2
Tank Settlement Criteria API 6 5 0 Appe ndix B Che vron SHEL L “Criteria for Settlement of Tanks” From J ourna l of Geote chnical Eng ine ering Division, Proceed ings of the Am erican Society of Civil Engineers , Vol. 108 , Augu st 1 982 Recommended Performance Criteria for Differential Settlement of   Ta nks Al lowable Tank Bottom Dif feren tial Se ttlem e nt 1) For New Tanks with Floating roofs 2) For New Tanks with Fixed roofs D s s  ⎠  ⎞ ⎝ ⎛ + + = Δ 4 4 6 1 . 0 2  where: Δ =Allowab le different ial settlem en t edg e to cen te r of tan k, in. D =Tank diameter, ft: S =Intial bottom slope (pos itive when cone d up ), in/ft Most soils-related d am age to tanks is du e to d iff eren tial settleme nt.  Ta nk (b o tt om) s e tt le me nt As a ge nera l rule, one m ust as sum e that th e tan k center will settle subs tantially more than th e tank edg e be cause of variation i n stress distribution. After settlements due t o hydrostatic testing and a n um ber of years of  operational service, the rem aining m inim um elevation of the ta nk pad me asu red at the p osition of the ta nk wall sha ll be 0.60 m above th e highest floor level of the bunded area. During hydrostatic testing of the tank, 30 to 70% of the total settlement will take place already and the remaining settlements will take place mainly during the first few years when the tank is in operation. Settlements will gradually become less, as can be seen in the typical settlem ent curve below.  MONITORING OF FOUNDATIONS Especially foundations on soft soil and weak rock should be evaluated by monitoring of settlement at intervals of: y 2 to 6 weeks during construction of the superstructure, y 6 months during the first two years after construction/water testing, y 3 to 5 years in the pe riod there after. Duri ng the wa ter test the tank se ttlem ents s hall be m onitored. I f the ma ximum settlem ent of the tank shell during the water test is m ore than 50 mm , the tan k settlem ents sh ould also be monitored during opera tion. three types of differential settlements: y differential settlements along the tank shell y different ial settlem ents be twee n tank centre and perim ete r y overall tilting

Tank Settlement 규정

  • Upload
    hiyeon

  • View
    240

  • Download
    5

Embed Size (px)

Citation preview

7/28/2019 Tank Settlement

http://slidepdf.com/reader/full/tank-settlement- 1/2

Tank Settlement CriteriaAPI 650 Appendix B Chevron SHELL

“Criteria for Settlement of Tanks”

From Journal of Geotechnical Engineering Division, Proceedings of the

American Society of Civil Engineers, Vol. 108, August 1982

Recommended Performance Criteria for Differential Settlement of 

 Tanks

Allowable Tank Bottom Differential Settlement

1) For New Tanks with Floating roofs

2) For New Tanks with Fixed roofs

Dss

⎟⎟

 ⎠

 ⎞

⎜⎜

⎝ 

⎛  ++=Δ

4

461.02

 

where:

Δ =Allowable differential settlement edge to center of tank, in.

D =Tank diameter, ft:

S =Intial bottom slope (positive when coned up), in/ft

Most soils-related damage to tanks is due to differential settlement.

 Tank (bottom) settlement

As a general rule, one must assume that the tank center will settlesubstantially more than the tank edge because of variation in stress

distribution.

After settlements due to hydrostatic testing and a number of years of 

operational service, the remaining minimum elevation of the tank pad

measured at the position of the tank wall shall be 0.60 m above the highest

floor level of the bunded area.

During hydrostatic testing of the tank, 30 to 70% of the total settlement

will take place already and the remaining settlements will take place

mainly during the first few years when the tank is in operation.

Settlements will gradually become less, as can be seen in the typical

settlement curve below. 

MONITORING OF FOUNDATIONS

Especially foundations on soft soil and weak rock should be evaluated by

monitoring of settlement at intervals of:

y  2 to 6 weeks during construction of the superstructure,

y  6 months during the first two years after construction/water testing,

y  3 to 5 years in the period thereafter.During the water test the tank settlements shall be monitored. If the

maximum settlement of the tank shell during the water test is more than 50

mm, the tank settlements should also be monitored during operation.

three types of differential settlements:

y  differential settlements along the tank shell

y  differential settlements between tank centre and perimeter

y  overall tilting

7/28/2019 Tank Settlement

http://slidepdf.com/reader/full/tank-settlement- 2/2