TD18 – post mortem analysis
1
1093766
Inspection 11WDSDVG1KEK SLAC
TD18 - analysis
• RF check made at CERN (confirmation of previous results from SLAC, EDMS: 1090704 )
• Straightness measurement• Cutting: see next slides• Visual inspection (EDMS:1093766)• SEM (localization of breakdowns)• Dimensional control (EDMS: 1099135)
2
3
4
5
6
7
8
9
10
11
For the straightness measurement we have cut 2 couplers
12
13
The engraved lign is not to be lost in the orientation of the discs after the cuts
G. Riddone, 20100816 14
Preparation for the measurement of straightness for the cells after bonding and of the couplers after brazing
Mesures 1
Mesures 2
Alignment of cells 0 and 20 is 0 in the vertical and horizontal axis
15
DISQUES MICRONS
COUPLEUR 0D.0 0D.1 0D.2 -9D.3 -5D.4 3D.5 3D.6 4D.7 -19D.8 -18D.9 -16
D.10 -17D.11 -14D.12 -8D.13 -5D.14 -3D.15 3D.16 2D.17 -15D.18 -12D.19 -9D.20 0
COUPLEUR 10
COUPLEUR D.1 D.3 D.5 D.7 D.9
D.11D.13
D.15D.17
D.19
COUPLEUR
-25
-20
-15
-10
-5
0
5
10
15
mesures1
Results after 4 passes with a micron comparator
16
DISQUES MICRONS
COUPLEUR 2D.0 0D.1 -1D.2 -4D.3 2D.4 6D.5 1D.6 -6D.7 -15D.8 0D.9 -10
D.10 -3D.11 -13D.12 -13D.13 -6D.14 -9D.15 -7D.16 -10D.17 0D.18 -2D.19 -10D.20 0
COUPLEUR 12
COUPLEUR D.1 D.3 D.5 D.7 D.9
D.11D.13
D.15D.17
D.19
COUPLEUR
-20
-15
-10
-5
0
5
10
15
Mesures 2
Results after 4 passes with a micron comparator at 90 degrees of the first measurement
17
COUPLEUR D.1 D.3 D.5 D.7 D.9
D.11D.13
D.15D.17
D.19
COUPLEUR
-25
-20
-15
-10
-5
0
5
10
15
Mesure 1
Mesures 2
Mesures1: 23 microns for the disc bonding from 0 to 20 30 microns with the coupler brazing
Mesures 2 : 21 microns for the disc bonding from 0 to 20 28 microns with the coupler brazing
Superposition of the values of two measurements
18
Cutting sections for analyses
19
5 cuts: Iris shall be not damaged 16,17,18,19 and 20STEP 1
Cut 5 Cut 1
Part
A
Part
B
Part
C
Part
D
Part
Ethe irises should not be damaged
Les disques seront gravés A,B,C,D et E
G. Riddone, 20100816 20
STEP 2.1
Cut 6Coupe disque 10
21
STEP 2.2
Cut 7
Part F
Part G
Longitudinal section of the discs 11 to 15
22
23
24
25
26
27
28
29
Dimensional control disk N 18 (EDMS: 1099135)
Diameter of the iris is 5.4024 mm before BONDING
30
Dimensional control (EDMS: 1099135)
Diameter after BONDING is 5.403 mm difference is 0.6 microns
Diameter of the iris is 5.4024 mm before BONDING
31
SEM (localization of breakdowns) by
Markus