Period Highlight: 1 Plan Actual % Complete Actual (beyond plan) % Complete (beyond plan)
Month: September October November December
Primary Responsibility, PLAN PLAN ACTUAL ACTUAL PERCENT Day: 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29
Major Team Deliverable Secondary Responsibility START DURATION START DURATION COMPLETE1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60
1 Product Design Specification 1.1 Product identification DR, JB 5 4 5 4 100%
1.2 Key project deadlines JB, DR 5 4 5 4 100%
1.3 Physical description DR, JB 5 4 5 4 100%
1.4 Financial requirements JB, DR 5 4 5 4 100%
1.5 Life Cycle targets PC, CW 5 4 5 4 100%
1.6 Social, Legal requirements JL, AG 5 4 5 4 100%
1.7 Manufacturing specifications CW, PC 5 4 5 4 100%
1.8 Market identification (need) AG, JL 5 4 5 4 100%
1.9 Editing and Completion Group 9 1 9 1 100%
2 Design Review I 2.1 Problem description JB,PC 9 10 9 10 100%
2.2 Summary of PDS PC,JB 9 10 9 10 100%
2.3 HOQ for critical design parameters JL,AG 9 10 9 10 100%
2.4 HOQ benchmarking other products AG,JL 9 10 9 10 100%
2.5 Pugh charts for design selection CW,DR 9 10 9 10 100%
2.6 Gantt chart and schedule DR,CW 9 10 9 10 100%
2.7 Powerpoint Generation Group 12 7 12 7 100%
3 Project Plan Report 3.1 Introduction JL,PC 9 10 9 10 100%
3.2 Problem description and Explanation - - - - - -
3.2.1 Background and requirements JB,AG 9 10 9 10 100%
3.2.2 Description and benchmarking AG,JB 9 10 9 10 100%
3.3 Goals, Objectives, Constraints/PDS PC,JL 9 10 9 10 100%
3.4 Approach CW,DR 9 10 9 10 100%
3.5 Task Description JL,PC 9 10 9 10 100%
3.6 List of Design Equations DR,CW 9 10 9 10 100%
3.7 Cost and Schedule DR,CW 9 10 9 10 100%
3.8 Editing and Completion Group 18 2 18 2 100%
4 EAB Poster 4.1 Problem description JB,CW 20 6 - - 0%
4.2 Task description JL,PC 20 6 - - 0%
4.3 Design specs, PDS information AG,DR 20 6 - - 0%
4.4 Concepts: desciptions and/or sketches CW,JB 20 6 - - 0%
4.5 Schedule DR,AG 20 6 - - 0%
4.6 Poster design and art PC,JL 23 3 - - 0%
4.7 Printing PC,JL 25 2 - - 0%
5 Design Review II 5.1 Problem Description JB 22 10 - - 0%
5.2 Pugh charts and/or decision matrices CW 22 10 - - 0%
5.3 Engineering analysis I DR,JL,JB 22 10 - - 0%
5.4 Engineering analysis II AG,PC,CW 22 10 - - 0%
5.6 Summary of analysis I JL 22 10 - - 0%
5.7 Summary of analysis II PC 22 10 - - 0%
5.8 CAD drawings CW,PC 22 10 - - 0%
5.9 Gantt chart and schedule DR 22 10 - - 0%
5.1 Powerpoint generation Group 28 6 - - 0%
6 Design Review III 6.1 Problem Description JB 34 13 - - 0%
6.2 Summary of PDS PC 34 13 - - 0%
6.3 HOQ for critical design parameters JL 34 13 - - 0%
6.4 HOQ benchmarking other products AG 34 13 - - 0%
6.5 Pugh charts CW 34 13 - - 0%
6.6 Analysis work completed DR 34 13 - - 0%
6.7 Details of final concept JL 34 13 - - 0%
6.8 Details of product architecture AG 34 13 - - 0%
6.9 Drawings of final concept CW 34 13 - - 0%
6.10 Gantt chart DR 34 13 - - 0%
6.11 Identify risk for not meeting targets JB 34 13 - - 0%
6.12 Powerpoint generation Group 43 5 - - 0%
7 Final Report 7.1 Executive summary Group 38 13 - - 0%
7.2 Introduction AG 38 13 - - 0%
7.3 Problem description JB 38 13 - - 0%
7.4 Goals, Objectives, Constraints PC 38 13 - - 0%
7.5 Approach CW 38 13 - - 0%
7.6 Design equations DR 38 13 - - 0%
7.7 Task Description JL 38 13 - - 0%
7.8 Results AG 38 13 - - 0%
7.9 Discussion and conclusion Group 42 9 - - 0%
7.10 Budget and Gantt chart DR 38 13 - - 0%
7.11 References Group 42 9 - - 0%
7.12 Appendices Group 42 9 - - 0%7.13 Editing and Completion Group 47 4 - - 0%