Approved Date: October 30th, 2020
Version: 1
TANZANIA PUBLIC SECTOR SYSTEMS
STRENGTHENING PLUS (PS3+) ACTIVITY YEAR 1 QUARTER 1 REPORT
JULY 31– SEPTEMBER 30, 2020
The USAID/Tanzania Public Sector Systems Strengthening Plus (PS3+)
The purpose of the USAID Public Sector Systems Strengthening Plus (PS3+) Activity is to provide
technical assistance to support the Government of Tanzania (GOT) to institutionalize public
systems that are responsive to citizens’ needs for quality services at the local level, particularly
for underserved populations. Led by Abt Associates, PS3+ is implemented in partnership with
IMA World Health, the Local Government Training Institute, Management Sciences for Health,
Tanzania Mentors for Action, and the University of Dar es Salaam. This activity covers the period
from July 31, 2020 through July 30, 2025.
Date: October 30, 2020
Contract/Agreement Number: REQ – 621 -20 – 000032
Submitted to: Godfrey Nyombi, USAID/Tanzania
Submitted by: Emmanuel Malangalila, Chief of Party, USAID PS3+
DISCLAIMER
This report is made possible with support from the U.S. President's Emergency Plan for AIDS Relief and the United
States Agency for International Development (USAID.) The contents of this report are the sole responsibility of Abt
Associates and do not necessarily reflect the views of USAID or the United States Government.
C O N T E N T S
Year 1 Quarter 1 Report: July 31–September 30, 2020 October 30, 2020 ▌i
CONTENTS
Acronyms .......................................................................................................................................iii
1. Executive Summary and Achievements ......................................................................... 1
1.1 Key Achievements ................................................................................................................................... 2
2. Operational and Management Activities ........................................................................ 4
2.1 Operational ............................................................................................................................................... 4
2.1.1 Staff Onboarding ....................................................................................................................... 4
2.1.2 Offices ......................................................................................................................................... 4
2.1.3 Procurement .............................................................................................................................. 5
2.2 Management .............................................................................................................................................. 5
2.2.1 Branding and Marking Plan ..................................................................................................... 5
2.2.2 Mobilization Plan ....................................................................................................................... 5
2.2.3 Post-Award Orientation Conference .................................................................................. 6
2.2.4 Coordination with USAID ...................................................................................................... 6
2.2.5 Collaborations ........................................................................................................................... 6
2.2.6 Subcontracts .............................................................................................................................. 7
2.2.7 Work Plan Development ........................................................................................................ 7
2.2.8 Selection of PS3+ Targeted Regions .................................................................................... 7
3. Technical Program ............................................................................................................ 9
3.1 Merged Results (1&3) ............................................................................................................................. 9
3.1.1 System Interoperability and Integrated M&E System (iMES) .......................................... 9
3.1.2 Extend and Institutionalize System User Support ............................................................ 9
3.2 Result 1: Improved Evidence-Based, inclusive Planning and Management at Local Levels ........................................................................................................................................................ 11
3.3 Result 2: Strengthened Local Governance to Promote Citizen Engagement and Social Accountability ............................................................................................................................. 11
3.3.1 Strengthen Citizen Engagement Governance Structures and Inform Citizens ........ 12
3.3.2 Strengthen Citizen and Private Sector Engagement in Planning and Budgeting
Processes .................................................................................................................................. 13
3.3.3 Strengthen Citizen input to PFM oversight and accountability ................................... 14
3.4 Result 3: Increased Efficiency in the Collection and Use of Financial Resources .................. 15
3.4.1 Enhance Health DFF and Introduce SNHI ........................................................................ 16
3.4.2 Improve Financial Reports and Data Analysis, Resource Tracking, and Incorporate into Undergraduate/Graduate Curriculum ............................................... 16
3.5 Communications .................................................................................................................................... 17
3.6 Monitoring, Evaluation, and Learning ................................................................................................ 18
3.7 Challenges ............................................................................................................................................... 18
3.7.1 General Elections in Tanzania .............................................................................................. 18
3.7.2 COVID-19 ................................................................................................................................ 19
C O N T E N T S
Year 1 Quarter 1 Report: July 31–September 30, 2020 October 30, 2020 ▌ii
LIST OF TABLES
Table 3. PS3+ Subcontractor Roles............................................................................................................................... 7
Table 4. List of Individuals Consulted at PO-RALG and LGA Level ................................................................... 12
Table 5. List of People and NGOs Consulted .......................................................................................................... 13
Table 6. List of Individuals Consulted ......................................................................................................................... 14
Table 7. List of Individuals Contacted ......................................................................................................................... 15
A C R O N Y M S
Year 1 Quarter 1 Report: July 31–September 30, 2020 October 30, 2020 ▌iii
ACRONYMS
CDC Centers for Disease Control and Prevention
CO Contracting Officer
COP Chief of Party
COR Contracting Officer’s Representative
CSO Civil Society Organizations
DFF Direct Facility Financing
DP Development Partner
D4D Data for Development USAID Project
FFARS Facility Financial Accounting and Reporting System
FGC Facility Governing Committee
GOT Government of Tanzania
GOTHOMIS Government of Tanzania Health Operations Management Information System
HLG Higher Local Government
HR Human Resources
HIM Health Information Mediator
ICT Information, Communication and Technology
iMES Integrated Monitoring and Evaluation System
IMA IMA World Health
LGA Local Government Authority
LGTI Local Government Training Institute
LGRCIS Local Government Revenue Collection Information System
LLG Lower Level Government
MSH Management Sciences for Health
MELP Monitoring, Evaluation, and Learning Plan
MOALF Ministry of Agriculture, Livestock, and Fishing
MOEST Ministry of Education, Science, and Technology
MOFP Ministry of Finance and Planning
MOHCDGEC Ministry of Health, Community Development, Gender, Elderly, and Children
MUSE Mfumo wa Ulipaji Serikalini
NBC National Business Council
A C R O N Y M S
Year 1 Quarter 1 Report: July 31–September 30, 2020 October 30, 2020 ▌iv
NGO Non-governmental organization
NHA National Health Accounts
NHIF National Health Insurance Fund
OR Operational Research
PEPFAR President's Emergency Plan for AIDS Relief
PFM Public Financial Management
PHC Primary Health Care
PlanRep Planning and Reporting System
POPSMGG President’s Office, Public Service Management and Good Governance
PO-RALG President’s Office for Regional Administration and Local Government
PS3+ Public Sector Systems Strengthening Plus
SNHI Single National Health Insurance
TCCIA Tanzania Chamber of Commerce and Industries
TMA Tanzania Mentors for Action
UDSM University of Dar es Salaam
USAID United States Agency for International Development
1 . E X E C U T I V E S U M M A R Y A N D A C H I E V E M E N T S
Year 1 Quarter 1 Report: July 31–September 30, 2020 October 30, 2020 ▌1
1. EXECUTIVE SUMMARY AND ACHIEVEMENTS
The purpose of the USAID Public Sector Systems Strengthening Plus (PS3+) Activity is to provide
technical assistance to support the Government of Tanzania (GOT) to institutionalize public
systems that are responsive to citizens’ needs for quality services at the local level, particularly
for underserved populations. The PS3+ Activity is a five year activity (July 2020– July 2025) led
by Abt Associates, in partnership with IMA World Health, Local Government Training Institute
(LGTI), Management Sciences for Health (MSH), Tanzania Mentors for Action (TMA), and
University of Dar es Salaam (UDSM).
The PS3+ Activity has three expected results.
Result 1, Improved evidence-based, inclusive planning and management at local levels, is centered
on strengthening and increasing interoperability between key management systems, extending
and enabling sectors beyond health and education to use them, and institutionalizing capacity
in system use for day-to-day operations.
Result 2, Strengthened local governance to promote citizen engagement and social
accountability, consists of:
strengthening the capacity of local level governance structures to engage communities in
planning, demanding feedback, and providing oversight for public financial management
( PFM) and public sector services;
mobilizing more citizens to engage in these processes; and
creating resilient links between communities and governance structures to
institutionalize citizen engagement, social accountability, and stewardship roles.
Result 3, Increased efficiency in the collection and use of financial resources, focuses on:
strengthening access to and interoperability between core systems used for financial
management in the public sector;
extending access to systems that underpin efficient human resource (HR) management;
and
extend output-based financing beyond health. In health, the Activity will support
implementation of social national health insurance (SNHI), increasing facility autonomy
to generate and use revenue to improve services. In addition, PS3+ will help the GOT
transition troubleshooting to Regional Help Desks to support system use and
implementation of payment reforms.
1 . E X E C U T I V E S U M M A R Y A N D A C H I E V E M E N T S
Year 1 Quarter 1 Report: July 31–September 30, 2020 October 30, 2020 ▌2
The PS3+ results and sub-results will feed directly into USAID/Tanzania’s Country Development
Cooperation Strategy, IR 3.2, Government Delivery of Services Improved, and subsequently into
Development Objective 3, Effective Democratic Governance Improved. PS3+ results and sub-
results will also benefit indirectly Development Objective 1, Tanzanian Women and Youth
Empowered, and Development Objective 2, Inclusive Broad-Based Economic Growth Sustained.
This quarterly performance report covers the period from July 31- September 30, 2020, which
corresponds to the fourth quarter of the USAID FY2020. The activities conducted during this
quarter were primarily start-up and mobilization activities, both technical and administrative. The
report summarizes significant achievements, program performance, and key challenges
encountered to date.
1.1 Key Achievements
Building on the vast in-country experience and relationships built overtime with GOT and other
stakeholders, PS3+ got off to a rapid start-up following the contract execution on July 31, 2020.
The Activity was successful in quickly mobilizing key management, administration and technical
staff to assist with the start-up processes including quick start technical activities as well as the
development of contractual deliverables. The technical leadership was hired within the first 30
days. The majority of technical and administration staff recruited were from its predecessor PS3,
allowing the Activity to quickly begin activities and establish momentum.
A post-award meeting was held on September 30, 2020 with USAID/Tanzania and Abt Associates,
followed by weekly meetings each Friday with the Contracting Officer Representative (COR). As
part of the quick start, PS3+ staff engaged GOT counterparts, mostly virtually due to COVID19,
in preliminary dialogue to exchange expectations and solicit their input in the development of the
Year 1 work plan. PS3+ and USAID worked together to develop and share letters of introduction
with key government ministries, and developed a Memorandum of Understanding (MOU) to
present to President’s Office for Regional Administration and Local Government (PO-RALG).
During this period, PS3+ submitted the following key contract deliverables: Mobilization Plan
covering the first 60 days of implementation, PS3+ Branding and Marking Plan, PS3+ Monitoring,
Evaluation and Learning Plan (MELP). USAID and PS3+ also selected the 13 targeted regions
where the Activity will implement focused interventions (Result Area 2 activities), in addition to
the nationwide interventions including Zanzibar (Result Area 1 and 3 activities). During this
quarter, USAID approved the Mobilization Plan, Branding and Marking Plan, and selection of
targeted regions for Result 2 activities.
On the administrative side, PS3+ identified a suitable office location and space in Oyster Bay,
Msasani Road, off Haile Selassie Rd, Plot No. 1132, Dar es Salaam. PS3+ developed a COVID 19
Policy consistent with the most recent USAID/Tanzania COVID 19 guidance to allow for safe
1 . E X E C U T I V E S U M M A R Y A N D A C H I E V E M E N T S
Year 1 Quarter 1 Report: July 31–September 30, 2020 October 30, 2020 ▌3
partial office opening. Bank accounts specific for PS3+ were opened with a local bank, a foreign
currency account (US dollars) and a current account in Tanzanian Shilling (TZS).
2 . O P E R A T I O N A L A N D M A N A G E M E N T A C T I V I T I E S
Year 1 Quarter 1 Report: July 31–September 30, 2020 October 30, 2020 ▌4
2. OPERATIONAL AND MANAGEMENT ACTIVITIES
This section summarizes the progress made during this quarter in implementing administrative
and management activities as listed in the Activity’s mobilization plan to ensure a rapid and
effective start-up.
2.1 Operational
2.1.1 Staff Onboarding
PS3+ was successful in quickly mobilizing key management, administration and technical staff to
assist with the start-up processes and quick start technical activities. This task was facilitated by
the fact that the majority of technical and administration staff recruited were from the
predecessor PS3. PS3+ is able to leverage their strong relationships built with government and
local stakeholders under PS3 to facilitate quick start activities and maintain the momentum of
core systems strengthening work. By the end of the reporting period, 72% of all head office staff
were successfully hired and the remaining staff will join in October 2020.
2.1.2 Offices
The lease for the PS3+ Head Office in Dar es
Salaam was executed in early September 2020. It
was selected for its location in a low-traffic area and
bigger office surface to accommodate COVID19
social distancing protocols. The office is located in
Oyster Bay, Msasani Rd, off Haile Selassie Rd, Plot
no 1132. The office configuration meets COVID19
regulations, while its locations position our staff
expertise and capability optimally for effective
support to GOT systems at all levels. The Dar es
Salaam PS3+ Head Office serves as our operational
headquarters to liaise with USAID/implementing
partners, lead policy dialogue with GOT
stakeholders, and provide technical and
administrative leadership and oversight to the program. However, while the office space is ready
for use (compartment completed, partial equipment/furniture delivered, and generators
installed), PS3+ staff members are required to work from home due to the COVID19 pandemic,
unless they have a compelling reason to go to the office. Only essential senior staff (Chief of
Party, F&A Director), accounting, operations and IT staff, are allowed to go to the office for tasks
requiring their presence. Other staff must request prior approval to go into the office per the
PS3+ COVID19 policy which is in line with Abt Associate’s requirements.
2 . O P E R A T I O N A L A N D M A N A G E M E N T A C T I V I T I E S
Year 1 Quarter 1 Report: July 31–September 30, 2020 October 30, 2020 ▌5
The process of establishing regional offices has started with the National Program Office based
in Dodoma. Our partner TMA has identified a space for PS3+ in their office building which is
currently being equipped. The National Program Office house national level staff and will be used
as PS3+ cornerstone for subnational activities. It also serves as a “touch-down station” for staff
that travel (as necessary and subject to COVID19 policies) to Dodoma from Dar es Salaam to
work with the GOT.
As for other regional cluster offices, PS3+ is awaiting the Activity official launch and formal
introduction to subnational government counterparts by PO-RALG to start engaging regional
governments to provide office space for PS3+ team members. The proposed four other regional
offices include Lake (Mwanza), Western (Kigoma), Highlands (Iringa) and Southern (Mtwara)
regions.
2.1.3 Procurement
A procurement plan was developed, submitted and approved by USAID/Tanzania. Utilities and
proper security systems have been established. Abt issued public tenders to procure all necessary
items, including IT equipment and office communications systems, office furniture and equipment,
and vehicles which are expected to be complete in November 2020.
2.2 Management
In Y1Q1 PS3+ completed the following activities in order to meet the contractual deliverables
due this quarter and to enable the operational and technical implementation activities.
2.2.1 Branding and Marking Plan
On August 5, 2020, PS3+ submitted the PS3+ Activity Branding and Marking Plan describing how
the Activity will be named, positioned, promoted, and communicated to the public so as to
guarantee that funds for activities are appropriately understood to be “from the American
People”. The Branding and Marking Plan outlines the public communications, Activity materials,
and other items that will visibly bear the Activity name. The Branding and Marking Plan was
approved by USAID/Tanzania on August 10, 2020.
2.2.2 Mobilization Plan
On August 13, 2020, PS3+ submitted the Activity mobilization plan describing key start-up
activities, both technical and administrative, for the first 60 days of implementation. The
Mobilization Plan includes the identification of quick start activities ought to be undertaken prior
to the development of the Year 1 work plan. The Mobilization Plan was approved by
USAID/Tanzania on August 31, 2020.
2 . O P E R A T I O N A L A N D M A N A G E M E N T A C T I V I T I E S
Year 1 Quarter 1 Report: July 31–September 30, 2020 October 30, 2020 ▌6
2.2.3 Post-Award Orientation Conference
On September 3, 2020, USAID held a post-award orientation conference with PS3+ through a
virtual session, via Google Meet, due to the COVID19 pandemic. The conference was attended
by Dennis Foster, PS3+ Contracting Officer (CO), Godfrey Nyombi, Contracting Officer
Representative (COR), other senior officials of the USAID mission in Tanzania, as well as Abt
Associates staff. In total, 25 participants attended the orientation conference. The objective of
the conference was to present an overview of the Task Order and conduct the post award
orientation to PS3+ Activity. Topics discussed included: VAT reimbursement process, work
permits, overview of import and tax challenges, MOUs, assistance to law enforcement and USAID
legal restrictions, gender compliance, Branding & Marking, M&E and data quality assessments,
environmental compliance, payment process, and financial management (Financial Reporting
(SF1034), accrual reports, taxes and compliance, and financial reviews and audit).
A post-award orientation package containing key reference documents was shared with PS3+ to
serve as a reference during implementation.
2.2.4 Coordination with USAID
In order to ensure close collaboration and coordination with USAID, the PS3+ senior
management team meets weekly on Fridays with the COR team to discuss programmatic and
technical developments. These meetings have been very helpful in providing client expectations
and guidance, implementation status of activities (progress made and challenges), and an avenue
for forging together proactive solutions.
On September 23, 2020 USAID sent letters of introduction of the new Activity PS3+ to GOT
counterpart ministries, including PO-RALG, President’s Office, Public Service Management and
Good Governance (POPSM), Ministry of Education, Science, and Technology (MOEST), Ministry
of Health, Community Development, Gender, Elderly and Children (MOHCDGEC), Ministry of
Finance and Planning (MOFP) and Ministry of Agriculture, Livestock, and Fishing (MOALF). This
has enabled the PS3+ Activity to start engaging with counterparts.
As in the past, PO-RALG is seen as the GOT gateway counterpart. Therefore PS3+ has drafted
a MOU to provide a framework for collaboration with PO-RALG in the implementation of the
PS3+ Activity. The memorandum will be shared with PO-RALG for review and plans will be made
for signing next quarter. As a gateway partner, the memorandum reads that “one of the
responsibilities of PO-RALG is to actively support and facilitate the Project in engaging in policy
dialogue with relevant sector ministries”.
2.2.5 Collaborations
In Y1Q1, PS3+ started engaging other USAID Activities and other DP projects for collaboration.
Such is the case with PHARM Access Foundation and PATH who were contacted in preliminary
2 . O P E R A T I O N A L A N D M A N A G E M E N T A C T I V I T I E S
Year 1 Quarter 1 Report: July 31–September 30, 2020 October 30, 2020 ▌7
landscaping assessment for the near future expansion of PS3+ activities in Zanzibar. The purpose
of the meeting with PHARM Access Foundation and PATH was to learn from their experience
in implementing activities in Zanzibar and assess areas of collaboration.
In the next quarter, PS3+ will conduct a comprehensive mapping of all DP collaborations to
identify linkages creating synergies and maximizing USAID investment and GOT systems
strengthening.
2.2.6 Subcontracts
PS3+ Activity has five subcontractors that comprise its consortium. Abt issued initial 30-day letter
agreements to all partners upon award. At the end of the quarter, subcontract agreements with
TMA and LGTI were executed. Letter agreements for UDSM, IMA World Health and MSH were
extended and Abt is in the process of finalizing contracts with the final subcontractors which
should be fully executed in November 2020.
Table 1. PS3+ Subcontractor Roles
Partner Role
TMA
Dodoma national office and regional office management; liaise with GOT at regional and LGA levels; lead integrated implementation of Result 1, 2, and 3 at regional, LGA and
facility levels.
LGTI Train/mentor government staff and deploy distance learning tools to strengthen LGA staff
management capacity.
UDSM
Lead operations research and data analysis (all RAs); contribute to Result 3 finance
interventions; integrate FFARS, PlanRep, and other national reforms into university
curricula; support LGTI in curriculum development.
IMA World Health
Support citizen engagement and community mobilization activities under Result 2:
empower facilities, villages/mtaa to increase citizen participation in planning/budgeting, resource management oversight, transparency, and social accountability; improve
evidence-based inclusive planning, management, and payment reform in agriculture,
nutrition, and other sectors.
MSH
Develop, implement, and refine Government of Tanzania Health Operations Management Information System (GOTHOMIS) Standard; extend health information systems (HIS) to
the facility level; integrate vertical HIS step-by-step over time; support system design with
clinical process and analysis expertise.
2.2.7 Work Plan Development
In Y1Q1 technical leads invested much of their time and efforts in the development of the Year
1 Work Plan based on the Task Order mandatory contract activities and virtual discussions with
GOT counterparts. As the Year 1 work plan was developed with limited virtual consultations,
following USAID review of the work plan and its approval, it may need to incorporate some
revisions to accommodate input from GOT counterparts and other stakeholders.
2.2.8 Selection of PS3+ Targeted Regions
PS3+ Activity will implement nationwide and in Zanzibar the activities related to Result 1
(Improved evidence-based, inclusive planning and management at local levels) and Result 3
2 . O P E R A T I O N A L A N D M A N A G E M E N T A C T I V I T I E S
Year 1 Quarter 1 Report: July 31–September 30, 2020 October 30, 2020 ▌8
(Increased efficiency in the collection and use of financial resources.). PS3+ intends to implement
Result 2 activities (Strengthened local governance to promote citizen engagement and social
accountability) in only a selected number of Regions due to the nature and scope of Result 2
activities. In collaboration with USAID, 13 targeted regions were selected based on the priority
regions for current and upcoming USAID and CDC programs. The 13 regions are: Dodoma,
Iringa, Kagera, Kigoma, Lindi, Mara, Mbeya, Morogoro, Mtwara, Mwanza, Njombe, Rukwa, and
Shinyanga.
3 . T E C H N I C A L P R O G R A M
Year 1 Quarter 1 Report: July 31–September 30, 2020 October 30, 2020 ▌9
3. TECHNICAL PROGRAM
This section presents the Activity’s achievements and results in technical start-up activities.
Results are presented per result area and following the Year 1 work plan proposed structure.
3.1 Merged Results (1&3)
There is a substantial overlap between Result 1&3. In order to avoid duplication, and then
differentiate for organization, management and communication purposes, the section of Merged
Results 1&3 was created to recognize the linkages and synergies of activities under Result 1&3.
The Merged Results (1&3) contain all programming and analysis of system interoperability
activities for all systems flowing through GOT information mediators: PO-RALG Muungano
Gateway, MOHCDGEC Health Information Mediator (HIM), MOFP, Enterprise Service Bus
(ESB), and President’s Office Public Service Management and Good Governance (POPSMGG)/e-
Government Agency (e-GA).
In addition, the Merged Results contain all PS3+ activities related to export, data management
and report creation in iMES, while all data/information use by “business process owners” to
improve management and service delivery are contained in Result 1&3 activities.
The Merged Results 1&3 section is placed at the front of the Results sections because the
sequencing of many of its system and interoperability activities are required before Result 1, 2,
and 3 implementation.
3.1.1 System Interoperability and Integrated M&E System (iMES)
PS3+ plans to support the GOT to strengthen and extend interoperability and ensure access to
data in iMES as a key element of systems strengthening and better use of reports and information
in all three results areas.
During Y1Q1, PS3+ supported PO-RALG to renew the iMES domain name and its IP address to
enable online access. The iMES is now accessible at http://imesportal.tamisemi.go.tz
3.1.2 Extend and Institutionalize System User Support
The Help Desk structure, staffing and operations for user support and troubleshooting for key
systems or processes (PlanRep, Facility Financial Accounting and Reporting System (FFARS)
Epicor, Local Government Revenue Collection Information System (LGRCIS), network services,
and general IT) are currently centralized at PO-RALG. There is need to bring user support closer
to the service delivery points (LGA, health facility, school, village/mtaa levels).
3 . T E C H N I C A L P R O G R A M
Year 1 Quarter 1 Report: July 31–September 30, 2020 October 30, 2020 ▌10
The establishment of Regional Help Desks in all 26 Regions and Zanzibar is the primary PS3+
information technology strategy to institutionalize responsibility and capacity for system use,
management, troubleshooting, maintenance and ongoing refinement.
During Y1Q1, PS3+ engaged preliminary virtual discussions with PO-RALG on plans to extend
Help Desk structure to regional level and Zanzibar. An action plan for Year 1 was discussed to
inform the Year 1 work plan. For Year 1, the following activities were identified/validated to
support the extension process. These include:
1. Review Help Desk system to enhance and extend user support structure;
2. Establish core regional Help Desk teams;
3. Extend licenses for the support teams at the regional level;
4. Train regional Help Desk teams in technical support for all core systems;
5. Develop necessary information, communication and technology (ICT) infrastructure in
each region for Help Desk systems; and
6. Deployment of the system, testing and initial support and maintenance at regions.
Next Quarter Activities
Continue engaging in dialogue to develop the strategy and sequencing with PO-RALG to
extend Help Desks to regional level
Dialogue with GOT and DPs on interoperability of systems across sectors
Dialogue with stakeholders on the system requirements to reengineer Muungano Gateway.
This may include: adding additional mediators, configuring data translation services, adding
additional data transport methods, developing dashboards,(e.g. FTP, FHIR), including other
data exchange formats (e.g. Custom, HL7, XML, Csv), and improve error handling and
reporting
Review Help Desk architecture to determine what is needed to enhance and extend user
support structure (refinement of the system, addition of more systems to Help Desk).
For Human Resource Management
Hold discussions with GOT for the strengthening and integration of the Ajira Portal, HSRS
and the Human Capital Management Information System (HCMIS).
Initiate discussions with GOT for the orientation of 13,000 new teachers through distance
learning.
3 . T E C H N I C A L P R O G R A M
Year 1 Quarter 1 Report: July 31–September 30, 2020 October 30, 2020 ▌11
3.2 Result 1: Improved Evidence-Based, inclusive Planning and
Management at Local Levels
Result 1 is centered on strengthening key cross-sectoral interoperable planning, budgeting, and
management systems, extending and enabling sectors beyond health and education to use them,
integrating national and LGA planning and budgeting systems, extending and integrating finance
and HR planning across levels of government, and institutionalizing capacity in system use for day-
to-day operations including prioritizing investments, multi-sectoral planning, health sector
planning, and data analysis, use of reports and management for results.
During Y1Q1 PS3+ conducted a three-day virtual meeting with PO-RALG Directorate of
Information and Communication Technology (DICT) team to identify priority activities for Result
1 to be included in the PS3+ Y1 work plan. Priorities identified include:
Continue to provide technical support to improve and address system issues for core systems
(PlanRep, LGRCIS, Epicor/MUSE, FFARs, GOTHOMIS, iMES, Help Desk etc.)
Support the development of a web-based application to enhance coordination and facilitation
of 10% loans to Women, Youth, and people with disabilities from LGAs own source revenue
with corresponding returns. This application will improve the coordination of the loan
program, enhance verification, validation and registration of qualified loan beneficiaries,
manage loan returns from beneficiaries through an approved LGA account; and facilitate
quarterly and annually accurate reporting.
Next Quarter Activities
Engage in dialogue and brainstorming sessions with GOT on further extension of PlanRep to
lower level government (LLG) including wards and villages/mtaa
Dialogue with GOT and DPs on interoperability of systems across sectors
Engage dialogue for the roll out of GOTHOMIS Version 4 (Lite and Standard) to facilities
which include update of the initially installed 64 facilities to most current stable release and
upgrade of lower version facilities to current stable GOTHOMIS v4
3.3 Result 2: Strengthened Local Governance to Promote Citizen
Engagement and Social Accountability
Result 2 aims at 1) strengthening the capacity of local level governance structures to engage
communities in planning, demanding feedback, and providing oversight for public financial
management (PFM) and public sector services; 2) mobilizing more citizens to engage in these
processes; and 3) creating resilient links between communities and governance structures to
institutionalize citizen engagement, social accountability, and stewardship roles. The focus is on
3 . T E C H N I C A L P R O G R A M
Year 1 Quarter 1 Report: July 31–September 30, 2020 October 30, 2020 ▌12
both the supply side (government institutions) and demand side – citizens including their
representative structures.
The majority of Result 2 activities for Y1Q1 were focused on initial consultations with GOT and
other stakeholders, to establish the ground work for dialogue to map out needs and refine and
identify interventions.
3.3.1 Strengthen Citizen Engagement Governance Structures and Inform Citizens
Realign roles and relationships of LGA, health facility, school and village/mtaa governance
structures in the joint oversight and planning
In Y1Q1, PS3+ engaged in dialogue with the PO-RALG departments responsible for coordinating
and overseeing LGA, village/mtaa, health and school governance structures. This initial
conversation was mainly for the PS3+ to refine understanding on local governance structures,
current changes on policy and practices for local governance and citizen engagement. These initial
conversations were productive in clarifying mandates in terms of relevant people and institutions
to include during the scoping exercise.
The list of individuals consulted is presented in Table 4
Table 2. List of Individuals Consulted at PO-RALG and LGA Level
SN Name of staff Organization Position Relevance
1 Mr. Emmanuel Nyanda PO-RALG-DSC Assistant Director Coordination of private sector, youth
and cross cutting issues
2 Ms. Zaituni Msoffe PO-RALG -DLG Elections Officer LGA, Village/mtaa governance
structures
3 Mr. Mashaka J. Makuka PO-RALG - DLG Administrative Officer LGA structures, relationships, roles
and responsibilities
4 Mr. Avelina Kapologwe PO-RALG - DLG Community Development
Officer
Coordination&; backstopping of LGA community mobilization, youth and
women inclusion
5 Mr. Herbert Ngowi Dodoma CC City Human Resources
Officer Roles/responsibility and LGA
structures; committee meetings
6 Mr. Godlove Swai Mvomero DC VEO Sangasanga village LLG -roles/ responsibilities and
committees
Enable LGA, village/mtaa and facility to share information with citizens.
For this activity, PS3+ focused on reviewing existing documents including the USAID/PS3
Operations Research Facility studies to refine understanding on challenges and needs for LGA,
village/mtaa and facility sharing information with citizens. Information from the document review
informed the Year 1 work plan development process.
3 . T E C H N I C A L P R O G R A M
Year 1 Quarter 1 Report: July 31–September 30, 2020 October 30, 2020 ▌13
3.3.2 Strengthen Citizen and Private Sector Engagement in Planning and
Budgeting Processes
Enhance citizen input to plans and budgets.
In Y1Q1, PS3+ consulted national level nongovernmental organizations (NGOs) working to
support citizens’ access to information from Higher Local Government (HLG), Lower Local
Government (LLG) and service delivery facilities. The purpose of the consultation was to
understand programs and interventions working on the demand side of citizen engagement. The
consultations were productive in helping the team to identify relevant institutions and individuals
for further follow up discussions. Through these initial conversations the team has started building
a mapping of Civil Society Organizations (CSO) strengthening capacity of facility governing
committees to effectively oversee health facility plans and budgets.
The list of people and NGOs consulted is presented in Table 5.
Table 3. List of People and NGOs Consulted
SN Name of Staff Organization Position Relevance
1 Ms. Rehema Tukai KPMG-AcT Deputy Programme
Director
Funds CSOs working on citizens budget
oversight and accountability
2 Mr. Richard Angelo Policy Forum Manager Local
Governance
CSOs Budget Working Group and Local Governance Working Group -SAM
Committees in 4 LGAs
3 Mr. Irenei Kiria Sikika Executive Director
Piloting Social Accountability Models-Score card, works with PO-RALG in 30 LGAs main
challenge support from MoHCDGEC
4 Mr. Israel Illunde Tanzania Youth
Partnership Coalition Executive Director
Youth participation &informal sector inclusion in LGA budgeting works through Policy
Forum in 5 regions Mtwara, Rukwa, Tabora,
Singida, Tanga; Youth Economic
Empowerment
Empower the private sector to effectively participate in LGA and service provider level planning
and budgeting processes.
Activities conducted in this quarter have been mainly to engage in dialogue with relevant
stakeholders to establish the status and identify interventions for empowering the private sector
engagement in planning and budgeting process, targeting business associations and groupings- for
women, youth and people living with disability at district and village/mtaa level in Tanzania. These
dialogues will help inform Year 1 activities and overall private sector strategy.
PS3+ focus in the next quarter will be to solidify the needs identification and to develop private
sector engagement strategies to guide LGA health, education and agriculture services
responsiveness to private sector needs.
The list of individuals consulted is presented in Table 6.
3 . T E C H N I C A L P R O G R A M
Year 1 Quarter 1 Report: July 31–September 30, 2020 October 30, 2020 ▌14
Table 4. List of Individuals Consulted
SN Name of Staff Organization Position Relevance
1 Zachy Mbenna TPSF Director of memberships and
capacity building
Private sector engagement with policy
including budget
2 James Flock USAID NAFAKA II
program ACDI/VOCA COP
Leveraging LGA plans and budgets to respond to private sector role in
agriculture
3 Farida Tesha PO-RALG FP-Co Dodoma City LGA experience in private sector
engagement in planning and budgeting
3.3.3 Strengthen Citizen input to PFM oversight and accountability
During this quarter the PS3+ team focused on exploring roles and responsibilities of GOT in
supporting citizen input to PFM oversight and accountability at LGA and service delivery levels.
During this initial dialogue, the team established contacts with the Directorate of Financial
Inspectorate and Tracking Unit at TAMISEMI. PO-RALG is currently collaborating with CSOs
involved in LGA budget tracking and accountability to institute accountability of direct facility
financing (DFF). Initial contacts have been made with the Acting Director in preparation for the
comprehensive scoping exercise to be completed in YIQ2.
Strengthen public-private dialogue and structures to improve oversight and accountability
The aim of this activity is to establish how the private sector is involved in dialogue with the GOT
to improve oversight and accountability. Initial limited consultations were made, including
dialogue with the Tanzania Chamber of Commerce and Industries (TCCIA), a major institution
facilitating the participation of the Private Sector in development management/issues under the
umbrella of National Business Council (NBC). Key learnings from the discussion with
stakeholders in PPP dialogue include: NBC is replicated at Regional (RBCs) and Districts levels
(DBCs); NBC, RBCs, DBCs are each convened twice yearly; membership is 50:50 between GOT
Officials and Private Sector (led by TCCIA).
The team could not ascertain gender and youth representation for the NBC. DBC Chairpersons
have multiple leadership roles in the Sectors of Commerce, Industries and Agriculture. Both the
public and the private sectors propose agendas for DBC meetings. The agenda may touch any
sector of the economy in the effort to improve or address development bottlenecks.
For Y1Q2, further discussions will be held with additional stakeholders including to deepen our
understanding of the role of private sector in PFM oversight and accountability.
3 . T E C H N I C A L P R O G R A M
Year 1 Quarter 1 Report: July 31–September 30, 2020 October 30, 2020 ▌15
Table 5. List of Individuals Contacted
SN
Name of
Stakeholder Organization Position Relevance
1 Mr. D.T. Ally Gairo LGA LGA Trade Officer LGA response to private sector
needs- business facilitation services
2 Mr. Amini Madulago TCCIA Gairo District
(Private Sector) Chairperson
Role of TCCCIA in PFM oversight
and accountability
3 Samwel, M. Gairo LGA (Public Sector) Planning Officer/
Economist Gairo LGA
Inclusion of private sector needs and interests during LGA planning
and budgeting process
Next Quarter Activities
The next quarter activities will mainly involve continued dialogue with key stakeholders to:
Develop checklist/ guiding questions for a more structured dialogue with stakeholders, in
order to solidify scoping exercises to assess needs and intervention separate
checklists/questionnaires and comprehensive scoping exercises will be developed for:
roles, capacity and functioning of LGA, health and school governance structures in
planning and budget process as per DFF management framework,
status of and gather recommendations for strengthening LGA, village/mtaa, health and
school facilities and agriculture sector roles in sharing information on plans, budget and
services with citizens
citizens and private sector engagement in planning and budgeting including all population,
poor, women and youth at HLG, LLG and service delivery facilities
private sector engagement and citizen engagement in PFM oversight and accountability
at HLG, LLG and service delivery facilities in sharing PFM information with citizens, its
accessibility to citizens and their response in using information to play their PFM
oversight role and improving public-private dialogue at regional, HLG and LLG.
3.4 Result 3: Increased Efficiency in the Collection and Use of Financial
Resources
Under Result 3, PS3+ will strengthen DFF, support implementation of single national health
insurance (SNHI) including contracting with private sector, extend output-based payment to
sectors beyond health, strengthen LGA and service provider revenue collection and expenditure
management, and strengthen systems and processes to improve HR management.
Many of Result 3 activities will build on or benefit from Merged Results 1&3 activities including
system interoperability and Regional Help Desks to support system use and implementation of
payment reforms.
3 . T E C H N I C A L P R O G R A M
Year 1 Quarter 1 Report: July 31–September 30, 2020 October 30, 2020 ▌16
3.4.1 Enhance Health DFF and Introduce SNHI
GOT continues to implement health sector financing reforms that will guarantee access to
affordable health care service to every citizen in the country. The introduction of SNHI under
the leadership of MOHCDGEC is considered to be one of the key reforms that will help to
achieve the objective of equal access to every citizen. Currently the SNHI technical team is
working on defining the SNHI architecture including defining how the funds for the pool will be
collected, how the poor will be financed, how the pool will be organized, what level of minimum
benefit package will be provided and how purchasing of services from the pool will be organized.
During Y1Q1 PS3+ provided technical support to MOHCDGEC for improving development of
SNHI concept paper for discussion within the GOT management, including the Cabinet
Secretariat. Among other tasks that PS3+ supported was to analyze Household Budget Survey
data for financial year 2020 in collaboration with the National Bureau of Statistics in order to
assess population ability to pay different levels of premium contributions that are proposed under
SNHI. Also, PS3+ supported analysis of potential revenue that could be generated if earmarked
tax was allocated on different commodities. This analysis was intended to identify potential fund
sources to finance the poor.
The National Health Insurance Fund (NHIF) has initiated different initiatives to improve its
operation efficiency in delivery of services to its members. Among other interventions include
improving PHC and hospital payment mechanisms by moving from fee-for-service to other more
efficient and strategic provider payment mechanisms. Currently the NHIF scheme has started
with the initiative to improve PHC payment mechanisms.
In Y1Q1 PS3+ provided technical support to NHIF to initiate development of capitation formula
that will be used to pay primary health care facilities. This task was supported through analysis of
previous years’ claims reimbursement to establish the potential budget that will be allocated to
PHC providers. Discussions were also initiated on the inclusion of potential adjustors in the
capitation formula.
3.4.2 Improve Financial Reports and Data Analysis, Resource Tracking, and
Incorporate into Undergraduate/Graduate Curriculum
The MOHCDGEC is currently working to develop 2017/18 National Health Accounts (NHA).
During Y1Q1 PS3+ provided technical support to map national NHA data together with
extraction of NHA tables for their validation by development partners and programs. The
validation task is currently ongoing under the leadership of the MOHCDGEC.
3 . T E C H N I C A L P R O G R A M
Year 1 Quarter 1 Report: July 31–September 30, 2020 October 30, 2020 ▌17
Next Quarter Activities
Continue to provide technical support on the development of different aspects of SNHI
architecture including revising SNHI concept paper based on comments from GOT
management and draft cabinet paper.
Continue to support development of NHIF primary health care (PHC) capitation mechanism
Initiate process to collect cost accounting data for development of hospital payment system
Consult with different stakeholders to review proposed PHC capitation mechanism
Finalize development of DHFF Management Framework
Initiate the process to extend FFARS to village and mtaa level
Support development of NHA
Initiate consultation with GOT on the potential improvement of provider payment
mechanisms for Education, Agriculture and Nutrition sectors
3.5 Communications
PS3+ began developing its Communications Strategy to serve as a plan to guide both internal and
external communication. The strategy will contain three tiers of communications. The first tier
of communications is contractual and involves timely production of contract deliverables. The
second tier of communication is internal and involves sharing information and coordinating to
improve management, stimulate openness and teamwork and ensure efficiency in knowledge
management. The third tier of communications is external with audiences including USG, national
and local government, DPs, key stakeholders and the international community. It will provide a
series of carefully coordinated communication channels and messages promoting GOT and PS3+
achievements, focused on promotion of results and not technical activities.
PS3+ also worked on other documents that will guide the activities implementation. These include
the following:
The development of the PS3+ COVID19 Policy to provide guidance for the partial opening
of the PS3+ office to support implementation and stakeholder engagement. The policy is
consistent with the most recent USAID/Tanzania COVID19 guidance. The mitigation plan
covers measures related to office configuration, personal protection, common areas/cleaning,
and policy for external visitors. The PS3+ team is committed to limiting and mitigating risk of
exposure by utilizing remote activities and communication where possible, and ensuring social
distancing and other measures are practiced during critical on-site activities. The criticality of
events will be assessed using the Risk Assessment Tools shared by USAID/Tanzania, while
duly requests to host on-site activities will be submitted to USAID for approval.
3 . T E C H N I C A L P R O G R A M
Year 1 Quarter 1 Report: July 31–September 30, 2020 October 30, 2020 ▌18
The development of PS3+ Activity reporting templates: technical report, trip report, success
story and PowerPoint template. These templates are expected to provide consistency and
uniformity in the course of communicating the progress made by the Activity.
Next Quarter Activities
Finalization of the communications strategy
Finalization of the landscaping assessment of local communication and public relations
firms/senior consultants and initiate process of contracting out PS3+Activity communications
activities.
Support the dissemination of the final report of USAID Tanzania Cost Efficiency, Revenues
and Expenditure Assessment of Four Public Systems Strengthening Interventions of the
predecessor PS3, conducted by Data for Development (D4D) project.
3.6 Monitoring, Evaluation, and Learning
During this quarter, PS3+ developed the Monitoring, Evaluation and Learning Plan (MELP)
describing how the Activity monitors, tracks, evaluates, analyzes, and reports project results. The
MELP includes guiding principles, mandatory and additional performance indicators, processes
and tools, data sources, data quality assurance (DQA) procedures, and learning including cross-
cutting training and operations research (OR).
The development process involved all PS3+ technical staff both in country and home office. As
the MELP was developed before initiating GOT dialogue and development of Year 1 work plan,
PS3+ may need to incorporate some revisions following USAID approval of Year 1 work plan
and input received from GOT counterparts.
The MEL plan was submitted to USAID/Tanzania on September 15, 2020.
Next Quarter Activities
Conduct the orientation of technical staff on project’s key documents (MELP and reporting
templates)
3.7 Challenges
3.7.1 General Elections in Tanzania
This quarter coincided with general elections in Tanzania expected to be held on October 28,
2020 to elect the President and Parliamentarians. The campaign was officially launched on August
28, 2020. This has had an impact on the project implementation because of difficulties in securing
meetings with high level ministry officials, including signing of the MOU with the government.
In order to mitigate this risk, PS3+ engaged technical staff throughout the election period while
waiting for the elections to be concluded.
3 . T E C H N I C A L P R O G R A M
Year 1 Quarter 1 Report: July 31–September 30, 2020 October 30, 2020 ▌19
3.7.2 COVID-19
Covid-19 has caused disruptions in the day to day implementation of activities with the working
from home policy and restriction of in-person meetings, events, and field activities. This might
slow down our pace of implementation.
In order to mitigate the risk and to be able to partially open the office/activities, PS3+ has put in
place a meeting and travel policy consistent with the most recent USAID/Tanzania COVID19
guidance.