Visit to C.H. Corn Power PlantFebruary 1, 2007Located 20 miles

southwest of Tallahassee at southern tip of Lake Talquin

One of only two hydroelectric plants in state of Florida

Page 3: Team 5 Scott Craig Cody Maher Jesse Ross Brian Van Stratum

Visit to C.H. Corn Power PlantThree turbines – one

Kaplan and two propellerMaximum power

generation of 12 MWTypical power output is

about 3 MW12 MW is about 3% of

Tallahassee’s typical power need of 425 MW

Page 4: Team 5 Scott Craig Cody Maher Jesse Ross Brian Van Stratum

Visit to C.H. Corn Power PlantBuilt in 1929 by West Florida

Power CompanyAbandoned as a power plant

in 1970Refurbished in 1981 by City

of Tallahassee as a hydroelectric demonstration project

Became fully operational in 1985 under City of Tallahassee Electric Utility Services

Page 5: Team 5 Scott Craig Cody Maher Jesse Ross Brian Van Stratum

Visit to C.H. Corn Power Plant

Page 6: Team 5 Scott Craig Cody Maher Jesse Ross Brian Van Stratum

User Demands

Water Wheel

Generator Head

Rectifier Bridge

Battery Monitor

DC Disconnect

Charge Controller

Dissipating Load

Inverter

NautilusBattery

Page 7: Team 5 Scott Craig Cody Maher Jesse Ross Brian Van Stratum

User Demands

Generator Head

Dissipating Load

and/or InverterAC Controller

Page 8: Team 5 Scott Craig Cody Maher Jesse Ross Brian Van Stratum

Water Wheel

Nautilus

Charge Controller Dissipating Load

DC Disconnect Inverter

DC Signal

Net Meter

UtilityBattery Monitor

Battery

Page 9: Team 5 Scott Craig Cody Maher Jesse Ross Brian Van Stratum

Water Wheel

Nautilus

Grid Connected System w/ No Battery

AC Signal

Dissipating Load

AC Controller

Utility

Net Meter

Page 10: Team 5 Scott Craig Cody Maher Jesse Ross Brian Van Stratum

Utility

Gridpoint Connect

User Demands

or

Renewable Energy

(Can operate in grid connected or islanded mode)

Page 11: Team 5 Scott Craig Cody Maher Jesse Ross Brian Van Stratum

GridpointAll in one design

Integrated inverter, controller, power electronics

Plug and playBattery storageCircuit protectionOnline monitoringCurrently designed for

photovoltaics (interest sparked)

Page 12: Team 5 Scott Craig Cody Maher Jesse Ross Brian Van Stratum

Turbine Options & Costs

ABS Alaskan (www.absak.com)

Nautilus: 3 turbines needed each priced at $10,600 Total = $31,800 Power 3 x 1900 W = 5700 W 50 year expected life

Neptune: 3 turbines needed each priced at $XXXXX Total = $XXXX Power 3 x 1900 W = 5700 W 50 year expected life.

Page 13: Team 5 Scott Craig Cody Maher Jesse Ross Brian Van Stratum

Turbine Options & Costs

Energy Systems & Design (www.microhydropower.com)

LH1000: 9 turbines needed each priced at $2,625

Total = $23,625 Only one year warranty

Page 14: Team 5 Scott Craig Cody Maher Jesse Ross Brian Van Stratum

Water Wheel CostsWater Wheel Factory

Overshot design9 ft diameter, all steel

structure$12,000 Also considered is a

breast wheel design, doubling the price of the original wheel

Page 15: Team 5 Scott Craig Cody Maher Jesse Ross Brian Van Stratum

No Longer Under ConsiderationVoith Siemens Turbine

$500,000Construction Costs

Sponsor only requires component selection and general layout

Page 16: Team 5 Scott Craig Cody Maher Jesse Ross Brian Van Stratum

Turbine and Water Wheel Decision Matrix

Page 17: Team 5 Scott Craig Cody Maher Jesse Ross Brian Van Stratum

Rate0.0562

kW hr

Money Saved (Dollars)

One Year

Pexpavg Rate 1 yr 4.73 103

Fifty Years

Pexpavg Rate 50 yr 2.365 105

Page 18: Team 5 Scott Craig Cody Maher Jesse Ross Brian Van Stratum

IEEE 1547Standard for Interconnecting Distributed Resources with

Electric Power Systems250kW or more requires monitoringIsolation device requiredFrequency must be within 0.5Hz of gridVoltage must be within 10% of grid voltagePhase angle must be within 20° of grid phase

Page 19: Team 5 Scott Craig Cody Maher Jesse Ross Brian Van Stratum

Websitewww.fsuhydroturbine.comPrevious presentations,

fall report, etc available on site

In process of mirroring site to www.eng.fsu.edu/ME_senior_design/2007/team5/index.html

Converting to html

Page 20: Team 5 Scott Craig Cody Maher Jesse Ross Brian Van Stratum

Remaining Schedule

Page 21: Team 5 Scott Craig Cody Maher Jesse Ross Brian Van Stratum