Version 1.0 IAA Tender For AVDGS
Chapter 9 – Bill of Quantities Appendix A – Technical Requirements
Page 1 of 34 File Name: IAA_A-VDGS-RFP-Appendix-A__Chapter 9 - BOQ
Saved: August 28, 2016
Technical Appendix A –
The A-VDGS
System Requirement Definition
Chapter 9 – Bill of Quantities
Amendment Record
Issue Date Reasons For Change Section Amended Author Remarks
Version 1.0 21.8.16 Created IAA
References and Related Documents IAA_A-VGDS-RFP-Appendix D-Price Proposal Form_v1.0
Version 1.0 IAA Tender For AVDGS
Chapter 9 – Bill of Quantities Appendix A – Technical Requirements
Page 2 of 34 File Name: IAA_A-VDGS-RFP-Appendix-A__Chapter 9 - BOQ
Saved: August 28, 2016
Table of Contents
9. CHAPTER 9 – Bill of Quantities 3
9.1 General 3
9.1.1 Guidelines and Instructions for the Bidder 3 9.1.2 Quantities and Expandability – Reminder 5 9.1.3 BOQ Structure 6
9.2 D.1 - A-VDGS WP#CS Solution for Central System and Project Services 8
9.3 D.2a – A-VDGS WP#BCD Solution for Concourses B C D 12
9.4 D.2b - A-VDGS WP#E Solution for Concourse E 15
9.5 D.3 – Maintenance Price 16
9.6 D.4 - Spare Parts 17
9.7 D.5 - Detailed Breakdown of A-VDGS System’s Components 20
9.8 D.6 - Option 1 – Concourse A (O) 27
9.9 D.7 - Option 2 – Remote Stands (O) 28
9.10 D.8 - Elective Options (E,O) 29
9.11 Option – Alternative Maintenance Model 31
9.12 Customer Furnished Equipment (CFE) in TLV AP 31
9.12.1 General 31 9.12.2 Interfaces 31
9.12.3 Electric Power and Air condition 32 9.12.4 Poles and Space for DSSs 32 9.12.5 Separated Core Rooms and Communication 32
9.12.6 Summarized Table 33
Version 1.0 IAA Tender For AVDGS
Chapter 9 – Bill of Quantities Appendix A – Technical Requirements
Page 3 of 34 File Name: IAA_A-VDGS-RFP-Appendix-A__Chapter 9 - BOQ
Saved: August 28, 2016
9. CHAPTER 9 – Bill of Quantities
9.1 General
9.1.1 Guidelines and Instructions for the Bidder
1. The Bidder shall describe the exact content of its proposed A-VDGS system to IAA
in accordance with the following directives and instructions.
2. This Chapter and of the RFP Documents the “Appendix D - Price Proposal Form”
are tightly coupled. The Bidder shall carefully read both documents
instructions, guidelines etc., before starting to fill-in the tables.
3. The Bidder shall also refer to the RFP for further instructions and guidance
regarding the Price Proposal.
4. The Bidder shall state as part of the response to this Chapter 9, without quoting
any price, the BOQ List of the components and all other parameters which have
effect on the Bidder's single solution required for the completion of the project in
accordance with the provisions of the Contract and the Technical Requirements.
5. The Bidder shall refer to any and all components and/or any other items within the
BOQ Lists and fulfill and/or complete and/or provide any and all of the Sections
herein and in compliance with their provisions.
6. The format of the response shall correspond exactly to the structure of the section.
7. Some of the table entries are filled in with item descriptions for illustrative purposes
only; The Bidder shall fill in each entry exactly according to the depicted
instructions.
8. Some items are provided with quantities, particularly the Quantities of End Devices
(DSS, WS, etc.) which are stipulated in the tables for evaluation purposes only.
IAA reserves the right to order any quantities of each proposed devices/items.
9. Special case is the Spare Part table (D.4) which includes minimum quantities set
by IAA. See instructions for this table in Section 9.59.6.
10. The Bidder shall propose a system configuration, according to the proposed
architecture of the A-VDGS System, which shall comply with the required
Version 1.0 IAA Tender For AVDGS
Chapter 9 – Bill of Quantities Appendix A – Technical Requirements
Page 4 of 34 File Name: IAA_A-VDGS-RFP-Appendix-A__Chapter 9 - BOQ
Saved: August 28, 2016
functionality, performance, and expansion ability of the solution, etc., as appears in
the Chapters 1 to 8 of the Technical Requirements. For this purpose, the Bidder
may add rows to the tables as required according to its proposed solution.
11. The Bidder shall submit a solution based on hardware and software components
and modules complying with the above-mentioned requirements.
12. The Bidder shall refer in its Bid and the Technical Proposal to a single solution for
the completion of the Project / Options in compliance with the Technical
Requirements. In this respect the Bidder's response to this chapter shall include all
component, sub-components, tasks, materials, labor, services etc. in order to
achieve its single solution.
13. IAA has the right to request further clarifications regarding Components / Items:
a) At IAA’s request, the Bidder shall clarify specific issues referring to its
proposal. Such clarifications are intended to remove any potential
misunderstandings and clarify various matters, in order for the proposal to attain
uniform content and a comparable common denominator.
b) At IAA’s request, the Bidder shall submit further breakdown for specified items
in the BOQ tables. This breakdown shall include the division of the original
items to sub-components (or tasks or material or labor). Each item in the
required expansion of detail shall be priced separately (as per the Price Proposal
form’s document).
14. The Bidder shall meticulously complete all the data required in each and every
table in this Chapter.
15. It is the Bidder's responsibility to ensure coherent and integrity of data provided in
this Chapter 9, and Appendix D. Appendix D shall include the prices and shall
be delivered separately according to the instructions of the RFP. No prices
shall be quoted in the tables of this Chapter 9.
16. For each item/component below The Bidder shall include a reference to a detailed
description of its exact and unique configuration as proposed to IAA.
17. For each of the aforementioned components, The Bidder shall provide the
following information: manufacturer, model, detailed specification of the exact
Version 1.0 IAA Tender For AVDGS
Chapter 9 – Bill of Quantities Appendix A – Technical Requirements
Page 5 of 34 File Name: IAA_A-VDGS-RFP-Appendix-A__Chapter 9 - BOQ
Saved: August 28, 2016
configuration proposed to IAA in the basic offer, launching date of the proposed
version, target date of next version, major new features of the next version, and
additional information as per Bidder's preference.
18. Occasionally, in the following tables, the Bidder is referred to Sections in the
Technical Requirements documents where the Bidder may find information about
the requested component. The references are general by nature, and under no
circumstances should the Bidder interpret these Sections as the full scope of
requirements for the relevant component.
19. If some components require additional breakdown (further than indicated in D.5),
for example, SW packages for the Central System, The Bidder shall add a specific
table with the detailed items and shall refer it to the specific line in D.5. This table
shall also be included in Appendix D - Price tables, with the prices.
20. For avoidance of doubt: No Prices should be included in the Bidder's response
to this Chapter.
9.1.2 Quantities and Expandability – Reminder
1. The A-VDGS System shall be able to expand and support additional End Devices
(DSS, WS) and additional interfaces, items and features as described in Chapter 3
and Chapter 4.
2. IAA reserves the right to order and integrate any quantity of any item at any time
during the contract period and its extensions (system life). Expanding the system
shall NOT require any additional costs on top of the item’s price (up to maximum
system capacity as required in Chapter 4).
3. All items prices include all costs in order to bring this item into a full operational
mode in the A-VDGS system. This includes, inter-alia, the shipment costs,
installation, configuration, integration, testing, etc.
4. Spare parts price includes the shipment cost from the Bidder's facilities.
5. Please See Contract and RFP invitation for Indexing instructions.
Version 1.0 IAA Tender For AVDGS
Chapter 9 – Bill of Quantities Appendix A – Technical Requirements
Page 6 of 34 File Name: IAA_A-VDGS-RFP-Appendix-A__Chapter 9 - BOQ
Saved: August 28, 2016
9.1.3 BOQ Structure
1. The BOQ in this document (without the prices) consists of the following tables
and Options. The D.# indicated the related Spreadsheet in the Appendix D Excel
Workbook:
a. Table 9 1 (D.0): BOQ Table's Structure – General instructions
b. Table 9 2 (D.1): A-VDGS Work Package WP#CS - Solution for Central
System and Project Services.
c. Table 9 3 (D.2a): A-VDGS Work Package WP#BCD - Solution’s
Components for Concourses B C D
d. Table 9 4 (D.2b): A-VDGS Work Package WP#E - Solution’s
Components for Concourse E
e. Table 9 6 (D.6): Spare Parts Maintenance Fix Price
f. Table 9 6 (D.4): Spare Parts
g. Table 9 7 (D.5): Detailed Breakdown for the A-VDGS System’s
Components
h. Table 9 8 (D.6): Option 1 – Future Concourse A
i. Table 9 9 (D.7): Option 2 – Future Hard/Remote Stands
j. Table 9 10 (D.8): Option 3 – Elective Options
k. Alternative Maintenance Model
l. Table 9 11: CFE Infrastructure at TLV AP
2. Each and every one of the Components and/or items in tables D.1, D.2a, D.2b, D.4,
D.5, D.6, D.7, and D.8 can be purchased separately as an option during system life.
3. The Bidder shall start filling Table D.5 first. This table depicts systems' main
components breakdown. Then tables D.1, D.2 and other tables should be filled.
Note that in Appendix D workbook some of the fields are locked and are calculated
automatically. Please refer to the instructions in Appendix D.
4. Description of the following tables structure:
Version 1.0 IAA Tender For AVDGS
Chapter 9 – Bill of Quantities Appendix A – Technical Requirements
Page 7 of 34 File Name: IAA_A-VDGS-RFP-Appendix-A__Chapter 9 - BOQ
Saved: August 28, 2016
Table 9-1: BOQ Table's Structure
# Component
RFP
Technical
Reference
Bidder’s
Reference
Un
it
Qu
an
tity
IAA’s
Comments
Bidder’s
Comments
Clarifications regard the Tables columns:
# Column
Digit
Identifier
Column Text Clarifications
1. # Ordinal number within the table.
2. Component Term of the required supply within the RFP glossary.
3. RFP Technical
Reference
The RFP’s Chapter / section that explains the required
component in highlights.
4. Bidder’s
Reference
The proposed solution within the Bidder’s technical
proposal to IAA’s requirement. It shall include model
number, HW and SW Configuration, etc.
5. Unit The unit definition of the component's quantity.
Default is blank for general number.
6. Quantity The required Quantities by IAA for evaluation
purpose only.
7. IAA's Comments Regarding the content of the component.
8. Bidder's
Comments
Bidder's comment regarding the component
Note: the unit price and total price are omitted.
General instructions for the Excel workbook can be found in the Instruction Sheet of Appendix D.
Version 1.0 IAA Tender For AVDGS
Chapter 9 – Bill of Quantities Appendix A – Technical Requirements
Page 8 of 34 File Name: IAA_A-VDGS-RFP-Appendix-A__Chapter 9 - BOQ
Saved: August 28, 2016
9.2 D.1 - A-VDGS WP#CS Solution for Central System and Project Services
1. This table consists the items replacing the existing Central System with the new one and
the various activities of A-VDGS Project Services.
2. The Bidder shall present the A-VDGS solution’s components to be deployed in Central
System in Table 9-2 (refers to spreadsheet D.1 in the Price Proposal Workbook), as well
as the Project services, with the guidelines below.
3. The Central System elements shall support WP# BCD and WP# E and up to 100 DSSs.
4. Note that the Central System Price in the Appendix D: Price Proposal Workbook, is a
calculated price from the Breakdown Table D.5. The Bidder must complete D.5 first
and then the calculated prices will be shown in this table (D.1).
5. The Bidder shall include the exact model numbers of all components that are included
in each item. Each shall be described in details in the Technical Proposal in order to
comply with the RFP requirements.
6. The Project Management shall include all project activities as depicted in the Chapter 7-
SOW and the Contract, including Design, Installations, integration etc., It is also
Includes all Project management activities for integrating concourses B, C, D and E.
The Bidder may put a Zero value for Documentation and System tests and add them to
the total price of Project Management.
7. The Bidder may split or add project management activities as it sees fit to comply with
the requirements of Chapter 7 - SOW and with the Contract for better understanding the
Scope of Work.
8. The dismounting of the old PDUs shall be part of the installation activities and it is
included in the Project Management price. It shall be design according to the transition
phase implementation from the old system to the new A-VDGS system.
9. The Project services also includes Bidder's experts visits during the Maintenance
Period. IAA may order any amount of days as required. The 50 days is for comparison
purposes only. Please refer to Chapter 8.
10. The Bidder is requested to add additional item's components as needed according to its
proposal.
Version 1.0 IAA Tender For AVDGS
Chapter 9 – Bill of Quantities Appendix A – Technical Requirements
Page 9 of 34 File Name: IAA_A-VDGS-RFP-Appendix-A__Chapter 9 - BOQ
Saved: August 28, 2016
Table 9-2 (D.1): A-VDGS Solution for Central System and Project Services
Component
RFP
Technical
Reference
Bid
der's
Referen
ce
UN
IT
Qu
antity
IAA's Comments
Bid
der's
Co
mm
ent
1 Systems / Modules / Core
Applications
1.1 Core 1 System: (Shall be
detailed in The Unit Breakdown
Table D.5)
Chapter
3,4,5
System 1 Including all SW HW,
Licensing, Certifications.
Complete functionality.
Detailed in D.5
1.2 Core 2 System: (Shall be
detailed in The Unit Breakdown
Table D.5)
Chapter 4
System 1 Core 2 HW + SW System. As
in Core 1 according to
Bidder's solution for
Redundant system. Detailed
in D.5
1.3 Bidder's Communication
Network (WAN/LAN).
(Shall be detailed in The Unit
Breakdown Table D.5)
Chapter
5,6
System 1 Including Redundant
communication network,
interface network connections
and the Integration with IAA
network. Detailed in D.5
1.4 Test system Core 3: (Shall
be detailed in The Unit
Breakdown Table D.5)
Chapter 4
System 1 Non redundant. Detailed in
D.5
1.5 Additional system
modules added by the
Bidder to comply with the
RFP
System determ
ined by
Bidder
The Bidder may add more
lines with additional items
regarding the central system.
2 Docking Sub System
(DSS)
SEE D.2a and D.2b
3 Clients
3.1 PC client for Operational
WS
Chapter
3,4,6
W
S 3
Including all SW, HW,
licenses, Detailed in D.5
3.2 PC client for Technical
WS
Chapter
3,4,6
WS 5
Including all SW, HW,
licenses, Detailed in D.5
3.3 Color Laser printer Chapter
3,4,6
WS 2
Standard color printer
3.4 A-VDGS Laptop - field
maintenance
Chapter
3,4,6
WS 2
Including all SW, HW,
licenses, Detailed in D.5
Version 1.0 IAA Tender For AVDGS
Chapter 9 – Bill of Quantities Appendix A – Technical Requirements
Page 10 of 34 File Name: IAA_A-VDGS-RFP-Appendix-A__Chapter 9 - BOQ
Saved: August 28, 2016
Component
RFP
Technical
Reference
Bid
der's
Referen
ce
UN
IT
Qu
antity
IAA's Comments
Bid
der's
Co
mm
ent
3.5 Additional WS type added
by the Bidder to comply
with the RFP
WS
determi
ned by
Bidder
The Bidder may add
additional lines for
additional WS types
4 Unique Testing Units
4.1 Determined by the Bidder Chapter 8
Including all SW, HW,
licenses, calibration
configuration and
customization to AVGDS.
4.2
5 Project Services Chapter 7
5.1
Project Management
Chapter 7
1
All project activities as
depicted in the SOW.
Including Design,
Installations, integration etc.,
It is also Includes all Project
management activities for B
C D and E
5.2
Documentation Chapter 7
1
All deliverable
documentation during the
Project (See SOW)
5.3 System Tests Chapter 7 1 ALL Acceptance tests
5.4 Customization
development
Chapter
3,5
1 Details in D.5
5.5
Operational End Users
training in TLV Chapter 7
5
Each for 6 – 13 Operators
including user manual for
each trainee and up-to-date
system capabilities. See
7.3.9.3 : 3#.
5.6 Operational End Users
training in supplier's
premises
Chapter 7
1
Not including expenses, up
to 6 operators and up-to-date
system capabilities. See
7.3.9.3 : 2# + 4#
5.7 System Technical User
Training in Supplier’s
premises.
Chapter 7
1
Not including expenses, up
to 6 operators and up-to-date
system capabilities. See
7.3.9.3 : 3#.
Version 1.0 IAA Tender For AVDGS
Chapter 9 – Bill of Quantities Appendix A – Technical Requirements
Page 11 of 34 File Name: IAA_A-VDGS-RFP-Appendix-A__Chapter 9 - BOQ
Saved: August 28, 2016
Component
RFP
Technical
Reference
Bid
der's
Referen
ce
UN
IT
Qu
antity
IAA's Comments
Bid
der's
Co
mm
ent
5.8 System Technical
Management (Advanced
Training) at Supplier's
premises.
Chapter 7
1
For up to 5 persons and
up-to-date system
capabilities. See 7.3.9.3 : 5#.
5.9 Operational managers /
experts. Chapter 7
1
For up to 4 participants and
up-to-date system
capabilities. See 7.3.9.3 : 6#.
5.10
Expert Visiting labor cost
during Maintenance Period
IAA may invite Bidder's
Experts for consultancy.
IAA will pay for the
expenses such as flight
and hotel according to
the contract terms. The
Bidder shall indicate the
price for 1-day labor.
The quantity of 50 days
is for evaluation only,
and IAA will be able to
exercise this item with
any quantity and anytime
during the system life.
5.11 Additional project
activities and deliverables
add by the Bidder
determin
ed by
Bidder
Version 1.0 IAA Tender For AVDGS
Chapter 9 – Bill of Quantities Appendix A – Technical Requirements
Page 12 of 34 File Name: IAA_A-VDGS-RFP-Appendix-A__Chapter 9 - BOQ
Saved: August 28, 2016
9.3 D.2a – A-VDGS WP#BCD Solution for Concourses B C D
1. Table 9 3 (refers to Spreadsheet D.2a in the Price Proposal Form Workbook)
with the guidelines below.
2. This table includes the main BOQ for replacing the existing PDU units at
concourses B C D.
3. The Bidder shall present the A-VDGS solution’s components to be deployed in
concourses B, C and D. The components of the nominal DSS unit shall be
described in D.5.
4. The Bidder is requested to add additional item's components as needed
according to its proposal. Any Item that comprises of components/LRUs which
is common to all DSS shall be listed in the Breakdown Table D.5.
5. If some Stands require additional components due to the specific layout of the
apron, then the Bidder shall add this in a separate line for the specific Stand.
Note that if All DSS require this additional item it shall be included in the
Nominal configuration in D.5.
6. Total amount of DSSs (Docking Sub-System) to be installed is 8 DSSs per
concourse.
7. The Price of the DSS in this table shall include all costs (shipment, installation,
integration, calibration, tests etc.).
8. Note that the price for dismounting the old PDU units shall be part of the
installation activities of the Project Management (See D.1).
9. The Bidder shall include the exact model numbers of all components that are
included in each item. Each shall be described in details in the Technical
Proposal in order to comply with the RFP requirements.
Version 1.0 IAA Tender For AVDGS
Chapter 9 – Bill of Quantities Appendix A – Technical Requirements
Page 13 of 34 File Name: IAA_A-VDGS-RFP-Appendix-A__Chapter 9 - BOQ
Saved: August 28, 2016
Table 9-3 (D.2a): WP#BCD- A-VDGS Solution’s Components for Concourses B C D
# Component RFP
Technical
Reference
Bid
der's
Referen
ce
UN
IT
Qu
antity
IAA's Comments
Bid
der's
Co
mm
ent
1 Systems / Modules / Core
Applications
1.1 Application and
management modules
(Operational and
Technical) of concourses
B C & D
Chapter
3,4,5,6
System 1 Locked Field!
Already included in the
Central System price
(see D.1 line 1)
2 Docking Sub System
(DSS)
2.1 Docking System for
concourses B C & D
Chapter 3
,4
DSS 24 Nominal Configuration
that supports all Stands.
Price includes all SW,
HW, Firmware, delivery,
shipment, configuration,
installation, testing,
Calibration, etc. to bring
the Docking system into
a full operational state.
DSS nominal
components shall be
listed in D.5.
2.2 Additional sensors/
elements for concourse B
C D for some docking
system at specific Stands
determined
by Bidder Some Stands may
require additional
sensors/ elements. Note
that if the item is
required for all DSSs, it
should be part of the
nominal DSS
configuration
2.3 Additional items required
for B C D and added by
the Bidder
determined
by Bidder The Bidder may add
additional lines of any
additional items/
activities for this
WorkPackage.
2.4
3 Project Services Chapter 7
Version 1.0 IAA Tender For AVDGS
Chapter 9 – Bill of Quantities Appendix A – Technical Requirements
Page 14 of 34 File Name: IAA_A-VDGS-RFP-Appendix-A__Chapter 9 - BOQ
Saved: August 28, 2016
# Component RFP
Technical
Reference
Bid
der's
Referen
ce
UN
IT
Qu
antity
IAA's Comments
Bid
der's
Co
mm
ent
3.1 Project management Chapter 7 1 Locked Field!
Already included in
Central System and
Project Services
3.2 Determine by the Bidder Chapter 7 Determ
ined by
Bidder
3.3
Version 1.0 IAA Tender For AVDGS
Chapter 9 – Bill of Quantities Appendix A – Technical Requirements
Page 15 of 34 File Name: IAA_A-VDGS-RFP-Appendix-A__Chapter 9 - BOQ
Saved: August 28, 2016
9.4 D.2b - A-VDGS WP#E Solution for Concourse E
1. The Bidder shall present the A-VDGS solution for concourse E in the following
2. Table 9 4 (refers to Spreadsheet D.2b in the Price Proposal Form Workbook).
3. The guidelines depicted for WP#BCD are applicable for WP# E as well, with the
following emphasizes:
a. WP# E consists of eight (8) DSS installations.
b. The DSS are with the same configuration as the DSS in BCD
c. The Central system price shall be quoted as 0$ for WP# E since the price is
quoted in WP#CS (D.1). It is mentioned here to emphasize that the Central
System shall support ALL DSS in B,C,D and E.
d. Project management of concourse E also quoted as 0$ since it is included in
WP#CS.
e. Concourse E is a new Concourse. No Old PDUs needed to be dismounted.
Table 9-4 (D.2): A-VDGS WP#E Solution for Concourse E
Component
RFP
Technical
Reference
Bid
der's
Referen
ce
UN
IT
Qu
antity
IAA's Comments
Bid
der's
Co
mm
ent
1 Systems / Modules /
Core Application
1.1 Application and
management modules
(Operational and
Technical) of concourse
E
Chapter 3
,4,5,6
system 1 Locked Field!
Already included in the Central
System price (see D.1 line 1)
2 Docking System
2.1 Docking System for
concourse E
Chapters
3, 4
DSS 8 Nominal Configuration that
supports all Stands. Price includes
all SW, HW, Firmware, delivery,
shipment, configuration,
installation, testing, Calibration, etc.
to bring the Docking system into a
full operational state. DSS nominal
components shall be listed in D.5.
Version 1.0 IAA Tender For AVDGS
Chapter 9 – Bill of Quantities Appendix A – Technical Requirements
Page 16 of 34 File Name: IAA_A-VDGS-RFP-Appendix-A__Chapter 9 - BOQ
Saved: August 28, 2016
Component
RFP
Technical
Reference
Bid
der's
Referen
ce
UN
IT
Qu
antity
IAA's Comments
Bid
der's
Co
mm
ent
2.2 Additional
sensors/elements for
concourse E for specific
docking systems at
specific Stands
deter
mine
d by
Bidde
r
Some Stands may require additional
sensors/ elements. Note that if the
item is required for all DSSs, it
should be part of the nominal DSS
configuration
2.3 Additional items
required for concourse E
and added by the Bidder
The Bidder may add additional
lines of any additional items/
activities for this WorkPackage.
3 Project Services Chapter 7 Concourse E
3.1 Project management Chapter 7 1
Included in Central System and
Project Services
3.2
Determine by the Bidder Chapter 7
deter
mine
d by
Bidde
r
3.3
9.5 D.3 – Maintenance Price
1. This table consists the Yearly Maintenance Fix Price for the Maintenance Services
described in Chapter 8 and the Contract.
2. The Capitalized Maintenance Price over the Contract Period will be evaluated
according to Appendix D with the specified Capitalization Interest in the TEP
(Total Evaluated Price) tab of the EXCEL Workbook.
Table 9-5 (D.3): Maintenance Yearly Price
Bidder's Proposal Value Comment
1
Fixed YEARLY Maintenance
Price for the services described
in Chapter 8.
Shall be
filled in
Appendix D
Only
Bidder must offer a yearly fixed price
regardless of the system capacity and
quantities even when implementing any
option up to maximum system capacity
as defined in Chapter 4 (Up to 100
DSSs)
Version 1.0 IAA Tender For AVDGS
Chapter 9 – Bill of Quantities Appendix A – Technical Requirements
Page 17 of 34 File Name: IAA_A-VDGS-RFP-Appendix-A__Chapter 9 - BOQ
Saved: August 28, 2016
9.6 D.4 - Spare Parts
1. The HW list in the following
2. Table 9-6 (D.4) (refers to Spreadsheet D.6 in the Price Proposal Form Workbook)
describes the minimum quantities of the various A-VDGS components and peripherals
required by IAA.
1. The Bidder shall update these quantities only if according to its RAM analysis and SLA
requirements (Chapter 8) should it define a greater quantity. If less quantity is
required (according to the policy for spare parts described in Chapter 8), then no
change in the quantities shall be made to the minimum quantities set in this table.
2. The Bidder shall include its explanation for the required quantities and the updated
detailed list of the LRUs in response to Chapter 8.
3. The Spare part price (which will be stated only in Appendix D – Price Proposal Form
Workbook) only include the HW price and shipment costs from the Bidder's premises,
since it is replacing an existing operating part. The prices of the LRUs in this table are
assumed to be lower than the price in D.5 table since they do not include SW,
integration, installation, and all other extra costs as defined for each item in other tables.
4. Since the Bidder’s solution may consist other LRU items, The Bidder is requested to
add all required replaceable units which are not described in the following table but are
needed for system operation. For example, if the nominal DSS consists of two types of
sensors, then the Bidder must add the second sensor in the list and set the relevant
quantities with the minimum as determine for other sensors. Another example
5. If, according to the Bidder's solution, some of the LRUs in the table are combined into
one LRU, the Bidder shall select one of the LRU as a master LRU (with the larger
minimum quantity) and set the price for the other LRU as 0. For example, if the solution
consists of one Dock Controller unit for all DSS logic and image processing, then the
Bidder shall set the price for the image processer unit to 0 and indicate in the Bidder's
comment that this LRU is combined with the Dock Controller.
6. The Capitalized Spare Part Price over the Contract Period, assuming renewal every two
years, will be evaluated according to Appendix D with the specified Capitalization
Interest in the TEP tab of the EXCEL Workbook.
Version 1.0 IAA Tender For AVDGS
Chapter 9 – Bill of Quantities Appendix A – Technical Requirements
Page 18 of 34 File Name: IAA_A-VDGS-RFP-Appendix-A__Chapter 9 - BOQ
Saved: August 28, 2016
Table 9-6 (D.4): Spare Parts
Component Technical
Reference
Bid
der's
Referen
ce
Qu
antity
for
Ev
aluatio
n
IAA's Comments
1 AVGDS Stand/APRON Unit Chapters
4,8
Minimum HW quantities - the
Bidder should adjust up the
quantities according to SLA and
RMA - The Quantity of a particular
item should be increased if RMA
analysis (Chapter 8) defines greater
quantity.
1.1 Pilot Display Unit (PDU) 3 a complete assembly for easy
replacement of the PDU
1.2 Dock Controller 3 The DSS logic and control
1.3 Detecting sensor 3 May be consists of several LRUs
detectors
1.4 LAN Switch (optic) 3
Shall support Ring topology. Hybrid
topology (Ring and Star) are
preferred
1.5 Operator Control Unit 3 Outdoor unit including all cables to
connect to the DSS
1.6 Image Processor 3 can be omitted if included in the
Dock Controller unit
1.7 Power supply 3
If different types are installed, the
Bidder shall add lines for each type
with the same quantity.
1.8 Fans 4
If different types are installed, the
Bidder shall add lines for each type
with the same quantity.
1.9 Obstacle detector 3 can be omitted if included in the
Detecting sensor
1.10 A/C 3
If an Air-Condition is required to
comply with the climate
requirements.
1.11 thermostat 3
If different thermostats are installed,
the Bidder shall add additional lines
for each type with same quantity.
1.12 Cabinet and accessories and
cables
1
complete set including all types of
cables
Version 1.0 IAA Tender For AVDGS
Chapter 9 – Bill of Quantities Appendix A – Technical Requirements
Page 19 of 34 File Name: IAA_A-VDGS-RFP-Appendix-A__Chapter 9 - BOQ
Saved: August 28, 2016
Component Technical
Reference
Bid
der's
Referen
ce
Qu
antity
for
Ev
aluatio
n
IAA's Comments
1.13 Additional HW (LRU)
components required for
keeping the SLA
the Bidder should add all required
elements for the spare parts in order
to comply with the SLA and
maintenance requirements as
depicted in chapter 8
2 Central System
2.1
Application server
1
HW only. Swappable. If Additional
Server types are proposed as part of
the solution, the Bidder must add
lines for each type with the same
quantity. Shall be set up from Image
Disk/USB
2.2 Storage unit 1 HW only
2.3 Switch router 1
2.4 Storage disk 2 Swappable
2.5 LAN switch 1 only for separate unit from router
2.6 FW 1 only for separate unit from router
2.7 Additional HW (LRU)
components required according
to Bidder's solution and for
keeping the SLA
1
2.8
3 Work Station
3.1 WS PC client standard for
technical
1
HW only – shall be set up from
Image Disk/USB
3.2 WS PC client (Pizza) for
operational
1
HW only – shall be set up from
Image Disk/USB
3.3 WS bright monitor for tower 1 To be installed in the operational
Tower
3.4 KVM unit (Fiber) 1 For remote Display/Mouse/Keyboard
over fiber optic
3.5 KVM unit (copper) 1 For remote Display/Mouse/Keyboard
over Ethernet cable
3.6 WS monitor standard 1
3.7 LAN optical converter 2 For Remote WS
3.8 Additional components
required for keeping the SLA
Version 1.0 IAA Tender For AVDGS
Chapter 9 – Bill of Quantities Appendix A – Technical Requirements
Page 20 of 34 File Name: IAA_A-VDGS-RFP-Appendix-A__Chapter 9 - BOQ
Saved: August 28, 2016
9.7 D.5 - Detailed Breakdown of A-VDGS System’s Components
1. In this Section the Bidder is required to present in following
2. Table 9-7 (refers to Spreadsheet D.5 in the Price Proposal Form Workbook) a detailed
component breakdown and LRU's that comprise the Main Central System and Backup
System components, Test system, DSS and other End Devices assemblies of A-VDGS
stated in the tables of WP#CS (D.1), WP# BCD (D.2a) and WP# E (D.2b).
3. IAA shall have the option to purchase each component listed in this table. The price
includes all costs needed (SW, HW, delivery, integration installation etc.) to bring the
item into a fully operational mode.
4. The Bidder is requested to add and describe all necessary items, not mentioned in the
table, to ensure complete system integrity and operation.
5. The Bidder must ensure the total integrity of data provided in this table and the
associated table in Appendix D - Price Proposal Form, except the prices which are
included in Appendix D - Price Proposal Form only.
6. All SW Modules/Applications/Packages Firmware etc. shall be provided with
licensing/certifications/permits etc. for the system life and are included in the
component price.
7. Main System’s HW components shall be duplicated for the backup system, including
SW modules. The Bidder may offer a different SW configuration for the Backup
System (for example, reduced price due to licensing policy) and shall indicate the
differences in the table.
8. If further breakdown is required for a specific item (e.g. Application SW), the Bidder
shall add an additional table with a detailed list of the components to describe this
item in D.5.
Version 1.0 IAA Tender For AVDGS
Chapter 9 – Bill of Quantities Appendix A – Technical Requirements
Page 21 of 34 File Name: IAA_A-VDGS-RFP-Appendix-A__Chapter 9 - BOQ
Saved: August 28, 2016
Table 9-7 (D.5): Detailed Breakdown for the A-VDGS System’s Components
Component
RFP
Technical
Reference
Bid
der's
Referen
ce
Qu
antity
IAA's Comments Bidder's
Comment
1 Core 1 System SW + HW A-VDGS WP#CS Line 1.1
1.1 Main Application system
Servers HW, standard
infrastructure SW ,
operating systems,
Information security etc.
Chapter
3,4,5,6
1 Including all licensing
certifications for HW and SW.
Please list the HW SW
modules and prices in a
separate sheet installed in the
rack
1.2 A-VDGS Operational
Application
chapter3 1 The Main Application
modules. May require an
additional breakdown table
1.3 A-VDGS Technical
Application
chapter 3 1 Technical management
module
1.4 Main Storage servers and
disks including HW and
DB management and
standard SW
chapter 4,6 1 Including all licensing
certifications for HW and SW.
Please list the HW SW
modules in a separate table
installed in the rack
1.5 Racks cables and
accessories
Chapter 4,
Chapter 6
1 Each core room shall have one
rack.
1.6 Additional components for
Main Core 1, proposed by
the Bidder
determined
by the
Bidder
The Bidder may add additional
components (lines) for Core 1
which are not listed above.
1.7
2 Core 2 System Chapters
4,5.6
A-VDGS WP#CS Line 1.2
2.1 Application servers for
Core 2
1 This is the Core 2 HW and
infrastructure SW which is
installed in a separate room.
Core 2 may operate as a Hot
standby or load balancing
mode, as determined by the
bidder. Includes all SW HW
licenses and certifications.
2.2 Storage and DB server for
Core 2
1 Storage elements for Core 2.
includes all SW HW licenses
and certifications
Version 1.0 IAA Tender For AVDGS
Chapter 9 – Bill of Quantities Appendix A – Technical Requirements
Page 22 of 34 File Name: IAA_A-VDGS-RFP-Appendix-A__Chapter 9 - BOQ
Saved: August 28, 2016
Component
RFP
Technical
Reference
Bid
der's
Referen
ce
Qu
antity
IAA's Comments Bidder's
Comment
2.3 VGDS Application SW for
backup (operational)
1 The A-VDGS SW (operational
modules) for Core 2
2.4 VGDS Application SW for
backup (operational)
1 The A-VDGS SW (technical
modules) for Core 2
2.5 Racks cables and
accessories
1 Core 2 has a separate
additional rack
2.6 Additional components for
Main Core 2, proposed by
the Bidder
determined
by the
Bidder
The Bidder may add additional
components (lines) for Core 2
which are not listed above.
3 Communication network
Core 1 and Core 2
A-VDGS WP#CS Line 1.3
3.1 Switch Router (optic +
copper)
Chapters 4,6 2 Each Core room shall have a
switch Router working in a
redundant mode. Including all
SW and HW licenses and
certifications
3.2 Firewalls and information
security elements
Chapters 4,6 2 Each Core room shall have
FWs working in a redundant
mode. FWs can be included in
the router. The Bidder may
determine the quantity and
types of FWs for Core 1 and
Core 2, including all SW and
HW licenses and
certifications.
3.3 LAN switch (optic) Chapters 4,6 2 Each Core room shall have
LANSW supporting Ring
Topology and Hybrid
topology, working in a
redundant mode. LANSWs
can be included in the router.
The Bidder may determine the
quantity and types of LANSW
for Core 1 and Core 2. to
connect to all DSS, WS, and
interfaces. Including all SW
and HW licenses and
certification
Version 1.0 IAA Tender For AVDGS
Chapter 9 – Bill of Quantities Appendix A – Technical Requirements
Page 23 of 34 File Name: IAA_A-VDGS-RFP-Appendix-A__Chapter 9 - BOQ
Saved: August 28, 2016
Component
RFP
Technical
Reference
Bid
der's
Referen
ce
Qu
antity
IAA's Comments Bidder's
Comment
3.4 LAN switch (optic) Chapter 6 2 for remote connection of the
operational and Technical WS
at the Operational Tower
3.5 Optical LAN converter Chapter 6
4
for WS installed at distance
from Core rooms over Fiber
optic redundant connection (2
at server side and 2 at the WS
side)
3.6 KVM (optic) Chapter 6
2
Extending the distance for
monitor mouse keyboard over
optic cable (2 sets of local and
remote device)
3.7 KVM (copper) Chapter 6
2
Extending the distance for
monitor mouse keyboard over
Ethernet cable (2 sets of local
and remote device)
3.8 Additional Network and
information security
devices for Core 1 and
Core 2, proposed by the
Bidder
4 Test system Chapters
4,5.6
A-VDGS WP#CS Line 1.4
4.1 Server for Test
Environment
1 Test environment HW and SW
shall be installed in Core 3 (no
redundancy). Including all SW
and HW licenses and
certifications.
4.2 Storage for Test 1 installed in Core 3
4.3 VGDS operational
Application - test
1 installed in Core 3
4.4 VGDS technical
Application for test
1 installed in Core 3
4.5 LAN/Router/Switch 1 With fiber optic connection to
core1 and core2 rooms.
4.6 cabinet + accessories +
cables
determined
by the
Bidder
Installed in Core3.
Version 1.0 IAA Tender For AVDGS
Chapter 9 – Bill of Quantities Appendix A – Technical Requirements
Page 24 of 34 File Name: IAA_A-VDGS-RFP-Appendix-A__Chapter 9 - BOQ
Saved: August 28, 2016
Component
RFP
Technical
Reference
Bid
der's
Referen
ce
Qu
antity
IAA's Comments Bidder's
Comment
4.7 Additional Test
environment components
proposed by the Bidder
5 Docking Sub System (Nominal
Configuration of DSS)
Chapter 3,4,6 A-VDGS WP#BCD and
WP#E Line 2.1
5.1 SW - All Application
modules and firmware
1 ALL inclusive costs including
inter alia, management,
shipment integration testing
calibration latest versions,
Licenses, certifications, SW
modules etc. for each
component of the DSS (if
delivered separately)
5.2 Pilot Display Unit (PDU) 1 As required by RFP
5.3 Dock Controller 1 The main Docking controller
(application firmware and
HW)
5.4 Obstacle detector 1 May be included in the
detecting sensor. If so price
should be zero
5.5 Detecting sensor 1 Bidder may determine the
nominal quantity of sensors
for B C D E)
5.6 LAN Switch 1 Supporting the Ring topology
and hybrid topology
5.7 Operator Control Unit
(OCU)
1 Outdoor unit connected to
main cabinet.
5.8 Image Processor 1 May be integrated with the
docking controller. If so, price
should be zero
5.9 Power supply 2 At least 2 power supplies for
redundancy
5.10 Fans 2 Bidder may determine the
nominal quantity of fans
included in each DSS (at least
2)
5.11 Air Condition 1 Air-condition for the cabinet.
5.12 Thermostat 2 the quantity may be
determined by the bidder for
nominal configuration
Version 1.0 IAA Tender For AVDGS
Chapter 9 – Bill of Quantities Appendix A – Technical Requirements
Page 25 of 34 File Name: IAA_A-VDGS-RFP-Appendix-A__Chapter 9 - BOQ
Saved: August 28, 2016
Component
RFP
Technical
Reference
Bid
der's
Referen
ce
Qu
antity
IAA's Comments Bidder's
Comment
5.13 Cabinet and accessories 1 including all cables to connect
ESTOPs and OCU, Network
and Electrical Power
5.14 Additional items devices
components proposed by
the Bidder
Determine
d by the
Bidder
The Bidder shall add
additional
devices/items/components and
SW modules which are part of
the required nominal
configuration of the DSS and
was not listed above
6 WS - Technical Chapter 3,6 A-VDGS WP#CS Line 3.2
6.1 A-VDGS Application 1 ALL SW and Licenses
6.2 PC + operating system 1 Standard PC as required
6.3 Monitor 1 Standard monitor
6.4 mouse+keyboard 1
6.5 Additional components 1
7 WS - Operational Chapter 3,6 A-VDGS WP#CS Line 3.1
7.1 A-VDGS Application 1 ALL SW and License
7.2 PC + operating system 1
Piza PC as defined in chapter
6. PC shall be installed in a
cabinet in the tower
7.3 Monitor high brightness 1 To be installed in the tower
7.4 mouse+keyboard 1
7.5 Additional components
8 LAPTOP A-VDGS WP#CS Line 3.3
8.1 A-VDGS Application Chapter 3,6 2
including licensing application
modules and testing tools
8.2 LAPTOP Chapter 6 2
HW + operating system +
standard SW
8.3
9 Customization and
Development
A-VDGS WP#CS Line 5.4
9.1 Operational management
enhancements
Chapter 3 1
Customization and developing
according to RFP including
HMI
Version 1.0 IAA Tender For AVDGS
Chapter 9 – Bill of Quantities Appendix A – Technical Requirements
Page 26 of 34 File Name: IAA_A-VDGS-RFP-Appendix-A__Chapter 9 - BOQ
Saved: August 28, 2016
Component
RFP
Technical
Reference
Bid
der's
Referen
ce
Qu
antity
IAA's Comments Bidder's
Comment
9.2 Technical management
enhancements
Chapter 3 1
Customization and developing
according to RFP including
HMI
9.3 AODB interface Chapter 5 1 redundant interface
9.4 AODB Test interface Chapter 5 1 non redundant
9.5 NTP interface Chapter 5 1 redundant interface
9.6 Dry contact interface for
each Stand for PBB interlock
Chapter 5 32
Local connection to the DSS at
the Apron
9.7 Interface to DCRS Chapter 5 1 redundant interface
9.8 Additional development and
customization determined by
the Bidder
1 for the
system
Version 1.0 IAA Tender For AVDGS
Chapter 9 – Bill of Quantities Appendix A – Technical Requirements
Page 27 of 34 File Name: IAA_A-VDGS-RFP-Appendix-A__Chapter 9 - BOQ
Saved: August 28, 2016
9.8 D.6 - Option 1 – Concourse A (O)
1. The following Table 9-8 (refers to Spreadsheet D.6 in the Price Proposal Form
Workbook) lists the option of implementing the DSS in concourse A which supposed
to be built sometime in the future.
2. The price, is already fixed by the price of a single DSS multiply by the number of the
required units (8). As mentioned earlier in this chapter, the price of the DSS (as
determined in table D.5) includes all costs needed in order to bring the unit into
complete operation.
3. The Price for Concourse A option will not be evaluated as part of the TEP - Total
Evaluated Price. The Bidder may offer a quantity discount percentage for this option.
The percentage will be multiplied by the price of 8 DSS and the result will be reduced
from the TEP with 75% weight factor.
4. Option 1 may be exercise at any time with any quantities during system life. Discount
will be applied fully only when ordering at least 8 DSSs. See chapter 7 and Appendix
D for details.
Table 9-8 (D.6): Option 1 – Concourse A
Component RFP
Technical
Reference
Bid
der's R
eference
and
Mo
del n
o.
Qu
antity
for
evalu
ation
IAA's Comments
1 Option 1 - Concourse A
1.1 Docking system for Future
Concourse A 8
All-inclusive price including, inter
alia, shipment, management
integration , testing configuration,
documentation, calibration and
operation
1.2 Discount for Option 1 in
Percentage A discount shall be offer for ordering
the whole amount
Version 1.0 IAA Tender For AVDGS
Chapter 9 – Bill of Quantities Appendix A – Technical Requirements
Page 28 of 34 File Name: IAA_A-VDGS-RFP-Appendix-A__Chapter 9 - BOQ
Saved: August 28, 2016
9.9 D.7 - Option 2 – Remote Stands (O)
1. The following of the TEP - Total Evaluated Prices. The Bidder may offer a quantity
discount percentage for this option. The percentage will be multiplied by the price of 28
DSS and the result will be reduced from the TEP with 75% weight factor.
2. Option 2 may be exercise at any time with any quantities during system life. Discount
will be applied fully only when ordering at least 8 DSSs. See chapter 7 and Appendix D
for details.
3. Table 9 8 (D.7): Option 2 – Remote Stands (refers to Spreadsheet D.7 in the Price
Proposal Form Workbook) lists the additional DSS units for Hard/Remote stands that
shall or may be included in the System sometime in the future.
4. The price, is already fixed by the price of a single DSS multiply by the number of the
required units (8). As mentioned earlier in this chapter, the price of the DSS (as
determined in table D.5) includes all costs needed in order to bring the unit into
complete operation.
5. The price for the Remote Stands option will not be evaluated as part of the TEP - Total
Evaluated Prices. The Bidder may offer a quantity discount percentage for this option.
The percentage will be multiplied by the price of 28 DSS and the result will be reduced
from the TEP with 75% weight factor.
6. Option 2 may be exercise at any time with any quantities during system life. Discount
will be applied fully only when ordering at least 8 DSSs. See chapter 7 and Appendix D
for details.
Table 9-8 (D.7): Option 2 – Remote Stands
Component RFP
Technical
Reference
Bid
der's R
eference
and
Mo
del n
o.
Qu
antity
for
evalu
ation
IAA's Comments
1 Option 2 - Remote Stands
1.1 Docking system for Future
Hard/Remote stand (based
on the same nominal DSS
for other Stands/Gates
28
All-inclusive price including, inter
alia , shipment, management
integration , testing configuration,
documentation, calibration and
operation
1.2 Discount for 28 Remote
Stands – in percentage
A discount shall be offer for
ordering all 28 units
Version 1.0 IAA Tender For AVDGS
Chapter 9 – Bill of Quantities Appendix A – Technical Requirements
Page 29 of 34 File Name: IAA_A-VDGS-RFP-Appendix-A__Chapter 9 - BOQ
Saved: August 28, 2016
9.10 D.8 - Elective Options (E,O)
1. The Bidder shall present the Elective Options - Advanced and Additional Features and
capabilities in the following
2. Table 9 9 (refers to Spreadsheet D.8 in the Price Proposal Form Workbook).
3. Each Additional Feature shall be described in detail in the Technical Proposal with all
specification and how it shall be integrated in the A-VDGS System.
4. Some of the features shall also include the HW components that support the feature
(unless specified otherwise).
5. The Bidder shall indicate if an Elective item option is already part of its proposed A-
VDGS system (or part of the DSS)
6. This table also includes an option for a smaller DSS unit with less capabilities and
redundancy that may be purchase for Remote stands with a straight center line. The
Bidder shall provide detail description if this elective option is applicable.
7. The options in this table are NOT evaluated in the Total Evaluated Price Proposal.
Table 9-9 (D.8): Elective Options (EO)
Line Component RFP
Technical
Reference
Bidder's
Reference
and Model
no.
Quantity
for
evaluation
IAA's Comments Bidder's
Comments
1 GENERAL 1.1 Interface to Light system per
Stand
Chapter 5 1 Dry contact interface
1.2 Additional sensor type for
detection
Chapter 4 1 Please elaborate of various
detectors and their capabilities
compared to the nominal sensors
depicted in D.5
1.3 DSS - split cabinets between the
PDU and Control/logic unit
Chapter 6 1 additional cost on top of nominal
price for DSS
1.4 Wide display 50"" Chapter 6 1 in parallel to PC standard monitor
1.5 Display extender unit Chapter 6 1 to install the display at distance
from the PC over fiber optic
1.6 PC high bright monitor 25"" Chapter 6 replacing the high bright
21"display
1.7 UPS unit for Docking system Chapter 6 1 if not included in the nominal
configuration
1.10 Mobile WS (Tablet) Chapter 6 1 including SW Wi-Fi and cellular
Version 1.0 IAA Tender For AVDGS
Chapter 9 – Bill of Quantities Appendix A – Technical Requirements
Page 30 of 34 File Name: IAA_A-VDGS-RFP-Appendix-A__Chapter 9 - BOQ
Saved: August 28, 2016
1.11 Wi-Fi coverage system for an
apron
Chapter 6 1 including the APs and connection
to the CS
1.12 Additional components added by
the Bidder which are described in
the RFP as an option
RFP Determine
d by the
Bidder
Any Elective option that is
described in the RFP
1.13 camera system at each Stand Chapter4 32 including the management
application and installed at each
Gate
1.14 Additional components proposed
by the bidder to improve and
extend the system.
RFP Determine
d by the
Bidder
Any option that the Bidder may
propose for the the system or
future expand
1.15 Additional training and courses
proposed by the Bidder
Chapter 7 Additional technical and/or
operational training and courses
proposed by the bidder
1.16 Additional items proposed by
the Bidder
2 Docking system for
Hard/Remote Stands -
Alternative option
Chapter
3, 4 This Option is for a DSS with
less capabilities and
redundancy, nevertheless
comply with the requirements
for the Hard Stand (straight
center line)
2.1 Application SW 1 All SW and licenses 2.2 Display unit for Hard Stand 1 reduced capability - small display
linear view
2.3 controller 1 2.4 detecting sensor 1 including obstacle detector
2.5 operator control unit 1 2.6 cabinet and accessories 1
2.7 Climate control devices 1 2.8 Fan 2
2.9 power supply 1 2.10 track-ball for operational WS 1
2.11 LAN SW 1 2.12 Additional components added by
the Bidder which are required for
DSS installed at hard/remote
stands
Determine
d by the
Bidder
Determine
d by the
Bidder
Small Docking System
Version 1.0 IAA Tender For AVDGS
Chapter 9 – Bill of Quantities Appendix A – Technical Requirements
Page 31 of 34 File Name: IAA_A-VDGS-RFP-Appendix-A__Chapter 9 - BOQ
Saved: August 28, 2016
9.11 Option – Alternative Maintenance Model
See Chapter 8 Section 8.5.6.
9.12 Customer Furnished Equipment (CFE) in TLV AP
9.12.1 General
1. The next Sections describe the available infrastructure at TLV AP, and will be
provided by IAA.
2. The Bidder shall specify what additional infrastructure is required for the proposed
A-VDGS.
3. The Bidder, as sole integrator of the A-VDGS project, is responsible in
accompanying, guiding, controlling and approving the CFE and other supplied by
IAA, such as: Infrastructure, Interfacing Systems, etc., as stipulated in chapter 7.
4. Please refer also to Chapter 1, Chapter 6 and the SOW for more details.
9.12.2 Interfaces
1. IAA will provide the ICD to the AODB (Operational and Test environment). Please
refer to Chapter 5 for more details of the implementation. The demarcation points
shall be fiber optic connector from the FW of the AODB system.
2. IAA will provide the ICD to the DCRS (Data Collect and Report System). Please
refer to Chapter 5 for more details of the implementation. The demarcation points
shall be fiber optic connectors from the FW of the DCRS system.
3. IAA will provide the ICD and the connection to the NTP (Main and Backup.).
Please refer to Chapter 5 for more details of the implementation.
4. IAA will provide the dry contact interface (when applicable) to systems at the Stand
(such as Bridge, UPS, etc.). Please refer to Chapter 5 for more details of the
implementation.
5. Current installed ESTOPS shall be connected to the new A-VDGS system.
Version 1.0 IAA Tender For AVDGS
Chapter 9 – Bill of Quantities Appendix A – Technical Requirements
Page 32 of 34 File Name: IAA_A-VDGS-RFP-Appendix-A__Chapter 9 - BOQ
Saved: August 28, 2016
9.12.3 Electric Power and Air condition
1. IAA will provide the required electric power and Air-condition to each of the three
Core rooms and near the positions of the various Work Stations.
2. The Bidder shall state the required space, electrical power and Heat dissipation,
needed for installing the Central System racks in each room.
3. The Bidder shall state the required space, electrical power and Heat dissipation,
needed for installing the Workstations.
4. IAA will provide the power board in a cabinet to each stand with circuit breakers
(230V/50HZ/16A) and utility outlets. Some Stands (in concourses E) will be
provided with three separate circuit breakers (230V/50HZ/16A).
5. The Supplier is responsible to connect each unit/device of the Docking Sub System
at each Stand as required with approved cables.
9.12.4 Poles and Space for DSSs
1. IAA will provide poles and/or space on the bridge façades for the DSS.
2. In concourses B C D the Supplier must use the current poles and shall confirm that
they are suitable for the new DSS.
3. IAA will install the same pole types at concourse E.
4. For Optional remote stands, IAA will provide the existing poles (where applicable,
or will install new poles as directed by the Supplier.
5. Please see Annex 3-A and 4-A for detailed description of each pole at each stand.
9.12.5 Separated Core Rooms and Communication
1. IAA will provide the space and passive fiber network for each Core room and the
various sites where the A-VDGS WS will be deployed.
2. IAA shall supply the Fiber Optic infrastructure between the various sites for the A-
VDGS. Please refer to chapter 6 for more details on the fiber optic connections
between the sites.
3. All Active Network devices and extenders shall be supplied by the Bidder.
Version 1.0 IAA Tender For AVDGS
Chapter 9 – Bill of Quantities Appendix A – Technical Requirements
Page 33 of 34 File Name: IAA_A-VDGS-RFP-Appendix-A__Chapter 9 - BOQ
Saved: August 28, 2016
4. All racks and closets, e.g. for specific equipment, specific networking equipment,
system servers and other equipment shall be supplied by the Bidder and included
in the BOQ and Pricing quotation (This Chapter 9 and Appendix D).
9.12.6 Summarized Table
1. The Bidder shall fill-in each required entry in the Table 9-10 below.
2. The Bidder may add Additional Components, not mentioned in the list, it may find
necessary for implementing the A-VDGS System.
3. During the Bidders conference and the site tour, IAA will present the various
locations in the Airport, the available space in each location, the availability of
power, HVAC and communication.
Table 9-10: CFE Infrastructure at TLV AP
# Component Unit Quantity Comments
1 Core Rooms : Core 1 in concourse B, Core 2 in Concourse D and Core 3 in
concourse E
1.1 Location required for
Cabinets / Racks in each Core
room 3
The Bidder will be familiar with
those rooms during the Bidders’
conference/site tour
1.2 Tower
1
The Bidder will be familiar with
the operational Tower during the
Bidders’ conference/site tour.
IAA will provide space and
passive network to each Work
position.
1.3 Network
The IAA will provide the
required passive Fiber Optic
infrastructure.
Version 1.0 IAA Tender For AVDGS
Chapter 9 – Bill of Quantities Appendix A – Technical Requirements
Page 34 of 34 File Name: IAA_A-VDGS-RFP-Appendix-A__Chapter 9 - BOQ
Saved: August 28, 2016
# Component Unit Quantity Comments
1.4 Electrical supply including UPS
The IAA will provide as needed
according to the technical
solution. UPS for specific
devices will be provided by the
Bidder as stated in the technical
chapters.
ICD for AODB and DCRS
interfaces 1
Redundant and test environment
NTP sources 2
IAA will provide connection to
redundant NTP sources.
2 Docking Sub System See Chapter 4
2.1 Poles / facades for each
Gate/Stand 32
Existing poles at specific
location as indicated in Annexes
3-A and 4-A
2.2 Fiber optic cables Single mode
The IAA will provide the
required end points fiber optic
passive network between the
various sites
2.3 Existing ESTOPS