Team 14: The Design and Construction of an Ackerman-Steered Robot Members: Kyle Quinn Julio Sosa Robert Steel. Introduction Final Design Received Parts Pending Parts Fabrication Raw Materials Updated Cost Analysis Remaining Timeline. Overview. Introduction. Project Scope - PowerPoint PPT Presentation
Citation preview
Team 14:
The Design and Construction
of an Ackerman-Steered Robot
Members:
Kyle Quinn
Julio Sosa
Robert Steel
Introduction
Final Design
Received Parts
Pending Parts
Fabrication
Raw Materials
Updated Cost Analysis
Remaining Timeline
Overview
Project Scope Research Robot All-terrain capabilities Accommodates Sensors
and Hardware Front and Rear Ackerman
Steering Client
CISCOR Dr. Emmanuel Collins
Introduction
Final Design
Motors Parallel to Frame Right Angle Gear Heads Telescoping Drive Shafts Batteries Around Frame Controllers in Rear
Received Parts
Anaheim Automation Frame
Pending Part
8” Steering Rack
Desert Karts could not supply order
3 Week Delay as Result
Dans Performance Parts
Price: $86 per unit
Fabrication Issues
Shimansky Quote $6200 Tallahassee Machining and
Welding unresponsive The Shop Parts & Things
Provided Feedback Redo Material Selection Drawing Packet Critique
Fabrication Resolution
Raw Materials from McMaster Carr
Machining at Physics Machine Shop
Frame Fabrication at Jackson Cook
Miscellaneous Fab. Done by group at COE Sheet Metal Bending Assembly
Raw Materials Ordered
Stress Proof (1144) Steel Rod
Assorted Aluminum Rod Stock
Assorted Aluminum Plate Stock
18 Gauge Stainless Steel Steet Metal
Steel Tube (Alloy 4130) Assorted Steel (1018)
Updated Cost Analysis
Grainger $64.31 Anaheim Automation $2181.60 McMaster Carr $420.32 Northern Tool $83.92 Stock Drive Products $793.76 Mulvanneys $36.00 Jackson Cook $376.60 Dan’s Performance Parts $202.00 McMaster Carr Raw Materials $903.18 Physics Shop Fabrication Pending Lowes $100.00 (est) Total Spent: $5161.69
3/16 Receive Manufactured Parts Begin Assembly Stage
3/23 Complete Assembly Turn Over to CISCOR Wiring and Programming
3/30 Receive From CISCOR 4/6 Complete Testing
Focused on Mechanical systems functioning properly
4/9 Final Report and Operation Manual Complete 4/16 Open House
Remaining Timeline
Donald Hollett CISCOR Dr. Emmanuel Collins Dr. Oscar Chuy Damion Dunlap Senior Design T.A.’s (per their request)
Acknowledgements
Questions?