70 Franklin Street
Boston MA 02110
T 617. 350. 7900
FMarchitecture.com 1 of 3
Taunton Municipal Airport – New Administration Building Taunton, MA
City of Taunton 1098-06
Addendum No.05 August 21, 2019
Attention all bidders: All bidders are required to acknowledge receipt of this addendum on the filed
sub-bid and general bid forms contained in the contract documents. All information included in this
addendum is hereby included as part of the Contract Documents and is to be included in the bidder’s
scope of work and contract price at the time of bid. Failure to acknowledge this addendum may result
in rejection of your bid.
General Information
Bidder questions that have not be answered yet will be answered in forthcoming addenda. Please note
the schedule extension as the force main and septic are being redesigned. Contractors shall make note
of the winter conditions noted within each spec section as construction and excavation is anticipated
to occur during the winter months.
Changes to the Specifications
Section Description of Change
00 11 13 Paragraph G: Revise the filed sub-bid opening date to September 23rd, 2019. The
times shall remain unchanged. Final filed sub-bidder questions will be accepted
until September 13th, 2019.
00 11 13 Paragraph G: Revise the general contract bid opening date to October 7th, 2019.
The times shall remain unchanged. Final general contract bidder questions will be
accepted until September 27th, 2019.
00 21 13 Article 19: Revise Substantial Completion date to December 10th, 2020.
Changes to the Drawings Sheets
Civil
C-7 Added label regarding A/C removal by Owner, and note regarding oil tank to be
removed by Owner
C-11 Adjusted water line location and size; added insets for water at building, and stub for
future use; added 6” X 4” reducer at building.
C-12 Removed this sheet from Contract
C-13 Removed this sheet from Contract
C-21 Removed conflict details and added gate valve detail.
2 of 3
Electrical
E-011 Removed power scope for Gate controller and revised keyed notes numbers as
necessary.
E-012 Added new sheet containing the base bid and add-alternate scope for the Gate
controller.
E-301 Added SRE existing 100A Gate Power sub panel to SLD as well as additional notes to
clarify new breakers to be installed.
Questions and Answers
Q1 Can the Fire Department & Police Department be on two separate channels (Channel 1 and
Channel 2) or are they required to be on one channel (both on Channel 1)?
A1. Two separate channels for police and fire.
Q2 Specification Section 01 50 00 Temporary Facilities and Controls, 1.19 Construction Auds -
Scaffolding, Platforms, Staging, Chutes B. The section requires the Filed Sub-contractors to
providing scaffolding to 8 feet in height and less. Can the Filed Sub-contractors be required as
part of their bid for all their own scaffolding requirements? Please advise.
A2. The specs will not be revised to shift ownership of the scaffolding.
Q3 Please confirm the Fire Protection Contractor’s scope of work starts 10’-0 outside Mechanical
Room 110
A3. No, the fire protection contractor’s scope of work includes the entire building including
10'-0" beyond the building
Q4 Does the painting subcontractor own the painting for all sprinkler piping and hangars or is
that the responsibility of the fire protection subcontractor?
A4. Refer to Addendum 3, Q27.
Q5 Question 11 on addendum number 2 talk about the test size for the windows. In the aluminum
window specification is say the test size shall be a minimum of 5’3 x 8’. The window
manufactures have noted that this exceeds there AAMA test size and will not be labeled or
certified.
A5. The minimum test size can be reduced to 5'-4" X 3'-0" since that is the size of the largest
window in the project
Q6 Is the Aluminum/Storefront contractor responsible for furnishing and installing all hardware
and operators specified in 08 71 00 that will be on storefront?
A6. No, hardware to be furnished and installed under 08 71 00.
Q7 Reference detail 2/A-321. What is this? For example, is it a riglet? Waterstop? Other? Is it
provided by the Filed Sub-Bid or General?
A7. Refer to the note on the detail "CONTINUOUS WATERSTOP AT FOUNDATION. REFER
TO MANUFACTURER RECOMMENDATIONS FOR WATERSTOP SIZE [07 700 01]"
Q8 Please confirm a fire pump is not required.
A8. Confirmed, a fire pump is not required.
Q9 Will the fire protection subcontractor be connecting to the fire service 10’ outside building wall
or will the fire protection subcontractor be connecting to the main in the street and carrying
3 of 3
the entire fire service into the building? Typically the utility contractor will bring the fire
service to 10’ outside building wall and sprinkler contractor connects. Please advise.
A9. The fire protection subcontractor will connect to the fire service 10’ outside the building
wall. The site utility contractor will bring the fire service to 10’ outside the building walls.
Q10 Please confirm that the gas sub-meter is supplied by the owner as shown on P-801, detail 6.
A10. The gas sub-meter is supplied by the plumbing subcontractor. Refer to the revised
plumbing drawings in Addendum 3.
End of Addendum No. 05
E
A
S
T
A
C
C
E
S
S
R
O
A
D
LIMIT OF WORK
C-7
DEMOLITION PLAN
1" = 20'
CNMRAL
NOTES:
1. THE CONTRACTOR SHALL VERIFY ALL EXIST. ELECTRICAL CIRCUITS TO BEDEMOLISHED AND/OR RELOCATED PRIOR TO DEMOLITION AND/ORPROVIDING TEMPORARY SERVICE.
2. PROVIDE TEMPORARY POWER AND COMMUNICATION FOR FUEL PUMP PRIORTO DEMOLISHING EXIST. BUILDING. UPON COMPLETION OF NEW BUILDINGINSTALL PERMANENT VEEDER-ROOT, SITE LIGHTING, POWER TO FUELPUMP, INCLUDING TELECOMM, TELECOMM TO EXIST. EMERGENCYTELEPHONE PEDESTAL AND POWER TO RELOCATED WIND SOCK.
3. FOR CONSTRUCTION PHASING SEE SHEETS C-3 - C-5.4. FOR CONSTRUCTION LEGEND SEE SHEET C-2.5. THE CONTRACTOR SHALL MAINTAIN WATER SERVICE TO THE SRE BUILDING
UNTIL THE NEW WATER MAIN HAS BEEN INSTALLED AND TESTED.6. OIL TANK INSIDE EXISTING BUILDING WILL BE REMOVED BY THE OWNER
(NOT IN CONTRACT).
REMOVE AND DISPOSE EXIST. ADMIN.BUILDING AND FOUNDATIONSEE ARCHITECTURAL PLANS
REMOVE AND DISPOSEEXIST. WIND SOCK AND POLE
REMOVE AND RELOCATE EXIST. MONUMENT(SEE LANDSCAPE SHEET FOR NEW LOCATION)
SAWCUTEXIST.PAVEMENT
SAWCUT EXIST.PAVEMENT
SAWCUT EXIST. PAVEMENT
REMOVE AND DISPOSE EXIST. SIDEWALK
REMOVE AND DISPOSEEXIST. SIDEWALK AND
LANDING
LIMITS OFSIDEWALK REMOVAL
EXIST. UTILITY POLE TO REMAIN
REMOVE AND DISPOSEEXIST. SIGN (TYP.)
INSTALL CATCH BASININLET PROTECTION (TYP.)
EXIST. CHAIN-LINKFENCE TO REMAIN
Project:
Owner:
Architect:
70 Franklin Street
Boston, MA 02110
t. 617.350.7900
f. 617.350.0051
Job No.:
Drawn By:
Checked By:
Date:
Scale:
Drawing Title:
Drawing No.:
MassDOT-AD Job No.:
2019-FMA-16-SAAB
Issued For:
Civil Engineer:
Airport Solutions Group, LLC
39 Winn Street
Burlington, MA 01803
t. 781.491.0083
f. 781.491.0360
Structural/MEP/FP Engineer:
Arup USA, Inc.
t. 617.864.2987
f. 617.864.6178
Geotechnical Engineer:
GZA GeoEnvironmental, Inc.
249 Vanderbilt Avenue
Norwood, MA 02062
t. 781.278.3700
f. 781.278.5701
Landscape Architect:
Landworks>Studio Inc.
83 North Street
Salem, MA 01970
t. 617.426.3030
f. 617.426.3033
Westcoat Drive
East Taunton, MA 02718
Taunton Municipal Airport,
New Administration Building
The City of Taunton
141 Oak Street
Taunton, MA 02780
Survey & Sewer Engineer:
Nitsch Engineering
2 Center Plaza
Boston, MA 02108
t. 617-338-0063
f. 617-338-6472
1098-06
20 June 2019
Bid Docs
No. Date Revision
60 State Street, 10th Floor
Boston, MA 02109
RECLAIM EXIST. FULLDEPTH PAVEMENT
REMOVE AND RELOCATEEXIST. TELCOMM TONEW BUILDING
DECOMMISSION AND CUT-OFF EXIST. WATERWELL IN ACCORDANCE WITH MASSDEP ANDLOCAL BOARD OF HEALTH REQUIREMENTS(OWNER HAS INDICATED THAT THE WELL ISBELOW THE BUILDING CRAWL SPACE)SEE NOTE 5 ABOVE
N
REMOVE AND DISPOSE EXIST.TELCOMM TO SRE BUILDING
CONTRACTOR TO COORDINATE WITHPHONE COMPANY TO PROVIDE NEW
SERVICE TO SRE BUILDING
8/20/2019 3:26:34 PM \\asg2012\CompanyData\ASG Data\Projects\PVT - Fennick McCredie\120-007 MassDOT Construct Bldgs - TAN Taunton\CADD\95 CONSTRUCTION SUBMISSION\120-007 SHEET_DEMO.dwg (TAV)
WES
TCO
AT D
RIVE
SRE
BUIL
DIN
G
REMOVE AND DISPOSE 4 LF OFEXIST. AIRPORT FENCE
(SEE LAYOUT PLAN FOREXACT LOCATION)
REMOVE HH.
REMOVE EXIST. CONDUIT.PROVIDE TEMPORARY POWER
FOR ACCESS GATE AND CAMERA.
REMOVE AND DISPOSE EXIST. DUCT TOPROPOSED EMH. PROVIDE TEMPORARYPOWER FOR VEEDER-ROOT, SHUTOFFSWITCH AND FUEL FACILITY.
REMOVE DRAIN
REMOVE AND DISPOSEWOOD POST ANDELECTRIC METER
REMOVE AND DISPOSE TANK.COORDINATE WITH PROVIDER.EXIST. CONC. PAD TO REMAIN
REMOVE AND DISPOSE POSTS,AND RELOCATE EXIST. GATE.
AND ASSOCIATED SIGNS TO NEW LOCATION(SEE LAYOUT, UTILITY, AND DETAIL SHEETS)
REMOVE AND DISPOSE EXIST.HOLDING TANK AND SEWER
PIPE
GRAPHIC SCALE
0' 10' 20' 40'
LIMIT OF WORK
REMOVE LEACHINGBASIN
REMOVE ANDREINSTALL CLF
COMPOST FILTER SOCKFOR EROSION CONTROL
A/C CONDENSERREMOVAL BY OWNER(NOT IN CONTRACT)
1ADDED LABELS REGARDINGOIL TANK AND A/C REMOVAL
1 8-21-19 ADDENDUM 5
1
1
W
W
E
E
VV
W
E
S
T
C
O
A
T
D
R
I
V
E
E
A
S
T
A
C
C
E
S
S
R
O
A
D
W W
W
W
W
W
W
W
ELECTRIC
WW
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
O
H
W
O
H
W
O
H
W
O
H
W
O
H
W
O
H
W
O
H
W
O
H
W
O
H
W
O
H
W
G
G
G
K
W
V
S
S
S
S
S
S
S
FM
FM
FM
FM
FM
FM
FM
FM
F
M
F
M
F
M
F
M
VV
F
M
F
M
F
M
F
M
F
M
F
M
FM
FM
F
M
F
M
F
M
F
M
ELECTRIC
ELECTRIC
F
F
F
2
5
'
2
5
'
25'
2
5
'
2
5
'
2
5
'
25'
1
0
0
'
1
0
0
'
1
0
0
'
1
0
0
'
100'
100'
1
0
0
'
1
0
0
'
1
0
0
'
1
0
0
'
1
0
0
'
1
0
0
'
1
0
0
'
FM
FM
FM
FM
FM
FM
FM
F
M
F
M
F
M
F
M
FM
WE
ST
CO
AT
D
RIV
E
W
E
S
T
C
O
A
T
D
R
I
V
E
M
I
D
D
L
E
B
O
R
O
A
V
E
N
U
E
WE
ST
CO
AT
D
RIV
E
W
W
W
W
W
W
G
G
G
G
O
H
W
O
H
W
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
G
W
V
FM
FM
FM
FM
FM
FM
FM
FM
FM
F
M
F
M
F
M
F
M
2
5
'
25'
2
5
'
2
5
'
2
5
'
25'
25'
25'
25'
25'
2
5
'
25'
2
5
'
2
5
'
2
5
'
2
5
'
2
5
'
2
5
'
1
0
0
'
1
0
0
'
100'
100'
100'
1
0
0
'
1
0
0
'
100'
100'
100'
1
0
0
'
1
0
0
'
1
0
0
'
1
0
0
'
100'
1
0
0
'
PROP.8" DI 11.25° BENDTHRUST BLOCK
C-11
UTILITY PLAN
AS SHOWN
CNMRAL
8/21/2019 2:51:49 PM \\asg2012\CompanyData\ASG Data\Projects\PVT - Fennick McCredie\120-007 MassDOT Construct Bldgs - TAN Taunton\CADD\95 CONSTRUCTION SUBMISSION\120-007 SHEET_UTILITY.dwg (TAV)
Project:
Owner:
Architect:
70 Franklin Street
Boston, MA 02110
t. 617.350.7900
f. 617.350.0051
Job No.:
Drawn By:
Checked By:
Date:
Scale:
Drawing Title:
Drawing No.:
MassDOT-AD Job No.:
2019-FMA-16-SAAB
Issued For:
Civil Engineer:
Airport Solutions Group, LLC
39 Winn Street
Burlington, MA 01803
t. 781.491.0083
f. 781.491.0360
Structural/MEP/FP Engineer:
Arup USA, Inc.
t. 617.864.2987
f. 617.864.6178
Geotechnical Engineer:
GZA GeoEnvironmental, Inc.
249 Vanderbilt Avenue
Norwood, MA 02062
t. 781.278.3700
f. 781.278.5701
Landscape Architect:
Landworks>Studio Inc.
83 North Street
Salem, MA 01970
t. 617.426.3030
f. 617.426.3033
Westcoat Drive
East Taunton, MA 02718
Taunton Municipal Airport,
New Administration Building
The City of Taunton
141 Oak Street
Taunton, MA 02780
Survey & Sewer Engineer:
Nitsch Engineering
2 Center Plaza
Boston, MA 02108
t. 617-338-0063
f. 617-338-6472
1098-06
20 June 2019
Bid Docs
No. Date Revision
60 State Street, 10th Floor
Boston, MA 02109
NOTES:1. FOR SANITARY SEWER SEE SHEET CS-100.2. FOR UTILITY DETAILS SEE SHEETS C-21 & C-22.3. FOR LIGHTING DETAILS SEE SHEET C-23.4. POWER TO EXISTING SLIDE GATE, CAMERAS AND
ACCESS CONTROL CABINET COMES FROM THEEXISTING BUILDING. PRIOR TO DEMOLITIONPROVIDE TEMPORARY POWER TO ALL EXISTINGFACILITIES,
5. REFER TO ELECTRICAL PLANS FOR CONDUIT SIZEAND WIRING.
6. ASSUME (1) 1,000 GAL PROPANE TANK FORSERVICE TO NEW ADMINISTRATION BUILDING.
PROP. LIGHTED BOLLARD (TYP.)FOR FOUNDATION DETAIL SEE C-17
DUCT BANK FORLIGHTED BOLLARDSSEE ELEC. PLANS FORSIZE AND TYPE
SEE NOTE 4
UTILITY PLANSCALE: 1 = 20'
WATER MAIN, THREE-PHASEPOWER AND GAS SERVICE
CONNECTION TO MIDDLEBOROAVENUESCALE: 1 = 100'
MATCH LINE - SEE INSET THIS SHEET
SEE PLUMBING PLANS FORCONT. OF WATER AND GASSERVICES
PROP. (3) 8" GATE VALVE
CONNECT TO EXIST. WATERMAIN WITH TAPPING SLEEVE
THRUST BLOCK
PROP. 6" GATE VALVEAND HYDRANT
THRUST BLOCK (TYP.)
8" DI
CONNECT TOEXISTING SERVICE
MATCH LINE - SEE RIGHT
MIDDLEBORO AVE
WES
TCO
AT D
RIVE
PROP.6" TEE6" HYDRANT6" DI GATE VALVETHRUST BLOCK
PROP. 6" HYDRANT6" GATE VALVETHRUST BLOCK
SEE ELECTRICALPLANS FOR CONT. OFTELECOMM. SERVICES
2'±
CONTRACTOR SHALL INTERCEPT EXIST.POWER, CONTROL AND COMM. FROM FUELFARM AND REROUTE TO PROP. BLDG.
2'
UTILITY COMPANY TOPROVIDE THREE-PHASEPOWER FOR BUILDING SITE(SEE INSET THIS SHEET)
UTILITY COMPANY TOPROVIDE THREE-PHASEPOWER FOR BUILDING SITE
SEE ELECTRICAL PLANS FOR CONT. OFPRIMARY ELECTRICAL SERVICE
PROP. THREE-PHASE TRANSFORMER BY UTILITY COMPANY(SEE ELECTRICAL SHEET FOR GROUNDING)
DUCT BANK FOREXIST. SERVICESSEE ELEC. PLANS
FOR SIZE AND TYPE
AIRPORT PRO
PERTY LINE
CONTRACTOR SHALL INTERCEPT EXIST. POWERAND CONTROL FROM SLIDE GATE AND CAMERAS
AND REROUTE TO PROP. BUILDING
SEE ELECTRICALPLANS FOR CONT. OFELECTRICAL SERVICE
DUCT BANK FORTELECOMM SERVICES
SEE ELEC. PLANS FORSIZE AND TYPE
DUCT BANK FOR SLIDEGATE AND CAMERAS
SEE ELEC. PLANS FORSIZE AND TYPE
DUCT BANK FOR FUEL FARM POWER,CONTROL AND COMM.SEE ELEC. PLANS FOR SIZE AND TYPE
PROP. LIGHT STANDARD (TYP.)FOR LIGHT STANDARDFOUNDATION SEE C-21
DUCT BANK FORSITE LIGHTING
SEE ELEC. PLANSFOR SIZE AND TYPE
DUCT BANK FOR PRIMARY ELECTRICSEE ELEC. PLANS FOR SIZE AND TYPE
MAT
CH L
INE
- SE
E SH
EET
C-12
PROVIDE SPARE CONDUITFOR 3-PHASE POWER TOSRE BUILDING
PROP. 8" SERVICERESIDENTIALDEVELOPMENT
PROP. NATURAL GASSTUB TO RESIDENTIALDEVELOPMENT
NEW NATURAL GASSERVICE BY UTILITYCOMPANY
NEW NATURAL GASLINE BY UTILITYCOMPANY
REMOVE TEMPORARY SERVICE
NATURAL GAS SERVICE
NEW ELECTRIC HANDHOLE
SEE ELECTRICALPLANS FOR CONT. OFTELECOMM. SERVICES
LOCATE GATE CONTROLCIRCUIT AND RUN LOW
VOLTATGE ELECTRICLINE IN 1" CONDUIT TO
NEW HANDHOLE ATNEW GATE LOCATION
INSET 1(PROPOSED GATE)
1" CONDUIT WITH LOWVOLTAGE CIRCUIT
4'
GATE CONTROLEQUIPMENT
PROVIDE 2" GAS ANDMETER TO SRE BLDG.(BY UTILITY COMPANY)
GRAPHIC SCALE
0' 10' 20' 40'GRAPHIC SCALE
0' 5' 10' 20'
GRAPHIC SCALE
0' 50' 100' 200' PROP. BOLLARDS BY CONTRACTOR(SEE DETAIL SHEETS FOR PLACEMENT)
LIMIT OF WORK
WATER LINE MODIFIED2
1 7-19-19 ADDENDUM 3
8" DI
8" D
I
6" DI8" DI6" DI
6" D
I3" HDPE
8" DI 45° BEND
PROP.8" DI 45° BENDTHRUST BLOCK
PROP. 8" DI 22.5°BEND
THRUST BLOCK
PROP. 6" DI FIRE LINE TOCONNECT TO PROP. 8" WATERMAIN WITH(1) 8" x 8" x 6" TEE(1) 6" DI GATE VALVE
PROP. 8"x 8"x 6"DI TEE6" DI GATE VALVETHRUST BLOCK
6" DI 11.25° BENDTHRUST BLOCK
2
GRAPHIC SCALE
0' 2.5' 5' 10'
8" DIGATE VALVE
8" DI TEE
8" DI CAP
THRUST BLOCK
INSET 3GRAPHIC SCALE
0' 2.5' 5' 10'
INSET 2
6" x 6" x 3" DI TEE
3" DI GATE VALVE
3" HDPE TEE
EDGE OF NEW BUILDING
6" D
I
SEE INSET 2 THIS SHEET
SEE INSET 3 THIS SHEET
PROP. 6" HYDRANT
8" TO 6"DI REDUCER
THRUST BLOCK
PROP.6" DI 45° BENDTHRUST BLOCK
PROP. HYDRANT 6"DI 45° BEND
THRUST BLOCK
PROP. 8" TEE6" GATE VALVETHRUST BLOCK
PROP. 8" GATE VALVE
PROPOSED 6"DI GATE VALVE PROP. 8" DI
GATE VALVE
3"HDPE
6" x 4" DI REDUCER
2 8-21-19 ADDENDUM 5
2
2
2
2
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
D
D
D
D
D
1
0
0
'
1
0
0
'
1
0
0
'
100'
2
5
'
2
5
'
2
5
'
2
5
'
2
5
'
2
5
'
2
5
'
2
5
'
2
5
'
2
5
'
1
0
0
'
100'
1
0
0
'
1
0
0
'
1
0
0
'
1
0
0
'
1
0
0
'
1
0
0
'
1
0
0
'
1
0
0
'
1
0
0
'
100'
1
0
0
'
C-12
UTILITY PLAN(2 OF 3)
1" = 60'
CNMRAL
8/21/2019 2:51:49 PM \\asg2012\CompanyData\ASG Data\Projects\PVT - Fennick McCredie\120-007 MassDOT Construct Bldgs - TAN Taunton\CADD\95 CONSTRUCTION SUBMISSION\120-007 SHEET_UTILITY.dwg (TAV)
Project:
Owner:
Architect:
70 Franklin Street
Boston, MA 02110
t. 617.350.7900
f. 617.350.0051
Job No.:
Drawn By:
Checked By:
Date:
Scale:
Drawing Title:
Drawing No.:
MassDOT-AD Job No.:
2019-FMA-16-SAAB
Issued For:
Civil Engineer:
Airport Solutions Group, LLC
39 Winn Street
Burlington, MA 01803
t. 781.491.0083
f. 781.491.0360
Structural/MEP/FP Engineer:
Arup USA, Inc.
t. 617.864.2987
f. 617.864.6178
Geotechnical Engineer:
GZA GeoEnvironmental, Inc.
249 Vanderbilt Avenue
Norwood, MA 02062
t. 781.278.3700
f. 781.278.5701
Landscape Architect:
Landworks>Studio Inc.
83 North Street
Salem, MA 01970
t. 617.426.3030
f. 617.426.3033
Westcoat Drive
East Taunton, MA 02718
Taunton Municipal Airport,
New Administration Building
The City of Taunton
141 Oak Street
Taunton, MA 02780
Survey & Sewer Engineer:
Nitsch Engineering
2 Center Plaza
Boston, MA 02108
t. 617-338-0063
f. 617-338-6472
1098-06
20 June 2019
Bid Docs
No. Date Revision
60 State Street, 10th Floor
Boston, MA 02109
EXIST. VERNAL POOL
100' VERNAL POOL BUFFER ZONE
AIRPORT PROPERTY LINE
RUNWAY 14-32
TAXIWAY A
EXIST. HANGAR (TYP.)
MAT
CH L
INE
- SE
E SH
EET
C-11
MAT
CH L
INE
- SE
E SH
EET
C-13
N
GRAPHIC SCALE
0' 30' 60' 120'
1 7-19-19 ADDENDUM 3
REMOVED WATER LINE2
2 8-21-19 ADDENDUM 5
2
N.I.C.
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
EXIST. DRAINAGE MANHOLERIM=37.30INV=33.06 (IN)
INV=33.06 (OUT)
EXIST. CONC. HEADWALL
INV.=33.20
(2) 15" RCP CULVERT
EXIST. CONC. HEADWALLINV=33.00
1
0
0
'
1
0
0
'
1
0
0
'
100'
1
0
0
'
2
5
'
2
5
'
2
5
'
25'
2
5
'
2
5
'
25'
25'
2
5
'
2
5
'
2
5
'
25'
25'
2
5
'
25'
25'
1
0
0
'
1
0
0
'
1
0
0
'
1
0
0
'
1
0
0
'
100'
1
0
0
'
1
0
0
'
1
0
0
'
1
0
0
'
100'
100'
1
0
0
'
100'
100'
25'
2
5
'
2
5
'
2
5
'
2
5
'
2
5
'
1
0
0
'
1
0
0
'
1
0
0
'
10
0'
1
0
0
'
1
0
0
'
C-13
UTILITY PLAN(3 OF 3)
1" = 60'
TAVSJR
8/21/2019 2:51:49 PM \\asg2012\CompanyData\ASG Data\Projects\PVT - Fennick McCredie\120-007 MassDOT Construct Bldgs - TAN Taunton\CADD\95 CONSTRUCTION SUBMISSION\120-007 SHEET_UTILITY.dwg (TAV)
Project:
Owner:
Architect:
70 Franklin Street
Boston, MA 02110
t. 617.350.7900
f. 617.350.0051
Job No.:
Drawn By:
Checked By:
Date:
Scale:
Drawing Title:
Drawing No.:
MassDOT-AD Job No.:
2019-FMA-16-SAAB
Issued For:
Civil Engineer:
Airport Solutions Group, LLC
39 Winn Street
Burlington, MA 01803
t. 781.491.0083
f. 781.491.0360
Structural/MEP/FP Engineer:
Arup USA, Inc.
t. 617.864.2987
f. 617.864.6178
Geotechnical Engineer:
GZA GeoEnvironmental, Inc.
249 Vanderbilt Avenue
Norwood, MA 02062
t. 781.278.3700
f. 781.278.5701
Landscape Architect:
Landworks>Studio Inc.
83 North Street
Salem, MA 01970
t. 617.426.3030
f. 617.426.3033
Westcoat Drive
East Taunton, MA 02718
Taunton Municipal Airport,
New Administration Building
The City of Taunton
141 Oak Street
Taunton, MA 02780
Survey & Sewer Engineer:
Nitsch Engineering
2 Center Plaza
Boston, MA 02108
t. 617-338-0063
f. 617-338-6472
1098-06
20 June 2019
Bid Docs
No. Date Revision
60 State Street, 10th Floor
Boston, MA 02109
MAT
CH L
INE
- SE
E SH
EET
C-12
100' VERNAL POOL BUFFER ZONE
100' WETLANDBUFFER ZONE (TYP.)
25' WETLAND BUFFER ZONE (TYP.)
EXIST. WETLANDS (TYP.)AIRPORT PROPERTY LINE
RUNWAY 14-32
TAXIWAY A
EXIST. ACCESS ROAD
S. PRECINCT ST.
CASWELL ST.
N
GRAPHIC SCALE
0' 30' 60' 120'
1 7-19-19 ADDENDUM 32 8-21-19 ADDENDUM 5
REMOVED WATER LINE2
2
N.I.C.
12"
LIMITS OF TRENCHEXCAVATION
FINISHED GRADE
NEW OREXISTINGUTILITY
A
A
FILL FROM UNDISTURBEDEARTH TO MID-DIAMETER
OF NEW OR EXISTINGUTILITY IN ACCORDANCE
WITH SPECIFICATIONS
MIN
.
TYPICAL UTILITY CROSSING DETAIL(DOES NOT APPLY TO ELECTRICAL CONDUIT)
SCALE: N.T.S.
NEW OR EXISTINGUTILITY
COMPACTED EARTH
NEW OREXISTINGUTILITY
SECTION A-A
CONCRETE ENCASEMENT DETAILSCALE: N.T.S.
WATER LINE
SANITARY SEWER OR STORM DRAIN
WAT
ER L
INE
SANITARY SEWER OR STORM DRAIN
A
A10
' MIN
.(T
YP.)
SANITARY SEWER OR STORM DRAIN
SECTION A-A
SECTION B-B
3" SANDBORROW
WATER LINE
12" MIN. CONCRETEENCASEMENT TYP.
ALL AROUND
12" MIN. CONCRETEENCASEMENT TYP.
ALL AROUND
PROTECT WATERMAIN WITH 30LBFELT ROOFINGPAPER PRIOR TOPLACING CONRETE
PLAN
PLAN
12" MIN. CONCRETEENCASEMENT TYP.
ALL AROUND
B
B
8" DI (TYP.)WATER MAIN
FINISHED GRADE
ACCESS TUBE
MASONRY RING
8" GATE VALVE
VALVE BOX AND COVER
RESTRAINED JOINTSFOLLOWER GLANDS.
8" DI GATE VALVE DETAILSCALE: N.T.S.
8" DI PIPE
C-21
CIVIL DETAILS(7 OF 10)
TAVSJRN.T.S.
8/6/2019 1:43:22 PM \\asg2012\CompanyData\ASG Data\Projects\PVT - Fennick McCredie\120-007 MassDOT Construct Bldgs - TAN Taunton\CADD\95 CONSTRUCTION SUBMISSION\120-007 SHEET_DETAILS.dwg (TAV)
Project:
Owner:
Architect:
70 Franklin Street
Boston, MA 02110
t. 617.350.7900
f. 617.350.0051
Job No.:
Drawn By:
Checked By:
Date:
Scale:
Drawing Title:
Drawing No.:
MassDOT-AD Job No.:
2019-FMA-16-SAAB
Issued For:
Civil Engineer:
Airport Solutions Group, LLC
39 Winn Street
Burlington, MA 01803
t. 781.491.0083
f. 781.491.0360
Structural/MEP/FP Engineer:
Arup USA, Inc.
t. 617.864.2987
f. 617.864.6178
Geotechnical Engineer:
GZA GeoEnvironmental, Inc.
249 Vanderbilt Avenue
Norwood, MA 02062
t. 781.278.3700
f. 781.278.5701
Landscape Architect:
Landworks>Studio Inc.
83 North Street
Salem, MA 01970
t. 617.426.3030
f. 617.426.3033
Westcoat Drive
East Taunton, MA 02718
Taunton Municipal Airport,
New Administration Building
The City of Taunton
141 Oak Street
Taunton, MA 02780
Survey & Sewer Engineer:
Nitsch Engineering
2 Center Plaza
Boston, MA 02108
t. 617-338-0063
f. 617-338-6472
1098-06
20 June 2019
Bid Docs
No. Date Revision
60 State Street, 10th Floor
Boston, MA 02109
1 7-19-19 ADDENDUM 3
2 REMOVED WATER LINE CONFLICT DETAILS
2
2 8-7-19 ADDENDUM 4
E LECTRIC
METAL GUARD RAIL
METAL G
UARD
RAIL
8' HIGH CLF
8' HIGH CLF
8' H
IGH
CLF
8' HIGH C
LF
8' HIGH CLF
GATE
CO
TAUNTON
E LECTRIC
METAL GUARD RAIL
METAL G
UARD
RAIL
8' HIGH CLF
8' HIGH CLF
8' H
IGH
CLF
8' HIGH C
LF
8' HIGH CLF
GATE
CO
WIRING TROUGH FORINCOMING ELECTRICALSERVICE
E02/EE02/E
E02/E
POWER CONNECTION FOR (2) 3HP PUMPS IN PUMPCHAMBER. PROVIDE 3#10 + 1#10G IN 1"C FOR EACH PUMPROUTED UNDERGROUND. DISCONNECT TO BE LOCATEDIN NEMA 3R ENCLOUSURE.
PROVIDE NEW HANDHOLE TO INTERCEPT ANDEXTEND EXISTING POWER, CONTROL ANDDATA WIRING FOR EXISTING FUEL FARM.
PROVIDE (1)2"C. FOR POWER AND (1)1" C. FORCONTROL WIRING ROUTED UNDERGROUNDFROM PUMPS TO CONTROL PANEL LOCATEDIN MECHANICAL ROOM.
DP-1/7,9,11
E04 E04
E01B/E
E01A/E
E01B
E01A/E
E01A
E01A
E01A/E
DP-1/6,8,10
NEW 208V, 3PH, 4-WIRE UTILITY TRANSFORMERBY UTILITY. REFER TO DETAIL 3 FORGROUNDING DETAILS. IN ADDITION, EC SHALLPROVIDE (3) OF THE FOLLOWING PER TMLPSPECIFICATIONS:1. 15kV LOAD BREAK ELBOWS2. PARKING STANDS3. INSULATED CAPS
EC SHALL PROVIDE (3)1/0-AL UNDERGROUNDCONDUCTORS IN A CONCRETE ENCASED DUCTBANKFROM POLE TO TRANSFORMER PAD. ENSURE THATTHERE IS SUFFICIENT SLACK AS NEEDED PER TMLPSPECIFICATIONS. (OVERHEAD PRIMARY ELECTRICALSERVICE FEEDERS BY UTILITY)
NEW SECONDARY ELECTRICALSERVICE FEEDERS. PROVIDE (2)4"C. IN
CONCRETE ENCASED DUCTBANK.REFER TO DWG E-301 FOR ADDITIONAL
INFORMATION.
PROVIDE (2)4" EMPTY CONDUITSWITH PULLSTRINGS FORTELECOMM SERVICE ROUTEDTO NEW TELECOMM ROOM.
E02/E
PROVIDE 2#8, #10G IN 1"C.FOR SITE LIGHTING (TYP.)
HANDHOLE (TYPICAL)
TXMR
E01A/E E04 FIXTURES TO BESPACED 5'-0" ON CENTER ,5'-0" OFFSET FROMVERTICAL SIGNAGE.
S4
S3
S3
S4
S4
S4 S1 S1
S2S2
S2S2
S3
S3
PROVIDE (2) 2" EMPTY CONDUITS WITH PULLSTRING FORSECURITY FIBER AND CITY OF TAUNTON DATA WIRING
ROUTED UNDERGROUND FROM NEW TELECOMM ROOM TOEXTERIOR OF EXISTING SRE BUILDING. CONDUITS SHALL
PENETRATE EXTERIOR WALL OUTSIDE OF EXISTING 2ND FLSECURITY ROOM IN SRE. WIRING BY OTHERS.
EXISTING SREBUILDING
PROVIDE HANDHOLE ADJACENT TO ALLSITE LIGHT POLES (TYPICAL).
HH
HH
REFER TO LIGHTING CONTROL SCHEDULEON DRAWING E-401 FOR CIRCUITING AND
CONTROL ZONE INFORMATION (TYP).
PROVIDE DATA WIRING IN 1"CFROM HANDHOLE TO VEEDER
ROOT LOCATED IN MANAGERSOFFICE 107. REFER TO E-701.
PROVIDE THE FOLLOWING FROM FUEL FARM HANDHOLE TO SREBUILDING (SEE DETAIL #6 ON E-804 FOR ADDITIONAL INFORMATION):1. 2"C FOR FUEL PUMP POWER TO NEW PANEL RP-2 VIA
CONTACTOR IN 2ND FL SECURITY ROOM IN SRE.2. 1"C FOR EMERGENCY STOP AND FUEL CABINET LIGHT POWER
TO NEW PANEL RP-2 IN 2ND FL SECURITY ROOM IN SRE.3. 1"C FOR EMERGENCY STOP SIGNAL TO NEW CONTACTOR IN
2ND FL SECURITY ROOM IN SRE.4. 1"C FOR METER RESET AND HOSE RETRACTOR POWER TO
NEW PANEL RP-2 IN 2ND FL SECURITY ROOM IN SRE.5. 1"C FOR GAS DISPENSER POWER TO NEW PANEL RP-2 IN 2ND
FL SECURITY ROOM IN SRE.6. 1"C FOR DISPENSER SHUT-OFF KEYSWITCH (HEAD END
ROOM) SIGNAL TO FUEL PUMP DISPENSER CONTROL PANEL.7. 1" C FOR DATA WIRING TO EXISTING VEEDER ROOT LOCATED
IN OFFICE IN SRE (TEMPORARY).
SEE NOTE #8
EXISTING CONDUITSTO FUEL FARM
NEW SECONDARY ELECTRICALSERVICE FEEDERS TO EXISTING SRE
BUILDING. PROVIDE 2-1/2"C INCONCRETE ENCASED DUCTBANK.
REFER TO DWG E-301 FOR ADDITIONALINFORMATION.
ADD ALTERNATE #1: GASGENERATOR, REFER TO E-301 FOR
ADDITIONAL INFORMATION.
PROVIDE UNDERGROUND (1)2-1/2"C FORPOWER AND (1)3/4"C FOR CONTROLS FROMGENERATOR TO OUTDOOR ATSs, REFER TODWG E-301 FOR ADDITIONAL INFORMATION.
2
2
1. SITE ELECTRICAL SERVICE
NEWBUILDINGM
PRIMARY (OVERHEAD)T
EXISTING POLE
GRADE
A B C
10' - 0".
SECTION VIEW
D
2. SITE ELECTRICAL DISTRIBUTION:
NEWBUILDING
GRADESECTION VIEWTO SITE LIGHTING
B C
H
LIGHTFIXTUREE
10' - 0".
SCOPE PROVIDED BY
OH PRIMARY N.I.C - BY UTILITYTRANSFORMER N.I.C - BY UTILITYPOLE N.I.C - EXIST. TO REMAIN
CONDUIT ELECTRICALTRENCH/BACKFILL CIVILCONC. DUCTBANK CIVILFEEDERS ELECTRICALHANDHOLE STRUCTURES ELECTRICAL
CONDUIT/RISER ELECTRICALFEEDERS ELECTRICALTRENCH/BACKFILL CIVILMETER N.I.C. - BY UTILITY
POLE RISER - CONDUIT ELECTRICALPOLE RISER - FEEDERS ELECTRICAL
LIGHT FIXTURES ELECTRICALCONCRETE BASE CIVILCONDUIT & WIRING ELECTRICALTRENCHING, EXCAVATION,& BACKFILL CIVIL
A
B
C
D
E
Project:
Owner:
Architect:
70 Franklin StreetBoston, MA 02110t. 617.350.7900f. 617.350.0051
Job No.:
Drawn By:
Checked By:
Date:
Scale:
Drawing Title:
Drawing No.:
MassDOT-AD Job No.:2019-FMA-16-SAAB
Issued For:
Civil Engineer:Airport Solutions Group, LLC39 Winn StreetBurlington, MA 01803
t. 781.491.0083
f. 781.491.0360
Structural/MEP/FP Engineer:Arup USA, Inc.60 State Street, 10th FloorBoston, MA 02109
t. 617.864.2987
f. 617.864.6178
Geotechnical Engineer:GZA GeoEnvironmental, Inc.249 Vanderbilt AvenueNorwood, MA 02062
t. 781.278.3700
f. 781.278.5701
Landscape Architect:Landworks>Studio Inc.83 North StreetSalem, MA 01970
t. 617.426.3030
f. 617.426.3033
Westcoat DriveEast Taunton, MA 02718
Taunton Municipal Airport,New Administration Building
The City of Taunton141 Oak StreetTaunton, MA 02780
Survey & Sewer Engineer:Nitsch Engineering2 Center PlazaBoston, MA 02108
t. 617-338-0063
f. 617-338-6472
1098-06
YE
MC
AS NOTED
ELECTRICAL SITEPOWER & LIGHTINGPLAN
E-011
20 June 2019
Bid Documents
1" = 20'-0"1
ELECTRICAL SITE POWER & LIGHTINGPLAN
GENERAL SHEET NOTES:
1. WIRING TYPE SHOWN FOR EXISTING EQUIPMENT (FUEL FARM, GATECONTROLLER, CARD READERS, SECURITY CAMERA) IS FOR BIDDING PURPOSESONLY. EC SHALL BE RESPONSIBLE FOR VERIFYING ALL ELECTRICALREQUIREMENTS INCLUDING BUT NOT LIMITED TO QUANTITY, LENGTH, TYPE ANDSIZE OF RACEWAYS AND WIRING FOR ALL EXISTING EQUIPMENT.
2. REFER TO CONSTRUCTION DRAWING E-012 FOR GATE POWER SCOPE.
SHEET KEYED NOTES:
1. EC SHALL PROVIDE POWER AND CONTROL WIRING FOR ALL SITE LIGHTING.2. ALL CONDUITS SHALL BE PROVIDED WITH PULL STRING.3. ALL PENETRATIONS THROUGH STRUCTURE SHALL BE LOCATED VERTICALLY
ABOVE THE TOP OF FOOTING AND AT LEAST 2’-0” BELOW THE TOP OF SLAB.LOCATE PENETRATIONS HORIZONTALLY BETWEEN COLUMN FOOTING EXTENTS.FOR MULTIPLE PENETRATIONS, REFER TO STRUCTURAL CONCRETE TYPICALDETAILS FOR MINIMUM SPACING REQUIREMENTS.
4. ALL EXTERIOR LIGHTING CIRCUITS SHALL BE HOMERUN TO PP-1 WITH 2#8, 1#10GIN 1"C. UON.
5. EC SHALL REFER TO CIVIL AND LANDSCAPE PLANS FOR EXACT LOCATIONS FORALL SITE WORK.
6. EC SHALL COORDINATE ALL SITE WORK WITH CIVIL, LANDSCAPE AND GENERALCONTRACTOR.
7. SITE LIGHTING TO BE COORDINATED WITH LANDSCAPE DRAWINGS.8. CONDUITS SHALL BE STUBBED UP EXTERIOR OF EXISTING SRE BUILDING.
CONDUITS SHALL PENETRATE EXTERIOR WALL OUTSIDE OF EXISTING 2ND FLSECURITY ROOM IN SRE. REFER TO DRAWING A-692 FOR ROOM LOCATION.
NTS2
SITE ELECTRICAL DETAIL
No. Date Revision1 2019.07.24 Addendum 32 2019.08.21 Addendum 5
12" = 1'-0"3
UTILITY TRANSFORMER PAD GROUNDINGDETAIL
2
E LECTRIC
8' HIGH CLF
8' HIGH CLF
8' H
IGH
CLF
GATE
CO
TAUNTON
E LECTRIC
8' HIGH CLF
8' HIGH CLF
8' H
IGH
CLF
GATE
CO
E LECTRIC
8' HIGH CLF
8' HIGH CLF
8' H
IGH
CLF
GATE
CO
TAUNTON
E LECTRIC
8' HIGH CLF
8' HIGH CLF
8' H
IGH
CLF
GATE
CO
EXISTING GATE CONTROLLER & (2) CARDREADERS (GATE #1). GATE CONTROLLER TO BEBACKED UP BY NEW BATTERY, HYINVERTER.
EXISTING CONDUITS FOR POWER AND LOW-VOLTAGEWIRING TO GATE CONTROLLER AND CARD READERS(GATE #1) TO BE REUSED FOR NEW GATE CONTROLLER.
EXISTING SREBUILDING
HH
EXISTING POLE MOUNTED SECURITYCAMERA.EXISTING HANDHOLE. INTERCEPT AND EXTEND
EXISTING POWER WIRING FOR GATECONTROLLER TO NEW GATE CONTROLLER &
SECURITY CAMERA AND LOW-VOLTAGE WIRINGFOR REUSED EXISTING CARD READERS.
HH
EXISTING CONDUIT FOR POWERWIRING TO SECURITY CAMERA.
NEW PEDESTRIAN GATE (GATE#2) LOCATION.CONTRACTOR SHALL RELOCATE (2) CARD
READERS AND ELECTRIC LATCH FOR PED GATE(GATE #2) TO NEW LOCATION. PROVIDE (1)1"CFOR TWO (2) SETS OF 3#12 CU LOW-VOLTAGE
WIRING TO HANDHOLE.
EXISTING PED GATE (GATE #2) WITHKEYCARD SYSTEM TO BE REMOVED ANDRELOCATED. CONTRACTOR SHALLDISCONNECT ALL ASSOCIATED WIRING ANDEXTEND TO NEW LOCATION. ANY UNUSEDEXISTING CONDUIT SHALL BE DEMOLISHEDAND REMOVED.
NEW CONDUIT TO NEW PED GATE(GATE #2) LOCATION. CONDUIT TYPE
AND SIZE SHALL MATCH EXISTING.
NEW SURFACE MOUNTED "HYINVERTER AC", FROMHYSECURITY, TO BE LOCATED NEAR GATE OPERATORFOR BATTERY BACK-UP. PROVIDE A 30AWEATHERPROOF DISCONNECT SWITCH AT THEINCOMING AC INPUT AND OUTPUT FROM THE ACPOWER SUPPLY IN THE HYINVERTER. COORDINATEINTERCONNECTION REQUIREMENTS WITHMANUFACTURER, HYSECURITY, AND LOCATION WITHARCHITECT PRIOR TO INSTALLATION.
SEE NOTES#1 & 2
SEE NOTES#3 & #4.
EXISTING SREBUILDING
HH
EXISTING HANDHOLE. INTERCEPT AND EXTENDEXISTING POWER WIRING FOR GATE
CONTROLLER & SECURITY CAMERA AND LOW-VOLTAGE WIRING FOR CARD READERS.
HH
NEW PEDESTRIAN GATE LOCATION. CONTRACTORSHALL RELOCATE (2) CARD READERS AND ELECTRICLATCH FOR PED GATE (GATE #2). PROVIDE (1)1"CFOR TWO (2) SETS OF 3#12 CU LOW-VOLTAGEWIRING TO HANDHOLE.
EXISTING PED GATE (GATE #2) WITHKEYCARD SYSTEM TO BE REMOVED ANDRELOCATED. CONTRACTOR SHALLDISCONNECT ALL ASSOCIATED WIRING ANDEXTEND TO NEW LOCATION. ANY UNUSEDEXISTING CONDUIT SHALL BE DEMOLISHEDAND REMOVED.
NEW CONDUIT TO NEW PED GATE(GATE #2) LOCATION. CONDUIT TYPEAND SIZE SHALL MATCH EXISTING.
SEE NOTES#1 & 2
EXISTING GATE CONTROLLER & (2) CARDREADERS (GATE #1). GATE CONTROLLER TO BEBACKED UP BY GENERATOR POWER. REFER TOE-301 FOR INTERCONNECTION SCOPE.
EXISTING CONDUITS FOR POWER AND LOW-VOLTAGEWIRING TO GATE CONTROLLER AND CARD READERS(GATE #1) TO BE REUSED FOR NEW GATE CONTROLLER.
EXISTING POLE MOUNTED SECURITYCAMERA.
EXISTING CONDUIT FOR POWERWIRING TO SECURITY CAMERA.
SEE NOTES#3 & #4.
Project:
Owner:
Architect:
70 Franklin StreetBoston, MA 02110t. 617.350.7900f. 617.350.0051
Job No.:
Drawn By:
Checked By:
Date:
Scale:
Drawing Title:
Drawing No.:
MassDOT-AD Job No.:2016-FMA-15-SAAB
Issued For:
Civil Engineer:Airport Solutions Group, LLC
39 Winn StreetBurlington, MA 01803
t. 781.491.0083
f. 781.491.0360
Structural/MEP/FP Engineer:Arup USA, Inc.955 Massachusetts Avenue, 4th FloorCambridge, MA 02139
t. 617.864.2987
f. 617.864.6178
Geotechnical Engineer:GZA GeoEnvironmental, Inc.
249 Vanderbilt AvenueNorwood, MA 02062
t. 781.278.3700
f. 781.278.5701
Landscape Architect:Landworks>Studio Inc.112 Shawmut Avenue, Studio 6BBoston, MA 02118
t. 617.426.3030
f. 617.426.3033
Sewer Engineer:Nitsch Engineering2 Center PlazaBoston, MA 02108
t. 617-338-0063
f. 617-338-6472
246 South Meadow RoadPlymouth, MA 02360
Plymouth Municipal Airport,New Administration Building
The Town of Plymouth11 Lincoln StreetPlymouth, MA 02360
Survey Engineer:Nitsch Engineering2 Center PlazaBoston, MA 02108
t. 617-338-0063
f. 617-338-6472
1098-06
YE
MC
ELECTRICAL GATESITE POWER PLAN
E-012
20 June 2019
Bid Documents
AS INDICATED
No. Date Revision1 2019.08.21 Addendum 5
1" = 20'-0"1
BASE SCOPE: ELECTRICAL GATE POWERSITE PLAN
1" = 20'-0"2
ADD ALTERNATE #1: ELECTRICAL GATEPOWER SITE PLAN 1
GENERAL SHEET NOTES:
1. WIRING TYPE SHOWN FOR EXISTING EQUIPMENT (FUEL FARM, GATE CONTROLLER, CARD READERS, SECURITYCAMERA) IS FOR BIDDING PURPOSES ONLY. EC SHALL BE RESPONSIBLE FOR VERIFYING ALL ELECTRICALREQUIREMENTS INCLUDING BUT NOT LIMITED TO QUANTITY, LENGTH, TYPE AND SIZE OF RACEWAYS AND WIRINGFOR ALL EXISTING EQUIPMENT.
2. REFER TO CONSTRUCTION DRAWING E-011 FOR OVERALL SITE POWER AND LIGHTING SCOPE.
SHEET KEYED NOTES:
1. PROVIDE (2) SETS OF 2#10 & 1#10G IN (1) 2"C FOR GATE (20A/2P) AND CAMERA (20A/1P) POWER CIRCUITED TOEXISTING 100A GATE POWER SUB-PANEL IN 1ST FL HEAD-END ROOM IN SRE BUILDING. PROVIDE (1) 20A/2P AND (1)20A/1P CIRCUIT BREAKER IN 100A GATE POWER SUB-PANEL IN EXISTING SPACE. CIRCUIT BREAKERS SHALL MATCHEXISTING. REFER TO DRAWING A-692 FOR PANEL LOCATION.
2. PROVIDE (1)1-1/2" CONDUIT WITH (4) SETS OF 3#12 CU LOW-VOLTAGE WIRING FOR (4) CARD READERS AND 3#12 CULOW-VOLTAGE CONTROL WIRING FOR GATE CONTROLLER. WIRING SHALL MATCH EXISTING. TWO (2) CARDREADERS LOCATED AT GATE #1 AND TWO (2) CARD READERS AT GATE #2.
3. CONDUITS SHALL BE STUBBED UP EXTERIOR OF EXISTING SRE BUILDING. CONDUITS SHALL PENETRATE EXTERIORWALL OUTSIDE OF EXISTING 1ST FL HEAD-END ROOM IN SRE. REFER TO DRAWING A-692 FOR ROOM LOCATION.
4. LOW VOLTAGE WIRING FOR CARD READERS AND GATE CONTROLLER SHALL TERMINATE IN GATE CONTROL PANELLOCATED IN 1ST FL HEAD-END ROOM IN SRE.
LEVEL 01
ROOF
LEVEL 01
LEVEL 02
ROOF
PANELDP-1400A
M
PANELPP-1100A
TO NEW 208/120V, 3-PHASE, 4-WIREELECTRICAL SERVICE FROM NEW
UTILITY TRANSFORMER. REFER TOE-011 AND CIVIL PLANS FOR EXACT
ROUTING
INTERIOR EQUIPMENTEXTERIOR EQUIPMENT
DISTRIBUTION &MECHANICALEQUIPMENT
GENERAL POWER& LIGHTING
C115D
(4)600KCMIL - 4"C (XHHW)
WEATHER PROOF UTILITY METER BY UTILITYCOMPANY. PROVIDE METER SOCKET,
MOUNTED ON EXTERIOR OF BUILDING. BONDTO WIRE TROUGH WITH BONDING JUMPER AS
DEPICTED. TYPICAL FOR (2)
LTGEAC
1
PROVIDE 3750VA LIGHTING INVERTER FOREMERGENCY LIGHTING CIRCUITS (LITHONIALIGHTING EAC-LC20-ISS-3750-120/120-OB12-XMBYP OR APPROVED EQUAL BY DUAL LIGHTOR EMERGILITE)
C420D (XHHW)
#4/0 IN 1"C PVC
200%SPAREWAYS
1/4"(D)x4"(W) COPPER BUSSERVICE ENTRANCE
GROUND BUS BAR
CONN
ECT
TO F
OUND
ATIO
NRE
BAR
STEE
L
CONN
ECT
TO M
ETAL
INCO
MING
WAT
ER P
IPE
COMM
UNIC
ATIO
NSGR
OUND
BUS
SEE DETAIL 3/E-801
ATS-AB400A
400A 120/208V, 3-PH, 4-POLE SERVICE-RATED AUTOMATIC TRANSFER SWITCH
IN NEMA 3R ENCLOUSURE (ASCO 300SERIES OR APPROVED EQUAL) PANEL
KP-1200A
M
FWP 200A
WIRING TROUGH WITH UTILITYCOMPANY LOCK PROVISIONS
RESTAURANTTENANT
C230D (XHHW)
GROU
ND R
ING
LOOP
REFE
R TO
DET
AIL 2
/E-8
01AN
D E-
101 F
OR LO
CATI
ON
SERV
ICE
TROU
GH
C55A
LTGLCP
LOW-VOLTAGE RELAY LIGHTINGCONTROL PANEL. REFER TO E-401AND E-802 FOR ADDITIONALINFORMATION.
N E
L
C115D
PROVIDE 60A-2P WITH 50A FUSE, 240V,DOUBLE-THROW MANUAL TRANSFER SWITCH.SEE NOTE 1.
TO NEMA L5-60R OUTLET LOCATED ON THEOUTSIDE OF THE BUILDING, REFER TO E-501.EXACT LOCATION TO BE CONFIRMED IN FIELD.
ELECTRICAL RISER DIAGRAM NOTES:
1. PROVIDE PERMANENT SWITCHING MEANS TO CONNECT TEMPORARY ALTERNATE POWER SOURCE PERNEC 700.3(F). PLACARD SHALL BE PROVIDED AT CONNECTION POINT INDICATING PHASE ROTATION ANDSYSTEM BONDING REQUIREMENTS. INSTALLATION SHALL BE IN FULL COMPLIANCE WITH NEC 700.3.
2. ADD ALTERNATE #1: PROVIDE 60A, 1-PHASE, 120/208V LOAD CENTER AS PART OF GENERATOR PACKAGE.LOAD CENTER SHALL BE MOUNTED WITHIN GENERATOR ENCLOSURE AND SHALL BE USED FORCONNECTIONS TO AUXILIARY EQUIPMENT (I.E. BATTERY CHARGER, HEATER, LIGHTS). PROVIDE ALLCONNECTIONS TO GENERATOR EQUIPMENT AS REQUIRED. ENDOR TO SIZE ALL LOAD CENTERCOMPONENTS AS REQUIRED. REFER TO NOTE 8 FOR ADDITIONAL INFORMATION.
3. NEW 400A ENCLOSED CIRCUIT BREAKER FOR NEW ADMIN BUILDING.4. NEW 200A ENCLOSED CIRCUIT BREAKER FOR EXISTING SRE BUILDING.5. PROVIDE EQUIPMENT GROUND FOR GENERATOR PER NEC 250.6. PROVIDE 3/4" CONDUIT BETWEEN GENERATOR AND ASSOCIATED AUTOMATIC TRANSFER SWITCH FOR
GENERATOR CONTROLS. GENERATOR LOCATION SHALL BE COORDINATED WITH E-011 ANDARCHITECTURAL PLANS. CONDUIT PATHS SHALL BE COORDINATED WITH CIVIL PLANS AND IN FIELD WITHARCHITECT PRIOR TO INSTALLATION.
7. SERVICE ENTRANCE RATED DISCONNECT.8. ADD ALTERNATE #1: 120/208V, 3-PH, 100kVA/80kW GAS STANDBY GENERATOR WITH SOUND ATTENUATING
WEATHERPROOF ENCLOSURE. ADD ALTERNATE PRCING SHALL ONLY INCLUDE THE COST OF THEGENERATOR, ALL OTHER ASSOCIATED CONNECTIONS AND EQUIPMENT SHALL BE CONSIDERED AS PART OFTHE BASE PROJECT.
9. EXISTING WEATHERPROOF 1-PH UTILITY METER TO BE REMOVED AND REPLACED WITH NEW 3-PH UTILITYMETER. CONTRACTOR SHALL COORDINATE REPLACEMENT OF METER WITH TMLP AND COORDINATE ANYSHUT-DOWNS WITH THE OWNER.
C55A
GSP-1
SEE NOTE 2. SEE NOTE 3.
SEE NOTE 5.
(2)C200D
C70B
TO NEWPANEL DP-1
ATS-SRE200A
EXISTING SRE BUILDING
NEW 225A/2P CIRCUIT BREAKERINTEGRAL TO EXISTING SREDISTRIBUTION PANEL TO FEED EXISTINGSINGLE-PHASE.
200A, 208/120V, 3-PH, 4-POLESERVICE-RATED AUTOMATICTRANSFER SWITCH IN NEMA 3RENCLOUSURE (ASCO 300 SERIESOR APPROVED EQUAL)
NEW ADMINISTRATION BUILDING
SEE NOTE 6.
SEE NOTE 7.N
G
N
G
SEE DETAIL 2.
INTERIOR EQUIPMENTEXTERIOR EQUIPMENT
MDP
120/240V1PH 200A
DP-2208/120V3PH 200A
SEE NOTE 8.
EXISTING 1-PHASE FEEDERS TOEXISTING MAIN PANELBOARD TO BEDEMOLISHED.
EXISTING 240/120V, 1-PH, 3-WIRESERVICE FROM UTILITY
EXISTING 240/120V, 1-PHASE SERVICEFEEDERS TO BE DEMOLISHED. CONDUIT
SHALL BE LEFT ABANDONED.CONTRACTOR SHALL COORDINATE ALL
TERMINATIONS REQUIREMENTS WITHTMLP AND COORDINATE ALL SHUT-
DOWNS WITH THE CITY OF TAUNTON.
C200D
SEE NOTE 4.
SEE NOTE 9.
SEE NOTE 6.C200D (XHHW)
C230B
NEW PANELBOARD LOCATED IN EXISTING ITROOM ON SECOND FLOOR. CONTRACTOR
TO COORDINATE EXACT LOCATION WITHINROOM IN FIELD AND WITH ARCHITECT.
TO NEW 208/120V, 3-PHASE, 4-WIREELECTRICAL SERVICE FROM NEW UTILITY
TRANSFORMER. REFER TO E-011 AND CIVILPLANS FOR EXACT ROUTING
(4)3/0 - 2-1/2"C (XHHW)
N
G
UNDERGROUND CONCRETEENCASED CONDUITS, REFER TOE-011.
GATE SUB PANEL120/240V1PH 100A
NEW 20A/2P AND 20A/1P CIRCUITBREAKERS TO BE INSTALLED PERDRAWING E-012, SHEET KEYED NOTE #1.
Project:
Owner:
Architect:
70 Franklin StreetBoston, MA 02110t. 617.350.7900f. 617.350.0051
Job No.:
Drawn By:
Checked By:
Date:
Scale:
Drawing Title:
Drawing No.:
MassDOT-AD Job No.:2019-FMA-16-SAAB
Issued For:
Civil Engineer:Airport Solutions Group, LLC39 Winn StreetBurlington, MA 01803
t. 781.491.0083
f. 781.491.0360
Structural/MEP/FP Engineer:Arup USA, Inc.60 State Street, 10th FloorBoston, MA 02109
t. 617.864.2987
f. 617.864.6178
Geotechnical Engineer:GZA GeoEnvironmental, Inc.249 Vanderbilt AvenueNorwood, MA 02062
t. 781.278.3700
f. 781.278.5701
Landscape Architect:Landworks>Studio Inc.83 North StreetSalem, MA 01970
t. 617.426.3030
f. 617.426.3033
Westcoat DriveEast Taunton, MA 02718
Taunton Municipal Airport,New Administration Building
The City of Taunton141 Oak StreetTaunton, MA 02780
Survey & Sewer Engineer:Nitsch Engineering2 Center PlazaBoston, MA 02108
t. 617-338-0063
f. 617-338-6472
1098-06
YE
MC
NTS
ELECTRICAL SINGLELINE DIAGRAM -SHEET 1
E-301
20 June 2019
Bid Documents
NTS2
ELECTRICAL GROUNDING DIAGRAM
No. Date Revision1 2019.07.24 Addendum 32 2019.08.21 Addendum 5
ELECTRICAL SINGLE LINE DIAGRAM1
NTS
2