicone), compression tape, bolts with packing rubber.

3. INSTALLATION INSTRUCTIONS

Ground Mounting – Variant A

It is expected that for this variant, at least concrete feet have been prepared in advance, or a flat surface is available to which the pergola is to be installed. The recommended minimum foot dimensions are 300 × 300 mm, frostproof depth.

A.1 First determine plane A1–A3 (C1–C3) and feet placement positions. If water outflow is located under the pole, start with this plane! The diagonal for the placement of the remaining poles

will be aligned to this plane. We recommend using a laser device or other technology for the alignment. After aligning, place the feet to the ground and mark out their anchoring holes. Use a suitable anchoring system to fasten the feet (e.g. threaded rod, chemical anchor) – we recommend stainless threaded rods. Do not tighten the nuts on the threaded rods. The recommended total height of the threaded rods is 150 mm, thereof 30 mm above the anchoring plane.

If you want to have the anchoring prepared in advance, you can use a drill template for the feet openings following the pergola placement measurements (see the last page of the manual, in full scale). We recommend checking the template dimensions (110 mm), due to different print formats.

A.2 Insert the pole cover section and slide pole A1 to foot A1. Pay attention to placing the right pole to the right place. If the motor supply cable passes through the pole, run it through a dedicated opening, see the anchoring template. If the pole serves for water draining, insert the funnel and the plastic tube (40×1.8 mm) for water draining (not part of delivery) into the pole and apply sealing compound to the funnel, see Fig. D.1.

A.3 Adjust the height of the pole A1 according to the actual passage height (the pole height can be adjusted in the range of + 2 cm) and tighten the four countersunk bolts M8. When fitting the pole to the foot, the pole is at the -2 cm position of the set height.

A.4 Repeat steps A.2 and A.3 for the remaining poles.

A.5 Insert the perimeter section A1A3 in the pre-installed pole A1 and pole A3. Do not hold the perimeter section by the eaves part only – hold it by the main supporting section. Otherwise eaves will likely be damaged.

If the pergola is placed under a roof or truss, it is necessary to allow for at least 380 mm above the pole inserted in the foot for inserting the perimeter section.

A.6 Secure the connection of the perimeter section A1A3 and pole A1 by pre-installed bolts (4 countersunk bolts M8 for each pole).

A.7 Secure the connection of the perimeter section A1A3 and pole A3 by pre-installed bolts (4 countersunk bolts M8 for each pole).

A.8 Repeat steps A.5 through A.7 for the perimeter section C1C3 and pole C1 and pole C3.

A.9 Prior to installing the perimeter section A1C1, insert reinforcement to both sides of the section. Then connect the section A1A3 and perimeter section C1C3. Prior to installing, apply sealing compound to the side cover of the drainage channel, see Fig. D.2. Insert the perimeter section A1C1 between the pole A1 and pole C1 so that the pre-installed 6HR screws fit in the grooves. Tighten the pre-installed 6HR screws on both sides of the perimeter section A1C1.

A.10 Insert two cup-head bolts M10×20 to each corner of the frame and tighten.

A.11 Insert one hexagon-head bolt M10×340 to each corner and tighten. If the pergola is placed under a roof or truss and the room above the pergola is not sufficient for inserting the bolts, do not use the bolts. This does not affect the pergola function.

A.12 Repeat steps A.9 and A.10 for the perimeter section A3C3.

A.13 Check the dimensions of the diagonals, check the frame flatness and pole verticality, and adjust if necessary.

A.14 If no problem is found, tighten the fastening nuts in the perimeter section, tighten the nuts in feet and overlap the gap by the pole cover section. Attach the cover section to the pole (use bolts or silicone).

Page 16: TECHNICAL MANUAL ARTOSI...PG 037 6-016278-0000 50 Cup-head bolt M10x20, A2, ISO 7380-2 PG 044 6-016385-0000 60 End section - (split) PG 064 3-03263-PU11 position item name business

PERGOLAS

16

A.15 Insert the individual slats in the corresponding side sockets and secure with locks. The side sockets in the perimeter section are adjusted to 45° slat tilting. The first slat and the last slat must be oriented with respect to the limit sections attached to

NÁVOD NA VYMĚŘENÍ A MONTÁŽ

Platnost návodu: 06. 11. 2019 6

MONTÁŽ DO ZEMĚ – VARIANTA A – obrázky k výše popsaným činnostem

Page 17: TECHNICAL MANUAL ARTOSI...PG 037 6-016278-0000 50 Cup-head bolt M10x20, A2, ISO 7380-2 PG 044 6-016385-0000 60 End section - (split) PG 064 3-03263-PU11 position item name business

PERGOLAS

16 17

NÁVOD NA VYMĚŘENÍ A MONTÁŽ

Platnost návodu: 06. 11. 2019 7

Page 18: TECHNICAL MANUAL ARTOSI...PG 037 6-016278-0000 50 Cup-head bolt M10x20, A2, ISO 7380-2 PG 044 6-016385-0000 60 End section - (split) PG 064 3-03263-PU11 position item name business

PERGOLAS

18

NÁVOD NA VYMĚŘENÍ A MONTÁŽ

Platnost návodu: 06. 11. 2019 8

Page 19: TECHNICAL MANUAL ARTOSI...PG 037 6-016278-0000 50 Cup-head bolt M10x20, A2, ISO 7380-2 PG 044 6-016385-0000 60 End section - (split) PG 064 3-03263-PU11 position item name business

PERGOLAS

18 19

the perimeter sections A1C1 and A3C3.

A.16 Connect the motor and lighting, if any, and hide the cables inside the perimeter section and transverse section.

A.17 If the pergola includes a LED lighting unit, connect it using connecting plugs.

A.18 Connect the LED lighting unit to the power supply unit using a cable with Hirschmann terminal.

A.19 Test the slat tilting function; the end-of-travel positions are factory-set. It is not possible to adjust the limit section for opening, as this will likely lead to the slat mechanism collision.

A.20 Attach the side covers to the perimeter sections.

NÁVOD NA VYMĚŘENÍ A MONTÁŽ

Platnost návodu: 06. 11. 2019 9

Page 20: TECHNICAL MANUAL ARTOSI...PG 037 6-016278-0000 50 Cup-head bolt M10x20, A2, ISO 7380-2 PG 044 6-016385-0000 60 End section - (split) PG 064 3-03263-PU11 position item name business

PERGOLAS

20

GROUND MOUNTING – VARIANT A – FIGURES TO ILLUSTRATE THE ABOVE ACTIVITIES

Wall Mounting – Variant BPrior to taking any measurements, check the surface to which the pergola is to be installed. Measure the surface inclination, difference of level at the house wall and on the opposite side of the pergola. Place the pergola in accordance with the client’s instructions (to the centre, to the left side, etc.).B.1 In locations A1 and C1 on the wall, mark out the places for the installation of the perimeter section holders, based on the

measure-taking. Take the measures by starting on one side and then indicating the placement of the individual feet dia-gonally. Then indicate the anchoring holes. In doing so, pay special attention to alignment and connection of the pergola poles to the water outflow. When taking measurements of the openings for the attachment of locations A1 and C1 (their height from the surface), take the surface inclination into account. This way you will ensure the same passage height on both sides of the pergola and the flatness of the perimeter section.

B.2 Take measurements of the anchoring points for the installation of the pole A3 and pole C3. Then proceed in accordance with items A.1 through A.4 above.B.3 Insert the perimeter section A1A3 to the pre-installed pole A3 and press it against the wall mounting point A1. Do not

hold the perimeter section by the eaves part only – hold it by the main supporting section. Otherwise eaves will likely be damaged. Prior to installing, apply sealing compound to the perimeter section, see Fig. D.3.

B.4 Use a suitable anchoring system to fasten to attach the perimeter section A1A3 to the wall at A1. Pay special attention to alignment and positioning during this operation.

Then proceed in accordance with items A.8 through A.14.B.5 Measure the placement of the end section at the building wall with the last slat closed, so that the slat fully shuts into the

section. Install the end section and apply polymer- or polyurethane-based caulk (1) to its rear and upper sides.B.6 Measure the placement of the cover section (4) above the points A1-C1 of the pergola. Prior to installing, apply compression

tape (2) to its rear side. We recommend a 15 mm tape with the 5–15 mm compression. Attach the cover section to the facade using bolts with packing rubber (3). Apply polymer- or polyurethane-based caulk (1) to the upper edge of the cover section.

Then proceed in accordance with items A.15 through A.20Wall Mounting – Variant B – figures to illustrate the above activities

Page 21: TECHNICAL MANUAL ARTOSI...PG 037 6-016278-0000 50 Cup-head bolt M10x20, A2, ISO 7380-2 PG 044 6-016385-0000 60 End section - (split) PG 064 3-03263-PU11 position item name business

PERGOLAS

20 21

Page 22: TECHNICAL MANUAL ARTOSI...PG 037 6-016278-0000 50 Cup-head bolt M10x20, A2, ISO 7380-2 PG 044 6-016385-0000 60 End section - (split) PG 064 3-03263-PU11 position item name business

PERGOLAS

22

NÁVOD NA VYMĚŘENÍ A MONTÁŽ

Platnost návodu: 06. 11. 2019 11

MONTÁŽ NA STĚNU - VARIANTA B – obrázky k výše popsaným činnostem

B3 - detail

B3 - detail

NÁVOD NA VYMĚŘENÍ A MONTÁŽ

Platnost návodu: 06. 11. 2019 11

MONTÁŽ NA STĚNU - VARIANTA B – obrázky k výše popsaným činnostem

B3 - detail

B5, B6

Page 23: TECHNICAL MANUAL ARTOSI...PG 037 6-016278-0000 50 Cup-head bolt M10x20, A2, ISO 7380-2 PG 044 6-016385-0000 60 End section - (split) PG 064 3-03263-PU11 position item name business

PERGOLAS

22 23

NÁVOD NA VYMĚŘENÍ A MONTÁŽ

Platnost návodu: 06. 11. 2019 12

B5, B6

Wall Mounting – Variant CPrior to taking any measurements, check the surface to which the pergola is to be installed. Measure the surface inclination, difference of level at the house wall and on the opposite side of the pergola. Place the pergola in accordance with the client’s instructions (to the centre, to the left side, etc.). Check the wall flatness at the perimeter section installation area.

C.1 Indicate on the wall the position for the installation of the perimeter section A1A3, based on the measure-taking. Take the measures by starting on one side and then indicating the placement of the individual feet diagonally. In doing so, pay special attention to alignment and connection of the pergola poles to the water outflow. When taking measurements of the openings for the attachment of locations A1 and C1 (their height from the surface), take the surface inclination into account. This way you will ensure the same passage height on both sides of the pergola and the flatness of the perimeter section.

C.2 Remove the eaves gutter from the perimeter section A1A3 (the gutter is not treated with sealing compound at the lower side).

C.3 Drill the wall mounting holes to the space below the eaves (the quantity and spacing of the holes should respect the material to which the pergola is to be anchored). The sections have already been predrilled – 3 holes of 28 mm diameter. Drill more holes if necessary.

C.4 Use a suitable anchoring system to attach the perimeter section A1A3 (e.g. M10 threaded rod, chemical anchor). Apply polymer- or polyurethane-based caulk (1) to the upper edge of the perimeter section, see Fig. C.6.

C.5 Attach the eaves gutter to the perimeter section A1A3. Do not forget to apply sealing compound to the lower side!

Then proceed in accordance with items A.1 through A.14.

C.6 Attach the cover section (4) to the pergola perimeter section and to the wall. Apply compression tape (2) to the cover section and attach the section to the perimeter section using Tex bolts with packing rubber (3). Apply polymer- or polyurethane-based caulk (1) to the upper edge of the cover section (1).

Then proceed in accordance with items A.15 through A.20.

WALL MOUNTING – VARIANT C – FIGURES TO ILLUSTRATE THE ABOVE ACTIVITIES

Page 24: TECHNICAL MANUAL ARTOSI...PG 037 6-016278-0000 50 Cup-head bolt M10x20, A2, ISO 7380-2 PG 044 6-016385-0000 60 End section - (split) PG 064 3-03263-PU11 position item name business

PERGOLAS

24

NÁVOD NA VYMĚŘENÍ A MONTÁŽ

Platnost návodu: 06. 11. 2019 14

MONTÁŽ NA STĚNU - VARIANTA C – obrázky k výše popsaným činnostem

C3

NÁVOD NA VYMĚŘENÍ A MONTÁŽ

Platnost návodu: 06. 11. 2019 14

MONTÁŽ NA STĚNU - VARIANTA C – obrázky k výše popsaným činnostem

C3

Page 25: TECHNICAL MANUAL ARTOSI...PG 037 6-016278-0000 50 Cup-head bolt M10x20, A2, ISO 7380-2 PG 044 6-016385-0000 60 End section - (split) PG 064 3-03263-PU11 position item name business

PERGOLAS

24 25

NÁVOD NA VYMĚŘENÍ A MONTÁŽ

Platnost návodu: 06. 11. 2019 15

C6

NÁVOD NA VYMĚŘENÍ A MONTÁŽ

Platnost návodu: 06. 11. 2019 15

C6

1 blue 2 black 3 brown 4 yellow-green

1 - Neutral wire (N)2 - Phase wire (L)3 - Unused4 - Protective wire (PE)

1 - Neutral wire (N)2 - Phase wire (up)3 - Phase wire (down)PE - Protective wire

Page 26: TECHNICAL MANUAL ARTOSI...PG 037 6-016278-0000 50 Cup-head bolt M10x20, A2, ISO 7380-2 PG 044 6-016385-0000 60 End section - (split) PG 064 3-03263-PU11 position item name business

PERGOLAS

26

STRUCTURAL PARTS TO BE TREATED WITH SEALING COMPOUND

NÁVOD NA VYMĚŘENÍ A MONTÁŽ

Platnost návodu: 06. 11. 2019 16

ČÁSTÍ KONSTRUKCE, KTERÉ JE NUTNO OŠETŘIT TĚSNÍCÍM TMELEM

D.1 D.2

D.3

Page 27: TECHNICAL MANUAL ARTOSI...PG 037 6-016278-0000 50 Cup-head bolt M10x20, A2, ISO 7380-2 PG 044 6-016385-0000 60 End section - (split) PG 064 3-03263-PU11 position item name business

PERGOLAS

26 27

UNPACKING AND STORING THE PERGOLA

In most cases, the pergola is supplied in wooden crates. We therefore recommend unloading the crates from the vehicle using a fork-lift truck. If a fork-lift truck cannot be provided, open the crates on the vehicle and carefully unload the individual parts of the pergola and place them on a flat surface – crate cover, etc. Check the crates and components inside them for any damage caused by the transport.

Store the pergola in the original packaging. If not installed immediately after unloading, store the pergola in a dry place and protect it from direct sunlight.

Be careful when unpacking the pergola, check whether all parts are intact, do not damage the paintwork. In case of any defect, document the defect and continue the assembly according to the manual. Only skip processes where sealing compound is to be applied! (This is due to possible replacement of defective parts, does not apply to slats.)

1. CONTROL

Motor with integrated IO receiver

The control is performed with the Situo 5 variation io controller (or possibly another IO controller).

If the pergola is delivered with an IO controller, the individual motors are paired with the controller and the extreme positions of the motors are set (start and end position of the slats). If the IO remote control is not included in the delivery, only the extreme positions of the motors are set. In this case, the motors must be paired with the controller before the initial start-up, or other settings must be made according to the instructions of the drive used. Do not change the setting of the extreme positions of the slats, they may collide and be damaged!!! If the pergola is equipped with integrated LED lighting, this lighting is paired with the remote control. Any reprogramming can be performed according to the instructions for Somfy LED lighting receiver IO.

Motor without integrated WT receiver

The control is performed by a local wall button connected by a wire path to the pergola drive. If these motors are connected to the control of a smart home, the control usually takes place via specific controls of the given manufacturer (actuators, applica-tions, remote controls). If you use a control system, first familiarize yourself with the instructions provided. Do not change the setting of the extreme positions of the slats, they may collide and be damaged!!!

Always operate the pergola from a place that allows a complete overview of the movement of the pergola roof.

2. MAINTENANCE

In order to keep the product in perfect operating and safety conditions, proceed as follows:

• Visually inspect the load-bearing structure at least twice a year (in spring and before winter). If it is necessary, clean the surface of aluminium profiles from dirt, dust and smog. Use a softened damp cloth for cleaning. Heavy soiling can be removed with conventional car paint cleaners. Do not use aggressive cleaning agents such as organic thinners, solvents, cleaning pastes and sands and strong alkaline cleaners to clean structures of the pergola.

• Check the tightening of all screws and fasteners at least twice a year (in spring and before winter).• At least twice a year (in spring and before winter) treat the rubber seal with a product designed for this purpose (silicone

spray, etc.)• Continuously remove coarse dirt such as twigs and branches from the slats of the pergola roof.• Continuously check and clean the drainage channels, especially from the leaves, to prevent them from clogging.

3. SAFETY INSTRUCTIONS

• There must be no objects or people in the moving parts of the Pergola! Do not block the slats while they are moving and never put your hands between the slats. If the pergola is equipped with shading technology, pull it to the upper position in case of bad weather.

• Do not allow children to play with the control. Check the pergola regularly for any leaks and damages.

In case of finding a defect or malfunction, contact your system supplier!!!

Due to continuous product improvement, the technical information provided in this manual may not correspond to the actual condition of the delivered pergola.

Page 28: TECHNICAL MANUAL ARTOSI...PG 037 6-016278-0000 50 Cup-head bolt M10x20, A2, ISO 7380-2 PG 044 6-016385-0000 60 End section - (split) PG 064 3-03263-PU11 position item name business

PERGOLAS

28

ELECTRICAL CONNECTIONS

The pergolas are controlled by one, two, or three motors, and the individual sections can be controlled individually, or together.The standard configuration is Somfy io motor with Somfy Situo 5 Variation io controller. If a rain sensor is used, it is necessary to use the WT motor with a remote control receiver (the rain sensor is not supplied in the io version).

The central junction box is located in the section (A1-A3 or C1-C3) together with the motors and ensures 220 V power supply for the motors and LED lighting unit. The junction box can be removed if necessary (to pair up the individual motors with the controller). Two cables with Hirschmann terminals lead from the box – one for the LED lighting unit, the other to connect the pergola to the input power.

Complete power supply of all electric parts of the pergola is therefore ensured by a single power supply cable with a Hir-schmann terminal. See below for the Hirschmann terminal connection.

Wiring of standard IO motor Wiring of WT motor

The LED supply unit is placed within the transverse section (A1-C1 or A3-C3). The unit is powered from the central box using a Hirschmann terminal.The LED supply unit contains a 220/24 V transformer, LED io receiver, connecting box. The unit can be removed from the transverse section

It is possible to equip the pergolas with LED strip lighting – 24 V DC, warm white colour, CRI 90+. The LED strips are integrated from below in the drainage channel, the strips are located on both longitudinal sides of the pergola (A1-A3 and C1-C3).The LED strips are powered using cables with screw connectors for fast connection.

Space for cable outlet

Page 29: TECHNICAL MANUAL ARTOSI...PG 037 6-016278-0000 50 Cup-head bolt M10x20, A2, ISO 7380-2 PG 044 6-016385-0000 60 End section - (split) PG 064 3-03263-PU11 position item name business

PERGOLAS

28 29

Template Type B 1

80

159

83

143

60

42

96

54

84,

5

16

40

60

80

32 127

11

PROSTORY PRO PROSTUP KABELU

1 4

A

B

C

D

31 2 4

A

D

C

B

2 3

ISOTRA ARTOSI - ŠABLONA PRO KOTVENÍ NA STĚNU - TypB (A3A1)

Space for cable outlet

Page 30: TECHNICAL MANUAL ARTOSI...PG 037 6-016278-0000 50 Cup-head bolt M10x20, A2, ISO 7380-2 PG 044 6-016385-0000 60 End section - (split) PG 064 3-03263-PU11 position item name business

PERGOLAS

30

300

300

VÝSUV

O

BJ. ROZM

ĚR PERGO

LY

ŠÍŘKA OBJ. ROZMĚR PERGOLY

110 110

95 95

PATKY ZA

LOŽIT V

NEZA

MRZN

É HLOUBC

E

Construction readiness

PUT TH

E FOO

TS IN TH

E NO

N-FREEZA

BLE DEPTH

ORD

ER DIM

ENSIO

N O

F PERGO

LA

ORDER DIMENSION OF PERGOLA

EXTENSIO

N

WIDTH

Page 31: TECHNICAL MANUAL ARTOSI...PG 037 6-016278-0000 50 Cup-head bolt M10x20, A2, ISO 7380-2 PG 044 6-016385-0000 60 End section - (split) PG 064 3-03263-PU11 position item name business

PERGOLAS

30 31

Notes:

Page 32: TECHNICAL MANUAL ARTOSI...PG 037 6-016278-0000 50 Cup-head bolt M10x20, A2, ISO 7380-2 PG 044 6-016385-0000 60 End section - (split) PG 064 3-03263-PU11 position item name business

… protecting your privacy.

ISOTRA a.s.

Bílovecká 2411/1, 746 01 Opava

Tel.: +420 553 685 111E-mail: [email protected]

www.isotra.com

Released: 02/2021

ISOTRA Partner