Dixons McMillan AcademyT D S M I D L A N D S - C A S E S T U D Y

Page 2: TDS MIDLANDS - CASE STUDY Dixons McMillan · PDF file... the Dixons McMillan Academy. ... SHS TO BEAM CONNECTION - DETAIL 1 SCALE 1:10 ... Steelwork to be in accordance with BS 5950-1:2000,

Bradford, West Yorkshire

Education

Steelwork

S I T E :

T Y P E :

S E R V I C E S :

T D S M I D L A N D S

Watson BattyI M A G E :

Page 3: TDS MIDLANDS - CASE STUDY Dixons McMillan · PDF file... the Dixons McMillan Academy. ... SHS TO BEAM CONNECTION - DETAIL 1 SCALE 1:10 ... Steelwork to be in accordance with BS 5950-1:2000,

T D S M I D L A N D S

The Dixons Academies Trust chose the former

Bradford College site to be the location for their

4th Free School, the Dixons McMillan Academy.

It was a building very much in need of conversion in

order to provide a modern, fit-for-purpose learning

environment for 11-18 year olds. In addition to the

conversion a double-height, multi-use entrance

hall was added to the existing structure and a

freestanding, new build sports hall was added to

the site.

TDS were asked to design the additional steelwork

required to strengthen the existing building

throughout the extensive renovation and remodel.

We were also commissioned to provide a new access/

escape staircase for the double-height entrance area

as well as plant access stairs to the roof.

The Project

Objective

DN

BML 1

45.19

BML 1

45.19

BML 1

45.20

BML 1

45.19

SLOPING CEILING

3801113

GUTTER FORMED IN INSULATION RWP

1:40 F

all

RWP

1450

RWP

EXISTING STRUCTURESTO BE DEMOLISHEDSHOWN DASHED.

HATCHED AREA DENOTESEXTENT OF NEW ROOFCONSTRUCTION OVER.

ColCol

UP

EXISTING STRUCTURESTO BE DEMOLISHEDSHOWN DASHED.

EXISTING STRUCTURESTO BE RETAINED SHOWNSHADED.

900

AREA OF NEW FLATROOF CONSTRUCTION

DENOTES SPAN OF50x225 C16 JOISTS

PLAN AT TOP OF ROOF LEVEL1:50

ROOF OPENINGFOR LADDERACCESS TOARCHITECTSSPECIFICATION

EXISTING RWPTO REMAIN ANDROOF TRIMMEDAND SEALEDAROUND

PLAN AT U/S OF ROOF LEVEL1:50

150x90

PFC

150x90

PFC

150x90

PFC

150x90

PFC

100x10

0x5 SHS

178x102x19 UB 178x102x19 UB 178x102x19 UB

178x

102x

19 U

B17

8x10

2x19

UB

150x90

PFC

150x90

PFC

PFC / SHS COLUMNS TO BEFIXED TO EXISTING CONCRETECOLUMNS USING 16mmØ RESINANCHOR THROUGH BOLTS @450 v ctrs

178x102x19 UB

DETAIL 1

DETAIL 3DETAIL 2

BEAM TO BE POSITIONED TOUNDERSIDE OF EXISTINGCONCRETE SOFFIT.

CONTRACTOR TO ENSUREFIXING INTO CONCRETE /STEEL COLUMN.

STAIR DETAIL TBC BY ARCHITECTAND SPECIALIST SUPPLIER

INSULATED UPSTAND. MINIMUM 150MM.MEMBRANE TO BE DRESSED INTO BRICKWORKJOINT TO ROOFING MANUFACTURER'S DETAIL. OPENING FOR ROOF ACCESS

HATCH. TRIM OUT WITH DOUBLEDUP 50x225 C16 JOISTS

FFL

INSULATION TOARCHITECTSSPECIFICATION

50x225 C16 TIMBER JOISTS@ 400 MAX cts DOUBLED UPAROUND OPENING,PROVIDE FULL DEPTHNOGGINS AT THIRD POINTS

NOMINAL 10mm GAP BETWEENWALL AND FIRST JOIST

SECTION A-A1:25

178x102x19 UB FITTED INTO LINEOF EXTERNAL BRICK LEAF

DENOTES WALL TO BEREMOVED UNDER

EXISTING CONCRETEDOWNSTAND BEAM

NOMINAL 10mm GAP BETWEENWALL AND FIRST JOIST

Existing structure to bedemolished shown dashed.

18mm PLYWOODDECK FIXED DOWNTO JOISTS

SECTION B-B1:25

178x102x19 UB FITTED INTO LINEOF EXTERNAL BRICK LEAF

EXISTING RCCONCRETECOLUMN

150x90 PFC COLUMN DOWN TOGROUND LEVEL FIXED TOEXISTING CONCRETE COLUMNUSING M16 RESIN ANCHORS @450 v ctrs

450

450

50x225 C16 TIMBER JOISTS @ 400 MAXcts DOUBLED UP AROUND OPENING,PROVIDE FULL DEPTH NOGGINS ATTHIRD POINTS, JOISTS SUPPORTEDAT EACH END ON JOIST HANGERSFIXED TO WALL PLATE

TIMBER WALL PLATE FIXEDTO EXISTING MASONRYWITH M12 RESIN ANCHORS@ 300 ctrs

TIMBER WALL PLATE FIXEDTO EXISTING MASONRYWITH M12 RESIN ANCHORS@ 300 ctrs

INSULATION TOARCHITECTSSPECIFICATION

18mm PLYWOODDECK FIXED DOWNTO JOISTS

FACE OF EXISTING COLUMN

100x

100x

5 SHS

COL

UMN

450

450

450

100

ELEVATION ON DETAIL 11:10

350x75x8THK PLATES FIXEDWITH M16 RESIN ANCHORTHROUGH BOLTS, PLATESTO BE STAGGERED AT450mm ctrs

100

100100

100100TOP OF COLUMN

FIXINGS IN BOTHDIRECTIONS AT TOP OFCOLUMN

6 No. M16SLOTTED BOLT2 No. M16 BOLTS

150x90 PFC

EXISTING COLUMNSHOWN INDICATIVELY

16mmØ RESIN ANCHORTHROUGH BOLTS AT450mm VERTICALCENTRES

178x102x19 UB

4 No. M16 BOLTS 178x102x19 UB

6 No. M16SLOTTED BOLT

150x90 PFC

16mmØ RESIN ANCHORTHROUGH BOLTS AT450mm VERTICALCENTRES

10mm PLATE

10mm PLATE

PACKER TO BE USEDIF REQUIRED10mm PLATES

PLAN SECTION

PFC TO BEAM CONNECTION -DETAIL 2SCALE 1:10

10mm PLATE

100x100x5 SHS

100x100x10EQUAL ANGLE

2 No. M16BOLTS

100x100x10EQUAL ANGLE

2 No. M16 BOLTS

178x102x19 UB

178x102x19 UB

2 No. M16 BOLTS

178x102x19 UB

10mm PLATE

100x100x10 SHS

6mm FILLET WELD

6mm FILLET WELD

10mm PLATE

PLAN SECTION

SHS TO BEAM CONNECTION -DETAIL 1SCALE 1:10

16mmØ RESIN ANCHORTHROUGH BOLTS

16mmØ RESIN ANCHOR THROUGHBOLTS UNDER PERPENDICULARBOLTS

CAPTIVE NUTSTO INTERNALFACE

PLANSECTION

PFC TO BEAM CONNECTION -DETAIL 3SCALE 1:10

178x102x19 UB

150x90 PFC

10mm PLATE

178x102x19 UB

150x90 PFC

10mm PLATE

10mm STIFFENERPLATE

16mmØ RESIN ANCHORTHROUGH BOLTS AT 450mmVERTICAL CENTRES

4 No. M16 BOLTS

4 No. M16 BOLTS

16mmØ RESIN ANCHORTHROUGH BOLTS AT 450mmVERTICAL CENTRES

A01. THESE NOTES ARE INTENDED TO AUGMENT DRAWINGS ANDSPECIFICATIONS. WHERE CONFLICT OF REQUIREMENTS EXISTS THEORDER OF PRECEDENCE SHALL BE AS SHOWN IN THE SPECIFICATION.OTHERWISE THE STRICTEST PROVISION SHALL GOVERN.

A02. THIS DRAWING TO BE READ IN CONJUNCTION WITH ALL OTHERRELEVANT ENGINEERS AND ARCHITECTS DRAWINGS.

A03. DRAWINGS NOT TO BE SCALED. ALL DIMENSIONS TO BE CHECKEDON SITE BY THE CONTRACTOR. ANY DISCREPANCIES TO BE NOTIFIEDTO THE ENGINEER AND FURTHER INSTRUCTIONS OBTAINED BEFOREWORK IS COMMENCED.

A04. THE STRUCTURE IS DESIGNED TO BE SELF-SUPPORTING ANDSTABLE AFTER THE BUILDING IS FULLY COMPLETED. IT IS THECONTRACTORS SOLE RESPONSIBILITY TO DETERMINE THE ERECTIONPROCEDURE AND SEQUENCE AND ENSURE THAT THE BUILDING AND ITSCOMPONENTS ARE SAFE DURING ERECTION. THIS INCLUDES THEADDITION OF WHATEVER TEMPORARY BRACING, GUYS OR TIE-DOWNSWHICH MAY BE NECESSARY, SUCH MATERIAL REMAINING THEPROPERTY OF THE CONTRACTOR ON COMPLETION, AND FORENSURING THAT THE WORKS AND ANY ADJACENT PROPERTIES ARESAFE IN THE TEMPORARY CONDITION.

NO PART OF THIS DRAWING MAY BE REPRODUCED, STORED IN ARETRIEVAL SYSTEM OR TRANSMITTED IN ANY FORM OR BY ANY MEANSWITHOUT PRIOR PERMISSION IN WRITING FROM ALAN WOOD &PARTNERS.

COURTYARD ROOF INFILLDETAILS

AS NOTED

SW

CONSTRUCTION

20.08.15

35968 518 B

MC

Notes

100mm at A1

Project:

Client:

Drawing:

Date: Scale@A1:

Drawn By:

Job. no. Dwg. no.

Approved By:

Drawing Status:

Rev.

Check By:

Consulting Civil& Structural EngineersProject ManagersBuilding Surveyors

Description Date Chk.Rev. Drn.

Hull Office341 Beverley RoadHullHU5 1LD

T. 01482 442138F. 01482 448086www.alanwood.co.uk

Also at:

YorkScarboroughLincoln Sheffield

T. 01904 611594T. 01723 865484T. 01522 300210T. 01142 440077

A CONSTRUCTION ISSUE 16.12.15 KR MC

B DETAILS ADDED & MINOR AMENDMENTS 23.03.16 SO MC

DIXONS McMILLANACADEMY

INTERSERVE

B

ALL DIMENSIONS BASED ON MET GEO ENVIRONMENTALBUILDING SURVEY DRAWINGS. TBC ON SITE BYCONTRACTOR

STEELWORK FABRICATOR TO UNDERTAKE MEASUREDSITE SURVEY TO CONFIRM ALL REQUIRED SETTING

COSMETIC CRACKING LIKELY TO OCCUR ANDALLOWANCE FOR REPOINTING TO BE MADE

STRUCTURAL STEELWORK

S01. All dimensions in millimetres U.N.O

S02. It is the responsibility of the steelwork fabricator to obtain any necessarysite dimensions required and to prepare connection design calculations forsubmission to the local authority for Building Regulation Approval.

S03. All steelwork to be grade S355

S04. Steelwork to be in accordance with BS 5950-1:2000, Table 4 and 5.

S05. Steelwork to be shot blasted to Sa2.5 and painted with a shop applied 75microns dry film thickness of quick drying zinc phosphate and epoxy primer.

S06. Steelwork built into cavities to be given additional 2no site coats ofbituminous paint.

S07. Steelwork connections and baseplates to be designed by the fabricator.

S08. After erection on site all damaged areas to be manually cleaned back to asound surface and repainted with a primer and other coats as noted above or anequivalent approved by the Engineer. In the case of galvanising the steel is to bepainted with an appropriate number of coats of zinc rich paint to give theequivalent specified thickness.

S09. Concrete encased steelwork to be left untreated.

S10. See steelwork fabricators drawings for details and positions of holdingdown bolts.

S11. All structural steelwork to be in accordance with the National StructuralSteelwork Specification for Building Construction 5th edition.

S12. Fabricator to provide GA's / detail drawings to Engineer prior to fabrication

B

B

Page 4: TDS MIDLANDS - CASE STUDY Dixons McMillan · PDF file... the Dixons McMillan Academy. ... SHS TO BEAM CONNECTION - DETAIL 1 SCALE 1:10 ... Steelwork to be in accordance with BS 5950-1:2000,

T D S M I D L A N D S

We received, from our contractor client, all necessary

site surveys of the demolition works and designs for

the steelwork. From this, using Tekla Structures, we

produced a comprehensive set of steelwork details

for approval. After the sign-off, we issued the designs

to the fabricator complete with all information

to ensure they could be correctly and efficiently

assembled on site.

Outcome

Watson BattyI M A G E S :

Page 5: TDS MIDLANDS - CASE STUDY Dixons McMillan · PDF file... the Dixons McMillan Academy. ... SHS TO BEAM CONNECTION - DETAIL 1 SCALE 1:10 ... Steelwork to be in accordance with BS 5950-1:2000,

Watson Batty

Alan Wood & Partners

A R C H I T E C T :

S T R U C T U R A L E N G I N E E R S :

Tel: 01952 225835