70 Franklin Street Boston MA 02110 T 617. 350. 7900 FMarchitecture.com 1 of 3 Taunton Municipal Airport – New Administration Building Taunton, MA City of Taunton 1098-06 Addendum No.05 August 21, 2019 Attention all bidders: All bidders are required to acknowledge receipt of this addendum on the filed sub-bid and general bid forms contained in the contract documents. All information included in this addendum is hereby included as part of the Contract Documents and is to be included in the bidder’s scope of work and contract price at the time of bid. Failure to acknowledge this addendum may result in rejection of your bid. General Information Bidder questions that have not be answered yet will be answered in forthcoming addenda. Please note the schedule extension as the force main and septic are being redesigned. Contractors shall make note of the winter conditions noted within each spec section as construction and excavation is anticipated to occur during the winter months. Changes to the Specifications Section Description of Change 00 11 13 Paragraph G: Revise the filed sub-bid opening date to September 23rd, 2019. The times shall remain unchanged. Final filed sub-bidder questions will be accepted until September 13th, 2019. 00 11 13 Paragraph G: Revise the general contract bid opening date to October 7th, 2019. The times shall remain unchanged. Final general contract bidder questions will be accepted until September 27th, 2019. 00 21 13 Article 19: Revise Substantial Completion date to December 10 th , 2020. Changes to the Drawings Sheets Civil C-7 Added label regarding A/C removal by Owner, and note regarding oil tank to be removed by Owner C-11 Adjusted water line location and size; added insets for water at building, and stub for future use; added 6” X 4” reducer at building. C-12 Removed this sheet from Contract C-13 Removed this sheet from Contract C-21 Removed conflict details and added gate valve detail.

Taunton Municipal Airport – New Administration Building

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

70 Franklin Street

Boston MA 02110

T 617. 350. 7900

FMarchitecture.com 1 of 3

Taunton Municipal Airport – New Administration Building Taunton, MA

City of Taunton 1098-06

Addendum No.05 August 21, 2019

Attention all bidders: All bidders are required to acknowledge receipt of this addendum on the filed

sub-bid and general bid forms contained in the contract documents. All information included in this

addendum is hereby included as part of the Contract Documents and is to be included in the bidder’s

scope of work and contract price at the time of bid. Failure to acknowledge this addendum may result

in rejection of your bid.

General Information

Bidder questions that have not be answered yet will be answered in forthcoming addenda. Please note

the schedule extension as the force main and septic are being redesigned. Contractors shall make note

of the winter conditions noted within each spec section as construction and excavation is anticipated

to occur during the winter months.

Changes to the Specifications

Section Description of Change

00 11 13 Paragraph G: Revise the filed sub-bid opening date to September 23rd, 2019. The

times shall remain unchanged. Final filed sub-bidder questions will be accepted

until September 13th, 2019.

00 11 13 Paragraph G: Revise the general contract bid opening date to October 7th, 2019.

The times shall remain unchanged. Final general contract bidder questions will be

accepted until September 27th, 2019.

00 21 13 Article 19: Revise Substantial Completion date to December 10th, 2020.

Changes to the Drawings Sheets

Civil

C-7 Added label regarding A/C removal by Owner, and note regarding oil tank to be

removed by Owner

C-11 Adjusted water line location and size; added insets for water at building, and stub for

future use; added 6” X 4” reducer at building.

C-12 Removed this sheet from Contract

C-13 Removed this sheet from Contract

C-21 Removed conflict details and added gate valve detail.

2 of 3

Electrical

E-011 Removed power scope for Gate controller and revised keyed notes numbers as

necessary.

E-012 Added new sheet containing the base bid and add-alternate scope for the Gate

controller.

E-301 Added SRE existing 100A Gate Power sub panel to SLD as well as additional notes to

clarify new breakers to be installed.

Questions and Answers

Q1 Can the Fire Department & Police Department be on two separate channels (Channel 1 and

Channel 2) or are they required to be on one channel (both on Channel 1)?

A1. Two separate channels for police and fire.

Q2 Specification Section 01 50 00 Temporary Facilities and Controls, 1.19 Construction Auds -

Scaffolding, Platforms, Staging, Chutes B. The section requires the Filed Sub-contractors to

providing scaffolding to 8 feet in height and less. Can the Filed Sub-contractors be required as

part of their bid for all their own scaffolding requirements? Please advise.

A2. The specs will not be revised to shift ownership of the scaffolding.

Q3 Please confirm the Fire Protection Contractor’s scope of work starts 10’-0 outside Mechanical

Room 110

A3. No, the fire protection contractor’s scope of work includes the entire building including

10'-0" beyond the building

Q4 Does the painting subcontractor own the painting for all sprinkler piping and hangars or is

that the responsibility of the fire protection subcontractor?

A4. Refer to Addendum 3, Q27.

Q5 Question 11 on addendum number 2 talk about the test size for the windows. In the aluminum

window specification is say the test size shall be a minimum of 5’3 x 8’. The window

manufactures have noted that this exceeds there AAMA test size and will not be labeled or

certified.

A5. The minimum test size can be reduced to 5'-4" X 3'-0" since that is the size of the largest

window in the project

Q6 Is the Aluminum/Storefront contractor responsible for furnishing and installing all hardware

and operators specified in 08 71 00 that will be on storefront?

A6. No, hardware to be furnished and installed under 08 71 00.

Q7 Reference detail 2/A-321. What is this? For example, is it a riglet? Waterstop? Other? Is it

provided by the Filed Sub-Bid or General?

A7. Refer to the note on the detail "CONTINUOUS WATERSTOP AT FOUNDATION. REFER

TO MANUFACTURER RECOMMENDATIONS FOR WATERSTOP SIZE [07 700 01]"

Q8 Please confirm a fire pump is not required.

A8. Confirmed, a fire pump is not required.

Q9 Will the fire protection subcontractor be connecting to the fire service 10’ outside building wall

or will the fire protection subcontractor be connecting to the main in the street and carrying

3 of 3

the entire fire service into the building? Typically the utility contractor will bring the fire

service to 10’ outside building wall and sprinkler contractor connects. Please advise.

A9. The fire protection subcontractor will connect to the fire service 10’ outside the building

wall. The site utility contractor will bring the fire service to 10’ outside the building walls.

Q10 Please confirm that the gas sub-meter is supplied by the owner as shown on P-801, detail 6.

A10. The gas sub-meter is supplied by the plumbing subcontractor. Refer to the revised

plumbing drawings in Addendum 3.

End of Addendum No. 05

E

A

S

T

A

C

C

E

S

S

R

O

A

D

LIMIT OF WORK

C-7

DEMOLITION PLAN

1" = 20'

CNMRAL

NOTES:

1. THE CONTRACTOR SHALL VERIFY ALL EXIST. ELECTRICAL CIRCUITS TO BEDEMOLISHED AND/OR RELOCATED PRIOR TO DEMOLITION AND/ORPROVIDING TEMPORARY SERVICE.

2. PROVIDE TEMPORARY POWER AND COMMUNICATION FOR FUEL PUMP PRIORTO DEMOLISHING EXIST. BUILDING. UPON COMPLETION OF NEW BUILDINGINSTALL PERMANENT VEEDER-ROOT, SITE LIGHTING, POWER TO FUELPUMP, INCLUDING TELECOMM, TELECOMM TO EXIST. EMERGENCYTELEPHONE PEDESTAL AND POWER TO RELOCATED WIND SOCK.

3. FOR CONSTRUCTION PHASING SEE SHEETS C-3 - C-5.4. FOR CONSTRUCTION LEGEND SEE SHEET C-2.5. THE CONTRACTOR SHALL MAINTAIN WATER SERVICE TO THE SRE BUILDING

UNTIL THE NEW WATER MAIN HAS BEEN INSTALLED AND TESTED.6. OIL TANK INSIDE EXISTING BUILDING WILL BE REMOVED BY THE OWNER

(NOT IN CONTRACT).

REMOVE AND DISPOSE EXIST. ADMIN.BUILDING AND FOUNDATIONSEE ARCHITECTURAL PLANS

REMOVE AND DISPOSEEXIST. WIND SOCK AND POLE

REMOVE AND RELOCATE EXIST. MONUMENT(SEE LANDSCAPE SHEET FOR NEW LOCATION)

SAWCUTEXIST.PAVEMENT

SAWCUT EXIST.PAVEMENT

SAWCUT EXIST. PAVEMENT

REMOVE AND DISPOSE EXIST. SIDEWALK

REMOVE AND DISPOSEEXIST. SIDEWALK AND

LANDING

LIMITS OFSIDEWALK REMOVAL

EXIST. UTILITY POLE TO REMAIN

REMOVE AND DISPOSEEXIST. SIGN (TYP.)

INSTALL CATCH BASININLET PROTECTION (TYP.)

EXIST. CHAIN-LINKFENCE TO REMAIN

Project:

Owner:

Architect:

70 Franklin Street

Boston, MA 02110

t. 617.350.7900

f. 617.350.0051

Job No.:

Drawn By:

Checked By:

Date:

Scale:

Drawing Title:

Drawing No.:

MassDOT-AD Job No.:

2019-FMA-16-SAAB

Issued For:

Civil Engineer:

Airport Solutions Group, LLC

39 Winn Street

Burlington, MA 01803

t. 781.491.0083

f. 781.491.0360

Structural/MEP/FP Engineer:

Arup USA, Inc.

t. 617.864.2987

f. 617.864.6178

Geotechnical Engineer:

GZA GeoEnvironmental, Inc.

249 Vanderbilt Avenue

Norwood, MA 02062

t. 781.278.3700

f. 781.278.5701

Landscape Architect:

Landworks>Studio Inc.

83 North Street

Salem, MA 01970

t. 617.426.3030

f. 617.426.3033

Westcoat Drive

East Taunton, MA 02718

Taunton Municipal Airport,

New Administration Building

The City of Taunton

141 Oak Street

Taunton, MA 02780

Survey & Sewer Engineer:

Nitsch Engineering

2 Center Plaza

Boston, MA 02108

t. 617-338-0063

f. 617-338-6472

1098-06

20 June 2019

Bid Docs

No. Date Revision

60 State Street, 10th Floor

Boston, MA 02109

RECLAIM EXIST. FULLDEPTH PAVEMENT

REMOVE AND RELOCATEEXIST. TELCOMM TONEW BUILDING

DECOMMISSION AND CUT-OFF EXIST. WATERWELL IN ACCORDANCE WITH MASSDEP ANDLOCAL BOARD OF HEALTH REQUIREMENTS(OWNER HAS INDICATED THAT THE WELL ISBELOW THE BUILDING CRAWL SPACE)SEE NOTE 5 ABOVE

N

REMOVE AND DISPOSE EXIST.TELCOMM TO SRE BUILDING

CONTRACTOR TO COORDINATE WITHPHONE COMPANY TO PROVIDE NEW

SERVICE TO SRE BUILDING

8/20/2019 3:26:34 PM \\asg2012\CompanyData\ASG Data\Projects\PVT - Fennick McCredie\120-007 MassDOT Construct Bldgs - TAN Taunton\CADD\95 CONSTRUCTION SUBMISSION\120-007 SHEET_DEMO.dwg (TAV)

WES

TCO

AT D

RIVE

SRE

BUIL

DIN

G

REMOVE AND DISPOSE 4 LF OFEXIST. AIRPORT FENCE

(SEE LAYOUT PLAN FOREXACT LOCATION)

REMOVE HH.

REMOVE EXIST. CONDUIT.PROVIDE TEMPORARY POWER

FOR ACCESS GATE AND CAMERA.

REMOVE AND DISPOSE EXIST. DUCT TOPROPOSED EMH. PROVIDE TEMPORARYPOWER FOR VEEDER-ROOT, SHUTOFFSWITCH AND FUEL FACILITY.

REMOVE DRAIN

REMOVE AND DISPOSEWOOD POST ANDELECTRIC METER

REMOVE AND DISPOSE TANK.COORDINATE WITH PROVIDER.EXIST. CONC. PAD TO REMAIN

REMOVE AND DISPOSE POSTS,AND RELOCATE EXIST. GATE.

AND ASSOCIATED SIGNS TO NEW LOCATION(SEE LAYOUT, UTILITY, AND DETAIL SHEETS)

REMOVE AND DISPOSE EXIST.HOLDING TANK AND SEWER

PIPE

GRAPHIC SCALE

0' 10' 20' 40'

LIMIT OF WORK

REMOVE LEACHINGBASIN

REMOVE ANDREINSTALL CLF

COMPOST FILTER SOCKFOR EROSION CONTROL

A/C CONDENSERREMOVAL BY OWNER(NOT IN CONTRACT)

1ADDED LABELS REGARDINGOIL TANK AND A/C REMOVAL

1 8-21-19 ADDENDUM 5

1

1

AutoCAD SHX Text
#OHW UE W/RISER
AutoCAD SHX Text
E
AutoCAD SHX Text
R=29.42
AutoCAD SHX Text
#2SL EBX LIGHT POLE/ SECURITY CAMERA
AutoCAD SHX Text
UP#2 W/
AutoCAD SHX Text
RISER
AutoCAD SHX Text
PIPES
AutoCAD SHX Text
E
AutoCAD SHX Text
R=29.50
AutoCAD SHX Text
#2R2 OHW
AutoCAD SHX Text
METAL GUARD RAIL
AutoCAD SHX Text
METAL GUARD RAIL
AutoCAD SHX Text
8' HIGH CLF
AutoCAD SHX Text
8' HIGH CLF
AutoCAD SHX Text
8' HIGH CLF
AutoCAD SHX Text
8' HIGH CLF
AutoCAD SHX Text
4' HIGH CLF
AutoCAD SHX Text
8' HIGH CLF
AutoCAD SHX Text
8' HIGH CLF
AutoCAD SHX Text
EDGE OF PAVEMENT
AutoCAD SHX Text
EDGE OF PAVEMENT
AutoCAD SHX Text
EDGE OF PAVEMENT
AutoCAD SHX Text
EDGE OF PAVEMENT
AutoCAD SHX Text
EDGE OF PAVEMENT
AutoCAD SHX Text
EDGE OF PAVEMENT
AutoCAD SHX Text
EDGE OF PAVEMENT
AutoCAD SHX Text
EDGE OF PAVEMENT
AutoCAD SHX Text
EDGE OF PAVEMENT
AutoCAD SHX Text
EDGE OF PAVEMENT
AutoCAD SHX Text
EDGE OF PAVEMENT
AutoCAD SHX Text
EDGE OF PAVEMENT
AutoCAD SHX Text
EDGE OF PAVEMENT
AutoCAD SHX Text
EDGE OF PAVEMENT
AutoCAD SHX Text
EDGE OF PAVEMENT
AutoCAD SHX Text
EDGE OF PAVEMENT
AutoCAD SHX Text
EDGE OF PAVEMENT
AutoCAD SHX Text
EDGE OF PAVEMENT
AutoCAD SHX Text
CONCRETE PAD
AutoCAD SHX Text
CCB
AutoCAD SHX Text
CCB
AutoCAD SHX Text
CCB
AutoCAD SHX Text
CCB
AutoCAD SHX Text
BIT.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
BIT.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
BIT. WALK
AutoCAD SHX Text
BIT. WALK
AutoCAD SHX Text
GENERATOR
AutoCAD SHX Text
BIT. PATCH
AutoCAD SHX Text
BITUMINOUS PARKING LOT
AutoCAD SHX Text
BITUMINOUS PARKING LOT
AutoCAD SHX Text
BITUMINOUS PARKING LOT
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
FUEL STATION
AutoCAD SHX Text
A/C
AutoCAD SHX Text
BULKHEAD
AutoCAD SHX Text
LANDING
AutoCAD SHX Text
BRICK
AutoCAD SHX Text
BIT. WALK
AutoCAD SHX Text
PROPANE
AutoCAD SHX Text
TANK
AutoCAD SHX Text
WOODS
AutoCAD SHX Text
WOODS
AutoCAD SHX Text
WOODS
AutoCAD SHX Text
WOODS
AutoCAD SHX Text
WOODS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
BITUMINOUS PAVEMENT
AutoCAD SHX Text
CONCRETE PAD
AutoCAD SHX Text
BITUMINOUS PAVEMENT
AutoCAD SHX Text
BITUMINOUS PAVEMENT
AutoCAD SHX Text
BITUMINOUS PAVEMENT
AutoCAD SHX Text
BITUMINOUS PAVEMENT
AutoCAD SHX Text
BITUMINOUS PAVEMENT
AutoCAD SHX Text
BITUMINOUS PAVEMENT
AutoCAD SHX Text
LOOP DETECTOR
AutoCAD SHX Text
RUNWAY LIGHTING ROOM
AutoCAD SHX Text
BUILDING #2
AutoCAD SHX Text
SHED
AutoCAD SHX Text
METAL BUILDING
AutoCAD SHX Text
METAL BUILDING
AutoCAD SHX Text
BUILDING #6 METAL
AutoCAD SHX Text
METAL BUILDING
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
OUTLET
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text
OUTLET
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text
OUTLET
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text
OUTLET
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
MONUMENT
AutoCAD SHX Text
KEY PAD ON CONC. PAD
AutoCAD SHX Text
GATE MOTOR ON CONC. PAD
AutoCAD SHX Text
KEY PAD ON CONC. PAD
AutoCAD SHX Text
CONC. PAD
AutoCAD SHX Text
MAILBOX ON CONC. PAD
AutoCAD SHX Text
TYPICAL
AutoCAD SHX Text
TIE DOWN
AutoCAD SHX Text
TYPICAL
AutoCAD SHX Text
TIE DOWN
AutoCAD SHX Text
BUILDING #3
AutoCAD SHX Text
GATE MOTOR ON CONC. PAD
AutoCAD SHX Text
EXISTING SRE BUILDING
AutoCAD SHX Text
STEEL TOWER W/ ROTATING BEACON
AutoCAD SHX Text
GATE
AutoCAD SHX Text
GATE
AutoCAD SHX Text
GATE
AutoCAD SHX Text
GATE
AutoCAD SHX Text
KEY PAD ON CONC. PAD
AutoCAD SHX Text
WIND SOCK POLE
AutoCAD SHX Text
LEACHING FIELD
AutoCAD SHX Text
PUMP CHAMBER
AutoCAD SHX Text
SEPTIC TANK
AutoCAD SHX Text
RECORD LOCATION WATER WELL
AutoCAD SHX Text
CO
AutoCAD SHX Text
CLEAN OUT
AutoCAD SHX Text
HH
AutoCAD SHX Text
LOOP DETECTOR
AutoCAD SHX Text
GRAVEL
AutoCAD SHX Text
STOP LINE
AutoCAD SHX Text
STOP LINE
AutoCAD SHX Text
STOP LINE
AutoCAD SHX Text
BIT. SPEED BUMP
AutoCAD SHX Text
LOOP DETECTOR
AutoCAD SHX Text
CONC. PAD
AutoCAD SHX Text
GATE
AutoCAD SHX Text
KEY PAD
AutoCAD SHX Text
CABLE HAND HOLE ON CONC. PAD
AutoCAD SHX Text
6" YELLOW PAINT LINE
AutoCAD SHX Text
EMERGENCY TELE PEDESTAL
AutoCAD SHX Text
ABANDONED
AutoCAD SHX Text
EXIST. WELL
AutoCAD SHX Text
LOOP DETECTOR
AutoCAD SHX Text
AREA LIGHTING
AutoCAD SHX Text
ELEC. CONDUIT ON FACE OF SIDEWALK
AutoCAD SHX Text
D
AutoCAD SHX Text
EXISTING SEPTIC LEACHING CHAMBER

W

W

E

E

VV

W

E

S

T

C

O

A

T

D

R

I

V

E

E

A

S

T

A

C

C

E

S

S

R

O

A

D

W W

W

W

W

W

W

W

ELECTRIC

WW

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

O

H

W

O

H

W

O

H

W

O

H

W

O

H

W

O

H

W

O

H

W

O

H

W

O

H

W

O

H

W

G

G

G

K

W

V

S

S

S

S

S

S

S

FM

FM

FM

FM

FM

FM

FM

FM

F

M

F

M

F

M

F

M

VV

F

M

F

M

F

M

F

M

F

M

F

M

FM

FM

F

M

F

M

F

M

F

M

ELECTRIC

ELECTRIC

F

F

F

2

5

'

2

5

'

25'

2

5

'

2

5

'

2

5

'

25'

1

0

0

'

1

0

0

'

1

0

0

'

1

0

0

'

100'

100'

1

0

0

'

1

0

0

'

1

0

0

'

1

0

0

'

1

0

0

'

1

0

0

'

1

0

0

'

FM

FM

FM

FM

FM

FM

FM

F

M

F

M

F

M

F

M

FM

WE

ST

CO

AT

D

RIV

E

W

E

S

T

C

O

A

T

D

R

I

V

E

M

I

D

D

L

E

B

O

R

O

A

V

E

N

U

E

WE

ST

CO

AT

D

RIV

E

W

W

W

W

W

W

G

G

G

G

O

H

W

O

H

W

OH

W

OH

W

OH

W

OH

W

OH

W

OH

W

G

W

V

FM

FM

FM

FM

FM

FM

FM

FM

FM

F

M

F

M

F

M

F

M

2

5

'

25'

2

5

'

2

5

'

2

5

'

25'

25'

25'

25'

25'

2

5

'

25'

2

5

'

2

5

'

2

5

'

2

5

'

2

5

'

2

5

'

1

0

0

'

1

0

0

'

100'

100'

100'

1

0

0

'

1

0

0

'

100'

100'

100'

1

0

0

'

1

0

0

'

1

0

0

'

1

0

0

'

100'

1

0

0

'

PROP.8" DI 11.25° BENDTHRUST BLOCK

C-11

UTILITY PLAN

AS SHOWN

CNMRAL

8/21/2019 2:51:49 PM \\asg2012\CompanyData\ASG Data\Projects\PVT - Fennick McCredie\120-007 MassDOT Construct Bldgs - TAN Taunton\CADD\95 CONSTRUCTION SUBMISSION\120-007 SHEET_UTILITY.dwg (TAV)

Project:

Owner:

Architect:

70 Franklin Street

Boston, MA 02110

t. 617.350.7900

f. 617.350.0051

Job No.:

Drawn By:

Checked By:

Date:

Scale:

Drawing Title:

Drawing No.:

MassDOT-AD Job No.:

2019-FMA-16-SAAB

Issued For:

Civil Engineer:

Airport Solutions Group, LLC

39 Winn Street

Burlington, MA 01803

t. 781.491.0083

f. 781.491.0360

Structural/MEP/FP Engineer:

Arup USA, Inc.

t. 617.864.2987

f. 617.864.6178

Geotechnical Engineer:

GZA GeoEnvironmental, Inc.

249 Vanderbilt Avenue

Norwood, MA 02062

t. 781.278.3700

f. 781.278.5701

Landscape Architect:

Landworks>Studio Inc.

83 North Street

Salem, MA 01970

t. 617.426.3030

f. 617.426.3033

Westcoat Drive

East Taunton, MA 02718

Taunton Municipal Airport,

New Administration Building

The City of Taunton

141 Oak Street

Taunton, MA 02780

Survey & Sewer Engineer:

Nitsch Engineering

2 Center Plaza

Boston, MA 02108

t. 617-338-0063

f. 617-338-6472

1098-06

20 June 2019

Bid Docs

No. Date Revision

60 State Street, 10th Floor

Boston, MA 02109

NOTES:1. FOR SANITARY SEWER SEE SHEET CS-100.2. FOR UTILITY DETAILS SEE SHEETS C-21 & C-22.3. FOR LIGHTING DETAILS SEE SHEET C-23.4. POWER TO EXISTING SLIDE GATE, CAMERAS AND

ACCESS CONTROL CABINET COMES FROM THEEXISTING BUILDING. PRIOR TO DEMOLITIONPROVIDE TEMPORARY POWER TO ALL EXISTINGFACILITIES,

5. REFER TO ELECTRICAL PLANS FOR CONDUIT SIZEAND WIRING.

6. ASSUME (1) 1,000 GAL PROPANE TANK FORSERVICE TO NEW ADMINISTRATION BUILDING.

PROP. LIGHTED BOLLARD (TYP.)FOR FOUNDATION DETAIL SEE C-17

DUCT BANK FORLIGHTED BOLLARDSSEE ELEC. PLANS FORSIZE AND TYPE

SEE NOTE 4

UTILITY PLANSCALE: 1 = 20'

WATER MAIN, THREE-PHASEPOWER AND GAS SERVICE

CONNECTION TO MIDDLEBOROAVENUESCALE: 1 = 100'

MATCH LINE - SEE INSET THIS SHEET

SEE PLUMBING PLANS FORCONT. OF WATER AND GASSERVICES

PROP. (3) 8" GATE VALVE

CONNECT TO EXIST. WATERMAIN WITH TAPPING SLEEVE

THRUST BLOCK

PROP. 6" GATE VALVEAND HYDRANT

THRUST BLOCK (TYP.)

8" DI

CONNECT TOEXISTING SERVICE

MATCH LINE - SEE RIGHT

MIDDLEBORO AVE

WES

TCO

AT D

RIVE

PROP.6" TEE6" HYDRANT6" DI GATE VALVETHRUST BLOCK

PROP. 6" HYDRANT6" GATE VALVETHRUST BLOCK

SEE ELECTRICALPLANS FOR CONT. OFTELECOMM. SERVICES

2'±

CONTRACTOR SHALL INTERCEPT EXIST.POWER, CONTROL AND COMM. FROM FUELFARM AND REROUTE TO PROP. BLDG.

2'

UTILITY COMPANY TOPROVIDE THREE-PHASEPOWER FOR BUILDING SITE(SEE INSET THIS SHEET)

UTILITY COMPANY TOPROVIDE THREE-PHASEPOWER FOR BUILDING SITE

SEE ELECTRICAL PLANS FOR CONT. OFPRIMARY ELECTRICAL SERVICE

PROP. THREE-PHASE TRANSFORMER BY UTILITY COMPANY(SEE ELECTRICAL SHEET FOR GROUNDING)

DUCT BANK FOREXIST. SERVICESSEE ELEC. PLANS

FOR SIZE AND TYPE

AIRPORT PRO

PERTY LINE

CONTRACTOR SHALL INTERCEPT EXIST. POWERAND CONTROL FROM SLIDE GATE AND CAMERAS

AND REROUTE TO PROP. BUILDING

SEE ELECTRICALPLANS FOR CONT. OFELECTRICAL SERVICE

DUCT BANK FORTELECOMM SERVICES

SEE ELEC. PLANS FORSIZE AND TYPE

DUCT BANK FOR SLIDEGATE AND CAMERAS

SEE ELEC. PLANS FORSIZE AND TYPE

DUCT BANK FOR FUEL FARM POWER,CONTROL AND COMM.SEE ELEC. PLANS FOR SIZE AND TYPE

PROP. LIGHT STANDARD (TYP.)FOR LIGHT STANDARDFOUNDATION SEE C-21

DUCT BANK FORSITE LIGHTING

SEE ELEC. PLANSFOR SIZE AND TYPE

DUCT BANK FOR PRIMARY ELECTRICSEE ELEC. PLANS FOR SIZE AND TYPE

MAT

CH L

INE

- SE

E SH

EET

C-12

PROVIDE SPARE CONDUITFOR 3-PHASE POWER TOSRE BUILDING

PROP. 8" SERVICERESIDENTIALDEVELOPMENT

PROP. NATURAL GASSTUB TO RESIDENTIALDEVELOPMENT

NEW NATURAL GASSERVICE BY UTILITYCOMPANY

NEW NATURAL GASLINE BY UTILITYCOMPANY

REMOVE TEMPORARY SERVICE

NATURAL GAS SERVICE

NEW ELECTRIC HANDHOLE

SEE ELECTRICALPLANS FOR CONT. OFTELECOMM. SERVICES

LOCATE GATE CONTROLCIRCUIT AND RUN LOW

VOLTATGE ELECTRICLINE IN 1" CONDUIT TO

NEW HANDHOLE ATNEW GATE LOCATION

INSET 1(PROPOSED GATE)

1" CONDUIT WITH LOWVOLTAGE CIRCUIT

4'

GATE CONTROLEQUIPMENT

PROVIDE 2" GAS ANDMETER TO SRE BLDG.(BY UTILITY COMPANY)

GRAPHIC SCALE

0' 10' 20' 40'GRAPHIC SCALE

0' 5' 10' 20'

GRAPHIC SCALE

0' 50' 100' 200' PROP. BOLLARDS BY CONTRACTOR(SEE DETAIL SHEETS FOR PLACEMENT)

LIMIT OF WORK

WATER LINE MODIFIED2

1 7-19-19 ADDENDUM 3

8" DI

8" D

I

6" DI8" DI6" DI

6" D

I3" HDPE

8" DI 45° BEND

PROP.8" DI 45° BENDTHRUST BLOCK

PROP. 8" DI 22.5°BEND

THRUST BLOCK

PROP. 6" DI FIRE LINE TOCONNECT TO PROP. 8" WATERMAIN WITH(1) 8" x 8" x 6" TEE(1) 6" DI GATE VALVE

PROP. 8"x 8"x 6"DI TEE6" DI GATE VALVETHRUST BLOCK

6" DI 11.25° BENDTHRUST BLOCK

2

GRAPHIC SCALE

0' 2.5' 5' 10'

8" DIGATE VALVE

8" DI TEE

8" DI CAP

THRUST BLOCK

INSET 3GRAPHIC SCALE

0' 2.5' 5' 10'

INSET 2

6" x 6" x 3" DI TEE

3" DI GATE VALVE

3" HDPE TEE

EDGE OF NEW BUILDING

6" D

I

SEE INSET 2 THIS SHEET

SEE INSET 3 THIS SHEET

PROP. 6" HYDRANT

8" TO 6"DI REDUCER

THRUST BLOCK

PROP.6" DI 45° BENDTHRUST BLOCK

PROP. HYDRANT 6"DI 45° BEND

THRUST BLOCK

PROP. 8" TEE6" GATE VALVETHRUST BLOCK

PROP. 8" GATE VALVE

PROPOSED 6"DI GATE VALVE PROP. 8" DI

GATE VALVE

3"HDPE

6" x 4" DI REDUCER

2 8-21-19 ADDENDUM 5

2

2

2

2

AutoCAD SHX Text
CO
AutoCAD SHX Text
VENT
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
#OHW UE W/RISER
AutoCAD SHX Text
E
AutoCAD SHX Text
R=29.42
AutoCAD SHX Text
#2SL EBX LIGHT POLE/ SECURITY CAMERA
AutoCAD SHX Text
UP#2 W/
AutoCAD SHX Text
RISER
AutoCAD SHX Text
PIPES
AutoCAD SHX Text
E
AutoCAD SHX Text
R=29.50
AutoCAD SHX Text
LOOP DETECTOR
AutoCAD SHX Text
CO
AutoCAD SHX Text
HH
AutoCAD SHX Text
LOOP DETECTOR
AutoCAD SHX Text
STOP LINE
AutoCAD SHX Text
STOP LINE
AutoCAD SHX Text
LOOP DETECTOR
AutoCAD SHX Text
EMERGENCY TELE PEDESTAL
AutoCAD SHX Text
LOOP DETECTOR
AutoCAD SHX Text
ELEC. CONDUIT ON FACE OF SIDEWALK
AutoCAD SHX Text
CO
AutoCAD SHX Text
VENT
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CATCH BASIN
AutoCAD SHX Text
HH
AutoCAD SHX Text
ELEC. (LIGHT) HH
AutoCAD SHX Text
GP
AutoCAD SHX Text
GP
AutoCAD SHX Text
PAINTED ELEC.
AutoCAD SHX Text
PAINTED ELEC.
AutoCAD SHX Text
PAINTED ELEC.
AutoCAD SHX Text
GP
AutoCAD SHX Text
GP
AutoCAD SHX Text
GP
AutoCAD SHX Text
GP
AutoCAD SHX Text
STONE WALL
AutoCAD SHX Text
S
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

D

D

D

D

D

1

0

0

'

1

0

0

'

1

0

0

'

100'

2

5

'

2

5

'

2

5

'

2

5

'

2

5

'

2

5

'

2

5

'

2

5

'

2

5

'

2

5

'

1

0

0

'

100'

1

0

0

'

1

0

0

'

1

0

0

'

1

0

0

'

1

0

0

'

1

0

0

'

1

0

0

'

1

0

0

'

1

0

0

'

100'

1

0

0

'

C-12

UTILITY PLAN(2 OF 3)

1" = 60'

CNMRAL

8/21/2019 2:51:49 PM \\asg2012\CompanyData\ASG Data\Projects\PVT - Fennick McCredie\120-007 MassDOT Construct Bldgs - TAN Taunton\CADD\95 CONSTRUCTION SUBMISSION\120-007 SHEET_UTILITY.dwg (TAV)

Project:

Owner:

Architect:

70 Franklin Street

Boston, MA 02110

t. 617.350.7900

f. 617.350.0051

Job No.:

Drawn By:

Checked By:

Date:

Scale:

Drawing Title:

Drawing No.:

MassDOT-AD Job No.:

2019-FMA-16-SAAB

Issued For:

Civil Engineer:

Airport Solutions Group, LLC

39 Winn Street

Burlington, MA 01803

t. 781.491.0083

f. 781.491.0360

Structural/MEP/FP Engineer:

Arup USA, Inc.

t. 617.864.2987

f. 617.864.6178

Geotechnical Engineer:

GZA GeoEnvironmental, Inc.

249 Vanderbilt Avenue

Norwood, MA 02062

t. 781.278.3700

f. 781.278.5701

Landscape Architect:

Landworks>Studio Inc.

83 North Street

Salem, MA 01970

t. 617.426.3030

f. 617.426.3033

Westcoat Drive

East Taunton, MA 02718

Taunton Municipal Airport,

New Administration Building

The City of Taunton

141 Oak Street

Taunton, MA 02780

Survey & Sewer Engineer:

Nitsch Engineering

2 Center Plaza

Boston, MA 02108

t. 617-338-0063

f. 617-338-6472

1098-06

20 June 2019

Bid Docs

No. Date Revision

60 State Street, 10th Floor

Boston, MA 02109

EXIST. VERNAL POOL

100' VERNAL POOL BUFFER ZONE

AIRPORT PROPERTY LINE

RUNWAY 14-32

TAXIWAY A

EXIST. HANGAR (TYP.)

MAT

CH L

INE

- SE

E SH

EET

C-11

MAT

CH L

INE

- SE

E SH

EET

C-13

N

GRAPHIC SCALE

0' 30' 60' 120'

1 7-19-19 ADDENDUM 3

REMOVED WATER LINE2

2 8-21-19 ADDENDUM 5

2

N.I.C.

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

EXIST. DRAINAGE MANHOLERIM=37.30INV=33.06 (IN)

INV=33.06 (OUT)

EXIST. CONC. HEADWALL

INV.=33.20

(2) 15" RCP CULVERT

EXIST. CONC. HEADWALLINV=33.00

1

0

0

'

1

0

0

'

1

0

0

'

100'

1

0

0

'

2

5

'

2

5

'

2

5

'

25'

2

5

'

2

5

'

25'

25'

2

5

'

2

5

'

2

5

'

25'

25'

2

5

'

25'

25'

1

0

0

'

1

0

0

'

1

0

0

'

1

0

0

'

1

0

0

'

100'

1

0

0

'

1

0

0

'

1

0

0

'

1

0

0

'

100'

100'

1

0

0

'

100'

100'

25'

2

5

'

2

5

'

2

5

'

2

5

'

2

5

'

1

0

0

'

1

0

0

'

1

0

0

'

10

0'

1

0

0

'

1

0

0

'

C-13

UTILITY PLAN(3 OF 3)

1" = 60'

TAVSJR

8/21/2019 2:51:49 PM \\asg2012\CompanyData\ASG Data\Projects\PVT - Fennick McCredie\120-007 MassDOT Construct Bldgs - TAN Taunton\CADD\95 CONSTRUCTION SUBMISSION\120-007 SHEET_UTILITY.dwg (TAV)

Project:

Owner:

Architect:

70 Franklin Street

Boston, MA 02110

t. 617.350.7900

f. 617.350.0051

Job No.:

Drawn By:

Checked By:

Date:

Scale:

Drawing Title:

Drawing No.:

MassDOT-AD Job No.:

2019-FMA-16-SAAB

Issued For:

Civil Engineer:

Airport Solutions Group, LLC

39 Winn Street

Burlington, MA 01803

t. 781.491.0083

f. 781.491.0360

Structural/MEP/FP Engineer:

Arup USA, Inc.

t. 617.864.2987

f. 617.864.6178

Geotechnical Engineer:

GZA GeoEnvironmental, Inc.

249 Vanderbilt Avenue

Norwood, MA 02062

t. 781.278.3700

f. 781.278.5701

Landscape Architect:

Landworks>Studio Inc.

83 North Street

Salem, MA 01970

t. 617.426.3030

f. 617.426.3033

Westcoat Drive

East Taunton, MA 02718

Taunton Municipal Airport,

New Administration Building

The City of Taunton

141 Oak Street

Taunton, MA 02780

Survey & Sewer Engineer:

Nitsch Engineering

2 Center Plaza

Boston, MA 02108

t. 617-338-0063

f. 617-338-6472

1098-06

20 June 2019

Bid Docs

No. Date Revision

60 State Street, 10th Floor

Boston, MA 02109

MAT

CH L

INE

- SE

E SH

EET

C-12

100' VERNAL POOL BUFFER ZONE

100' WETLANDBUFFER ZONE (TYP.)

25' WETLAND BUFFER ZONE (TYP.)

EXIST. WETLANDS (TYP.)AIRPORT PROPERTY LINE

RUNWAY 14-32

TAXIWAY A

EXIST. ACCESS ROAD

S. PRECINCT ST.

CASWELL ST.

N

GRAPHIC SCALE

0' 30' 60' 120'

1 7-19-19 ADDENDUM 32 8-21-19 ADDENDUM 5

REMOVED WATER LINE2

2

N.I.C.

12"

LIMITS OF TRENCHEXCAVATION

FINISHED GRADE

NEW OREXISTINGUTILITY

A

A

FILL FROM UNDISTURBEDEARTH TO MID-DIAMETER

OF NEW OR EXISTINGUTILITY IN ACCORDANCE

WITH SPECIFICATIONS

MIN

.

TYPICAL UTILITY CROSSING DETAIL(DOES NOT APPLY TO ELECTRICAL CONDUIT)

SCALE: N.T.S.

NEW OR EXISTINGUTILITY

COMPACTED EARTH

NEW OREXISTINGUTILITY

SECTION A-A

CONCRETE ENCASEMENT DETAILSCALE: N.T.S.

WATER LINE

SANITARY SEWER OR STORM DRAIN

WAT

ER L

INE

SANITARY SEWER OR STORM DRAIN

A

A10

' MIN

.(T

YP.)

SANITARY SEWER OR STORM DRAIN

SECTION A-A

SECTION B-B

3" SANDBORROW

WATER LINE

12" MIN. CONCRETEENCASEMENT TYP.

ALL AROUND

12" MIN. CONCRETEENCASEMENT TYP.

ALL AROUND

PROTECT WATERMAIN WITH 30LBFELT ROOFINGPAPER PRIOR TOPLACING CONRETE

PLAN

PLAN

12" MIN. CONCRETEENCASEMENT TYP.

ALL AROUND

B

B

8" DI (TYP.)WATER MAIN

FINISHED GRADE

ACCESS TUBE

MASONRY RING

8" GATE VALVE

VALVE BOX AND COVER

RESTRAINED JOINTSFOLLOWER GLANDS.

8" DI GATE VALVE DETAILSCALE: N.T.S.

8" DI PIPE

C-21

CIVIL DETAILS(7 OF 10)

TAVSJRN.T.S.

8/6/2019 1:43:22 PM \\asg2012\CompanyData\ASG Data\Projects\PVT - Fennick McCredie\120-007 MassDOT Construct Bldgs - TAN Taunton\CADD\95 CONSTRUCTION SUBMISSION\120-007 SHEET_DETAILS.dwg (TAV)

Project:

Owner:

Architect:

70 Franklin Street

Boston, MA 02110

t. 617.350.7900

f. 617.350.0051

Job No.:

Drawn By:

Checked By:

Date:

Scale:

Drawing Title:

Drawing No.:

MassDOT-AD Job No.:

2019-FMA-16-SAAB

Issued For:

Civil Engineer:

Airport Solutions Group, LLC

39 Winn Street

Burlington, MA 01803

t. 781.491.0083

f. 781.491.0360

Structural/MEP/FP Engineer:

Arup USA, Inc.

t. 617.864.2987

f. 617.864.6178

Geotechnical Engineer:

GZA GeoEnvironmental, Inc.

249 Vanderbilt Avenue

Norwood, MA 02062

t. 781.278.3700

f. 781.278.5701

Landscape Architect:

Landworks>Studio Inc.

83 North Street

Salem, MA 01970

t. 617.426.3030

f. 617.426.3033

Westcoat Drive

East Taunton, MA 02718

Taunton Municipal Airport,

New Administration Building

The City of Taunton

141 Oak Street

Taunton, MA 02780

Survey & Sewer Engineer:

Nitsch Engineering

2 Center Plaza

Boston, MA 02108

t. 617-338-0063

f. 617-338-6472

1098-06

20 June 2019

Bid Docs

No. Date Revision

60 State Street, 10th Floor

Boston, MA 02109

1 7-19-19 ADDENDUM 3

2 REMOVED WATER LINE CONFLICT DETAILS

2

2 8-7-19 ADDENDUM 4

mearner
Snapshot

E LECTRIC

METAL GUARD RAIL

METAL G

UARD

RAIL

8' HIGH CLF

8' HIGH CLF

8' H

IGH

CLF

8' HIGH C

LF

8' HIGH CLF

GATE

CO

TAUNTON

E LECTRIC

METAL GUARD RAIL

METAL G

UARD

RAIL

8' HIGH CLF

8' HIGH CLF

8' H

IGH

CLF

8' HIGH C

LF

8' HIGH CLF

GATE

CO

WIRING TROUGH FORINCOMING ELECTRICALSERVICE

E02/EE02/E

E02/E

POWER CONNECTION FOR (2) 3HP PUMPS IN PUMPCHAMBER. PROVIDE 3#10 + 1#10G IN 1"C FOR EACH PUMPROUTED UNDERGROUND. DISCONNECT TO BE LOCATEDIN NEMA 3R ENCLOUSURE.

PROVIDE NEW HANDHOLE TO INTERCEPT ANDEXTEND EXISTING POWER, CONTROL ANDDATA WIRING FOR EXISTING FUEL FARM.

PROVIDE (1)2"C. FOR POWER AND (1)1" C. FORCONTROL WIRING ROUTED UNDERGROUNDFROM PUMPS TO CONTROL PANEL LOCATEDIN MECHANICAL ROOM.

DP-1/7,9,11

E04 E04

E01B/E

E01A/E

E01B

E01A/E

E01A

E01A

E01A/E

DP-1/6,8,10

NEW 208V, 3PH, 4-WIRE UTILITY TRANSFORMERBY UTILITY. REFER TO DETAIL 3 FORGROUNDING DETAILS. IN ADDITION, EC SHALLPROVIDE (3) OF THE FOLLOWING PER TMLPSPECIFICATIONS:1. 15kV LOAD BREAK ELBOWS2. PARKING STANDS3. INSULATED CAPS

EC SHALL PROVIDE (3)1/0-AL UNDERGROUNDCONDUCTORS IN A CONCRETE ENCASED DUCTBANKFROM POLE TO TRANSFORMER PAD. ENSURE THATTHERE IS SUFFICIENT SLACK AS NEEDED PER TMLPSPECIFICATIONS. (OVERHEAD PRIMARY ELECTRICALSERVICE FEEDERS BY UTILITY)

NEW SECONDARY ELECTRICALSERVICE FEEDERS. PROVIDE (2)4"C. IN

CONCRETE ENCASED DUCTBANK.REFER TO DWG E-301 FOR ADDITIONAL

INFORMATION.

PROVIDE (2)4" EMPTY CONDUITSWITH PULLSTRINGS FORTELECOMM SERVICE ROUTEDTO NEW TELECOMM ROOM.

E02/E

PROVIDE 2#8, #10G IN 1"C.FOR SITE LIGHTING (TYP.)

HANDHOLE (TYPICAL)

TXMR

E01A/E E04 FIXTURES TO BESPACED 5'-0" ON CENTER ,5'-0" OFFSET FROMVERTICAL SIGNAGE.

S4

S3

S3

S4

S4

S4 S1 S1

S2S2

S2S2

S3

S3

PROVIDE (2) 2" EMPTY CONDUITS WITH PULLSTRING FORSECURITY FIBER AND CITY OF TAUNTON DATA WIRING

ROUTED UNDERGROUND FROM NEW TELECOMM ROOM TOEXTERIOR OF EXISTING SRE BUILDING. CONDUITS SHALL

PENETRATE EXTERIOR WALL OUTSIDE OF EXISTING 2ND FLSECURITY ROOM IN SRE. WIRING BY OTHERS.

EXISTING SREBUILDING

PROVIDE HANDHOLE ADJACENT TO ALLSITE LIGHT POLES (TYPICAL).

HH

HH

REFER TO LIGHTING CONTROL SCHEDULEON DRAWING E-401 FOR CIRCUITING AND

CONTROL ZONE INFORMATION (TYP).

PROVIDE DATA WIRING IN 1"CFROM HANDHOLE TO VEEDER

ROOT LOCATED IN MANAGERSOFFICE 107. REFER TO E-701.

PROVIDE THE FOLLOWING FROM FUEL FARM HANDHOLE TO SREBUILDING (SEE DETAIL #6 ON E-804 FOR ADDITIONAL INFORMATION):1. 2"C FOR FUEL PUMP POWER TO NEW PANEL RP-2 VIA

CONTACTOR IN 2ND FL SECURITY ROOM IN SRE.2. 1"C FOR EMERGENCY STOP AND FUEL CABINET LIGHT POWER

TO NEW PANEL RP-2 IN 2ND FL SECURITY ROOM IN SRE.3. 1"C FOR EMERGENCY STOP SIGNAL TO NEW CONTACTOR IN

2ND FL SECURITY ROOM IN SRE.4. 1"C FOR METER RESET AND HOSE RETRACTOR POWER TO

NEW PANEL RP-2 IN 2ND FL SECURITY ROOM IN SRE.5. 1"C FOR GAS DISPENSER POWER TO NEW PANEL RP-2 IN 2ND

FL SECURITY ROOM IN SRE.6. 1"C FOR DISPENSER SHUT-OFF KEYSWITCH (HEAD END

ROOM) SIGNAL TO FUEL PUMP DISPENSER CONTROL PANEL.7. 1" C FOR DATA WIRING TO EXISTING VEEDER ROOT LOCATED

IN OFFICE IN SRE (TEMPORARY).

SEE NOTE #8

EXISTING CONDUITSTO FUEL FARM

NEW SECONDARY ELECTRICALSERVICE FEEDERS TO EXISTING SRE

BUILDING. PROVIDE 2-1/2"C INCONCRETE ENCASED DUCTBANK.

REFER TO DWG E-301 FOR ADDITIONALINFORMATION.

ADD ALTERNATE #1: GASGENERATOR, REFER TO E-301 FOR

ADDITIONAL INFORMATION.

PROVIDE UNDERGROUND (1)2-1/2"C FORPOWER AND (1)3/4"C FOR CONTROLS FROMGENERATOR TO OUTDOOR ATSs, REFER TODWG E-301 FOR ADDITIONAL INFORMATION.

2

2

1. SITE ELECTRICAL SERVICE

NEWBUILDINGM

PRIMARY (OVERHEAD)T

EXISTING POLE

GRADE

A B C

10' - 0".

SECTION VIEW

D

2. SITE ELECTRICAL DISTRIBUTION:

NEWBUILDING

GRADESECTION VIEWTO SITE LIGHTING

B C

H

LIGHTFIXTUREE

10' - 0".

SCOPE PROVIDED BY

OH PRIMARY N.I.C - BY UTILITYTRANSFORMER N.I.C - BY UTILITYPOLE N.I.C - EXIST. TO REMAIN

CONDUIT ELECTRICALTRENCH/BACKFILL CIVILCONC. DUCTBANK CIVILFEEDERS ELECTRICALHANDHOLE STRUCTURES ELECTRICAL

CONDUIT/RISER ELECTRICALFEEDERS ELECTRICALTRENCH/BACKFILL CIVILMETER N.I.C. - BY UTILITY

POLE RISER - CONDUIT ELECTRICALPOLE RISER - FEEDERS ELECTRICAL

LIGHT FIXTURES ELECTRICALCONCRETE BASE CIVILCONDUIT & WIRING ELECTRICALTRENCHING, EXCAVATION,& BACKFILL CIVIL

A

B

C

D

E

Project:

Owner:

Architect:

70 Franklin StreetBoston, MA 02110t. 617.350.7900f. 617.350.0051

Job No.:

Drawn By:

Checked By:

Date:

Scale:

Drawing Title:

Drawing No.:

MassDOT-AD Job No.:2019-FMA-16-SAAB

Issued For:

Civil Engineer:Airport Solutions Group, LLC39 Winn StreetBurlington, MA 01803

t. 781.491.0083

f. 781.491.0360

Structural/MEP/FP Engineer:Arup USA, Inc.60 State Street, 10th FloorBoston, MA 02109

t. 617.864.2987

f. 617.864.6178

Geotechnical Engineer:GZA GeoEnvironmental, Inc.249 Vanderbilt AvenueNorwood, MA 02062

t. 781.278.3700

f. 781.278.5701

Landscape Architect:Landworks>Studio Inc.83 North StreetSalem, MA 01970

t. 617.426.3030

f. 617.426.3033

Westcoat DriveEast Taunton, MA 02718

Taunton Municipal Airport,New Administration Building

The City of Taunton141 Oak StreetTaunton, MA 02780

Survey & Sewer Engineer:Nitsch Engineering2 Center PlazaBoston, MA 02108

t. 617-338-0063

f. 617-338-6472

1098-06

YE

MC

AS NOTED

ELECTRICAL SITEPOWER & LIGHTINGPLAN

E-011

20 June 2019

Bid Documents

1" = 20'-0"1

ELECTRICAL SITE POWER & LIGHTINGPLAN

GENERAL SHEET NOTES:

1. WIRING TYPE SHOWN FOR EXISTING EQUIPMENT (FUEL FARM, GATECONTROLLER, CARD READERS, SECURITY CAMERA) IS FOR BIDDING PURPOSESONLY. EC SHALL BE RESPONSIBLE FOR VERIFYING ALL ELECTRICALREQUIREMENTS INCLUDING BUT NOT LIMITED TO QUANTITY, LENGTH, TYPE ANDSIZE OF RACEWAYS AND WIRING FOR ALL EXISTING EQUIPMENT.

2. REFER TO CONSTRUCTION DRAWING E-012 FOR GATE POWER SCOPE.

SHEET KEYED NOTES:

1. EC SHALL PROVIDE POWER AND CONTROL WIRING FOR ALL SITE LIGHTING.2. ALL CONDUITS SHALL BE PROVIDED WITH PULL STRING.3. ALL PENETRATIONS THROUGH STRUCTURE SHALL BE LOCATED VERTICALLY

ABOVE THE TOP OF FOOTING AND AT LEAST 2’-0” BELOW THE TOP OF SLAB.LOCATE PENETRATIONS HORIZONTALLY BETWEEN COLUMN FOOTING EXTENTS.FOR MULTIPLE PENETRATIONS, REFER TO STRUCTURAL CONCRETE TYPICALDETAILS FOR MINIMUM SPACING REQUIREMENTS.

4. ALL EXTERIOR LIGHTING CIRCUITS SHALL BE HOMERUN TO PP-1 WITH 2#8, 1#10GIN 1"C. UON.

5. EC SHALL REFER TO CIVIL AND LANDSCAPE PLANS FOR EXACT LOCATIONS FORALL SITE WORK.

6. EC SHALL COORDINATE ALL SITE WORK WITH CIVIL, LANDSCAPE AND GENERALCONTRACTOR.

7. SITE LIGHTING TO BE COORDINATED WITH LANDSCAPE DRAWINGS.8. CONDUITS SHALL BE STUBBED UP EXTERIOR OF EXISTING SRE BUILDING.

CONDUITS SHALL PENETRATE EXTERIOR WALL OUTSIDE OF EXISTING 2ND FLSECURITY ROOM IN SRE. REFER TO DRAWING A-692 FOR ROOM LOCATION.

NTS2

SITE ELECTRICAL DETAIL

No. Date Revision1 2019.07.24 Addendum 32 2019.08.21 Addendum 5

12" = 1'-0"3

UTILITY TRANSFORMER PAD GROUNDINGDETAIL

2

E LECTRIC

8' HIGH CLF

8' HIGH CLF

8' H

IGH

CLF

GATE

CO

TAUNTON

E LECTRIC

8' HIGH CLF

8' HIGH CLF

8' H

IGH

CLF

GATE

CO

E LECTRIC

8' HIGH CLF

8' HIGH CLF

8' H

IGH

CLF

GATE

CO

TAUNTON

E LECTRIC

8' HIGH CLF

8' HIGH CLF

8' H

IGH

CLF

GATE

CO

EXISTING GATE CONTROLLER & (2) CARDREADERS (GATE #1). GATE CONTROLLER TO BEBACKED UP BY NEW BATTERY, HYINVERTER.

EXISTING CONDUITS FOR POWER AND LOW-VOLTAGEWIRING TO GATE CONTROLLER AND CARD READERS(GATE #1) TO BE REUSED FOR NEW GATE CONTROLLER.

EXISTING SREBUILDING

HH

EXISTING POLE MOUNTED SECURITYCAMERA.EXISTING HANDHOLE. INTERCEPT AND EXTEND

EXISTING POWER WIRING FOR GATECONTROLLER TO NEW GATE CONTROLLER &

SECURITY CAMERA AND LOW-VOLTAGE WIRINGFOR REUSED EXISTING CARD READERS.

HH

EXISTING CONDUIT FOR POWERWIRING TO SECURITY CAMERA.

NEW PEDESTRIAN GATE (GATE#2) LOCATION.CONTRACTOR SHALL RELOCATE (2) CARD

READERS AND ELECTRIC LATCH FOR PED GATE(GATE #2) TO NEW LOCATION. PROVIDE (1)1"CFOR TWO (2) SETS OF 3#12 CU LOW-VOLTAGE

WIRING TO HANDHOLE.

EXISTING PED GATE (GATE #2) WITHKEYCARD SYSTEM TO BE REMOVED ANDRELOCATED. CONTRACTOR SHALLDISCONNECT ALL ASSOCIATED WIRING ANDEXTEND TO NEW LOCATION. ANY UNUSEDEXISTING CONDUIT SHALL BE DEMOLISHEDAND REMOVED.

NEW CONDUIT TO NEW PED GATE(GATE #2) LOCATION. CONDUIT TYPE

AND SIZE SHALL MATCH EXISTING.

NEW SURFACE MOUNTED "HYINVERTER AC", FROMHYSECURITY, TO BE LOCATED NEAR GATE OPERATORFOR BATTERY BACK-UP. PROVIDE A 30AWEATHERPROOF DISCONNECT SWITCH AT THEINCOMING AC INPUT AND OUTPUT FROM THE ACPOWER SUPPLY IN THE HYINVERTER. COORDINATEINTERCONNECTION REQUIREMENTS WITHMANUFACTURER, HYSECURITY, AND LOCATION WITHARCHITECT PRIOR TO INSTALLATION.

SEE NOTES#1 & 2

SEE NOTES#3 & #4.

EXISTING SREBUILDING

HH

EXISTING HANDHOLE. INTERCEPT AND EXTENDEXISTING POWER WIRING FOR GATE

CONTROLLER & SECURITY CAMERA AND LOW-VOLTAGE WIRING FOR CARD READERS.

HH

NEW PEDESTRIAN GATE LOCATION. CONTRACTORSHALL RELOCATE (2) CARD READERS AND ELECTRICLATCH FOR PED GATE (GATE #2). PROVIDE (1)1"CFOR TWO (2) SETS OF 3#12 CU LOW-VOLTAGEWIRING TO HANDHOLE.

EXISTING PED GATE (GATE #2) WITHKEYCARD SYSTEM TO BE REMOVED ANDRELOCATED. CONTRACTOR SHALLDISCONNECT ALL ASSOCIATED WIRING ANDEXTEND TO NEW LOCATION. ANY UNUSEDEXISTING CONDUIT SHALL BE DEMOLISHEDAND REMOVED.

NEW CONDUIT TO NEW PED GATE(GATE #2) LOCATION. CONDUIT TYPEAND SIZE SHALL MATCH EXISTING.

SEE NOTES#1 & 2

EXISTING GATE CONTROLLER & (2) CARDREADERS (GATE #1). GATE CONTROLLER TO BEBACKED UP BY GENERATOR POWER. REFER TOE-301 FOR INTERCONNECTION SCOPE.

EXISTING CONDUITS FOR POWER AND LOW-VOLTAGEWIRING TO GATE CONTROLLER AND CARD READERS(GATE #1) TO BE REUSED FOR NEW GATE CONTROLLER.

EXISTING POLE MOUNTED SECURITYCAMERA.

EXISTING CONDUIT FOR POWERWIRING TO SECURITY CAMERA.

SEE NOTES#3 & #4.

Project:

Owner:

Architect:

70 Franklin StreetBoston, MA 02110t. 617.350.7900f. 617.350.0051

Job No.:

Drawn By:

Checked By:

Date:

Scale:

Drawing Title:

Drawing No.:

MassDOT-AD Job No.:2016-FMA-15-SAAB

Issued For:

Civil Engineer:Airport Solutions Group, LLC

39 Winn StreetBurlington, MA 01803

t. 781.491.0083

f. 781.491.0360

Structural/MEP/FP Engineer:Arup USA, Inc.955 Massachusetts Avenue, 4th FloorCambridge, MA 02139

t. 617.864.2987

f. 617.864.6178

Geotechnical Engineer:GZA GeoEnvironmental, Inc.

249 Vanderbilt AvenueNorwood, MA 02062

t. 781.278.3700

f. 781.278.5701

Landscape Architect:Landworks>Studio Inc.112 Shawmut Avenue, Studio 6BBoston, MA 02118

t. 617.426.3030

f. 617.426.3033

Sewer Engineer:Nitsch Engineering2 Center PlazaBoston, MA 02108

t. 617-338-0063

f. 617-338-6472

246 South Meadow RoadPlymouth, MA 02360

Plymouth Municipal Airport,New Administration Building

The Town of Plymouth11 Lincoln StreetPlymouth, MA 02360

Survey Engineer:Nitsch Engineering2 Center PlazaBoston, MA 02108

t. 617-338-0063

f. 617-338-6472

1098-06

YE

MC

ELECTRICAL GATESITE POWER PLAN

E-012

20 June 2019

Bid Documents

AS INDICATED

No. Date Revision1 2019.08.21 Addendum 5

1" = 20'-0"1

BASE SCOPE: ELECTRICAL GATE POWERSITE PLAN

1" = 20'-0"2

ADD ALTERNATE #1: ELECTRICAL GATEPOWER SITE PLAN 1

GENERAL SHEET NOTES:

1. WIRING TYPE SHOWN FOR EXISTING EQUIPMENT (FUEL FARM, GATE CONTROLLER, CARD READERS, SECURITYCAMERA) IS FOR BIDDING PURPOSES ONLY. EC SHALL BE RESPONSIBLE FOR VERIFYING ALL ELECTRICALREQUIREMENTS INCLUDING BUT NOT LIMITED TO QUANTITY, LENGTH, TYPE AND SIZE OF RACEWAYS AND WIRINGFOR ALL EXISTING EQUIPMENT.

2. REFER TO CONSTRUCTION DRAWING E-011 FOR OVERALL SITE POWER AND LIGHTING SCOPE.

SHEET KEYED NOTES:

1. PROVIDE (2) SETS OF 2#10 & 1#10G IN (1) 2"C FOR GATE (20A/2P) AND CAMERA (20A/1P) POWER CIRCUITED TOEXISTING 100A GATE POWER SUB-PANEL IN 1ST FL HEAD-END ROOM IN SRE BUILDING. PROVIDE (1) 20A/2P AND (1)20A/1P CIRCUIT BREAKER IN 100A GATE POWER SUB-PANEL IN EXISTING SPACE. CIRCUIT BREAKERS SHALL MATCHEXISTING. REFER TO DRAWING A-692 FOR PANEL LOCATION.

2. PROVIDE (1)1-1/2" CONDUIT WITH (4) SETS OF 3#12 CU LOW-VOLTAGE WIRING FOR (4) CARD READERS AND 3#12 CULOW-VOLTAGE CONTROL WIRING FOR GATE CONTROLLER. WIRING SHALL MATCH EXISTING. TWO (2) CARDREADERS LOCATED AT GATE #1 AND TWO (2) CARD READERS AT GATE #2.

3. CONDUITS SHALL BE STUBBED UP EXTERIOR OF EXISTING SRE BUILDING. CONDUITS SHALL PENETRATE EXTERIORWALL OUTSIDE OF EXISTING 1ST FL HEAD-END ROOM IN SRE. REFER TO DRAWING A-692 FOR ROOM LOCATION.

4. LOW VOLTAGE WIRING FOR CARD READERS AND GATE CONTROLLER SHALL TERMINATE IN GATE CONTROL PANELLOCATED IN 1ST FL HEAD-END ROOM IN SRE.

LEVEL 01

ROOF

LEVEL 01

LEVEL 02

ROOF

PANELDP-1400A

M

PANELPP-1100A

TO NEW 208/120V, 3-PHASE, 4-WIREELECTRICAL SERVICE FROM NEW

UTILITY TRANSFORMER. REFER TOE-011 AND CIVIL PLANS FOR EXACT

ROUTING

INTERIOR EQUIPMENTEXTERIOR EQUIPMENT

DISTRIBUTION &MECHANICALEQUIPMENT

GENERAL POWER& LIGHTING

C115D

(4)600KCMIL - 4"C (XHHW)

WEATHER PROOF UTILITY METER BY UTILITYCOMPANY. PROVIDE METER SOCKET,

MOUNTED ON EXTERIOR OF BUILDING. BONDTO WIRE TROUGH WITH BONDING JUMPER AS

DEPICTED. TYPICAL FOR (2)

LTGEAC

1

PROVIDE 3750VA LIGHTING INVERTER FOREMERGENCY LIGHTING CIRCUITS (LITHONIALIGHTING EAC-LC20-ISS-3750-120/120-OB12-XMBYP OR APPROVED EQUAL BY DUAL LIGHTOR EMERGILITE)

C420D (XHHW)

#4/0 IN 1"C PVC

200%SPAREWAYS

1/4"(D)x4"(W) COPPER BUSSERVICE ENTRANCE

GROUND BUS BAR

CONN

ECT

TO F

OUND

ATIO

NRE

BAR

STEE

L

CONN

ECT

TO M

ETAL

INCO

MING

WAT

ER P

IPE

COMM

UNIC

ATIO

NSGR

OUND

BUS

SEE DETAIL 3/E-801

ATS-AB400A

400A 120/208V, 3-PH, 4-POLE SERVICE-RATED AUTOMATIC TRANSFER SWITCH

IN NEMA 3R ENCLOUSURE (ASCO 300SERIES OR APPROVED EQUAL) PANEL

KP-1200A

M

FWP 200A

WIRING TROUGH WITH UTILITYCOMPANY LOCK PROVISIONS

RESTAURANTTENANT

C230D (XHHW)

GROU

ND R

ING

LOOP

REFE

R TO

DET

AIL 2

/E-8

01AN

D E-

101 F

OR LO

CATI

ON

SERV

ICE

TROU

GH

C55A

LTGLCP

LOW-VOLTAGE RELAY LIGHTINGCONTROL PANEL. REFER TO E-401AND E-802 FOR ADDITIONALINFORMATION.

N E

L

C115D

PROVIDE 60A-2P WITH 50A FUSE, 240V,DOUBLE-THROW MANUAL TRANSFER SWITCH.SEE NOTE 1.

TO NEMA L5-60R OUTLET LOCATED ON THEOUTSIDE OF THE BUILDING, REFER TO E-501.EXACT LOCATION TO BE CONFIRMED IN FIELD.

ELECTRICAL RISER DIAGRAM NOTES:

1. PROVIDE PERMANENT SWITCHING MEANS TO CONNECT TEMPORARY ALTERNATE POWER SOURCE PERNEC 700.3(F). PLACARD SHALL BE PROVIDED AT CONNECTION POINT INDICATING PHASE ROTATION ANDSYSTEM BONDING REQUIREMENTS. INSTALLATION SHALL BE IN FULL COMPLIANCE WITH NEC 700.3.

2. ADD ALTERNATE #1: PROVIDE 60A, 1-PHASE, 120/208V LOAD CENTER AS PART OF GENERATOR PACKAGE.LOAD CENTER SHALL BE MOUNTED WITHIN GENERATOR ENCLOSURE AND SHALL BE USED FORCONNECTIONS TO AUXILIARY EQUIPMENT (I.E. BATTERY CHARGER, HEATER, LIGHTS). PROVIDE ALLCONNECTIONS TO GENERATOR EQUIPMENT AS REQUIRED. ENDOR TO SIZE ALL LOAD CENTERCOMPONENTS AS REQUIRED. REFER TO NOTE 8 FOR ADDITIONAL INFORMATION.

3. NEW 400A ENCLOSED CIRCUIT BREAKER FOR NEW ADMIN BUILDING.4. NEW 200A ENCLOSED CIRCUIT BREAKER FOR EXISTING SRE BUILDING.5. PROVIDE EQUIPMENT GROUND FOR GENERATOR PER NEC 250.6. PROVIDE 3/4" CONDUIT BETWEEN GENERATOR AND ASSOCIATED AUTOMATIC TRANSFER SWITCH FOR

GENERATOR CONTROLS. GENERATOR LOCATION SHALL BE COORDINATED WITH E-011 ANDARCHITECTURAL PLANS. CONDUIT PATHS SHALL BE COORDINATED WITH CIVIL PLANS AND IN FIELD WITHARCHITECT PRIOR TO INSTALLATION.

7. SERVICE ENTRANCE RATED DISCONNECT.8. ADD ALTERNATE #1: 120/208V, 3-PH, 100kVA/80kW GAS STANDBY GENERATOR WITH SOUND ATTENUATING

WEATHERPROOF ENCLOSURE. ADD ALTERNATE PRCING SHALL ONLY INCLUDE THE COST OF THEGENERATOR, ALL OTHER ASSOCIATED CONNECTIONS AND EQUIPMENT SHALL BE CONSIDERED AS PART OFTHE BASE PROJECT.

9. EXISTING WEATHERPROOF 1-PH UTILITY METER TO BE REMOVED AND REPLACED WITH NEW 3-PH UTILITYMETER. CONTRACTOR SHALL COORDINATE REPLACEMENT OF METER WITH TMLP AND COORDINATE ANYSHUT-DOWNS WITH THE OWNER.

C55A

GSP-1

SEE NOTE 2. SEE NOTE 3.

SEE NOTE 5.

(2)C200D

C70B

TO NEWPANEL DP-1

ATS-SRE200A

EXISTING SRE BUILDING

NEW 225A/2P CIRCUIT BREAKERINTEGRAL TO EXISTING SREDISTRIBUTION PANEL TO FEED EXISTINGSINGLE-PHASE.

200A, 208/120V, 3-PH, 4-POLESERVICE-RATED AUTOMATICTRANSFER SWITCH IN NEMA 3RENCLOUSURE (ASCO 300 SERIESOR APPROVED EQUAL)

NEW ADMINISTRATION BUILDING

SEE NOTE 6.

SEE NOTE 7.N

G

N

G

SEE DETAIL 2.

INTERIOR EQUIPMENTEXTERIOR EQUIPMENT

MDP

120/240V1PH 200A

DP-2208/120V3PH 200A

SEE NOTE 8.

EXISTING 1-PHASE FEEDERS TOEXISTING MAIN PANELBOARD TO BEDEMOLISHED.

EXISTING 240/120V, 1-PH, 3-WIRESERVICE FROM UTILITY

EXISTING 240/120V, 1-PHASE SERVICEFEEDERS TO BE DEMOLISHED. CONDUIT

SHALL BE LEFT ABANDONED.CONTRACTOR SHALL COORDINATE ALL

TERMINATIONS REQUIREMENTS WITHTMLP AND COORDINATE ALL SHUT-

DOWNS WITH THE CITY OF TAUNTON.

C200D

SEE NOTE 4.

SEE NOTE 9.

SEE NOTE 6.C200D (XHHW)

C230B

NEW PANELBOARD LOCATED IN EXISTING ITROOM ON SECOND FLOOR. CONTRACTOR

TO COORDINATE EXACT LOCATION WITHINROOM IN FIELD AND WITH ARCHITECT.

TO NEW 208/120V, 3-PHASE, 4-WIREELECTRICAL SERVICE FROM NEW UTILITY

TRANSFORMER. REFER TO E-011 AND CIVILPLANS FOR EXACT ROUTING

(4)3/0 - 2-1/2"C (XHHW)

N

G

UNDERGROUND CONCRETEENCASED CONDUITS, REFER TOE-011.

GATE SUB PANEL120/240V1PH 100A

NEW 20A/2P AND 20A/1P CIRCUITBREAKERS TO BE INSTALLED PERDRAWING E-012, SHEET KEYED NOTE #1.

Project:

Owner:

Architect:

70 Franklin StreetBoston, MA 02110t. 617.350.7900f. 617.350.0051

Job No.:

Drawn By:

Checked By:

Date:

Scale:

Drawing Title:

Drawing No.:

MassDOT-AD Job No.:2019-FMA-16-SAAB

Issued For:

Civil Engineer:Airport Solutions Group, LLC39 Winn StreetBurlington, MA 01803

t. 781.491.0083

f. 781.491.0360

Structural/MEP/FP Engineer:Arup USA, Inc.60 State Street, 10th FloorBoston, MA 02109

t. 617.864.2987

f. 617.864.6178

Geotechnical Engineer:GZA GeoEnvironmental, Inc.249 Vanderbilt AvenueNorwood, MA 02062

t. 781.278.3700

f. 781.278.5701

Landscape Architect:Landworks>Studio Inc.83 North StreetSalem, MA 01970

t. 617.426.3030

f. 617.426.3033

Westcoat DriveEast Taunton, MA 02718

Taunton Municipal Airport,New Administration Building

The City of Taunton141 Oak StreetTaunton, MA 02780

Survey & Sewer Engineer:Nitsch Engineering2 Center PlazaBoston, MA 02108

t. 617-338-0063

f. 617-338-6472

1098-06

YE

MC

NTS

ELECTRICAL SINGLELINE DIAGRAM -SHEET 1

E-301

20 June 2019

Bid Documents

NTS2

ELECTRICAL GROUNDING DIAGRAM

No. Date Revision1 2019.07.24 Addendum 32 2019.08.21 Addendum 5

ELECTRICAL SINGLE LINE DIAGRAM1

NTS

2