Task 6: Short Period Nb3Sn Superconducting Helical Undulator

Jim Clarke/George Ellwood28/11/2012

Page 2: Task 6: Short Period Nb 3 Sn Superconducting Helical Undulator Jim Clarke/George Ellwood 28/11/2012

Contents• Goals• Status• Testing• Schedule

2

Page 3: Task 6: Short Period Nb 3 Sn Superconducting Helical Undulator Jim Clarke/George Ellwood 28/11/2012

3

NbTi Helical Undulator• Final Parameters:

• 215A

• Beam tube ID: 4.7 mm

• Winding ID: 6.35 mm

• Field on axis: 0.86 T

• Margin with this conductor: 30%

Page 4: Task 6: Short Period Nb 3 Sn Superconducting Helical Undulator Jim Clarke/George Ellwood 28/11/2012

(Revised) Goals• To create two identical undulators with Nb3Sn

• 300mm long and direct comparison with previous NbTi undulators

• The same period, diameter, winding groove etc as NbTi

4

Page 5: Task 6: Short Period Nb 3 Sn Superconducting Helical Undulator Jim Clarke/George Ellwood 28/11/2012

Supercon – final wire choice

5

•Field on axis 1.2T 40%> NbTi

•Operating current 720A

•Peak field on conductor 3.5T

Page 6: Task 6: Short Period Nb 3 Sn Superconducting Helical Undulator Jim Clarke/George Ellwood 28/11/2012

Supercon Test Results from CERN

6

• Operating current 720A required

• Wire will quench at <4T

• Not ideal but we will gain useful experience by winding an undulator with this wire

• So, we will wind two 300mm helical undulators and measure their performance in terms of quench, stability, and peak field

Page 7: Task 6: Short Period Nb 3 Sn Superconducting Helical Undulator Jim Clarke/George Ellwood 28/11/2012

Alumina Coating

7

50µm Alumina plasma sprayed coating.

This has been electrically tested to over 1000V without breaking down.

Page 8: Task 6: Short Period Nb 3 Sn Superconducting Helical Undulator Jim Clarke/George Ellwood 28/11/2012

Heat treatment and vacuum impregnation tooling

8

Page 9: Task 6: Short Period Nb 3 Sn Superconducting Helical Undulator Jim Clarke/George Ellwood 28/11/2012

1st Milestone Undulator

9

Now fully fabricated, wound, impregnated and heat treated – ready for tests

Page 10: Task 6: Short Period Nb 3 Sn Superconducting Helical Undulator Jim Clarke/George Ellwood 28/11/2012

10

Page 11: Task 6: Short Period Nb 3 Sn Superconducting Helical Undulator Jim Clarke/George Ellwood 28/11/2012

11

Page 12: Task 6: Short Period Nb 3 Sn Superconducting Helical Undulator Jim Clarke/George Ellwood 28/11/2012

12

Page 13: Task 6: Short Period Nb 3 Sn Superconducting Helical Undulator Jim Clarke/George Ellwood 28/11/2012

13

Page 14: Task 6: Short Period Nb 3 Sn Superconducting Helical Undulator Jim Clarke/George Ellwood 28/11/2012

14

Page 15: Task 6: Short Period Nb 3 Sn Superconducting Helical Undulator Jim Clarke/George Ellwood 28/11/2012

Testing• No suitable test cryostat at RAL• LASA Milan (Giovanni Volpini) have kindly

offered to carry out the tests of both undulators

• Thanks to Amalia/CERN and Frank/KIT for also trying to fit us in!

15

Page 16: Task 6: Short Period Nb 3 Sn Superconducting Helical Undulator Jim Clarke/George Ellwood 28/11/2012

4.3mm diameter bore

Arepoc Hall probe mounted on a carbon fibre rodMaximum diameter 4mm

Page 17: Task 6: Short Period Nb 3 Sn Superconducting Helical Undulator Jim Clarke/George Ellwood 28/11/2012

• Good interaction with LASA• Drawings developed• Interfaces all being considered

17

Page 18: Task 6: Short Period Nb 3 Sn Superconducting Helical Undulator Jim Clarke/George Ellwood 28/11/2012

Schedule• Undulator 1 ready for test now• Undulator 2 ready for test by end December• Both undulators should be tested at LASA by

mid Feb 2013.• Test one after the other ~3 days each• Simple peak B field check with Hall probe and

magnet performance as function of current

18

Page 19: Task 6: Short Period Nb 3 Sn Superconducting Helical Undulator Jim Clarke/George Ellwood 28/11/2012

Summary• We are still on target to achieve our goals by

the end of M48• We have completed the first undulator, fully

impregnated and heat treated• Second undulator to follow shortly• Tests will be carried out at LASA Milan

19

Page 20: Task 6: Short Period Nb 3 Sn Superconducting Helical Undulator Jim Clarke/George Ellwood 28/11/2012

Acknowledgements• Many thanks to our colleagues at LASA, CERN,

KIT and others within HFM without whom we would not have been able to achieve our goals