Table of Contents

1- Introduction

2- Legal Status & Our contact

3- Certificates

4- Organizational Chart

5- Workforce

6- Quality Policy

7- Method Statement

8- Standard Product

9- Completed Projects

10- Ongoing Projects

11- Power Tools

12- Our Team

1- Introduction

Cube House design contractor based in Qatar. It was founded by Mr.

Mohamed N. Allouh three (3) years ago.

Cube House design has made an honest attempt to give value for money

to its esteem and growing network of clients, while offering wide variety

of designs of Gypsum Ceiling, Dry wall Partitions, Wall Paneling, and

Decorative Paints. We offer professionally crafted finishing and

Professional Qualified Engineers, Designers & Craftsman.

Our workforce has broad based professional experience in their field and

can deliver any product or design compatible with the latest trend and

styles of client's choice. We create ambiance that is impressive, inspiring,

and remarkable to all, weather it is Residential, Office, School or Palace.

It would always be fascinating décor to support the comforts of our client

and value of his investment.

Vision:

The Middle East region is passing through its advanced development

phase of the 21st Century. Particularly our Beloved Country Qatar. It is

located on the cross road of civilization and will be the most desirable

commercial hub of the world.

The architecture will be the blend of contemporary and conventional

designs and life styles of East &West. In this perspective, Cube House

Designs would like to be the part of pioneers devoted to build this region.

Mission:

Moving with trends Cube House commits to offer the most modern,

comfortable and cost Effective interiors solutions to our clients. We

believe in Quality as " Key to Existence". Thus we closely monitor the

quality of our products and services followed by exceptional after Sales

Customer Care.

Our Mission is to be recognized as Trusted Fit out and interior Design

Contractor in the region.

Safety:

Proper Scaffolding shall be used and safety harness to be used and

secured, if required. All personal protective equipment shall be used as

appropriate according to the nature of the job.

Safety belt is required in high level of ceiling

Scaffolding tag should be provided while using.

Electrical machines should be use

2 – Legal Status

Legal Name: Cube House Decoration & Gypsum board

Type: Limited Liability Company (L.L.C.)

Office:

Tel: +974 44665920

Fax: +974 44665920

Registered Address: P.O. BOX: 9507

Salwa Road, Doha, Qatar

e-mail: [email protected]

Web site: www.cubehousedecoration.com

Year of establishment: 2010

Ownership:

1. Sheik Abdulla Saoud J A AL-THANI

2. Mohamed Allouh

Activities: Interior Design, Suspended Ceiling works, GRG molding,

Gypsum board ceilings, Drywall Partitions, Gypsum Wall paneling.

Decorative painting and Finishes.

Our Contacts

Main Office:

Tel: +974 44665920

Registered Address: Salwa Road, Doha, Qatar

General manger: Mr.: Mohamed Allouh

Tel: +974 55824984

Operations Manager: Mr. Ahmed Ellabad

Tel: +974 30306100

Website: www.cubehousedecoration.com

e-mail: [email protected]

www.facebook.com/pages/Cube-House-Decoration

www. twitter.com/account/@cube_house_dec

http://i. instagram.com/cubehousedecoration/

3 - Certificates

4 – Organizational Chart

5 - Workforce

Position Quantity

Owner & Managing Director 1

General Manager 1

Project Manager 1

Production Manager 1

Finance Manager 1

Sr. Designer And Estimation Manager 1

Safety Officer 1

Procurement Assistant 1

Project Engineer 2

Accountant 1

Junior Designer 1

Draftsman 3

Site Forman 2

Production Forman 3

Site Skilled Labors 10

Production Skilled Labors 10

Site Helpers 30

Total Workforce 71

6 – Quality Policy

Cube house Interior is committed to comply with the requirements of BS

EN ISO 9001:2008 and to meet or exceed Customers contractual

expectations. We demonstrate this trough quality audits and customer

satisfaction. We have established and maintain an effective Quality

Management System, which has been planned, developed to satisfy our

clients and our growing ambition.

Cube house have progressively diversified to provide commercial and

residential fit out projects.

Cube house aspire to be the best in our market sector and will, trough the

implementation of the Quality Management System, demonstrate our

commitment and ability to consistently provide products and service that

meets Customer Requirement and Satisfaction.

The quality Management System has been implemented using a

combination of policies, procedures and objectives. These are

communicated throughout the company and reviewed and evaluated on a

regular basis.

All employees of Cube house are encouraged to actively seek continuous

improvements in the quality of service given to our fully committed to

the Documented Quality Management System and will ensure its

effectiveness is closely monitored.

7 - Ongoing Projects

Purpose:

The purpose of the method statement is to describe the sequence and

methodology for the installation of Gypsum Board Ceiling, And Gypsum

Partitions and any other type of False Ceiling.

Scope:

Supply & Apply false ceiling & partitions works as following:

Gypsum Board & Gypsum Bulkhead

Gypsum Partitions.

References:

Contract drawing reference as following:

Approved shop drawings as following:

Main Contract.

Definitions and abbreviations:

PM - Main Contractor Project Manager

CM - Main Contractor Construction Manager

PE - Main Contractor Project Engineer

SE - Main Contractor Section Engineer

QCE - Main Contractor Quality Control Engineer

SM - Main Contractor Safety Manager

SO - Main Contractor Safety Officer

SR - Main Contractor Surveyor

SF - Main Contractor Section Foreman

PM,v- Vancouver project Manager

CM,v - Vancouver Construction Manager

PE, v- Vancouver Project Engineer

QCP - Quality Control Procedure

ITP - Inspection And Test Plan

ITL - Independent Test Laboratory

MS - Method Statement

FM - Form

NCR - Non Conformance Report

ITR - Inspections And Test Request

WIR - Work Inspection Request

Responsibilities:

The site operation activities and control are executed by the following

with their corresponding roles and supervision responsibilities:

The Project Manager and Construction Manager are responsible for the

overall management of the work and control of the staff in executing the

work, as per relevant documents called for in this method statement.

The Project and Site Engineers shall be responsible for on-site activities

and supervision of temporary Scaffolding, required tools and related

construction activities.

Competent QC Engineer/Inspector shall be responsible for checking and

inspecting the execution of the works in accordance with the approved

materials, approved method statement and the inspection and test plan.

The QA/QC Manager is Responsible for ensuring the quality standards of

the work activities, to ensure safe system of work are followed, the

required precautions implemented, i.e. Scaffolding system, and PPE tools

and related work practices.

Procedures:

General requirements for False Ceiling & Partition Installation.

All joints shall be filled a tape properly after using joint mesh.

Partitions lay out should be inspected by Main Contractor before starting

truck fixation.

Partition type should be identified before starting the work in each area.

Partition work should be coordinated properly with M.E.P subcontractor

specially after fixing our structural framing and just before closing the

second layer board.

Gypsum Board should be fixed staggering in same horizontal level.

All joints tape shall be even and shall not exceed the level of board by

removing paper from the edge which doesn't have sloped edges but ot for

chamfered edge which already to receive filling materials.

Where applicable, provide bulkhead as indicated on the approved shop

drawing.

The tiles cut piece shall be carried out as per the approved shop drawing

ad shall not be less than 30 cm (not less than half tile).

The tiles cutting and formulation of cut piece shall be formed bu using

suitable cutting machine to avoid any irregular edges for the cut pieces.

All necessary coordination with the mechanical and electrical works shall

be carried out in three stages:

Before Starting suspended GI Furring ceiling system.

Before fixing Gypsum Board.

After fixing Gypsum Board.

Coordinate the finish Ceiling level with the adjacent levels, and adjacent

window.

The installation of the tiles and the Gypsum Board shall be subjected to

the construction drawing, the approved shop drawing, and mock-up to be

done.

Bulkhead edges and corners shall be provided with proprietary coved

mesh accessories with nice finish tapped.

All coordination process should be supported by formal clearance letter

from M.E.P subcontractor in all stages, main contractor and final

approval from the consultant.

Any temporary opening required by M.E.P. should be by marking on

gypsum board before finishing stages. (Joint Treatment)

Gypsum board false ceiling

Preparation prior to installation

Site survey by our engineer to assure the work is ready to start

accordingly.

Obtain M.E.P. clearance formal from Main Contractor Coordinator.

Checked by our Engineer id the level of shop drawings is approved for

matching with the site condition after M.E.P. service had been installed.

Any materials at slab concrete soffit base incompatible with the support

shall be removed by main contractor.

All block works, plaster, at least paint, to be completed till the slab soffit.

Fire sealant to be applied wherever applicable.

Fixation Suspension System

Fixing the wall angle by (Hilti Gun steel nail) to the wall matching the

level which had been marked before starting the fixation.

Submit first WIR-1 for approval.

Fix the Main channel supported from soffit of lab using Hilti Material

fixation (X-CC DNI 27 p8) as approved in our submittal from engineer.

Horizontal main channel fixing to dropped supported from top by using

1/2" white screw

Furring channel fixing to horizontal main channel perpendicularly by 1/2"

white screw

Approval for suspended system ceiling should be obtained from the

engineer after inspected from Q/C engineer, and the consultant.

AII MEP Access panels required to be marked on the slab soffit for the

engineer's approvals.

Acceptance letter from M.E.P subcontractor to satisfy that all support

should not object any M.E.P services in future.

Fixation of Gypsum Board

After obtaining M.E.P clearance and engineer approval.

Fixing Gypsum board stagger on furring channel by 1" drywall gypsum

screw using the required accessories and metal angels as approved

materials and shop drawings.

M.E.P. subcontractor should mark all M.E.P services which is need to cut

with its tag for each opening.

Submit third WIR-3 for approval, Got formal approval for marking from

engineer before start the cutting.

After cutting only, we can start joint treatment and assuring that the

joint level should not exceed the board level.

If required in joint area, paper should be removed and hanging the board

before treatment with the joint compound.

In same time of filling joint compound Joint mesh should be fixed and

matching same level of Gypsum Board Ceiling.

Gypsum Board Ceiling ready for Engineers inspection.

Submit fourth WIR-4 for approval.

Gypsum Partition:

Preparation prior to installation.

Survey our engineer to assure the work is ready to start accordingly.

Partitions Lay out should be marked on the floor by our engineering

team.

Any materials at slab concrete incompatible with the support truck

should be removed by main contractor.

Cleared approved shop drawings for partitions type's & partitions lay out

should be available with our construction manager and project engineer

at site.

Fixation Suspension System

Submit first WIR-1 for lay out approval.

Fixing the truck to the floor matching the approved lay out on the floor

which had been marked before starting the fixation.

Fix the first and last vertical stud only for each expected wall partition in

the same time fix the top truck also for check alignment and vertically

assurance.

Continue fixing stud channel 600 mm c/c fixing to top and bottom truck

supported by using 1/2" white screw and paralleled to basic stud which

will be ad bench mark for it.

Horizontal truck channel fixing support for stud each 1200 mm as

standard for two purposes, structural, and to get Rockwool insulation.

Around opening doors and window should be taken in considerations for

extra support channels, as horizontal truck and vertical stud in position

to receive flat faces, and to provide white wood fillet 50 mm as required to

receive support screws.

Approval for structure framing partition system should be obtained from

the engineer after inspected from Q/C engineer, and the consultant WIR-

2.

Our site engineer team will give enough time and coordination for M.E.P

Subcontractor to start his work in this critical time to fix his pipes and

conduits.

All M.E.P. Access panels which it might be required to be marked on the

structural framing to give us chance for sufficient support in this stage.

Acceptance letter from M.E.P subcontractor to satisfy that all support

should not object any M.E.P service in future.

Fixation of Gypsum Board

After obtaining M.E.P clearance and engineer approval.

Fixing one layer only Gypsum Board stagger on stud channel by using 1"

drywall gypsum screw using the required accessories and metal angles as

approved materials and shop drawings.

M.E.P Subcontractor should mark all M.E.P services which it need to cut

with its tag for each opening.

Submit Fourth WIR-4 for approval, Got formal approval for fix second

layer gypsum board from engineer before closing the partition.

After cutting only, we can start joint treatment and assuring that the

joint level should not exceed the board level.

If required in joint area, paper should be removed and hanging the board

before treatment with the joint compound.

In same time of filling joint compound Joint mesh, should be fixed and

matching same level of Gypsum Board Ceiling.

Gypsum ceiling ready for engineear inspection.

Submit fifth WIR-5 for approval

In case of double layer board, we can hold the second layer fixing up to

final stage of works to avoid any damages it might be happens.

So same procedures of finishing board we can go through and to do WIR

as well.

Protection of finished works

After the final inspection for gypsum board ceiling, and Gypsum

Partition walls just to care that nothing to spoil the surfaces as much as

possible especially from M.E.P subcontractor.

We recommend not starting final finish touch unless we ensure that

M.E.P subcontractor had been successfully finished his works.

For double layer gypsum partitions we recommend that to hold the

second layer of board fixing up to final stage.

Quality control:

Significant stages of works shall be ensured by Project Engineer and

QA/QC Engineer to be conforming to Engineer requirement and QA/QC

procedures including the setting out and application of the recommended

materials mentioned in this method statement and as per inspection and

test plan (ITP)

Inspection Request (WIR) shall be submitted for checking the different

items stated in this method statement as follows:

8 – Standard Products

1- KNAUF

2- UNITED MINING INDUSTRIES

3- QATAR GYPSUM BOARD FACTORY

4- NATIONAL GYPSUM

5- GYPROC GYPSUM

8-1 - KNAUF

8-2

8.2 - UNITED MINING INDUSTRIES

8-3- QATAR GYPSUM BOARD FACTORY

8-4 – GYPROC GYPSUM

9 – Completed Projects

OWNER ALI BIN MOHAMED AL-THANI & SONS COMPANY

CONSULTANT SHOAA ENGINEEING CONSULTANT

MAIN CONTRACTOR ALI BIN MOHAMED AL-THANI & SONS COMPANY

WORK PIECE TYPE PARTITIONS & CEILING 1 LEVEL – 2 LEVEL – 3 LEVEL & CORNICHE 15 CM

SQUARE METERS 890

LOCATION KHIRTYAT

OWNER SAIED ABDULLA AL AMER AL KABI

CONSULTANT AL-ARAIYA ENGINEEING CONSULTANT

MAIN CONTRACTOR AL SARF TRADING & CONTRACTING COMPANY

WORK PIECE TYPE PARTITIONS & CEILING

SQUARE METERS 2,500

LOCATION BIN OMRAN – FAREEJ KLEEP

OWNER SHIEKH ALI BIN FALEH

CONSULTANT SHOAA ENGINEEING CONSULTANT

MAIN CONTRACTOR ALI BIN FALEH

WORK PIECE TYPE DESIGN - PARTITIONS & CEILING 1 LEVEL – 2 LEVEL – CORNICHE 45 CM

SQUARE METERS 2,950

LOCATION AIN KHALED

OWNER UNCERSAL GROUP

CONSULTANT GKH ENGINEEING CONSULTAN

MAIN CONTRACTOR CUBE HOUSE DECORATION COMPANY

WORK PIECE TYPE PARTITIONS & CEILING

SQUARE METERS 577

LOCATION AL-NAJMA

10 –

10 –

OWNER SHIEKH HAMAD BIN ALI AL-THANI

CONSULTANT AL-HADAF ENGINEERING CONSULTANT

MAIN CONTRACTOR ARABIN UNIT CONTRACTING COMPANY

WORK PIECE TYPE PARTITIONS & CEILING

SQUARE METERS 1,850

LOCATION AL-NASR

10 - Ongoing Projects

OWNER AL JAZERA COMPANY

CONSULTANT AL-SAREAA ENGINEERING CONSULTANT

MAIN CONTRACTOR AL-SARF TRADING & CONTRACTING COMPANY

WORK PIECE TYPE CEILING

SQUARE METERS 3,500

LOCATION MESHURIB

OWNER SHEIKH MOHAMED AL-THANI

CONSULTANT AL-SAREAA ENGINEEING CONSULTANT

MAIN CONTRACTOR AL-SARF TRADING & CONTRACTING COMPANY

WORK PIECE TYPE CEILING

SQUARE METERS 2,980

LOCATION BIN MAHMOUD

OWNER SHIEKH KHALIFA AL-THANI

CONSULTANT AL-SAREAA ENGINEEING CONSULTANT

MAIN CONTRACTOR AL MANIA TRADING & CONTRACTING COMPANY

WORK PIECE TYPE CEILING

SQUARE METERS 350

LOCATION ASPIER

OWNER PROFESSIONAL CONTRACTORS WORKS

CONSLTANT AL-SAREAA ENGINEERING CONSULTANT

MAIN CONTRACTOR PROFESSIONAL CONTRACTORS WORKS

WORK PIECE TYPE CEILING

SQUARE METERS 4,000

LOCATION AL-MANSORA

OWNER LEKHWIYA SACODECO (QD-CPC)

CONSULTANT BARZAN ENGINEEING CONSULTANT

MAIN CONTRACTOR QATARI DIAR VINCI COMPANY

WORK PIECE TYPE CEILING & CORNICE

SQUARE METERS 12,000

LOCATION DUHAIL

OWNER SHEIKH K.H.

CONSULTANT SHOAA ENGINEERING CONSULTANT

MAIN CONTRACTOR AL SARF TRADING & CONTRACTING ESTABLISHMENT

WORK PIECE TYPE CEILING + CORNICE

SQUARE METERS 1,000

LOCATION AL DAFNA

OWNER SHEIKH ALI

CONSLTANT AL MANIA ENGINEEING CONSULTANT

MAIN CONTRACTOR CUBE HOUSE DECORATIONS

WORK PIECE TYPE CEILING + CORNICE + PARTITION + PAINTING

SQUARE METERS 2,500

LOCATION AL SADD

OWNER MOHAMED ELYAN VILLA

CONSLTANT BARZAN ENGINEERING CONSULTANT

MAIN CONTRACTOR CUBE HOUSE DECORATIONS

WORK PIECE TYPE CEILING + PARTITION + CORNICE + PAINTING

SQUARE METERS 1,200

LOCATION WAKRA

11 – Power Tools

12 - Our Team