Upload
bertina-esther-gaines
View
216
Download
2
Embed Size (px)
DESCRIPTION
Team Responsibilities ResearchDocumentationWebsiteMicro- controller Component Interfacing Power Supply Marshalia Green XXXX Lutrisha Johnson XXXX Brad Lowe XXXX John Thompson XXXX
Citation preview
Team leader: Brad Lowe Team members: Marshalia Green
John Thompson Lutrisha Johnson
Faculty Advisor: Dr. Robert Reese
Team Responsibilities
Research Documentation Website Micro-controller
Component Interfacing
PowerSupply
Marshalia Green
X X X X
Lutrisha Johnson
X X X X
Brad Lowe X X X X
John Thompson
X X X X
Presentation OutlineI. IntroductionII. SimulationIII. TestingIV. Future WorkV. Demonstration
MotivationEnergy Conservation
Decrease Energy Costs
Convenience
Design Diagram
Light
Control Unit01
Sensor
MotionSensor
Design Requirements• Power (operate from house @ 120V AC)
• Size (light switch, 4.5 in x 3.5 in x 1.5 in)
• Installation (anyone with basic knowledge of electrical wiring)
• Life Expectancy (10 years)
System Components
•Photoelectric Beam Sensors
•Motion Detector
•PIC Microcontroller
Power Supply Requirements3 doorways = 6 beams1 beam = 10V @ 25mA6 beams = 10V @ 150mA
PIC = 5V @ 100mA
Light control relay = 10V @ 100mA
Total DC Current = 350 mA
Prototype of Power Supply
Power Supply Components
Transformer (10V @ 1A)
Bridge rectifier
Capacitor
Voltage Regulator (7805)
Size of Transformer:
1.38 in X 1.88 in
Simulation Power Supply
Power Supply Test5V
Very small current ripple
120V AC
Beam Testing
5V on
0V off
Results of Beam Testing
Power consumption
Data Sheet: 10V @ 25mA
Measured: 10V @ 16mA
Beam detection length = 14 ft
Cost Analysis (Prototype)
The total cost for the system is $99.82.
Beams $60.00Motion Detector $20.00Microcontroller $4.62Transformer $6.00Voltage Regulator $0.75Rectifier $0.52Relay $3.99Capacitor $0.85Power Mosfet(relay control)
$1.99
Fuses/Fuse Holder $1.10
Prototype
SummaryPower supply for beams:• Functions properly
Power supply for circuit:• Complete
Microcontroller:• Programming not complete
Motion Detector:• Acquired, but being tested
Future Work• Complete Testing and Debugging
of Design
• Board Fabrication
• Packaging
Timeline
Tasks August September October November December
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
Order Parts
Fabricate PC Board
Place Parts on PCB
Test Design
Debug Design
Final Packaging
Presentation
Demonstration