Upload
leandra-buchanan
View
21
Download
0
Embed Size (px)
DESCRIPTION
Networking for Communications Challenged Communities: Architecture, Test Beds and Innovative Alliances Grant Agreement: 223994. Technical Kick off meeting Grosuplje September 22-23 2008. Integration Preparation António Cunha – Pedro Nunes Institute [email protected] www.las.ipn.pt. - PowerPoint PPT Presentation
Citation preview
Technical Kick off meetingGrosuplje September 22-23 2008
Integration Preparation
António Cunha – Pedro Nunes Institute [email protected]
Networking for Communications Challenged Communities: Architecture, Test Beds and Innovative Alliances
Grant Agreement: 223994
Networking for Communications Challenged Communities: Architecture, Test Beds and Innovative Alliances
Grant Agreement: 223994
What we want to have in May 2011?
14 May 2008 www.n4c.eu 2
Networking for Communications Challenged Communities: Architecture, Test Beds and Innovative Alliances
Grant Agreement: 223994
Please:• Imagine that we are in 2011• Forget the details...• Imagine a unic platform that should fullfil all
the requirements
14 May 2008 www.n4c.eu 3
Networking for Communications Challenged Communities: Architecture, Test Beds and Innovative Alliances
Grant Agreement: 223994
To start the integration process we need:
14 May 2008 www.n4c.eu 4
System Requirements
System Specification
(Sysml ?)
Integration workplan
Development and tests+ + +
Networking for Communications Challenged Communities: Architecture, Test Beds and Innovative Alliances
Grant Agreement: 223994
14 May 2008 www.n4c.eu 5
Agenda• Phase 1 (2 minutes): Sysml overview (idb block)• Phase 2 (20 minutes): Identify the system main modules and the
communication protocols.– Phase deliverable: N4C global diagram (Sysml)
• Phase 3 (15 minutes): Identify the main functions and the inputs and outputs of each module– Phase deliverable: “n” Sysml diagrams (one per module), with inputs and
outputs (draft)
• Phase 4 (15 minutes): Identify the expected time for each module development and the dependences between each other– Phase deliverable: Integration workplan
• Phase 5 (“optional”): Identify the system requirements– Phase deliverable: System requirements list
Networking for Communications Challenged Communities: Architecture, Test Beds and Innovative Alliances
Grant Agreement: 223994
Phase 1: Sysml overview (idb block)
14 May 2008 www.n4c.eu 6
Time: 2 minutes
UML 2
UML 2Reuse(1, 2)
UMLreused by
SysML
UMLnot required
by SysML(UML -
UML4SysML)
SysMLextensions to
UML
SysML
Networking for Communications Challenged Communities: Architecture, Test Beds and Innovative Alliances
Grant Agreement: 223994
Phase 2: Identify the system main modules and the communication protocols.
14 May 2008 www.n4c.eu 7
Time: 20 minutes Deliverable: N4C global diagram (Sysml)
ibd [block] PowerSubsystem [Alternative 1 - Combined Motor Generator]
emg:ElectricMotorGenerator
trsm:Transmission
ice:InternalCombustionEngine
acl:accelerator
ecu:PowerControlUnit
ft:FuelTankAssy
dif:Differential
rfw:ChassisSubsytem.FrontWheel
lfw:ChassisSubsytem.FrontWheel
Port:FuelTankFitting
Port:ICEFuelFitting
fuelDelivery
torqueOut:Torque
torquein:Torque
spline
fuelSupply:Fuel
epc:ElectricalPowerController
bp:BatteryPack
i1:ElectricCurrent
i2:ElectricCurrent
fp:FuelPump
fi:FuelInjector
fdistbp:BrakeSubsystem.BrakePedal
<>
<>
<><>
4
fuelReturn:Fuel
<>
<>
<>
<>
g1:Torque
t2:T
orqu
e
t1:Torque
ice
ctrl
I_ICECmds
I_ICECmds
ctrl
ctrl
I_ICEData I_ICEData
trsmepc
c3
c2
c1
I_IEPCCmdI_IEPCData
I_IEPCDataI_EPCCmd
I_TRSMData
I_TRSMCmd
I_TRSMCmd
I_TRSMData
<><>
<>
rightHalfShaft
<><>
<>
leftHalfShaft
Client server port
Flow port
Item flow
Connector
Networking for Communications Challenged Communities: Architecture, Test Beds and Innovative Alliances
Grant Agreement: 223994
Phase 3: Identify the main functions and the inputs and outputs of each module
14 May 2008 www.n4c.eu 8
Time: 15 minutes Deliverable: “n” Sysml diagrams (one per module), with inputs and outputs
par [constraintBlock] StraightLineVehicleDynamics
AccellerationEquation
VelocityEquation
PostionEquation
PowerEquation
«value»globalTime.delta-t
whlpwr twCd Cf
tp
tp
dt
dt
dt
tw
tw
a
a
v
v
acc
vel
Cf
Cd
whlpwr
v
x
«value»HSUV.position
incline
i
Networking for Communications Challenged Communities: Architecture, Test Beds and Innovative Alliances
Grant Agreement: 223994
Phase 4: Identify the expected time for each module development and the dependences
between each other
14 May 2008 www.n4c.eu 9
Time: 15 minutes Deliverable: Integration workplan
M1 M2 M3 M4 M5 M6 M7 M8 Mn
Module 1
Module 2
Module 3
Module 4
Module n
Networking for Communications Challenged Communities: Architecture, Test Beds and Innovative Alliances
Grant Agreement: 223994
Phase 5 (optional): Identify the system requirements
14 May 2008 www.n4c.eu 10
Time: -- minutes Deliverable: System requirements Checklist
Ref. Description Module Responsible Version
R1
R2
R3
R4
Rn
N4C speaker: António CunhaSpeakers organisation: Pedro Nunes Institute
Speakers e-mail address: [email protected] Speakers web page: www.las.ipn.pt
END/FIM