18
TAKENAKA EUROPE GmbH - INTRODUCTION OF POLAND BRANCH

TAKENAKA EUROPE GmbH - INTRODUCTION OF POLAND BRANCH · The “Takenaka way” of quality and reliability of our construction works and services is the basis of our success with our

  • Upload
    others

  • View
    8

  • Download
    0

Embed Size (px)

Citation preview

Page 1: TAKENAKA EUROPE GmbH - INTRODUCTION OF POLAND BRANCH · The “Takenaka way” of quality and reliability of our construction works and services is the basis of our success with our

TAKENAKA EUROPE GmbH - INTRODUCTION OF POLAND BRANCH

Page 2: TAKENAKA EUROPE GmbH - INTRODUCTION OF POLAND BRANCH · The “Takenaka way” of quality and reliability of our construction works and services is the basis of our success with our

10,000+ Employees

2,500+ out of 10,000

Licenced Architects

US$10 B

Annual turnover

400+Years

History

50% of our Projects are

26Branches Worldwide

17 generationsPrivate company Design&Build

Outline of TAKENAKA Corporation

2

Page 3: TAKENAKA EUROPE GmbH - INTRODUCTION OF POLAND BRANCH · The “Takenaka way” of quality and reliability of our construction works and services is the basis of our success with our

Corporation founded Tokyo TowerTOKYO DOME StadiumFirst air supported dome in JapanMaster Builder, Founder Takenaka R&D Institute Kobe Office of Mitsui Bank

1993 2001

Kansai International Airport

20051994 Into the future

Tokyo Opera Cityand New National Theatre

PRADA Boutique

1995

ACROS FukuokaGreen Covering Building

The oldest

construction firm

in Japan

First Sports Facility with Retractable Roof Taiwan Hakka Cultural CenterSapporo Dome “Hiroba”

Working in

abroad over half

century since

1960.

Taiho Shrine in 1847 1st Steel Structure Building1st Prize in Design competition

National Theater

1610 1847 189

9

1962 19731909 1955 19581912 19881969

Japan Antarctic Expedition Founded Takenaka Europe GmbH

“Over 400 years history through trust from clients”

2014

The Tallest Building in Japan “Abeno Harukas”

2012

Outline of TAKENAKA Corporation

National Art Gallery Singapore (Conversion of 100-year building)

3

Page 4: TAKENAKA EUROPE GmbH - INTRODUCTION OF POLAND BRANCH · The “Takenaka way” of quality and reliability of our construction works and services is the basis of our success with our

Katunayake International Airport

Terminal Building

(Construction: JV) 1987

Nadia International Airport

Terminal Building

(Construction: JV) 1980

Kuala Lumpur Int’l Airport

Satellite Building

(Construction: JV) 1998

Int’l Airport Expansion (Ph. 2),

Terminal 3, Concourse 2 &

CarPark

(Construction: JV) 2007

Suvanrnabumi International

Airport

(Construction: JV) 2005

Development of New Bacolod

Airport

(Construction: JV) 2008

Central Japan Int’l Airport

Passenger Terminal Building

(Construction: JV) 2005

Kansai International Airport

Passenger Terminal Building

(Construction: JV) 1994

Hamad International Airport

Emiri (Royal) Terminal,

(Construction: JV) 2013

Abu Dhabi, UAE

Doha, Qatar

Mombasa, Kenya Colombo, Sri Lanka Kuala Lumpur, Malaysia,

Samut Prakan, Thailand Nagoya, JapanOsaka, Japan

Changi International Airport

Terminal 1 extension and new T4

(Construction) 2017 (scheduled)

Changi International Airport

Terminal 1

(Construction) 1981

Singapore

TAKENAKA – Airports worldwide

Singapore

Dubai, UAE Bacolod, Philippines

Manila, Philippines

Bali, Indonesia

Bali International Airport

Terminal Building

(Construction: JV) 1992

Moi International Airport

Terminal Building

(Construction: JV) 1978

Ninoy Aquino Int’l Airport

Terminal 3

(Construction: JV) 2008

4

Page 5: TAKENAKA EUROPE GmbH - INTRODUCTION OF POLAND BRANCH · The “Takenaka way” of quality and reliability of our construction works and services is the basis of our success with our

Carpentry Museum

Japan, 2014Linking tradition with innovation.

Previous museum

since 1984 in Kobe

Since 1984, TAKENAKA

operates an own museum

for carpentry tools and

techniques in Kobe.

It moved 2014 to a newly

designed building that

combines craftsmanship

and modern technologies.

Traditions

5

Page 6: TAKENAKA EUROPE GmbH - INTRODUCTION OF POLAND BRANCH · The “Takenaka way” of quality and reliability of our construction works and services is the basis of our success with our

Centrifuge FacilityWind Tunnel Test Room

Acoustic Laboratory

Electromagnetic Shield Room

One of the biggest

R&D Institutes in the

construction industry

worldwide.

200 researchers

in the field of Material

sciences, basic and

applied construction

technologies.

Takenaka

R&D Institute

1993, Japan

“Building

the future“

Innovations

6

Page 7: TAKENAKA EUROPE GmbH - INTRODUCTION OF POLAND BRANCH · The “Takenaka way” of quality and reliability of our construction works and services is the basis of our success with our

In 1979, Takenaka Corporation became the first non-manufacturer to receive the Deming Prize for its Total Quality Control.

In 1992, it received the Japan Quality Control Award.

Today, TAKENAKA Quality Management (TQM)is an essential part of the company’s daily business.

• Since 1996, Headquarters in Tokyo and Osaka and all Japan regional offices became successively certified to the quality management standard ISO 9001.

• At Takenaka Europe, Headquarters and its 12 branch offices are certified by Bureau Veritas to ISO 9001:2008 for the scope “Design, Engineering and Construction of Buildings”.

The “Takenaka way” of quality and reliability of our construction works and services is the basis of our success with our clients all over Europe.

TAKENAKA Quality Management systems

Takenaka Europe

ISO 9001 Group certification

Deming

Price1979

Japan Quality

Control award

1992

7

Page 8: TAKENAKA EUROPE GmbH - INTRODUCTION OF POLAND BRANCH · The “Takenaka way” of quality and reliability of our construction works and services is the basis of our success with our

TAKENAKA – REFERENCE PROJECTS

8

Page 9: TAKENAKA EUROPE GmbH - INTRODUCTION OF POLAND BRANCH · The “Takenaka way” of quality and reliability of our construction works and services is the basis of our success with our

Please let us be your business partner in Europe■ Takenaka Europe

Paris

Barcelona

Milan

Budapest

Bucharest

London

Brussels Düsseldorf

Amsterdam

Prague

Wroclaw

Zilina

POLAND

CZECHSLOVAKIA

⚫Takenaka Europe has existed in Europe for 46 years. As a local

subsidiary of Takenaka Corporation.

⚫We have over 1500 projects in 12 countries in Europe and we give full

support to clients in Europe.

History of Takenaka Europe

GERMANY

BELGIUM

SPAIN

UK

NETHERLANDS

FRANCE

ITALY

POLAND

HUNGARY

CZECH

SLOVAKIA

ROMANIA

since 1973

since 1975

since 1975

since 1981

since 1983

since 1984

since 1988

since 1993

since 1995

since 1997

since 2000

since 2006

TAKENAKA EUROPE

Komatsu Belgium Construction Machinery Office Daikin Device Czech A/C Unit Factory KIA Europe Automotive Design Center Toshiba Poland LCD Factory Hyundai Czech Automotive FactoryAisan Czech Fuel Pump Factory

Mori Seiki Germany Machine Tool Technical Center JAL Frankfurt Airport Lounge EXPO 2015 Japanese Pavilion, Italy Amada Germany Metal Processing Machinery

Solution Center

TBAI Poland Seat Factory Toyotomi France Body Parts

Factory

9

Page 10: TAKENAKA EUROPE GmbH - INTRODUCTION OF POLAND BRANCH · The “Takenaka way” of quality and reliability of our construction works and services is the basis of our success with our

■ Poland results

There are many production facilities in Poland

Japanese Art Museum1 TOYOTA Poland Training Center2 Warsaw Japanese Embassy3 Japanese Ambassador’s Residence4 TOYOTA Motor Industries Poland Factory 1-4ph

TOYOTA Motor ManufacturingFactory 1-4 ph

6 Bridgestone Diversified Products1st & 2nd Factory

7

Fuji Seal Factory extension8 NIFCO Factory 1-3ph9 TBMECA Factory 1-2ph10 ACCUROMM Factory11

KOTANI Factory12 NGK Factory 1-4 ph13 MEIKO Logistic Center I & II14 TOYOTA Tsusho Service Center15

TOSHIBA Factory16 Electrolux Factory Extension17 TMMP Central Office18 MAKITA Service Center 19

TBAI Factory 1-3ph20 Yamazaki Mazak Show room21 Donaldson Factory 1ph22 SL Factory 1ph & ph223

NGK 2nd Factory 1ph – 2ph24 MEIKO Logistic Center III25

MUBEA 1st Factory AKS Factory SOPP factory

Borgers Factory29 Novoferm Factory30

Poland achievements

Barry Callebaut Factory31 TOYO SEAL Factory32 NGK 3rd Factory33 34 YAGI Factory35 36 37

GLIWICE

1

3 4

2

5

69

10

11

23

13

12 14

16

1517

19

7

18

20

21

22

8

24

25

3029

31

32

33

34

353637

5

10

Page 11: TAKENAKA EUROPE GmbH - INTRODUCTION OF POLAND BRANCH · The “Takenaka way” of quality and reliability of our construction works and services is the basis of our success with our

Clients from Automotive sector

TMIP diesel engine plant 1st to 4th

Jelcz-Laskowice Poland

Toyota Motor Industries Poland

Diesel engine

PC + S / F 2

2003 – 2008

52,743 m2

Design & Construction

TMMP Gasoline Engine & Transmission Plant 1st to 4th

Wałbrzych Poland

Toyota Motor Manufacturing Poland

Gasoline engine transmission

PC + S / F 2

2000 – 2009 (Ph1-4)

113,253 m2 (including the central office building)

Design & Constrction

Place:

Investor:

Product:

Structure:

Duration:

Floor area:

Scope:

Place:

Investor:

Product:

Structure:

Duration:

Floor area:

Scope:

Nifco Plastic Parts Factory 1st to 3rd

Swidnica Poland

Nifco Poland

Plastic parts for vehicles

PC / F 2

2007 – 2015

18,352 m2

Design & Construction

Place:

Investor:

Product:

Structure:

Duration:

Floor area:

Scope:

NGK Poland 1st plant 1st to 4th

Gliwice Poland

NGK CERAMICS POLSKA

Exhaust filter for diesel engine

PC + S / F 3

2003 – 2007

77,761 m2

Design & Construction

Place:

Investor:

Product:

Structure:

Duration:

Floor area:

Scope:

11

Page 12: TAKENAKA EUROPE GmbH - INTRODUCTION OF POLAND BRANCH · The “Takenaka way” of quality and reliability of our construction works and services is the basis of our success with our

Clients from Automotive sector

Nowogrodziec Poland

TBAI Poland

Automotive seat

PC / F 1

2009–2016

28,475 m2

Design & Construction

TBAI (Toyota Boshoku, Aisin Seiki) Automotive seat plant

Place:

Investor:

Product:

Structure:

Duration:

Floor area:

Scope:

Donaldson Air conditioning filter plant

Skarbimierz Poland

Donaldson Poland

Air conditioning filter

PC / F 2

2013 – 2014

13,477 m2

Design & Construction

Place:

Investor:

Product:

Structure:

Duration:

Floor area:

Scope:

Żory Poland

SL Poland

Plastic parts

PC / F 1

2013 – 2014

5,882 m2

Design & Construction

SL Plastic Parts Factory 1st-2nd

Place:

Investor:

Product:

Structure:

Duration:

Floor area:

Scope:

Ph 1

Ph 2

NGK Poland 2nd plant 1st-2nd

Gliwice Poland

NGK Ceramics Polska

Exhaust filter for diesel engine

PC + S / F 4

2011 – 2016

23,911 m2 + 23,445 m2

Design & Construction

Place:

Investor:

Product:

Structure:

Duration:

Floor area:

Scope:

12

Page 13: TAKENAKA EUROPE GmbH - INTRODUCTION OF POLAND BRANCH · The “Takenaka way” of quality and reliability of our construction works and services is the basis of our success with our

Mubea Automotive leaf spring factory

Ujazd Poland

MUBEA Automotive Poland

Automotive steel plate spring

PC / F 2

2015 – 2016

23,526 m2

Design & Construction

Place:

Investor:

Product:

Structure:

Duration:

Floor area:

Scope:

Clients from automotive sector

Build of plant for vehicle interiors

Zlotorja Poland

Borgers Polska

Thermal insulation for vehicle interior

PC + S / F 3

2016 – 2017

16,510 m2

Construction

Place:

Investor:

Product:

Structure:

Duration:

Floor area:

Scope:

Gliwice Poland

NGK Ceramics Polska

Nox sensor

PC / F 3

2017 – 2018

13,700 m2

Design & Construction

NGK Poland third plant

Place:

Investor:

Product:

Structure:

Duration:

Floor area:

Scope:

Żarów Poland

YAGI POLAND FACTORY

Bearing

PC+S / F 1

2017 – 2018

7,190 m2

Design & Construction

Yagi bearing factory second term expansion

Place:

Investor:

Product:

Structure:

Duration:

Floor area:

Scope:

13

Page 14: TAKENAKA EUROPE GmbH - INTRODUCTION OF POLAND BRANCH · The “Takenaka way” of quality and reliability of our construction works and services is the basis of our success with our

Żarów Poland

AKS Precision Ball Polska

Bearing steel ball

PC / F 1

2016 – 2017

7,810 m2

Design & Construction

Second stage expansion of steel ball factory

Place:

Investor:

Product:

Structure:

Duration:

Floor area:

Scope:

Clients from automotive sector and other industrial

Chocolate candy packing plant

Kamienna Góra Poland

SOPP Packaging Poland

Chocolate candy packing

PC / F 2

2016 – 2017

8,226 m2

Design & Construction

Place:

Investor:

Product:

Structure:

Duration:

Floor area:

Scope:

Barry Callebaut Chocolate Factory Expansion

Łódź Poland

Barry Callebaut POLSKA

Chocolate ingredients

PC+S / F 1

2016 – 2017

2,600 m2

Construction

Place:

Investor:

Product:

Structure:

Duration:

Floor area:

Scope:

14

Page 15: TAKENAKA EUROPE GmbH - INTRODUCTION OF POLAND BRANCH · The “Takenaka way” of quality and reliability of our construction works and services is the basis of our success with our

Bridgestone Photovoltaic Panel Interlayer Factory

Żarów Poland

Bridgestone Diversified Products Poland

Photovoltaic panel interlayer

PC / F 3

2011 – 2012

16,885 m2

Design & Construction

Kutno Poland

Fuji-Seal Poland.

Film processing and printing for packaging

PC / F 1

2013 – 2014

5,297 m2

設計・施工

Fuji seal film printing processing plant second term expansion

Place:

Investor:

Product:

Structure:

Duration:

Floor area:

Scope:

Place:

Investor:

Product:

Structure:

Duration:

Floor area:

Scope:

Clients from other industrial sector

Toshiba LCD TV assembly plant

Kobierzyce Poland

Toshiba Television Central

liquid crystal television

PC / F 1

2006 – 2007

39,679 m2

Design & Construction

Place:

Investor:

Product:

Structure:

Duration:

Floor area:

Scope:

Ph 1

Ph 2

Electrolux Dishwasher Factory Phase 2 Expansion

Żarów Poland

ELECTROLUX Poland.

Dishwasher

PC + S / F 2

2007 – 2008

9,823 m2

Construction

Place:

Investor:

Product:

Structure:

Duration:

Floor area:

Scope:

15

Page 16: TAKENAKA EUROPE GmbH - INTRODUCTION OF POLAND BRANCH · The “Takenaka way” of quality and reliability of our construction works and services is the basis of our success with our

Makita Service Center

Bielsko-Biala Poland

MAKITA

Service center

PC + S / F 1

2008 – 2009

5,440 m2

Design & Construction

Yamazaki Mazak Technology Center

Katowice Poland

Yamazaki Mazak Poland

Industrial Machinery Showroom

PC + S / F 2

2011 – 2011

1,292 m2

Design & Construction

Place:

Investor:

Product:

Structure:

Duration:

Floor area:

Scope:

Place:

Investor:

Product:

Structure:

Duration:

Floor area:

Scope:

Clients from other industrial sector

Meiko Trans Warehouse

Gliwice Poland

MEIKO Trans Polska.

Warehouse

PC / F 1

2016

12,538 m2

Design & Construction

Place:

Investor:

Product:

Structure:

Duration:

Floor area:

Scope:

Extension of plant of Manufacturer and supplier of garage doors, frames and drives

Wykroty Poland

Novoferm Poland

Doors

PC / F 1

2016 – 2017

3,649 m2

Design & Construction

Place:

Investor:

Product:

Structure:

Duration:

Floor area:

Scope:

16

Page 17: TAKENAKA EUROPE GmbH - INTRODUCTION OF POLAND BRANCH · The “Takenaka way” of quality and reliability of our construction works and services is the basis of our success with our

Our Advantages in Construction Project

□We can make various effective and reasonable proposal for your facility because we are always considering design and

construction service as one package.

□We can support your opinion or demand with our knowledge and experience about Polish regulations and local procedure.

□We will control the total schedule and keep your dead line, because all design and construction procedure is in our responsibility.

Advantage of TAKENAKA’s After Service

□ EXPERIENCE IN LOCAL MARKET

• Network with local authority, local subcontractors and local infrastructure providers.

• Over 20 years of maintenance experience in Dolnośląskie, Opolskie, Śląskie, Łódzkie Voivodeship area.

□ QUCK REACTION

• Polish Staff of all departments are in Takenaka’s Bielany Wrocławskie office.

□ CONTACT 24 HOURS

• You can call and contact our window person emergency trouble.

□ TIGHT NETWORK IN TAKENAKA

• You can expect our technical support and advice by the Takenaka network.

17

Page 18: TAKENAKA EUROPE GmbH - INTRODUCTION OF POLAND BRANCH · The “Takenaka way” of quality and reliability of our construction works and services is the basis of our success with our

【 OTHER OFFICES 】

【 TAKENAKA POLAND BRANCH 】

■ WROCLAW OFFICEAddress: Bielany Business Point 1st Floor, Irysowa 1, Bielany Wrocławskie

PL55-040 Kobierzyce, Poland

Tel: +48 71 360 8980

Fax: +48 71 360 8970

■ KATOWICE OFFICEAddress: ul. Sowińskiego 4, PL 40-018 Katowice, Poland

■TAKENAKA CORPORATION (International Department)Address: 1-1-1 Shinsuna, Koto-ku Tokyo, 136-0075, Japan

Tel: +81 3 6810 5671

Fax: +81 3 6660 6166

■TAKENAKA EUROPE GMBHAddress: Grafenberger Allee , 136 - D-40237 Düsseldorf, Germany

Tel: +49 211 16794 0

Fax: +49 211 16794 44

□BELGIUM BranchAddress: Airport Business Park, Berkenlaan 1, 1831 Diegem, Belgium

Tel: +32 2 71 451 10

Fax +32 2 71 451 20

□CZECH BranchAddress: Evropska Business Center; Kladenska 68,

160 00 Prague 6, Czech Republic

Tel: +420 2 35094511

Fax: +420 2 35094549

□FRANCE BranchAddress: Tour GALLIENI 2, 36 avenue du Général de Gaulle, 93170 Bagnolet, France

Tel: +33 1 48 970 203

Fax: +33 1 48 970 137

□HUNGARY BranchAddress: Varmegye utca 3-5, 1052 Budapest, Hungary

Tel: +36 1 486 2360

Fax: +36 1 486 0745

□ITALY BranchAddress: Via Leone XIII, 14, 20145 Milano, Italy

Tel: +39 2 4859 139 0

Fax: +39 2 4859 139 5

□NETHERLANDS Branch

Address: Kabelweg 21, 1014 BA Amsterdam, Netherlands

Tel: +31 20 686 6101

Fax: +31 20 686 8618

□Romania BranchAddress: Airport Plaza Building, Entrance B, 3rd floor Office 310

1A Drumul Garii Odai Str. Otopeni City, Ilfov, 075100 Romania

Tel: +40 31 4054 951

Fax: +40 31 4054 952

□SLOVAKIA BranchAddress: Pivovarska 16, 01001 Zilina, Slovak Republic

Tel: +421 41 507 79 01

Fax: +421 41 507 79 04

□SPAIN BranchAddress: Gran Via Carlos III, 94, 20 4a, 8028 Barcelona, Spain

Tel: +34 934 09 72 73

Fax: +34 934 09 26 27

□UK BranchAddress: Tavistock House North, Tavistock Square,

London WC1H 9HR, United Kingdom

Tel: +44 20 7255 4060

Fax: +44 20 7383 7308

■ WARSZAWA OFFICEAddress: ul. Jana Muzykanta 60, PL 02-188 Warszawa, Poland

18