Technical Kick off meeting Grosuplje September 22-23 2008 Integration Preparation António Cunha – Pedro Nunes Institute [email protected] www.las.ipn.pt Networking for Communications Challenged Communities: Architecture, Test Beds and Innovative Alliances Grant Agreement: 223994

Technical Kick off meeting Grosuplje September 22-23 2008

Embed Size (px)

DESCRIPTION

Networking for Communications Challenged Communities: Architecture, Test Beds and Innovative Alliances Grant Agreement: 223994. Technical Kick off meeting Grosuplje September 22-23 2008. Integration Preparation António Cunha – Pedro Nunes Institute [email protected] www.las.ipn.pt. - PowerPoint PPT Presentation

Citation preview

Page 1: Technical Kick off meeting Grosuplje September 22-23 2008

Technical Kick off meetingGrosuplje September 22-23 2008

Integration Preparation

António Cunha – Pedro Nunes Institute [email protected]

Networking for Communications Challenged Communities: Architecture, Test Beds and Innovative Alliances

Grant Agreement: 223994

Page 2: Technical Kick off meeting Grosuplje September 22-23 2008

Networking for Communications Challenged Communities: Architecture, Test Beds and Innovative Alliances

Grant Agreement: 223994

What we want to have in May 2011?

14 May 2008 www.n4c.eu 2

Page 3: Technical Kick off meeting Grosuplje September 22-23 2008

Networking for Communications Challenged Communities: Architecture, Test Beds and Innovative Alliances

Grant Agreement: 223994

Please:• Imagine that we are in 2011• Forget the details...• Imagine a unic platform that should fullfil all

the requirements

14 May 2008 www.n4c.eu 3

Page 4: Technical Kick off meeting Grosuplje September 22-23 2008

Networking for Communications Challenged Communities: Architecture, Test Beds and Innovative Alliances

Grant Agreement: 223994

To start the integration process we need:

14 May 2008 www.n4c.eu 4

System Requirements

System Specification

(Sysml ?)

Integration workplan

Development and tests+ + +

Page 5: Technical Kick off meeting Grosuplje September 22-23 2008

Networking for Communications Challenged Communities: Architecture, Test Beds and Innovative Alliances

Grant Agreement: 223994

14 May 2008 www.n4c.eu 5

Agenda• Phase 1 (2 minutes): Sysml overview (idb block)• Phase 2 (20 minutes): Identify the system main modules and the

communication protocols.– Phase deliverable: N4C global diagram (Sysml)

• Phase 3 (15 minutes): Identify the main functions and the inputs and outputs of each module– Phase deliverable: “n” Sysml diagrams (one per module), with inputs and

outputs (draft)

• Phase 4 (15 minutes): Identify the expected time for each module development and the dependences between each other– Phase deliverable: Integration workplan

• Phase 5 (“optional”): Identify the system requirements– Phase deliverable: System requirements list

Page 6: Technical Kick off meeting Grosuplje September 22-23 2008

Networking for Communications Challenged Communities: Architecture, Test Beds and Innovative Alliances

Grant Agreement: 223994

Phase 1: Sysml overview (idb block)

14 May 2008 www.n4c.eu 6

Time: 2 minutes

UML 2

UML 2Reuse(1, 2)

UMLreused by

SysML

UMLnot required

by SysML(UML -

UML4SysML)

SysMLextensions to

UML

SysML

Page 7: Technical Kick off meeting Grosuplje September 22-23 2008

Networking for Communications Challenged Communities: Architecture, Test Beds and Innovative Alliances

Grant Agreement: 223994

Phase 2: Identify the system main modules and the communication protocols.

14 May 2008 www.n4c.eu 7

Time: 20 minutes Deliverable: N4C global diagram (Sysml)

ibd [block] PowerSubsystem [Alternative 1 - Combined Motor Generator]

emg:ElectricMotorGenerator

trsm:Transmission

ice:InternalCombustionEngine

acl:accelerator

ecu:PowerControlUnit

ft:FuelTankAssy

dif:Differential

rfw:ChassisSubsytem.FrontWheel

lfw:ChassisSubsytem.FrontWheel

Port:FuelTankFitting

Port:ICEFuelFitting

fuelDelivery

torqueOut:Torque

torquein:Torque

spline

fuelSupply:Fuel

epc:ElectricalPowerController

bp:BatteryPack

i1:ElectricCurrent

i2:ElectricCurrent

fp:FuelPump

fi:FuelInjector

fdistbp:BrakeSubsystem.BrakePedal

<>

<>

<><>

4

fuelReturn:Fuel

<>

<>

<>

<>

g1:Torque

t2:T

orqu

e

t1:Torque

ice

ctrl

I_ICECmds

I_ICECmds

ctrl

ctrl

I_ICEData I_ICEData

trsmepc

c3

c2

c1

I_IEPCCmdI_IEPCData

I_IEPCDataI_EPCCmd

I_TRSMData

I_TRSMCmd

I_TRSMCmd

I_TRSMData

<><>

<>

rightHalfShaft

<><>

<>

leftHalfShaft

Client server port

Flow port

Item flow

Connector

Page 8: Technical Kick off meeting Grosuplje September 22-23 2008

Networking for Communications Challenged Communities: Architecture, Test Beds and Innovative Alliances

Grant Agreement: 223994

Phase 3: Identify the main functions and the inputs and outputs of each module

14 May 2008 www.n4c.eu 8

Time: 15 minutes Deliverable: “n” Sysml diagrams (one per module), with inputs and outputs

par [constraintBlock] StraightLineVehicleDynamics

AccellerationEquation

VelocityEquation

PostionEquation

PowerEquation

«value»globalTime.delta-t

whlpwr twCd Cf

tp

tp

dt

dt

dt

tw

tw

a

a

v

v

acc

vel

Cf

Cd

whlpwr

v

x

«value»HSUV.position

incline

i

Page 9: Technical Kick off meeting Grosuplje September 22-23 2008

Networking for Communications Challenged Communities: Architecture, Test Beds and Innovative Alliances

Grant Agreement: 223994

Phase 4: Identify the expected time for each module development and the dependences

between each other

14 May 2008 www.n4c.eu 9

Time: 15 minutes Deliverable: Integration workplan

M1 M2 M3 M4 M5 M6 M7 M8 Mn

Module 1

Module 2

Module 3

Module 4

Module n

Page 10: Technical Kick off meeting Grosuplje September 22-23 2008

Networking for Communications Challenged Communities: Architecture, Test Beds and Innovative Alliances

Grant Agreement: 223994

Phase 5 (optional): Identify the system requirements

14 May 2008 www.n4c.eu 10

Time: -- minutes Deliverable: System requirements Checklist

Ref. Description Module Responsible Version

R1

R2

R3

R4

Rn

Page 11: Technical Kick off meeting Grosuplje September 22-23 2008

N4C speaker: António CunhaSpeakers organisation: Pedro Nunes Institute

Speakers e-mail address: [email protected] Speakers web page: www.las.ipn.pt

END/FIM