Technical Capability Assessment Update with NASA Industry Forum March 10, 2015 Lesa Roe NASA Deputy Associate Administrator

Technical Capability Assessment - NASA

  • Upload
    others

  • View
    10

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Technical Capability Assessment - NASA

Technical Capability Assessment

Update with NASA Industry Forum

March 10, 2015

Lesa Roe

NASA Deputy Associate Administrator

Page 2: Technical Capability Assessment - NASA

2

Agenda

• Background and Agency Actions

• Technical Capabilities Assessment Purpose

• Technical Capabilities Assessment Process

• Status and Next Steps

Page 3: Technical Capability Assessment - NASA

Completing the Puzzle

3

Mission

Integration

Tech Capability

Assessment

Business

Services

Assessment

Program/

Project

Planning

Contract

Assessment

NEW AGENCY

OPERATING MODELCompetition

Model

IMPERATIVE: Establish a more efficient operating model that maintains

critical capabilities AND meets current and future mission needs

Page 4: Technical Capability Assessment - NASA

Purpose of the Technical Capabilities Assessment

Establish a more efficient operating model that maintains critical capabilities AND

meets current and future mission needs

• NASA has a highly complex technical mission.

– There are significant goal changes on a periodic basis.

– Technical capabilities are vital to performing the mission.

• NASA has developed, maintains, and partners for technical capabilities.

– There are many diverse capabilities across the Agency with many customers and partners.

• Budget environment is challenging.

– We must make informed changes in the way we operate, what we maintain, and where we

invest.

• TCAT is developing a method to:

– Strategically address the technical capabilities required to support Agency goals;

– Enable decision makers to make informed decisions on investing/divesting strategically within

the budget while strengthening innovation in critical areas needed to advance our mission.

4

Page 5: Technical Capability Assessment - NASA

The Big Picture

Technical

Capabilities

Assets

Workforce

Make or Buy

5

Near Term

Mission

Needs

1-10 years

Future

Mission

Needs

30-years

Solutions

We want to make decisions about our

capabilities and solutions based on

future & current mission needs

Page 6: Technical Capability Assessment - NASA

Technical Capabilities

TC1

TC2

TC3

Etc.

Capability Groups (What are we assessing?)

Portfolio

Workforce

(Competencies)

Assets

Equipment Facilities

Program/Project

Management

CapabilitiesProject Management

Systems Engineering

Safety & Mission

Assurance

Workforce

(Competencies)

Assets

Equipment Facilities

Institutional CapabilitiesHR

Legal

Facilities Management

IT

Etc.

Workforce

(Competencies)

Assets

Equipment Facilities

6

Page 7: Technical Capability Assessment - NASA

7

Linking Solutions to Technical Capabilities

GN&C

Flight Dynamics

Aerodynamics

Structures and

Mechanisms

NASA

Langley

Capabilities

So

luti

on

:

Arr

ival

Tra

nsp

ort

ati

on

What does NASA Langley Research Center

do in support of Space Solutions?

What skills does NASA Langley use?

Recovery

Landing

Descent

Entry

Page 8: Technical Capability Assessment - NASA

8

Centers

Technical

Capabilities

Basic

Research

Aero

Space

So

luti

on

s

Linking Solutions to Technical Capabilities

Page 9: Technical Capability Assessment - NASA

9

Solutions

• Solutions are the systems, subsystems and activities that result from the

decomposition of Agency objectives, while being independent of budget,

organization, and programs. These are grouped in levels known as “Tiers.”

• Solutions refer to both current and future portfolio content.

Arrival Transportation

En

try, D

escen

t &

Lan

din

g

Entry

Descent

Landing

Aerobraking

Aerocapture

Recovery

Re

nd

ezvo

us

Do

ck

Acquisition & Rendezvous

Docking

Berthing

Tier 1 Tier 2 Tier 3

Research 1 9 43

Space 9 26 97

Aero 3 12 31

Total 13 47 171

Space Solution Example: Numbers of Solutions:

Page 10: Technical Capability Assessment - NASA

Air Vehicles Systems Architecture

Vehicle Platform

Propulsion

Ground Support

Aviation Safety

Air Traffic ManagementStrategic Management

Tactical Management

Unmanned Aerial Systems

ATM Human Systems Integration

General Air Traffic Management

Human Sustainment (Aero)Air Crew & Passengers

Ground Crew

Science & Exploratory

TechnologyEarth

Astrophysics

Heliophysics

Planetary Science

Space Environments Characterization & Effects

Life Science

Physical Science

Human Research

Information Systems

Human Sustainment

(Space)Launch & EDL

In-space

Extraterrestrial

Instruments Sensor Systems

Experiment Apparatus

Spacecraft (Bus)Instrument Platform

Habitation Platform

In-space Servicing

Specialized SystemsLong Term Management

Communications

General SpaceSystem Architecture

Ascent TransportationVehicle

Ground Support

Propulsion

In-space TransportationVehicle

In-space Servicing

Propulsion

Arrival TransportationEntry, Descent & Landing

Rendezvous & Dock

Extraterrestrial Surface

SystemsSurface Transportation

Off-surface Transportation

Power & Energy

In-situ Sample and/or Resource Access &

Utilization

Infrastructure Platform Bus

In-situ Servicing

Communications & Navigation

Tier 1 and 2 Solutions List

10

Page 11: Technical Capability Assessment - NASA

Progress and Plan

We are here

Da

ta In

pu

t Solutions Set Definition

Center Solutions Set Participation

Prioritization for: Center Identity, Near Term and Future Portfolios

An

aly

sis Prioritization

Analysis

Center Technical Capability Mapping

Capability Discussions

Observations

DE

CIS

ION

S Decisions on Individual Solutions/Capabilities

Collective decision-making –Agency, Mission Directorates, Field Centers In

stitu

tionaliz

e Integrate into NASA existing planning process

Capability Leadership

Begin Right-sizing Activities –workforce & assets

11

1. Making decisions; transparency of data, analysis, and decisions is

critical across the Agency, and with stakeholders.

2. Approach must be integrated with other initiatives: Improving how we

operate (business model) as we right-size our capabilities.

Page 12: Technical Capability Assessment - NASA

Why Capability Leadership?

As we formulate missions and we move to strategically

address workforce and infrastructure, there are four key

areas we need to address….

• Building a strong foundation to support Agency near

and far term goals

• Advancing capabilities to meet long-term needs

• Optimizing deployment of capabilities across all

Centers

• Stop doing work we no longer need to do

These 4 bullets are the essence of capability leadership.

12

Page 13: Technical Capability Assessment - NASA

*Tech Capability Leadership Area 1

Tech Capability Leadership Area 2

Tech Capability Leadership Area X

Tech Capability Leadership Area 3

Tech Capability Leadership Area 4

Project XProject 4Project 3Project 2Project 1

When do we determine something to be an Agency Technical Capability :

• Based on technical nature, complexity, and criticality for the Agency,

• Where a short-term programmatic approach is not sufficient,

• Where greater coordination and alignment is needed,

• and/or where an integrated advancement approach is required to address future Agency objectives.

Mission Directorate A Mission Directorate B

*Technical Capability Leadership can be discipline, research, service, or systems level

13

Page 14: Technical Capability Assessment - NASA

Current NASA Capability Areas

1. Aerosciences

2. Avionics

3. Electrical Power

4. Flight Mechanics

5. Guidance Navigation & Control (GNC)

6. Human Factors

7. Life Support/Active Thermal

8. Loads and Dynamics

9. Materials

10. Mechanical Systems

11. Non-Destructive Evaluation (NDE)

12. Passive Thermal

13. Propulsion

14. Software

15. Structures

16. Systems Engineering (recently filled)

17. Space Environments (not yet filled)

18. Cryogenics (not yet filled)

19. Instruments and Sensors (not yet filled)

14

1. Life Sciences

2. Earth Science

3. Heliiophysics (on hold pending Earth Science approach)

4. Planetary (on hold pending Earth Science approach)

5. Astrophysics (on hold pending Earth Science approach)

Discipline Areas:

Research Areas:

1. Aircraft Operations

2. Environmental Test Facilities (tiger team in work)

3. Mission Operations (tiger team in work)

Technical Service Areas:

Page 15: Technical Capability Assessment - NASA

• Advises Agency and ensures proper alignment across

Missions and Centers.

• Establishes plans/roadmaps to provide technical

guidance to the Agency.

• Determine gap areas for advancement and strategic

investment.

• Advises on capability sizing and strategic hiring,

including contracting, across all Centers.

• Determines investments and divestments within

capability scope, including advising Centers on assets.

• Solicits innovative ideas from outside the capability area.

• Establishes standards and specifications within

capability scope.

Agency Capability Leadership Area Roles

14

Page 16: Technical Capability Assessment - NASA

Accomplishments to Date

1. Held All Hands at all ten NASA Centers to brief NASA Actions and

Technical Capability Assessment plans for transparency to our workforce.

Had sessions with all SES/ST/SL as part of the Virtual Executive Summit.

Established an internal employee web site for transparency of process and

decisions.

2. Briefed Authorization and Appropriations Congressional Committee staff

and Congressional Member staff on NASA Technical Capability

Assessment.

3. Reviewed and incorporated lessons learned from previous Agency

decisions on capabilities, specifically meeting with Arc Jet teams at JSC

and Ames.

4. Provided Agency direction on next steps for institutionalizing technical

capability leadership.

5. Made NASA Council decisions on Microgravity Flight Services, Balloon

Services, Aircraft Operations, Life Sciences, Earth Sciences, Human

Factors, Mission Operations, Nuclear Power and Propulsion, Environments

Test. Established Aircraft Operations, Earth Science Research, Life

Sciences Research, and Agency discipline technical capabilities to be

managed under new model.

16

Page 17: Technical Capability Assessment - NASA

Assessments/Decisions that are underway:• Entry, Descent, and Landing

• Rendezvous and Capture

• Extraterrestrial Surface Systems

• Ascent Transportation – Vehicle

• Aerosciences

• Materials

• Propulsion

• Human Factors

February:• Software

• Structures

• Avionics

• Electrical Power

March:• Guidance Navigation & Control (GNC)

• Flight Mechanics

• Life Support

• Active Thermal

• Mechanical Systems

April:• Non-Destructive Evaluation (NDE)

• Passive Thermal

• Loads and Dynamics

All Technical Assessment result in decisions in the Annual Agency Program Management Council17

Technical Assessments Schedule for 2015

Page 18: Technical Capability Assessment - NASA

Technical Assessments/State of the Capability

Pre-AssessmentBaseline Assessment and

Initial AlignmentAnnual Iterative

Assessment

FY 15 Follow-on Years

Background:

• Scope

• Decomposition

• Definitions

• Team composition

Baseline:

• Center Characterization

• Mission Needs

• Workforce demographics

• Facilities and assets

• Technical challenges/

State of the Discipline

• Gaps/overlap analysis

• Recommendations

Expanded:

• Changes from baseline

• Capability quality

• Facility utilization

• External availability

• Make/Buy decisions

• Partnerships/collaborations

• Emerging innovations

• Updated recommendations

18

Page 19: Technical Capability Assessment - NASA

Annual Path for Integrating Capability Leadership

Agency

Program

Management

Council

(APMC)

Agency Strategy

Implementation

Planning

(A-SIP)

Strategic

Planning

Guidance

(SPG)

OctoberSeptember January

Investment/

divestment

priorities and

integrated issues

from capability

leadership teams

19

Page 20: Technical Capability Assessment - NASA

20

BACKUP