Chapter 5: Ensuring People-Centered, Clean and Efficient Governance Department of the Interior and Local Government (DILG) IX 5-1 Chapter 6: Pursuing Swift and Administration of Justice Department of Justice - Parole and Probation Administration (DOJ-PPA) IX 6-1 Chapter 7: Promoting Philippine Culture and Values National Commission for Culture and the Arts (NCCA) 7-1 Chapter 8: Expanding Economic Opportunities in Agriculture, Forestry, and Fisheries Department of Agriculture (DA) IX 8-1 Philippine Rubber Research Institute (PRRI) 8-2 Philippine Coconut Authority (PCA) IX 8-3 Philippine Fiber Industry and Development Authority (PhilFIDA) IX 8-4 Bureau of Fisheries and Aquatic Resources (BFAR) IX 8-5 Philippine Fisheries Development Authority-Zamboanga Fish Port Complex (PFDA-ZFPC) 8-6 Department of Agrarian Reform (DAR) IX 8-7 Chapter 9: Expanding Economic Opportunities in Industry and Services Through Trabaho at Negosyo Department of Trade and Industry (DTI) IX 9-1 Department of Tourism (DOT) IX 9-2 Zamboanga City Special Economic Zone Authority and Freeport (ZAMBOECOZONE) 9-3 Cooperative Development Authority (CDA) IX 9-4 Chapter 10: Accelerating Human Capital Development Department of Health (DOH) IX 10-1 National Nutrition Council (NNC) IX 10-2 Department of Education (DepEd 10-3 Technical Education and Skills Development Authority (TESDA) IX 10-4 Dipolog School of Fisheries (DSF) 10-5 Kabasalan Institute of Technology (KIT) 10-6 Basilan State College (BSC) 10-7 Josefina Herrera Cerilles State College (JHCSC) 10-8 Jose Rizal Memorial State University (JRMSU) 10-9 Zamboanga City State Polytechnic College (ZCSPC) 10-10 Zamboanga State College of Marine Science and Technology (ZSCMST) 10-11 Western Mindanao State University (WMSU) 10-12 Chapter 11: Reducing Vulnerability of Individuals and Families Department of Social Welfare and Development (DSWD) IX 11-1 Department of Labor and Employment (DOLE) IX 11-2 Chapter 12: Building Safe and Secure Communities National Housing Authority (NHA) IX 13-1 Chapter 14: Vigorously Advancing Science, Technology, and Innovation Department of Science and Technology (DOST) IX 14-1 Chapter 18: Ensuring Security, Public Order and Safety Philippine National Police (PNP) IX 18-1 Chapter 19: Accelerating Infrastructure Development Department of Public Works and Highways (DPWH) IX 19-1 Civil Aviation Authority of the Philippines (CAAP) IX 19-2 National Irrigation Administration (NIA) IX 19-3 Department of Transportation (DOTr) 19-4 Chapter 20: Ensuring Ecological Integrity, Clean and Healthy Environment Department of Environment and Natural Resources (DENR) IX 20-1 Mines and Geosciences Bureau (MGB) IX 20-2 Environmental Management Bureau (EMB) IX 20-3

Page 4: Table of Contents (By Chapter)

Table of Contents (in Alphabetical Order)

Name of RLA/SUC Page Basilan State College (BSC) 10-7 Bureau of Fisheries and Aquatic Resources (BFAR) IX 8-5 Civil Aviation Authority of the Philippines (CAAP) IX 19-2 Cooperative Development Authority (CDA) IX 9-4 Department of Agrarian Reform (DAR) IX 8-7 Department of Agriculture (DA) IX 8-1 Department of Education (DepEd) IX 10-3 Department of Environment and Natural Resources (DENR) IX 20-1 Department of Health (DOH) IX 10-1 Department of Justice - Parole and Probation Administration (DOJ-PPA) IX 6-1 Department of Labor and Employment (DOLE) IX 11-2 Department of Public Works and Highways (DPWH) IX 19-1 Department of Science and Technology (DOST) IX 14-1 Department of Social Welfare and Development (DSWD) IX 11-1 Department of the Interior and Local Governent (DILG) IX 5-1 Department of Transportation (DOTr) 19-4 Department of Tourism (DOT) IX 9-2 Department of Trade and Industry (DTI) IX 9-1 Dipolog School of Fisheries (DSF) 10-5 Environmental Management Bureau (EMB) IX 20-3 Jose Rizal Memorial State University (JRMSU) 10-9 Josefina Herrera Cerilles State College (JHCSC) 10-8 Kabasalan Institute of Technology (KIT) 10-6 Mines and Geosciences Bureau (MGB) IX 20-2 National Commission for Culture and the Arts (NCCA) 7-1 National Housing Authority (NHA) IX 13-1 National Irrigation Administration (NIA) IX 19-3 National Nutrition Council (NNC) IX 10-2 Philippine Coconut Authority (PCA) IX 8-3 Philippine Fiber Industry and Development Authority (PhilFIDA) IX 8-4 Philippine Fisheries Development Authority-Zamboanga Fish Port Complex (PFDA-ZFPC) 8-5 Philippine National Police (PNP) IX 18-1 Philippine Rubber Research Institute (PRRI) 8-2 Technical Education and Skills Development Authority (TESDA) IX 10-4 Western Mindanao State University (WMSU) 10-12 Zamboanga City Special Economic Zone Authority and Freeport (ZAMBOECOZONE) 9-3 Zamboanga City State Polytechnic College (ZCSPC) 10-10 Zamboanga State College of Marine Science and Technology (ZSCMST) 10-11

Page 5: Table of Contents (By Chapter)

Page 1 of 5

UPDATED ZAMBOANGA PENINSULA REGIONAL DEVELOPMENT

INVESTMENT PROGRAM, 2017-2022

Executive Summary

By virtue of Executive Order No. 325, the Regional Development Councils (RDCs) were mandated to, among others, review, prioritize, and endorse to the national government the annual and multi-year sectoral investment programs of the region for funding and implementation. Regional Development Council (RDC) IX, the premier policy-making body of the Zamboanga Peninsula region reviewed and endorsed the Updated Regional Development Investment Program (RDIP), 2017-2022 of 29 regional line agencies, six state universities and colleges (SUCs), two TESDA-supervised schools and one special development authority. In pursuit of a matatag, maginhawa at panatag na buhay in 2040 in the region, an amount of about PHP715.39 billion worth of development programs and projects for the period 2017-2022 was approved and endorsed by RDC IX during its 166th Regular Meeting on 5 September 2019 in Pagadian City . From 2017 to 2019, a total of PHP142.60 billion was already provided by the national government for the implementation of various programs/projects/activities included in RDIP, through the General Appropriation Act. In 2019, NEDA issued Memorandum Circular No. 01, mandating the organization and convening of the inter-agency planning committees to facilitate the updating of the Philippine Development Plan (PDP), Public Investment Program (PIP), Results Matrices (RM), Regional Development Plans (RDPs), and Regional Development Investment Programs (RDIPs). Based on RDC IX Resolution No. 008, series of 2019, “Approving the Guidelines on the Updating of the Updated Zamboanga Peninsula Regional Development Investment Program, 2017-2022,” a one-day workshop on the preparation of the Updated RDIP 2017-2022 was conducted on 24 July 2019 in Pagadian City. The updating of the RDIP, 2017-2022 is part of the regional planning process in support of the achievement of societal goals and sector outcomes that are guided by the Ambisyon Natin 2040, the 2030 Sustainable Development Agenda, and President Rodrigo R. Duterte’s 0+10-Point Socio-Economic Agenda. The RDIP is also expected to be inclusive of the gender and development advocacy/program of the government. The Updated RDIP, 2017-2022, based on the initial submissions of line agencies and SUCs, now amounts to PHP715.39 billion. The updating took into account how much was actually funded in the years 2017, 2018, and 2019. On the other hand, the remaining half of the planning period, 2020, 2021, and 2022 highlighted proposals that would bring the region closer to its vision of becoming the center of sustainable agri-fishery industries of the country. The RDIP, as an accompanying document of the RDP, is an instrument that supports the achievement of development targets and objectives enunciated in the RDP. It also takes into account the availability of resources of the government to implement the proposed programs/projects phased annually over the remaining term of the current administration. RDC IX already approved the Updated RDP, 2017-2022 through Joint Regional Development Council (RDC) IX and Regional Peace and Order Council (RPOC) IX Resolution No. 005, series of 2019.

Page 6: Table of Contents (By Chapter)

Page 2 of 5

Updated RDIP Summary by RDP Chapter

The RDP has 22 chapters but only 12 of which cover sectoral strategies requiring public investments. (Table 1). Fifty-five percent of the regional investment requirement is for projects for accelerating infrastructure development (Chapter 19) or about PHP392 billion. Chapter 10 or projects for accelerating human capital development require PHP187 billion. The region will need an aggregate amount of PHP86.7 billion worth of projects for expanding economic opportunities in the agri-fishery and industries sectors (Chapters 8 and 9). Under the “malasakit” pillar of the RDP (Chapters 5, 6 and 7), enhancing the social fabric will require a total of almost PHP600 million. Projects intended for inequality-reducing transformation or the “pagbabago” pillar (Chapters 8, 9, 10,11 and 12), the region has to invest a total of PHP315 billion. Science and technology programs and projects (Chapter 14) require PHP1.2 billion. Interventions that support peace and order, as well as, a healthy environment (Chapters 18 and 20) will need a total of PHP6.09 billion investment. Table 1: Summary of Updated Zamboanga Peninsula Updated RDIP, 2017-2022

by RDP Chapter

Chapter

No.

RDP Chapter Title Total Investment

Cost (2017-2022)

(in Thousand Pesos)

Concerned Agencies

5 Ensuring People-Centered, Clean and Efficient Governance

46,807.20 DILG IX

6 Pursuing Swift and Fair Administration of Justice

534,913.81 DOJ-PPA IX

7 Promoting Philippine Culture and Values

17,000.00 NCCA

8 Expanding Economic Opportunities in Agriculture, Forestry, and Fisheries

75,796,120.88 DA IX, PRRI, PCA IX, PHILFIDA IX, BFAR IX, PFDA-ZFPC, DAR IX

9 Expanding Economic Opportunities in Industry and Services through Trabaho at Negosyo

10,912,732.21 DTI IX, DOT IX, ZAMBOECOZONE, CDA IX

10 Accelerating Human Capital Development

187,372,443.58 DOH IX, DepEd IX, NNC IX, TESDA IX, TESDA-DSF, TESDA-ZSPI (KIT), BASC, JRMSU, JHCSC, WMSU, ZCSPC, ZSCMST

11 Reducing Vulnerability of Individuals and Families

37,612,542.13 DSWD IX, DOLE IX

12 Building Safe and Secure Communities

3,748,125.00 NHA IX

Page 7: Table of Contents (By Chapter)

Page 3 of 5

Chapter

No.

RDP Chapter Title Total Investment

Cost (2017-2022)

(in Thousand Pesos)

Concerned Agencies

14 Vigorously Advancing Science, Technology and Innovation

1,246,249.25 DOST IX

18 Ensuring Security, Public Order and Safety

3,179,880.27 PNP IX

19 Accelerating Infrastructure Development

392,016,207.86 DPWH IX, CAAP IX, NIA IX, DOTr

20 Ensuring Ecological Integrity, Clean and Healthy Environment

2,908,535.50 DENR IX, EMB IX, MGB IX

21 Ensuring Safe, Orderly, and Regular Migration

Total 715,391,557.68

Updated RDIP Summary by Sector

The infrastructure sector investment requirements account for 55 percent or PHP392.02 billion of the total requirement of the region. It is followed by the social development sector at 32 percent or PHP228.75 billion worth of programs and projects. The economic development sector requirements account for 13 percent of the regional total costing PHP90.86 billion; while the development administration sector accounts for 0.53 percent of the investment requirement or PHP3.76 billion. (Figure 1) Figure 1: Sectoral Distribution of Updated Zamboanga Peninsula Regional Development

Investment Program, 2017-2022

Page 8: Table of Contents (By Chapter)

Page 4 of 5

Annual Investment Requirement, 2017-2022

Table 2 shows the annual investment requirement of the region, from 2017 to 2022, by sector (in Million Pesos). Table 2: Summary of Updated Zamboanga Peninsula Updated Regional Development

Investment Program, 2017-2022 by Sector

Sector Investment Cost in Million Pesos

2017* 2018* 2019* 2020** 2021*** 2022*** Total

Economic Development

17,865.66 22,052.40 16,939.57 87,774.71 157,709.10 89,674.77 392,016.21

Social Development

20,125.18 23,047.64 32,676.47 41,018.80 47,337.33 64,544.69 228,750.11

Infrastructure Development

1,961.30 2,594.92 3,993.40 24,905.96 29,957.53 27,450.52 90,863.64

Development Administration

405.51 441.68 499.48 624.64 1,568.01 222.28 3,761.60

Total 40,357.65 48,136.64 54,108.93 154,324.11 236,571.97 181,892.25 715,391.56 Notes: *- Actual amount funded in the GAA

**-RDC IX-endorsed FY 2020 budget proposal

***-Proposed investment requirements

Investment Requirement by Area, 2017-2022

Figure 2 shows that 2017-2022 programs and projects with regionwide coverage account for 36% of the total investment requirement or PHP256.43 billion. For the provinces, Zamboanga del Norte (including Dipolog City and Dapitan City) has a share of 20% or PHP 143.90 worth of programs and projects. It is followed by the province of Zamboanga del Sur (including Pagadian City) with 17% share of the pie or PHP181.82 billion. The province of Zamboanga Sibugay shares 10% of the total investment requirement or PHP 75.71 billion. For the cities, Zamboanga City accounts for 13% of the regional investment cost or PHP91.67 billion. Isabela City shares 4% or PHP25.85 billion worth of programs and projects. Figure 2: Spatial Distribution of Updated Zamboanga Peninsula Regional Development

Investment Program, 2017-2022

Page 9: Table of Contents (By Chapter)

Page 5 of 5

Table 3 shows the spatial distribution of programs and projects in the region, from 2017 to 2022, by area (in Million Pesos).

Table 3: Summary of Updated Zamboanga Peninsula Updated Regional Development

Investment Program, 2017-2022 by Area

Area Investment Cost in Million Pesos

2017* 2018* 2019* 2020** 2021*** 2022*** Total

City

Zamboanga City

3,347.24 6,964.65 7,836.81 14,216.45 30,658.11 28,650.18 91,673.44

Isabela City 598.96 1,367.11 1,043.83 6,270.25 8,398.59 8,169.44 25,848.18 Province

Zamboanga del Norte

6,873.90 8,428.17 9,127.02 35,812.65 57,875.46 25,784.60 143,901.81

Zamboanga del Sur

4,647.14 3,550.47 7,587.64 30,037.07 49,000.34 27,001.88 121,824.54

Zamboanga Sibugay

3,444.93 4,508.60 3,953.32 22,613.34 25,927.33 15,264.77 75,712.29

Regionwide 21,458.49 23,373.82 24,494.60 45,541.56 64,545.08 77,017.76 256,431.30

Total 40,370.65 48,192.81 54,043.23 154,491.32 236,404.91 181,888.63 715,391.56 Notes: *- Actual amount funded in the GAA.

**-RDC IX-endorsed FY 2020 budget proposal

***-Proposed investment requirements

Page 10: Table of Contents (By Chapter)

SUMMARY BY CHAPTER

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-endorsed)

2021(Proposed)

2022(Proposed)

Total

Chapter 5 - 5,707.20 - 11,500.00 27,100.00 2,500.00 46,807.20 DILG IX 5,707.20 11,500.00 27,100.00 2,500.00 46,807.20

Chapter 6 454.13 428.62 20,859.40 81,339.60 212,052.95 219,779.10 534,913.81 DOJ-PPA IX 454.13 428.62 20,859.40 81,339.60 212,052.95 219,779.10 534,913.81

Chapter 7 - - 5,400.00 9,000.00 2,600.00 - 17,000.00 NCCA 5,400.00 9,000.00 2,600.00 17,000.00 Chapter 8 1,212,200.31 1,450,808.01 1,598,455.68 21,238,765.91 26,250,639.08 24,045,251.88 75,796,120.88 DA IX 816,249.49 830,612.37 1,041,443.00 19,564,845.04 24,261,730.49 21,186,807.16 67,701,687.54 PRRI 7,856.00 6,000.00 6,320.00 186,128.00 109,371.77 315,675.77 PCA IX 162,864.00 296,931.51 276,634.50 266,350.59 227,883.86 200,320.94 1,430,985.40 PhilFIDA IX 9,225.70 15,257.21 17,884.26 19,657.08 141,321.82 24,009.40 227,355.47 BFAR IX 140,551.00 153,540.00 124,550.00 1,241,935.00 1,244,634.00 1,231,257.00 4,136,467.00 PFDA-ZFPC 1,159,111.00 1,159,111.00 DAR IX 83,310.12 146,610.92 131,943.92 139,658.20 188,940.91 134,374.61 824,838.69

Chapter 9 171,182.00 543,426.00 2,081,155.00 2,753,959.00 2,760,075.65 2,602,934.56 10,912,732.21 DTI IX 95,704.00 139,248.00 89,128.00 225,580.00 236,894.00 202,494.00 989,048.00 DOT IX 4,653.00 6,332.00 5,931.00 13,879.00 7,950.00 8,775.00 47,520.00 ZAMBOECOZONE 70,000.00 389,000.00 1,980,500.00 2,514,500.00 2,481,792.00 2,382,500.00 9,818,292.00 CDA IX 825.00 8,846.00 5,596.00 33,439.65 9,165.56 57,872.21

Chapter 10 19,900,229.30 21,978,978.70 21,860,605.31 29,697,263.18 38,369,846.69 55,565,520.40 187,372,443.58 DOH IX 915,349.30 620,922.00 234,322.00 720,334.00 571,652.60 538,820.26 3,601,400.16

INVESTMENT COST (in Thousand Pesos)

CHAPTER/ RLA/ SUC

UPDATED ZAMBOANGA PENINSULA REGIONAL DEVELOPMENT INVESTMENT PROGRAM, 2017-2022

Page 1 of 3

Page 11: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-endorsed)

2021(Proposed)

2022(Proposed)

TotalINVESTMENT COST (in Thousand Pesos)

CHAPTER/ RLA/ SUC

NNC IX 4,171.18 3,469.58 4,680.98 3,622.38 15,944.10 DepEd IX 18,648,062.00 20,514,164.00 20,923,835.00 27,648,333.00 36,057,611.00 53,274,442.60 177,066,447.60 TESDA IX 102,297.00 519,371.12 169,200.47 316,730.00 271,421.00 257,551.00 1,636,570.59 DSF 3,069.00 3,151.00 3,228.00 26,262.60 28,701.01 30,046.09 94,457.70 KIT 7,408.00 7,616.00 7,718.00 80,959.00 119,130.11 122,038.07 344,869.18 BSC 27,000.00 66,000.00 349,500.00 301,000.00 283,550.00 114,500.00 1,141,550.00 JHCSC 45,500.00 15,887.00 21,000.00 83,000.00 201,300.00 168,000.00 534,687.00 JRMSU 65,424.00 49,292.00 38,585.00 83,250.00 308,500.00 277,500.00 822,551.00 ZCSPC - 19,320.58 99,045.67 241,000.00 200,000.00 200,000.00 759,366.25 ZSCMST 10,000.00 67,925.00 165,300.00 389,000.00 632,225.00 WMSU 86,120.00 163,255.00 - 125,000.00 158,000.00 190,000.00 722,375.00

Chapter 11 118,815.00 116,578.00 9,190,564.00 10,842,539.00 8,659,879.01 8,684,167.12 37,612,542.13 DSWD IX - - 9,119,838.00 10,679,356.00 8,500,880.64 8,522,817.00 36,822,891.64 DOLE IX 118,815.00 116,578.00 70,726.00 163,183.00 158,998.37 161,350.12 789,650.49

Chapter 12 106,133.00 952,087.00 1,619,905.00 470,000.00 305,000.00 295,000.00 3,748,125.00 NHA IX 106,133.00 952,087.00 1,619,905.00 470,000.00 305,000.00 295,000.00 3,748,125.00 Chapter 13 -

Chapter 14 61,035.00 94,173.00 95,903.00 354,617.00 307,979.00 338,776.00 1,252,483.00 DOST IX 61,035.00 94,173.00 95,903 354,617 307,979 338,776 1,252,483.00

Chapter 15

Chapter 16

Chapter 17

Chapter 18 405,057.20 435,545.37 478,621.29 531,801.43 1,328,854.99 - 3,179,880.27

Page 2 of 3

Page 12: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-endorsed)

2021(Proposed)

2022(Proposed)

TotalINVESTMENT COST (in Thousand Pesos)

CHAPTER/ RLA/ SUC

PNP IX 405,057.20 435,545.37 478,621.29 531,801.43 1,328,854.99 3,179,880.27 Chapter 19 17,865,660.00 22,052,395.00 16,939,574.47 87,774,709.40 157,709,102.49 89,674,766.50 392,016,207.86 DPWH IX 16,723,786.00 20,674,283.00 15,714,109.46 86,862,509.40 152,132,141.49 88,064,477.50 380,171,306.85 CAAP IX 2,500.00 2,000.00 151,000.00 250,000.00 273,000.00 295,000.00 973,500.00 NIA IX 1,089,374.00 1,363,112.00 915,140.01 662,200.00 2,102,961.00 1,315,289.00 7,448,076.01 DOTr 50,000.00 13,000.00 159,325.00 3201000 3,423,325.00 Chapter 20 516,887.00 506,513.00 224,119.00 558,617.50 638,840.50 463,558.50 2,908,535.50 DENR IX 498,932.00 477,274.00 197,609.00 504,229.00 578,899.00 404,153.00 2,661,096.00 MGB IX 8,884.00 16,414.00 13,778.00 17,491.00 19,239.50 21,163.00 96,969.50 EMB IX 9,071.00 12,825.00 12,732.00 36,897.50 40,702.00 38,242.50 150,470.00

TOTAL 40,357,652.94 48,136,639.90 54,115,162.16 154,324,112.01 236,571,970.36 181,892,254.06 715,397,791.44

Page 3 of 3

Page 13: Table of Contents (By Chapter)

UPDATED ZAMBOANGA PENINSULA REGIONAL DEVELOPMENT INVESTMENT PROGRAM (RDIP) 2017-2022

Agency: DILG IXChapter: 5 Ensuring People-Centered, Clean, and Efficient Governance

2017 (Actual) 2018 (Actual) 2019

(Actual)

2020 (RDC

Endorsed)

2021 (Proposed)

2022 (Proposed) Total

(1) (2) (4) (5) (6) (7) (9) (10) (11) (12) (13) (14) (15) (17)OUTCOME 1 - Business-Friendlyand Competitive LGUs

1) Improved LGU Competitiveness To improve the local economic Regionwide LGUs with streamlined Increased/improved National 225.00 225.00 and Ease of Doing Business environment of LGUs and Business permits and Licensing local economic Law

enhance investment opportunities System investments

OUTCOME 2 - Environment-ProtectiveClimate Change Adative and Disaster-Resilient LGUs

and Disaster-Resilient Communities

1) Enhancing LGU Capacity on To enhance/strengthen the Regionwide LGUs provided with Improved disaster resiliency RA 10121 173.98 3,500.00 3,500.00 7,173.98 Disaster Risk Reduction and capacities of local governments capacity building interventions measures of LGUsManagement and Climate Change in addressing and mitigating on LCCAP formulationAdaptation (DRRM-CCA) the impacts of disasters and Local Climate

calamities LGUs provided with Change Action Plantehcnical assistance on DRRM (LCCAP)

Operation LISTOProtocols

OUTCOME 3 - SOCIALLY-PROTECTIVELGUs

Services

1) Institutionalizing Gender-Responsive To promote gender-responsive Regionwide LGU GAD Plans reviewed Gender-responsive RA 9710 875.50 1,300.00 2,175.50 Local Governance local governance and endorsed PPAs

OUTCOME 4 - PEACEFUL, ORDERLY AND SAFE LGUs

1) Strengthening the Peace and To strengthen the local POCs Regionwide Organized and functional Organized and 2,690.00 2,500.00 2,700.00 7,890.00 Order Councils (POCs) and ensure full functionality POCs at all levels functional POCs

to effectively address peace

RemarksExpected OutputBasis for

Implementation

Chapter Outcome/ Project Title Project Description/ Objectives

Specific Location

(Province/ City / Municipality /

Barangay)

RDP Results Matrices Indicators Addressed

2019 Investment Targets (in exact amount PhP)

Creating Vibrant and Productive Local Economies

Building Environment-Protective, Climate Change Adaptive

Ensuring Effective, Responsive and Resilient Social Protection

Ensuring Peaceful, Orderly and Safe Communities

Chapter 5-1-DILG IXPage 1 of 3

Page 14: Table of Contents (By Chapter)

2017 (Actual) 2018 (Actual) 2019

(Actual)

2020 (RDC

Endorsed)

2021 (Proposed)

2022 (Proposed) Total

RemarksExpected OutputBasis for

Implementation

Chapter Outcome/ Project Title Project Description/ Objectives

Specific Location

(Province/ City / Municipality /

Barangay)

RDP Results Matrices Indicators Addressed

2019 Investment Targets (in exact amount PhP)

and security concerns

2) Strengthening Anti-Drug Abuse To organize and ensure Regionwide Organized and functional Organized and National 2,000.00 2,500.00 4,500.00 Councils (ADACs) functionality of the ADACs ADACs at the P/C/M/Bs functional ADACs Directive

at all levels to address drug-related concerns at thelocal level

3) Advocacy on the following: Regionwide a) Prevention and Countering To effectively address and Strengthened adovcacy on Nartional Adovcacy Programs National 2,500.00 2,500.00 Violent Extremism fight the war against these National Adovcacy Programs advocated Directive b) Anti-Illegal Drugs social menances c) Anti-Criminality

4) Enhanced Comprehensive Local To afford Former Rebels Regionwide Former Rebels provided with FRs streamlined in mainstream 500.00 500.00 Integration Program (E-CLIP) the opportunity to live a financial assistance society

normal life and go back to mainstream of society

5) Enhancement of the Peoples A disciplinary machinery Regionwide Organized/Strengthened/ 0rganized and 700.00 700.00 Law Enforcement Board (PLEB) intended to hear and decide Functional PLEBs functional PLEBs

cases of erring police officers

6) Ending Local Communist Armed To put an end to the decades- Regionwide E.O. 70 5,000.00 5,000.00 Conflict (ELCAC) long local communist

instugencies in the country.

OUTCOME 5 - ACCOUNTABLE,TRANSPARENT, PARTICIPATIVE AND EFFECTIVE LOCAL GOVERNANCE

1) Seal of Good Local Governance To enhance LGU performance Regionwide Increase in the number of Improved performance RA 11292 1,655.00 1,500.00 3,155.00 (SGLG) geared towards local governance LGUs conferred with the Seal of LGUs

excellence

2) Seal of Good Local Governance To scale-up performance of Regionwide Improved performance 1,000.00 1,000.00 for Barangays barangays of barangays

3) Lupong Tagapamayapa To gauge and improve Regionwide Organized and strengthened Functional Lupons RA 7160 200.00 200.00 400.00 Incentives Awards (LTIA) performance of Lupons Lupons

4) Katarungang Pambarangay (KP) To enhance the capacity of Regionwide Organized and functional Immediate resolution of 200.00 200.00 the barangays in the mediation/ Katarungang Pambarangay casesresolution of cases at thebarangay level

Creating High Performing and Corrupt-Free LGUs

Chapter 5-1-DILG IXPage 2 of 3

Page 15: Table of Contents (By Chapter)

2017 (Actual) 2018 (Actual) 2019

(Actual)

2020 (RDC

Endorsed)

2021 (Proposed)

2022 (Proposed) Total

RemarksExpected OutputBasis for

Implementation

Chapter Outcome/ Project Title Project Description/ Objectives

Specific Location

(Province/ City / Municipality /

Barangay)

RDP Results Matrices Indicators Addressed

2019 Investment Targets (in exact amount PhP)

5) Strengthening of Local Development To ensure functionality of Regionwide Organized/Strengthend/ Functional LDCs RA 7160 500.00 500.00 Councils (LDCs) LDCs Functional LDCs at all levels

6) Civil Society Organizations/ To strengthen public- Regionwide Strengthend PPP-CSO Strengthened CSO-PPP National 300.00 300.00 People Participation Partnership private partnerships engagements Partnerships DirectiveProgram (CSO-PPP)

7) Citizens Satisfaction Index Assist the LGUs to improve Regionwide Improved client satisfaction Improve citizen satisfaction 200.00 200.00 System (CSIS) the delivery of basis services on LGU programs and services in the delivery of basic

services

8) Community-Based Monitoring To faciliate effective planning Regionwide Improved LGU planning and Effective local plans 112.72 250.00 362.72 System (CBMS) at the local level and facilitate database systems

data generation

9) Barangay Newly Elected Officials (BNEO) To capacitate the new set of Regionwide Barangay Officials fully Improved performance 2,000.00 2,000.00 Program barangay officials in all aspects capacitated on their duties of barangay officials

of governance and functions

10) Newly Elected Officials (NEO) Program To capacitate the newly elected Regionwide NEOs fully capacitated on their Improved capacities 2,500.00 2,500.00 local officials in all aspects of mandates of NEOs and improved 3,500.00 3,500.00 governance LGU performance

11) Transition to Federalism Public information and advocacy Strengnthend advocacy effortson Federalsim on Federalism

STRENGTHENED INTERNAL ORGANIZATIONALTo enhance technical Regionwide Enhanced/Improved tehnical 2,025.00 2,025.00 CAPACITY capabilities of personnel capacities of organic personnel

GRAND TOTAL 5,707.20 11,500.00 27,100.00 2,500.00 46,807.20

Chapter 5-1-DILG IXPage 3 of 3

Page 16: Table of Contents (By Chapter)

Updated Zamboanga Peninsula Regional Development Investment Program (RDIP), 2017-2022

Agency: Parole and Probation Administration IX Chapter 6: Pursuing Swift and Fair Administration of Justice

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15)Program 1: Investigation

Investigation Administer the Parole and Probation System

Regionwide No. of Investigation cases handled

PAP 1: Investigation of petitioners for Probation, Parole, Executive Clemency, Suspended Sentence and Community Service for First Time Minor Drug Offenders (FTDMO).

GAA

2

61,962.60 171,215.62 690,000.00 690,000.00 1,015,000.00 1,400,000.00 4,028,178.22

Jail Decongestion Decongest Jails, provide access to DOJ-PPA services, lessen expenditures for prisoners daily maintenance and subsistence

Regionwide Number of Jail Visits Conducted

PAP 2: Strengthened Jail Decongestion Program

GAA

2

- - 66,000.00 66,000.00 150,000.00 280,000.00 562,000.00

Strengthen Investigation System

Enhance investigation skills and acquire new techniques in investigation and report writing

Regionwide Increase number of investigations; improve and accurate reports

PAP 3: Restudy Investigation Tool or Instrument > Review "Case Classification" System> Continuous Updating of Skills> Reproduction of TCLP Forms, Flyers & Leaflets

GAA

2

- - 1,200,000.00 1,300,000.00 1,540,000.00 1,657,500.00 5,697,500.00

Subtotal for Program 1 61,962.60 171,215.62 1,956,000.00 2,056,000.00 2,705,000.00 3,337,500.00 10,287,678.22

Program 2: Supervision Supervision Establish a more enlightened

and humane Correctional System,;Reduce the incidence of Residivism.

Regionwide > No. of Supervison Cases handled.

PAP 1: Supervision of Probation, Parolees, FTMDO and Community Service

GAA

> Probation cases handled.> Parole/Pardon Cases handled> Suspended Sentence for FTMDO> Community Service> Disposition Rate of clients' compliance to terms/conditions of probation/parole/pardon

Level of Readiness

(for 2020-2022 projects only)

Chapter Outcome/ Project Title

Project Description/ Objectives

Specific Location (Province/ City / Municipality /

Barangay)

RDP Results Matrices Indicators Addressed Expected Output

Investment Requirements (in exact amount PhP)

Basis for Implementat

ionMode of Funding

2

34,545.40 25,421.00 5,250,000.00 5,250,000.00 7,560,000.00 9,400,000.00 27,519,966.40

Chapter 6-1-DOJ-PPA IXPage 1 of 3

Page 17: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

Level of Readiness

(for 2020-2022 projects only)

Chapter Outcome/ Project Title

Project Description/ Objectives

Specific Location (Province/ City / Municipality /

Barangay)

RDP Results Matrices Indicators Addressed Expected Output

Investment Requirements (in exact amount PhP)

Basis for Implementat

ionMode of Funding

> Disposition Rate of supervision recommendations sustained by th Courts/BPP.

Subtotal for Program 2 34,545.40 25,421.00 5,250,000.00 5,250,000.00 7,560,000.00 9,400,000.00 27,519,966.40

Program 3: Rehabilitation ServicesA) Therapeutic Community Treatment Modality

TC is a Self-Help Social Learning Treatment Modality that uses the TC Family as the primary therapeutic vehicle.

Regionwide PAP 1: Therapeutic Community ladderized Program

> Mandatory Sessions Conducted> Reinforcing Activities such as Tree Planting, Spiritul Enhancement, Counseling, Lectures on GAD-Related Laws, Issues and Concerns (Kasambahay Law, VAWC, Anti-Rape Law, Magna Carta for Women, Anti trafficking in Persons Act, etc.) & Skills Training

B) Restorative Justice Program

PAP 2: Restitution

> Resoration of Relationship

> Community Work Service

Volunteer Probation Assistants

PAP 3: VPA Mobilization as Direct Supervisors and as Resource Individuals

> Assistance in the Supervision of Clients

4,663,600.00 4,283,400.00 89,724.00 158,035.79

4

GAAParticipation Rate of Clients in the rehabilitation programs.

RegionwideRJ is a process through which remorseful offenders accept responsibility for their misconduct to those injured and to the community which, in response, allows the reintegration of the offender into the community

1

35,491.00 2,159.88 1,700,000.00 1,700,000.00

1

164,100.13 140,100.76

5,040,000.00 6,580,000.00 15,057,650.88

10,761,200.00 13,103,600.00 39,509,000.89 GAA 7,670,000.00 7,670,000.00

GAAMobilization Rate of Volunteer Probation Assistants (VPAs) assisting in the rehabilitation program of clients.

RegionwideVPA Generate maximum, citizen participation and community involvement in the over-all process of client rehabilitation

5,986,750.00 7,358,000.00 22,539,509.79

Chapter 6-1-DOJ-PPA IXPage 2 of 3

Page 18: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

Level of Readiness

(for 2020-2022 projects only)

Chapter Outcome/ Project Title

Project Description/ Objectives

Specific Location (Province/ City / Municipality /

Barangay)

RDP Results Matrices Indicators Addressed Expected Output

Investment Requirements (in exact amount PhP)

Basis for Implementat

ionMode of Funding

> Assistance in the conduct of rehabilitation Activities for clients

Subtotal for Program 3 357,626.92 231,984.64 13,653,400.00 14,033,600.00 21,787,950.00 27,041,600.00 77,106,161.56

Program 4: Special Infrastructure ProjectsA) Regional Office Building (Coursed Through DPWH)

Provides safe and secure office location and accesible clientele

Pagadian City PAP 1: Construction of Regional Office Building

GAA2

30,000,000.00 30,000,000.00

B) Half-Way House Zamboanga City PAP 2: Construction of Half-Way House GAA 3 30,000,000.00 30,000,000.00

Zamboanga City (Talisayan, Z.C) 20,000,000.00 20,000,000.00 40,000,000.00 Zamboanga City (Cabaluay, Z.C) 20,000,000.00 20,000,000.00 40,000,000.00 Zamboanga Sibugay 20,000,000.00 20,000,000.00 40,000,000.00 Zamboanga Del Norte 20,000,000.00 20,000,000.00 40,000,000.00 Dipolog City 20,000,000.00 20,000,000.00 40,000,000.00 Dapitan City 20,000,000.00 20,000,000.00 40,000,000.00 Isabela City 20,000,000.00 20,000,000.00 40,000,000.00 Zamboanga Del Sur (Molave, ZDS) 20,000,000.00 20,000,000.00 40,000,000.00 Zamboanga Del Sur (Pagadian City) 20,000,000.00 20,000,000.00 40,000,000.00

Subtotal for Program 4 60,000,000.00 180,000,000.00 180,000,000.00 420,000,000.00

GRAND TOTAL 454,134.92 428,621.26 20,859,400.00 81,339,600.00 212,052,950.00 219,779,100.00 534,913,806.18

Construction of city and provincial Rehabilitation

and Training Centers

C) Casa Esperanza (Rehabilitation and Training Centers)

Chapter 6-1-DOJ-PPA IXPage 3 of 3

Page 19: Table of Contents (By Chapter)

Updated Zamboanga Peninsula Regional Development Investment Program (RDIP), 2017-2022

Agency: National Commission on Culture and the Arts Chapter 7: Promoting Philippine Culture and ValuesTable 7.1 RDIP Investment Targets By Outcome

2017 2018 2019 2020 2021 2022 Total

Training programs for transfer of IKSPS 3,600.00 3,600.00 1,000.00 8,200.00

Creation of Local Cutlure and Arts Councils 1,800.00 1,900.00 600.00 4,300.00

Cultural Mapping 3,500.00 1,000.00 4,500.00

Total 5,400.00 9,000.00 2,600.00 17,000.00

CHAPTER OUTCOME NO. OF PROJECTS

INVESTMENT TARGETS (in PHP '000)

Outcome: Philippine culture and values promoted; Diverse cultures valued

Chapter 7-1-NCCAPage 1 of 1

Page 20: Table of Contents (By Chapter)

Updated Zamboanga Peninsula Regional Development Investment Program (RDIP), 2017-2022

Agency: Department of Agriculture, Regional Field Office-IXChapter: 8 - Expanding Economic Opportunities in Agriculture, Forestry, and Fisheries

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

(1) (2) (3) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15)

III. OperationsAFMA

MFO 2. Technical and Support Services Regionwide RAFMP GAA

2020: level 3; 2021-2022: level 4 458,993,514.84 476,417,113.14 279,836,000.00 496,420,333.33 6,787,974,610.00 3,556,952,030.00 12,056,593,601.31

MFO 2.1 Production Support Services

This refers to production support services provided to the farmers to increase agricultural production

Regionwide

RAFMP

GAA 2020: level 3; 2021-2022: level 4

342,953,526.52 349,359,313.47 128,134,000.00 306,032,333.33 2,887,450,530.00 2,817,069,570.00 6,830,999,273.32 1. National Rice Program 57,410,517.64 183,213,421.83 41,938,000.00 73,900,000.00 2. National Livestock Program 76,768,896.84 47,212,714.40 39,627,000.00 76,627,000.00 3. National Corn Program 37,190,479.80 42,716,045.43 8,646,000.00 25,060,000.00 4. National HVCD Program 134,047,543.17 72,821,820.45 31,774,000.00 123,148,333.33 5. Promotion & Dev't of Organic Agriculture Program 37,536,089.07 3,395,311.36 6,149,000.00 4,372,000.00 6. Halal Food Industry Development Program 2,925,000.00

MFO 2.2 Market Development Services

This refers to the marketing activities in support to the market development

Regionwide

RAFMP

GAA 2020: level 3; 2021-2022: level 4

11,610,958.99 5,493,106.00 10,873,000.00 19,535,000.00 27,233,400.00 70,248,400.00 144,993,864.99

MFO 2.3 Extension Support, Education and Training Services

This refers to the extension support, education and training services in support to the agricultural production activities of the farmers.

Regionwide

RAFMP

GAA 2020: level 3; 2021-2022: level 4

86,875,314.42 100,408,336.52 125,888,000.00 145,280,000.00 3,854,820,680.00 655,844,060.00 4,969,116,390.94 1. National Rice Program 42,272,713.68 56,482,777.55 72,748,000.00 77,571,000.00 2. National Livestock Program 9,248,594.22 9,394,514.01 7,651,000.00 7,651,000.00 3. National Corn Program 11,999,896.43 11,882,129.05 20,350,000.00 21,440,000.00 4. National HVCD Program 19,081,363.00 18,173,971.49 19,200,000.00 31,192,000.00 5. Promotion & Dev't of Organic Agriculture Program 4,272,747.09 4,474,944.42 4,179,000.00 5,415,000.00 6. Halal Food Industry Development Program 1,760,000.00 2,011,000.00

MFO 2.4 Research and Development

This refers to R&D activities funded and conducted by the DA.

Regionwide

RAFMP

GAA 2020: level 3; 2021-2022: level 4 17,553,714.91 21,156,357.15 14,941,000.00 25,573,000.00 18,470,000.00 13,790,000.00 111,484,072.06

1. National Rice Program 16,153,815.54 16,399,261.63 8,654,000.00 20,810,000.00 2. National Livestock Program 3,985,442.52 4,068,000.00 4,068,000.00 3. National Corn Program 1,399,899.37 771,653.00 706,000.00 695,000.00 4. National HVCD Program 1,513,000.00 -

Mode of Funding

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (in exact amount PhP)

Basis for ImplementationChapter Outcome/ Project Title Project Description/

Objectives

Specific Location

(Province/ City / Municipality / Barangay)

Chapter 8 - 1 - DA IXPage 1 of 9

Page 21: Table of Contents (By Chapter)

Updated Zamboanga Peninsula Regional Development Investment Program (RDIP), 2017-2022

Agency: Department of Agriculture, Regional Field Office-IXChapter: 8 - Expanding Economic Opportunities in Agriculture, Forestry, and Fisheries

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

(1) (2) (3) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15)

Mode of Funding

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (in exact amount PhP)

Basis for ImplementationChapter Outcome/ Project Title Project Description/

Objectives

Specific Location

(Province/ City / Municipality / Barangay)

MFO 3. Irrigation Network Services (INS)

Service area generated from the establishment and installation of small-scale irrigation projects (SSIPs)

Regionwide

RAFMP

GAA 2020: level 3; 2021-2022: level 4

82,322,446.40 114,113,457.15 75,939,000.00 79,420,000.00 1,034,025,000.00 50,406,000.00 1,436,225,903.55 1. National Rice Program 74,504,031.43 87,455,384.61 68,500,000.00 67,800,000.00 2. National Corn Program 2,377,795.00 19,950,000.00 2,000,000.00 3. National HVCD Program 5,440,619.97 4,750,000.00 7,439,000.00 8,120,000.00 4. Promotion & Dev't of Organic Agriculture Program 1,958,072.54 1,500,000.00

MFO 4. Farm to Market Road (FMR) Network Services

To establish farm to market road to improve the delivery of farm products from the production area to the target market

Regionwide

RAFMP

GAA 2020: level 3; 2021-2022: level 4

3,401,201.65 2,000,446.74 477,000,000.00 2,005,000,000.00 6,208,138,100.00 9,979,745,000.00 18,675,284,748.39

Zamboanga Del Sur District I

To establish farm to market road to improve the delivery of farm products from the production area to the target market

Regionwide

RAFMP

GAA 2020: level 3; 2021-2022: level 4

732,000,000.00 50,000,000.00 65,000,000.00

Zamboanga Del Sur District II

To establish farm to market road to improve the delivery of farm products from the production area to the target market

Regionwide

RAFMP

GAA 2020: level 3; 2021-2022: level 4

672,000,000.00 50,000,000.00 65,000,000.00

Zamboanga Sibugay District I

To establish farm to market road to improve the delivery of farm products from the production area to the target market

Regionwide

RAFMP

GAA 2020: level 3; 2021-2022: level 4

1,504,000,000.00 50,000,000.00 65,000,000.00

Zamboanga Sibugay District II

To establish farm to market road to improve the delivery of farm products from the production area to the target market

Regionwide

RAFMP

GAA 2020: level 3; 2021-2022: level 4

434,000,000.00 50,000,000.00 65,000,000.00

Zamboanga Del Norte District I

To establish farm to market road to improve the delivery of farm products from the production area to the target market

Regionwide

RAFMP

GAA 2020: level 3; 2021-2022: level 4

396,000,000.00 50,000,000.00 65,000,000.00

Zamboanga Del Norte District II

To establish farm to market road to improve the delivery of farm products from the production area to the target market

Regionwide

RAFMP

GAA 2020: level 3; 2021-2022: level 4

348,000,000.00 50,000,000.00 65,000,000.00

Chapter 8 - 1 - DA IXPage 2 of 9

Page 22: Table of Contents (By Chapter)

Updated Zamboanga Peninsula Regional Development Investment Program (RDIP), 2017-2022

Agency: Department of Agriculture, Regional Field Office-IXChapter: 8 - Expanding Economic Opportunities in Agriculture, Forestry, and Fisheries

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

(1) (2) (3) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15)

Mode of Funding

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (in exact amount PhP)

Basis for ImplementationChapter Outcome/ Project Title Project Description/

Objectives

Specific Location

(Province/ City / Municipality / Barangay)

Zamboanga Del Norte District III

To establish farm to market road to improve the delivery of farm products from the production area to the target market

Regionwide

RAFMP

GAA 2020: level 3; 2021-2022: level 4

680,000,000.00 50,000,000.00 65,000,000.00

Zamboanga City District I

To establish farm to market road to improve the delivery of farm products from the production area to the target market

Regionwide

RAFMP

GAA 2020: level 3; 2021-2022: level 4

88,000,000.00 50,000,000.00 65,000,000.00

Zamboanga City District II

To establish farm to market road to improve the delivery of farm products from the production area to the target market

Regionwide

RAFMP

GAA 2020: level 3; 2021-2022: level 4

508,000,000.00 50,000,000.00 65,000,000.00

Isabela City, Basilan Province

To establish farm to market road to improve the delivery of farm products from the production area to the target market

Regionwide

RAFMP

GAA 2020: level 3; 2021-2022: level 4

160,000,000.00 50,000,000.00 65,000,000.00

MFO 5. Agricultural and Fishery Machinery, Equipment and Facilities Support Services (PAEF)

This refers to the agricultural machinery, equipment, and facilities provided to the farmer associations.

Regionwide

RAFMP

GAA 2020: level 3; 2021-2022: level 4

211,092,464.02 139,052,494.18 81,747,000.00 177,955,000.00 2,406,810,410.00 2,479,509,110.00 5,496,166,478.20 1. National Rice Program 144,106,667.00 57,971,761.00 39,115,000.00 73,805,000.00 2. National Livestock Program 10,882,260.52 13,552,355.95 - 3. National Corn Program 37,351,333.00 34,724,334.00 17,291,000.00 58,300,000.00

4. National HVCD Program 15,564,303.50 29,859,043.23 22,555,000.00 43,275,000.00 5. Promotion & Dev't of Organic Agriculture Program 3,187,900.00 2,945,000.00 2,786,000.00 2,575,000.00

OTHER PROGRAMSRegionwide RAFMP GAA

2020: level 3; 2021-2022: level 4

Halal Food Industry Development Program Regionwide RAFMP GAA

2020: level 3; 2021-2022: level 4 41,216,000.00 32,283,000.00 73,499,000.00

Foreign Assisted and Locally-Funded Program -

-Special Area for Agricultural Development (SAAD)

Zamboanga Del Norte and Sulu

WFP GAA 2020: level 3; 2021-2022: level 4

60,439,861.49 99,028,860.08 126,921,000.00 131,500,000.00 417,889,721.57

-Kabuhayan at Kaunlaran ng Kababayang Katutubo (4Ks)

Regionwide WFP GAA 2020: level 3; 2021-2022: level 4

28,663,000.00 12,760,000.00 14,407,000.00 55,830,000.00

-Food Security PlanRegionwide FSP GAA 2020: level 3;

2021-2022: level 4 16,261,762,708.00 5,107,505,016.00 5,073,505,016.00 26,442,772,740.00

Chapter 8 - 1 - DA IXPage 3 of 9

Page 23: Table of Contents (By Chapter)

Updated Zamboanga Peninsula Regional Development Investment Program (RDIP), 2017-2022

Agency: Department of Agriculture, Regional Field Office-IXChapter: 8 - Expanding Economic Opportunities in Agriculture, Forestry, and Fisheries

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

(1) (2) (3) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15)

Mode of Funding

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (in exact amount PhP)

Basis for ImplementationChapter Outcome/ Project Title Project Description/

Objectives

Specific Location

(Province/ City / Municipality / Barangay)

Submitted Proposals Regionwide RAFMP/RDP/FSP GAA2020: level 3; 2021-2022: - 2,663,301,351.00

Farmer's Trading Center in Twenty-Seven (27) Municipalities in the Province of Zamboanga del Norte

1. Motivate the interest of farmers to produce production volume of their agricultural produce; 2. Increase the

2 cities and 25 municipalities

RAFMP/RDP/FSP GAA

43,200,000.00

Establishment of Solar Dryer and Bodega for the Corn Production and Marketing Program in Zamboanga del Norte

1. Effectively reduced pathogen numbers to a safe level and consequently to produce good quality of corn for market; 2. Integrate food security and nutrition technology processes in the province; 3. Protect environment by using efficient solar energy mechanisms; 4. Improve the quality of life and diversification of the rural economy.

22 municipalities RAFMP/RDP/FSP GAA

18,968,637.00

Provision of Mud Boat and Thresher for Small - Scale Rice Farmers in the Province of Zamboanga del Norte

1. Provide local farmers ready access on pre and post-harvest machineries; 2. To bolster efficiency,

13 municipalities; 23 barangays

3,624,800.00

Construction of Warehouse for Agricultural Produce from the Marginal Farmers in Zamboanga del Norte

Help farmers in augmenting their income and bring bread and butter to every

2 cities and 25 municipalities 20,000,000.00

Establishment of Solar Dryer for Marginal Farmers in Zamboanga del Norte

1. Nutritional value and flavor of the farm produce is minimally affected; 2. Transportation costs are reduced; 3. Protection from contamination by animals or insects; 4. Reduce spoilage; 5. Increase farm production by reducing spoilage and decomposition brought by mishandling of farm produce and lack of post-harvest facilities such as solar dryer.

2 cities and 25 municipalities 50,000,000.00

Chapter 8 - 1 - DA IXPage 4 of 9

Page 24: Table of Contents (By Chapter)

Updated Zamboanga Peninsula Regional Development Investment Program (RDIP), 2017-2022

Agency: Department of Agriculture, Regional Field Office-IXChapter: 8 - Expanding Economic Opportunities in Agriculture, Forestry, and Fisheries

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

(1) (2) (3) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15)

Mode of Funding

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (in exact amount PhP)

Basis for ImplementationChapter Outcome/ Project Title Project Description/

Objectives

Specific Location

(Province/ City / Municipality / Barangay)

Agro-Forestry Program in Zamboanga del Norte

Generally, the project aims to rehabilitate the denuded areas of the province and help address the pressing problem brought about by the continuous degradation of hillylands; specifically intends to: 1. Establish 52 reforestation project sites in 52 pilot barangays in the province; 2. Capacitate the barangay LGUs to engage in economic activities and generate

52 pilot barangays 21,624,000.00

Provision of Quality Banana- Lakatan Planting Materials: Creating Markets for Smallholder Farmers in Zamboanga del Norte

1. Help smallholder Lakatan banana farmers to make transition from subsistence to income income generation by

10 pilot barangays 80,000.00

Establishment of ZN Product Display and Agri-business Marketing Assistance Center

1. To address long-standing agricultural and food concerns such as unfavorable prices usually recieved by small farmers for their marketable quantities in the province; 2. To address the lack of employment and income opportunities in rural areas in the province; 3. Provide a ready market for farmers produce at strategic-locations identified in each municipality where buyers/wholesalers can

2 cities and 25 municipalities 50,000,000.00

Chapter 8 - 1 - DA IXPage 5 of 9

Page 25: Table of Contents (By Chapter)

Updated Zamboanga Peninsula Regional Development Investment Program (RDIP), 2017-2022

Agency: Department of Agriculture, Regional Field Office-IXChapter: 8 - Expanding Economic Opportunities in Agriculture, Forestry, and Fisheries

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

(1) (2) (3) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15)

Mode of Funding

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (in exact amount PhP)

Basis for ImplementationChapter Outcome/ Project Title Project Description/

Objectives

Specific Location

(Province/ City / Municipality / Barangay)

Livestock Auction Market

1. Offer a marketplace for all livestock and the ability to sell in suitable batches; 2. Returning a good profit and securing fair market price; 3. Provides producers a venue for all livestock that are an expanding part of the province agriculture economy; and 4. Provides opportunities for producers, buyers and agriculture leaders to come together and communicate about what is taking place in

Dipolog City, Sindangan and Liloy

8,000,000.00

Double "A" Slaughter House

1. Purposely to avoid contamination of the meat; 2. Provide a higher quality of meat

Dipolog City 8,000,000.00

Food Processing There is a need to establish food processing facilities

Dapitan City 2,500,000

Farm to Market Road

To reduce the transportation cost of agricultural commodities

Dapitan City 50,000,000

Solar Power Irrigation System Project

This is to increase productivity of agricultural commodities

Dapitan City 10,000,000

Upland Soil Fertility and Conservation Project Dapitan City 5,000,000

Biodegradable Waste Utilization/Urban Gardenng enhancement

Dapitan City 150,000

Power Tiller/Mechanical Harvester This is to reduce the cost of production Dapitan City 500,000

Adlai Processing CenterThis is in support to the massive planting of adlai

Dapitan City 800,000

Double A Slaughter House Expansion To cater the expanding activities of slaugther house

Dapitan City 8,000,000

Tissue Culture Laboratory for High Value Crops & Cut Flowers

This is to support the production of HVC and cut-flowers

Dapitan City 850,000

Climate Change Mitigation Program / River Dredging

This is to support the conservation activities of rivers

Dapitan City 10,000,000

Chapter 8 - 1 - DA IXPage 6 of 9

Page 26: Table of Contents (By Chapter)

Updated Zamboanga Peninsula Regional Development Investment Program (RDIP), 2017-2022

Agency: Department of Agriculture, Regional Field Office-IXChapter: 8 - Expanding Economic Opportunities in Agriculture, Forestry, and Fisheries

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

(1) (2) (3) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15)

Mode of Funding

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (in exact amount PhP)

Basis for ImplementationChapter Outcome/ Project Title Project Description/

Objectives

Specific Location

(Province/ City / Municipality / Barangay)

Construction of Communal Irrigation System

Support to production activities Pagadian City

12,000,000.00

Construction of Small Scale Irrigation System

Support to production activities Pagadian City

10,000,000.00

Provision of Tractor Pagadian City3,000,000.00

Provision of Harvester/Thresher Pagadian City750,000.00

Establishment of aqua-silvi culture project Pagadian City

1,000,000.00

Establishment of sea cages Pagadian City2,500,000.00

Conduct technology transfer of diversified farming management and good practices

Pagadian City100,000.00

Provision of Certified Rice Seeds for Zamboanga City 5,850,000.00 Provision of Inorganic Fertilizers for Zamboanga City 27,300,000.00 Soil Fertility and Sustainability Survey for Corn and High Valued Crops Areas for Zamboanga City 2,000,000.00 Corn Production and Development for Zamboanga City 14,116,440.00

Corn Mechanized Harvesting Program in Upland Areas for Zamboanga City 1,580,000.00 Corn Farm Tractor Project for Zamboanga City 2,000,000.00 Establishment of Maize and Cassava Flour Mill Plant for Zamboanga City 6,200,000.00 Establishment of Village Type Corn Postharvest and Processing Center for Zamboanga City 12,900,000.00 Upland Multi-tilling Machine for High Value Commodities for Zamboanga City 340,000.00 Greenhouse for High Value Commodities for Zamboanga City 800,000.00 Pump Irrigation System in Open Source (PISOS) for High Value Commodities for Zamboanga City 395,000.00 Hand Tractor with Rotavator for High Value Commodities for Zamboanga City 375,874.00

Chapter 8 - 1 - DA IXPage 7 of 9

Page 27: Table of Contents (By Chapter)

Updated Zamboanga Peninsula Regional Development Investment Program (RDIP), 2017-2022

Agency: Department of Agriculture, Regional Field Office-IXChapter: 8 - Expanding Economic Opportunities in Agriculture, Forestry, and Fisheries

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

(1) (2) (3) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15)

Mode of Funding

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (in exact amount PhP)

Basis for ImplementationChapter Outcome/ Project Title Project Description/

Objectives

Specific Location

(Province/ City / Municipality / Barangay)

Four Wheel Mini Tractor for High Value Commodities for Zamboanga City 4,000,000.00

Agricultural and Biosystems Engineering Program: Zamboanga City Groundwater Survey & Mapping in Agricultural and Fishpond Production Areas (Rice, Corn, Mango, Banana, Rubber and Fishpond) 393,000,000.00

Rice Mechanized Harvesting Program in Irrigated Areas for Zamboanga City 12,200,000.00

Agricultural Biosystems Engineering Program: Small-Holder Drip Systems (SDS) for High Value Crops for Zamboanga City

24,000,000.00

Establishment of Flowers, Fruits and Vegetable Trading Center with Cold Storage Facility in Zamboanga ECOZONE for Zamboanga City

5,300,000.00

Construction/Establishment of Solar Power Irrigation System (SPIS) in Zamboanga City

13,650,000.00

Laser Land Leveling for Lowland Corn and Irrigated Rice Areas for Zamboanga City

6,200,000.00

Construction/Rehab/Improvement of Farm-to-Market Road for Zamboanga City

1,328,871,600.00

Irrigation Development for Zamboanga City 390,000,000.00

Honey Production (Support for Organic and Halal Program) for Zamboanga City

20,000.00

Chevon Production (Support for Organic and Halal Programs) for Zamboanga City

120,000.00

Diary Production (Support to Organic and Halal Programs) for Zamboanga City

27,000.00

Feedlot Fattening (Support to Organic and Halal Programs) for Zamboanga City

12,000.00

Vegetable Hybridization Project 1,000,000.00 Vegetable Demo Project 300,000.00 Utilization of Waste for Organic Fertilizers 1,000,000.00 Barangay Enhancement on Nature and Gardens Program 19,000,000.00 Establishment of Zamboanga City Stock Farm and Training Center 50,000,000.00

Chapter 8 - 1 - DA IXPage 8 of 9

Page 28: Table of Contents (By Chapter)

Updated Zamboanga Peninsula Regional Development Investment Program (RDIP), 2017-2022

Agency: Department of Agriculture, Regional Field Office-IXChapter: 8 - Expanding Economic Opportunities in Agriculture, Forestry, and Fisheries

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

(1) (2) (3) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15)

Mode of Funding

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (in exact amount PhP)

Basis for ImplementationChapter Outcome/ Project Title Project Description/

Objectives

Specific Location

(Province/ City / Municipality / Barangay)

Free Range Chicken Production (Support for Organic and Halal Programs 30,000.00 Duck Production (Support for Organic and Halal Prorams) 30,000.00 Native Pig Production 36,000.00

TOTAL OPERATIONS 816,249,488.40 830,612,371.29 1,041,443,000.00 19,564,845,041.33 24,261,730,487.00 21,186,807,156.00 67,701,687,544.02

Chapter 8 - 1 - DA IXPage 9 of 9

Page 29: Table of Contents (By Chapter)

Updated Zamboanga Peninsula Regional Development Investment Program (RDIP), 2017-2022

Agency: DA-Philippine Rubber Research InstituteChapter: Expanding Economic Opportunities in Agriculture, Forestry, and Fisheries

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

(1) (2) (3) (5) (9) (10) (11) (12) (13) (14) (15) (17)Outcome 1: Volume of production increased

PAP 1 General Management and Supervision

PRRI is a newly created staff bureau of Department of Agriculture and currently borrowing an office at DA-RFO IX. However, space of the office cannot support the number of residing staff thus, overcrowding was observed in every division. With these, establishment of PRRI Building will be done where daily activties and operations will be perform

Zamboanga Sibugay/Naga/Tambanan

Establishment of PRRI Building 164,938,000.00 85,062,000.00 250,000,000.00 Reproposed for 2021 since it was not included in the 2020 NEP

PAP 2 Production Support Services

As mandated, the PRRI will spearhead the mass propagation of quality rubber planting materials. This activty is in line to the PRRI Strategic Plan which addresses the inadequate supply of quality planting materials which affects the production of raw rubber since it is one of the most vital part of rubber industry development. This project will enable smallholder farmers to have access to quality planting materials, modern production techniques and other support services from production to marketing of rubber products thorugh establishment of budwwod garden in rubber farmers association and cooperatives.

Zamboanga Sibugay/Titay, NagaZamboanga del Norte/Tampilisan

15,000 number of rubber budded seedlings was produced;13,500 number of rubber budded seedlings distributed

2,449,000.00 544,000.00 2,993,000.00 2020 budget was based on NEP

PAP 3 Extension Support, Education and Training Services

This activity will enhance the Rubber Farmers Association and Cooperatives through Capability Development of Rubber Farmers Associations and Cooperativea. This includes capacitating rubber farmers on rubber practices and technology from production to harvesting, and enhancing their managerial skills including decision making process for the benefit of their associations and cooperatives

Zamboanga Sibugay/Naga, Kabasalan, Siay, RT Lim, Ipil, TitayZamboanga del Norte/Tampilisan

90 Trainings on Capability Development Program of Rubber Farmers Associations and Cooperatives;22 Sites for the Establishment of Technology Demonstration on Matured Technologies12,000 IEC Materials

320,000.00 2,040,000.00 380,000.00 2,740,000.00

PAP 4 Research and Development

Research and development activities will be conducted in order to address problems on pest and disease, low productivity, decreasing of tapping labour, lack of income during its immature stage, and marketing of rubber products. These R&D activities will enhance production and productivity of rubber thus increase the income of rubber farmers for at least 25% . Matured technology that results from these research studies will be disseminated to the local rubber farmers, association, and cooperatives in order to enhance their production and productivity of

Zamboanga Sibugay/Ipil, Titay, NagaZamboanga del Norte/Liloy

29 new and continuing research studies conducted;1 research facility upgraded and maintained3 research facilities established

7,856,000.00 6,000,000.00 6,000,000.00 16,701,000.00 23,385,773.00 46,086,773.00 *Inter-regional since approval of research proposal was still on-going*To be conducted by PRRI personnel*2020 budget was based on NEP 2020

GRAND TOTAL (Outcome 1 + Outcome 2) 7,856,000.00 6,000,000.00 6,320,000.00 186,128,000.00 109,371,773.00 301,819,773.00

Remarks

Investment Requirements (in exact amount PhP)

Chapter Outcome/ Project Title Project Description/ Objectives Specific Location (Province/

City / Municipality / Barangay) Expected Output

Chapter 8- 2 - PRRIPage 1 of 1

Page 30: Table of Contents (By Chapter)

Zamboanga Peninsula Regional Development Investment Program 2017-2022CHAPTER 8: EXPANDING ECONOMIC OPPORTUNITIES IN AGRICULTURE, FORESTRY, AND FISHERIESAgency: Philippine Coconut Authority (PCA) IXMode of Implementation: GAA

2017 2018 2019 2020 2021 2022

1. Accelerated Coconut Planting/Replanting Project (ACPRP) - Expand coco planting and replanting

Zamboanga del Norte 3,203,100 ongoing 15,062,500.00 25,000,000.00 9,724,000.00 25,000,000.00 25,000,000.00 25,000,000.00 124,786,500.00

Zamboanga del Sur 2,509,900 ongoing 10,250,000.00 20,000,000.00 8,580,000.00 20,000,000.00 20,000,000.00 20,000,000.00 98,830,000.00

Zamboanga Sibugay 1,906,221 ongoing 9,062,500.00 15,000,000.00 6,149,000.00 15,000,000.00 15,000,000.00 15,000,000.00 75,211,500.00

Zamboanga City 689,850 ongoing 2,812,500.00 5,000,000.00 3,146,000.00 5,000,000.00 5,000,000.00 5,000,000.00 25,958,500.00

Isabela City 1,008,172 10,000,000.00 10,000,000.00 10,000,000.00 30,000,000.00

Sub-Total 9,317,243 37,187,500.00 65,000,000.00 27,599,000.00 75,000,000.00 75,000,000.00 75,000,000.00 354,786,500.00 2. Coconut Fertilization Program (CFP) - Expand fertilization of nutrient-deficient coco palms

Zamboanga del Norte 19,823.00 ongoing 3,200,000.00 - 5,932,000.00 15,840,000.00 15,840,000.00 15,840,000.00 56,652,000.00

Zamboanga del Sur 15,929.00 ongoing 2,432,000.00 - 4,860,000.00 11,360,000.00 11,360,000.00 11,360,000.00 41,372,000.00

Zamboanga Sibugay 11,175.00 ongoing 2,060,800.00 - 2,518,000.00 6,560,000.00 6,560,000.00 6,560,000.00 24,258,800.00

Zamboanga City 3,660.00 ongoing 614,400.00 - 1,640,000.00 6,240,000.00 6,240,000.00 6,240,000.00 20,974,400.00

Isabela City 6,400.00 4,000,000.00 4,000,000.00 4,000,000.00 12,000,000.00 Sub-Total 56,987.00 8,307,200.00 - 14,950,000.00 44,000,000.00 44,000,000.00 44,000,000.00 155,257,200.00

3. KAANIB Enterprise Development Program (KEDP)- To adopt farm diversification & livestock integration

Zamboanga del Norte 30.00 ongoing 1,430,087.00 4,129,650.00 772,500.00 6,332,237.00

Zamboanga del Sur 30.00 ongoing 855,880.00 4,408,110.00 772,500.00 6,036,490.00

Zamboanga Sibugay 25.00 ongoing 727,776.00 3,546,627.84 643,750.00 4,918,153.84

Zamboanga City 15.00 ongoing 64,562.00 2,646,000.00 386,250.00 3,096,812.00

Sub-Total 100.00 3,078,305.00 14,730,387.84 - - 2,575,000.00 - 20,383,692.84

Zamboanga del Norte 4 ongoing 3,213,000.00 1,260,000.00 463,750.00 500,000.00 375,000.00 375,000.00 6,186,750.00

Zamboanga del Sur 4 ongoing 4,470,600.00 1,260,000.00 463,750.00 500,000.00 375,000.00 375,000.00 7,444,350.00

Zamboanga Sibugay 3 ongoing 2,519,280.00 1,260,000.00 463,750.00 375,000.00 375,000.00 4,993,030.00

Zamboanga City 3 ongoing 1,071,000.00 630,000.00 463,750.00 375,000.00 375,000.00 2,914,750.00

Sub-Total 14 11,273,880.00 4,410,000.00 1,855,000.00 1,000,000.00 1,500,000.00 1,500,000.00 21,538,880.00

Zamboanga del Norte 125.00 ongoing 1,436,000.00 2,532,000.00 897,500.00 1,795,000.00 1,795,000.00 8,455,500.00

Zamboanga Sibugay 120.00 ongoing 1,096,500.00 1,899,000.00 1,920,000.00 1,077,000.00 1,077,000.00 7,069,500.00

Sub-Total 245.00 2,532,500.00 4,431,000.00 1,920,000.00 897,500.00 2,872,000.00 2,872,000.00 15,525,000.00

Zamboanga del Norte 240.00 ongoing 1,436,000.00 2,532,000.00 330,000.00 825,000.00 825,000.00 5,948,000.00

Zamboanga Sibugay 230.00 ongoing 1,096,500.00 1,899,000.00 247,500.00 825,000.00 825,000.00 4,893,000.00

Zamboanga City 70.00 ongoing 1,057,500.00 1,266,000.00 157,500.00 157,500.00 2,638,500.00

Sub-Total 540.00 3,590,000.00 5,697,000.00 - 577,500.00 1,807,500.00 1,807,500.00 13,479,500.00

A program aimed at giving agricultural grade salt/organic fertilizers to the farmers to support the nutritional needs

of the coconut thereby increasing production

4. SmallholderOil-Palm Plantation Dev't. Project

(SOPDP)

Community Household Level Coconut Processing (CHLCP)

A project aimed at giving machineries and equipment to the matured coconut farmers' organization to engaged into a coconut-based enterprises

Coconut Intercropping Project (CIP) - Crops/Fertilizer

A project aimed at giving planting materials to the Farmers

A project aimed at giving Oil Palm planting materials to interested farmers who wanted to start Oil Palm production

MC. 06, series of

2015

Investment Targets (in exact amount PhP): GOCC

hectares fertilized

MC. No. 5, series of

2018

MC. No. 01, series

2015

RDP Results Matrices

Indicators Addressed

no. of machineries

hectares fertilized

hectares planted

seedlings planted

hectares planted

MC. No. 5, series of

2018

Expected Output

Basis for Implement

ation

Status/ Level of Readiness

A planting/replanting project aimed at giving farmers chance to plant more coconut trees.

Chapter Outcome/ Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

Total Project Cost 2017-2022

Chapter 8-3- PCA IX Page 1 of 2

Page 31: Table of Contents (By Chapter)

2017 2018 2019 2020 2021 2022

Investment Targets (in exact amount PhP): GOCCRDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implement

ation

Status/ Level of Readiness

Chapter Outcome/ Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

Total Project Cost 2017-2022

Zamboanga City 2,588,734 ongoing 58,230,615.00 58,230,615.00 29,115,307.00 23,292,245.00 168,868,782.00

Isabela City 3,129,648 ongoing 134,000,000.00 137,140,000.00 106,000,000.00 377,140,000.00

Sub-Total 5,718,382 58,230,615.00 192,230,615.00 166,255,307.00 129,292,245.00 - - 546,008,782.00

6. Seed Farm

A program aimed at establishment of Coconut farms planted with selected coconut varieties for possible source of planting materials in the future

Payao, Zamboanga Sibugay

hectares planted/

maintained20 ha. ongoing 399,196.25 83,349.00 129,360.00 141,442.80 753,348.05

Sub-Total - - - 399,196.25 83,349.00 129,360.00 141,442.80 753,348.05

Zamboanga del Norte 100,000 ongoing 932,500.00 500,000.00 500,000.00 5,000,000.00 5,000,000.00 11,932,500.00

Zamboanga del Sur 50,000 ongoing 1,000,000.00 1,000,000.00 1,000,000.00 2,500,000.00 2,500,000.00 8,000,000.00

Zamboanga Sibugay 150,000 ongoing 1,000,000.00 1,000,000.00 1,000,000.00 7,500,000.00 7,500,000.00 18,000,000.00

Zamboanga City 500,000 ongoing 38,664,000.00 7,500,000.00 5,000,000.00 5,000,000.00 25,000,000.00 25,000,000.00 106,164,000.00

Isabela City 700,000 ongoing 35,000,000.00 35,000,000.00 70,000,000.00 Sub-Total 1,500,000 38,664,000.00 10,432,500.00 7,500,000.00 7,500,000.00 75,000,000.00 75,000,000.00 214,096,500

Sindangan, Zambo. Norteno. of site established

1 site 16,156,000.00 16,156,000.00

Ipil, Zamboanga Sibugayno. of site established

1 site 25,000,000.00 25,000,000.00

Sub-Total 0 - - 16,156,000.00 - 25,000,000.00 41,156,000.00

Regional Office Building (proposed budget) Pagadian City, Zamboanga del Sur

40,000,000.00 40,000,000.00

Provincial Office Building Ipil, Zamboanga Sibugay 8,000,000.00 8,000,000.00 Sub-Total 40,000,000.00 8,000,000.00 48,000,000.00

162,864,000.00 296,931,502.84 276,634,503.25 266,350,594.00 227,883,860.00 200,320,942.80 1,430,985,402.89 GRAND TOTAL

8. KAANIB - Coconut Hub Project

A program aimed at empowering matured coconut farmers organization by giving them financial assistance for acquisition of necessary machineries and equipment/giving them the needed skills training.

5. Coconut Scale Insect Emergency Action Program

An emergency Program aimed at controlling CSI infestation and spread to other areas

no. of trees treated

ongoing

7. Integrated Pest Management

A program aimed at formulation of solutions to prevent/control

pest infestation

MC. No. 05, series of

2016

no. of trees treated

Chapter 8-3- PCA IX Page 2 of 2

Page 32: Table of Contents (By Chapter)

Updated Zamboanga Peninsula Regional Development Investment Program (RDIP), 2017-2022

Agency: PHILIPPINE FIBER INDUSTRY DEVELOPMENT AUTHORITY Chapter: 8 Expanding Economic Opportunities in Agriculture, Forestry, and Fisheries

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15)Outcome 1: Inequality in Economic Opportunities ReducedMFO-1: Technical Support Services

Regionwide 71,600,000.00 71,600,000.00 Regionwide hectares 150.0 hectares Roadmap 2 1,275,000.00 1,416,000.00 1,574,050.00 1,749,300.00 1,943,300.00 7,957,650.00

Regionwide pieces100,000 pcs seedlings Directives GAA 2,000,000.00 222,220.00 249,000.00 274,000.00 304,830.00 338,700.00 3,388,750.00

Regionwide pieces200,000 pcs. seedlings Roadmap GAA 1,200,000.00 1,224,000.00 1,346,400.00 1,481,040.00 5,251,440.00

Regionwide hectares 120 hectares Roadmap GAA 274,000.00 600,000.00 600,000.00 666,660.00 740,740.00 823,050.00 3,704,450.00 Regionwide hectares 12 hectares Roadmap GAA 240,00 266,660.00 296,300.00 329,220.00 365,800.00 406,440.00 1,664,420.00 Regionwide no. 4 FFS Roadmap GAA 194,000.00 215,560.00 239,510.00 266,120.00 295,690.00 328,540.00 1,539,420.00

Conduct Livelihood Trainings Regionwide tranings 10 trainings Roadmap GAA 182,000.00 202,220.00 224,690.00 249,660.00 277,400.00 308,220.00 1,444,190.00 Regionwide tranings 10 trainings Roadmap GAA 300,000.00 333,330.00 370,370.00 411,520.00 457,240.00 508,050.00 2,380,510.00 Regionwide research 4 research Roadmap GAA 488,000.00 452,220.00 602,500.00 669,410.00 743,790.00 826,430.00 3,782,350.00 Regionwide units 4 MFDM Roadmap GAA 2,700,000.00 3,000,000.00 3,333,330.00 3,703,700.00 4,115,270.00 4,572,470.00 21,424,770.00

Abaca Disease Management Project Regionwide hectares 200 hectares Directives GAA 1,200,000.00 1,333,330.00 1,481,480.00 1,646,090.00 1,828,990.00 7,489,890.00 Regionwide hectares 100 hectares Directives GAA 2,700.00 2,970,000.00 3,267,000.00 3,593,700.00 3,953,070.00 4,348,377.00 18,134,847.00

GAA 400,000.00 400,000.00 444,440.00 493,830.00 548,700.00 2,286,970.00

trainings 10 trainings GAA 600,000.00 600,000.00 666,660.00 740,740.00 823,050.00 3,430,450.00

Production and distribution of IEC Regionwide pieces1,000 IEC distributed GAA

150,000.00 150,000.00 166,660.00 185,180.00 205,750.00 857,590.00

Regionwide units 50 units IHSD GAA 600,000.00 600,000.00 600,000.00 600,000.00 600,000.00 3,000,000.00

Regionwide no. GAA 500,000.00 500,000.00 555,550.00 617,280.00 685,870.00 2,858,700.00

Regionwide no. 3 units GAA 1,200,000.00 1,333,330.00 1,481,480.00 1,646,090.00 1,828,990.00 7,489,890.00

- Permits: -

Regionwide number GAA 75,000.00 60,000.00 66,670.00 74,080.00 82,310.00 91,450.00 449,510.00

Regionwide number GAA 250,000.00 250,000.00 277,780.00 308,640.00 342,940.00 381,040.00 1,810,400.00 Regionwide number GAA 150,000.00 150,000.00 166,670.00 185,190.00 205,760.00 228,630.00 1,086,250.00

Monitoring: Regionwide - Issuance of Traders LicensesIssuances of Permits to Transport Fiber (PTF)

Conduct Farmers TrainingsResearch & DevelopmentDistribution of Post Harvest Facilities

Cotton Development ProgramSupport to Acquire certification for abaca on Sustainable production

Capabiity building for farmers through training on updated abaca production and livelihood technologies

Fabrication of fiber extraction Devices for selected fiber producers in collaboration with LGUs and private sectorsConduct School on Air Program

Establishment of Livelihood Processing and Training Centers with LGUs for Organized Cooperative/ AssociationsMFO 2- FIBER DEVELOPMENT PROGRAM

Issuances of Primary Cetiificates (PCFI)

Conduct FFS

Mode of Funding

Level of Readiness(for 2020-

2022 projects

only)

Investment Requirements (in exact amount PhP)

Opening of New abaca FarmsProduction of Abaca Planting Materials through Macro-propagation

Production of Seed-Derived Abaca Planting MaterialsRehabilitation of old and Unproductive Abaca Farms

Maintenance of Abaca Nurseries Nurseries

Integrated Abaca Development Program

Chapter Outcome/ Project Title

Project Description/ Objectives

Specific Location

(Province/ City / Municipality /

Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementa

tion

Chapter 8-4-PHILFIDA IX Page 1 of 2

Page 33: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

Mode of Funding

Level of Readiness(for 2020-

2022 projects

only)

Investment Requirements (in exact amount PhP)

Chapter Outcome/ Project Title

Project Description/ Objectives

Specific Location

(Province/ City / Municipality /

Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementa

tion

Regionwide number 5 GAA 260,000.00 260,000.00 270,000.00 300,000.00 333,330.00 370,370.00 1,793,700.00 Number of Bales Inspected and Approved Regionwide number 7,000 bales GAA 2,250,000.00 250,000.00 277,780.00 308,640.00 342,940.00 381,040.00 3,810,400.00 Number of inspection Report submitted Regionwide number GAA 50,000.00 50,000.00 55,000.00 61,110.00 67,900.00 75,450.00 359,460.00

Regionwide number GAA 50,000.00 50,000.00 55,000.00 61,110.00 67,900.00 75,450.00 359,460.00 INFRASTRUCTURE PROJECTS -

D-1 - ZDS number 2 32,000,000.00 32,000,000.00 D3 -ZDN number 2 1,500,000.00 1,500,000.00

D3 -ZDN number2 km. road network 2,500,000.00 2,500,000.00

D3 -ZDN number 1 greenhouse 2,000,000.00 2,000,000.00 D3 -ZDN number 5,000,000.00 5,000,000.00

D3 -ZDN hectares/ KM

70 hectares completely fenced 5,000,000.00 5,000,000.00

GRAND TOTAL (Outcome 1 + Outcome 2) 9,225,700.00 15,257,210.00 17,884,260.00 19,657,080.00 141,321,820.00 24,009,397.00 227,355,467.00

Establishment of Greenhouse abaca nursery at SeedbankConstruction of Irrigation System in Seedbank

Completion of Perimeter Fencing of ZFRESS - 70.0 has.

No. of sites and Faciities monitored and or inspected with reports issued

Number of Establishment Re-inspected /Re-evaluated

Construction of 3 Storey Building for PhilFIDA IX Regional OfficeProcurement of one unit Hauling Truck - ZFRESSConstruction of Road Network at ZFRESS Research areas- 2 km pilotting

Chapter 8-4-PHILFIDA IX Page 2 of 2

Page 34: Table of Contents (By Chapter)

Updated Zamboanga Peninsula Regional Development Investment Program (RDIP), 2017-2022

Agency: BUREAU OF FISHERIES AND AQUATIC RESOURCES IX

Chapter: Expanding Economic Opportunities in Agriculture, Forestry, and Fisheries

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

3-0-00-00-0-00000-000 OPERATIONS 89,952 116,969 98,537 1,175,091 1,177,603 1,159,673 3,817,826 -

3-1-00-00-0-00000-000 Productivity in Fisheries Sector within ecological limits Increased 3-1-01-00-0-00000-000 FISHERIES DEVELOPMENT PROGRAM 43,507 57,043 39,083 769,598 761,211 732,206 2,402,647 -

3-1-01-01-0-00000-000 CAPTURE FISHERIES SUB-PROGRAM 19,564 21,649 10,314 235,392 242,454 249,727 779,100 -

3-1-01-01-1-00001-000 FISHING GEAR/PARAPHERNALIA DISTRIBUTION

19,564 21,649 10,314 235,392 242,454 249,727 779,100 -

PERSONNEL SERVICES

- Number of fishing gear/paraphernalia distributed 19,564 21,649 10,314 235,392 242,454 249,727 779,100 -

a. Gill Net 18,900 sets distributed 10,000 10,533 2,206 65,939 67,917 69,954.69 226,549.86

b. Hook and Lines 9,973 sets distributed 1,800 1,800 750 6,446 6,639 6,838.56 24,273.94

c. Lambaklad 11 lambaklad projects distributed 2,000 - 8,000 8,240 8,487.20 26,727.20

d. Fish Pot 16,456 pcs distributed 1,133 1,100 - 7,128 7,342 7,562.10 24,264.94

e. Payao 142 units distributed 2,060 2,060 1,920 6,282 6,470 6,664.57 25,457.03

f. Squid Jigger 7,525 sets distributed 1,030 1,030 750 5,049 5,200 5,356.48 18,415.95

g. Motorized banca 2886 units distributed - 3,000 72,832 75,017 77,267.26 228,115.81

h. Nonmotorized banca 835 units distributed 1,906 2,001 1,000 6,782 6,985 7,195.02 25,869.48

i. Marine engine 1631 units distributed - - 27,440 28,263 29,111.10 84,814.30

Investment Requirements (in Thousand Pesos)RemarksChapter Outcome/ Project Title Expected Output

Chapter 8-5- BFAR IXPage 1 of 11

Page 35: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Investment Requirements (in Thousand Pesos)RemarksChapter Outcome/ Project Title Expected Output

k. Multiple handline 1388 sets distributed - - 882 908 935.71 2,726.17

l. Tuna handline 2,007 sets distributed - - 1,624 1,673 1,722.90 5,019.62

o. Crab pot 23,848 pcs distributed 1,125 1,125 688 1,750 1,803 1,856.58 8,347.08

p. Modified stationary liftnet 32 units distributed 5,209 5,365 5,526.23 16,100.50

r. Fish corral 3 units distributed 2,500 2,575 2,652.25 7,727.25

s. Bagnet 3 units distributed 2,778 2,861 2,947.18 8,586.52

t. Life Vest 2,250 pcs distributed 510 563 580 597.29 2,250.18

u. Others 3 types of Other Fishing Gears distributed 14,188 14,614 15,052.05 43,853.69

3-1-01-02-0-00000-000 AQUACULTURE SUB-PROGRAM 19,308 15,838 11,779 288,115 296,504 305,144 936,688 -

3-1-01-02-1-00001-000 FISHERIES PRODUCTION AND DISTRIBUTION 14,008 13,538 10,030 204,239 210,227 216,395 668,437 -

PERSONNEL SERVICES 1,896.00 1,282 4,621.00 4,621.00 4,621.00 17,041.00

3-1-01-02-1-00001-001 Broodstock Development and Maintenance 1,231 1,240 620 3,065 3,157 3,252 12,565 -

- Number of broodstocks maintained (pcs) 1,219 1,220 600 3,051 3,143 3,237 12,469 -

a. Tilapia 13,000 pcs of Tilapia Broodstocks maintained 1,000 1,000 600 2,000 2,060 2,121.80 8,781.80

b. Carp 600 pcs of Carp broodstock maintained 600 618 636.54 1,854.54

c. Milkfish 219 pcs of Milkfish Broodstocks maintained 219 210 216 222.79 868.09

d. Other species of fish 600 pcs of Other Species maintained 220 241 248 255.68 964.91

- Number of broodstocks distributed (pcs) 12 20 20 14 14 15 95 -

a. Tilapia 104,000 pcs of tilapia broodstock distributed 12 20 20 14 14 14.85 95.27

Chapter 8-5- BFAR IXPage 2 of 11

Page 36: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Investment Requirements (in Thousand Pesos)RemarksChapter Outcome/ Project Title Expected Output

3-1-01-02-1-00001-002 Fingerlings/Seed Stocks Production and Distribution 10,881 12,298 8,128 196,553 202,449 208,523 638,831 -

- Number of fingerlings/seed stocks distributed (in M) 330 330 120 400 412 424 2,016 -

a. Tilapia 33 Million pcs of Tilapia fingerlings/seedstocks distributed 330 330 120 400 412 424.36 2,016.36

- Number of fingerlings/seed stock produced (in M) 1,200 1,200 500 2,000 2,060 2,122 9,082 -

a. Tilapia 36 Million fingerlings/ seedstock produced 1,200 1,200 500 2,000 2,060 2,121.80 9,081.80

- Number of fingerlings/seed stock procured (in M) 1,531 1,531 500 12,876 13,262 13,660 43,360 -

b. Milkfish 4.980 Million pcs of Milkfish fingerlings/ seedstock procured 1,531 1,531 500 2,876 2,962 3,051.15 12,451.43

d. Other species of fish 15.450 Million pcs of Shrimp fry procured 10,000 10,300 10,609.00 30,909.00

Additional proposed funding was intended for the procurement of fish seeds/ fingerlings for the 5 aquaculture potential commodity

- Number of seaweed propagules distributed (kg)

- - 1,350 38,292 39,440 40,624 119,706 -

b. Number of seaweed propagules procured 5.985 Million kgs of SW propagules procured 1,350 38,292 39,440 40,623.56 119,705.51

- Number of seaweed farm implements distributed

17,565 sets of SW Farm Implements distributed

7,200 8,669 5,500 106,740 109,942 113,240.47 351,291.67

- Number of seaweed nurseries established 3 units of SW nurseries established - - 110 113 116.70 340.00

- Number of seaweed nurseries maintained 4 units of SW Nurseries maintained 300 299 80 2,336 2,406 2,478.26 7,899.34

- Number of seaweed culture laboratory maintained

1 unit of SW Tissue Culture Laboratory maintained 225 226 78 5,248 5,405 5,567.60 16,750.04

- Number of mariculture parks maintained 1 unit of mariculture park maintained 95 43 28,174 29,019 29,889.80 87,221.02

- Number of cages for livelihood distributed

3 modules of Cages for livelihood distributed - 331 341 351.16 1,023.09

- Number of Environmental Monitoring conducted

6 Environmental monitoring conducted - 46 47 48.80 142.18

3-1-01-02-1-00002-000 OPERATION AND MANAGEMENT OF PRODUCTION FACILITIES

5,300 2,300 1,749 83,877 86,277 88,749 268,251 -

Chapter 8-5- BFAR IXPage 3 of 11

Page 37: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Investment Requirements (in Thousand Pesos)RemarksChapter Outcome/ Project Title Expected Output

PESONNEL SERVICES 3,876.79 3,876.79 3,876.79 11,630.37

- Number of Technology Stations operated/maintained

4 Technology Outreach Stations Maintained 5,300 2,300 1,749 10,000 10,300 10,609.00 40,258.00

- Establishment of Seaweed Development Center

1 Seaweed Development Center Established 50,000 51,500 53,045.00 154,545.00

- Number of hatcheries established/maintained 3 units hatcheries established 20,000 20,600 21,218.00 61,818.00

3-1-01-03-0-00000-000 POST-HARVEST SUB-PROGRAM

609 4,609 3,578 202,214 173,980 127,700 512,690 -

3-1-01-03-1-00001-000 PROVISION OF FISHERY ON-FARM EQUIPMENT AND POST-HARVEST FACILITIES

609 4,609 3,578 202,214 173,980 127,700 512,690 -

PERSONNEL SERVICES

3-1-01-03-1-00001-001 Establishment of Fishery On-Farm Equipment and Post-Harvest Facilities 609.0 4,609.0 578.0 177,214.0 145,140.4 97,994.6 426,145.1

- Number of Fish Landing Established 2 units Fish Landing established 35,000 35,000.00 2 units Proposed for the Boat/Fish Landing of Mabuhay, Zamboanga Sibugay

- Number of Ice Plant and Cold Storage (IPCS) established

1 unit IPCS establsihed 50,000 50,000 100,000.00

- Number of other postharvest equipment distributed

609 4,609 578 92,214 95,140 97,995 291,145 -

a. Fish stalls 160 units distributed - 160 164.80 324.80

b. Ice Making Machine 9 units distributed 15,000 15,450 15,913.50 46,363.50

d. Smokehouse 393 units distributed 309 309 8,000 8,240 8,487.20 25,345.20

e. Elevated solar dryer 2,155 units Estabished 300 300 13,755 14,168 14,592.68 43,115.33

f. Seaweed dryers 317 units established 3,000 40,000 41,200 42,436.00 126,636.00

g. Freezer 155 units distributed 3,000 3,090 3,182.70 9,272.70

i. Processing utensils 1,355 sets distributed 1,000 578 8,259 8,507 8,761.97 27,105.74

Chapter 8-5- BFAR IXPage 4 of 11

Page 38: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Investment Requirements (in Thousand Pesos)RemarksChapter Outcome/ Project Title Expected Output

j. Sorter 185 units distributed 4,200 4,326 4,455.78 12,981.78

3-1-01-03-1-00001-002 Establishment/maintenance & operation of Other Fishery-Related Infrastructure and Equipment

- - 3,000.0 25,000.0 28,840.0 29,705.2 86,545.2 -

- Post Harvest Service Facility Established/maintained 3 units Established 25,000 25,750 26,522.50 77,272.50

- Number of refrigerated van procured/operated 3 units procured / operated 3,000 3,090 3,182.70 9,272.70

3-1-01-04-0-00000-000 MARKET DEVELOPMENT SUB-PROGRAM

4,026 2,947 3,412 1,156 4,270 4,312 20,123 -

3-1-01-04-1-00001-000 MARKET DEVELOPMENT SERVICES

4,026 2,947 3,412 1,156 4,270 4,312 20,123 -

PERSONNEL SERVICES 3,356 2,276.00 2,880 2,880 2,880 14,272.00

3-1-01-04-1-00001-001 Marketing Assistance

270 271 132 431 443 457 2,004 -

- Number of market Monitoring conducted 25 25 22 26 27 28.07 153.79

- Number of investment/industry fora conducted 121 122 70 221 227 233.93 994.54

- Number of market matching facilitated 124 124 40 184 189 194.72 855.30

3-1-01-04-1-00001-002 Participation to Agri-Aqua Fairs and Exhibits

400 400 400 725 947 975 3,847 -

- Number of Agri-aqua fair/exhibit conducted 305 314 323.57 942.72

- Number of Agri-aqua fair/exhibit participated 400 400 400 420 433 445.58 2,498.18

- Number of investment facilitated 200 206.00 406.00

3-1-01-05-0-00000-000 LOCALLY FUNDED AND FOREIGN ASSISTED SUB-PROGRAM

- 12,000 10,000 42,721 44,003 45,323 154,047 -

Chapter 8-5- BFAR IXPage 5 of 11

Page 39: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Investment Requirements (in Thousand Pesos)RemarksChapter Outcome/ Project Title Expected Output

LOCALLY FUNDED PROJECTS - 12,000 10,000 42,721 44,003 45,323 154,047 -

3-1-01-05-2-00001-000 Special Areas for Agricultural Development (SAAD)

- 12,000 10,000 42,721 44,003 45,323 154,047 -

- Number of Livelihood Projects distributed 11,000 8,000 33,129 34,123 35,146.33 121,397.76

- Number of trainings conducted 1,000 5,200 5,356 5,516.68 17,072.68

- Number of technical assistance provided 1,000 1,000 4,392 4,524 4,659.80 15,576.19

3-1-02-00-0-00000-000 FISHERIES REGULATORY & LAW ENFORCEMENT PROGRAM

18,036 30,505 33,121 294,442 302,822 311,302 990,229 -

3-1-02-00-1-00001-000 MONITORING, CONTROL AND SURVEILLANCE

10,740 12,250 11,725 79,323 81,669 84,047 279,754 -

PERSONNEL SERVICES 2,395 2,357.80 2,395 2,395 9,542.80

3-1-02-00-1-00001-001 Regulations and enforcement Activities

10,300 11,800 8,995 76,500 78,795 81,159 267,549 -

- Establishment of MCS Center 5,000 5,150 5,304.50 15,454.50

- Number of multi-mission vessels procured 3,000 3,090 3,182.70 9,272.70

- Number of multi-mission vessels /operated 6,300 6,300 4,896 15,000 15,450 15,913.50 63,859.50

- Number of MCS and Patrol vessels procured - 48,000 49,440 50,923.20 148,363.20

- Number of Vessel Monitoring Systems operated 1,000 1,000 1,030 1,060.90 4,090.90

- Number of Fishery Protection and Law Enforcement Group deployed 3,300 3,800 3,399 3,500 3,605 3,713.15 21,317.15

- Number of fishery law enforcement field operations conducted 700 700 700 1,000 1,030 1,060.90 5,190.90

3-1-02-00-1-00001-002 Biotoxin/HAB Monitoring

440 450 335 465 479 493 2,662 -

Chapter 8-5- BFAR IXPage 6 of 11

Page 40: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Investment Requirements (in Thousand Pesos)RemarksChapter Outcome/ Project Title Expected Output

- Number of Harmful Algal Bloom (HAB) monitoring conducted 240 240 125 265 273 281.14 1,424.09

- Number of Harmful Algal Bloom (HAB) laboratories maintained 200 210 210 200 206 212.18 1,238.18

3-1-02-00-1-00002-000 QUALITY CONTROL AND INSPECTION

1,947 6,904 4,075 15,894 16,392 16,792 62,004 -

PERSONNEL SERVICES 881 5624 3,062 2,951.93 3,062 3,062 18,642.93

3-1-02-00-1-00002-001 Monitoring and Inspection of Fishery Faclities

404 897 513 7,363 7,584 7,811 24,572 -

- Number of fishery facilities and aquaculture farms monitored/inspected 159 370 200 1,500 1,545 1,591.35 5,365.35

- Number of analysis conducted 280 100 1,500 1,545 1,591.35 5,016.35

- Number of Laboratories maintained/operated 245 247 213 4,363 4,494 4,628.71 14,190.60

3-1-02-00-1-00002-002 Monitoring and Inspection of Fishery Products

662 383 500 5,579 5,746 5,919 18,789 -

- Number of fishery products monitored/inspected 173 173 200 500 515 530.45 2,091.45

- Number of analysis conducted 279 100 1,000 1,030 1,060.90 3,469.90

- Number of Laboratories maintained/operated 210 210 200 4,079 4,201 4,327.41 13,227.78

3-1-02-00-1-00003-000 QUARANTINE, REGISTRATION AND LICENSING

2,950 748 7,918 11,484 11,640 11,800 46,540 -

PERSONNEL SERVICES 1,202.00 5,326 6,283.72 6,283.72 6,283.72 25,379.16

3-1-02-00-1-00003-001 Permit Issuance 1,748 748 2,592 5,200 5,356 5,517 21,160 -

- Number of permits, licenses and accreditations issued

1,144 144 2,138 2,100 2,163 2,228 9,917 -

a. commercial fishing vessels and gears 12 12 13 500 515 530.45 1,582.45

b. FLA covered areas 1,000 2,000 1,000 1,030 1,060.90 6,090.90

Chapter 8-5- BFAR IXPage 7 of 11

Page 41: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Investment Requirements (in Thousand Pesos)RemarksChapter Outcome/ Project Title Expected Output

c. other fisheries entities 80 80 85 500 515 530.45 1,790.45

d. fisheries products 52 52 40 100 103 106.09 453.09

- Number of inspections conducted 604 604 454 3,100 3,193 3,289 11,243 -

a. commercial fishing vessels and gears 206 206 140 1,000 1,030 1,060.90 3,642.63

b. FLA covered areas 210 210 120 1,000 1,030 1,060.90 3,630.90

c. other fisheries entities 133 133 80 1,000 1,030 1,060.90 3,436.89

d. fisheries products 55 55 114 100 103 106.09 533.09

3-1-02-00-1-00004-000 COASTAL AND INLAND FISHERIES RESOURCE MANAGEMENT

2,399 10,603 9,403 187,742 193,122 198,662 601,931 -

PERSONNEL SERVICES 1,104 6824 8425 8,425.00 8,425.00 8,425.00 41,628.00

- Number of LGUs assisted 670 670 700 45,739 47,111 48,524.51 143,414.68 For the Fisheries and Coastal Resource Management Development Project of Zamboanga Del Norte in 2020

- Number of Bays co-managed 1,500 82,247 84,714 87,255.84 255,717.25

- Number of Marine Mammal Strandling Facility operated - 5,000 5,150 5,304.50 15,454.50

- Number of sanctuaries monitored/assisted 577 577 278 25,253 26,011 26,790.91 79,486.50

- Number of mangrove propagules planted (in thousand) - 19,518 20,104 20,706.65 60,328.19

Mangrove Rehabilitation Project proposed by PLGU Zamboanga Del Norte

- Number of communal waters stocked 48 48 60 62 63.65 281.45

- Number of Lakes/reservoir developed/restored (NIFEP) 984 1,500 1,545 1,591.35 5,620.35

3-1-03-00-0-00000-000 FISHERIES EXTENSION PROGRAM 28,360 29,371 26,293 106,893 109,287 111,754 411,957 -

Chapter 8-5- BFAR IXPage 8 of 11

Page 42: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Investment Requirements (in Thousand Pesos)RemarksChapter Outcome/ Project Title Expected Output

3-1-03-00-1-00001-000 EXTENSION SUPPORT, EDUCATION AND TRAINING SERVICES

28,360 29,371 26,293 106,893 109,287 111,754 411,957 -

PERSONNEL SERVICES 1,063.00 27,070.51 27,070.51 27,070.51 82,274.53

3-1-03-00-1-00001-001 Provision of Training and Technical Assistance

14,045 14,051 9,270 26,703 27,504 28,329 119,902 -

- Operation of Regional Fisheries Training Centers and Asian Fisheries Academy 3,314 3,314 3,501 9,712 10,003 10,303.46 40,147.82

- Number of trainings conducted 4,659 4,663 2,590 9,750 10,043 10,344 42,048 -

a. Aquaculture 105 aquaculture trainings conducted

1,314 1,315 850 1,857 1,913 1,970.09 9,218.80

b. Municipal 49 municipal trainings conducted

360 360 250 762 785 808.85 3,326.36

c. Commercial 35 commercial trainings conducted

254 255 140 1,058 1,089 1,122.03 3,918.00

d. Regulatory 56 reguatory trainings conducted

865 866 500 2,568 2,645 2,724.39 10,168.43

e. Post Harvest 56 post harvest trainings conducted

721 721 350 1,713 1,764 1,817.32 7,086.71

f. Others 70 other fishery related trainings conducted 1,145 1,146 500 1,792 1,846 1,901.13 8,329.89

- Number of training materials distributed

- Number of technical assistance provided (incl. access to credit) 6,072 6,074 3,179 7,241 7,458 7,682 37,706 -

a. Aquaculture 17, 850 aquaculture TA rendered

2,037 2,038 788 2,601 2,679 2,759.40 12,902.31

b. Municipal 8,925 municipal TA rendered

1,501 1,502 638 1,728 1,780 1,833.24 8,981.95

c. Commercial 7,483 commercial TA rendered

954 954 535 1,097 1,130 1,163.81 5,833.63

d. Regulatory 6,083 regulatory TA rendered

954 954 560 1,095 1,128 1,161.69 5,852.24

e. Post Harvest 7,483 post Harvest TA rendered

212 213 223 244 251 258.86 1,402.17

f. Others 7,343 Other fishery related TA rendered 414 414 435 476 490 504.99 2,733.76

Chapter 8-5- BFAR IXPage 9 of 11

Page 43: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Investment Requirements (in Thousand Pesos)RemarksChapter Outcome/ Project Title Expected Output

3-1-03-00-1-00001-002 Establishment of Technology Demonstrations

4,700 4,700 3,935 39,243 40,420 41,633 134,631 -

- Number of technology demonstrations established

4,700 4,700 3,935 39,243 40,420 41,633 134,631 -

a. Aquaculture 4,000 3,800 2,935 20,220 20,827 21,451 73,233 -

Integrated Farming 100 800 824 848.72 2,572.72

Upland Aquaculture - 1,000 1,030 1,060.90 3,090.90

Pond Aquaculture Technology - 500 515 530.45 1,545.45

Cage Aqucultyure Technology 600 600 - 3,300 3,399 3,500.97 11,399.97

Pen AquculCulture Technology 200 - 1,000 1,030 1,060.90 3,290.90

Aquasilvi/Mangrove Aquaculture 1,700 1,500 300 3,000 3,090 3,182.70 12,772.70

Aquarium Fish Culture - - - - -

Shellfish Culture 300 3,500 3,605 3,713.15 11,118.15

Aquatourism "Fishyalan" 1,735 2,000 2,060 2,121.80 7,916.80

Seaweed Farming 1,700 1,500 500 5,120 5,274 5,431.81 19,525.41

b. Capture - - 500 16,400 16,892 17,399 51,191 -

Fishing Technology 500 16,400 16,892 17,398.76 51,190.76

c. Post Harvest 700 900 500 2,623 2,702 2,783 10,207 -

Post Harvest Technology 700 900 500 2,623 2,702 2,782.74 10,207.43

3-1-03-00-00001-003 Conduct of Information, Education and Communication

632 2,040 1,461 1,764 1,817 1,871 9,585 -

- Number of IEC materials developed/produced 367 1,080 1,061 1,323 1,363 1,403.57 6,597.26

- Number of IEC materials distributed - - -

Chapter 8-5- BFAR IXPage 10 of 11

Page 44: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Investment Requirements (in Thousand Pesos)RemarksChapter Outcome/ Project Title Expected Output

- Number of IEC activities conducted 265 960 400 441 454 467.86 2,988.09

3-1-03-00-00001-004 Strengthening Partnership with Stakeholders

7,920 8,580 11,627 12,112 12,475 12,850 65,564 -

- No. of Fisherfolk Operations Center, FARMC PMC operated 960 4,840 5,040 4,938 5,086 5,238.72 26,102.86

- Number of FARMCs strengthened 200 200 210 221 228 234.46 1,293.09

- Number of LGU technicians assisted 2,880 2,880 2,880 3,456 3,560 3,666.47 19,322.15

- Number of other stakerholders assisted (academe; NGAs; NGOs; POs) 3,880 - - - - 3,880.00

- Number of fisherfolk children provided with scholarship 660 3,497 3,497 3,602 3,709.97 14,965.88

3-1-04-00-0-00000-000 FISHERIES POLICY PROGRAM 50 50 40 4,158 4,283 4,411 12,992 -

3-1-04-00-1-00001-000 FORMULATION, MONITORING AND EVALUATION OF POLICIES, PLANS AND PROGRAMS

50 50 40 4,158 4,283 4,411 12,992 -

PERSONNEL SERVICES

3-1-04-00-1-00001-003 Conduct of stakeholders

- - - 4,103 4,226 4,353 12,682 -

- Number of stakeholders consultations conducted 1,103 1,136 1,170.17 3,409.26

- Number of Conferences/ workshops on program development organized 3,000 3,090 3,182.70 9,272.70

3-1-04-00-1-00001-004 Fisheries Data Updating

50 50 40 55 57 58 310 -

- Number of fisheries data updated 7 annual regional fisheries data updated 50 50 40 55 57 58.49 310.40

Automatic Appropriations - 1,461 2,641 2,641 - 2,641 9,384 -

Retirement and Life Insurance Premium (RLIP) 1,461 2,641 2,641 2,641 9,384

Special Provision - - - - - - - -

Chapter 8-5- BFAR IXPage 11 of 11

Page 45: Table of Contents (By Chapter)

Zamboanga Peninsula CY 2021 Annual Investment Program (AIP)

Agency: Philippine Fisheries Development Authority- Zamboanga Fish Port ComplexChapter: 8 Expanding Economic Opportunities in Agriculture, Forestry, and Fisheries

Grand Total

(1) (2) (3) (28)

Rehabilitation/Improvement of the Zamboanga Fish Port Complex Project Sangali, Zamboanga City 1,159,111.00

GRAND TOTAL 1,159,111.00

2022 Investment Targets (in PHP '000)Chapter Outcome/ Project

TitleProject Description/

Objectives

Specific Location (Province/ City / Municipality /

Barangay)

Chapter 8-6-PFDA-ZFPC Page 1 of 1

Page 46: Table of Contents (By Chapter)

Updated Zamboanga Peninsula Regional Development Investment Program (RDIP), 2017-2022

Agency: Department of Agrarian Reform (DAR) IXChapter: EXPANDING ECONOMIC OPPORTUNITIES IN AGRICULTURE, FORESTRY AND FISHERIES

2017(Actual)

2018(Actual)

2019(Per GAA)

2020 (Per APM)

2021(Proposed)

2022(Proposed) Total

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15)Outcome 1: PAP 1 : Land Tenure Security Program (LTSP)

Regional Total 4,330.00 3,255.00 1,846.00 2,754.00 1,181.00 3,181.00 16,547.00 Regional Office - Zamboanga del Norte 2,285.00 1,655.00 765.00 1,113.00 513.00 823.00 7,154.00 Zamboanga del Sur 347.00 871.00 286.00 1,072.00 653.00 2,358.00 5,587.00 Zamboanga Sibugay 1,698.00 729.00 795.00 569.00 15.00 3,806.00

Regional Total 736.00 610.00 460.00 869.00 1,140.00 971.00 4,786.00 Regional OfficeZamboanga del Norte 186.00 89.00 61.00 247.00 305.00 315.00 1,203.00 Zamboanga del Sur 178.00 280.00 184.00 375.00 501.00 315.00 1,833.00 Zamboanga Sibugay 372.00 241.00 215.00 247.00 334.00 341.00 1,750.00

Regional Total 14,300.00 7,064.00 5,529.00 6,592.00 14,382.00 15,692.00 63,559.00 Regional OfficeZamboanga del Norte 5,189.00 2,668.00 722.00 1,521.00 3,600.00 3,245.00 16,945.00 Zamboanga del Sur 5,950.00 2,022.00 1,804.00 2,302.00 5,740.00 6,054.00 23,872.00 Zamboanga Sibugay 3,161.00 2,374.00 3,003.00 2,769.00 5,042.00 6,393.00 22,742.00 Regional Total - - 762.00 817.00 1,200.00 1,500.00 4,279.00 Regional Office 762.00 817.00 1,200.00 1,500.00 Zamboanga del NorteZamboanga del Sur - Zamboanga Sibugay - Total for Program 1- LTSP 19,366.00 10,929.00 8,597.00 11,032.00 17,903.00 21,344.00 89,171.00 Regional Office - - 762.00 817.00 1,200.00 1,500.00 4,279.00 Zamboanga del Norte 7,660.00 4,412.00 1,548.00 2,881.00 4,418.00 4,383.00 25,302.00 Zamboanga del Sur 6,475.00 3,173.00 2,274.00 3,749.00 6,894.00 8,727.00 31,292.00 Zamboanga Sibugay 5,231.00 3,344.00 4,013.00 3,585.00 5,391.00 6,734.00 28,298.00

PAP 2 : Agrarian Justice Delivery Program (AJDP)Supervision and Management for effective delivery of legal Regional Total 1,118.00 3,106.00 3,271.00 3,369.00 3,526.00 3,632.00 16,904.00

Regional Office 1,118.00 3,106.00 3,271.00 3,369.00 1,919.00 1,976.00 13,641.00 Zamboanga del Norte 634.00 653.00 1,287.00 Zamboanga del Sur 581.00 599.00 1,180.00 Zamboanga Sibugay 392.00 404.00 796.00

Adjudication of Agrarian Reform Cases (AARC)

Legal complaints resolved.Regional Total 5,534.00 4,261.00 4,315.00 5,939.00 7,217.00 7,659.00 34,925.00

Regional Office 468.00 480.00 502.00 674.00 731.00 776.00 3,631.00 Zamboanga del Norte 1,868.00 1,310.00 1,325.00 1,818.00 2,159.00 2,295.00 10,775.00

9,479 hectares with approved subdivision

plans 14,427 hectares

redocumented with individual CLOAs

4,082 hectares DNYD/P & FSD lands

redocumented Supervision & Management of systems & procedures relative to tenurial security program

To supervise & monitor the implementation of the different activties under the LTS Program.

To provide legal interventions to Agrarian Reform Beneficiaries (ARBs) and landowners.

RA 9700 CARPER LAW

5,135 cases resolved by DAR Adjudication Board affecting 4,328 ARBs & 792 landowners

Land Acquisition and Distribution

To continue the processing of landholdings covered under CARP for distribution to Agrarian Reform Beneficiaries (ARBs).

CARP Lands with titles (EPs/CLOAs) distributed to ARBs.

Distributed a total of 3,464 hectares of CARP lands to 1,587 ARBs .

RA 9700 CARPER

LAW

General Appropriation Act (GAA)

Leasehold Operations To continue the processing of landholdings covered under CARP for distribution to Agrarian Reform Beneficiaries (ARBs).

Agricultural lands placed under leasehold contract agreements (LCAs) to tenant-tillers.

6,512 hectares placed under LCAs) involving

2,748 tenant-tillers

Post Land Distribution To address post-LAD problems to stabilize ARBs land ownership,protect their rigths and adress the concerns of affected landowners as well.

Landholdings redocumented & subdivided with individual CLOAs.

Chapter Outcome/ Project Title

Project Description/ Objectives

Specific Location (Province/ City / Municipality /

Barangay)

RDP Results Matrices Indicators

AddressedExpected Output

Basis for Implement

ation

Mode of Funding

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (PhP '000)

Chapter 8-7- DAR IXPage 1 of 3

Page 47: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Per GAA)

2020 (Per APM)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title

Project Description/ Objectives

Specific Location (Province/ City / Municipality /

Barangay)

RDP Results Matrices Indicators

AddressedExpected Output

Basis for Implement

ation

Mode of Funding

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (PhP '000)

Zamboanga del Sur 1,614.00 1,345.00 1,402.00 1,946.00 2,518.00 2,668.00 11,493.00 Zamboanga Sibugay 1,584.00 1,126.00 1,086.00 1,501.00 1,809.00 1,920.00 9,026.00

Resolution of Agrarian Law Implementation (ALI) Cases

Agrarian Law Implemented.

Regional Total 1,196.00 3,674.00 3,262.00 5,613.00 5,264.00 5,583.00 24,592.00 Regional Office 365.00 1,432.00 1,143.00 1,618.00 1,712.00 1,813.00 8,083.00 Zamboanga del Norte 253.00 1,017.00 789.00 1,495.00 1,359.00 1,440.00 6,353.00 Zamboanga del Sur 218.00 720.00 806.00 1,532.00 1,337.00 1,417.00 6,030.00 Zamboanga Sibugay 360.00 505.00 524.00 968.00 856.00 913.00 4,126.00

Regional Total 3,236.00 7,250.00 5,797.00 9,499.00 10,069.00 10,669.00 46,520.00 Regional Office 381.00 900.00 754.00 1,230.00 1,303.00 1,381.00 5,949.00 Zamboanga del Norte 1,001.00 2,698.00 1,993.00 3,244.00 3,438.00 3,641.00 16,015.00 Zamboanga del Sur 961.00 2,244.00 1,855.00 3,060.00 3,244.00 3,437.00 14,801.00 Zamboanga Sibugay 893.00 1,408.00 1,195.00 1,965.00 2,084.00 2,210.00 9,755.00 Total for Program 2- AJDP 11,084.00 18,291.00 16,645.00 24,420.00 26,076.00 27,543.00 124,059.00 Regional Office 2,332.00 5,918.00 5,670.00 6,891.00 5,665.00 5,946.00 32,422.00 Zamboanga del Norte 3,122.00 5,025.00 4,107.00 6,557.00 7,590.00 8,029.00 34,430.00 Zamboanga del Sur 2,793.00 4,309.00 4,063.00 6,538.00 7,680.00 8,121.00 33,504.00 Zamboanga Sibugay 2,837.00 3,039.00 2,805.00 4,434.00 5,141.00 5,447.00 23,703.00

PAP 3 : Agrarian Reform Beneficiaries Development and Sustainability Program (ARBDSP)

Regional Total 2,202.00 5,642.00 4,469.00 4,212.00 4,148.00 4,738.00 25,411.00 Regional Office 1,484.00 1,655.00 1,031.00 940.00 3,000.00 3,500.00 11,610.00 Zamboanga del Norte 255.00 1,520.00 1,208.00 1,093.00 455.00 490.00 5,021.00 Zamboanga del Sur 235.00 1,288.00 1,220.00 1,170.00 468.00 504.00 4,885.00 Zamboanga Sibugay 228.00 1,179.00 1,010.00 1,009.00 225.00 244.00 3,895.00

Social Infrastructure Building (SIB)

Regional Total 7,026.00 7,490.00 5,709.00 6,501.00 6,866.00 7,335.00 40,927.00 Regional OfficeZamboanga del Norte 2,605.00 2,205.00 1,637.00 1,826.00 2,025.00 2,095.00 12,393.00 Zamboanga del Sur 1,934.00 2,396.00 1,932.00 2,899.00 2,180.00 2,315.00 13,656.00 Zamboanga Sibugay 2,487.00 2,889.00 2,140.00 1,776.00 2,661.00 2,925.00 14,878.00

24,218 ARBs were trained with enterprise development involving 342 ARBOs

58 products & services developed

39 ARBOs became microfinance service providers & 25,757 ARBs were provided with microfinance services

RA 9700 CARPER LAW

*106,030 ARBs trained & 20,560 ARBs became member of ARB organizations

Enterprise Development, Economic and Physical Infrastructure Support

To ensure the productivity of the lands awarded to ARBs through the provision of support services to increase productivity and income of the farmers.

Agrarian Reform Beneficiary Organizations (ARBOs) & Agrarian Reform Beneficiaries (ARBs) transformed into productive and profitable enterpreneurs.

Supervision and Management for Effective Delivery of Support Services

To ensure the productivity of the lands awarded to ARBs through the provision of support services to increase productivity and income of the farmers.

Agrarian Reform Beneficiary Organizations (ARBOs) & Agrarian Reform Beneficiaries (ARBs) transformed into productive and profitable enterpreneurs.

342 ARBOs assessed & 813 functional infrastructures maintained

9,206 ALI cases disposed/ resolved representing 8,736 ARBs involving 11,319 hectares

Provision of Agarian Legal Assistance (ALA)

To provide legal interventions to Agrarian Reform Beneficiaries (ARBs) and landowners.

Legal Assistance to Farmers Provided.

18,721 agrarian-related conflicts processed, Represented & assisted the farmers in 4,696 quasi-judicial cases

landowners

Chapter 8-7- DAR IXPage 2 of 3

Page 48: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Per GAA)

2020 (Per APM)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title

Project Description/ Objectives

Specific Location (Province/ City / Municipality /

Barangay)

RDP Results Matrices Indicators

AddressedExpected Output

Basis for Implement

ation

Mode of Funding

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (PhP '000)

342 organizations were provided with credit & 21,528 ARBs with credit services116 ARBOs were provided with support facilities & equipment

Regional Total 22,015.00 14,819.00 7,697.00 9,444.00 16,619.00 17,283.00 87,477.00 Regional Office 340.00 60.00 400.00 Zamboanga del Norte 6,974.00 4,716.00 2,517.00 3,100.00 4,815.00 4,886.00 27,008.00 Zamboanga del Sur 8,386.00 5,150.00 2,673.00 3,199.00 6,772.00 7,319.00 33,499.00 Zamboanga Sibugay 6,655.00 4,613.00 2,507.00 3,085.00 5,032.00 5,078.00 26,970.00

Climate Resilient Farm Productivity Support

1,270 ARBs were trained on farming technology & technology handholding37 ARBOs were provided with AES, farm infra support, farm machineries & equipment

Regional Total 1,945.00 1,425.00 17,550.00 7,200.00 2,500.00 2,500.00 19,620.00 Regional Office 13,500.00 Zamboanga del Norte 650.00 1,350.00 1,800.00 500.00 500.00 4,800.00 Zamboanga del Sur 645.00 545.00 1,350.00 1,800.00 1,500.00 1,500.00 7,340.00 Zamboanga Sibugay 650.00 880.00 1,350.00 3,600.00 500.00 500.00 7,480.00 Total for Program 3 -ARBDSP 33,188.00 29,376.00 35,425.00 27,357.00 30,133.00 31,856.00 187,335.00 Regional Office 1,484.00 1,995.00 14,531.00 1,000.00 3,000.00 3,500.00 25,510.00 Zamboanga del Norte 10,484.00 8,441.00 6,712.00 7,819.00 7,795.00 7,971.00 49,222.00 Zamboanga del Sur 11,200.00 9,379.00 7,175.00 9,068.00 10,920.00 11,638.00 59,380.00 Zamboanga Sibugay 10,020.00 9,561.00 7,007.00 9,470.00 8,418.00 8,747.00 53,223.00

63,638.00 58,596.00 60,667.00 62,809.00 74,112.00 80,743.00 400,565.00 Regional Office 3,816.00 7,913.00 20,963.00 8,708.00 9,865.00 10,946.00 62,211.00 Zamboanga del Norte 21,266.00 17,878.00 12,367.00 17,257.00 19,803.00 20,383.00 108,954.00 Zamboanga del Sur 20,468.00 16,861.00 13,512.00 19,355.00 25,494.00 28,486.00 124,176.00 Zamboanga Sibugay 18,088.00 15,944.00 13,825.00 17,489.00 18,950.00 20,928.00 105,224.00

40,000.00 40,000.00 19,672.12 88,014.92 71,276.92 76,849.20 74,828.91 53,631.61 384,273.69

83,310.12 146,610.92 131,943.92 139,658.20 188,940.91 134,374.61 824,838.69

RESEARCH AND DEVELOPMENT

GRAND TOTAL Convergence on Value Chain Enhancement for Rural Growth & Empowerment (Project ConVERGE)

TOTAL (LTSP + ADJP + ARBDSP)

Chapter 8-7- DAR IXPage 3 of 3

Page 49: Table of Contents (By Chapter)

RDIP Form B (Funding Counterparts)Zamboanga Peninsula Regional Development Investment Program 2017-2022CHAPTER 8: EXPANDING ECONOMIC OPPORTUNITIES IN AGRICULTURE, FORESTRY, AND FISHERIESAgency: Department of Agrarian Reform (DAR) IXMode of Implementation: PPP, ODA, LGU

2016 and Prior 2017 2018 2019 2020 2021 2022 Total for2017-2022

Outcome: Inequality in Economic Opportunities Reduced Foreign Assisted Project (FAP) - Convergence on Value Chain Enhancement for Rural Growth & Empowerment (Project ConVERGE)

1. Participa-tory Value Chain Analysis & Planning

LGU Persons/ households production/farm income increased.

Regional Total 2,387,999 4,969,000 1,249,320 - - - 6,218,320.00 Regional Office 266,000 4,609,000 387,330 4,996,330.00 Zamboanga del 707,333 120,000 287,330 407,330.00 Zamboana del Sur 707,333 120,000 287,330 407,330.00 Zamboanga Sibugay 707,333 120,000 287,330 407,330.00

2. Integrated Small holders Agricultural and Rural Enterprise DevelopmentSupport to Farm Enterprises Development

LGU Persons/ households with improved quality and quantity of farm production

Cropping season will be increased from 2 to 3x a year; Produce good quality products

ConVERGE Financing Agreement between PH & IFAD

for Loan Number 2000001259

For the Regional Office, figures available until 2019 only

Regional Total 6,844,292 25,947,000 6,674,440 64,485,600 70,341,238 49,143,938 - 216,592,215.00 Regional Office 250,000 32,000 1,416,000 4,480,000 1,416,000 1,416,000 8,760,000.00 Zamboanga del 2,198,097 10,852,000 1,923,720.00 27,332,000 40,192,237.50 20,354,937.50 100,654,895.00 Zamboanga del Norte Resettlement Cluster Integrated Rubber Enterprise (ZNR-CIRE) - Godod, Leon Postigo, Salug, Tampilisan

District III

Improvement of quantity and quality of production at the farm level, and the phasing of production to meet market demands.

Figures (2016-2018) from province's procurement docs; Figures for 2019-2021 are from respective FS. Latter is subject to adjustment and realignment.

Value chain business development plans for selected crops validated and implemented resulting in improved farm income.

Market demand analysis and value chain analysis undertaken and ARC cluster value chain investment plans prepared

ConVERGE Financing Agreement between the Rep. of

the Phil. & International Fund for

Agricultural Dev't. (IFAD) for Loan

Number 2000001259 Figures from the 2016, 2017 and 2018 RPB; No more Comp A budget for 2019 onwards

Basis for Implemen-tation

Investment Targets (in exact amount PhP): NG Loan

Expected Output

Remarks (e.g. LGU-identified)

This project builds on the initiatives of DAR to provide integrated & complementary support services that

Chapter Outcome/

Project Title

Project Description/ Objectives

Co- Imple-menting Agency

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Chapter 8-7-DAR IX - Project ConvergePage 1 of 4

Page 50: Table of Contents (By Chapter)

2016 and Prior 2017 2018 2019 2020 2021 2022 Total for2017-2022

Basis for Implemen-tation

Investment Targets (in exact amount PhP): NG Loan

Expected Output

Remarks (e.g. LGU-identified)

Chapter Outcome/

Project Title

Project Description/ Objectives

Co- Imple-menting Agency

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Zamboanga del Sur

2,198,097 10,186,000 1,411,000.00 14,774,000 4,994,000.00 4,994,000.00 36,359,000.00

SALUG VALLEY CLUSTER AGRICULTURE DEVELOPMENT PROJECT -Mahayag, Dumingag, Molave, Tambulig, Aurora, Magsaysay, Josefina

District I

Zamboanga 2,198,097 4,877,000 1,923,720.00 17,899,600 23,739,000.00 22,379,000.00 70,818,320.00 Salipyasin ARC Cluster Project - Ipil, Kabasalan, Naga, RT Lim, Titay and Tungawan

District II

Chapter 8-7-DAR IX - Project ConvergePage 2 of 4

Page 51: Table of Contents (By Chapter)

2016 and Prior 2017 2018 2019 2020 2021 2022 Total for2017-2022

Basis for Implemen-tation

Investment Targets (in exact amount PhP): NG Loan

Expected Output

Remarks (e.g. LGU-identified)

Chapter Outcome/

Project Title

Project Description/ Objectives

Co- Imple-menting Agency

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Value Chain Related Rural Infrastructure

Rural Infrastructures (roads & irrigation proj.) provided to farmer beneficiaries.

ConVERGE Financing Agreement between PH & IFAD

for Loan Number 2000001259

Figures shown are lump sum for entire implementation of each RI project

Regional Total - 52,029,917 59,065,485 5,679,670 200,000 200,000.00 - 111,685,412.51 Regional Office 983,000 1,956,000.00 2,150,660.00 200,000.00 200,000.00 5,489,660.00 Zamboanga del Norte

- 32,808,544 9,297,000 242,670 - - - 42,348,213.68 1. Concreting/ Rehab of Farm to Market Road

LGU/ DPWH

Sitio Rebe-Brgy. Baluno-Phase I Mun. of Godod

1.47km 8,888,218 8,888,218.29

2. Concreting/ Rehab of Farm to Market Road

LGU/ DPWH

Sitio Rebe-Brgy. Baluno-Phase II Mun. of Godod

3.30km 19,203,961 19,203,961.10

3. Concreting/ Rehab of Farm to Market Road

LGU/ DPWH

Sitio Rebe-Brgy. Baluno-Phase III Mun. of Godod

.80km 4,659,364 4,659,364.29

4. Rehab of Farm to Market Road

LGU/ DPWH

Cabong to Tininggaan FMR (Phase I)

3.66km 9,240,000 9,240,000.00

Opex 57,000 57,000 242,670 Zamboanga del Sur

- 18,181,374 31,635,544 2,242,670 - - - 52,059,587.93

1. Construction of Communal Irrigation System

LGU/ NIA Brgy. Tagolalo, Mun. of Aurora (Phase I and II)

94 has.10,081,684 6,549,374.02

16,631,058.23

2. Concreting of Farm to Market Road

LGU/ DPWH

Production Area to MAFAMCO Warehouse

1.0 km.6,788,370

6,788,369.53

3. Concreting/ Rehab of Farm to Market Road

LGU/ DPWH

Brgys. Gabunon and Alang-alang, Mun. of Tambulig

3.0541,254,320 25,029,170

26,283,490.17

4. Construction of Multipurpose Warehouse

LGU Multipurpose Warehouse in MAFAMCO

22,000,000

2,000,000.00

Opex 57,000 57,000 242,670

Provision of farm-to-market roads, access roads and bridges, drainage crossings, rehabilitation/ restoration of communal irrigation systems (CIS), post-harvest facilities, and water supply required for the processing of local products.

Chapter 8-7-DAR IX - Project ConvergePage 3 of 4

Page 52: Table of Contents (By Chapter)

2016 and Prior 2017 2018 2019 2020 2021 2022 Total for2017-2022

Basis for Implemen-tation

Investment Targets (in exact amount PhP): NG Loan

Expected Output

Remarks (e.g. LGU-identified)

Chapter Outcome/

Project Title

Project Description/ Objectives

Co- Imple-menting Agency

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Zamboanga Sibugay

- 57,000.00 16,176,941 1,043,670 - - - 17,277,610.90 1. Concreting/ Rehab of Farm to Market Road

LGU/ DPWH

Junction National Highway-Silingan FMR

0.64 4,877,895

4,877,895.45

2. Concreting/ Rehab of Farm to Market Road

LGU/ DPWH

Tambanan, Mun. of Naga

1.5 11,242,045

11,242,045.45

3. Construction of Multipurpose Warehouse

LGU GARBEMCO, Kabasalan

1801,000

801,000.00

Opex 57,000 57,000 242,670 Monitoring and Evaluation and Knowledge Management / Project Management

LGU, DBM Percentage of project loan disbursed; physical and financial targets achieved

Complete, accurate financial recordsprepared and audited annually.

ConVERGE Financing Agreement between PH & IFAD

for Loan Number 2000001259

Regional Total 10,439,834 5,069,000 4,287,677 6,683,927 4,287,677 4,287,677 - 24,615,958.82 Regional Office 7,790,334 3,809,000 1,758,000 2,432,000 1,758,000 1,758,000 11,515,000.00 Zamboanga del Norte 883,167 420,000 853,059 1,417,309 853,059 853,059 4,396,486.27 Zamboanga del Sur 883,167 420,000 838,309 1,417,309 838,309 838,309 4,352,236.27 Zamboanga Sibugay 883,167 420,000 838,309 1,417,309 838,309 838,309 4,352,236.27 GRAND TOTAL 19,672,125 88,014,917 71,276,922 76,849,197 74,828,915 53,631,615 - 364,601,566.33 Regional Office 8,306,334 9,433,000 5,517,330 9,062,660 3,374,000 3,374,000 - 30,760,990.00 Zamboanga del Norte 3,788,597 44,200,544 12,361,109 28,991,979 41,045,297 21,207,997 - 147,806,924.95 Zamboanga del Sur 3,788,597 28,907,374 34,172,183 18,433,979 5,832,309 5,832,309 - 93,178,154.20 Zamboanga Sibugay 3,788,597 5,474,000 19,226,300 20,360,579 24,577,309 23,217,309 - 92,855,497.17

Explanation of the general guidelines for Project Management, Monitoring and Evaluation and Knowledge Management, Financial Management and Procurement. This covers activities which ensures that project implementation is within the timeframe and approved budget, all leading to the desired output and outcome.

Figures available until 2019 only.

The budget covers the main activities under project management and M&E/KM, namely: meetings for RMSC, maintenance of the office, procurement of offie equipment, attendance to activities as required by the CPMO, and other knowledge-sharing activities.

Chapter 8-7-DAR IX - Project ConvergePage 4 of 4

Page 53: Table of Contents (By Chapter)

Updated Zamboanga Peninsula Regional Development Investment Program (RDIP), 2017-2022

Agency: DTI-IXChapter: 9 - Expanding Economic Opportunities in Industry and Services Through Trabaho at Negosyo

2017 (Actual) 2018 (Actual) 2019 (2019 GAA) 2020 (RDC-endorsed) 2021 (Proposed) 2022 (Proposed) Total

(1) (3) (9) (10) (11) (12) (13) (14) (15)Outcome 1:Facilitating investment environment and potentials/Industries Developed

Industry Development Program

11,184,000.00 12,786,000.00 11,530,000.00 17,543,000.00 12,342,000.00 14,370,000.00 79,755,000

Industry Cluster Program

Regionwide 15,853,000.00 11,342,000.00 13,000,000.00 40,195,000

Outcome 2:

Expanded economic opportunities in industry & services for MSMEs/Technical Advisory Services

Investment Requirements (in exact amount PhP)

CMCI/Competitiveness Initiatives

Regionwide

Chapter Outcome/ Project Title

Specific Location (Province/ City / Municipality /

Barangay)

1,690,000.00 1,000,000.00 1,370,000.00 4,060,000

Chapter 9-1-DTI IXPage 1 of 7

Page 54: Table of Contents (By Chapter)

2017 (Actual) 2018 (Actual) 2019 (2019 GAA) 2020 (RDC-endorsed) 2021 (Proposed) 2022 (Proposed) Total

Investment Requirements (in exact amount PhP)

Chapter Outcome/ Project Title

Specific Location (Province/ City / Municipality /

Barangay)

MSME Development Program

58,903,000.00 100,586,000.00 51,139,000.00 151,393,000.00 165,400,000.00 123,700,000.00 651,121,000.00 Regionwide

2,395,308.79 Zamboanga City 10,760,000.72 7,000,000.00 7,000,000.00 7,000,000.00 31,760,001 Zamboanga del Norte

12,503,495.00 7,000,000.00 7,000,000.00 7,000,000.00 33,503,495 Zamboanga del Sur 10,373,056.00 37,000,000.00 37,000,000.00 7,000,000.00 91,373,056 Zamboanga Sibugay 12,734,210.00 15,000,000.00 15,000,000.00 3,000,000.00 45,734,210 Isabela City 5,000,000.00 5,000,000.00 1,000,000.00 11,000,000

Subtotal3,545,000.00 48,766,000.00 3,602,000.00 71,000,000.00 71,000,000.00 25,000,000.00 222,913,000

Regionwide2,038,000.00

U 1,422,000.00 1,408,000.00 1,440,000.00 6,894,000

Zamboanga City District 2

1,412,000.00 1,408,000.00 1,440,000.00 4,260,000

Isabela CityLone District

706,000.00 704,000.00 720,000.00 2,130,000

Zamboanga del NorteDistrict 1

5,648,000.00 5,632,000.00 5,760,000.00 23,811,000

Zamboanga del NorteDistrict 2

4,942,000.00 4,928,000.00 5,040,000.00 14,910,000

Zamboanga del NorteDistrict 3

8,472,000.00 8,448,000.00 8,640,000.00 25,560,000

Zamboanga del SurDistrict 1

8,472,000.00 8,448,000.00 8,640,000.00 32,116,000

Zamboanga del SurDistrict 2

10,590,000.00 10,560,000.00 10,800,000.00 31,950,000

6,771,000.00

6,556,000.00

Establishment and Maintenance of Negosyo Centers

Shared Service Facilities

2,624,000.00

Chapter 9-1-DTI IXPage 2 of 7

Page 55: Table of Contents (By Chapter)

2017 (Actual) 2018 (Actual) 2019 (2019 GAA) 2020 (RDC-endorsed) 2021 (Proposed) 2022 (Proposed) Total

Investment Requirements (in exact amount PhP)

Chapter Outcome/ Project Title

Specific Location (Province/ City / Municipality /

Barangay)

Zamboanga SibugayDistrict 1

6,354,000.00 6,336,000.00 6,480,000.00 25,097,000

Zamboanga SibugayDistrict 2

4,942,000.00 4,928,000.00 5,040,000.00 14,910,000

Subtotal 30,529,000.00 23,916,000.00 22,000,000.00 52,960,000.00 52,800,000.00 54,000,000.00 236,205,000

SME Roving Academy (SMERA)

Regionwide 18,533,000.00 20,000,000.00 20,000,000.00 120,325,000

Financing/Credit Facilitation

Regionwide 2,700,000.00 400,000.00 500,000.00 3,600,000

KAPATID Mentor ME Regionwide 5,000,000.00 5,000,000.00 5,000,000.00 15,000,000 MSME Conference/ Trabaho Negosyo Kabuhayan (TNK)

Regionwide 1,200,000.00 1,200,000.00 1,300,000.00 3,700,000

Regionwide 990,000.00 2,000,000.00 2,500,000.00 5,490,000

Zamboanga City 874,000.00 2,000,000.00 2,500,000.00 5,374,000

Zamboanga del Sur 885,000.00 2,000,000.00 2,500,000.00 5,385,000

Zamboanga del Norte 665,000.00 2,000,000.00 2,500,000.00 5,165,000

Zamboanga Sibugay 762,000.00 1,800,000.00 2,500,000.00 5,062,000

Isabela City 200,000.00 400,000.00 600,000

Subtotal 6,896,000.00 4,176,000.00 4,923,000.00 14,300,000.00 10,000,000.00 12,900,000.00 27,076,000.00

Bamboo Industry Development Project

Regionwide 483,000.00 - - - - - 483,000

RAPID Program Regionwide - - - - 5,000,000.00 5,000,000.00 10,000,000

Increasing trade, investments and exports /Trade & Investment Promotion Services

OTOP Next Gen

5,927,000.00

17,450,000.00 23,728,000.00 20,614,000.00

Chapter 9-1-DTI IXPage 3 of 7

Page 56: Table of Contents (By Chapter)

2017 (Actual) 2018 (Actual) 2019 (2019 GAA) 2020 (RDC-endorsed) 2021 (Proposed) 2022 (Proposed) Total

Investment Requirements (in exact amount PhP)

Chapter Outcome/ Project Title

Specific Location (Province/ City / Municipality /

Barangay)

EXPORTS AND INVESTMENTS DEVELOPMENT PROGRAM 7,880,000.00 8,785,000.00 8,638,000.00 38,278,000.00 40,278,000.00 43,300,000.00 147,159,000.00

Regionwide 10,000,000.00 11,000,000.00 12,000,000.00 33,000,000

Zamboanga City 1,500,000.00 1,500,000.00 1,700,000.00 4,700,000

Zamboanga del Sur 1,500,000.00 1,500,000.00 1,700,000.00 4,700,000

Zamboanga del Norte 1,500,000.00 1,500,000.00 1,700,000.00 4,700,000

Zamboanga Sibugay 1,500,000.00 1,500,000.00 1,700,000.00 4,700,000

Isabela City 500,000.00 500,000.00 500,000.00 1,500,000

Subtotal - - - 16,500,000.00 17,500,000.00 19,300,000.00 53,300,000

Export Pathways Program-Regional Interactive Platform for Phil. Exports (EPP-RIPPLES)

Regionwide 6,000,000.00 6,000,000.00 6,000,000.00 18,000,000

Regionwide 3,398,000.00 3,000,000.00 3,500,000.00 9,898,000 Zamboanga City 520,000.00 578,000.00 600,000.00 1,698,000

Zamboanga del Sur 520,000.00 550,000.00 600,000.00 1,670,000 Zamboanga del Norte 520,000.00 550,000.00 600,000.00 1,670,000

Zamboanga Sibugay 520,000.00 550,000.00 600,000.00 1,670,000

Isabela City 300,000.00 350,000.00 400,000.00 1,050,000 Subtotal - - - 5,778,000.00 5,578,000.00 6,300,000.00 17,656,000

BIMP-EAGA Regionwide 5,000,000.00 6,000,000.00 6,500,000.00 17,500,000

Regional Halal Industry Devlopment Program

Regionwide 5,000,000.00 5,200,000.00 5,200,000.00 15,400,000

Investment Promotion/ Facilitation

Market Promotion

Chapter 9-1-DTI IXPage 4 of 7

Page 57: Table of Contents (By Chapter)

2017 (Actual) 2018 (Actual) 2019 (2019 GAA) 2020 (RDC-endorsed) 2021 (Proposed) 2022 (Proposed) Total

Investment Requirements (in exact amount PhP)

Chapter Outcome/ Project Title

Specific Location (Province/ City / Municipality /

Barangay)

Ensure consumer access to safe and quality goods and service/Consumer Protection Services

CONSUMER PROTECTION PROGRAM

12,642,000.00 13,138,000.00 15,467,000.00 14,188,000.00 16,335,000.00 17,224,000.00 88,994,000.00 Regionwide 2,000,000.00 2,000,000.00 2,000,000.00 6,000,000

Zamboanga City 500,000.00 1,000,000.00 1,000,000.00 2,500,000

Zamboanga del Sur 500,000.00 500,000.00 550,000.00 1,550,000

Zamboanga del Norte 500,000.00 500,000.00 550,000.00 1,550,000

Zamboanga Sibugay 400,000.00 400,000.00 500,000.00 1,300,000

Isabela City 124,000.00 124,000.00 124,000.00 372,000

Subtotal 4,024,000.00 4,524,000.00 4,724,000.00 13,272,000

Regionwide 1,000,000.00 1,000,000.00 1,000,000.00 3,000,000 Zamboanga City 500,000.00 600,000.00 650,000.00 1,750,000

Zamboanga del Sur 500,000.00 600,000.00 650,000.00 1,750,000

Zamboanga del Norte 500,000.00 600,000.00 650,000.00 1,750,000

Zamboanga Sibugay 500,000.00 600,000.00 650,000.00 1,750,000

Isabela City 164,000.00 264,000.00 200,000.00 628,000

Subtotal 3,164,000.00 3,664,000.00 3,800,000.00 10,628,000

Regionwide 1,000,000.00 1,000,000.00 1,000,000.00 3,000,000 Zamboanga City 1,500,000.00 1,750,000.00 1,800,000.00 5,050,000

Zamboanga del Sur 1,500,000.00 1,650,000.00 1,800,000.00 4,950,000

Zamboanga del Norte 1,500,000.00 1,747,000.00 1,800,000.00 5,047,000

Zamboanga Sibugay 1,000,000.00 1,500,000.00 1,800,000.00 4,300,000

Monitoring & Enforcement of Fair Trade Laws (FTLs)

Business Accreditation/ Sales Promo Permits

Consumer Complaints Resolution

Chapter 9-1-DTI IXPage 5 of 7

Page 58: Table of Contents (By Chapter)

2017 (Actual) 2018 (Actual) 2019 (2019 GAA) 2020 (RDC-endorsed) 2021 (Proposed) 2022 (Proposed) Total

Investment Requirements (in exact amount PhP)

Chapter Outcome/ Project Title

Specific Location (Province/ City / Municipality /

Barangay)

Isabela City 500,000.00 500,000.00 500,000.00 1,500,000

Subtotal 7,000,000.00 8,147,000.00 8,700,000.00 23,847,000 CONSUMER EDUCATION AND ADVOCACY PROGRAM 5,095,000.00 3,953,000.00 2,354,000.00 4,178,000.00 2,539,000.00 3,900,000.00 22,019,000.00

Regionwide 100,000.00 50,000.00 100,000.00 250,000

Zamboanga City 200,000.00 100,000.00 150,000.00 450,000

Zamboanga del Sur 200,000.00 100,000.00 150,000.00 450,000

Zamboanga del Norte 200,000.00 100,000.00 150,000.00 450,000

Zamboanga Sibugay 200,000.00 100,000.00 150,000.00 450,000

Isabela City 100,000.00 50,000.00 100,000.00 250,000

Subtotal 1,000,000.00 500,000.00 800,000.00 2,300,000 Regionwide 50,000.00 50,000.00 100,000.00 200,000 Zamboanga City 200,000.00 143,000.00 200,000.00 543,000

Zamboanga del Sur 200,000.00 140,000.00 200,000.00 540,000

Zamboanga del Norte 200,000.00 140,000.00 200,000.00 540,000

Zamboanga Sibugay 200,000.00 140,000.00 200,000.00 540,000

Isabela City 150,000.00 100,000.00 150,000.00 400,000

Subtotal 1,000,000.00 713,000.00 1,050,000.00 2,763,000

Regionwide 78,000.00 50,000.00 100,000.00 228,000

Zamboanga City 250,000.00 175,000.00 200,000.00 625,000

Zamboanga del Sur 250,000.00 175,000.00 200,000.00 625,000

Zamboanga del Norte 250,000.00 175,000.00 200,000.00 625,000

Zamboanga Sibugay 200,000.00 175,000.00 200,000.00 575,000

Isabela City 150,000.00 76,000.00 100,000.00 326,000

Subtotal 1,178,000.00 826,000.00 1,000,000.00 3,004,000

Consumer Education & Information Campaign

Diskwento Caravan

Bagwis Awards

Chapter 9-1-DTI IXPage 6 of 7

Page 59: Table of Contents (By Chapter)

2017 (Actual) 2018 (Actual) 2019 (2019 GAA) 2020 (RDC-endorsed) 2021 (Proposed) 2022 (Proposed) Total

Investment Requirements (in exact amount PhP)

Chapter Outcome/ Project Title

Specific Location (Province/ City / Municipality /

Barangay)

Regionwide 50,000.00 50,000.00 100,000.00 200,000

Zamboanga City 200,000.00 100,000.00 200,000.00 500,000

Zamboanga del Sur 200,000.00 100,000.00 200,000.00 500,000

Zamboanga del Norte 200,000.00 100,000.00 200,000.00 500,000

Zamboanga Sibugay 200,000.00 100,000.00 200,000.00 500,000 Isabela City 150,000.00 50,000.00 150,000.00 350,000

Subtotal 1,000,000.00 500,000.00 1,050,000.00 2,550,000 GRAND TOTAL 95,704,000 139,248,000 89,128,000 225,580,000 236,894,000 202,494,000 989,048,000

Consumer Groups Strengthening

Chapter 9-1-DTI IXPage 7 of 7

Page 60: Table of Contents (By Chapter)

Updated Zamboanga Peninsula Regional Development Investment Program (RDIP) 2017-2022

Agency: DOT-R9Chapter: 9 Expanding Economic Opportunities in Industry and Services Through Trabaho at Negosyo

2017(Actual)

2018(Actual)

2019(Actual)

2020(Proposed)

2021(Proposed)

2022(Proposed) Total

(1) (2) (3) (9) (10) (11) (12) (13) (14) (15)Outcome 1:

PAP 1: Tourism Devt Planning Technical Assistance (Tourism Plans) RegionwideStatistics RegionwideSenior Citizen and PWD mandated programs RegionwideRegional Convergence InitiativesGAD Programs

1,222,000.00 1,243,000.00 1,165,000.00 1,800,000.00 2,150,000.00 2,300,000.00 9,880,000.00

PAP 2: Tourism Industry ManpowerTrainings for LGUs RegionwideTrainings for AEs RegionwideTrainings for Community-based Organization RegionwideCapability Trainings for Tourism Officers

1,553,000.00 1,579,000.00 1,479,000.00 2,167,000.00 1,850,000.00 2,050,000.00 10,678,000.00

PAP 3: Product and Market DevtFarm TourismParticipation to Travel FairsProduction of Promo MaterialsDevelopment of Tourism Circuit

Technical Asssitance to LGUsHalal tourism

1,142,000.00 2,761,000.00 2,586,000.00 2,182,000.00 2,900,000.00 3,100,000.00 14,671,000.00

Outcome 2:Accreditation Program for ZamPen Regionwide 736,000.00 749,000.00 701,000.00 7,730,000.00 1,050,000.00 1,325,000.00 12,291,000.00

GRAND TOTAL 4,653,000.00 6,332,000.00 5,931,000.00 13,879,000.00 7,950,000.00 8,775,000.00 47,520,000.00

Investment Requirements (in exact amount PhP)

PAP 4: Tourism Standards and Regulation

Chapter Outcome/ Project Title Project Description/ Objectives

Specific Location

(Province/ City / Municipality /

Barangay)

Chapter 9-2-DOT IXPage 1 of 1

Page 61: Table of Contents (By Chapter)

Zamboanga Peninsula Regional Development Investment Program 2017-2022

Agency: Zamboanga City Special Economic Zone and Freeport Authority RDP Chapter: 9 Expanding Economic Opportunities in Industry and Services Through Trabaho at Negosyo

2016 and Prior 2017 2018 2019 2020 2021 2022 2017-2022 Total Project Cost

Infrastructure Development accelerated and operations sustainedAsian Halal Centre Department of

Budget and Management (DBM)

San Ramon, Zamboanga City

Road Concreting

Regional Development Plan 2017-2022

2018-2022

73,000.00 - 50,000.00 70,000.00 70,000.00 44,500.00 - 234,500.00 307,500.00

Department of Trade and Industry (DTI)

Power Supply RDC IX Resolution No. IX-014-15

22,000.00 - 3,000.00 6,000.00 6,000.00 6,000.00 - 21,000.00 43,000.00

Water Supply Republic Act No. 7903

28,000.00 - 5,000.00 5,000.00 5,000.00 5,000.00 - 20,000.00 48,000.00

Standard Manufacturing Building (SMB)

- - 50,000.00 100,000.00 100,000.00 100,000.00 100,000.00 450,000.00 450,000.00

Land Development

- - 5,500.00 25,000.00 25,000.00 24,500.00 - 80,000.00 80,000.00

Perimeter Fence - - - 10,000.00 10,000.00 - - 20,000.00 20,000.00

Toll Gates/ Security Outposts

- - - 1,000.00 1,000.00 1,000.00 - 3,000.00 3,000.00

Sewage Treatment Plant

15,000.00 - - - 15,000.00 - - 15,000.00 30,000.00

La Paz Biotech Farms Department of Budget and Management (DBM), Department of Trade and Industry (DTI), Department of Public Works and Highways (DPWH)

La Paz, Zamboanga City

Maintenance of ecological integrity, reducing inequality in economic development opportunities in agriculture, fishery industries and services

Road Concreting

Republic Act No. 7903, RDP 2017-2022, DTI-DPWH Convergence Program

2017-2022

135,000.00 65,000.00 50,000.00 175,000.00 175,000.00 175,000.00 175,000.00 815,000.00 950,000.00

Power Distribution Lines and Street Lights

61,900.00 5,000.00 4,500.00 7,500.00 7,500.00 7,500.00 7,500.00 39,500.00 101,400.00

West Corporate Centre Department of Budget and Management (DBM)

San Ramon, Zamboanga City

4-Storey Building Complex

Republic Act No. 7903, RDP 2017-2022

2018-2022

- 221,000.00 221,000.00 442,000.00 442,000.00

Solar Power Supply

2020-2022

18,292.00 18,292.00 18,292.00

San Ramon Newport San Ramon, Zamboanga City World-Class International Seaport

Republic Act No. 7903, RDC IX Resolution No. 086B-14

Contract awarded for Feasibility Study

2019-2023 1,260,000.00 2,100,000.00 2,100,000.00 2,100,000.00 7,560,000.00 7,560,000.00

Investment Targets (in PHP '000)

Basis for Implementation

Status/Level of

Readiness

Implementation Period

Expected Output

Chapter Outcome/Project Title

Project Description/ Objectives

Co-Implementing

Agency

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Chapter 9-3-ZAMBOECOZONEPage 1 of 2

Page 62: Table of Contents (By Chapter)

2016 and Prior 2017 2018 2019 2020 2021 2022 2017-2022 Total Project Cost

Investment Targets (in PHP '000)

Basis for Implementation

Status/Level of

Readiness

Implementation Period

Expected Output

Chapter Outcome/Project Title

Project Description/ Objectives

Co-Implementing

Agency

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Proposed Water Containment Facility Address water containment/mini- 100,000.00 100,000.00 100,000.00

TOTAL 334,900.00 70,000.00 389,000.00 1,980,500.00 2,514,500.00 2,481,792.00 2,382,500.00 9,818,292.00 10,153,192.00

Chapter 9-3-ZAMBOECOZONEPage 2 of 2

Page 63: Table of Contents (By Chapter)

Updated Zamboanga Peninsula Regional Development Investment Program (RDIP), 2017-2022

Agency: COOPERATIVE DEVELOPMENT AUTHORITY - PAGADIAN EXTENSION OFFICEChapter: 9: EXPANDING ECONOMIC OPPORTUNITIES IN INDUSTRY AND SERVICES THROUGH TRABAHO AND NEGOSYO

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15)Outcome 1: Empowering the Poor and the PAP 1: Cooperative Development Program

Technical Advisory Services

Regionwide Chapter 9

No. of Technical Advisory Services (TAS) rendered

RA 6939 300,000.00 300,000.00

Handholding Services

Regionwide Chapter 9

No. of coops provided with handholding services

RA 6939/ RA 9520 300,000.00 300,000.00 1,369,918 1,506,910 3,476,828.72

Pre-Registration Seminar (PRS) for prospective cooperatives Regionwide Chapter 9

No. of prospective cooperatives trained

RA 6939/ RA 9520/ Revised

IRR1,296,000 1,440,000 2,736,000.00

Mandatory/Enhancement training for cooperative officers

Regionwide Chapter 9No. of trainings conducted

RA 6939/ RA 9520/ Revised

IRR3,870,000 4,230,000 8,100,000.00

Strengthening partnership with national government agencies, local government units, academe and other stakeholders

Regionwide Chapter 9

No. of MOU forged

Roadmap 11,400 11,400 22,800.00

Strengthening of cooperatives as business enterprises through Value-Chain Program for Coops

Regionwide Chapter 9

No. of coop product/ service profiles posted in EO website

RA 6939/ RA 9520/ Revised

IRR-

Mindanao Peace and Normalization through Cooperative Development Projects

Basilan, ZS, ZDS, ZDN, Sulu Chapter 9

No. of coop provided with Mini-rice mill and Livelihood funding

8,000,000.00 4,750,000.00 12,750,000.00

Mode of Funding

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (in exact amount PhP)

Basis for Implementat

ion

Chapter Outcome/ Project Title

Project Description/ Objectives

Specific Location

(Province/ City / Municipality /

Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Chapter 9-4-CDA IXPage 1 of 2

Page 64: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

Mode of Funding

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (in exact amount PhP)

Basis for Implementat

ion

Chapter Outcome/ Project Title

Project Description/ Objectives

Specific Location

(Province/ City / Municipality /

Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Cooperative Training Center Pagadian City Chapter 9

No. of Coop Training Center Established

25,000,000.00 25,000,000.00

Subtotal for Outcome 1 300,000.00 8,300,000.00 5,050,000.00 - 31,547,318.44 7,188,310.28 52,385,628.72

Outcome 2: Members and Public Protection ProgramPAP 2: Cooperative Regulatory Program

Registration of Cooperatives and Expansion of Membership

Regionwide Chapter 9

No. of cooperatives registered

RA 6939/ RA 9520/ Revised

IRR160,000.00 168,000.00 168,000.00 165,000.00 180,000.00 841,000.00

Financial Inclusion

Regionwide Chapter 9

No. of Coop Branches issued a Certificate of Authority

RA 6939/ RA 9520/ Revised

IRR 25,000.00 30,000.00 55,000.00

Regionwide Chapter 9

No. of satellite offices issued a Letter of Authority

RA 6939/ RA 9520/ Revised

IRR 25,000.00 30,000.00 55,000.00

Inspection of Cooperatives Regionwide Chapter 9

No. of Cooperatives inspected

RA 6939/ RA 9520/ Revised

IRR365,000.00 378,000.00 378,000.00 1,642,770.00 1,700,370.00 4,464,140.00

Collection of Mandatory Reports Regionwide Chapter 9

No. of Annual Reports Collected

RA 6939/ RA 9520/ Revised

IRR 34,560.00 36,880.00 71,440.00

Subtotal for Outcome 2 525,000.00 546,000.00 546,000.00 - 1,892,330.00 1,977,250.00 5,486,580.00

GRAND TOTAL (Outcome 1 + Outcome 2) 825,000.00 8,846,000.00 5,596,000.00 - 33,439,648.44 9,165,560.28 57,872,208.72

Chapter 9-4-CDA IXPage 2 of 2

Page 65: Table of Contents (By Chapter)

Updated Zamboanga Peninsula Regional Development Investment Program (RDIP), 2017-2022

Agency: Department of Health IX Chapter: 10 - Accelerating Human Capital Development

CHAPTER OUTCOME/PROJECT TITLE Mode of Funding

Level of Readiness(for 2020-2022 projects only)

LGU Proponent Remarks

2017 2018 2019 2020 2021 2022 Total PREXC OO1: (Health Policy and Standard Development Program) Health Sector Research Development

6,890.00 874.00 874.00 863.00 949.00 1,044.00 11,494.00

PREXC OO1: (Health Systems Strengthening Program - HSSP) Local Health Systems Development and Assistance

13,300.00 13,300.00 10,667.00 9,206.00 10,126.60 11,139.26 67,739.00

PREXC OO1: Human Resource for Health (HRH) and Institutional Capacity Management

339,030.00 4,559.00 3,156.00 3,156.00 3,472.00 3,819.00 357,192.00

PREXC OO1: Health Promotion - 7,598.00 7,194.00 4,670.00 5,137.00 5,651.00 30,250.00

PREXC OO1: (Public Health Program – PHP) Public Health Management

215,256.00 118,029.00 136,495.00 129,851.00 142,836.00 157,120.00 899,587.00

PREXC OO1: (PHP) Epidemiology and Surveillance

11,490.00 1,124.00 6,696.00 - - - 19,310.00

PREXC OO1: Health Emergency Preparedness and Response

- 7,598.00 6,301.00 3,902.00 4,292.00 4,721.00 26,814.00

PREXC OO2: (Health Facilities Operation Program) --- Blood Centers and TRC

- - 8,992.00 14,459.00 200,000.00 250,000.00 473,451.00

Investment Requiremetns (in Thousand Pesos )

Chapter 10-1-DOH IXPage 1 of 2

Page 66: Table of Contents (By Chapter)

CHAPTER OUTCOME/PROJECT TITLE Mode of Funding

Level of Readiness(for 2020-2022 projects only)

LGU Proponent Remarks

2017 2018 2019 2020 2021 2022 Total

Investment Requiremetns (in Thousand Pesos )

CO: Health Facility Enhancement Program 322,700.00 460,781.00 49,350.00 549,825.00 200,000.00 100,000.00 1,682,656.00

PREXC OO3: (Health Regulatory Program) Regulation of Regional Health Facilities and Services (RRFHS)

6,683.30 7,059.00 4,597.00 4,402.00 4,840.00 5,326.00 32,907.00

GRAND TOTAL 915,349.30 620,922.00 234,322.00 720,334.00 571,652.60 538,820.26 3,601,400.16

Chapter 10-1-DOH IXPage 2 of 2

Page 67: Table of Contents (By Chapter)

Updated Zamboanga Peninsula Regional Development Investment Program (RDIP), 2017-2022

Agency: National Nutrition Council Regional Office IX Chapter: 10 - Accelerating Human Capital Development

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed)

Total (in actual amount)

(1) (2) (3) (4) (5) (6) (7) (8) (11) (12) (13) (14) (15)

Programs: Projects: Indicators:Quality nutrition for all ensured

LGU Mobilization for Nutrition (Training on NPM and the conduct of MELLPI)

Regionwide

Proportion of households meeting 100% recommended energy intake PPAN Target 2017-2022

Prevalence of stunting among children under 5 yrs old PPAN Target 2017-2022

Prevalence of wasting among children under 5 yrs old PPAN Target 2017-2022

Prevalence of overweight among children under 5 yrs old PPAN Target 2017-2022

Prev. of 0-5 yrs old UW children PPAN Target 2017-2022

Prev. of 6-10 yrs old UW children PPAN Target 2017-2022

Prev. of 6-10 yrs old Stunted children PPAN Target 2017-2022

Prev. of 6-10 yrs old Wasted children PPAN Target 2017-2022

Prev. of 6-10 yrs old overweight children PPAN Target 2017-2022

Percent LGU provided with Capacity Building on Nutrition Program Management

Annual Regional Target

NNC Regional Funding

282,000.00 282,000.00 282,000.00 282,000.00 1,128,000.00

Percent LGU with quality Local Nutrition Action Plans (LNAPs) formulated

Annual Regional Target

Percent LGU trained on the Basic Course for BNS Conducted (per LGU request)

Annual Regional Target

Number of NAOs with plantilla position (Advocacy only but descretion of the LCEs)

Annual Regional Target

Percent LGU getting scores in MELLPI at least 85% weighted score on efficiency and effectiveness

Annual Regional Target

NNC Regional Funding

97,175.00 97,175.00 97,175.00 97,175.00 388,700.00

Program: IYCF and First 1000 Days

Mobilization of LGUs on the First 1000 days including expansion of ECCD/F1K areas

Regionwide 2019-2022 Regional Plan of Action for Nutrition

NNC, RNC, LGUs

400,000.00 400,000.00 400,000.00 400,000.00 1,600,000.00

Increased no. of LGUs implementing ECCD F1K supported by policies, resolutions or local ordinances RNC and RDC Endorsement of ECCD F1K and RPAN 2019-2022Issuance of DILG memo circular supporting RNC and RDC EndorsementConduct of ECCD F1K and RPAN dissemination and advocacy fora/summit/media caravan

Mode of Funding

Level of Readiness(for 2020-

2022 projects only)

INVESTMENT COST (in exact amount)

Expected Output

Basis for Implementation

Chapter Outcome/ Project Title Project Description/ Objectives

Specific Location

(Province/ City / Municipality /

Barangay)

RDP Results Matrices Indicators Addressed

Chapter 10-2-NNC IXPage 1 of 5

Page 68: Table of Contents (By Chapter)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed)

Total (in actual amount)

Mode of Funding

Level of Readiness(for 2020-

2022 projects only)

INVESTMENT COST (in exact amount)

Expected Output

Basis for Implementation

Chapter Outcome/ Project Title Project Description/ Objectives

Specific Location

(Province/ City / Municipality /

Barangay)

RDP Results Matrices Indicators Addressed

Advocacy on local policy issuance supporting and implementing ECCD F1K Orientation and training of relevant stakeholders in ECCD F1K expansion areasPreparation/Adoption of P/C/MNAPs of all provinces, municipalities and cities highlighting ECCD F1K and integration in local development and investment plansMonitoring, assessment and adjustments for scaling up

Strengthening of health delivery system for F1K

Regionwide 2019-2022 Regional Plan of Action for Nutrition

DOH, LGUs

Review of existing system in RHUs completedEnhanced/Strengthened delivery system/network for F1K Planning for reviewExecution of review and reporting of resultsStrengthening of the Service Delivery Network for F1K Days Mobilization and capacity building of health workers including BNSs, BHWs and NDPsIntegration of results in RHU operationsMonitoring, evaluation and adjustments

Information Management in the F1K Regionwide 2019-2022 Regional Plan of Action for Nutrition

DOH and LGUs

A harmonized system of information for the efficient and effective implementation of F1K services developed and utilized by the health system and the LGUsReview of the system Finalization and endorsement of the information system Implementation of the harmonized information systemMonitoring, evaluation and re-design

Training of pregnant women on recipe trials

Regionwide 2019-2022 Regional Plan of Action for Nutrition

DOH

No. of pregnant women trained on recipe trialsSelection and identification of PW to be trainedConduct of recipe trial trainings (3 batches per year; 30 PW per batch)

Conduct of follow up visits and monitoring of adoption of the recipeProject monitoring, reporting and adjustments

Mobilization of LGUs to Organize Complementary Feeding and IYCF Support Groups

Regionwide 2019-2022 Regional Plan of Action for Nutrition

DOH, NNC 324,000.00 324,000.00 324,000.00 324,000.00 1,296,000.00

No. of LGUs with organized complementary feeding and IYCF Support groupsAdvocacy and mobilization of local officials including barangay officials and other partners Training on IYCF & Pabasa sa NutrisyonLakbay Aral to Catarman, Leyte Reproduction and dissemination of IYCF IEC materialsMonitoring, evaluation and adjustments

Chapter 10-2-NNC IXPage 2 of 5

Page 69: Table of Contents (By Chapter)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed)

Total (in actual amount)

Mode of Funding

Level of Readiness(for 2020-

2022 projects only)

INVESTMENT COST (in exact amount)

Expected Output

Basis for Implementation

Chapter Outcome/ Project Title Project Description/ Objectives

Specific Location

(Province/ City / Municipality /

Barangay)

RDP Results Matrices Indicators Addressed

Monitoring, reporting, and adjustmentsPromotion of locally produced complementary food

Regionwide 2019-2022 Regional Plan of Action for Nutrition

DOH

Number of local producers supporting complementary food/IYCFStrengthen advocacy & promotion of complementary food Expand partnership and networking on complementary food production

Provision of technical assistance and forging agreements with local producers of complementary foodMonitoring, evaluation and adjustments for scaling up

Advocacy for Stronger Enforcement and Compliance Monitoring on EO 51 (Milk Code), RA 10028 (Breastfeeding Area in Workplaces) and the Mother-Baby Friendly Hospital Initiative (MBFHI)

Regionwide 2019-2022 Regional Plan of Action for Nutrition

DOH, DOLE 172,800.00 172,800.00 172,800.00 172,800.00 691,200.00

No. of health and non-health facilities/establishments compliant to EO 51, RA 10028 and MBFHIReactivation of monitoring teams supported by a policy issuanceRe-orientation on the protocol of monitoring complianceCapacity building on Lactation Management and IYCF and adoption of the maternity protection policyConduct of monitoring visits and and issuance of certification to compliant facilities/establishmentsReview of progress of enforcement and compliance monitoring and adjustments/scaling up

Communication Support for F1K Regionwide 2019-2022 Regional Plan of Action for Nutrition

NNC 1,000,000.00 1,000,000.00 1,000,000.00 1,000,000.00 4,000,000.00

A regional sub-strategy in line with the national strategy for the communication support on F1K fully developed and implementedCommunication planning including the inventory of existing communication projects and tools related to the First 1000 DaysDevelopment of improved key messages and communication materials and collateralsPre-testing of developed materialsImplementation, monitoring and adjustments

Overweight and Obesity Management and Prevention

Promotion of Healthy Lifestyle Regionwide 2019-2022 Regional Plan of Action for Nutrition

RNC, LGUs, NDAP

230,000.00 80,000.00 80,000.00 80,000.00 470,000.00

Number of advocacy activities on healthy lifestyle conductedNumber of agencies/entities with physical fitness activities among employeesConduct of multi-sectoral forum on healthy lifestyle.Media Promotion Activities (kapihan, news releases, broadcast releases, social media, radio program)Advocacy for and conduct of Physical fitness activity among employees

Chapter 10-2-NNC IXPage 3 of 5

Page 70: Table of Contents (By Chapter)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed)

Total (in actual amount)

Mode of Funding

Level of Readiness(for 2020-

2022 projects only)

INVESTMENT COST (in exact amount)

Expected Output

Basis for Implementation

Chapter Outcome/ Project Title Project Description/ Objectives

Specific Location

(Province/ City / Municipality /

Barangay)

RDP Results Matrices Indicators Addressed

Monitoring, reporting and adjustmentsNutrition promotion for behaviour change

Strengthening nutrition education among parents through the Family Development Sessions

Regionwide 2019-2022 Regional Plan of Action for Nutrition

DSWD, NNC 500,000.00 396,000.00 396,000.00 396,000.00 1,688,000.00

Percentage increase in the number of Parents’ Committee supporting SFP Organize pool of resource persons to conduct nutrition education among parents of SFP beneficiaries and in FDS nutrition and health related modulesTraining of program implementers and pool of resource persons on Nutrition Program Management, Family Development on nutritionRegular monitoring activities including conduct of Social Welfare Forum every semester

Updating and publication of nutrition promotion materials

Regionwide 2019-2022 Regional Plan of Action for Nutrition

DSWD, PIA, LGUs, DOST-FNRI, NNC

439,200.00 21,600.00 259,000.00 21,600.00 741,400.00

Number of books on food trends, innovative recipes and healthy lifestyle produced and disseminatedCapacity building of child development workers and parents on new trends and recipesReproduction and dissemination of NIE materials in all 72 LGUs

Mandatory food fortification program

Advocacy for and Monitoring of Compliance of RA 8976 and RA 8172

Regionwide 2019-2022 Regional Plan of Action for Nutrition

DOH, NNC 100,000.00 120,000.00 144,000.00 172,800.00 536,800.00

A mechanism for advocacy and compliance monitoring of food fortification strengthened and implementedImprovements in the compliance level for MFF evidenced in the region

Strengthening of the Regional MFF Task Forces (including Bantay Asin Task Force)Development of regional protocol/guidelines on MFF monitoringCapacity building for the Task ForcesConduct of joint monitoring , reporting and adjustments

Nutrition in Emergencies Capacity Building for Nutrition in Emergencies

Regionwide 2019-2022 Regional Plan of Action for Nutrition

RNC, LGUs 250,000.00 200,000.00 1,150,000.00 300,000.00 1,900,000.00

Number of LGUs with organized nutrition clusterNumber of trainings conductedConsultative meeting/ Advocacy and lobbying to LCEsIssuance/Re-issuance of resolutions/executive orders on Regional/Local Nutrition CommitteesConduct of NiEm trainings including information management and orientation on ICS and PIMAMDevelopment of NiEm plan and Integration to DRRM planCapacity mapping and prepositioning of suppliesMonitoring, evaluation and adjustments

Enabling Programs Mobilization of Local Government Units for Delivery of Nutritional Outcomes

Regionwide 2019-2022 Regional Plan of Action for Nutrition

NNC, DOH, RNC

Chapter 10-2-NNC IXPage 4 of 5

Page 71: Table of Contents (By Chapter)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed)

Total (in actual amount)

Mode of Funding

Level of Readiness(for 2020-

2022 projects only)

INVESTMENT COST (in exact amount)

Expected Output

Basis for Implementation

Chapter Outcome/ Project Title Project Description/ Objectives

Specific Location

(Province/ City / Municipality /

Barangay)

RDP Results Matrices Indicators Addressed

Number of LGUs capacitated and mobilized for delivery of nutritional outcomesPool of LGU mobilizers organizedDevelopment and implementation of a regional LGU mobilization strategy supported by the RNC, RDC and DILGOrganization and training of LGU MobilizersOrganization/reactivation/strengthening and monitoring of Local Nutrition CommitteesMonitoring, evaluation and adjustments for scaling up

Policy Development for Food and Nutrition

Regionwide 2019-2022 Regional Plan of Action for Nutrition

NNC, DOH, RNC

Policy guidelines issued at regional and local levelsRegional research and policy agenda developed and implementedInventory, compilation and review of existing policies on food and nutrition Development of a regional research and policy agenda Development and dissemination of policy papers and policy briefs Advocacy and lobbying on the creation of plantilla positions for full-time Nutrition Action Officers, setting up of nutrition office with corresponding budget, hiring of Nutritionist-dietitians and full deployment of BNSs Monitoring, assessment and updating

Management and Strengthening Support to RPAN Effectiveness

Regionwide 2019-2022 Regional Plan of Action for Nutrition

NNC, DOH, RNC

376,000.00 376,000.00 376,000.00 376,000.00 1,504,000.00

RNC and NNC Region IX strengthened for Effective Implementation of the RPANAdditional nutrition human resource recruited and capacitated Hiring of additional nutrition human resource (NDs hired by DOH)

53-A.2Training on F1K, LGU mobilization and continuing education on technical updates among RNC, NNC 9, NAOs, BNS etc.

Strengthening internal RNC, NNC systems and processesAssessment and enhancement/ adjustments

GRAND TOTAL 4,171,175.00 3,469,575.00 4,680,975.00 3,622,375.00 15,944,100.00

Chapter 10-2-NNC IXPage 5 of 5

Page 72: Table of Contents (By Chapter)

Programs and Projects Expected Output Mode of Funding

2017 2018 2019 2020 2021 2022 Total

(Actual ) (Actual) (Actual) ( RDC endorsed) (Proposed) (Proposed) (In Thousand Pesos)

I. General Administration and Support 1. General Management and Supervision1.1. Regional Office Proper 55,914.00 63,335.00 62,422.00 102,154.00 107,262.00 112,615.00 503,702.00 1.1.1 Furniture and Fixtures for the new Regional Office Building in Balintawak

No.of Furniture & Fixtures Procured CO 30,000.00 33,600.00 3,528.00 67,128.00

1.2.2 Repair of RDs Office and Construction of Covered Court in RO

RDs Office Repaired & Covered Court Constructed

CO 5,200.00 5,824.00 6,115.00 17,139.00

1.1.3 Construction of Conference Room and Facilities Conference Room & Facilities Procured

CO 1,000.00 1,120.00 1,176.00 3,296.00

1.1.4 Computer Units for ISO &Other Use Computer Units procured CO 180.00 202.00 212.00 594.00

1.1.5 CCTV/ Safety/ Security Measure CCTV Maintained CO 200.00 224.00 235.00 659.00 1.1.6 Water Facility and management Water Facility Managed CO 200.00 224.00 235.00 659.00 1.1.7.Construction of Office Canopy & Renovation of NEAP Building

Office Canopy Constructed & NEAP Building Constructed

MOOE 500.00 560.00 1,060.00

1.1.8 Construction of Guard House& Parking Area 707.00 770.00 1,477.00 1.1.9 Construction of Concrete Fence in Balintawak Concrete Fence constructed 120.00 132.00 252.00 1.2 Division Office Proper MOOE 216,476.00 455,273.00 249,359.00 256,579.00 256,579.00 269,408.00 1,703,674.00 1.3 Secondary Schools Proper 124,540.00 124,540.00 2. Administration of Personnel Benefits 2.1 Terminal Leave Benefits No. of Personnel Paid PS 23,015.00 20,665.00 28,999.00 32,392.00 34,612.00 139,683.00 2.2 Lumpsum for Creation of New Positions New Positions Created PS 283,900.00 59,672.00 84,137.00 85,360.00 89,628.00 602,697.00 2. 2. 1. Regional Ofice Proper- IT Positions IT Positions Created PS 3,825.00 4,208.00 4,418.00 12,451.00 2.3 Lumpsum for Filling -up of Positions Civilian Civilian Positions Filled-Up 996,073.00 128,814.00 91,662.00 91,662.00 99,270.00 101,057.00 1,508,538.00 2.4 Retirement Gratuity Benefits No. of Personnel Paid 111,898.00 111,898.00 2.5 Special Hardship Allowance No.of Beneficiaries Paid 166,302.00 1,002,900.00 1,169,202.00 2.6 ERF, MT, Reclass No. of Promoted Personnel Paid 32,188.00 32,188.00 2.7. Magna Carta No.of Beneficiaries Paid 16,201.00 16,201.00 2.8 Cash Allowance No.of Beneficiaries Paid 43,577.00 43,577.00

UPDATED ZAMBOANGA PENINSULA REGIONAL DEVELOPMENT INVESTMENT PROGRAM 2017-2022

RDP Chapter : 10 Accelerating Human Capital DevelopmentAgency : Department of Education, Region IX, Zamboanga Peninsula

Amount in Thousand Pesos

Chapter 10-3-DepEd IXPage 1 of 4

Page 73: Table of Contents (By Chapter)

Programs and Projects Expected Output Mode of Funding

2017 2018 2019 2020 2021 2022 Total

(Actual ) (Actual) (Actual) ( RDC endorsed) (Proposed) (Proposed) (In Thousand Pesos)

Amount in Thousand Pesos

2.10 Schools Divisions 10,549,323.00 10,549,323.00 Sub-Total GAS 12,200,594.00 2,069,135.00 483,780.00 604,136.00 627,592.00 624,701.00 16,609,938.00 II. Support to Operations

1. Planning and Management Information System

1.1 Regional Office Proper No.of Personnel Paid PS 4,022.00 4,888.00 7,661.00 8,203.00 8,613.00 33,387.00 2. Learner Support Programs No.of Teachers Paid PS 2.1 Regional Office Proper No.of Teachers Paid PS 5,794.00 4,380.00 7,192.00 7,711.00 8,096.00 33,173.00 2.2 Division Offices Proper No.of Teachers Paid PS 70,796.00 61,906.00 63,414.00 66,924.00 70,271.00 333,311.00 2.3 Hazard Pay- Magna Carta Benefits for PHW No.of Teachers Paid PS 17,902.00 19,503.00 19,503.00 20,478.00 21,502.00 98,888.00 2.4 Subsistence Allowance- Magna Carta Benefits for PHW No.of Teachers Paid PS 2,627.00 2,627.00 2,627.00 2,758.00 2,896.00 13,535.00

2.5 Laundry Allowance= Magna Carta Benefits for PHW No.of Teachers Paid PS 4,100.00 380.00 380.00 380.00 399.00 419.00 6,058.00 3. Organizational and Professional Development for Non-School Personnel3.1. Regional Office Proper No.of Teachers Paid PS 5,755.00 5,902.00 6,229.00 6,540.00 24,426.00 3.2 Division Office Proper No.of Teachers Paid PS 200.00 220.00 231.00 651.00 SubTotal Support to Operation Sub-Total Support to Operation 4,100.00 101,521.00 99,439.00 106,879.00 112,922.00 118,568.00 543,429.00 III. Operations 1. Education Policy Development Program 1. 1 Policy and Research Program ( Division Office Proper ) No. of policy and researches submitted PS 2,500.00 62,830.00 69,609.00 71,239.00 75,183.00 78,942.00 360,303.00

1.2 Curriculum Programs, Learning Management Models, Standards and Strategy Development

240,266.00 240,266.00

1.2.1 Regional Office Proper No. of personnel trained MOOE 23,866.00 26,452.00 27,051.00 28,606.00 30,037.00 136,012.00 1.2.2 Division Office Proper No. of personnel trained MOOE 227,593.00 252,074.00 257,403.00 272,204.00 285,814.00 1,295,088.00 1.3 Early Language Literacy and Numeracy No. of learners 7,952.00 7,952.00 1.3.1 Regional Office Proper 1,200.00 2,850.00 3,192.00 3,352.00 10,594.00 2. Basic Education Program 2.,1 New School Personnel Positions No.of Learning Kits printed MOOE/CO 1,589,141.00 1,264,284.00 1,415,998.00 334,448.00 351,170.00 4,955,041.00 2.1.1 Lumpsum for Creation of New Positions No.of Personnel Served MOOE 996,073.00 1,069.00 159,583.00 311,297.00 1,468,022.00 3,587,972.60 6,524,016.60 2.1.2 Lumpsum for Filling up of Positions No. Of Positions Filled 519,708.00 1,104,701.00 1,104,701.00 1,159,936.00 1,217,933.00 5,106,979.00 2. 2 Learning Tools and Equipment No. of Learning Tools & Equipment

Procured 450,000.00 504,000.00 529,200.00 1,483,200.00

Chapter 10-3-DepEd IXPage 2 of 4

Page 74: Table of Contents (By Chapter)

Programs and Projects Expected Output Mode of Funding

2017 2018 2019 2020 2021 2022 Total

(Actual ) (Actual) (Actual) ( RDC endorsed) (Proposed) (Proposed) (In Thousand Pesos)

Amount in Thousand Pesos

2.3 Textbook and Other Instructional Materials No. of Textbook & Other Instructional Materials Procured 106,967.00 5,000.00 5,600.00 5,880.00 123,447.00 2.3.1 Regional Office Proper 5,000.00 5,600.00 5,880.00 16,480.00 2.3.2 Division Offices Proper 12,500.00 14,000.00 14,700.00 41,200.00 2.4 Department of Education Computerization Program No.of Training kits printed CO 266,642.00 407,500.00 45,600.00 14,700.00 734,442.00 2.5 Provision and Maintenance of Basic Education Facilities Basic Ed Facilities Provided & Maintained 2,062,382.00 5,787,000.00 6,481,440.00 6,805,512.00 21,136,334.00

2.6 Science & Mathematics Equipment Science & Math Equipment Prcured 140,127.00 140,127.00 3. Inclusive Education Program No.of Benificiaries Paid PS 3.1 Multigrade Education No.of Benificiaries Paid PS 4,816.00 1,200.00 1,344.00 1,411.00 8,771.00 3,2 Indigenous People Education ( IPED) Program No.of Benificiaries Paid PS 7,509.00 4,170.00 4,670.00 4,904.00 21,253.00 3.3 Flexible Learning Option ( ALS/ ADM /EIE) No. of learners enrolled 2,500.00 1,344.00 1,411.00 5,255.00 3.4 ALS Assessment Tools for ALS 8 Subjects No.of Assessment Tools 900.00 1,008.00 1,058.00 2,966.00 3.5 Maadrasah Education Program No. of learners enrolled 28,055.00 31,422.00 32,993.00 92,470.00

4. Support for Schools and Learners Programs

4.1 Operation of Schools- Elementary ( Kinder- Grade 6 ) No. of Non-Teaching Positions Paid PS 497,769.00 10,100,810.00 10,998,043.00 10,144,898.00 10,663,031.00 11,196,183.00 53,600,734.00

4. 2 Operation of Schools- Junior HS ( Grade 7-10 ) No.of Personnel Paid PS 322,725.00 4,285,340.00 4,830,430.00 4,467,492.00 4,697,433.00 4,932,305.00 23,535,725.00 4. 3 Operation of Schools- Senior HS ( Grade 11-12 ) No.of Personnel Paid PS 426,554.00 995,019.00 921,222.00 968,733.00 1,017,169.00 4,328,697.00

4.4 Government Assistance and Subsidies- Education Service Contracting (ESC)

No. of Personnel Paid PS 217,256.00 52,785.00 58,064.00 60,967.00 389,072.00

4.5 Government Assistance and Subsidies -( Program Service Contracting )

No. of beneficiaries 785,276.00 457,176.00 502,894.00 528,038.00 2,273,384.00

4.6 .Voucher Program for Non-DepEd Public SHS No.of beneficiaries 84,550.00 84,550.00 4.6. 2 Joint Delivery Voucher for Senior High School Technical Vocational Livelihood Soecialization

No. of Athletes and Coaches MOOE 426,554.00 8,900.00 9,790.00 10,280.00 455,524.00

4.7 Implementation of the Grant of Cash Allowance No.of recipients MOOE Hardship Pay, Equivalent Records Forms (ERF), Conversion to Master Teacher (MT) and Reclassification of Positions

MOOE 16,849.00 242,067.00 384,639.00 1,320,000.00 14,520,000.00 16,483,555.00

4.7.1 Special Hardship Allowance No.of Students and Teachers MOOE 166,302.00 166,302.00 196,374.00 207,513.00 219,949.00 230,947.00 1,187,387.00

4.7.2 ERF, MT , Reclass No 4,593.00 32,188.00 46,485.00 46,485.00 48,809.00 51,250.00 229,810.00 4.7.3 Cash Allowance No. of personnel paid 43,577.00 43,577.00 130,641.00 130,641.00 137,173.00 144,032.00 629,641.00 4.8 School Dental Health Care Program No. of Personnel Trained MOOE 55,597.00 88,246.00 6,200.00 6,820.00 7,161.00 164,024.00

Chapter 10-3-DepEd IXPage 3 of 4

Page 75: Table of Contents (By Chapter)

Programs and Projects Expected Output Mode of Funding

2017 2018 2019 2020 2021 2022 Total

(Actual ) (Actual) (Actual) ( RDC endorsed) (Proposed) (Proposed) (In Thousand Pesos)

Amount in Thousand Pesos

4.9 Regional Integrated Competetions ( ZPRAA Meet/ Palaro, RSPC, RFOT, Academic Contest, Research Congress , Mosabaqah, BSP/ GSP Encampment

No. of RIC Participants and Activities MOOE 6,017,000.00 6,618,700.00 12,635,700.00

4.9. 1. Regional Office Proper 4.10 Project Related to Youth / National Drug Education Program/ Adolescent Regional Health Program

No. of Activities held

4.10.1 Regional Office Proper 1,200.00 1,320.00 1,386.00 3,906.00 4. 11 Disaster Risk Reduction Management( DRRM ) Kits and Assessment

No. of DRRM Kita & Assessment Procured

4. 11.1 Regional Office Proper 1,100.00 1,155.00 2,255.00 4.12 World Teacher's Day No. of World Teachers Day Participants MOOE 500.00 550.00 578.00 1,628.00 4.12.1 Regional Office Proper No.of Policy Issued MOOE 4.13 School-Based Feeding Program No. of Learners Fed MOOE 147,850.00 147,856.00 143,871.00 172,683.00 181,317.00 190,383.00 983,960.00 4.14 Implementation of the Redesigned Tech-Voc HS Program No. of Learners 239,000.00 239,000.00

5. Education Human Resource Development Program No.of Assessment Materials Printed MOOE

5.1 Human Resource Development for Personnel in Schools and Learning Centers

No.of QAME held MOOE 39,115.00 39,115.00

5.1.1 Regional Office Proper No.of TA given MOOE 2,244.00 2,513.00 2,639.00 7,396.00 5.1.2 Division Office Proper No.of Sessions & Pupils MOOE 34,528.00 34,804.00 36,776.00 41,190.00 43,249.00 190,547.00 5.2.1 Teacher Quality and Development Program5.2.1 Regional Office Proper No. of Teachers Trained Capital Outlay 600.00 672.00 706.00 1,978.00 5.2.2 Division Offices Proper MOOE 5.3 Regional Learning Assessment Tools No. of Learning Assessment Tools Procured 5.3.1 Regional Office Proper MOOE 1,000.00 1,120.00 1,176.00 3,296.00

Sub-Total Operations 6,443,368.00 18,343,508.00 20,340,616.00 26,937,318.00 35,317,097.00 52,531,173.60 159,913,080.60

SUMMARY

I. General Administration and Support 12,200,594.00 2,069,135.00 483,780.00 604,136.00 627,592.00 624,701.00 16,609,938.00

II. Support to Operations 4,100.00 101,521.00 99,439.00 106,879.00 112,922.00 118,568.00 543,429.00

III. Operations 6,443,368.00 18,343,508.00 20,340,616.00 26,937,318.00 35,317,097.00 52,531,173.60 159,913,080.60

GRAND TOTAL 18,648,062.00 20,514,164.00 20,923,835.00 27,648,333.00 36,057,611.00 53,274,442.60 177,066,447.60

Chapter 10-3-DepEd IXPage 4 of 4

Page 76: Table of Contents (By Chapter)

Updated Zamboanga Peninsula Regional Development Investment Program 2017-2022Agency: TECHNICAL EDUCATION AND SKILLS DEVELOPMENT AUTHORITY IXChapter: 10 Accelerating Human Capital Development

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC

endorsed)

2021(Proposed)

2022(Proposed) Total

(1) (2) (3) (4) (5) (6) (7) (9) (10) (11) (12) (13) (14) (15) (16) (17)

OUTCOME: Equal access for all women and men to affordable and quality technical, vocational and tertiary education ensured and employability of graduates increased.

Program 1: Technical Education and Skills Development (TESD) Policy Programs 1,500,000 780,000 860,000 1,200,000 1,020,000 1,100,000 6,460,000

Formulation/ publication and dissemination of 2017-2022 TESD Plans

Regional and Provincial

applies to all results matrix indicators No. of TESD Plans GAA GAA 900,000 440,000 480,000 900,000 560,000 600,000 3,880,000

TESD Policies developed and issued or updated and disseminated

Regional and Provincial

applies to all results matrix indicators No. of policies GAA GAA 600,000 340,000 380,000 300,000 460,000 500,000 2,580,000

Program 2: Technical Education and Skills Development (TESD) Regulatory Programs 5,500,000 8,200,000 9,450,000 7,050,000 11,950,000 13,200,000 55,350,000

No. of new programs registered GAA GAA 500,000 750,000 1,150,000 500,000 1,950,000 2,350,000 7,200,000

No. of Programs Audited GAA GAA 800,000 1,000,000 1,400,000 1,000,000 2,200,000 2,600,000 9,000,000

Assessed No. workers assessed GAA GAA 1,800,000 3,000,000 3,200,000 2,500,000 3,600,000 3,800,000 17,900,000

Certified / Certification Rate

No. of certified workers GAA GAA 1,000,000 2,000,000 2,200,000 1,500,000 2,600,000 2,800,000 12,100,000

TVET Program Registration and Accreditation Services

Any technical vocational institution (TVI) must first apply for and be issued a Certificate of TVET Program Registration (CTPR) before it can offer a course and accept enrollees. TESDA conducts regular audits/ inspection visits of schools and training centers to ensure their continuous compliance to the registration standards.

Regionwide Institution-based Training Program

Competency Assessment and Certification of Skilled Workers

Aims to elevate the status of and professionalize skilled occupations. Passing the competency assessment confirms that a TESD graduate or a worker of a particular qualification can demonstrate the standards of competence expected at the workplace.

Regionwide

Mode of Funding

Investment Requirements (in exact amount PhP)

LGU Proponent RemarksExpected

Output

Basis for Implementation

TESD Policies, Plans and Programs

Chapter Outcome/

Project TitleProject Description/ Objectives

Specific Location

(Province/ Municipality

/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Chpater 10-4-TESDA IXPage 1 of 5

Page 77: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC

endorsed)

2021(Proposed)

2022(Proposed) Total

Mode of Funding

Investment Requirements (in exact amount PhP)

LGU Proponent RemarksExpected

Output

Basis for Implementation

Chapter Outcome/

Project TitleProject Description/ Objectives

Specific Location

(Province/ Municipality

/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Assessed/Certified No. of Assessors trained/ accredited

TESDA Guidelines GAA

Assessed/CertifiedNumber of New assessment centers accredited

TESDA Guidelines GAA

Skills Competition The skills competition will showcase the world-class skills and competence of our technical-vocational trainees and industry workers.

Provincial and Regional Levels Certified

No. of qualifications for the National Skills Competitions participated

TESDA Guidelines GAA 400,000 800,000 800,000 800,000 800,000 800,000 4,400,000

Program 3: Technical Education and Skills Development (TESD) Programs 82,307,000 71,838,000 77,666,000 108,800,000 91,201,000 98,701,000 530,513,000

No. of TTI enrollees GAA

GAA

No. of TTI graduates GAA

GAA

Institution-based Programs

A mode of training program delivery which is implemented by training institutions with registered programs, whether public or private, and conducted within the premise of the school.

Regionwide Institution-based training program

No. of Trainees trained

TESDA Guidelines GAA 1,500,000 2,000,000 2,000,000 1,000,000 2,200,000 2,400,000 11,100,000

Enterprise-based Programs

Programs consisting of activities undertaken by and within the company/firms which may be in a form of dual training system, apprenticeship and learnership.

Regionwide Enterprised-based Training Programs

No. of Trainees trained

TESDA Guidelines GAA 1,200,000 700,000 700,000 800,000 800,000 1,000,000 5,200,000

Community-based Programs

Are program designed to respond to the need for skills training of a community, specifically directed in promoting self-employment.

Regionwide Community-based Training Programs

No. of Trainees trained

TESDA Guidelines GAA 8,000,000 2,750,000 3,100,000 9,000,000 3,900,000 4,300,000 31,050,000

No. of TWSP subsidized enrolees GAA GAA

53,665,000 75,000,000 64,900,000 71,000,000 355,008,000Training for Work Scholarship Program (TWSP)

Training program which provide immediate interventions to highly critical skills through appropriate training programs that are linked up with jobs with immediate employment both locally and

RegionwideTraining for Work Scholarship Program (TWSP)

41,656,000

850,000 4,750,000

48,787,000

4,300,000 4,800,000 10,000,000 5,800,000

TESDA Technology Institutions program delivery

The program is being implemented by the TESDA Administered Schools and TESDA Training Centers Regionwide Institution-based

Training Programs 16,650,000

Accreditation of Competency Assessors and Assessment Centers

The process of recognizing and/or empowering an individual/institution to perform certain roles and responsibilities on behalf of TESDA organization and authorizing an establishment to manage the assessment activities.

Regionwide 1,000,000 650,000 700,000

6,300,000 47,850,000

750,000 800,000

Chpater 10-4-TESDA IXPage 2 of 5

Page 78: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC

endorsed)

2021(Proposed)

2022(Proposed) Total

Mode of Funding

Investment Requirements (in exact amount PhP)

LGU Proponent RemarksExpected

Output

Basis for Implementation

Chapter Outcome/

Project TitleProject Description/ Objectives

Specific Location

(Province/ Municipality

/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

No. of TWSP subsidized graduates

GAA GAA

No. of Enrolees GAA GAA

No. of Graduates GAA GAA

No. of TVET Trainers trained (TM I)

TESDA Guidelines GAA

No. of TVET Trainers provided with skills upgrading

Presidential Directives/Special Programs 6,500,000 431,673,120 73,994,466 104,500,000 114,000,000 136,000,000 866,667,586

Livelihood Skills Training for Drug Dependents/ Inmates and their families and Rebel returnees

Provide special and/or onsite skills training program for drug dependents and inmates as well as rebel returnees as part of the government’s rehabilitation/reintegration program.

Regionwide

Institution-based / Enterprised-based / Community-based training programs

No. of beneficiaries trained

TESDA Guidelines GAA 2,000,000 2,000,000 2,000,000 9,500,000 2,000,000 2,000,000 19,500,000 Part of Community-

based in 2016

Barangay Scholarship Program

This is aimed at expanding and providing equal opportunities for the greater number of people in the smallest government unit, the barangay. The Barangay Chairperson shall identify the benificiary.

Regionwide

Institution-based / Enterprised-based / Community-based training programs

No. of beneficiaries trained

TESDA Guidelines GAA 2,500,000 2,000,000 2,000,000 9,500,000 2,000,000 2,000,000 20,000,000 Part of Community-

based in 2016

Skills Training for IPs/ OFWs/ PWDs and Women

Special skills training program for IPs, OFWs, PWDs and Women, particularly the housewives and victims of human trafficking, to ensure their economic well-being.

Regionwide

Institution-based / Enterprised-based / Community-based training programs

No. of beneficiaries trained

TESDA Guidelines GAA 2,000,000 2,000,000 2,000,000 9,500,000 2,000,000 2,000,000 19,500,000

Part of Community-based and Institution-based in 2016

1,700,000 1,000,000 1,900,000 2,000,000 9,800,000 Budget is part of TWSP

Trainers Development

TESDA conducts continuing training for trainers, administrators, supervisors and non- teaching personnel to improve and upgrade the delivery of technology- based structions.

Regionwide

Institution-based / Enterprised-based / Community-based training programs

1,600,000 1,600,000

11,701,000 11,701,000 12,000,000 11,701,000 11,701,000 70,505,000

Private Education Student Financial Assistance (PESFA)

Educational grants provided to qualified and deserving students of postsecondary non-degree courses and assists private institutions in their development efforts by assuring a steady supply of enrollees to their course offerings.

RegionwidePrivate Education Student Financial Assistance (PESFA)

11,701,000

Program (TWSP) jobs with immediate employment both locally and overseas.

(TWSP)

Chpater 10-4-TESDA IXPage 3 of 5

Page 79: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC

endorsed)

2021(Proposed)

2022(Proposed) Total

Mode of Funding

Investment Requirements (in exact amount PhP)

LGU Proponent RemarksExpected

Output

Basis for Implementation

Chapter Outcome/

Project TitleProject Description/ Objectives

Specific Location

(Province/ Municipality

/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Universal Access to Quality Tertiary Education Act (RA 10931)

Providing free technical-vacational education and training Regionwide Institution-based

training programNo. of EnroleesNo. of Graduates GAA GAA 425,673,120 64,994,466 70,000,000 80,000,000 100,000,000 740,667,586

National Task Force to End Local Communist Armed Conflict (EO 70)

Effective implementation of the whole-of-nation approach to attain inclusive and sustainable peace. Regionwide Community-based

Training ProgramNo. of EnroleesNo. of Graduates

TESDA Guidelines GAA 3,000,000 6,000,000 8,000,000 10,000,000 27,000,000

Tulong Trabaho Act(RA 11230)

Providing free access to technical-vacational education and training Regionwide

Institution-based / Enterprised-based / Community-based training programs

No. of EnroleesNo. of Graduates GAA GAA 20,000,000 20,000,000 40,000,000

Support to Operations 2,350,000 3,280,000 3,330,000 3,380,000 3,650,000 3,650,000 19,640,000

No. of clients provided with Career Guidance services

TESDA Guidelines GAA 200,000 200,000 200,000 200,000 250,000 250,000 1,300,000

No. of TVET situationer prepared and posted on the website

TESDA Guidelines GAA 100,000 100,000 100,000 100,000 100,000 100,000 600,000

No. of Press Releases;No. of Press Briefings;Percentage requests for TV appearances/ Radio guestings attended

TESDA Guidelines GAA 450,000 380,000 380,000 380,000 400,000 400,000 2,390,000

Gender and development

Conduct of training programs that will address to the requirements of the applicable laws for gender and development.

Regionwide applies to all results matrix indicators

No. of programs conducted

applicable laws GAA 1,000,000 2,000,000 2,000,000 2,000,000 2,200,000 2,200,000 11,400,000

Maintenance of the TESDA Training and Monitoring System (T2MIS)

This is an online system for training application and monitoring of the agency's performance in training, assessment and certification.

Regionwide applies to all results matrix indicators

Monthly monitoring reports

TESDA Guidelines GAA 600,000 600,000 650,000 700,000 700,000 700,000 3,950,000

Advocacy and Communication

applies to all results matix indicators

Chpater 10-4-TESDA IXPage 4 of 5

Page 80: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC

endorsed)

2021(Proposed)

2022(Proposed) Total

Mode of Funding

Investment Requirements (in exact amount PhP)

LGU Proponent RemarksExpected

Output

Basis for Implementation

Chapter Outcome/

Project TitleProject Description/ Objectives

Specific Location

(Province/ Municipality

/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

General Administration and Support Services 4,140,000 3,600,000 3,900,000 91,800,000 49,600,000 4,900,000 157,940,000

General Management and Supervision

Regionwide

General Management and Supervision provided

TESDA Guidelines GAA 4,140,000 3,600,000 3,900,000 4,800,000 4,600,000 4,900,000 25,940,000

Construction of Regional Office

To construct an Office Building to house the TESDA regional office at the designated Regional Center in Pagadian City.

Pagadian City 1 office building E.O. 429, s. 1990 GAA 42,000,000 45,000,000 87,000,000

42,000,000 had been endorced by the RDC for 2020 AIP but since it has not been included in the 2020 NEP yet, 45,000,000 is proposed for 2021

To construct 3 office buildings for the provincial offices at the designated provincial government centers in respective provinces.

Dipolog City,Pagadian City,Ipil, Zamboanga Sibugay

3 office buildings 45,000,000 45,000,000

GRAND TOTAL 102,297,000 519,371,120 169,200,466 316,730,000 271,421,000 257,551,000 1,636,570,586

Chpater 10-4-TESDA IXPage 5 of 5

Page 81: Table of Contents (By Chapter)

ZAMBOANGA PENINSULA REGIONAL DEVELOPMENT INVESTMENT PROGRAM 2017 - 2022RDP Chapter: Accelerating Human Capital DevelopmentAGENCY : TESDA, DIPOLOG SCHOOL OF FISHERIES

2017 2018 2019 2020 2021 2022

Develop graduates with high competence and skills in fisheries and allied sciences through assured training programs

Institution-based Training Programs

DSF, Olingan, Dipolog City

No. of Trainees

enrolled & graduated

No. of Enrolled: 1,000 No. of Graduates: 900

Mandate from TESDA Higher Office to

TECH/VOC Institutionson-going 5 1,302.26 1,367.43 1,068.60 2,390.00 3,307.50 3,472.88 12,908.67

Target of No. of Enrollees is set by TESDA Central

Office

Enterprise-based/Apprenticeship

Programs

Province of Zamboanga del Norte

No. of Trainees

enrolled & graduated

No. of Enrolled: 25 No. of Graduates: 25

Mandate from TESDA Higher Office to

TECH/VOC Institutionson-going 5 - - - 500.00 110.25 115.76 726.01

Target of No. of Enrollees is set by TESDA Central

Office

Community-based Skills Training Program

Province of Zamboanga del Norte

No. of Trainees

enrolled and graduated

No. of Enrolled: 2,000 No. of Graduates: 1,800

Mandate from TESDA Higher Office to

TECH/VOC Institutionson-going 5 - - - 1,650.00 551.25 578.81 2,780.06

Target of No. of Enrollees is set by TESDA Central

Office

Skills Training Program for Special Clients

Province of Zamboanga del Norte

No. of persons

trained in skills

trainings

Drug Dependents: 15 Rebel Returnees: 15 Inmates & their Families: 15 Ips & Cultural Communities: 25 Overseas Filipinos: 5 Women : 15 PWDs: 2 Senior Citizens: 5

Mandate from TESDA Higher Office to

TECH/VOC Institutionson-going 5 - - - - 110.25 115.76 226.01

According to the absorptive capacity

of the institution

Trainers Development TESDA, TDI

No. of Trainers

trained and upgraded

No. of Trainers Trained & 25 Upgraded

Mandate to trainers of TESDA Administrered

Schoolson-going 5 249.78 263.76 279.60 1,000.00 1,102.50 1,157.63 4,053.27

Gender and Development DSF, Olingan, Dipolog City

Ratio of men &

women in TESD

2:1 Ratio of men & women in TESD

Mandate from TESDA Higher Office to

TECH/VOC Institutionson-going 5 143.30 147.60 250.00 1,326.66 551.25 578.81 2,997.62

Establishment of Quality Management System (QMS)

DSF, Olingan, Dipolog City

APACC Accreditation and STAR Rating of 13

Qualifications

APACC Mandate to TECHVOC Institutions on-going 5 50.00 50.00 50.00 1,500.00 1,102.50 1,157.63 3,910.13

Lilihood Skills Training for IPs, PFWs & PWDs

Province of Zamboanga del Norte

25 Trainees per year

Skills Training for Livelihood

Mandate to TESDA Administered Schools on-going 5 - - - - 110.25 115.76 226.01

Technology Research & Innovations

Province of Zamboanga del Norte

2 Research per year

Introduce new methods and innovation through research

for

Mandate from TESDA Higher Office to

TECH/VOC Institutionson-going 5 153.45 - 161.40 600.00 551.25 578.81 2,044.91

Basis for Implementation

Status/ Level of Readiness

Implementation Period

Cost in Thousand PesosTotal Project

Cost RemarksExpected OutputChapter Outcome/ Project Title

Project Description/ Objectives

Co-Implementing

Agency

Specific Location (Province/

Municipality/ City/ Barangay)

RDP Results

Matrices Indicators Addressed

Chapter 10-5-DSF-TESDA IXPage 1 of 3

Page 82: Table of Contents (By Chapter)

2017 2018 2019 2020 2021 2022

Basis for Implementation

Status/ Level of Readiness

Implementation Period

Cost in Thousand PesosTotal Project

Cost RemarksExpected OutputChapter Outcome/ Project Title

Project Description/ Objectives

Co-Implementing

Agency

Specific Location (Province/

Municipality/ City/ Barangay)

RDP Results

Matrices Indicators Addressed

General Administrative & Support Services

DSF, Olingan, Dipolog City

100% delivery of

General Administrati

ve and Support Services

Maintenance, Utilities and travelling expense for

trainers and staff

Mandate from TESDA Higher Office to

TECH/VOC Institutionson-going 5 613.80 632.21 968.40 - 2,205.00 2,315.25 6,734.66

Increase of fund due to the increase of

travelling allowance per diem

TVET Partnerships-Industries and Schools

Province of Zamboanga del Norte

50 industries per year

Apprenticeship, dual traning and Curriculum Development

Mandate from TESDA Higher Office to

TECH/VOC Institutionson-going 5 - - - - 110.25 115.76 226.01

Development of Information System

DSF, Olingan, Dipolog City

Transparency and

Accessibility of

Institution\'sInformation

to the Public

Accessed information in website, and social media through upgraded internet

connection

Mandate from HIGHER AUTHORITY of

internet accessibilityon-going 5 - - - - 220.50 231.53 452.03

UTPRAS Program Registration for New

Programs

DSF, Olingan, Dipolog City

2 programs of

registration per year

Implementtion of programs newly registered

Mandate from TESDA Higher Office to

TECH/VOC Institutionson-going 5 - - - - 220.50 231.53 452.03

Compliance with Technical Audit for TVET Programs

DSF, Olingan, Dipolog City

Once every year

Compliance as to the UTPRAS Registration and

Certification

Mandate from TESDA Higher Office to

TECH/VOC Institutionson-going 5 - - - 2,795.94 220.50 231.53 3,247.97

Competency Assessment and Certification

DSF, Olingan, Dipolog City

1,900 assessed per

year

Certified as NC holders legible for employment

Mandate from TESDA Higher Office to

TECH/VOC Institutionson-going 5 - - - 2,000.00 220.50 231.53 2,452.03

Updating of the School Library Holdings

DSF, Olingan, Dipolog City

Updated library

collection to all

programs in school

Digitization of library services and regular update of collection for enhacement

and innovation

Mandate from TESDA Higher Office to

TECH/VOC Institutionson-going 5 - - - - 220.50 231.53 452.03

Acquisition of Tools & Equipments for Diploma

Programs (NC III & NC IV)

DSF, Olingan, Dipolog City

Tools and Equipments

for 6 Diploma Programs

Provide complete tools and equipments to all Diploma

Program Trainees

Mandate to TESDA Administered Schools on-going 5 - - - - 551.25 578.81 1,130.06

Improvement of the different training

laboratories

DSF, Olingan, Dipolog City

Latoratories for the 20

qualifications

Provide complete facilitites to all laboratories for

trainers in all qualifications

Mandate to TESDA Administered Schools on-going 5 556.41 690.00 400.00 - 2,205.01 2,315.26 6,166.68

Acquisition of Stand-by Power Generator

DSF, Olingan, Dipolog City

I unit of 500 QVA

Power Generator

Cotinued Power Supply of the School in case of Power Interrruption especially in

the Multi-Purpose Community-based Hatchery

With approval of apprpriate approving

body but not yet ongoing

5 - - - 2,500.00 2,205.00 2,315.25 7,020.25

Previously requested and

endorsed by the Council but not

funded

Chapter 10-5-DSF-TESDA IXPage 2 of 3

Page 83: Table of Contents (By Chapter)

2017 2018 2019 2020 2021 2022

Basis for Implementation

Status/ Level of Readiness

Implementation Period

Cost in Thousand PesosTotal Project

Cost RemarksExpected OutputChapter Outcome/ Project Title

Project Description/ Objectives

Co-Implementing

Agency

Specific Location (Province/

Municipality/ City/ Barangay)

RDP Results

Matrices Indicators Addressed

Acquisition of Service Vehicle for mobilization of community-based trainings

& extension services

DSF, Olingan, Dipolog City

1 unit - Van Type

Vehicle

For Community-based Training within the Province

of Zamboanga del Norte

With approval of apprpriate approving

body but not yet ongoing

5 - - - - 1,800.00 1,800.00 3,600.00

Previously requested and

endorsed by the Council but not

funded

Rehabilitation of the Community-Based Multi-

Species Hatchery

DSF, Olingan, Dipolog City

2 Community-

based Multispecies Hatchery

for rehabilitatio

n

For Trainees in the Diploma in Fishery and Aquaculture

Qualifications

With approval of apprpriate approving

body but not yet ongoing

5 - - - - 2,205.00 2,315.25 4,520.25

Previously requested and

endorsed by the Council but not

funded

Perimeter Fence of the main campus

DSF, Olingan, Dipolog City 800 meters

Secure facilities and the school pond from outside

intruders and a requirement for the Organbic Agriculture

Production NC II

With approval of apprpriate approving

body but not yet ongoing

5 - - - 4,000.00 3,307.50 3,472.88 10,780.38

Previously requested and

endorsed by the Council but not

funded

Concreting of Supply Cannal and

Rehabilitation/Repair of Fishpond Dikes

DSF, Olingan, Dipolog City

10 Fishpond Dikes

Training Facility for the Aquaculture and Diploma in

Fishery Technology

With approval of apprpriate approving

body but not yet ongoing

5 - - 50.00 6,000.00 5,512.50 5,788.13 17,350.63

Previously requested and

endorsed by the Council but not

funded3,069.00 3,151.00 3,228.00 26,262.60 28,701.01 30,046.09 94,457.70

Chapter 10-5-DSF-TESDA IXPage 3 of 3

Page 84: Table of Contents (By Chapter)

Updated Zamboanga Peninsula Regional Development Investment Program (RDIP), 2017-2022

Agency: KABASALAN INSTITUTE OF TECHNOLOGYChapter: 10. ACCELERATING HUMAN CAPITAL DEVELOPMENT

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

(1) (2) (6) (7) (9) (10) (11) (12) (13) (14) (15)Outcome 1:

Equal Access for all women and men to

affordable and quality technical, vocational

and tertiary education and higher

employability rate of graduates

Institution-based Programs

Operation of TechVoc

Institutions as mandated by the higher TESDA

office

GAA 1,550,000.00 1,534,000.00 1,616,000.00 1,875,000.00 2,130,000.00 2,407,000.00 11,112,000.00

Universal Access to Tertiary Education

Act RA10931

Operation of TechVoc

Institutions as mandated by the higher TESDA

office

GAA 34,890,075.75 36,000,000.00 70,890,075.75

Gender & Development Plan

Operation of TechVoc

Institutions as mandated by the higher TESDA

office

GAA

Skills Training for Indigeneous People & PWD's (GAD)

Operation of TechVoc

Institutions as mandated by the

GAA

1,107,000.00 4,844,000.00 863,000.00 980,000.00

Chapter Outcome/ Project Title

Project Description/ Objectives

Basis for Implementation

Mode of Funding

Investment Requirements (in exact amount PhP)

713,000.00 438,000.00 743,000.00

Chapter 10-6-KIT-TESDA IXPage 1 of 11

Page 85: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title

Project Description/ Objectives

Basis for Implementation

Mode of Funding

Investment Requirements (in exact amount PhP)

Area-Based Planning-

coordination with LGUs

Operation of TechVoc

Institutions as mandated by the

GAA 240,000.00 306,000.00 250,000.00 290,000.00 329,000.00 372,000.00 1,787,000.00

Operation of TechVoc

Institutions as mandated by the

GAA

Operation of TechVoc

Institutions as mandated by the

GAA

Operation of TechVoc

Institutions as mandated by the higher TESDA

office

GAA

Operation of TechVoc

Institutions as mandated by the higher TESDA

office

GAA

Updating of Library Holdings

Operation of TechVoc

Institutions as mandated by the higher TESDA

office

GAA 112,000.00 110,000.00 117,000.00 136,000.00 87,500.00 107,500.00 670,000.00

TVET Partnership - Industries &

Schools240,000.00 263,000.00 250,000.00 290,000.00 329,000.00 372,000.00 1,744,000.00

Chapter 10-6-KIT-TESDA IXPage 2 of 11

Page 86: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title

Project Description/ Objectives

Basis for Implementation

Mode of Funding

Investment Requirements (in exact amount PhP)

Operation of TechVoc

Institutions as mandated by the higher TESDA

office

GAA

Operation of TechVoc

Institutions as mandated by the higher TESDA

office

GAA

Operation of TechVoc

Institutions as mandated by the higher TESDA

office

GAA

Operation of TechVoc

Institutions as mandated by the higher TESDA

office

GAA

Operation of TechVoc

Institutions as mandated by the higher TESDA

office

GAA

136,000.00 717,000.00

Social Marketing & Advocacy 80,000.00 88,000.00 83,000.00 97,000.00 100,000.00 113,000.00 561,000.00

Monitoring Employment Status of TTI Graduates

88,000.00 175,000.00 92,000.00 106,000.00 120,000.00

Chapter 10-6-KIT-TESDA IXPage 3 of 11

Page 87: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title

Project Description/ Objectives

Basis for Implementation

Mode of Funding

Investment Requirements (in exact amount PhP)

Operation of TechVoc

Institutions as mandated by the higher TESDA

office

GAA

Operation of TechVoc

Institutions as mandated by the higher TESDA

office

GAA

Operation of TechVoc

Institutions as mandated by the higher TESDA

office

GAA

Operation of TechVoc

Institutions as mandated by the higher TESDA

office

GAA

Skills Training for Drug Dependent

Operation of TechVoc

Institutions as mandated by the higher TESDA

office

GAA 250,000.00 280,000.00 350,000.00 360,000.00 408,960.00 462,125.00 2,111,085.00

1,538,000.00 7,378,000.00

Online Scholarship Program 380,000.00 350,000.00 396,000.00 - 449,850.00 508,330.00 2,084,180.00

Brgy. Scholarship Program 990,000.00 1,313,000.00 1,032,000.00 1,120,000.00 1,385,000.00

Chapter 10-6-KIT-TESDA IXPage 4 of 11

Page 88: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title

Project Description/ Objectives

Basis for Implementation

Mode of Funding

Investment Requirements (in exact amount PhP)

Skills Training for Entreprenuers &

Family Enterprises

Operation of TechVoc

Institutions as mandated by the higher TESDA

office

GAA - 125,000.00 185,000.00 220,000.00 249,920.00 282,409.60 1,062,329.60

Skills Training for Inmates and their

families

Operation of TechVoc

Institutions as mandated by the higher TESDA

office

GAA - 125,000.00 185,000.00 200,000.00 227,200.00 256,700.00 993,900.00

Skills Training for OFW Reintegration

Operation of TechVoc

Institutions as mandated by the higher TESDA

office

GAA - 135,000.00 195,000.00 234,000.00 265,800.00 300,300.00 1,130,100.00

Skills Training for Victims of Disaster

and Calamities

Operation of TechVoc

Institutions as mandated by the higher TESDA

office

GAA - - - 208,000.00 236,200.00 267,000.00 711,200.00

Skills Training for Senior Citizens

Operation of TechVoc

Institutions as mandated by the higher TESDA

office

GAA - - - 220,000.00 250,000.00 282,400.00 752,400.00

Chapter 10-6-KIT-TESDA IXPage 5 of 11

Page 89: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title

Project Description/ Objectives

Basis for Implementation

Mode of Funding

Investment Requirements (in exact amount PhP)

Skills Training for Displaced Women

Operation of TechVoc

Institutions as mandated by the higher TESDA

office

GAA - - - 220,000.00 250,000.00 282,400.00 752,400.00

Establishment /Maintenace of

EMIS

Operation of TechVoc

Institutions as mandated by the higher TESDA

office

GAA 180,000.00 152,000.00 118,000.00 218,000.00 226,000.00 255,000.00 1,149,000.00

Operation of TechVoc

Institutions as mandated by the higher TESDA

office

GAA

Operation of TechVoc

Institutions as mandated by the higher TESDA

office

GAA

Operation of TechVoc

Institutions as mandated by the higher TESDA

office

GAA

226,460.00 850,660.00 Trainers Skills

Upgrading Programs (TSUP)

111,000.00 90,000.00 115,000.00 134,000.00 174,200.00

Chapter 10-6-KIT-TESDA IXPage 6 of 11

Page 90: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title

Project Description/ Objectives

Basis for Implementation

Mode of Funding

Investment Requirements (in exact amount PhP)

Non-teaching staff capability building

programs

Operation of TechVoc

Institutions as mandated by the higher TESDA

office

GAA 56,000.00 63,000.00 58,000.00 68,000.00 88,400.00 99,890.00 433,290.00

Operation of TechVoc

Institutions as mandated by the higher TESDA

office

GAA

Operation of TechVoc

Institutions as mandated by the higher TESDA

office

GAA

Operation of TechVoc

Institutions as mandated by the higher TESDA

office

GAA

Financial Management and

Reporting88,000.00 88,000.00 88,000.00 102,000.00 116,000.00 131,000.00 613,000.00

Chapter 10-6-KIT-TESDA IXPage 7 of 11

Page 91: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title

Project Description/ Objectives

Basis for Implementation

Mode of Funding

Investment Requirements (in exact amount PhP)

Operation of TechVoc

Institutions as mandated by the higher TESDA

office

GAA

Operation of TechVoc

Institutions as mandated by the higher TESDA

office

GAA

Drug Abuse Prevention and Post-

Rehabilitation Programs

Operation of TechVoc

Institutions as mandated by the higher TESDA

office

GAA 337,000.00 - - - - - 337,000.00

GAA

Operation of TechVoc

Institutions as mandated by the higher TESDA

office

GAA

121,000.00 525,000.00

Job Linkaging and Networking

Services

515,000.00 502,000.00 512,000.00 411,000.00 534,300.00 694,590.00 3,168,890.00

Post-training Assistance (Career Orientation and Job Induction and Job

Placement Program)

78,000.00 44,000.00 81,000.00 94,000.00 107,000.00

Chapter 10-6-KIT-TESDA IXPage 8 of 11

Page 92: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title

Project Description/ Objectives

Basis for Implementation

Mode of Funding

Investment Requirements (in exact amount PhP)

Promotion of Research Culture

Operation of TechVoc

Institutions as mandated by the higher TESDA

office

GAA 45,000.00 44,000.00 49,000.00 54,000.00 61,000.00 69,000.00 322,000.00

Compliance for Technical Audit for

TVET Programs

Operation of TechVoc

Institutions as mandated by the higher TESDA

office

GAA 1,075,000.00 1,061,000.00 903,000.00 1,134,000.00 1,288,224.00 1,755,443.00 7,216,667.00

UTPRAS Program Registration

Operation of TechVoc

Institutions as mandated by the higher TESDA

office

GAA 280,000.00 330,000.00 300,000.00 305,000.00 346,480.00 391,522.40 1,953,002.40

Promotion of Quality Assurance

System

Operation of TechVoc

Institutions as mandated by the higher TESDA

office

GAA 1,500,000.00 1,500,000.00 3,000,000.00

Subtotal for Outcome 1 7,408,000.00 7,616,000.00 7,718,000.00 8,959,000.00 47,130,109.75 50,038,070.00 128,869,179.75

Outcome 2: GASSOutcome 3:

Chapter 10-6-KIT-TESDA IXPage 9 of 11

Page 93: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title

Project Description/ Objectives

Basis for Implementation

Mode of Funding

Investment Requirements (in exact amount PhP)

Upgraded tools, equipment, and

facilities for Quality TVET and for

increased absorptive capacity

Acquisition of tools & equipment to

upgrade Program Offering levels to NC III and NC IV

Operation of TechVoc

Institutions as mandated by the higher TESDA

office

GAA 20,000,000.00 20,000,000.00 20,000,000.00 60,000,000.00

Construction of New Building to in-house 9 classrooms,

conference and multi-purpose

rooms, administrative

offices and School Library

Operation of TechVoc

Institutions as mandated by the higher TESDA

office

GAA 30,000,000.00 30,000,000.00 30,000,000.00 90,000,000.00

Mobile Training Program -

Acquisition of Service Vehicle

Operation of TechVoc

Institutions as mandated by the higher TESDA

office

GAA 18,000,000.00 18,000,000.00 18,000,000.00 54,000,000.00

Acquisition of 50-seater School Bus

for various training programs

Operation of TechVoc

Institutions as mandated by the higher TESDA

office

GAA 3,000,000.00 3,000,000.00 3,000,000.00 9,000,000.00

Chapter 10-6-KIT-TESDA IXPage 10 of 11

Page 94: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title

Project Description/ Objectives

Basis for Implementation

Mode of Funding

Investment Requirements (in exact amount PhP)

Renovation of Hostel to Dormitory

Type

Operation of TechVoc

Institutions as mandated by the higher TESDA

office

GAA 1,000,000.00 1,000,000.00 1,000,000.00 3,000,000.00

Subtotal for Outcome 3 - - - 72,000,000.00 72,000,000.00 72,000,000.00 216,000,000.00

GRAND TOTAL 7,408,000.00 7,616,000.00 7,718,000.00 80,959,000.00 119,130,109.75 122,038,070.00 344,869,179.75

Chapter 10-6-KIT-TESDA IXPage 11 of 11

Page 95: Table of Contents (By Chapter)

Zamboanga Peninsula Regional Development Investment Program 2017-2022Chapter : 10 Accelerating Human Capital DevelopmentAgency : BASILAN STATE COLLEGEMode of Implementation: GAA

2016 and Prior 2017 2018 2019 2020 2021 2022 2017-2022 Total Project

Cost

1. Student Resource Learning Center

Raise school library to an international and more technical

standard

BaSC Main Campus Isabela

City, Basilan

Accesibility to a International

standard library

MTDP 2011-2016 Roadmap PHE

80% completion

2017 10

2. Construction of two (2) storey (10) classroom building Lamitan Campus

House growing population and or

conducivity

BaSC Lamitan Campus, Lamitan

City, Basilan

Condusive Functinal classroom

MTDP 2011-2016 2017 11

3. Establishment of MIS Management Information System

Provide management with

information for decision making

BaSC Main Campus Isabela

City, Basilan

Data bank MTDP 2011-2016 Roadmap PHE

2017 3

4. Equipment and Facilities for Trade Technology

Facilitate quality instruction

BaSC Main Campus Isabela

City, Basilan

Improve Skills MTDP 2011-2016 2017 3

5. Four (4) Storey - 32 classroom Building.

House growing student population of the College of Arts and Sciences

BaSC Main Campus Isabela

City, Basilan

Coducivity 2018 66

6. Sport Complex Student and other clientele Sport

Enthusiast Catalyst of Peace thru Sports

BaSC, Main Campus Isabela

City, Basilan

Maximum expression of

Sport Potential

MTDP 2016 Strategic Plan 2017-

2021

2019 100

7. State of the Art Facilities for HRRM and Agriculture

Quality Learning Experience for Productivity

BaSC Main Campus and Sta.

Clara Campus Lamitan, Basilan

Quality functional facilities

MTDP 2016 Strategic Plan 2017-2021 Roadmap PHE

2019 6

8. Construction of Farmers Institute Training Center

Transfer of knowledge and Technology to

farmers

BaSC, Sta. Clara,Lamitan City,

Basilan

Host Training and Seminars

MTDP 2016 Strategic Plan 2017-

2021

2019 15

Implementation Period

Investment Targets (in million PhP): NG Local

Chapter Outcome/Project Title

Project Description/ Objectives

Co-Implementing

Agency

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Status/Level of

Readiness

Chapter 10-7-BaSCPage 1 of 9

Page 96: Table of Contents (By Chapter)

2016 and Prior 2017 2018 2019 2020 2021 2022 2017-2022 Total Project

Cost

Implementation Period

Investment Targets (in million PhP): NG Local

Chapter Outcome/Project Title

Project Description/ Objectives

Co-Implementing

Agency

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Status/Level of

Readiness

9. Construction of two (2) storey 10 classroom with 2 laboratory room for Agriculture and Fisheries

Quality Agriculture- Fisheries

Instruction

Sta. Clara and Lamitan Campuses,

Lamitan City, Basilan

Improve Instruction

quality product

MTDP 2016 Strategic Plan 2017-2021 Roadmap PHE

2019 30

10. Student Cultural Peace Center

Center for propagating and

peace multiculture activities

BaSC, Main Campus Isabela

City, Basilan

Student Activity Center

MTDP 2016 Strategic Plan 2017-

2021

2019 35

11. Construction of Islamic Building

House student increasing population

BaSC, Main Campus Isabela

City, Basilan

Functional Islamic Building

MTDP 2016 Strategic Plan 2017-2021 Roadmap PHE

2019 3

12. Faculty Development Quality Faculty, Quality Instruction

and Product

Across College Campus

15% Doctoral Degree

50% Masters Degree 35% Pursuing Studies

MTDP 2016 Strategic Plan 2017-2021 Roadmap PHE

2019 3

15. Construction of Power House

House the Electric Generator which

caters the growing structure.

BaSC, Main Campus Isabela

City, Basilan

House the Generator Set

MTDP 2016 Strategic Plan 2017-

2021

2019 25

16. Upgrading Main Electrical Line 3 Phase Electric Generator

Source of Energy for the General use

of the College Activities and

Operations

BaSC, Main Campus Isabela

City, Basilan

Functional Electric

Generator for all occasion

MTDP 2016 Strategic Plan 2017-

2021

2019 6.5

17. Research ConsultancyDevelop Research

Culture in the college

BaSC, Main Campus Isabela

City, Basilan

Establish Culture of Research among faculty

and student

MTDP 2016 Strategic Plan 2017-2021 Roadmap PHE

2019 1.5

18. Major Renovation of CCJE Building

Quality Instruction BaSC Main Campus Isabela

City, Basilan

CCJE Building ronovated

MTDP 2016 Strategic Plan 2017-

2021

2019 3.5

19. Motor Pool

House service vehicles and maintenance

operation

BaSC, Main Campus Isabela

City, Basilan

Functional Maintenance

Operation

MTDP 2016 Strategic Plan 2017-

2021

2019 15

Chapter 10-7-BaSCPage 2 of 9

Page 97: Table of Contents (By Chapter)

2016 and Prior 2017 2018 2019 2020 2021 2022 2017-2022 Total Project

Cost

Implementation Period

Investment Targets (in million PhP): NG Local

Chapter Outcome/Project Title

Project Description/ Objectives

Co-Implementing

Agency

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Status/Level of

Readiness

20. Accreditation

Quality Assurance Across College Leveled-up Program

Accredited

MTDP 2016 Strategic Plan 2017-2021 Roadmap PHE

2019 3

21. Printing Press Building and Facilities

Production and reporduction of

instructional materials

BaSC, Main Campus Isabela

City, Basilan

Reproduce and Production of Instructional

Material

MTDP 2016 Strategic Plan 2017-

2021

2019 10

22. Road Construction for Lamitan Campus and Sta.Clara Campus

Approximately to the college location

for accesibility

Sta. Clara and Lamitan Campuses,

Lamitan City, Basilan

Accesibility MTDP 2016 Strategic Plan 2017-

2021

2019 50

23. Construction of College Clinic with Ambulance

Student / Employee health watch

BaSC, Main Campus Isabela

City, Basilan

Student Health Watched

MTDP 2016 Strategic Plan 2017-

2021

2019 5

24. Food Innovation Center Seasonal fruits

EnhanceBaSC, Main

Campus Isabela City, Basilan

Market accepted enhance product

MTDP 2016 Strategic Plan 2017-2021 Roadmap PHE

2019 3

25. 2 Dormitory Building for Main Campus and Sta. Clara Campus

●A separate Dormitory for 2

diffferent Campuses ●to house for feeder

●1 Building - Sta. Clara Female

● 1 Buiding Main Campus Isabela

House Female Students

MTDP 2016 Strategic Plan 2017-

2021

2019 35

26. 6- Door classroom building Maluso Campus

House growing student Population

BaSC Maluso, Lantawan, Basilan

Conducivity whole some experience

MTDP 2016 Strategic Plan 2017-

2021

2020

1028. Baseline Research for Different Diversity such as culture and Bio

Research culture Across Campuses increase research capability

MTDP 2016 Strategic Plan 2017-

2021

2020

229. Skills Development Trainig on Agri-Trade Technology

Improve productivity

BaSC Sta. Clara and Lamitan

Campuses, Lamitan City, Basilan

Increased net-work

MTDP 2016 Strategic Plan 2017-

2021

2020

130. Acquisition of 50 Hectare Agricultural Land for IGP and Instruction

Area for Agriculture student

BaSC,Sta. Clara, Lamitan City,

Basilan

Improve Capability and Productivity

MTDP 2016 Strategic Plan 2017-

2021

2020

5031. Goat Milk Production Skills Enhancement BaSC,Sta. Clara

Lamitan City, Basilan

Improve knowledge

MTDP 2016 Strategic Plan 2017-

2021

2020

1.5

Chapter 10-7-BaSCPage 3 of 9

Page 98: Table of Contents (By Chapter)

2016 and Prior 2017 2018 2019 2020 2021 2022 2017-2022 Total Project

Cost

Implementation Period

Investment Targets (in million PhP): NG Local

Chapter Outcome/Project Title

Project Description/ Objectives

Co-Implementing

Agency

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Status/Level of

Readiness

32. Establishment of Demo Farm

Show Room of Agriculture Skill

BaSC, Sta. Clara Lamitan City,

Basilan

Accessibility to farmers/students

MTDP 2016 Strategic Plan 2017-

2021

2020

2.533. Computer Units Improve IT skills BaSC,Main

Campus, Isabela City, Basilan

IT skills Improved

MTDP 2016 Strategic Plan 2017-

2021

2020

334. Establish Linkages LNI Increase Network BaSC,Main

Campus, Isabela City, Basilan

Improved Linkages

MTDP 2016 Strategic Plan 2017-

2021

2020

3 .Sport complex

Phase 2 60

Establishment of Main Electrical

Line 6.5

Procurement of Generator Set

5

Construction of 2 storey

Criminology Laboratory and

Classroom30

Acquisition of Facilities and Equipment for

the 8 Completed Classroom Building

16

Proposed Construction of the Bleacher /

Office Building10

Chapter 10-7-BaSCPage 4 of 9

Page 99: Table of Contents (By Chapter)

2016 and Prior 2017 2018 2019 2020 2021 2022 2017-2022 Total Project

Cost

Implementation Period

Investment Targets (in million PhP): NG Local

Chapter Outcome/Project Title

Project Description/ Objectives

Co-Implementing

Agency

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Status/Level of

Readiness

Proposed Construction and

Development Restoration of Shoreline and

Mangrove30

Procurement of Science

Laboratory Facilities and Chemicals.

1.5

8.Establishment of Agricultural

Research Center

70

35. Establishment of Inhouse Renew Program

Quality Instruction-product

BaSC, Main Campus, Isabela

City, Basilan

Improve Quality MTDP 2016 Strategic Plan 2017-

2021

GAA 2021

0.536. Procurement, Production and Dissemination of Instructional Materials

Accessibility to Instructional

material

BaSC, Main Campus, Isabela

City, Basilan

Minimize Utilization of Instructional

material

MTDP 2016 Strategic Plan 2017-

2021

2021

2

37. TLE Building Qulality ExperienceBaSC, Main, Isabela City,

Basilan

Quality Product MTDP 2016 Strategic Plan 2017-

2021

2021

5

38. Laboratory High School Building

Accesibility BaSC, Sta.Clara and Lamitan

Campus, Lamitan City, Basilan

Renovated for conducivity

MTDP 2016 Strategic Plan 2017-

2021

2021

12

39. Science Laboratory Equipment Up-graded

Improved Instruction

BaSC, Main, Isabela City,

Basilan

Enhanced skill MTDP 2016 Strategic Plan 2017-

2021

2021

3

40. Renovation of Piping water System-Sta. Clara and Main Campus

Improved Material Sta. Clara and Lamitan Campuses,

Basilan.

Efficiency Water unitilization

MTDP 2016 Strategic Plan 2011-

2016

2021

1

Chapter 10-7-BaSCPage 5 of 9

Page 100: Table of Contents (By Chapter)

2016 and Prior 2017 2018 2019 2020 2021 2022 2017-2022 Total Project

Cost

Implementation Period

Investment Targets (in million PhP): NG Local

Chapter Outcome/Project Title

Project Description/ Objectives

Co-Implementing

Agency

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Status/Level of

Readiness

41. Establishment / Implementation of ISO

Quality Management

System

BaSC Main Campus Isabela

City, Basilan

Attained ISO cetification

MTDP 2016 Strategic Plan 2017-2021 Roadmap PHE

2021 2.5

42. Strategic Planning 2022-2026

Attain direction BaSC Main Campus

Projection, focus per roadmap

MTDP 2016 Strategic Plan 2017-

2021

2021

243.Graduate Building House Graduate

StudiesBaSC, Main

Campus, Isabela City, Basilan

conducivity MTDP 2016 Strategic Plan 2017-

2021

2021

1544. Nursing Simulation-Demonstration Room

Quality instruction BaSC,CHS. Main Campus, Isabela

City, Basilan

Quality Graduates

MTDP 2016 Strategic Plan 2017-

2021

2021

30

45. Farm TractorEfficient BaSC,Sta. Clara

Lamitan City, Basilan

Improved Knowledge-skills

MTDP 2016 Strategic Plan 2017-

2021

2021

1.5

46. Faculty Development Program

Increased Quality Instruction

Across Campuses 10% Doctoral 25% Master

MTDP 2016 Strategic Plan 2017-

2021

2020-2021-2020

2 2 2

47. Regularization of self liquidating Program

Regularize Program Across Campuses Program Regularize

MTDP 2016 Strategic Plan 2017-

2021

2021

1

48. Speech Lab Specific ActivityBaSC, Main, Isabela City,

Basilan

Better Presentation

MTDP 2016 Strategic Plan 2017-

2021

2021

2

49. Capacity Development Training of Personnel

Enhance personnel capacity

BaSC, Main, Isabela City,

Basilan

Efficiency and Effective service

delivery

MTDP 2016 Strategic Plan 2017-

2021

2021

1

50. Local Area Network

Improved line of Inter- correctedness BaSC, Main,

Isabela City, Basilan

Efficient Net-working

MTDP 2016 Strategic Plan 2017-

2021

2021

1

51Research Laboratory with facilities & equipment

49.Laboratory Facilities & Equipment for Research

BaSC, Main and Campuses

Functional Laboratory

Facilities and Equipments

MTDP 2016 Strategic Plan 2017-

2023

2021

0.55

52. Perception on the Immunization programs of the Department of Health

Study Focus on Immunization

Programs

BaSC, Main and Campuses

Perception

MTDP 2016 Strategic Plan 2017-

2024

2021

0.3

Chapter 10-7-BaSCPage 6 of 9

Page 101: Table of Contents (By Chapter)

2016 and Prior 2017 2018 2019 2020 2021 2022 2017-2022 Total Project

Cost

Implementation Period

Investment Targets (in million PhP): NG Local

Chapter Outcome/Project Title

Project Description/ Objectives

Co-Implementing

Agency

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Status/Level of

Readiness

53. Varietal trial on the growth and development of cassava in Basilan

Research study on Cassava in Basilan

BaSC, Main and Campuses

MTDP 2016 Strategic Plan 2017-

2025

2021

0.3

54. An expert system for depression diagnosis running on android device

Research Study

BaSC, Main and Campuses

MTDP 2016 Strategic Plan 2017-

2026

2021

0.155. Formal and non-formal Madrasah: Issues and concerns

Research StudyBaSC, Main and

CampusesMTDP 2016

Strategic Plan 2017-2027

2021

0.2

56. Poultry ProductionImprovement Production

BaSC, Sta. Clara , Lamitan City,

Basilan

Increase IGP MTDP 2016 Strategic Plan 2017-

2021

2021

1.2

57. Layer Production2021

1.458. 5 Mini Truck for Extension Campuses 1 main (Double Tire)

To Ferry goods and personnel and for Transport Service

BaSC, Main and Campuses

Effective and Efficence

Delivery of Service

MTDP 2016 Strategic Plan 2017-

2022

2021

2

59. MAngrove Rehabilitation

MTDP 2016 Strategic Plan 2017-

2021

2021

0.2

60. Good GovernanceMTDP 2016

Strategic Plan 2017-2022

2021

0.3

61. Trade Technology Intervention

MTDP 2016 Strategic Plan 2017-

2023

2021

1.5

62. Accelerate Adult Literacy

MTDP 2016 Strategic Plan 2017-

2024

2021

0.3

63. Barangay Arabic Literacy Training

MTDP 2016 Strategic Plan 2017-

2025

2021

0.2

Increase Community Engagement

Malamawi Lamitan Tipo-Tipo Maluso

Improved quality of life of

Barangay Diki, Malamawi,

Basilan

Chapter 10-7-BaSCPage 7 of 9

Page 102: Table of Contents (By Chapter)

2016 and Prior 2017 2018 2019 2020 2021 2022 2017-2022 Total Project

Cost

Implementation Period

Investment Targets (in million PhP): NG Local

Chapter Outcome/Project Title

Project Description/ Objectives

Co-Implementing

Agency

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Status/Level of

Readiness

64. Nutritional Status Enhancement

MTDP 2016 Strategic Plan 2017-

2026

2021

0.25

65.Generated Improved Food stuff production

MTDP 2016 Strategic Plan 2017-

2027

2021

0.2566. Yakan Cloth Weaving Center and Facilities

Promotion and Reproduction of Native product

BaSC, Main Campus Isabela

City, Basilan

Trained and Produced Yakan

cloth weavers

MTDP 2016 Strategic Plan 2017-

2021

2021

2

67. Community Involvement Planning, Dissemination, Coordination

Maximize community

Involvement

BaSC, Across Campuses

MTDP 2016 Strategic Plan 2017-

2021

2021

1

68. Construction of Modern Tertiary School Buildings

202170

69. Sport complex Phase 2

202160

70. Construction of Modern Student Resource Research Center

2021

30

71. Student Dormitory

202130

68. Student Leadership, Skills Development

Enhance Leadership skills

BaSC, Across Campuses

Obtain Leadership

MTDP 2016 Strategic Plan 2017-

2021

2022

1

69. CCTV Accesibility of data for decision making

BaSC, Main, Isabela City,

Basilan

Accesibility of data

MTDP 2016 Strategic Plan 2017-

2021

2022

0.50

70. Construction of 2 storey (10) classroom building, Tipo-Tipo Campus

BaSC, Tipo-Tipo Campus, Tipo-Tipo, Basilan

House the growing student

population

MTDP 2016 Strategic Plan 2017-

2021

2022

10

Chapter 10-7-BaSCPage 8 of 9

Page 103: Table of Contents (By Chapter)

2016 and Prior 2017 2018 2019 2020 2021 2022 2017-2022 Total Project

Cost

Implementation Period

Investment Targets (in million PhP): NG Local

Chapter Outcome/Project Title

Project Description/ Objectives

Co-Implementing

Agency

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Status/Level of

Readiness

71. Fishing Boat for Instruction Purpose

Improve Instruction quality expire

BaSc, Sta. Clara Campus, Lamitan

City, Basilan Quality

MTDP 2016 Strategic Plan 2017-

2021

2022

100

72.Internet ConnectionMTDP 2016

Strategic Plan 2017-2021 1

27 66 349.5 301 283.55 114.5 1141.55

Chapter 10-7-BaSCPage 9 of 9

Page 104: Table of Contents (By Chapter)

Updated Zamboanga Peninsula Regional Development Investment Program (RDIP), 2017-2022

Agency: J.H. Cerilles State CollegeChapter: 10

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

(1) (3) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15)

Outcome 1:

HIGHER EDUCATION PROGRAM:

Locally Funded Projects:

1. Construction /Rehabilitation of Multi-purpose Bldg including P500,000 for sports facilities

Mati, San Miguel, Zamboanga del Sur

Plan and POW GAA Completed 5,500,000.00 5,500,000.00

2. Repair and Improvement of Structures/Facilities and acquisition of equipment

Main, Lakewood, Dumingag, Zambo.Del Sur

Plan and POW GAA Completed 5,000,000.00 5,000,000.00

3. Construction of 2-storey Teacher Education Building

Main, Lakewood, Dumingag, Zambo.Del Sur

Plan and POW GAA Completed 16,900,000.00 16,900,000.00

4.Improvement/ Upgrading/Expansion of Mini-Hostel at Dumingag Campus

Dumingag, Zamboanga del Sur

Plan and POW GAA Completed 1,100,000.00 1,100,000.00

5. Purchase of Service Vehicle for the Main Campus

Mati, San Miguel, Zamboanga del Sur

Plan and POW GAA On going 1,500,000.00 1,500,000.00

OO 1.Relevant and quality tertiary education ensured to achieve inclusive growth

Chapter Outcome/ Project Title

Specific Location (Province/ City / Municipality /

Barangay)

Basis for Implementation

Mode of Funding

Level of Readiness(for 2020-2022 projects only)

Investment Requirements (in exact amount PhP)

Chapter 10-8-JHCSCPage 1 of 8

Page 105: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title

Specific Location (Province/ City / Municipality /

Barangay)

Basis for Implementation

Mode of Funding

Level of Readiness(for 2020-2022 projects only)

Investment Requirements (in exact amount PhP)

6. Purchase of 2 Buses for the Main, Dumingag and CMSE Campuses

Main, Lakewood, Dumingag, Zambo.Del Sur

Plan and POW GAA Completed 6,000,000.00 6,000,000.00

7. Purchase of Criminology Laboratory Equipment

Dumingag, Zamboanga del Sur

Plan and POW GAA Completed 2,000,000.00 2,000,000.00

8. Construction of Two-Storey Library with AVR Building in Dumingg Campus

Dumingag, Zamboanga del Sur

q GAA Completed 7,500,000.00 7,500,000.00

1.Completion of School Building in Canuto MS Enerio Campus

Lakewood, Zamboanga del sur

Plan and POW GAA Completed 1,787,000.00 1,787,000.00

2. Completion of Water Supply System in the Main Campus

Mati, San Miguel, Zamboanga del Sur

POW GAA Completed 5,000,000.00 5,000,000.00

3. Completion of Extension Services Building in the Main Campus

Mati, San Miguel, Zamboanga del Sur

Plan and POW GAA Completed 1,000,000.00 1,000,000.00

4. Renovation / Improvement/ Upgrading of the Science and Criminology Laboratories Building Chemicals in Dumingag Campus

Dumingag, Zamboanga del Sur

GAA/ Plan and POW / Specifications

GAA Completed 3,100,000.00 3,100,000.00

5. Consturction/ Repair/Rehabilitation of Academic Building

Mati, San Miguel, Zamboanga del Sur

GAA/ Plan and POW / Specifications

GAA Completed 5,000,000.00 5,000,000.00

Chapter 10-8-JHCSCPage 2 of 8

Page 106: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title

Specific Location (Province/ City / Municipality /

Barangay)

Basis for Implementation

Mode of Funding

Level of Readiness(for 2020-2022 projects only)

Investment Requirements (in exact amount PhP)

1.Renovation/Improvement/ Upgrading of Academic Building (IT) with complete furniture and fixture in Pagadian City

Pagadian CityPlan and POW/ Specifications

GAA Completed 5,000,000.00 5,000,000.00

2.Improvement/ Upgrading of the Multi-Purpose Building

Mati, San Miguel, Zamboanga del Sur

Plan and POW/ Specifications

GAA Completed 6,000,000.00 6,000,000.00

3. Construction of 3-storey Student Center Building at Main Campus

Main Campus Mati, San Miguel, Zamboanga del

Sur

Plan and POW/ Specifications

GAA 10,000,000.00 10,000,000.00

1. Construction of 2 Two-Storey Dormitory Buildings with Complete Furniture and Fixtures (Male and Female) (Dapiwak and Dumingag Campuses)

Dumingag, ZDSPlan and POW/ Specifications

GAA Level 1 25,000,000.00 25,000,000.00

2. Construction of HRM Building with Hostel at Pagadian Campus

Padadian CityPlan and POW/ Specifications

GAA Level 1 18,000,000.00 18,000,000.00

3. Sports Oval Development at Main Campus

Mati, San Miguel, ZDSPlan and POW/ Specifications

GAA Level 1 40,000,000.00 40,000,000.00

1. Completion of Ten-Classroom Academic Building in Dumingag (Caridad) Campus

Dumingag, ZDSPlan & POW, BOT Approved

GAA Level 1 15,000,000.00 15,000,000.00

Chapter 10-8-JHCSCPage 3 of 8

Page 107: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title

Specific Location (Province/ City / Municipality /

Barangay)

Basis for Implementation

Mode of Funding

Level of Readiness(for 2020-2022 projects only)

Investment Requirements (in exact amount PhP)

2. Acquisition of Additional Criminology Laboratory Equipment and Apparatuses in Dumingag Campus

Dumingag, ZDSSpecification, PPMP, BOT Approved

GAA Level 1 6,000,000.00 6,000,000.00

3. Acquisition of Equipment and Furniture of Nursing Skills Laboratory in Pagadian Campus

Pagadian, ZDSSpecification, PPMP, BOT Approved

GAA Level 1 18,300,000.00 18,300,000.00

4. Construction of Two-Story 8-CL Academic Building in Dumingag (Dapiwak) Campus

Dumingag, ZDSPlan & POW, BOT Approved

GAA Level 1 15,000,000.00 15,000,000.00

5. Construction of Library Building in Canuto MS Enerio Lakewood Campus

Lakewood, ZDSPlan & POW, BOT Approved

GAA Level 1 5,000,000.00 5,000,000.00

6. Construction of Dormitory Building in Dumingag Campus (Caridad)

Dumingag, ZDSPlan & POW, BOT Approved

GAA Level 1 15,000,000.00 15,000,000.00

7. Construction of HRM Building with Hostel at Pagadian Campus

Pagadian, ZDSPlan & POW, BOT Approved

GAA Level 1 25,000,000.00 25,000,000.00

8. Establishment of Water System with Chlorinator Tank in Lakewood Campus

CMSE Campus, Lakewood, ZDS

Plan & POW, BOT Approved

GAA Level 2 5,000,000.00 5,000,000.00

Chapter 10-8-JHCSCPage 4 of 8

Page 108: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title

Specific Location (Province/ City / Municipality /

Barangay)

Basis for Implementation

Mode of Funding

Level of Readiness(for 2020-2022 projects only)

Investment Requirements (in exact amount PhP)

9. Construction of Infimary Building at Main Campus

Mati, San Miguel, ZDSPlan & POW, BOT Approved

GAA Level 1 6,000,000.00 6,000,000.00

10. Construction of Dormitory Building in Dumingag Campus (Dapiwak)

Dumingag, Zamboanga del Sur

Plan & POW, BOT Approved

GAA Level 1 15,000,000.00 15,000,000.00

11. Construction of Engineering Academic building at the Main Campus

Mati, San Miguel, ZDSPlan & POW, BOT Approved

GAA Level 1 40,000,000.00 40,000,000.00

27. Ground Levelling for Sports Oval Development at Main Campus

Main Campus Mati, San Miguel, ZDS

GAA Level 2 20,000,000.00 20,000,000.00

34.Construction of Two-Story 8-CL Classroom in Canuto MS Enerio Campus in Lakewood

GAA Level 3 15,000,000.00 15,000,000.00

30. Widening of the Narrow Concrete Road at the Main Campus

Main Campus Mati, San Miguel, ZDS

GAA Level 4 2,000,000.00 2,000,000.00

32. Improvement/ Expansion of Water System with Chlorinator Tank at Dumingag Campus

Dumingag, ZDS GAA Level 5 5,000,000.00 5,000,000.00

33. Construction of Guidance and DSA Building (Dapiwak)

Dumingag, ZDS GAA Level 6 3,000,000.00 3,000,000.00

Chapter 10-8-JHCSCPage 5 of 8

Page 109: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title

Specific Location (Province/ City / Municipality /

Barangay)

Basis for Implementation

Mode of Funding

Level of Readiness(for 2020-2022 projects only)

Investment Requirements (in exact amount PhP)

36. Construction of Covered Walk at Dumingag Campus

Dumingag, ZDS GAA Level 7 5,000,000.00 5,000,000.00

35. Acquisition of Safety and Security Facilities and Equipment in Dumingag Campus

Dumingag, ZDS GAA Level 8 5,000,000.00 5,000,000.00

37. Construction of Multi-purpose Function Hall with Complete Furniture and Fixtures in Dumingag

Dumingag, ZDS GAA Level 9 25,000,000.00 25,000,000.00

40. Construction of Stairway to Admin at Main Campus

Main Campus Mati, San Miguel, ZDS

GAA Level 10 5,000,000.00 5,000,000.00

41. Improvement/ Concreting of School Roadways and Drainage

Dumingag, ZDS GAA Level 11 10,000,000.00 10,000,000.00

42. Construction of Student Center Building in Dumingag Campus

Dumingag, ZDS GAA Level 12 15,000,000.00 15,000,000.00

43. Construction of 2-storey Guest House at Main Campus

Main Campus Mati, San Miguel, ZDS

GAA Level 13 20,000,000.00 20,000,000.00

Chapter 10-8-JHCSCPage 6 of 8

Page 110: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title

Specific Location (Province/ City / Municipality /

Barangay)

Basis for Implementation

Mode of Funding

Level of Readiness(for 2020-2022 projects only)

Investment Requirements (in exact amount PhP)

44. Construction of Admin Building in Dumingag Campus

Dumingag, ZDS GAA Level 14 20,000,000.00 20,000,000.00

45. Construction of Perimeter Fence at the Main Campus (Colleges and High School Campuses)

Main Campus Mati, San Miguel, Zamboanga del

Sur 20,000 GAA Level 15 20,000,000.00 20,000,000.00

45. Construction of Perimeter Fence in Duningag Campus

Dumingag, ZDS 20,000 GAA Level 16 16,000,000.00 16,000,000.00

45,500,000.00 15,887,000.00 21,000,000.00 83,000,000.00 185,300,000.00 166,000,000.00 433,687,000.00

Outcome 2: -

OO 2: Higher Education Research improved to promote economic productivity and innovation -

-

1. Establishment of Dairy Buffalo for Milk Production and Processing Center at JHCSC School of Agriculture

Dumingag, ZDSGAA/ Plan and POW / Specifications

GAA Level 1 10,000,000.00 10,000,000.00

10,000,000.00 -

Outcome 3: -

-

1. Construction of Community Extension Office in Dumingag (Dapiwak) Campus

Dumingag, ZDSGAA/ Plan and POW / Specifications

GAA Level 1 2,000,000.00

TECHNICAL ADVISORY EXTENSION PROGRAM

Subtotal for Outcome 1

RESEARCH PROGRAM

Subtotal for Outcome 2

003: Community Engagement Increased

Chapter 10-8-JHCSCPage 7 of 8

Page 111: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title

Specific Location (Province/ City / Municipality /

Barangay)

Basis for Implementation

Mode of Funding

Level of Readiness(for 2020-2022 projects only)

Investment Requirements (in exact amount PhP)

2. Construction of Community Extension Office in CMSE Lakewood Campus

Lakewood, ZDSGAA/ Plan and POW / Specifications

GAA Level 1 2,000,000.00 2,000,000.00

3. Acquisition of Service Vehicles for Community Extension Services

to be used by all campuses

Specification, PPMP, BOT Approved

GAA Level 2 2,000,000.00 2,000,000.00

4. Acquisition Of Tractor Dumingag, ZDSSpecification, PPMP, BOT Approved

GAA Level 3 2,000,000.00 2,000,000.00

6,000,000.00 2,000,000.00 8,000,000.00

GRAND TOTAL (Outcome 1 + Outcome 2 + Outcome 3) 45,500,000.00 15,887,000.00 21,000,000.00 83,000,000.00 201,300,000.00 168,000,000.00 534,687,000.00

Subtotal for Outcome 3

Chapter 10-8-JHCSCPage 8 of 8

Page 112: Table of Contents (By Chapter)

Updated Zamboanga Peninsula Regional Development Investment Program (RDIP), 2017-2022Agency: JOSE RIZAL MEMORIAL STATE UNIVERSITYChapter 10: Accelerating Human Capital Development

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15)PROGRAMS:

1. Construction of 3 storey Engineering Building and facilities in Main campus

3 Storey Engineering Building with facilities and equipment

Dapitan City OO: 1 Relevant and quality higher education ensured to achieved inclusive growth (1,2,3)

Constructed 3 storey Engineering building and facilities

GAA/ POW and Plan/ BOR Approval

GAA GAA FY 2016

2. Construction of 3 storey building in main campus

Construction of OBE Building in main campus

Dapitan City OO: 1 Relevant and quality higher education ensured to achieved inclusive growth (1,2,3)

Constructed 3 storey (OBE) building

GAA/ POW and Plan/ BOR Approval

GAA GAA FY 2015

3. Construction of Research Laboratory Building inclusive of Tissue culture and Microbiological laboratory facilities

Research Laboratory building and Laboratory facilities

Dapitan City OO: 1 Relevant and quality higher education ensured to achieved inclusive growth (1,2,3)

Constructed Research Laboratory Building and facilities

GAA/ POW/Plan and BOR Approval

GAA GAA FY 2016 Completed

4. Const./Rehablitation of Academic Building in Dipolog Campus

Construction of 3 storey 9CL School Building

Dipolog City OO: 1 Relevant and quality higher education ensured to achieved inclusive growth (1,2,3)

Constructed 3 storey 9 CL School Building

GAA/ POW/Plan and BOR Approval

GAA GAA FY 2016 Completed

5. Construction of Audio-visual Building in Siocon Campus

Construction of 1 storey Audio-visual Building

Siocon Campus OO: 1 Relevant and quality higher education ensured to achieved inclusive growth (1,2,3)

Constructed Audio-visual Building in Siocon campus

GAA/ POW/Plan and BOR Approval

GAA GAA FY 2017 Completed

6,000,000 6,000,000

6.Construction of Information Technology Education Building , Laboratory facilties and equipment

Construction of 4 storey Education Technology Education (ITE) Building and facilities in main campus

Dapitan City OO: 1 Relevant and quality higher education ensured to achieved inclusive growth (1,2,3)

Constructed (ITE) Building with facilties

Plan and POW , Feasibility study.

GAA GAA FY 2017 On Going

43,196,000 43,196,000

7. Construction of E-Library Building in Dipolog City

Construction of 3 storey Learning common building in Dipolog

Dipolog City OO: 1 Relevant and quality higher education ensured to achieved inclusive growth (1,2,3)

Constructed Learning commons Library building

Plan and POW , Feasibility study.

GAA GAA FY 2017 On Going

6,753,000 6,753,000

8. Construction of 2 storey 12 CL School Building and Facilities in Tampilisan Campus

Two (2) storey 12 CL School Building and facilities

Tampilisan, ZN OO: 1 Relevant and quality higher education ensured to achieved inclusive growth (1,2,3)

Constructed 2 storey Building 12 CL School Building and facilities

Plan and POW , Feasibility study.

GAA GAA FY 2018 On Going

20,996,000 20,996,000

9. Construction of 2 storey 12 CL School Building and Facilities in Katipunan Campus

Two (2) storey 12 CL School Building in katipunan campus

Katipunan ,ZN. OO: 1 Relevant and quality higher education ensured to achieved inclusive growth (1,2,3)

Constructed 2 storey 12 CL School Building and facilities

Plan and POW , Feasibility study.

GAA GAA FY 2018 On Going

20,996,000 20,996,000

10. Construction of IGP Building and meat processing plant and facilities in Katipunan Campus

Meat processing plant, banquet hall and catering services for IGP of College of Business management

Katipunan , ZN OO: 1 Relevant and quality higher education ensured to achieved inclusive growth (1,2,3)

Constructed IGP Building and meat processing, banquet hall complete with facilities and equipment

Plan and POW , Feasibility study.

GAA Level 1 , New Proposal

24,000,000 24,000,000

11. Construction of 1 storey 4 CL Science Building in Siocon Campus

One (1) storey 4 CL Science Building Siocon, ZN. OO: 1 Relevant and quality higher education ensured to achieved inclusive growth (1,2,3)

Constructed 1 storey 4 CL in Socon Campus

Plan and POW , Feasibility study.

GAA Level 1 , New Proposal

12,000,000 12,000,000

12. Construction of University perimeter Fence with lighting facilities in Dapitan main campus

University perimeter fence Closure with Electrical Post and Lighting

Dapitan City OO: 1 Relevant and quality higher education ensured to achieved inclusive growth (1,2,3)

Constructed perimeter fence with electrical and lighting facilties

Plan and POW , Feasibility study.

GAA Level 1 , New Proposal

10,000,000.00 10,000,000

13. Construction of 2 storey Industrial Technology Building with facilities in Dipolog

3 Storey 12 CL Engineering and technology Building

Dipolog City OO: 1 Relevant and quality higher education ensured to achieved inclusive growth (1,2,3)

Constructed 2storey Industrial Technology Building with facilities

Plan and POW , Feasibility study.

GAA Level 1 , New Proposal

30,000,000 30,000,000

14. Construction of Audio-visual Center Building and facilities in Katipunan Campus

(15m x 20m. Room size ) with stage and comfort room

Katipunan. ZN. OO: 1 Relevant and quality higher education ensured to achieved inclusive growth (1,2,3)

Constructed Audio-visual Building with facilties in Katipunan Campus

Plan and POW , Feasibility study.

GAA Level 1 , New Proposal

12,000,000 12,000,000

OO 1.Relevant and quality tertiary education ensured to achieve inclusive growth

Mode of Funding

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (in exact amount PhP)

Expected Output Basis for Implementation

HIGHER EDUCATION SERVICES:

Chapter Outcome/ Project Title Project Description/ Objectives

Specific Location

(Province/ City / Municipality /

Barangay)

RDP Results Matrices Indicators Addressed

Chapter 10-9-JRMSUPage 1 of 5

Page 113: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

Mode of Funding

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (in exact amount PhP)

Expected Output Basis for ImplementationChapter Outcome/ Project Title Project Description/ Objectives

Specific Location

(Province/ City / Municipality /

Barangay)

RDP Results Matrices Indicators Addressed

15. Construction of 3 storey Criminology with laboratory facilities and equipment in Dapitan main campuis

Three (3) storey Criminology Building and facilities

Dapitan City OO: 1 Relevant and quality higher education ensured to achieved inclusive growth (1,2,3)

Constructed 3 storey Criminology Builduing and facilities in Dapitan main campus

Plan and POW , Feasibility study.

GAA Level 1 , New Proposal

35,000,000.00 - 35,000,000

16. Construction of Learning Commons Library and facilties in JRMSU Dapitan

2 storey learning commons Library and facilities

Dapitan City OO: 1 Relevant and quality higher education ensured to achieved inclusive growth (1,2,3)

Constructed 2 storey Learning commons Library Building , facilities and equipment

Plan and POW , Feasibility study.

GAA GAA FY 2019 On going

38,585,000 38,585,000

17. Construction/ Renovation of 2nd Floor Library Building in Katipunan campus

Const/renovation of 2nd floor Libarary Building

Katipunan , ZN. OO: 1 Relevant and quality higher education ensured to achieved inclusive growth (1,2,3)

Constructed./Renovated 2nd Floor Library Building in Katipunan

Plan and POW , Feasibility study.

GAA Level 1 , New Proposal

5,000,000 5,000,000

18. Construction of of two storey (ICT) Building, with facilities and equipment in Tampilisan Campus

Two storey building with complete facilities and equipment

Tampilisan ZN. OO: 1 Relevant and quality higher education ensured to achieved inclusive growth (1,2,3)

Constructed two (2) storey ICT (ICT) Building and facilities in Tampilisan

Plan and POW , Feasibility study.

GAA Level 1 , New Proposal

22,000,000 22,000,000

19. Construction of e-Library Building Facilities and equipment in Tampilisan Campus

Two (2) storey E-Library Building with facilities and equipment

Tampilisan, ZN. OO: 1 Relevant and quality higher education ensured to achieved inclusive growth (1,2,3)

Constructed Two(2) storey e-Library building with facilities and equipment

Plan and POW , Feasibility study.

GAA Level 1 , New Proposal

22,000,000 22,000,000

20.Construction of 2 Units Comfort Rooms with (8) partition per unit in Dapitan, Main campus

2 units Comfort rooms with 8 partition per unit in main campus

Dapitan City OO: 1 Relevant and quality higher education ensured to achieved inclusive growth (1,2,3)

Constructed 2 units Comfort Rooms in Dapitan Main

Plan and pOW GAA Level 1 , New Proposal

5,000,000 5,000,000

21. Construction of 3 storey HRM mini-hotel laboratory Building in Dapitan main campus

Three (3) storey HRM Mini-hotel laboratory building

Dapitan City OO: 1 Relevant and quality higher education ensured to achieved inclusive growth (1,2,3)

Constructed 3 storey HRM mini-hostel Laboratory Building in main campus

Plan and POW GAA Level 1 , New Proposal

30,000,000 30,000,000

22. Construction of Audio -visual building (Theater Type) and facilities in Dapitan Main

Construction of 2 storey Audi-visual Building (Theater Type)

Dapitan City OO: 1 Relevant and quality higher education ensured to achieved inclusive growth (1,2,3)

Cosntructed Audio-visual Building (Theater type) in main campus

Plan and POW GAA Level 1 , New Proposal

46,000,000 46,000,000

23. Construction of 3 storey 12 CL (Allied Medical Dental & Nursing Aide Building and facilities in main campus

Three (3) storey 12 CL AMDNA Building Dapitan City OO: 1 Relevant and quality higher education ensured to achieved inclusive growth (1,2,3)

Cosntructed 3 storey 12 CL Allied Medical Dental Nursing Aide building and facilities

Plan and POW GAA Level 1 , New Proposal

40,000,000 40,000,000

24. Construction of 1 unit 5 CL Agriculture Building and facilities in Tampilisan Campus

1 unit 5 CL College of Agriculture Building in Tampilisan

Tampilisan ZN. OO: 1 Relevant and quality higher education ensured to achieved inclusive growth (1,2,3)

Constructed 1 unit 5 CL Agriculture Building in Tampilisan

Plan and POW GAA Level 1 , New Proposal

5,000,000 5,000,000

25. Construction/Renovation of 2 Storey Technology Building in Siocon campus

Renovation of 2 Storey technology Building

Siocon ZN. OO: 1 Relevant and quality higher education ensured to achieved inclusive growth (1,2,3)

Constructed /renovated Technology building in Siocon campus

Plan and POW GAA Level 1 , New Proposal

17,000,000 17,000,000

26. Construction/Renovation of Midwifery Building and laboratory facilities in Siocon campus

Construction/renovation of existing midwifery building

Siocon Campus OO: 1 Relevant and quality higher education ensured to achieved inclusive growth (1,2,3)

Constructed/Renovated Midwifery Building and Laboratory facilities in Siocon

Plan and POW GAA Level 1 , New Proposal

12,000,000 12,000,000

27.Construction of Student Comfort room in JRMSU Siocon

3 units comfort rooms with 4 partitions Siocon ZN. OO: 1 Relevant and quality higher education ensured to achieved inclusive growth (1,2,3)

Constructed 3 units comfort rooms with 4 partition

Plan and POW GAA Level 1 , New Proposal

2,250,000 2,250,000

28. Construction of 2 storey , 6CL College of Arts and Sciences Building

(9.0M x 8.0m classroom size) two (2) Storey Building

Katipunan ZN. OO: 1 Relevant and quality higher education ensured to achieved inclusive growth (1,2,3)

Constructed Two (2) Storey , 6CL building

Plan and POW / JRMSU Mandate for Instruction Purpose

GAA Level 1 , New Proposal

15,000,000 15,000,000

29. Purchase of Agricultural Machinery and equipment

One (1) unit four wheel tractor , two wheel tractor, combine rice harvester, rice transplanter

Tampilisan ZN. OO: 1 Relevant and quality higher education ensured to achieved inclusive growth (1,2,3)

Purchase of One (1) unit for wheel tractor, combine rice harvester , rice transplanter

Feasiblity study and specifications

GAA Level 1 , New Proposal

5,000,000 5,000,000

Chapter 10-9-JRMSUPage 2 of 5

Page 114: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

Mode of Funding

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (in exact amount PhP)

Expected Output Basis for ImplementationChapter Outcome/ Project Title Project Description/ Objectives

Specific Location

(Province/ City / Municipality /

Barangay)

RDP Results Matrices Indicators Addressed

30. Construction of Bleacher of Covered Court in Katipunan campus

Construction of concrete bleacher at both side of JRMSU Katipunan Covered Court

Katipunan ZN. OO: 1 Relevant and quality higher education ensured to achieved inclusive growth (1,2,3)

Constructed concrete bleacher both sides of Covered court

Plan and POW GAA Level 1 , New Proposal

10,000,000 10,000,000

31 Construction/Renovation of 2nd Floor of Technology Building and facilities in Dipolog Campus

Construction/Renovation of 2nd Floor of Technology Building with facilities and equipment

Dipolog City OO: 1 Relevant and quality higher education ensured to achieved inclusive growth (1,2,3)

Constructed/renovated 2nd Floor of Technology Building and facilities

Plan and POW GAA Level 1 , New Proposal

10,000,000 10,000,000

32 Completion of Gymnasium with facilities in JRMSU Dipolog Campus

Completion of University Gymnasium with state of the art facilities

Dipolog City OO: 1 Relevant and quality higher education ensured to achieved inclusive growth (1,2,3)

Completed University Gymnasium with state of the art facilities and equipment

Plan and POW GAA NEP FY 2020 Level 1 , New Proposal

6,000,000 6,000,000

33. Construction of 3 storey Research Building in Dipolog Campus

3 storey Research Building with complete facilities and equipment

Dipolog City OO: 1 Relevant and quality higher education ensured to achieved inclusive growth (1,2,3)

Constructed Research Building with facilities

Plan and POW GAA Level 1 , New Proposal

15,000,000 10,000,000 25,000,000

34.Construction of Perimeter fence along Sorronda Road Section in JRMSU Dipolog Campus

Construction of Perimeter fence along Sorronda Road section

Dipolog City OO: 1 Relevant and quality higher education ensured to achieved inclusive growth (1,2,3)

Constructed Perimeter fence along Sorronda Road in JRMSU Dipolog

Plan and POW GAA Level 1 , New Proposal

15,000,000 15,000,000

35. Renovation/ Construction of (Old Building) Building in JRMSU Dipolog campus

Renovation of old college building with complete amenities

Dipolog City OO: 1 Relevant and quality higher education ensured to achieved inclusive growth (1,2,3)

Renovated Old College Building with complete amenities

Plan and POW GAA Level 1 , New Proposal

20,000,000 20,000,000

36. Construction of Administration Building in Dapitan main campus

Construction of 2 storey Administration Building

Dapitan City OO: 1 Relevant and quality higher education ensured to achieved inclusive growth (1,2,3)

Constructed Administration Building in Dapitan main campus

Plan and POW GAA Level 1 , New Proposal

50,000,000 50,000,000

37. Construction of 2 storey 40 CL School building in Dipolog Campus

Two (2) storey 40 CL School building in Dipolog Campus

Dipolog City OO: 1 Relevant and quality higher education ensured to achieved inclusive growth (1,2,3)

Constructed Two (2) storey 40 CL School Building

Plan and POW GAA Level 1 , New Proposal

62,500,000 62,500,000

38. Construction of 3 storey Research Building with Roof deck in Dipolog Campus

Construction of 3 storey Research Building with a total floor area of 560 sq.m.

Dipolog City OO: 1 Relevant and quality higher education ensured to achieved inclusive growth (1,2,3)

Constructed Research Building with Roof Deck in Dipolog campus

Plan and POW GAA Level 1 , New Proposal

15,000,000 15,000,000

39. Purchase of 1 unit School Bus for Dapitan Main

Transport School bus, 45 to 50 seaters capacity, 4 wheel Drive(Brand New)

Dapitan City OO: 1 Relevant and quality higher education ensured to achieved inclusive growth

Provision of School Bus in the Main campus, answers the Transportation Problem of On

Plan Specification GAA Level 1 , New Proposal

5,000,000 5,000,000

40.. Purchase of 1 unit School Bus for Katipunan Campus

Transport School bus, 45 to 50 seaters capacity, 4 wheel Drive(Brand New)

Katipunan, Z.N. OO: 1 Relevant and quality higher education ensured to achieved inclusive growth

Provision of School Bus in the Katipunan campus, answers the Transportation Problem of

Plan Specification GAA Level 1 , New Proposal

5,000,000 5,000,000

41. Purchase of 1 unit School Bus for Siocon Campus

Transport School bus, 45 to 50 seaters capacity, 4 wheel Drive(Brand New)

Siocon, Z.N. OO: 1 Relevant and quality higher education ensured to achieved inclusive growth

Provision of School Bus in the Siocon Campus, answers the Transportation Problem of On

Plan Specification GAA Level 1 , New Proposal

5,000,000 5,000,000

42. Construction of Dormitory Building/ HRM Laboratory with facilities and equipment in JRMSU Dipolog Campus

3 storey Dormitory building/HRM Laboratory with Facilities and equipment

Dipolog City OO: 1 Relevant and quality higher education ensured to achieved inclusive growth (1,2,3)

Constructed 3 storey Dormitory/ HRM Laboratory with facilities and equipment

Feasiblity study , CHED Recommendation on Program Offering, POE

GAA Level 1 , New Proposal

50,000,000 50,000,000

43. Purchase of Maritime Engineering Laboratory machineries and equipment in Dapitan main

150mm swing lathe machine, Milling machine, 400KW Maritime engine, Process simulator and arc welding machine

Dapitan City OO: 1 Relevant and quality higher education ensured to achieved inclusive growth (1,2,3)

Provision of Maritime Engineering laboratory machineries and equipment for CHED COC.

Feasiblity study , CHED Recommendation on Program Offering, POE

GAA Level 1 , New Proposal

4,500,000 4,500,000

TOTAL Outcome (1) HIGHER EDUCATION SERVICES PROJECTS 55,949,000 46,992,000 38,585,000 64,250,000 285,500,000 277,500,000 768,776,000RESEARCH SERVICES:OO 2: Higher Education Research improved to promote economic productivity and innovation

Chapter 10-9-JRMSUPage 3 of 5

Page 115: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

Mode of Funding

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (in exact amount PhP)

Expected Output Basis for ImplementationChapter Outcome/ Project Title Project Description/ Objectives

Specific Location

(Province/ City / Municipality /

Barangay)

RDP Results Matrices Indicators Addressed

1. Mariculture Research: Screening of invertebrates & vertebrates potential for mariculture

1. Determine the mariculture potential of selected marine finfish and invertebrate species;2. Conduct spawning trials of potential marine finfish and invertebrate species through natural and induced spawnings;3. Establish sea ranches

Dapitan City OO 2: Higher education research improved to promote economic productivity and innovations (1)

Identification of marine invertebrates potential for mariculture; spawning trials using natural & induced spawning (production of juveniles); establishment of sea ranches

GAA/ Asean Education Mandate for Tertiary Education,Feasibility study, POE

GAA GAA FY 2017 Completed

6,000,000 6,000,000

2. Developing a cassava value chain from raw materials to the processed chips

Conduct research study on Value chain analysis of cassava chips, with the other product, banana will also be included in the study

Dapitan City OO 2: Higher education research improved to promote economic productivity and innovations (1)

Identificatied gaps on the linkages of stakeholders and policy recommendation.

GAA/ Asean Education Mandate for Tertiary Education,Feasibility study, POE

GAA GAA FY 2018 Completed

300,000 300,000

3. Hydrological inventory of the major river systems in Zamboanga del Norte: A Ridge to Reef Approach of Marine Protected Areas Management

Generally, the study aims to assess the major rivers in Zamboanga del Norte using hydrobiological, socioeconomic & cultural parameters. Specifically, the study will determine 1) species composition, abundance & distribution of flora & fauna relative to the sections of the rivers and

Dapitan City OO 2: Higher education research improved to promote economic productivity and innovations (1)

Species composition, abundance & distribution of flora & fauna relative to the sections of the rivers and surrounding areas;

GAA/ Feasibility study and the Asean Education Mandate for Tertiary Education; high siltation of reefs; connectivity of rivers

GAA Level 1 , New Proposal

6,000,000 6,000,000

4. Monitoring of Ecological condition of NIPAS Sites and impacts of nearby Fishing Grounds in Northern Zamboanga Peninsula

To determine the potential impacts of MPA establishment to adjacent fishing grounds; determine the ecological conditions particularly fish community inside and outside the MPA.

Dapitan City OO 2: Higher education research improved to promote economic productivity and innovations (1)

Potential impacts of MPA establishment to adjacent fishing grounds; ecological conditions particularly fish community inside and outside the MPA.

GAA/ Asean Education Mandate for Tertiary Education

GAA Level 1 , New Proposal

7,000,000 7,000,000

5. Sustainable production of organic Coconut-cacao Based Farming in Zamboanga del Norte

Determine the status of cacao-coconut production & socio-economic condition of farmers in Zamboanga del Norte

Katipunan, ZN OO 2: Higher education research improved to promote economic productivity and innovations (1)

status of cacao-coconut production & socio-economic condition of farmers in Zamboanga del Norte

GAA/ Asean Education Mandate for Tertiary Education

GAA New Proposal 6,000,000 6,000,000

6. S & T community-based farms (STCBF) on Enhancing Abaca production in the Zamboanga Peninsula

To introduce Science and Technology approaches on abaca production to improve yield.

Tampilisan, ZN. OO 2: Higher education research improved to promote economic productivity and innovations (1)

Adoption by farmers in ZamPen on S & T practices on abaca production

GAA/ Asean Education Mandate for Tertiary Education

GAA Level 1 , New Proposal

6,000,000 6,000,000

7. Biodiversity and spatial patterns of seagrasses and their tissue nutrients in the northern Zamboanga Peninsula: Implications for fishery management

To establsih a comprehensive baseline data on seagrass communities and associated fisheries biodiversity along the coast of the northern Zamboanga Peninsula

Dapitan City OO 2: Higher education research improved to promote economic productivity and innovations (1)

Comprehensive baseline data on seagrass communities and associated fisheries biodiversity along the coast of the northern Zamboanga Peninsula

GAA/ Asean Education Mandate for Tertiary Education

GAA Level 1 , New Proposal

2,000,000 2,000,000

6,000,000 300,000 - 13,000,000 14,000,000 - 33,300,000

1. Rural Economic Development Strategies: A Collaboration with GK and LGU Thru Barangay Walang Iwanan (BWI) Program of

Livelihood Extension program for marginalized and vulnerable residents of 5 campuses

Dapitan City, Province of Zamboanga del Norte

OO 3: Community engagement increased (1)

Empowering the community and developed economic lives by providing orientation and other resources for economic

GAA, Feasibility Study, Program of Expenditures

GAA GAA FY 2017 Completed

3,475,000 3,475,000

2. Bringing Health Care to the People: Health Resiliency of Families

Community participation and involvement is getting due attention before the concurrence of the illnesses of 5 coastal Brgys. In Dapitan City

Dapitan City, Province of Zamboanga del Norte

OO 3: Community engagement increased (1)

Bring health closer to the people leading to health resilient individual , family and community

GAA Feasibility Study, Program of Expenditures

GAA GAA FY 2018 Completed

2,000,000 2,000,000

GRAND TOTAL Outcome (2) RESEARCH PROJECTS-TECHNICAL ADVISORY EXTENSION SERVICES:003. Community Engagement Increased

Chapter 10-9-JRMSUPage 4 of 5

Page 116: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

Mode of Funding

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (in exact amount PhP)

Expected Output Basis for ImplementationChapter Outcome/ Project Title Project Description/ Objectives

Specific Location

(Province/ City / Municipality /

Barangay)

RDP Results Matrices Indicators Addressed

1. Increasing Productivity of Rural Communities: A Poverty Reduction Programa. Gulayan Sa Bakuran- for Food Security in Zamboanga del Norteb. Institution and Community Based Entrepreneurship

Increased economic productivity through community programs, technology transfer and skills development

Dapitan City, Province of Zamboanga del Norte

OO 3: Community engagement increased (1)

a. food security of identified beneficiaryb. skilled and SME engaged

GAA Feasibility Study, Program of Expenditures

GAA Level 1 , New Proposal

4,000,000 4,000,000

2. Community-led Sustainable Sanitation through Zero Open Defecation (ZOD)

The project aims to eliminate open defecation in all coastal barangays in Zamboanga del Norte.

all coastal barangays in Zamboanga del Norte

OO 3: Community engagement increased (1) a. Philippine Health Agenda

Zero open defecation (ZOD) in all coastal barangays in Zamboanga del Norte

GAA Feasibility Study, Program of Expenditures

GAA Level 1 , New Proposal

4,000,000 4,000,000

3. Development of Integrated Organic Farming System: Promoting Agri Eco tourism for Climate Change Adaptation

Development of a Climate Change Resillient farming system in the province of Zamboanga del Norte

Dapitan City, Province of Zamboanga del Norte

OO 3: Community engagement increased (1)

Organic farm products GAA Feasibility Study, Program of Expenditures

GAA Level 1 , New Proposal

2,000,000 2,000,000

4. Enhancing Cacao Based Agroforestry System in Zamboanga del Norte

Improved Production of Cacao in the Province of Zamboanga del Norte

Dapitan City, Province of Zamboanga del Norte

OO 3: Community engagement increased (1)

Increased C02 Sequestration Capacity

Increased Food Production

GAA Feasibility Study, Program of Expenditures

GAA Level 1 , New Proposal

5,000,000 5,000,000

3,475,000 2,000,000 - 6,000,000 9,000,000 - 20,475,000GRAND TOTAL Outcome (1,2,3) 65,424,000 49,292,000 38,585,000 83,250,000 308,500,000 277,500,000 822,551,000

TOTAL Outcome (3) EXTENSION PROJECTS

Chapter 10-9-JRMSUPage 5 of 5

Page 117: Table of Contents (By Chapter)

Updated Zamboanga Peninsula Regional Development Investment Program (RDIP), 2017-2022

Agency: Zamboanga City State Polytechnic CollegeChapter: 10 - Accelerating Human Capital Development

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

(1) (2) (3) (4) (5) (9) (10) (11) (12) (13) (14) (15)2018

Construction/Establishment of Main Library building

The two-storey building will house the learning resource materials of the institution effecting a conducive learning environment.

ZCSPC, Baliwasan, Zamboanga City

Percentage of undergraduate programs with accreditation; and percentage of graduates who are employed.

Completed construction of the main library building

14, 490, 193.03

Construction/Repair/Improvement of an Annex to the existing dormitory as HRM Building

The construction/repair/improvement of an annex to the existing dormitory of the HRM building is an upgrade of the learning space of the students.

ZCSPC, Baliwasan, Zamboanga City

Percentage of undergraduate programs with accreditation; and percentage of graduates who are employed.

Completed the Construction/Repair/Improvement of an Annex to the existing dormitory as HRM Building 4, 830, 387.80

Subtotal for Outcome 1 19, 320, 580.832019

Construction of Academic Building for all Social Sciences Courses

The building will provide services to all students coming from other departments in terms of satisfying the social science subject requirements of their respective curricula. To be able to accommodate all the students and provide them a conducive learning space.

ZCSPC, Baliwasan, Zamboanga City

Percentage of undergraduate programs with accreditation; and percentage of graduates who are employed.

Completed construction of a three-storey building according to specifications and helping solve the inadequacy of the number of classrooms in the college.

33 ,524, 194. 03

Construction of Engineering BuildingConstruction of Engineering building that serves as the learning and working space of the students in designing, planning, construction and management of infrastructures.

ZCSPC, Baliwasan, Zamboanga City

Percentage of undergraduate programs with accreditation; and percentage of graduates who are employed.

Completed construction of the Engineering Building

33, 747, 144.90

Refitting of Garments and Textile Shop Laboratory

Refitting of Garments and Textile Shop Laboratory for students learning and working space.

ZCSPC, Baliwasan, Zamboanga City

Percentage of undergraduate programs with accreditation and percentage of graduates who are employed.

Refitted Garments and Textile Shop Laboratory

17, 789, 855.67

Construction of Academic Building (Entrepreneurship/IGP Center) Phase 1

The IGP building is the hub for the school’s entrepreneurship engagements that would supplement the operations cost of the institution.

ZCSPC, Baliwasan, Zamboanga City

Percentage of undergraduate programs with accreditation; and Percentage of graduates who are employed.

Academic Building (Entrepreneurship/IGP Center) Phase 1

7, 471, 800.80

Subtotal for Outcome 1 99, 045, 670.10

6, 512.674.70

Investment Requirements (in exact amount PhP)

Completion of Phase 1 of the Academic Building for Maritime Education

Construction of the third floor of the academic building, complying with the European Maritime Safety Authority (EMSA) requirements for maritime schools; improve instruction, enhance graduates’ employability and help alleviate poverty.

ZCSPC, Baliwasan, Zamboanga City

Percent-age of undergraduate programs with accreditation; and Percentage of graduates who are employed.

Construction of the third floor of the Maritime Education bldg. completed according to specifications, and on time..

Chapter Outcome/ Project Title Project Description/ Objectives

Specific Location (Province/ City / Municipality /

Barangay)

RDP Results Matrices Indicators Addressed Expected Output

Chapter 10-10-ZCSPCPage 1 of 4

Page 118: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

Investment Requirements (in exact amount PhP)

Chapter Outcome/ Project Title Project Description/ Objectives

Specific Location (Province/ City / Municipality /

Barangay)

RDP Results Matrices Indicators Addressed Expected Output

2020 - Tier 1

Completion of Academic Building (Entrepreneurship/IGP Center)

The IGP building is the hub for the school’s entrepreneurship engagements that would supplement the operations cost of the institution.

ZCSPC, Baliwasan, Zamboanga City

Percentage of undergraduate programs with accreditation; and Percentage of graduates who are employed.

Completion of Entrepreneurship/IGP Building according to specifications and within the time frame period.

6, 000, 000.00

Expansion/Upgrading of the Fabrication, Laboratory, Innovation and Business Incubation Hub Building

The building will have seminar rooms, laboratories, and workshops for conceptualization, design and prototyping of creative/innovative products and a product launching hall. It is equipped with computers connected to the NET, and other IT gadgets that facilitate easy connectivity and access to knowledge and technology sources.

ZCSPC, Baliwasan, Zamboanga City

Percentage of undergraduate programs with accreditation and percentage of graduates who are employed

Completed expansion/upgrading of the Fabrication Laboratory, Innovation and Business Incubation Hub Building to facilitate easy connectivity and access to knowledge and technology sources.

40, 000, 000.00

Subtotal for Outcome 1 46, 000, 000.00 2020 - Tier 2

Construction of Student Housing

The Student Housing building is the dormitory of students from other localities and places in the region or nation that would serve as the second home of the migrant students in the city .

ZCSPC, Baliwasan, Zamboanga City

Percent-age of undergraduate programs with accreditation; and Percentage of graduates who are employed.

Construction of the Student Housing to cater to the migrant students coming from nearby municipalities, cities and other provinces.

60, 000,000.00

Subtotal for Outcome 1 195, 000, 000.002021 - Tier 2

90, 000, 000.00

Construction of Mechatronics, Robotics and Instrumentation Engineering Building

The building is an 8-storey glass and concrete structure with standard size lecture rooms, laboratories and workshops for the baccalaureate, master's and doctorate programs in Computer Science and Computer Technology and Engineering programs.

ZCSPC, Baliwasan, Zamboanga City

Percentage of undergraduate programs with accreditation and percentage of graduates who are employed.

A workshop building for Mechatronics, Robotics and Instrumentation Engineering is constructed to service the students primarily in Computer Science and Computer Technology and Engineering programs.

45, 000, 000, . 00

Construction of Information and Communication Technology (ICT) Building

The building will have lecture rooms, laboratories, and workshop for the baccalaureate, master’s and doctorate programs in Information and Communication Technology, Data Science, Analytics, Knowledge Management and Data Mining.

ZCSPC, Baliwasan, Zamboanga City

Percentage of undergraduate programs with accreditation and percentage of graduates who are employed.

The ICT building is constructed for use by the students enrolled in the college.

Chapter 10-10-ZCSPCPage 2 of 4

Page 119: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

Investment Requirements (in exact amount PhP)

Chapter Outcome/ Project Title Project Description/ Objectives

Specific Location (Province/ City / Municipality /

Barangay)

RDP Results Matrices Indicators Addressed Expected Output

Construction of Welding and Automotive Technology Building

Construction of Additional Automotive Shop Laboratory Building to accommodate the increasing number of students enrolled in automotive course.

ZCSPC, Baliwasan, Zamboanga City

Percentage of undergraduate programs with accreditation and percentage of graduates who are employed.

Additional Automotive Shop Laboratory Building constructed which can accommodate the increasing number of students enrolled in automotive course.

60, 000, 000.00

Construction of Laboratory Building for Biological, Chemical, Physical and Environmental Sciences

The building will have specialized laboratories and stock rooms for biological, chemical, physical and environmental sciences. The laboratories are specification standards-compliant, i.e., equipped with secured gas and water lines, water sprinklers, fume hoods, emergency evacuation facilities and fixtures and other safety features.

ZCSPC, Baliwasan, Zamboanga City

Percentage of undergraduate programs with accreditation and percentage of graduates who are employed.

Laboratory specialized for Biological, Chemical, Physical and Environmental Sciences is constructed.

70, 000, 000.00

Expansion/Refitting of the Old College of Arts Building

The Department of Arts and Sciences services all students coming from other departments in terms of satisfying the social science subject requirements of their respective curricula. To be able to accommodate the growing number of students and provide them a conducive learning space, there is a dire need to expand the said building.

ZCSPC, Baliwasan, Zamboanga City

Percentage of undergraduate programs with accreditation and percentage of graduates who are employed.

Completed expansion/refitting of the three-storey DAS building according to specifications, to help solve the inadequacy of the number of classrooms in the college.

70, 000, 000.00

Subtotal for Outcome 1 200, 000, 000.00

2022

e-Library Building

In response to the Education 4.0 advocacy of the 21st century, the e-Library buidling will be a repository of sophisticated information storage and retrieval system, the digital repository or digital collection, online database of digital objects and/or digitalized contents to serve the students and other clienteles better.

ZCSPC, Baliwasan, Zamboanga City

Percentage of undergraduate programs with accreditation and percentage of graduates who are employed.

Completed the construction of the one-storey e-Library building

45,000, 000.00

Smart Factory Building

Aligned with the Industry 4.0 trends, the Smart Factory Building is a hig-tech research laboratory, fully integrated and collaborative manufacturing system that responds in real-time to meet the changing demands and conditions in factories, supply network, and customer needs.

ZCSPC, Baliwasan, Zamboanga City

Percentage of undergraduate programs with accreditation and percentage of graduates who are employed.

Completed the construction of the Smart Factory building.

60, 000, 000.00

Chapter 10-10-ZCSPCPage 3 of 4

Page 120: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

Investment Requirements (in exact amount PhP)

Chapter Outcome/ Project Title Project Description/ Objectives

Specific Location (Province/ City / Municipality /

Barangay)

RDP Results Matrices Indicators Addressed Expected Output

Food Engineering Laboratory and Workshop

The Food Engineering Laboratory and Workshop building will house latest innovative technology for the hands-on training of the students in the multidisciplinary fields in food engineering, thus ensuring quality assurance of products, specifically of indigenous materials.

ZCSPC, Baliwasan, Zamboanga City

Percentage of undergraduate programs with accreditation and percentage of graduates who are employed.

Completed the construction of the Food Engineering Laboratory and Workshop building.

50, 000, 000.00

Digital Innovation Hub (DIH)

The Digital Innovation Hub building is a one-stop-shop that would cater the school's clienteles and even other companies - to become more competitive with regard to business/production processes, products or services using digital technologies. Based upon technology infrastructure (competence center), the DIH provides access to the latest knowledge, expertise and technology to support clienteles with piloting, testing and experimenting with digital innovations.

ZCSPC, Baliwasan, Zamboanga City

Percentage of undergraduate programs with accreditation and percentage of graduates who are employed.

Completed the construction of the Digital Innovation Hub.

45, 000, 000.00 Sub-total for Outcome 1 200, 000, 000.00

19, 320, 580.83 99, 045, 670.10 241, 000, 000.00 200, 000, 000.00 200, 000, 000.00

Chapter 10-10-ZCSPCPage 4 of 4

Page 121: Table of Contents (By Chapter)

Zamboanga Peninsula Regional Development Investment Program 2020 - 2022

RDP Chapter: 10 - Accelerating Human Capital DevelopmentAgency: ZAMBOANGA STATE COLLEGE OF MARINE SCIENCES AND TECHNOLOGYGoal: Zamboanga State College of Marine Sciences and Technology will become the Center of Development for maritime program and top tier research center in Southern Philippines.

2017 2018 2019 2020 2021 2022 Total

PAP 1. PROCUREMENT OF TRAINING EQUIPMENTS FOR THE COMPLETED THREE (3) STOREY BUILDING OF THE ZSCMST REGIONAL MARITIME TRAINING CENTER FOR BASIC TRAINING (FORMERLY SOLAS)

A3 / A8 10,000 57,925 67,925

PAP 2. Upgrade of Maritime Education Laboratories and Equipment

A3 / A6 10,000 8,000 18,000

PAPs Specific Location Congressional District Source

ZSCMST Main Campus B, Fort Pilar,

Rio Hondo, Zamboanga City

1

This is in conformance to the initiative of the country in compliance to the international; i.e. EMSA standards

Cost in Thousand Pesos

Strategy 1. Strategy 1. Project TLESSI Upgrade - Upgrading of teaching-learning enhancement and support system and infrastructures, (e.g. quality mentoring, advising, financing)

OV1 Remarks

MFO 1. Higher Education Services

ZSCMST Main Campus B, Fort Pilar,

Rio Hondo, Zamboanga City

1

These are training equipment for the operation of the completed Three (3) Storey Maritime Training Center Building

Chapter 10-11-ZSCMSTPage 1 of 6

Page 122: Table of Contents (By Chapter)

2017 2018 2019 2020 2021 2022 Total

PAPs Specific Location Congressional District Source

Cost in Thousand Pesos

OV1 Remarks

PAP 3. Construction of Twenty-five (25) Rooms Digital-Based Maritime Education Buildings with installed IT equipment and accessories, internet connection and network system

A1 50,000 100,000 150,000

PAP 4. Rehabilitation of the College of Education and Natural Sciences Building

A1 25,000 25,000

PAP 5. REHABILITATION AND UPGRADE OF THE MALE DORMITORY INTO ZSCMST STUDENT RESIDENCES

A1 15,000 15,000

PAP 6. REHABILITATION AND UPGRADE OF THE COLLEGE FEMALE DORMITORY

A1 15,000 15,000

PAP 7. CONSTRUCTION OF THE COLLEGE NEW MALE DORMITORY

A1 65,000 65,000

ZSCMST Main Campus B, Fort Pilar,

Rio Hondo, Zamboanga City

1

The College is committed to provide a safe, comfortable and affordable living options for the students

ZSCMST Main Campus B, Fort Pilar,

Rio Hondo, Zamboanga City

1

ZSCMST Main Campus, Fort Pilar,

Rio Hondo, Zamboanga City

1

ZSCMST Main Campus B, Fort Pilar,

Rio Hondo, Zamboanga City

1

ZSCMST Main Campus A, Fort Pilar,

Rio Hondo, Zamboanga City

1

Chapter 10-11-ZSCMSTPage 2 of 6

Page 123: Table of Contents (By Chapter)

2017 2018 2019 2020 2021 2022 Total

PAPs Specific Location Congressional District Source

Cost in Thousand Pesos

OV1 Remarks

PAP 8. REHABILITATION AND UPGRADING OF THE COLLEGE OF AQUACULTURE LABORATORY BUILDING

A1 2800 2,800

PAP 9. Procurement of learning/academic resources for the newly rehabilitated ZSCMST Learning Resource Center.

A3 / A6 3,500 3,000 6,500

PAP 10. Construction and Procurement of Equipment for the CENS TLE Laboratory Building

A1 5,000 5,000

PAP 11. Construction of Twenty-five (25) Rooms Digital-Based Teacher Education Building with installed IT equipment and accessories, internet connection and network system Phase I

A1 35,000 35,000

ZSCMST Main Campus B, Fort Pilar,

Rio Hondo, Zamboanga City

1

This is in preparation for higher accreditation levels in AACUP and SUC Levelling.

ZSCMST Main Campus B, Fort Pilar,

Rio Hondo, Zamboanga City

1

ZSCMST Main Campus, Fort Pilar,

Rio Hondo, Zamboanga City

1

The building is one of the ZSCMST buildings which were rigged with bullets during the incident of the infamous 2013 Zamboanga siege. Unfortunately, the national government at that time failed to prioritize its rehabilitation.

ZSCMST Main Campus B, Fort Pilar,

Rio Hondo, Zamboanga City

1

This is in preparation for higher accreditation levels in AACUP and SUC Levelling.

Chapter 10-11-ZSCMSTPage 3 of 6

Page 124: Table of Contents (By Chapter)

2017 2018 2019 2020 2021 2022 Total

PAPs Specific Location Congressional District Source

Cost in Thousand Pesos

OV1 Remarks

PAP 12. Construction of One-Stop Shop with Installation of Digital Equipment and Network System Administration Building.

A1 / A3 / A7 68,000 68,000

PAP 13. Rehabilitation and Upgrading of the College of Business Administration Building into Digital-Based Hospitality Management and Entrepreneurship Building with Installation of Digital Equipment and Network System Phase I

A1 / A3 / A7 20,000 20,000

PAP 14. Upgrade and Digitization of MCLL Activity Center.

A1 / A3 / A7 20,000 20,000

PAP 15. Construction of CBA Hot and Cold Kitchen Laboratory

A3 / A7 20,000 20,000

PAP 16. Upgrading of campus drainage system/ construction of storm drains

A3 / A7 25,000 25,000

ZSCMST Main Campus A, Fort Pilar,

Rio Hondo, Zamboanga City

1

ZSCMST Main Campus A, Fort Pilar,

Rio Hondo, Zamboanga City

1 and 2

ZSCMST Main Campus, Fort Pilar,

Rio Hondo, Zamboanga City

1

ZSCMST Main Campus A, Fort Pilar,

Rio Hondo, Zamboanga City

1

ZSCMST Main Campus A and

Victoria Campus, Zamboanga City

1 and 2

Chapter 10-11-ZSCMSTPage 4 of 6

Page 125: Table of Contents (By Chapter)

2017 2018 2019 2020 2021 2022 Total

PAPs Specific Location Congressional District Source

Cost in Thousand Pesos

OV1 Remarks

PAP 17. Construction of New Digital-Based Full Mission Bridge, Engine and Machine Shop Laboratory for the College of Maritime Education

A3 / A7 30,000 30,000

PAP 18. ZSCMST Comprehensive Land Use Plan 3,000 3,000

591,225

PAP 19. Establishment of Land-Based Seaweed Seedling Production System in Mindanao

15,000 15,000

PAP 20. Vertically Integrated Lucrative Land-Based Aquaculture Research "VILLAR Program"

A1 5,500 5,500

Strategy 2. Establish ICT-based Research Chat Room to encourage research concept note and proposal development between and among members of a research team, or between and among research teams.

ZSCMST Main Campus, Fort Pilar,

Rio Hondo, Zamboanga City

1

ZSCMST Main Campus A, Fort Pilar,

Rio Hondo, Zamboanga City

1

The purpose of this project is to enhance the capability of the College to conduct research in a wider marine ecosystem.

MFO 2. Research Services

ZSCMST Main Campus, Fort Pilar,

Rio Hondo, Zamboanga City

1

ZSCMST Main Campus, Fort Pilar,

Rio Hondo, Zamboanga City

1

Subtotal

Chapter 10-11-ZSCMSTPage 5 of 6

Page 126: Table of Contents (By Chapter)

2017 2018 2019 2020 2021 2022 Total

PAPs Specific Location Congressional District Source

Cost in Thousand Pesos

OV1 Remarks

PAP 21. Construction of Digital-Based Fin and shellfish seed-stocks Hatchery and Bank

A1 10,000 10,000

PAP 22. Procurement of Glass-hulled, flat-bottomed boat A1 8,000 8,000

38,500

PAP 23. Construction of Community Extension Center A1 2500 2,500

0 0 0 2,5000 0 10,000 67,925 165,300 389,000 632,225

SubtotalGRAND TOTAL

MFO 3. Extension ServicesStrategy 3. Project CCBP (Community Capacity Building Program)

ZSCMST Main Campus B, Fort Pilar,

Rio Hondo, Zamboanga City

1

Establishment/upgrading of extension centers and facilities specifically intended for dissemination of mature technologies

ZSCMST Victoria Campus, Zamboanga

City1

The very purpose was for the establishment and support for Centers of Development (CODs) and Research and Development Centers sustaining the already recognized Center of Excellence in Fishery Program of the College.

ZSCMST Main Campus A, Fort Pilar,

Rio Hondo, Zamboanga City

1 and 2

Subtotal

Chapter 10-11-ZSCMSTPage 6 of 6

Page 127: Table of Contents (By Chapter)

Updated Zamboanga Peninsula Regional Development Investment Program (RDIP), 2017-2022

Agency: Western Mindanao State UniversityChapter 10: Accelerating Human Capital Development

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17)OO 1: Relevant and quality tertiary education ensured to achieve inclusive growth and access of deserving but poor students to quality tertiary education increased

1. Reconstruction of the Integrated Laboratory High School and Senior High School Building (Phase 3)

This will restore the spatial requirements for the basic education/laboratory component of the educational mandate of instruction. This is also to complete the construction of the building of which Phases I and II have been already granted and in replacement of the old secondary school building that was gutted down by fire in 2014.

WMSU Campus, Normal Road,

Baliwasan, Zamboanga City

- Mean years of schooling increased - Functional literacy rate increased - Net enrollment rate increased (%) - Completion rate increased (%) - Proportion of students performing at moving towards mastery, closely approximating mastery or mastered increased (%) - Proportion of students at low mastery reduced

6 Storeys

62 Rooms- 20 Classrooms- 2 Storage rooms- 1 Library- 3 Laboratories- 1 Faculty Room - 1 Multi-purpose hall 1-AVR 11 - Offices 19 - Restrooms 3- Equipment rooms Total Floor Area: 5,412 sq.m

Support to Basic Education Reform (K12 Program)

GAA 45,298,000.00 45,298,000.00 Ongoing

2. Construction and/or Rehabilitation of Multi-Purpose Building This project will provide the university with one (1) storey classroom/laboratory for the College of Engineering and Technology.

WMSU Campus, Normal Road,

Baliwasan, Zamboanga City

- Percentage of tertiary graduates in science, engineering, manufacturing and construction increased (%)

1 Classroom Total Floor Area: 120.87 sq.m

Strategic Plan 2016-2025

GAA 1,000,000.00 1,000,000.00 Completed

3. Installation of Renewable Energy Solar Facility (Phase 1) This is in line with the renewable energy campaign and in full compliance to the environmental sustainability framework. As investment, this will generate reasonable returns from the gradual reduction in power consumption and result in the decline in the total energy maintenance cost.

WMSU Campus, Normal Road,

Baliwasan, Zamboanga City

- Total energy savings in government offices increased

Day Yield: 74.719 KWH

Power: 58.34 KW

National Renewable Energy Program (NREP), Strategic Plan 2016-2025

GAA 25,000,000.00 25,000,000.00 Completed

4. Rehabilitation of Campus Drainage System and Water Collection Facility (Phase 2)

The project is parallel to the environmental resource use maximization with the collection of rain and run-off water with a drainage system connected to a water collection facility for water re-use for domestic purposes e.g. grounds maintenance, cleaning, comfort rooms.

WMSU Campus, Normal Road,

Baliwasan, Zamboanga City

- Total energy savings in government offices increased

1,060.30 Linear Meters underground structure for water storage

Philippine Clean Water Act of 2004

GAA 11,822,000.00 11,822,000.00 Completed

Mode of Funding

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (in exact amount PhP)

LGU Proponent RemarksBasis for

ImplementationChapter Outcome/ Project Title Project Description/ Objectives

Specific Location

(Province/ City / Municipality /

Barangay)

RDP Results Matrices Indicators Addressed Expected Output

Chapter 10-12-WMSUPage 1 of 6

Page 128: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Mode of Funding

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (in exact amount PhP)

LGU Proponent RemarksBasis for

ImplementationChapter Outcome/ Project Title Project Description/ Objectives

Specific Location

(Province/ City / Municipality /

Barangay)

RDP Results Matrices Indicators Addressed Expected Output

5. Engineering Innovation Center 3-storey building adjacent/complementary to the College of Engineering and Technology to house the DOST-funded technology innovation facilities/equipment. This will also serve as viable venue for new and emerging technology.

WMSU Campus, Normal Road,

Baliwasan, Zamboanga City

- Percentage of tertiary graduates in science, engineering, manufacturing and construction increased (%) - Number of patents, licenses, and royalties issued to HEIs increased - Number of researchers and scientists increased -Number of graduate education graduates (MA/PhD) engaged in original research of creative work increased - Number of innovation hubs established within HEIs increased

3 Storeys 17 Rooms - 6 Classrooms - 2- Offices - 1 - Storage Room - 7 - Restrooms - 1 Genset Room Total Floor Area: 723.58 sq.m

Strategic Plan 2016-2025

GAA 12,000,000.00 12,000,000.00 Ongoing

6. La Paz Integrated Climate Change Center Environmental studies and research climate change complex to monitor weather and environmental conditions and shifts. To further concretize the university's commitment to environmental preservation.

La Paz, Zamboanga City

- Number of reviewed Climate Change (CC)/Disaster Risk Reducation Management (DRRM) - enhanced plan increased - Number of patents, licenses, and royalties issued to HEIs increased - Number of researchers and scientists increased - Number of innovation hubs established within HEIs increased

2 Storeys

19 Rooms- No Classrooms- Admin/Research Offices only

Total Floor Area: 1,025.8 sq.m

Climate Change Act

GAA 21,255,000.00 21,255,000.00 Ongoing

7. Installation of Renewable Energy Solar Facility (Final Phase) This is in line with the renewable energy campaign and in full compliance to the environmental sustainability framework.

WMSU Campus, Normal Road,

Baliwasan, Zamboanga City

- Total energy savings in government offices increased

Rooftop Construction with installation of solar panels

National Renewable Energy Program (NREP)

GAA 50,000,000.00 50,000,000.00 Ongoing

8. Rehabilitation of Campus Drainage System and Water Collection Facility (Final Phase)

The project is parallel to the environmental resource use maximization with the collection of rain and run-off water with a drainage system connected to a water collection facility for water re-use for domestic purposes e.g. grounds maintenance, cleaning, comfort rooms.

WMSU Campus, Normal Road,

Baliwasan, Zamboanga City

- Total energy savings in government offices increased

674.53 Linear Meters around the campus; underground construction

Philippine Clean Water Act of 2004

GAA 10,000,000.00 10,000,000.00 Ongoing

9. Renovation of Administration Building for the University Information Technology Center with Provision for Equipment

This project aims at synchronizing data and linking all units into one singular network.

WMSU Campus, Normal Road,

Baliwasan, Zamboanga City

- Percentile rank in the WGI - Regulatory Quality Improved - Government agencies with frontline service offices passing the Report Card Survey increased

2 Storeys

18 Rooms- No Classrooms (Admin/Research Offices only)

Total Floor Area:

Strategic Plan 2016-2025

GAA 20,000,000.00 20,000,000.00 Ongoing

Chapter 10-12-WMSUPage 2 of 6

Page 129: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Mode of Funding

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (in exact amount PhP)

LGU Proponent RemarksBasis for

ImplementationChapter Outcome/ Project Title Project Description/ Objectives

Specific Location

(Province/ City / Municipality /

Barangay)

RDP Results Matrices Indicators Addressed Expected Output

10. Construction of Two (2)-Storey, Ten (10)-Classroom Building, ESU, Siay, Zamboanga Sibugay

The project will provide the WMSU ESU-Siay with a two-storey reinforced concrete construction of ten (10)-classroom building which will be implemented through public bidding in compliance with R.A. 9184.

Siay, Zamboanga Sibugay

- Mean years of schooling increased - Functional literacy rate increased - Net enrollment rate increased (%) - Completion rate increased (%) - Proportion of students performing at moving towards mastery, closely approximating mastery or mastered increased (%) - Proportion of students at low mastery reduced

2-Storeys 10-Classrooms

GAA 12,000,000.00 12,000,000.00 Ongoing

11. Construction of Six (6)-Classroom Building, ESU, Naga, Zamboanga Sibugay

The project will provide the WMSU ESU-Naga with a reinforced concrete construction of six (6)-classroombuilding which will be implemented through public bidding in compliance with R.A. 9184.

Naga, Zamboanga

Sibugay

- Mean years of schooling increased - Functional literacy rate increased - Net enrollment rate increased (%) - Completion rate increased (%) - Proportion of students performing at moving towards mastery, closely approximating mastery or mastered increased (%) - Proportion of students at low mastery reduced

1-Storey 6-Classrooms

GAA 7,000,000.00 7,000,000.00 Ongoing

12. Construction of Four (4)-Classroom Building for Crime Laboratory Facilities/Equipment, ESU,Tungawan, Zamboanga Sibugay

The project will provide the WMSU ESU-Tungawan with a reinforced concrete construction of six (6)-classroombuilding which will be implemented through public bidding in compliance with R.A. 9184.

Tungawan, Zamboanga

Sibugay

- Mean years of schooling increased - Functional literacy rate increased - Net enrollment rate increased (%) - Completion rate increased (%) - Proportion of students performing at moving towards mastery, closely approximating mastery or mastered increased (%) - Proportion of students at low mastery reduced

1-Storey 4-Classrooms

GAA 8,000,000.00 8,000,000.00 Ongoing

13. Construction of T en (10)-Classroom, Three (3)-Storey Building and Computer Laboratorywith Accessories, and Purchase of Books for the Library, ESU, Alicia, Zamboanga Sibugay

The project will provide the WMSU ESU-Alicia with a three (3)-sotrey reinforced concrete construction of ten(10)-classroom building which will be implemented through public bidding in compliance with R.A. 9184.

Alicia, Zamboanga

Sibugay

- Mean years of schooling increased - Functional literacy rate increased - Net enrollment rate increased (%) - Completion rate increased (%) - Proportion of students performing at moving towards mastery, closely approximating mastery or mastered increased (%) - Proportion of students at low mastery reduced

3-Storeys 10-Classrooms

GAA 15,000,000.00 15,000,000.00 Insufficient fund. No

reply from DPWH

Chapter 10-12-WMSUPage 3 of 6

Page 130: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Mode of Funding

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (in exact amount PhP)

LGU Proponent RemarksBasis for

ImplementationChapter Outcome/ Project Title Project Description/ Objectives

Specific Location

(Province/ City / Municipality /

Barangay)

RDP Results Matrices Indicators Addressed Expected Output

14. College of Medicine To assist in the health needs of the region by offering a venue for quality and affordable medical education via the formal training of local individuals who are committed to health development.

WMSU Campus, Normal Road,

Baliwasan, Zamboanga City

- Mean years of schooling increased - Proportion of births attended by skilled health personnel increased

RDP Results Matrices Indicators are based on the NEDA - Philippine Development Plan

Strategic Plan 2016-2025

GAA 3 100,000,000.00 100,000,000.00

15. Agriculture Innovation Center This will be a venue for the incubation of prototype agricultural technology with the use of common and indigenous materials to be developed for industry use.

WMSU San Ramon Campus,

San Ramon, Zamboanga City

- Number of patents, licenses, and royalties issued to HEIs increased - Number of researchers and scientists increased -Number of graduate education graduates (MA/PhD) engaged in original research of creative work increased - Number of innovation hubs established within HEIs increased - Number of technology adoptors increased

2-Storey 6-Agriculture research areas for appropriate technology testing and incubation

Strategic Plan 2016-2025

GAA 3 28,000,000.00 28,000,000.00

16. International and Languages Development Center This center will enhance the university's internationalization efforts and re-affirm WMSU's pioneering stance in using language studies, researches and instruction as potential vehicles in becoming a recognized academic center.

WMSU Campus, Normal Road,

Baliwasan, Zamboanga City

- Number of HEIs engaged in local and global partnerships and collaborations increased

3-Storey 10-Classroom instruction and research facility for Language studies and training

Strategic Plan 2016-2025, ASEAN Integration

GAA 4 25,000,000.00 25,000,000.00

17. Construction and Expansion of Learning Resource Center and Library

Maintains instructional leadership via enhanced reference holdings could be better served with a sufficient library and learning materials center.

WMSU Campus, Normal Road, Baliwasan, Zamboanga City

- Mean years of schooling increased - Functional literacy rate increased

3-Storey structure with IT equipment and research

Strategic Plan 2016-2025

GAA 4 25,000,000.00 25,000,000.00

18. City East Coast School Campus An appropriate response to the constricting spatial conditions of the current campus and to establish a campus in the east coast area to cater to other parts of ZamPen and decongest the city center.

Off-city campus in the east coast

- Mean years of schooling increased - Functional literacy rate increased - Net enrollment rate increased (%) - Completion rate increased (%) - Proportion of students performing at moving towards mastery, closely approximating mastery or mastered increased (%) - Proportion of students at low mastery reduced

50-hectares alternative campus area

Strategic Plan 2016-2025

GAA 4 75,000,000.00 75,000,000.00

Subtotal for Organizational Outcome 1 83,120,000.00 155,255,000.00 0.00 0.00 128,000,000.00 125,000,000.00 491,375,000.00

Chapter 10-12-WMSUPage 4 of 6

Page 131: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Mode of Funding

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (in exact amount PhP)

LGU Proponent RemarksBasis for

ImplementationChapter Outcome/ Project Title Project Description/ Objectives

Specific Location

(Province/ City / Municipality /

Barangay)

RDP Results Matrices Indicators Addressed Expected Output

OO 2: Higher education research improved to promote economic productivity and innovation

1. Creative Reinvention and Recycling Facility with Equipment The facility is to establish a pioneering academic-based project in the city that concretizes efforts in the campaign for zero-waste management and to complement university instruction in environmental engineering and to create by-products from garbage recycling for commercialization.

WMSU Campus, Normal Road, Baliwasan, Zamboanga City

- Number of patents, licenses, and royalties issued to HEIs increased - Number of researchers and scientists increased - Number of graduate education graduates (MA/PhD) engaged in original research of creative work increased - Number of innovation hubs established within HEIs increased

Materials Recovery Facility (MRF); Complementary Facility to the Innovation Center

Strategic Plan 2016-2025

GAA 2 50,000,000.00 50,000,000.00

Subtotal for Organizational Outcome 2 0.00 0.00 0.00 50,000,000.00 0.00 0.00 50,000,000.00

OO 3: Community engagement increased1. Renovation of Extension Training Laboratories with Complete Facilties for Livelihood Training & TESDA Accreditation

This is to open opportunities for technical education students for greater participation, through skills manpower, in the development agenda. It will, furthermore, pave the way for the complementation of techinical training to formal engineering and voc-tech education.

WMSU Campus, Normal Road,

Baliwasan, Zamboanga City

- Certification rate of TVET graduates increased - Percentage of youth Not in Education, Employment or Training (NEET) decreased - Youth placed in employment, education or training increasd

2 Storeys

4 Classrooms

Total Floor Area: 467.014 sq.m

Strategic Plan 2016-2025

GAA 8,000,000.00 8,000,000.00 Ongoing

Subtotal for Organizational Outcome 3 0.00 8,000,000.00 0.00 0.00 0.00 0.00 8,000,000.00

General Administration and Support Services1. Repair and Improvement of Structure (Gymnasium) This project is in maintenance of the

existing university gymnasium that needs major repair due to its hazardous structural canopy condition. This is likewise to halt further deterioriation that may incur greater cost.

WMSU Campus, Normal Road, Baliwasan, Zamboanga City

- Mean years of schooling increased

Repair of existing structure

Strategic Plan 2016-2025

GAA 3,000,000.00 3,000,000.00 Ongoing

2. Peace Studies Center and Museum The central position of the university makes it a pioneer for peace studies and concerns. The proposed center should be a facility for formal studies and lectures and home for peace and conflict artifacts.

WMSU Campus, Normal Road, Baliwasan, Zamboanga City

- Level of awareness of Filipino values, cultural diversity, creativity, and culture-sensitivity increased - Tolerance and respect for others enhanced - Pride of being Filipino increased - Pride of place increased

2-storey facility for housing materials and artefacts

Strategic Plan 2016-2025

GAA 2 25,000,000.00 25,000,000.00

3. University Executive and Administrative Center To construct an integrated and central administration building that would house all offices and to streamline operations in a growing university setting. This is to replace the old administration building that is space-inadequate and deteriorating.

WMSU Campus, Normal Road, Baliwasan, Zamboanga City

- Percentile rank in the WGI - Regulatory Quality Improved - Government agencies with frontline service offices passing the Report Card Survey increased

Central University governance center; 5-storey executive center to house administrative offices and units

Strategic Plan 2016-2025

GAA 2 50,000,000.00 50,000,000.00

Chapter 10-12-WMSUPage 5 of 6

Page 132: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Mode of Funding

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (in exact amount PhP)

LGU Proponent RemarksBasis for

ImplementationChapter Outcome/ Project Title Project Description/ Objectives

Specific Location

(Province/ City / Municipality /

Barangay)

RDP Results Matrices Indicators Addressed Expected Output

4. Business and Technopreneurship Development Center A hub to host the academic-industry interface and to further develop and promote homegrown technology and inventions via a viable marketing avenue. This will further open greater socio-economic interventions by the university.

WMSU Campus, Normal Road, Baliwasan, Zamboanga City

- Number of patents, licenses, and royalties issued to HEIs increased - Number of researchers and scientists increased -Number of graduate education graduates (MA/PhD) engaged in original research of creative work increased - Number of innovation hubs established within HEIs increased - Number of technology adoptors increased

5-storey technology creation and development hub with technology laboratory and exhibition area

Strategic Plan 2016-2025

GAA 3 30,000,000.00 30,000,000.00

5. Green Infrastructure Innovation (Renovation of Buildings) The proposed "greening" of campus structures will expectedly lessen power use and maximize the use of natural potentials.

WMSU Campus, Normal Road, Baliwasan, Zamboanga City

- Total energy savings in government offices increased

Repair of buildings as eco-friendly

Strategic Plan 2016-2025

GAA 4 50,000,000.00 50,000,000.00

6. Government-Academe-Industry Incubation Hub The hub will be host and venue for partnerships among government industry and the university for dicussions and policy-making to support development programs.

WMSU Campus, Normal Road, Baliwasan, Zamboanga City

- Number of HEIs engaged in local and global partnerships and collaborations increased

5-storey center to house incubate industries

Strategic Plan 2016-2025

GAA 4 15,000,000.00 15,000,000.00

Subtotal for General Administration and Support Services 3,000,000.00 0.00 0.00 75,000,000.00 30,000,000.00 65,000,000.00 173,000,000.00

GRAND TOTAL 86,120,000.00 163,255,000.00 0.00 125,000,000.00 158,000,000.00 190,000,000.00 722,375,000.00

Chapter 10-12-WMSUPage 6 of 6

Page 133: Table of Contents (By Chapter)

Chapter 11 : Reducing Vulnerability of Individuals and Families

2017 (Actual)

2018 Actual) 2019 (Actual) 2020 (RDC-

endorsed) 2021 (Proposed) 2022 (Proposed) Total Project Cost LGU Proponent Remarks

7,967,731 10,111,080 7,959,377 7,967,731 34,005,919

Z. Norte - 15 Municipalities

Z. Sur - 6 Municipalities

Z. Sibugay -6 Municipalities

Z. Norte - (25 mun. and 2 cities) 2,082,880 2,053,963 2,053,964.00 2,082,880 8,273,687

Z. Sur - (26 mun. & 1 City) 1,858,147 1,822,516 1,822,516.00 1,858,147 7,361,326

Z. Sibugay - (16 municipalities) 1,182,263 1,164,719 1,164,720.00 1,182,263 4,693,965

Zamboanga City - beneficiaries 1,031,429 1,014,988 1,014,987.00 1,031,429 4,092,833

Isabela City - beneficiaries 185,287 178,200 178,200.00 185,287 726,974

ZN 25 mun. 2 Cities= 73,080 28,528 28,527.00 73,080 203,215

ZS 26 mun. 1 City = 73,080 26,483 26,483.00 73,080 199,126

ZSP 7 municipalities = 41,760 25,150 25,150.00 41,760 133,820

Zambo. City = 16,320 17,320 17,319.00 16,320 67,279 Isabela City =

5,556 16,609 16,609 5,556 44,330

Annual ODA On-going

3. Sustainable Livelihood Program (SLP)

The sustainable program is a capacity building program for the poor, vulnerable and marginalized families and individuals in acquiring necessary livelihood assests to help improve their socio-economic wellbeing.

Reduced vulnerability of individuals and families

Improved soci-economic

wellbeng of the vulnerable,

marginalized families and inidividuals

By stages GAA

2. Pantawid Pamilyang Pilipino Program

Provision of conditional cash to extremely poor households to improve their health, nutrition and educationl particularly on children aged 0-14

Reduced vulnerability of individuals and families

Improved health, nutrition and education of in-school children

Annual ODA

On-going

by Cycle ODA On-going

200 M regionwide but no identified municipalities yet

On-going

Organizational Outcome 1 - Well-being of poor families improved

1. Grants - KC-National Community Driven Development Program (NCDDP)

A community-driven development (CDD) initiative of the Department and development in conflict affected areas (CAAs). It has 3 strategic pillars : 1) Laying the foudnation for peace; 2) Building resillient communities, and 3) Regional and Sub-Regional Development.

Build foundation for inclusive growth and high-trust society

Empowered community in terms of decision making and improved local goverance in terms of participation and reduced poverty

Updated Zamboanga Peninsula Regional Development Investment Program (RDIP), 2017-2022

Agency : Department of Social Welfare and Development IX (DSWD)

Chapter Outcome/ Project Title

Project Discription/Objectives Specific Location

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implmen-

tation

Mode of Funding

Status/ Level of

Readiness

In Exact Amount

Chapter 11-1-DSWD IXPage 1 of 3

Page 134: Table of Contents (By Chapter)

2017 (Actual)

2018 Actual) 2019 (Actual) 2020 (RDC-

endorsed) 2021 (Proposed) 2022 (Proposed) Total Project Cost LGU Proponent Remarks

Chapter Outcome/ Project Title

Project Discription/Objectives Specific Location

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implmen-

tation

Mode of Funding

Status/ Level of

Readiness

In Exact Amount

ZN 25 mun. 2 Cities = children 72,675 95,989 95,989 72,675 337,328

ZS 26 mun. 1 City = children 79,296 97,744 97,744 79,296 354,080

ZSP 16 municipalities = Children 56,912 67,468 67,468 56,912 248,760

Zamboanga City - children 30,308 49,090 49,090 30,308 158,796

Isabela City - children 4,370 7,449 7,449 4,370 23,638

ZN 25 mun. 2 Cities = 416,166 422,076 422,076 416,166 1,676,484

ZS 26 mun. 1 City = 392,130 399,672 399,672 392,130 1,583,604

ZSP 16 municipalities = 228,924 233,430 233,430 228,924 924,708

Zamboanga City = 110,748 212,364 212,364 110,748 646,224

Isabela City = 26,400 25,620 25,620 26,400 104,040

ZN 25 mun. 2 Cities = 718,283 718,283

ZS 26 mun. 1 City = 637,582 637,582 ZSP 16 municipalities = 407,257 407,257

Zamboanga City = 333,025 333,025

Isabela City = 55,555 55,555

478,471 491,661 464,888.69 478,471 1,913,492

1. Provision of Center-based services Regionwide 278,594 374,278 182,233.00 278,594 1,113,699

2. Provision of Community-based Services

Regionwide 5,879 5,879 88,382.67 5,879 106,020

GAA

Organnizational Outcome 2 - Rights of the poor and vulnerable sectors promoted and protected

Reduced vulnerability of individuals and families

Rights of the poor and vulnerable

sectors promoted and protected

Annual GAA

GAA On-going

On-going

On-going

6. Un conditional Cash Transfer (UCT)

UCT also known as Tax Reform Cash Transfer Project is the biggest mitigating measure under Train Law.

Reduced vulnerability of individuals and families

Rights of the poor and

vulnerable sectors promoted

and protected

Annual GAA On-going

5. Social Pension Program - for indigent Senior Citizens

Institutionalized social protection by providing monthly stipend of P500.00 nidigent senior citizen to augment the daily subsistence and other medical needs.

Reduced vulnerability of individuals and families

Rights of the poor and

vulnerable sectors promoted

and protected

Annual

4. Supplementary Feeding (SF) Program - 2,101 Day Care Centers / 143,397 children

Provision of augmentation support for feeding program for children as part of Early Childhood Care and Development using indigenous food.

Reduced vulnerability of individuals and families

Improved and sustained

nutritional status of the children beneficiairies

by Cycle

Chapter 11-1-DSWD IXPage 2 of 3

Page 135: Table of Contents (By Chapter)

2017 (Actual)

2018 Actual) 2019 (Actual) 2020 (RDC-

endorsed) 2021 (Proposed) 2022 (Proposed) Total Project Cost LGU Proponent Remarks

Chapter Outcome/ Project Title

Project Discription/Objectives Specific Location

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implmen-

tation

Mode of Funding

Status/ Level of

Readiness

In Exact Amount

- Recovery & Rehabilitation Program for Trafficked Persons

Regionwide 1,498 1,498 1,773.02 1,498 6,267

3. Expanded Assistance to Individuals in Crisis (E-AICs)

Regionwide 192,500 110,006 192,500.00 192,500 687,506

42,847 8,800 8,800 8,800 69,247

1. Augmentation to LGUs for disaster relief and immediate response to IDPs

Regionwide

Build foundation for inclusive growth and high-trust society

Improved soci-economic wellbeng of the vulnerable, marginalized families and inidividuals

Annual GAA On-going 42,847 8,800 8,800 8,800 69,247

110 643 643 643 2,039

1. Registration, Accreditation and Licensing of partner intermediaries and stakeholders

Regionwide

Build foundation for inclusive growth and high-trust society

Delivery of coordinated SWD programs by LGUs and other intermediaries improved

Annual GAA On-going 110 643 643 643 2,039

630,679 67,172 67,172 67,172 832,195

1. Capability Building and Provision of Technical Assistance to stakeholders and intermediaries

Ensure implementation of capacity building intervention program for LSWDOs will be provided as specified in the TARA Plan.

Regionwide

Build foundation for inclusive growth and high-trust society

Delivery of coordinated SWD programs by LGUs and other intermediaries improved

Annual GAA On-going 630,679 67,172 67,172 67,172 832,195

9,119,838 10,679,356 8,500,881 8,522,817 36,822,892 -

Organizational Outcome 4 - Continuing compliance of social welfare and development (SWD) agencies to standards in the delivery of social welfare services ensured

Organizational Outcome 5 - Delivery of social welfare and development (SWD) programs by lcoal government units (LGUs), through local social welfare and development offices (LSWDOs), improved

GRAND TOTAL

Note : The amount reflected herein are subject for validation from NPMO

Reduced vulnerability of individuals and families

Rights of the poor and

vulnerable sectors promoted

and protected

Annual GAA On-going

Organizationa Outcome 3 - Immediate relief and early recovery of disaster victims/survivors ensured

Chapter 11-1-DSWD IXPage 3 of 3

Page 136: Table of Contents (By Chapter)

Updated Zamboanga Peninsula Regional Development Investment Program (RDIP), 2017-2022

Agency: DEPARTMENT OF LABOR AND EMPLOYMENT REGION 9Chapter: 11 REDUCING VULNERABILITY OF INDIVIDUALS AND FAMILIES

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17)Outcome 1: EMPLOYABILITY OF WORKERS AND COMPETITIVENESS OF MSMES ENHANCEDSpecial Program for Employment of Students (SPES)

Provide students capacity to pursue education by providng temporary employment

Regionwide SPES: no. of beneficiaries 5,416 youth assisted RA 9547/ RA 10917 GAA 1 47,937,000.00 47,937,000.00 33,000,000.00 52,461,000.00 53,510,220.00 54,580,424.40 289,425,644.40

Employment Facilitation Services

Employment facilitation Regionwide PES: no. of qualified jobseekers referred for placement; LMI: no. of individuals reached

56,100 jobseekers reffered for services

RA 8759/ RA 10691 GAA 1 584,000.00 623,000.00 633,000.00 676,000.00 696,280.00 717,168.40 3,929,448.40

Subtotal for Outcome 1 48,521,000.00 48,560,000.00 33,633,000.00 53,137,000.00 54,206,500.00 55,297,592.80 293,355,092.80

Outcome 2: PROTECTION OF WORKERS’ RIGHTS AND MAINTENANCE OF INDUSTRIAL PEACE ENSUREDLabor Inspection Enforcement and

administration of labor laws

Regionwide Number of establishments inspected

1,192 establishments inspected

various labor laws GAA 1 4,381,000.00 3,806,000.00 4,034,000.00 5,072,000.00 5,224,160.00 5,380,884.80 27,898,044.80

Workers' Organization & Tripartism & Empowerment Programs

dispute prevention Regionwide WODP: workers served 65 workers served various labor laws GAA 1 954,000.00 966,000.00 966,000.00 1,104,000.00 1,126,080.00 1,148,601.60 6,264,681.60

Settlement & disposition of labor disputes through collective bargaining

dispute prevention Regionwide SENA: settlement rate 77% settlement rate various labor laws GAA 1 543,000.00 549,000.00 512,000.00 629,000.00 647,870.00 667,306.10 3,548,176.10

Subtotal for Outcome 2 5,878,000.00 5,321,000.00 5,512,000.00 6,805,000.00 6,998,110.00 7,196,792.50 37,710,902.50

Outcome 3: SOCIAL PROTECTION FOR VULNERABLE WORKERS STRENGTHENEDDOLE Integrated Livelihood & Emergency Employment Program (DILEEP)

job generation, income augmentation, & poverty reduction

Regionwide DILEEP: no. of beneficiaries 1,486 beneficiaries assisted thru livelihood

D.O. 173-17 GAA 1 63,905,000.00 62,184,000.00 31,133,000.00 95,101,000.00 97,184,000.00 98,227,680.00 447,734,680.00 with Project HOPE proposed budget 2020-2022

Workers Amelioration & Welfare Services

social protection Regionwide LLCS: no. of establishments 5,000 workers served various labor laws GAA 1 511,000.00 513,000.00 448,000.00 592,000.00 609,760.00 628,052.80 3,301,812.80

Subtotal for Outcome 3 64,416,000.00 62,697,000.00 31,581,000.00 95,693,000.00 97,793,760.00 98,855,732.80 451,036,492.80 -

CAPITAL OUTLAY 7,548,000.00 7,548,000.00 RDC endorsed - -

GRAND TOTAL (Outcome 1 + Outcome 2+Outcome 3) 118,815,000.00 116,578,000.00 70,726,000.00 163,183,000.00 158,998,370.00 161,350,118.10 789,650,488.10

Mode of Funding

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (in exact amount PhP)

LGU Proponent RemarksBasis for

ImplementationChapter Outcome/ Project

TitleProject Description/

Objectives

Specific Location

(Province/ City / Municipality /

Barangay)

RDP Results Matrices Indicators Addressed Expected Output

Chapter 11-2-DOLE IXPage 1 of 1

Page 137: Table of Contents (By Chapter)

Updated Zamboanga Peninsula Regional Development Investment Program (RDIP), 2017-2022

Agency: National Housing AuthorityChapter: 12

2017(Actual)

2018(Actual)

2019(Actual)

2020(Proposed)

2021(Proposed)

2022(Proposed) Total

(1) (3) (5) (9) (10) (11) (12) (13) (14) (15) (16)

2017

Sirawai Kalibugan IP Housing 10,000,000.00 10,000,000.00

Baliguian Kalibugan IP Housing 10,000,000.00 10,000,000.00

Ipil IP Housing 9,976,535.00 9,976,535.00

Naga Subanen Housing 10,000,000.00 10,000,000.00

R. T. Lim Subanen Housing

10,000,000.00 10,000,000.00

2018

24,000,000.00 24,000,000.00 Basilan

RESETTLEMENT ASSISTANCE TO LGUS

Al Hidaya Subdivision Phase 2Brgy. Menzi, Isabela City, Basilan Developed lots

Brgy. Pigsalabukan, Roseller Lim, Zamboanga Sibugay

100 House on Stilts and foot bridges

Brgy. Piacan, Sirawai, Zamboanga del Norte

100 House on Stilts with foot bridges

Sirawai, Zamboanga del Norte

Roseller Lim, Zamboanga Sibugay

Brgy.Baluno, Naga, Zamboanga Sibugay

100 House on Stilts and foot bridges

Naga, Zamboanga Sibugay

Brgy. Bacalan, Ipil, Zamboanga Sibugay

100 House on Stilts and foot bridges

Ipil, Zamboanga Sibugay

9,359,999.96 9,359,999.96 Kumalarang, Zamboanga del Sur

Brgy. Poblacion, Baliguian, Zamboanga del Norte

100 House on Stilts and foot bridges

Baliguian, Zamboanga del Norte

Al Hidaya Subdivision Phase 2 Brgy. Menzi, Isabela City, Basilan

Developed lots

INDIGENOUS PEOPLE HOUSING ASSISTANCE

Yllana Bay Village Brgy. Panduman, Tukuran, Zamboanga del Sur

Developed lots

Kumalarang Resettlement Project Brgy. Poblacion, Kumalarang, Zamboanga del Sur

Developed lots

24,000,000.00 Basilan 24,000,000.00

Ipil, Zamboanga Sibugay 11,436,222.98

11,359,994.48 Tukuran, Zamboanga del Sur

11,359,994.48

RESETTLEMENT ASSISTANCE TO LGUS

LGU Ipil Housing Subdivision Brgy. Veterans Village, Ipil, Zamboanga Sibugay

Developed lots

Investment Requirements (in exact amount PhP)

11,436,222.98

LGU Proponent

Outcome 1: Adequate housing for low-income families provided

Chapter Outcome/ Project Title Specific Location (Province/ City / Municipality / Barangay) Expected Output

Chapter 12-1-NHA IXPage 1 of 6

Page 138: Table of Contents (By Chapter)

Updated Zamboanga Peninsula Regional Development Investment Program (RDIP), 2017-2022

Agency: National Housing AuthorityChapter: 12

2017(Actual)

2018(Actual)

2019(Actual)

2020(Proposed)

2021(Proposed)

2022(Proposed) Total

Investment Requirements (in exact amount PhP)

LGU ProponentChapter Outcome/ Project Title Specific Location (Province/ City / Municipality / Barangay) Expected Output

10,000,000.00 10,000,000.00

9,976,535.00 9,976,535.00

10,000,000.00 10,000,000.00

10,000,000.00 10,000,000.00 AFP/PNP HOUSING

878,750,000.00

2019

-

-

Al Hidaya Subdivision Phase 2 23,985,310.21 23,985,310.21 Basilan

Kumalarang Resettlement Project 9,359,999.96 9,359,999.96

AFP/PNP HOUSING -

Cabaluay Place Brgy. Cabaluay, Zamboanga City 1,502,061,000.00 1,502,061,000.00

-

Labuan Sea Breeze Subdivision Ph 1 Brgy. Labuan, Zamboanga City 84,499,014.74 84,499,014.74 Zamboanga City

Kumalarang, Zamboanga del Sur

Developed lots with housing units

HOUSING PROGRAM FOR CALAMITY VICTIMS

Developed lots with housing units

RESETTLEMENT ASSISTANCE TO LGUS

Brgy. Menzi, Isabela City, Basilan Developed lots

Brgy. Poblacion, Kumalarang, Zamboanga del Sur

Developed lots

Cabaluay PlaceBrgy. Cabaluay, Zamboanga City

Developed lots with housing units 878,750,000.00

R.T. Lim Kalibugan Tribe IP Housing ProjectBrgy. Pres. Roxas, R.T. Lim, Zamboanga Sibugay House on Stilts and foot bridges R.T. Lim, Zamboanga

Sibugay

Naga Samal IP Housing Project Brgy.Baluno, Naga, Zamboanga Sibugay House on Stilts and foot bridges

Naga, Zamboanga Sibugay

Sirawai, Zamboanga del Norte

Ipil IP Housing Brgy. Buluan, Ipil, Zamboanga Sibugay House on Stilts and foot bridges Ipil, Zamboanga Sibugay

Sirawai Kalibugan IP Housing Brgy. Piacan, Sirawai, Zamboanga del Norte House on Stilts and foot bridges

INDIGENOUS PEOPLE HOUSING ASSISTANCE

9,359,999.96 Kumalarang Resettlement Project Brgy. Poblacion, Kumalarang, Zamboanga del Sur

Developed lots 9,359,999.96 Kumalarang, Zamboanga del Sur

Chapter 12-1-NHA IXPage 2 of 6

Page 139: Table of Contents (By Chapter)

Updated Zamboanga Peninsula Regional Development Investment Program (RDIP), 2017-2022

Agency: National Housing AuthorityChapter: 12

2017(Actual)

2018(Actual)

2019(Actual)

2020(Proposed)

2021(Proposed)

2022(Proposed) Total

Investment Requirements (in exact amount PhP)

LGU ProponentChapter Outcome/ Project Title Specific Location (Province/ City / Municipality / Barangay) Expected Output

2020

-

Liloy Central Village 25,000,000.00 25,000,000.00

San Jose Resettlement 25,000,000.00 25,000,000.00

Roxas Ville 25,000,000.00 25,000,000.00

Villa Alto Resettlement Ph 2 25,000,000.00 25,000,000.00

Kolibugan Norte Village IP Housing Proj. 20,000,000.00 20,000,000.00

Newland IP Housing Project 20,000,000.00 20,000,000.00

Sunop IP Housing Project 20,000,000.00 20,000,000.00

Dilud IP Housing Project 20,000,000.00 20,000,000.00

Canibongan IP Housing Project 20,000,000.00 20,000,000.00

Saad IP Housing Project 20,000,000.00 20,000,000.00

Labangon IP Housing Project 20,000,000.00 20,000,000.00

Katipunan IP Housing 20,000,000.00 20,000,000.00

Kaangayan IP Housing Project 20,000,000.00 20,000,000.00 Brgy. Kaangayan, Mahayag, Zamboanga del Sur

Developed lot with housing units Mahayag, Zamboanga

del Sur

Brgy. Labangon, Dumingag, Zamboanga del Sur

Developed lot with housing units Dumingag, Zamboanga

del Sur

Katipunan, Zamboanga del Norte

Developed lot with housing units Katipunan, Zamboanga

del Norte

Brgy. Canibongan, Dumingag, Zamboanga del Sur

Developed lot with housing units Dumingag, Zamboanga

del Sur

Brgy. Saad, Dumingag, Zamboanga del Sur

Developed lot with housing units Dumingag, Zamboanga

del Sur

Brgy. Sunop, Dumingag, Zamboanga del Sur

Developed lot with housing units Dumingag, Zamboanga

del Sur

Brgy. Dilud, Dumingag, Zamboanga del Sur

Developed lot with housing units Dumingag, Zamboanga

del Sur

Sibuco, Zamboanga del Norte

Developed lot with housing units Sibuco, Zamboanga del

Norte

Brgy. Newland, Mutia, Zamboanga del Norte

Developed lot with housing units Mutia, Zamboanga del

Norte

Brgy. East Poblacion,Manukan, Zamboanga del Norte

Developed lots Manukan, Zamboanga del Norte

INDIGENOUS PEOPLE HOUSING ASSISTANCE

Brgy. San Jose, Imelda, Zamboanga Sibugay

Developed lots Imelda, Zamboanga Sibugay

Brgy. Lower Irasan, Roxas, Zamboanga del Norte

Developed lots Roxas, Zamboanga del Norte

RESETTLEMENT ASSISTANCE TO LGUS

Brgy. Baybay, Liloy, Zamboanga del Norte

Developed lotsLiloy, Zamboanga del Norte

Chapter 12-1-NHA IXPage 3 of 6

Page 140: Table of Contents (By Chapter)

Updated Zamboanga Peninsula Regional Development Investment Program (RDIP), 2017-2022

Agency: National Housing AuthorityChapter: 12

2017(Actual)

2018(Actual)

2019(Actual)

2020(Proposed)

2021(Proposed)

2022(Proposed) Total

Investment Requirements (in exact amount PhP)

LGU ProponentChapter Outcome/ Project Title Specific Location (Province/ City / Municipality / Barangay) Expected Output

Margosatubig IP Housing Project 20,000,000.00 20,000,000.00

Dalangin IP Housing 20,000,000.00 20,000,000.00

Labuan Sea Breeze Subdivision Ph 2 Brgy. Labuan, Zamboanga City 150,000,000.00 150,000,000.00 Zamboanga City

2021

Rizal Resettlement Ph 2 25,000,000.00 25,000,000.00

Yllana Bay Village Ph 2 25,000,000.00 25,000,000.00

Dipolog Resetllement Project 50,000,000.00 50,000,000.00

Siayan Resettlement Poject 25,000,000.00 25,000,000.00

Olutangga IP Housing Project 20,000,000.00 20,000,000.00

Dilud IP Housing Project 20,000,000.00 20,000,000.00

Labangon IP Housing Project 20,000,000.00 20,000,000.00

Brgy. Dilud, Dumingag, Zamboanga del Sur

Developed lot with housing units Dumingag, Zamboanga

del Sur

Brgy. Labangon, Dumingag, Zamboanga del Sur

Developed lot with housing units Dumingag, Zamboanga

del Sur

INDIGENOUS PEOPLE HOUSING ASSISTANCE

Brgy. Looc-Sapi, Olutangga, Zamboanga Sibugay

Developed lot with housing units Olutangga, Zamboanga

Sibugay

Brgy. Gulayon, Dipolog, Zamboanga del Norte

Developed lots Dipolog, Zamboanga del Norte

Brgy. Muñoz, Siayan, Zamboanga del Norte

Developed lots Siayan, Zamboanga del Norte

Rizal, Zamboanga del Norte

Brgy. Panduman, Tukuran, Zamboanga del Sur

Developed lots Tukuran, Zamboanga del Sur

Developed lots with housing units

RESETTLEMENT ASSISTANCE TO LGUS

Brgy. South Mapang, Rizal, Zamboanga del Norte

Developed lots

Brgy. Dalangin, Titay, Zambaonga Sibugay

Developed lot with housing units Titay, Zamboanga

Sibugay

HOUSING PROGRAM FOR CALAMITY VICTIMS

Brgy. Samboang, Margosatubig, Zamboanga del Sur

Developed lot with housing units Margosatubig,

Zamboanga del Sur

Chapter 12-1-NHA IXPage 4 of 6

Page 141: Table of Contents (By Chapter)

Updated Zamboanga Peninsula Regional Development Investment Program (RDIP), 2017-2022

Agency: National Housing AuthorityChapter: 12

2017(Actual)

2018(Actual)

2019(Actual)

2020(Proposed)

2021(Proposed)

2022(Proposed) Total

Investment Requirements (in exact amount PhP)

LGU ProponentChapter Outcome/ Project Title Specific Location (Province/ City / Municipality / Barangay) Expected Output

Bayog IP Housing Project 20,000,000.00 20,000,000.00

Lizon Valley IP Housing Project 20,000,000.00 20,000,000.00

Subanen Village 20,000,000.00 20,000,000.00

Midsalip IP Housing Project 20,000,000.00 20,000,000.00

Kumalarang IP Housing Project 20,000,000.00 20,000,000.00

Labangan IP Housing Project Labangan, Zamboanga del Sur 20,000,000.00 20,000,000.00

2022

Pagadian Resttlement Project 50,000,000.00 50,000,000.00

25,000,000.00 25,000,000.00

Aurora Resettlement Project Ph 2 25,000,000.00 25,000,000.00

Midsalip Resetllement Project Midsalip, Zamboanga del Sur 25,000,000.00 25,000,000.00

San Pablo Resetllement Housing Project San Pablo, Zamboanga del Sur 25,000,000.00 25,000,000.00

Pitogo Resettlement Housing Project Pitogo, Zamboanga del Sur 25,000,000.00 25,000,000.00

20,000,000.00 20,000,000.00

20,000,000.00 20,000,000.00

Josefina, Zamboanga del Norte

Pres. Roxas IP Housing Project Pob. Gubat, Pres. Roxas, Zamboanga del Norte

Developed lot with housing units Pres. Roxas, Zamboanga

del Norte

INDIGENOUS PEOPLE HOUSING ASSISTANCE

Josefina IP Housing Josefina, Zamboanga del Sur Developed lot with housing units

Developed lots San Pablo, Zamboanga del Sur

Developed lotsPitogo, Zamboanga del Sur

Brgy. Alang-alang, Aurora, Zamboanga del Sur

Developed lotsAurora, Zamboanga del Sur

Developed lots Midsalip, Zamboanga del Sur

Jose Dalman Housing Resttlement Project Brgy.Poblacion, Jose Dalman, Zamboanga del Norte

Developed lots Jose Dalman, Zamboanga del Norte

RESETTLEMENT ASSISTANCE TO LGUS

Pagadian City, Zamboanga del Sur

Developed lots Pagadian City, Zamboanga del Sur

Kumalarang, Zamboanga del Sur

Developed lot with housing units Kumalarang, Zamboanga

del Sur

Developed lot with housing units Labangan, Zamboanga

del Sur

Brgy. Poblacion, Katipunan, Zamboanga del Norte

Developed lot with housing units Katipunan, Zamboanga

del Norte

Brgy. Poblacion, Midsalip, Zamboanga del Sur

Developed lot with housing units Midsalip, Zamboanga del

Sur

Brgy. Poblacion, Bayog, Zamboanga del Sur

Developed lot with housing units

Bayog, Zamboanga del Sur

Brgy. Lizon Valley, Pagadian City, Zamboanga del Sur

Developed lot with housing units Pagadian City,

Zamboanga del Sur

Chapter 12-1-NHA IXPage 5 of 6

Page 142: Table of Contents (By Chapter)

Updated Zamboanga Peninsula Regional Development Investment Program (RDIP), 2017-2022

Agency: National Housing AuthorityChapter: 12

2017(Actual)

2018(Actual)

2019(Actual)

2020(Proposed)

2021(Proposed)

2022(Proposed) Total

Investment Requirements (in exact amount PhP)

LGU ProponentChapter Outcome/ Project Title Specific Location (Province/ City / Municipality / Barangay) Expected Output

20,000,000.00 20,000,000.00

20,000,000.00 20,000,000.00

20,000,000.00 20,000,000.00

20,000,000.00 20,000,000.00

GRAND TOTAL 106,132,752.42 952,086,534.96 1,619,905,324.91 470,000,000.00 305,000,000.00 295,000,000.00 3,748,124,612.29

Lapuyan IP Housing Project Lapuyan, Zamboanga del Sur Developed lot with housing units Lapuyan, Zamboanga del

Sur

Dimataling IP Housing Project Dimataling, Zamboanga del Sur Developed lot with housing units Dimataling, Zamboanga

del Sur

Sergio Osmeña IP Housing Sergio Osmeña, Zamboanga del Norte

Developed lot with housing units Sergio Osmeña,

Zamboanga del Norte

Dinas IP Housing Project Dinas, Zamboanga del Sur Developed lot with housing units

Dinas, Zamboanga del Sur

Chapter 12-1-NHA IXPage 6 of 6

Page 143: Table of Contents (By Chapter)

Updated Zamboanga Peninsula Regional Development Investment Program (RDIP), 2017-2022

Agency: Department of Science and Technology IXChapter: 14, Vigorously Advancing Science, Technology, and Innovation

2017(Actual)

2018(Actual)

2019(Approved)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

(1) (2) (3) (4) (5) (9) (10) (11) (12) (13) (14) (15)Outcome 1:

Zamboanga CityDistrict 1

8,506,300 7,868,988 27,000,000 10,450,000 11,495,000 65,320,288 Zamboanga CityDistrict 2

258,848 3,358,095 27,000,000 47,950,000 52,745,000 131,311,943 Isabela CityLone District

- - 7,117,000 8,529,000 9,381,900 25,027,900 Zamboanga del NorteDistrict 1

- 3,681,139 34,600,000 24,500,000 26,950,000 89,731,139 Zamboanga del NorteDistrict 2

8,618,517 4,641,200 51,080,000 26,600,000 29,260,000 120,199,717 Zamboanga del NorteDistrict 3 4,957,736 8,435,000 38,720,000 21,500,000 23,650,000 97,262,736 Zamboanga del norte wide

768,797 - - - - -

Investment Requirements (in exact amount PhP)

Technology Transfer and Commercialization and S&T Services

Provision of technology upgrading services at the industry and firm levels through innovation support; Implementation of projects that strengthen the participation of various S&T sectors particularly in R&D, community empowerment, HRD, S&T Information dissemination, and linkages designed to contribute to the productivity improvement and quality of life of Filipinos; Provision of testing and calibration services; and Promotion of S&T in the countryside.

Technology Transfer:- No. of Customers assisted- No. of technology interventions provided- No. of jobs created- % per client who rate the assistance as satisfactory or better- % of request for assistance that are acted upon within the standard time- No. of innovation centers established/maintained

Other S&T Services:- No. of firms benefitting from technical and

Technology Transfer:- No. of Customers assisted: 5,561- No. of technology interventions provided: 4,671- No. of jobs created:7,141- % per client who rate the assistance as satisfactory or better: 97%- % of request for assistance that are acted upon within the standard time:100%- No. of innovation centers established/maintained: 5

Other S&T Services:- No. of firms benefitting from technical and consultancy services

Chapter Outcome/ Project Title

Project Description/ Objectives

Specific Location

(Province/ City / Municipality /

Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Chapter 14-1-DOST IXPage 1 of 2

Page 144: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Approved)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Investment Requirements (in exact amount PhP)

Chapter Outcome/ Project Title

Project Description/ Objectives

Specific Location

(Province/ City / Municipality /

Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Zamboanga del SurDistrict 1

14,357,623 20,311,199 48,500,000 42,200,000 46,420,000 171,788,822 Zamboanga del SurDistrict 2

2,098,961 6,990,000 48,500,000 58,700,000 64,570,000 180,858,961 Zamboanga SibugayDistrict 1

3,300,000 7,306,250 32,312,000 35,400,000 38,940,000 117,258,250 Zamboanga SibugayDistrict 2

10,367,478 12,060,100 39,788,000 22,150,000 24,365,000 108,730,578 Regionwide

7,800,692 19,521,029 10,000,000 11,000,000 48,321,722 GRAND TOTAL 61,034,952 94,173,000 95,903,000 354,617,000 307,979,000 338,776,900 1,252,483,852

technical and consultancy services provided- % of client who rate the technical services as satisfatory or better- % of request for assistance that are acted upon within the ISO

consultancy services provided: 383- % of client who rate the technical services as satisfatory or better:100%- % of request for assistance that are acted upon within the ISO:100%

Chapter 14-1-DOST IXPage 2 of 2

Page 145: Table of Contents (By Chapter)

UPDATED ZAMBOANGA PENINSULA REGIONAL DEVELOPMENT INVESTMENT PROGRAM (RDIP) 2017-2022

Agency: Philippine National Police Regional Office IXChapter 18: Ensuring Security, Public Order and Safety

(-1-) (2) (-3-) (-4-) (-5-) (-6-) (-7-) (-9-) (-10-) (-11-) (-12-) (-13-)PROGRAM 1 - General Administration and Support

A. Personnel and Records ManagementA.1 Personnel ManagementA.1.a. Recruitment and Selection

PAPS 1 1) Conduct of Information Campaign Region IX

No. of information campaign activities conducted

Security & Public Order Improve

PNP-MTDP MOOE 775.81 834.20 916.71 1,018.56 1,157.46

2) Appointment of Patrolman/Patrolwoman - - - - -

PAPS 2 a) Regular Region IX No. of applicant processed

Security & Public Order Improve

PNP-MTDP MOOE 173,671.14 186,743.16 205,212.26 228,013.62 259,106.39

PAPS 3 b) Attrition Region IX No. of applicant processed

Security & Public Order Improve

PNP-MTDP MOOE 113,189.00 121,708.60 133,745.71 148,606.35 168,870.85

PAPS 4 3) Appointment of Non-Uniformed Personnel

No. of appointed NUP (SG17 and below)

Security & Public Order Improve

PNP-MTDP MOOE 28,479.89 30,623.54 33,652.24 37,391.38 42,490.20

A. 1.b. Placement and Promotion - - - - - 1) 3rd Level - - - - -

PAPS 5a) Assesment and Placement of Applicants to third Level Positions

Region IXNo. of applicants/candidates processed

Security & Public Order Improve

PNP-MTDP MOOE 4,413.12 4,745.29 5,214.61 5,794.01 6,584.10

PAPS 6 b) Promotion of 3rd Level Region IX No. of Oath Taking ceremonies Conducted

Security & Public Order Improve

PNP-MTDP MOOE 4,040.72 4,344.86 4,774.57 5,305.08 6,028.50

PAPS 7 c) Turn-over/ Assumption Activities Region IX No. of Activities

conducted

Security & Public Order Improve

PNP-MTDP MOOE 12,611.52 13,560.78 14,901.96 16,557.73 18,815.60

PAPS 8 d) Retirement Honors Region IX

No. of Retirees

Security & Public Order Improve

PNP-MTDP MOOE 670,805.82 721,296.58 792,633.60 880,704.00 1,000,800.00

2) 2nd Level - - - - -

PAPS 9 a) Placement of 2nd Level Region IX No. of Placement request processed

Security & Public Order Improve

PNP-MTDP MOOE 37,960.85 40,818.12 44,855.08 49,838.98 56,635.20

b) Promotion 2nd Level - - - - - -

4,066,239.99

-

230,108.23

26,751.13

24,493.73

76,447.59

172,637.24

- -

-

1,052,746.57

686,120.51

4,702.75

(-14-) (-15-)

Investment Requirements (In exact amount PhP)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (Proposed) 2021 (Proposed) 2022 (Proposed) Total

Chapter Outcome/Projec

t Title

Project Description/Objecti

ves

Specific Location

(Province/City/Municipality/Barangay

)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

Chapter 18 - PNP IXPage 1 of 54

Page 146: Table of Contents (By Chapter)

(-14-) (-15-)

Investment Requirements (In exact amount PhP)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (Proposed) 2021 (Proposed) 2022 (Proposed) Total

Chapter Outcome/Projec

t Title

Project Description/Objecti

ves

Specific Location

(Province/City/Municipality/Barangay

)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

PAPS 10 i. PCpl to PMAJ Region IX No. of Applicants Processed

Security & Public Order Improve

PNP-MTDP MOOE 155,844.38 167,574.61 184,147.92 204,608.80 232,510.00

PAPS 11 ii. PLTCOL Continous Promotion Region IX No. of Applicants

Processed

Security & Public Order Improve

PNP-MTDP MOOE 13,026.42 14,006.90 15,392.20 17,102.45 19,434.60

PAPS 12 c) Processing of Attestation (PNCOs) Region IX No. of Attestation

processed

Security & Public Order Improve

PNP-MTDP MOOE 150,100.94 161,398.86 177,361.38 197,068.20 223,941.14

PAPS 133) Accounting and Monitoring of Personnel assigned at RPHAU

Region IX No. of accounting activities conducted

Security & Public Order Improve

PNP-MTDP MOOE 45,409.13 48,827.02 53,656.07 59,617.85 67,747.56

4) Placement and Promotion of NUP - - - - -

PAPS 14 a) Placement Region IX No. of Reassignment request process

Security & Public Order Improve

PNP-MTDP MOOE 576.10 619.46 680.72 756.36 859.50

PAPS 15 b) Promotion Region IX No. of NUP promotion processed

Security & Public Order Improve

PNP-MTDP MOOE 28,479.89 30,623.54 33,652.24 37,391.38 42,490.20

A. 1.c. Disciplinary and Non-Disciplinary System - - - - -

PAPS 161) Stringent Implementation of Internal Cleansing Strategy

Region IXNo. of conferences/ monitoring activities conducted

Security & Public Order Improve

PNP-MTDP MOOE 13,447.48 14,459.66 15,889.74 17,655.26 20,062.80

PAPS 17 2) Revitalized Internal Cleansing Region IX No. of meeting conducted

Security & Public Order Improve

PNP-MTDP MOOE 26,178.92 28,149.38 30,933.38 34,370.42 39,057.30

PAPS 18 3) Resolution of Admin Cases Region IX

No. of resolved admin cases

Security & Public Order Improve

PNP-MTDP MOOE 130,862.23 140,712.08 154,628.65 171,809.62 195,238.20

PAPS 19 4) Implementation of Atttrition System Region IX

No. of candidates for attrition assessed and evaluated

Security & Public Order Improve

PNP-MTDP MOOE 9,307.56 10,008.13 10,997.95 12,219.94 13,886.30

A.2. Records Management - - - - - A.2.a. Personnel Records - - - - - 1) Implementation of records management System - - - - -

PAPS 20 a. Creation of new PPF Region IX No. of PPF created (New)

Security & Public Order Improve

PNP-MTDP MOOE 7,681.29 8,259.45 9,076.32 10,084.80 11,460.00

PAPS 21 b. Updating of personnel data of PAIS Region IX No. of personnel accounts

updated

Security & Public Order Improve

PNP-MTDP MOOE 119,167.53 128,137.13 140,810.03 156,455.59 177,790.44

-

46,561.86

722,360.71

56,419.89

- -

81,514.95

158,689.40

793,250.78

3,492.14

172,637.24

-

909,870.52

275,257.63

-

944,685.71

78,962.58

Chapter 18 - PNP IXPage 2 of 54

Page 147: Table of Contents (By Chapter)

(-14-) (-15-)

Investment Requirements (In exact amount PhP)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (Proposed) 2021 (Proposed) 2022 (Proposed) Total

Chapter Outcome/Projec

t Title

Project Description/Objecti

ves

Specific Location

(Province/City/Municipality/Barangay

)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

PAPS 22 c. Submission of SALN Region IX

No. of Review and Compliance Committee (RCC) meetings conducted

Security & Public Order Improve

PNP-MTDP MOOE 8,181.50 8,797.31 9,667.37 10,741.53 12,206.28

PAPS 23 d. Issuance of Personnel Records or Certificates Region IX No. of Personnel

documents/records issued

Security & Public Order Improve

PNP-MTDP MOOE 119,167.53 128,137.13 140,810.03 156,455.59 177,790.44

PAPS 24 e. Processing of ID Region IX No. of ID request processed

Security & Public Order Improve

PNP-MTDP MOOE 23,908.01 25,707.54 28,250.05 31,388.94 35,669.25

PAPS 25 f. Issuance of Orders Region IX No. of orders issuedSecurity & Public Order Improve

PNP-MTDP MOOE 55,820.05 60,021.56 65,957.76 73,286.40 83,280.00

A.3. Capability of Enhancement Program - - - - - A.3.a. Performance Evaluation - - - - -

PAPS 26 1) Online Recruitment Sytem of Pat and NUP Region IX No. of online applicants

assessed

Security & Public Order Improve

PNP-MTDP MOOE 2,060.27 2,215.35 2,434.45 2,704.94 3,073.80

2) Cascading amd Implementation of Enhanced Personnel Policies (MSPP, SPMS, OAS, Decentralization)

No. of cascading activities conducted - - - - -

3) Personnel Services Survey No. of survey conducted - - - - -

PAPS 27 4) Command Activities Region IX

No. of Participants

Security & Public Order Improve

PNP-MTDP MOOE 154,757.74 166,406.18 182,863.93 203,182.14 230,888.80

B. Administration Personnel Benefits - - - - -

b.1. Administration of Morale and Welfare Benefits - - - - -

PAPS 28 a. Claims and Benefits of Active Personnel Region IX

No. of salary and pay allowances, collateral allowances, and back wages processed

Security & Public Order Improve

PNP-MTDP MOOE 599,678.39 644,815.47 708,588.43 787,320.48 894,682.36

PAPS 29 b. Special Promotion Region IXNo. of personnel recommended/ processed for special promotion

Security & Public Order Improve

PNP-MTDP MOOE 1,460.52 1,570.45 1,725.77 1,917.52 2,179.00

PAPS 30 c. Awards and Recognition Region IX No. of awards issuedSecurity & Public Order Improve

PNP-MTDP MOOE 85,902.68 92,368.47 101,503.81 112,782.01 128,161.38

PAPS 31d. Educational Assistance/Scholarship Program

Region IX

No. of educational assistance/ scholarship processed for PNP dependents

Security & Public Order Improve

PNP-MTDP MOOE 7,053.25 7,584.14 8,334.22 9,260.24 10,523.00 42,754.84

3,635,085.12

8,853.25

520,718.35

938,098.79

-

-

12,488.82

-

-

338,365.77

-

-

49,593.99

722,360.71

144,923.79

Chapter 18 - PNP IXPage 3 of 54

Page 148: Table of Contents (By Chapter)

(-14-) (-15-)

Investment Requirements (In exact amount PhP)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (Proposed) 2021 (Proposed) 2022 (Proposed) Total

Chapter Outcome/Projec

t Title

Project Description/Objecti

ves

Specific Location

(Province/City/Municipality/Barangay

)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

PAPS 32 e. KIPO/WIPO Region IX No. of KIPO/WIPO benefits processed

Security & Public Order Improve

PNP-MTDP MOOE 73,741.72 79,292.17 87,134.26 96,815.84 110,018.00

- - - - HUMAN RESOURCE SERVICES - - - -

Administrative Management - - - - Sub-Activity - - - -

PAPS 33 PNP Basic Computer Essential Course (BCEC)

Region IX

No. of seminar conductedSecurity & Public Order Improve

PNP-MTDP MOOE 85,985.09 92,457.09 101,601.20 112,890.22 128,284.34

PAPS 34 Financial Accountability for Finance Officers

Region IX

No. of seminar conductedSecurity & Public Order Improve

PNP-MTDP MOOE 53,893.89 57,950.41 63,681.77 70,757.53 80,406.28

PAPS 35 Pre-Retirement Seminar for Retiring PNP Personnel

Region IX

No. of seminar conductedSecurity & Public Order Improve

PNP-MTDP MOOE 53,631.84 57,668.64 63,372.13 70,413.48 80,015.32

PAPS 36

PNP Code of ethics, code of Professional Conduct and Ethical Standards and other Moral enrichment Program Seminar Region IX

No. of seminar conductedSecurity & Public Order Improve

PNP-MTDP MOOE 43,339.83 46,601.97 51,210.96 56,901.06 64,660.30

PAPS 37 PAIS Refresher SEMINAR

Region IX

No. of seminar conductedSecurity & Public Order Improve

PNP-MTDP MOOE 117,429.21 126,267.97 138,756.01 154,173.34 175,196.98

PAPS 38 Basic Human Resource Management Seminar

Region IX

No. of seminar conductedSecurity & Public Order Improve

PNP-MTDP MOOE 147,657.44 158,771.44 174,474.12 193,860.13 220,295.60

PAPS 39 FTP Pre-OJT Orientation Seminar

Region IX

No. of seminar conductedSecurity & Public Order Improve

PNP-MTDP MOOE 113,759.67 122,322.23 134,420.03 149,355.59 169,722.26

PAPS 40 Records Management Seminar

Region IX

No. of seminar conductedSecurity & Public Order Improve

PNP-MTDP MOOE 157,628.40 169,492.90 186,255.94 206,951.04 235,171.64

PAPS 41 FORM POLICE

Region IX

No. of seminar conductedSecurity & Public Order Improve

PNP-MTDP MOOE 154,812.16 166,464.68 182,928.22 203,253.58 230,969.98

PAPS 42 Field Training Officers Course

Region IX

No. of training conductedSecurity & Public Order Improve

PNP-MTDP MOOE 714,677.51 768,470.44 844,473.01 938,303.34 1,066,253.80

PAPS 43 Values Development Program for NUP

Region IX

No. of seminar conductedSecurity & Public Order Improve

PNP-MTDP MOOE 31,222.24 33,572.31 36,892.64 40,991.83 46,581.62

4,332,178.10

189,260.64

689,579.78

955,499.93

938,428.63

262,714.13

711,823.51

895,058.73

521,217.94

326,689.88

325,101.41

-

- -

447,001.99

-

Chapter 18 - PNP IXPage 4 of 54

Page 149: Table of Contents (By Chapter)

(-14-) (-15-)

Investment Requirements (In exact amount PhP)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (Proposed) 2021 (Proposed) 2022 (Proposed) Total

Chapter Outcome/Projec

t Title

Project Description/Objecti

ves

Specific Location

(Province/City/Municipality/Barangay

)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

PAPS 44 Personnel Orientation Course for NUP

Region IX

No. of seminar conductedSecurity & Public Order Improve

PNP-MTDP MOOE 26,228.33 28,202.51 30,991.77 34,435.30 39,131.02

Operations Management - - - - - Sub-Activity - - - - -

PAPS 45 BISOC

Region IX

No. of training conductedSecurity & Public Order Improve

PNP-MTDP MOOE 8,511,672.28 9,152,335.78 10,057,511.85 11,175,013.17 12,698,878.60

PAPS 46Explosive Ordnance Reconnaissance Agent (EORA) Training Region IX

No. of training conductedSecurity & Public Order Improve

PNP-MTDP MOOE 628,485.76 675,791.14 742,627.62 825,141.80 937,661.14

PAPS 47Civil Disturbance Management (CDM) Refresher Course Region IX

No. of seminar conductedSecurity & Public Order Improve

PNP-MTDP MOOE 221,387.10 238,050.64 261,594.12 290,660.13 330,295.60

PAPS 48 PNP Special Weapons and Tactics Course (SWAT)

Region IX

No. of training conductedSecurity & Public Order Improve

PNP-MTDP MOOE 2,022,619.02 2,174,859.16 2,389,955.12 2,655,505.69 3,017,620.10

PAPS 49 Basic Information Collection and Analysis Seminar

Region IX

No. of seminar conductedSecurity & Public Order Improve

PNP-MTDP MOOE 122,798.18 132,041.05 145,100.05 161,222.28 183,207.14

PAPS 50 Combat Casualty Care Seminar

Region IX

No. of seminar conductedSecurity & Public Order Improve

PNP-MTDP MOOE 213,698.71 229,783.55 252,509.40 280,566.00 318,825.00

PAPS 51Crime Scene First Responders Seminar/Workshop Region IX

No. of seminar conductedSecurity & Public Order Improve

PNP-MTDP MOOE 182,932.43 196,701.53 216,155.53 240,172.81 272,923.65

PAPS 52 Patrol Officers Basic Course (POBC)

Region IX

No. of training conductedSecurity & Public Order Improve

PNP-MTDP MOOE 319,457.14 343,502.30 377,475.06 419,416.73 476,609.92

PAPS 53 Basic K9 Handling Course

Region IX

No. of training conductedSecurity & Public Order Improve

PNP-MTDP MOOE 4,298,191.27 4,621,711.05 5,078,803.35 5,643,114.83 6,412,630.49

PAPS 54 Hostage Negotiation Course

Region IX

No. of seminar conductedSecurity & Public Order Improve

PNP-MTDP MOOE 222,645.79 239,404.08 263,081.40 292,312.67 332,173.49

PAPS 55Managing Police and Patrol Operrations (EMPO) Training Region IX

No. of seminar conductedSecurity & Public Order Improve

PNP-MTDP MOOE 720,904.23 775,165.84 851,830.59 946,478.44 1,075,543.68

PAPS 56 Basic Operations Course for PNCO and NUP

Region IX

No. of seminar conductedSecurity & Public Order Improve

PNP-MTDP MOOE 257,032.16 276,378.66 303,712.82 337,458.69 383,475.78

4,369,922.79

1,558,058.11

1,936,461.15

26,054,450.99

1,349,617.44

744,368.70

1,295,382.66

1,108,885.95

3,809,707.46

1,341,987.59

12,260,559.08

- -

51,595,411.68

158,988.93

Chapter 18 - PNP IXPage 5 of 54

Page 150: Table of Contents (By Chapter)

(-14-) (-15-)

Investment Requirements (In exact amount PhP)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (Proposed) 2021 (Proposed) 2022 (Proposed) Total

Chapter Outcome/Projec

t Title

Project Description/Objecti

ves

Specific Location

(Province/City/Municipality/Barangay

)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

PAPS 57 Boat Handling and Seaborne Operations

Region IX

No. of seminar conductedSecurity & Public Order Improve

PNP-MTDP MOOE 201,961.21 217,162.59 238,640.21 265,155.79 301,313.40

PAPS 58 Beat Patrol Seminar

Region IX

No. of seminar conductedSecurity & Public Order Improve

PNP-MTDP MOOE 60,659.77 65,225.56 71,676.44 79,640.49 90,500.56

Investigation Management - - - - - Sub-Activity - - - - -

PAPS 59 Automated Fingerprint Identification Seminar Region IX

No. of seminar conductedSecurity & Public Order Improve

PNP-MTDP MOOE 120,174.80 129,220.22 142,000.24 157,778.04 179,293.23

PAPS 60 Criminal Investigation Course (CIC)

Region IX

No. of training conductedSecurity & Public Order Improve

PNP-MTDP MOOE 1,568,733.42 1,686,810.13 1,853,637.51 2,059,597.23 2,340,451.40

PAPS 61 Identification and Seizure of Digital Evidence

Region IX

No. of training conductedSecurity & Public Order Improve

PNP-MTDP MOOE 333,421.18 358,517.39 393,975.16 437,750.17 497,443.38

PAPS 62 Investigation Officer Basic Course (IOBC)

Region IX

No. of training conductedSecurity & Public Order Improve

PNP-MTDP MOOE 957,442.17 1,029,507.71 1,131,327.16 1,257,030.17 1,428,443.38

PAPS 63 Pre-Charge Evaluation Seminar

Region IX

No. of seminar conductedSecurity & Public Order Improve

PNP-MTDP MOOE 78,195.09 84,080.74 92,396.41 102,662.68 116,662.14

PAPS 64

Revised Specialized Course on the Investigation of Crimes Involving Women and Children for PNP-WCPD Officers Region IX

No. of training conductedSecurity & Public Order Improve

PNP-MTDP MOOE 262,375.27 282,123.94 310,026.31 344,473.68 391,447.36

PAPS 65Summary Hearing Proceeding Seminar for Motu Propio Region IX

no of seminar conductedSecurity & Public Order Improve

PNP-MTDP MOOE 65,684.62 70,628.62 77,613.87 86,237.63 97,997.31

Logistics Management - - - - - Sub-Activity - - - - -

PAPS 66Supply Management Proper Care of Fas and Ammunition Seminar Workshop Region IX

No. of seminar conductedSecurity & Public Order Improve

PNP-MTDP MOOE 53,377.64 57,395.32 63,071.78 70,079.75 79,636.08

PAPS 67 Seminar on Relief from Property Accountability

Region IX

No. of seminar conductedSecurity & Public Order Improve

PNP-MTDP MOOE 53,696.17 57,737.82 63,448.15 70,497.94 80,111.30

PAPS 68Disposal of Beyond Economic Repair (BER) Equipment Seminar Region IX

No. of seminar conductedSecurity & Public Order Improve

PNP-MTDP MOOE 53,150.52 57,151.09 62,803.40 69,781.55 79,297.22

Police Community Relation Management (PCR) - - - - - Sub-Activity - - - - -

- -

323,560.56

325,491.38

322,183.78

398,162.05

- -

5,803,750.60

473,997.06

1,590,446.55

728,466.53

9,509,229.70

2,021,107.28

367,702.83

- -

1,224,233.21

Chapter 18 - PNP IXPage 6 of 54

Page 151: Table of Contents (By Chapter)

(-14-) (-15-)

Investment Requirements (In exact amount PhP)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (Proposed) 2021 (Proposed) 2022 (Proposed) Total

Chapter Outcome/Projec

t Title

Project Description/Objecti

ves

Specific Location

(Province/City/Municipality/Barangay

)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

PAPS 69Police Community Affairs Development Course (PCADC) Region IX

No. of training conductedSecurity & Public Order Improve

PNP-MTDP MOOE 996,232.98 1,071,218.26 1,177,162.92 1,307,958.80 1,486,316.82

PAPS 70 Seminar Workshop on Social Media Exploitation

Region IX

No. of seminar conductedSecurity & Public Order Improve

PNP-MTDP MOOE 313,654.72 337,263.14 370,618.84 411,798.71 467,953.08

PAPS 71Peace-Building and Countering Violent Extremism Forum Region IX

No. of seminar conductedSecurity & Public Order Improve

PNP-MTDP MOOE 16,938.54 18,213.49 20,014.82 22,238.69 25,271.24

PAPS 72Countering Violent Extremism Seminar Workshop Region IX

No. of seminar conductedSecurity & Public Order Improve

PNP-MTDP MOOE 53,819.04 57,869.94 63,593.34 70,659.27 80,294.62

PAPS 73Seminar Workshop on Clan War (Family Rido) Mediation for PNP Personnel Region IX

No. of seminar conductedSecurity & Public Order Improve

PNP-MTDP MOOE 26,006.13 27,963.58 30,729.20 34,143.56 38,799.50

PAPS 74

Seminar Workshop on Cyberspace Monitoring and Counter Terrorist Propaganda (in collaboration with ACG) Region IX

No. of seminar conductedSecurity & Public Order Improve

PNP-MTDP MOOE 24,490.38 26,333.74 28,938.18 32,153.53 36,538.10

PAPS 75Organizational and Training of Ulamas, Asatidz and Imams in Peacebuilding and Religious Rehabilatation Region IX

No. of seminar conductedSecurity & Public Order Improve

PNP-MTDP MOOE 33,097.62 35,588.84 39,108.61 43,454.01 49,379.56

PAPS 76GMEF and HGDG for GADFPS TWG and PROs/NSUs PCS Officers Seminar Region IX

No. of seminar conductedSecurity & Public Order Improve

PNP-MTDP MOOE 51,071.19 54,915.26 60,346.44 67,051.60 76,195.00

PAPS 77Media Monitoring and Issues and Analysis Seminar Workshop Region IX

No of seminar conductedSecurity & Public Order Improve

PNP-MTDP MOOE 25,802.03 27,744.12 30,488.04 33,875.60 38,495.00

PAPS 78 Social Media and Product Development Training

Region IX

No. of seminar conductedSecurity & Public Order Improve

PNP-MTDP MOOE 50,870.11 54,699.04 60,108.84 66,787.60 75,895.00

PAPS 79 Strategic Communication Seminar Workshop

Region IX

No. of seminar conductedSecurity & Public Order Improve

PNP-MTDP MOOE 51,138.22 54,987.33 60,425.64 67,139.60 76,295.00

PAPS 80Hosting and Events SpecializationSeminar Workshop Region IX

No. of seminar conductedSecurity & Public Order Improve

PNP-MTDP MOOE 51,943.88 55,853.64 61,377.62 68,197.36 77,497.00

PAPS 81Community Oriented Policing System Seminar(COPSS) Region IX

No. of training conductedSecurity & Public Order Improve

PNP-MTDP MOOE 216,002.49 232,260.74 255,231.58 283,590.65 322,262.10

PAPS 82 Quality Service Lane Seminar

Region IX

No. of seminar conductedSecurity & Public Order Improve

PNP-MTDP MOOE 26,080.53 28,043.58 30,817.12 34,241.24 38,910.50 158,092.96

309,985.79

314,869.51

1,309,347.56

309,579.49

156,404.78

308,360.60

157,641.96

148,453.92

200,628.64

1,901,288.50

102,676.79

326,236.21

6,038,889.78

Chapter 18 - PNP IXPage 7 of 54

Page 152: Table of Contents (By Chapter)

(-14-) (-15-)

Investment Requirements (In exact amount PhP)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (Proposed) 2021 (Proposed) 2022 (Proposed) Total

Chapter Outcome/Projec

t Title

Project Description/Objecti

ves

Specific Location

(Province/City/Municipality/Barangay

)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

PAPS 83Anti-Violent Extremism and Counter Radicalization Seminar Region IX

No. of seminar conductedSecurity & Public Order Improve

PNP-MTDP MOOE 105,140.75 113,054.58 124,235.80 138,039.77 156,863.38

PAPS 84 Barangay Peacekeeping Action Team (BPAT)

Region IX

No. of seminar conductedSecurity & Public Order Improve

PNP-MTDP MOOE 116,713.78 125,498.69 137,910.64 153,234.05 174,129.60

Mandatory Schooling (Career Courses) - - - - - Sub-Activity - - - - -

PAPS 84 a. 55. 1. PSOSEC

Region IX

No. of schoolingSecurity & Public Order Improve

PNP-MTDP MOOE 11,702.92 12,583.79 13,828.34 15,364.82 17,460.02

PAPS 85 b. 55. 2. PSOAC

Region IX

No. of SchoolingSecurity & Public Order Improve

PNP-MTDP MOOE 8,473.47 9,111.26 10,012.37 11,124.85 12,641.88

PAPS 86 c. 55. 3. PSOBC

Region IX

No. of SchoolingSecurity & Public Order Improve

PNP-MTDP MOOE 8,601.82 9,249.27 10,164.03 11,293.37 12,833.37

PAPS 87 d. 55. 4. PSOCC

Region IX

No. of SchoolingSecurity & Public Order Improve

PNP-MTDP MOOE 14,825.32 15,941.21 17,517.81 19,464.24 22,118.45

PAPS 88 e. 55. 5. PSSLC

Region IX

No. of SchoolingSecurity & Public Order Improve

PNP-MTDP MOOE 2,946.05 3,167.80 3,481.09 3,867.88 4,395.32

PAPS 89 f. 55. 6. PSJLC

Region IX

No. of SchoolingSecurity & Public Order Improve

PNP-MTDP MOOE 2,771.67 2,980.29 3,275.05 3,638.94 4,135.16

PAPS 90 g. 59. 7. PSBRC

Region IX

No. of SchoolingSecurity & Public Order Improve

PNP-MTDP MOOE 8,018.45 8,621.99 9,474.71 10,527.46 11,963.02

PAPS 91PNP Standard Handgun Marksmanship Training Phase 1-HFPT Region IX

No. of seminar conductedSecurity & Public Order Improve

PNP-MTDP MOOE 500,394.13 538,058.20 591,272.75 656,969.72 746,556.50

PAPS 92PNP Standard Handgun Marksmanship Training Phase 2-HQMT Region IX

No. of seminar conductedSecurity & Public Order Improve

PNP-MTDP MOOE 575,129.19 618,418.48 679,580.75 755,089.72 858,056.50

PAPS 93PNP Standard Handgun Marksmanship Training Phase 3-HCMT Region IX

No. of seminar conductedSecurity & Public Order Improve

PNP-MTDP MOOE 131,480.42 141,376.80 155,359.12 172,621.24 196,160.50

PAPS 94Integrated training program for mandatory seminars on MRP,HR and GAD Region IX

No. of seminar conductedSecurity & Public Order Improve

PNP-MTDP MOOE 118,243.94 127,144.02 139,718.70 155,243.00 176,412.50

Comprehensive Health and Physical Fitness Program - - - - -

716,762.15

-

3,033,251.30

3,486,274.64

796,998.07

17,858.14

16,801.11

48,605.63

51,363.83

52,141.85

89,867.03

- -

70,939.88

637,334.28

707,486.75

Chapter 18 - PNP IXPage 8 of 54

Page 153: Table of Contents (By Chapter)

(-14-) (-15-)

Investment Requirements (In exact amount PhP)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (Proposed) 2021 (Proposed) 2022 (Proposed) Total

Chapter Outcome/Projec

t Title

Project Description/Objecti

ves

Specific Location

(Province/City/Municipality/Barangay

)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

Sub-Activity - - - - -

PAPS 95 a. 58.1. Physical Fitness Test

Region IX

No. of activities conducted

Security & Public Order Improve

PNP-MTDP MOOE 5,362.16 5,765.76 6,336.00 7,040.00 8,000.00

PAPS 96 b. 59. 2. Pulisteniks/Zumba/Taebo

Region IX

No. of activities conducted

Security & Public Order Improve

PNP-MTDP MOOE 128,691.76 138,378.24 152,064.00 168,960.00 192,000.00

PRO9 SUMMER SPORTSFEST - - - - -

PAPS 97 a. basketball

Region IX

No. of activities conducted

Security & Public Order Improve

PNP-MTDP MOOE 48,795.63 52,468.42 57,657.60 64,064.00 72,800.00

PAPS 98 b. volleyball

Region IX

No. of activities conducted

Security & Public Order Improve

PNP-MTDP MOOE 34,518.88 37,117.08 40,788.00 45,320.00 51,500.00

PAPS 99 c. badminton

Region IX

No. of activities conducted

Security & Public Order Improve

PNP-MTDP MOOE 17,762.14 19,099.08 20,988.00 23,320.00 26,500.00

PAPS 100 d. cheerdance

Region IX

No. of activities conducted

Security & Public Order Improve

PNP-MTDP MOOE 51,945.89 55,855.80 61,380.00 68,200.00 77,500.00

PAPS 101 e. shooting

Region IX

No. of activities conducted

Security & Public Order Improve

PNP-MTDP MOOE 21,783.76 23,423.40 25,740.00 28,600.00 32,500.00

PAPS 102 f. tennis

Region IX

No. of activities conducted

Security & Public Order Improve

PNP-MTDP MOOE 6,903.78 7,423.42 8,157.60 9,064.00 10,300.00

Inter-Unit Competition - - - - -

PAPS 103 a. Basketball

Region IX

No. of activities conducted

Security & Public Order Improve

PNP-MTDP MOOE 68,368.74 73,514.77 80,785.47 89,761.63 102,001.85

PAPS 104 b. Volleyball

Region IX

No. of activities conducted

Security & Public Order Improve

PNP-MTDP MOOE 64,067.65 68,889.95 75,703.24 84,114.71 95,584.90

Sports Supervision & Training - - - - -

PAPS 105a. 61. 1. National Civil Disturbance Management (CDM) Competition Region IX

No. of activities conducted

Security & Public Order Improve

PNP-MTDP MOOE 54,148.94 58,224.66 63,983.15 71,092.38 80,786.80

PAPS 106 b. 61. 2. Polce Skills Olympics Competition

Region IX

No. of activities conducted

Security & Public Order Improve

PNP-MTDP MOOE 113,132.70 121,648.07 133,679.19 148,532.44 168,786.86

-

328,235.93

685,779.26

-

414,432.46

388,360.45

314,881.69

132,047.16

41,848.79

295,785.64

209,243.96

107,669.22

32,503.92

780,094.00

-

-

Chapter 18 - PNP IXPage 9 of 54

Page 154: Table of Contents (By Chapter)

(-14-) (-15-)

Investment Requirements (In exact amount PhP)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (Proposed) 2021 (Proposed) 2022 (Proposed) Total

Chapter Outcome/Projec

t Title

Project Description/Objecti

ves

Specific Location

(Province/City/Municipality/Barangay

)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

PAPS 107c. 61.3. Special Weapon Action Team (SWAT) Challlenge Region IX

No. of activities conducted

Security & Public Order Improve

PNP-MTDP MOOE 67,075.13 72,123.79 79,256.91 88,063.24 100,071.86

Crime Prevention Sports Component - - - - -

PAPS 108a. 62. 1. Basketball Competition for the Out-of-School-Youth (OSYs) Region IX

No. of activities conducted

Security & Public Order Improve

PNP-MTDP MOOE 40,216.18 43,243.20 47,520.00 52,800.00 60,000.00

General Administration and Support - - - - - Sub-Activity - - - - -

PAPS 109 a. 63. 1. Preparation of Monthly Reports

Region IX

No. of activities conducted

Security & Public Order Improve

PNP-MTDP MOOE 42,329.13 45,515.20 50,016.70 55,574.11 63,152.40

PAPS 110 b. 63.2. Submission of Monthly Reports

Region IX

No. of activities conducted

Security & Public Order Improve

PNP-MTDP MOOE 25,439.31 27,354.09 30,059.44 33,399.38 37,953.84

PAPS 111c. 63. 3. Inspection and Monitoring of Trainings and Training Venue Region IX

No. of activities conducted

Security & Public Order Improve PNP-MTDP MOOE

46,071.49 49,539.24 54,438.72 60,487.47 68,735.76

PAPS 112 d. 63. 4. Attend Family Conference to NHQ

Region IX

No. of activities conducted

Security & Public Order Improve

PNP-MTDP MOOE 108,295.97 116,447.28 127,964.04 142,182.27 161,570.76

PAPS 113 d. 63. 4. Morale Enhancement Exercises

Region IX

No. of activities conducted

Security & Public Order Improve

PNP-MTDP MOOE 35,390.23 38,054.02 41,817.60 46,464.00 52,800.00

- - - - C. Plans Services - - - - a. Plans and Budget (OPB) - - - -

PAPS 114 a.1 Budget (AOPB)

Region IX

No. of AOPB Prepared Security & Public Order Improve

PNP-MTDP MOOE 48,284.20 51,918.49 57,053.29 63,392.54 72,036.98

PAPS 115a.2. Consolidation of OPB Quarterly Accomplishments Reports

Region IX

No. of OPB Quarterly Report consolidation/submitted

Security & Public Order Improve

PNP-MTDP MOOE 726.57 781.26 858.53 953.92 1,084.00

PAPS 116a.3 AOPB conferences/meetings conducted Region IX

No. of AOPB conferences/meetings conducted

Security & Public Order Improve

PNP-MTDP MOOE 45,515.66 48,941.57 53,781.95 59,757.72 67,906.50

PAPS 117 a.4 AOPB Work Plan

Region IX

No. of AOPB Work Plan prepared

Security & Public Order Improve

PNP-MTDP MOOE 290.63 312.50 343.41 381.57 433.60

PAPS 118 a.5 AOPB Cascading/Seminar/Workshop Region IX

No. of AOPB workshop/seminar conducted

Security & Public Order Improve

PNP-MTDP MOOE 12,173.84 13,090.15 14,384.78 15,983.09 18,162.60

275,903.40

1,761.71

73,794.45

-

292,685.50

4,404.28

214,525.85

- -

154,206.06

279,272.68

656,460.32

- -

256,587.54

406,590.93

-

243,779.38

Chapter 18 - PNP IXPage 10 of 54

Page 155: Table of Contents (By Chapter)

(-14-) (-15-)

Investment Requirements (In exact amount PhP)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (Proposed) 2021 (Proposed) 2022 (Proposed) Total

Chapter Outcome/Projec

t Title

Project Description/Objecti

ves

Specific Location

(Province/City/Municipality/Barangay

)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

PAPS 119 b. Unit Performance Evaluation Rating (UPER) - - - - -

b.1 UPER of Offices/Units

Region IX

No. of Offices/Units Evaluated

Security & Public Order Improve

PNP-MTDP MOOE 435.94 468.76 515.12 572.35 650.40

b.2 Consolidation of Quarterly UPER

Region IX

No. of Quarterly UPER consolidated/submitted

Security & Public Order Improve

PNP-MTDP MOOE 826.84 889.08 977.01 1,085.57 1,233.60

PAPS 120 c. Coordination/Liaising with other agency - - - - -

PAPS 121c.1 Regional Development Council/NEDA, DILG, DBM and other planning offices/meetings/conferences Region IX

No. of NEDA conferences/meetings attended

Security & Public Order Improve

PNP-MTDP MOOE 59,179.55 63,633.93 69,927.39 77,697.10 88,292.16

e. Organizational Development - - - - -

PAPS 122e.1 Implementation of Approved Policies and Guidelines on Organization and Staffing of Offices/Units Region IX

No. Implemented Approved Policies and Guidelines on Organization and Staffing of Offices/Units

Security & Public Order Improve PNP-MTDP MOOE

6,204.93 6,671.96 7,331.83 8,146.48 9,257.36

PAPS 123e.2 Cascading of offices/units re compliance to policies Region IX No. of Offices/Units inspected

Security & Public Order Improve

PNP-MTDP MOOE 98,603.07 106,024.80 116,510.77 129,456.41 147,109.56

f. Strategy Management - - - - -

PAPS 123 f.1 Conferences/meetings conducted/attended

No. of conferences/meetings conducted/attended

40,506.80 43,555.70 47,863.41 53,181.57 60,433.60

f.2 Consolidation of performance reports

No. of UPER consolidated/submitted 754.19 810.95 891.16 990.18 1,125.20

PROGRAM 2 - SUPPORT TO OPERATIONS - - - -

II. Support to Operations - - - -

A. Materiel Development - - - - 1. Research and Development Programs - - - -

PAPS 124 a. Survey of New uniforms needed by personnel

Region IX

No. of surveys conductedSecurity & Public Order Improve

PNP-MTDP MOOE 9,269.61 9,967.33 10,953.11 12,170.12 13,829.68

PAPS 125b. Survey of New equipment needed by the unit

Region IX No. of surveys conducted

Security & Public Order Improve

PNP-MTDP MOOE 9,269.61 9,967.33 10,953.11 12,170.12 13,829.68

PAPS 126 c. Field Testing of new uniforms

Region IX

No. of Field Testing conducted

Security & Public Order Improve

PNP-MTDP MOOE 420.69 452.35 497.09 552.32 627.64

2. Policy Development and Implementation - - - - - -

56,189.85

56,189.85

2,550.09

-

- -

245,541.09

4,571.68

-

37,612.56

597,704.61

-

-

358,730.13

-

-

2,642.57

5,012.10

Chapter 18 - PNP IXPage 11 of 54

Page 156: Table of Contents (By Chapter)

(-14-) (-15-)

Investment Requirements (In exact amount PhP)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (Proposed) 2021 (Proposed) 2022 (Proposed) Total

Chapter Outcome/Projec

t Title

Project Description/Objecti

ves

Specific Location

(Province/City/Municipality/Barangay

)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

a. Stringent Implementation of PNP LOI "Tamang Bihis" - - - - -

PAPS 127 a.1. Conduct of Rank Inspection

Region IX

No. of inspection conducted

Security & Public Order Improve

PNP-MTDP MOOE 2,306.16 2,479.74 2,724.99 3,027.76 3,440.64

PAPS 128 a.2 Conduct of On-the-spot inspection

Region IX

No. of inspection conducted

Security & Public Order Improve

PNP-MTDP MOOE 871.89 937.51 1,030.23 1,144.70 1,300.80

b. Task Force "Bantay Bihis" Operation - - - - -

PAPS 129

b.1. Conduct of Information Drive/Visitation (Brgy Visitation, Criminology schools, manufacturers, supplier and distributors of PNP uniforms Region IX

No. of Info drive conducted

Security & Public Order Improve

PNP-MTDP MOOE 2,228.78 2,396.54 2,633.56 2,926.18 3,325.20

PAPS 130b.2 Occular Inspection of Accredited Retailers of PNP Uniforms

Region IX

No. of inspection conducted

Security & Public Order Improve

PNP-MTDP MOOE 223,992.04 240,851.65 264,672.14 294,080.16 334,182.00

PAPS 131 b.3 Inspection of ICA Items of PNP Recruits

Region IX

No. of Inspection Conducted

Security & Public Order Improve

PNP-MTDP MOOE 11,486.28 12,350.83 13,572.35 15,080.38 17,136.80

- - - - - - - -

B. Health Services - - - - 1. Psychological, Medical & Dental Screening Program - - - -

PAPS 132a. Annual Physiclal Examination of PNP personnel Region IX

No. of personnel for APESecurity & Public Order Improve

PNP-MTDP MOOE 4,359.43 4,687.56 5,151.17 5,723.52 6,504.00

b. PNP Recruits No. of recruit - - - - - c.Lateral Entry No. of personnel for Lateral Entry - - - - -

PAPS 133 d.Physical Fitness Test (PFT)

Region IX

No. of personnel for PFTSecurity & Public Order Improve

PNP-MTDP MOOE 13,576.98 14,598.90 16,042.75 17,825.28 20,256.00

PAPS 134 e.Schooling

Region IX No. of PNP personnel for Schooling

Security & Public Order Improve

PNP-MTDP MOOE 2,292.34 2,464.89 2,708.67 3,009.63 3,420.03

PAPS 135 f. Promotion (PCO, PNCO & NUP)

Region IX

No. of PNP personnel for Promotion

Security & Public Order Improve

PNP-MTDP MOOE 4,973.40 5,347.74 5,876.64 6,529.60 7,420.00

2. Medical Assistance Program - - - - - -

82,299.92

13,895.55

30,147.38

26,425.68

- -

- -

-

1,357,777.99

69,626.64

-

5,285.14

-

13,510.25

-

13,979.28

Chapter 18 - PNP IXPage 12 of 54

Page 157: Table of Contents (By Chapter)

(-14-) (-15-)

Investment Requirements (In exact amount PhP)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (Proposed) 2021 (Proposed) 2022 (Proposed) Total

Chapter Outcome/Projec

t Title

Project Description/Objecti

ves

Specific Location

(Province/City/Municipality/Barangay

)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

PAPS 136 a. During PNP activities

Region IX

No. of Medical Teams Assisted during PNP activities

Security & Public Order Improve

PNP-MTDP MOOE 33,030.89 35,517.08 39,029.76 43,366.40 49,280.00

PAPS 137 b. During National Events

Region IX

No. of Medical Teams deployed in National & International Events

Security & Public Order Improve

PNP-MTDP MOOE 24,279.95 26,107.47 28,689.53 31,877.25 36,224.15

PAPS 138c. Provide Medical Assistance during SAR and Relief Operations Region IX

No. of Medical Teams Assisted during SAR and Relief Operations

Security & Public Order Improve

PNP-MTDP MOOE 25,247.16 27,147.48 29,832.40 33,147.11 37,667.17

PAPS 139 d. Conduction / Referral of patients

Region IX

No. of patient for conduction and referred

Security & Public Order Improve

PNP-MTDP MOOE 15,394.75 16,553.50 18,190.66 20,211.84 22,968.00

3. Medical Services - - - - - a. Medical Consultations and Treatment - - - - -

PAPS 140 a.1. Medical Cases

Region IX

No. of patients for Family Medicine consultations

Security & Public Order Improve

PNP-MTDP MOOE 1,077,525.41 1,158,629.47 1,273,219.20 1,414,688.00 1,607,600.00

PAPS 141 a.2. Pediatric Cases

Region IX

No. of patients for Pediatric Cases

Security & Public Order Improve

PNP-MTDP MOOE 96,357.96 103,610.71 113,857.92 126,508.80 143,760.00

a.3.Surgical Cases - - - - -

PAPS 142 a.3.1 OPD Minor Surgery

Region IX

No. of patients for Minor Surgery

Security & Public Order Improve

PNP-MTDP MOOE 5,763.78 6,197.62 6,810.57 7,567.30 8,599.20

PAPS 143 a.3.2. Operation Tuli

Region IX

No. of patients for Operation Tuli

Security & Public Order Improve

PNP-MTDP MOOE 121,657.95 130,815.00 143,752.75 159,725.28 181,506.00

b. Provide Ancillary Services - - - - -

PAPS 144 b.1.Provide ECG (Electrocardiogram)

Region IX

No. of patients examinedSecurity & Public Order Improve

PNP-MTDP MOOE 3,351.35 3,603.60 3,960.00 4,400.00 5,000.00

b.2. Provide NP Services for Fireams Licensing No. of Firearms licensing applicants - - - - - b.3. Provide NP Services for PTC-FOR No. of PTC-FOR applicants - - - - - b.4. Provide NP Validation Services - - - - -

PAPS 145 b.4.1 License to Operate (LTO)

Region IX

No. of License to Operate Clearance validated

Security & Public Order Improve

PNP-MTDP MOOE 214.49 230.63 253.44 281.60 320.00

PAPS 146 b.4.2 Security Guard

Region IX

No. of Security Guard Clearance validated

Security & Public Order Improve

PNP-MTDP MOOE 5,362.16 5,765.76 6,336.00 7,040.00 8,000.00 32,503.92

-

-

1,300.16

-

20,314.95

-

-

34,938.46

737,456.99

-

6,531,662.08

584,095.38

153,041.31

93,318.75

-

200,224.13

147,178.35

Chapter 18 - PNP IXPage 13 of 54

Page 158: Table of Contents (By Chapter)

(-14-) (-15-)

Investment Requirements (In exact amount PhP)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (Proposed) 2021 (Proposed) 2022 (Proposed) Total

Chapter Outcome/Projec

t Title

Project Description/Objecti

ves

Specific Location

(Province/City/Municipality/Barangay

)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

PAPS 147 c. Reimbursement and Hospital Expenses (RHE)

Region IX

No. of RHE processedSecurity & Public Order Improve

PNP-MTDP MOOE 10,054.04 10,810.80 11,880.00 13,200.00 15,000.00

PAPS 148 d.Total Permanent Physical Disability

Region IX

No. of TPPD processedSecurity & Public Order Improve

PNP-MTDP MOOE 804.32 864.86 950.40 1,056.00 1,200.00

4. Dental Services - - - - -

PAPS 149 a. Dental Examination

Region IX

No. of patients examinedSecurity & Public Order Improve

PNP-MTDP MOOE 35,591.32 38,270.23 42,055.20 46,728.00 53,100.00

b. Restorative Treatment - - - - -

PAPS 150 b.1. Oral Prophylaxis

Region IX

No. of patient treated for Oral Prophylaxis treatment

Security & Public Order Improve

PNP-MTDP MOOE 36,516.29 39,264.83 43,148.16 47,942.40 54,480.00

PAPS 151 b.2. Light Cure resin

Region IX

No. of patient treated for Light Cure resin treatment

Security & Public Order Improve

PNP-MTDP MOOE 35,312.94 37,970.91 41,726.27 46,362.52 52,684.68

PAPS 152 b.3. Glass Ionomer

Region IX

No. of patient treated for Glass Ionomer treatment

Security & Public Order Improve

PNP-MTDP MOOE 3,265.55 3,511.35 3,858.62 4,287.36 4,872.00

PAPS 153 c. Dental Surgery

Region IX

No. of patient treated for dental surgery

Security & Public Order Improve

PNP-MTDP MOOE 66,111.32 71,087.44 78,118.06 86,797.85 98,633.92

PAPS 154 d. Endodontic Treatment

Region IX

No. of patient treated for endodontic treatment

Security & Public Order Improve

PNP-MTDP MOOE 20,237.00 21,760.21 23,912.32 26,569.25 30,192.33

PAPS 155 e. Orthodontic Assessment

Region IX

No. of patient treated for Orthodontic assessment

Security & Public Order Improve

PNP-MTDP MOOE 11,375.14 12,231.34 13,441.03 14,934.48 16,971.00

f. Orthodontic treatment No. of patient treated for Orthodontic treatment - - - - -

g. Prosthodontic Treatment - - - - -

PAPS 156 g.1. Complete Denture and Partial Denture

Region IX

No. of patient treated for Complete Denture and Partial Denture

Security & Public Order Improve

PNP-MTDP MOOE 3,515.11 3,779.69 4,153.51 4,615.01 5,244.33

PAPS 157 g.2. Plastic Jacket Crown

Region IX

No. of patient for Plastic Jacket Crown done

Security & Public Order Improve

PNP-MTDP MOOE 1,582.97 1,702.12 1,870.46 2,078.29 2,361.69

PAPS 158 g.3. Denture Rebase, Reline and Repair

Region IX

No. of patient for Denture Rebased, Relined and Repaired

Security & Public Order Improve

PNP-MTDP MOOE 13,143.98 14,133.31 15,531.11 17,256.79 19,609.99

h. Pedodontic Treatment - - - - -

9,595.54

79,675.19

-

- -

21,307.65

400,748.59

122,671.12

68,952.98

221,351.67

214,057.33

19,794.89

-

215,744.75

-

60,944.84

4,875.59

Chapter 18 - PNP IXPage 14 of 54

Page 159: Table of Contents (By Chapter)

(-14-) (-15-)

Investment Requirements (In exact amount PhP)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (Proposed) 2021 (Proposed) 2022 (Proposed) Total

Chapter Outcome/Projec

t Title

Project Description/Objecti

ves

Specific Location

(Province/City/Municipality/Barangay

)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

PAPS 159 h.1. Pit and Fissure Sealant

Region IX

No. of patient for Pit and Fissure Sealant treated

Security & Public Order Improve

PNP-MTDP MOOE 15,392.72 16,551.32 18,188.26 20,209.18 22,964.97

PAPS 160 h.2. Flouride Application

Region IX

No. of patient for flouride application

Security & Public Order Improve

PNP-MTDP MOOE 31,227.86 33,578.34 36,899.28 40,999.20 46,590.00

PAPS 161 i. Periodontic Treatment

Region IX

No. of patient for periodontic done

Security & Public Order Improve

PNP-MTDP MOOE 21,392.52 23,002.71 25,277.70 28,086.34 31,916.29

5. Rehabilatative Services - - - - -

PAPS 162a. Stress management & Debriefing Seminars (LOI- Lusog Kaisipan) Region IX

No. of Stress Mngt. & Debriefing Seminars conducted

Security & Public Order Improve

PNP-MTDP MOOE 59,260.63 63,721.10 70,023.19 77,803.55 88,413.12

6. Outreach Programs - - - - -

PAPS 163 a. Blood Letting Activity

Region IX

No. of Blood-letting Activity

Security & Public Order Improve

PNP-MTDP MOOE 6,003.60 6,455.49 7,093.94 7,882.16 8,957.00

PAPS 164 b. Medical Mission

Region IX

No. of Medical Mission activity

Security & Public Order Improve

PNP-MTDP MOOE 6,003.60 6,455.49 7,093.94 7,882.16 8,957.00

PAPS 165 c. Dental Mission

Region IX

No. of Dental Mission activity

Security & Public Order Improve

PNP-MTDP MOOE 6,003.60 6,455.49 7,093.94 7,882.16 8,957.00

PAPS 166 d. Feeding Program

Region IX

No. of Feeding Program activity

Security & Public Order Improve

PNP-MTDP MOOE 35,456.00 38,124.73 41,895.31 46,550.35 52,898.12

PAPS 167 e. Operation Tuli

Region IX

No. of Operation Tuli Activity

Security & Public Order Improve

PNP-MTDP MOOE 3,001.80 3,227.74 3,546.97 3,941.08 4,478.50

7. Health Service Best Practices and Initiatives - - - - - Community Relations Program - - - - -

PAPS 168 1. Free Health Caravan

Region IX

No. of free health caravan activity done

Security & Public Order Improve

PNP-MTDP MOOE 123,855.77 133,178.25 146,349.72 162,610.80 184,785.00

PAPS 169 2. Monthly Health lecture activity

Region IX

No. of health lectures activity done

Security & Public Order Improve

PNP-MTDP MOOE 125,500.85 134,947.15 148,293.57 164,770.64 187,239.36

PAPS 170 3. Hospital Visitation

Region IX

No. of hospital visitation activity done

Security & Public Order Improve

PNP-MTDP MOOE 2,623.92 2,821.42 3,100.46 3,444.95 3,914.72 15,905.47

-

750,779.53

760,751.57

214,924.51

18,196.10

-

36,392.20

36,392.20

36,392.20

-

359,221.59

-

93,306.45

189,294.69

129,675.56

Chapter 18 - PNP IXPage 15 of 54

Page 160: Table of Contents (By Chapter)

(-14-) (-15-)

Investment Requirements (In exact amount PhP)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (Proposed) 2021 (Proposed) 2022 (Proposed) Total

Chapter Outcome/Projec

t Title

Project Description/Objecti

ves

Specific Location

(Province/City/Municipality/Barangay

)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

PAPS 171 4. Brigada Eskwela

Region IX

No. of Brigada Eskwela conducted

Security & Public Order Improve

PNP-MTDP MOOE 1,738.85 1,869.73 2,054.65 2,282.94 2,594.25

PAPS 172 5. Health Information and Dissemination

Region IX

No. of leaflets/flyers distributed

Security & Public Order Improve

PNP-MTDP MOOE 8,718.87 9,375.13 10,302.34 11,447.04 13,008.00

PAPS 173 6. Patients Satisfaction Survey

Region IX

No. of patients to be surveyed

Security & Public Order Improve

PNP-MTDP MOOE 2,010.81 2,162.16 2,376.00 2,640.00 3,000.00

8. Subject Matter Exchange Programs - - - - -

PAPS 174 a. Continuining Education Training

Region IX

No. of conventions and seminars attended

Security & Public Order Improve

PNP-MTDP MOOE 44,591.70 47,948.06 52,690.18 58,544.64 66,528.00

9. Hospital Quality Control Programs - - - - -

b.3. Repair/Maintenance of Medical, Dental & Lab Equipment Region IX

No.of equipment for maintenance procedures

Security & Public Order Improve

PNP-MTDP MOOE - - - - -

PAPS 175 b.3.1 Medical Equipment

Region IX

No.of equipment undergone maintenance procedures

Security & Public Order Improve

PNP-MTDP MOOE 6,606.18 7,103.42 7,805.95 8,673.28 9,856.00

PAPS 176 b.3.2 Dental Equipment

Region IX

No.of equipment undergone maintenance procedures

Security & Public Order Improve

PNP-MTDP MOOE 6,606.18 7,103.42 7,805.95 8,673.28 9,856.00

10. General Administration and Support Programs

Region IX

Security & Public Order Improve

PNP-MTDP MOOE - - - - -

PAPS 177 a. Personnel Management

Region IX

No. of processed documentation

Security & Public Order Improve

PNP-MTDP MOOE 2,477.32 2,663.78 2,927.23 3,252.48 3,696.00

b. Morale and Welfare - - - - - b.1. Conferences - - - - 0

PAPS 178 b.1.1. RHS Unit Conference

Region IX

No. of conference to be conducted

Security & Public Order Improve

PNP-MTDP MOOE 14,075.66 15,135.12 16,632.00 18,480.00 21000

PAPS 179 b.1.2. PSMU/TWG Meeting Region IXNo. of conference to be conducted - - - - 0

PAPS 180 b.2. Team Building

Region IX

No. of personnel attendedSecurity & Public Order Improve

PNP-MTDP MOOE 28,902.03 31,077.45 34,151.04 37,945.60 43120

PAPS 181 b.3. Personnel Assistance No. of personnel assisted - - - - 0c. Personnel transaction - - - - 0 -

-

175,196.11

-

- -

85,322.78

40,044.83

-

15,016.81

-

-

40,044.83

12,188.97

-

270,302.57

10,540.41

52,851.37

Chapter 18 - PNP IXPage 16 of 54

Page 161: Table of Contents (By Chapter)

(-14-) (-15-)

Investment Requirements (In exact amount PhP)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (Proposed) 2021 (Proposed) 2022 (Proposed) Total

Chapter Outcome/Projec

t Title

Project Description/Objecti

ves

Specific Location

(Province/City/Municipality/Barangay

)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

PAPS 182 c.1. Communication

Region IX

No.of Letters mailedSecurity & Public Order Improve

PNP-MTDP MOOE 1,090.02 1,172.06 1,287.98 1,431.09 1626.24

PROGRAM 3 - CRIME PREVENTION AND SUPPRESSION PROGRAM - - - - A. INTELLIGENCE SERVICES - - - -

PAPS 183 1. Intelligence Operations % of criminal and threat groups - - - -

PAPS 184 A. Enhanced Intelligence Operations

No. of COPLANS launched - - - -

a.1 COPLANs on High Value Targets (HVTs) - - - -

PAPS 185 a.1.1 COPLANs formulated

Region IX

No. of COPLANs formulated

Security & Public Order Improve

PNP-MTDP MOOE 193,706.44 208,286.49 228,886.26 254,318.06 288,997.80

PAPS 186 a.1.2 COPLANs implemented

Region IX

No. of COPLANs implemented

Security & Public Order Improve

PNP-MTDP MOOE 62,236.01 66,920.44 73,538.94 81,709.94 92,852.20

PAPS 187

a.1.3 Special Project Review Board Committee (SPRB) conducted Region IX

No. of SPRBs meeting conducted

Security & Public Order Improve

PNP-MTDP MOOE 23,633.04 25,411.87 27,925.13 31,027.92 35,259.00

PAPS 188 a. 2 Implementation of Search Warrants (SWs)

Region IX

No. of Search Warrant Implemented

Security & Public Order Improve

PNP-MTDP MOOE 627,321.41 674,539.15 741,251.81 823,613.12 935,924.00

a.3 Barangay Information Network (BIN) - - - - -

PAPS 189 a.3.1 BINs Established

Region IX

No. of BINs EstablishedSecurity & Public Order Improve

PNP-MTDP MOOE 1,631,134.59 1,753,908.16 1,927,371.60 2,141,524.00 2,433,550.00

PAPS 190 a.3.2 BINs Recruited

Region IX

No. of BINs MaintainedSecurity & Public Order Improve

PNP-MTDP MOOE 1,518,060.10 1,632,322.69 1,793,761.20 1,993,068.00 2,264,850.00

PAPS 191 a.3.3 Action agents recruited and documented

Region IX

No. of Action agents recruited and documented

Security & Public Order Improve

PNP-MTDP MOOE 13,555.53 14,575.84 16,017.41 17,797.12 20,224.00

PAPS 192 a.3.4 Action agents maintained

Region IX

No. of Action agents maintained

Security & Public Order Improve

PNP-MTDP MOOE 301,859.27 324,579.86 356,681.16 396,312.40 450,355.00

PAPS 193Region IX

No. of EB RecruitedSecurity & Public Order Improve

PNP-MTDP MOOE 2,442,227.83 2,626,051.43 2,885,770.80 3,206,412.00 3,643,650.00

B. Most Wanted Persons (MWPs) arrested - - - - -

1,829,787.68

14,804,112.06

-

9,887,488.34

9,202,062.00

82,169.90

143,256.95

3,802,649.48

-

-

1,174,195.06

377,257.52

-

-

-

6,607.40

-

Chapter 18 - PNP IXPage 17 of 54

Page 162: Table of Contents (By Chapter)

(-14-) (-15-)

Investment Requirements (In exact amount PhP)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (Proposed) 2021 (Proposed) 2022 (Proposed) Total

Chapter Outcome/Projec

t Title

Project Description/Objecti

ves

Specific Location

(Province/City/Municipality/Barangay

)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

PAPS 194 b.1 MWPs arrested with rewards

Region IX

No. of MWPs arrested with rewards

Security & Public Order Improve

PNP-MTDP MOOE 101,256.96 108,878.45 119,646.65 132,940.72 151,069.00

PAPS 195 MWPs Surrendered with rewards

Region IX

No. of submitted applications for reward claims on the arrest/surrendered/death of MWPs with reward

Security & Public Order Improve

PNP-MTDP MOOE 8,216.03 8,834.44 9,708.18 10,786.86 12,257.80

PAPS 196 MWPs Recommended with rewards

Region IX

No. of MWPs recommended for issuance of reward

Security & Public Order Improve

PNP-MTDP MOOE 871.89 937.51 1,030.23 1,144.70 1,300.80

PAPS 197 MWPs Memo/reports

Region IX

No. of memos/reports produced

Security & Public Order Improve

PNP-MTDP MOOE 2,179.72 2,343.78 2,575.58 2,861.76 3,252.00

PAPS 198 b.2 High Value Target/s (HVTs) arrested/neutralized

No. of HVTs arrested/neutralized 675,980.30 726,860.53 798,747.84 887,497.60 1,008,520.00

PAPS 199 Validation of Drug Personalities Conducted

Region IX

Monitoring and Validation of Drug Personalities Conducted

Security & Public Order Improve

PNP-MTDP MOOE 804,470.98 865,022.56 950,574.24 1,056,193.60 1,200,220.00

C. Organized Crime Groups/Criminal Groups - - - - -

PAPS 200 c.1 Workshop/validation conducted/attended on OCGs/CGs Region IX

No. of workshop/validation conducted

Security & Public Order Improve

PNP-MTDP MOOE 54,531.79 58,636.34 64,435.54 71,595.04 81,358.00

PAPS 201 Workshop/Validation Conducted by PPOs/CPO

Region IX

No. of workshop/validation conducted by PPOs/CPO

Security & Public Order Improve

PNP-MTDP MOOE 115,079.93 123,741.86 135,980.06 151,088.96 171,692.00

PAPS 202 c.2 OCGs/CGs neutralized/dismantled

Region IX

No. of OCGs/CGs neutralized/dismantled

Security & Public Order Improve

PNP-MTDP MOOE 84,982.68 91,379.22 100,416.73 111,574.14 126,788.80

D. Partisan Armed Groups (PPAGs) - - - - -

PAPS 203 d.1 Workshop/validation conducted/attended on PPAGs Region IX

No. of workshop/validation conducted/attended

Security & Public Order Improve

PNP-MTDP MOOE 27,897.96 29,997.81 32,964.62 36,627.36 41,622.00

PAPS 204 d. 2 PPAGs documented

Region IX

No. of PPAGs documented

Security & Public Order Improve

PNP-MTDP MOOE 222,261.13 238,990.46 262,626.88 291,807.65 331,599.60

PAPS 205 d.3 PPAGs neutralized/dismantled

Region IX

No. of PPAGs neutralized/dismantled

Security & Public Order Improve

PNP-MTDP MOOE 9,145.43 9,833.79 10,806.36 12,007.07 13,644.40

2. Increase Production and Disseminationof Information - - - - -

1,347,285.73

55,437.06

-

515,141.58

-

169,109.75

-

330,556.71

697,582.81

13,212.84

4,097,606.27

4,876,481.38

613,791.78

49,803.31

5,285.14

Chapter 18 - PNP IXPage 18 of 54

Page 163: Table of Contents (By Chapter)

(-14-) (-15-)

Investment Requirements (In exact amount PhP)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (Proposed) 2021 (Proposed) 2022 (Proposed) Total

Chapter Outcome/Projec

t Title

Project Description/Objecti

ves

Specific Location

(Province/City/Municipality/Barangay

)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

PAPS 206 A. Case Management Intelligence Sytem (CMIS)

Region IX

No. of CMIS deployedSecurity & Public Order Improve

PNP-MTDP MOOE 672,758.98 723,396.75 794,941.49 883,268.32 1,003,714.00

PAPS 207 B. Data Encoded

Region IX

No. of data encodedSecurity & Public Order Improve

PNP-MTDP MOOE 12,064.85 12,972.96 14,256.00 15,840.00 18,000.00

PAPS 208 C. Periodic reports produced and disseminated

Region IX

No. of periodic reports produced and disseminated

Security & Public Order Improve

PNP-MTDP MOOE 908,215.31 976,575.60 1,073,160.00 1,192,400.00 1,355,000.00

D. Information reports - - - - -

PAPS 209 d.1. Information reports received/processed

Region IX

No. of info reports received/processed

Security & Public Order Improve

PNP-MTDP MOOE 631,655.37 679,199.32 746,372.88 829,303.20 942,390.00

PAPS 210 d.2. intelligence products disseminated/utilized

Region IX

No. of intel products disseminated/ utilized

Security & Public Order Improve

PNP-MTDP MOOE 959,356.88 1,031,566.54 1,133,589.60 1,259,544.00 1,431,300.00

PAPS 211 E. Briefings presented

Region IX

No. of briefings presentedSecurity & Public Order Improve

PNP-MTDP MOOE 25,430.03 27,344.12 30,048.48 33,387.20 37,940.00

PAPS 212 F. Loose Firearms

Region IX

No of Loose Firearms confiscated

Security & Public Order Improve

PNP-MTDP MOOE 146,672.42 157,712.27 173,310.19 192,566.88 218,826.00

PAPS 213 3. Strengthening of Intelligence Community

Region IX

No. of RPIC conferences conducted

Security & Public Order Improve

PNP-MTDP MOOE 27,386.55 29,447.90 32,360.33 35,955.92 40,859.00

PAPS 214Region IX

No. of PPIC/CPIC conferences conducted

Security & Public Order Improve

PNP-MTDP MOOE 107,331.08 115,409.76 126,823.91 140,915.46 160,131.20

PAPS 215Region IX

No. of AFP-PNP LJRVC/RBOR meetings conducted/attended

Security & Public Order Improve

PNP-MTDP MOOE 12,944.25 13,918.54 15,295.10 16,994.56 19,312.00

PAPS 216 A. Intelligence trainings/seminars/workshop/ conferences

Region IX

No. of trngs/seminars/workshop conducted

Security & Public Order Improve

PNP-MTDP MOOE 109,546.18 117,791.59 129,441.31 143,823.68 163,436.00

PAPS 217 a.1 BIN Informant Handlers Training

Region IX

No. of BIN Informant Handlers Training conducted

Security & Public Order Improve

PNP-MTDP MOOE 76,951.51 82,743.56 90,926.99 101,029.98 114,806.80

PAPS 218 B. Intelligence Eligibility

Region IX

No. of Intelligence Eligibility processed

Security & Public Order Improve

PNP-MTDP MOOE 14,244.57 15,316.74 16,831.58 18,701.76 21,252.00

PAPS 219 C. Policies/directives disseminated

Region IX

No. of policies/directives disseminated

Security & Public Order Improve

PNP-MTDP MOOE 31,251.99 33,604.29 36,927.79 41,030.88 46,626.00

466,458.83

86,346.65

189,440.95

650,611.40

78,464.46

664,038.77

154,149.83

889,087.76

166,009.69

-

3,828,920.77

5,815,357.01

4,078,079.54

73,133.81

5,505,350.91

Chapter 18 - PNP IXPage 19 of 54

Page 164: Table of Contents (By Chapter)

(-14-) (-15-)

Investment Requirements (In exact amount PhP)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (Proposed) 2021 (Proposed) 2022 (Proposed) Total

Chapter Outcome/Projec

t Title

Project Description/Objecti

ves

Specific Location

(Province/City/Municipality/Barangay

)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

4. Improvement of Foreign Liaising Capability - - - - - A. Liasing Activities - - - - -

PAPS 220 a.1. Liaising activities conducted (local)

Region IX

No. of Liaising activities conducted

Security & Public Order Improve

PNP-MTDP MOOE 19,959.29 21,461.60 23,584.18 26,204.64 29,778.00

PAPS 221 a.2 Information exchanged/shared to OPA

Region IX

No. of information exchanged/shared to OPA

Security & Public Order Improve

PNP-MTDP MOOE 15,211.90 16,356.88 17,974.60 19,971.78 22,695.20

PAPS 222 B. Police Security Assistance

Region IX

No. of police security assistance facilitated to foreign nationals

Security & Public Order Improve

PNP-MTDP MOOE 2,069.66 2,225.44 2,445.54 2,717.26 3,087.80

PAPS 223 C. Cases/incidents involving foreign nationals

Region IX

No. of cases/incidents involving foreign nationals monitored and reported

Security & Public Order Improve

PNP-MTDP MOOE 12,798.93 13,762.29 15,123.40 16,803.78 19,095.20

PAPS 224 D. Foreign National Keeper Network

Region IX

No. of recruits/members recruited/maintained

Security & Public Order Improve

PNP-MTDP MOOE 7,040.91 7,570.88 8,319.64 9,244.05 10,504.60

PAPS 225Region IX

No. of communications/reports submitted

Security & Public Order Improve

PNP-MTDP MOOE 12,791.43 13,754.22 15,114.53 16,793.92 19,084.00

5. Counter-Intelligence Operations - - - - - A.Strengthening of Counter-Intelligence Drive - - - - -

PAPS 226 a.1. Security Surveys (SS)

Region IX

No. of surveys conductedSecurity & Public Order Improve

PNP-MTDP MOOE 400,204.57 430,327.50 472,887.36 525,430.40 597,080.00

PAPS 227 a. 2 Security Inspection (SI) conducted

Region IX

No. of Inspection Conducted

Security & Public Order Improve

PNP-MTDP MOOE 337,263.58 362,649.01 398,515.39 442,794.88 503,176.00

PAPS 228 a.3. Counter-Intelligence information (CI) checked Region IX

No. of info checkedSecurity & Public Order Improve

PNP-MTDP MOOE 513,480.14 552,129.18 606,735.36 674,150.40 766,080.00

PAPS 229 a.4. Counter-Intelligence information (CI) monitored Region IX

No. of Counterintelligence information (CI) monitored

Security & Public Order Improve

PNP-MTDP MOOE 969,471.25 1,042,442.20 1,145,540.88 1,272,823.20 1,446,390.00

PAPS 230 a.5. Background Investigation (BI) conducted

Region IX

No. of BI conductedSecurity & Public Order Improve

PNP-MTDP MOOE 1,250,957.67 1,345,115.77 1,478,149.20 1,642,388.00 1,866,350.00

PAPS 231 a.6. Custodial Debriefing conducted

Region IX

No. of Custodial Debriefing conducted

Security & Public Order Improve

PNP-MTDP MOOE 167,773.84 180,401.98 198,243.94 220,271.04 250,308.00 1,016,998.80

3,112,575.07

5,876,667.53

7,582,960.64

-

2,425,929.83

2,044,398.85

42,680.08

77,538.09

-

92,210.36

12,545.70

77,583.60

- -

120,987.70

Chapter 18 - PNP IXPage 20 of 54

Page 165: Table of Contents (By Chapter)

(-14-) (-15-)

Investment Requirements (In exact amount PhP)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (Proposed) 2021 (Proposed) 2022 (Proposed) Total

Chapter Outcome/Projec

t Title

Project Description/Objecti

ves

Specific Location

(Province/City/Municipality/Barangay

)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

PAPS 232Region IX

No. of document/media exploited/debriefing reports and briefings presented

Security & Public Order Improve

PNP-MTDP MOOE 470,495.75 505,909.40 555,944.40 617,716.00 701,950.00

PAPS 233 a.7. Clearance/s issued to civilians

Region IX

No. of clearance/s issuedSecurity & Public Order Improve

PNP-MTDP MOOE 5,435.89 5,845.04 6,423.12 7,136.80 8,110.00

PAPS 234 a.8. Clearance/s issued to uniformed personnel (PNP/AFP) Region IX

No. of clearance/s issuedSecurity & Public Order Improve

PNP-MTDP MOOE 3,261.53 3,507.02 3,853.87 4,282.08 4,866.00

B. Increasing Sources of information - - - - -

PAPS 235 b.1. Debriefing conducted

Region IX

No. of debriefing conducted

Security & Public Order Improve

PNP-MTDP MOOE 41,551.35 44,678.87 49,097.66 54,552.96 61,992.00

PAPS 2366. Regional Task Force to end Local Communist Armed Conflict (RTF-ELCAC) Region IX

No. of Intelligence convergence in support of RTF-ELCAC

Security & Public Order Improve

PNP-MTDP MOOE 28,073.57 30,186.64 33,172.13 36,857.92 41,884.00

PAPS 237 Formulation of Intelligence Collection

Region IX

No. of Formulation of Intelligence Collection Plan relative to RTF-ELCAC

Security & Public Order Improve

PNP-MTDP MOOE 38,752.31 41,669.15 45,790.27 50,878.08 57,816.00

PAPS 238 Gathering of Priority Intelligence Requirements

Region IX

No. of Gathering of Priority Intelligence Requirements relative to RTF-ELCAC

Security & Public Order Improve

PNP-MTDP MOOE 65,758.81 70,708.40 77,701.54 86,335.04 98,108.00

PAPS 239 Formulation of Intelligence Directives

Region IX

No. of Formulation of Intelligence Directives relative to RTF-ELCAC

Security & Public Order Improve

PNP-MTDP MOOE 181.64 195.32 214.63 238.48 271.00

PAPS 240Intelligence Operation in support to RTF-ELCAC Clusters Region IX

No. of Intelligence Operation in support to RTF-ELCAC Clusters

Security & Public Order Improve

PNP-MTDP MOOE 325,913.23 350,444.33 385,103.66 427,892.96 486,242.00

OPERATION SERVICES - - - - B. Crime Prevention and Control Programs relative to the EMPO

Reduction of crime incidents - - - -

1. Regular Law Enforcement Activities - - - -

PAPS 241 a. Conduct Checkpoint/chokepoint Region IX

No. of checkpoint conducted

Security & Public Order Improve

PNP-MTDP MOOE 21,267,922.52 22,868,733.89 25,130,476.80 27,922,752.00 31,730,400.00

b. Conduct of Beat /foot patrol - - - - -

PAPS 242b.1. Rural Region IX

No of operations conducted

Security & Public Order Improve

PNP-MTDP MOOE 270,720.82 291,097.65 319,887.53 355,430.59 403,898.40

-

1,641,035.00

-

-

128,920,285.20

1,101.07

1,975,596.19

-

170,174.26

234,905.81

398,611.78

19,770.51

-

251,872.85

2,852,015.55

32,950.85

Chapter 18 - PNP IXPage 21 of 54

Page 166: Table of Contents (By Chapter)

(-14-) (-15-)

Investment Requirements (In exact amount PhP)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (Proposed) 2021 (Proposed) 2022 (Proposed) Total

Chapter Outcome/Projec

t Title

Project Description/Objecti

ves

Specific Location

(Province/City/Municipality/Barangay

)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

PAPS 243b.2. Urban Region IX

No of operations conducted

Security & Public Order Improve

PNP-MTDP MOOE 143,861.30 154,689.58 169,988.54 188,876.16 214,632.00

c. Conduct of Mobile Patrol - - - - -

PAPS 244c.1. Rural (4 wheel vehicle) Region IX

No.of operations conducted

Security & Public Order Improve

PNP-MTDP MOOE 19,388,339.10 20,847,676.45 22,909,534.56 25,455,038.40 28,926,180.00

PAPS 245c.2.( Urban 4 wheel vehicle) Region IX

No. of operations conducted

Security & Public Order Improve

PNP-MTDP MOOE 5,632,886.73 6,056,867.46 6,655,898.30 7,395,442.56 8,403,912.00

d. Conduct of Motorcycle Patrol - - - - -

PAPS 246d.1. Rural Region IX

No. of operations conducted

Security & Public Order Improve

PNP-MTDP MOOE 4,574,615.76 4,918,941.68 5,405,430.41 6,006,033.79 6,825,038.40

PAPS 247d.2. Urban Region IX

No. of operations conducted

Security & Public Order Improve

PNP-MTDP MOOE 1,241,666.39 1,335,125.15 1,467,170.50 1,630,189.44 1,852,488.00

PAPS 248c. Conduct of OPLAN SITA Region IX

No. of operation conducted

Security & Public Order Improve

PNP-MTDP MOOE 6,025,822.37 6,479,378.89 7,120,196.58 7,911,329.54 8,990,147.20

PAPS 249d. Conduct of OPLAN Bakal Region IX

No. of operation conducted

Security & Public Order Improve

PNP-MTDP MOOE 4,897,958.64 5,266,622.19 5,787,496.92 6,430,552.13 7,307,445.60

PAPS 250 e. Conduct of OPLAN GALUGAD Region IX

No. of Inspection conducted

Security & Public Order Improve

PNP-MTDP MOOE 194,476.42 209,114.43 229,796.08 255,328.97 290,146.56

PAPS 251f. Conduct of K-9 patrol Region IX

No. of operations conducted

Security & Public Order Improve

PNP-MTDP MOOE 171,624.08 184,542.02 202,793.43 225,326.03 256,052.31

PAPS 252 g. Conduct of OPLAN KatoK Region IX

No. of operation conducted

Security & Public Order Improve

PNP-MTDP MOOE 745,038.17 801,116.32 880,347.60 978,164.00 1,111,550.00

PAPS 253 h. Conduct of Seaborne Patrol

Region IX

No. of operation conducted

Security & Public Order Improve

PNP-MTDP MOOE 2,647,226.57 2,846,480.18 3,128,000.20 3,475,555.78 3,949,495.20

2. Security Measures - - - - -

PAPS 254a. Target Hardening Region IX

No. of camps/stations defense drill conducted

Security & Public Order Improve

PNP-MTDP MOOE 342,965.80 368,780.43 405,253.22 450,281.36 511,683.36

3. Border Control Operations - - - - -

-

2,078,964.17

-

1,040,337.87

4,516,216.09

16,046,757.92

36,526,874.58

29,690,075.48

1,178,862.46

-

27,730,060.04

7,526,639.48

-

117,526,768.51

34,145,007.06

872,047.58

Chapter 18 - PNP IXPage 22 of 54

Page 167: Table of Contents (By Chapter)

(-14-) (-15-)

Investment Requirements (In exact amount PhP)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (Proposed) 2021 (Proposed) 2022 (Proposed) Total

Chapter Outcome/Projec

t Title

Project Description/Objecti

ves

Specific Location

(Province/City/Municipality/Barangay

)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

PAPS 255 b.1. Conduct of Entrance/Exit Checkpoints Region IX

No. of operation conducted

Security & Public Order Improve

PNP-MTDP MOOE 351,111.35 377,539.08 414,878.11 460,975.68 523,836.00

4. Social Investigation - - - - - 5. Proper Deployment of PNP personnel - - - - -

PAPS 256a. Establish and deploy personnel on the areas vacated by AFP Region IX

NO. of personnel deployed

Security & Public Order Improve

PNP-MTDP MOOE 126,843.11 136,390.44 149,879.60 166,532.89 189,241.92

PAPS 257 b. Conduct coordination response with the AFP Region IX

No. of response conducted

Security & Public Order Improve

PNP-MTDP MOOE 627,565.38 674,801.49 741,540.10 823,933.44 936,288.00

6. SIMEX/CEREX/COMMEX

- - - - -

PAPS 258a. Inter-operability Region IX

No. of meetings conducted

Security & Public Order Improve

PNP-MTDP MOOE 70,177.76 75,459.96 82,923.03 92,136.70 104,700.80

PAPS 259 b. Conduct coordination and cooperation

Region IX

No. of coordination/cooperation conducted

Security & Public Order Improve

PNP-MTDP MOOE 141,437.40 152,083.22 167,124.42 185,693.80 211,015.68

PAPS 260 c. Dragnet operation

Region IX

No. of operation conducted

Security & Public Order Improve

PNP-MTDP MOOE 88,398.37 95,052.01 104,452.76 116,058.62 131,884.80

7. Red Teaming - - - - -

PAPS 261 a. Conducted challenging strategy

Region IX

No. of activities conducted

Security & Public Order Improve

PNP-MTDP MOOE 1,038,824.36 1,117,015.45 1,227,489.50 1,363,877.22 1,549,860.48

8. Feedback Mechanism - - - - -

PAPS 262 a. Action taken to gaps & lapses identified Region IX

No. Of meeting/ validation conducted

Security & Public Order Improve

PNP-MTDP MOOE 402,212.59 432,486.66 475,260.07 528,066.74 600,075.84

9. Review, assess, evaluate and validate the implementation of anti-criminality policies

- - - - -

a. NHQ - - - - -

PAPS 263 b. PRO9

Region IX

No. of assessment, evaluation and validation conducted

Security & Public Order Improve

PNP-MTDP MOOE 24,391.27 26,227.17 28,821.07 32,023.41 36,390.24

PAPS 264 c. PPO

Region IX

No. of assessment, evaluation and validation conducted

Security & Public Order Improve

PNP-MTDP MOOE 1,485,284.72 1,597,080.35 1,755,033.35 1,950,037.06 2,215,951.20

147,853.17

9,003,386.68

2,438,101.90

-

-

-

6,297,067.01

-

425,398.26

857,354.51

535,846.57

768,887.95

3,804,128.41

-

2,128,340.22

- -

Chapter 18 - PNP IXPage 23 of 54

Page 168: Table of Contents (By Chapter)

(-14-) (-15-)

Investment Requirements (In exact amount PhP)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (Proposed) 2021 (Proposed) 2022 (Proposed) Total

Chapter Outcome/Projec

t Title

Project Description/Objecti

ves

Specific Location

(Province/City/Municipality/Barangay

)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

PAPS 265 10. Update LGU-PNP Anti-Criminality Action Plans

Region IX

No. of LACAP monitoredSecurity & Public Order Improve

PNP-MTDP MOOE 8,636.02 9,286.04 10,204.44 11,338.27 12,884.40

11.Implementation of Security and Protection Operation(LOI 13/2011 SANG INGAT -CHARLIE

- - - - -

PAPS 266 Security Operation Conducted Region IX

No. of Security Operations conducted

Security & Public Order Improve

PNP-MTDP MOOE 10,685,085.35 11,489,339.08 12,625,647.34 14,028,497.05 15,941,473.92

PAPS 267 Checkpoint operationNo. of checkpoint conducted 1,396,252.79 1,501,347.08 1,649,831.96 1,833,146.62 2,083,121.16

13. Implementation of JLD Nr 07-2010 (Creation of Joint Peace and Security Coordinating Center)

- - - - -

a. JPSCC conducted/attended - - - - -

PAPS 268a.1. PRO9 Region IX

No. of meeting conducted/ attended

Security & Public Order Improve

PNP-MTDP MOOE 20,195.28 21,715.35 23,863.02 26,514.47 30,130.08

PAPS 269 a.2 PPO/CPO Level

Region IX

No. of meetings conducted

Security & Public Order Improve

PNP-MTDP MOOE 242,343.32 260,584.22 286,356.28 318,173.64 361,560.96

PAPS 270 a.3. CPS/MPS level

Region IX

No. of meetings conducted

Security & Public Order Improve

PNP-MTDP MOOE 720,027.52 774,223.14 850,794.66 945,327.40 1,074,235.68

14. PNP MC No. 2017-020 " Strengthened Bantay Turista"

- - - - -

PAPS 271 d. Tourist Assistance Desks (TAD) Region IX

No. of TADS establishedSecurity & Public Order Improve

PNP-MTDP MOOE 1,168,043.16 1,255,960.39 1,380,176.25 1,533,529.17 1,742,646.78

PAPS 272 f. Inspection of Tourist Police Units (TPU/TAD) Region IX

No. of inspection conducted

Security & Public Order Improve

PNP-MTDP MOOE 94,966.80 102,114.84 112,214.11 124,682.34 141,684.48

15. Maintain of Operation Center - - - - -

PAPS 273 a. Monitoring of incidents (RTOC) Region IX

No. of incidents monitored

Security & Public Order Improve

PNP-MTDP MOOE 340,035.81 365,629.90 401,791.10 446,434.56 507,312.00

PAPS 274 b.. Monitoring of incidents (PTOC) Region IX

No of incidents monitoredSecurity & Public Order Improve

PNP-MTDP MOOE 289,902.33 311,722.93 342,552.67 380,614.08 432,516.00

PAPS 275 c. Monitoring of incidents (CTOC/MTOC) Region IX

No of incidents monitoredSecurity & Public Order Improve

PNP-MTDP MOOE 272,464.59 292,972.68 321,948.00 357,720.00 406,500.00

2,061,203.38

1,757,308.01

1,651,605.27

7,080,355.74

575,662.57

-

1,469,018.42

4,364,608.40

-

-

-

122,418.20

-

64,770,042.75

8,463,699.61

52,349.18

Chapter 18 - PNP IXPage 24 of 54

Page 169: Table of Contents (By Chapter)

(-14-) (-15-)

Investment Requirements (In exact amount PhP)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (Proposed) 2021 (Proposed) 2022 (Proposed) Total

Chapter Outcome/Projec

t Title

Project Description/Objecti

ves

Specific Location

(Province/City/Municipality/Barangay

)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

16. Participate in the Peace and Order Council - - - - -

PAPS 276 a. PRO level (Quarterly)

Region IX

No. of meetings attendedSecurity & Public Order Improve

PNP-MTDP MOOE 15,488.86 16,654.69 18,301.85 20,335.39 23,108.40

PAPS 277 b. PPO level (Quarterly)

Region IX

No. of meetings attendedSecurity & Public Order Improve

PNP-MTDP MOOE 18,315.25 19,693.82 21,641.56 24,046.18 27,325.20

17. Conduct of Conference - - - - -

PAPS 278 a Conduct of Command Conference Region IX

No. of conference conducted

Security & Public Order Improve

PNP-MTDP MOOE 80,432.35 86,486.40 95,040.00 105,600.00 120,000.00

PAPS 279 b. Conduct of Staff Conference PRO Region IX

No. of conference conducted

Security & Public Order Improve

PNP-MTDP MOOE 96,518.82 103,783.68 114,048.00 126,720.00 144,000.00

PAPS 280 c. Conduct of Staff Conference PPO

Region IX

No. of conference conducted

Security & Public Order Improve

PNP-MTDP MOOE 386,075.29 415,134.72 456,192.00 506,880.00 576,000.00

B. Law Enforcement Programs - - - - - 1. Monitor the Implementation of Special Laws

- - - - -

a. LOI 5406 Anti Illegal Gambling Campaign - - - - -

PAPS 281 a.1. Conduct of Anti-Illegal Gambling Operations

Region IX

No. of Operations Conducted

Security & Public Order Improve

PNP-MTDP MOOE 589,699.84 634,085.85 696,797.64 774,219.60 879,795.00

2. Implementation of Campaign Against Illegal Fishing

- - - - -

PAPS 282 a. Conduct of illegal fishing operations Region IX

No. Of operation conducted

Security & Public Order Improve

PNP-MTDP MOOE 120,997.07 130,104.37 142,971.84 158,857.60 180,520.00

3. Implementation of Anti-illegal Logging Campaign - - - - -

PAPS 283 a. Conduct of Illegal logging operations

Region IX

No. of operation conducted

Security & Public Order Improve

PNP-MTDP MOOE 20,551.27 22,098.14 24,283.67 26,981.86 30,661.20

4. Implementation of CMC 17-2017 PNP Anti Illegal Drugs Double Barrel Reloaded

- - - - - -

733,450.88

-

124,576.14

-

3,574,597.94

-

2,340,282.01

-

-

-

487,558.75

585,070.50

-

93,889.19

111,022.00

Chapter 18 - PNP IXPage 25 of 54

Page 170: Table of Contents (By Chapter)

(-14-) (-15-)

Investment Requirements (In exact amount PhP)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (Proposed) 2021 (Proposed) 2022 (Proposed) Total

Chapter Outcome/Projec

t Title

Project Description/Objecti

ves

Specific Location

(Province/City/Municipality/Barangay

)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

PAPS 284 a. Conduct anti-illegal drugs operation

Region IX

No. of positive operation conducted checkpoint; interdiction- Land; Oplan sita;Police Response, Search Incidental to Lawful; Arrest Seized of Drugs Incidental to lawful Search; SW

Security & Public Order Improve

PNP-MTDP MOOE 1,157,201.70 1,244,302.90 1,367,365.82 1,519,295.36 1,726,472.00

PAPS 285 b. Service Warrant of Arrest

Region IX

No. of operation conducted

Security & Public Order Improve

PNP-MTDP MOOE 88,462.72 95,121.20 104,528.79 116,143.10 131,980.80

PAPS 286 c. Service of Search Warrant

Region IX

No. of search warrant served

Security & Public Order Improve

PNP-MTDP MOOE 264,950.60 284,893.12 313,069.36 347,854.85 395,289.60

PAPS 287 d. Conduct Buy Bust Operation

Region IX

No. of operation conducted

Security & Public Order Improve

PNP-MTDP MOOE 570,120.60 613,032.90 673,662.53 748,513.92 850,584.00

PAPS 288 f. Over Sight Committee Meeting Region IX

No. of meetings conducted

Security & Public Order Improve

PNP-MTDP MOOE 96,518.82 103,783.68 114,048.00 126,720.00 144,000.00

PAPS 289 g. Field Inspection and Evaluation Region IX

No. of Field Inspection and Evaluation Conducted

Security & Public Order Improve

PNP-MTDP MOOE 179,463.88 192,971.92 212,057.05 235,618.94 267,748.80

5. Implementation of Campaign on Smuggling and Protected species of Phil flora & fauna RA 4653/Violation of TCCPPiracy

- - - - -

PAPS 290 a. Smuggling of protected species of Phil flora & fauna RA 4653 operation campaign Region IX

No.of operations conducted

Security & Public Order Improve

PNP-MTDP MOOE 21,691.00 23,323.65 25,630.39 28,478.21 32,361.60

PAPS 291 b. Smuggling of Prime Commodities (rice,sugar,etc.) Region IX

No. of operations conducted

Security & Public Order Improve

PNP-MTDP MOOE 25,046.63 26,931.86 29,595.46 32,883.84 37,368.00

6. Strengthen linkages with other agencies - - - - -

PAPS 292 a. RLECC Region IX

No. of meetings attendedSecurity & Public Order Improve

PNP-MTDP MOOE 29,223.75 31,423.39 34,531.20 38,368.00 43,600.00

PAPS 293 b. PLECC Region IX

No. of meetings attendedSecurity & Public Order Improve

PNP-MTDP MOOE 116,895.02 125,693.57 138,124.80 153,472.00 174,400.00

PAPS 294 c. MLECC Region IX

No. of meetings attendedSecurity & Public Order Improve

PNP-MTDP MOOE 571,069.70 614,053.44 674,784.00 749,760.00 852,000.00

708,585.39

3,461,667.14

151,825.80

-

177,146.35

1,087,860.59

-

131,484.84

1,606,057.53

3,455,913.95

585,070.50

7,014,637.78

536,236.62

Chapter 18 - PNP IXPage 26 of 54

Page 171: Table of Contents (By Chapter)

(-14-) (-15-)

Investment Requirements (In exact amount PhP)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (Proposed) 2021 (Proposed) 2022 (Proposed) Total

Chapter Outcome/Projec

t Title

Project Description/Objecti

ves

Specific Location

(Province/City/Municipality/Barangay

)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

7. Monitors the accomplishments on FAS and Explosives

- - - - -

PAPS 295 a. Implementation of LOI 64-2010 Kontra Boga-Bravo Region IX

No. of operation conducted

Security & Public Order Improve

PNP-MTDP MOOE 4,279,637.88 4,601,761.16 5,056,880.40 5,618,756.00 6,384,950.00

PAPS 296 b. Implementation of Bilang Boga Region IX

No. of FAS license to be renewed

Security & Public Order Improve

PNP-MTDP MOOE 4,493,583.92 4,831,810.66 5,309,682.05 5,899,646.72 6,704,144.00

8. Supervise the Internal Security Operations Campaign Plan Kapanatagan

- - - - -

PAPS 297 a. ISO Validation Board Meeting

Region IX

No. of meeting conductedSecurity & Public Order Improve

PNP-MTDP MOOE 8,130.42 8,742.39 9,607.02 10,674.47 12,130.08

PAPS 298 b. Conduct Major ISO

Region IX

No. of Major ISO conducted

Security & Public Order Improve

PNP-MTDP MOOE 1,307,639.90 1,406,064.41 1,545,125.73 1,716,806.36 1,950,916.32

PAPS 299 c. Conduct Minor ISO

Region IX

No. of Minor ISO conducted

Security & Public Order Improve

PNP-MTDP MOOE 1,021,251.18 1,098,119.55 1,206,724.78 1,340,805.31 1,523,642.40

PAPS 300 d. Daily Aggressive Patrols Region IX

No. of Daily Aggressive Patrols conducted

Security & Public Order Improve

PNP-MTDP MOOE 1,688,611.88 1,815,711.70 1,995,287.58 2,216,986.20 2,519,302.50

Implementation of ELCAC - - - - -

PAPS 301 RTF-ELCAC Meeting attended

Region IX

No. of RTF-ELCAC Meeting attended

Security & Public Order Improve

PNP-MTDP MOOE 33,879.50 36,429.57 40,032.50 44,480.55 50,546.08

PAPS 302 PTF-ELCAC Meetings

Region IX

No. of PTF-ELCAC Meetings attended

Security & Public Order Improve

PNP-MTDP MOOE 12,837.16 13,803.40 15,168.57 16,853.97 19,152.24

PAPS 303 M/CTF-ELCAC Meetings

Region IX

No. of M/CTF-ELCAC Meetings attended

Security & Public Order Improve

PNP-MTDP MOOE 52,276.58 56,211.37 61,770.74 68,634.16 77,993.36

PAPS 304Meetings on the Situational Awarenessand Knowledge

Region IX

No. of Meetings attended on the Situational Awarenessand KnowledgeManagement

Security & Public Order Improve

PNP-MTDP MOOE 59,353.93 63,821.43 70,133.44 77,926.04 88,552.32

PAPS 305Meetings on the Local GovernmentEmpowerment

Region IX

No.of Meetings attended on the Local GovernmentEmpowerment

Security & Public Order Improve

PNP-MTDP MOOE 59,353.93 63,821.43 70,133.44 77,926.04 88,552.32 359,787.16

77,815.35

316,886.21

359,787.16

10,235,899.86

-

205,368.20

49,284.39

7,926,552.72

6,190,543.23

25,941,985.45

27,238,867.35

-

-

Chapter 18 - PNP IXPage 27 of 54

Page 172: Table of Contents (By Chapter)

(-14-) (-15-)

Investment Requirements (In exact amount PhP)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (Proposed) 2021 (Proposed) 2022 (Proposed) Total

Chapter Outcome/Projec

t Title

Project Description/Objecti

ves

Specific Location

(Province/City/Municipality/Barangay

)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

PAPS 306 Meetings on the Legal Cooperation

Region IX

No. of Meetings attended on the Legal Cooperation

Security & Public Order Improve

PNP-MTDP MOOE 53,809.46 57,859.63 63,582.01 70,646.68 80,280.32

PAPS 307 Meetings on the StrategicCommunication

Region IX

No.of Meetings Conducted on the StrategicCommunication

Security & Public Order Improve

PNP-MTDP MOOE 59,353.93 63,821.43 70,133.44 77,926.04 88,552.32

PAPS 308 Sectoral Unification,Capacity-building

Region IX

No. of Meetings attended on the Sectoral Unification,Capacity-building andEmpowerment

Security & Public Order Improve

PNP-MTDP MOOE 53,809.46 57,859.63 63,582.01 70,646.68 80,280.32

PAPS 309 Basic Service Course

Region IX

No. of Meetings attended on the Basic Services

Security & Public Order Improve

PNP-MTDP MOOE 59,295.80 63,758.93 70,064.76 77,849.73 88,465.60

PAPS 310Poverty Reduction, livelihood and employment Program

Region IX

No. of Poverty Reduction,Livelihood and Employment

Security & Public Order Improve

PNP-MTDP MOOE 53,809.46 57,859.63 63,582.01 70,646.68 80,280.32

PAPS 311Infrastructure,ResourceManagement and Employment

Region IX

No. of Meetings attended on the Infrastructure,ResourceManagement and Employment

Security & Public Order Improve

PNP-MTDP MOOE 59,295.80 63,758.93 70,064.76 77,849.73 88,465.60

PAPS 312 Localized PeaceEngagement

Region IX

No. of Meetings Conducted on the Localized PeaceEngagement

Security & Public Order Improve

PNP-MTDP MOOE 53,809.46 57,859.63 63,582.01 70,646.68 80,280.32

PAPS 313

Meetings Conducted on the Peace, LawEnforcement andDevelopmentSupport Region IX

No. of Meetings Conducted on the Peace, LawEnforcement andDevelopmentSupport

Security & Public Order Improve

PNP-MTDP MOOE 170,184.56 182,994.15 201,092.47 223,436.08 253,904.64

PAPS 314 E-CLIP and AmnestyProgram

Region IX

No. of Meetings attended on the E-CLIP and AmnestyProgram

Security & Public Order Improve

PNP-MTDP MOOE 53,809.46 57,859.63 63,582.01 70,646.68 80,280.32

PAPS 315 InternationalEngagement

Region IX

No. of Meetings attended on the InternationalEngagement

Security & Public Order Improve

PNP-MTDP MOOE 59,470.18 63,946.43 70,270.80 78,078.67 88,725.76

D. Logistical Services - - - - 1. Procurement Program - - - - Procurement of FUEL - - - -

- -

326,178.11

360,491.84

-

359,434.81

326,178.11

1,031,611.91

326,178.11

359,434.81

326,178.11

326,178.11

359,787.16

Chapter 18 - PNP IXPage 28 of 54

Page 173: Table of Contents (By Chapter)

(-14-) (-15-)

Investment Requirements (In exact amount PhP)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (Proposed) 2021 (Proposed) 2022 (Proposed) Total

Chapter Outcome/Projec

t Title

Project Description/Objecti

ves

Specific Location

(Province/City/Municipality/Barangay

)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

PAPS 316Diesel

Region IX

No. of liters procuredSecurity & Public Order Improve

PNP-MTDP MOOE 129,662,300.18 139,421,828.15 153,210,800.16 170,234,222.40 193,447,980.00

PAPS 317 Gasoline

Region IX

No. of liters procuredSecurity & Public Order Improve

PNP-MTDP MOOE 23,702,609.81 25,486,677.22 28,007,337.60 31,119,264.00 35,362,800.00

Procurement of Oil and Lubricants - - - - -

PAPS 318ATO

Region IX

No. of liters procuredSecurity & Public Order Improve

PNP-MTDP MOOE 2,000,620.70 2,151,205.06 2,363,961.60 2,626,624.00 2,984,800.00

PAPS 319Steering Oil/ATO

Region IX

No. of liters procuredSecurity & Public Order Improve

PNP-MTDP MOOE 107,176.11 115,243.13 126,640.80 140,712.00 159,900.00

PAPS 320Gear Oil

Region IX

No. of liters procuredSecurity & Public Order Improve PNP-MTDP MOOE

107,176.11 115,243.13 126,640.80 140,712.00 159,900.00

PAPS 321Engine Oil

Region IX

No. of liters procuredSecurity & Public Order Improve

PNP-MTDP MOOE 1,212,879.65 1,304,171.67 1,433,155.68 1,592,395.20 1,809,540.00

Procurement of Ammunition - - - - -

PAPS 322 5.56 mm

Region IX

No. of rounds procuredSecurity & Public Order Improve

PNP-MTDP MOOE 26,422,992.82 28,411,820.24 31,221,780.48 34,690,867.20 39,421,440.00

PAPS 323 5.56 mm linked

Region IX

No. of rounds procuredSecurity & Public Order Improve

PNP-MTDP MOOE 1,726,614.49 1,856,574.72 2,040,192.00 2,266,880.00 2,576,000.00

PAPS 324 7.62 mm

Region IX

No. of rounds procuredSecurity & Public Order Improve

PNP-MTDP MOOE 564,956.84 607,480.47 667,560.96 741,734.40 842,880.00

PAPS 325 7.62 mm linked

Region IX

No. of rounds procuredSecurity & Public Order Improve

PNP-MTDP MOOE 2,606,008.20 2,802,159.36 3,079,296.00 3,421,440.00 3,888,000.00

PAPS 326 9mm

Region IX

No. of rounds procuredSecurity & Public Order Improve

PNP-MTDP MOOE 2,971,935.19 3,195,629.24 3,511,680.48 3,901,867.20 4,433,940.00

PAPS 327 40 mm

Region IX

No. of rounds procuredSecurity & Public Order Improve

PNP-MTDP MOOE 3,764.23 4,047.56 4,447.87 4,942.08 5,616.00

PAPS 328 Procurement of Office Supplies

Region IX

No. of procurement conducted

Security & Public Order Improve

PNP-MTDP MOOE 330,975.11 355,887.21 391,084.85 434,538.72 493,794.00

22,817.75

2,006,279.89

3,424,612.67

15,796,903.56

18,015,052.11

-

160,168,900.74

10,466,261.21

649,672.04

649,672.04

7,352,142.20

143,678,688.63

-

12,127,211.36

785,977,130.88

Chapter 18 - PNP IXPage 29 of 54

Page 174: Table of Contents (By Chapter)

(-14-) (-15-)

Investment Requirements (In exact amount PhP)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (Proposed) 2021 (Proposed) 2022 (Proposed) Total

Chapter Outcome/Projec

t Title

Project Description/Objecti

ves

Specific Location

(Province/City/Municipality/Barangay

)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

Procurement of Military & Pol Equipmnt - - - - -

PAPS 329 Tear Gas

Region IX No. of pieces procured

Security & Public Order Improve

PNP-MTDP MOOE 29,491.86 31,711.68 34,848.00 38,720.00 44,000.00

PAPS 330 Handcuffs

Region IX

No. of pieces procuredSecurity & Public Order Improve

PNP-MTDP MOOE 5,634,286.26 6,058,372.32 6,657,552.00 7,397,280.00 8,406,000.00

PAPS 331 Reflectorized Vest

Region IX

No. of pieces procuredSecurity & Public Order Improve

PNP-MTDP MOOE 4,686,525.04 5,039,274.24 5,537,664.00 6,152,960.00 6,992,000.00

Procurement of Awards & Mementos - - - - -

PAPS 332 Memento

Region IX

No. of procurement conducted

Security & Public Order Improve

PNP-MTDP MOOE 96,518.82 103,783.68 114,048.00 126,720.00 144,000.00

PAPS 333 Plaque

Region IX

No. of procurement conducted

Security & Public Order Improve

PNP-MTDP MOOE 36,194.56 38,918.88 42,768.00 47,520.00 54,000.00

PAPS 334 Medals

Region IX

No. of procurement conducted

Security & Public Order Improve

PNP-MTDP MOOE 13,673.50 14,702.69 16,156.80 17,952.00 20,400.00

2. Supply Management - - - - - a. Issuance and Distribution - - - - - Bidding and Awarding of Contract - - - - -

PAPS 335 Preparation of ITB, Bid docs & Advertisement Region IX

No. of activities conducted

Security & Public Order Improve

PNP-MTDP MOOE 26,810.78 28,828.80 31,680.00 35,200.00 40,000.00

PAPS 336 BAC Conferences Region IX

No. of conferences conducted

Security & Public Order Improve

PNP-MTDP MOOE 24,565.65 26,414.68 29,027.12 32,252.35 36,650.40

PAPS 337 Bid Evaluation, Post Qualification and Awarding of Contracts Region IX

No. of activities conducted

Security & Public Order Improve

PNP-MTDP MOOE 2,826.39 3,039.13 3,339.71 3,710.78 4,216.80

PAPS 338 Preparation and submission of logistics reports Region IX

No. of reports submittedSecurity & Public Order Improve

PNP-MTDP MOOE 51,637.57 55,524.27 61,015.68 67,795.20 77,040.00

PAPS 339 Transportation/Shipment of Newly Issued Equipment Region IX

No. of activities conducted

Security & Public Order Improve

PNP-MTDP MOOE 84,453.97 90,810.72 99,792.00 110,880.00 126,000.00

PAPS 340 b. Supply Inventory, Inspection & Accountability

- - - - - -

17,132.81

313,012.72

511,936.69

-

162,519.58

148,910.19

82,884.99

- -

-

585,070.50

219,401.44

178,771.54

34,153,490.58

28,408,423.28

-

Chapter 18 - PNP IXPage 30 of 54

Page 175: Table of Contents (By Chapter)

(-14-) (-15-)

Investment Requirements (In exact amount PhP)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (Proposed) 2021 (Proposed) 2022 (Proposed) Total

Chapter Outcome/Projec

t Title

Project Description/Objecti

ves

Specific Location

(Province/City/Municipality/Barangay

)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

PAPS 341 Issuance of Property Clearances Region IX

No. of clearances issuedSecurity & Public Order Improve

PNP-MTDP MOOE 12,598.76 13,547.06 14,886.88 16,540.97 18,796.56

PAPS 342 Inspection/Inventory and Physical Accounting of Property Plant & Equipment (PPE) Region IX

No. of inspection conducted

Security & Public Order Improve

PNP-MTDP MOOE 8,043.24 8,648.64 9,504.00 10,560.00 12,000.00

PAPS 343 Implementation of LOI-BAWI Region IX

No. of activities conducted

Security & Public Order Improve

PNP-MTDP MOOE 784.70 843.76 927.21 1,030.23 1,170.72

Bonding of Accountable Officers - - - - -

PAPS 344 Bonding of Supply PCO & PNCO Accountable Officer Region IX

No. of supply & accountable officer bonded

Security & Public Order Improve

PNP-MTDP MOOE 32,193.05 34,616.18 38,039.76 42,266.40 48,030.00

PAPS 345 Postage and Courier Services Region IX

No. of payments conducted

Security & Public Order Improve

PNP-MTDP MOOE 6,434.59 6,918.91 7,603.20 8,448.00 9,600.00

c. Repair and Maintenance - - - - -

PAPS 346 Mobility Assets Region IX

No. of units repaired & maintained

Security & Public Order Improve

PNP-MTDP MOOE 281,513.23 302,702.40 332,640.00 369,600.00 420,000.00

PAPS 347 Periodic Maintenance Services on newly issued PNP Mobility Region IX

No. of Newly Issued Mobility Assets undergone PMS

Security & Public Order Improve

PNP-MTDP MOOE 643,458.82 691,891.20 760,320.00 844,800.00 960,000.00

PAPS 348 Water craft Region IX

No. of repaired & maintained water craft

Security & Public Order Improve

PNP-MTDP MOOE 8,847.56 9,513.50 10,454.40 11,616.00 13,200.00

PAPS 349 Refurbishment of Firearms Region IX

No of repaired & maintained Fas

Security & Public Order Improve

PNP-MTDP MOOE 46,918.87 50,450.40 55,440.00 61,600.00 70,000.00

PAPS 350 Communication equipment Region IX

No. of repaired & maintained commo equipment

Security & Public Order Improve

PNP-MTDP MOOE 40,216.18 43,243.20 47,520.00 52,800.00 60,000.00

PAPS 351 Investigative equipment Region IX

No. of investigative equipment repaired &maintained

Security & Public Order Improve

PNP-MTDP MOOE 4,021.62 4,324.32 4,752.00 5,280.00 6,000.00

PAPS 352 ISO equipment Region IX

No. of ISO equiment repaired & maintained

Security & Public Order Improve

PNP-MTDP MOOE 6,702.70 7,207.20 7,920.00 8,800.00 10,000.00

ICT Machinery & equipment - - - - - -

243,779.38

24,377.94

40,629.90

3,900,470.02

53,631.46

284,409.27

39,004.70

-

1,706,455.63

4,756.62

-

195,145.39

76,370.23

48,755.88

Chapter 18 - PNP IXPage 31 of 54

Page 176: Table of Contents (By Chapter)

(-14-) (-15-)

Investment Requirements (In exact amount PhP)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (Proposed) 2021 (Proposed) 2022 (Proposed) Total

Chapter Outcome/Projec

t Title

Project Description/Objecti

ves

Specific Location

(Province/City/Municipality/Barangay

)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

PAPS 353 Desktop Computers Region IX

No. of Desktop repairedSecurity & Public Order Improve

PNP-MTDP MOOE 152,821.47 164,324.16 180,576.00 200,640.00 228,000.00

PAPS 354 Printer Region IX

No. of Printer RepairedSecurity & Public Order Improve

PNP-MTDP MOOE 59,653.99 64,144.08 70,488.00 78,320.00 89,000.00

PAPS 355 Office equipment Region IX

No. of office equipment repaired & maintained

Security & Public Order Improve

PNP-MTDP MOOE 40,216.18 43,243.20 47,520.00 52,800.00 60,000.00

PAPS 356 Motorpool equipment Region IX

No. of Motorpool equipment repaired & maintained

Security & Public Order Improve

PNP-MTDP MOOE 29,491.86 31,711.68 34,848.00 38,720.00 44,000.00

PAPS 357 PNP building and facilities Region IX

No. of buildings repairedSecurity & Public Order Improve

PNP-MTDP MOOE 402,161.76 432,432.00 475,200.00 528,000.00 600,000.00

PAPS 358 Repair & Maintenance of PNP buildings Region IX

No. of Newly Constructed PNP bldgs repaired & maintained

Security & Public Order Improve

PNP-MTDP MOOE 321,729.41 345,945.60 380,160.00 422,400.00 480,000.00

PAPS 359 Other PNP structures Region IX

No. of structures repaired & maintained

Security & Public Order Improve

PNP-MTDP MOOE 201,080.88 216,216.00 237,600.00 264,000.00 300,000.00

PAPS 360 Genset Region IX

No. of Genset repaired & maintained

Security & Public Order Improve

PNP-MTDP MOOE 53,621.57 57,657.60 63,360.00 70,400.00 80,000.00

PAPS 361 Military and police equipment Region IX

No. of Military & Police equipment repaired & maintained

Security & Public Order Improve

PNP-MTDP MOOE 8,043.24 8,648.64 9,504.00 10,560.00 12,000.00

PAPS 362 Furniture & Fixtures Region IX

No. of furniture & fixtures for the newly constructed PNP bldgs provided

Security & Public Order Improve

PNP-MTDP MOOE 337,537.05 362,943.06 398,838.53 443,153.92 503,584.00

PAPS 363 Rent of vehicles Region IX

No. of vehicles rentedSecurity & Public Order Improve

PNP-MTDP MOOE 48,259.41 51,891.84 57,024.00 63,360.00 72,000.00

Maintenance of K9 - - - - -

PAPS 364 Food

Region IX kg of food provided

Security & Public Order Improve

PNP-MTDP MOOE 96,518.82 103,783.68 114,048.00 126,720.00 144,000.00

PAPS 365 Multi vitamins

Region IX

No. of multi-vitamin provided

Security & Public Order Improve

PNP-MTDP MOOE 8,043.24 8,648.64 9,504.00 10,560.00 12,000.00

PAPS 366 K9 cages

Region IX

No. of cages procuredSecurity & Public Order Improve

PNP-MTDP MOOE 20,108.09 21,621.60 23,760.00 26,400.00 30,000.00 121,889.69

-

585,070.50

48,755.88

48,755.88

2,046,056.55

292,535.25

1,950,235.01

1,218,896.88

325,039.17

243,779.38

178,771.54

2,437,793.76

926,361.63

361,606.07

Chapter 18 - PNP IXPage 32 of 54

Page 177: Table of Contents (By Chapter)

(-14-) (-15-)

Investment Requirements (In exact amount PhP)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (Proposed) 2021 (Proposed) 2022 (Proposed) Total

Chapter Outcome/Projec

t Title

Project Description/Objecti

ves

Specific Location

(Province/City/Municipality/Barangay

)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

PAPS 367 Medical Check up

Region IX

No. of medical check upSecurity & Public Order Improve

PNP-MTDP MOOE 16,086.47 17,297.28 19,008.00 21,120.00 24,000.00

d. Disposal - - - - -

PAPS 368 Disposal of BER Equipment and Appraisal Region IX

No. of activities conducted

Security & Public Order Improve

PNP-MTDP MOOE 7,507.02 8,072.06 8,870.40 9,856.00 11,200.00

PAPS 369 Turn- in of BER Equipment Region IX

No. of BER equipment turned- in

Security & Public Order Improve

PNP-MTDP MOOE 16,494.80 17,736.34 19,490.49 21,656.10 24,609.20

PAPS 370 Preparation of ITB and Advertisement Region IX

No. of activities conducted

Security & Public Order Improve

PNP-MTDP MOOE 13,405.39 14,414.40 15,840.00 17,600.00 20,000.00

PAPS 371 Disposal Committee Conferences Region IX No. of conferences conducted

Security & Public Order Improve

PNP-MTDP MOOE 2,681.08 2,882.88 3,168.00 3,520.00 4,000.00

PAPS 372 Conduct of other disposal activities Region IX

No. of activities conducted

Security & Public Order Improve

PNP-MTDP MOOE 18,767.55 20,180.16 22,176.00 24,640.00 28,000.00

Disposal of UXO/ROW and corroded ammo

- - - - -

PAPS 373 PENTEX 100gms Region IX

No. of units utilizedSecurity & Public Order Improve

PNP-MTDP MOOE 225,768.25 242,761.56 266,770.94 296,412.16 336,832.00

PAPS 374 Detonating Cord Region IX

No. of units utilizedSecurity & Public Order Improve

PNP-MTDP MOOE 89,183.39 95,896.12 105,380.35 117,089.28 133,056.00

PAPS 375 Time Fuse Region IX

No. of units utilizedSecurity & Public Order Improve

PNP-MTDP MOOE 26,424.71 28,413.67 31,223.81 34,693.12 39,424.00

PAPS 376 Fuse Igniter Region IX

No. of units utilizedSecurity & Public Order Improve

PNP-MTDP MOOE 1,321.77 1,421.26 1,561.82 1,735.36 1,972.00

PAPS 377 Blasting Cap Region IX

No. of units utilizedSecurity & Public Order Improve

PNP-MTDP MOOE 20,644.30 22,198.18 24,393.60 27,104.00 30,800.00

e. Logistics Training - - - - -

PAPS 378 Seminar in Proper Care & Maintenance of Mobility Assets Region IX

No. of participants attended

Security & Public Order Improve

PNP-MTDP MOOE - - - - - -

8,012.22

125,140.08

-

1,368,544.91

540,605.14

160,179.30

16,251.96

113,763.71

-

45,505.48

99,986.92

81,259.79

97,511.75

-

Chapter 18 - PNP IXPage 33 of 54

Page 178: Table of Contents (By Chapter)

(-14-) (-15-)

Investment Requirements (In exact amount PhP)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (Proposed) 2021 (Proposed) 2022 (Proposed) Total

Chapter Outcome/Projec

t Title

Project Description/Objecti

ves

Specific Location

(Province/City/Municipality/Barangay

)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

PAPS 379 Seminar on Relief from Property Accountability Region IX

No. of participants attended

Security & Public Order Improve

PNP-MTDP MOOE - - - - -

PAPS 380 Seminar on Disposal of BER Equipment Region IX

No. of participants attended

Security & Public Order Improve

PNP-MTDP MOOE - - - - -

PAPS 381 Seminar on Supply Management Region IX

No. of participants attended

Security & Public Order Improve

PNP-MTDP MOOE - - - - -

3. Property Management - - - - - a. Real Estate - - - - -

PAPS 382 Inspection of doable lots for titling

Region IX

No of inspections conducted

Security & Public Order Improve

PNP-MTDP MOOE 14,131.96 15,195.66 16,698.53 18,553.92 21,084.00

PAPS 383 Survey of PNP lots

Region IX

No. of surveys conductedSecurity & Public Order Improve

PNP-MTDP MOOE 14,131.96 15,195.66 16,698.53 18,553.92 21,084.00

PAPS 384 Titling of PNP lots

Region IX

No. of lots for titlingSecurity & Public Order Improve

PNP-MTDP MOOE 167,299.29 179,891.71 197,683.20 219,648.00 249,600.00

PAPS 385 Inspection of ongoing construction of PNP Buildings Region IX

No. of inspection conducted

Security & Public Order Improve

PNP-MTDP MOOE 102,953.41 110,702.59 121,651.20 135,168.00 153,600.00

PAPS 386 Insurance of PNP Buildings Region IX

No. of insured PNP buildings

Security & Public Order Improve

PNP-MTDP MOOE 754,910.27 811,731.48 892,012.61 991,125.12 1,126,278.55

b. Fixed expenditure - - - - -

PAPS 387 Water expenses Region IX

Amount consumed (cu.m)Security & Public Order Improve

PNP-MTDP MOOE 2,001,209.20 2,151,837.85 2,364,656.98 2,627,396.64 2,985,678.00

PAPS 388 Electricity expenses Region IX

Amount consumed (kwh)Security & Public Order Improve

PNP-MTDP MOOE 13,278,953.36 14,278,444.47 15,690,598.32 17,433,998.13 19,811,361.51

Communication Expenses - - - - -

PAPS 389 Telephone Region IX

Amount paidSecurity & Public Order Improve

PNP-MTDP MOOE 1,409,363.70 1,515,444.84 1,665,324.00 1,850,359.99 2,102,681.81

PAPS 390 Cellular Phone Region IX

Amount paidSecurity & Public Order Improve

PNP-MTDP MOOE 148,995.13 160,209.82 176,054.74 195,616.38 222,291.34

8,543,174.33

903,167.42

12,130,778.66

80,493,355.79

-

624,075.20

4,576,058.04

-

85,664.07

85,664.07

1,014,122.20

-

- -

-

-

Chapter 18 - PNP IXPage 34 of 54

Page 179: Table of Contents (By Chapter)

(-14-) (-15-)

Investment Requirements (In exact amount PhP)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (Proposed) 2021 (Proposed) 2022 (Proposed) Total

Chapter Outcome/Projec

t Title

Project Description/Objecti

ves

Specific Location

(Province/City/Municipality/Barangay

)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

PAPS 391 Internet Subscription Region IX

Amount paidSecurity & Public Order Improve

PNP-MTDP MOOE 53,911.83 57,969.71 63,702.98 70,781.09 80,433.06

Implementation of FCA on electric - - - - -

PAPS 392 Conduct of infro drive Region IX

No. of information drive conducted

Security & Public Order Improve

PNP-MTDP MOOE 653.92 703.13 772.68 858.53 975.60

PAPS 393 Implementation of Fixed Ceiling Amount on electricity Region IX

No. of implemented Fixed Ceiling Amount on electricty

Security & Public Order Improve

PNP-MTDP MOOE 1,307.83 1,406.27 1,545.35 1,717.06 1,951.20

c. Registration and Insurance of PNP Mobility Assets

- - - - -

PAPS 394 Registration of Vehicles Region IX

No. of PNP vehicles registered

Security & Public Order Improve

PNP-MTDP MOOE 585,798.20 629,890.54 692,187.41 769,097.12 873,974.00

PAPS 395 Emission test of Land vehicles Region IX

No. of PNP vehicles tested

Security & Public Order Improve

PNP-MTDP MOOE 107,042.06 115,098.98 126,482.40 140,536.00 159,700.00

PAPS 396 Insurance of Land Vehicles Region IX

No. of PNP vehicles insured

Security & Public Order Improve

PNP-MTDP MOOE 1,318,600.81 1,417,850.33 1,558,077.29 1,731,196.98 1,967,269.30

- - - - E. POLICE COMMUNITY RELATIONS SERVICES - - - - SANTINIG ACTIVITIES - - - - A. Police Institutional Information Program - - - - 1. Police Information and Continuing Education (P.I.C.E.)

- - - -

PAPS 397 a. Police Information and Continuing Education (P.I.C.E.) Region IX

No. of activities conducted

Security & Public Order Improve

PNP-MTDP MOOE 75,854.14 81,563.59 89,630.32 99,589.25 113,169.60

B. Police Community Information Program - - - - - B. 1. Broadcast and Electronic Media - - - - -

PAPS 398 a. Television appearance/guesting

Region IXNo. of activities

conducted

Security & Public Order Improve

PNP-MTDP MOOE 100,874.23 108,466.92 119,194.42 132,438.24 150,498.00

PAPS 399 b. Radio guestings

Region IXNo. of activities

conducted

Security & Public Order Improve

PNP-MTDP MOOE 100,874.23 108,466.92 119,194.42 132,438.24 150,498.00

c. Social Media Post/CT - - - - -

611,471.81

611,471.81

-

459,806.91

-

-

- -

-

7,992,994.71

- -

-

3,550,947.27

648,859.44

-

3,963.85

7,927.71

326,798.67

Chapter 18 - PNP IXPage 35 of 54

Page 180: Table of Contents (By Chapter)

(-14-) (-15-)

Investment Requirements (In exact amount PhP)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (Proposed) 2021 (Proposed) 2022 (Proposed) Total

Chapter Outcome/Projec

t Title

Project Description/Objecti

ves

Specific Location

(Province/City/Municipality/Barangay

)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

PAPS 400 c.1. Social Media Post

Region IXNo. Important

updates/public safety tips

Security & Public Order Improve

PNP-MTDP MOOE 12,064.85 12,972.96 14,256.00 15,840.00 18,000.00

c.2. Social Media Engagement

Region IXNo. of engagements with

citizens

Security & Public Order Improve

PNP-MTDP MOOE - - - - -

c.3 Social Media FB Live Programming

Region IXNo. of engagements with

citizens

Security & Public Order Improve

PNP-MTDP MOOE - - - - -

PAPS 401 c.4 Complaints/Crime Reported

Region IX

No. of reported complaints/crimes

reported through SMS hotline acted upon

Security & Public Order Improve

PNP-MTDP MOOE 7,342.67 7,895.34 8,676.20 9,640.22 10,954.80

B.2. Seminar-Workshops on Social Media - - - - -

a. Social Media Exploitation

Region IXNo. of trainings

conducted/ attended

Security & Public Order Improve

PNP-MTDP MOOE - - - - -

b. Seminar-Workshop on Cyberspace Monitoring and Countering Terrorist Propaganda Region IX

No. of trainings conducted/ attended

Security & Public Order Improve

PNP-MTDP MOOE - - - - -

c. Media Monitoring, Issues and Analysis

Region IXNo. of trainings

conducted/ attended

Security & Public Order Improve

PNP-MTDP MOOE - - - - -

d. Social Media and Product Development Training

No. of trainings conducted/ attended

- - - - -

e. Strategic Communications Seminar-Workshop Region IX

No. of trainings conducted/ attended

Security & Public Order Improve

PNP-MTDP MOOE - - - - -

f. Hosting and Events Specialization Seminar-Workshop Region IX

No. of trainings conducted/ attended

Security & Public Order Improve

PNP-MTDP MOOE - - - - -

2. Printed Media (Information, Education and Communication (IEC) materials

- - - - -

PAPS 402 a. Crime Prevention and Public Safety

Region IX No. of copies printed

Security & Public Order Improve

PNP-MTDP MOOE 127,876.72 137,501.84 151,100.93 167,889.92 190,784.00

PAPS 403 b. Office/Unit magazine/newsletter/gazette No. of copies printed 8,718.87 9,375.13 10,302.34 11,447.04 13,008.00

PAPS 404 c. Press releases/featured stories

Region IX

No. of press releases/featured stories

published

Security & Public Order Improve

PNP-MTDP MOOE 1,743.77 1,875.03 2,060.47 2,289.41 2,601.60

775,153.41

52,851.37

10,570.27

-

-

-

-

-

-

44,509.24

-

-

73,133.81

-

-

Chapter 18 - PNP IXPage 36 of 54

Page 181: Table of Contents (By Chapter)

(-14-) (-15-)

Investment Requirements (In exact amount PhP)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (Proposed) 2021 (Proposed) 2022 (Proposed) Total

Chapter Outcome/Projec

t Title

Project Description/Objecti

ves

Specific Location

(Province/City/Municipality/Barangay

)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

PAPS 405 d. Tarpaulin /streamer display

Region IXNo. of Tarpaulin/streamer

displayed

Security & Public Order Improve

PNP-MTDP MOOE 207,515.47 223,134.91 245,203.20 272,448.00 309,600.00

3. Conduct of community awareness lectures on crime prevention, public safety, anti-illegal drugs campaign, information gathering, etc.

- - - - -

PAPS 406 a. Lectures on Crime Prevention/Public Safety

Region IXNo. of awareness lectures

conducted

Security & Public Order Improve

PNP-MTDP MOOE 394,980.36 424,710.06 466,714.35 518,571.50 589,285.80

PAPS 407 b. Press Conference

Region IXNo. of Press Conferences

conducted

Security & Public Order Improve

PNP-MTDP MOOE 257,772.82 277,175.07 304,587.99 338,431.10 384,580.80

PAPS 408 c. Community/Barangay Dialogues Region IX

No of dialogue on Public Safety Awareness

Security & Public Order Improve

PNP-MTDP MOOE 438,191.97 471,174.16 517,773.80 575,304.22 653,754.80

PAPS 409 d. Stakeholders/Sectoral Dialogue Region IX

No. dialogue on Public Safety Awareness with

the stakeholders

Security & Public Order Improve

PNP-MTDP MOOE 71,603.56 76,993.08 84,607.78 94,008.64 106,828.00

C. Freedom of Information (FOI) Program - - - - -

PAPS 410 1. Maintenance of FOI Desk/ Action taken in FOI

Region IXNo. of requests acted

upon

Security & Public Order Improve

PNP-MTDP MOOE 81,207.72 87,320.13 95,956.19 106,617.98 121,156.80

PAPS 411 D. PIS Best Practice and Good Deeds

Region IXNo. of Best

Practices/Good Deeds

Security & Public Order Improve

PNP-MTDP MOOE 37,491.13 40,313.04 44,300.04 49,222.27 55,934.40

E. Information Operations - - - - - 1. Operationalization of Information operations - - - - -

PAPS 412 a. Implementation of NHQ issued I.O plan

Region IXNo. of IO Plan implemented

Security & Public Order Improve

PNP-MTDP MOOE 70,780.47 76,108.03 83,635.20 92,928.00 105,600.00

PAPS 413 a. Conduct of IOWG Meeting on monitored PNP Organization related issues Region IX

No. of IOWG meeting conducted

Security & Public Order Improve

PNP-MTDP MOOE 342,513.13 368,293.69 404,718.34 449,687.04 511,008.00

PAPS 414 b. Formulation of IO Plan

Region IXNo. of IO Plan

formulated

Security & Public Order Improve

PNP-MTDP MOOE 115,983.45 124,713.39 137,047.68 152,275.20 173,040.00

2. Implementation of Joint AFP/PNP Civil Relations Committee (JAPCRC)

- - - - -

2,076,220.19

703,059.72

-

- -

429,051.70

-

492,258.82

227,260.89

1,562,547.79

2,656,198.95

434,041.05

1,257,901.58

-

2,394,262.08

Chapter 18 - PNP IXPage 37 of 54

Page 182: Table of Contents (By Chapter)

(-14-) (-15-)

Investment Requirements (In exact amount PhP)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (Proposed) 2021 (Proposed) 2022 (Proposed) Total

Chapter Outcome/Projec

t Title

Project Description/Objecti

ves

Specific Location

(Province/City/Municipality/Barangay

)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

PAPS 415 a. Quarterly JAPCRC Meeting

Region IX No. of JAPCRC Meeting

Security & Public Order Improve

PNP-MTDP MOOE 25,439.68 27,354.50 30,059.88 33,399.87 37,954.40

PAPS 416 b. Joint Civil Relations Program crafted

Region IXNo. of Civil Relations

Program crafted

Security & Public Order Improve

PNP-MTDP MOOE 13,702.19 14,733.53 16,190.70 17,989.66 20,442.80

PAPS 417 c. Implementation of Joint Community Relations

Region IXNo. of engagements with

citizens

Security & Public Order Improve

PNP-MTDP MOOE 2,565.79 2,758.92 3,031.78 3,368.64 3,828.00

F. Gender Awareness and Development - - - - - 1. Advocacy campaign/awareness activities

- - - - -

PAPS 418 a. Information drive/ dialogue/ lectures/ symposia to community partners. LGUs, NGOs and barangay Region IX

No. of activities conducted/participated

Security & Public Order Improve

PNP-MTDP MOOE 850,283.10 914,282.91 1,004,706.49 1,116,340.54 1,268,568.80

PAPS 419

b. Conduct of Bisita Eskwela- I am STRONG (BES) activities information drive/dialogue/lectures/visitations to schools including DARE lectures Region IX

No. of activities conducted

Security & Public Order Improve

PNP-MTDP MOOE 559,461.70 601,571.72 661,067.83 734,519.81 834,681.60

PAPS 420

c. Information drives through TRIMP on VAWC, TIP, GBVC and other GAD-related activities by guesting and appearing at local TV and radio stations and by utilizing print and social media Region IX

No. of information drives conducted

Security & Public Order Improve

PNP-MTDP MOOE 35,579.92 38,257.98 42,041.74 46,713.04 53,083.00

PAPS 421 d. Lectures on GAD and MOVE to PNP personnel Region IX

No. of lectures/orientations

conducted and participated

Security & Public Order Improve

PNP-MTDP MOOE 1,300,453.32 1,398,336.91 1,536,633.96 1,707,371.07 1,940,194.40

PAPS 422 e. Production and distribution of GAD-related IEC materials Region IX

No. of activities conducted

Security & Public Order Improve

PNP-MTDP MOOE 249,940.85 268,753.61 295,333.63 328,148.48 372,896.00

PAPS 423

f. Information Drive/dialogue/lecture on PNP Agency Specific Action Plan for Women/Peace and Security Region IX

No. of info drives/ dialogue/lecture

conducted

Security & Public Order Improve

PNP-MTDP MOOE 23,990.96 25,796.73 28,348.06 31,497.84 35,793.00

PAPS 424 g. Conduct of Gender Sensitivity Lecture/Orientation for PNP Personnel Region IX

No. 0f Lecture/Orientation

conducted

Security & Public Order Improve

PNP-MTDP MOOE 746,456.06 802,640.93 882,023.00 980,025.55 1,113,665.40

1,515,072.57

145,426.59

4,524,810.94

3,391,302.66

215,675.68

7,882,989.67

-

-

5,154,181.84

154,208.33

83,058.88

15,553.12

Chapter 18 - PNP IXPage 38 of 54

Page 183: Table of Contents (By Chapter)

(-14-) (-15-)

Investment Requirements (In exact amount PhP)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (Proposed) 2021 (Proposed) 2022 (Proposed) Total

Chapter Outcome/Projec

t Title

Project Description/Objecti

ves

Specific Location

(Province/City/Municipality/Barangay

)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

PAPS 425

h. Lecture/Orientation on Juvenile Justice and Welfare Act of 2006/ Children in Conflict with Laws Region IX

No. 0f Lecture/Orientation

conducted

Security & Public Order Improve

PNP-MTDP MOOE 226,271.62 243,302.82 267,365.74 297,073.04 337,583.00

PAPS 426 i. One-day Orientation for Prospective Retirees and Retired PNP Personnel and Dependents Region IX

No. 0f Lecture/Orientation

conducted

Security & Public Order Improve

PNP-MTDP MOOE 44,663.15 48,024.89 52,774.60 58,638.45 66,634.60

PAPS 427 k. Continuing Gender Sensitivity Orientation for RA 9262 Region IX

No. 0f Lecture/Orientation

conducted

Security & Public Order Improve

PNP-MTDP MOOE 149,291.21 160,528.19 176,404.60 196,005.11 222,733.08

PAPS 428 l. Family Enrichment Lecture on Responsible Parenthood and Family Values for PNP Personnel Region IX

No. 0f Lecture/Orientation

conducted

Security & Public Order Improve

PNP-MTDP MOOE 157,629.31 169,493.88 186,257.02 206,952.24 235,173.00

G. Community Inter-relations and Development - - - - -

PAPS 429 1. Inter-agency and coordination/linkages

Region IX

No. of coordination/linkages

conducted

Security & Public Order Improve

PNP-MTDP MOOE 214,810.68 230,979.23 253,823.33 282,025.92 320,484.00

PAPS 430 2. Operationalization of MOU/MOA

Region IXNo. of MOU/MOA

operationalized

Security & Public Order Improve

PNP-MTDP MOOE 14,131.96 15,195.66 16,698.53 18,553.92 21,084.00

PAPS 431 3. Community dialogue

Region IXNo. of dialogue

conducted

Security & Public Order Improve

PNP-MTDP MOOE 438,191.97 471,174.16 517,773.80 575,304.22 653,754.80

H. Salaam Police- Peacebuilding and Counter Radicalization activities

- - - - -

PAPS 432 a. Continuous information and education for Muslim personnel Region IX

No. of information/education

conducted

Security & Public Order Improve

PNP-MTDP MOOE 37,491.13 40,313.04 44,300.04 49,222.27 55,934.40

PAPS 433 b. PCVE & Counter Radicalization

Region IXNo. of activities

conducted

Security & Public Order Improve

PNP-MTDP MOOE 94,869.96 102,010.71 112,099.68 124,555.20 141,540.00

PAPS 434 c. Display of streamer/tarpaulin

Region IXNo. displayed

streamer/tarpaulin

Security & Public Order Improve

PNP-MTDP MOOE 14,477.82 15,567.55 17,107.20 19,008.00 21,600.00

I. Kabataan Kontra Droga at Terorismo (KKDAT) - - - - -

PAPS 435 1. Lectures on the ill-effects of drugs and anti-terrorism Region IX No. of lectures conducted

Security & Public Order Improve

PNP-MTDP MOOE 574,806.32 618,071.31 679,199.24 754,665.82 857,574.80

-

3,484,317.49

227,260.89

575,075.55

87,760.58

85,664.07

2,656,198.95

-

955,505.45

-

1,302,123.16

1,371,596.22

270,735.69

904,962.19

Chapter 18 - PNP IXPage 39 of 54

Page 184: Table of Contents (By Chapter)

(-14-) (-15-)

Investment Requirements (In exact amount PhP)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (Proposed) 2021 (Proposed) 2022 (Proposed) Total

Chapter Outcome/Projec

t Title

Project Description/Objecti

ves

Specific Location

(Province/City/Municipality/Barangay

)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

PAPS 436 2. Information dissemination/conduct of pulong-pulong Region IX

No. of activities conducted

Security & Public Order Improve

PNP-MTDP MOOE 618,326.92 664,867.66 730,623.80 811,804.22 922,504.80

J. PNP Bookmobile Services - - - - -

PAPS 437 1. Information dissemination- distribution of IEC materials Region IX

No. of activities conducted

Security & Public Order Improve

PNP-MTDP MOOE 4,359.43 4,687.56 5,151.17 5,723.52 6,504.00

PAPS 438 2. Display of tarpaulins/streamers

Region IXNo. of Tarpaulin/streamer

displayed

Security & Public Order Improve

PNP-MTDP MOOE 7,238.91 7,783.78 8,553.60 9,504.00 10,800.00

II. SAMBAYAN COMMUNITY AFFAIRS - - - - -

A. Community Organization and Mobilization - - - - -

PAPS 439 1. Organization/Mobilization of volunteer NGOs/Pos/ Sectoral Organizations Region IX

No. of organized/mobilized NGOs/Pos/Sectoral

Organizations

Security & Public Order Improve

PNP-MTDP MOOE 67,661.57 72,754.38 79,949.87 88,833.18 100,946.80

PAPS 440 2. Number of Barangay Peacekeeping Action Team (BPATs) Seminar

No. of BPATs organized/maintained

438,191.97 471,174.16 517,773.80 575,304.22 653,754.80

PAPS 441 3. Number of BPAT's operations conducted on - - - - -

PAPS 442 a. Community Policing/Law Enforcement Activities (i.e checkpoint, traffic) Region IX

No. of activities conducted

Security & Public Order Improve

PNP-MTDP MOOE 330,987.17 355,900.18 391,099.10 434,554.56 493,812.00

PAPS 443

b. Implementation of Barangay Justice System/ conflict resolution in the community/mediation in the community Region IX

No. of activities conducted

Security & Public Order Improve

PNP-MTDP MOOE 25,252.33 27,153.04 29,838.50 33,153.89 37,674.88

PAPS 444 c. Support on the Internal Security Operations

Region IX

No. of activities conducted

Security & Public Order Improve

PNP-MTDP MOOE 249,940.85 268,753.61 295,333.63 328,148.48 372,896.00

PAPS 445 5. School-based activities

Region IXNo. of activities

conducted

Security & Public Order Improve

PNP-MTDP MOOE 536,761.82 577,163.24 634,245.32 704,717.02 800,814.80

PAPS 446 6. Church-based activities

Region IXNo. of activities

conducted

Security & Public Order Improve

PNP-MTDP MOOE 306,742.45 329,830.59 362,451.20 402,723.55 457,640.40

PAPS 447 7. Council of Community Elders (CCE)

Region IXNo. of activities

conducted

Security & Public Order Improve

PNP-MTDP MOOE 67,661.57 72,754.38 79,949.87 88,833.18 100,946.80

B. Community Assistance, Inter-relations and Development

- - - - -

1,859,388.19

410,145.80

-

153,072.65

1,515,072.57

3,253,702.20

2,656,198.95

-

2,006,353.02

-

-

410,145.80

-

26,425.68

43,880.29

3,748,127.41

Chapter 18 - PNP IXPage 40 of 54

Page 185: Table of Contents (By Chapter)

(-14-) (-15-)

Investment Requirements (In exact amount PhP)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (Proposed) 2021 (Proposed) 2022 (Proposed) Total

Chapter Outcome/Projec

t Title

Project Description/Objecti

ves

Specific Location

(Province/City/Municipality/Barangay

)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

PAPS 448 1. Inter-agency coordination/linkages

Region IX

No. of coordination/linkages

conducted

Security & Public Order Improve

PNP-MTDP MOOE 71,603.56 76,993.08 84,607.78 94,008.64 106,828.00

PAPS 449 2. Operationalization of MOU/MOA

Region IXNo. of MOU/MOA

operationalized

Security & Public Order Improve

PNP-MTDP MOOE 2,681.08 2,882.88 3,168.00 3,520.00 4,000.00

PAPS 450 3. Community Dialogue

Region IXNo. of community

dialogue conducted

Security & Public Order Improve

PNP-MTDP MOOE 438,191.97 471,174.16 517,773.80 575,304.22 653,754.80

4. Number of Outreach activites attended/participated

- - - - -

PAPS 451 a. Medical

Region IXNo. of medical services conducted/supported

Security & Public Order Improve

PNP-MTDP MOOE 168,585.81 181,275.06 199,203.36 221,337.07 251,519.40

PAPS 452 b. Dental

Region IXNo. of dental services conducted/supported

Security & Public Order Improve

PNP-MTDP MOOE 168,585.81 181,275.06 199,203.36 221,337.07 251,519.40

PAPS 453 c. Feeding

Region IXNo. of feeding programs

conducted/supported

Security & Public Order Improve

PNP-MTDP MOOE 75,477.05 81,158.12 89,184.74 99,094.16 112,607.00

PAPS 454C. DISASTER PREPAREDNESS and RESPONSE

- - - - -

PAPS 455 1. Disaster preparedness/response drills - - - - -

PAPS 456 a. fire drill

Region IXNo. of earthquake drills

conducted

Security & Public Order Improve

PNP-MTDP MOOE 308,081.65 331,270.59 364,033.61 404,481.79 459,638.40

PAPS 457 b. earthquake drill

Region IXNo. of earthquake drills

conducted

Security & Public Order Improve

PNP-MTDP MOOE 308,081.65 331,270.59 364,033.61 404,481.79 459,638.40

PAPS 458 2. Disaster Preparedness Audit

Region IXNo. Disaster

Preparedness conducted

Security & Public Order Improve

PNP-MTDP MOOE 37,927.07 40,781.80 44,815.16 49,794.62 56,584.80

PAPS 459 3. Disaster Preparedness and Contingency Response ( DPCR) Drill Competition Region IX

No. of Disaster Drill Competition conducted

Security & Public Order Improve

PNP-MTDP MOOE 9,651.88 10,378.37 11,404.80 12,672.00 14,400.00

4. Disaster Response Activities - - - - -

PAPS 460 a. Activation of Regional Disaster Operations Center Region IX

No. of activated Regional Disaster Operations

Center

Security & Public Order Improve

PNP-MTDP MOOE 641.45 689.73 757.94 842.16 957.00

58,507.05

-

3,888.28

1,867,506.04

1,867,506.04

229,903.45

457,521.07

-

-

-

1,021,920.71

1,021,920.71

434,041.05

16,251.96

2,656,198.95

Chapter 18 - PNP IXPage 41 of 54

Page 186: Table of Contents (By Chapter)

(-14-) (-15-)

Investment Requirements (In exact amount PhP)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (Proposed) 2021 (Proposed) 2022 (Proposed) Total

Chapter Outcome/Projec

t Title

Project Description/Objecti

ves

Specific Location

(Province/City/Municipality/Barangay

)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

PAPS 461 b. Relief and Retrieval Operations

Region IXNo. of relief operations

conducted

Security & Public Order Improve

PNP-MTDP MOOE 2,565.79 2,758.92 3,031.78 3,368.64 3,828.00

5. Search and Rescue (SAR) Training

No. of trainings conducted/participated - - - - -

D. RECOVERY AND WELLNESS PROGRAM - - - - -

PAPS 462 1. Community-Based Recovery and Wellness Program (supported) Region IX

No. of community-based Recovery and Wellness

Program

Security & Public Order Improve

PNP-MTDP MOOE 192,430.38 206,914.39 227,378.45 252,642.72 287,094.00

PAPS 463 E. CAD BEST PRACTICES AND GOOD DEEDS

Region IXNo. of best

practices/good deeds

Security & Public Order Improve

PNP-MTDP MOOE 103,974.90 111,800.97 122,858.21 136,509.12 155,124.00

F. GENDER AWARENESS AND DEVELOPMENT - - - - -

PAPS 464

1. Engagements/consultations/meetings with different agencies/stakeholders regarding VAWC and other GBVC and GAD-related topics Region IX

No. of engagements attended

Security & Public Order Improve

PNP-MTDP MOOE 65,879.46 70,838.13 77,844.10 86,493.44 98,288.00

2. Women Empowerment (Women's Month Celebration)

- - - - -

PAPS 465 a. Women's Month Kick-Off Ceremony

Region IXNo. of activities

conducted

Security & Public Order Improve

PNP-MTDP MOOE 15,540.25 16,709.95 18,362.58 20,402.87 23,185.08

PAPS 466 b. Free Health Services for Female PNP Personnel

Region IXNo. of Activitiies

Conducted

Security & Public Order Improve

PNP-MTDP MOOE 16,045.45 17,253.17 18,959.53 21,066.14 23,938.80

PAPS 467 c. Leisure/Recreational Acitivities for Women (Zumba Dance Party) Region IX

No. of activities conducted

Security & Public Order Improve

PNP-MTDP MOOE 19,923.90 21,423.55 23,542.36 26,158.18 29,725.20

PAPS 468 d. Skills training for Women

Region IXNo. of activities

conducted/participated

Security & Public Order Improve

PNP-MTDP MOOE 63,113.05 67,863.50 74,575.27 82,861.42 94,160.70

PAPS 469 e. Women's Night (Culmination)

Region IXNo. of activities

conducted

Security & Public Order Improve

PNP-MTDP MOOE 353,718.16 380,342.11 417,958.36 464,398.18 527,725.20

3. W.A.V.E activities (Women Against Violent Extremism)

- - - - -

PAPS 470 a. Visitation (family homes,youth/women society groups and barangay centers) Region IX

No. of activities conducted

Security & Public Order Improve

PNP-MTDP MOOE 124,254.31 133,606.79 146,820.64 163,134.05 185,379.60

2,144,142.00

-

753,195.39

97,263.10

120,773.18

382,573.94

399,343.12

-

94,200.74

1,166,459.94

630,267.20

-

15,553.12

-

-

Chapter 18 - PNP IXPage 42 of 54

Page 187: Table of Contents (By Chapter)

(-14-) (-15-)

Investment Requirements (In exact amount PhP)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (Proposed) 2021 (Proposed) 2022 (Proposed) Total

Chapter Outcome/Projec

t Title

Project Description/Objecti

ves

Specific Location

(Province/City/Municipality/Barangay

)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

PAPS 471 b. P.R.O.C.A.R.E.S (medical/dental mission, skills training,gift-giving, job fair) Region IX

No. of activities conducted/supported

Security & Public Order Improve

PNP-MTDP MOOE 202,993.83 218,272.93 239,860.37 266,511.52 302,854.00

PAPS 472 4. Maintenance of Daycare Center

Region IXNo. of Day Care Centers

maintained

Security & Public Order Improve

PNP-MTDP MOOE 264,161.08 284,044.17 312,136.45 346,818.28 394,111.68

PAPS 473 5. FJGAD Best Practices/Good Deeds

Region IXNo. of best

practices/good deeds

Security & Public Order Improve

PNP-MTDP MOOE 69,342.07 74,561.37 81,935.57 91,039.52 103,454.00

PAPS 474 6. Participation in the Conduct of MOVE Summit

Region IXNo. of activities

participated

Security & Public Order Improve

PNP-MTDP MOOE 26,643.22 28,648.62 31,482.00 34,980.00 39,750.00

PAPS 475 7. PNP Agency Specific Action Plan for Women/Peace and Security Forums Region IX

No. of activities conducted/participated

Security & Public Order Improve

PNP-MTDP MOOE 124,230.45 133,581.13 146,792.45 163,102.72 185,344.00

PAPS 476 8. Participation in the National Disability Prevention and Rehabilitation Week Region IX

No. of activities participated

Security & Public Order Improve

PNP-MTDP MOOE 3,999.67 4,300.72 4,726.06 5,251.18 5,967.25

PAPS 477 9. Recreational Activities for Persons with Disability (paralympics/variety show) Region IX

No. of activities conducted

Security & Public Order Improve

PNP-MTDP MOOE 553,026.47 594,652.12 653,463.87 726,070.96 825,080.64

PAPS 478 10. Job fair for persons with disability

Region IXNo. of activities

conducted

Security & Public Order Improve

PNP-MTDP MOOE 110,547.23 118,867.99 130,624.16 145,137.96 164,929.50

PAPS 479 11. Participation in the Elderly Filipino Week

Region IXNo. of activities

participated

Security & Public Order Improve

PNP-MTDP MOOE 3,999.67 4,300.72 4,726.06 5,251.18 5,967.25

PAPS 480 12. Recreational Activities for Senior Citizens

Region IXNo. of activities

conducted

Security & Public Order Improve

PNP-MTDP MOOE 160,127.94 172,180.58 189,209.43 210,232.70 238,900.80

PAPS 481 13. Health Program for the Senior Citizens

Region IXNo. of activities

conducted

Security & Public Order Improve

PNP-MTDP MOOE 1,518,261.18 1,632,538.91 1,793,998.80 1,993,332.00 2,265,150.00

PAPS 482 14. Establishment of Breastfeeding Areas in Police Stations Region IX

No. Breastfeeding Areas established

Security & Public Order Improve

PNP-MTDP MOOE 694,221.09 746,474.29 820,301.42 911,446.03 1,035,734.12

PAPS 483 15. Establishment of Diaper-Changing Areas in Police Stations Region IX

No. of Diaper-Changing Areas established

Security & Public Order Improve

PNP-MTDP MOOE 1,048,669.04 1,127,601.12 1,239,122.11 1,376,802.35 1,564,548.12

PAPS 484 16. Establishment of FJGADD Desks

Region IXNo. of FJGADD Desks

established

Security & Public Order Improve

PNP-MTDP MOOE 2,147,352.77 2,308,981.47 2,537,342.28 2,819,269.20 3,203,715.00

6,356,742.74

13,016,660.73

970,651.47

9,203,280.89

4,208,176.96

3,352,294.06

670,106.84

24,244.87

161,503.84

753,050.74

24,244.87

1,230,492.65

1,601,271.66

420,332.53

Chapter 18 - PNP IXPage 43 of 54

Page 188: Table of Contents (By Chapter)

(-14-) (-15-)

Investment Requirements (In exact amount PhP)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (Proposed) 2021 (Proposed) 2022 (Proposed) Total

Chapter Outcome/Projec

t Title

Project Description/Objecti

ves

Specific Location

(Province/City/Municipality/Barangay

)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

PAPS 485 17. School Caravan: Info Drives on VAWC, Cyber Pornography and other GBVC cases Region IX

No. of activities conducted

Security & Public Order Improve

PNP-MTDP MOOE 93,621.25 100,668.01 110,624.18 122,915.76 139,677.00

PAPS 486

18. Dialogue with Community Partners. LGUs and NGOs for the Prevention and Suppression of Trafficking in Persons Region IX

No.of dialogues conducted

Security & Public Order Improve

PNP-MTDP MOOE 76,428.83 82,181.54 90,309.38 100,343.76 114,027.00

19. GMEF and HGDG for GADFPS TWG and PROs/NSUs PCS Officers Seminar

No. of trainings/seminar conducted - - - - -

PAPS 487G. SALAAM POLICE CENTER 1. Masjid Visitations Region IX

No. of visitations conducted

Security & Public Order Improve

PNP-MTDP MOOE 205,345.00 220,801.08 242,638.55 269,598.38 306,361.80

PAPS 488 2. Jail Visitations

Region IXNo. of visitations

conducted

Security & Public Order Improve

PNP-MTDP MOOE 136,896.67 147,200.72 161,759.03 179,732.26 204,241.20

PAPS 489 3. Madrasah-based activities

Region IXNo. of activities

conducted

Security & Public Order Improve

PNP-MTDP MOOE 263,320.24 283,140.04 311,142.90 345,714.34 392,857.20

PAPS 490 4. Networking, monitoring and liaising with Regional NCMF, elders and other Muslim NGOs Region IX

No. of activities conducted

Security & Public Order Improve

PNP-MTDP MOOE 68,448.33 73,600.36 80,879.52 89,866.13 102,120.60

PAPS 491 5. Organization and continuing mobilization of Salaam Force Multipliers, imams and ustadz Region IX

No. of Force Multipliers organized

Security & Public Order Improve

PNP-MTDP MOOE 118,829.15 127,773.28 140,410.20 156,011.33 177,285.60

PAPS 492 6. Dialogue, pulong-pulong with Muslim Community Elders and religious leaders. Region IX

No. of activities conducted

Security & Public Order Improve

PNP-MTDP MOOE 106,935.21 114,984.10 126,356.16 140,395.73 159,540.60

PAPS 493 7. Interfaith meetings among Muslim clerics

Region IXNo. of activities

conducted

Security & Public Order Improve

PNP-MTDP MOOE 66,606.03 71,619.39 78,702.62 87,447.36 99,372.00

8. Peacebuilding and Countering Violent Extremism Forum Region IX

No. of seminars conducted/attended

Security & Public Order Improve

PNP-MTDP MOOE - - - - -

9. Countering Violent Extremism Seminar-Workshop Region IX

No. of seminars conducted/attended

Security & Public Order Improve

PNP-MTDP MOOE - - - - -

10. Seminar-Workshop on Clan War (Family Rido) Mediation for PNP Personnel Region IX

No. of seminars conducted/attended

Security & Public Order Improve

PNP-MTDP MOOE - - - - -

-

-

-

720,309.55

648,211.80

403,747.40

829,829.87

1,596,174.72

414,914.94

463,290.52

-

1,244,744.81

567,506.20

Chapter 18 - PNP IXPage 44 of 54

Page 189: Table of Contents (By Chapter)

(-14-) (-15-)

Investment Requirements (In exact amount PhP)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (Proposed) 2021 (Proposed) 2022 (Proposed) Total

Chapter Outcome/Projec

t Title

Project Description/Objecti

ves

Specific Location

(Province/City/Municipality/Barangay

)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

11. Organizational and Training of Ulamas, Asatidz and Imams in Peacebuilding and Religious Rehabilitation

No. of seminars conducted/attended

- - - - -

PAPS 494 H. SALAAM GOOD DEEDS

Region IX No. of good deeds

Security & Public Order Improve

PNP-MTDP MOOE 201,228.07 216,374.27 237,773.92 264,193.25 300,219.60

I. PNP BOOKMOBILE SERVICES - - - - -

PAPS 495 1. Streetchildren Basic Education/Story-telling and Reading Class Region IX

No. of activities conducted

Security & Public Order Improve

PNP-MTDP MOOE 141,100.87 151,721.36 166,726.77 185,251.97 210,513.60

PAPS 496 2. Out-of-School Youth Basic Education

Region IXNo. of activities

conducted

Security & Public Order Improve

PNP-MTDP MOOE 142,709.51 153,451.09 168,627.57 187,363.97 212,913.60

PAPS 497 3. Skills and Livelihood Training Program

Region IXNo. of activities

conducted

Security & Public Order Improve

PNP-MTDP MOOE 25,660.07 27,591.47 30,320.29 33,689.22 38,283.20

PAPS 498 4. Community dialogue/pulong-pulong

Region IXNo. of activities

conducted

Security & Public Order Improve

PNP-MTDP MOOE 2,262.16 2,432.43 2,673.00 2,970.00 3,375.00

PAPS 499 5. Basic Computer Class

Region IXNo. of activities

conducted

Security & Public Order Improve

PNP-MTDP MOOE 75,456.81 81,136.35 89,160.83 99,067.58 112,576.80

J. PROGRAM ENHANCEMENTS - - - - -

1. PNP's Citizens' Charter - - - - -

PAPS 500 a. PNP Quality Service Lane (QSL) Implementation

Region IX

No. of PNP QSL operationalized/maintaine

d

Security & Public Order Improve

PNP-MTDP MOOE 64,675.65 69,543.71 76,421.66 84,912.96 96,492.00

PAPS 501 b.Pulis Niyo Po sa Barangay

Region IXNo. of activities

conducted

Security & Public Order Improve

PNP-MTDP MOOE 136,896.67 147,200.72 161,759.03 179,732.26 204,241.20

2. Best Practices and compliance to other PCR directives

- - - - -

PAPS 502 a. PPD Best Practices (Conduct of Surveys)

Region IX No. of best practices

Security & Public Order Improve

PNP-MTDP MOOE 91,051.03 97,904.33 107,587.18 119,541.31 135,842.40

3. Police Community Affairs and Development Course

No. of trainings conducted/participated

- - - - -

REGIONAL TASK FORCE ON ENDING LOCAL COMMUNIST ARMED CONFICT- ELCAC

- - - - - -

-

551,926.26

-

-

392,045.99

829,829.87

13,712.59

457,398.37

-

855,314.57

865,065.74

155,544.24

-

1,219,789.11

-

Chapter 18 - PNP IXPage 45 of 54

Page 190: Table of Contents (By Chapter)

(-14-) (-15-)

Investment Requirements (In exact amount PhP)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (Proposed) 2021 (Proposed) 2022 (Proposed) Total

Chapter Outcome/Projec

t Title

Project Description/Objecti

ves

Specific Location

(Province/City/Municipality/Barangay

)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

STRATEGIC COMMUNICATIONS SUMMIT

- - - - -

PAPS 5021. Production/Printing of Infographics and Product Development Region IX

No. of activities conducted

Security & Public Order Improve

PNP-MTDP MOOE 126,680.95 136,216.08 149,688.00 166,320.00 189,000.00

PAPS 503 2. Social Media Analysis

Region IX

No. of activities conducted

Security & Public Order Improve

PNP-MTDP MOOE 44,237.79 47,567.52 52,272.00 58,080.00 66,000.00

PAPS 5043. Capacity Development of Police Stations and PNP Mobile Forces in I.O Region IX

No. of lectures conductedSecurity & Public Order Improve

PNP-MTDP MOOE 1,086,500.32 1,168,279.91 1,283,824.08 1,426,471.20 1,620,990.00

PAPS 505 4. Cyber Patrolling Activities (IO)

Region IX

No. of activities conducted

Security & Public Order Improve

PNP-MTDP MOOE 129,081.06 138,796.83 152,523.99 169,471.10 192,580.80

PAPS 506 5. Counter Mobilization Activities

Region IX

No. of activities conducted

Security & Public Order Improve

PNP-MTDP MOOE 14,025.39 15,081.07 16,572.60 18,414.00 20,925.00

PAPS 507 6. Youth Summit (Out-of-School Youth)

Region IX

No. of summits conducted

Security & Public Order Improve

PNP-MTDP MOOE 347,590.35 373,753.07 410,717.66 456,352.95 518,582.90

PAPS 5087. Youth Summit (High School and College Students) Region IX No. of summits conducted

Security & Public Order Improve

PNP-MTDP MOOE 663,834.27 713,800.30 784,395.93 871,551.03 990,398.90

PAPS 5098. Labor Community Engagement in Blue Collar Workers Region IX No. of engagements conducted

Security & Public Order Improve

PNP-MTDP MOOE 359,013.02 386,035.51 424,214.84 471,349.82 535,624.80

PAPS 5109. Livelihood projects and Skills Development for Urban Poor Region IX

No. of activities conducted

Security & Public Order Improve

PNP-MTDP MOOE 359,013.02 386,035.51 424,214.84 471,349.82 535,624.80

PAPS 511 10. Community Visitation

Region IX

No. of activities conducted

Security & Public Order Improve

PNP-MTDP MOOE 228,236.45 245,415.54 269,687.40 299,652.67 340,514.40

Project UNDER CAPITAL OUTLAY - - - - -

1. Construction of Day Care Centers

Region IX

No. of Day Care Centers constructed

Security & Public Order Improve

PNP-MTDP MOOE - - - - -

Region IX - - - - PROGRAM 4 - Crime Investigation ProgramRegion IX - - - -

A. INVESTIGATION SERVICES Region IX - - - -

- -

-

-

-

2,176,237.99

2,176,237.99

1,383,506.47

85,018.06

2,106,996.93

4,023,980.43

268,157.31

6,586,065.51

782,453.79

-

767,905.03

Chapter 18 - PNP IXPage 46 of 54

Page 191: Table of Contents (By Chapter)

(-14-) (-15-)

Investment Requirements (In exact amount PhP)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (Proposed) 2021 (Proposed) 2022 (Proposed) Total

Chapter Outcome/Projec

t Title

Project Description/Objecti

ves

Specific Location

(Province/City/Municipality/Barangay

)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

PAPS 511 1. Case Investigation and Managemenent

Region IX

No. of crime investigations undertaken

Security & Public Order Improve

PNP-MTDP MOOE 5,141,366.21 5,528,350.77 6,075,110.73 6,750,123.04 7,670,594.36

PAPS 512 MWP persons arrested

Region IX

% of MWP persons arrested

Security & Public Order Improve

PNP-MTDP MOOE 1,314,984.50 1,413,961.83 1,553,804.21 1,726,449.12 1,961,874.00

PAPS 513Wanted person Arrested within 30 days upon receipt of WA Region IX

Timeliness: Percentage of Wanted person Arrested within 30 days upon receipt of WA

Security & Public Order Improve

PNP-MTDP MOOE 2,032,298.98 2,185,267.72 2,401,393.10 2,668,214.56 3,032,062.00

PAPS 514 Index Crime Solved

Region IX

No. of Increased Index Crime Solved

Security & Public Order Improve

PNP-MTDP MOOE 513,069.81 551,687.97 606,250.51 673,611.68 765,467.82

PAPS 515 Index Crime Cleared

Region IX

No. of Increased Index Crime Cleared

Security & Public Order Improve

PNP-MTDP MOOE 683,759.70 735,225.48 807,940.09 897,711.21 1,020,126.38

PAPS 516 Non-Index Crime Solved

Region IX

No. of Increased Non-Index Crime Solved

Security & Public Order Improve

PNP-MTDP MOOE 2,437,665.01 2,621,145.17 2,880,379.31 3,200,421.45 3,636,842.56

PAPS 517 Non-Index Crime Solved

Region IX

No. of Increased Non-Index Crime Cleared

Security & Public Order Improve

PNP-MTDP MOOE 2,701,034.18 2,904,337.82 3,191,580.03 3,546,200.03 4,029,772.76

PAPS 518 1.1. Service of Warrant of Arrest

Region IX

No. of Warrant of Arrest served

Security & Public Order Improve

PNP-MTDP MOOE 400,204.57 430,327.50 472,887.36 525,430.40 597,080.00

PAPS 519 1.2 Conduct Case Folow-up

Region IX

No. of Unsolved CasesSecurity & Public Order Improve

PNP-MTDP MOOE 866,117.85 931,309.51 1,023,417.05 1,137,130.05 1,292,193.24

PAPS 520 investigation of Dismissed Drug Cases

Region IX

Case Review on the investigation of Dismissed Drug Cases

Security & Public Order Improve

PNP-MTDP MOOE 101,747.52 109,405.93 120,226.30 133,584.77 151,800.88

PAPS 521Case Review on the investigation of Sensational Cases Region IX

No. of Case Review on the investigation of Sensational Cases

Security & Public Order Improve

PNP-MTDP MOOE 13,652.43 14,680.03 16,131.90 17,924.33 20,368.56

PAPS 522 Henious Crime

Region IX

Case Review on the investigation on Henious Crime

Security & Public Order Improve

PNP-MTDP MOOE 13,652.43 14,680.03 16,131.90 17,924.33 20,368.56

PAPS 523 investigation of other crimes

Region IX

Case review on investigation of other crimes

Security & Public Order Improve

PNP-MTDP MOOE 5,343.09 5,745.26 6,313.48 7,014.97 7,971.56

PAPS 524 1.4 Conduct of Dictated Conference

Region IX

No. of dictated conferences conducted

Security & Public Order Improve

PNP-MTDP MOOE 13,652.43 14,680.03 16,131.90 17,924.33 20,368.56 82,757.25

82,757.25

82,757.25

32,388.37

2,425,929.83

5,250,167.70

616,765.40

4,144,762.87

14,776,453.50

16,372,924.81

7,971,073.66

12,319,236.37

3,110,087.79

31,165,545.11

Chapter 18 - PNP IXPage 47 of 54

Page 192: Table of Contents (By Chapter)

(-14-) (-15-)

Investment Requirements (In exact amount PhP)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (Proposed) 2021 (Proposed) 2022 (Proposed) Total

Chapter Outcome/Projec

t Title

Project Description/Objecti

ves

Specific Location

(Province/City/Municipality/Barangay

)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

PAPS 525 2. Strengthening Case Evidence and Case Filing - - - - -

PAPS 526 2.1. Conduct of Preliminary and Follow-up Investigation

Region IX

No. of preliminary & follow- up investigation conducted

Security & Public Order Improve

PNP-MTDP MOOE 4,000.54 4,301.66 4,727.10 5,252.33 5,968.56

PAPS 527 Investigated and follow up of heinous crimes

Region IX

No. of Cases Investigated and follow up of heinous crimes

Security & Public Order Improve

PNP-MTDP MOOE 262,969.15 282,762.53 310,728.05 345,253.39 392,333.40

PAPS 528Cases Investigated and follow up of Violation of specials laws Region IX

No. of Cases Investigated and follow up of Violation of specials laws

Security & Public Order Improve

PNP-MTDP MOOE 757,999.23 815,052.94 895,662.57 995,180.63 1,130,887.08

PAPS 529 investigated and follow-up of other crimes

Region IX

No. of investigated and follow-up of other crimes

Security & Public Order Improve

PNP-MTDP MOOE 1,736,094.92 1,866,768.73 2,051,394.21 2,279,326.90 2,590,144.20

PAPS 530 Cases Investigated and follow-up of illegal drugs

Region IX

No. of Cases Investigated and follow-up of illegal drugs

Security & Public Order Improve

PNP-MTDP MOOE 370,400.15 398,279.73 437,670.03 486,300.04 552,613.68

PAPS 531Region IX

No. of Pre- Charge evaluation and investigation conducted

Security & Public Order Improve

PNP-MTDP MOOE 27,337.05 29,394.68 32,301.85 35,890.94 40,785.16

PAPS 532Region IX

No. of PNP personnel under Pre-Charge Evaluation and Investigation

Security & Public Order Improve

PNP-MTDP MOOE 52,007.08 55,921.59 61,452.29 68,280.33 77,591.28

PAPS 533 2.3. Filing of cases to Pros /Court

Region IX

No. of cases filed to Pros/ Court

Security & Public Order Improve

PNP-MTDP MOOE 1,539,684.23 1,655,574.45 1,819,312.58 2,021,458.42 2,297,111.84

PAPS 5342.4. Ensure attendance of Police Investigators to court duties Region IX

No. of court duties attended

Security & Public Order Improve

PNP-MTDP MOOE 2,260,928.45 2,431,105.86 2,671,544.90 2,968,383.22 3,373,162.75

PAPS 5352.5. Investigate Killings of Militants and Mediamen and foreigner Region IX

No. of Cases investigated on killings of militants and mediamen and foreigner

Security & Public Order Improve

PNP-MTDP MOOE 13,738.17 14,772.22 16,233.21 18,036.90 20,496.48

PAPS 536 2.6. Activation of "TF USIG" / SITG

Region IX

No. of SITG Cases Activated

Security & Public Order Improve

PNP-MTDP MOOE 665.07 715.13 785.85 873.17 992.24

3. Heightened Legal Offensive over ISO related Incidents

- - - - -

PAPS 5373.1. Execute Filing of cases against High Valued Targets and other threat groups Region IX

No. of Cases FiledSecurity & Public Order Improve

PNP-MTDP MOOE 2,728.67 2,934.05 3,224.23 3,582.48 4,071.00

4. Enhancement of Investigation of Cases Involving Women and Children

- - - - - -

4,031.46

-

16,540.43

9,333,141.52

13,705,125.17

83,276.99

2,245,263.63

2.2 Conduct Pre- Charge Evaluation and Investigation

165,709.68

315,252.56

1,594,046.52

4,594,782.44

10,523,728.95

-

24,250.20

Chapter 18 - PNP IXPage 48 of 54

Page 193: Table of Contents (By Chapter)

(-14-) (-15-)

Investment Requirements (In exact amount PhP)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (Proposed) 2021 (Proposed) 2022 (Proposed) Total

Chapter Outcome/Projec

t Title

Project Description/Objecti

ves

Specific Location

(Province/City/Municipality/Barangay

)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

PAPS 5384.1. Conduct Rescue Operations and Extend Special Protection to Victims Region IX

No. of rescue operation conducted

Security & Public Order Improve

PNP-MTDP MOOE 86,619.61 93,139.37 102,350.95 113,723.28 129,231.00

PAPS 5394.2. Administer Mediation and Perform Initial Counseling Between Parties on Domestic Violence Cases Region IX

No. of mediation and counseling admisnistered

Security & Public Order Improve

PNP-MTDP MOOE 383,611.70 412,485.70 453,280.99 503,645.54 572,324.48

PAPS 5404.3 Conduct investigation of Cases involving Women and Children Region IX

No. of women's and children's cases investigated

Security & Public Order Improve

PNP-MTDP MOOE 760,373.19 817,605.58 898,467.67 998,297.41 1,134,428.88

PAPS 5414.4. Conduct case conference on sensational cases Region IX

No. of case conference to be conducted

Security & Public Order Improve

PNP-MTDP MOOE 12,848.10 13,815.16 15,181.50 16,868.33 19,168.56

PAPS 542 4.5. Conduct info drive/ symposium

Region IX

No. of info drive/ symposium conducted

Security & Public Order Improve

PNP-MTDP MOOE 2,080,342.92 2,236,927.87 2,458,162.49 2,731,291.66 3,103,740.52

PAPS 543

4.6. Maintain closer partnership and liaising with RJJWC and RIACAT agencies and other stakeholders Region IX

No. of coordinations made

Security & Public Order Improve

PNP-MTDP MOOE 601,119.23 646,364.76 710,290.94 789,212.16 896,832.00

B. CASE MONITORING PROGRAM - - - - -

PAPS 544 1. Monitor the investigation of Heinous Crimes

Region IX

No. of cases monitored/ tracked

Security & Public Order Improve

PNP-MTDP MOOE 262,969.15 282,762.53 310,728.05 345,253.39 392,333.40

PAPS 545 2. Monitoring of other crimes

Region IX

No. of other crimes monitored/ tracked

Security & Public Order Improve

PNP-MTDP MOOE 1,736,094.92 1,866,768.73 2,051,394.21 2,279,326.90 2,590,144.20

PAPS 546 3. Monitor the investigation on Violation of Special laws

Region IX

No. of cases monitored/ tracked

Security & Public Order Improve

PNP-MTDP MOOE 757,999.23 815,052.94 895,662.57 995,180.63 1,130,887.08

PAPS 547 4. Monitor the investigation on illegal drugs

Region IX

No. of cases monitored/ tracked

Security & Public Order Improve

PNP-MTDP MOOE 370,400.15 398,279.73 437,670.03 486,300.04 552,613.68

PAPS 548 5. Monitor the investigation on illegal gambling

Region IX

No. of cases monitored/ tracked

Security & Public Order Improve

PNP-MTDP MOOE 30,908.22 33,234.65 36,521.59 40,579.55 46,113.12

C. RESEARCH AND ANALYSIS PROGRAM - - - - -

PAPS 5481. Implementation of National Crime Reporting System (NCRS) Region IX

No. of filled-up NCRS submitted

Security & Public Order Improve

PNP-MTDP MOOE 151,420.50 162,817.74 178,920.59 198,800.66 225,909.84

187,357.13

-

917,869.33

10,523,728.95

4,594,782.44

2,245,263.63

3,643,819.09

-

1,594,046.52

4,609,172.74

77,881.66

12,610,465.45

525,064.21

2,325,348.41

Chapter 18 - PNP IXPage 49 of 54

Page 194: Table of Contents (By Chapter)

(-14-) (-15-)

Investment Requirements (In exact amount PhP)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (Proposed) 2021 (Proposed) 2022 (Proposed) Total

Chapter Outcome/Projec

t Title

Project Description/Objecti

ves

Specific Location

(Province/City/Municipality/Barangay

)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

PAPS 5492. Enhancement of Unit Crime Periodic Report (UCPER) Region IX

No. of UCPER generated and evaluated

Security & Public Order Improve

PNP-MTDP MOOE 4,280.21 4,602.37 5,057.55 5,619.50 6,385.80

D. IMPLEMENTATION OF e- PROJECTS - - - - -

PAPS 550 d.1. NGIS Course

Region IX

No. of NGIS Course conducted

Security & Public Order Improve

PNP-MTDP MOOE 346,936.05 373,049.52 409,944.52 455,493.91 517,606.72

PAPS 551 d.2. Conduct Validation on e-Projects

Region IX

No of validations conducted

Security & Public Order Improve

PNP-MTDP MOOE 60,431.51 64,980.12 71,406.72 79,340.80 90,160.00

E. ELCAC - - - - -

PAPS 552Conduct of case review of cases against CPP-NPA

Region IX No. of cases reviewed

Security & Public Order Improve

PNP-MTDP MOOE 19,436.56 20,899.53 22,966.51 25,518.35 28,998.12

PAPS 553

Assist other cluster of the NTF-ELCAC in filing cases against CPP-NPA

Region IX No. of cases filedSecurity & Public Order Improve

PNP-MTDP MOOE 13,103.82 14,090.13 15,483.66 17,204.07 19,550.08

PAPS 554

Assist other cluster of the NTF-ELCAC in collecting evidence and interview of witness

Region IX

No. of collecting evidence and interview of witness

Security & Public Order Improve

PNP-MTDP MOOE 18,884.87 20,306.31 22,314.63 24,794.04 28,175.04

PAPS 555

Intensified monitoring of CP-NPA activities and atrocities committed

Region IX No of Intensified Activities

Security & Public Order Improve

PNP-MTDP MOOE 15,742.97 16,927.93 18,602.12 20,669.02 23,487.52

PAPS 556

Conduct of inter-agency case conference with other members of the NTF-ELCAC

Region IX

No. of inter-agency case conference conducted

Security & Public Order Improve

PNP-MTDP MOOE 17,023.59 18,304.93 20,115.31 22,350.35 25,398.12

PAPS 557

Conduct Case build-up on cases of purging committed by the NPA

Region IX No. of Case build-up conducted

Security & Public Order Improve

PNP-MTDP MOOE 8,511.81 9,152.48 10,057.67 11,175.19 12,699.08

PAPS 558

assist in the exhumation of human remains of possible victim of purging

Region IXNo. of exhumation of human remains Assisted

Security & Public Order Improve

PNP-MTDP MOOE 17,023.59 18,304.93 20,115.31 22,350.35 25,398.12

103,192.30

51,596.23

103,192.30

79,431.77

114,474.89

95,429.55

366,319.14

-

117,819.06

25,945.44

-

2,103,030.72

Chapter 18 - PNP IXPage 50 of 54

Page 195: Table of Contents (By Chapter)

(-14-) (-15-)

Investment Requirements (In exact amount PhP)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (Proposed) 2021 (Proposed) 2022 (Proposed) Total

Chapter Outcome/Projec

t Title

Project Description/Objecti

ves

Specific Location

(Province/City/Municipality/Barangay

)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

PAPS 559

Inter-agency case build-up on extortion activities by CPP-NPA

Region IXNo. of Inter-agency case build-up

Security & Public Order Improve

PNP-MTDP MOOE 34,047.18 36,609.87 40,230.62 44,700.69 50,796.24

PAPS 560

Intensified inter-agency joint effort to arrest CPP-NPA wanted personalities

Region IXNo. of Intensified inter-agency joint effort Conducted

Security & Public Order Improve

PNP-MTDP MOOE 20,643.04 22,196.82 24,392.11 27,102.35 30,798.12

PAPS 561

Conduct inter-agency capacity building trainings and awareness seminars on NTF-ELCAC

Region IX

No. of inter-agency capacity building trainings and awareness seminars conducted

Security & Public Order Improve

PNP-MTDP MOOE 245,315.99 263,780.64 289,868.83 322,076.48 365,996.00

PROGRAM 5 - Capital Outlay - - - - CAPITAL OUTLAY - INFRASTRUCTURE

PAPS 562

Construction of Zamboanga del Norte PPO New Standard Building

Region IX No. of Construction Security & Public Order ImprovePNP-MTDP MOOE 25,200,000.00

PAPS 563

Construction of Zamboanga del Sibugay PPO New Standard Building

Region IX No. of Construction Security & Public Order ImprovePNP-MTDP MOOE 25,200,000.00

PAPS 564

Construction of 4-Storey PNCO Condominium / RHQ

Region IX No. of Construction Security & Public Order ImprovePNP-MTDP MOOE 45,000,000.00

PAPS 565

Construction of 4-Storey PCO Condominium / RHQ

Region IX No. of Construction Security & Public Order ImprovePNP-MTDP MOOE 45,000,000.00

PAPS 566

Construction of PPO Standard Building / ZNPPO AND ZSBY PPO

Region IX No. of Construction Security & Public Order ImprovePNP-MTDP MOOE 50,400,000.00 50,400,000.00

25,200,000.00

45,000,000.00

45,000,000.00

-

-

25,200,000.00

206,384.59

125,132.44

1,487,037.94

Chapter 18 - PNP IXPage 51 of 54

Page 196: Table of Contents (By Chapter)

(-14-) (-15-)

Investment Requirements (In exact amount PhP)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (Proposed) 2021 (Proposed) 2022 (Proposed) Total

Chapter Outcome/Projec

t Title

Project Description/Objecti

ves

Specific Location

(Province/City/Municipality/Barangay

)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

PAPS 567

Construction of 4-Storey PNCO Condominium / RHQ

Region IX No. of Construction Security & Public Order ImprovePNP-MTDP MOOE 46,936,000.00

PAPS 568

Construction of 4-Storey PNCO Condominium / ZSBPPO, ZSBPPO, ZNPPO & RMFB

Region IX No. of Construction Security & Public Order ImprovePNP-MTDP MOOE 187,744,000.00

PAPS 569 Construction of HQs Bldg / RMFB Region IX No. of

Construction Security & Public Order ImprovePNP-MTDP MOOE 69,995,600.00

PAPS 570

Construction of HQs Bldg / PMFC (ZSBPPO, ZNPPO and ZSPPO)

Region IX No. of Construction Security & Public Order ImprovePNP-MTDP MOOE 135,325, 500.00

CAPITAL OUTLAY - NON INFRASTRUCTURE

PAPS 571 Surveillance Drones @ PSF/PMFC Region IX

No. of Surveillance Drones

Security & Public Order ImprovePNP-MTDP MOOE 600,000.00

PAPS 572

Desktop Computers for Staff Work / Eprojects @ RHQ/PPO/MPS

Region IX No. Desktop Computers Security & Public Order ImprovePNP-MTDP MOOE 11,800,000.00

PAPS 573

PNP Regional Camp Network Through the iGovPhil Project Camp Abendan and Camp Batalla @ RHQ

Region IX No. of Network Security & Public Order ImprovePNP-MTDP MOOE 3,305,040.00

PAPS 574

Installation of Police Provincial Office / Camp Network Through the iGovPhil Project @  PPOs

Region IX

No. of Installations of Camp network Through iGovPhil @ PPOs

Security & Public Order ImprovePNP-MTDP MOOE 4,522,760.00 4,522,760.00

600,000.00

11,800,000.00

3,305,040.00

69,995,600.00

-

-

46,936,000.00

187,744,000.00

Chapter 18 - PNP IXPage 52 of 54

Page 197: Table of Contents (By Chapter)

(-14-) (-15-)

Investment Requirements (In exact amount PhP)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (Proposed) 2021 (Proposed) 2022 (Proposed) Total

Chapter Outcome/Projec

t Title

Project Description/Objecti

ves

Specific Location

(Province/City/Municipality/Barangay

)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

PAPS 575

Installation of Police Station Network Through the iGovPhil Project @ MPS/CPS

Region IX

No. of Installations of Camp network Through iGovPhil @MPS/CPS

Security & Public Order ImprovePNP-MTDP MOOE 40,735,500.00

PAPS 576

Procurement of Portable Large-Venue Multimedia Projector (PRO9 Multipurpose Hall), and Small Office Projectors @ RHQ/PPO/MPS

Region IX

No. of Procurement of Portable Large-Venue Multimedia Projector

Security & Public Order ImprovePNP-MTDP MOOE 4,295,000.00

PAPS 577

Procurement of LED Video Wall for Outdoor Use @ RHQ

Region IXNo. of Procurement of LED Video Wall

Security & Public Order ImprovePNP-MTDP MOOE 1,375,000.00

PAPS 578

Procurement of External Drive 1TB for file back-up for RHQ/PPO/MPS

Region IX

No. of Procurement of External Drive 1TB for file back-up

Security & Public Order ImprovePNP-MTDP MOOE 374,500.00

PAPS 579

Procurement of Office Application (Business /Enterprise Version) @  RHQ/PPO/MPS

Region IXNo. of Procurement of Office Application

Security & Public Order ImprovePNP-MTDP MOOE 4,493,500.00

PAPS 580

Procurement of Internet Security and Anti-Virus Software @ RHQ/PPO/MPS

Region IX

No. of Procurement of Internet Security and Anti-Virus Software

Security & Public Order ImprovePNP-MTDP MOOE 608,000.00

PAPS 581

Procurement of Graphic Design Software @ RHQ / PPO / MPS

Region IX

No. of Procurement of Graphic Design Software

Security & Public Order ImprovePNP-MTDP MOOE 252,500.00

608,000.00

252,500.00

1,375,000.00

374,500.00

4,493,500.00

40,735,500.00

4,295,000.00

Chapter 18 - PNP IXPage 53 of 54

Page 198: Table of Contents (By Chapter)

(-14-) (-15-)

Investment Requirements (In exact amount PhP)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (Proposed) 2021 (Proposed) 2022 (Proposed) Total

Chapter Outcome/Projec

t Title

Project Description/Objecti

ves

Specific Location

(Province/City/Municipality/Barangay

)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

PAPS 582

Procurement of Uninterruptible Power Supply (1) for Desktop PC 1kVA @ RHQ/PPO/MPS

No. of Power Supply Security & Public Order ImprovePNP-MTDP MOOE 2,733,500.00

PAPS 583

Web Hosting & Cloud Storage Subscription for Back-up Files RHQ / PPO / MPS

Region IX

No. of Subscription Web Hosting & Cloud Storage

Security & Public Order ImprovePNP-MTDP MOOE 264,000.00

PAPS 584

Security Monitoring 32-channel CCTV System Upgrade @  RHQ/PPO/MPS

Region IX No of CCTV Upgrade Security & Public Order ImprovePNP-MTDP MOOE

9,197,000.00

PAPS 585 Purchase of Light Transport Vehicle Region IX No. of Light

Transport Vehicle Security & Public Order ImprovePNP-MTDP MOOE 9,416,120.00

PAPS 586Purchase of EOD Bomb Disposal Robot

Region IX No. of Purchase of EOD Security & Public Order ImprovePNP-MTDP MOOE 71,520,000.00

PAPS 587 Shuttle Bus Region IX No. of Purchase of Shuttle Bus Security & Public Order ImprovePNP-MTDP MOOE 26,040,000.00

PAPS 588 Purchase of Heavy Motorcycle Region IX No. of Purchase of

Heavy Motorcycle Security & Public Order ImprovePNP-MTDP MOOE 3,743,720.00

PAPS 589 Purchase of 5.56 mm Basic Assault Rifle Region IX

No. of Puchase of 5.56 mm Basic Assault Rifle

Security & Public Order ImprovePNP-MTDP MOOE 33,783,438.00

TOTAL 405,057,196.26 435,545,372.32 478,621,288.27 531,801,431.41 1,328,854,986.42

33,783,438.00

3,179,880,274.67

71,520,000.00

26,040,000.00

3,743,720.00

264,000.00

9,197,000.00

9,416,120.00

2,733,500.00

Chapter 18 - PNP IXPage 54 of 54

Page 199: Table of Contents (By Chapter)

Chapter 19: Accelerating Infrastructure Development

PROGRAM 2017 2018 2019 2020 2021 2022 TOTAL

OO1: Ensure Safe and Reliable National Road System

11,871,616.00 11,982,564.00 4,881,900.00 28,666,196.91 66,296,176.39 27,894,495.95 151,592,949.25

OO2: Protect Lives and Properties Against Major Floods

1,934,898.00 3,538,506.00 1,712,278.00 11,460,640.89 21,951,544.00 17,515,000.00 58,112,866.89

Convergence and Special Support Program

397,426.00 1,736,262.00 976,937.00 20,717,739.10 25,203,639.10 24,697,459.10 73,729,462.30

Local Projects 2,519,846.00 3,416,951.00 8,142,994.46 26,017,932.50 38,680,782.00 17,957,522.45 96,736,028.41

GRAND TOTAL 16,723,786.00 20,674,283.00 15,714,109.46 86,862,509.40 152,132,141.49 88,064,477.50 380,171,306.85

Updated Zamboanga Peninsula Regional Development Investment Program (RDIP), 2017-2022(in Thousand Pesos)

Page 200: Table of Contents (By Chapter)

AGENCY: DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

2017 2018 2019 2020 2021 2022 GRANDTOTAL

OO1 1,405,804.00 1,168,761.00 - 2,764,820.00 6,407,341.00 1,817,052.00 13,563,778.00 OO2 240,000.00 350,000.00 180,000.00 1,269,185.89 4,045,000.00 2,064,000.00 8,148,185.89 CSSP - 390,000.00 - 1,677,660.00 1,836,260.00 1,677,660.00 5,581,580.00 LP 216,413.00 190,000.00 1,416,500.00 2,648,896.00 2,267,875.00 1,782,524.00 8,522,208.00 SUB-TOTAL 1,862,217.00 2,098,761.00 1,596,500.00 8,360,561.89 14,556,476.00 7,341,236.00 35,815,751.89 OO1 2,334,932.00 1,752,583.00 118,696.00 3,576,041.00 7,696,234.00 2,383,580.00 17,862,066.00 OO2 195,000.00 499,313.00 - 550,000.00 1,588,650.00 890,000.00 3,722,963.00 CSSP - 200,000.00 - 2,643,410.00 2,643,410.00 2,643,410.00 8,130,230.00 LP 213,304.00 554,500.00 2,162,625.00 3,260,215.40 5,108,913.39 2,000,200.00 13,299,757.79 SUB-TOTAL 2,743,236.00 3,006,396.00 2,281,321.00 10,029,666.40 17,037,207.39 7,917,190.00 43,015,016.79 OO1 1,089,921.00 1,403,714.00 1,412,578.00 3,419,415.91 7,472,682.44 2,201,000.00 16,999,311.35 OO2 320,000.00 500,000.00 480,726.00 2,364,000.00 3,226,000.00 2,705,000.00 9,595,726.00 CSSP - 225,122.00 111,200.00 1,388,971.10 1,325,971.10 1,329,991.10 4,381,255.30 LP 432,975.00 562,300.00 190,000.00 4,583,920.64 9,712,716.15 - 15,481,911.80 SUB-TOTAL 1,842,896.00 2,691,136.00 2,194,504.00 11,756,307.65 21,737,369.69 6,235,991.10 46,458,204.45 OO1 1,247,855.00 1,609,929.00 1,128,424.00 6,843,172.00 16,699,700.00 4,378,000.00 31,907,080.00 OO2 235,000.00 531,935.00 421,993.00 2,342,000.00 3,802,000.00 3,625,000.00 10,957,928.00 CSSP - 332,650.00 180,000.00 2,874,400.00 3,003,700.00 2,874,400.00 9,265,150.00 LP 457,950.00 249,000.00 1,631,477.21 1,426,575.00 1,377,475.00 542,375.00 5,684,852.21 SUB-TOTAL 1,940,805.00 2,723,514.00 3,361,894.21 13,486,147.00 24,882,875.00 11,419,775.00 57,815,010.21 OO1 2,142,751.00 - 135,000.00 4,266,708.00 13,156,622.00 5,536,180.00 25,237,261.00 OO2 45,000.00 - - 942,250.00 1,293,000.00 1,255,000.00 3,535,250.00 CSSP 46,376.00 - 75,000.00 4,138,158.00 4,360,458.00 4,138,158.00 12,758,150.00 LP 92,000.00 164,000.00 1,253,864.25 1,978,011.45 1,369,839.45 1,017,189.45 5,874,904.62 SUB-TOTAL 2,326,127.00 164,000.00 1,463,864.25 11,325,127.45 20,179,919.45 11,946,527.45 47,405,565.62 OO1 939,547.00 1,058,824.00 305,514.00 1,592,359.00 1,592,359.00 - 5,488,603.00 OO2 348,398.00 333,258.00 398,150.00 722,205.00 1,703,301.00 1,746,000.00 5,251,312.00 CSSP 1,050.00 111,700.00 480,822.00 3,016,990.00 3,016,990.00 3,016,990.00 9,644,542.00 LP 62,000.00 222,500.00 122,000.00 2,493,890.00 2,864,990.00 - 5,765,380.00 SUB-TOTAL 1,350,995.00 1,726,282.00 1,306,486.00 7,825,444.00 9,177,640.00 4,762,990.00 26,149,837.00 OO1 889,106.00 1,027,011.00 344,710.00 3,713,285.00 3,742,554.00 2,050,000.00 11,766,666.00 OO2 125,000.00 350,000.00 - 1,913,000.00 3,615,593.00 2,552,000.00 8,555,593.00 CSSP - 25,000.00 54,915.00 3,174,250.00 3,374,250.00 3,374,250.00 10,002,665.00 LP 296,724.00 557,000.00 178,000.00 1,427,039.00 3,363,739.00 - 5,822,502.00 SUB-TOTAL 1,310,830.00 1,959,011.00 577,625.00 10,227,574.00 14,096,136.00 7,976,250.00 36,147,426.00

4. ZAMBOANGA DEL SUR 1ST DEO/ PAGADIAN CITY / ZDS 1ST LD

5. ZAMBOANGA DEL SUR 2ND DEO/ GUIPOS / ZDS 2ND LD

6. ZAMBOANGA SIBUGAY 1ST DEO/ DIPLAHAN / ZS 1ST LD

7. ZAMBOANGA SIBUGAY 2ND DEO/ IPIL / ZS 2ND LD

3. ZAMBOANGA DEL NORTE 3RD DEO SEGABE, PIÑAN / ZDN 1ST LD

Summary of Updated Zamboanga Peninsula Regional Development Investment Program (RDIP), 2017-2022Region IX, Zamboanga City

DISTRICT ENGINEERING OFFICE/LEGISLATIVE DISTRICT

AMOUNT IN THOUSAND PESOS(₱ 'OOO)

1. ZAMBOANGA DEL NORTE 1ST DEO DIPOLOG CITY / ZDN 2ND LD

2. ZAMBOANGA DEL NORTE 2ND DEO/ LABASON / ZDN 3RD LD

Page 201: Table of Contents (By Chapter)

2017 2018 2019 2020 2021 2022 GRANDTOTAL

DISTRICT ENGINEERING OFFICE/LEGISLATIVE DISTRICT

AMOUNT IN THOUSAND PESOS(₱ 'OOO)

District 1OO1 916,121.00 1,825,392.00 7,649.00 1,057,916.00 1,185,916.00 1,185,916.00 6,178,910.00 OO2 366,500.00 575,000.00 78,000.00 1,008,000.00 1,008,000.00 1,008,000.00 4,043,500.00 CSSP 200,000.00 410,000.00 60,000.00 1,194,300.00 3,877,500.00 3,877,500.00 9,619,300.00 LP 127,000.00 132,000.00 412,114.00 2,618,800.00 4,651,285.00 4,651,285.00 12,592,484.00 SUB-TOTAL 1,609,621.00 2,942,392.00 557,763.00 5,879,016.00 10,722,701.00 10,722,701.00 32,434,194.00 District 2OO1 896,000.00 1,863,000.00 1,241,197.00 426,500.00 7,148,997.95 7,148,997.95 18,724,692.90 OO2 50,000.00 254,000.00 132,713.00 - 1,320,000.00 1,320,000.00 3,076,713.00 CSSP 150,000.00 41,790.00 15,000.00 324,600.00 1,428,100.00 1,428,100.00 3,387,590.00 LP 99,480.00 90,651.00 676,414.00 1,837,452.00 2,164,266.00 2,164,266.00 7,032,529.00 SUB-TOTAL 1,195,480.00 2,249,441.00 2,065,324.00 2,588,552.00 12,061,363.95 12,061,363.95 32,221,524.90 OO1 9,579.00 273,350.00 188,132.00 1,005,980.00 1,193,770.00 1,193,770.00 3,864,581.00 OO2 10,000.00 145,000.00 20,696.00 350,000.00 350,000.00 350,000.00 1,225,696.00 CSSP - - - 285,000.00 337,000.00 337,000.00 959,000.00 LP 522,000.00 695,000.00 100,000.00 3,743,133.00 5,799,683.00 5,799,683.00 16,659,499.00 SUB-TOTAL 541,579.00 1,113,350.00 308,828.00 5,384,113.00 7,680,453.00 7,680,453.00 22,708,776.00

16,723,786.00 20,674,283.00 15,714,109.46 86,862,509.40 152,132,141.49 88,064,477.50 380,171,306.85 GRAND TOTAL

8. ZAMBOANGA CITY DEO

9. ISABELA CITY DEO / BASILAN LONE DISTRICT

Chapter 19-1-DPWH IX(Summary by DEO)

Page 2 of 2

Page 202: Table of Contents (By Chapter)

Updated Zamboanga Peninsula Regional Development Investment Program (RDIP), 2017-2022

Agency: DPWH IXChapter 19: Accelerating Infrastructure Development

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

ZAMBOANGA DEL NORTE 1ST DEO, DIPOLOG CITYZAMBOANGA DEL NORTE 2ND LEGISLATIVE DISTRICTa. OO1: Ensure Safe and Reliable National Road System

(i) Asset Preservation of National Roads1. Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development Management-4 (HDM-4)

a. Primary Road1. Dipolog - Sindangan - Liloy Road,

K1872+000 - K1872+285,K1872+326 - K1873+770,K1873+801 - K1875+299,K1875+323 - K1877+000

Concrete Reconstruction Diplahan/Sindangan 4.624 km. POW, Plans

and Contract GAA 3 129,472.00 129,472.00

2. Dipolog - Sindangan - Liloy Road,K1877+000 - K1877+611,K1877+638 - K1877+850,K1879+000 - K1881+375

Concrete Reconstruction Sindangan 4.222 km. POW, Plans

and Contract GAA 3 118,216.00 118,216.00

3. Dipolog - Sindangan - Liloy Road,K1894+860 - K1895+000, K1899+000 - K1902+907,K1902+948 - K1904+000

Concrete Reconstruction Sindangan 4.024 km. POW, Plans

and Contract GAA 3 121,000.00 121,000.00

4. Dipolog - Sindangan - Liloy Road,K1917+1963 - K1920+599,K1920+787 - K1920+915,K1922+402 - K1925+000

Concrete Reconstruction Jose Dalman 4.522 km. POW, Plans

and Contract GAA 3 126,616.00 126,616.00

5. Dipolog - Sindangan - Liloy Road,K1847+963 - K1848+852,K1848+877 - K1851+000, K1851+000 - K1852+000

Concrete Reconstruction Jose Dalman 4.001 km. POW, Plans

and Contract GAA 3 120,000.00 120,000.00

6. Dipolog - Sindangan - Liloy Road,K1852+000 - K1852+987,K1852+993 - K1853+234,K1853+257 - K1854+308,K1855+000 - K1855+113,K1855+119 - K1856+000, K1857+635 - K1858+000

Concrete Reconstruction Jose Dalman 3.618 km. POW, Plans

and Contract GAA 3 109,000.00 109,000.00

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results

Matrices Indicators Addressed

Expected Output

Basis for Implementa

tion

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

Investment Requirements (in exact amount PhP)

Page 203: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results

Matrices Indicators Addressed

Expected Output

Basis for Implementa

tion

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

Investment Requirements (in exact amount PhP)

7. Dipolog - Sindangan - Liloy Road,K1904+000 - K1905+324,K1905+375 - K1906+000,K1907+000 - K1909+021,K1909+032 - K1910+000

Concrete Reconstruction Jose Dalman 4.98 km. POW, Plans

and Contract GAA 3 139,440.00 139,440.00

8. Dipolog - Sindangan - Liloy Road,K1914+000 - K1917+1963 Concrete

Reconstruction Sindangan 5.028 km. POW, Plans and Contract GAA 3 140,784.00 140,784.00 281,568.00

9. Dipolog - Sindangan - Liloy Road,K1858+000 - K1859+885,K1859+968 - K1861+633,K1861+698 - K1862+000

Concrete Reconstruction Sindangan 3.818 km. POW, Plans

and Contract GAA 3 115,000.00 115,000.00

10. Dipolog - Sindangan - Liloy Road,K1910+000 - K1911+945,K1911+961 - K1912+114,K1912+131 - K1914+000

Concrete Reconstruction Jose Dalman 4.051 km. POW, Plans

and Contract GAA 3 113,428.00 113,428.00 226,856.00

11. Dipolog - Sindangan - Liloy Road,K1862+000 - K1863+690,K1864+000 - K1865+912,K1865+952 - K1866+871,K1866+883 - K1867+010,K1868+160 - K1868+697

Concrete Reconstruction Jose Dalman 5.168 km. POW, Plans

and Contract GAA 3 144,704.00 144,704.00

12. Dipolog - Sindangan - Liloy Road,K1895+000 - K1898+653 Concrete

ReconstructionManawan, Jose

Dalman 3.29 POW, Plans and Contract GAA 3 107,211.00 107,211.00

13. Dipolog-Sindangan-Liloy Rd - K1869 + -300 - K1869 + 000, K1869 + 247 - K1869 + 563, K1871 + -247 - K1872 + 000, K1921 + 363 - K1922 + 317, K1925 + 000 - K1925 + 870

Road Upgrading Gravel to

Paved

3.99 km. POW, Plans and Contract GAA 3 68,886.00 68,886.00

14. Dipolog - Sindangan - Liloy Road,Concrete

Reconstruction Sindangan 1.775 km POW, Plans and Contract GAA 3 159,150.00 159,150.00 318,300.00

15. Dipolog - Sindangan - Liloy Road, K1856+263 - K1857+629 Concrete

Reconstruction 1.364 km POW, Plans and Contract GAA 3 38,192.00 38,192.00

This project was deleted in FY2019 GAA, hence, proposed for 2021

16. Dipolog - Sindangan - Liloy Road, K1881+467 - K1884+000 Concrete

Reconstruction 2.481 km POW, Plans and Contract GAA 3 69,468.00 69,468.00

This project was deleted in FY2019 GAA, hence, proposed for 2021

Chapter 19-1-DPWH IX-ZDN 1DEOPage 2 of 33

Page 204: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results

Matrices Indicators Addressed

Expected Output

Basis for Implementa

tion

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

Investment Requirements (in exact amount PhP)

17. Dipolog - Sindangan - Liloy Road, K1884+000 - K1885+820 Concrete

Reconstruction 1.816 km POW, Plans and Contract GAA 3 50,848.00 50,848.00

This project was deleted in FY2019 GAA, hence, proposed for 2021

18. Dipolog - Sindangan - Liloy Road, K1885+820 - K1887+860 Concrete

Reconstruction 2.027 km POW, Plans and Contract GAA 3 56,756.00 56,756.00

This project was deleted in FY2019 GAA, hence, proposed for 2021

19. Dipolog - Sindangan - Liloy Road, K1887+860 - K1887+1963 Concrete

Reconstruction 1.103 km POW, Plans and Contract GAA 3 30,844.00 30,844.00

This project was deleted in FY2019 GAA, hence, proposed for 2021

20. Dipolog - Sindangan - Liloy Road, K1887+2010 - K1891+000 Concrete

Reconstruction 2.047 km POW, Plans and Contract GAA 3 57,316.00 57,316.00

This project was deleted in FY2019 GAA, hence, proposed for 2021

21. Dipolog - Sindangan - Liloy Road, K1925+1003 - K1926+1035 Concrete

Reconstruction 1.003 km POW, Plans and Contract GAA 3 28,084.00 28,084.00

This project was deleted in FY2019 GAA, hence, proposed for 2021

22. Dipolog - Sindangan - Liloy Road, K1926+1035 - K1929+005 Concrete

Reconstruction 1.907 km. POW, Plans and Contract GAA 3 53,396.00 53,396.00

This project was deleted in FY2019 GAA, hence, proposed for 2021

23. Dipolog - Sindangan - Liloy Road, K1847+000 - K1847+715.50 Concrete

ReconstructionPOW, Plans and Contract GAA 3 10,000.00 10,000.00

This project was deleted in FY2019 GAA, hence, proposed for 2021

b. Secondary Road - 24. Dipolog Old Airport Road

Concrete Reconstruction Dipolog City

POW, Plans and Contract GAA 3 -

25. Dipolog South Airport RoadConcrete

Reconstruction Dipolog City

POW, Plans and Contract GAA 3 -

26. Dipolog - Polanco - Piñan Jct. Oroquieta Concrete

Reconstruction Turno, Dipolog City

POW, Plans and Contract GAA 3 -

27. Katipunan - By-pass RoadConcrete

Reconstruction Katipunan, Dipolog City

POW, Plans and Contract GAA 3 -

28. Dipolog - Punta - Dansullan - S. Osmeña Road

Concrete Reconstruction

Dipolog City POW, Plans and Contract GAA 3

2,004.00 2,004.00

29. Sindangan - Siayan - Dumingag Road Concrete

Reconstruction

Sindangan, Zamboang del

Norte

POW, Plans and Contract GAA 3 -

c. Tertiary Road - 30. Sindangan - Bayog - Lakewood

Road Concrete Reconstruction

Sindangan, Zamboang del

Norte

POW, Plans and Contract GAA 3 -

31. Dipolog - Polanco - Piñan Jct. Oroquieta Concrete

Reconstruction

Sindangan, Zamboang del

Norte

POW, Plans and Contract GAA 3 -

2. Preventive Maintenance based on Pavement Management System -

Chapter 19-1-DPWH IX-ZDN 1DEOPage 3 of 33

Page 205: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results

Matrices Indicators Addressed

Expected Output

Basis for Implementa

tion

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

Investment Requirements (in exact amount PhP)

a. Primary Road - 32. Dipolog - Sindangan - Liloy Road

Asphalt Overlay

Katipunan, Roxas, Manukan, Jose

Dalman, Sindangan

POW, Plans and Contract GAA 3 237,000.00 - 237,000.00

33. Dipolog - Oroquieta RoadAsphalt Overlay

Dipolog City, Galas, Olingan,

Punta

POW, Plans and Contract GAA 3 -

b. Secondary Road - 34. Dipolog Old Airport Road

Asphalt Overlay Dipolog City

POW, Plans and Contract GAA 3 5,000.00 - 5,000.00

35. Dipolog South Airport RoadAsphalt Overlay Dipolog City

POW, Plans and Contract GAA 3 -

36. Dipolog - Polanco - Piñan Jct. Oroquieta Asphalt

Overlay Turno, Gulayon,Dipolog City

POW, Plans and Contract GAA 3 -

37. Katipunan - By-pass RoadAsphalt Overlay Katipunan, Dipolog

City

POW, Plans and Contract GAA 3 -

38. Sindangan - Siayan - Dumingag Road Asphalt

Overlay Siayan, Zamboang del Norte

POW, Plans and Contract GAA 3 4,500.00 50,000.00 118,000.00 120,000.00 292,500.00

c. Tertiary Road GAA 3 - 39. Sindangan - Bayog - Lakewood

Road Asphalt Overlay

Sindangan, Zamboang del

Norte

POW, Plans and Contract GAA 3 -

3. Construction/Upgrading/Rehabilitation of Drainage along National Roads - a. Primary Road -

40. Dipolog - Sindangan - Liloy Road,K1919+000 - K1920+000 Construction of

Lined CanalPoblacion Sindangan 1.06 POW, Plans

and Contract GAA 3 139,150.00 114,000.00 253,150.00

41. Dipolog - Sindangan - Liloy Road,K1917+913.60 - K1917+1400 Construction of

Lined CanalPoblacion Sindangan

952.80 ln.m

POW, Plans and Contract GAA 3 7,200.00 7,200.00

42. Dipolog - Oroquieta RoadConstruction of

Lined Canal

Dipolog City, Galas, Olingan,

Punta

POW, Plans and Contract GAA 3 20,000.00 20,000.00 40,000.00

43. Dipolog - Punta - Dansullan - S. Osmeña Road Construction of

Lined Canal Sinaman, Diwan, Sangkol

POW, Plans and Contract GAA 3 -

b. Secondary Road - 44. Dipolog Old Airport Road

Construction of Lined Canal Dipolog City

POW, Plans and Contract GAA 3 -

45. Dipolog South Airport RoadConstruction of

Lined Canal Dipolog City

POW, Plans and Contract GAA 3 -

46. Dipolog - Polanco - Piñan Jct. Oroquieta Construction of

Lined Canal Turno, Gulayon,Dipolog City

POW, Plans and Contract GAA 3 -

47. Katipunan - By-pass RoadConstruction of

Lined Canal Katipunan, Dipolog City

POW, Plans and Contract GAA 3 -

Chapter 19-1-DPWH IX-ZDN 1DEOPage 4 of 33

Page 206: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results

Matrices Indicators Addressed

Expected Output

Basis for Implementa

tion

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

Investment Requirements (in exact amount PhP)

48. Sindangan - Siayan - Dumingag Road Construction of

Lined Canal Siayan, Zamboang del Norte

POW, Plans and Contract GAA 3 -

4. Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - a. Primary Road -

49. Dipolog - Sindangan - Liloy Road,K1925+704 - K1925+874 Slope

Protection Ingin, Sindangan 3879 sq.m POW, Plans and Contract 10,000.00 10,000.00

50. Dipolog - Sindangan - Liloy Road Package 1,2,3 & 4 Slope

Protection Ingin, Sindangan 3879 sq.m POW, Plans and Contract GAA 3 503,000.00 503,000.00

51. Dipolog - Sindangan - Liloy Road,Slope

Protection Ingin, Sindangan 3879 sq.m POW, Plans and Contract GAA 3 130,000.00 130,000.00

52. Dipolog - Sindangan - Liloy Road,Slope

Protection Ingin, Sindangan 3879 sq.m POW, Plans and Contract GAA 3 118,000.00 118,000.00

53. Dipolog - Punta - Dansullan Road K1855+605 - K1855+677 Slope

ProtectionSangkol, Dipolog

City 72 m POW, Plans and Contract GAA 3 2,000.00 2,000.00

54. Dipolog - Sindangan - Liloy Road,K1869+102 - K1869+115

Slope Protection Dapatan, Manukan POW, Plans

and Contract GAA 3 32,000.00

K1925+704-k1925+874 Ingin, Sindangan GAA 3 - b. Secondary Road -

55. Sindangan - Siayan - Dumingag Road, K1929+920 - K1929+990, K1937+140 - K1937+660 ,K1939+9355-K1939+9500, k1939+060-k1939+090

Slope Protection Siayan 5,849

sq.m.POW, Plans and Contract GAA 3 17,269.00 20,000.00 37,269.00

56. Sindangan - Siayan - Dumingag Road Slope

Protection Siayan 5,849 sq.m.

POW, Plans and Contract GAA 3 17,269.00 326,000.00 343,269.00

57. Sindangan - Siayan - Dumingag Road Slope

Protection Siayan 5,849 sq.m.

POW, Plans and Contract GAA 3 17,269.00 117,000.00 134,269.00

58. Sindangan - Siayan - Dumingag Road Slope

Protection Siayan 5,849 sq.m.

POW, Plans and Contract GAA 3 17,269.00 120,000.00 137,269.00

59. Sindangan - Siayan - Dumingag Road, K1929+200 - K1929+300, K1939+5122- K1999+5276,K1939+8431 - K1939+8664,

Slope Protection Siayan 5,428

sq.mPOW, Plans and Contract GAA 3 45,000.00 45,000.00

c. Tertiary Road - 60. Sindangan - Bayog - Lakewood

Road Slope Protection Siayan POW, Plans

and Contract GAA 3 5,000.00 5,000.00

61. Sindangan - Bayog - Lakewood Road Slope

Protection Siayan POW, Plans and Contract GAA 3 116,000.00 116,000.00

62. Sindangan - Bayog - Lakewood Road Slope

Protection Siayan POW, Plans and Contract GAA 3 115,000.00 115,000.00

183 m 32,000.00

Chapter 19-1-DPWH IX-ZDN 1DEOPage 5 of 33

Page 207: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results

Matrices Indicators Addressed

Expected Output

Basis for Implementa

tion

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

Investment Requirements (in exact amount PhP)

63. Sindangan - Bayog - Lakewood Road Slope

Protection Siayan POW, Plans and Contract GAA 3 116,000.00 116,000.00

(ii) Network Development - 1. Improvement/Widening of National Roads -

a. Primary Road - 64. Dipolog - Oroquieta National Road

Road WideningDipolog City,

Galas, Olingan, Punta

POW, Plans and Contract GAA 3 64,230.00 64,230.00

65. Dipolog - Sindangan - Liloy RoadRoad Widening Katipunan, Roxas,

Manukan

POW, Plans and Contract GAA 3 326,003.00 120,000.00 - 446,003.00

66. Dipolog - Sindangan - Liloy Road,K1857+635 - K1859+885,K1859+968 - K1861+633,K1861+698 - K1862+000

Road Widening 4.18 km. POW, Plans and Contract GAA 3 146,300.00 146,300.00

67. Dipolog - Sindangan - Liloy Road,K1909+924 - K1911+945,K1911+961 - K1912+114,K1912+131 - K1913+000

Road Widening 3.117 km. POW, Plans and Contract GAA 3 120,000.00 120,000.00

68. Dipolog - Sindangan - Liloy Road,K1904+000 - K1905+324,K1905+375 - K1906+000,K1907+000 - K1909+021,K1909+032 - K1909+924

Road Widening 4.887 km. POW, Plans and Contract GAA 3 170,000.00 170,000.00

69. Dipolog - Sindangan - Liloy Road,K1877+000 - K1877+611,K1877+638 - K1877+850,K1879+000 - K1881+375

Road Widening 4.222 km. POW, Plans and Contract GAA 3 148,000.00 148,000.00 296,000.00

70. Dipolog - Sindangan - Liloy Road,K1926+1035 - K1929+005 Road Widening 1.907 km. POW, Plans

and Contract GAA 3 67,000.00 67,000.00 134,000.00

71. Dipolog - Sindangan - Liloy Road,K1872+000 - K1872+285,K1872+326 - K1873+770,K1873+801 - K1875+299,K1875+323 - K1877+000

Road Widening 4.624 km. POW, Plans and Contract GAA 3 162,000.00 162,000.00 324,000.00

72. Dipolog - Sindangan - Liloy RoadK1857+000 - K1859+750 Road Widening

Roxas, ZN

POW, Plans and Contract GAA 3 80,000.00 80,000.00

73. Dipolog-Sindangan-Liloy Road, K1873+700 - K1878+000, Manukan, Zamboanga del Norte

Road Widening Manukan, ZN POW, Plans and Contract GAA 3 200,000.00 200,000.00

74. Dipolog - Sindangan - Liloy Road K1886+800 - K1887+860

Road Widening Jose Dalman POW, Plans and Contract GAA 3 32,270.00 32,270.00

This project was deleted in FY2019 GAA, hence, proposed for 2021

75. Dipolog-Sindangan-Liloy RoadK1891+076 - K1892+490,K1892+531 - K1893+880

Road Widening Tamil, Jose Dalman, ZN

POW, Plans and Contract GAA 3 70,000.00 70,000.00

Chapter 19-1-DPWH IX-ZDN 1DEOPage 6 of 33

Page 208: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results

Matrices Indicators Addressed

Expected Output

Basis for Implementa

tion

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

Investment Requirements (in exact amount PhP)

76. Dipolog-Sindangan-Liloy RoadK1911+530 - K1918+400 Road Widening

Sindangan

POW, Plans and Contract GAA 3 120,000.00 120,000.00

77. Dipolog - Punta - Dansullan RoadK1846+557 - K1850+000 Road Widening Sinaman, Diwan,

Sangkol3.408 km. POW, Plans

and Contract GAA 3 122,000.00 122,000.00

78. Dipolog - Punta - Dansullan RoadK1850+000 - K1854+000 Road Widening Sinaman, Diwan,

Sangkol3.88 km. POW, Plans

and Contract GAA 3 137,000.00 137,000.00

79. Dipolog - Punta - Dansullan RoadK1854+000 - K1856+619 Road Widening Sinaman, Diwan,

Sangkol2.812 km. POW, Plans

and Contract GAA 3 102,000.00 102,000.00

b. Secondary Road - 80. Dipolog Old Airport Road

Road WideningDipolog City

POW, Plans and Contract GAA 3 -

81. Dipolog South Airport RoadRoad Widening

Dipolog City

POW, Plans and Contract GAA 3 -

82. Dipolog - Polanco - Piñan Jct. Oroquieta Road Widening Turno, Gulayon,

Dipolog City

POW, Plans and Contract GAA 3 22,657.00 22,657.00

83. Katipunan - By-pass RoadRoad Widening Katipunan, Dipolog

City

POW, Plans and Contract GAA 3 -

84. Sindangan - Siayan - Dumingag Road Road Widening

Sindangan, Siayan, Zamboang del

Norte

POW, Plans and Contract GAA 3 150,000.00 145,000.00 140,000.00 435,000.00

2. Construction of By-Passes/Diversion Roads, including ROW - 85. Airport - Turno - Sinaman Bypass

Road incluing ROWa. Concreting

Road Concreting

Turno, Galas, Sinaman, Dipolog

City

POW, Plans and Contract GAA 3 100,000.00 145,000.00 130,120.00 125,000.00 500,120.00

3. Construction of Missing Gaps connecting National Roads, including ROW - 86. Sindangan - Bayog - Lakewood

Road Road Concreting

Talinga, Titik, Sindangan,

Zamboang del Norte

POW, Plans and Contract GAA 3 150,000.00 150,000.00 280,000.00 280,000.00 860,000.00

(iii) Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - a. Tertiary Road -

87. Sindangan - Bayog - Lakewood Road Road

Concreting

Talinga, Titik, Sindangan,

Zamboang del Norte

POW, Plans and Contract GAA 3 570,000.00 334,450.00 350,000.00 1,254,450.00

88. Sindangan - Bayog - Lakewood Road (Package 1) Road

ConcretingPOW, Plans and Contract GAA 3 102,000.00 102,000.00

89. Sindangan - Bayog - Lakewood Road (Package 2) Road

ConcretingPOW, Plans and Contract GAA 3 175,000.00 175,000.00

90. Sindangan - Bayog - Lakewood Road (Package 3) Road

ConcretingPOW, Plans and Contract GAA 3 175,000.00 175,000.00

(iv) Construction and Maintenance of Bridges along National Roads - 1. Construction of New Bridge -

a. Tertiary Road -

Chapter 19-1-DPWH IX-ZDN 1DEOPage 7 of 33

Page 209: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results

Matrices Indicators Addressed

Expected Output

Basis for Implementa

tion

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

Investment Requirements (in exact amount PhP)

91. Bewa Bridge along Sindangan - Bayog - Lakewood Road

Sindangan, Zamboang del

Norte

POW, Plans and Contract GAA 3 150,000.00 150,000.00 300,000.00

92. Titik Bridge along Sindangan - Bayog - Lakewood Road

Sindangan, Zamboang del

Norte

POW, Plans and Contract GAA 3 120,000.00 120,000.00 240,000.00

93. Canangan Bridge along Sindangan - Bayog - Lakewood Road

Sindangan, Zamboang del

Norte

POW, Plans and Contract GAA 3 110,000.00 110,000.00 220,000.00

94. Talinga Br. Along Sindangan-Bayog-Lakewood Road

Sindangan, Zamboang del

Norte

POW, Plans and Contract GAA 3 30,000.00 30,000.00 60,000.00

2. Replacement of Termporary Bridge to Permanent - a. Tertiary Road -

3. Replacement of Permanent Weak Bridges - a. Primary Road -

95. Barra Bridge #2 along Dipolog - Airport Road (Completion)

Dipolog City

POW, Plans and Contract GAA 3 -

96. Talinga Bridge, Sindangan

Sindangan

POW, Plans and Contract GAA 3 5,485.00 5,485.00

97. Iboan Bridge along Dipolog - Sindangan-Liloy Road Iboan, Roxas POW, Plans

and Contract GAA 3 6,000.00 6,000.00 12,000.00

4. Retrofitting/Strengthening of Permanent Bridge - 98. Ingin Bridge (B00457MN) along

Dipolog - Sindangan - Liloy RoadSindangan, ZN

POW, Plans and Contract GAA 3 11,829.00 11,829.00

99. Piao Bridge (B00454MN) along Dipolog - Sindangan - Liloy Road

Sindangan, ZN

POW, Plans and Contract GAA 3 13,919.00 13,919.00

100. Tamilocan Br. (B01194MN) along Dipolog-Oroquieta Rd

Retrofitting / Strengthening

of Bridge

POW, Plans and Contract GAA 3 9,455.00 9,455.00

5. Widening of Permanent Bridges - a. Primary Road -

I. All Bridges along Dipolog - Sindangan - Liloy Road - 101. Sindangan Bridge (B00455MN) Sindangan,

Zamboang del Norte

POW, Plans and Contract GAA 3 110,000.00 150,000.00 260,000.00

102. Irasan Bridge (B00432MN)

Sindangan, Zamboang del

Norte

POW, Plans and Contract GAA 3 6,600.00 6,600.00 13,200.00

The Municipality of this project is in Roxas, Z.N instead of Sindangan, Z.N

103. Dequis Bridge (B00440MN)

Sindangan, Zamboang del

Norte

POW, Plans and Contract GAA 3 29,680.00 29,680.00 59,360.00

The Municipality of this project is in Manukan, Z.N instead of Sindangan, Z.N

Chapter 19-1-DPWH IX-ZDN 1DEOPage 8 of 33

Page 210: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results

Matrices Indicators Addressed

Expected Output

Basis for Implementa

tion

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

Investment Requirements (in exact amount PhP)

104. Manawan Bridge (B00447MN)

Sindangan, Zamboang del

Norte

POW, Plans and Contract GAA 3 35,600.00 35,600.00 71,200.00

The Municipality of this project is in Jose Dalman, Z.N instead of Sindangan, Z.N

105. Pasanan Bridge (B00450MN) Sindangan, Zamboang del

Norte

POW, Plans and Contract GAA 3 36,600.00 36,600.00 73,200.00

106. Laputay Bridge (B00451MN) Sindangan, Zamboang del

Norte

POW, Plans and Contract GAA 3 12,600.00 12,600.00 25,200.00

107. Lintuad Bridge (B00452MN) Sindangan, Zamboang del

Norte

POW, Plans and Contract GAA 3 21,700.00 21,700.00 43,400.00

108. Iboan Bridge (B00427MN)

Sindangan, Zamboang del

Norte

POW, Plans and Contract GAA 3 6,600.00 6,600.00 13,200.00

The Municipality of this project is in Roxas, Z.N instead of Sindangan, Z.N

109. Piao Bridge (B00429MN) Sindangan, Zamboang del

Norte

POW, Plans and Contract GAA 3 61,740.00 61,740.00 123,480.00

110. Langatian Bridge (B00430MN)

Sindangan, Zamboang del

Norte

POW, Plans and Contract GAA 3 6,780.00 6,780.00 13,560.00

The Municipality of this project is in Roxas, Z.N instead of Sindangan, Z.N

111. Siare Bridge (B00453MN) Sindangan, Zamboang del

Norte

POW, Plans and Contract GAA 3 20,720.00 20,720.00 41,440.00

112. Piao Bridge II (B00454MN) Sindangan, Zamboang del

Norte

POW, Plans and Contract GAA 3 189,900.00 189,900.00 379,800.00

113. Dicayo Bridge (S01057MN)

Widening Katipunan, Nabilid POW, Plans and Contract GAA 3 113,600.00 113,600.00

This peoject's Bridge ID in GAA is (B00425MN) instead of (S01057MN)

114. Mias Bridge (B00426MN)Widening Katipunan POW, Plans

and Contract GAA 3 15,060.00 15,060.00

115. Minang Bridge (B00428MN)

Widening Minang, Roxas 22.93 ln.m POW, Plans and Contract GAA 3 22,930.00 22,930.00

This project was deleted in FY2019 GAA, hence, proposed for 2021

116. Tangian Bridge (B00431MN)

Widening Langatian, Roxas 41 mtrs POW, Plans and Contract GAA 3 41,000.00 41,000.00

This project was deleted in FY2019 GAA, hence, proposed for 2021

117. Dohinob Diut Bridge (B00433MN)

Widening Roxas 84.47 ln.m POW, Plans and Contract GAA 3 2,039.00 2,039.00

This project was deleted in FY2019 GAA, hence, proposed for 2021

Chapter 19-1-DPWH IX-ZDN 1DEOPage 9 of 33

Page 211: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results

Matrices Indicators Addressed

Expected Output

Basis for Implementa

tion

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

Investment Requirements (in exact amount PhP)

118. Dohinob Dacu Bridge (B00434MN)

Widening Roxas

65 ln.m

POW, Plans and Contract GAA 3 2,297.00 2,297.00

This project was deleted in FY2019 GAA, hence, proposed for 2021

119. Lipras Bridge (B00435MN)Widening

Manukan

POW, Plans and Contract GAA 3 -

120. Dipane Bridge (B00436MN)Widening

Manukan

POW, Plans and Contract GAA 3 -

121. Sipulan Bridge (B00437MN)Widening

Manukan

POW, Plans and Contract GAA 3 -

122. Dapatan Bridge (B00438MN)

Widening

Manukan 81.00 ln.m

POW, Plans and Contract GAA 3 1,893.00 1,893.00

This project was deleted in FY2019 GAA, hence, proposed for 2021

123. Manukan Bridge (B00439MN)Widening

Manukan 40.56 ln.m

POW, Plans and Contract GAA 3 1,230.00 1,230.00

124. Dequis Bridge (B00440MN)

Widening

Manukan 31.65 ln.m

POW, Plans and Contract GAA 3 1,850.00 1,850.00

This project was deleted in FY2019 GAA, hence, proposed for 2021

125. Patunan Bridge (B00441MN)Widening

Manukan

POW, Plans and Contract GAA 3 -

126. Piangon Bridge (B00442MN)

Widening

Manukan 25.98 ln.m

POW, Plans and Contract GAA 3 1,380.00 1,380.00

This project was deleted in FY2019 GAA, hence, proposed for 2021

127. Bogatong Bridge (B00443MN)Widening

Manukan

POW, Plans and Contract GAA 3 -

128. Disakan Bridge (B00444MN)Widening

Manukan 92.00 ln.m

POW, Plans and Contract GAA 3 2,269.00 2,269.00

129. Punot Diut Bridge (B00445MN)

Widening Ponot Diut Bridge, Jose Dalman 41 mtrs POW, Plans

and Contract GAA 3 41,000.00 41,000.00

This project was deleted in FY2019 GAA, hence, proposed for 2021

130. Punot Dacu Bridge (B00446MN)Widening

Jose Dalman

POW, Plans and Contract GAA 3 -

131. Motibot Bridge (B00448MN)

Widening

Sindangan 40.6 ln.m

POW, Plans and Contract GAA 3 1,156.00 1,156.00

This project was deleted in FY2019 GAA, hence, proposed for 2021

132. Nipaan Bridge (B00449MN)

Widening

Sindangan 51.00 ln.m

POW, Plans and Contract GAA 3 31,050.00 31,050.00

This project was deleted in FY2019 GAA, hence, proposed for 2021

Chapter 19-1-DPWH IX-ZDN 1DEOPage 10 of 33

Page 212: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results

Matrices Indicators Addressed

Expected Output

Basis for Implementa

tion

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

Investment Requirements (in exact amount PhP)

133. Lingawan Bridge (B00456MN)

Widening

Sindangan 81.9 ln.m

POW, Plans and Contract GAA 3 2,693.00 2,693.00

This project was deleted in FY2019 GAA, hence, proposed for 2021

134. Ingin Bridge (B00457MN)Widening

Sindangan

POW, Plans and Contract GAA 3 -

135. Talinga Bridge (B00458MN)Widening

Sindangan

POW, Plans and Contract GAA 3 -

136. All Bridges along Dipolog - Oroquieta Road GAA 3 -

137. Quezon Bridge (B01191MN)Widening

Dipolog City

POW, Plans and Contract GAA 3 -

138. Miputak Bridge (B01192MN)Widening

Dipolog City

POW, Plans and Contract GAA 3 -

139. Olingan Bridge (B01193MN)Widening

Dipolog City

POW, Plans and Contract GAA 3 -

140. Tamilocan Bridge (B01194MN)Widening Tamilocan, Dipolog

City 55.51ln.m POW, Plans and Contract GAA 3 -

b. Secondary Roads - I. All Bridges along Sindangan - Siayan Road - 141. Balok Bridge (B00137MN) Widening Siayan, Zamboang

del Norte184.2 ln.m POW, Plans

and ContractGAA 3 2,470.00 2,470.00

This project was deleted in FY2019 GAA, hence, proposed for 2021

142. Denoyan Bridge (B00139MN)Widening Siayan, Zamboang

del Norte

POW, Plans and Contract GAA 4 -

143. Localoc Bridge (B00141MN)Widening Siayan, Zamboang

del Norte

POW, Plans and Contract GAA 5 -

144. Calacas Bridge (B00244MN)Widening Siayan, Zamboang

del Norte

POW, Plans and Contract GAA 6 -

145. Lapuyan Bridge (B01598MN)Widening Siayan, Zamboang

del Norte

POW, Plans and Contract GAA 7 -

1,405,804.00 1,168,761.00 - 2,764,820.00 6,407,341.00 1,817,052.00 13,563,778.00 OO2: Protect Lives and Properties Against Major Floods -

1. Construction/Maintenance of Flood Mitigation Structures and Drainage System - 146. Construction of Dipolog River

Flood Control Development Project, Barangay Turno and Barra, Dipolog City, Zamboanga del Norte 2nd LD

Construction of Flood

Mitigation Structure

Dipolog City POW, Plans and Contract GAA 3 45,000.00 50,000.00 215,000.00 110,000.00 420,000.00

OO1 - Subtotal

Chapter 19-1-DPWH IX-ZDN 1DEOPage 11 of 33

Page 213: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results

Matrices Indicators Addressed

Expected Output

Basis for Implementa

tion

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

Investment Requirements (in exact amount PhP)

147. Construction/Extension of Flood Control Structure along the left bank of Dohinob River (Upstream) Brgy. Dahi, Roxas, Zamboanga del Norte

Construction of Flood

Mitigation Structure

Roxas POW, Plans and Contract GAA 3 45,000.00 45,000.00

The project name does't coincide with the project name in GAA 2017 and also the project Description

148. Construction/Extension of Flood Control Structure at Brgy. Lawis, Sindangan, Zamboanga del Norte

Construction of Flood

Mitigation Structure

POW, Plans and Contract GAA 3 150,000.00 290,000.00 150,000.00 590,000.00

149. Construction of Flood Control Structure along Piao River (Upstream), Zamboanga del Norte

Construction of Flood

Mitigation Structure

POW, Plans and Contract GAA 3 125,000.00 235,000.00 130,000.00 490,000.00

150. Construction of Flood Control Structure at Dicayo River (Upstream - Rightbank) Dicayo, Katipunan

Construction of Flood

Mitigation Structure

POW, Plans and Contract GAA 3 105,000.00 215,000.00 110,000.00 430,000.00

151. Construction/ Rehabilitation of Slope Protection and Drainage along Brgy. Uno Creek, Brgy. Uno, Katipunan, Zamboanga del Norte

Construction of Flood

Mitigation Structure

POW, Plans and Contract GAA 3 6,717.00 6,717.00

152. Construction of Flood Control Structure along Upper Piao River, Brgy. Piao, Manuel Roxas, Zamboanga del Norte

Construction of Flood

Mitigation Structure

POW, Plans and Contract GAA 3 30,000.00 222,000.00 115,000.00 367,000.00

153. Construction of Flood Control Structure along Piao River (Upstream & Downstream), Brgy.Langatian, Zamboanga del Norte

Construction of Flood

Mitigation Structure

POW, Plans and Contract GAA 3 30,000.00 224,000.00 125,000.00 379,000.00

154. Construction of Flood Control Structure along Dipolog River

Construction of Flood

Mitigation Structure

POW, Plans and Contract GAA 3 30,000.00 238,000.00 120,000.00 388,000.00

155. Construction of River/Flood Control along both sides of the Upper Stream of Tangian River, Brgy. Langatian, Pres. Manuel A. Roxas, Zamboanga del Norte

Construction of Flood

Mitigation Structure

POW, Plans and Contract GAA 3 30,000.00 224,000.00 125,000.00 379,000.00

156. Repair/Rehabilitation of Piao Bridge Abutment B at Piao, Roxas, Zamboanga del Norte

Construction of Flood

Mitigation Structure

POW, Plans and Contract GAA 3 1,500.00 - 1,500.00

157. Repair/Maintenance of Piao River Control at Goleo, Sindangan, Zamboanga del Norte

Construction of Flood

Mitigation Structure

POW, Plans and Contract GAA 3 5,968.89 212,000.00 105,000.00 322,968.89

158. Construction of Flood Control Structure along Dicayo River (Downstream), Barangay Daanglungsod, Katipunan, Zamboanga del Norte

Construction of Flood

Mitigation Structure

POW, Plans and Contract GAA 3 76,235.00 170,000.00 230,000.00 112,000.00 588,235.00

Chapter 19-1-DPWH IX-ZDN 1DEOPage 12 of 33

Page 214: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results

Matrices Indicators Addressed

Expected Output

Basis for Implementa

tion

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

Investment Requirements (in exact amount PhP)

159. Construction of Flood Control Structure along Talinga River (Downstream-Right Bank), Brgy. Talinga, Sindangan, Zamboanga del Norte

Construction of Flood

Mitigation Structure

POW, Plans and Contract GAA 3 120,000.00 250,000.00 124,000.00 494,000.00

160. Dipolog River Basin Flood Control Project, Dipolog City

Construction of Flood

Mitigation Structure

Dipolog City POW, Plans and Contract GAA 3 100,000.00 120,000.00 238,000.00 125,000.00 583,000.00

161. Construction of Flood Control Structure at Goleo, Sindangan, Zamboanga del Norte

Construction of Flood

Mitigation Structure

Sindangan, Zamboang del

Norte

POW, Plans and Contract GAA 3 20,000.00 20,000.00

162. Construction of Flood Control Structure at Mandih, Sindangan, Zamboanga del Norte 2nd LD

Construction of Flood

Mitigation Structure

Sindangan, Zamboang del

Norte

POW, Plans and Contract GAA 3 30,000.00 30,000.00

163. Construction ofFlood Control Structure along the left bank of Disacan River (Upstream)

Construction of Flood

Mitigation Structure

Manukan, ZN POW, Plans and Contract GAA 3 70,000.00 70,000.00

164. Construction ofFlood Control Structure along the left bank of Disacan River (Downstream)

Construction of Flood

Mitigation Structure

Jose Dalman POW, Plans and Contract GAA 3 70,000.00 103,765.00 173,765.00

165. Construction of Flood Control from Polanco to Lugdungan down to Turno

Construction of Flood

Mitigation Structure

Lugdungan, Dipolog City 367 ln.m POW, Plans

and Contract GAA 3 50,000.00 250,000.00 130,000.00 430,000.00

166. Construction of Flood Control Structure at Dohinob River, Roxas, Zamboanga del Norte

Construction of Flood

Mitigation Structure

Roxas POW, Plans and Contract GAA 3 50,000.00 120,000.00 270,000.00 125,000.00 565,000.00

167. Construction of Flood Control Structure at Ponot Diut River (downstream) both sides, Jose Dalman

Construction of Flood

Mitigation Structure

Jose Dalman POW, Plans and Contract GAA 3 40,000.00 130,000.00 280,000.00 135,000.00 585,000.00

168. Construction of Jose Dalman Seawall Construction of

Seawall Jose Dalman, ZN POW, Plans and Contract GAA 3 -

169. Construction/Extension of Flood Control Structure at Brgy. Lawis, Sindangan, Zamboanga del Norte

Construction of Flood

Mitigation Structure

Sindangan POW, Plans and Contract GAA 3 -

170. Construction/Extension of Seawall/River Control at Roxas, Zamboanga del Norte

Construction of Flood

Mitigation Structure

Roxas POW, Plans and Contract GAA 3 15,000.00 222,000.00 115,000.00 352,000.00

171. Construction of Seawall and Foreshore Protection for Storm Surge

Construction of Flood

Mitigation Structure

Dipolog City POW, Plans and Contract GAA 3 100,000.00 215,000.00 108,000.00 423,000.00

Chapter 19-1-DPWH IX-ZDN 1DEOPage 13 of 33

Page 215: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results

Matrices Indicators Addressed

Expected Output

Basis for Implementa

tion

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

Investment Requirements (in exact amount PhP)

172. Construction of Flood Control Structure along Piao River (Upstream), Zamboanga del Norte

Construction of Flood

Mitigation Structure

Dipolog City 600 ln.m POW, Plans and Contract GAA 3 -

173. Construction of Flood Control Structure of Brgy. Disud along National Highway nearby Disud Elementary School

Construction of Flood

Mitigation Structure

Sindangang, Zamboanga del

Norte

POW, Plans and Contract GAA 3 15,000.00 15,000.00

Dipolog 1st DEO inserted Project for proposed FY2021

240,000.00 350,000.00 180,000.00 1,269,185.89 4,045,000.00 2,064,000.00 8,148,185.89 c. Convergence and Special Support Program -

1. Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - 174. Const./Extension of Dipolog City

Boulevard Road Concreting Dipolog City 580 ln.m POW, Plans

and Contract GAA 3 40,000.00 40,000.00 40,000.00 120,000.00

175. Construction of Roxas Boulevard, Zamboanga del Norte Road

Concreting Roxas 580 ln.m POW, Plans and Contract GAA 3 30,000.00 30,000.00 30,000.00 90,000.00

176. Road from Jct. National Highway leading to Morias Falls, Miatan, Katipunan

Road Concreting Katipunan POW, Plans

and Contract GAA 3 90,000.00 50,000.00 50,000.00 50,000.00 240,000.00

177. Construction of Katipunan Boulevard, Zamboanga del Norte Road

Concreting Katipunan POW, Plans and Contract GAA 3 121,400.00 150,000.00 121,400.00 392,800.00

178. Road Concreting from Jct. National Highway leading to Lipay Falls, Lipay, Jose Dalman

POW, Plans and Contract GAA 3 50,000.00 50,000.00 50,000.00 150,000.00

179. Road Concreting from Jct. National Highway leading to Lipay Cave, Lipay, Jose Dalman

POW, Plans and Contract GAA 3 50,000.00 50,000.00 50,000.00 150,000.00

180. Road Concreting from Jct. Poblacion Jose Dalman - Sitio Inawayan, Balatakan leading to Marupay Falls, Marupay, Jose Dalman

POW, Plans and Contract GAA 3 40,000.00 40,000.00 40,000.00 120,000.00

181. Road Concreting from Brgy. Lugdungan to Boundery Brgy. Isis, Polanco , Zamboanga del Norte

POW, Plans and Contract GAA 3 40,000.00 40,000.00 40,000.00 120,000.00

182. Road Concreting of Diwan, Dipolog City to Seres, Katipunan, Zamboanga del Norte

POW, Plans and Contract GAA 3 40,000.00 40,000.00 40,000.00 120,000.00

183. Construction/Concreting of Road from Junction Dipolog-Oroquieta Nat'l Road leading to Dipolog City Boulevard, Barangay Estaka to Central Barangay Section along Dipolog River Control, Zamboanga del Norte

POW, Plans and Contract GAA 3 60,000.00 60,000.00 60,000.00 180,000.00

184. Road Concreting from Junction Dipolog-Oroquieta National Road to Ajero Beach, Dipolog City, Zamboanga del Norte

POW, Plans and Contract GAA 3 22,500.00 22,500.00 22,500.00 67,500.00

002 - Subtotal

Chapter 19-1-DPWH IX-ZDN 1DEOPage 14 of 33

Page 216: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results

Matrices Indicators Addressed

Expected Output

Basis for Implementa

tion

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

Investment Requirements (in exact amount PhP)

185. Construction of Road from Junction 3003 Steps Linabo Peak to Tulwanan Village (Old town site of Dipolog, Lugdungan. Dipolog City, Zamboanga del Norte

POW, Plans and Contract GAA 3 90,000.00 110,000.00 90,000.00 290,000.00

186. Road Concreting from Lingatungan to Lupasang leading to Payag River, Manukan, Zamboanga del Norte

POW, Plans and Contract GAA 3 30,000.00 30,000.00 30,000.00 90,000.00

187. Road Concreting from Jct. Disakan to Palanca leading to Palanca Cave, Manukan, Zamboanga del Norte

POW, Plans and Contract GAA 3 30,000.00 30,000.00 30,000.00 90,000.00

188. Road Concreting from Jct. Nat'l Highway, Brgy. Siari to Brgy. RG Macias to SHINYU MARU, incl. Construction of Bridge, Sindangan, Zamboanga del Norte

POW, Plans and Contract GAA 3 30,000.00 30,000.00 30,000.00 90,000.00

189. Road from Jct. National Highway leading to Ikogan Cave, Sanao, Katipunan

Road Concreting Katipunan POW, Plans

and Contract GAA 3 -

190. Road from Jct. National Highway leading to Zapanta-Gomez Cave, Lipakan, Roxas

Road Concreting

Roxas POW, Plans and Contract

GAA 3

90,000.00

90,000.00

The project name does't coincide in the project name on GAA 2018 instead, it should be "Construction of Concrete Road - NRJ leading to Zapanta - Gomez Cave, Brgy. Lipakan, Pres. Manuel A. Roxas, Zamboanga del Norte"

191. Road from Jct. National Highway leading to Lipay Falls, Lipay, Jose Dalman

Road Concreting Jose Dalman POW, Plans

and Contract GAA 3 - Project No. 175 duplicates with No.162

192. Road from Jct. National Highway leading to Lipay Cave, Lipay, Jose Dalman

Road Concreting Jose Dalman POW, Plans

and Contract GAA 3 - Project No. 176 duplicates with No.163

193. Road from Jct. Poblacion Jose Dalman - Sitio Inawayan, Balatakan leading to Marupay Falls, Marupay, Jose Dalman

Road Concreting Jose Dalman, ZN POW, Plans

and Contract GAA 3 -

Project No. 177 duplicates with No.164

194. Construction of Katipunan Boulevard, Zamboanga del Norte

Road Concreting

Brgy. Uno -Brgy. Dos

POW, Plans and Contract

GAA 3

226,400.00 226,400.00 226,400.00

679,200.00

Project No. 178 duplicates with No.161 and also, the amount does not coincide with the amount plugged-in for FY2020 RBP

2. Construction/ Improvement of Various Infrastructure in support of National Security -

Chapter 19-1-DPWH IX-ZDN 1DEOPage 15 of 33

Page 217: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results

Matrices Indicators Addressed

Expected Output

Basis for Implementa

tion

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

Investment Requirements (in exact amount PhP)

195. Construction of Concrete Road, Dumingag to Katipunan, Zamboanga del Norte

POW, Plans and Contract GAA 3 100,000.00 110,000.00 100,000.00 310,000.00

3. Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones - 196. Improvement/Concreting of

Junction Dipolog-Manukan Road Connecting Manukan East Poblacion to Mate to Serongan Provincial Road to Sitio Sitoy to Pangandao to Sitio Tiwalos to Sitio Labawan in support of Rubber, Abaca, Coconut and Cacao Industries, Pangandao Manukan, Zamboanga del Norte

POW, Plans and Contract

GAA 3 50,000.00 50,000.00 50,000.00 150,000.00

197. Improvement/Concreting of Junction Serongan connecting Sitio Bacong to Patagan to Sitio Tiniguiban, in support of abaca, rubber and coconut industries, Manukan, Zamboanga del Norte

POW, Plans and Contract

GAA 3 50,000.00 50,000.00 50,000.00 150,000.00

198. Improvement/Concreting of Junction Dipolog - Manukan Road connecting Upper Disakan to Sitio Matam to Suisayan to Sitio Pigan in support of rubber, abaca, coconut and cacao industries, Manukan, Zamboanga del Norte

POW, Plans and Contract

GAA 3 50,000.00 50,000.00 50,000.00 150,000.00

199. Improvement/Rehabilitation of Sitio Sindotan Moliton - Brgy. Sibatog - Brgy. Marupay Tantingon Brgy. Road Connecting Provincial Road Capase - Junction Roxas in support of coconut industry, (Dipolog Coconut Oil Mill and WILMAR Edible Oil Phils.) Roxas, Zamboanga del Norte (Package 1)

POW, Plans and Contract

GAA 3 50,000.00 50,000.00 50,000.00 150,000.00

200. Improvement/Rehabilitation of Sitio Sindotan Moliton - Brgy. Sibatog - Brgy. Marupay Tantingon Brgy. Road Connecting Provincial Road Capase - Junction Roxas in support of coconut industry, (Dipolog Coconut Oil Mill and WILMAR Edible Oil Phils.) Roxas, Zamboanga del Norte (Package 2)

POW, Plans and Contract

GAA 3 50,000.00 50,000.00 50,000.00 150,000.00

Chapter 19-1-DPWH IX-ZDN 1DEOPage 16 of 33

Page 218: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results

Matrices Indicators Addressed

Expected Output

Basis for Implementa

tion

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

Investment Requirements (in exact amount PhP)

201. Improvement/Concreting of San Jose-Sinaman-Punta Road to industrial Zone connecting Barangay Galas Road and Dipolog Port, Dipolog, Zamboanga del Norte

POW, Plans and Contract

GAA 3 50,000.00 50,000.00 50,000.00 150,000.00

202. Improvement/Concreting of Lower Diwan-Guinsangaan-Cayasan Road to Industrial Zone connecting Purok Virginia, Diwan and Dipolog Port, Dipolog, Zamboanga del Norte

POW, Plans and Contract

GAA 3 50,000.00 50,000.00 50,000.00 150,000.00

203. Improvement/Concreting of Purok Naga, Minaog to Purok Tipo, Sicayab Farm to Industrial Zone connecting Barangay Sicayab and Turno-Dicayas-Minaog by-pass road

POW, Plans and Contract

GAA 3 50,000.00 50,000.00 50,000.00 150,000.00

204. Improvement/Rehabilitation of Roxas Junction to Brgys. Banbanan - Capase- Balubo - Panampalay Roads connecting Provincial Road in support of Coconut, Coffee, and Abaca Industries, Roxas, Zamboanga del Norte

POW, Plans and Contract

GAA 3 50,000.00 50,000.00 50,000.00 150,000.00

205. Improvement/Rehabilitation Junction National Road Brgy. Maras - Sitio Barili - to Jct. Nat'l Road Bayog - Lakewood, Sindangan Nat'l Road Jct. Brgy. Dagohoy Section, Sindangan, Zamboanga del Norte

Road Concreting Sindangan 4.0 km POW, Plans

and Contract GAA 3 100,000.00 100,000.00

Dipolog 1st DEO inserted Project for proposed 2021

206. NRJ Dipolog-Sindangan Road, Jose Dalman to Jct. Dinasan Provincial Road, 400m from Jct. Ilihan to Lopero Brgy. Road, in support of Agribusiness (Rubber, and Coco) & Lopero Agrarian Reform Community (SIGILO) Jose Dalman Association, Zamboanga del Norte

Road Concreting Jose Dalman, ZN POW, Plans

and Contract GAA 3 80,000.00 35,000.00 35,000.00 35,000.00 185,000.00

The project name does't coincide with the project name of FY2020 RBP

207. Jct. Dipolog-Sindangan Road connecting to Bago Dalongdong (Joaquin Macias) in support of Rice, Rubber, Coconut, & Abaca Industries, Sindangan, Zamboanga Del Norte

Road Concreting Sindangan POW, Plans

and Contract GAA 3 80,000.00 81,000.00 81,000.00 81,000.00 323,000.00

208. Jct. Dipolog-Sindangan-Liloy Road connecting to Bago-Siari Section in support of Rice, Rubber, Coconut, & Abaca Industries, Sindangan, Zamboanga Del Norte

Road Concreting Sindangan POW, Plans

and Contract GAA 3 50,000.00 61,360.00 61,360.00 61,360.00 234,080.00

The project name does't coincide with the project name of FY2020 RBP

- 390,000.00 - 1,677,660.00 1,836,260.00 1,677,660.00 5,581,580.00 CSSP - Subtotal

Chapter 19-1-DPWH IX-ZDN 1DEOPage 17 of 33

Page 219: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results

Matrices Indicators Addressed

Expected Output

Basis for Implementa

tion

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

Investment Requirements (in exact amount PhP)

A. Locally-Funded Projects - National Building Program - a. Multipurpose/Facilities -

209. Construction of two-storey Standard DPWH Building with Roof Deck, Zamboanga Del Norte 1st District Engineering Office (DEO) Building, Barangay Gulayon, Dipolog City,

Construction of Multipurpose

BuildingDipolog City Number of

Buildings 1.00 POW, Plans and Contract GAA 3 27,413.00 15,000.00 11,150.00 53,563.00

B. Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects - Roads and Bridges - a. Local Roads -

210. Construction/Opening of Miputak - Galas - Olingan Alternate Road, Dipolog City, TL=7.0 kms.

Road Concreting Dipolog City Lane Km 14.0 POW, Plans

and Contract GAA 3 50,000.00 50,000.00 75,000.00 25,000.00 25,000.00 225,000.00

211. Concreting of Daanglungsod - Sinuyak - Sitog Road, Municipality of KatipunanTL=8.323 kms

Road Concreting Katipunan, ZN Lane Km 16.646 POW, Plans

and Contract GAA 3 - 40,000.00 20,000.00 20,000.00 28,199.00 108,199.00

212. Concreting of Taga - Malugas Road, Municipality of KatipunanTL=3.16 kms

Road Concreting

Katipunan, ZNLane Km 6.32

POW, Plans and Contract GAA 3

- - 32,400.00 - - 32,400.00

213. Concreting of Katipunan - Matam Road, Municipality of KatipunanTL=14.32 kms

Road Concreting Katipunan, ZN Lane Km 28.64 POW, Plans

and Contract GAA 3 - 80,000.00 40,000.00 40,000.00 26,160.00 186,160.00

214. Concreting of Sinuyak - Seres Road, Municipality of KatipunanTL=4.821 kms

Road Concreting

Katipunan, ZNLane Km 9.642 POW, Plans

and Contract GAA 3 - 22,673.00 40,000.00 - 62,673.00

215. Concreting of Sicawang - Binary Road, Municipality of KatipunanTL =1.389 kms

Road Concreting

Katipunan, ZNLane Km 2.778

POW, Plans and Contract GAA 3

- - 13,890.00 - - 13,890.00

216. Concreting of Basagan - Singatong - Sanao Road, Municipality of KatipunanTL = 9.14 kms

Road Concreting Katipunan, ZN Lane Km 18.28 POW, Plans

and Contract GAA 3 - 60,000.00 30,000.00 28,820.00 - 118,820.00

217. Concreting of Nanginan - Piñamar Road, Municipality of Katipunan TL=1.50 kms

Road Concreting Katipunan, ZN Lane Km 3.00 POW, Plans

and Contract GAA 3 10,180.00 - 10,180.00

218. Concreting of Roxas - Denoman - Capase Road , Municipality of RoxasTL = 4.425 kms

Road Concreting Roxas, ZN Lane Km 8.850 POW, Plans

and Contract GAA 3 57,525.00 57,525.00

219. Concreting of Dohinob - Layasan - Mamara Road , Municipality of Roxas TL = 2.80 kms

Road Concreting

Roxas, ZN

Lane Km 5.60

POW, Plans and Contract

GAA 3

20,800.00

20,800.00

220. Concreting of Dohinob - Sipacong (Galokso) Road , Municipality of RoxasTL = 0.75 kms

Road Concreting

Roxas, ZN

Lane Km 1.50

POW, Plans and Contract

GAA 3

750.00

750.00

221. Concreting of Nabilid - Pamologan Road, Municipality of RoxasTL = 3.39 kms

Road Concreting

Roxas, ZN

Lane Km 6.78

POW, Plans and Contract

GAA 3

40,000.00

40,000.00

Chapter 19-1-DPWH IX-ZDN 1DEOPage 18 of 33

Page 220: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results

Matrices Indicators Addressed

Expected Output

Basis for Implementa

tion

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

Investment Requirements (in exact amount PhP)

222. Concreting of Batangan - Tanayan Road, Municipality of Roxas TL = 4.0 kms

Road Concreting

Roxas, ZN

Lane Km 8.0

POW, Plans and Contract

GAA 3

40,000.00

40,000.00

223. Concreting of Manukan - Bangahan (Serongan) Road, Municipality of Manukan TL = 8.89 kms

Road Concreting Manukan, ZN Lane Km 17.78 POW, Plans

and Contract GAA 3 115,570.00 115,570.00

224. Concreting of Depane - Meses Road, Municipality of Manukan TL = 2.41 kms

Road Concreting Manukan, ZN Lane Km 4.82 POW, Plans

and Contract GAA 3 31,330.00 31,330.00

225. Concreting of Ponot - Dalongdong Road, Municipality of Jose DalmanTL = 3.10 kms

Road Concreting Jose Dalman, ZN Lane Km 6.20 POW, Plans

and Contract GAA 3 40,300.00 40,300.00

226. Concreting of Tabon - Inawayan Road, Municipality of Jose DalmanTL = 4.72 kms

Road Concreting Jose Dalman, ZN Lane Km 9.44 POW, Plans

and Contract GAA 3 47,000.00 47,000.00

227. Concreting of Poblacion - Polayo Road, Municipality of SiayanTL = 5 kms

Road Concreting Siayan, ZN Lane Km 10.0 POW, Plans

and Contract GAA 3 65,000.00 65,000.00

228. Concreting of Muñoz - Balok Road, Municipality of Siayan TL = 5 kms

Road Concreting Siayan, ZN Lane Km 10.0 POW, Plans

and Contract GAA 3 65,000.00 65,000.00

229. Concreting of New Siare - Gunyan - Balunokan Road, Municipality of SiayanTL = 12 kms

Road Concreting Siayan, ZN Lane Km 24.0 POW, Plans

and Contract GAA 3 110,000.00 110,000.00

230. Concreting of Poblacion - Paranglumba - Domogok Road, Municipality of SiayanTL = 1 km

Road Concreting Siayan, ZN Lane Km 2.0 POW, Plans

and Contract GAA 3 13,000.00 13,000.00

231. Concreting of Mauswagon - Gunyan - Seriac Road, Municipality of SiayanTL = 9.16 kms

Road Concreting Siayan, ZN Lane Km 18.32 POW, Plans

and Contract GAA 3 110,000.00 110,000.00

232. Concreting of Soguilon - Crossing Highway - Centro Road, Municipality of SiayanTL = 2 kms

Road Concreting Siayan, ZN Lane Km 4.0 POW, Plans

and Contract GAA 3 26,000.00 26,000.00

233. Concreting of Crossing Soguilon - Mangilay Road, Municipality of SiayanTL = 5 kms

Road Concreting Siayan, ZN Lane Km 10.0 POW, Plans

and Contract GAA 3 65,000.00 65,000.00

234. Concreting of Poblacion (Hanging Bridge) - Moyo Road, Municipality of SiayanTL = 5 kms

Road Concreting Siayan, ZN Lane Km 10.0 POW, Plans

and Contract GAA 3 65,000.00 65,000.00

235. Concreting of Horseshoe - Disud Road, Municipality of SindanganTL = 2.995 kms

Road Concreting

Sindangan, ZN Lane Km 5.990 POW, Plans

and Contract GAA 3 38,935.00 38,935.00

Chapter 19-1-DPWH IX-ZDN 1DEOPage 19 of 33

Page 221: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results

Matrices Indicators Addressed

Expected Output

Basis for Implementa

tion

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

Investment Requirements (in exact amount PhP)

236. Concreting of Siare - Dinokot - Madalum - Sindangan Road, Municipality of SindanganTL = 12.935 kms

Road Concreting

Sindangan, ZN Lane Km 25.870 POW, Plans

and Contract GAA 3 168,155.00 168,155.00

237. Concreting of Pangalalan - Bago - Dalongdong Road, Municipality of SindanganTL = 12.63 kms

Road Concreting

Sindangan, ZN Lane Km 25.26 POW, Plans

and Contract GAA 3 164,190.00 164,190.00

238. Concreting of Disud - Bitoon Road, Municipality of SindanganTL = 2.75 kms

Road Concreting

Sindangan, ZN Lane Km 5.50 POW, Plans

and Contract GAA 3 35,750.00 35,750.00

239. Concreting of Sindangan - Dicoyong - Nato Road, Municipality of SindanganTL = 13.871 kms

Road Concreting

Sindangan, ZN Lane Km 27.742 POW, Plans

and Contract GAA 3 180,323.00 180,323.00

240. Construction of Minaog-Sicayab By-Pass Road TL=3.00 KM

Road Concreting

Dipolog CityLane Km 6.00 POW, Plans

and Contract GAA 3 - 30,000.00 - - 30,000.00

241. Completion of Miputak-Turno By-Pass Road at Turno, Dipolog CityW=12.00 m, TL = 1.00 Km

Road Concreting Dipolog City Lane Km 2.00 POW, Plans

and Contract GAA 3 - 40,000.00 - - 40,000.00

242. Construction of Miputak-Galas-Olingan School of Fisheries Road Galas, Dipolog CityTL=7.00 kms

Road Concreting

Dipolog City

Lane Km 14.00 POW, Plans and Contract GAA 3 - 100,000.00 25,000.00 25,000.00 25,000.00 175,000.00

243. Construction of Purok Green Leaves to Purok Rose, Sta. Filomena, Dipolog CityTL = 5 kms

Road Concreting Dipolog City Lane Km 10.00 POW, Plans

and Contract GAA 3 - - 50,000.00 - - 50,000.00

244. Construction of of Gulayon (National Highway) Lugdungan Rd., Gulayon, Dipolog City inlucding Const. of Lugdungan Br.TL = 5 kms

Road Concreting Dipolog City Lane Km 10.00 POW, Plans

and Contract GAA 3 - 100,000.00 25,000.00 25,000.00 25,000.00 175,000.00

0

245. Construction of Jct. Dalongdong, Sindangan-Dinasan-Poblacion, Jose Dalman RoadTL=4 kms

Road Concreting Jose Dalman, ZN Lane Km 8.0 POW, Plans

and Contract GAA 3 - - 40,000.00 - - 40,000.00

0

246. NRJ Langatian-Banbanan-Dinoman-Lipakan-Capase-Moliton-Canibongan-Salisig-Galokso-Dohinob NRJ, Pres. Manuel A. Roxas

Road Concreting Roxas Lane Km 36.0 POW, Plans

and Contract GAA 3 - 100,000.00 50,000.00 50,000.00 34,000.00 234,000.00

247. NRJ, Bago-RG Macias (Dinokot) La Concepcion (Madalum)-Tigbao-Binuangan-Calatunan-Disud NRJ, SindanganTL=18 kms

Road Concreting Sindangan, ZN Lane Km 36.0 POW, Plans

and Contract GAA 3 - 100,000.00 50,000.00 50,000.00 34,000.00 234,000.00

248. Concreting of Poblacion, Manukan-Bangahan-Libuton Road (going to Libuton Cave)TL=5 kms

Road Concreting

Manukan, ZN

Lane Km 10.0 POW, Plans and Contract GAA 3 - - 50,000.00 - - 50,000.00

Chapter 19-1-DPWH IX-ZDN 1DEOPage 20 of 33

Page 222: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results

Matrices Indicators Addressed

Expected Output

Basis for Implementa

tion

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

Investment Requirements (in exact amount PhP)

249. Concreting of Basagan-Singatong-Sanao Road (going to Sanao Cave)TL=9.40 kms

Road Concreting Katipunan, ZN Lane Km 18.80 POW, Plans

and Contract GAA 3 - 22,200.00 110,000.00 - 132,200.00

250. Concreting of Basagan-Singatong-Sanao-Miatan Road (going to Morgia's Falls)TL=9.54 kms

Road Concreting Katipunan, ZN Lane Km 19.08 POW, Plans

and Contract GAA 3 - 24,020.00 110,000.00 - 134,020.00

251. Concreting of NRJ Don Jose Aguirre-Meses Road (going to Tulbong Falls, Meses, ManukanTL=8 kms

Road Concreting Manukan, ZN Lane Km 16.0 POW, Plans

and Contract GAA 3 - 4,000.00 110,000.00 - 114,000.00

252. NRJ Tabon-Sitio Inayawan-Balatakan-Poblacion, NRJ Jose DalmanTL=15 kms

Road Concreting Jose Dalman, ZN Lane Km 30.0 POW, Plans

and Contract GAA 3 - 100,000.00 50,000.00 45,000.00 195,000.00

253. Const. of Banicapt to Bagakayan Rd., Galas, Dipolog CityTL = 5.00 kms

Road Concreting

Dipolog CityLane Km 10.00 POW, Plans

and Contract GAA 3 - 75,000.00 25,000.00 25,000.00 25,000.00 150,000.00

254. Road Concreting of Brgy. Road, Brgy. PoblacionTL = 0.80 kms

Road Concreting Siayan, ZN Lane Km 1.60 POW, Plans

and Contract GAA 3 - - 4,000.00 - 4,000.00

255. Concreting of Road from Jct. Nat'l Highway - Brgy. Disud, SindanganTL = 5.00 kms

Road Concreting Sindangan, ZN Lane Km 10.000 POW, Plans

and Contract GAA 3 - - 50,000.00 - - 50,000.00

256. Concreting of Provincial Rd along Brgy. Villaramos - Brgy. Saloyong TL = 4.347 kms

Road Concreting Lane Km 8.694

POW, Plans and Contract GAA 3

21,735.00 21,735.00 21,735.00 21,735.00 86,940.00

257. Construction/Widening with Bike Lane along Airport-Turno-Sinaman By-Pass Road, Dipolog CityTL = 0.8 kms

Road Widening Dipolog City

Lane Km 1.600

POW, Plans and Contract GAA 3

8,000.00

8,000.00

258. Widening of Miputak-Turno By-Pass Road (Integrated Terminal-Turno Junction National Highway), Dipolog CityTL = 0.8 kms

Road Widening Dipolog City

Lane Km 1.600

POW, Plans and Contract

GAA 3

8,000.00

8,000.00

259. Widening of Dipolog City Port Access Road with Provision of Drainage both side, Dipolog CityTL = 0.8 kms

Road Widening Galas, Dipolog City

Lane Km 1.600

POW, Plans and Contract GAA 3

8,000.00

8,000.00

260. Widening Galas-Gulayon PIC Road with Drainage (Galas, Dipolog Natl. Highway to Ubay, Polanco Natl. Highway), Dipolog City

Road Widening Galas-Gulayon, Dipolog City

Lane Km 1.600

POW, Plans and Contract

GAA 3

8,000.00

8,000.00

261. Construction of of Gulayon (National Highway) Lugdungan Rd., Gulayon, Dipolog City inlucding Const. of Lugdungan Br.TL = 5.8 kms

Road Concreting

Gulayon, Dipolog City

Lane Km 11.60

POW, Plans and Contract

GAA 3

- 58,000.00

58,000.00

262. Rehabilitation/Concreting of Farm-to-Market Road of Ponot Dinasan-Dalongdong-Bago, Sindangan (Jose Dalman/Sindangan)TL = 5.00 kms

Road Concreting

Jose Dalman, Sindangan

Lane Km 8.000

POW, Plans and Contract

GAA 3

40,000.00

40,000.00

Chapter 19-1-DPWH IX-ZDN 1DEOPage 21 of 33

Page 223: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results

Matrices Indicators Addressed

Expected Output

Basis for Implementa

tion

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

Investment Requirements (in exact amount PhP)

263. Rehabilitation/Concreting of Farm-to-Market Road of NRJ Tabon-Sitio Inayawan-Balatakan-Poblacion, Jose DalmanTL = 5.00 kms

Road Concreting

Jose Dalman

Lane Km 10.000

POW, Plans and Contract

GAA 3

50,000.00

50,000.00

264. Rehabilitation/Concreting of Farm-to-Market Road of NRJ Daanglungsod Katipunan-San Vicente-Basagan-Sinuyak-Patik-Seres-Seroan-New Rizal, Sergio Osmeña Sr., Mahayahay Bgry. Proper (Katipunan, Sergio Osmeña)

Road Concreting

Katipunan, Sergio Osmeña

Lane Km 8.000

POW, Plans and Contract

GAA 3

40,000.00

40,000.00

265. Construction of Bagakayan-Olingan Alternate Road, Dipolog CityTL = 10.00 kms

Road Concreting

Olingan, Dipolog City

Lane Km 20.00

POW, Plans and Contract

GAA 3

50,000.00

50,000.00

266. Rehabilitation/Concreting of Farm-to-Market Road of San Jose-Sinaman NRJ Punta, Dipolog CityTL = 6.00 kms

Road Concreting

Dipolog City

Lane Km 12.00

POW, Plans and Contract

GAA 3

60,000.00

60,000.00

267. Rehabilitation/Concreting of Farm-to-Market Road of NRJ NRJ Langatian-Banbanan-Dinoman-Lipakan-Capase-Moliton-Canibongan-Salisig-Galokso-Dohinob NRJ, Pres. Manuel A. RoxasTL = 3.640 kms

Road Concreting

Roxas

Lane Km 7.280

POW, Plans and Contract

GAA 3

18,200.00

18,200.00

268. Miputak-Galas-Olingan By-Pass Road, Dipolog City TL = 0.350 kms

Road Concreting

Dipolog CityLane Km 0.700

POW, Plans and Contract GAA 3

1,750.00 1,750.00

269. Minaog-Sicayab Alternate Road, Dipolog CityTL = 6.00 kms

Road Concreting

Olingan, Dipolog City Lane Km 12.00

POW, Plans and Contract GAA 3

6,000.00 6,000.00

270. Concreting of Daanglungsod - Sinuyak - Sitog Road, Mun. of KatipunanTL = 8.323 kms.

Upgrading of existing

Provincial and Barangay

Roads

Katipunan, ZDN

Lane Km 16.646

POW, Plans and Contract

GAA 3

-

100,000.00

- - -

100,000.00

271. Concreting of Taga - Malugas Road, Mun. of KatipunanTL = 2.16 kms.

Upgrading of existing

Provincial and Barangay

Roads

Katipunan, ZDN

Lane Km 4.32

POW, Plans and Contract

GAA 3

- 30,240.00 - - -

30,240.00

272. Concreting of Katipunan - Matam Road, Mun. of KatipunanTL = 14.32 kms.

Upgrading of existing

Provincial and Barangay

Roads

Katipunan, ZDN

Lane Km 28.64

POW, Plans and Contract

GAA 3

-

100,000.00

- - -

100,000.00

273. Concreting of Sinuyak - Seres Road, Mun. of KatipunanTL = 4.321

Upgrading of existing

Provincial and Barangay

Roads

Katipunan, ZDN

Lane Km 8.642

POW, Plans and Contract

GAA 3

- - 64,818.00 - -

64,818.00

Chapter 19-1-DPWH IX-ZDN 1DEOPage 22 of 33

Page 224: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results

Matrices Indicators Addressed

Expected Output

Basis for Implementa

tion

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

Investment Requirements (in exact amount PhP)

274. Concreting of Sicawang - Biniray Road, Mun. of KatipunanTL = 1.389 kms.

Upgrading of existing

Provincial and Barangay

Roads

Katipunan, ZDN Lane Km 2.778 POW, Plans and Contract GAA 3 - - 13,890.00 - - 13,890.00

275. Concreting of Basagan - Singatong - Sanao Road, Mun. of KatipunanTL = 9.14 kms.

Upgrading of existing

Provincial and Barangay

Roads

Katipunan, ZDN Lane Km 18.28 POW, Plans and Contract GAA 3 - - 90,000.00 - - 90,000.00

276. Concreting of Nanginan - Piñamar Road, Mun. of RoxasTL = 1.018 kms.

Upgrading of existing

Provincial and Barangay

Roads

Katipunan, ZDN Lane Km 2.036 POW, Plans and Contract GAA 3 - - 13,890.00 - - 13,890.00

277. Concreting of Dohinob - Layasan - Mamara Road, Mun. of RoxasTL = 2.80 kms.

Upgrading of existing

Provincial and Barangay

Roads

Roxas, ZDN Lane Km 5.60 POW, Plans and Contract GAA 3 - - 20,800.00 - - 20,800.00

278. Concreting of Dohinob - Sipacong (Galokso) Road, Mun. of RoxasTL = 0.75 kms.

Upgrading of existing

Provincial and Barangay

Roads

Roxas, ZDN Lane Km 1.50 POW, Plans and Contract GAA 3 - - 7,500.00 - - 7,500.00

279. Concreting of Nabilid - Pamologon Road, Mun. of RoxasTL = 2.39 kms.

Upgrading of existing

Provincial and Barangay

Roads

Roxas, ZDN Lane Km 4.78 POW, Plans and Contract GAA 3 - - 30,000.00 - - 30,000.00

280. Concreting of Batangan - Tanyan Road, Mun. of RoxasTL = 3.5 kms.

Upgrading of existing

Provincial and Barangay

Roads

Roxas, ZDN Lane Km 7.0 POW, Plans and Contract GAA 3 - - 40,000.00 - - 40,000.00

281. Concreting of Manukan -Bangahan (Serongan) Road, Mun. of ManukanTL = 8.89 kms.

Upgrading of existing

Provincial and Barangay

Roads

Manukan, ZDN Lane Km 17.78 POW, Plans and Contract GAA 3 - - 90,000.00 - - 90,000.00

282. Concreting of Depane - Meses Road, Mun. of ManukanTL = 2.41 kms.

Upgrading of existing

Provincial and Barangay

Roads

Manukan, ZDN Lane Km 4.82 POW, Plans and Contract GAA 3 - - 36,150.00 - - 36,150.00

283. Concreting of Ponot - Dalongdong Road, Mun. of Jose DalmanTL = 3.10 kms.

Upgrading of existing

Provincial and Barangay

Roads

Jose Dalman, ZDN Lane Km 6.20 POW, Plans and Contract GAA 3 - - 35,000.00 - - 35,000.00

284. Concreting of Tabon - Inayawan Road, Mun. of Jose DalmanTL = 4.72 kms.

Upgrading of existing

Provincial and Barangay

Roads

Jose Dalman, ZDN Lane Km 9.44 POW, Plans and Contract GAA 3 - - 50,000.00 - - 50,000.00

Chapter 19-1-DPWH IX-ZDN 1DEOPage 23 of 33

Page 225: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results

Matrices Indicators Addressed

Expected Output

Basis for Implementa

tion

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

Investment Requirements (in exact amount PhP)

285. Concreting of Poblacion - Polayo Road, Mun. of SiayanTL = 5.0 kms.

Upgrading of existing

Provincial and Barangay

Roads

Siayan, ZDN Lane Km 10.0 POW, Plans and Contract GAA 3 - - 50,000.00 - - 50,000.00

286. Concreting of Muñoz - Balok Road, Mun. of SiayanTL = 5.0 kms.

Upgrading of existing

Provincial and Barangay

Roads

Siayan, ZDN Lane Km 10.0 POW, Plans and Contract GAA 3 - - 50,000.00 - - 50,000.00

287. Concreting of New Siare - Gunyan - Balunokan Road, Mun. of SiayanTL = 12 kms.

Upgrading of existing

Provincial and Barangay

Roads

Siayan, ZDN Lane Km 24.00 POW, Plans and Contract GAA 3 - - - 110,000.00 - 110,000.00

288. Concreting of Poblacion - Paranglumba - Domogok Road, SiayanTL = 1.0 kms.

Upgrading of existing

Provincial and Barangay

Roads

Siayan, ZDN Lane Km 2.00 POW, Plans and Contract GAA 3 - - - 16,000.00 - 16,000.00

289. Concreting of Mauswagon - Gunyan - Seriac Road, SiayanTL = 9.16 kms.

Upgrading of existing

Provincial and Barangay

Roads

Siayan, ZDN Lane Km 18.32 POW, Plans and Contract GAA 3 - - - 110,000.00 - 110,000.00

290. Concreting of Soguilon - Crossing Highway - Centro Road, SiayanTL = 2 kms.

Upgrading of existing

Provincial and Barangay

Roads

Siayan, ZDN Lane Km 4.00 POW, Plans and Contract GAA 3 - - - 32,000.00 - 32,000.00

291. Concreting of Soguilon - Mangilay Road, Mun. of SiayanTL = 5.0 kms.

Upgrading of existing

Provincial and Barangay

Roads

Siayan, ZDN Lane Km 10.0 POW, Plans and Contract GAA 3 - - - 105,000.00 - 105,000.00

292. Concreting of Poblacion (Hanging Bridge) - Moyo Road, Mun. of SiayanTL = 5.0 kms.

Upgrading of existing

Provincial and Barangay

Roads

Siayan, ZDN Lane Km 10.0 POW, Plans and Contract GAA 3 - - - 108,000.00 - 108,000.00

293. Concreting of Horseshoe - Disud Road, Mun. of SindanganTL = 2.995 kms.

Upgrading of existing

Provincial and Barangay

Roads

Sindangan, ZDN Lane Km 5.990 POW, Plans and Contract GAA 3 - - - - 50,915.00 50,915.00

294. Concreting of Siare - Dinokot - Madalum - Sindangan Road, SindanganTL = 12.935 kms.

Upgrading of existing

Provincial and Barangay

Roads

Sindangan, ZDN Lane Km 25.870 POW, Plans and Contract GAA 3 - - - - 219,895.00 219,895.00

295. Concreting of Pangalalan - Bago - Dalongdong Road, Mun. of SindanganTL = 12.63 kms.

Upgrading of existing

Provincial and Barangay

Roads

Sindangan, ZDN Lane Km 25.26 POW, Plans and Contract GAA 3 - - - - 214,710.00 214,710.00

Chapter 19-1-DPWH IX-ZDN 1DEOPage 24 of 33

Page 226: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results

Matrices Indicators Addressed

Expected Output

Basis for Implementa

tion

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

Investment Requirements (in exact amount PhP)

296. Concreting of Disud - Bitoon Road, Mun. of SindanganTL = 1.75 kms.

Upgrading of existing

Provincial and Barangay

Roads

Sindangan, ZDN Lane Km 3.50 POW, Plans and Contract GAA 3 - - - 20,000.00 29,750.00 49,750.00

297. Concreting of Sindangan - Dicoyong - Nato Road, Mun. of SindanganTL = 13.871 kms.

Upgrading of existing

Provincial and Barangay

Roads

Sindangan, ZDN Lane Km 7.742 POW, Plans and Contract GAA 3 - - - - 235,807.00 235,807.00

298. Construction/Opening of Miputak - Sta. Filomena - Galas Road along Miputak Creek, Dipolog City, Zamboanga del NorteTL = 5km

Construction/ opening Dipolog City Lane Km 10.000 POW, Plans

and Contract GAA 3 50,000.00 50,000.00

b. Bridges - 299. Construction of Miputak Jumbo

BridgeTL = 25 lm

Construction of Bridge Dipolog City Square Meters 183.00 POW, Plans

and Contract GAA 3 45,000.00 - - 45,000.00

300. Construction of Barra - Minaog Bridge 1TL = 70.84 lm

Construction of Bridge

Dipolog CitySquare Meters 512.40

POW, Plans and Contract GAA 3

75,000.00 10,000.00 - - 85,000.00

301. Construction of Barra - Minaog Bridge 2TL = 140.51 lm

Construction of Bridge Dipolog City Square Meters 1,024.80 POW, Plans

and Contract GAA 3 10,000.00 - 10,000.00

302. Construction of Gulayon - Lugdungan BridgeTL = 40 lm

Construction of Bridge Dipolog City Square Meters 292.80 POW, Plans

and Contract GAA 3 100,000.00 - - 100,000.00

303. Construcion of Cayasan, Diwan - Sinuyak BridgeTL = 60 lm

Construction of Bridge Katipunan, ZN Square Meters 439.20 POW, Plans

and Contract GAA 3 100,000.00 - - 100,000.00

304. Completion of Gusane(Bdry. Barangay Dicoyong - Brgy. Dumalogdog, SiayanTL = 150.84 lm

Construction of Bridge Siayan, ZN Square Meters 1,104.14 POW, Plans

and Contract GAA 3 75,000.00 - 100,000.00 - - - 175,000.00

305. Fisheries Olingan Bridge, Dipolog City Construction of

Bridge

San Jose, Dipolog City Square Meters 146.40 POW, Plans

and Contract GAA 3 6,000.00 6,000.00

306. San Jose- Basagan Bridge, Dipolog CityTL = 60 lm

Construction of Bridge

San Jose, Dipolog City Square Meters 439.20 POW, Plans

and Contract GAA 3 -

307. Balintawak-Lugdongan Bridge, Dipolog City Construction of

Bridge

Lugdongan, Dipolog City Square Meters 109.80 POW, Plans

and Contract GAA 3 4,500.00 4,500.00

308. Const. of RCDG Bridge at Paralumba (Paralumba River), Siayan

Construction of Bridge

SiayanSquare Meters 818.40 POW, Plans

and Contract GAA 3110,000.00

110,000.00

309. Const. of RCDG Bridge at Cayasan, Diwan (Lubungan River), Dipolog City

Construction of Bridge

Dipolog CitySquare Meters 366.00 POW, Plans

and Contract GAA 360,000.00

60,000.00

310. Const. of RCDG Bridge at Brgy. Dinoman (Dinoman River), Roxas Construction of

Bridge

RoxasSquare Meters 219.60 POW, Plans

and Contract GAA 330,000.00

30,000.00

Chapter 19-1-DPWH IX-ZDN 1DEOPage 25 of 33

Page 227: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results

Matrices Indicators Addressed

Expected Output

Basis for Implementa

tion

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

Investment Requirements (in exact amount PhP)

311. Diongan Br., Sitio New Siare to Barangay Diongan, SiayanTL = 80 Ln.m

Upgrading of existing

bridges in the province

Siayan, ZDN

Lineal Meters 80.00

POW, Plans and Contract

GAA 3

- - 40,000.00 - -

40,000.00

c. Multipurpose/Facilities - 312. Const. of MPB Zamboanga del

Norte Federation of Multipurpose Cooperative at Biasong, Dipolog

Construction of Multipurpose

BuildingBiasong, ZN Number of

Buildings 1.00 POW, Plans and Contract GAA 3 - 5,000.00 - 5,000.00

C. Local Infrastructure Program - Buildings and Other Structures - a. Multipurpose/Facilities -

313. Sindangan Cultural and Sports Complex (SCSC), Disud, Sindangan, ZN

Construction of Multipurpose

BuildingSindangan, ZN Number of

Buildings 1.00 POW, Plans and Contract GAA 3 - - 60,000.00 - 60,000.00

314. Construction/Completion of Multi-Purpose Sports Complex at Barangay Olingan, Dipolog City

Construction of Multipurpose

BuildingDipolog City Number of

Buildings 1.00 POW, Plans and Contract GAA 3 - 100,000.00 100,000.00 110,000.00 100,000.00 410,000.00

315. Construction/Completion of Dipolog City Feeder Port, Brgy. Galas, Dipolog City

Construction of Multipurpose

BuildingDipolog City Number of

Buildings 1.00 POW, Plans and Contract GAA 3 - 100,000.00 100,000.00 110,000.00 100,000.00 410,000.00

316. Construction of Multi-Purpose Building, Brgy. Labakid, Pres. Manuel Roxas, Zamboanga del Norte

Construction of multi-purpose

building

Roxas, Zamboanga del Norte

Number of Buildings 1.00 POW, Plans

and Contract GAA 1,750.00 1,750.00

317. Construction of Multi-Purpose Building, Brgy. Dos, Katipunan, Zamboanga del Norte

Construction of multi-purpose

building

Katipunan, Zamboanga del Norte

Number of Buildings 1.00 POW, Plans

and Contract GAA 1,750.00 1,750.00

318. Construction of Multi-Purpose Building, Brgy. Bato, Sindangan, Zamboanga del Norte

Construction of multi-purpose

building

Sindangan, Zamboanga del Norte

Number of Buildings 1.00 POW, Plans

and Contract GAA 1,750.00 1,750.00

319. Construction of Multi-Purpose Building, Sitio Delaros, Brgy. R.G. Macias, Sindangan, Zamboanga del Norte

Construction of multi-purpose

building

Sindangan, Zamboanga del Norte

Number of Buildings 1.00 POW, Plans

and Contract GAA 1,500.00 1,500.00

320. Construction of Multi-Purpose Building, Brgy. Sinaman, Dipolog, Zamboanga del Norte

Construction of multi-purpose

buildingDipolog City Number of

Buildings 1.00 POW, Plans and Contract GAA 1,750.00 1,750.00

321. Construction of Multi-Purpose Building, Tubod Elementary School, Brgy. Galas, Dipolog, Zamboanga del Norte

Construction of multi-purpose

buildingGalas, Dipolog City Number of

Buildings 1.00 POW, Plans and Contract GAA 1,750.00 1,750.00

322. Construction of Multi-Purpose Building, Sitio Cayasan, Brgy. Diwan, Dipolog, Zamboanga del Norte

Construction of multi-purpose

buildingDipolog City Number of

Buildings 1.00 POW, Plans and Contract GAA 1,750.00 1,750.00

323. Construction of Multi-Purpose Building, Sitio Looc, Brgy. Estaka, Dipolog, Zamboanga del Norte

Construction of multi-purpose

buildingDipolog City Number of

Buildings 1.00 POW, Plans and Contract GAA 1,750.00 1,750.00

Chapter 19-1-DPWH IX-ZDN 1DEOPage 26 of 33

Page 228: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results

Matrices Indicators Addressed

Expected Output

Basis for Implementa

tion

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

Investment Requirements (in exact amount PhP)

324. Construction of Multi-Purpose Building, Turno Elementary School, Brgy. Turno, Dipolog, Zamboanga del Norte

Construction of multi-purpose

buildingDipolog City Number of

Buildings 1.00 POW, Plans and Contract GAA 1,750.00 1,750.00

325. Construction of Multi-Purpose Building, Brgy. Macasing, Siayan, Zamboanga del Norte

Construction of multi-purpose

building

Siayan, Zamboanga del Norte

Number of Buildings 1.00 POW, Plans

and Contract GAA 1,750.00 1,750.00

326. Construction of Multi-Purpose Building, Brgy. Balunukan, Siayan, Zamboanga del Norte

Construction of multi-purpose

building

Siayan, Zamboanga del Norte

Number of Buildings 1.00 POW, Plans

and Contract GAA 1,750.00 1,750.00

327. Construction of Multi-Purpose Building, Gunyan National High School-New Siare, Brgy. Gunyan, Siayan, Zamboanga del Norte

Construction of multi-purpose

building

Siayan, Zamboanga del Norte

Number of Buildings 1.00 POW, Plans

and Contract GAA 1,500.00 1,500.00

328. Construction of Multi-Purpose Building, Brgy. Tabon, Jose Dalman, Zamboanga del Norte

Construction of multi-purpose

building

Jose Dalman, Zamboanga del Norte

Number of Buildings 1.00 POW, Plans

and Contract GAA 1,500.00 1,500.00

329. Construction of Barangay Hall, Brgy. Bitoon, Sindangan, Zamboanga del Norte

Construction of Barangay Hall

Sindangan, Zamboanga del Norte

Number of Buildings 1.00 POW, Plans

and Contract GAA 800.00 800.00

330. Construction of Barangay Hall, Brgy. Caluan, Sindangan, Zamboanga del Norte

Construction of Barangay Hall

Sindangan, Zamboanga del Norte

Number of Buildings 1.00 POW, Plans

and Contract GAA 800.00 800.00

331. Construction of Barangay Hall, Brgy. Joaquin Macias, Sindangan, Zamboanga del Norte

Construction of Barangay Hall

Sindangan, Zamboanga del Norte

Number of Buildings 1.00 POW, Plans

and Contract GAA 800.00 800.00

332. Construction of Barangay Hall, Brgy. Piao, Sindangan, Zamboanga del Norte

Construction of Barangay Hall

Sindangan, Zamboanga del Norte

Number of Buildings 1.00 POW, Plans

and Contract GAA 800.00 800.00

333. Construction of Barangay Hall, Brgy. Talinga, Sindangan, Zamboanga del Norte

Construction of Barangay Hall

Sindangan, Zamboanga del Norte

Number of Buildings 1.00 POW, Plans

and Contract GAA 800.00 800.00

334. Construction of Barangay Hall, Brgy. Datagan, Sindangan, Zamboanga del Norte

Construction of Barangay Hall

Sindangan, Zamboanga del Norte

Number of Buildings 1.00 POW, Plans

and Contract GAA 800.00 800.00

335. Construction of Barangay Hall, Brgy. Situbo, Pres. Manuel Roxas, Zamboanga del Norte

Construction of Barangay Hall

Roxas, Zamboanga del Norte

Number of Buildings 1.00 POW, Plans

and Contract GAA 800.00 800.00

336. Construction of Barangay Hall, Brgy. Salisig, Pres. Manuel Roxas, Zamboanga del Norte

Construction of Barangay Hall

Roxas, Zamboanga del Norte

Number of Buildings 1.00 POW, Plans

and Contract GAA 800.00 800.00

337. Construction of Barangay Hall, Brgy. Lower Irasan, Pres. Manuel Roxas, Zamboanga del Norte

Construction of Barangay Hall

Roxas, Zamboanga del Norte

Number of Buildings 1.00 POW, Plans

and Contract GAA 800.00 800.00

338. Construction of Barangay Hall, Brgy. Villahermoso, Pres. Manuel Roxas, Zamboanga del Norte

Construction of Barangay Hall

Roxas, Zamboanga del Norte

Number of Buildings 1.00 POW, Plans

and Contract GAA 800.00 800.00

Chapter 19-1-DPWH IX-ZDN 1DEOPage 27 of 33

Page 229: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results

Matrices Indicators Addressed

Expected Output

Basis for Implementa

tion

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

Investment Requirements (in exact amount PhP)

339. Construction of Barangay Hall, Brgy. Sibatog, Pres. Manuel Roxas, Zamboanga del Norte

Construction of Barangay Hall

Roxas, Zamboanga del Norte

Number of Buildings 1.00 POW, Plans

and Contract GAA 800.00 800.00

340. Construction of Barangay Hall, Brgy. Nabilid, Pres. Manuel Roxas, Zamboanga del Norte

Construction of Barangay Hall

Roxas, Zamboanga del Norte

Number of Buildings 1.00 POW, Plans

and Contract GAA 800.00 800.00

341. Construction of Barangay Hall, Brgy. Minang, Pres. Manuel Roxas, Zamboanga del Norte

Construction of Barangay Hall

Roxas, Zamboanga del Norte

Number of Buildings 1.00 POW, Plans

and Contract GAA 800.00 800.00

342. Construction of Barangay Hall, Brgy. Balubo, Pres. Manuel Roxas, Zamboanga del Norte

Construction of Barangay Hall

Roxas, Zamboanga del Norte

Number of Buildings 1.00 POW, Plans

and Contract GAA 800.00 800.00

343. Construction of Barangay Hall, Brgy. Sebod, Pres. Manuel Roxas, Zamboanga del Norte

Construction of Barangay Hall

Roxas, Zamboanga del Norte

Number of Buildings 1.00 POW, Plans

and Contract GAA 800.00 800.00

344. Construction of Barangay Hall, Brgy. Tamarok, Jose Dalman, Zamboanga del Norte

Construction of Barangay Hall

Jose Dalman, Zamboanga del Norte

Number of Buildings 1.00 POW, Plans

and Contract GAA 800.00 800.00

345. Construction of Barangay Hall, Brgy. San Jose, Dipolog, Zamboanga del Norte

Construction of Barangay Hall Dipolog City Number of

Buildings 1.00 POW, Plans and Contract GAA 800.00 800.00

346. Construction of Barangay Hall, Brgy. Barra, Dipolog, Zamboanga del Norte

Construction of Barangay Hall Dipolog City Number of

Buildings 1.00 POW, Plans and Contract GAA 800.00 800.00

347. Construction of Day Care Center, Brgy. Bantayan, Sindangan, Zamboanga del Norte

Construction of Day-Care

Center

Sindangan, Zamboanga del Norte

Number of Buildings 1.00 POW, Plans

and Contract GAA 800.00 800.00

348. Construction of Barangay Health Center, Brgy. Fatima, Sindangan, Zamboanga del Norte

Construction of Barangay

Health Center

Sindangan, Zamboanga del Norte

Number of Buildings 1.00 POW, Plans

and Contract GAA 1,000.00 1,000.00

349. Construction (Completion) of Multipurpose Building, Turno, Dipolog, Zamboanga del Norte

Construction of Multi-purpose

BuildingDipolog City Number of

Buildings 1.00 POW, Plans and Contract GAA 1,750.00 1,750.00

350. Construction of Home Economics Building in Dagohoy Elementary School, Dagohoy, Sindangan, Zamboanga del Norte

Construction of Multi-purpose

Building

Sindangan, Zamboanga del Norte

Number of Buildings 1.00 POW, Plans

and Contract GAA 800.00 800.00

351. Construction of Home Economics Building in Loquilos Elementary School, Linay, Manukan, Zamboanga del Norte

Construction of Multi-purpose

Building

Manukan, Zamboanga del Norte

Number of Buildings 1.00 POW, Plans

and Contract GAA 800.00 800.00

352. Construction of Home Economics Building in Molina Elementary School, Labakid, Sindangan, Zamboanga del Norte

Construction of Multi-purpose

Building

Sindangan, Zamboanga del Norte

Number of Buildings 1.00 POW, Plans

and Contract GAA 800.00 800.00

353. Construction of Home Economics Building in Paranglumba Elementary School, Paranglumba, Siayan, Zamboanga del Norte

Construction of Multi-purpose

Building

Siayan, Zamboanga del Norte

Number of Buildings 1.00 POW, Plans

and Contract GAA 800.00 800.00

354. Construction of Home Economics Building in San Antonio Elementary School, San Antonio, Manukan, Zamboanga del Norte

Construction of Multi-purpose

Building

Manukan, Zamboanga del Norte

Number of Buildings 1.00 POW, Plans

and Contract GAA 800.00 800.00

Chapter 19-1-DPWH IX-ZDN 1DEOPage 28 of 33

Page 230: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results

Matrices Indicators Addressed

Expected Output

Basis for Implementa

tion

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

Investment Requirements (in exact amount PhP)

355. Construction of Home Economics Building in Upper Irasan Elementary School, Upper Irasan, Pres. Manuel Roxas, Zamboanga del Norte

Construction of Multi-purpose

Building

Roxas, Zamboanga del Norte

Number of Buildings 1.00 POW, Plans

and Contract GAA 800.00 800.00

356. Construction of Multipurpose Building (Barangay Hall), Basagan, Katipunan, Zamboanga del Norte

Construction of Multi-purpose

Building

Katipunan, Zamboanga del Norte

Number of Buildings 1.00 POW, Plans

and Contract GAA 800.00 800.00

357. Construction of Multipurpose Building (Barangay Hall), Calubian, Sindangan, Zamboanga del Norte

Construction of Multi-purpose

Building

Sindangan, Zamboanga del Norte

Number of Buildings 1.00 POW, Plans

and Contract GAA 800.00 800.00

358. Construction of Multipurpose Building (Barangay Hall), Datagan, Siayan, Zamboanga del Norte

Construction of Multi-purpose

Building

Siayan, Zamboanga del Norte

Number of Buildings 1.00 POW, Plans

and Contract GAA 800.00 800.00

359. Construction of Multipurpose Building (Barangay Hall), Dinasan, Jose Dalman, Zamboanga del Norte

Construction of Multi-purpose

Building

Jose Dalman, Zamboanga del Norte

Number of Buildings 1.00 POW, Plans

and Contract GAA 800.00 800.00

360. Construction of Multipurpose Building (Barangay Hall), Diongan, Siayan, Zamboanga del Norte

Construction of Multi-purpose

Building

Siayan, Zamboanga del Norte

Number of Buildings 1.00 POW, Plans

and Contract GAA 800.00 800.00

361. Construction of Multipurpose Building (Barangay Hall), Lawis, Sindangan, Zamboanga del Norte

Construction of Multi-purpose

Building

Sindangan, Zamboanga del Norte

Number of Buildings 1.00 POW, Plans

and Contract GAA 800.00 800.00

362. Construction of Multipurpose Building (Barangay Hall), Lipay, Jose Dalman, Zamboanga del Norte

Construction of Multi-purpose

Building

Jose Dalman, Zamboanga del Norte

Number of Buildings 1.00 POW, Plans

and Contract GAA 800.00 800.00

363. Construction of Multipurpose Building (Barangay Hall), Marupay, Pres. Manuel Roxas, Zamboanga del Norte

Construction of Multi-purpose

Building

Roxas, Zamboanga del Norte

Number of Buildings 1.00 POW, Plans

and Contract GAA 800.00 800.00

364. Construction of Multipurpose Building (Barangay Hall), Minaog, Dipolog, Zamboanga del Norte

Construction of Multi-purpose

BuildingDipolog City Number of

Buildings 1.00 POW, Plans and Contract GAA 800.00 800.00

365. Construction of Multipurpose Building (Barangay Hall), Misok, Sindangan, Zamboanga del Norte

Construction of Multi-purpose

Building

Sindangan, Zamboanga del Norte

Number of Buildings 1.00 POW, Plans

and Contract GAA 800.00 800.00

366. Construction of Multipurpose Building (Barangay Hall), Punta, Dipolog, Zamboanga del Norte

Construction of Multi-purpose

BuildingDipolog City Number of

Buildings 1.00 POW, Plans and Contract GAA 800.00 800.00

367. Construction of Multipurpose Building (Barangay Hall), R.G. Macias, Sindangan, Zamboanga del Norte

Construction of Multi-purpose

Building

Sindangan, Zamboanga del Norte

Number of Buildings 1.00 POW, Plans

and Contract GAA 800.00 800.00

Chapter 19-1-DPWH IX-ZDN 1DEOPage 29 of 33

Page 231: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results

Matrices Indicators Addressed

Expected Output

Basis for Implementa

tion

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

Investment Requirements (in exact amount PhP)

368. Construction of Multipurpose Building (Food Processing/ Livelihood Center), Lawis, Sindangan, Zamboanga del Norte

Construction of Multi-purpose

Building

Sindangan, Zamboanga del Norte

Number of Buildings 1.00 POW, Plans

and Contract GAA 12,000.00 12,000.00

369. Construction of Multipurpose Building (Food Processing/ Livelihood Center), Sicayab, Dipolog, Zamboanga del Norte

Construction of Multi-purpose

BuildingDipolog City Number of

Buildings 1.00 POW, Plans and Contract GAA 8,000.00 8,000.00

370. Construction of Multipurpose Building in Don Bartolome Aripal National High School, Upper Disakan, Manukan, Zamboanga del Norte

Construction of Multi-purpose

Building

Manukan, Zamboanga del Norte

Number of Buildings 1.00 POW, Plans

and Contract GAA 1,750.00 1,750.00

371. Construction of Multipurpose Building in Lapero National High School, Lapero, Sindangan, Zamboanga del Norte

Construction of Multi-purpose

Building

Sindangan, Zamboanga del Norte

Number of Buildings 1.00 POW, Plans

and Contract GAA 1,750.00 1,750.00

372. Construction of Multipurpose Building in Lower Inuman Elementary School, Lower Inuman, Sindangan, Zamboanga del Norte

Construction of Multi-purpose

Building

Sindangan, Zamboanga del Norte

Number of Buildings 1.00 POW, Plans

and Contract GAA 1,750.00 1,750.00

373. Construction of Multipurpose Building in New Tambo Elementary School, New Tambo, Katipunan, Zamboanga del Norte

Construction of Multi-purpose

Building

Katipunan, Zamboanga del Norte

Number of Buildings 1.00 POW, Plans

and Contract GAA 1,300.00 1,300.00

374. Construction of Type C Multipurpose Building in Dumalogdog National High School, Dumalogdog, Sindangan, Zamboanga del Norte

Construction of Multi-purpose

Building

Sindangan, Zamboanga del Norte

Number of Buildings 1.00 POW, Plans

and Contract GAA 800.00 800.00

375. Construction of Type C Multipurpose Building in Singatong Elementary School, Singatong, Katipunan, Zamboanga del Norte

Construction of Multi-purpose

Building

Katipunan, Zamboanga del Norte

Number of Buildings 1.00 POW, Plans

and Contract GAA 800.00 800.00

376. Construction of Type C Multipurpose Building in Talinga Elementary School, Talinga, Sindangan, Zamboanga del Norte

Construction of Multi-purpose

Building

Sindangan, Zamboanga del Norte

Number of Buildings 1.00 POW, Plans

and Contract GAA 800.00 800.00

b. School Buildings - 377. Construction of 1 Unit 2

Classroom School Building, Sigamok Elementary School, Brgy. Sigamok, Jose Dalman, Zamboanga del Norte

Construction of School

Building

Jose Dalman, Zamboanga del Norte

Number of School

Buildings1.00 POW, Plans

and Contract GAA 800.00 800.00

c. Local Roads - 378. Road Opening with Concreting

Purok Madasigon to Brgy. Labakid, Brgy. Dohinob, Pres. Manuel Roxas, Zamboanga del Norte TL = 0.162 kms

Construction of Concrete Road

Roxas, Zamboanga del Norte Lane Km 0.325 POW, Plans

and Contract GAA

1,750.00

1,750.00

379. Road Concreting from Crossing Seriac to Centro Seriac, Brgy. Seriac, Siayan, Zamboanga del Norte

Construction of Concrete Road

Siayan, Zamboanga del Norte Lane Km 0.372 POW, Plans

and Contract GAA1,750.00

1,750.00

Chapter 19-1-DPWH IX-ZDN 1DEOPage 30 of 33

Page 232: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results

Matrices Indicators Addressed

Expected Output

Basis for Implementa

tion

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

Investment Requirements (in exact amount PhP)

380. Road Concreting from Crossing Gonayen to Elementary School, Brgy. Gonayen, Siayan, Zamboanga del Norte TL = 0.186 kms

Construction of Concrete Road

Siayan, Zamboanga del Norte

Lane Km 0.372 POW, Plans and Contract GAA

1,750.00

1,750.00

381. Road Concreting from Crossing Soguilon to Elementary School, Brgy. Soguilon, Siayan, Zamboanga del NorteTL = 0.186 kms

Construction of Concrete Road

Siayan, Zamboanga del Norte

Lane Km 0.372 POW, Plans and Contract GAA

1,750.00

1,750.00

382. Road Concreting Purok Caimito, Brgy. Sangkol, Dipolog, Zamboanga del Norte TL = 0.214 kms

Construction of Concrete Road Dipolog City Lane Km 0.428 POW, Plans

and Contract GAA1,750.00

1,750.00

383. Concreting of Road from Sitio Capis to Sitio Laitan, Palaranan, Manukan, Zamboanga del NorteTL = 0.200 kms

Construction of concrete Road

Manukan, Zamboanga del Norte

Lane Km 0.400 POW, Plans and Contract GAA

1,450.00 1,450.00

384. Concreting of Road from Sitio Patunan to Purok Bato, Punta Blanca, Manukan, Zamboanga del Norte

Construction of concrete Road

Manukan, Zamboanga del Norte

Lane Km 0.400 POW, Plans and Contract GAA

1,750.00 1,750.00

385. Concreting of Road of Barangay Road to Sitio Layawan Elementary School, Dicoyong, Sindangan, Zamboanga del NorteTL = 0.199

Construction of concrete Road

Sindangan, Zamboanga del Norte

Lane Km 0.399 POW, Plans and Contract GAA

1,750.00

1,750.00

386. Concreting of Road of Centro, Gampis, Sindangan, Zamboanga del NorteTL = 0.101

Construction of concrete Road

Sindangan, Zamboanga del Norte

Lane Km 0.202 POW, Plans and Contract GAA

700.00 700.00

387. Concreting of Road of Sector 2-Fatima; and between Sector 1-Mahogany and Sector 5-Baybay, Disud, Sindangan, Zamboanga del NorteTL = 0.250 kms

Construction of concrete Road

Sindangan, Zamboanga del Norte

Lane Km 0.500 POW, Plans and Contract GAA

1,750.00

1,750.00

388. Concreting of Road of Sitio Damusag, La Concepcion, Sindangan, Zamboanga del NorteTL = 0.18 kms

Construction of concrete Road

Sindangan, Zamboanga del Norte

Lane Km 0.360 POW, Plans and Contract GAA

1,750.00 1,750.00

389. Concreting of Road of Sitio Gopek, Balok, Sindangan, Zamboanga del NorteTL = 0.200 kms

Construction of concrete Road

Sindangan, Zamboanga del Norte

Lane Km 0.400 POW, Plans and Contract GAA

1,750.00 1,750.00

390. Concreting of Road of Sitio Gopo, Joaquin Macias, Sindangan, Zamboanga del NorteTL = 0.18 kms

Construction of concrete Road

Sindangan, Zamboanga del Norte

Lane Km 0.360 POW, Plans and Contract GAA

1,750.00 1,750.00

391. Concreting of Road of Sitio Pase, Moyo, Siayan, Zamboanga del NorteTL = 0.18 kms

Construction of concrete Road

Siayan, Zamboanga del Norte Lane Km 0.360 POW, Plans

and Contract GAA1,750.00

1,750.00

392. Concreting of Road of Sitio Sikitan, Binuangan, Sindangan, Zamboanga del NorteTL = 0.198 kms

Construction of concrete Road

Sindangan, Zamboanga del Norte

Lane Km 0.396 POW, Plans and Contract GAA

1,750.00 1,750.00

393. Concreting of Road of Upper Gusa, Calatunan, Sindangan, Zamboanga del NorteTL = 0.18 kms

Construction of concrete Road

Sindangan, Zamboanga del Norte

Lane Km 0.360 POW, Plans and Contract GAA

1,750.00 1,750.00

Chapter 19-1-DPWH IX-ZDN 1DEOPage 31 of 33

Page 233: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results

Matrices Indicators Addressed

Expected Output

Basis for Implementa

tion

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

Investment Requirements (in exact amount PhP)

394. Construction of Concrete Road - Concreting of Road, Sitio Gondok, Brgy. Polayo, Siayan, Zamboanga del NorteTL = 3.00 kms

Construction of concrete Road

Siayan, Zamboanga del Norte

Lane Km 6.00 POW, Plans and Contract GAA 3

15,000.00

15,000.00

395. Road Concreting from Jct. Nat'l Highway (Sindangan - Siayan - Dumingag Road) Piao, Sindangan - Brgy. Labakid, Sindangan, Zamboanga del NorteTL = 1.2 kms

Construction of concrete Road

Sindangan, Zamboanga del Norte

Lane Km 2.40 POW, Plans and Contract GAA 3

15,000.00

15,000.00

396. Road Concreting from Jct. Nat'l Highway to Maras East Elementary School to circumferencial road Jct. Nat'l HighwayTL = 1.4 kms

Construction of concrete Road

Sindangan, Zamboanga del Norte

Lane Km 2.80 POW, Plans and Contract GAA 3

15,000.00

15,000.00

d. Water Supply - 397. Repair/Rehab of MORIAS Water

System traversing Brgy. Lapero, Brgy. Lower Nipaan, Brgy. Siari, Brgy. Motibot, Sindangan, Zamboanga del Norte

Rehabilitation of Water

Suplly System

Sindangan, Zamboanga del Norte

Number of Water Supply Systems

1.00 POW, Plans and Contract GAA

2,250.00

2,250.00

398. Construction of Potable Water System at Brgy. Disud, Sindangan, Zamboanga del Norte

Construction of Water Suply

SystemSindangan, ZN

Number of Water Supply Systems

1.00 POW, Plans and Contract GAA 3 5,000.00 5,000.00

e. Flood Control and Drainage - Drainage /Protection - Local Infrastructure Program - 399. Construction of Drainage Canal at

Sitio Lawag, Galas, Dipolog City, Zamboanga del Norte

Construction of Drainage Structures

Dipolog City Lineal Meters 572.00 POW, Plans

and Contract GAA - 5,720.00 - 5,720.00

Regionwide - A. Local Infrastructure Program -

a. Local Roads - 400. Road Concreting of Brgy. Road,

Brgy. Poblacion, Siayan, Zamboanga del NorteTL = 0.440 kms

Construction of Concrete Road

Siayan, Zamboanga del Norte Lane Km 0.88 POW, Plans

and Contract GAA4,000.00

4,000.00

401. Concreting of Pangalalan-Bago-Dalongdon Provincial Road in Sindangan, Zamboanga del NorteTL = 0.151 kms

Construction of Concrete Road

Sindangan, Zamboanga del Norte

Lane Km 0.302 POW, Plans and Contract GAA

5,000.00 5,000.00

402. Concreting of Road, Brgy. Disud, Sindangan, Zamboanga del NorteTL = 0.29 kms

Construction of Concrete Road

Sindangan, Zamboanga del Norte

Lane Km 0.580 Plans and POW GAA

- 2,000.00 2,000.00

b. Multipurpose/Facilities - 403. Construction of Covered Court,

Brgy. Lower Dicayas, Dipolog City, Zamboanga Del Norte

Construction of Multi-purpose

BuildingDipolog City Number of

Buildings 1.00 Plans and POW GAA

-

- 2,000.00 2,000.00

404. Completion/Improvement of Sindangan Cultural and Sports Center, Sindangan, Zamboanga Del Norte

Improvement of multi-purpose building

Sindangan, Zamboanga del Norte

Number of Buildings 1.00 POW, Plans

and Contract GAA 5,000.00 5,000.00

216,413.00 190,000.00 1,416,500.00 2,648,896.00 2,267,875.00 1,782,524.00 8,522,208.00 Subtotal

Chapter 19-1-DPWH IX-ZDN 1DEOPage 32 of 33

Page 234: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results

Matrices Indicators Addressed

Expected Output

Basis for Implementa

tion

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

Investment Requirements (in exact amount PhP)

1,862,217.00 2,098,761.00 1,596,500.00 8,360,561.89 14,556,476.00 7,341,236.00 35,815,751.89 GRAND TOTAL

Chapter 19-1-DPWH IX-ZDN 1DEOPage 33 of 33

Page 235: Table of Contents (By Chapter)

Updated Zamboanga Peninsula Regional Development Investment Program (RDIP), 2017-2022

Agency: DPWH IXChapter 19: Accelerating Infrastructure Development

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

ZAMBOANGA DEL NORTE 2ND DEO, LABASONZAMBOANGA DEL NORTE 3RD LEGISLATIVE DISTRICTa. OO1: Ensure Safe and Reliable National Road System

(i) Asset Preservation of National Roads1. Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development Management-4 (HDM-4)

a. Primary Road1. Sindangan - Liloy Road Concrete

ReconstructionLeon Postigo, Salug, Liloy km. Plans and POW GAA 3 296,014.00 110,000.00 406,014.00

2. Sindangan - Liloy RoadK1930+(-892) - K1930+786,K1930+812 - K1933+448

Concrete Reconstruction

Leon Postigo, Salug, Liloy km. 4.292 Plans and POW GAA 3 296,014.00 120,176.00 416,190.00

3. Sindangan - Liloy RoadK1946+872 - K1948+000K1951+000 - K1951+158K1951+503 - K1953+500K1961+455 - K1962+000

Concrete Reconstruction

Leon Postigo, Salug, Liloy km. 4.458 Plans and POW GAA 3 296,014.00 124,824.00 420,838.00

4. Liloy - Ipil Road Concrete Reconstruction

Tampilisan, Kalawir km. Plans and POW GAA 3 - - 110,000.00 110,000.00 Tampilisan, Kalawit

5. Liloy - Ipil RoadK1981+065 - K1984+215K1984+842 - K1986+519

Concrete Reconstruction

Tampilisan, Kalawir km. 4.563 Plans and POW GAA 3 - - 127,764.00 127,764.00

Tampilisan, Kalawitb. Secondary Road -

6. Liloy - Siocon RoadConcrete

Reconstruction Labason, Baliguian Plans and POW GAA 3 - - 25,484.00 30,000.00 102,000.00 157,484.00

The amount 25,484 released in CY 2019 GAA is a road slope protection structure along Liloy-Siocon Road

7. Siocon - Sirawai - Sibuco - Limpapa Road

Concrete Reconstruction

Siocon, Sirawai, Sibuco km. Plans and POW GAA 3 - - -

8. Siocon - Sirawai - Sibuco - Limpapa Road(Sirawai - Sibuco Road)

Concrete Reconstruction

Siocon, Sirawai, Sibuco km. Plans and POW GAA 3 - - -

9. Siocon - Sirawai - Sibuco - Limpapa Road(Sirawai - Sibuco Road)

Concrete Reconstruction

Siocon, Sirawai, Sibuco km. Plans and POW GAA 3 - - -

10. Zamboanga West Coastal Road Concrete Reconstruction Sibuco km. Plans and POW GAA 3 - - -

11. Zamboanga West Coastal Road(Limpapa - Sibuco Road)

Concrete Reconstruction Sibuco km. Plans and POW GAA 3 -

12. Zamboanga West Coastal Road(Limpapa - Sibuco Road)

Concrete Reconstruction Sibuco km. Plans and POW GAA 3 -

13. Zamboanga West Coastal Road(Limpapa - Sibuco Road)

Concrete Reconstruction Sibuco km. Plans and POW GAA 3 -

14. Siocon - Sirawai - Sibuco - Limpapa Road

Concrete Reconstruction Sibuco km. Plans and POW GAA 3 -

15. Siocon - Sirawai - Sibuco - Limpapa Road

Concrete Reconstruction Sibuco km. Plans and POW GAA 3 -

c. Tertiary Road - 16. ZNAC Access Road Concrete

Reconstruction Tampilisan km. Plans and POW GAA 3 -

17. Liloy - Lamao Port Road Concrete Reconstruction Liloy km. Plans and POW GAA 3 - - -

2. Preventive Maintenance based on Pavement Management System -

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation LGU Proponent RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Page 236: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation LGU Proponent RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

a. Primary Road - 18. Sindangan - Liloy Road

Asphalt Overlay Leon Postigo, Salug, Liloy km. Plans and POW GAA 3 - -

19. Liloy - Ipil RoadAsphalt Overlay Tampilisan,

Kalawir km. Plans and POW GAA 3 - - Tampilisan, Kalawitb. Secondary Road -

20. Liloy - Siocon RoadAsphalt Overlay Labason, Baliguian km. Plans and POW GAA 3 15,014.00 20,000.00 105,000.00 140,014.00

21. Siocon - Sirawai - Sibuco - Limpapa Road Asphalt Overlay Siocon, Sirawai km. Plans and POW GAA 3 - - -

22. Siocon - Sirawai - Sibuco - Limpapa Road(Sirawai - Sibuco Road)

Asphalt Overlay Siocon, Sirawai km. Plans and POW GAA 3 - - -

23. Siocon - Sirawai - Sibuco - Limpapa Road(Sirawai - Sibuco Road)

Asphalt Overlay Sirawai km. Plans and POW GAA 3 - - -

24. Zamboanga West Coastal Road Asphalt Overlay Sibuco km. Plans and POW GAA 3 - - - 25. Zamboanga West Coastal Road

(Limpapa - Sibuco Road) Asphalt Overlay Sibuco km. Plans and POW GAA 3 - - -

26. Zamboanga West Coastal Road(Limpapa - Sibuco Road) Asphalt Overlay Sibuco km. Plans and POW GAA 3 - - -

27. Zamboanga West Coastal Road(Limpapa - Sibuco Road) Asphalt Overlay Sibuco km. Plans and POW GAA 3 - - -

28. Siocon - Sirawai - Sibuco - Limpapa Road Asphalt Overlay Sibuco km. Plans and POW GAA 3 - - -

29. Siocon - Sirawai - Sibuco - Limpapa Road Asphalt Overlay Sibuco km. Plans and POW GAA 3 - - -

c. Tertiary Road - - - 30. ZNAC Access Road Asphalt Overlay Tampilisan km. Plans and POW GAA 3 - - - 31. Liloy - Lamao Port Road Asphalt Overlay Liloy km. Plans and POW GAA 3 - - -

3. Construction/Upgrading/Rehabilitation of Drainage along National Roads - a. Primary Road -

32. Sindangan - Liloy Road Improvement/ construction of drainage system

Leon Postigo, Salug, Liloy km. Plans and POW GAA 3 - 10,000.00 108,000.00 118,000.00

33. Liloy - Ipil Road Improvement/ construction of drainage system

Tampilisan, Kalawir km. Plans and POW GAA 3 - 10,000.00 106,000.00 116,000.00

Tampilisan, Kalawitb. Secondary Road -

34. Liloy - Siocon Road Improvement/ construction of drainage system

Labason, Baliguian km. Plans and POW GAA 3 - 10,000.00 10,000.00 20,000.00

35. Siocon - Sirawai - Sibuco - Limpapa Road

Improvement/ construction of drainage system

Siocon, Sirawai km. Plans and POW GAA 3 - - 5,000.00 103,000.00 108,000.00

36. Siocon - Sirawai - Sibuco - Limpapa Road(Sirawai - Sibuco Road)

Improvement/ construction of drainage system

Sirawai, Sibuco km. Plans and POW GAA 3 - - 5,000.00 105,000.00 110,000.00

37. Siocon - Sirawai - Sibuco - Limpapa Road(Sirawai - Sibuco Road)

Improvement/ construction of drainage system

Sirawai, Sibuco km. Plans and POW GAA 3 - - 5,000.00 5,000.00 10,000.00

38. Zamboanga West Coastal Road(Limpapa - Sibuco Road)

Improvement/ construction of drainage system

Sibuco km. Plans and POW GAA 3 - 50,000.00 50,000.00

c. Tertiary Road - - - 39. ZNAC Access Road Improvement/

construction of drainage system

Tampilisan km. Plans and POW GAA 3 - - -

Chapter 19-1-DPWH IX-ZDN 2DEOPage 2 of 35

Page 237: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation LGU Proponent RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

40. Liloy - Lamao Port Road Improvement/ construction of drainage system

Liloy km. Plans and POW GAA 3 - - -

4. Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - a. Primary Road -

41. Sindangan - Liloy RoadSlope Protection Leon Postigo,

Salug, Liloy sq.m. Plans and POW GAA 3 - 20,000.00 10,000.00 105,000.00 135,000.00

42. Liloy - Ipil RoadSlope Protection Tampilisan,

Kalawir sq.m. Plans and POW GAA 3 - - 10,000.00 108,000.00 118,000.00 Tampilisan, Kalawitb. Secondary Road -

43. Liloy - Siocon RoadSlope Protection Labason, Baliguian sq.m. Plans and POW GAA 3 36,376.00 20,000.00 20,000.00 76,376.00

44. Liloy - Siocon Road Slope Protection Gutalac, Baliguian sq.m. Plans and POW GAA 3 110,000.00 75,000.00 185,000.00 45. Liloy - Siocon Road

K2028+943 - K2028+987 Slope Protection Gutalac sq.m. 1505 Plans and POW GAA 3 104,000.00 104,000.00

46. Siocon - Sirawai - Sibuco - Limpapa Road Slope Protection Siocon, Sirawai sq.m. Plans and POW GAA 3 - - 10,000.00 112,000.00 122,000.00

47. Siocon - Sirawai - Sibuco - Limpapa Road(Sirawai - Sibuco Road)

Slope Protection Sirawai, Sibuco sq.m. Plans and POW GAA 3 - 10,000.00 115,000.00 125,000.00

48. Zamboanga West Coastal Road Slope Protection Sirawai, Sibuco sq.m. Plans and POW GAA 3 - 10,000.00 110,000.00 120,000.00 49. Zamboanga West Coastal Road

(Limpapa - Sibuco Road) Slope Protection Sibuco, Sirawai sq.m. Plans and POW GAA 3 - 10,000.00 102,000.00 112,000.00

50. Zamboanga West Coastal Road(Limpapa - Sibuco Road) Slope Protection Sibuco, Sirawai sq.m. Plans and POW GAA 3 - 5,000.00 5,000.00 10,000.00

51. Zamboanga West Coastal Road(Limpapa - Sibuco Road) Slope Protection Sibuco, Sirawai sq.m. Plans and POW GAA 3 - 5,000.00 5,000.00 10,000.00

52. Siocon - Sirawai - Sibuco - Limpapa Road Slope Protection Sibuco, Sirawai sq.m. Plans and POW GAA 3 - 5,000.00 5,000.00 10,000.00

53. Siocon - Sirawai - Sibuco - Limpapa Road Slope Protection Sibuco, Sirawai sq.m. Plans and POW GAA 3 - 5,000.00 5,000.00 10,000.00

c. Tertiary Road - 54. ZNAC Access Road Slope Protection Tampilisan sq.m. Plans and POW GAA 3 - - - 55. Liloy - Lamao Port Road Slope Protection Liloy sq.m. Plans and POW GAA 3 - - -

(ii) Network Development - 1. Improvement/Widening of National Roads -

a. Primary Road - 56. Sindangan - Liloy Road

Road Widening Leon Postigo, Salug, Liloy km. Plans and POW GAA 3 - 105,000.00 215,700.00 - 320,700.00

57. Sindangan - Liloy RoadK1939+000 - K1942+480 Road Widening Leon Postigo,

Salug, Liloy km. 3.5 Plans and POW GAA 3 - - - 140,000.00 140,000.00

58. Sindangan - Liloy RoadK1942+480 - K1946+152 Road Widening Leon Postigo,

Salug, Liloy km. 3.75 Plans and POW GAA 3 - - - 150,000.00 150,000.00

59. Sindangan - Liloy RoadK1946+152 - K1950+100 Road Widening Leon Postigo,

Salug, Liloy km. 4.0 Plans and POW GAA 3 - - - 160,000.00 160,000.00

60. Sindangan - Liloy RoadK1962+341 - K1965+185 Road Widening Leon Postigo,

Salug, Liloy km. 2.728 Plans and POW GAA 3 - - - 110,000.00 110,000.00

61. Sindangan - Liloy RoadPackage 1 Road Widening Leon Postigo,

Salug, Liloy km. 4.427 Plans and POW GAA 3 - - - - 177,080.00 177,080.00

62. Sindangan - Liloy RoadPackage 2 Road Widening Leon Postigo,

Salug, Liloy km. 4.162 Plans and POW GAA 3 - - - - 166,500.00 166,500.00

63. Sindangan - Liloy RoadPackage 3 Road Widening Leon Postigo,

Salug, Liloy km. 3.750 Plans and POW GAA 3 - - - - 150,000.00 150,000.00

64. Sindangan - Liloy RoadPackage 4 Road Widening Leon Postigo,

Salug, Liloy km. 3.750 Plans and POW GAA 3 - - - - 150,000.00 150,000.00

65. Liloy - Ipil RoadRoad Widening Tampilisan,

Kalawir km. Plans and POW GAA 3 239,711.00 70,697.00 167,196.00 - 477,604.00 Tampilisan, Kalawit

Chapter 19-1-DPWH IX-ZDN 2DEOPage 3 of 35

Page 238: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation LGU Proponent RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

66. Liloy - Ipil RoadK1931+373 - K1984+422

Road Widening Tampilisan, Kalawir km. 2.875 Plans and POW GAA 3 - - - 115,000.00 115,000.00

Tampilisan, Kalawit and Double check from K1931+373 to K1981+373 along Liloy-Ipil Road

67. Liloy - Ipil RoadK1984+422 - K1987+255 Road Widening Tampilisan,

Kalawir km. 2.7 Plans and POW GAA 3 - - - 108,000.00 108,000.00 Tampilisan, Kalawit68. Liloy - Ipil Road

K1987+255 - K1990+047 Road Widening Tampilisan, Kalawir km. 2.8 Plans and POW GAA 3 - - - 112,000.00 112,000.00 Tampilisan, Kalawit

69. Liloy - Ipil RoadK1990+047 - K1993+053 Road Widening Tampilisan,

Kalawir km. 2.95 Plans and POW GAA 3 - - - 118,000.00 118,000.00 Tampilisan, Kalawit70. Liloy - Ipil Road

Road Widening Tampilisan, Kalawir km. 1.677 Plans and POW GAA 3 - - - 67,080.00 67,080.00 Tampilisan, Kalawit

71. Flaring of Jct. ZNAC Road including Street Lightings km. Plans and POW GAA 3 - - -

b. Secondary Road - 72. Liloy - Siocon Road

Road Widening Labason, Baliguian km. Plans and POW GAA 3 - - 50,000.00 50,000.00

73. Liloy - Siocon RoadK1988+000 - K1990+741 Road Widening Labason, Baliguian km. 2.75 Plans and POW GAA 3 - - - 110,000.00 110,000.00

74. Liloy - Siocon RoadK1992+000 - K1994+603 Road Widening Labason, Baliguian km. 2.625 Plans and POW GAA 3 - - - 105,000.00 105,000.00

75. Liloy - Siocon RoadRoad Widening Labason, Baliguian km. 3.00 Plans and POW GAA 3 - - - 120,000.00 120,000.00

76. Liloy - Siocon RoadRoad Widening Labason, Baliguian km. 3.00 Plans and POW GAA 3 - - - 120,000.00 120,000.00

77. Liloy - Siocon RoadK1966+(-775) - K1966+(-132) Road Widening Liloy km. 0.46 Plans and POW GAA 3 45,000.00 45,000.00

78. Siocon - Sirawai - Sibuco - Limpapa Road Road Widening Siocon, Sirawai km. Plans and POW GAA 3 - - -

79. Siocon - Sirawai - Sibuco - Limpapa Road(Sirawai - Sibuco Road)

Road Widening Sirawai, Sibuco km. Plans and POW GAA 3 - - -

80. Siocon - Sirawai - Sibuco - Limpapa Road(Sirawai - Sibuco Road)

Road Widening Sirawai, Sibuco km. Plans and POW GAA 3 - - -

81. Zamboanga West Coastal Road Road Widening Sirawai, Sibuco km. Plans and POW GAA 3 - - - 82. Zamboanga West Coastal Road

(Limpapa - Sibuco Road) Road Widening Sibuco, Sirawai km. Plans and POW GAA 3 - - -

83. Zamboanga West Coastal Road(Limpapa - Sibuco Road) Road Widening Sibuco, Sirawai km. Plans and POW GAA 3 - - -

84. Zamboanga West Coastal Road(Limpapa - Sibuco Road) Road Widening Sibuco, Sirawai km. Plans and POW GAA 3 - - -

85. Siocon - Sirawai - Sibuco - Limpapa Road Road Widening Sibuco, Sirawai km. Plans and POW GAA 3 - - -

86. Siocon - Sirawai - Sibuco - Limpapa Road Road Widening Sibuco, Sirawai km. Plans and POW GAA 3 - - -

c. Tertiary Road - - - 87. ZNAC Access Road Road Widening Tampilisan km. Plans and POW GAA 3 - - - 88. Liloy - Lamao Port Road Road Widening Liloy km. Plans and POW GAA 3 - - -

2. Off - Carriageway/Improvement including Drainage - 89. Liloy - Ipil Road Asphalt

Reconstruction Tampilisan, Kalawit km. Plans and POW GAA 3 10,888.00 - 10,888.00

3. Construction of By-Passes/Diversion Roads, including ROW -

Chapter 19-1-DPWH IX-ZDN 2DEOPage 4 of 35

Page 239: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation LGU Proponent RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

90. Jct. National Highway - Siocon - Jct. National Highway, R.T. Lim Poblacion, Siocon - Brgy. Tagaytay Section, Zamboanga Del Norte

Road Concreting Siocon, Zamboanga Del Norte km. Plans and POW GAA 3 150,000.00 295,000.00 300,000.00 300,000.00 300,000.00 1,345,000.00

91. Improvement/Concreting of Baliguian Coastal Road, Jct. Baliguian - Kauswagan - Mamad Section

Road ConcretingBaliguian, Zamboanga Del Norte

km. Plans and POW GAA 3 188,740.00 300,000.00 300,000.00 300,000.00 300,000.00 1,388,740.00

a. Road - b. Bridges (9-Br.) - c. Slope Protection -

92. Construction of Canawan By-Pass Road including Canawan Bridge (New Construction of Parallel Bridge), Canawan Section

Road Concreting Salug km. Plans and POW GAA 3 - - -

Duplication of entry (No. 94)

93. Construction of Labason Bypass Road, Lopoc - Kipit Section Road Concreting Labason km. Plans and POW GAA 3 - - 200,000.00 200,000.00 150,000.00 550,000.00

94. Construction of Canawan By-Pass Road including Canawan Bridge (New Construction of Bridge), Canawan Section

Road Concreting Salug km. Plans and POW GAA 3 65,000.00 112,000.00 65,000.00 242,000.00

95. Pob. Labason Boulevard - Osukan Coastal Road incl. Bridge, L=1.42 kms.

Road Concreting Labason km. Plans and POW GAA 3 110,000.00 110,000.00 110,000.00 330,000.00

96. Labason - Danslan - Tampilisan Road, L=21.7 kms. Road Concreting Labason,

Tampilisan km. Plans and POW GAA 3 110,000.00 110,000.00 110,000.00 330,000.00

97. Liloy Coastal Road - Lamao - Punta San Miguel - Banigan Road Road Concreting Liloy km. Plans and POW GAA 3 120,000.00 120,000.00 120,000.00 360,000.00

98. Naga - Sandayong - Godod - Salug Road Road Concreting Salug, Godod km. Plans and POW GAA 3 120,000.00 120,000.00 120,000.00 360,000.00

99. Cayamcam - Sirawai Road Road Concreting Sirawai km. Plans and POW GAA 3 120,000.00 120,000.00 120,000.00 360,000.00 100. Labason - Kalawit - Titay Road Road Concreting Labason, Kalawit km. Plans and POW GAA 3 120,000.00 120,000.00 120,000.00 360,000.00

(iii) Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - b. Secondary Road -

101. Liloy - Siocon RoadRoad Concreting Labason, Baliguian km. Plans and POW GAA 3 316,000.00 12,112.00 150,000.00 150,000.00 150,000.00 778,112.00

102. Liloy - Siocon Road2034+000 - 2037+000 Road Concreting Labason, Baliguian km. 3.043 Plans and POW GAA 3 - - - 121,720.00 121,720.00

103. Liloy - Siocon Road2037+000 - 2040+003 Road Concreting Labason, Baliguian km. 3.268 Plans and POW GAA 3 - - - 130,720.00 130,720.00

104. Liloy - Siocon Road2040+003 - 2043+003 Road Concreting Labason, Baliguian km. 3.033 Plans and POW GAA 3 - - - 121,320.00 121,320.00

105. Liloy - Siocon Road2043+003 - 2046+000 Road Concreting Labason, Baliguian km. 3.192 Plans and POW GAA 3 - - - 127,680.00 127,680.00

106. Liloy - Siocon Road2046+000 - 2048+1652048+186 - 2049+500

Road Concreting Labason, Baliguian km. 3.637 Plans and POW GAA 3 - - - 145,480.00 145,480.00

107. Liloy - Siocon Road2049+500 - 2053+000 Road Concreting Labason, Baliguian km. 3.748 Plans and POW GAA 3 - - - 150,000.00 150,000.00

108. Liloy - Siocon Road2053+000 - 2056+000 Road Concreting Labason, Baliguian km. 3.09 Plans and POW GAA 3 - - - 123,600.00 123,600.00

109. Liloy - Siocon Road2056+000 - 2057+220 Road Concreting Labason, Baliguian km. 1.273 Plans and POW GAA 3 - - - 51,000.00 51,000.00

110. Siocon - Sirawai - Sibuco - Limpapa Road Road Concreting Siocon, Sirawai km. Plans and POW GAA 3 - - -

Chapter 19-1-DPWH IX-ZDN 2DEOPage 5 of 35

Page 240: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation LGU Proponent RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

111. Siocon - Sirawai - Sibuco - Limpapa Road(Sirawai - Sibuco Road)

Road Concreting Sirawai, Sibuco km. Plans and POW GAA 3 - - -

112. Zamboanga West Coastal Road(S00014MN) Road Concreting Sirawai, Sibuco km. Plans and POW GAA 3 - - 33,200.00 33,200.00 66,400.00

113. Zamboanga West Coastal Road(Limpapa - Sibuco Road) Road Concreting Sibuco, Sirawai km. Plans and POW GAA 3 - - 21,000.00 21,000.00 42,000.00

114. Zamboanga West Coastal Road(Limpapa - Sibuco Road) Road Concreting Sibuco, Sirawai km. Plans and POW GAA 3 - - 21,375.00 21,375.00 42,750.00

115. Zamboanga West Coastal Road(Limpapa - Sibuco Road) (S01150MN)

Road Concreting Sibuco, Sirawai km. Plans and POW GAA 3 141,775.00 250,000.00 4,750.00 4,750.00 401,275.00

116. Siocon - Sirawai - Sibuco - Limpapa Road (S01165MN) Road Concreting Sibuco, Sirawai km. Plans and POW GAA 3 182,400.00 154,750.00 337,150.00

117. Siocon - Sirawai - Sibuco - Limpapa Road (S01165MN)2119+130 - 2120+3802120+995 - 2121+4602126+620 - 2128+000

Road Concreting Sibuco, Sirawai km. 3.095 Plans and POW GAA 3 - - - 154,750.00 154,750.00

118. Siocon - Sirawai - Sibuco - Limpapa Road Road Concreting Sibuco, Sirawai km. Plans and POW GAA 3 - - -

119. Zamboanga West Coastal Road(Limpapa - Sibuco Section) S01166MNChainage 4269 - Chainage 9000, Chainage 9070 - Chainage 9339

Road Concreting Sibuco, Sirawai km. Plans and POW GAA 3 - 250,000.00 250,000.00

120. Zamboanga West Coastal Road(Siocon - Sirawai - Sibuco - Limpapa Road) S01166MNChainage 6600 - Chainage 9900L = 3.3 Kms.

Road Concreting Sibuco, Sirawai km. Plans and POW GAA 3 - - -

121. Zamboanga West Coastal Road(Siocon - Sirawai - Sibuco - Limpapa Road) S01166MNChainage 9900 - Chainage 13200L = 3.3 Kms.

Road Concreting Sibuco, Sirawai km. Plans and POW GAA 3 - - 165,450.00 165,450.00 330,900.00

122. Zamboanga West Coastal Road(Sibuco - Sirawai Section) S01166MNChainage 15121 - Chainage 18430

Road Concreting Sibuco, Sirawai km. 3.309 Plans and POW GAA 3 - - 165,400.00 165,400.00

123. Zamboanga West Coastal Road(Sibuco - Sirawai Section) S01166MNChainage 12405 - Chainage 15121

Road Concreting Sibuco, Sirawai km. 2.716 Plans and POW GAA 3 - - 136,000.00 136,000.00

124. Zamboanga West Coastal Road(Sibuco - Sirawai Section) S01150MNK2009+430 - K2009+620

Road Concreting Sibuco, Sirawai km. 0.19 Plans and POW GAA 3 - - 4,750.00 4,750.00

125. Zamboanga West Coastal Road(Limpapa - Sibuco Section) S01148MNK2003+415 - K2004+040K2004+860 - K2005+090

Road Concreting Sibuco, Limpapa km. 0.855 Plans and POW GAA 3 - - 21,375.00 21,375.00

Chapter 19-1-DPWH IX-ZDN 2DEOPage 6 of 35

Page 241: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation LGU Proponent RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

126. Zamboanga West Coastal Road(Limpapa - Sibuco Section) S01148MNK1993+880 - K1995+520

Road Concreting Sibuco, Limpapa km. 1.64 Plans and POW GAA 3 - - 21,000.00 21,000.00

127. Zamboanga West Coastal Road S00014MNLintangan Approaches Road Concreting Sibuco, Limpapa km. 0.54 Plans and POW GAA 3 - - 10,750.00 10,750.00

128. Zamboanga West Coastal Road S00014MNMalayal Approaches Road Concreting Sibuco, Limpapa km. 1.566 Plans and POW GAA 3 - - 11,650.00 11,650.00

129. Zamboanga West Coastal Road S00014MNLingayon Approaches Road Concreting Sibuco, Limpapa km. 0.37 Plans and POW GAA 3 - - 10,800.00 10,800.00

130. Zamboanga West Coastal Road S00014MNLimpapa Approaches Road Concreting Sibuco, Limpapa km. 0.01 Plans and POW GAA 3 - - 15,000.00 15,000.00

c. Tertiary Road - 131. ZNAC Access Road Road Concreting Tampilisan km. Plans and POW GAA 3 - - - 132. Liloy - Lamao Port Road Road Concreting Liloy km. Plans and POW GAA 3 - - -

(iv) Construction and Maintenance of Bridges along National Roads - 1. Construction of New Bridge -

133. Bogabongan Br. 2 Along Sindangan - Liloy Road, Zamboanga del Norte

Construction of new Bridge Leon Postigo sq.m. Plans and POW GAA 3 36,000.00 - 36,000.00

134. Mangop Br. 2 Along Sindangan - Liloy Road, Zamboanga del Norte Construction of

new Bridge Leon Postigo sq.m. Plans and POW GAA 3 35,000.00 - 35,000.00

135. Sebongan Bridge along Sirawai - Sibuco Road

Construction of new Bridge Leon Postigo sq.m. Plans and POW GAA 3 - 32,210.00 32,210.00 64,420.00

136. Bitugan Bridge along Sirawai - Sibuco Road, Zamboang del Norte Construction of

new Bridge Sibuco sq.m. Plans and POW GAA 3 - -

137. Lingayon Bridge along Zambonga West Coast Road (Limpapa - Sibuco Section)

Construction of new Bridge Sibuco sq.m. Plans and POW GAA 3 - 60,000.00 60,000.00 120,000.00

138. Liyang Nahut Bridge along Zamboanga West Coastal Road (Limpapa-Sibuco Section)

Construction of new Bridge Sibuco sq.m.

246.51 Plans and POW GAA 3

26,840.00 26,840.00

139. Lambaguan Bridge along Zamboanga West Coastal Road (Limpapa-Sibuco Section)

Construction of new Bridge Sibuco sq.m.

294.21 Plans and POW GAA 3

32,210.00 32,210.00

140. Sibungon Bridge along Zamboanga West Coastal Road (Limpapa-Sibuco Section)

Construction of new Bridge Sibuco sq.m.

294.21 Plans and POW GAA 3

32,210.00 32,210.00

2. Replacement of Temporary Bridge to Pemanent - 141. Nonoyan Bridge along Liloy -

Siocon Road, Nonoyan Baliguian, Zamboang del Norte

Replacement of Bridge Baliguian sq.m. Plans and POW GAA 3 - -

142. Gacsod Bridge along Gutalac Road, Zamboang del Norte

Replacement of Bridge Gutalac sq.m. Plans and POW GAA 3 - -

3. Rehabilitation of Permanent Bridge - a. Primary Road - I. All Bridges along Sindangan - Liloy Road -

Chapter 19-1-DPWH IX-ZDN 2DEOPage 7 of 35

Page 242: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation LGU Proponent RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

143. Milawid Br. (BOO516MN) Rehabilitation/ Major Repair of

BridgeLeon Postigo sq.m. Plans and POW GAA 3 - - -

Milanid Br. (BOO516MN)144. Bacugan Br. (BOO517MN) Rehabilitation/

Major Repair of Bridge

Leon Postigo sq.m. Plans and POW GAA 3 - - 30,000.00 30,000.00 60,000.00

145. Delusom Br. (BOO518MN) Rehabilitation/ Major Repair of

BridgeLeon Postigo sq.m. Plans and POW GAA 3 - - -

146. Manil Br. (BOO519MN) Rehabilitation/ Major Repair of

BridgeLeon Postigo sq.m. Plans and POW GAA 3 - - 5,000.00 5,000.00 10,000.00

147. Delotoc Br. (BOO520MN) Rehabilitation/ Major Repair of

BridgeLeon Postigo sq.m. Plans and POW GAA 3 15,000.00 - 15,000.00

148. Mangop Br. (BOO521MN) Rehabilitation/ Major Repair of

BridgeLeon Postigo sq.m. Plans and POW GAA 3 4,000.00 - 4,000.00

149. Bugabongan Br. (BOO522MN) Rehabilitation/ Major Repair of

BridgeLeon Postigo sq.m. Plans and POW GAA 3 6,000.00 - 6,000.00

Bogabongan Br. (BOO522MN)150. Polandoc Br. (BOO523MN) Rehabilitation/

Major Repair of Bridge

Salug sq.m. Plans and POW GAA 3 20,000.00 - 20,000.00

151. Lipakan Br. (BOO524MN) Rehabilitation/ Major Repair of

BridgeSalug sq.m. Plans and POW GAA 3 10,000.00 - 10,000.00

152. Simukoy Br. (BOO525MN) Rehabilitation/ Major Repair of

BridgeSalug sq.m. Plans and POW GAA 3 - - 5,000.00 5,000.00 10,000.00

153. Canawan Br. (BOO526MN) Rehabilitation/ Major Repair of

BridgeSalug sq.m. Plans and POW GAA 3 - - 5,000.00 5,000.00 10,000.00

154. Caracol Br. (BOO527MN) Rehabilitation/ Major Repair of

BridgeSalug sq.m. Plans and POW GAA 3 5,000.00 - 5,000.00

155. Salug Br. (BOO528MN) Rehabilitation/ Major Repair of

BridgeSalug sq.m. Plans and POW GAA 3 10,000.00 - 10,000.00

156. Mucas Br. (BOO529MN) Rehabilitation/ Major Repair of

BridgeLiloy sq.m. Plans and POW GAA 3 - - -

157. Kayok Br. (BOO530MN) Rehabilitation/ Major Repair of

BridgeLiloy sq.m. Plans and POW GAA 3 - - -

158. Timan Br. (BOO531MN) Rehabilitation/ Major Repair of

BridgeLiloy sq.m. Plans and POW GAA 3 - - -

II. All Bridges along Liloy - Ipil Road GAA 3 - 159. Molos Br. (BOO532MN) Rehabilitation/

Major Repair of Bridge

Tampilisan sq.m. Plans and POW GAA 3 5,000.00 5,000.00

160. Calimpunan Br. (BOO533MN) Rehabilitation/ Major Repair of

BridgeTampilisan sq.m. Plans and POW GAA 3 - - 5,000.00 5,000.00 10,000.00

161. Patawag Br. (BOO534MN) Rehabilitation/ Major Repair of

BridgeTampilisan sq.m. Plans and POW GAA 3 - - 5,000.00 5,000.00 10,000.00

Chapter 19-1-DPWH IX-ZDN 2DEOPage 8 of 35

Page 243: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation LGU Proponent RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

162. Gatas Br. (BOO535MN) Rehabilitation/ Major Repair of

BridgeTampilisan sq.m. Plans and POW GAA 3 10,000.00 - 10,000.00

III. All Bridges along Liloy - Siocon Road - 163. Gayam Br. (BO1174MN) Rehabilitation/

Major Repair of Bridge

Liloy sq.m. Plans and POW GAA 3 5,000.00 - 5,000.00

164. Ganasi Br. (BO1175MN) Rehabilitation/ Major Repair of

BridgeLiloy sq.m. Plans and POW GAA 3 5,000.00 - 5,000.00

165. Patawag Br. (BO1177MN) Rehabilitation/ Major Repair of

BridgeLiloy sq.m. Plans and POW GAA 3 - - -

166. Bobongan Br. (BO1178MN) Rehabilitation/ Major Repair of

BridgeLiloy sq.m. Plans and POW GAA 3 15,000.00 - 15,000.00

167. Lopoc Br. (BO1179MN) Rehabilitation/ Major Repair of

BridgeLabason sq.m. Plans and POW GAA 3 - - -

168. Labason Br. (BO1180MN) Rehabilitation/ Major Repair of

BridgeLabason sq.m. Plans and POW GAA 3 - - -

169. Osukan Br. (BO1181MN) Rehabilitation/ Major Repair of

BridgeLabason sq.m. Plans and POW GAA 3 - - -

170. Kipit Br. 1 (BO1182MN) Rehabilitation/ Major Repair of

BridgeLabason sq.m. Plans and POW GAA 3 - 5,000.00 5,000.00

171. Kipit Br. 2 (BO1183MN) Rehabilitation/ Major Repair of

BridgeLabason sq.m. Plans and POW GAA 3 - 10,000.00 10,000.00

172. Lux Br. 1 (BO1184MN) Rehabilitation/ Major Repair of

BridgeGutalac sq.m. Plans and POW GAA 3 - 2,500.00 2,500.00

173. Lux Br. 2 (BO1185MN) Rehabilitation/ Major Repair of

BridgeGutalac sq.m. Plans and POW GAA 3 - 2,500.00 2,500.00

174. Gutalac Br. (BO1186MN) Rehabilitation/ Major Repair of

BridgeGutalac sq.m. Plans and POW GAA 3 - - -

175. Sibalic Br. (BO1187MN) Rehabilitation/ Major Repair of

BridgeGutalac sq.m. Plans and POW GAA 3 - - -

176. Brazil Br. (BO1188MN) Rehabilitation/ Major Repair of

BridgeBaliguian sq.m. Plans and POW GAA 3 - - -

177. Siocon Br. (BO1189MN) Rehabilitation/ Major Repair of

BridgeSiocon sq.m. Plans and POW GAA 3 - - -

IV. All Bridges along Siocon - Sirawai - Sibuco - Limpapa Road GAA 3 - 178. Tugbungan Br. (BO1637MN) Rehabilitation/

Major Repair of Bridge

Baliguian sq.m. Plans and POW GAA 3 - - -

179. San Vicente Br. (BO1589MN) Rehabilitation/ Major Repair of

Bridgesq.m. Plans and POW GAA 3 - - -

4. Retrofitting/Strengthening of Permanent Bridge - I. All Bridges along Liloy - Siocon Road -

Chapter 19-1-DPWH IX-ZDN 2DEOPage 9 of 35

Page 244: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation LGU Proponent RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

180. Gayam Br. (BO1174MN) Retrofitting/Strengthening Liloy sq.m. Plans and POW GAA 3 - - -

181. Ganasi Br. (BO1175MN) Retrofitting/Strengthening Liloy sq.m. Plans and POW GAA 3 - - -

182. Patawag Br. (BO1177MN) Retrofitting/Strengthening Liloy sq.m. Plans and POW GAA 3 - - -

183. Bobongan Br. (BO1178MN) Retrofitting/Strengthening Liloy sq.m. Plans and POW GAA 3 - - -

184. Lopoc Br. (BO1179MN) Retrofitting/Strengthening Labason sq.m. Plans and POW GAA 3 - - -

185. Labason Br. (BO1180MN) Retrofitting/Strengthening Labason sq.m. Plans and POW GAA 3 - - -

186. Osukan Br. (BO1181MN) Retrofitting/Strengthening Labason sq.m. Plans and POW GAA 3 - - -

187. Kipit Br. 1 (BO1182MN) Retrofitting/Strengthening Labason sq.m. Plans and POW GAA 3 - - -

188. Kipit Br. 2 (BO1183MN) Retrofitting/Strengthening Labason sq.m. Plans and POW GAA 3 - - -

189. Lux Br. 1 (BO1184MN) Retrofitting/Strengthening Gutalac sq.m. Plans and POW GAA 3 - - -

190. Lux Br. 2 (BO1185MN) Retrofitting/Strengthening Gutalac sq.m. Plans and POW GAA 3 - - -

191. Gutalac Br. (BO1186MN) Retrofitting/Strengthening Gutalac sq.m. Plans and POW GAA 3 - - -

192. Sibalic Br. (BO1187MN) Retrofitting/Strengthening Gutalac sq.m. Plans and POW GAA 3 - 5,000.00 5,000.00

193. Brazil Br. (BO1188MN) Retrofitting/Strengthening Baliguian sq.m. Plans and POW GAA 3 - - -

194. Siocon Br. (BO1189MN) Retrofitting/Strengthening Siocon sq.m. Plans and POW GAA 3 - - -

5. Widening of Permanent Bridges - I. All Bridges along Sindangan - Liloy Road -

195. Milanid Br. (BOO516MN) Widening of Bridges Leon Postigo sq.m. Plans and POW GAA 3 - 24,748.00 24,748.00

196. Bacungan Br. (BOO517MN) Widening of Bridges Leon Postigo sq.m. Plans and POW GAA 3 - 24,795.00 24,795.00

197. Delusom Br. (BOO518MN) Widening of Bridges Leon Postigo sq.m. Plans and POW GAA 3 - 39,283.00 39,283.00

198. Manil Br. (BOO519MN) Widening of Bridges Leon Postigo sq.m. Plans and POW GAA 3 - - 42,000.00 42,000.00 84,000.00

199. Mangop Br. (BOO521MN) Widening of Bridges Leon Postigo sq.m. Plans and POW GAA 3 - -

200. Bugabongan Br. (BOO522MN) Widening of Bridges Leon Postigo sq.m. Plans and POW GAA 3 - - Bogabongan Br. (BOO522MN)

201. Polandoc Br. (BOO523MN) Widening of Bridges Salug sq.m. Plans and POW GAA 3 - - 227,000.00 227,000.00 454,000.00

202. Lipakan Br. (BOO524MN) Widening of Bridges Salug sq.m. Plans and POW GAA 3 - - 76,000.00 76,000.00 152,000.00

203. Simokoy Br. (BOO525MN) Widening of Bridges Salug sq.m. Plans and POW GAA 3 - - - Simukoy Br. (BOO525MN)

204. Canawan Br. (BOO526MN) Widening of Bridges Salug sq.m. Plans and POW GAA 3 - - 43,212.00 39,440.00 39,440.00 122,092.00

205. Caracol Br. (BOO527MN) Widening of Bridges Salug sq.m. Plans and POW GAA 3 - 22,800.00 22,800.00

206. Salug Br. (BOO528MN) Widening of Bridges Salug sq.m. Plans and POW GAA 3 - 80,446.00 80,446.00

Chapter 19-1-DPWH IX-ZDN 2DEOPage 10 of 35

Page 245: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation LGU Proponent RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

207. Mucas Br. (BOO529MN) Widening of Bridges Liloy sq.m. Plans and POW GAA 3 - 42,750.00 42,750.00

208. Patawag Br. (BOO534MN) Widening of Bridges Tampilisan sq.m. Plans and POW GAA 3 - - 24,000.00 24,000.00 48,000.00 Patawag Br. Is along Liloy-Ipil Road

209. Calimpunan Br. (BOO533MN) Widening of Bridges Kalawit sq.m. Plans and POW GAA 3 - - 33,000.00 33,000.00 66,000.00 Calimpunan Br. Is along Liloy-Ipil Road

210. Gatas Br. (BOO535MN) Widening of Bridges Kalawit sq.m. Plans and POW GAA 3 - - 56,000.00 56,000.00 112,000.00 Gatas Br. Is along Liloy-Ipil Road

211. Kayok Br. (BOO530MN) Widening of Bridges Liloy sq.m. Plans and POW GAA 3 - - -

212. Timan Br. (BOO531MN) Widening of Bridges Liloy sq.m. Plans and POW GAA 3 - - 17,970.00 17,970.00 35,940.00

II. All Bridges along Liloy - Ipil Road - 213. Molos Br. (B00532MN) Widening of

Bridges Tampilisan sq.m. Plans and POW GAA 3 33,678.00 33,678.00

2,334,932.00 1,752,583.00 118,696.00 3,576,041.00 7,696,234.00 2,383,580.00 17,862,066.00 OO2: Protect Lives and Properties Against Major Floods -

1. Construction/Maintenance of Flood Mitigation Structures and Drainage System - 214. River Control along the Camp

Ofelia Easement and Malayal Side along the Concrete Abtiment of Bridge, Malayal, Sibuco, Zamboanga del Norte

Construction of Flood mitigation

structureLabason, ZN sq.m. Plans and POW GAA 3 - -

Duplication of Entry (No. 225)

215. Rehablitation/Construction/Improvement/ River Control with pile boarding from Calle Dapitan to Cebu River TC Bridge, Poblacion, Sibuco, Zamboanga del Norte

Construction of Flood mitigation

structureLabason, ZN sq.m. Plans and POW GAA 3 - 100,000.00 105,000.00 100,000.00 305,000.00

Specific Location (Column): Sibuco, ZN

216. Construction of Labason River Control, Poblacion, Labason, Zamboanga del Norte 3rd LD

Construction of Flood mitigation

structureLabason, ZN sq.m. Plans and POW GAA 3 100,000.00 100,000.00

217. Construction of River Control along Kipit River, Brgy. Kipit, Labason, Zamboanga del Norte 3rd LD

Construction of Flood mitigation

structureLabason, ZN sq.m. Plans and POW GAA 3 95,000.00 95,000.00

218. Baybay Liloy Seawall Construction of Flood mitigation

structureLiloy, ZN sq.m. Plans and POW GAA 3 - 110,000.00 110,000.00

219. Construction/Extension of Flood Control Structure along Siocon River (Downstream), Siocon, Zamboanga del Norte, L = 917 lm.

Construction of Flood mitigation

structureLiloy, ZN sq.m. Plans and POW GAA 3 - 109,213.00 109,213.00

Specific Location (Column): Siocon, ZN

220. Construction/Extension of Flood Control Structure along Siocon River (Upstream), Siocon, Zamboanga del Norte, L = 963 lm.

Construction of Flood mitigation

structureLiloy, ZN sq.m. Plans and POW GAA 3 - 105,000.00 130,000.00 130,000.00 150,000.00 515,000.00

Specific Location (Column): Siocon, ZN

221. Construction of Salug River Control at Salug Bridge, Salug ZN 3LD

Construction of Flood mitigation

structureLiloy, ZN sq.m. Plans and POW GAA 3 - 150,000.00 150,000.00 300,000.00

Specific Location (Column): Salug, ZN

222. Rehabilitation of Labason Flood Control at Antonino, Labason ZN 3LD

Construction of Flood mitigation

structureLiloy, ZN sq.m. Plans and POW GAA 3 - - 120,000.00 120,000.00 120,000.00 360,000.00

Specific Location (Column): Labason, ZN

223. Construction of Palandok Seawall, Leon Postigo, Zamboanga del Norte

Construction of Flood mitigation

structureLiloy, ZN sq.m. Plans and POW GAA 3 - 25,000.00 112,000.00 100,000.00 237,000.00

Specific Location (Column): Leon B. Postigo, ZN

001 - Subtotal

Chapter 19-1-DPWH IX-ZDN 2DEOPage 11 of 35

Page 246: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation LGU Proponent RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

224. Construction of Flood Control at Talinga River, Leon Postigo (donwstream & upstream)

Construction of Flood mitigation

structureLiloy, ZN sq.m. Plans and POW GAA 3 - - 100,000.00 120,000.00 120,000.00 340,000.00

Specific Location (Column): Leon B. Postigo, ZN

225. River Control along the Camp Ofelia Easement and Malayal Side along the Concrete Abtiment of Bridge, Malayal, Sibuco, Zamboanga del Norte

Construction of Flood mitigation

structureLiloy, ZN sq.m. Plans and POW GAA 3 - - 100,000.00 116,000.00 150,000.00 366,000.00

River Control along the Camp Ofelia Easement and Malayal Side along the Concrete Abutment of Bridge, Malayal, Sibuco, Zamboanga del Norte

Location: Sibuco, ZN

226. Construction of River Control , Imelda, Labason, Zamboanga del Norte, L = 276 lm.

Construction of Flood mitigation

structureImelda, ZN sq.m. Plans and POW GAA 3 - 150,100.00 150,100.00

Specific Location (Column): Imelda, Labason, ZN

227. Construction of Flood Control at Patawag River (donwstream & upstream), Liloy and Labason, Zamboanga del Norte

Construction of Flood mitigation

structure

Liloy & Labason, ZN sq.m. Plans and POW GAA 3 114,000.00 114,000.00

228. Construction of Malayal Revetment Bunk Protection Works , Malayal, Sibuco, Zamboanga del Norte

Construction of Flood mitigation

structureSibuco, ZN sq.m. Plans and POW GAA 3 134,650.00 134,650.00

229. Construction of River Control at Lintangan River, Sibuco, Zamboanga del Norte

Construction of Flood mitigation

structureSibuco, ZN sq.m. Plans and POW GAA 3 115,000.00 115,000.00

230. Construction of Flood Control at Mucas River (Both Sides), Salug, Zamboanga del Norte

Construction of Flood mitigation

structureSalug, ZN sq.m. Plans and POW GAA 3 118,000.00 118,000.00

231. Construction of Flood Control at Bacungan River (Both Sides), Leon Postigo, Zamboanga del Norte Construction of

Flood mitigation structure

Leon B. Postigo, ZN sq.m. Plans and POW GAA 3 150,000.00 150,000.00

232. Construction of River Control along Polandok River (Both Sides), Leon B. Postigo, Zamboanga del Norte

Construction of Flood mitigation

structure

Leon B. Postigo, ZN sq.m. Plans and POW GAA 3 104,000.00 104,000.00

195,000.00 499,313.00 - 550,000.00 1,588,650.00 890,000.00 3,722,963.00 c. Convergence and Special Support Program -

1. Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - 233. a. Construction of Jetty Ports Road concreting

inlcluding drainage

km. Plans and POW GAA 3 - - 30,000.00 30,000.00 30,000.00 90,000.00

234. b. Construction of Jetty Ports Road concreting inlcluding drainage

km. Plans and POW GAA 3 - - 20,000.00 20,000.00 20,000.00 60,000.00

235. Construction of Jetty Ports Road concreting inlcluding drainage

Labason, ZN km. Plans and POW GAA 3 - - 7,000.00 7,000.00 7,000.00 21,000.00

236. Concreting of Jct. Nat'l Highway - Bobongan Blvd.

Road concreting inlcluding drainage

Labason, ZN km. Plans and POW GAA 3 - - 11,550.00 11,550.00 11,550.00 34,650.00

002- Subtotal

Poblacion, Labason ZN

Chapter 19-1-DPWH IX-ZDN 2DEOPage 12 of 35

Page 247: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation LGU Proponent RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

237. Concreting of Pob. LBP - Tiniguiban Road

Road concreting inlcluding drainage

Leon B. Postigo km. Plans and POW GAA 3 - - 50,000.00 50,000.00 50,000.00 150,000.00

238. Concreting of Pob. Salug - Masak Road

Road concreting inlcluding drainage

Salug, ZN km. Plans and POW GAA 3 - - 50,000.00 50,000.00 50,000.00 150,000.00

239. Concreting of Brgy. Tinuyop to Brgy. Nasibac, Leon B. Postigo, Zamboanga del Norte

Road concreting inlcluding drainage

Tampilisan, ZN km. Plans and POW GAA 3 - - 50,000.00 50,000.00 50,000.00 150,000.00 Specific Location (Column): Leon B. Postigo

240. Road Concreting from Municipal Road to Philippine Carabao Center Jct. Kalawit, Zamboanga del Norte

Road concreting inlcluding drainage

Tampilisan, ZN km. Plans and POW GAA 3 - - 20,000.00 20,000.00 20,000.00 60,000.00

Specific Location (Column): Kalawit

241. Proposed Concreting of Junction National Highway (Sindangan-Liloy Road) Brgy. Delusom - Brgy. Nasibac leading to Baga Falls, Nasibac, Leon B. Postigo, ZN

Road concreting inlcluding drainage

Leon B. Postigo km. Plans and POW GAA 3 50,000.00 50,000.00 50,000.00 150,000.00

242. Concreting of Road from Junction National Highway (Sindangan-Lliloy Road) leading to Timan Beach, Brgy. Timan, Liloy, Zamboanga del Norte

Road concreting inlcluding drainage

Liloy km. Plans and POW GAA 3 12,500.00 12,500.00 12,500.00 37,500.00

243. Concreting of Road from Junction National Highway (Liloy-Siocon Road) to Brgy. Punta and Sta. Cruz Beach, Liloy, Zamboanga del Norte

Road concreting inlcluding drainage

Liloy km. Plans and POW GAA 3 60,000.00 60,000.00 60,000.00 180,000.00

244. Concreting of Road from Junction National Highway (Liloy-Siocon Road) to Brgy. Banigan leading to Solaj Beach Resort-Charcoal Beach, Zamboanga del Norte

Road concreting inlcluding drainage

Liloy km. Plans and POW GAA 3 25,000.00 25,000.00 25,000.00 75,000.00

245. Concreting of Road from Junction National Highway (Liloy-Siocon Road) leading to Patawag Beach, Brgy. Patawag, Liloy, Zamboanga del Norte

Road concreting inlcluding drainage

Liloy km. Plans and POW GAA 3 12,500.00 12,500.00 12,500.00 37,500.00

246. Concreting of Road from Junction National Highway (Liloy-Siocon Road) leading to Banigan Beach, Brgy. Banigan, Liloy, Zamboanga del Norte

Road concreting inlcluding drainage

Liloy km. Plans and POW GAA 3 50,000.00 50,000.00 50,000.00 150,000.00

247. Concreting of Road from Junction National Highway (Liloy-Siocon Road) leading to San Miguel Beach, Brgy. San Miguel, Liloy, Zamboanga del Norte

Road concreting inlcluding drainage

Liloy km. Plans and POW GAA 3 60,000.00 60,000.00 60,000.00 180,000.00

248. Concreting of Road from Junction National Highway (Liloy-Siocon Road) leading to Villa M. Tejero Beach, Llioy, Zamboanga del Norte

Road concreting inlcluding drainage

Llioy km. Plans and POW GAA 3 20,000.00 20,000.00 20,000.00 60,000.00

Chapter 19-1-DPWH IX-ZDN 2DEOPage 13 of 35

Page 248: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation LGU Proponent RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

249. Concreting of Road from Junction National Highway (Liloy-Lamao Port Road) to Bitoon Beach, Lamao, Liloy, Zamboanga del Norte

Road concreting inlcluding drainage

Liloy km. Plans and POW GAA 3 20,000.00 20,000.00 20,000.00 60,000.00

250. Concreting of Road from Junction National Highway (Liloy-Siocon Road) to Dansalan Beach, Labason, Zamboanga del Norte

Road concreting inlcluding drainage

Labason km. Plans and POW GAA 3 50,000.00 50,000.00 50,000.00 150,000.00

251. Concreting of Osukan National Highway-Osukan Beach

Road concreting inlcluding drainage

Labason km. Plans and POW GAA 3 18,500.00 18,500.00 18,500.00 55,500.00

252. Concreting of Junction National Highway (Liloy-Siocon Road) - Poblacion Kalawit leading to Kalawit Lake, Kalawit, Zamboanga del Norte

Road concreting inlcluding drainage

Liloy & Kalawit km. Plans and POW GAA 3 10,000.00 10,000.00 10,000.00 30,000.00

253. Poblacion, Tampilisan - Situbo Road

Road concreting inlcluding drainage

Tampilisan, ZN km. Plans and POW GAA 3 - - -

254. Concreting of Access Road to Miampic Cave

Road concreting inlcluding drainage

Salug, ZN km. Plans and POW GAA 3 - - 50,000.00 50,000.00 50,000.00 150,000.00

255. Concreting of Access Road to Dulongin Beaach

Road concreting inlcluding drainage

Siocon, ZN km. Plans and POW GAA 3 - - 50,000.00 50,000.00 50,000.00 150,000.00

256. Concreting of Jct. Nat'l Highway - Maja Beach

Road concreting inlcluding drainage

Labason, ZN km. Plans and POW GAA 3 - - 50,000.00 50,000.00 50,000.00 150,000.00

257. Concreting of Pob. Liloy - Punta Road

Road concreting inlcluding drainage

Liloy, ZN km. Plans and POW GAA 3 - - 50,000.00 50,000.00 50,000.00 150,000.00

258. Concreting of Access Road - ZNAC Falls

Road concreting inlcluding drainage

Tampilisan, ZN km. Plans and POW GAA 3 - - 50,000.00 50,000.00 50,000.00 150,000.00

259. Concreting of Access Road to Conception Falls

Road concreting inlcluding drainage

Kalawit, ZN km. Plans and POW GAA 3 - - 61,700.00 61,700.00 61,700.00 185,100.00

260. Concreting of Access Road to Mt. Gampoy Falls

Road concreting inlcluding drainage

Kalawit, ZN km. Plans and POW GAA 3 - - 15,500.00 15,500.00 15,500.00 46,500.00

261. Concreting of Access Road Junction Poblacion Tampilisan - Brgy. Situbo leading to Situbo Falls

Road concreting inlcluding drainage

Situbo, ZN km. Plans and POW GAA 3 - - 23,360.00 23,360.00 23,360.00 70,080.00

262. Concreting of Access Road Junction National Highway - Barangay San Juan leading to Maja Beach Resort

Road concreting inlcluding drainage

San Juan, ZN km. Plans and POW GAA 3 - - 62,500.00 62,500.00 62,500.00 187,500.00

Specific Location: San Juan, Gutalac, ZDN

2. Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones - 263. Brgy. San Jose Road leading to San

Jose Multi-Purpose Cooperative, in support of Agribusiness: Rice and Rubber, Kalawit, Zamboanga del Norte

Road concreting inlcluding drainage

Kalawit, ZN km. Plans and POW GAA 3 - 75,000.00 75,000.00

Chapter 19-1-DPWH IX-ZDN 2DEOPage 14 of 35

Page 249: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation LGU Proponent RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

264. Jct. National Highway–Brgy. Morob, in support of Bamboo Craft, Leon T. Postigo, Zamboanga del Norte

Road concreting inlcluding drainage

Leon Postigo, ZN km. Plans and POW GAA 3 - 125,000.00 125,000.00

265. Improvement/Concreting of Makot-Tan-awan Road connecting Baliguian Coastal Road and Baliguian National Highway Junction in support to coconut, cacao and rubber industries, Baliguian, Zamboanga del Norte

Road concreting inlcluding drainage

Dansalan, Labason, ZN km. Plans and POW GAA 3 - - 50,000.00 50,000.00 50,000.00 150,000.00

Specific Location (Column): Baliguian

266. Improvement/Concreting of Ubay San Isidro (PR) Purok 3, Ubay-El Siquijor in support to abaca industry, San Isidro, Godod, Zamboanga del Norte

Road concreting inlcluding drainage

Labason, ZN km. Plans and POW GAA 3 - - 75,000.00 75,000.00 75,000.00 225,000.00

Revision of Project Title:

Improvement/Concreting of Brgy. Ubay - San Isidro connecting Purok 3, Ubay-Sitio El Siquijor, San Isidro in support to coconut and cacao industries, Labason, Zamboanga del Norte

267. Improvement/Concreting of Junction Poblacion Godod Road in support to rubber industry, Godod, Zamboanga del Norte

Road concreting inlcluding drainage

Siocon, ZN km. Plans and POW GAA 3 - - 50,000.00 50,000.00 50,000.00 150,000.00

Specific Location (Column): Godod

Revision of Project Title:

Improvement/Concreting of Junction Poblacion Godod to Bunawan Road in support to rubber industry, Godod, Zamboanga del Norte

268. Improvement/Concreting of Junction National Highway (Liloy-Siocon Road) to Barangay Immaculada Conception in support to cacao, coconut and abaca industries, Gutalac, Zamboanga del Norte

Road concreting inlcluding drainage

Siocon, ZN km. Plans and POW GAA 3 - - 75,000.00 75,000.00 75,000.00 225,000.00

Specific Location (Column): Gutalac

269. Improvement/Concreting of Junction National Highway (Liloy-Siocon Road) to Barangay Bagong Silang inn support to cacao and coconut industries, Gutalac, Zamboanga del Norte

Road concreting inlcluding drainage

Siocon, ZN km. Plans and POW GAA 3 - - 75,000.00 75,000.00 75,000.00 225,000.00

Specific Location (Column): Gutalac

270. Improvement/Concreting of Junction National Highway (Liloy-Siocon Road) to Barangay Sto. Niño in support to cacao, coconut and abaca industries, Gutalac, Zamboanga del Norte

Road concreting inlcluding drainage

Dansalan, Labason, ZN km. Plans and POW GAA 3 - - 75,000.00 75,000.00 75,000.00 225,000.00

Specific Location (Column): Gutalac

271. Improvement/Concreting of Junction National Highway to Barangay San Juan in support to coconut and rubber industries, Gutalac, Zamboanga del Norte

Road concreting inlcluding drainage

Liloy, Siocon, ZN km. Plans and POW GAA 3 - - 75,000.00 75,000.00 75,000.00 225,000.00

Specific Location (Column): Gutalac

Chapter 19-1-DPWH IX-ZDN 2DEOPage 15 of 35

Page 250: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation LGU Proponent RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

272. Improvement/Concreting of Junction National Highway (Liloy-Siocon Road) Barangay Canuto Enerio in support to cacao, coconut and abaca industries, Gutalac, Zamboanga del Norte

Road concreting inlcluding drainage

Godod, ZN km. Plans and POW GAA 3 - - 73,800.00 73,800.00 73,800.00 221,400.00

Specific Location (Column): Gutalac

273. Improvement/Concreting of Provincial Road leading to Livelihood Incubator for Enterprise (LIFE) in support to coconut and cacao industries, Barangay Dansalan, Labason, Zamboanga del Norte

Road concreting inlcluding drainage

Dapitan, ZN km. Plans and POW GAA 3 - - 75,000.00 75,000.00 75,000.00 225,000.00

Specific Location (Column): Labason

274. Improvement/Concreting of Junction National Secondary Highway (Liloy-Siocon) - Labason Small Coconut Farmers and Farm Workers Multi Purpose Cooperative, in support to coconut industry, Dansalan, Labason, ZDN

Road concreting inlcluding drainage

Tampilisan, ZN km. Plans and POW GAA 3 - - 40,000.00 40,000.00 40,000.00 120,000.00

Specific Location (Column): Labason

275. Improvement/Concreting of Barangay Lawigan to Brgy. Gabo Road in support to cacao, coconut, coffee and rubber industries, Labason, Zamboanga del Norte

Road concreting inlcluding drainage

Siocon, ZN km. Plans and POW GAA 3 - - 67,000.00 67,000.00 67,000.00 201,000.00

Specific Location (Column): Labason

276. Improvement/Concreting of Barangay Kipit to Brgy. New Salvacion Road in support to cacao, coconut, coffee and rubber industries, Labason, Zamboanga del Norte

Road concreting inlcluding drainage

Siocon, ZN km. Plans and POW GAA 3 - - 40,000.00 40,000.00 40,000.00 120,000.00

Specific Location (Column): Labason

277. Improvement/Concreting of Barangay San Isidro Road in support to cacao and coconut industries, Labason, Zamboanga del Norte

Road concreting inlcluding drainage

Siocon, ZN km. Plans and POW GAA 3 - - 30,000.00 30,000.00 30,000.00 90,000.00

Specific Location (Column): Labason

278. Improvement/Concreting of Barangay Lapatan to Brgy. Gabu Road in support to cacao, coconut, coffee and rubber industries, Labason, Zamboanga del Norte

Road concreting inlcluding drainage

Dansalan, Labason, ZN km. Plans and POW GAA 3 - - 30,000.00 30,000.00 30,000.00 90,000.00

Specific Location (Column): Labason

279. Improvement/Concreting of El Paraiso - Compra Road in support to rubber and coconut industries, Liloy, Zamboanga del Norte

Road concreting inlcluding drainage

Labason, ZN km. Plans and POW GAA 3 - - 30,000.00 30,000.00 30,000.00 90,000.00

Specific Location (Column): Liloy

280. Improvement/Concreting of San Roque - Overview Road in support to rubber and coconut industries, Liloy, Zamboanga del Norte

Road concreting inlcluding drainage

Siocon, ZN km. Plans and POW GAA 3 - - 70,000.00 70,000.00 70,000.00 210,000.00

Specific Location (Column): Liloy

Chapter 19-1-DPWH IX-ZDN 2DEOPage 16 of 35

Page 251: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation LGU Proponent RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

281. Improvement/Concreting of Brgy. El Paraiso - Brgy. Comunal Road in support to rubber and coconut industries, Liloy, Zamboanga del Norte

Road concreting inlcluding drainage

Siocon, ZN km. Plans and POW GAA 3 - - 40,000.00 40,000.00 40,000.00 120,000.00

Specific Location (Column): Liloy

282. Improvement/Concreting of Brgy. San Roque - Brgy. San Isidro Road in support of coconut industry, Liloy, Zamboanga del Norte

Road concreting inlcluding drainage

Siocon, ZN km. Plans and POW GAA 3 - - 40,000.00 40,000.00 40,000.00 120,000.00

Specific Location (Column): Liloy

283. Improvement/concreting of Access Road at New Dapitan to Molos connecting National Highway leading to AMARISA in support to Coconut and Rubber Industries, Tampilisan, Zamboanga del Norte

Road concreting inlcluding drainage

Dansalan, Labason, ZN km. Plans and POW GAA 3 - - 40,000.00 40,000.00 40,000.00 120,000.00

Specific Location (Column): Tampilisan

284. Improvement/concreting of Junction Brgy. Situbo to Brgy. Tubod connecting to secondary national highway leading to Situbo Famers Rubber Association (SFRA) in support to Coconut and Rubber Industries, Tampilisan, Zamboanga del Norte

Road concreting inlcluding drainage

Liloy, Siocon, ZN km. Plans and POW GAA 3 - - 50,000.00 50,000.00 50,000.00 150,000.00

Specific Location (Column): Tampilisan

285. Improvement/concreting of Access Road at New- Barili to Junction Sto. Niño, connecting to National Highway leading to Standard Rubber Processing Inc. (STANDECO) in support to Rubber and Coconut Industries, Tampilisan, Zamboanga del Norte

Road concreting inlcluding drainage

Godod, ZN km. Plans and POW GAA 3 - - 65,000.00 65,000.00 65,000.00 195,000.00

Specific Location (Column): Tampilisan

286. Improvement/Concreting of Jct. Sitio Greenridge-Barangay New Lituban connecting to Provincial Road to Sitio Guisakan (Barangay Dionisio Riconalla) via Barangay Makiang leading to Siocon Abaca Service Provider in support to abaca, rubber and coconut industries, Siocon, ZDN

Road concreting inlcluding drainage

Dapitan, ZN km. Plans and POW GAA 3 - - 40,000.00 40,000.00 40,000.00 120,000.00

Specific Location (Column): Siocon

287. Improvement/Concreting of Jct. Sitio Makiang Tabuk (Barangay Makiang ) connecting to the Provincial Road to Barangays New Lituban, Bulacan and Pisawak leading to Zanorte Muslim-Christian-Highlanders' Association in support to Abaca Processing Center/Storage Facility and coconut industries, Siocon, ZDN

Road concreting inlcluding drainage

Tampilisan, ZN km. Plans and POW GAA 3 - - 25,000.00 25,000.00 25,000.00 75,000.00

Specific Location (Column): Siocon

Chapter 19-1-DPWH IX-ZDN 2DEOPage 17 of 35

Page 252: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation LGU Proponent RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

288. Improvement/Concreting of Jct. Sitio Matimbang and Sitio Greenridge (Brgy New Lituban) to Sitio Matunoy (Brgy. A.L. Micubo Sr.) via Sitio Kalayuhan (Brgy. Pangian) connecting to National highway leading to MNLF Outer 5 Association in support to abaca andcoconut industries, Siocon, ZDN

Road concreting inlcluding drainage

Siocon, ZN km. Plans and POW GAA 3 - - 40,000.00 40,000.00 40,000.00 120,000.00

Specific Location (Column): Siocon

289. Improvement/Concreting of Jct. Sitio Mambong connecting to RT Lim - Siocon Secondary National Highway to Sitio Platinum, Barangay Candiz leading to Siocon Abaca Service Provider in support to rubber and abaca industries, Siocon, ZDN

Road concreting inlcluding drainage

Siocon, ZN km. Plans and POW GAA 3 - - 50,000.00 50,000.00 50,000.00 150,000.00

Specific Location (Column): Siocon

290. Improvement/Concreting of Jct. Sitio Paduan, Barangay Candiz connecting to Siocon-RT Lim Provincial Road to Barangay Candiz Proper leading to various farmers' associations in support to rubber and coconut industries, Siocon, ZDN

Road concreting inlcluding drainage

Siocon, ZN km. Plans and POW GAA 3 - - 40,000.00 40,000.00 40,000.00 120,000.00

Specific Location (Column): Siocon

291. Improvement/Concreting of Jct. Sitio Sicacac (Brgy. Pisawak) connecting to Siocon-RT Lim Provincial Road to Sitio Cuyan (Barangay Pisawak) leading to various associations in support to rubber, abaca, cacao, coffee and coconut industries, Siocon, ZDN

Road concreting inlcluding drainage

Dansalan, Labason, ZN km. Plans and POW GAA 3 - - 62,500.00 62,500.00 62,500.00 187,500.00

Specific Location (Column): Siocon

292. Improvement/Concreting of Sto. Niño-Fatima Road connecting to Provincial Road leading to ___in support to rubber industry, Salug, ZDN

Road concreting inlcluding drainage

Labason, ZN km. Plans and POW GAA 3 - - 30,000.00 30,000.00 30,000.00 90,000.00

Specific Location (Column): Salug

293. Improvement/Concreting of Lipakan-Ipilan Road connceting to National Highway leading to Biodiesel Processing Plant in support to coconut industry, Salug, ZDN

Road concreting inlcluding drainage

Siocon, ZN km. Plans and POW GAA 3 - - 20,000.00 20,000.00 20,000.00 60,000.00

Specific Location (Column): Salug

294. Improvement/Concreting of Tangarak- Sitio Log deck (Sto. Niño)- Sitio Binawing (Lintangan)- Road Section connecting PRDP Section 1 Road and Brgy Road to National Coastal Road in support to abaca, rubber, cacao and coconut industries, Sibuco, Zamboanga del Norte

Road concreting inlcluding drainage

Siocon, ZN km. Plans and POW GAA 3 - - 40,000.00 40,000.00 40,000.00 120,000.00

Specific Location (Column): Sibuco

Chapter 19-1-DPWH IX-ZDN 2DEOPage 18 of 35

Page 253: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation LGU Proponent RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

295. Improvement/Concreting of Km. 26-Sitio Teo-Lunday Valley Road Section connecting Sibuco Curuan National Road and Boundary Brgy Kalabasa Road to Zamboanga City National Highway in support to abaca, rubber and cacao industries, Sibuco, Zamboanga del Norte

Road concreting inlcluding drainage

Siocon, ZN km. Plans and POW GAA 3 - - 40,000.00 40,000.00 40,000.00 120,000.00

Specific Location (Column): Sibuco

296. Concreting of Paniran - Sitio Log Deck (Sto. Niño) Road Section connecting PRDP Section 1 Road connecting National Road and Poblacion - Sitio-Log Deck PRDP Road in Support to Abaca, Rubber, Cacao, and Coconut Industries, Sibuco, Zamboanga del Norte

Road concreting inlcluding drainage

Dansalan, Labason, ZN km. Plans and POW GAA 3 - - 50,000.00 50,000.00 50,000.00 150,000.00

Specific Location (Column): Sibuco

No. of Proj. = - 200,000.00 - 2,643,410.00 2,643,410.00 2,643,410.00 8,130,230.00 Local ProjectsA. National Bridge Construction/ Replacement Program (Design and Build Bridges)

a. Roads and Bridges297. Nonoyan Bridge and Approaches

along Liloy-Siocon Road, Nonoyan Baliguian, Zamboanga D. Norte

Construction of Bridge Baliguian sq. m. 330.00 Plans and POW GAA 2 53,040.00 53,040.00

298. Gacsod Bridge and Approaches along Gutalac Road, Zamboanga Del Norte

Construction of Bridge Gutalac sq. m. 184.00 Plans and POW GAA 2 33,040.00 33,040.00

299. Construction of Sebungon Bridge along Sirawai-Sibuco Road, Zamboanga del Norte

Construction of Bridge Sibuco sq. m. 115.95 Plans and POW GAA 2 23,040.00 23,040.00

b. Multi-purpose Facilities - 300. Construction of Standard Two-

Storey Office Bldg. of Zamboanga del Norte 2nd DEO, Osukan, Labason, Zamboanga del Norte

Construction of multipurpose

buildingLabason 1 proj. Plans and POW GAA 2 39,184.00 39,184.00

B. GAD Projects - - 301. Construction of Rest area with

viewing deck.a. Leon B. Postigob. Baliguian, Zamboanga del Norte

Leon Postigo, Baliguian, ZN km. Plans and POW GAA 2 - - 1,000.00 1,000.00

1M transferred to 2021 from 2019

302. Repainting of pedestrian lanes/ Maintenance of National Roadsalong National Roads ZN km. Plans and POW GAA 2 - - 1,000.00 1,000.00

1M transferred to 2021 from 2019

C. Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects - - Roads and Bridges - - a. Local Roads - -

303. Construction of Boulevard, Liloy, Zamboanga del Norte

Construction of road Liloy, ZN km. 5 Plans and POW GAA 2 100,000.00 100,000.00 Added FY 2018 GAA

304. Construction of local roads, Barangay Tapican to Barangay Mabuhay, Liloy, Zamboanga del Norte

Concreting of Road Liloy, ZN km. 0.20 Plans and POW GAA 2 2,000.00 2,000.00 Added FY 2018 GAA

CSSP - Subtotal

Chapter 19-1-DPWH IX-ZDN 2DEOPage 19 of 35

Page 254: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation LGU Proponent RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

305. Construction of local roads, Barangay Tapican to Barangay Ganese, Liloy Zamboanga del Norte

Concreting of Road Liloy, ZN km. 0.20 Plans and POW GAA 2 2,000.00 2,000.00 Added FY 2018 GAA

306. Concreting of (3.85 kms) Timan - Sta. Niño Road

Road Upgrading Gravel to Paved Liloy, ZN km. Plans and POW GAA 2 - - 30,000.00 20,000.00 50,000.00

- Duplication of entry (No. 111)

307. Concreting of (4.58 kms) Tampilisan - Lawaan - San Jose Road

Road Upgrading Gravel to Paved Tampilisan, ZN km. Plans and POW GAA 2 - - 30,000.00 29,540.00 59,540.00

- Duplication of entry (No. 112)

308. Concreting of (5.17 kms) Sta. Niño - New Dapitan Road

Road Upgrading Gravel to Paved Tampilisan, ZN km. Plans and POW GAA 2 - - 30,000.00 37,210.00 67,210.00

- Duplication of entry (No. 113)

309. Concreting of (0.70 kms) Pagkain Ng Bayan - Kalawit - Marcelo Rd. Road Upgrading

Gravel to Paved Kalawit, ZN km. Plans and POW GAA 2 - - 9,100.00 9,100.00 - Duplication of entry (No. 114)

310. Concreting of (12.5 kms) Kalawit - Marcelo Rd

Road Upgrading Gravel to Paved Kalawit, ZN km. Plans and POW GAA 2 - - 50,000.00 50,000.00 100,000.00

- Duplication of entry (No. 115)

311. Concreting of (4.4 kms) Kalawit - Titay Rd

Road Upgrading Gravel to Paved Kalawit, ZN km. Plans and POW GAA 2 - - 57,200.00 57,200.00

- Duplication of entry (No. 116)

312. Concreting of (11 kms.) Kalawit - Labason (Kalawit Side) Rd.

Road Upgrading Gravel to Paved Kalawit, ZN km. Plans and POW GAA 2 - - 50,000.00 50,000.00 100,000.00

- Duplication of entry (No. 117)

313. Concreting of (11 kms.) Pob. - Mamad - Alegria - Diculom Road, Baliguian

Road Upgrading Gravel to Paved Baliguian, ZN km. Plans and POW GAA 2 - - 50,000.00 50,000.00 100,000.00

- Duplication of entry (No. 132)

314. Concreting of (9.75 kms) Bucana - Lituban - D. Riconalla Road

Road Upgrading Gravel to Paved Siocon, ZN km. Plans and POW GAA 2 - - 50,000.00 50,000.00 100,000.00

- Duplication of entry (No. 133)

315. Concreting of (2.81 kms) Rizon - Mangop Road

Road Upgrading Gravel to Paved Leon Postigo, ZN km. Plans and POW GAA 2 - - 36,530.00 36,530.00

- Duplication of entry (No. 86)

316. Concreting of (5.13 kms) Bacong - Sto. Niño Road

Road Upgrading Gravel to Paved Salug, ZN km. Plans and POW GAA 2 - - 30,690.00 36,000.00 66,690.00

- Duplication of entry (No. 89)

317. Concreting of (4 kms) NRJ - New Barili Road

Road Upgrading Gravel to Paved Tampilisan, ZN km. Plans and POW GAA 2 - - 30,000.00 20,000.00 50,000.00

- Duplication of entry (No. 90)

318. Concreting of (3.75 kms) Canawan - Lumbia Road

Road Upgrading Gravel to Paved Salug, ZN km. Plans and POW GAA 2 - - 30,000.00 18,750.00 48,750.00

- Duplication of entry (No. 91)

319. Concreting of (4.10 kms) Kayok - Candelaria - La Libertad Road

Road Upgrading Gravel to Paved Liloy, ZN km. Plans and POW GAA 2 - - 20,000.00 20,000.00 40,000.00

- Duplication of entry (No. 92)

320. Concreting of (2.55 kms) Communal - Cabangcalan Road

Road Upgrading Gravel to Paved Liloy, ZN km. Plans and POW GAA 2 - - 33,150.00 33,150.00

- Duplication of entry (No. 93)

321. Concreting of (0.28 kms) Bacungan - Tiniguiban Road, Municipality of Leon Postigo

Road Upgrading Gravel to Paved

Leon Postigo,ZN km. Plans and POW GAA 2 - 3,640.00 3,640.00

- Duplication of entry (No. 87)

322. Concreting of (10.52 kms) Delusom - Tinuyop Road, Municipality of Leon Postigo

Road Upgrading Gravel to Paved

Leon Postigo,ZN km. Plans and POW GAA 2 - 136,760.00 - 136,760.00

- Duplication of entry (No. 88)

323. Concreting of (3.82 kms) Compra - San Isidro Road, Municipality of Liloy

Road Upgrading Gravel to Paved Liloy, ZN km. 3.82 Plans and POW GAA 2 - 49,660.00 49,660.00

49.66M transferred to 2021 from 2019

324. Concreting of (3.08 kms) Fatima - Tapican Road, Municipality of Liloy

Road Upgrading Gravel to Paved Liloy, ZN km. Plans and POW GAA 2 - 40,040.00 40,040.00

- Duplication of entry (No. 94)

325. Concreting of (12.91 kms) Communal - Silucap - Goin - Compra Road, Municipality of Liloy

Road Upgrading Gravel to Paved Liloy, ZN km. Plans and POW GAA 2 - 167,830.00 167,830.00

- Duplication of entry (No. 95)

326. Concreting of (4.93 kms) Patawag - Mabuhay - Silucap Road, Municipality of Liloy

Road Upgrading Gravel to Paved Liloy, ZN km. Plans and POW GAA 2 - 64,090.00 64,090.00

- Duplication of entry (No. 96)

327. Concreting of (4.7 kms) Fatima - Villa M. Tejero Road, Municipality of Liloy

Road Upgrading Gravel to Paved Liloy, ZN km. Plans and POW GAA 2 - 61,100.00 61,100.00

- Duplication of entry (No. 193)

Chapter 19-1-DPWH IX-ZDN 2DEOPage 20 of 35

Page 255: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation LGU Proponent RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

328. Concreting of (4.48 kms) Fatima - Punta, Municipality of Liloy

Road Upgrading Gravel to Paved Liloy, ZN km. Plans and POW GAA 2 - 58,240.00 58,240.00

- Duplication of entry (No. 97)

329. Concreting of (7.11 kms) Tampilisan - Situbo Road, Municipality of Tampilisan

Road Upgrading Gravel to Paved

Tampilisan, ZN km. 7.11 Plans and POW GAA 2 - 92,430.00 92,430.00

330. Concreting of (4.57 kms) Liguac - Caracol Road, Municipality of Salug

Road Upgrading Gravel to Paved Salug, ZN km. Plans and POW GAA 2 - 59,410.00 59,410.00

- Duplication of entry (No. 98)

331. Concreting of (4 kms) Ramon Magsaysay - Tapalan Road, Municipality of Salug

Road Upgrading Gravel to Paved Salug, ZN km. Plans and POW GAA 2 - 52,000.00 52,000.00

- Duplication of entry (No. 99)

332. Concreting of (9.05 kms) Salug - Liguac - Binone Road, Municipality of Salug

Road Upgrading Gravel to Paved Salug, ZN km. Plans and POW GAA 2 - -

- Duplication of entry (No. 100)

333. Concreting of (8.20 kms) Mucas - Godod (Salug Side) Road, Municipality of Salug

Road Upgrading Gravel to Paved Salug, ZN km. Plans and POW GAA 2 - -

- Duplication of entry (No. 101)

334. Concreting of (4 kms) Balakan - Calucap Road, Municipality of Salug

Road Upgrading Gravel to Paved Salug, ZN km. Plans and POW GAA 2 - -

- Duplication of entry (No. 102)

335. Concreting of (3.75 kms) Caracol - Pukay Road, Municipality of Salug Road Upgrading

Gravel to Paved Salug, ZN km. Plans and POW GAA 2 - - - Duplication of entry (No. 103)

336. Concreting of (32.80 kms) Mucas - Godod (Godod Side) Road, Municipality of Godod

Road Upgrading Gravel to Paved Godod, ZN km. Plans and POW GAA 2 - -

- Duplication of entry (No. 104)

337. Concreting of (9.06 kms) Balakan - Miampic Road, Municipality of Godod

Road Upgrading Gravel to Paved Godod, ZN km. Plans and POW GAA 2 - 117,780.00 117,780.00

- Duplication of entry (No.105)

338. Concreting of (4.15 kms) Balakan - Danao Road, Municipality of Godod

Road Upgrading Gravel to Paved Godod, ZN km. Plans and POW GAA 2 - 53,950.00 53,950.00

- Duplication of entry (No.106)

339. Concreting of (10.4 kms) Bunawan - Sianan - San Pedro Road, Municipality of Godod

Road Upgrading Gravel to Paved Godod, ZN km. Plans and POW GAA 2 - 135,200.00 135,200.00

- Duplication of entry (No.107)

340. Concreting of (8.35 kms) Binone - Godod Road, Municipality of Godod

Road Upgrading Gravel to Paved Godod, ZN km. Plans and POW GAA 2 - 108,550.00 108,550.00

- Duplication of entry (No.108)

341. Concreting of (5.80 kms) Godod - Bunawan Road, Municipality of Godod

Road Upgrading Gravel to Paved Godod, ZN km. Plans and POW GAA 2 - 75,400.00 75,400.00

- Duplication of entry (No.109)

342. Concreting of (5.83 kms) Banigan - San Miguel Road, Municipality of Liloy

Road Upgrading Gravel to Paved Liloy, ZN km. Plans and POW GAA 2 - 75,790.00 75,790.00

- Duplication of entry (No.110)

343. Rehab./Concreting of (573 meters) Tilubog - Naga Boundary, Municipality of Tampilisan

Road Upgrading Gravel to Paved Tampilisan, ZN km. 0.573 Plans and POW GAA 2 - 10,000.00 10,000.00

10M transferred to 2021 from 2019

344. Concreting of (6.4 kms) Dansalan - San Isidro Road, Municipality of Labason

Road Upgrading Gravel to Paved Labason, ZN km. Plans and POW GAA 2 - 83,200.00 83,200.00

- Duplication of entry (No.118)

345. Concreting of (4.55 kms) La Union - Gabu Road, Municipality of Labason

Road Upgrading Gravel to Paved Labason, ZN km. Plans and POW GAA 2 - 59,150.00 59,150.00

- Duplication of entry (No.119)

346. Concreting of (6.3 kms) Kipit - New Salvacion Road, Municipality of Labason

Road Upgrading Gravel to Paved Labason, ZN km. Plans and POW GAA 2 - 81,900.00 81,900.00

- Duplication of entry (No.120)

Chapter 19-1-DPWH IX-ZDN 2DEOPage 21 of 35

Page 256: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation LGU Proponent RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

347. Concreting of (14.635 kms) Patawag - Pianon - San Jose Road, Municipality of Labason

Road Upgrading Gravel to Paved Labason, ZN km. Plans and POW GAA 2 - 190,255.00 190,255.00

- Duplication of entry (No.121)

348. Concreting of (5 kms) Lawigan - Balas Road, Municipality of Labason

Road Upgrading Gravel to Paved Labason, ZN km. Plans and POW GAA 2 - 65,000.00 65,000.00

- Duplication of entry (No.122)

349. Concreting of (8.12 kms) Osukan - Balas Road, Municipality of Labason

Road Upgrading Gravel to Paved Labason, ZN km. Plans and POW GAA 2 - 105,560.00 105,560.00

- Duplication of entry (No.123)

350. Concreting of (6.08 kms) Labason - La Union - Lapatan Road, Municipality of Labason

Road Upgrading Gravel to Paved Labason, ZN km. Plans and POW GAA 2 - 79,040.00 79,040.00

- Duplication of entry (No.124)

351. Concreting of (8.20 kms) Gatas - Batayan - Pagkain ng Bayan Road, Municipality of Kalawit

Road Upgrading Gravel to Paved Kalawit, ZN km. Plans and POW GAA 2 - 106,600.00 106,600.00

- Duplication of entry (No.125)

352. Concreting of (5.6154 kms) NRJ - Cocob - Map - Canupong Road, Municipality of Gutalac

Road Upgrading Gravel to Paved Gutalac, ZN km. Plans and POW GAA 2 - 73,000.20 73,000.20

- Duplication of entry (No.126)

353. Concreting of (11.62 kms) Kalawit - Labason (Labason Side) Road, Municipality of Labason

Road Upgrading Gravel to Paved Labason, ZN km. Plans and POW GAA 2 - 151,060.00 151,060.00

- Duplication of entry (No.127)

354. Concreting of (5.6154 kms) NRJ - Bangangon - San Juan Road, Municipality of Gutalac

Road Upgrading Gravel to Paved Gutalac, ZN km. Plans and POW GAA 2 - -

- Duplication of entry (No.128)

355. Concreting of (15.6 kms) Salvador - San Vicente - Tipan Road, Municipality of Gutalac

Road Upgrading Gravel to Paved Gutalac, ZN km. Plans and POW GAA 2 - -

- Duplication of entry (No.129)

356. Concreting of (6.9231077 kms) NRJ - Sas - Talaptap Road, Municipality of Gutalac

Road Upgrading Gravel to Paved Gutalac, ZN km. Plans and POW GAA 2 - -

- Duplication of entry (No.130)

357. Concreting of (0.85 kms) NRJ - New Dapitan Road, Municipality of Gutalac

Road Upgrading Gravel to Paved Gutalac, ZN km. Plans and POW GAA 2 - -

- Duplication of entry (No.131)

358. Concreting of (6.98 kms) Siocon - San Jose - Siay - Pisawak Road, Municipality of Siocon

Road Upgrading Gravel to Paved Siocon, ZN km. Plans and POW GAA 2 - 90,740.00 90,740.00

- Duplication of entry (No.134)

359. Concreting of (21 kms) Siay - Pisawak - Kilalaban Road, Municipality of Siocon

Road Upgrading Gravel to Paved Siocon, ZN km. Plans and POW GAA 2 - 273,000.00 273,000.00

- Duplication of entry (No.135)

360. Concreting of Tan-awan - San Jose Road, Poblacion, Baliguian, Zamboanga del Norte

Road Concreting including drainage

Baliguian, ZN km. 14.58 Plans and POW GAA 2 75,000.00 100,000.00 175,000.00

361. Concreting of (28 kms) Lunday - Litawan Road, Municipality of Sibuco

Road Upgrading Gravel to Paved Sibuco, ZN km. Plans and POW GAA 2 - 36,400.00 36,400.00

- Duplication of entry (No.136)

362. Concreting of (8.6 kms) Pob. Sibuco - Sto. Niño Road, Municipality of Sibuco

Road Upgrading Gravel to Paved Sibuco, ZN km. Plans and POW GAA 2 - 111,800.00 111,800.00

- Duplication of entry (No.137)

363. Concreting of (16 kms) Sto. Niño - Lawin Road, Municipality of Sibuco

Road Upgrading Gravel to Paved Sibuco, ZN km. Plans and POW GAA 2 - -

- Duplication of entry (No.138)

364. Concreting of (16 kms) Sibuco - Lunday Road, Municipality of Sibuco

Road Upgrading Gravel to Paved Sibuco, ZN km. Plans and POW GAA 2 - -

- Duplication of entry (No.139)

365. Concreting of (6 kms) Jatian - Lakiki Road, Municipality of Sibuco

Road Upgrading Gravel to Paved Sibuco, ZN km. Plans and POW GAA 2 - -

- Duplication of entry (No.140)

Chapter 19-1-DPWH IX-ZDN 2DEOPage 22 of 35

Page 257: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation LGU Proponent RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

366. Concreting of (1.0 km) Poblacion - Doña Cecilia Road, Municipality of Sirawai

Road Upgrading Gravel to Paved Sirawai, ZN km. 1 Plans and POW GAA 2 - 13,000.00 13,000.00

367. Concreting of (6 kms) Piakan Propoer - Lubok Kulasian Road, Municipality of Sirawai

Road Upgrading Gravel to Paved Sirawai, ZN km. 6 Plans and POW GAA 2 - 78,000.00 78,000.00

368. Concreting of Poblacion - Balacbaan - Tilubog FMR Road Upgrading

Gravel to PavedZamboanga del Norte km. 1.5 Plans and POW GAA 2 - - 19,000.00 19,000.00

-19M transferred to 2021 from 2019

-Specific Location: Tampilisan369. Concreting of Poblacion

Tampilisan - Situbo - Sandayong FMR

Road Upgrading Gravel to Paved Tampilisan km. 1.6 Plans and POW GAA 2 - - 20,000.00 20,000.00

20M transferred to 2021 from 2019

370. Road Upgrading of Gutalac - San Isidro - Immaculada Concepcion - Tugop Gutalac Kalawit Road, Gutalac along Gutalac - Kalawit - Titay Road

Road Upgrading Gravel to Paved Gutalac, ZN km. 26.25 Plans and POW GAA 2 - - 105,000.00 100,000.00 110,000.00 315,000.00

110M transferred to 2022 rom 2019

371. Construction/Improvement/Concrete Paving of Jct. Curuan - Lunday - Sibuco Road

Road Upgrading Gravel to Paved Sibuco, ZN km. 26.25 Plans and POW GAA 2 - - 105,000.00 100,000.00 110,000.00 315,000.00

110M transferred to 2022 rom 2019

372. Rehabilitation/Concreting of Provincial Rd along Leon Postigo, Brgy. Delusom - Brgy. Tinuyop - Brgy. Nasibac, Brgy. San Pedro, Godod

Road Upgrading Gravel to Paved

Leon B. Postigo, ZDN km. Plans and POW GAA 2 168,000.00 168,000.00 336,000.00

- Duplication of entry (No. 82)

373. Concreting of Provincial Rd along Brgy. Bucana - Lituban - D. Riconalla - TabayoNL = 15 kms.

Road Upgrading Gravel to Paved Siocon km. 15 Plans and POW GAA 2 52,500.00 52,500.00 52,500.00 157,500.00

52.5M deleted from 2019 since its not funded in 2019 and has proposed allocation for CY 2020-2022 already

374. ZWCR: Package 1 , Limpapa-Sibuco Sec., Sibuco Chainage 8860 - 14000; 14000 - 18430

Road Upgrading Gravel to Paved

Limpapa-Sibuco Sec., Sibuco

km. Plans and POW GAA 2 250.00 250.00

- Duplication of entry in RDIP form A (No. 121, 122, 123)

375. ZWCR: Package 2, Sibuco Chainage 0.0 - 4430; 4430 - 8860

Road Upgrading Gravel to Paved

Sibuco

km. Plans and POW GAA 2 250,000.00 250.00 250,250.00

- added 250M in 2018

- Funded under GAA 2018

376. SIOCON - SIRAWAI - SIBUCO - LIMPAPA ROAD, Sirawai km 2119 + 130 to 2120 + 380; km 2120 + 995 to 2121 + 460; km 2126 + 620 to 2128 + 000

Road Upgrading Gravel to Paved

Sirawai

km. Plans and POW GAA 2 250.00 250.00

- Duplication of entry in RDIP form A (No. 117)

377. Rehabilitation/Concreting of Farm-to-Market Road of NRJ Fatima-Punta-Lamao-Villa M. Tejero-Fatima NRJ, Liloy

Road Upgrading Gravel to Paved

Liloy

km. Plans and POW GAA 2

112.00

112.00

378. Rehabilitation/Concreting of Farm-to-Market Road of Poblacion Sibuco-Sitio Binawing-Lintangan, Sibuco, Z.N.

Road Upgrading Gravel to Paved

Sibuco

km. Plans and POW GAA 2

350.00

350.00

379. Rehabilitation/Concreting of Farm-to-Market Road of Cocob-Map-Canupong, Gutalac

Road Upgrading Gravel to Paved

Gutalackm. Plans and POW GAA 2

102.20 102.20

Chapter 19-1-DPWH IX-ZDN 2DEOPage 23 of 35

Page 258: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation LGU Proponent RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

380. Concreting of Provincial Road along Brgy. Bucanan-Lituban-D. Riconalla-Tabayo, Siocon

Road Upgrading Gravel to Paved

Sioconkm. Plans and POW GAA 2

210.00 210.00

381. Rehabilitation/Concreting of Provincial Road along Leon Postigo, Brgy. Delusom-Brgy. Tinuyop-Brgy. Nasibac, Brgy. San Pedro, Godod (Leon Postigo-Godod)

Road Upgrading Gravel to Paved

Leon Postigo-Godod

km. Plans and POW GAA 2

672.00

672.00

382. LABASON BYPASS RD, Labason Sta. 0 + 000 - 4 + 167 Road Upgrading

Gravel to Paved

Labason

km. Plans and POW GAA 2 -

- Duplication of entry in RDIP form A (No.93)

383. Rehabilitation/Concreting of Farm-to-Market Road of Poblacion San Vicente-Doña Cecilia-Pulang Lupa-Catuyan-Mintal, Sirawai

Road Upgrading Gravel to Paved

Sirawai

km. Plans and POW GAA 2

126.00

126.00

384. Rehabilitation/Concreting of Farm-to-Market Road of boundary Curuan, Zamboanga City-Lunday Brgy. Site, Lunday, Sibuco, Z.N.

Road Upgrading Gravel to Paved

Sibuco

km. Plans and POW GAA 2

140.00

140.00

385. Concreting of Rizon - Mangop Road, Mun. of Leon PostigoL = 2.81 kms.

Upgrading of existing

Provincial and Barangay Roads

Leon B. Postigo, ZDN km. Plans and POW GAA 2 - - - 194,194.00 - 194,194.00

194.194M transferred to 2021 from 2019

386. Concreting of Bacungan - Tiniguiban Road, Leon PostigoL = 0.28 kms.

Upgrading of existing

Provincial and Barangay Roads

Leon B. Postigo, ZDN km. 0.28 Plans and POW GAA 2 - - - 3,920.00 - 3,920.00

3.920M transferred to 2021 from 2019

387. Concreting of Delusom - Tinuyop Road, Leon PostigoL = 10.52 kms.

Upgrading of existing

Provincial and Barangay Roads

Leon B. Postigo, ZDN km. 10.52 Plans and POW GAA 2 - - - 157,800.00 - - 157,800.00

388. Concreting of Bacong - Sto. Niño Road, Mun. of SalugL = 5.13 kms.

Upgrading of existing

Provincial and Barangay Roads

Salug, ZDN km. 5.13 Plans and POW GAA 2 - - - 71,820.00 - 71,820.00

71.820M transferred to 2021 from 2019

389. Concreting of NRJ - New Barili Road, Mun. of TampilisanL = 4.0 kms.

Upgrading of existing

Provincial and Barangay Roads

Tampilisan, ZDN km. 4 Plans and POW GAA 2 - - - 56,000.00 - 56,000.00

56M transferred to 2021 from 2019

390. Concreting of Canawan - Lumbia Road, Mun. of SalugL = 2.75 kms.

Upgrading of existing

Provincial and Barangay Roads

Salug, ZDN km. 2.75 Plans and POW GAA 2 - - - 38,500.00 - 38,500.00

38.5M transferred to 2021 from 2019

391. Concreting of Kayok - Candelaria - La Libertad Road, LiloyL = 1.29 kms.

Upgrading of existing

Provincial and Barangay Roads

Liloy, ZDN km. 1.29 Plans and POW GAA 2 - - - 18,060.00 - 18,060.00

18.060M transferred to 2021 from 2019

392. Concreting of Communal - Cabangcalan Road, Mun. of LiloyL = 2.55 kms.

Upgrading of existing

Provincial and Barangay Roads

Liloy, ZDN km. 2.55 Plans and POW GAA 2 - - - 35,700.00 - 35,700.00

35.70M transferred to 2021 from 2019

393. Concreting of Fatima - Tapican Road, Mun. of LiloyL = 3.08 kms.

Upgrading of existing

Provincial and Barangay Roads

Liloy, ZDN km. 3.08 Plans and POW GAA 2 - - - 53,120.00 - 53,120.00

53.120M transferred to 2021 from 2019

Chapter 19-1-DPWH IX-ZDN 2DEOPage 24 of 35

Page 259: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation LGU Proponent RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

394. Concreting of Communal - Silucap - Goin - Compra Road, LiloyL = 12.91 kms.

Upgrading of existing

Provincial and Barangay Roads

Liloy, ZDN km. 12.91 Plans and POW GAA 2 - - - 180,740.00 - 180,740.00

180.740M transferred to 2021 from 2019

395. Concreting of Patawag - Mabuhay - Silucap Road, LiloyL = 4.93 kms.

Upgrading of existing

Provincial and Barangay Roads

Liloy, ZDN km. 4.93 Plans and POW GAA 2 - - - 69,020.00 - 69,020.00

69.02M transferred to 2021 from 2019

396. Concreting of Fatima - Punta, Mun. of LiloyL = 4.48 kms.

Upgrading of existing

Provincial and Barangay Roads

Liloy, ZDN km. 4.48 Plans and POW GAA 2 - - - 62,720.00 - 62,720.00

62.72M transferred to 2021 from 2019

397. Concreting of Liguac - Caracol Road, Mun. of SalugL = 4.57 kms.

Upgrading of existing

Provincial and Barangay Roads

Liloy, ZDN km. 4.57 Plans and POW GAA 2 - - - 68,550.00 - - 68,550.00

Specific Location: Salug

398. Concreting of Ramon Magsaysay - Tapalan Road, Mun. of SalugL = 4.0 kms.

Upgrading of existing

Provincial and Barangay Roads

Liloy, ZDN km. 4 Plans and POW GAA 2 - - - 60,000.00 - - 60,000.00

Specific Location: Salug

399. Concreting of Salug - Liguac - Binone Road, Mun. of SalugL = 9.05 kms.

Upgrading of existing

Provincial and Barangay Roads

Liloy, ZDN km. 9.05 Plans and POW GAA 2 - - - - 144,800.00 - 144,800.00

Specific Location: Salug

400. Concreting of Mucas - Godod (Salug Side) Road, Mun. of SalugL = 8.20 kms.

Upgrading of existing

Provincial and Barangay Roads

Liloy, ZDN km. 8.2 Plans and POW GAA 2 - - - - 131,200.00 - 131,200.00

Specific Location: Salug

401. Concreting of Balakan - Calucap Road, Mun. of SalugL = 4.0 kms.

Upgrading of existing

Provincial and Barangay Roads

Liloy, ZDN km. 4 Plans and POW GAA 2 - - - - 64,000.00 - 64,000.00

Specific Location: Salug

402. Concreting of Caracol - Pukay Road, Mun. of SalugL = 3.75 kms.

Upgrading of existing

Provincial and Barangay Roads

Liloy, ZDN km. 3.75 Plans and POW GAA 2 - - - - 60,000.00 - 60,000.00

Specific Location: Salug

403. Concreting of Mucas - Godod (Godod side) Road, Mun. of GododL = 28.10 kms.

Upgrading of existing

Provincial and Barangay Roads

Liloy, ZDN km. 28.1 Plans and POW GAA 2 - - - - 449,600.00 - 449,600.00

Specific Location: Godod

404. Concreting of Balakan - Miampic Road, Mun. of GododL = 9.06 kms.

Upgrading of existing

Provincial and Barangay Roads

Liloy, ZDN km. 9.06 Plans and POW GAA 2 - - - - - 154,020.00 154,020.00

Specific Location: Godod

405. Concreting of Balakan - Danao Road, Mun. of GododL = 4.15 kms.

Upgrading of existing

Provincial and Barangay Roads

Liloy, ZDN km. 4.15 Plans and POW GAA 2 - - - - - 70,550.00 70,550.00

Specific Location: Godod

406. Concreting of Bunawan - Sianan - San Pedro Road, Mun. of GododL = 10.4 kms.

Upgrading of existing

Provincial and Barangay Roads

Liloy, ZDN km. 10.4 Plans and POW GAA 2 - - - - - 176,800.00 176,800.00

Specific Location: Godod

407. Concreting of Binone - Godod Road, Mun. of GododL = 8.35 kms.

Upgrading of existing

Provincial and Barangay Roads

Liloy, ZDN km. 8.35 Plans and POW GAA 2 - - - - - 141,950.00 141,950.00

Specific Location: Godod

Chapter 19-1-DPWH IX-ZDN 2DEOPage 25 of 35

Page 260: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation LGU Proponent RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

408. Concreting of Godod - Bunawan Road, Mun. of GododL = 5.80 kms.

Upgrading of existing

Provincial and Barangay Roads

Liloy, ZDN km. 5.8 Plans and POW GAA 2 - - - - - 98,600.00 98,600.00

Specific Location: Godod

409. Concreting of Banigan - San Miguel Road, Mun. of LiloyL = 5.83 kms.

Upgrading of existing

Provincial and Barangay Roads

Liloy, ZDN km. 5.83 Plans and POW GAA 2 - - - - - 99,110.00 99,110.00

410. Concreting of Timan - Sto. NiÑo Road, Mun. of LiloyL = 3.85 kms.

Upgrading of existing

Provincial and Barangay Roads

Liloy, ZDN km. 3.85 Plans and POW GAA 2 - - - 53,900.00 - 53,900.00

53.9M transferred to 2021 from 2019

411. Concreting of Tampilisan - Lawaan - San Jose Road, TampilisanL = 3.58 kms.

Upgrading of existing

Provincial and Barangay Roads

Liloy, ZDN km. 3.58 Plans and POW GAA 2 - - - 50,120.00 - 50,120.00

50.12M transferred to 2021 from 2019

Specific Location: Godod412. Concreting of Stao. Niño - New

Dapitan Road, Mun. of TampilisanL = 3.47 kms.

Upgrading of existing

Provincial and Barangay Roads

Liloy, ZDN km. 3.47 Plans and POW GAA 2 - - - 48,580.00 - 48,580.00

- 48.58M transferred to 2021 from 2019- from Stao. To Sto.

Specific Location: Godod413. Concreting of Pagkain ng Bayan -

Kalawit - Marcelo Road, KalawitL = 0.70 kms.

Upgrading of existing

Provincial and Barangay Roads

Kalawit, ZDN km. 0.7 Plans and POW GAA 2 - - - 9,800.00 - 9,800.00

9.800M transferred to 2021 from 2019

414. Concreting of Kalawit - Marcelo Road, Mun. of Kalawit

Upgrading of existing

Provincial and Barangay Roads

Kalawit, ZDN km. 12 Plans and POW GAA 2 - - - 175,000.00 - 175,000.00

175M transferred to 2021 from 2019

415. Concreting of Kalawit - Titay Road, Mun. of KalawitL = 4.4 kms.

Upgrading of existing

Provincial and Barangay Roads

Kalawit, ZDN km. 4.4 Plans and POW GAA 2 - - - 61,600.00 - 61,600.00

61.6M transferred to 2021 from 2019

416. Concreting of Kalawit - Labason (Kalawit Side) Road, KalawitL = 11.0 kms.

Upgrading of existing

Provincial and Barangay Roads

Kalawit, ZDN km. 11 Plans and POW GAA 2 - - - 154,000.00 - 154,000.00

154M transferred to 2021 from 2019

417. Concreting of Dansalan - San Isidro Road, Mun. of LabasonL = 4.4 kms.

Upgrading of existing

Provincial and Barangay Roads

Labason, ZDN km. 4.4 Plans and POW GAA 2 - - - 61,600.00 - 61,600.00

61.6M transferred to 2021 from 2019

418. Concreting of La Union - Gabu Road, Mun. of LabasonL = 4.55 kms.

Upgrading of existing

Provincial and Barangay Roads

Labason, ZDN km. 4.55 Plans and POW GAA 2 - - - 63,700.00 - 63,700.00

63.7M transferred to 2021 from 2019

419. Concreting of Kipit - New Salvacion Road, Mun. of LabasonL = 6.3 kms.

Upgrading of existing

Provincial and Barangay Roads

Labason, ZDN km. 6.3 Plans and POW GAA 2 - - - 88,200.00 - 88,200.00

88.2M transferred to 2021 from 2019

420. Concreting of Patawag - Pianon - San Jose Road, LabasonL = 6.3 kms.

Upgrading of existing

Provincial and Barangay Roads

Labason, ZDN km. 6.3 Plans and POW GAA 2 - - - 204,890.00 - 204,890.00

204.89M transferred to 2021 from 2019

421. Concreting of Lawigan - Balas Road, Mun. of LabasonL = 5 kms.

Upgrading of existing

Provincial and Barangay Roads

Labason, ZDN km. 5 Plans and POW GAA 2 - - - 70,000.00 - 70,000.00

70M transferred to 2021 from 2019

Chapter 19-1-DPWH IX-ZDN 2DEOPage 26 of 35

Page 261: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation LGU Proponent RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

422. Concreting of Osukan - Balas Road, Mun. of LabasonL = 8.12 kms.

Upgrading of existing

Provincial and Barangay Roads

Labason, ZDN km. 8.12 Plans and POW GAA 2 - - - 121,800.00 - - 121,800.00

423. Concreting of Labason - La Union - Lapatan Road, LabasonL = 4.08 kms.

Upgrading of existing

Provincial and Barangay Roads

Labason, ZDN km. 4.08 Plans and POW GAA 2 - - - 61,200.00 - - 61,200.00

424. Concreting of Gatas - Batayan - Pagkain ng Bayan Road, KalawitL = 8.20 kms.

Upgrading of existing

Provincial and Barangay Roads

Kalawit, ZDN km. 8.2 Plans and POW GAA 2 - - - 123,000.00 - - 123,000.00

425. Concreting of NRJ - Cocob - Map - Canupong Road, Mun. of GutalacL = 5.6154 kms.

Upgrading of existing

Provincial and Barangay Roads

Gutalac, ZDN km. 5.62 Plans and POW GAA 2 - - - 84,231.00 - - 84,231.00

426. Concreting of Kalawit - Labason (Labason side) Road, LabasonL = 11.62 kms.

Upgrading of existing

Provincial and Barangay Roads

Labason, ZDN km. 11.62 Plans and POW GAA 2 - - - 174,300.00 - - 174,300.00

427. Concreting of NRJ - Bangangon - San Juan Road, Mun. of GutalacL = 5.6154 kms.

Upgrading of existing

Provincial and Barangay Roads

Gutalac, ZDN km. 5.62 Plans and POW GAA 2 - - - - 89,920.00 - 89,920.00

428. Concreting of Salvador - San Vicente - Tipan Road, Mun. of GutalacL = 15.6 kms.

Upgrading of existing

Provincial and Barangay Roads

Gutalac, ZDN km. 15.6 Plans and POW GAA 2 - - - - 249,600.00 - 249,600.00

429. Concreting of NRJ - Sas - Talaptap Road, Mun. of GutalacL = 6.9231077 kms.

Upgrading of existing

Provincial and Barangay Roads

Gutalac, ZDN km. 6.92 Plans and POW GAA 2 - - - - 110,880.00 - 110,880.00

430. Concreting of NRJ - New Dapitan Road, Mun. of GutalacL = 0.85 kms.

Upgrading of existing

Provincial and Barangay Roads

Gutalac, ZDN km. 0.85 Plans and POW GAA 2 - - - - 13,600.00 - 13,600.00

431. Concreting of Concreting of Poblacion - Mamad - Alegria - Diculom Road, BaliguianL = 11 kms.

Upgrading of existing

Provincial and Barangay Roads

Baliguian, ZDN km. 11 Plans and POW GAA 2 - - - 154,000.00 - - 154,000.00

432. Concreting of Bucana - Lituban - D. Riconalla Road, Mun. of SioconL = 8.95 kms.

Upgrading of existing

Provincial and Barangay Roads

Siocon, ZDN km. 8.95 Plans and POW GAA 2 - - - 125,300.00 - - 125,300.00

433. Concreting of Siocon - San Jose - Siay - Pisawak Road, Mun. of SioconL = 6.98 kms.

Upgrading of existing

Provincial and Barangay Roads

Siocon, ZDN km. 6.98 Plans and POW GAA 2 - - - 97,720.00 - - 97,720.00

434. Concreting of Siay - Pisawak - Kilalaban Road, Mun. of SioconL = 21 kms.

Upgrading of existing

Provincial and Barangay Roads

Siocon, ZDN km. 21 Plans and POW GAA 2 - - - 294,000.00 - - 294,000.00

435. Concreting of Lunday - Litawan Road, Municipality of SibucoL = 28 kms.

Upgrading of existing

Provincial and Barangay Roads

Sibuco, ZDN km. 28 Plans and POW GAA 2 - - - - 420,000.00 - 420,000.00

Chapter 19-1-DPWH IX-ZDN 2DEOPage 27 of 35

Page 262: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation LGU Proponent RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

436. Concreting of Pob. Sibuco - Sto. Niño Road, Mun. of SibucoL = 8.6 kms.

Upgrading of existing

Provincial and Barangay Roads

Sibuco, ZDN km. 8.6 Plans and POW GAA 2 - - - - 129,000.00 - 129,000.00

437. Concreting of Sto. Niño - Lawin Road, Mun. of SibucoL = 16 kms.

Upgrading of existing

Provincial and Barangay Roads

Sibuco, ZDN km. 16 Plans and POW GAA 2 - - - - 256,000.00 - 256,000.00

438. Concreting of Sibuco - Lunday Road, Mun. of SibucoL = 16 kms.

Upgrading of existing

Provincial and Barangay Roads

Sibuco, ZDN km. 16 Plans and POW GAA 2 - - - - 256,000.00 - 256,000.00

439. Concreting of Jatian - Lakiki Road, Mun. of SibucoL = 6.0 kms.

Upgrading of existing

Provincial and Barangay Roads

Sibuco, ZDN km. 6 Plans and POW GAA 2 - - - - - 102,000.00 102,000.00

440. Concreting of Piakan Proper - Lubok Kulasian Road, Mun. of SirawaiL = 6.0 kms.

Upgrading of existing

Provincial and Barangay Roads

Sirawai, ZDN km. 6 Plans and POW GAA 2 - - - - - 102,000.00 102,000.00

441. Concreting of Barangay Road - Banbanan, Tampilisan, Zamboanga del Norte

Road Concreting Tampilisan km. 0.51 Plans and POW GAA 2 6,000.00 6,000.00 Added FY 2019 GAA

442. Concreting of Barangay Road - Banigan, Liloy, Zamboanga del Norte

Road Concreting Liloy km. 0.6 Plans and POW GAA 2 6,000.00 6,000.00 Added FY 2019 GAA

443. Concreting of Barangay Road - Latabon, Siocon, Zamboanga del Norte

Road Concreting Siocon km. 0.5 Plans and POW GAA 2 6,000.00 6,000.00 Added FY 2019 GAA

444. Concreting of Barangay Road - Lipakan, Salug, Zamboanga del Norte

Road Concreting Salug km. 0.54 Plans and POW GAA 2 6,000.00 6,000.00 Added FY 2019 GAA

445. Concreting of Barangay Road - New Calamba, Kalawit, Zamboanga del Norte

Road Concreting Kalawit km. 0.57 Plans and POW GAA 2 6,000.00 6,000.00 Added FY 2019 GAA

446. Concreting of Barangay Road - S. Cabral, Siocon, Zamboanga del Norte

Road Concreting Siocon km. 0.53 Plans and POW GAA 2 6,000.00 6,000.00 Added FY 2019 GAA

447. Concreting of Barangay Road - Sioran, Godod, Zamboanga del Norte

Road Concreting Godod km. 0.825 Plans and POW GAA 2 10,000.00 10,000.00 Added FY 2019 GAA

b. Bridges - 448. Construction of Bridge, Barangay

El Paraiso, Liloy, Zamboanga del Norte

Construction of Bridge Liloy No. of Bridge 1 Plans and POW GAA 2 100,000.00 100,000.00 Added FY 2018 GAA

449. Const. of RCDG Bridge at Brgy. Sibalic (Sibalic River), Gutalac

Construction of Bridge

Gutalacsq.m. Plans and POW GAA 2

109.23 109.23

450. Const. of RCDG Bridge at Brgy. Lomogom (Palandok River), Godod

Construction of Bridge

Gododsq.m. Plans and POW GAA 2

122.16 122.16

451. Const. of Panganuran RCDG Br. Upgrading of existing bridges in the province

Gutalac, ZDN sq.m. Plans and POW GAA 2 - - - 54,000.00 - 54,000.00 54M transferred to 2021 from 2019

452. Const. of 5 Bridges along Baliguian - Mamad - Milidan Road

Upgrading of existing bridges in the province

Baliguian, ZDN sq.m. Plans and POW GAA 2 - - - 200,000.00 - 200,000.00 200M transferred to 2021 from 2019

453. Const. of Siocon Bridge, Siocon, Zamboanga del Norte

Upgrading of existing bridges in the province

Baliguian, ZDN sq.m. Plans and POW GAA 2 - - - 100,000.00 - 100,000.00 200M transferred to 2021 from 2019

Chapter 19-1-DPWH IX-ZDN 2DEOPage 28 of 35

Page 263: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation LGU Proponent RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

c. Water Supply - 454. Construction of Water System

(Level II), Sibuco, Zamboanga del Norte

Construction of Water Supply

SystemSibuco 1 proj. Plans and POW GAA 2 5,000.00 5,000.00

D. Local Infrastructure Program - - Buildings and Other Structures - - a. Multipurpose/Facilities - -

455. Construction of Multipurpose Building (Covered Court)Mangop, Leon Postigo

Construction of Multipurpose

BuildingLeon Postigo, ZN 1 proj. Plans and POW GAA 2 - 3,800.00 3,800.00

from 3M to 3.8M based on FY 2019 GAA

456. Construction of Multipurpose Building (Covered Court)Punta, Liloy

Construction of Multipurpose

BuildingLiloy, ZN 1 proj. Plans and POW GAA 2 -

3,000.00 3,000.00

3M transferred to 2021 from 2019

457. Construction of Multipurpose Building (Covered Court)Mucas, Salug

Construction of Multipurpose

BuildingSalug, ZN 1 proj. Plans and POW GAA 2 - 3,000.00 3,000.00

3M transferred to 2021 from 2019

458. Construction of Multipurpose Building (Covered Court)Paraiso, Kalawit

Construction of Multipurpose

BuildingKalawit, ZN 1 proj. Plans and POW GAA 2 - 3,000.00 3,000.00

3M transferred to 2021 from 2019

459. Construction of Multipurpose Building (Covered Court)Tipan, Gutalac

Construction of Multipurpose

BuildingGutalac, ZN 1 proj. Plans and POW GAA 2 - 3,000.00 3,000.00

3M transferred to 2021 from 2019

460. Construction of Multipurpose Building (Covered Court)San Juan, Gutalac

Construction of Multipurpose

BuildingGutalac, ZN 1 proj. Plans and POW GAA 2 - 3,405.00 3,405.00

461. Construction of Multipurpose Building (Covered Court)San Vicente, Gutalac

Construction of Multipurpose

BuildingGutalac, ZN 1 proj. Plans and POW GAA 2 - 3,405.00 3,405.00

462. Construction of Multipurpose Building (Covered Court)Matunoy, Gutalac

Construction of Multipurpose

BuildingGutalac, ZN 1 proj. Plans and POW GAA 2 - 3,000.00 3,000.00

3M transferred to 2021 from 2019

463. Construction of Multipurpose Building (Covered Court)Bucana, Siocon, Zamboanga del Norte

Construction of Multipurpose

BuildingSiocon, ZN 1 proj. Plans and POW GAA 2 - 3,810.00 3,810.00

464. Construction of Multipurpose Building (Covered Court)S. Arabi, Siocon

Construction of Multipurpose

BuildingSiocon, ZN 1 proj. Plans and POW GAA 2 - - 3,000.00 3,000.00

3M transferred to 2021 from 2019

465. Construction of Multipurpose Building (Covered Court), Calucap, Salug, Zamboanga del Norte

Construction of Multipurpose

BuildingSalug, ZN 1 proj. Plans and POW GAA 2 - 3,767.00 3,767.00

466. Construction of Multipurpose Building (Covered Court), Gatas, Kalawit, Zamboanga del Norte

Construction of Multipurpose

BuildingGatas, Kalawit, ZN 1 proj. Plans and POW GAA 2 - 3,767.00 3,767.00

467. Construction of Multipurpose Building (Covered Court), Godod Central School, Poblacion, Godod, Zamboanga del Norte

Construction of Multipurpose

BuildingGodod, ZN 1 proj. Plans and POW GAA 2 - 3,787.00 3,787.00

468. Construction of Multipurpose Building (Covered Court), Imelda, Labason, Zamboanga del Norte

Construction of Multipurpose

BuildingImelda, ZN 1 proj. Plans and POW GAA 2 - 3,752.00 3,752.00

469. Construction of Multipurpose Building (Covered Court), Lubok Elementary School, Lubok, Sirawai, Zamboanga del Norte

Construction of Multipurpose

BuildingGodod, ZN 1 proj. Plans and POW GAA 2 - 3,822.00 3,822.00

Chapter 19-1-DPWH IX-ZDN 2DEOPage 29 of 35

Page 264: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation LGU Proponent RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

470. Construction of Multipurpose Building (Covered Court), Manil, Leon B. Postigo, Zamboanga del Norte

Construction of Multipurpose

BuildingLeon Postigo, ZN 1 proj. Plans and POW GAA 2 - 3,782.00 3,782.00

471. Construction of Multipurpose Building (Covered Court), Puliran, Sibuco, Zamboanga del Norte

Construction of Multipurpose

BuildingSibuco, ZN 1 proj. Plans and POW GAA 2 - 3,932.00 3,932.00

472. Construction of Multipurpose Building (Covered Court), San Jose Elementary School, San Jose, Baliguian, Zamboanga del Norte

Construction of Multipurpose

BuildingBaliguian, ZN 1 proj. Plans and POW GAA 2 - 3,792.00 3,792.00

473. Construction of Multipurpose Building (Covered Court), Silucap, Liloy, Zamboanga del Norte

Construction of Multipurpose

BuildingLiloy, ZN 1 proj. Plans and POW GAA 2 - 3,762.00 3,762.00

474. Construction of Multipurpose Building (Covered Court), Tilubog, Tampilisan, Zamboanga del Norte

Construction of Multipurpose

BuildingTampilisan, ZN 1 proj. Plans and POW GAA 2 - 3,774.00 3,774.00

475. Construction of Multipurpose Bldg. (Covered Court), Nacibac, Leon B. Postigo, Zamboanga del Norte

Construction of Multipurpose

BuildingLeon B. Postigo 1 proj. Plans and POW GAA 2 3,782.00 3,782.00

476. Construction of Multipurpose Bldg. (Covered Court), Poblacion West, Salug, Zamboanga del Norte

Construction of Multipurpose

BuildingSalug 1 proj. Plans and POW GAA 2 3,768.00 3,768.00

477. Construction of Multipurpose Bldg. (Covered Court), Poblacion, Godod, Zamboanga del Norte

Construction of Multipurpose

BuildingGodod 1 proj. Plans and POW GAA 2 3,787.00 3,787.00

478. Construction of Multipurpose Bldg. (Covered Court), Cabangcalan, Liloy, Zamboanga del Norte

Construction of Multipurpose

BuildingLiloy 1 proj. Plans and POW GAA 2 3,763.00 3,763.00

479. Construction of Multipurpose Bldg. (Covered Court), Tininggaan, Tampilisan, Zamboanga del Norte

Construction of Multipurpose

BuildingTampilisan 1 proj. Plans and POW GAA 2 3,774.00 3,774.00

480. Construction of Multipurpose Bldg. (Covered Court), Daniel Maing, Kalawit, Zamboanga del Norte

Construction of Multipurpose

BuildingKalawit 1 proj. Plans and POW GAA 2 3,768.00 3,768.00

481. Construction of Multipurpose Bldg. (Covered Court), Balas, Labason, Zamboanga del Norte

Construction of Multipurpose

BuildingLabason 1 proj. Plans and POW GAA 2 3,752.00 3,752.00

482. Construction of Multipurpose Bldg. (Covered Court), Sas, Gutalac, Zamboanga del Norte

Construction of Multipurpose

BuildingGutalac 1 proj. Plans and POW GAA 2 3,773.00 3,773.00

483. Construction of Multipurpose Bldg. (Covered Court), Poblacion, Gutalac, Zamboanga del Norte

Construction of Multipurpose

BuildingGutalac 1 proj. Plans and POW GAA 2 3,772.00 3,772.00

484. Construction of Multipurpose Bldg. (Covered Court), St. Mary, Sirawai, Zamboanga del Norte

Construction of Multipurpose

BuildingSirawai 1 proj. Plans and POW GAA 2 3,823.00 3,823.00

Chapter 19-1-DPWH IX-ZDN 2DEOPage 30 of 35

Page 265: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation LGU Proponent RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

485. Construction of Multipurpose Bldg. (Covered Court), Candiz, Siocon, Zamboanga del Norte

Construction of Multipurpose

BuildingSiocon 1 proj. Plans and POW GAA 2 3,810.00 3,810.00

486. Construction of Multipurpose Bldg. (Siocon Public Market), Siocon, Zamboanga del Norte 3rd LD

Construction of Multipurpose

BuildingSiocon 1 proj. Plans and POW GAA 2 2,000.00 2,000.00

487. Construction of Multipurpose Bldg. (Covered Court), Malayal, Sibuco, Zamboanga del Norte

Construction of Multipurpose

BuildingSibuco 1 proj. Plans and POW GAA 2 3,932.00 3,932.00

488. Construction of Multipurpose Bldg. (Subanen Cultural Heritage Bldg.), Tabayo, Siocon, Zamboanga del Norte

Construction of Multipurpose

BuildingSiocon 1 proj. Plans and POW GAA 2 1,500.00 1,500.00

489. Construction of a Multi-purpose Building (Covered Court), Barangay Imelda, Labason, Zamboanga del Norte

Construction of Multipurpose

BuildingLabason No. of Blg. 1 Plans and POW GAA 2 5,000.00 5,000.00 Added FY 2018 GAA

490. Construction of a Multi-purpose Building (Livelihood Center), Barangay Kipit, Labason, Zamboanga del Norte

Construction of Multipurpose

BuildingLabason No. of Blg. 1 Plans and POW GAA 2 2,500.00 2,500.00 Added FY 2018 GAA

491. Construction of a Multi-purpose Building (Livelihood Center), Barangay Poblacion, Gutalac, Zamboanga del Norte

Construction of Multipurpose

BuildingGutalac No. of Blg. 1 Plans and POW GAA 2 2,500.00 2,500.00 Added FY 2018 GAA

492. Construction of a Multi-purpose Building (Livelihood Center), Barangay Poblacion, Tampilisan Zamboanga del Norte

Construction of Multipurpose

BuildingTampilisan No. of Blg. 1 Plans and POW GAA 2 2,500.00 2,500.00 Added FY 2018 GAA

493. Construction of a Multi-purpose Building, Kalawit, Zamboanga del Norte

Construction of Multipurpose

BuildingKalawit No. of Blg. 1 Plans and POW GAA 2 5,000.00 5,000.00 Added FY 2018 GAA

494. Construction of a Multi-purpose Building (Covered Court), Bacungan National High School, Barangay Bacungan, Leon Postigo, Zamboanga del Norte

Construction of Multipurpose

BuildingLeon Postigo No. of Blg. 1 Plans and POW GAA 2 3,000.00 3,000.00 Added FY 2018 GAA

495. Construction of Multi-purpose Building (Municipal Library Building.), Leon B. Postigo, Zamboanga del Norte

Construction of Multipurpose

BuildingLeon Postigo No. of Blg. 1 Plans and POW GAA 2 5,000.00 5,000.00 Added FY 2018 GAA

496. Completion of Multi-Purpose Building (Covered Court), Brgy. La Libertad,Gutalac, Zamboanga del Norte

Construction of Multipurpose

Building FlooringGutalac No. of Blg. 1 Plans and POW GAA 2 355.00 355.00 Added FY 2019 GAA

497. Completion of Multi-Purpose Building (Covered Court), Brgy. Lawigan,Labason, Zamboanga del Norte

Construction of Multipurpose

Building FlooringLabason No. of Blg. 1 Plans and POW GAA 2 340.00 340.00 Added FY 2019 GAA

498. Completion of Multi-Purpose Building (Covered Court), Brgy. New Calamba,Kalawit, Zamboanga del Norte

Construction of Multipurpose

Building FlooringKalawit No. of Blg. 1 Plans and POW GAA 2 390.00 390.00 Added FY 2019 GAA

499. Completion of Multi-Purpose Building (Covered Court), Brgy. Salvador,Gutalac, Zamboanga del Norte

Construction of Multipurpose

Building FlooringGutalac No. of Blg. 1 Plans and POW GAA 2 355.00 355.00 Added FY 2019 GAA

Chapter 19-1-DPWH IX-ZDN 2DEOPage 31 of 35

Page 266: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation LGU Proponent RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

500. Completion of Multi-Purpose Building (Covered Court), Salug National High School, Brgy. Poblacion,Salug, Zamboanga del Norte

Construction of Multipurpose

Building FlooringSalug No. of Blg. 1 Plans and POW GAA 2 400.00 400.00 Added FY 2019 GAA

501. Completion of Multi-Purpose Building (Covered Court), Sitio San Roque, Brgy. Poblacion,Kalawit, Zamboanga del Norte

Construction of Multipurpose

Building FlooringKalawit No. of Blg. 1 Plans and POW GAA 2 390.00 390.00 Added FY 2019 GAA

502. Construction of Multi-Purpose Building (Covered Court), Brgy. Dipolod,Salug, Zamboanga del Norte

Construction of Multipurpose

BuildingSalug No. of Blg. 1 Plans and POW GAA 2 3,800.00 3,800.00 Added FY 2019 GAA

503. Construction of Multi-Purpose Building (Covered Court), Brgy. Lakiki,Sibuco, Zamboanga del Norte

Construction of Multipurpose

BuildingSibuco No. of Blg. 1 Plans and POW GAA 2 3,950.00 3,950.00 Added FY 2019 GAA

504. Construction of Multi-Purpose Building (Covered Court), Brgy. Lumay,Baliguian, Zamboanga del Norte

Construction of Multipurpose

BuildingBaliguian No. of Blg. 1 Plans and POW GAA 2 3,800.00 3,800.00 Added FY 2019 GAA

505. Construction of Multi-Purpose Building (Covered Court), Brgy. Makiang,Siocon, Zamboanga del Norte

Construction of Multipurpose

BuildingSiocon No. of Blg. 1 Plans and POW GAA 2 3,850.00 3,850.00 Added FY 2019 GAA

506. Construction of Multi-Purpose Building (Covered Court), Brgy. Overview,Liloy, Zamboanga del Norte

Construction of Multipurpose

BuildingLiloy No. of Blg. 1 Plans and POW GAA 2 3,800.00 3,800.00 Added FY 2019 GAA

507. Construction of Multi-Purpose Building (Covered Court), Brgy. Pisawak,Siocon, Zamboanga del Norte

Construction of Multipurpose

BuildingSiocon No. of Blg. 1 Plans and POW GAA 2 3,850.00 3,850.00 Added FY 2019 GAA

508. Construction of Multi-Purpose Building (Covered Court), Brgy. Pitawe,Gutalac, Zamboanga del Norte

Construction of Multipurpose

BuildingGutalac No. of Blg. 1 Plans and POW GAA 2 3,520.00 3,520.00 Added FY 2019 GAA

509. Construction of Multi-Purpose Bldg. (Covered Court), Brgy. Poblacion,Tampilisan, Zamboanga del Norte

Construction of Multipurpose

BuildingTampilisan No. of Blg. 1 Plans and POW GAA 2 3,800.00 3,800.00 Added FY 2019 GAA

510. Construction of Multi-Purpose Building (Covered Court), Brgy. Tiogan, Bacungan (Leon B. Postigo),Zamboanga del Norte

Construction of Multipurpose

BuildingLeon B. Postigo No. of Blg. 1 Plans and POW GAA 2 3,800.00 3,800.00 Added FY 2019 GAA

511. Construction of Multi-Purpose Building (Covered Court), Fatima Central School, Brgy. Fatima,Liloy, Zamboanga del Norte

Construction of Multipurpose

BuildingLiloy No. of Blg. 1 Plans and POW GAA 2 3,800.00 3,800.00 Added FY 2019 GAA

512. Construction of Multi-Purpose Building (Covered Court), Lubok National High School, Brgy. Lubok,Sirawai, Zamboanga del Norte

Construction of Multipurpose

BuildingSirawai No. of Blg. 1 Plans and POW GAA 2 3,850.00 3,850.00 Added FY 2019 GAA

Chapter 19-1-DPWH IX-ZDN 2DEOPage 32 of 35

Page 267: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation LGU Proponent RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

513. Construction of Multi-Purpose Building (Covered Court), Pianon National High School, Brgy. Pianon, Kalawit, Zamboanga del Norte

Construction of Multipurpose

BuildingKalawit No. of Blg. 1 Plans and POW GAA 2 3,800.00 3,800.00 Added FY 2019 GAA

514. Construction of Multi-Purpose Building (Covered Court), Rambon Elementary School, Brgy. Rambon,Godod, Zamboanga del Norte

Construction of Multipurpose

BuildingGodod No. of Blg. 1 Plans and POW GAA 2 3,800.00 3,800.00 Added FY 2019 GAA

515. Construction of Multi-Purpose Building (Covered Court), Sibuco National High School,Sibuco, Zamboanga del Norte

Construction of Multipurpose

BuildingSibuco No. of Blg. 1 Plans and POW GAA 2 3,950.00 3,950.00 Added FY 2019 GAA

516. Construction of Multi-Purpose Building (Covered Court), Sitio Bucana, Brgy. Osukan,Labason, Zamboanga del Norte

Construction of Multipurpose

BuildingLabason No. of Blg. 1 Plans and POW GAA 2 3,800.00 3,800.00 Added FY 2019 GAA

517. Construction of Multi-Purpose Building (Covered Court), Ubay National High School, Brgy. Ubay,Labason, Zamboanga del Norte

Construction of Multipurpose

BuildingLabason No. of Blg. 1 Plans and POW GAA 2 3,800.00 3,800.00 Added FY 2019 GAA

518. Construction of Multi-Purpose Building (TESDA Provincial Training Center - Liloy Extension),Liloy, Zamboanga del Norte

Construction of Multipurpose

BuildingLiloy No. of Blg. 1 Plans and POW GAA 2 3,000.00 3,000.00 Added FY 2019 GAA

519. Construction/Completion of Multi-Purpose Building, Brgy. Poblacion, Tampilisan, Zamboanga del Norte

Construction of Multipurpose

BuildingTampilisan No. of Blg. 1 Plans and POW GAA 2 2,000.00 2,000.00 Added FY 2019 GAA

520. Construction of Multi-Purpose Building (Covered Court), Gutalac Central School, Brgy. Poblacion, Gutalac,Zamboanga del Norte

Construction of Multipurpose

BuildingGutalac No. of Blg. 1 Plans and POW GAA 2 4,000.00 4,000.00 Added FY 2019 GAA

521. Construction of Multi-Purpose Building, Brgy. Manaol Brgy. Hall, Siocon, Zamboanga del Norte

Construction of Multipurpose

BuildingSiocon No. of Blg. 1 Plans and POW GAA 2 2,000.00 2,000.00 Added FY 2019 GAA

522. Construction of Multi-Purpose Building, Brgy. Latabon, Siocon, Zamboanga del Norte

Construction of Multipurpose

BuildingSiocon No. of Blg. 1 Plans and POW GAA 2 2,500.00 2,500.00 Added FY 2019 GAA

b. Flood Control and Drainage - - 523. Drainage System Poblacion and

Jatail Sibuco, Zamboanga del Norte

Improvement/ construction of drainage system

Siocon, ZN sq.m. Plans and POW GAA 2 - - 20,000.00 20,000.00 20M transferred to 2021 from 2019

524. Construction of Reinforced Concrete Box Culvert, Sitio Kianan, Poblacion, Leon B. Postigo, Zamboanga del Norte

Construction of Flood Mitigation

StructureLeon Postigo, ZN sq.m. Plans and POW GAA 2 - 2,000.00 2,000.00

c Water Management Facilities - - 525. Construction of Water Supply

(Level II), Sto. Niño, Salug, Zamboanga del Norte

Construction of Water Supply

SystemSalug, ZN 1 proj. Plans and POW GAA 2 - 1,443.00 1,443.00

526. Construction of Water Supply (Level II), Bongalao, Sibuco, Zamboanga del Norte

Construction of Water Supply

SystemSibuco, ZN 1 proj. Plans and POW GAA 2 - 3,000.00 3,000.00

Chapter 19-1-DPWH IX-ZDN 2DEOPage 33 of 35

Page 268: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation LGU Proponent RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

527. Construction of Water Supply System (Level II), Candelaria, Liloy, Zamboanga del Norte

Construction of Water Supply

SystemLiloy, ZN 1 proj. Plans and POW GAA 2 - 2,000.00 2,000.00

528. Construction of Water Supply System (Level II), Goin, Liloy, Zamboanga del Norte

Construction of Water Supply

SystemLiloy, ZN 1 proj. Plans and POW GAA 2 - 2,200.00 2,200.00

529. Construction of Water Supply System (Level II), Ipilan, Salug, Zamboanga del Norte

Construction of Water Supply

SystemSalug, ZN 1 proj. Plans and POW GAA 2 - 2,000.00 2,000.00

530. Construction of Water Supply System (Level II), Lipakan, Salug, Zamboanga del Norte

Construction of Water Supply

SystemSalug, ZN 1 proj. Plans and POW GAA 2 - 2,000.00 2,000.00

531. Construction of Water Supply System (Level II), Morob-Mangop-Bogabongan, Leon B. Postigo, Zamboanga del Norte

Construction of Water Supply

SystemLeon Postigo, ZN 1 proj. Plans and POW GAA 2 - 2,800.00 2,800.00

532. Construction of Water Supply System (Level II), New Calamba, Kalawit, Zamboanga del Norte

Construction of Water Supply

SystemKalawit, ZN 1 proj. Plans and POW GAA 2 - 2,000.00 2,000.00

533. Construction of Water Supply System (Level II), Tugop, Kalawit, Zamboanga del Norte

Construction of Water Supply

SystemKalawit, ZN 1 proj. Plans and POW GAA 2 - 2,000.00 2,000.00

534. Water System (Spring Development), Barangay Sipacong, Leon Postigo, Zamboanga del Norte

Construction of Water Supply

SystemLeon B. Postigo No. of Water

Supply System 1 Plans and POW GAA 2 2,000.00 2,000.00 Added FY 2018 GAA

535. Construction of Potable Water System, Canawan, Salug, Zamboanga del Norte

Construction of Water Supply

SystemSalug 1 proj. Plans and POW GAA 2 996.00 996.00

536. Construction of Water Supply System (level II) - Cabangcalan, Liloy, Zamboanga del Norte

Construction of Water Supply

SystemLiloy No. of Water

Supply System 1 Plans and POW GAA 2 2,000.00 2,000.00 Added FY 2019 GAA

537. Construction of Water Supply System (level II) - Mabuhay, Liloy, Zamboanga del Norte

Construction of Water Supply

SystemLiloy No. of Water

Supply System 1 Plans and POW GAA 2 2,000.00 2,000.00 Added FY 2019 GAA

538. Construction of Water Supply System (level II) - Cawit-Cawit , Sibuco, Zamboanga del Norte

Construction of Water Supply

SystemSibuco No. of Water

Supply System 1 Plans and POW GAA 2 3,500.00 3,500.00

539. Construction of Water Supply System (level II) - Lambaguan, Sibuco, Zamboanga del Norte

Construction of Water Supply

SystemSibuco No. of Water

Supply System 1 Plans and POW GAA 2 3,500.00 3,500.00

540. Construction of Water Supply System (level II) - Pangian, Sibuco, Zamboanga del Norte

Construction of Water Supply

SystemSibuco No. of Water

Supply System 1 Plans and POW GAA 2 3,500.00 3,500.00

541. Construction of Water Supply System (level II) - Sitio Binawing, Lintangan, Sibuco, Zamboanga del Norte

Construction of Water Supply

SystemSibuco No. of Water

Supply System 1 Plans and POW GAA 2 3,500.00 3,500.00

542. Construction of Water Supply System (level II) - Pasilnahut, Sibuco, Zamboanga del Norte

Construction of Water Supply

SystemSibuco No. of Water

Supply System 1 Plans and POW GAA 2 5,000.00 5,000.00

543. Construction of Water Supply System (level II) - Lingayon, Sibuco, Zamboanga del Norte

Construction of Water Supply

SystemSibuco No. of Water

Supply System 1 Plans and POW GAA 2 3,000.00 3,000.00

544. Construction of Water Supply System (level II) - Guimba Parang, Malayal, Sibuco, Zamboanga del Norte

Construction of Water Supply

SystemSibuco No. of Water

Supply System 1 Plans and POW GAA 2 5,000.00 5,000.00

Chapter 19-1-DPWH IX-ZDN 2DEOPage 34 of 35

Page 269: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation LGU Proponent RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

545. Construction of Water Supply System (level II) - Paniran, Sibuco, Zamboanga del Norte

Construction of Water Supply

SystemSibuco No. of Water

Supply System 1 Plans and POW GAA 2 5,000.00 5,000.00

546. Construction of Water Supply System (level II) - Sitio Teo, Lunday, Sibuco, Zamboanga del Norte

Construction of Water Supply

SystemSibuco No. of Water

Supply System 1 Plans and POW GAA 2 5,000.00 5,000.00

547. Construction of Water Supply System (level II) - Cusipan, Sibuco, Zamboanga del Norte

Construction of Water Supply

SystemSibuco No. of Water

Supply System 1 Plans and POW GAA 2 5,000.00 5,000.00

548. Construction of Water Supply System (level II) - Dinolan, Sibuco, Zamboanga del Norte

Construction of Water Supply

SystemSibuco No. of Water

Supply System 1 Plans and POW GAA 2 5,000.00 5,000.00

Regionwide - Local Infrastructure Program - a. Local Roads -

549. Concreting of Fatima - Villa M. Tejero, Mun. of LiloyL = 4.7 kms.

Upgrading of existing

Provincial and Barangay Roads

Liloy, ZDN km. 4.7 Plans and POW GAA 2 10,000.00 - - 65,800.00 - 75,800.00

65.8M transferred to 2021 from 2019

Buildings and Other Structures - b. Multipurpose/Facilities -

550. Construction of Multipurpose Building in Poblacion, Leon B. Postigo, Zamboanga del Norte

Construction of Multipurpose

BuildingLeon B. Postigo 1 proj. Plans and POW GAA 2 - 3,000.00 3,000.00

551. Construction of Multi-Purpose Hall, Brgy. Poblacion,Sibuco, Zamboanga del Norte

Construction of Multipurpose

BuildingSibuco No. of Blg. 1 Plans and POW GAA 2 10,000.00 10,000.00 Added FY 2019 GAA

213,304.00 554,500.00 2,162,625.00 3,260,215.40 5,108,913.39 2,000,200.00 13,299,757.79 2,743,236.00 3,006,396.00 2,281,321.00 10,029,666.40 17,037,207.39 7,917,190.00 43,015,016.79 GRAND TOTAL

Subtotal

Chapter 19-1-DPWH IX-ZDN 2DEOPage 35 of 35

Page 270: Table of Contents (By Chapter)

Updated Zamboanga Peninsula Regional Development Investment Program (RDIP), 2017-2022

Agency: DPWH IXChapter 19: Accelerating Infrastructure Development

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

ZAMBOANGA DEL NORTE 3RD DEO, SEGABE, PIÑANZAMBOANGA DEL NORTE 1ST LEGISLATIVE DISTRICTa. OO1: Ensure Safe and Reliable National Road System

(i) Asset Preservation of National Roads1. Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development Management-4 (HDM-4)

a. Primary Road1. Dipolog - Oroquieta National Road Concrete

Reconstruction (Asphalt to concrete

Rizal km. Plans and POW GAA 3 50,000.00 100,000.00 55,818.00 411,848.00 220,000.00 837,666.00

b. Secondary Road - 2. Jct. Polo - Dapitan Park National

Road K1826+921 - K1828+427, Length = 1.510 km.

Concrete Reconstruction (Asphalt to concrete

Dapitan km. 1.51 Plans and POW GAA 3 - - 38,958.00 38,958.00 77,916.00

3. Jct. Pulauan Port Road K1827+(-320) - K1827+(-253) Length = 0.067 km.

Concrete Reconstruction (Asphalt to concrete

Dapitan km. 0.067 Plans and POW GAA 3 - 13,836.00 1,500.00 1,500.00 16,836.00

4. Jct. Pulauan Port Road K1828+215 - K1828+438 Length = 0.223 km.

Concrete Reconstruction (Asphalt to concrete

Dapitan km. 0.223 Plans and POW GAA 3 - 13,836.00 4,014.00 17,850.00

5. Rizal - Dakak - Dapitan Coastal Loop Road

Concrete Reconstruction (Asphalt to concrete

Dapitan km. 1.846 Plans and POW GAA 3 - 164,070.00 50,000.00 76,337.72 290,407.72

6. Rizal - Dakak - Dapitan Coastal Loop Road K1859+430 K1860+254

Concrete Reconstruction (Asphalt to concrete

Dapitan km. 0.824 Plans and POW GAA 3 38,154.00 38,154.00 76,308.00

7. Rizal - Dakak - Dapitan Coastal Loop Road K1840+557 K1840+905,K1843+674 K1843+995,K1844+828 K1844+903,K1845+419 K1845+522,K1819+821 K1820+000

Concrete Reconstruction (Asphalt to concrete

Dapitan km. 1.846 Plans and POW GAA 3 38,183.72 38,183.72 76,367.44

c. Tertiary Road km. 3 - 8. Dipolog - Polanco - Piñan - Jct.

Oroquieta RoadConcrete Reconstruction (Asphalt to concrete

Piñan km. Plans and POW 3 - 125,142.00 100,447.00 225,589.00

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Page 271: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

9. Dipolog - Polanco - Piñan - Jct. Oroquieta RoadK1810+(471) - K1811+000K1812+610 - K1813+717 K1813+961 - K1814+642K1814+652 - K1815+609

Concrete Reconstruction (Asphalt to concrete

Piñan km. 4.298 Plans and POW 3 - 130,000.00 130,000.00

10. Dipolog - Polanco - Piñan - Jct. Oroquieta RoadK1815+609 - K1815+928K1819+487 - K1820+077K1820+088 - K1823+000

Concrete Reconstruction (Asphalt to concrete

Piñan km. 4.792 Plans and POW 3 - 134,176.00 134,176.00

11. Dipolog - Polanco - Piñan - Jct. Oroquieta RoadK1823+000 - K1824+736K1826+635 - K1828+926

Concrete Reconstruction (Asphalt to concrete

Piñan km. 3.963 Plans and POW 3 - 110,964.00 110,964.00

12. Road Reconstruction on Flood Prone Area along Dipolog - Oroquieta National Primary Road Burgos - Bitoon Section,K1814+400 - K1817+000Dapitan City, Zamboanga del Norte

Road Concreting km Plans and POW 3 - - 34,000.00 34,000.00 68,000.00

13. Dipolog - Polanco - Piñan - Jct. Oroquieta Road,K1812+610 - K1813+717, K1813+961 - K1814+642, K1814+652 - K1815+000, K1815+609 - K1815+928K1822+518.70 - K1824+736

Concrete Reconstruction (Asphalt to concrete

Piñan km. 4.767 Plans and POW GAA 3 143,000.00 143,000.00

14. Gilbert and Aviles St. National Road Chainage 0 - 223 Length = 0.223 km.

Concrete Reconstruction (Asphalt to concrete

Piñan km. 0.223 Plans and POW GAA 3 4,014.00 4,014.00

15. Piñan - Mutia Road (S01024MN) K1818+000 - K1818+275, K1818+928 - K1819+178, K1826+807 - K1826+901

Concrete Reconstruction (Asphalt to concrete

Piñan km. 0.619 Plans and POW GAA 3 28,003.00 18,707.00 18,707.00 65,417.00

2. Preventive Maintenance based on Pavement Management System - a. Primary Road -

16. Dipolog - Oroquieta National Road Asphalt Overlay Rizal km. Plans and POW 3 -

17. Dipolog - Punta - Dansullan - Sergio Osmeña Road

Asphalt Overlay Sergo Osmeña km. Plans and POW 3 42,698.85 42,698.85

18. Dipolog - Punta - Dansullan - Sergio Osmeña RoadK1857+(-1123) - K1857+334K1857+360 - K1862+164

Asphalt Overlay Sergo Osmeña km. 7.629 Plans and POW 3 114,000.00 114,000.00

Chapter 19-1-DPWH IX-ZDN 3DEOPage 2 of 56

Page 272: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

19. Dipolog - Punta - Dansullan - Sergio Osmeña RoadK1862+164 - K1862+680K1862+886 - K1868+893K1868+920 - K1870+000

Asphalt Overlay Sergo Osmeña km. 7.417 Plans and POW 3 110,000.00 110,000.00

20. Dipolog - Punta - Dansullan - Sergio Osmeña RoadK1870+000 - K1874+539K1874+690 - K1878+000

Asphalt Overlay Sergo Osmeña km. 7.417 Plans and POW 3 112,000.00 112,000.00

21. Dipolog - Punta - Dansullan - Sergio Osmeña RoadK1878+000 - K1882+060K1882+091 - K1884+1488

Asphalt Overlay Sergo Osmeña km. 7.464 Plans and POW 3 112,000.00 112,000.00

22. Dipolog - Punta - Dansullan - Sergio Osmeña RoadK1884+1488 - K1893+688

Asphalt Overlay Sergo Osmeña km. 7.852 Plans and POW 3 118,000.00 118,000.00

b. Secondary Road - 23. Jct. Polo - Dapitan Park National

RoadAsphalt Overlay Dapitan km. Plans and POW 3 - 7,572.00 7,572.00

24. Jct. Palauan Port Road Asphalt Overlay Dapitan km. Plans and POW - - -

25. Rizal - Dakak - Dapitan Coastal Loop Road

Asphalt Overlay Dapitan km. Plans and POW - 3,705.00 10,817.00 14,522.00

26. Rizal - Dakak - Dapitan Coastal Loop Road

Asphalt Overlay Dapitan km. Plans and POW - 110,000.00 115,000.00 225,000.00

27. Rizal - Dakak - Dapitan Coastal Loop Road

Asphalt Overlay Dapitan km. Plans and POW - 114,000.00 120,000.00 234,000.00

c. Tertiary Road - 28. Dipolog - Polanco - Piñan - Jct.

Oroquieta RoadAsphalt Overlay Piñan km. Plans and POW - -

29. Gilbert and Aviles St. National Road

Asphalt Overlay Piñan km. Plans and POW - - -

30. Ilaya Isis - Polanco Road Asphalt Overlay Polanco km. Plans and POW -

31. Piñan - Mutia Road (S01024MN) Asphalt Overlay Piñan km. Plans and POW - - -

32. Piñan - Mutia Dual Road (S01035MN)

Asphalt Overlay Piñan km. Plans and POW - - -

33. Polanco - Macleodes Road Asphalt Overlay Polanco km. Plans and POW - - -

3. Construction/Upgrading/Rehabilitation of Drainage along National Roads - a. Primary Road -

34. Dipolog - Oroquieta National RoadK1824+000 - K1825+000, L=1.023km

Improvement/Construction of Drainage

Dapitan km. 1.023 Plans and POW GAA 10,000.00 10,000.00 20,000.00

35. Dipolog - Punta - Dansullan - Sergio Osmeña RoadK1884+145.31 - K1884+820

Improvement/Construction of Drainage

Sergio Osmeña km. 0.6747 Plans and POW GAA 9,909.00 9,909.00

Chapter 19-1-DPWH IX-ZDN 3DEOPage 3 of 56

Page 273: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

b. Secondary Road - 36. Jct. Polo - Dapitan Park National

RoadK1825+(-260) - K1825+180 (L/S)

Improvement/Construction of Drainage

Dapitan km. 0.44 Plans and POW GAA - - 4,692.72 4,692.72 9,385.44

37. Jct. Palauan Port Road Improvement/Construction of Drainage

Dapitan km. Plans and POW GAA - - -

38. Rizal - Dakak - Dapitan Coastal Loop RoadK1865+760 - K1866+000, L=0.480 km. (B/S)

Improvement/Construction of Drainage

Dapitan km. 0.48 Plans and POW GAA - - 6,800.00 6,800.00 13,600.00

c. Tertiary Road - 39. Dipolog - Polanco - Piñan - Jct.

Oroquieta RoadK1828+000 - K1828+500 (B/S), L=1.0 km

Improvement/Construction of Drainage

Piñan km. 1 Plans and POW GAA - - 10,000.00 10,000.00 20,000.00

40. Gilbert and Aviles St. National Road

Improvement/Construction of Drainage

Dapitan km. Plans and POW GAA -

41. Ilaya Isis - Polanco Road Improvement/Construction of Drainage

Polanco km. Plans and POW GAA 3,100.00 3,100.00 6,200.00

42. Ilaya Isis - Polanco Road k1819+059 - k1819+214 Length = 310 lm.

Improvement/Construction of Drainage

Polanco lm. 310 Plans and POW GAA 3,100.00 3,100.00 6,200.00

43. Piñan - Mutia Road (S01024MN)K1822+572 - K1823+541 (L/S)

Improvement/Construction of Drainage

Piñan km. 0.969 Plans and POW GAA 9,690.00 9,690.00 19,380.00

44. Piñan - Mutia Dual Road (S01035MN)

Improvement/Construction of Drainage

Piñan km. 0.518 Plans and POW GAA 5,480.00 5,480.00 10,960.00

45. Polanco - Macleodes Road Improvement/Construction of Drainage

Polanco km. 0.917 Plans and POW GAA 18,340.00 18,340.00 36,680.00

46. Polanco - Macleodes Road K1828+(-217) - K1828+700 BS Length = 1.834

Improvement/Construction of Drainage

Polanco ln.m. 1834 Plans and POW GAA 18,340.00 18,340.00 36,680.00

4. Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - a. Primary Road -

47. Dipolog - Oroquieta National RoadK1827+621 - 1828+100 Slope

Protection Rizal sq.m. Plans and POW 33,000.00 33,000.00 66,000.00

48. Dipolog - Oroquieta National RoadSlope Protection Rizal sq.m. Plans and POW 110,000.00 112,000.00 222,000.00

49. Dipolog - Punta - Dansullan - Sergio Osmeña Road

Slope Protection Sergo Osmeña sq.m. 3000 Plans and POW 5,800.00 50,000.00 20,000.00 75,800.00

50. Dipolog - Punta - Dansullan - Sergio Osmeña Road

Slope Protection Sergo Osmeña sq.m. Plans and POW 112,000.00 114,000.00 226,000.00

Chapter 19-1-DPWH IX-ZDN 3DEOPage 4 of 56

Page 274: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

51. Dipolog - Punta - Dansullan - Sergio Osmeña Road

Slope Protection Sergo Osmeña sq.m. Plans and POW 108,000.00 110,000.00 218,000.00

b. Secondary Road - 52. Dapitan-Dakak-Rizal Coastal Loop

National RSlope Protection Dapitan sq.m. Plans and POW GAA - - 20,000.00 20,000.00

53. Jct. Polo - Dapitan Park National Road

Slope Protection Dapitan sq.m. Plans and POW GAA - - -

54. Jct. Palauan Port Road Slope Protection Dapitan sq.m. Plans and POW GAA - - -

55. Jct. Palauan Port Road K1827+300 - K1827+380

Slope Protection Dapitan sq.m. Plans and POW GAA - - 40,000.00 40,000.00

56. Jct. Palauan Port Road K1827+450 - K1827+550

Slope Protection Dapitan sq.m. Plans and POW GAA - - 40,000.00 40,000.00

57. Rizal - Dakak - Dapitan Coastal Loop Road

Slope Protection Dapitan sq.m. Plans and POW GAA - 146,000.00 114,000.00 116,000.00 376,000.00

58. Rizal - Dakak - Dapitan Coastal Loop Road, K1825+600 - K1825+700, K1836+820 - K1836+904.74K1852+100 - K1852+540

Slope Protection Sibutad sq.m. 1,911.10 Plans and POW GAA 130,000.00 130,000.00

59. Rizal - Dakak - Dapitan Coastal Loop Road, K1803+520 - K1803+600, K1826+400 - K1826+695, K1853+079 - K1853+30

Slope Protection Rizal sq.m. 800.00 Plans and POW GAA 110,000.00 110,000.00

60. Construction of Rockfall Protection System along Rizal-Dakak-Dapitan Coastal Loop Road, Canlucani Section, Dapitan City, Zamboanga del Norte

Construction of Flood mitigation structure

Canlucani Section, Dapitan City, Zamboanga del Norte

ln.m. Plans and POW GAA 20,000.00 20,000.00

c. Tertiary Road - 61. Dipolog - Polanco - Piñan - Jct.

Oroquieta RoadSlope Protection Piñan sq.m. Plans and POW - - -

62. Gilbert and Aviles St. National Road

Slope Protection Dapitan sq.m. Plans and POW - - -

63. Ilaya Isis - Polanco Road Slope Protection Polanco sq.m. Plans and POW - - -

64. Piñan - Mutia Road (S01024MN) Slope Protection Piñan sq.m. Plans and POW - - -

65. Piñan - Mutia Dual Road (S01035MN)

Slope Protection Piñan sq.m. Plans and POW - - -

66. Polanco - Macleodes Road Slope Protection Polanco sq.m. Plans and POW - - -

(ii) Network Development - 1. Improvement/Widening of National Roads -

a. Primary Road - 67. Dipolog - Oroquieta National Road

Road Widening Rizal km. Plans and POW 550,940.00 200,000.00 150,000.00 62,446.00 105,000.00 1,068,386.00

Chapter 19-1-DPWH IX-ZDN 3DEOPage 5 of 56

Page 275: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

68. Dipolog - Oroquieta National Road K1817+662 - K1819+235.70K1819+441 - K1820+113 K1826+269 - K1826+535 Road Widening Dapitan km. Plans and POW GAA 105,000.00 105,000.00

68. Dipolog - Punta - Dansullan - Sergio Osmeña Road Road Widening Sergo Osmeña km. Plans and POW 200,000.00 150,000.00 350,000.00

69. Dipolog - Punta - Dansullan - Sergio Osmeña RoadK1878+695 - K1884+000

Road Widening Sergo Osmeña km. 5.312 Plans and POW 150,000.00 150,000.00

70. Dipolog - Punta - Dansullan - Sergio Osmeña RoadK1889+273 - K1893+775

Road Widening Sergo Osmeña km. 5.1 Plans and POW 120,000.00 120,000.00

71. Dipolog - Punta - Dansullan - Sergio Osmeña RoadK1884+000 - K1884+870K1887+316 -K1889+273

Road Widening Sergo Osmeña km. 1.505 Plans and POW 102,000.00 102,000.00

b. Secondary Road - 72. Jct. Polo - Dapitan Park National

Road Road Widening Dapitan km. Plans and POW - - -

73. Jct. Palauan Port RoadRoad Widening Dapitan km. Plans and POW - - -

74. Rizal - Dakak - Dapitan Coastal Loop Road Road Widening Dapitan km. Plans and POW - - 102,000.00 220,000.00 322,000.00

75. Rizal - Dakak - Dapitan Coastal Loop Road, including ROW, K1804+949 - K1808+089 Length=3.14 km.

Road Widening Rizal km. 3.14 Plans and POW GAA 110,000.00 110,000.00 220,000.00

76. Rizal - Dakak - Dapitan Coastal Loop Road, including ROW, K1808+089 - K1811+229 Length=3.14 km.

Road Widening Rizal km. 3.14 Plans and POW GAA 110,000.00 110,000.00 220,000.00

77. Rizal - Dakak - Dapitan Coastal Loop RoadK1865+500 - K1867+000 K1867+000 - K1868+881

Road Widening Dapitan km. 1.5 Plans and POW GAA 102,000.00 102,000.00

75. Rizal - Dakak - Dapitan Coastal Loop RoadK1805+000 - K1809+000

Road Widening Dapitan km. 4 Plans and POW 150,000.00 110,000.00 260,000.00

76. Rizal - Dakak - Dapitan Coastal Loop RoadK1809+000 - K1813+000

Road Widening Dapitan km. 4 Plans and POW 150,000.00 120,000.00 270,000.00

77. Rizal - Dakak - Dapitan Coastal Loop RoadK1913+000 - K1817+000

Road Widening Dapitan km. 4 Plans and POW 150,000.00 150,000.00

78. Rizal - Dakak - Dapitan Coastal Loop RoadK1817+000 - K1821+000

Road Widening Dapitan km. 4 Plans and POW 150,000.00 150,000.00

Chapter 19-1-DPWH IX-ZDN 3DEOPage 6 of 56

Page 276: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

79. Rizal - Dakak - Dapitan Coastal Loop Road Road Widening Dapitan km. Plans and POW 120,000.00 120,000.00

80. Rizal - Dakak - Dapitan Coastal Loop Road Road Widening Dapitan km. Plans and POW 114,000.00 114,000.00

c. Tertiary Road - 81. Dipolog - Polanco - Piñan - Jct.

Oroquieta RoadK1810+(-471) - K1814+680,K1815+929 - K1827+644

Road Widening Piñan km. Plans and POW 43,860.00 - 50,000.00 80,912.00 174,772.00

82. Dipolog - Polanco - Piñan - Jct. Oroquieta Road Road Widening Piñan km. Plans and POW 234,000.00 234,000.00

83. Dipolog - Polanco - Piñan - Jct. Oroquieta RoadK1811+290.8 - K1814+640 Road Widening Piñan km. 3.4 Plans and POW 136,000.00 136,000.00

84. Dipolog - Polanco - Piñan - Jct. Oroquieta RoadK1815+928 - K1819+100 Road Widening Piñan km. 3.17 Plans and POW 127,000.00 127,000.00

85. Dipolog - Polanco - Piñan - Jct. Oroquieta RoadK1819+100 - K1822+200

Road Widening Piñan km. 3.106 Plans and POW 124,000.00 124,000.00

86. Dipolog - Polanco - Piñan - Jct. Oroquieta, National Road, incliding ROW, K1815+928 - K1818+700 Length=2.763 km.

Road Widening Piñan km. 2.763 Plans and POW GAA 54,568.00 54,568.00

87. Dipolog - Polanco - Piñan - Jct. Oroquieta Road including RROWK1811+290.80 - K1812+202 Length=0.9132 km.

Road Widening Piñan km. 0.9132 Plans and POW GAA 24,787.00 24,787.00

88. Flaring of Intersection along Dipolog-Polanco-Piñan-Jct. Oroquieta Road (S01032MN) and Ilaya-Isis-Polanco Road (S01033MN) Length=0.12128 km.

Road Widening Polanco km. 0.12128 Plans and POW GAA 1,557.90 1,557.90

89. Dipolog - Polanco - Piñan - Jct. Oroquieta Road including RROWK1812+367 - K1814+542 Length=2.257 km.

Road Widening Piñan km. 2.257 Plans and POW GAA -

90. Dipolog - Polanco - Piñan - Jct. Oroquieta Road including RROWK1818+938 - K1819+972 Length=1.041 km.

Road Widening Polanco km. 1.041 Plans and POW GAA -

Chapter 19-1-DPWH IX-ZDN 3DEOPage 7 of 56

Page 277: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

91. Dipolog - Polanco - Piñan - Jct. Oroquieta Road including RROWK1820+188 - K1823+000 Length = 2.83 km.

Road Widening Polanco km. 2.83 Plans and POW GAA -

92. Dipolog - Polanco - Piñan - Jct. Oroquieta Road including RROWK1823+000 - K1825+326 Length = 2.337 km.

Road Widening Polanco km. 2.337 Plans and POW GAA -

93. Dipolog - Polanco - Piñan - Jct. Oroquieta Road including RROWK1825+547 - K1827+544 Length = 2.087 km.

Road Widening Polanco km. 2.087 Plans and POW GAA -

94. Gilbert and Aviles St. National Road Road Widening Dapitan km. Plans and POW GAA -

95. Ilaya Isis - Polanco RoadRoad Widening Polanco km. Plans and POW GAA -

96. Piñan - Mutia Road (S01024MN) K1818+578- K1822+543 Road Widening Piñan km. Plans and POW GAA -

97. Piñan - Mutia Road (S01024MN) K1818+578 - K1821+000 Length = 2.422km. Road Widening Piñan km. 2.422 Plans and POW GAA 118,950.00 118,950.00

98. Piñan - Mutia Road (S01024MN) K1821+000 - K1822+543 Length = 1.543 km. Road Widening Mutia km. 1.543 Plans and POW GAA - -

99. Piñan - Mutia Road (S01024MN) K1829+777 - K1835+000 Length = 5.223 km. Road Widening Mutia km. 5.223 Plans and POW GAA 156,690.00 156,690.00

100. Piñan - Mutia Road (S01024MN) K1835+000 - K1839+409 Length = 5.408 km. Road Widening Mutia km. 5.408 Plans and POW GAA 162,240.00 162,240.00

101. Piñan - Mutia Dual Road (S01035MN) Road Widening Piñan km. Plans and POW GAA -

102. Polanco - Macleodes RoadRoad Widening Polanco km. Plans and POW GAA -

103. Polanco - Macleodes Road K1830+349 - K1835+000 Road Widening Polanco km. 2.352 Plans and POW GAA 122,250.00 122,250.00

104. Polanco - Macleodes Road K1833+000 - K1835+000 Length = 1.723 km.

Road Widening Polanco km. 1.723 Plans and POW GAA -

105. Polanco - Macleodes Road K1835+000 - K1840+000 Length = 4.928 km.

Road Widening Polanco km. 4.928 Plans and POW GAA 147,840.00 147,840.00

Chapter 19-1-DPWH IX-ZDN 3DEOPage 8 of 56

Page 278: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

106. Polanco - Macleodes Road K1840+000 - K1845+000 Length = 2.388 km.

Road Widening Polanco km. 2.388 Plans and POW GAA 141,270.00 141,270.00

107. Polanco - Macleodes Road K1842+500 - K1845+000 Length = 2.321 km.

Road Widening Polanco km. 2.321 Plans and POW GAA -

108. Polanco - Macleodes Road K1845+000 - K1848+948 Length = 3.760 km.

Road Widening Polanco km. 3.76 Plans and POW GAA 112,800.00 112,800.00

2. Off-Carriageway Improvement - a. Secondary Road -

109. Rizal - Dakak - Dapitan Coastal Loop Road

Paving of Shoulders ln.m. Plans and POW GAA - 20,000.00 20,000.00

3. Construction of By-pass and Diversion Roads - a. -

110. Construction of Sicayab Bucana - Dapitan Port Diversion Road, Barangay Sicayab Bucana, Dapitan, Zamboanga del Norte

Road Opening/Concreting

Dapitan, ZN km. 5 Plans and POW GAA - - 6,700.00 250,000.00 256,700.00

111. Construction of San Isidro - Marapong Road, Sergio Osmena, Zamboang del Norte

Road Opening/Concreting

Sergio Osmeña km. Plans and POW GAA 105,000.00 50,000.00 155,000.00

(iii) Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - a. Primary Road -

112. Dipolog - Oroquieta National Road Road Concreting Rizal km. Plans and POW GAA -

113. Dipolog - Punta - Dansullan - Sergio Osmeña Road

Road Concreting Sergio Osmeña km. Plans and POW GAA -

b. Secondary Road - 114. Jct. Polo - Dapitan Park National

RoadRoad Concreting Dapitan km. Plans and POW GAA - - -

115. Jct. Palauan Port Road Road Concreting Dapitan km. Plans and POW GAA - - -

116. Rizal - Dakak - Dapitan Coastal Loop Road

Road Concreting Dapitan km. Plans and POW GAA 378,850.00 111,260.00 105,800.00 595,910.00

117. Construction of Turnouts (LS/RS) along Jct. Pulauan Port Road, Dapitan City

Road Concreting Dapitan City units 8 Plans and POW GAA 7,800.00 7,800.00

c. Tertiary Road - 118. Dipolog - Polanco - Piñan - Jct.

Oroquieta RoadRoad Concreting Piñan km. Plans and POW GAA - - -

119. Gilbert and Aviles St. National Road

Road Concreting Dapitan km. Plans and POW GAA -

120. Ilaya Isis - Polanco Road Road Concreting Polanco km. Plans and POW GAA 19,075.00 6,600.00 25,675.00

121. Piñan - Mutia Road (S01024MN) Road Concreting Piñan km. Plans and POW GAA 29,443.00 29,443.00

122. Piñan - Mutia Dual Road (S01035MN)

Road Concreting Piñan km. Plans and POW GAA 43,403.00 43,403.00

Chapter 19-1-DPWH IX-ZDN 3DEOPage 9 of 56

Page 279: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

123. Polanco - Macleodes Road Road Concreting Polanco km. Plans and POW GAA 43,393.00 - 43,393.00

(iv) Construction and Maintenance of Bridges along National Roads - 1. Construction of New Bridge -

a. Primary Road - 124. Construction of Oyan Br. 2

(Parallel Bridge), along Dipolog - Oroquieta National Road

Construction of Bridges Dapitan sq.m. Plans and POW GAA - 43,400.00 43,400.00 86,800.00

125. Construction of Opao Br. 2 (Parallel Bridge), along Dipolog - Oroquieta National Road

Construction of Bridges Dapitan sq.m. Plans and POW GAA - 162,000.00 162,000.00 324,000.00

126. Construction of Tutua Br. (Parallel Bridge), along Dipolog - Oroquieta National Road

Construction of Bridges Dapitan sq.m. Plans and POW GAA - 45,000.00 45,000.00 90,000.00

127. Construction of Macasoy Br., along Dipolog - Oroquieta National Road

Construction of Bridges Dapitan sq.m. Plans and POW GAA - 45,000.00 45,000.00 90,000.00

128. Construction of Pulauan Br. (B01962MN) Phase II, along Dipolog - Oroquieta National Road

Construction of Bridges Dapitan sq.m. Plans and POW GAA 8,000.00 8,000.00

129. Construction of Polo Br. 2 (Parallel Bridge), along Jct. Polo - Dapitan Park Nat''l Road.

Construction of Bridges Dapitan sq.m. Plans and POW GAA - 150,000.00 150,000.00

130. Construction of Dionum Br. 2 (Parallel Bridge), along Piñan - Mutia Road

Construction of Bridges Piñan sq.m. Plans and POW GAA - 120,000.00 120,000.00

b. Secondary Road - 131. Balubohan Br. Construction of

Bridges sq.m. Plans and POW GAA - -

132. Const./Widening of Polo Br. Along Jct. Polo - Dapitan Park Rd. Construction of

Bridges Dapitan sq.m. Plans and POW GAA 105,000.00 150,000.00 255,000.00

133. Bagting Br. Along Jct. Polo - Dapitan Park National Rd

Construction of Bridges Dapitan sq.m. Plans and POW GAA 120,000.00 120,000.00

134. Nangcaan Br. Along Rizal - Dakak - Dapitan Coastal Loop Rd Construction of

Bridges Dapitan sq.m. Plans and POW GAA 60,000.00 60,000.00

135. Construction of Polo Br. 2 (Parallel Bridge), along Jct. Polo - Dapitan Park Nat''l Road.

Construction of Bridges Dapitan sq.m. Plans and POW GAA - 150,000.00 150,000.00 300,000.00

c., Tertiary Road - 136. Alvenda Br. Construction of

Bridges sq.m. Plans and POW GAA - -

137. Polanco Br. & Approaches (B00418MN) (Phase III)

Construction/Completion Polanco, ZN sq.m. Plans and POW GAA 10,000.00 24,000.00 34,000.00

138. Napuyan Br (B01587MN) Lengthening of Bridge Piňan, ZN sq.m. Plans and POW GAA 30,000.00 30,000.00

139. Piňan Br (B01586MN) Lengthening of Bridge Piňan, ZN sq.m. Plans and POW GAA 30,000.00 30,000.00

Chapter 19-1-DPWH IX-ZDN 3DEOPage 10 of 56

Page 280: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

140. Dapdap Br. Along Dipolog - Polanco - Macleodes Rd

Lengthening of Bridge Piňan, ZN sq.m. Plans and POW GAA 80,000.00 80,000.00

141. Construction of Dionum Br. 2 (Parallel Bridge), along Piñan - Mutia Road

Construction of Bridges Piñan sq.m. Plans and POW GAA - 120,000.00 120,000.00 240,000.00

142. Malobog Br. (B00413MN) Construction of Bridges Piñan sq.m. Plans and POW GAA 30,000.00 30,000.00

2. Replacement of Temporary Bridges - a. Primary Road -

143. Dionum Br. (B01588MN) along Piñan-Mutia Rd

Replacement of Br. Piñan sq.m. Plans and POW GAA 175,083.00 175,083.00

144. Isis Br. (B00419MN) along Ilaya-Isis-Polanco Rd

Replacement of Br. Polanco sq.m. Plans and POW GAA 25,000.00 36,000.00 61,000.00

145. Replacement of Polanco Br. Phase III (Parallel Bridge), along Dipolog - Polanco - Piñan - Jct. Oroquieta Road

Replacement of Br. Polanco sq.m. Plans and POW GAA -

146. Replacement of Isis Br. Phase II, along Ilaya - Isis - Polanco Road

Replacement of Br. Polanco sq.m. Plans and POW GAA 25,000.00 33,000.00 58,000.00

147. Tolon Br. (B00581MN) Replacement of Br. Rizal sq.m. Plans and POW GAA -

148. Potungan Br. (B00582MN) Replacement of Br. Rizal sq.m. Plans and POW GAA -

149. Opao Br. (B00583MN) Replacement of Br. Rizal sq.m. Plans and POW GAA -

150. Leop Br. (B00584MN) Replacement of Br. Dapitan sq.m. Plans and POW GAA -

151. Oyan Br. (B00585MN) Replacement of Br. Dapitan sq.m. Plans and POW GAA -

152. Macasoy Br. (B00586MN) Replacement of Br. Dapitan sq.m. Plans and POW GAA 25,000.00 21,000.00 21,000.00 67,000.00

153. Tutua Br. (B00587MN) Replacement of Br. Dapitan sq.m. Plans and POW GAA -

154. Pulauan Br. (B00588MN) Replacement of Br. Dapitan sq.m. Plans and POW GAA -

155. Bago Br. (B01827MN) along Rizal-Dakak-Dapitan Coastal Loop Rd Replacement of

Br. sq.m. Plans and POW GAA 3,750.00 3,750.00

b. Secondary Road - 156. Bago Br. (B01827MN) along Rizal-

Dakak-Dapitan Coastal Loop Rd Replacement of Br. sq.m. Plans and POW GAA 3,750.00 3,750.00

c. Tertiary Road - 157. Dionum Br. (B01588MN) along

Piñan-Mutia RdReplacement of Br. Piñan sq.m. Plans and POW GAA 175,083.00 175,083.00

158. Replacement of Isis Br. Phase II, along Ilaya - Isis - Polanco Road

Replacement of Br. Polanco sq.m. Plans and POW GAA 25,000.00 33,000.00 58,000.00

4. Retrofitting/Strengthening of Permanent Bridge - a. Primary Road -

Chapter 19-1-DPWH IX-ZDN 3DEOPage 11 of 56

Page 281: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

159. Dilawa Br. (B01522MN) along Dipolog-Punta-Dansullan-S Osmeña-Zamboanga del Norte/Sur Bdry Rd

Replacement of Br. Rizal sq.m. Plans and POW GAA 10,000.00 10,000.00

160. Biayon Br. (B00423MN) Retrofitting/Strengthening of Br.

Sergio Osmeña sq.m. Plans and POW GAA 3,200.00 3,200.00

161. Layawan Br. (B00422MN) Retrofitting/Strengthening of Br.

Sergio Osmeña sq.m. Plans and POW GAA 4,500.00 1,700.00 1,700.00 7,900.00

162. Salug Dacu Bridge (B00424MN) Retrofitting/Strengthening of Br.

Sergio Osmeña Plans and POW GAA 10,000.00 10,000.00 20,000.00

163. Tutua Br. (B00587MN) Retrofitting/Strengthening of Br.

Dapitan City Plans and POW GAA 5,200.00 5,200.00

164. Potungan Br. (B00582MN) Retrofitting/Strengthening of Br.

Dapitan City Plans and POW GAA 40,000.00 40,000.00 80,000.00

165. Pulauan Br. (B00588MN) Retrofitting/Strengthening of Br.

Dapitan City sq.m. Plans and POW GAA 5,200.00 15,000.00 20,200.00

166. Tolon Br. (B00581MN) Retrofitting/Strengthening of Br.

Rizal, ZN sq.m. Plans and POW GAA -

b. Secondary Road - 167. Polo Br. (B00411MN) Retrofitting/Str

engthening of Br.

Dapitan City sq.m. Plans and POW GAA 30,000.00 15,000.00 15,000.00 60,000.00

168. Bagting Bridge (B00411MN) Retrofitting/Strengthening of Br.

Dapitan City sq.m. Plans and POW GAA 30,000.00 23,500.00 23,500.00 77,000.00

c. Tertiary Road - I. All Bridges along Dipolog - Polanco - Piñan Jct. Oroquieta Road -

169. Malobog Br. (B00413MN) Retrofitting/Strengthening of Br.

Piñan sq.m. Plans and POW GAA -

170. Nipaan Br. (B00414MN) Retrofitting/Strengthening of Br.

Piñan sq.m. Plans and POW GAA -

171. Lingasad Br. (B00415MN) Retrofitting/Strengthening of Br.

Piñan sq.m. Plans and POW GAA -

172. Calambuayan Br. (B00416MN) Retrofitting/Strengthening of Br.

Piñan sq.m. Plans and POW GAA -

173. Guinles Br. (B00417MN) Retrofitting/Strengthening of Br.

Polanco sq.m. Plans and POW GAA -

Chapter 19-1-DPWH IX-ZDN 3DEOPage 12 of 56

Page 282: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

174. Polanco Br. (B00418MN) Retrofitting/Strengthening of Br.

Polanco sq.m. Plans and POW GAA 45,000.00 45,000.00

175. Biayon Br. (B00423MN) Retrofitting/Strengthening of Br.

Sergio Osmeña sq.m. Plans and POW GAA 3,200.00 3,200.00

176. Layawan Br. (B00422MN) Retrofitting/Strengthening of Br.

Sergio Osmeña sq.m. Plans and POW GAA 4,500.00 1,700.00 6,200.00

177. Polo Br. (B00411MN) Retrofitting/Strengthening of Br.

Dapitan City sq.m. Plans and POW GAA 30,000.00 15,000.00 45,000.00

178. Bagting Bridge (B00411MN) Retrofitting/Strengthening of Br.

Dapitan City sq.m. Plans and POW GAA 30,000.00 23,500.00 53,500.00

179. Pulauan Br. (B00588MN) Retrofitting/Strengthening of Br.

Dapitan City sq.m. Plans and POW GAA 5,200.00 15,000.00 20,200.00

180. Salug Dacu Bridge (B00424MN) Retrofitting/Strengthening of Br.

Sergio Osmeña Plans and POW GAA 10,000.00 10,000.00

181. Potungan Br. (B00582MN) Retrofitting/Strengthening of Br.

Dapitan City Plans and POW GAA 40,000.00 40,000.00

182. Tolon Br. (B00581MN) Retrofitting/Strengthening of Br.

Rizal, ZN sq.m. Plans and POW GAA -

II. All Bridges along Ilaya - Isis - Polanco Road - 183. Isis Br. (B00419MN) Retrofitting/Str

engthening of Br.

Polanco sq.m. Plans and POW GAA -

184. Canibongan Br. (B00420MN) Retrofitting/Strengthening of Br.

Polanco sq.m. Plans and POW GAA -

III. All Bridges along Piñan - Mutia Road - 185. Napuyan Br. (B01587MN) Retrofitting/Str

engthening of Br.

Piñan sq.m. Plans and POW GAA - 1,200.00 1,200.00 2,400.00

186. Dionum Br. (B01588MN) Retrofitting/Strengthening of Br.

Piñan sq.m. Plans and POW GAA - -

187. Piñan Br. (Bo1586mn) Retrofitting/Strengthening of Br.

Piñan sq.m. Plans and POW GAA - 1,200.00 1,200.00 2,400.00

5. Widening of Permanent Bridges - a. Primary Road - I. All Bridges along Dipolog - Oroquieta National Road -

188. Tolon Br. (B00581MN) Widening of Bridges Rizal sq.m. Plans and POW GAA -

Chapter 19-1-DPWH IX-ZDN 3DEOPage 13 of 56

Page 283: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

189. Potungan Br. (B00582MN) Widening of Bridges Rizal sq.m. Plans and POW GAA -

190. Opao Br. (B00583MN) Widening of Bridges Rizal sq.m. Plans and POW GAA -

191. Leop Br. (B00584MN) Widening of Bridges Rizal sq.m. Plans and POW GAA 57,950.00 57,950.00 115,900.00

192. Oyan Br. (B00585MN) Widening of Bridges Rizal sq.m. Plans and POW GAA -

193. Macasoy Br. (B00586MN) Widening of Bridges Rizal sq.m. Plans and POW GAA 40,000.00 40,000.00

194. Tutua Br. (B00587MN) Widening of Bridges Rizal sq.m. Plans and POW GAA 5,200.00 5,200.00 10,400.00

195. Pulauan Br. (B00588MN) Widening of Bridges Rizal sq.m. Plans and POW GAA -

196. Nipaan Br. (B00414MN) along Dipolog-Polanco-Piñan-Jct Oroquieta Rd

Widening of Bridges Piñan sq.m. Plans and POW GAA - 11,450.00 10,000.00 15,900.00 37,350.00

197. Lingasad Br. & Approaches(B00415MN)

Widening of Bridges Dapitan City sq.m. Plans and POW GAA - - 35,000.00 35,000.00

198. Bypass Polo Bridge & Approaches Widening of Bridges sq.m. Plans and POW GAA - - -

199. Napuyan Br (B01587MN) & Approaches

Widening of Bridges Piňan, ZN sq.m. Plans and POW GAA -

200. Piňan Br (B01586MN) & Approaches

Widening of Bridges Piňan, ZN sq.m. Plans and POW GAA -

II. All Bridges along Dipolog - Punta - Dansullan - Sergio Osmeña Road - 201. Sicot Br. (B00421MN) Widening of

Bridges Sergio Osmeña sq.m. Plans and POW GAA 32,000.00 32,000.00 64,000.00

202. Layawan Br. (B00422MN) Widening of Bridges Sergio Osmeña sq.m. Plans and POW GAA 144,000.00 144,000.00 288,000.00

203. De Venta Perla (B01606MN) & Approaches

Widening of Bridges Sergio Osmeña sq.m. Plans and POW GAA 270,000.00 270,000.00 540,000.00

204. Biayon Br. (B00423MN) Widening of Bridges Sergio Osmeña sq.m. Plans and POW GAA 54,000.00 54,000.00 108,000.00

205. Salug Dacu Br. (B00424MN) Widening of Bridges Sergio Osmeña sq.m. Plans and POW GAA 162,000.00 162,000.00 324,000.00

206. Dilawa Br. (B01522MN) Widening of Bridges Sergio Osmeña sq.m. Plans and POW GAA 34,131.00 34,131.00 68,262.00

b. Secondary Road - 207. Bypass Polo Bridge & Approaches Widening of

Bridges sq.m. Plans and POW GAA - - -

c. Tertiary Road - I. All Bridges along Dipolog - Polanco - Piñan Jct. Oroquieta Road -

208. Nipaan Br. (B00414MN) along Dipolog-Polanco-Piñan-Jct Oroquieta Rd

Widening of Bridges Piñan sq.m. Plans and POW GAA - 11,450.00 10,000.00 15,900.00 37,350.00

209. Lingasad Br. & Approaches(B00415MN)

Widening of Bridges Dapitan City sq.m. Plans and POW GAA - - 35,000.00 35,000.00 70,000.00

210. Calambuayan Br. & Approaches(B00416MN)

Widening of Bridges Polanco 30,000.00 30,000.00

Chapter 19-1-DPWH IX-ZDN 3DEOPage 14 of 56

Page 284: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

211. Guinles Br. & Approaches(B00417MN)

Widening of Bridges Polanco 40,000.00 40,000.00

II. All Bridges along Piñan - Mutia Road - 212. Napuyan Br (B01587MN) &

ApproachesWidening of Bridges Piňan, ZN sq.m. Plans and POW GAA -

213. Piňan Br (B01586MN) & Approaches

Widening of Bridges Piňan, ZN sq.m. Plans and POW GAA -

III. All Bridges along Ilaya - Isis Road - 214. Canibongan Br (B00420MN) &

ApproachesWidening of Bridges Polanco sq.m. Plans and POW GAA 22,000.00 22,000.00

6. Rehabilitation/Major Repair of Permanent Bridges - a. Primary Road -

215. Dionum Br. (B01588MN) along Piñan-Mutia Rd Rehabilitation sq.m. Plans and POW GAA - 3,000.00 3,000.00

216. Leop Br. (B00584MN) along Dipolog-Oroquieta National Rd Rehabilitation sq.m. Plans and POW GAA - 2,500.00 1,700.00 1,700.00 5,900.00

217. Layawan Br. (B00422MN) Widening of Bridges sq.m. Plans and POW GAA 1,700.00 1,700.00 3,400.00

218. Napuyan Br. (Cantilever) (B01587MN) along Piñan-Mutia Rd

Rehabilitation sq.m. Plans and POW GAA - 4,550.00 1,200.00 5,750.00

219. Tolon Br. (B00581MN) Rehabilitation sq.m. Plans and POW GAA - 4,550.00 2,000.00 2,000.00 8,550.00 220. Oyan Br. (B00585MN) along

Dipolog-Oroquieta National Rd Rehabilitation sq.m. Plans and POW GAA - 4,000.00 1,300.00 1,300.00 6,600.00

221. Piñan Br. (Cantilever) (B01586MN) along Piñan-Mutia Rd

Rehabilitation sq.m. Plans and POW GAA - 4,600.00 1,200.00 5,800.00

222. Tutua Br. (B00587MN) along Dipolog-Oroquieta National Rd Rehabilitation sq.m. Plans and POW GAA - 5,300.00 5,200.00 5,200.00 15,700.00

b. Tertiary Road - 223. Dionum Br. (B01588MN) along

Piñan-Mutia Rd Rehabilitation sq.m. Plans and POW GAA - 3,000.00 3,000.00

224. Napuyan Br. (Cantilever) (B01587MN) along Piñan-Mutia Rd

Rehabilitation sq.m. Plans and POW GAA - 4,550.00 1,200.00 1,200.00 6,950.00

225. Piñan Br. (Cantilever) (B01586MN) along Piñan-Mutia Rd

Rehabilitation sq.m. Plans and POW GAA - 4,600.00 1,200.00 1,200.00 7,000.00

1,089,921.00 1,403,714.00 1,412,578.00 3,419,415.91 7,472,682.44 2,201,000.00 16,999,311.35 OO2: Protect Lives and Properties Against Major Floods -

1. Construction/Maintenance of Flood Mitigation Structures and Drainage System - 226. Construction of Flood Control

Structure along Opao River, Opao, Dapitan City, Zamboanga del Norte

Construction of Flood mitigation structure

Opao, Dapitan City, Zamboanga del Norte

ln.m. 227.2 Plans and POW GAA 60,000.00 120,000.00 60,000.00 240,000.00

227. Construction of Flood Control Structure along Dipolog River, Piñan, Zamboanga del Norte

Construction of Flood mitigation structure

Piñan, Zamboanga del Norte ln.m. 646.4 Plans and POW GAA 105,000.00 105,000.00 105,000.00 315,000.00

OO1- Subtotal

Chapter 19-1-DPWH IX-ZDN 3DEOPage 15 of 56

Page 285: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

228. Construction of Flood Control Structure at Opao Bridge, Abutment B (Dapitan River), Brgy. Opao, Dapitan City, Zamboanga del Norte

Construction of Flood mitigation structure

Brgy. Opao, Dapitan City, Zamboanga del Norte

ln.m. 289.2 Plans and POW GAA 60,000.00 120,000.00 40,000.00 220,000.00

229. Construction of Flood Control Structure Opao-Barcelona Section (Dapitan River) along Dipolog-Oroquieta Road, Brgy. Barcelona, Dapitan City, Zamboanga del NorteK1808+000 - K1809+000

Construction of Flood mitigation structure

Brgy. Barcelona, Dapitan City, Zamboanga del Norte

ln.m. 312.8 Plans and POW GAA 60,000.00 120,000.00 60,000.00 240,000.00

230. Construction of Flood Control Structure, Ilaya Bridge Section (Dapitan River) along Dipolog-Oroquieta Road, Brgy. Ilaya, Dapitan City, Zamboanga del Norte

Construction of Flood mitigation structure

Brgy. Ilaya, Dapitan City, Zamboanga del Norte

ln.m. 688.56 Plans and POW GAA 150,000.00 150,000.00 150,000.00 450,000.00

231. Construction/Extension of Flood Control Structure (Revetment) along Dipolog River, Guinles Section, Zamboanga Del Norte

Construction of Flood mitigation structure

Guinles Section and along Dipolog - Polanco - Piñan Jct Oroquieta

ln.m. 274.8 Plans and POW GAA 30,000.00 30,000.00 35,000.00 40,000.00 130,000.00 60,000.00 325,000.00

232. Construction/Extension of Flood Control Structure (Revetment) along Dapitan River, (Oyan Bridge Section), Zamboanga Del Norte

Construction of Flood mitigation structure

Oyan Bridge Section along Dipolog - Oroquieta Road at Dapitan City

ln.m. Plans and POW GAA 50,000.00 125,000.00 70,000.00 245,000.00

233. Construction of flood control structure along Dapitan River, Ilaya Bridge Section (Abutment "B"),Dapitan City, Zamboanga del Norte

Construction of Flood mitigation structure

Ilaya Bridge Section (Abutment "B"),Dapitan City, Zamboanga del Norte

ln.m. 348 Plans and POW GAA 40,000.00 70,000.00 110,000.00 50,000.00 270,000.00

234. Construction of Rockfall Protection System along Rizal-Dakak-Dapitan Coastal Loop Road, Canlucani Section, Dapitan City, Zamboanga del Norte

Construction of Flood mitigation structure

Canlucani Section, Dapitan City, Zamboanga del Norte

ln.m. Plans and POW GAA 20,000.00 20,000.00

235. Construction/Extension of Flood Control Structure (Revetment) along Dapitan River, Barcelona - Leop Section, Zamboanga Del Norte

Construction of Flood mitigation structure

Barcelona - Leop Section along Dipolog - Oroquieta Road at Dapitan City

ln.m. 253.2 Plans and POW GAA 40,000.00 40,726.00 60,000.00 110,000.00 60,000.00 310,726.00

236. Construction of Flood Control Structure along Sunrise Boulevard, Dapitan City, Zamboanga del Norte

Construction of Flood mitigation structure

Dapitan City ln.m. 4500 Plans and POW GAA 30,000.00 30,000.00

Chapter 19-1-DPWH IX-ZDN 3DEOPage 16 of 56

Page 286: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

237. Construction of Flood Control Structure (Revetment/Bank Protection) along Dipolog River (Sianib Section), Polanco, Zamboanga del Norte

Construction of Flood mitigation structure

Polanco ln.m. 328 Plans and POW GAA 50,000.00 115,000.00 120,000.00 285,000.00

238. Construction of Flood Control Structure along Dionum Br. (Piñan - Mutia Road), Dipolog River, Zamboanga del Norte

Construction of Flood mitigation structure

Piñan ln.m. 864 Plans and POW GAA 150,000.00 150,000.00 150,000.00 450,000.00

239. Establishment and Operation of a Sanitary Landfill and Material Recovery Facilities (MRF)

Construction of Flood mitigation structure

Dapitan City ln.m. Plans and POW GAA -

240. Construction of River Control Structure along Layawan (Polanco) River, (Poblacion Polanco Side), Dipolog-Polanco-Macleodes National Road, Zamboanga Del Norte

Construction of Flood mitigation structure

Polanco, ZN ln.m. Plans and POW GAA 20,000.00 50,000.00 20,000.00 116,000.00 206,000.00

241. Construction/Extension of Flood Control Structure (Revetment) along Dapitan River (Oyan Bridge Section), Oyan, Dapitan City, Zamboanga Del Norte

Construction of Flood mitigation structure

Oyan, Dapitan City, Zamboanga Del Norte

ln.m. 231.2 Plans and POW GAA - 50,000.00 50,000.00 100,000.00

242. Construction of Flood Control structure (Revetment/Bank Protection) along De Venta Perla Bridge Upstream (Downstream), Polanco Side, De Venta Perla, Polanco, Zamboanga del Norte

Construction of Flood mitigation structure

De Venta Perla, Polanco, Zamboanga del Norte

ln.m. 639.2 Plans and POW GAA - 94,000.00 115,000.00 115,000.00 324,000.00

243. Construction/Extension of River Control, Polo to Sulangon, Dapitan City, Zamboanga del Norte

Construction of Flood mitigation structure

Dapitan City, Zamboanga del Norte

ln.m. 690 Plans and POW GAA - 150,000.00 150,000.00 150,000.00 450,000.00

244. Construction/Extension of Flood Control Structure (Revetment/Bank Protection) along Layawan River (Batotiltil-Talaban Section), Biayon, Polanco, Zamboanga del Norte.

Construction of Flood mitigation structure

Biayon, Polanco, Zamboanga del Norte

ln.m. 304 Plans and POW GAA - 65,000.00 65,000.00 65,000.00 195,000.00

245. Construction of Flood Control Structure along Opao River, Opao, Dapitan City, Zamboanga del Norte

Construction of Flood mitigation structure

Opao, Dapitan City, Zamboanga del Norte

ln.m. Plans and POW GAA - 60,000.00 60,000.00 120,000.00

246. Construction of Flood Control Structure at Opao Bridge, Abutment B (Dapitan River), Brgy. Opao, Dapitan City, Zamboanga del Norte

Construction of Flood mitigation structure

Brgy. Opao, Dapitan City, Zamboanga del Norte

ln.m. Plans and POW GAA - 60,000.00 60,000.00 120,000.00

Chapter 19-1-DPWH IX-ZDN 3DEOPage 17 of 56

Page 287: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

247. Construction of Flood Control Structure Opao-Barcelona Section (Dapitan River) along Dipolog-Oroquieta Road, Brgy. Barcelona, Dapitan City, Zamboanga del Norte

Construction of Flood mitigation structure

Brgy. Barcelona, Dapitan City, Zamboanga del Norte

ln.m. Plans and POW GAA - 60,000.00 60,000.00 120,000.00

248. Construction of Dapitan River Control (Guinles Section) along Dipolog-Polanco-Piñan-Jct. Oroquieta National Road, Zamboanga del Norte

Construction of Flood mitigation structure

Guinles Section and along Dipolog - Polanco - Piñan Jct Oroquieta

ln.m. Plans and POW GAA - -

249. Construction of Flood Control Structure (Poblacion Side) along Layawan River, Polanco, Zamboanga del Norte

Construction of Flood mitigation structure

Polanco, ZN ln.m. Plans and POW GAA 100,000.00 50,000.00 150,000.00

250. Construction of Flood Control structure at Dapitan City Sunrise Boulevard/River Bank Protection, Dapitan City, Zamboanga del Norte

Construction of Flood mitigation structure

Dapitan City ln.m. Plans and POW GAA - -

251. Construction/ Extension of Flood Control Structure (Revetment) along Dapitan River, Tutua-Macasoy Section along Dipolog-Oroquieta Road, Dapitan City, Zamboanga del Norte

Construction of Flood mitigation structure

Dapitan City ln.m. 552 Plans and POW GAA - 120,000.00 120,000.00 120,000.00 360,000.00

252. Construction/Extension of Flood Control Structure (Revetment/Bank Protection) along Layawan River, Dapdap Bridge (Labrador Section), Polanco, Zamboanga del Norte

Construction of Flood mitigation structure

Polanco, Zamboanga del Norte

ln.m. 843.14 Plans and POW GAA - 60,000.00 120,000.00 60,000.00 240,000.00

253. Construction of Flood Control structure (Revetment/Bank Protection) along Layawan River (De Venta Perla - Batotiltil Section), De Venta Perla, Polanco, Zamboanga del Norte

Construction of Flood mitigation structure

Polanco, ZN ln.m. Plans and POW GAA - 30,000.00 65,000.00 65,000.00 160,000.00

254. Construction of Flood Control Structure, De Venta Perla (Upstream) Sergio Osmeña side, Zamboanga del Norte

Construction of Flood mitigation structure

Sergio Osmeña ln.m. 239.6 Plans and POW GAA - 30,000.00 40,000.00 115,000.00 70,000.00 255,000.00

255. Construction of River/Flood Control Structure along Dicayo River, Brgy. Dr. Jose Rizal, Katipunan, Zamboanga Del Norte

Construction of Flood mitigation structure

Katipunan, ZN ln.m. Plans and POW GAA - 60,000.00 60,000.00

Chapter 19-1-DPWH IX-ZDN 3DEOPage 18 of 56

Page 288: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

256. Construction/Extension of Flood Control Structure (Revetment) along Dapitan River, Tutua-Polo Section along Dipolog-Oroquieta Road, Dapitan City, Zamboanga del Norte

Construction of Flood mitigation structure

Dapitan City ln.m. 219.45 Plans and POW GAA 100,000.00 110,000.00 235,000.00 115,000.00 115,000.00 115,000.00 790,000.00

257. Construction/Extension of Flood Control Structure (Revetment) along Dipolog River, Dapdap Polanco Section along Polanco-Macleodes National Road, Zamboanga del Norte

Construction of Flood mitigation structure

Dapdap Polanco, ZN ln.m. Plans and POW GAA - 60,000.00 40,000.00 115,000.00 115,000.00 115,000.00 445,000.00

258. Construction of Flood Control Structure along Sunrise Boulevard, Dapitan City, Zamboanga del Norte

Construction of Flood mitigation structure

Dapitan City ln.m. 1,149 Plans and POW GAA - 30,000.00 150,000.00 150,000.00 150,000.00 480,000.00

259. Construction/Extension of Sunset Boulevard Shore Protection Structures, Dapitan City, Zamboanga del Norte

Construction of Flood mitigation structure

Dapitan City ln.m. 880 Plans and POW GAA - - 150,000.00 150,000.00 60,000.00 360,000.00

260. Flood Control Structure along Lawayan River, Dapdap Section, Polanco, Zamboanga del Norte

Const. of RC revetment

Dapdap Section, Polanco, Zamboanga del Norte

ln.m. 141.00 Plans and POW GAA 20,000.00 20,000.00

261. Construction of Flood Control (Revetment/Dike) Structure along Dipolog River, Conacon-Guinles Section, Polanco, Zamboanga del Norte

Construction of Flood mitigation structure

Conacon-Guinles Section, Polanco, Zamboanga del Norte

ln.m. 666.67 Plans and POW GAA 50,000.00 50,000.00

262. Construction/Extension of Flood Control Structure (Revetment) along, Dipolog River, Guinles Section including RROW and along Dipolog-Polanco-Pi ñan Jct. Oroquieta Road, Zamboanga del Norte

Construction of Flood mitigation structure

Guinles Section ln.m. 247.00 Plans and POW GAA 30,000.00 105,000.00 105,000.00 240,000.00

263. Construction/Extension of Flood Control Structure (Revetment/Bank Protection) along Dipolog River, Polanco Bridge, Polanco, Zamboanga del Norte

Construction of Flood mitigation structure

Polanco, Zamboanga del Norte

ln.m. 322.80 Plans and POW GAA 50,000.00 120,000.00 170,000.00

264. Construction/Extension of Flood Control Structure (Revetment/Bank Protection) along Dipolog River, Polanco Bridge (Upstream), Polanco, Zamboanga del Norte

Construction of Flood mitigation structure

Polanco, Zamboanga del Norte

ln.m. 375 375 Plans and POW GAA 120,000.00 60,000.00 180,000.00

Chapter 19-1-DPWH IX-ZDN 3DEOPage 19 of 56

Page 289: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

264. Construction/Extension of Flood Control Structure (Oyan-Macasoy Section), along Dapitan River, Dapitan City, Zamboanga del Norte

Construction of Flood mitigation structure

Dapitan City, Zamboanga del Norte

ln.m. Plans and POW GAA 150,000.00 150,000.00 300,000.00

265. Construction/Extension of Flood Control Structure (Ilaya - Oyan Section), along Dapitan River, Dapitan City, Zamboanga del Norte

Construction of Flood mitigation structure

Dapitan City, Zamboanga del Norte

ln.m. Plans and POW GAA 150,000.00 150,000.00 300,000.00

320,000.00 500,000.00 480,726.00 2,364,000.00 3,226,000.00 2,705,000.00 9,595,726.00 c. Convergence and Special Support Program -

1. Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - 266. Construction/Improvement of

Dapitan City Sunset By-Pass Road Leading to Dapitan City Beach and Dakak Park Beach Resort Sta. 003+270 - 003+470 Length =0.200 km.

Road Concreting Dapitan City km. 0.200 Plans and POW GAA - - 50,000.00 50,000.00

267. Construction/Improvement of Dapitan City Sunrise By-Pass Road Leading to Rizal Shrine and Dakak Park Beach Resort Sta. 002+114 - Sta. 003+417 Length = 1.305 km.

Road Concreting Dapitan City km. 1.305 Plans and POW GAA - - 50,000.00 50,000.00 50,000.00 150,000.00

268. Road Concreting from Barangay Isis - Barangay Lugdungan Boundary Leading to Linabo Peak (3003 steps), Polanco, Zamboanga del Norte

Road Concreting Polanco km. 3.6395 Plans and POW GAA - - 60,000.00 60,000.00 60,000.00 180,000.00

269. Road Concreting from Barangay Situbo - Barangay Penacio, Sergio Osmeña Sr. Leading to Highlander Farm, Alvenda, Mutia, Zamboanga del Norte

Road Concreting Mutia km. 1.41233 Plans and POW GAA - - 34,525.80 34,525.80 34,525.80 103,577.40

270. Road Concreting from Barangay Sinai Leading to Butanas Resort, Sergio Osmeña Sr., Zamboanga del Norte

Road Concreting Sergio Osmeña km. 0.83646 Plans and POW GAA - - 17,559.30 17,559.30 17,559.30 52,677.90

271. Road Concreting from Barangay Esperanza Jct. National Road to Barangay Esperanza Leading to Maniway Peak and Highland Resort, Rizal, Zamboanga del Norte

Road Concreting Rizal km. 2.4 Plans and POW GAA - - 92,000.00 92,000.00 92,000.00 276,000.00

272. Road Widening along Sunset Boulevard leading to Dis-Embarko and Rizal Peak, Dapitan City, Zamboanga del Norte

Road Concreting Dapitan City km. 1.955 Plans and POW GAA - - 74,906.00 74,906.00 74,906.00 224,718.00

OO2- Subtotal

Chapter 19-1-DPWH IX-ZDN 3DEOPage 20 of 56

Page 290: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

273. Improvement of Roads, Jct. National Highway to Libay Wharf Leading to Piñahon Island

Road Concreting Sibutad km. 0.13 Plans and POW GAA - - 5,000.00 5,000.00 5,000.00 15,000.00

274. Construction of Fisherman's Harbour and Disembarkation for Tourist, Aliguay, Dapitan City

Road Concreting Dapitan City km. Plans and POW GAA - - 50,000.00 50,000.00 100,000.00

2. Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Seaports - 275. Construction of Sicayab, Bucana-

Pulauan Port Road including RROW

Road Concreting Dapitan City km. 5 Plans and POW GAA - - 120,000.00 120,000.00 240,000.00

276. Access Road leading to Dapitan Port, incl. ROW, Zamboanga del Norte

Road Concreting Dapitan City km. Plans and POW GAA - 7,600.00 - 7,600.00

3. Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones - 277. Improvement/Rehabilitation of San

Pedro - Maligaya - Sinaad - San Francisco Barangay Road connecting National Road Leading to Sinaad Farmers Association in Support of Rubber and Coconut Industries, Sergio Osmeña Sr., Zamboanga del Norte

Road Concreting Sergio Osmeña km 1.045 Plans and POW GAA 40,000.00 40,000.00 40,000.00 120,000.00

278. Upgrading Gravel to Paved Tuburan Barangay Road, in support of Tuburan Farmers Association, Abaca Processing Center, Tuburan, Sergio Osmeña, Zamboanga del Norte

Road Concreting Sergio Osmeña km 1.305 Plans and POW GAA 50,000.00 50,000.00 50,000.00 150,000.00

279. Road Opening/Construction/Rehabilitation of San Isidro - Kauswagan - Nebo - Marapong - Nazareth - Bagumbayan Road, Sergio Osmeña Sr., Zamboanga

Road Concreting Sergio Osmeña km 1.305 Plans and POW GAA 50,000.00 50,000.00 50,000.00 150,000.00

280. Improvement/Rehabilitation of Sitio Bobonao. Ilaya-Burgos-Tamion-Dwaan Road in support to copra industry, Dapitan City, Zamboanga del Norte.

Road Concreting Dapitan km 1.045 Plans and POW GAA 40,000.00 40,000.00 40,000.00 120,000.00

281. Improvement/Rehabilitation of Sitio Dunlog-Sitio Janing Road, Barangay Potungan Connectiing National Highway leading to Adlay Growers and other Fruit Trees Growers in support to Adlay and other fruit industries, Dapitan City, Zamboanga del Norte

Road Concreting Dapitan km 0.78 Plans and POW GAA 30,000.00 30,000.00 30,000.00 90,000.00

Chapter 19-1-DPWH IX-ZDN 3DEOPage 21 of 56

Page 291: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

282. Improvement/Concreting of Sitio Napuyan-Eco Park, Aseniero Road in support to Casava and Adlay Growers and the Eco Park project of Dapitan City, Zamboanga del Norte

Road Concreting Dapitan km 1.347 Plans and POW GAA 40,000.00 40,000.00 40,000.00 120,000.00

283. Improvement/Rehabilitation of Junction San Nicolas-aseniero-Masidlakon-Opao Via Sitio Mahayag Road, Connecting Tertiary National Road to Barangay Aseniero-Masidlakon-Opao Junction Primary National Road leading to Sigayan Cacao Coffee Farmers Association, in support of cacao and coffee industries, Aseniero ,Masidlakon Dapitan City, Zamboanga del Norte

Road Concreting Dapitan km 1.7177 Plans and POW GAA 50,000.00 50,000.00 50,000.00 150,000.00

284. Improvement/Rehabilitation of Leop, Barcelona-San Nicolas Road leading to Kennemer Nursery in support of Cacao annd coffee industries, Barcelona, Dapitan City, Zamboanga del Norte

Road Concreting Dapitan km 1.3626 Plans and POW GAA 40,000.00 40,000.00 40,000.00 120,000.00

285. Improvement/Rehabilitation of Tubac-New Siquijor-Bergado Barangay Road, connecting Provincial road to Barangay New Siquijor-Bergado leading to Bergago Farmers Association in support of Abacca and coconut industries, Mutia, Zamboanga del Norte

Road Concreting Mutia km 2.0604 Plans and POW GAA 58,500.00 58,500.00 58,500.00 175,500.00

286. Improvement/Rehabilitation of Sitio Sinab, Opao Road in support of Cacao industry, Dapitan City, Zamboanga del Norte

Road Concreting Dapitan km 1.045 Plans and POW GAA 40,000.00 40,000.00 40,000.00 120,000.00

287. Improvement/Rehabilitation of Ilaya-Ba-ao Road in support of copra industry, Dapitan City, Zamboanga del Norte

Road Concreting Dapitan km 1.045 Plans and POW GAA 40,000.00 40,000.00 40,000.00 120,000.00

Chapter 19-1-DPWH IX-ZDN 3DEOPage 22 of 56

Page 292: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

288. Improvement/Rehabilitation of Barangay Dampalan-Princesa Lamaya Road connecting National Road leading to Dampalan & Princesa Lamaya Farmers association in support of rubber and coconut industries, Sergio Osmena, Zamboanga del Norte

Road Concreting Sergio Osmeña km 0.78 Plans and POW GAA 30,000.00 30,000.00 30,000.00 90,000.00

289. Improvement/Rehabilitation of Barangay Bajo-Liwanag Road connecting National Road leading to Bajo & Liwanag Farmers association in support of abacca and coconut industries, Sergio Osmena, Zamboanga del Norte

Road Concreting Sergio Osmeña km 0.78 Plans and POW GAA 30,000.00 30,000.00 30,000.00 90,000.00

290. Improvement/Rehabilitation of Barangay San Juan-Dampalan Road connecting National Road leading to San Juan & Dampalan Farmers association in support of rubber and abacca industries, Sergio Osmena, Zamboanga del Norte

Road Concreting Sergio Osmeña km 0.325 Plans and POW GAA 12,500.00 12,500.00 12,500.00 37,500.00

291. Improvement/Rehabilitation of Barangay San Juan-New Tanggub Road connecting National Road leading to San Juan & New Tanggub Farmers association in support of rubber and coconut industries, Sergio Osmena, Zamboanga del Norte

Road Concreting Sergio Osmeña km 0.78 Plans and POW GAA 30,000.00 30,000.00 30,000.00 90,000.00

292. Improvement/Rehabilitation of Barangay Situbo-Antonino-Penacio Road connecting National Road leading to Situbo, Antonino & Penacio Farmers association in support of coconut, rubber and abacca industries, Sergio Osmena, Zamboanga del Norte

Road Concreting Sergio Osmeña km 0.78 Plans and POW GAA 30,000.00 30,000.00 30,000.00 90,000.00

293. Improvement/Rehabilitation of Boundary Aseniero - Sitio Simay, Masidlakon Road leading to Cassava and Adlay Growers Association in support of cassava industry, Dapitan City, Zamboanga del Norte

Road Concreting Dapitan km 1.7373 Plans and POW GAA 50,000.00 50,000.00 50,000.00 150,000.00

Chapter 19-1-DPWH IX-ZDN 3DEOPage 23 of 56

Page 293: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

294. Improvement/Rehabilitation of Barangay Venus-Tinindugan Road, connecting to National Road leading to Venus & Tinindugan Farmers Association in support of rubber and abaca industries, Sergio Osmeña, Zamboanga del Norte

Plans and POW GAA 30,000.00 30,000.00 30,000.00 90,000.00

295. Concreting (Gravel to Paved) of Barangay Buenavista Road, in support of brgy. Buenavista Farmers Association, Corn and Vegetable Production at Brgy. Buenavista, Sergio Osmeña, Zamboanga del Norte.

Plans and POW GAA 40,000.00 40,000.00 40,000.00 120,000.00

296. Concreting (Gravel to Paved) of Tinidugan Barangay Road, In Support of Tinidugan Farmers Association, Corn and Vegetable Production, Tinidugan, Sergio Osmeña, Zamboanga del Norte

Plans and POW GAA 30,000.00 30,000.00 30,000.00 90,000.00

297. Concreting of Brgy. Road,Brgy. Tinindugan, in support of Tinindugan Farmers association Corn and Vegetables Production, Tinindugan, Sergio Osmena, Zamboanga del Norte.L = 4.383 km

Road Concreting Sergio Osmeña km. Plans and POW GAA - 77,522.00 77,522.00

298. Buenavista Barangay Road, in support of Corn and Vegetables Production at Barangay Buenavista, Sergio Osmeña, Zamboanga del Norte

Road Concreting Sergio Osmeña km. Plans and POW GAA - 65,000.00 65,000.00 130,000.00

299. Buenavista Barangay Road, in support of Corn and Vegetables Production at Barangay Buenavista-Sinai, Sergio Osmeña, Zamboanga del Norte

Road Concreting Sergio Osmeña km. 1.50 Plans and POW GAA - 57,000.00 57,000.00

299. Concreting of Brgy. Road,Brgy. Biayon - Brgy. Wilben - Brgy. San Jose Rd, in suppport of Brgy. Biayon, Wilben, San Jose Farmers association Corn and Vegetables Production, Biayon, Wilben, San Jose Sergio Osmena, Zamboanga del Norte.L = 3.5 km

Road Concreting Sergio Osmeña km. 2.0571 Plans and POW GAA - 75,000.00 46,200.00 65,000.00 65,000.00 65,000.00 316,200.00

Chapter 19-1-DPWH IX-ZDN 3DEOPage 24 of 56

Page 294: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

300. Upgrading Gravel to Paved of National Highway Sergio Osmeña - Penacio - Tuburan Road, in suppoert of Tuburan Farmers Association, Abaca Processing Center, Tuburan, Sergio Osmeña, Zamboanga del Norte

Road Concreting Sergio Osmeña km. Plans and POW GAA - - -

301. Construction of Fisherman's Harbour and Disembarkation for Tourist, Aliguay, Dapitan City

Road Concreting Dapitan City km. Plans and POW GAA - - -

3. Convergence and Special Support Program - Construction/ Improvement of Various Infrastructure in support of National Security - 302. Completion of PNP Highway

Patrol Group Multi-Purpose Building, Dapitan City, Zamboanga del Norte

Construction of Multi Purpose Building

Dapitan City, Zamboanga del Norte No. of Bldg. 1 Plans and POW GAA 3,000.00 3,000.00 6,000.00

303. Concreting of Barangay Del Pilar - Poblacion South, Piñan Road Road

Concreting Piñan km 5.68 Plans and POW GAA 37,500.00 37,500.00 75,000.00

304. Concreting of 101 Brigade Camp, Del Pilar Circumferential Road Road

Concreting Piñan km 0.98 Plans and POW GAA 18,480.00 18,480.00 36,960.00

- 225,122.00 111,200.00 1,388,971.10 1,325,971.10 1,329,991.10 4,381,255.30 A. Locally-Funded Projects -

National Bridge Construction/ Replacement Program (Design and Build Bridges) - a. National Bridges -

305. Potungan Bridge and Approaches including Right-of-Way Acquisition along Dapitan City Road, Zamboanga del Norte 1st Congressional District

Construction of Bridges Dapitan City sq.m. Plans and POW GAA 87,975.00 - - - 87,975.00

B. Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects - Roads and Bridges - a. Local Roads -

306. Construction of Road, Barangay San Juan - Dampalan- San Isidro Sergio Osmeña Road, Sergio Osmeña, Zamboanga del Norte

Road Concreting Sergio Osmeña km 2.16 Plans and POW GAA 2 25,000.00 50,000.00 55,351.90 55,351.90 185,703.80

307. Construction of Dapitan Sunrise Bypass Road, Dapitan City, Zamboanga del Norte

Road Concreting Dapitan City km 4.5 Plans and POW GAA 3 50,000.00 50,000.00 - 89,231.00 189,231.00

308. Construction/Improvement of Sunset Boulevard, Dapitan City, Zamboanga del Norte

Road Concreting Dapitan City km Plans and POW GAA 50,000.00 - 50,000.00

309. Construction of Ma. Cristina-Pob. Sibutad Road, Dapitan City & Municipality of Sibutad, Zamboanga del Norte

Road Concreting Sibutad, ZN km 1.915 Plans and POW GAA 2 50,000.00 50,000.00 42,922.00 126,358.00 269,280.00

CSSP - Subtotal

Chapter 19-1-DPWH IX-ZDN 3DEOPage 25 of 56

Page 295: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

310. Concreting of Segabe - Bacuyong Road

Road Concreting Piñan, ZN km 1.05 Plans and POW GAA 2 - 13,650.00 13,650.00 27,300.00

311. Concreting of Piñan - Bacuyong Road, Municipality of Piñan Road

Concreting Piñan, ZN km 5.264 Plans and POW GAA 2 - 79,500.00 79,500.00 159,000.00

312. Concreting of Piñan - Head Tipan Road, Municipality of Piñan Road

Concreting Piñan, ZN km 7.55 Plans and POW GAA 2 - 40,000.00 40,000.00 80,000.00

313. Concreting of Piñan - Napuyan Road Road

Concreting Piñan, ZN km 1.3 Plans and POW GAA 2 - 16,900.00 16,900.00 33,800.00

314. Concreting of Sikitan - Sta. Fe Road, Municipality of Piñan Road

Concreting Piñan, ZN km 2 Plans and POW GAA 2 20,000.00 30,000.00 30,000.00 80,000.00

315. Concreting of Lingasad - Magangon Road, Municipality of Polanco

Road Concreting Polanco, ZN km 1.32 Plans and POW GAA 2 19,800.00 19,800.00 39,600.00

316. Concreting of Lingasad - Loboc Road, Municipality of Polanco Road

Concreting Polanco, ZN km 3.35 Plans and POW GAA 2 50,250.00 50,250.00 100,500.00

317. Concreting of Calambuayan - Magangon Road, Municipality of Polanco

Road Concreting Polanco, ZN km 1.37 Plans and POW GAA 2 20,550.00 20,550.00 41,100.00

318. Concreting of Guinles-San Antonio-Linabo Road, Polanco Road

Concreting Polanco, ZN km 5.42 Plans and POW GAA 2 30,000.00 30,000.00 60,000.00

319. Concreting of Bilwak-Lapayang Baha Road, Municipality of Polanco

Road Concreting Polanco, ZN km 3.43 Plans and POW GAA 2 51,450.00 51,450.00 102,900.00

320. Concreting of Malala-Milad Road, Municipality of Polanco Road

Concreting Polanco, ZN km 1.19 Plans and POW GAA 2 17,850.00 17,850.00 35,700.00

321. Concreting of (2.871 kms) Maligaya - Malala Road, Municipality of Polanco

Road Concreting Polanco, ZN km Plans and POW GAA 3 37,323.00 37,323.00

322. Concreting of Alvenda (Mutia)-Penacio-Intramurus (Sergio Osmeña) Road, Municipality of Mutia

Road Concreting Mutia, ZN km 12 Plans and POW GAA 2 40,000.00 40,000.00 80,000.00

323. Concreting of Tinglan-Tubac Road, Municipality of Mutia Road

Concreting Mutia, ZN km 4.39 Plans and POW GAA 2 65,850.00 65,850.00 131,700.00

324. Concreting of New Dapitan - Potungan River (La Union) Road, Rizal

Road Concreting Rizal, ZN km 0.2 Plans and POW GAA 2 3,000.00 3,000.00 6,000.00

Chapter 19-1-DPWH IX-ZDN 3DEOPage 26 of 56

Page 296: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

325. Concreting of Mapang-Mabuhay Road, Municipality of Rizal Road

Concreting Rizal, ZN km 3.4 Plans and POW GAA 2 51,000.00 51,000.00 102,000.00

326. Concreting of Balubuhan-Nangca Road, Municipality of Rizal Road

Concreting Rizal, ZN km 0.3 Plans and POW GAA 2 4,500.00 4,500.00 9,000.00

327. Concreting of Bagacay-Bagwa Road, Municipality of Sibutad

Road Concreting Sibutad, ZN km 1.74 Plans and POW GAA 2 31,500.00 31,500.00 63,000.00

328. Concreting of Mauswagon-La Union-Potungan River Road, Municipality of La Libertad

Road Concreting La Libertad, ZN km 2.1 Plans and POW GAA 2 27,750.00 27,750.00 55,500.00

329. Concreting of Dampalan-La Libertad-La Victoria Road, Municipality of La Libertad

Road Concreting La Libertad, ZN km 1.85 Plans and POW GAA 2 14,700.00 14,700.00 29,400.00

330. Concreting of Mauswagon-Tuayon Road, Municipality of La Libertad Road

Concreting La Libertad, ZN km 0.98 Plans and POW GAA 2 14,700.00 14,700.00 29,400.00

331. Concreting of Mauswagon - New Carcar - Sta. Cruz Road, Municipality of La Libertad

Road Concreting La Libertad, ZN km 1.45 Plans and POW GAA 2 - 18,850.00 18,850.00 37,700.00

332. Concreting of La Libertad-Sta. Cruz, Municipality of La Libertad Road

Concreting La Libertad, ZN km 4.47 Plans and POW GAA 2 - 67,050.00 67,050.00 134,100.00

333. Concreting of La Libertad-New Bataan Road, Municipality of La Libertad

Road Concreting La Libertad, ZN km 1.41 Plans and POW GAA 2 - 21,150.00 21,150.00 42,300.00

334. Concreting of (8.323 kms) Daanglungsod - Sinuyak - Sitog Road, Municipality of Katipunan

Road Concreting Katipunan, ZN km Plans and POW GAA 2 - 108,199.00 108,199.00 216,398.00

335. Concreting of Damasing-Casul Provincial Road

Road Concreting Rizal, ZN km 1 Plans and POW GAA 2 - 20,000.00 20,000.00 40,000.00

336. Concreting of Purok Lumbayaw-Maniway Peak, L = 2 kms.

Road Concreting Rizal, ZN km Plans and POW GAA 3 - 51,276.51 51,276.51

337. Concreting of Barangay/Local Roads, L = 1.9 kms.(1.9 kms. X 4.00 m wide FMR Minlasag-Calube Road Section)

Road Concreting Rizal, ZN km 1.9 Plans and POW GAA 2 - 20,000.00 20,000.00 40,000.00

338. Dapitan - Ma. Cristina - Sibutad Roadincluding Construction of Pit-usan Bridge = 40 ln.m.

Road Concreting Sibutad, ZN km Plans and POW GAA 3 162,500.00 162,500.00

339. Rehabilitation/Construction/Improvement / Concreting of Tolon - Birayan - Nilabo Road (with exception)

Road Concreting Rizal, ZN km 3.815 Plans and POW GAA 2 54,593.97 54,593.97 109,187.94

Chapter 19-1-DPWH IX-ZDN 3DEOPage 27 of 56

Page 297: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

340. Rehabilitation/Construction/Improvement / Concreting of Mabuhay Barangay Road (with exception)

Road Concreting Sergio Osmeña km 2.095 Plans and POW GAA 2 30,000.00 30,000.00 60,000.00

341. Rehabilitation/Construction/Improvement / Concreting of Sipaon Barangay Road (with exception)

Road Concreting Rizal, ZN km 2.635 Plans and POW GAA 2 37,739.53 37,739.53 75,479.06

342. Rehabilitation/Construction/Improvement of Tandang Sora and Doña Josefa Marcos

Road Concreting km 0.7 Plans and POW GAA 2 10,000.00 10,000.00 20,000.00

343. Terminal Complex By-Pass Road Road Concreting km 2.795 Plans and POW GAA 2 40,000.00 40,000.00 80,000.00

344. Sulangon Resettlement Site Road (One Lane), Dapitan City

Road Concreting Dapitan City km Plans and POW GAA 3 20,000.00 20,000.00

345. Aseniero - San Francisco FMR, Dapitan City

Road Concreting Dapitan City km Plans and POW GAA 3 50,000.00 50,000.00

346. Ilaya - Hilltop FMR, Dapitan City Road Concreting Dapitan City km Plans and POW GAA 3 20,000.00 20,000.00

347. Concreting of Brgy. Ilaya - Brgy. Burgos Road, Dapitan City, Zamboanga del Norte

Road Concreting Dapitan City km 2.515 Plans and POW GAA 2 36,000.00 36,000.00 72,000.00

348. Rehabilitation/Concreting of Farm-to-Market Road of NRJ San Juan-Dampalan-Sto. Rosario-San Isidro, Sergio Osmeña

Road Concreting Sergio Osmeña km 10 Plans and POW GAA 2 50,000.00 50,000.00 100,000.00

349. Sulangon - Antipolo FMR, Dapitan City

Road Concreting Dapitan City km Plans and POW GAA 3 20,000.00 20,000.00

350. Concreting of Road Owaon to Antipolo Owaon, Dapitan City Road

Concreting Dapitan City km 1.885 Plans and POW GAA 2 27,000.00 27,000.00 54,000.00

351. Concreting of Brgy. Road along Brgy. Diwaan (Proper Diwaan to Sulangon Bridge Section), Dapitan city

Road Concreting Dapitan City km 0.335 Plans and POW GAA 2 4,800.00 4,800.00 9,600.00

352. Concreting of Brgy. Road along Brgy. Sulangon (Bua-an, sulangan - Ma. Uray Section), Dapitan City

Road Concreting Dapitan City km 0.335 Plans and POW GAA 2 4,800.00 4,800.00 9,600.00

353. Liyang – Sicayab Bucana FMR, Dapitan City

Road Concreting Dapitan City km Plans and POW GAA 3 20.00 20.00

354. Concreting of Sinonoc - Ma. Cristina Road

Concreting Dapitan City km 3.495 Plans and POW GAA 2 50,000.00 50,000.00 100,000.00

355. Rehabilitation/Concreting of Farm-to-Market Road of NJR Guinles-San Antonio-Sebaca-Sitio Celix-Lingasad-Bacuyong, Piñan (Piñan, Polanco, Dapitan)

Road Concreting

Piñan, Polanco, Dapitan City km 15 Plans and POW GAA 2 20,000.00 20,000.00 40,000.00

Chapter 19-1-DPWH IX-ZDN 3DEOPage 28 of 56

Page 298: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

356. Rehabilitation/Concreting of Farm-to-Market Road of Penacio, Sergio Osmeña-Teresita-Sta. Fe, Piñan (Sergio Osmeña, Piñan)

Road Concreting

Sergio Osmeña, Piñan km 10 Plans and POW GAA 2 50,000.00 50,000.00 100,000.00

357. Rehabilitation/Concreting of Farm-to-Market Road of Linay, Dipolog City-Sinaad-San Francisco-Mabuhay-Macalibre-Princesa Lamaya-Dampalan, Sergio Osmeña (Dipolog City, Sergio Osmeña)

Road Concreting

Dipolog City, Sergio Osmeña km 5 Plans and POW GAA 2 30,000.00 30,000.00 60,000.00

358. Bypass Road, Polo, Dapitan City Road Concreting Dapitan City km Plans and POW GAA 3 520,000.00 520,000.00

359. Rehabilitation/Concreting of Farm-to-Market Road of Biayon-Danao-San Jose, Sergio Osmeña

Road Concreting Sergio Osmeña km 2.095 Plans and POW GAA 2 30,000.00 30,000.00 60,000.00

360. Construction/Concreting of Road, Barangay Alvenda-Tuburan-Pob. Sergio Osmeña, Municipality of Mutia and Sergio Osmeña, Zamboanga del Norte

Construction of concrete Road

Mutia/Sergio Osmeña km 1.91 Plans and POW GAA 2 - 70,000.00 50,000.00 50,000.00 170,000.00

361. Concrete Paving of Road from Brgy. Venus to Brgy. Tinindogan, Sergio Osmeña, Zamboanga del Norte

Construction of concrete Road Sergio Osmeña km Plans and POW GAA - 30,000.00 - - 30,000.00

362. Construction/Concreting of Road, Brgy. Alvenda, Mutia - Brgy. Teresita, Piñan, Phase-II, Mun. of Piñan, Zamboanga del Norte

Road Concreting Piñan km 2.175 Plans and POW GAA 2 - - 45,000.00 45,000.00 90,000.00

363. Concreting of Labrador - Letapan - Silawe Road Mun. of Polanco, Zamboanga del Norte

Road Concreting Polanco km 4.4 Plans and POW GAA 2 - 63,000.00 63,000.00 126,000.00

364. Concreting of brgy. Anastacio Road Mun. of Polanco, Zamboanga del Norte

Road Concreting Polanco km 3.775 Plans and POW GAA 2 - - 54,000.00 54,000.00 108,000.00

365. Concreting of brgy. Ilaya - National High School Road, Dapitan City, Zamboanga del Norte

Road Concreting Dapitan City km 0.375 Plans and POW GAA 2 - - 5,400.00 5,400.00 10,800.00

366. Concreting of Brgy. Sinai - Brgy. Bagong Baguio Road (Intermittent Section) Mun. of Sergio Osmeña Sr., Zamboanga del Norte

Road Concreting Sergio Osmeña km 1.05 Plans and POW GAA 2 - - 20,000.00 15,000.00 15,000.00 50,000.00

367. Concreting of Jct. National Highway at Brgy. Tinglan - Pasorio Road, Mun. of Mutia, Zamboanga del Norte

Road Concreting Mutia km 0.505 Plans and POW GAA 2 - - 7,200.00 7,200.00 14,400.00

Chapter 19-1-DPWH IX-ZDN 3DEOPage 29 of 56

Page 299: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

368. Concreting of Jct. National Highway at Brgy. Buenasuerte - La Puresima Road, Mun. of Mutia, Zamboanga del Norte

Road Concreting Mutia km 3.775 Plans and POW GAA 2 - - 54,000.00 54,000.00 108,000.00

369. Concreting of Jct. National Highway at Brgy. Sto. Tomas - Brgy. San Miguel, Mun. of Mutia, Zamboanga del Norte

Road Concreting Mutia km 3.145 Plans and POW GAA 2 - - 45,000.00 45,000.00 90,000.00

370. Concreting of Jct. National Highway at Brgy. Poblacion - Brgy. Sto. Tomas, Mun. of Mutia, Zamboanga del Norte

Road Concreting Mutia km 2.095 Plans and POW GAA 2 - - 30,000.00 30,000.00 60,000.00

371. Concreting of Road Mun. of Piñan, Zamboanga del Norte

Road Concreting Piñan km 3.775 Plans and POW GAA 2 - - 54,000.00 54,000.00 108,000.00

372. Concreting of Road Mun. of Rizal, Zamboanga del Norte

Road Concreting Rizal km 3.775 Plans and POW GAA 2 - - 54,000.00 54,000.00 108,000.00

373. Concreting of Road Mun. of La Libertad, Zamboanga del Norte

Road Concreting Libertad km 3.775 Plans and POW GAA 2 - - 54,000.00 54,000.00 108,000.00

374. Concreting of Road with Drainage components going Road #21 (A & B), Dapitan City

Road Concreting Dapitan City km 0.7 Plans and POW GAA 2 - - 10,000.00 54,001.00 64,001.00

375. Improvement & Concreting of Road Brgy. Talisay - Brgy. Sinonoc, Talisay, Dapitan City

Road Concreting Dapitan City km 0.42 Plans and POW GAA 2 - - 6,000.00 6,000.00 12,000.00

376. Improvement & Concreting of Road Brgy. Kauswagan - Daro, Kauswagan, Talisay, Dapitan City

Road Concreting Dapitan City km 0.42 Plans and POW GAA 2 - - 6,000.00 6,000.00 12,000.00

377. Concreting of Purok Jasmin Sicayab - Bucana, Dapitan City

Road Concreting Dapitan City km 0.35 Plans and POW GAA 2 - - 5,000.00 5,000.00 10,000.00

378. Concreting of Aseniero - Sigayan Aseniero, Dapitan City

Road Concreting Dapitan City km 0.35 Plans and POW GAA 2 - - 5,000.00 5,000.00 10,000.00

379. Concreting of Sigayan - San Francisco Sigayan, Dapitan City

Road Concreting Dapitan City km 0.35 Plans and POW GAA 2 - - 5,000.00 5,000.00 10,000.00

380. Concreting of Road going to Dapitan City National High School to Dapitan City Teacher Village, Banonong, Dapitan City

Road Concreting Dapitan City km 0.35 Plans and POW GAA 2 - - 5,000.00 5,000.00 10,000.00

381. Concreting of Larayan - Liyang Road Concreting km 1.26 Plans and POW GAA 2 - - 18,000.00 18,000.00 36,000.00

382. La Libertad, Sta. Catalina - New Siquijor Road (5.7 kms)

Upgrading of existing bridges in the province

La Libertad km 5.7 Plans and POW GAA 2 30,000.00 30,000.00 60,000.00

383. Road Concreting of Alvenda, Mutia-Penacio, Tuburan, Situbo, S. Osmeña Road

Road Concreting Sergio Osmeña km 2.795 Plans and POW GAA 2 40,000.00 40,000.00 80,000.00

Chapter 19-1-DPWH IX-ZDN 3DEOPage 30 of 56

Page 300: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

384. Construction of Alvenda,Mutia - Tuburan, Sergio Osmeña, Zamboanga del Norte Leading to Lake Dumagat

Road Concreting Sergio Osmeña km 2.795 Plans and POW GAA 2 40,000.00 40,000.00 80,000.00

385. Construction of Ma. Cristina-Poblacion Sibutad, Zamboanga del Norte Leading to Piñahon Island

Road Concreting Sibutad km 2.795 Plans and POW GAA 2 40,000.00 40,000.00 80,000.00

386. Rehab/Concreting of Sto. Tomas-Diolen-Unidos (critical Section), Municipality of Mutia

Road Concreting Mutia km 2 Plans and POW GAA 2 30,000.00 30,000.00 60,000.00

387. Concreting of Brgy. Road from Sianib National High Way to Purok Humayan,Lapayanbaha at Brgy. Sianib, Polanco, ZN

Road Concreting Polanco km 0.5 Plans and POW GAA 2 4,000.00 4,000.00 8,000.00

388. Concreting of Barangay Road going to Purok Rosal, Rose and Gumamela at Brgy. Dansullan, Polanco, ZN.

Road Concreting Polanco km 0.445 Plans and POW GAA 2 6,400.00 6,400.00 12,800.00

389. Concreting of Road at Brgy. Labrador, Polanco, ZN. Road

Concreting Polanco km 1 Plans and POW GAA 2 8,000.00 8,000.00 16,000.00

390. Concreting of Road from the covered court at Brgy. San Pedro, Polanco

Road Concreting Polanco km 0.25 Plans and POW GAA 2 2,000.00 2,000.00 4,000.00

391. Concreting of Road at Brgy. San Antonio, Polanco, ZN. Road

Concreting Polanco km 0.96 Plans and POW GAA 2 7,680.00 7,680.00 15,360.00

392. Concreting of Prov'l Road along @ Brgy. Bacuyong, Piñan Road

Concreting Piñan km 0.84 Plans and POW GAA 2 12,600.00 12,600.00 25,200.00

393. Concreting of Barangay Road from Dilawa Barangay Hall to Dilawa Elem. School (selected Critical Section) Brgy. Dilawa, Piñan

Road Concreting Piñan km 0.17 Plans and POW GAA 2 2,400.00 2,400.00 4,800.00

394. Concreting of Barangay Road at Purok 1-Purok 2, Brgy. Bagong Silang, Piñan

Road Concreting Piñan km 0.5 Plans and POW GAA 2 1,600.00 1,600.00 3,200.00

395. Concreting of Barangay Road of Jose Hamoy-Junction Road Jose Saguin (Jose Hamoy section) Brgy. Pob. South, Piñan, ZN.

Road Concreting Piñan km 0.055 Plans and POW GAA 2 800.00 800.00 1,600.00

396. Concreting of Barangay Road along Purok Bayanihan, Brgy. Del Pilar, Piñan

Road Concreting Piñan km 0.5 Plans and POW GAA 2 2,400.00 2,400.00 4,800.00

Chapter 19-1-DPWH IX-ZDN 3DEOPage 31 of 56

Page 301: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

397. Concreting of Barangay Road selected critical section along Bacuyong-Lingasad (Bacuyong section) Piñan

Road Concreting Piñan km 1.5 Plans and POW GAA 2 12,000.00 12,000.00 24,000.00

398. Concreting of Road Concreting at Brgy. Prinsesa Freshia, Sergio Osmeña

Road Concreting Sergio Osmeña km 1 Plans and POW GAA 2 8,000.00 8,000.00 16,000.00

399. Concreting of Road at Brgy. Poblacion, Mutia

Road Concreting Mutia km 0.5 Plans and POW GAA 2 4,000.00 4,000.00 8,000.00

400. Concreting of Barangay Road along Barangay Diwaan, Dapitan City

Road Concreting Dapitan City km 0.56 Plans and POW GAA 2 8,000.00 8,000.00 16,000.00

401. Concreting of Barangay Road along Barangay Sigayan, (Purok Nangka-Purok Marang) Dapitan City

Road Concreting Dapitan City km 2.1 Plans and POW GAA 2 16,816.00 16,816.00 33,632.00

402. Concreting of Barangay Road along Tangigi, Brgy. Polo, Dapitan City

Road Concreting Dapitan City km 0.28 Plans and POW GAA 2 4,000.00 4,000.00 8,000.00

403. Concreting of Brgy. Road from boundary Daro going to old Public Market of Kauswagon, Dapitan City

Road Concreting Dapitan City km 0.28 Plans and POW GAA 2 4,000.00 4,000.00 8,000.00

404. Concreting of Brgy Road of Sitio Nituan and 200 meters Brgy. Road from the National Highway at Brgy. Opao , Dapitan City, ZN.

Road Concreting Dapitan City km 0.7 Plans and POW GAA 2 4,000.00 4,000.00 8,000.00

405. Concreting of Purok Orchid, Brgy. Owaon, Dapitan City, ZN.(Revised)

Road Concreting Dapitan City km 1 Plans and POW GAA 2 8,000.00 8,000.00 16,000.00

406. Construction of Farm-to-Market Road at Brgy. Polo, Dapitan City

Road Concreting Dapitan City km 0.14 Plans and POW GAA 2 2,000.00 2,000.00 4,000.00

407. Concreting of Brgy. Road along Brgy. Nangca, Rizal Road

Concreting Rizal km 0.28 Plans and POW GAA 2 4,000.00 4,000.00 8,000.00

408. Concreting of Barangay Road along Purok 5 and along Purok 3, Brgy. Sipaloc, Sibutad

Road Concreting Sibutad km 0.615 Plans and POW GAA 2 4,912.00 4,912.00 9,824.00

409. Concreting of Barangay Road of 2 section along Barangay Sibuloc, Sibutad

Road Concreting Sibutad km 0.39 Plans and POW GAA 2 5,600.00 5,600.00 11,200.00

410. Concreting of Brgy. Road New Carcar-Sipaon Road (New Carcar Section) Brgy. New Carcar, La Libertad

Road Concreting La Libertad km 2.27 Plans and POW GAA 2 18,176.00 18,176.00 36,352.00

Chapter 19-1-DPWH IX-ZDN 3DEOPage 32 of 56

Page 302: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

411. Concreting of Brgy. Road Mauswagon, Brgy. Mauswagon, La Libertad

Road Concreting La Libertad km 0.28 Plans and POW GAA 2 4,000.00 4,000.00 8,000.00

412. Rehabilitation/Improvement of FMR Poblacion - San Antonio, Sibutad, ZN

Road Concreting Sibutad km 0.5 Plans and POW GAA 3 10,000.00 10,000.00

413. Rehabilitation/Improvement of FMR Poblacion - Lopoc - Minlasag, Sibutad, ZN

Road Concreting Sibutad km 0.5 Plans and POW GAA 3 10,000.00 10,000.00

414. Rehabilitation/Improvement of FMR Calilic - Oyan, Sibutad, ZN

Road Concreting Sibutad km 0.5 Plans and POW GAA 3 10,000.00 10,000.00

415. Rehabilitation/Improvement of FMR Marapong - Bagwa, Sibutad, ZN

Road Concreting Sibutad km 0.5 Plans and POW GAA 3 10,000.00 10,000.00

416. Rehabilitation/Improvement of FMR Sipaloc - Rizalina, Sibutad, ZN

Road Concreting Sibutad km 0.5 Plans and POW GAA 3 10,000.00 10,000.00

417. Rehabilitation/Improvement of FMR Minlasag - Calube, Sibutad, ZN

Road Concreting Sibutad km 0.5 Plans and POW GAA 3 10,000.00 10,000.00

418. Rehabilitation/Improvement of FMR Sipaloc - Minlasag, Sibutad, ZN

Road Concreting Sibutad km 0.5 Plans and POW GAA 3 10,000.00 10,000.00

419. Rehabilitation/Improvement of FMR Sibuloc - Calilic, Sibutad, ZN

Road Concreting Sibutad km 0.5 Plans and POW GAA 3 10,000.00 10,000.00

420. Rehabilitation/Improvement of FMR Kanim - Sitio Biasong, Sibutad, ZN

Road Concreting Sibutad km 0.5 Plans and POW GAA 3 10,000.00 10,000.00

421. Rehabilitation/Improvement of FMR Panganuran - Daro, Sibutad, ZN

Road Concreting Sibutad km 0.5 Plans and POW GAA 3 10,000.00 10,000.00

422. Concreting of Teresita - Bagong Silang Road, Piñan, ZN

Road Concreting Piñan km 0.8 Plans and POW GAA 3 20,000.00 20,000.00

423. Concreting of Luzvilla - Sikitan Road, Piñan, ZN

Road Concreting Piñan km 0.8 Plans and POW GAA 3 20,000.00 20,000.00

424. Concreting of Sikitan - Dilawa Road, Piñan, ZN

Road Concreting Piñan km 0.8 Plans and POW GAA 3 20,000.00 20,000.00

425. Concreting of Ubay - Sta. Fe Road, Piñan, ZN

Road Concreting Piñan km 0.8 Plans and POW GAA 3 20,000.00 20,000.00

426. Concreting of Diversion Road from National Highway Leop, Dapitan City passing through Adante, Piñan, ZN

Road Concreting Piñan km 0.8 Plans and POW GAA 3 20,000.00 20,000.00

427. Concreting of Ubay Road, Piñan, ZN

Road Concreting Piñan km 0.8 Plans and POW GAA 3 20,000.00 20,000.00

428. Concreting of Del Pilar - Calican, Piñan, ZN

Road Concreting Piñan km 0.8 Plans and POW GAA 3 20,000.00 20,000.00

429. Concreting of Mabuhay - Manggahay Road, Rizal, ZN

Road Concreting Rizal km 2.4 Plans and POW GAA 3 60,000.00 60,000.00

Chapter 19-1-DPWH IX-ZDN 3DEOPage 33 of 56

Page 303: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

430. Concreting of Napilan Road, Rizal, ZN

Road Concreting Rizal km 0.6 Plans and POW GAA 3 15,000.00 15,000.00

431. Concreting of La Esperanza - Rizalina, Rizal, ZN

Road Concreting Rizal km 0.8 Plans and POW GAA 3 20,000.00 20,000.00

432. Concreting of La Esperanza - Damasing, Rizal, ZN

Road Concreting Rizal km 0.8 Plans and POW GAA 3 20,000.00 20,000.00

433. Concreting of Birayan - Nangcaan, Rizal, ZN

Road Concreting Rizal km 2.4 Plans and POW GAA 3 60,000.00 60,000.00

434. Concreting of Nangcaan - San Roque, Rizal, ZN

Road Concreting Rizal km 3.2 Plans and POW GAA 3 80,000.00 80,000.00

435. Concreting of Nangcaan - Rizalina, Rizal, ZN

Road Concreting Rizal km 2 Plans and POW GAA 3 50,000.00 50,000.00

436. Concreting of Mitimos - San Roque and Construction of Bridge, Rizal, ZN

Road Concreting Rizal km Plans and POW GAA 3 90,000.00 90,000.00

437. Concreting of Poblacion - Purok 2 Barangay Road, Mutia, ZN

Road Concreting Mutia km 2.2 Plans and POW GAA 3 55,000.00 55,000.00

438. Concreting of New Siquijor - Unidos Barangay Road, Mutia, ZN Road

Concreting Mutia km 2 Plans and POW GAA 3 50,000.00 50,000.00

439. Concreting of Tubac - Unidos Barangay Road, Mutia, ZN

Road Concreting Mutia km 2 Plans and POW GAA 3 50,000.00 50,000.00

440. Concreting of Newland - Head Tipan Barangay Road, Mutia, ZN

Road Concreting Mutia km 2 Plans and POW GAA 3 50,000.00 50,000.00

441. Concreting of Buenasuerte - Newland Barangay Road, Mutia, ZN

Road Concreting Mutia km 6 Plans and POW GAA 3 150,000.00 150,000.00

442. Concreting of Poblacion - Silano, Piñan Barangay Road, Mutia, ZN

Road Concreting Mutia km 3 Plans and POW GAA 3 75,000.00 75,000.00

443. Concreting of Purok 1, Poblacion Barangay Road, Mutia, ZN

Road Concreting Mutia km 2 Plans and POW GAA 3 50,000.00 50,000.00

444. Concreting of Unidos - Conception Road, Mutia, ZN

Road Concreting Mutia km 1 Plans and POW GAA 3 25,000.00 25,000.00

445. Concreting of Alvenda - Conception Road, Mutia, ZN

Road Concreting Mutia km 1 Plans and POW GAA 3 25,000.00 25,000.00

446. Road Opening of Barangay Roads from Burgos - Tamion - Diwaan, Dapitan City

Road Concreting Dapitan City km 3 Plans and POW GAA 3 150,000.00 150,000.00

447. Road Opening of Barangay Roads from Linabo - Ma. Cristina, Dapitan City

Road Concreting Dapitan City km 3 Plans and POW GAA 3 150,000.00 150,000.00

448. Construction of Circumferential Road at Ilihan Hill, Potol, Dapitan City

Road Concreting Dapitan City km 0.8 Plans and POW GAA 3 20,000.00 20,000.00

449. Construction of Interchange Roads at Junction Polo Bridge - Sunset Boulevard - Sunrise Boulevard, Dapitan City

Road Concreting Dapitan City km Plans and POW GAA 3 20,000.00 20,000.00

450. Concreting of Municipal Streets, Sergio Osmeña, ZN

Road Concreting Sergio Osmeña km 5 Plans and POW GAA 3 125,000.00 125,000.00

Chapter 19-1-DPWH IX-ZDN 3DEOPage 34 of 56

Page 304: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

451. Concreting of San Juan - New Tangub FMR, Sergio Osmeña, ZN Road

Concreting Sergio Osmeña km 4 Plans and POW GAA 3 100,000.00 100,000.00

452. Concreting of Antonino - Luzvilla FMR, Sergio Osmeña, ZN Road

Concreting Sergio Osmeña km 3 Plans and POW GAA 3 15,000.00 15,000.00

453. Concreting of Access Road from National Highway to Garbage Site at Venus, Sergio Osmeña, ZN

Road Concreting Sergio Osmeña km 1.5 Plans and POW GAA 3 50,000.00 50,000.00

454. Concreting of Brgy. Selinog FMR, Brgy. Selinog, Dapitan City Road

Concreting Sergio Osmeña km Plans and POW GAA 3 10,000.00 - 25,000.00 35,000.00

455. Construction/Concrete Paving of FMR Dapitan City Maria Cristina - Poblacion Sibutad Road (Poblacion Sibutad - Kikit Section), Brgy. Maria Cristina, Dapitan City, Zamboanga del Norte

Road Concreting Sergio Osmeña km Plans and POW GAA 3 8,000.00 8,000.00

456. Construction/Concrete Paving of FMR Dapitan City - Maria Cristina - Poblacion Sibutad Road ( Maria Cristina - Capucao Section), Brgy. Maria Cristina - Capucao Section, Dapitan City, Zamboanga del Norte

Road Concreting Sergio Osmeña km Plans and POW GAA 3 5,000.00 5,000.00

457. Concreting of Labrador - Letapan - Silawe FMR, Brgys. Labrador, Letapan & Silawe, Polanco, Zamboanga del Norte

Road Concreting Sergio Osmeña km Plans and POW GAA 3 5,000.00 5,000.00

458. Concreting of Barangay Tolon FMR, Brgy. Tolon, Rizal, Zamboanga del Norte

Road Concreting Sergio Osmeña km Plans and POW GAA 3 2,000.00 2,000.00

459. Concreting of Bagacay - Oyan - Calilic - Poblacion (Sibutad) Phase 2 FMR, Brgys. Bagacay, Oyan, & Calilic, Sibutad, Zamboanga del Norte

Road Concreting Sergio Osmeña km Plans and POW GAA 3 5,000.00 5,000.00

460. Concreting of Brgy. Poblacion Bajo FMR, Brgy. Poblacion Bajo, Sergio Osmeña, Zamboanga del Norte

Road Concreting Sergio Osmeña km Plans and POW GAA 3 10,000.00 10,000.00

461. Concreting of Brgy. Diland FMR, Brgy. Diland, Mutia, Zamboanga del Norte

Road Concreting Sergio Osmeña km Plans and POW GAA 3 5,000.00 5,000.00

462. Concreting of Brgy. La Esperanza - Damasing FMR, Brgy. La Esperanza, Rizal, Zamboanga del Norte

Road Concreting Sergio Osmeña km Plans and POW GAA 3 5,000.00 5,000.00

Chapter 19-1-DPWH IX-ZDN 3DEOPage 35 of 56

Page 305: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

463. Concreting of Brgy. Luzvilla - Sikitan FMR, Brgy. Luzvilla and Brgy. Sikitan, Piñan, Zamboanga del Norte

Road Concreting Sergio Osmeña km Plans and POW GAA 3 10,000.00 10,000.00

464. Concreting of Brgy. Sibuloc FMR, Brgy. Sibuloc, Sibutad, Zamboanga del Norte

Road Concreting Sergio Osmeña km Plans and POW GAA 3 7,000.00 7,000.00

465. Concreting of Brgy. Poblacion - Singaran FMR, Brgy. Poblacion and Brgy. Singaran, La Libertad, Zamboanga del Norte

Road Concreting Sergio Osmeña km Plans and POW GAA 3 5,000.00 5,000.00

466. Concreting of Brgy. Teresita - Bagong Silang FMR, Brgy. Teresita and Brgy. Bagong Silang, Piñan, Zamboanga del Norte

Road Concreting Sergio Osmeña km Plans and POW GAA 3 10,000.00 10,000.00

467. Concreting of Brgy. Venus FMR, Brgy. Venus, Sergio Osmeña, Zamboanga del Norte

Road Concreting Sergio Osmeña km Plans and POW GAA 3 10,000.00 10,000.00

468. Concreting of Brgy. Bago Baguio FMR, Brgy. Bago Baguio, Sergio Osmeña, Zamboanga del Norte

Road Concreting Sergio Osmeña km Plans and POW GAA 3 10,000.00 10,000.00

469. Road Widening with Drainage along Sunset Boulevard, Dapitan City, Zamboanga del Norte

Road Concreting Dapitan City km 0.902 Plans and POW GAA 3 29,513.00 29,513.00

470. Road Riprapping at Brgy. Pasorio, Mutia, Zamboanga del Norte Road

Concreting Mutia km Plans and POW GAA 3 2,000.00 2,000.00

471. Road Concreting at Brgy. Totongon, Mutia, Zamboanga del Norte

Road Concreting Mutia km Plans and POW GAA 3 10,000.00 10,000.00

472. Road Concreting at Brgy. New Castle, Mutia, Zamboanga del Norte

Road Concreting Mutia km Plans and POW GAA 3 10,000.00 10,000.00

473. Road Concreting at Brgy. Desin, Piñan, Zamboanga del Norte

Road Concreting Piñan km 2.5 Plans and POW GAA 3 62,500.00 62,500.00

474. Road Opening of San Antonio FMR, Sergio Osmeña

Road Concreting Sergio Osmeña km Plans and POW GAA 3 15,000.00 15,000.00

475. Road Concreting at Brgy. Sawang, Sibutad, Zamboanga del Norte Road

Concreting Sibutad km 2 Plans and POW GAA 3 50,000.00 50,000.00

476. Road Concreting at Brgy. Dangi, Polanco, Zamboanga del Norte

Road Concreting Polanco km Plans and POW GAA 3 10,000.00 10,000.00

477. Road Concreting of Brgy. Buenavista - Brgy. Sinai, Sergio Osmeña, Zamboanga del Norte

Road Concreting Sergio Osmeña km Plans and POW GAA 3 40,000.00 40,000.00

b. Bridges Plans and POW GAA - 478. Construction of Pitusan Bridge

(Local Bridge), Dapitan City, Zamboanga del Norte

Construction of Bridges Dapitan City sq.m. Plans and POW GAA 50,000.00 50,000.00 - - 100,000.00

Chapter 19-1-DPWH IX-ZDN 3DEOPage 36 of 56

Page 306: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

479. Construction of Tuburan - Sergio Osmeña RCDG Bridge

Construction of Bridges Sergio Osmeña sq.m. 666 Plans and POW GAA 2 90,000.00 90,000.00 180,000.00

480. Construction of 40 ln.m. Pitusan Bridge, Dapitan City

Construction of Bridges Dapitan City sq.m. 381.6 Plans and POW GAA 3 78,000.00 78,000.00

481. Construction of One Lane Pre-stress Concrete Girder (PSCG) Bridge, Oyan - Marapong (12 ln.m.), Sibutad

Construction of Bridges Sibutad sq.m. 88.8 Plans and POW GAA 2 20,000.00 20,000.00 40,000.00

482. Construction of One Lane Pre-stress Concrete Girder (PSCG) Bridge, Oyan - Bagakay (15 ln.m.), Sibutad

Construction of Bridges Sibutad sq.m. 111 Plans and POW GAA 2 28,000.00 28,000.00 56,000.00

483. Rehabilitation/Restoration of Hanging Bridge at Sitio Sinab, Barangay Opao

Construction of Bridges Dapitan City No. of Bridge 1 Plans and POW GAA 2 5,000.00 5,000.00 10,000.00

484. Concruction of Concrete Bridge, Diwaan to Tamion

Construction of Bridges Dapitan City sq.m. 370 Plans and POW GAA 2 50,000.00 50,000.00 100,000.00

485. Const. of RCDG Bridge at Bgry. Villahermosa (Layawan River), Polanco

Construction of Bridges Polanco sq.m. 296 Plans and POW GAA 2 40,000.00 40,000.00 80,000.00

486. Const. of RCDG Bridge at Bgry. La Union (Potungan River), La Libertad

Construction of Bridges La Libertad sq.m. 412.8 Plans and POW GAA 2 30,000.00 30,000.00 60,000.00

487. Const. of Kauswagan Bridge, Sergio Osmeña

Construction of Bridges Sergio Osmeña ln.m. 120 Plans and POW GAA 3 130,000.00 130,000.00

488. Const. of RCDG Bridge at Bgry. Singaran (Dapitan River), La Libertad

Construction of Bridges La Libertad sq.m. 444 Plans and POW GAA 2 86,232.24 86,232.24 172,464.48

489. Construction of Bridge along Brgy. San Isidro, Sergio Osmeña

Upgrading of existing bridges in the province

Sergio Osmeña ln.m. 120 Plans and POW GAA 2 - - 45,000.00 130,000.00 175,000.00

490. Construction of 2nd Polo RCDG Bridge, Dapitan City

Construction of Bridges Dapitan City sq.m. Plans and POW GAA 3 - - 30,000.00 30,000.00

491. Rehabilitation of Ba-ao Spill-Way, Dapitan City

Construction of Bridges Dapitan City No. of Bridge 1 Plans and POW GAA 2 - - 10,000.00 10,000.00 20,000.00

492. Construction of Ba-ao Hanging Bridge, Brgy. Ba-ao, Dapitan City, Zamboanga delNorte

Construction of Hanging Bridge

Dapitan City No. of Bridge 1 Plans and POW GAA 2 27,000.00 27,000.00 54,000.00

493. Construction of Tinglan - Pasorio Bridge, Mutia, ZN

Construction of Bridges Mutia sq.m. Plans and POW GAA 3 60,000.00 60,000.00

494. Construction of Diolen - Unidos Bridge, Mutia, ZN

Construction of Bridges Mutia sq.m. Plans and POW GAA 3 60,000.00 60,000.00

495. Construction of Diland - Head Tipan Bridge, Mutia, ZN

Construction of Bridges Mutia sq.m. Plans and POW GAA 3 60,000.00 60,000.00

496. Construction of Princesa Lamaya Bridge, Sergio Osmeña, ZN

Construction of Bridges Sergio Osmeña sq.m. Plans and POW GAA 3 50,000.00 50,000.00

497. Construction of Bridge, Brgy. New Castle, Mutia, Zamboanga del Norte

Construction of Bridges Mutia sq.m. Plans and POW GAA 3 20,000.00 20,000.00

Chapter 19-1-DPWH IX-ZDN 3DEOPage 37 of 56

Page 307: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

c. Flood Control - 498. Construction of Seawall at Sunset

Boulevard Construction of Flood mitigation structure

Dapitan City ln.m. 337.25 Plans and POW GAA 2 60,000.00 60,000.00 120,000.00

499. Const. of Flood Control Structure along Dapitan Poblacion

Construction of Flood mitigation structure

Dapitan City ln.m. 224.84 Plans and POW GAA 2 40,000.00 40,000.00 80,000.00

500. Construction of River Control, Polo to Sulangon, Dapitan City

Construction of Flood mitigation structure

Dapitan City ln.m. 168.63 Plans and POW GAA 2 30,000.00 30,000.00 60,000.00

501. Dredging at Mouth of Dapitan River Dredging Dapitan City cu.m. 13970 Plans and POW GAA 2 15,000.00 15,000.00 30,000.00

502. Dredging at Liboran River from Banonong to Bagting, Dapitan City Dredging Dapitan City cu.m. 13970 Plans and POW GAA 2 30,000.00 15,000.00 15,000.00 60,000.00

503. Construction of Drainage along Road 27, Dapitan City

Construction of Drainage Dapitan City ln.m. 680.74 Plans and POW GAA 2 10,000.00 10,000.00 20,000.00

504. Construction of Drainage Components along Sunset Boulevard Dapitan Resort Hotel Going to Dapitan New Government Center (Left Side)

Construction of Drainage Dapitan City ln.m. 544.59 Plans and POW GAA 2 8,000.00 8,000.00 16,000.00

505. Construction of Drainage along Datu Pag-Buaya St.

Construction of Drainage Dapitan City ln.m. 408.44 Plans and POW GAA 2 6,000.00 6,000.00 12,000.00

506. Construction of Drainage Structure along Sunset Boulevard, Dapitan City, Zamboanga del Norte

Construction of Drainage Dapitan City ln.m. 2020 Plans and POW GAA 3 31,195.00 31,195.00

507. Construction of Drainage Structure (Box Culvert), Owaon, Dapitan City, Zamboanga del Norte

Construction of Drainage Dapitan City ln.m. Plans and POW GAA 3 3,000.00 3,000.00

508. Construction of Drainage Structure (Box Culvert), San Antonio, Sergio Osmeña, Zamboanga del Norte

Construction of Drainage Sergio Osmeña ln.m. Plans and POW GAA 3 3,000.00 3,000.00

509. Construction of Drainage Structure (Box Culvert), Damasing, Rizal, Zamboanga del Norte

Construction of Drainage Rizal ln.m. Plans and POW GAA 3 5,000.00 5,000.00

510. Construction of Drainage Structure (Box Culvert), Lagbas, Dapitan, Zamboanga del Norte

Construction of Drainage Dapitan City ln.m. Plans and POW GAA 3 8,000.00 8,000.00

Chapter 19-1-DPWH IX-ZDN 3DEOPage 38 of 56

Page 308: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

511. Installation of slope protection system for unstable slope, using high tensile wire mesh along Rizal-Dakak-Dapitan Coastal Loop Road, K1852+000 - K1854+000, Barangay Guimputlan-Tag-ulo, Dapitan City, Zamboanga Del Norte

Construction of Slope Protection

Dapitan City sq.m. 3055.77 Plans and POW GAA 40,000.00 40,000.00 80,000.00

512. Construction of Slope Protection, Sibutad NHS,Sibutad, Zamboanga Del Norte

Construction of Slope Protection

Sibutad ln.m. Plans and POW GAA 5,000.00 5,000.00

513. Construction of Slope Protection, Sergio Osmeña NHS,Sergio Osmeña, Zamboanga Del Norte

Construction of Slope Protection

Sergio Osmeña ln.m. Plans and POW GAA 300.00 300.00

514. Installation of RCCP with Headwalls along Seroan-Mahayahay Barangay Section, Sergio Osmeña

Construction of Flood mitigation structure

Sergio Osmeña sq.m. 15.28 Plans and POW GAA 2 200.00 200.00 400.00

515. Construction of 40m line Ditch Canal & 20m Slope Protection at MagsaysayElementary School, Sibutad

Construction of Drainage Sibutad sq.m. 12.99 Plans and POW GAA 2 170.00 170.00 340.00

516. Construction of Flood control at Sibutad Integrated National High School

Construction of Flood mitigation structure

Sibutad ln.m. 35 Plans and POW GAA 2 800.00 800.00 1,600.00

517. Construction of Flood Control Structure of National Highway nearby Disud Elementary School, Zamboanga del Norte

Construction of Flood mitigation structure

ln.m. 168.63 Plans and POW GAA 2 30,000.00 30,000.00 60,000.00

518. Construction of Flood Control Structure at Ilaya Bridge Section (Abutment A) alongDipolog-Oroquieta Road, Dapitan City, Zamboanga del Norte

Construction of Flood mitigation structure

Dapitan City ln.m. 281.05 Plans and POW GAA 2 50,000.00 50,000.00 100,000.00

519. 12mw Dapitan River Mini-Hydro Power Plant in Municipality of La Libertad andMutia

Construction of Flood mitigation facility

La Libertad & Mutia

Number of Facility 1 Plans and POW GAA 2 1,000,000.00 1,000,000.00 2,000,000.00

520. Construction of Shore Protection Structure along Sunset Boulevard, Dapitan City, Zamboanga del Norte

Construction of Flood mitigation facility

Dapitan City ln.m. 2062 Plans and POW GAA 2 242,176.00 242,176.00 484,352.00

d. GAD Projects - 521. Construction of Covered Path

Walk and Waiting Sheds at DPWH District Office

Dapitan City Project 1 Plans and POW GAA 3 1,300.00 1,300.00

Chapter 19-1-DPWH IX-ZDN 3DEOPage 39 of 56

Page 309: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

522. Construction of 1 storey Rest area Building with 6 units comfort roomsBarcelona, Dapitan City

Dapitan City Unit 1 Plans and POW GAA 3 6,000.00 6,000.00

523. Installation of Informative/directional signs. Road Maintenance ServicesDipolog-Oroq. City Road sections jct. Barcelona and Polo Rotonda, Dapitan City

Dapitan City Project 1 Plans and POW GAA 3 1,500.00 1,500.00

524. Construction of Loading and unloading bays along National highwayDipolog-Oroq. City Road sections jct. Barcelona and Polo Rotonda, Dapitan City

Dapitan City km. Plans and POW GAA 3 10,000.00 10,000.00

525. Construction of walking lanes and pavement markingsDipolog-Oroq. City Road K 1795+(-437) –K1817+000

Dapitan City km. Plans and POW GAA 3 1,600.00 1,600.00

526. Construction of walking lanes and pavement markingsDipolog-Punta-Dansullan-Sergio Osmeña Road K1857+1123 to K1893+775

Sergio Osmeña km. Plans and POW GAA 3 20,000.00 20,000.00

527. Construction of Restroom at S. Osmeña, ZDN Sergio Osmeña Unit 1 Plans and POW GAA 3 1,000.00 1,000.00

528. Construction of Restroom at Libay, Sibutad Sibutad Unit 1 Plans and POW GAA 3 1,000.00 1,000.00

529. Construction of Waiting Sheds along Highway of ZDN 1st LD, at the following locations, viz;a. Macleodes, Polancob. Barcelona, Dapitan

Polanco, Dapitan City Unit 1 Plans and POW GAA 3 1,000.00 1,000.00

e. Water Supply System - 530. Construction of Water System

(Level II), Sergio Osmeña, Sr., Zamboanga del Norte

Construction of Water System Sergio Osmeña No. of Water

System 1 Plans and POW GAA 5,000.00 52,000.00 57,000.00

531. Construction of Water Supply System at Bucana, Brgy. Sicayab, Dapitan City, Zamboanga del Norte

Construction of Water System Dapitan City No. of Water

System 1 Plans and POW GAA 2 5,500.00 5,500.00 11,000.00

532. Construction of Water Supply System at Banbanan, Dapitan City, Zamboanga del Norte

Construction of Water System Dapitan City No. of Water

System 1 Plans and POW GAA 2 3,078.00 3,078.00 6,156.00

Chapter 19-1-DPWH IX-ZDN 3DEOPage 40 of 56

Page 310: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

533. Construction of Water Supply System at Brgy. Hilltop, Dapitan City, Zamboanga del Norte

Construction of Water System Dapitan City No. of Water

System 1 Plans and POW GAA 2 3,632.00 3,632.00 7,264.00

534. Construction of Water Supply System at Brgy. Sigayan, Dapitan City, Zamboanga del Norte

Construction of Water System Dapitan City No. of Water

System 1 Plans and POW GAA 2 3,397.00 3,397.00 6,794.00

535. Extension of Pipeline at Brgy. Oro, Dapitan City, Zamboanga del Norte

Construction of Water System Dapitan City No. of Water

System 1 Plans and POW GAA 2 1,063.00 1,063.00 2,126.00

536. Construction of Water Supply System at Purok Nangka-Tutua, Sulangon, Dapitan City, Zamboanga del Norte

Construction of Water System Dapitan City No. of Water

System 1 Plans and POW GAA 2 3,388.00 3,388.00 6,776.00

537. Construction of Water Supply System at Brgy. Villarico, Piñan, Zamboanga del Norte

Construction of Water System Piñan No. of Water

System 1 Plans and POW GAA 2 3,320.00 3,320.00 6,640.00

538. Construction of Water Supply System at Brgy. Sikitan, Piñan, Zamboanga del Norte

Construction of Water System Piñan No. of Water

System 1 Plans and POW GAA 2 2,943.00 2,943.00 5,886.00

539. Construction of Water Supply System at Brgy. Bagacay, Sibutad, Zamboanga del Norte

Construction of Water System Sibutad No. of Water

System 1 Plans and POW GAA 2 3,313.00 3,313.00 6,626.00

540. Construction of Water Supply System at Brgy. Minsalag, Sibutad, Zamboanga del Norte

Construction of Water System Sibutad No. of Water

System 1 Plans and POW GAA 2 1,919.00 1,919.00 3,838.00

541. Construction of Water Supply System at Brgy. Libay, Sibutad, Zamboanga del Norte

Construction of Water System Sibutad No. of Water

System 1 Plans and POW GAA 2 2,589.00 2,589.00 5,178.00

542. Extension of Pipeline at Brgy. Singaran, La Libertad, Zamboanga del Norte

Construction of Water System La Libertad No. of Water

System 1 Plans and POW GAA 2 1,219.00 1,219.00 2,438.00

543. Construction of Water Supply System at Brgy. La Union, La Libertad, Zamboanga del Norte

Construction of Water System La Libertad No. of Water

System 1 Plans and POW GAA 2 1,221.00 1,221.00 2,442.00

544. Purchasing and Installation of Pipeline along Brgy. Conacon and Brgy. Sto. Nino, Polanco, Zamboanga del Norte

Construction of Water System Polanco No. of Water

System 1 Plans and POW GAA 2 7,345.00 7,345.00 14,690.00

545. Construction of Water Supply System at Brgy. Letapan, Polanco, Zamboanga del Norte

Construction of Water System Polanco No. of Water

System 1 Plans and POW GAA 2 2,890.00 2,890.00 5,780.00

546. Construction of Water Supply System at Brgy. Mangangon, Polanco, Zamboanga del Norte

Construction of Water System Polanco No. of Water

System 1 Plans and POW GAA 2 3,690.00 3,690.00 7,380.00

547. Construction of Water Supply System at PEO Main Office, Brgy. Obay, Polanco, Zamboanga del Norte

Construction of Water System Polanco No. of Water

System 1 Plans and POW GAA 2 2,121.00 2,121.00 4,242.00

Chapter 19-1-DPWH IX-ZDN 3DEOPage 41 of 56

Page 311: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

548. Construction of Water Supply System at Brgy. Silawe, Polanco, Zamboanga del Norte

Construction of Water System Polanco No. of Water

System 1 Plans and POW GAA 2 2,025.00 2,025.00 4,050.00

549. Expansion of Pipeline at Brgy. Anastacio, Polanco, Zamboanga del Norte

Construction of Water System Polanco No. of Water

System 1 Plans and POW GAA 2 1,300.00 1,300.00 2,600.00

550. Construction of Water Supply System at Begy. Head Tipan, Mutia, Zamboanga del Norte

Construction of Water System Mutia No. of Water

System 1 Plans and POW GAA 2 2,109.00 2,109.00 4,218.00

551. Construction of Water Supply System at Brgy. Nazareth, Sergio Osmeña,Zamboanga del Norte

Construction of Water System Sergio Osmeña No. of Water

System 1 Plans and POW GAA 2 2,700.00 2,700.00 5,400.00

552. Construction of Water Supply System at Brgy. San Juan, Sergio Osmeña,Zamboanga del Norte

Construction of Water System Sergio Osmeña No. of Water

System 1 Plans and POW GAA 2 2,400.00 2,400.00 4,800.00

553. Construction of Water Supply System (Pob. Bajo - Venus - San Juan - Dampalan - Labiray), Sergio Osmeña,Zamboanga del Norte

Construction of Water System Sergio Osmeña No. of Water

System 1 Plans and POW GAA 3 50,000.00 50,000.00

554. Construction of Water Supply System at Brgy. Princesa Freshia, Sergio Osmeña, Zamboanga del Norte

Construction of Water System Sergio Osmeña No. of Water

System 1 Plans and POW GAA 2 1,005.00 1,005.00 2,010.00

555. Construction of Water Supply System at Brgy. Bagumbayan, Sergio Osmeña, Zamboanga del Norte

Construction of Water System Sergio Osmeña No. of Water

System 1 Plans and POW GAA 2 2,260.00 2,260.00 4,520.00

556. Construction of Water Supply System (Sinai - Poblacion Alto - Poblacion Bajo), Sergio Osmeña

Construction of Water System Sergio Osmeña No. of Water

System 1 Plans and POW GAA 3 75,000.00 75,000.00

557. Construction of Water Supply System (Sinai - Poblacion Alto - Biayon), Sergio Osmeña

Construction of Water System Sergio Osmeña No. of Water

System 1 Plans and POW GAA 3 50,000.00 50,000.00

558. Construction of Water Supply System at Brgy. Nilabo, Rizal, Zamboanga del Norte

Construction of Water System Rizal No. of Water

System 1 Plans and POW GAA 2 2,627.00 2,627.00 5,254.00

559. Construction of Water Supply System at Sebaca, Rizal, Zamboanga del Norte

Construction of Water System Rizal No. of Water

System 1 Plans and POW GAA 2 2,420.00 2,420.00 4,840.00

560. Construction of Water Supply System at Brgy. South Mapang, Rizal, Zamboanga del Norte

Construction of Water System Rizal No. of Water

System 1 Plans and POW GAA 2 3,443.00 3,443.00 6,886.00

561. Construction of Water Supply System at Brgy. Mitimos, Rizal, Zamboanga del Norte

Construction of Water System Rizal No. of Water

System 1 Plans and POW GAA 2 3,035.00 3,035.00 6,070.00

Chapter 19-1-DPWH IX-ZDN 3DEOPage 42 of 56

Page 312: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

562. Construction/Improvement of Water Supply System at Dapitan City, Zamboanga del Norte

Construction of Water System Dapitan City No. of Water

System 1 Plans and POW GAA 3 200,000.00 200,000.00

563. Construction of Water Supply System at Brgy. New Dapitan, Rizal, Zamboanga del Norte

Construction of Water System Rizal No. of Water

System 1 Plans and POW GAA 3 4,000.00 4,000.00

564. Construction of Water Supply System at Brgy. Dampalan, Dapitan City, Zamboanga del Norte

Construction of Water System Dapitan City No. of Water

System 1 Plans and POW GAA 3 4,000.00 4,000.00

565. Construction of Water System (Installation of Reservoir), Brgy. Venus, Sergio Osmeña, Zamboanga del Norte

Construction of Water System Sergio Osmeña No. of Water

System 1 Plans and POW GAA 3 2,000.00 2,000.00

566. Construction of Water System Level II. Brgy. Kanim, Sibutad, Zamboanga del Norte

Construction of Water System Sibutad No. of Water

System 1 Plans and POW GAA 3 4,000.00 4,000.00

567. Construction of Water System Level II Brgy. Poblacion, Sergio Osmeña, Zamboanga del Norte

Construction of Water System Sergio Osmeña No. of Water

System 1 Plans and POW GAA 3 4,000.00 4,000.00

568. Construction of Water System Level I. Brgy. Desin, Piñan, Zamboanga del Norte

Construction of Water System Piñan No. of Water

System 1 Plans and POW GAA 3 4,000.00 4,000.00

569. Construction of Water System Brgy. Totongon, Mutia, Zamboanga del Norte

Construction of Water System Mutia No. of Water

System 1 Plans and POW GAA 3 4,000.00 4,000.00

570. Construction of Water System (Spring Dev't), Brgy. Tubak, Mutia, Zamboanga del Norte

Construction of Water System Mutia No. of Water

System 1 Plans and POW GAA 3 4,000.00 4,000.00

571. Construction of Water System, Brgy. Diolen, Mutia, Zamboanga del Norte

Construction of Water System Mutia No. of Water

System 1 Plans and POW GAA 3 4,000.00 4,000.00

572. Construction of Water System, Brgy. Newland, Mutia, Zamboanga del Norte

Construction of Water System Mutia No. of Water

System 1 Plans and POW GAA 3 4,000.00 4,000.00

573. Construction of Water System (Spring Dev't), Brgy. Buenasuerte, Mutia, Zamboanga del Norte

Construction of Water System Mutia No. of Water

System 1 Plans and POW GAA 3 4,000.00 4,000.00

574. Construction of Water System, Birayan, Rizal, Zamboanga del Norte

Construction of Water System Rizal No. of Water

System 1 Plans and POW GAA 3 4,000.00 4,000.00

575. Construction of Water System, Dangi, Polanco, Zamboanga del Norte

Construction of Water System Polanco No. of Water

System 1 Plans and POW GAA 3 4,000.00 4,000.00

Buildings and Other Structures - - a. Multipurpose/Facilities - -

Chapter 19-1-DPWH IX-ZDN 3DEOPage 43 of 56

Page 313: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

576. Construction of Multipurpose Building/Covered Court at Brgy Oyan, Dapitan City, Zamboanga del Norte

Construction of Multi-Purpose building

Dapitan City No. of Bldg. 1 Plans and POW GAA 2,200.00 - - - 2,200.00

577. Construction of Multipurpose Building/Covered Court at Brgy Sulangon, Dapitan City, Zamboanga del Norte

Construction of Multi-Purpose building

Dapitan City No. of Bldg. 1 Plans and POW GAA 2,200.00 - - - 2,200.00

578. Construction of Multipurpose Building/Covered Court at Brgy Tamion, Dapitan City, Zamboanga del Norte

Construction of Multi-Purpose building

Dapitan City No. of Bldg. 1 Plans and POW GAA 2,200.00 - - - 2,200.00

579. Construction of Multipurpose Building/Covered Court at Brgy Bao, Dapitan City, Zamboanga del Norte

Construction of Multi-Purpose building

Dapitan City No. of Bldg. 1 Plans and POW GAA 2,200.00 - - - 2,200.00

580. Construction of Multipurpose Building/Covered Court at Brgy San Pedro,Polanco, Zamboanga del Norte

Construction of Multi-Purpose building

Polanco No. of Bldg. 1 Plans and POW GAA 2,200.00 - - - 2,200.00

581. Construction of Multipurpose Building/Covered Court at Brgy Dangi, Polanco, Zamboanga del Norte

Construction of Multi-Purpose building

Polanco No. of Bldg. 1 Plans and POW GAA 2,200.00 - - - 2,200.00

582. Construction of Multipurpose Building/Covered Court at Brgy San Miguel, Polanco, Zamboanga del Norte

Construction of Multi-Purpose building

Polanco No. of Bldg. 1 Plans and POW GAA 2,200.00 - - - 2,200.00

583. Construction of Multipurpose Building/Covered Court at Brgy Biayon, Sergio Osmena, Zamboanga del Norte

Construction of Multi-Purpose building

Sergio Osmeña No. of Bldg. 1 Plans and POW GAA 2,200.00 - - - 2,200.00

584. Construction of Multipurpose Building/Covered Court at Brgy Poblacion Bajo, Sergio Osmena, Zamboanga del Norte

Construction of Multi-Purpose building

Sergio Osmeña No. of Bldg. 1 Plans and POW GAA 2,200.00 - - - 2,200.00

585. Construction of Multipurpose Building/Covered Court at Brgy Lamaya, Sergio Osmena, Zamboanga del Norte

Construction of Multi-Purpose building

Sergio Osmeña No. of Bldg. 1 Plans and POW GAA 2,200.00 - - - 2,200.00

586. Construction of Multipurpose Building/Covered Court at Brgy San Juan, Sergio Osmena, Zamboanga del Norte

Construction of Multi-Purpose building

Sergio Osmeña No. of Bldg. 1 Plans and POW GAA 2,200.00 - - - 2,200.00

587. Construction of Multipurpose Building/Covered Court at Brgy San Isidro, Sergio Osmena, Zamboanga del Norte

Construction of Multi-Purpose building

Sergio Osmeña No. of Bldg. 1 Plans and POW GAA 2,200.00 - - - 2,200.00

Chapter 19-1-DPWH IX-ZDN 3DEOPage 44 of 56

Page 314: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

588. Construction of Multipurpose Building/Covered Court at Brgy Bagong Baguio, Sergio Osmena, Zamboanga del Norte

Construction of Multi-Purpose building

Sergio Osmeña No. of Bldg. 1 Plans and POW GAA 2,200.00 - - - 2,200.00

589. Construction of Multipurpose Building/Covered Court at Brgy Pasorio, Mutia, Zamboanga del Norte

Construction of Multi-Purpose building

Mutia No. of Bldg. 1 Plans and POW GAA 3 2,200.00 - - 1,000.00 3,200.00

590. Construction of Multipurpose Building/Covered Court at Brgy Diolen, Mutia, Zamboanga del Norte

Construction of Multi-Purpose building

Mutia No. of Bldg. 1 Plans and POW GAA 2,200.00 - - - 2,200.00

591. Construction of Multipurpose Building/Covered Court at Brgy Nasipang, Rizal, Zamboanga del Norte

Construction of Multi-Purpose building

Rizal No. of Bldg. 1 Plans and POW GAA 2,200.00 - - - 2,200.00

592. Construction of Multipurpose Building/Covered Court at Brgy East Poblacion, Rizal, Zamboanga del Norte

Construction of Multi-Purpose building

Rizal No. of Bldg. 1 Plans and POW GAA 2,200.00 - - - 2,200.00

593. Construction of Multipurpose Building/Covered Court at Brgy Mabuhay, Rizal, Zamboanga del Norte

Construction of Multi-Purpose building

Rizal No. of Bldg. 1 Plans and POW GAA 2,200.00 - - - 2,200.00

594. Construction of Multipurpose Building/Covered Court at Brgy Calilic, Sibutad, Zamboanga del Norte

Construction of Multi-Purpose building

Sibutad No. of Bldg. 1 Plans and POW GAA 2,200.00 - - - 2,200.00

595. Construction of Multipurpose Building/Covered Court at Brgy Adante, Pinan, Zamboanga del Norte

Construction of Multi-Purpose building

Piñan No. of Bldg. 1 Plans and POW GAA 2,200.00 - - - 2,200.00

596. Construction of Multipurpose Building/Covered Court at Brgy Sta Fe, Pinan, Zamboanga del Norte

Construction of Multi-Purpose building

Piñan No. of Bldg. 1 Plans and POW GAA 300.00 - - - 300.00

597. Construction of Multipurpose Building/Covered Court at Brgy Sebaca, Rizal, Zamboanga del Norte

Construction of Multi-Purpose building

Rizal No. of Bldg. 1 Plans and POW GAA 500.00 - 500.00

598. Construction of Multipurpose Building/Covered Court at Brgy Balubohan, Rizal, Zamboanga del Norte

Construction of Multi-Purpose building

Rizal No. of Bldg. 1 Plans and POW GAA 500.00 - - - 500.00

599. Construction of Multipurpose Building/Covered Court at Brgy Segabe, Pinan, Zamboanga del Norte

Construction of Multi-Purpose building

Piñan No. of Bldg. 1 Plans and POW GAA 1,200.00 - - - 1,200.00

Chapter 19-1-DPWH IX-ZDN 3DEOPage 45 of 56

Page 315: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

600. Construction of Multipurpose Building/Covered Court at Brgy Calube, Sibutad, Zamboanga del Norte

Construction of Multi-Purpose building

Sibutad No. of Bldg. 1 Plans and POW GAA 3 3,500.00 - - 2,000.00 5,500.00

601. Construction (Completion) of Multipurpose Building/Covered Court, Brgy. Cawa-Cawa, Dapitan City, Zamboanga del Norte

Construction of Multi-Purpose building

Dapitan City No. of Bldg. 1 Plans and POW GAA 3 - 2,000.00 - 1,000.00 3,000.00

602. Construction (Completion) of Multipurpose Building/Covered Court, Central School, Brgy. West Poblacion, Rizal, Zamboanga del Norte

Construction of Multi-Purpose building

Rizal No. of Bldg. 1 Plans and POW GAA - 1,000.00 - - 1,000.00

603. Construction (Completion) of Multipurpose Building/Gym, Brgy. West Poblacion, Rizal, Zamboanga del Norte

Construction of Multi-Purpose building

Rizal No. of Bldg. 1 Plans and POW GAA - 2,000.00 - - 2,000.00

604. Construction of Elementary School Building, Brgy. Guinles, Polanco, Zamboanga del Norte

Construction of Multi-Purpose building

Polanco No. of Bldg. 1 Plans and POW GAA - 5,000.00 - - 5,000.00

605. Construction of Multipurpose Building, National High School, Brgy. Sebaca, Rizal, Zamboanga del Norte

Construction of Multi-Purpose building

Rizal No. of Bldg. 1 Plans and POW GAA 1,500.00 1,500.00

606. Construction of Multipurpose Building/Covered Court, Brgy. Buena Vista, Sergio Osmeña, Zamboanga del Norte

Construction of Multi-Purpose building

Sergio Osmeña No. of Bldg. 1 Plans and POW GAA - 2,500.00 - - 2,500.00

607. Construction of Multipurpose Building/Covered Court, Brgy. Kauswagan, Dapitan City, Zamboanga del Norte

Construction of Multi-Purpose building

Dapitan City No. of Bldg. 1 Plans and POW GAA 3 - 2,500.00 - 1,000.00 3,500.00

608. Construction of Multi-Purpose Building/Covered Court, Brgy. Kauswagan, Sergio Osmeña, Zamboanga del Norte

Construction of Multi-Purpose building

Sergio Osmeña No. of Bldg. 1 Plans and POW GAA - 2,500.00 - - 2,500.00

609. Construction of Multi-Purpose Building/Covered Court, Brgy. Labiray, Sergio Osmeña, Zamboanga del Norte

Construction of Multi-Purpose building

Sergio Osmeña No. of Bldg. 1 Plans and POW GAA - 2,500.00 - - 2,500.00

610. Construction of Multipurpose Building/Covered Court, Brgy. Lapu-Lapu, Piñan, Zamboanga del Norte

Construction of Multi-Purpose building

Piñan No. of Bldg. 1 Plans and POW GAA - 2,500.00 - - 2,500.00

611. Construction of Multipurpose Building/Covered Court, Brgy. Liwanag, Sergio Osmeña, Zamboanga del Norte

Construction of Multi-Purpose building

Sergio Osmeña No. of Bldg. 1 Plans and POW GAA - 2,500.00 - - 2,500.00

Chapter 19-1-DPWH IX-ZDN 3DEOPage 46 of 56

Page 316: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

612. Construction of Multipurpose Building/Covered Court, Brgy. Mabuhay, Sergio Osmeña, Zamboanga del Norte

Construction of Multi-Purpose building

Sergio Osmeña No. of Bldg. 1 Plans and POW GAA - 2,500.00 - - 2,500.00

613. Construction of Multi-Purpose Building/Covered Court, Brgy. Marapong, Sergio Osmeña, Zamboanga del Norte

Construction of Multi-Purpose building

Sergio Osmeña No. of Bldg. 1 Plans and POW GAA - 2,500.00 - - 2,500.00

614. Construction of Multipurpose Building/Covered Court, Brgy. Napilan, Rizal, Zamboanga del Norte

Construction of Multi-Purpose building

Sergio Osmeña No. of Bldg. 1 Plans and POW GAA - 2,500.00 - - 2,500.00

615. Construction of Multi-Purpose Building/Covered Court, Brgy. Nazareth, Sergio Osmeña, Zamboanga del Norte

Construction of Multi-Purpose building

Sergio Osmeña No. of Bldg. 1 Plans and POW GAA - 2,500.00 - - 2,500.00

616. Construction of Multipurpose Building/Covered Court, Brgy. Nebo, Sergio Osmeña, Zamboanga del Norte

Construction of Multi-Purpose building

Sergio Osmeña No. of Bldg. 1 Plans and POW GAA - 2,500.00 - - 2,500.00

617. Construction of Multipurpose Building/Covered Court, Brgy. New Siquijor, Mutia, Zamboanga del Norte

Construction of Multi-Purpose building

Mutia No. of Bldg. 1 Plans and POW GAA - 2,500.00 - - 2,500.00

618. Construction of Multi-Purpose Building/Covered Court, Brgy. Princisa Lamaya, Sergio Osmeña, Zamboanga del Norte

Construction of Multi-Purpose building

Sergio Osmeña No. of Bldg. 1 Plans and POW GAA - 2,500.00 - - 2,500.00

619. Construction of Multipurpose Building/Covered Court, Brgy. San Francisco, Sergio Osmeña, Zamboanga del Norte

Construction of Multi-Purpose building

Sergio Osmeña No. of Bldg. 1 Plans and POW GAA - 2,500.00 - - 2,500.00

620. Construction of Multipurpose Building/Covered Court, Brgy. Senai, Sergio Osmeña, Zamboanga del Norte

Construction of Multi-Purpose building

Sergio Osmeña No. of Bldg. 1 Plans and POW GAA - 2,500.00 - - 2,500.00

621. Construction of Multipurpose Building/Covered Court, National High School, Brgy. West Poblacion, Rizal, Zamboanga del Norte

Construction of Multi-Purpose building

Rizal No. of Bldg. 1 Plans and POW GAA - 2,500.00 - - 2,500.00

622. Construction of Multi-Purpose Building/LGU Gymnasium, Brgy. Poblacion Alto, Sergio Osmeña, Zamboanga del Norte

Construction of Multi-Purpose building

Sergio Osmeña No. of Bldg. 1 Plans and POW GAA - 7,500.00 - - 7,500.00

623. Construction of Multi-Purpose PDEA Office Building, Brgy. San Pedro, Dapitan City, Zamboanga del Norte

Construction of Multi-Purpose building

Dapitan City No. of Bldg. 1 Plans and POW GAA - 10,000.00 - - 10,000.00

Chapter 19-1-DPWH IX-ZDN 3DEOPage 47 of 56

Page 317: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

624. Construction of Multi-Purpose Hall, Brgy. Poblacion, Sergio Osmeña, Zamboanga del Norte

Construction of Multi-Purpose building

Sergio Osmeña No. of Bldg. 1 Plans and POW GAA - 10,000.00 - - 10,000.00

625. Construction of COMELEC Multi-Purpose Building (Covered Court), Linabo, Dapitan City, Zamboanga del Norte

Construction of Multi-Purpose building

Dapitan City No. of Bldg. 1 Plans and POW GAA - 2,500.00 - - 2,500.00

626. Construction of COMELEC Multi-Purpose Building (Phase I), Dapitan City, Zamboanga del Norte

Construction of Multi-Purpose building

Dapitan City No. of Bldg. 1 Plans and POW GAA - 10,000.00 - - 10,000.00

627. Construction of COMELEC Multi-Purpose Building-Phase II, Dapitan City, Zamboanga del Norte

Construction of Multi-Purpose building

Dapitan City No. of Bldg. 1 Plans and POW GAA - 2,500.00 - - 2,500.00

628. Construction of Multi-Purpose Building (Covered Court), 5th Infantry Batallion, Brgy. Del Pilar, Pinan, Zamboanga del Norte

Construction of Multi-Purpose building

Piñan No. of Bldg. 1 Plans and POW GAA - 2,500.00 - - 2,500.00

629. Construction of Multi-Purpose Building (Covered Court), Brgy. Alvenda, Mutia, Zamboanga del Norte

Construction of Multi-Purpose building

Mutia No. of Bldg. 1 Plans and POW GAA - 2,500.00 - - 2,500.00

630. Construction of Multi-Purpose Building (Covered Court), Brgy. Antipolo, Dapitan City, Zamboanga del Norte

Construction of Multi-Purpose building

Dapitan City No. of Bldg. 1 Plans and POW GAA - 2,500.00 - - 2,500.00

631. Construction of Multi-Purpose Building (Covered Court), Brgy. Antonino, Sergio Osmeña Sr., Zamboanga del Norte

Construction of Multi-Purpose building

Sergio Osmeña No. of Bldg. 1 Plans and POW GAA - 2,500.00 - - 2,500.00

632. Construction of Multi-Purpose Building (Covered Court), Brgy. Aseniero, Dapitan City, Zamboanga del Norte

Construction of Multi-Purpose building

Dapitan City No. of Bldg. 1 Plans and POW GAA 3 - 2,500.00 - 2,000.00 4,500.00

633. Construction of Multi-Purpose Building (Covered Court), Brgy. Carang, Dapitan City, Zamboanga del Norte

Construction of Multi-Purpose building

Dapitan City No. of Bldg. 1 Plans and POW GAA - 2,500.00 - - 2,500.00

634. Construction of Multi-Purpose Building (Covered Court), Brgy. Diwaan, Dapitan City, Zamboanga del Norte

Construction of Multi-Purpose building

Dapitan City No. of Bldg. 1 Plans and POW GAA - 2,500.00 - - 2,500.00

635. Construction of Multi-Purpose Building (Covered Court), Brgy. Lapayan Baja ES, Polanco, Zamboanga del Norte

Construction of Multi-Purpose building

Polanco No. of Bldg. 1 Plans and POW GAA - 2,500.00 - - 2,500.00

Chapter 19-1-DPWH IX-ZDN 3DEOPage 48 of 56

Page 318: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

636. Construction of Multi-Purpose Building (Covered Court), Brgy. Libay, Sibutad, Zamboanga del Norte

Construction of Multi-Purpose building

Sibutad No. of Bldg. 1 Plans and POW GAA 3 - 2,500.00 - 1,000.00 3,500.00

637. Construction of Multi-Purpose Building (Covered Court), Brgy. Linabo, Polanco, Zamboanga del Norte

Construction of Multi-Purpose building

Polanco No. of Bldg. 1 Plans and POW GAA - 2,500.00 - - 2,500.00

638. Construction of Multi-Purpose Building (Covered Court), Brgy. Ma. Cristina, Dapitan City, Zamboanga del Norte

Construction of Multi-Purpose building

Dapitan City No. of Bldg. 1 Plans and POW GAA - 2,500.00 - - 2,500.00

639. Construction of Multi-Purpose Building (Covered Court), Brgy. Masidlakon, Dapitan City, Zamboanga del Norte

Construction of Multi-Purpose building

Dapitan City No. of Bldg. 1 Plans and POW GAA 3 - 2,500.00 - 2,000.00 4,500.00

640. Construction of Multi-Purpose Building (Covered Court), Brgy. Nangcaan, Rizal, Zamboanga del Norte

Construction of Multi-Purpose building

Rizal No. of Bldg. 1 Plans and POW GAA - 2,500.00 - - 2,500.00

641. Construction of Multi-Purpose Building (Covered Court), Brgy. New Tangub, Sergio Osmeña Sr., Zamboanga del Norte

Construction of Multi-Purpose building

Sergio Osmeña No. of Bldg. 1 Plans and POW GAA - 2,500.00 - - 2,500.00

642. Construction of Multi-Purpose Building (Covered Court), Brgy. Newland, Mutia, Zamboanga del Norte

Construction of Multi-Purpose building

Mutia No. of Bldg. 1 Plans and POW GAA - 2,500.00 - - 2,500.00

643. Construction of Multi-Purpose Building (Covered Court), Brgy. Panganuran, Sibutad, Zamboanga del Norte

Construction of Multi-Purpose building

Sibutad No. of Bldg. 1 Plans and POW GAA - 2,500.00 - - 2,500.00

644. Construction of Multi-Purpose Building (Covered Court), Brgy. Penacio, Sergio Osmeña Sr., Zamboanga del Norte

Construction of Multi-Purpose building

Sergio Osmeña No. of Bldg. 1 Plans and POW GAA - 2,500.00 - - 2,500.00

645. Construction of Multi-Purpose Building (Covered Court), Brgy. Pian, Polanco, Zamboanga del Norte

Construction of Multi-Purpose building

Polanco No. of Bldg. 1 Plans and POW GAA - 2,500.00 - - 2,500.00

646. Construction of Multi-Purpose Building (Covered Court), Brgy. Potungan, Dapitan City, Zamboanga del Norte

Construction of Multi-Purpose building

Dapitan City No. of Bldg. 1 Plans and POW GAA - 2,500.00 - - 2,500.00

647. Construction of Multi-Purpose Building (Covered Court), Brgy. San Antonio ES, Polanco, Zamboanga del Norte

Construction of Multi-Purpose building

Polanco No. of Bldg. 1 Plans and POW GAA - 2,500.00 - - 2,500.00

Chapter 19-1-DPWH IX-ZDN 3DEOPage 49 of 56

Page 319: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

648. Construction of Multi-Purpose Building (Covered Court), Brgy. San Miguel, Mutia, Zamboanga del Norte

Construction of Multi-Purpose building

Mutia No. of Bldg. 1 Plans and POW GAA 3 - 2,500.00 - 1,000.00 3,500.00

649. Construction of Multi-Purpose Building (Covered Court), Brgy. Situbo, Sergio Osmeña Sr., Zamboanga del Norte

Construction of Multi-Purpose building

Sergio Osmeña No. of Bldg. 1 Plans and POW GAA - 2,500.00 - - 2,500.00

650. Construction of Multi-Purpose Building (Covered Court), Brgy. Sto. Niño, Polanco, Zamboanga del Norte

Construction of Multi-Purpose building

Polanco No. of Bldg. 1 Plans and POW GAA - 2,500.00 - - 2,500.00

651. Construction of Multi-Purpose Building (Covered Court), Brgy. Tuburan, Sergio Osmeña Sr., Zamboanga del Norte

Construction of Multi-Purpose building

Sergio Osmeña No. of Bldg. 1 Plans and POW GAA - 2,500.00 - - 2,500.00

652. Construction of Multi-Purpose Building (Covered Court), Brgy. Wilben, Sergio Osmeña Sr., Zamboanga del Norte

Construction of Multi-Purpose building

Sergio Osmeña No. of Bldg. 1 Plans and POW GAA - 2,500.00 - - 2,500.00

653. Construction of Multi-Purpose Building (Covered Court), Dakak Nat'l High School, Brgy. Taguilon, Dapitan City, Zamboanga del Norte

Construction of Multi-Purpose building

Dapitan City No. of Bldg. 1 Plans and POW GAA - 2,500.00 - - 2,500.00

654. Construction of Multi-Purpose Building (Covered Court), Sibutad Central School, Sibutad, Zamboanga del Norte

Construction of Multi-Purpose building

Sibutad No. of Bldg. 1 Plans and POW GAA - 2,500.00 - - 2,500.00

655. Construction of Multi-Purpose Building (Covered Court), Taguilon Elementary School, Dapitan City, Zamboanga del Norte

Construction of Multi-Purpose building

Dapitan City No. of Bldg. 1 Plans and POW GAA - 2,500.00 - - 2,500.00

656. Construction of Multi-Purpose Building, Brgy. Aliguay Island, Dapitan City, Zamboanga del Norte

Construction of Multi-Purpose building

Dapitan City No. of Bldg. 1 Plans and POW GAA - 4,000.00 - - 4,000.00

657. Construction of Multi-Purpose Building, Brgy. Selinog Island, Dapitan City, Zamboanga del Norte

Construction of Multi-Purpose building

Dapitan City No. of Bldg. 1 Plans and POW GAA - 4,000.00 - - 4,000.00

658. Construction of Philippine Coast Guard Multi-Purpose Building, Brgy. San Vicente, Dapitan City, Zamboanga del Norte

Construction of Multi-Purpose building

Dapitan City No. of Bldg. 1 Plans and POW GAA - 6,000.00 - - 6,000.00

659. Construction of PNP Highway Patrol Group Multi-Purpose Building, Dapitan City, Zamboanga del Norte

Construction of Multi-Purpose building

Dapitan City No. of Bldg. 1 Plans and POW GAA - 6,000.00 - - 6,000.00

Chapter 19-1-DPWH IX-ZDN 3DEOPage 50 of 56

Page 320: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

660. Construction of Legislative Building at Poblacion, Sibutad, Zamboanga del Norte

Construction of Multi-Purpose building

Sibutad No. of Bldg. 1 Plans and POW GAA 3 - 5,000.00 5,000.00

661. Construction of Public Market at Poblacion, Mutia, ZN Construction of

Multi-Purpose building

Mutia No. of Bldg. 1 Plans and POW GAA 3 - 20,000.00 20,000.00

662. Construction of Bus Terminal at Poblacion, Mutia, ZN Construction of

Multi-Purpose building

Mutia No. of Bldg. 1 Plans and POW GAA 3 - 20,000.00 20,000.00

663. Construction of Drug Rehabilitation Center, Mutia, ZN Construction of

Multi-Purpose building

Mutia No. of Bldg. 1 Plans and POW GAA 3 - 20,000.00 20,000.00

664. Construction of Sports Complex, Mutia, ZN Construction of

Multi-Purpose building

Mutia No. of Bldg. 1 Plans and POW GAA 3 - 20,000.00 20,000.00

665. Construction of Pasalubong Center, Mutia, ZN Construction of

Multi-Purpose building

Mutia No. of Bldg. 1 Plans and POW GAA 3 - 20,000.00 20,000.00

666. Post Harvest Facilities and other Ancillaries (Integrated Bus Terminal and Wet Market), Polo, Dapitan City

Construction of Multi-Purpose building

Dapitan City No. of Bldg. 1 Plans and POW GAA 3 - 250,000.00 250,000.00

667. Construction of Terminal Building at San Vicente, Dapitan City Construction of

Multi-Purpose building

Dapitan City No. of Bldg. 1 Plans and POW GAA 3 - 20,000.00 20,000.00

668. Construction of Poblacion Alto Training Center, Sergio Osmeña Construction of

Multi-Purpose building

Sergio Osmeña No. of Bldg. 1 Plans and POW GAA 3 - 20,000.00 20,000.00

669. Installation of Sinai - Pob. Alto - Pob. Bajo Street Lights Construction of

Multi-Purpose building

Sergio Osmeña Number of Facility 1 Plans and POW GAA 3 - 30,000.00 30,000.00

670. Construction of 1 Unit 4 Classroom School Building at Sibutad Central Elementary School

Construction of Multi-Purpose building

Sibutad No. of Bldg. 1 Plans and POW GAA 3 - 2,000.00 2,000.00

671. Improvement of Welcome Arc at Bagacay, Sibutad, Zamboanga del Norte

Construction of Multi-Purpose building

Sibutad Number of Facility 1 Plans and POW GAA 3 - 1,000.00 1,000.00

Chapter 19-1-DPWH IX-ZDN 3DEOPage 51 of 56

Page 321: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

672. Construction of Standard DPWH District Engineering Office Building

Construction of Multi-Purpose building

Piñan Number of Bldg. 1 Plans and POW GAA 3 - 62,400.00 62,400.00

673. Construction of Multipurpose Building, Segabe, Piñan, Zamboanga del Norte

Construction of Multi-Purpose building

Piñan Number of Bldg. 1 Plans and POW GAA 3 - 10,000.00 10,000.00

674. Construction of Multipurpose Building, Brgy. West Poblacion, Rizal, Zamboanga del Norte

Construction of Multi-Purpose building

Rizal Number of Bldg. 1 Plans and POW GAA 3 - 3,500.00 3,500.00

675. Construction of Multipurpose Building, Central Elementary School, Brgy. Poblacion Bajo, Sergio Osmeña, Zamboanga del Norte

Construction of Multi-Purpose building

Sergio Osmeña Number of Bldg. 1 Plans and POW GAA 3 - 3,500.00 3,500.00

676. Construction of Multipurpose Building, Barangay Balubohan, Rizal, Zamboanga del Norte

Construction of Multi-Purpose building

Rizal Number of Bldg. 1 Plans and POW GAA 3 - 3,000.00 3,000.00

677. Construction of Multipurpose Building, Barangay East Poblacion, Rizal, Zamboanga del Norte

Construction of Multi-Purpose building

Rizal Number of Bldg. 1 Plans and POW GAA 3 - 1,000.00 1,000.00

678. Construction of Multipurpose Building, Calube Elementary School, Brgy. Calube, Sibutad, Zamboanga del Norte

Construction of Multi-Purpose building

Sibutad Number of Bldg. 1 Plans and POW GAA 3 - 1,500.00 1,500.00

679. Construction of Multipurpose Building, Brgy. La Union, La Libertad, Zamboanga del Norte

Construction of Multi-Purpose building

La Libertad Number of Bldg. 1 Plans and POW GAA 3 - 3,500.00 3,500.00

680. Construction of Multipurpose Building, Brgy. Anastacio, Polanco, Zamboanga del Norte

Construction of Multi-Purpose building

Polanco Number of Bldg. 1 Plans and POW GAA 3 - 3,500.00 3,500.00

681. Construction of Multipurpose Building, Brgy. Poblacion South, Piñan, Zamboanga del Norte

Construction of Multi-Purpose building

Piñan Number of Bldg. 1 Plans and POW GAA 3 - 3,500.00 3,500.00

682. Construction of Multipurpose Building, Brgy. Lapu-Lapu, Piñan, Zamboanga del Norte

Construction of Multi-Purpose building

Piñan Number of Bldg. 1 Plans and POW GAA 3 - 1,000.00 1,000.00

683. Construction of Multipurpose Building, Brgy. Buenasuerte, Mutia, Zamboanga del Norte

Construction of Multi-Purpose building

Mutia Number of Bldg. 1 Plans and POW GAA 3 - 3,500.00 3,500.00

Chapter 19-1-DPWH IX-ZDN 3DEOPage 52 of 56

Page 322: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

684. Construction of Multipurpose Building, Brgy. Sawang, Sibutad, Zamboanga del Norte

Construction of Multi-Purpose building

Sibutad Number of Bldg. 1 Plans and POW GAA 3 - 3,500.00 3,500.00

685. Construction of Multipurpose Building, Brgy. Tubac, Mutia, Zamboanga del Norte

Construction of Multi-Purpose building

Mutia Number of Bldg. 1 Plans and POW GAA 3 - 3,500.00 3,500.00

686. Construction of Multipurpose Building, Brgy. Mabunao, Rizal, Zamboanga del Norte

Construction of Multi-Purpose building

Rizal Number of Bldg. 1 Plans and POW GAA 3 - 3,500.00 3,500.00

687. Construction of Multipurpose Building, Brgy. Sto. Niño, Dapitan City, Zamboanga del Norte

Construction of Multi-Purpose building

Dapitan City Number of Bldg. 1 Plans and POW GAA 3 - 3,500.00 3,500.00

688. Construction of Multipurpose Building, Brgy. Ma. Uray, Dapitan City, Zamboanga del Norte

Construction of Multi-Purpose building

Dapitan City Number of Bldg. 1 Plans and POW GAA 3 - 3,500.00 3,500.00

689. Construction of Multipurpose Building, Brgy. Totongon, Mutia, Zamboanga del Norte

Construction of Multi-Purpose building

Mutia Number of Bldg. 1 Plans and POW GAA 3 - 3,500.00 3,500.00

690. Reconstruction of Multi-Purpose Hall, Brgy. Diolen, Mutia, Zamboanga del Norte

Construction of Multi-Purpose building

Mutia Number of Bldg. 1 Plans and POW GAA 3 - 2,000.00 2,000.00

691. Construction of Multi-Purpose Building, Brgy. Dilawa, Piñan, Zamboanga del Norte

Construction of Multi-Purpose building

Piñan Number of Bldg. 1 Plans and POW GAA 3 - 3,500.00 3,500.00

692. Construction of Multi-Purpose Building, Dilawa NHS, Brgy. Dilawa, Piñan, Zamboanga del Norte

Construction of Multi-Purpose building

Piñan Number of Bldg. 1 Plans and POW GAA 3 - 3,500.00 3,500.00

693. Completion of Multi-Purpose Building, Brgy. Lapu-Lapu, Piñan, Zamboanga del Norte

Construction of Multi-Purpose building

Piñan Number of Bldg. 1 Plans and POW GAA 3 - 2,000.00 2,000.00

694. Construction of Multi-Purpose Building (Covered Court), Brgy. Lower Gumay, Piñan, Zamboanga del Norte

Construction of Multi-Purpose building

Piñan Number of Bldg. 1 Plans and POW GAA 3 - 3,500.00 3,500.00

695. Construction of Multi-Purpose Building (Covered Court), Brgy. Ubay, Piñan, Zamboanga del Norte

Construction of Multi-Purpose building

Piñan Number of Bldg. 1 Plans and POW GAA 3 - 3,500.00 3,500.00

Chapter 19-1-DPWH IX-ZDN 3DEOPage 53 of 56

Page 323: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

696. Construction of Multi-Purpose Building (Covered Court), Brgy. Upper Gumay, Piñan, Zamboanga del Norte

Construction of Multi-Purpose building

Piñan Number of Bldg. 1 Plans and POW GAA 3 - 3,500.00 3,500.00

697. Construction of Multi-Purpose Building (Covered Court), Brgy. Upper Gumay, Piñan, Zamboanga del Norte

Construction of Multi-Purpose building

Piñan Number of Bldg. 1 Plans and POW GAA 3 - 3,500.00 3,500.00

698. Construction of School Perimeter Fence at Labiray ES, Sergio Osmeña, Zamboanga del Norte

Construction of Multi-Purpose building

Sergio Osmeña Number of Bldg. 1 Plans and POW GAA 3 - 1,000.00 1,000.00

699. Construction of Multi-Purpose Building (Covered Court), San Antonio, Sergio Osmeña, Zamboanga del Norte

Construction of Multi-Purpose building

Sergio Osmeña Number of Bldg. 1 Plans and POW GAA 3 - 3,500.00 3,500.00

700. Construction of Multi-Purpose Building, Pob. Bajo, Sergio Osmeña, Zamboanga del Norte

Construction of Multi-Purpose building

Sergio Osmeña Number of Bldg. 1 Plans and POW GAA 3 - 3,500.00 3,500.00

701. Construction of Multi-Purpose Building (Covered Court), Sawang ES, Sibutad, Zamboanga del Norte

Construction of Multi-Purpose building

Sibutad Number of Bldg. 1 Plans and POW GAA 3 - 3,500.00 3,500.00

702. Installation of Solar Street Light, Sibuloc, Sibutad, Zamboanga del Norte

Construction of Multi-Purpose building

Sibutad Number of Bldg. 1 Plans and POW GAA 3 - 2,000.00 2,000.00

703. Construction of Multi-Purpose Building (Covered Court), Sibuloc, Sibutad, Zamboanga del Norte

Construction of Multi-Purpose building

Sibutad Number of Bldg. 1 Plans and POW GAA 3 - 3,500.00 3,500.00

704. Construction of Barangay Office, Birayan, Rizal, Zamboanga del Norte

Construction of Multi-Purpose building

Rizal Number of Bldg. 1 Plans and POW GAA 3 - 2,000.00 2,000.00

705. Construction of Barangay Office, Mabuhay, Rizal, Zamboanga del Norte

Construction of Multi-Purpose building

Rizal Number of Bldg. 1 Plans and POW GAA 3 - 2,000.00 2,000.00

706. Construction of Multi-Purpose Building, West Poblacion, Rizal, Zamboanga del Norte

Construction of Multi-Purpose building

Rizal Number of Bldg. 1 Plans and POW GAA 3 - 3,500.00 3,500.00

707. Construction of Multi-Purpose Building (Covered Court), New Dapitan, Rizal, Zamboanga del Norte

Construction of Multi-Purpose building

Rizal Number of Bldg. 1 Plans and POW GAA 3 - 3,500.00 3,500.00

Chapter 19-1-DPWH IX-ZDN 3DEOPage 54 of 56

Page 324: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

708. Construction of Barangay Office, Balubohan, Rizal, Zamboanga del Norte

Construction of Multi-Purpose building

Rizal Number of Bldg. 1 Plans and POW GAA 3 - 2,000.00 2,000.00

709. Construction of Multi-Purpose Building, East Poblacion, Rizal, Zamboanga del Norte

Construction of Multi-Purpose building

Rizal Number of Bldg. 1 Plans and POW GAA 3 - 3,500.00 3,500.00

Local Roads and Bridges - - b. Local Roads - -

710. Construction of Road, Brgy. Bagong Baguio, Sergio Osmeña, Zamboanga del Norte

Road Concreting Sergio Osmeña km. Plans and POW GAA 30,000.00 5,000.00 - - 35,000.00

711. Pob. La Libertad - El Paraiso Rd.15 km. Road

Concreting La Libertad km. Plans and POW GAA 2 - - 150,000.00 75,000.00 225,000.00

712. Asphalt Overlay along Jct Polo to Dapitan Park Road, Dapitan City - Km 1829+008 to Km 1829+539, Km1827+998 to Km 1828+427

Asphalt Overlay Dapitan City km. Plans and POW GAA 20,000.00 20,000.00

713. Rehabilitation of Road Leading to Maniwag Peaks and Highland Resort, Rizal, Zamboanga del Norte

Construction of Multi-Purpose building

Sibutad Number of Facility 1 Plans and POW GAA 5,000.00 5,000.00

c. Bridges - - 714. Teresita Br

L = 40.84 ln.m.Construction of Bridges sq.m. Plans and POW GAA - -

715. Alvenda BrL = 60.84 ln.m.

Construction of Bridges sq.m. Plans and POW GAA - -

716. Daan Tipan BrL = 120.84 ln.m.

Construction of Bridges sq.m. Plans and POW GAA - -

717. Upper Gumay BrL = 60.84 ln.m.

Construction of Bridges Piñan ln.m. 60.84 Plans and POW GAA 3 - 100,000.00 100,000.00

718. Lower Gumay BrL = 90.84 ln.m.

Construction of Bridges Piñan ln.m. 90.84 Plans and POW GAA 3 - 100,000.00 100,000.00

719. Pob. South Piñan BrL = 40.84 ln.m.

Construction of Bridges Piñan sq.m. Plans and POW GAA - -

720. Sta Fe BrL = 20.84 ln.m.

Construction of Bridges sq.m. Plans and POW GAA - -

721. El Paraiso BrL = 160 m.

Construction of Bridges La Libertad ln.m. 120 Plans and POW GAA 3 - - - 120,000.00 120,000.00

Water Management - - a. Water Supply - -

722. Construction of Water System Level II, Brgy. Calubi, Sibutad, Zamboanga del Norte

Construction of Water System Sibutad No. of Water

System 1 Plans and POW GAA - 3,000.00 - - 3,000.00

723. Construction of Water System Level II, Brgy. Guimputlan, Dapitan City, Zamboanga del Norte

Construction of Water System Dapitan City No. of Water

System 1 Plans and POW GAA - 3,000.00 - - 3,000.00

Chapter 19-1-DPWH IX-ZDN 3DEOPage 55 of 56

Page 325: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

LGU Proponent RemarksChapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

Mode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

REGIONWIDE - Local Infrastructure Program - a. Roads and Bridges -

Local Roads - 724. Concrete Paving of Road (Phase

2), Brgy. Bagong Baguio, Sergio Osmeña, Including RROW, Zamboanga del Norte

km Plans and POW GAA

-

60,000.00 60,000.00

432,975.00 562,300.00 190,000.00 4,583,920.64 9,712,716.15 - 15,481,911.80 1,842,896.00 2,691,136.00 2,194,504.00 11,756,307.65 21,737,369.69 6,235,991.10 46,458,204.45

Subtotal GRAND TOTAL

Chapter 19-1-DPWH IX-ZDN 3DEOPage 56 of 56

Page 326: Table of Contents (By Chapter)

Updated Zamboanga Peninsula Regional Development Investment Program (RDIP), 2017-2022

Agency: DPWH IXChapter 19: Accelerating Infrastructure Development

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

ZAMBOANGA DEL SUR 1ST DEO, PAGADIAN CITYZAMBOANGA DEL SUR 1ST LEGISLATIVE DISTRICTa. OO1: Ensure Safe and Reliable National Road System

(i) Asset Preservation of National Roads1. Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development Management-4 (HDM-4)

a. Primary Road1. Pagadian City - Zamboanga City

Road Concrete Reconstruction Pagadian City

km.

POW, Plans and Contract GAA 3 - -

2. Lanao - Pagadian - Zamboanga City Road (RN9) Concrete

Reconstruction Aurora, ZDSkm.

POW, Plans and Contract GAA 3 - 30,000.00 30,000.00 60,000.00

3. Lanao - Pagadian - Zamboanga City Road (RN1) Concrete

Reconstruction Labangan, ZDSkm.

POW, Plans and Contract GAA 3 - 40,000.00 40,000.00 40,000.00 120,000.00

4. Jct. Tukuran - Jct. Karomatan Road (S01103MN) Concrete

Reconstruction Tukuran, ZDSkm.

POW, Plans and Contract GAA 3 - 58,041.00 58,041.00

5. Jct. Tukuran - Jct. Karomatan Road (S01104MN Concrete

Reconstruction Tukuran, ZDSkm.

POW, Plans and Contract GAA 3 - 5,000.00 5,000.00 10,000.00

6. Jct. Aurora - Ozamis City RoadConcrete

Reconstruction Tambulig, ZDSkm.

POW, Plans and Contract GAA 3 21,865.00 21,865.00

7. Jct. Blancia - Molave - Josefina Road Concrete

Reconstruction

Molave, Mahayag,

Josefina, ZDS km.

POW, Plans and Contract GAA 3 - 10,000.00 15,000.00 10,000.00 35,000.00

b. Secondary Road - 8. Sindangan - Siayan - Dumingag -

Mahayag Road (Mahayag - Dumingag Section)

Concrete Reconstruction Dumingag, ZDS

km.

POW, Plans and Contract GAA 3 - - -

c. Tertiary Road - 9. Pagadian City Airport Road

Concrete Reconstruction Pagadian City

km.

POW, Plans and Contract GAA 3 - - -

Basis for Implementation RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location

(Province/ Municipality/

City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Page 327: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Basis for Implementation RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location

(Province/ Municipality/

City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

10. Pagadian City Wharf RoadConcrete

Reconstruction Pagadian Citykm.

POW, Plans and Contract GAA 3 - - -

11. Jct. Aurora - Jct. Monte Alegre - Jct. Labangan Road Concrete

ReconstructionAurora,

Labangan, ZDSkm.

POW, Plans and Contract GAA 3 - - -

12. Jct. Pulacan - Military Camp RoadConcrete

Reconstruction Labangan, ZDSkm.

POW, Plans and Contract GAA 3 - - -

13. Jct. Switch - Jct. Monte Alegre Road Concrete

ReconstructionRamon

Magsaysay, ZDSkm.

POW, Plans and Contract GAA 3 - - -

14. Eastern Bobongan - Sominot - Midsalip - Dumingag Road (S01325MN)

Concrete Reconstruction

Midsalip, Dumingag, ZDS km.

POW, Plans and Contract GAA 3 - - -

15. Eastern Bobongan - Sominot - Midsalip - Dumingag Road (S01351MN)

Concrete Reconstruction Sominot, ZDS

km.

POW, Plans and Contract GAA 3 - - -

2. Preventive Maintenance based on Pavement Management System - a. Primary Road -

16. Pagadian City - Zamboanga City Road

Asphalt Overlay Pagadian City km.

POW, Plans and Contract GAA 3 - 7,498.00 30,000.00 30,000.00 67,498.00

17. Pagadian City - Zamboanga City RoadK1662+000 - K1666+000

Asphalt Overlay Pagadian City

Km 4.008

POW, Plans and Contract GAA 3 120,240.00 120,240.00

18. Pagadian City - Zamboanga City RoadK1667+536 - K1667+905, K1667+929 - K1671+000

Asphalt Overlay Pagadian City

Km 3.415

POW, Plans and Contract GAA 3 102,450.00 102,450.00

19. Pagadian City - Zamboanga City RoadK1671+000 - 1674+307

Asphalt Overlay Pagadian City

Km 3.334

POW, Plans and Contract GAA 3 102,000.00 102,000.00

20. Lanao - Pagadian - Zamboanga City Road (RN9)

Asphalt Overlay Aurora, ZDS Km

POW, Plans and Contract GAA 3 - 54,000.00 54,000.00 108,000.00

21. Lanao - Pagadian - Zamboanga City Road (RN9)K1623+(-573) - K1626+300

Asphalt Overlay Aurora, ZDS

Km 3.634

POW, Plans and Contract GAA 3 109,000.00 109,000.00

22. Lanao - Pagadian - Zamboanga City Road (RN9)K1626+300 - K1630+000

Asphalt Overlay Aurora, ZDS

Km 4.044

POW, Plans and Contract GAA 3 121,320.00 121,320.00

Chapter 19-1-DPWH IX-ZDS 1DEOPage 2 of 58

Page 328: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Basis for Implementation RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location

(Province/ Municipality/

City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

23. Lanao - Pagadian - Zamboanga City Road (RN9)K1630+000 - K1634+000

Asphalt Overlay Aurora, ZDS

Km 4.044

POW, Plans and Contract GAA 3 121,320.00 121,320.00

24. Lanao - Pagadian - Zamboanga City Road (RN9)K1634+000 - K1638+000

Asphalt Overlay Aurora, ZDS

Km 3.957

POW, Plans and Contract GAA 3 118,710.00 118,710.00

25. Lanao - Pagadian - Zamboanga City Road (RN9)K1638+000 - 1641+537

Asphalt Overlay Aurora, ZDS

Km 3.58

POW, Plans and Contract GAA 3 107,400.00 107,400.00

26. Lanao - Pagadian - Zamboanga City Road (RN9)K1641+561 - K1644+877,K1644+924 - K1646+000

Asphalt Overlay Aurora, ZDS

Km 4.422

POW, Plans and Contract GAA 3 132,660.00 132,660.00

27. Lanao - Pagadian - Zamboanga City Road (RN9)K1646+000 - K1646+224,K1646+245 - K1647+738

Asphalt Overlay Aurora, ZDS

Km 1.752

POW, Plans and Contract GAA 3 52,560.00 52,560.00

28. Lanao - Pagadian - Zamboanga City Road (RN1)K1648+(-273) - K1649+097,K1651+007 - K1651+267,K1651+288 - K1651+449,K1651+473 - K1653+114

Asphalt Overlay Tukuran, ZDS

Km 3.373

POW, Plans and Contract GAA 3 - 102,000.00 102,000.00

29. Lanao - Pagadian - Zamboanga City Road (RN1)K1653+143 - K1655+000,K1655+000 - K1656+000,K1656+000 - K1658+360,K1658+442 - K1659+100

Asphalt Overlay Tukuran, ZDS

Km 5.755

POW, Plans and Contract GAA 3 158,565.00 158,565.00

30. Jct. Tukuran - Jct. Karomatan Road (S01103MN), K1648+(-262) - K1650+404

Asphalt Overlay Tukuran, ZDS

Km 2.683

POW, Plans and Contract GAA 3 - - 78,000.00 78,000.00

31. Jct. Tukuran - Jct. Karomatan Road (S01104MN), K1651+(-536) - K1654+000

Asphalt Overlay Tukuran, ZDS

Km 3.536

POW, Plans and Contract GAA 3 - - 106,080.00 106,080.00

32. Jct. Tukuran - Jct. Karomatan Road (S01104MN), K1654+000 - K1656+201, K1656+223 - K1656+227

Asphalt Overlay Tukuran, ZDS

Km 2.205

POW, Plans and Contract GAA 3 66,150.00 66,150.00

Chapter 19-1-DPWH IX-ZDS 1DEOPage 3 of 58

Page 329: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Basis for Implementation RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location

(Province/ Municipality/

City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

33. Jct. Aurora - Ozamis City RoadK1630+(-771) - K1636+000,K1636+816 - 1638+000

Asphalt Overlay Tambulig, ZDS

Km 7.868

POW, Plans and Contract GAA 3 - - 118,020.00 118,020.00

34. Jct. Aurora - Ozamis City RoadK1638+000 - 1646+972

Asphalt Overlay Tambulig, ZDS Km 8.805

POW, Plans and Contract GAA 3 132,075.00 132,075.00

35. Jct. Aurora - Ozamis City RoadK1646+991 - K1647+556,K1647+621 - K1649+058,K1649+112 - K1651+193,K1652+569 - K1653+820,K1653+850 - K1655+600,K1657+170 - K1658+000

Asphalt Overlay Tambulig, ZDS

Km 8.138

POW, Plans and Contract GAA 3 122,070.00 122,070.00

36. Jct. Aurora - Ozamis City RoadK1658+000 - K1659+921

Asphalt Overlay Tambulig, ZDS Km 1.924

POW, Plans and Contract GAA 3 28,860.00 28,860.00

37. Jct. Blancia - Molave - Josefina RoadK1652+(-843) - K1659+000

Asphalt Overlay Tambulig, ZDS

Km 8.005

POW, Plans and Contract GAA 3 - 120,075.00 120,075.00

38. Jct. Blancia - Molave - Josefina RoadK1659+000 - K1659+430,K1660+195 - K1667+000

Asphalt Overlay Mahayag, ZDS

Km 7.274

POW, Plans and Contract GAA 3 109,110.00 109,110.00

39. Jct. Blancia - Molave - Josefina RoadK1667+000 - K1675+000

Asphalt Overlay Mahayag, ZDS

Km 8.07

POW, Plans and Contract GAA 3 121,050.00 121,050.00

40. Jct. Blancia - Molave - Josefina RoadK1675+000 - K1676+055,K1676+150 - K1683+000

Asphalt Overlay Josefina, ZDS

Km 7.939

POW, Plans and Contract GAA 3 119,085.00 119,085.00

41. Jct. Blancia - Molave - Josefina RoadK1683+000 - K1687+151

Asphalt Overlay Josefina, ZDS

Km 4.128

POW, Plans and Contract GAA 3 61,920.00 61,920.00

b. Secondary Road - 42. Sindangan - Siayan - Dumingag -

Mahayag Road (Mahayag - Dumingag Section)

Asphalt Overlay Dumingag, ZDS

km.

POW, Plans and Contract GAA 3 - - 30,000.00 30,000.00 60,000.00

c. Tertiary Road - 43. Pagadian City Airport Road Asphalt

Overlay Pagadian City km.POW, Plans and

Contract GAA 3 - - -

44. Pagadian City Wharf Road Asphalt Overlay Pagadian City km.

POW, Plans and Contract GAA 3 - - 15,000.00 15,000.00 30,000.00

45. Jct. Aurora - Jct. Monte Alegre - Jct. Labangan Road

Asphalt Overlay

Aurora, Labangan, ZDS km.

POW, Plans and Contract GAA 3 - - 40,000.00 40,000.00 80,000.00

Chapter 19-1-DPWH IX-ZDS 1DEOPage 4 of 58

Page 330: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Basis for Implementation RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location

(Province/ Municipality/

City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

46. Jct. Aurora - Jct. Monte Alegre - Jct.K1630+(-260) + K1638+000

Asphalt Overlay Aurora, ZDS

km. 8.288 Km.

POW, Plans and Contract GAA 3 124,320.00 124,320.00

47. Jct. Aurora - Jct. Monte Alegre - Jct.K1638+000 - K1645+889

Asphalt Overlay Aurora, ZDS

km. 7.869 Km

POW, Plans and Contract GAA 3 118,035.00 118,035.00

48. Jct. Aurora - Jct. Monte Alegre - Jct. K1645+921 - K1650+466, K1650+489 - K1656+174

Asphalt Overlay Aurora, ZDS

km. 10.257 Km.

POW, Plans and Contract GAA 3 153,000.00 153,000.00

49. Jct. Pulacan - Military Camp RoadK1651+(-102) - K1651+1750 Asphalt

Overlay Labangan, ZDSkm. 1.852 Km.

POW, Plans and Contract GAA 3 - - 27,780.00 27,780.00

50. Jct. Switch - Jct. Monte Alegre Road Asphalt

Overlay Ramon

Magsaysay, ZDS km.

POW, Plans and Contract GAA 3 18,615.00 - 18,615.00

51. Jct. Switch - Jct. Monte Alegre Road K1642+(-1039) - K1643+748,K1643+776 - K1648+882

Asphalt Overlay

Ramon Magsaysay, ZDS

km. 7.895 Km.

POW, Plans and Contract GAA 3 - 118,425.00 118,425.00

52. Eastern Bobongan - Sominot - Midsalip - Dumingag Road (S01325MN)

Asphalt Overlay

Midsalip, Dumingag, ZDS km.

POW, Plans and Contract GAA 3 - - -

53. Eastern Bobongan - Sominot - Midsalip - Dumingag Road (S01351MN)

Asphalt Overlay Sominot, ZDS

km.

POW, Plans and Contract GAA 3 - - -

3. Construction/Upgrading/Rehabilitation of Drainage along National Roads - a. Primary Road -

54. Pagadian City - Zamboanga City Road

Construction of Lined Canal Pagadian City ln.m

POW, Plans and Contract GAA 3 - 40,000.00 20,000.00 20,000.00 80,000.00

55. Lanao - Pagadian - Zamboanga City Road (RN9)

Construction of Lined Canal Aurora, ZDS ln.m

POW, Plans and Contract GAA 3 - - 50,000.00 50,000.00 100,000.00

56. Lanao - Pagadian - Zamboanga City Road (RN1)

Construction of Lined Canal Labangan, ZDS ln.m

POW, Plans and Contract GAA 3 - - -

57. Tukuran Cross Drainage Construction of Lined Canal ln.m

POW, Plans and Contract GAA 3 -

58. Tukuran Cross Drainage Construction of Lined Canal ln.m

POW, Plans and Contract GAA 3 -

59. Jct. Tukuran - Jct. Karomatan Road (S01103MN)

Construction of Lined Canal Tukuran, ZDS ln.m

POW, Plans and Contract GAA 3 - - 20,000.00 20,000.00 40,000.00

60. Jct. Tukuran - Jct. Karomatan Road (S01104MN

Construction of Lined Canal Tukuran, ZDS ln.m

POW, Plans and Contract GAA 3 - - -

Chapter 19-1-DPWH IX-ZDS 1DEOPage 5 of 58

Page 331: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Basis for Implementation RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location

(Province/ Municipality/

City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

61. Jct. Aurora - Ozamis City Road Construction of Lined Canal Tambulig, ZDS ln.m

POW, Plans and Contract GAA 3 - - 20,000.00 20,000.00 40,000.00

62. Jct. Blancia - Molave - Josefina Road Construction of

Lined Canal

Molave, Mahayag,

Josefina, ZDS ln.m

POW, Plans and Contract GAA 3 - - 30,000.00 30,000.00 60,000.00

b. Secondary Road - 63. Sindangan - Siayan - Dumingag -

Mahayag Road (Mahayag - Dumingag Section)

Construction of Lined Canal Dumingag, ZDS

ln.m

POW, Plans and Contract GAA 3 - - -

c. Tertiary Road - 64. Pagadian City Airport Road Construction of

Lined Canal Pagadian City ln.mPOW, Plans and

Contract GAA 3 - - 7,000.00 7,000.00 14,000.00

65. Pagadian City Wharf Road Construction of Lined Canal Pagadian City ln.m

POW, Plans and Contract GAA 3 - - -

66. Jct. Aurora - Jct. Monte Alegre - Jct. Labangan Road

Construction of Lined Canal

Aurora, Labangan, ZDS ln.m

POW, Plans and Contract GAA 3 - - -

67. Jct. Pulacan - Military Camp Road Construction of Lined Canal Labangan, ZDS ln.m

POW, Plans and Contract GAA 3 - - -

68. Jct. Switch - Jct. Monte Alegre Road Construction of

Lined Canal Ramon

Magsaysay, ZDS ln.m

POW, Plans and Contract GAA 3 - - -

69. Eastern Bobongan - Sominot - Midsalip - Dumingag Road (S01325MN)

Construction of Lined Canal

Midsalip, Dumingag, ZDS ln.m

POW, Plans and Contract GAA 3 - - -

70. Eastern Bobongan - Sominot - Midsalip - Dumingag Road (S01351MN)

Construction of Lined Canal Sominot, ZDS

ln.m

POW, Plans and Contract GAA 3 - - -

4. Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - a. Primary Road -

71. Pagadian City - Zamboanga City Road

Slope Protection Pagadian City sq.m.

POW, Plans and Contract GAA 3 20,000.00 20,000.00 40,000.00

72. Lanao - Pagadian - Zamboanga City Road (RN9)

Slope Protection Aurora, ZDS sq.m.

POW, Plans and Contract GAA 3 23,216.00 16,400.00 10,000.00 110,000.00 159,616.00

73. Lanao - Pagadian - Zamboanga City Road (RN1)

Slope Protection Labangan, ZDS sq.m.

POW, Plans and Contract GAA 3 - 10,000.00 115,000.00 125,000.00

74. Jct. Tukuran - Jct. Karomatan Road (S01103MN)

Slope Protection Tukuran, ZDS sq.m.

POW, Plans and Contract GAA 3 - 10,000.00 10,000.00 20,000.00

75. Jct. Aurora - Ozamis City Road Slope Protection Tambulig, ZDS sq.m.

POW, Plans and Contract GAA 3 5,000.00 12,200.00 34,792.00 104,000.00 108,000.00 263,992.00

76. Jct. Blancia - Molave - Josefina Road Slope

Protection

Molave, Mahayag,

Josefina, ZDS sq.m.

POW, Plans and Contract GAA 3 4,000.00 4,000.00

Chapter 19-1-DPWH IX-ZDS 1DEOPage 6 of 58

Page 332: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Basis for Implementation RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location

(Province/ Municipality/

City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

b. Secondary Road - 77. Sindangan - Siayan - Dumingag -

Mahayag Road (Mahayag - Dumingag Section)

Slope Protection Dumingag, ZDS

sq.m.

POW, Plans and Contract 22,381.00 13,420.00 30,000.00 107,000.00 110,000.00 282,801.00

c. Tertiary Road - 78. Pagadian City Airport Road Slope

Protection Pagadian City sq.m.POW, Plans and

Contract GAA 3 - - -

79. Pagadian City Wharf Road Slope Protection Pagadian City sq.m.

POW, Plans and Contract GAA 3 - - -

80. Jct. Aurora - Jct. Monte Alegre - Jct. Labangan Road

Slope Protection

Aurora, Labangan, ZDS sq.m.

POW, Plans and Contract GAA 3 - - -

81. Jct. Pulacan - Military Camp Road Slope Protection Labangan, ZDS sq.m.

POW, Plans and Contract GAA 3 - - 10,000.00 10,000.00 20,000.00

82. Jct. Switch - Jct. Monte Alegre Road Slope

ProtectionRamon

Magsaysay, ZDS sq.m.

POW, Plans and Contract GAA 3 5,000.00 10,000.00 10,000.00 10,000.00 35,000.00

83. Eastern Bobongan - Sominot - Midsalip - Dumingag Road (S01325MN)

Slope Protection

Midsalip, Dumingag, ZDS sq.m.

POW, Plans and Contract GAA 3 - - 20,000.00 20,000.00 40,000.00

84. Eastern Bobongan - Sominot - Midsalip - Dumingag Road (S01351MN)

Slope Protection Sominot, ZDS

sq.m.

POW, Plans and Contract GAA 3 4,078.00 - 4,078.00

(ii) Network Development - 1. Improvement/Widening of National Roads -

a. Primary Road - 85. Pagadian City - Zamboanga City

Road Road Widening Pagadian City km.POW, Plans and

Contract GAA 3 -

86. Lanao - Pagadian - Zamboanga City Road (RN9) Road Widening Aurora, ZDS km.

POW, Plans and Contract GAA 3 150,000.00 150,000.00 150,000.00 450,000.00

87. Lanao - Pagadian - Zamboanga City Road K1623+(-725) - K1625+000

Road Widening Aurora, ZDSkm. 2.660 Km.

POW, Plans and Contract GAA 3 106,400.00 106,400.00

88. Lanao - Pagadian - Zamboanga City RoadK1625+000 - K1628+000

Road Widening Aurora, ZDSkm. 3.005 Km.

POW, Plans and Contract GAA 3 120,200.00 120,200.00

89. Lanao - Pagadian - Zamboanga City RoadK1628+000 - K1631+000

Road Widening Aurora, ZDSkm. 3.032 Km.

POW, Plans and Contract GAA 3 121,280.00 121,280.00

90. Lanao - Pagadian - Zamboanga City RoadK1631+000 - K1634+000

Road Widening Aurora, ZDSkm. 3.025 Km.

POW, Plans and Contract GAA 3 121,000.00 121,000.00

Chapter 19-1-DPWH IX-ZDS 1DEOPage 7 of 58

Page 333: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Basis for Implementation RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location

(Province/ Municipality/

City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

91. Lanao - Pagadian - Zamboanga City RoadK1634+000 - K1637+000

Road Widening Aurora, ZDSkm. 2.955 Km.

POW, Plans and Contract GAA 3 118,200.00 118,200.00

92. Lanao - Pagadian - Zamboanga City RoadK1637+000 - K1640+000

Road Widening Aurora, ZDSkm. 3.008 Km.

POW, Plans and Contract GAA 3 120,320.00 120,320.00

93. Lanao - Pagadian - Zamboanga City RoadK1640+000 - K1643+000

Road Widening Aurora, ZDSkm. 2.992 Km.

POW, Plans and Contract GAA 3 119,680.00 119,680.00

94. Lanao - Pagadian - Zamboanga City RoadK1643+000 - K1644+400,K1646+000 - K1647+738

Road Widening Aurora, ZDS

km. 3.224 Km.

POW, Plans and Contract GAA 3 128,960.00 128,960.00

95. Lanao - Pagadian - Zamboanga City Road (RN1) Road Widening Labangan, ZDS km.

POW, Plans and Contract GAA 3 59,000.00 200,000.00 27,650.00 27,650.00 27,650.00 341,950.00

96. Jct. Tukuran - Jct. Karomatan Road (S01103MN) Road Widening Tukuran, ZDS km.

POW, Plans and Contract GAA 3 50,000.00 50,000.00 50,000.00 150,000.00

97. Jct. Tukuran - Jct. Karomatan Road (S01104MN Road Widening Tukuran, ZDS km.

POW, Plans and Contract GAA 3 89,000.00 50,000.00 20,000.00 20,000.00 20,000.00 199,000.00 -

98. Jct. Aurora - Ozamis City RoadRoad Widening Tambulig, ZDS km.

POW, Plans and Contract GAA 3 - 50,000.00 100,000.00 150,000.00 150,000.00 150,000.00 600,000.00 -

99. Jct. Aurora - Ozamis City RoadK1657+000 - K1659+921 Road Widening Tambulig, ZDS km. 3.029 Km.

POW, Plans and Contract GAA 3 121,160.00 121,160.00

100. Jct. Aurora - Ozamis City RoadK1654+000 - K1657+000 Road Widening Tambulig, ZDS km. 3.011 Km.

POW, Plans and Contract GAA 3 120,440.00 120,440.00

101. Jct. Aurora - Ozamis City RoadK1651+000 - K1654+000 Road Widening Tambulig, ZDS km. 3.069 Km.

POW, Plans and Contract GAA 3 122,760.00 122,760.00

102. Jct. Aurora - Ozamis City RoadK1647+500 - K1651+000 Road Widening Tambulig, ZDS km. 3.598 Km.

POW, Plans and Contract GAA 3 143,920.00 143,920.00

103. Jct. Aurora - Ozamis City RoadK1644+000 - K1646+500 Road Widening Tambulig, ZDS km. 3.523 Km.

POW, Plans and Contract GAA 3 140,920.00 140,920.00

104. Jct. Aurora - Ozamis City RoadK1639+000 - K1640+200,K1642+100 - K1644+000

Road Widening Tambulig, ZDSkm. 3.012 Km.

POW, Plans and Contract GAA 3 120,480.00 120,480.00

105. Jct. Aurora - Ozamis City RoadK1636+000 - K1639+000 Road Widening Tambulig, ZDS km. 3.0 Km.

POW, Plans and Contract GAA 3 120,000.00 120,000.00

106. Jct. Aurora - Ozamis City RoadK1633+000 - K1636+000 Road Widening Tambulig, ZDS km. 2.977 Km.

POW, Plans and Contract GAA 3 119,080.00 119,080.00

107. Jct. Aurora - Ozamis City RoadK1630+(-771) - K1633+000 Road Widening Tambulig, ZDS km. 4.42 Km.

POW, Plans and Contract GAA 3 177,200.00 177,200.00

Chapter 19-1-DPWH IX-ZDS 1DEOPage 8 of 58

Page 334: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Basis for Implementation RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location

(Province/ Municipality/

City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

108. Jct. Blancia - Molave - Josefina Road Road Widening

Molave, Mahayag,

Josefina, ZDS km.

POW, Plans and Contract GAA 3 - 104,000.00 150,000.00 150,000.00 150,000.00 554,000.00

- 109. Jct. Blancia - Molave - Josefina

RoadK1684+000 - K1687+151

Road Widening Josefina, ZDSkm. 3.073 Km.

POW, Plans and Contract GAA 3 122,920.00 122,920.00

110. Jct. Blancia - Molave - Josefina RoadK1681+000 - K1684+000

Road Widening Josefina, ZDSkm. 3.055 Km.

POW, Plans and Contract GAA 3 122,200.00 122,200.00

111. Jct. Blancia - Molave - Josefina RoadK1677+500 - K1681+000

Road Widening Josefina, ZDSkm. 3.485 Km.

POW, Plans and Contract GAA 3 139,400.00 139,400.00

112. Jct. Blancia - Molave - Josefina RoadK1674+000 - K1677+500

Road Widening Josefina, ZDSkm. 3.563 Km.

POW, Plans and Contract GAA 3 142,520.00 142,520.00

113. Jct. Blancia - Molave - Josefina RoadK1670+500 - K1674+000

Road Widening Josefina, ZDSkm. 3.524 Km.

POW, Plans and Contract GAA 3 141,680.00 141,680.00

114. Jct. Blancia - Molave - Josefina RoadK1667+000 - K1670+500

Road Widening Josefina, ZDSkm. 3.514 Km.

POW, Plans and Contract GAA 3 140,560.00 140,560.00

115. Jct. Blancia - Molave - Josefina RoadK1663+500 - K1667+000

Road Widening Josefina, ZDSkm. 3.529 Km.

POW, Plans and Contract GAA 3 141,160.00 141,160.00

116. Jct. Blancia - Molave - Josefina RoadK1661+290 - K1663+500

Road Widening Josefina, ZDSkm. 2.228 Km.

POW, Plans and Contract GAA 3 89,120.00 89,120.00

117. Jct. Blancia - Molave - Josefina RoadK1655+000 - K1658+000

Road Widening Josefina, ZDSkm. 3.216 Km.

POW, Plans and Contract GAA 3 128,640.00 128,640.00

118. Jct. Blancia - Molave - Josefina RoadK1652+(-843) - K1655+000

Road Widening Josefina, ZDSkm. 3.787 Km.

POW, Plans and Contract GAA 3 151,480.00 151,480.00

b. Secondary Road km. - 119. Sindangan - Siayan - Dumingag -

Mahayag Road (Mahayag - Dumingag Section)

Road Widening Dumingag, ZDSkm.

POW, Plans and Contract GAA 3 30,000.00 300,000.00 150,000.00 150,000.00 630,000.00

Chapter 19-1-DPWH IX-ZDS 1DEOPage 9 of 58

Page 335: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Basis for Implementation RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location

(Province/ Municipality/

City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

c. Tertiary Road km. - 120. Pagadian City Airport Road

Road Widening Pagadian City km.POW, Plans and

Contract GAA 3 - - -

121. Pagadian City Wharf RoadRoad Widening Pagadian City km.

POW, Plans and Contract GAA 3 - - -

122. Jct. Aurora - Jct. Monte Alegre - Jct. Labangan Road Road Widening Aurora,

Labangan, ZDS km.POW, Plans and

Contract GAA 3 - 66,000.00 50,000.00 250,000.00 150,000.00 150,000.00 666,000.00

123. Jct. Aurora - Jct. Monte Alegre - Jct. Labangan RoadK1630+(-260) - K1633+000

Road Widening Aurora, Labangan, ZDS km. 3.526 Km.

POW, Plans and Contract GAA 3 141,040.00 141,040.00

124. Jct. Aurora - Jct. Monte Alegre - Jct. Labangan RoadK1633+000 - K1636+000

Road Widening Aurora, Labangan, ZDS km. 3.013 Km.

POW, Plans and Contract GAA 3 120,520.00 120,520.00

125. Jct. Aurora - Jct. Monte Alegre - Jct. Labangan RoadK1636+000 - K1639+000

Road Widening Aurora, Labangan, ZDS km. 3.017 Km.

POW, Plans and Contract GAA 3 120,680.00 120,680.00

126. Jct. Aurora - Jct. Monte Alegre - Jct. Labangan RoadK1639+000 - K1640+300,K1641+400 - K1644+000

Road Widening Aurora, Labangan, ZDS

km. 3.90 Km.

POW, Plans and Contract GAA 3 156,000.00 156,000.00

127. Jct. Aurora - Jct. Monte Alegre - Jct. Labangan RoadK1644+000 - K1647+800

Road Widening Aurora, Labangan, ZDS km. 3.755 Km.

POW, Plans and Contract GAA 3 150,200.00 150,200.00

128. Jct. Aurora - Jct. Monte Alegre - Jct. Labangan RoadK1651+000 - K1653+000

Road Widening Aurora, Labangan, ZDS km. 2.009 Km.

POW, Plans and Contract GAA 3 80,360.00 80,360.00

129. Jct. Aurora - Jct. Monte Alegre - Jct. Labangan RoadK1653+000 - K1656+174

Road Widening Aurora, Labangan, ZDS km. 3.188 Km.

POW, Plans and Contract GAA 3 127,520.00 127,520.00

130. Jct. Pulacan - Military Camp RoadK1651+(-102) - K1652+750 Road Widening Labangan, ZDS

km. 1.852 Km.

POW, Plans and Contract GAA 3 - - 74,080.00 74,080.00

131. Jct. Switch - Jct. Monte Alegre Road Road Widening Ramon

Magsaysay, ZDS km.

POW, Plans and Contract GAA 3 - 24,000.00 24,000.00

132. Jct. Switch - Jct. Monte Alegre RoadK1642+(-260) - K1645+000

Road Widening Ramon Magsaysay, ZDS km. 3.260 Km.

POW, Plans and Contract GAA 3 - 130,400.00 130,400.00

133. Jct. Switch - Jct. Monte Alegre RoadK1645+000 - K1648+882

Road Widening Ramon Magsaysay, ZDS km. 3.884 Km.

POW, Plans and Contract GAA 3 155,360.00 155,360.00

Chapter 19-1-DPWH IX-ZDS 1DEOPage 10 of 58

Page 336: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Basis for Implementation RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location

(Province/ Municipality/

City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

134. Eastern Bobongan - Sominot - Midsalip - Dumingag Road (S01325MN)

Road Widening Midsalip, Dumingag, ZDS km.

POW, Plans and Contract GAA 3 30,000.00 150,000.00 150,000.00 150,000.00 480,000.00

135. Eastern Bobongan - Sominot - Midsalip RoadK1684+000 - K1687+000

Road Widening Midsalip, Dumingag, ZDS km. 3.0 Km.

POW, Plans and Contract GAA 3 120,000.00 120,000.00

136. Eastern Bobongan - Sominot - Midsalip RoadK1687+000 - K1690+475

Road Widening Midsalip, Dumingag, ZDS km. 3.475 Km.

POW, Plans and Contract GAA 3 139,000.00 139,000.00

137. Eastern Bobongan - Sominot - Midsalip RoadK1642+(-249) - K1645+000

Road Widening Sominot, ZDSkm. 3.248 Km.

POW, Plans and Contract GAA 3 130,000.00 130,000.00

138. Eastern Bobongan - Sominot - Midsalip RoadK1645+000 - K1648+000

Road Widening Sominot, ZDSkm. 2.999 Km.

POW, Plans and Contract GAA 3 120,000.00 120,000.00

139. Eastern Bobongan - Sominot - Midsalip RoadK1648+000 - K1651+000

Road Widening Sominot, ZDSkm. 3.0 Km.

POW, Plans and Contract GAA 3 120,000.00 120,000.00

140. Eastern Bobongan - Sominot - Midsalip - Dumingag Road (S01351MN)

Road Widening Sominot, ZDSkm.

POW, Plans and Contract GAA 3 - - 150,000.00 150,000.00 150,000.00 450,000.00

2. Off-Carriageway Improvement including drainage - 141. Jct. Aurora - Monte Alegre - Jct.

Labangan RoadK1649+249 - K1650+460

Paving of Shoulders sq.m

POW, Plans and Contract GAA 3 - -

142. SINDANGAN-SIAYAN-DUMINGAG-MAHAYAG ROAD (MAHAYAG-DUMINGAG ROAD)

Paving of Shoulders

sq.m

POW, Plans and Contract GAA 3 - 20,000.00 20,000.00 40,000.00

3. Construction of By-Passes/Diversion Roads, including ROW - 143. NRJ Eastern Bobongan - Sominot -

Midsalip - Dumingag Road - NRJ Sindangan - Bayog - Lakewood Road PACKAGE 1

Road Concreting ZDS1

km. 5.0 Km.

POW, Plans and Contract GAA 3 150,000.00 150,000.00

144. NRJ Eastern Bobongan - Sominot - Midsalip - Dumingag Road - NRJ Sindangan - Bayog - Lakewood Road PACKAGE 2

Road Concreting ZDS1

km. 5.0 Km.

POW, Plans and Contract GAA 3 150,000.00 150,000.00

144. NRJ Eastern Bobongan - Sominot - Midsalip - Dumingag Road - NRJ Sindangan - Bayog - Lakewood Road ) PACKAGE 3

Road Concreting ZDS1

km. 5.0 Km.

POW, Plans and Contract GAA 3 150,000.00 150,000.00

Chapter 19-1-DPWH IX-ZDS 1DEOPage 11 of 58

Page 337: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Basis for Implementation RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location

(Province/ Municipality/

City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

145. NRJ Eastern Bobongan - Sominot - Midsalip - Dumingag Road - NRJ Sindangan - Bayog - Lakewood Road PACKAGE 4

Road Concreting ZDS1

km. 5.0 Km.

POW, Plans and Contract GAA 3 150,000.00 150,000.00

146. NRJ Eastern Bobongan - Sominot - Midsalip - Dumingag Road - NRJ Sindangan - Bayog - Lakewood Road PACKAGE 5

Road Concreting ZDS1

km. 6 Km.

POW, Plans and Contract GAA 3 180,000.00 180,000.00

147. NRJ Eastern Bobongan - Sominot - Midsalip - Dumingag Road - NRJ Sindangan - Bayog - Lakewood Road PACKAGE 6

Road Concreting ZDS1

km. 5.5 Km.

POW, Plans and Contract GAA 3 165,000.00 165,000.00

148. NRJ Eastern Bobongan - Sominot - Midsalip - Dumingag Road - NRJ Sindangan - Siayan - Dumingang - Mahayag -Road ( Valencia - Macasing - Malagalad - Canibongan - Siriac - Gunyan Section) PACKAGE 1

Road Concreting ZDS1

km. 5.9 Km.

POW, Plans and Contract GAA 3 177,000.00 177,000.00

149. NRJ Eastern Bobongan - Sominot - Midsalip - Dumingag Road - NRJ Sindangan - Siayan - Dumingang - Mahayag -Road ( Valencia - Macasing - Malagalad - Canibongan - Siriac - Gunyan Section) PACKAGE 2

Road Concreting ZDS1

km. 5.9 Km.

POW, Plans and Contract GAA 3 177,000.00 177,000.00

150. NRJ Jct. Aurora - Monte Alegre - Jct. Labangan Road - NRJ Lanao - Pagadian - Zamboanga City Road (RN1) PACKAGE 1

Road Concreting ZDS1

km. 5.25 Km.

POW, Plans and Contract GAA 3 157,500.00 157,500.00

151. NRJ Jct. Aurora - Monte Alegre - Jct. Labangan Road - NRJ Lanao - Pagadian - Zamboanga City Road (RN1) PACKAGE 2

Road Concreting ZDS1

km. 5.25 Km.

POW, Plans and Contract GAA 3 157,500.00 157,500.00

152. NRJ Sindanga - Siayan - Dumingang - Mahayag Road - NRJ Jct. Blancia - Molave - Josefina Road PACKAGE 1

Road Concreting ZDS1

km. 4.0 Km.

POW, Plans and Contract GAA 3 120,000.00 120,000.00

153. NRJ Sindanga - Siayan - Dumingang - Mahayag Road - NRJ Jct. Blancia - Molave - Josefina Road PACKAGE 2

Road Concreting ZDS1

km. 4.0 Km.

POW, Plans and Contract GAA 3 120,000.00 120,000.00

Chapter 19-1-DPWH IX-ZDS 1DEOPage 12 of 58

Page 338: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Basis for Implementation RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location

(Province/ Municipality/

City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

154. NRJ Sindanga - Siayan - Dumingang - Mahayag Road - NRJ Jct. Blancia - Molave - Josefina Road PACKAGE 3

Road Concreting ZDS1

km. 4.0 Km.

POW, Plans and Contract GAA 3 120,000.00 120,000.00

155. NRJ Sindanga - Siayan - Dumingang - Mahayag Road - NRJ Jct. Blancia - Molave - Josefina Road ) PACKAGE 4

Road Concreting ZDS1

km. 4.0 Km.

POW, Plans and Contract GAA 3 120,000.00 120,000.00

156. NRJ Sindanga - Siayan - Dumingang - Mahayag Road - NRJ Jct. Blancia - Molave - Josefina Road PACKAGE 5

Road Concreting ZDS1

km. 4.0 Km.

POW, Plans and Contract GAA 3 120,000.00 120,000.00

157. NRJ Jct. Blancia- Molave-Josefina Road - NRJ Blancia

Road Concreting ZDS1 km. 4.28 Km.

POW, Plans and Contract GAA 3 128,400.00 128,400.00

158. NRJ Jct. Blancia- Molave-Josefina Road - NRJ Blancia- Molave-Josefina Road PACKAGE 1

Road Concreting ZDS1

km. 5.867 Km.

POW, Plans and Contract GAA 3 176,000.00 176,000.00

159. NRJ Jct. Blancia- Molave-Josefina Road - NRJ Blancia- Molave-Josefina Road PACKAGE 2

Road Concreting ZDS1

km. 5.867 Km.

POW, Plans and Contract GAA 3 176,000.00 176,000.00

160. NRJ Jct. Blancia- Molave-Josefina Road - NRJ Blancia- Molave-Josefina Road PACKAGE 3

Road Concreting ZDS1

km. 5.867 Km.

POW, Plans and Contract GAA 3 176,000.00 176,000.00

161. NRJ Jct. Aurora - Ozamis City Road - NRJ Sindangan - Siayan - Dumingag- Mahayag Road

Road Concreting ZDS1

km. 7.780 Km.

POW, Plans and Contract GAA 3 233,400.00 233,400.00

162. NRJ Jct.Switch- Jct. Monte Alegre Road - NRJ Aurora - Ozamis City Road

Road Concreting ZDS1

km. 7.470 Km.

POW, Plans and Contract GAA 3 224,100.00 224,100.00

163. NRJ Jct. Switch - Jct. Monte Alegre Road - NRJ Eastern Bobongan- Sominot- Midsalip- Dumingang Road- NRJ Sindangan- Bayog- Lakewood Road PACKAGE 1

Road Concreting ZDS1

km. 6.350 Km.

POW, Plans and Contract GAA 3 190,500.00 190,500.00

Chapter 19-1-DPWH IX-ZDS 1DEOPage 13 of 58

Page 339: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Basis for Implementation RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location

(Province/ Municipality/

City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

164. NRJ Jct. Switch - Jct. Monte Alegre Road - NRJ Eastern Bobongan- Sominot- Midsalip- Dumingang Road- NRJ Sindangan- Bayog- Lakewood Road PACKAGE 2

Road Concreting ZDS1

km. 6.350 Km.

POW, Plans and Contract GAA 3 190,500.00 190,500.00

165. NRJ Eastern Bobongan- Sominot- Midsalip- Dumingang Road- NRJ Sindangan- Bayog- Lakewood Road- NRJ Eastern Bobongan- Sominot- Midsalip- Dumingang Road- NRJ Sindangan- Bayog- Lakewood Road PACKAGE 1

Road Concreting ZDS1

km. 4.0705 Km.

POW, Plans and Contract GAA 3 122,100.00 122,100.00

166. NRJ Eastern Bobongan- Sominot- Midsalip- Dumingang Road- NRJ Sindangan- Bayog- Lakewood Road- NRJ Eastern Bobongan- Sominot- Midsalip- Dumingang Road- NRJ Sindangan- Bayog- Lakewood Road PACKAGE 2

Road Concreting ZDS1

km. 4.0705 Km.

POW, Plans and Contract GAA 3 122,100.00 122,100.00

167. NRJ Eastern Bobongan- Sominot- Midsalip- Dumingang Road- NRJ Sindangan- Bayog- Lakewood Road- NRJ Eastern Bobongan- Sominot- Midsalip- Dumingang Road- NRJ Sindangan- Bayog- Lakewood Road PACKAGE 1

Road Concreting ZDS1

km. 4.2055 Km.

POW, Plans and Contract GAA 3 126,150.00 126,150.00

168. NRJ Eastern Bobongan- Sominot- Midsalip- Dumingang Road- NRJ Sindangan- Bayog- Lakewood Road- NRJ Eastern Bobongan- Sominot- Midsalip- Dumingang Road- NRJ Sindangan- Bayog- Lakewood Road PACKAGE 2

Road Concreting ZDS1

km. 4.2055 Km.

POW, Plans and Contract GAA 3 126,150.00 126,150.00

Chapter 19-1-DPWH IX-ZDS 1DEOPage 14 of 58

Page 340: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Basis for Implementation RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location

(Province/ Municipality/

City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

169. NRJ Eastern Bobongan- Sominot- Midsalip- Dumingang Road- NRJ Sindangan- Bayog- Lakewood Road- NRJ Eastern Bobongan- Sominot- Midsalip- Dumingang Road- NRJ Sindangan- Bayog- Lakewood Road

Road Concreting ZDS1

km. 6.370 Km.

POW, Plans and Contract GAA 3 191,100.00 191,100.00

170. Bagalupa-Labangan-Guibang Road, Zamboanga del Sur

Road Concreting km.

POW, Plans and Contract GAA 3 37,000.00 32,520.00 32,520.00 32,520.00 134,560.00

171. Labangan-Pagadian City-Dumalinao ZDS By-Pass Road, incl. ROW, Zamboanga Del Sur 1st LD

Road Concreting Labangan, ZDS

km.

POW, Plans and Contract GAA 3 150,000.00 300,000.00 67,000.00 300,000.00 600,000.00 600,000.00 2,017,000.00

172. Sominot-Dumingag Road, Zamboanga del Sur

Road Concreting km.

POW, Plans and Contract GAA 3 75,000.00 105,000.00 300,000.00 300,000.00 300,000.00 1,080,000.00

173. Sominot-Mahayag Road, Zamboanga del Sur

Road Concreting km.

POW, Plans and Contract GAA 3 67,500.00 103,000.00 150,000.00 300,000.00 300,000.00 920,500.00

174. LANGAPUD-BAGALUPA-GUBANG ROAD

Road Concreting Tambulig, ZDS km.

POW, Plans and Contract GAA 3 90,000.00 90,000.00 80,000.00 260,000.00

175. MOLAVE- TAMBULIG- DON VICTORIANO ROAD

Road Concreting Tambulig, ZDS km.

POW, Plans and Contract GAA 3 150,000.00 150,000.00 150,000.00 450,000.00

176. LABANGAN - SOMINOT ROAD Road Concreting Tambulig, ZDS km.

POW, Plans and Contract GAA 3 150,000.00 150,000.00 150,000.00 450,000.00

177. NRJ Poblacion-Tambulig-Tungawan-Pasingkalan Road km. GAA 3 50,720.00 66,417.00 75,000.00 75,000.00 80,000.00 347,137.00

178. TABUAN-MAN-ILAN (TUKURAN)-KAHAYAGAN (AURORA) ROAD, ZAMBOANGA DEL SUR

Road Concreting Tambulig, ZDS

km.

POW, Plans and Contract GAA 3 150,000.00 150,000.00 150,000.00 450,000.00

179. RAMON MAGSAYSAY-MOLAVE ROAD, ZAMBOANGA DEL SUR

Road Concreting Tambulig, ZDS

km.

POW, Plans and Contract GAA 3 150,000.00 150,000.00 150,000.00 450,000.00

180. LABANGAN-SOMINOT ROAD, ZAMBOANGA DEL SUR Road

Concreting Tambulig, ZDSkm.

POW, Plans and Contract GAA 3 150,000.00 150,000.00 150,000.00 450,000.00

181. PAGADIAN CITY-TUKURAN COASTAL ROAD, STA 0 + 000 - STA 10 + 000 km.

GAA 3 50,720.00 66,417.00 100,000.00 100,000.00 100,000.00 417,137.00

Chapter 19-1-DPWH IX-ZDS 1DEOPage 15 of 58

Page 341: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Basis for Implementation RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location

(Province/ Municipality/

City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

182. NRJ Valencia-Tamorayan-Tagun-Macasing-Datu Tutukan-Labangon-So. Sinatalan(Labangon)-Pangi-NRJ Pisompongan Diversion Road (Dumingag-Midsalip), L= 31.50 km.

Road Concreting

km.

POW, Plans and Contract GAA 3 250,000.00 695,000.00 945,000.00

183. NRJ Valencia-Macasing-Malagalad-Canibongan-Siriac (Zamboanga del Norte)-NRJ Gunyan Dievrsion Road (Dumingag-Siayan Diversion Road), L= 11.80 km.

Road Concreting

km.

POW, Plans and Contract GAA 3 170,000.00 184,000.00 354,000.00

184. NRJ Lantian-San Isidro--Balimbingan-Luy-a-Tabuan-NRJ Camanga Diversion Road, L= 10.50 km.

Road Concreting

km.

POW, Plans and Contract GAA 3 170,000.00 145,000.00 315,000.00

185. NRJ Upper Salug Daku-Guripan-Malubo-Tulan-Pedagan-NRJ Paraiso Diversion Road, L= 20.0 km.

Road Concreting

km.

POW, Plans and Contract GAA 3 200,000.00 400,000.00 600,000.00

186. So. Sandal (San Isidro)-Lower Mahayag-NRJ Poblacion Diversion Road, L= 4.28 km.

Road Concreting km.

POW, Plans and Contract GAA 3 110,000.00 18,400.00 128,400.00

187. NRJ Bag-ong Argao-Sto. Rosario-Simata-Silangit-Bag-ong Gutlang-Bag-ong Ariosa-NRJ Litapan Diversion Road, L= 17.60km.

Road Concreting

km.

POW, Plans and Contract GAA 3 200,000.00 328,000.00 528,000.00

188. NRJ Dipolo-Miligan-San Isidro Diversion Road, L= 7.78 km.

Road Concreting km.

POW, Plans and Contract GAA 3 150,000.00 83,400.00 233,400.00

189. NRJ Pob.-Bambong Diut-San Fernando-Malating-NRJ Kauswagan Bypass Road, L= 7.47 km.

Road Concreting

km.

POW, Plans and Contract GAA 3 150,000.00 74,100.00 224,100.00

190. NRJ Switch-Katipunan-Magsaysay-Mabini-NRJ Sinaguing Diversion Road, L= 12.70 km.

Road Concreting

km.

POW, Plans and Contract GAA 3 150,000.00 231,000.00 381,000.00

Chapter 19-1-DPWH IX-ZDS 1DEOPage 16 of 58

Page 342: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Basis for Implementation RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location

(Province/ Municipality/

City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

191. NRJ Bobongan-Sapa Anding-Upper Laperian-NRJ Gapasan Circumferential Road, L= 8.14 km.

Road Concreting

km.

POW, Plans and Contract GAA 3 150,000.00 94,200.00 244,200.00

192. NRJ Bacahan-Bulanay-Barubuhan-NRJ Poblacion Diversion Road, L= 8.41 km.

Road Concreting km.

POW, Plans and Contract GAA 3 150,000.00 102,300.00 252,300.00

193. NRJ Poblacion-San Miguel-Dipalusan-NRJ Sinaguing Diversion Road, L= 6.37 km.

Road Concreting km.

POW, Plans and Contract GAA 3 150,000.00 41,100.00 191,100.00

194. NRJ Riverside-Calolot Road leading to Calolot Mountain Resort, L= 4.31 km.

Road Concreting Tambulig, ZDS

km.

POW, Plans and Contract GAA 3 129,300.00 129,300.00 258,600.00

4. Construction of Missing Gaps connecting National Roads, including ROW - 195. Labangan-Midsalip Road,

Zamboanga del Sur 1st LDRoad

ConcretingLabangasn,

Midsalip, ZDS km.POW, Plans and

Contract GAA 3 150,000.00 180,000.00 60,000.00 300,000.00 600,000.00 600,000.00 1,890,000.00

196. Midsalip-Buboan Road, Zamboanga del Sur 1st LD

Road Concreting Midsalip, ZDS km.

POW, Plans and Contract GAA 3 150,000.00 120,000.00 60,000.00 300,000.00 300,000.00 300,000.00 1,230,000.00

Chapter 19-1-DPWH IX-ZDS 1DEOPage 17 of 58

Page 343: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Basis for Implementation RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location

(Province/ Municipality/

City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

(iii) Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - a. Primary Road -

197. Jct Aurora-Monte Alegre-Jct Labangan Rd - K1636+0 - K1636+816

Construction of Concrete Road km. 0.82 POW, Plans and

Contract GAA 3 25,000.00 25,000.00 25,000.00 25,000.00 100,000.00

b. Secondary Road - 198. Sindangan - Siayan - Dumingag -

Mahayag Road (Mahayag - Dumingag Section)

Road Concreting Dumingag, ZDS

km.

POW, Plans and Contract GAA 3 - 6,930.00 6,930.00

c. Tertiary Road - 199. Eastern Bobongan - Sominot -

Midsalip - Dumingag Road (S01325MN)

Road Concreting

Midsalip, Dumingag, ZDS km.

POW, Plans and Contract GAA 3 300,000.00 300,000.00

200. Eastern Bobongan - Sominot - Midsalip - Dumingag Road (S01351MN)

Road Concreting Sominot, ZDS

km.

POW, Plans and Contract GAA 3 - - -

(iv) Construction and Maintenance of Bridges along National Roads - 1 Rehabilitation of Permanent Bridges -

201. Botel Br. (B01204MN) along Lanao-Pagadian-Zamboanga City Rd

Widening Tukuran, ZDSkm.

POW, Plans and Contract GAA 3 5,070.00 5,070.00 5,070.00 15,210.00

202. Salug Daku Br. (B01775MN) along Sindangan-Siayan-Dumingag-Mahayag Rd (Mahayag-Dumingag Sect)

Widening Tukuran, ZDS

km.

POW, Plans and Contract GAA 3 14,240.00 14,240.00 14,240.00 42,720.00

203. Tawagan Sur Br. (BO1501MN)Widening Pagadian City km.

POW, Plans and Contract GAA 3 5,500.00 5,500.00 5,500.00 16,500.00

a. Along Tukuran - Jct. Karomatan Road - 204. Militar Br. (BOO499MN)

Widening Tukuran, ZDS km.POW, Plans and

Contract GAA 3 10,000.00 10,000.00 15,000.00 15,000.00 15,000.00 65,000.00

205. Taguio Br. (BO1508MN)Widening Tukuran, ZDS km.

POW, Plans and Contract GAA 3 -

b. Along Jct. Aurora - Ozamis City Road km. - 206. Mendoza Br. (BOO459MN)

Widening Tambulig, ZDS km.POW, Plans and

Contract GAA 3 5,700.00 5,700.00

207. Dipolo Gamay Br. (BOO460MN)Widening Tambulig, ZDS km.

POW, Plans and Contract GAA 3 -

208. Dipolo Daku Br. (BOO461MN)Widening Tambulig, ZDS km.

POW, Plans and Contract GAA 3 -

209. Salug Diut Br. (BOO462MN)Widening Tambulig, ZDS km.

POW, Plans and Contract GAA 3 -

Chapter 19-1-DPWH IX-ZDS 1DEOPage 18 of 58

Page 344: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Basis for Implementation RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location

(Province/ Municipality/

City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

210. Gabunon Br. (BOO463MN)Widening Tambulig, ZDS km.

POW, Plans and Contract GAA 3 -

211. Tuluan Br. (BOO464MN)Widening Tambulig, ZDS km.

POW, Plans and Contract GAA 3 -

212. Ludiong Br. (BOO465MN)Widening Tambulig, ZDS km.

POW, Plans and Contract GAA 3 -

213. Usugan Br. (BOO466MN)Widening Tambulig, ZDS km.

POW, Plans and Contract GAA 3 22,500.00 22,500.00

2 Widening of Permanent Bridges - a. Along Pagadian City - Zamboanga City Road -

214. Gatas Br. 1 (BOO499MN)Widening Pagadian City km.

POW, Plans and Contract GAA 3 -

215. Gatas Br. 2 (BOO589MN)Widening Pagadian City km.

POW, Plans and Contract GAA 3 -

216. Balangasan Br. (BOO590MN)Widening Pagadian City km.

POW, Plans and Contract GAA 3 -

217. Tawagan Sur Br. (BO1501MN)Widening Pagadian City km.

POW, Plans and Contract GAA 3 -

Chapter 19-1-DPWH IX-ZDS 1DEOPage 19 of 58

Page 345: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Basis for Implementation RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location

(Province/ Municipality/

City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

b. Along Lanao - Pagadian - Zamboanga City Road - 218. Baclay Br. (BO1195MN)

Widening Aurora, ZDS km.POW, Plans and

Contract GAA 3 -

219. Tukuran Br. (BO1196MN)Widening Aurora, ZDS km.

POW, Plans and Contract GAA 3 -

220. Tinutungan Br. (BO1197MN)Widening Aurora, ZDS km.

POW, Plans and Contract GAA 3 -

221. Malabaguid Br. 1 (BO1198MN)Widening Labangan, ZDS km.

POW, Plans and Contract GAA 3 -

222. Tabuan Br. (BO1200MN)Widening Labangan, ZDS km.

POW, Plans and Contract GAA 3 -

223. Bayao Br. (BO1201MN)Widening Labangan, ZDS km.

POW, Plans and Contract GAA 3 -

224. Lantian Br. (BO1202MN)Widening Labangan, ZDS km.

POW, Plans and Contract GAA 3 22,500.00 22,500.00

225. Labangan Br. (BO1203MN)Widening Labangan, ZDS km.

POW, Plans and Contract GAA 3 -

226. Botel Br. (BO1204MN)Widening Labangan, ZDS km.

POW, Plans and Contract GAA 3 25,000.00 25,000.00

c. Along Tukuran - Jct. Karomatan Road - 227. Militar Br. (BOO499MN)

Widening Tukuran, ZDS km.POW, Plans and

Contract GAA 3 -

228. Taguio Br. (BO1508MN)Widening Tukuran, ZDS km.

POW, Plans and Contract GAA 3 -

d. Along Jct. Aurora - Ozamis City Road - 229. Mendoza Br. (BOO459MN)

Widening Tambulig, ZDS km.POW, Plans and

Contract GAA 3 -

230. Dipolo Gamay Br. (BOO460MN)Widening Tambulig, ZDS km.

POW, Plans and Contract GAA 3 -

231. Dipolo Daku Br. (BOO461MN)Widening Tambulig, ZDS km.

POW, Plans and Contract GAA 3 -

232. Salug Diut Br. (BOO462MN)Widening Tambulig, ZDS km.

POW, Plans and Contract GAA 3 -

233. Gabunon Br. (BOO463MN)Widening Tambulig, ZDS km.

POW, Plans and Contract GAA 3 -

234. Tuluan Br. (BOO464MN)Widening Tambulig, ZDS km.

POW, Plans and Contract GAA 3 30,000.00 30,000.00 30,000.00 90,000.00

235. Ludiong Br. (BOO465MN)Widening Tambulig, ZDS km.

POW, Plans and Contract GAA 3 30,000.00 30,000.00 30,000.00 90,000.00

236. Usugan Br. (BOO466MN)Widening Tambulig, ZDS km.

POW, Plans and Contract GAA 3 -

e. Along Jct. Aurora - Jct. Monte Alegre - Jct. Labangan Road -

Chapter 19-1-DPWH IX-ZDS 1DEOPage 20 of 58

Page 346: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Basis for Implementation RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location

(Province/ Municipality/

City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

237. Navalan Br. (BOO467MN)Widening Aurora, ZDS km.

POW, Plans and Contract GAA 3 -

238. Pulacan Br. (BOO468MN)Widening Aurora, ZDS km.

POW, Plans and Contract GAA 3 -

f. Along Jct. Switch - Jct. Monte Alegre Road - 239. Ramon Magsaysay Br.

(BOO469MN) Widening Ramon Magsaysay, ZDS km.

POW, Plans and Contract GAA 3 -

g. Along Jct. Blancia - Molave - Mahayag - Josefina Road - 240. Demorok Br. (BO1546MN)

Widening Josefina, ZDS km.POW, Plans and

Contract GAA 3 -

h. Along Sindangan - Siayan - Dumingag - Mahayag Road - 241. Salug Daku Br. (BOO123MN)

Widening Mahayag, ZDS km.POW, Plans and

Contract GAA 3 -

242. Maguilles Br. (BOO125MN)Widening Mahayag, ZDS km.

POW, Plans and Contract GAA 3 -

243. Gitran Br. (BOO127MN)Widening Mahayag, ZDS km.

POW, Plans and Contract GAA 3 -

i. Along Eastern Bobongan - Suminot - Midsalip - Dumingag Road - 244. Midsalip Br. (BO1563MN)

Widening Sominot, ZDS km.POW, Plans and

Contract GAA 3 -

245. Guma Br. (BO1564MN)Widening Sominot, ZDS km.

POW, Plans and Contract GAA 3 -

246. Lower Landing Br. (FVR) (B01678MN) Widening km.

POW, Plans and Contract GAA 3 -

3 Retrofitting/Strengthening of Permanent Bridges - 247. BALANGASAN BRIDGE

ALONG PAGADIAN-ZAMBOANGA CITY ROAD

Retrofitting/ Strengthening Pagadian City

km.

POW, Plans and Contract GAA 3 5,500.00 5,700.00 5,700.00 5,700.00 22,600.00

248. Balangasan Bridge (B01849MN) Retrofitting/ Strengthening Pagadian City km.

POW, Plans and Contract GAA 3 5,000.00 5,000.00

a. Along Lanao - Pagadian - Zamboanga City Road - 249. Tinutungan Br. (B01197MN) Retrofitting/

Strengthening km.POW, Plans and

Contract GAA 3 5,500.00 5,500.00

250. BOTEL BRIDGE ALONG LANAO-PAGADIAN-ZAMBOANGA CITY ROAD

Retrofitting/ Strengthening km.

POW, Plans and Contract GAA 3 5,500.00 5,700.00 5,700.00 5,700.00 22,600.00

251. LANTIAN BRIDGE ALONG LANAO-PAGADIAN-ZAMBOANGA CITY ROAD

Retrofitting/ Strengthening km.

POW, Plans and Contract GAA 3 5,500.00 5,700.00 5,700.00 5,700.00 22,600.00

252. Tawagan Bridge (B01501MN) Retrofitting/ Strengthening Pagadian City km.

POW, Plans and Contract GAA 3 5,000.00 5,000.00

Chapter 19-1-DPWH IX-ZDS 1DEOPage 21 of 58

Page 347: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Basis for Implementation RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location

(Province/ Municipality/

City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

b. Along Jct. Aurora - Ozamis City Road - 253. Tuluan Br. (BOO464MN) Retrofitting/

Strengthening km.POW, Plans and

Contract GAA 3 5,700.00 5,700.00

254. DIPOLO DAKU BRIDGE ALONG JCT. AURORA-OZAMIS CITY ROAD

Retrofitting/ Strengthening km.

POW, Plans and Contract GAA 3 5,700.00 15,000.00 15,000.00 15,000.00 50,700.00

255. DIPOLO GAMAY BRIDGE ALONG JCT. AURORA-OZAMIS CITY ROAD

Retrofitting/ Strengthening km.

POW, Plans and Contract GAA 3 5,700.00 20,000.00 20,000.00 20,000.00 65,700.00

c. Along Jct. Aurora - Jct. Monte Alegre - Jct. Labangan Road - 256. Navalan Br. (B00467MN) Retrofitting/

Strengthening km.POW, Plans and

Contract GAA 3 5,700.00 5,700.00

257. PULACAN BRIDGE ALONG JCT, AURORA-MONTE ALEGRE-JCT.LABANGAN

Retrofitting/ Strengthening

km.

POW, Plans and Contract GAA 3 5,700.00 6,000.00 6,000.00 6,000.00 23,700.00

d. Along Eastern Bobongan - Suminot - Midsalip - Dumingag Road - 258. Midsalip Br. (BO1563MN) Retrofitting/

Strengthening km.POW, Plans and

Contract GAA 3 5,500.00 5,500.00

259. Guma Br. (BO1564MN) Retrofitting/ Strengthening km.

POW, Plans and Contract GAA 3 5,500.00 5,500.00

e. Along Tukuran-Karomatan Road - 260. Tagulo Bridge (B01508MN) Retrofitting/

Strengthening Tukuran, ZDS km.POW, Plans and

Contract GAA 3 5,000.00 5,000.00

4 Replacement of Permanent Weak Bridges - a. Along Lanao - Pagadian - Zamboanga City Road -

261. Tukuran Br. (BO1196MN) Retrofitting/ Strengthening km.

POW, Plans and Contract GAA 3 50,000.00 23,000.00 73,000.00

5 Construction of New Bridges - 262. Timbaboy Bridge 2 along Eastern

Bobongan-Sominot-Midsalip-Dumingag Rd

Construction of Concrete Bridge

sq.m. 200.34 POW, Plans and Contract GAA 3 33,510.00 35,000.00 35,000.00 103,510.00

263. USUGAN BRIDGE 2 ALONG JCT. AURORA-OZAMIS CITY ROAD

Construction of Concrete Bridge

sq.m. 200.34 POW, Plans and Contract GAA 3 90,000.00 90,000.00 180,000.00

264. Malabaquid Br. 2 Construction of Concrete Bridge

sq.m. 200.34 POW, Plans and Contract GAA 3 25,000.00 15,000.00 15,000.00 55,000.00

265. Tabuan Br. 2 Construction of Concrete Bridge

sq.m. 228.01 POW, Plans and Contract GAA 3 30,000.00 15,000.00 15,000.00 60,000.00

1,247,855.00 1,609,929.00 1,128,424.00 6,843,172.00 16,699,700.00 4,378,000.00 36,123,880.00 OO 1- Subtotal

Chapter 19-1-DPWH IX-ZDS 1DEOPage 22 of 58

Page 348: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Basis for Implementation RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location

(Province/ Municipality/

City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

OO2: Protect Lives and Properties Against Major Floods - 1. Construction/Maintenance of Flood Mitigation Structures and Drainage System -

266. Construction of Usugan River Control, Tungawan, Tambulig, Zamboanga del Sur

Construction of Flood

Mitigation Structure

Tambulig, ZDS

ln.m

POW, Plans and Contract GAA 3 45,000.00 45,572.00 108,000.00 150,000.00 150,000.00 150,000.00 648,572.00

267. Construction of Salug Daku River Control, Tumapic, Mahayag, Zamboanga del Sur

Construction of Flood

Mitigation Structure

Mahayag, ZDS

ln.m

POW, Plans and Contract GAA 3 45,000.00 101,081.00 60,000.00 60,000.00 60,000.00 326,081.00

268. Construction of Dipolo River Control

Construction of Flood

Mitigation Structure

Ramon Magsaysay, ZDS

ln.m

POW, Plans and Contract GAA 3 20,000.00 20,000.00

269. Construction of Dipolo River Control

Construction of Flood

Mitigation Structure

Tungawan, Tambulig,

Zamboanga del Sur ln.m

POW, Plans and Contract GAA 3 - 110,000.00 120,000.00 230,000.00

270. Construction of Revetment with concrete sheet piles along Mapangi River, Zamboanga del Sur 1st LD

Construction of Flood

Mitigation Structure

Margosatubig, ZDS

ln.m

POW, Plans and Contract GAA 3 100,000.00 50,000.00 50,000.00 150,000.00 150,000.00 150,000.00 650,000.00

271. Construction of Guitran River Control, Dumingag, Zamboanga del Sur

Construction of Flood

Mitigation Structure

Dumingag, Zamboanga del

Sur ln.m

POW, Plans and Contract GAA 3 - 20,000.00 120,000.00 120,000.00 120,000.00 380,000.00

272. Construction of Bucayan River Control, Dumingag, Zamboanga del Sur

Construction of Flood

Mitigation Structure

Dumingag, Zamboanga del

Sur ln.m

POW, Plans and Contract GAA 3 - 25,000.00 55,000.00 55,000.00 55,000.00 190,000.00

273. Construction of Flood Control, Sto. Niño, Tukuran, Zamboanga del Sur

Construction of Flood

Mitigation Structure

Tukuran, Zamboanga del

Sur ln.m

POW, Plans and Contract GAA 3 - 25,000.00 60,000.00 60,000.00 60,000.00 205,000.00

274. Construction of Flood Control, Militar, Tukuran, Zamboanga del Sur

Construction of Flood

Mitigation Structure

Tukuran, Zamboanga del

Sur ln.m

POW, Plans and Contract GAA 3 - 60,000.00 60,000.00 60,000.00 180,000.00

275. Construction of Dipolo Flood Control, Upper Timonan Bridge, Dumingag, Zamboanga del Sur

Construction of Flood

Mitigation Structure

Dumingag, Zamboanga del

Sur ln.m

POW, Plans and Contract GAA 3 - 120,000.00 120,000.00 120,000.00 360,000.00

Chapter 19-1-DPWH IX-ZDS 1DEOPage 23 of 58

Page 349: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Basis for Implementation RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location

(Province/ Municipality/

City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

276. Construction of Salug Diut Flood Control, Brgy. Bliss, Molave, Zamboanga del Sur

Construction of Flood

Mitigation Structure

Molave, Zamboanga del

Sur ln.m

POW, Plans and Contract GAA 3 - 70,000.00 70,000.00 70,000.00 210,000.00

277. Construction of Tawagan Flood Control, Tawagan Sur, Pagadian City

Construction of Flood

Mitigation Structure

Tawagan Sur, Pagadian City

ln.m

POW, Plans and Contract GAA 3 - 41,363.00 40,000.00 50,000.00 50,000.00 50,000.00 231,363.00

278. Construction of Dipolo River Control, Katipunan, Ramon Magsaysay, Zamboanga del Sur

Construction of Flood

Mitigation Structure

Ramon Magsaysay,

Zamboanga del Sur ln.m

POW, Plans and Contract GAA 3 - 20,000.00 70,000.00 70,000.00 70,000.00 230,000.00

279. Construction of Guinabot River Control, Poblacion, Midsalip, Zamboanga del Sur

Construction of Flood

Mitigation Structure

Midsalip, Zamboanga del

Surln.m

POW, Plans and Contract GAA 3 - 20,000.00 20,000.00

280. Construction of Timbaboy River Control, Midsalip, Zamboanga del Sur

Construction of Flood

Mitigation Structure

Midsalip, Zamboanga del

Sur ln.m

POW, Plans and Contract GAA 3 - 45,000.00 45,000.00 50,000.00 140,000.00

281. Construction of Dipolo Flood Control, Tiparak, Tambulig, Zamboanga del Sur

Construction of Flood

Mitigation Structure

Tambulig, Zamboanga del

Sur ln.m

POW, Plans and Contract GAA 3 - 30,000.00 90,000.00 90,000.00 220,000.00 430,000.00

282. Construction of Dipolo Flood Control, Sagrada Familia, Tambulig, Zamboanga del Sur

Construction of Flood

Mitigation Structure

Tambulig, Zamboanga del

Sur ln.m

POW, Plans and Contract GAA 3 - 30,000.00 60,000.00 60,000.00 60,000.00 210,000.00

283. Construction of Dipolo Flood Control, San Vicente, Tambulig, Zamboanga del Sur

Construction of Flood

Mitigation Structure

Tambulig, Zamboanga del

Sur ln.m

POW, Plans and Contract GAA 3 - 30,000.00 150,000.00 150,000.00 330,000.00

284. Contruction of Flood Control, Dipolo Gamay Bridge, Molave, Zamboanga del Sur

Construction of Flood

Mitigation Structure

Molave, Zamboanga del

Sur ln.m

POW, Plans and Contract GAA 3 - 10,000.00 60,000.00 60,000.00 60,000.00 190,000.00

285. Construction of Tawagan Flood Control, Bulanit, Labangan, Zamboanga del Sur

Construction of Flood

Mitigation Structure

Labangan, Zamboanga del

Sur ln.m

POW, Plans and Contract GAA 3 - 20,000.00 20,000.00 20,000.00 60,000.00

Chapter 19-1-DPWH IX-ZDS 1DEOPage 24 of 58

Page 350: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Basis for Implementation RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location

(Province/ Municipality/

City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

286. CONSTRUCTION OF USUGAN FLOOD CONTROL PROJECT, BRGY. NEW VILLAGE, RIVERSIDE, HAPPY VALLEY AND CALOLOT, TAMBULIG, ZAMBOANGA DEL SUR ln.m

GAA 3 150,000.00 150,000.00 150,000.00 450,000.00

287. CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SUDLON, MOLAVE, ZAMBOANGA DEL SUR

Construction of Flood

Mitigation Structure ln.m

POW, Plans and Contract GAA 3 - 30,000.00 30,000.00 30,000.00 90,000.00

288. CONSTRUCTION OF SUDLON FLOOD CONTROL STRUCTURE, DIULO BRIDGE,DOWNSTREAM,MOLAVE, ZAMBOANGA DEL SUR ln.m

GAA 3 30,000.00 30,000.00 30,000.00 90,000.00

289. CONSTRUCTION OF SALUG DAKU FLOOD CONTROL (SECTION 1), POBLACION MAHAYAG, ZAMBOANGA DEL SUR

Construction of Flood

Mitigation Structure ln.m

POW, Plans and Contract GAA 3 - 50,000.00 50,000.00 110,000.00 210,000.00

290. CONSTRUCTION OF FLOOD CONTROL STRUCTURE, TAGULO RIVER, TUKURAN, ZAMBOANGA DEL SUR

Construction of Flood

Mitigation Structure ln.m

POW, Plans and Contract GAA 3 - 50,000.00 50,000.00 50,000.00 150,000.00

291. CONSTRUCTION OF FLOOD CONTROL SYSTEM ALONG POBLACION B RIVER BANK LOCATED IN POBLACION B, MIDSALIP, ZAMBOANGA DEL SUR

Construction of Flood

Mitigation Structure

ln.m

POW, Plans and Contract GAA 3 - 10,000.00 10,000.00 20,000.00 40,000.00

292. CONSTRUCTION OF FLOOD CONTROL ALONG SIBULAO RIVER (DOWNSTREAM FROM DAM SITE) INCLUDING THE ROW ACQUISITION IN BRGY. SIBULAO, ZAMBOANGA DEL SUR

Construction of Flood

Mitigation Structure

ln.m

POW, Plans and Contract GAA 3 - 30,000.00 30,000.00 30,000.00 90,000.00

293. CONSTRUCTION OF FLOOD CONTROL ALONG PIAO RIVER (UPSTREAM), ZAMBOANGA DEL SUR

Construction of Flood

Mitigation Structure ln.m

POW, Plans and Contract GAA 3 - 70,000.00 70,000.00 70,000.00 210,000.00

Chapter 19-1-DPWH IX-ZDS 1DEOPage 25 of 58

Page 351: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Basis for Implementation RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location

(Province/ Municipality/

City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

294. CONSTRUCTION OF FLOOD CONTROL ALONG SALUG DAKU RIVER, BRGY. LOWER DAKU, MAHAYAG, ZAMBOANGA DEL SUR

Construction of Flood

Mitigation Structure ln.m

POW, Plans and Contract GAA 3 - 50,000.00 50,000.00 120,000.00 220,000.00

295. CONSTRUCTION OF FLOOD CONTROL ALONG SALUG DAKU ( MILIGAN ), MOLAVE, ZAMBOANGA DEL SUR

Construction of Flood

Mitigation Structure ln.m

POW, Plans and Contract GAA 3 - 150,000.00 150,000.00 150,000.00 450,000.00

296. CONSTRUCTION OF FLOOD CONTROL STRUCTURE, MAPANGI RIVER BASIN, TAMBULIG, ZAMBOANGA DEL SUR ln.m

GAA 3 150,000.00 150,000.00 150,000.00 450,000.00

297. Construction of Pagadian Seawall, Pagadian City

Construction of Flood

Mitigation Structure ln.m

POW, Plans and Contract GAA 3 - -

298. Construction of San Carlos Seawall, Tukuran, Zamboanga del Sur

Construction of Flood

Mitigation Structure

Tukuran, Zamboanga del

Sur ln.m

POW, Plans and Contract GAA 3 - 50,000.00 50,000.00 150,000.00 250,000.00

299. Construction of Lumponid Flood control, Midsalip, Zamboanga del Sur

Construction of Flood

Mitigation Structure

Midsalip, Zamboanga del

Sur ln.m

POW, Plans and Contract GAA 3 - -

300. Tambulig Seawall (Barangay Angeles-Mabini)

Construction of Seawall ln.m

POW, Plans and Contract GAA 3 120,000.00 120,000.00 240,000.00

301. Construction of Tungawan Flood Control, Tambulig, Zamboanga del Sur

Construction of Flood

Mitigation Structure

Tambulig, Zamboanga del

Sur ln.m

POW, Plans and Contract GAA 3 - -

302. Construction of Kapalaran Flood Control, Tambulig, Zamboanga del Sur

Construction of Flood

Mitigation Structure

Tambulig, Zamboanga del

Sur ln.m

POW, Plans and Contract GAA 3 - -

303. Construction of Katipunan Flood Control, Ramon Magsaysay, Zamboanga del Sur

Construction of Flood

Mitigation Structure

Ramon Magsaysay,

Zamboanga del Sur ln.m

POW, Plans and Contract GAA 3 - -

Chapter 19-1-DPWH IX-ZDS 1DEOPage 26 of 58

Page 352: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Basis for Implementation RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location

(Province/ Municipality/

City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

304. Construction of Dumingag Flood Control, Dumingag, Zamboanga del Sur

Construction of Flood

Mitigation Structure

Dumingag, Zamboanga del

Sur ln.m

POW, Plans and Contract GAA 3 - -

305. Construction of Caridad Flood Control, Dumingag, Zamboanga del Sur

Construction of Flood

Mitigation Structure

Dumingag, Zamboanga del

Sur ln.m

POW, Plans and Contract GAA 3 - -

306. Construction of Labangan Flood Control, Labangan, Zamboanga del Sur

Construction of Flood

Mitigation Structure

Labangan, Zamboanga del

Sur ln.m

POW, Plans and Contract GAA 3 - -

307. Construction of Dipolo Flood Control, Brgy. Balugo, Tambulig, Zamboanga del Sur

Construction of Flood

mitigation Structure ln.m

POW, Plans and Contract GAA 3 20,000.00 150,000.00 150,000.00 320,000.00

308. Construction of Dipolo Flood Control, Brgy. Kapalaran, Tambulig, Zamboanga del Sur

Construction of Flood

mitigation Structure ln.m

POW, Plans and Contract GAA 3 20,000.00 150,000.00 150,000.00 320,000.00

309. Construction of Flood Control, Lower Landing Bridge (Downstream) along Mahayag-Dumingag Road, Zamboanga del Sur

Construction of Flood

mitigation Structure ln.m

POW, Plans and Contract GAA 3 25,000.00 25,000.00 20,912.00 30,000.00 30,000.00 50,000.00 180,912.00

310. Construction of Labangan Seawall, Labangan, Zamboanga del Sur\

Construction of Flood

mitigation Structure ln.m

POW, Plans and Contract GAA 3 -

311. Construction of Lantian Flood Control, Labangan, Zamboanga del Sur

Construction of Flood

mitigation Structure ln.m

POW, Plans and Contract GAA 3 10,000.00 10,000.00

312. Construction of River Control/Megadikes along Labangan River, Labangan, Zamboanga del Sur

Construction of Flood

mitigation Structure ln.m

POW, Plans and Contract GAA 3 20,000.00 20,000.00

313. Construction of River Protection and Flood Control at Salug Daku, Ramon Magsaysay, Zamboanga del Sur

Construction of Flood

mitigation Structure ln.m

POW, Plans and Contract GAA 3 20,000.00 102,000.00 102,000.00 102,000.00 326,000.00

Chapter 19-1-DPWH IX-ZDS 1DEOPage 27 of 58

Page 353: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Basis for Implementation RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location

(Province/ Municipality/

City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

314. Construction of Tukuran Seawall, Tukuran, Zamboanga del Sur Const. of

revetment with steel sheet piles ln.m

250.00 POW, Plans and Contract GAA 3 20,000.00 150,000.00 150,000.00 320,000.00

315. Construction of Flood Control Structure on Steel Sheet Pile Foundation of Salug Daku Flood Control, Sta. 0+289 - Sta. 0+914, Mahayag, Zamboaga del Sur

Const. of revetment with steel sheet piles

ln.m

500.00 POW, Plans and Contract GAA 3 40,000.00 150,000.00 150,000.00 150,000.00 490,000.00

316. Construction of Flood Control Structure, Barangay Alang-Alang,Tambulig, Zamboanga del Sur

Const. of revetment with steel sheet piles ln.m

125.00 POW, Plans and Contract GAA 3 10,000.00 150,000.00 150,000.00 310,000.00

317. Construction of Flood Control, Sitio Lunas, Brgy. Mahayahay, Dumingag, Zamboanga del Sur

Construction of Flood

Mitigation Structure ln.m

POW, Plans and Contract GAA 3 50,000.00 50,000.00

318. Construction of Flood Control, Brgy. Tagulo, Tukuran, Zamboanga del Sur

Construction of Flood

Mitigation Structure ln.m

POW, Plans and Contract GAA 3 50,000.00 50,000.00

319. Construction of Flood Control, Brgy. Lower Tiparak, Tambulig, Zamboanga del Sur

Construction of Flood

Mitigation Structure ln.m

POW, Plans and Contract GAA 3 50,000.00 50,000.00

320. Construction of Flood Control, Brgy. Balugo, Tambulig, Zamboanga del Sur

Construction of Flood

Mitigation Structure ln.m

POW, Plans and Contract GAA 3 50,000.00 50,000.00

321. Construction of Flood Control, Brgy. Alang-Alang, Tambulig, Zamboanga del Sur

Construction of Flood

Mitigation Structure ln.m

POW, Plans and Contract GAA 3 50,000.00 50,000.00

322. Construction of Flood Control, Brgy. San Jose, Tambulig, Zamboanga del Sur

Construction of Flood

Mitigation Structure ln.m

POW, Plans and Contract GAA 3 50,000.00 50,000.00

323. Construction of Flood Control, Brgy. Happy Valley, Tambulig, Zamboanga del Sur

Construction of Flood

Mitigation Structure ln.m

POW, Plans and Contract GAA 3 50,000.00 50,000.00

Chapter 19-1-DPWH IX-ZDS 1DEOPage 28 of 58

Page 354: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Basis for Implementation RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location

(Province/ Municipality/

City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

324. Construction of Flood Control, Brgy. Lower Timonan, Dumingag, Zamboanga del Sur

Construction of Flood

Mitigation Structure ln.m

POW, Plans and Contract GAA 3 50,000.00 50,000.00

325. Construction of Flood Control, Brgy. Upper Timonan, Dumingag, Zamboanga del Sur

Construction of Flood

Mitigation Structure ln.m

POW, Plans and Contract GAA 3 50,000.00 50,000.00

326. Construction of Flood Control, Brgy. Tawagan Norte, Labangan, Zamboanga del Sur

Construction of Flood

Mitigation Structure ln.m

POW, Plans and Contract GAA 3 30,000.00 30,000.00

235,000.00 531,935.00 421,993.00 2,342,000.00 3,802,000.00 3,625,000.00 10,957,928.00 c. Convergence and Special Support Program -

1. Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - 327. NRJ Jct. Aurora - Ozamis City

leading to Calolot Mountain Resort Road Concreting km 4.35 Km.

POW, Plans and Contract GAA 3 129,300.00

328. Narciso Ramos Nat'l Highway to Zamboanga del Sur Coastal Road (Matab-ang, Dumalinao)

Road Concreting

Tukuran, labangan and Pagadian City km

POW, Plans and Contract GAA 3 - -

329. Jct. National Highway leading to Bokong Mountain Resort Road

Concreting

Labangan to Midsalip to

Bayog km

POW, Plans and Contract GAA 3 - -

330. NRJ leading to Eden Park Panoramic View/ Zipline and Shrine, Aurora, Zamboanga del Sur

Road Concreting

km

POW, Plans and Contract GAA 3 25,000.00 10,000.00 40,000.00 40,000.00 40,000.00 155,000.00

331. NRJ leading to Josefina Masapak Water Falls, Brgy. Ebarle, Josefina, Zamboanga Del Sur

Road Concreting km

POW, Plans and Contract GAA 3 30,000.00 10,000.00 40,000.00 40,000.00 40,000.00 160,000.00

332. Jct. National Highway leading to Binayan Water Falls

Road Concreting

Labangan and Pagadian City km

POW, Plans and Contract GAA 3 - -

333. Jct. National Highway leading to Pelucoban Resort

Road Concreting Tambulig km

POW, Plans and Contract GAA 3 - -

334. Jct. National Highway leading to El Durado Resort

Road Concreting Mahayag km

POW, Plans and Contract GAA 3 - -

335. Road Upgrading (Gravel to Paved) Jct. National Highway leading to Aurora Wonderland

Road Concreting Aurora

km

POW, Plans and Contract GAA 3 20,000.00 20,000.00

OO 2- Subtotal

Chapter 19-1-DPWH IX-ZDS 1DEOPage 29 of 58

Page 355: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Basis for Implementation RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location

(Province/ Municipality/

City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

336. Road Upgrading (Gravel to Paved) Jct. National Highway leading to Balas River Cruise, Aurora, Zamboanga del Sur

Road Concreting Aurora

km

POW, Plans and Contract GAA 3 38,000.00 20,000.00 40,000.00 40,000.00 40,000.00 178,000.00

337. Jct. National Highway leading to Aurora Mountain Resort

Road Concreting Aurora km

POW, Plans and Contract GAA 3 20,000.00 20,000.00

338. Jct. National Highway leading to Pulacan Falls

Road Concreting Labangan km

POW, Plans and Contract GAA 3 - -

339. Road Upgrading (Gravel to Paved) Jct. National Highwy leading to Bugwak Spring, Molave, Zamboanga del Sur

Road Concreting Molave

km

POW, Plans and Contract GAA 3 25,000.00 10,000.00 40,000.00 40,000.00 40,000.00 155,000.00

340. Jct. National Highway leading to Parasan Water Falls

Road Concreting Molave km

POW, Plans and Contract GAA 3 - -

341. Road Upgrading (Gravel to Paved) Jct. National Highway leading to Simata Adventure Park, Molave, Zamboanga del Sur

Road Concreting Molave

km

POW, Plans and Contract GAA 3 25,000.00 10,000.00 40,000.00 40,000.00 40,000.00 155,000.00

342. Road Upgrading (Gravel to Paved) Jct. National Highway leading to Sunop Cave and Water Falls, Sominot, Zamboanga del Sur

Road Concreting Dumingag

km

POW, Plans and Contract GAA 3 22,500.00 10,000.00 40,000.00 40,000.00 40,000.00 152,500.00

343. Road Upgrading (Gravel to Paved) Jct. National Highway leading to Philippine Eagle Sanctuary, Midsalip, Zamboanga del Sur

Road Concreting Midsalip

km

POW, Plans and Contract GAA 3 22,500.00 10,000.00 40,000.00 40,000.00 40,000.00 152,500.00

344. ROAD UPGRADING (GRAVEL TO PAVED) NRJ BLANCIA-MOLAVE-JOSEFINA ROAD LEADING TO SANIEL INTEGRATED FARM TECHNOLOGY BUSINESS SCHOOL INC.,MAHAYAG, ZAMBOANGA DEL SUR

Road Concreting

km

GAA 3 35,000.00 35,000.00 35,000.00 105,000.00

Chapter 19-1-DPWH IX-ZDS 1DEOPage 30 of 58

Page 356: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Basis for Implementation RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location

(Province/ Municipality/

City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

345. CONSTRUCTION OF CONCRETE ROAD NRJ EASTERN BOBONGAN-SOMINOT-MIDSALIP-DUMINGAG ROAD LEADING TO PICTORAN FOREST AND WATER FALLS, SOMINOT, ZAMBOANGA DEL SUR

Road Concreting

km

GAA 3 40,000.00 40,000.00 40,000.00 120,000.00

346. CONSTRUCTION OF CONCRETE ROAD NRJ JCT. AURORA-OZAMIS CITY ROAD ALONG CALOLOT BOULEVARD, TAMBULIG, ZAMBOANGA DEL SUR

Road Concreting

km

GAA 3 40,000.00 40,000.00 40,000.00 120,000.00

347. ROAD UPGRADING NRJ JCT. SWITCH-JCT. MONTE ALEGRE ROAD LEADING TO PARADISE PANORAMIC VIEW AND SWIMMING POOL, RAMON MAGSAYSAY, ZAMBOANGA DEL SUR

Road Concreting

km

GAA 3 20,000.00 20,000.00 20,000.00 60,000.00

348. ROAD UPGRADING NRJ BLANCIA-MOLAVE-JOSEFINA ROAD LEADING TO HERITAGE REHABILITATION AND NATURE PARK, JOSEFINA, ZAMBOANGA DEL SUR

Road Concreting

km

GAA 3 40,000.00 40,000.00 40,000.00 120,000.00

349. CONSTRUCTION OF CONCRETE ROAD NRJ EASTERN BOBONGAN-SOMINOT-MIDSALIP-DUMINGAG ROAD LEADING TO DUELIC CRYSTAL FALLS, MIDSALIP, ZAMBOANGA DEL SUR

Road Concreting

km

GAA 3 40,000.00 40,000.00 40,000.00 120,000.00

350. ROAD UPGRADING JCT. NATIONAL HIGHWAY LEADING TO PALPALAN VIEW PARK, PAGADIAN CITY, ZAMBOANGA DEL SUR

Road Concreting

km

GAA 3 30,000.00 30,000.00 30,000.00 90,000.00

Chapter 19-1-DPWH IX-ZDS 1DEOPage 31 of 58

Page 357: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Basis for Implementation RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location

(Province/ Municipality/

City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

351. ROAD UPGRADING JCT. NATIONAL HIGHWAY LEADING TO LOURDES HOT AND COLD SPRING,PAGADIAN CITY, ZAMBOANGA DEL SUR

Road Concreting

km

GAA 3 40,000.00 40,000.00 40,000.00 120,000.00

352. ROAD UPGRADING JCT. NATIONAL HIGHWAY LEADING TO KENDIS CAVE,PAGADIAN CITY, ZAMBOANGA DEL SUR

Road Concreting

km

GAA 3 40,000.00 40,000.00 40,000.00 120,000.00

353. CONSTRUCTION OF CONCRETE ROAD NRJ EASTERN BOBONGAN-SOMINOT-MIDSALIP-DUMINGAG ROAD LEADING TO SAWA MOUNTAIN RESORT, SOMINOT, ZAMBOANGA DEL SUR

Road Concreting

km

GAA 3 40,000.00 40,000.00 40,000.00 120,000.00

354. CONSTRUCTION OF CONCRETE ROAD NRJ EASTERN BOBONGAN-SOMINOT-MIDSALIP-DUMINGAG ROAD LEADING TO DATAGAN MOUNTAIN RESORT,SOMINOT, ZAMBOANGA DEL SUR

Road Concreting

km

GAA 3 40,000.00 40,000.00 40,000.00 120,000.00

355. CONSTRUCTION OF CONCRETE ROAD NRJ EASTERN BOBONGAN-SOMINOT-MIDSALIP-DUMINGAG ROAD LEADING TO BONGGA MOUNTAIN RESORT, RAMON MAGSAYSAY, ZAMBOANGA DEL SUR

Road Concreting

km

GAA 3 20,000.00 20,000.00 20,000.00 60,000.00

356. ROAD UPGRADING FROM NRJ LANAO-PAGADIAN-ZAMBOANGA CITY ROAD LEADING TO BAGONG MASLOG WATERFALLS, AURORA, ZAMBOANGA DEL SUR

Road Concreting

km

GAA 3 40,000.00 40,000.00 40,000.00 120,000.00

Chapter 19-1-DPWH IX-ZDS 1DEOPage 32 of 58

Page 358: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Basis for Implementation RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location

(Province/ Municipality/

City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

357. ROAD CONCRETING FROM NRJ LANAO-PAGADIAN-ZAMBOANGA CITY ROAD LEADING TO AURORA MOUNTAIN RESORT, ANONANG, AURORA,ZAMBOANGA DEL SUR

Road Concreting

km

GAA 3 30,000.00 30,000.00 30,000.00 90,000.00

358. ROAD UPGRADING FROM NRJ AURORA-MONTE ALEGRE-JCT.LABANGAN ROAD LEADING TO COMMONWEALTH WATER RAFTING ADVENTURE PARK, AAURORA, ZAMBOANGA DEL SUR

Road Concreting

km

GAA 3 30,000.00 30,000.00 30,000.00 90,000.00

359. ROAD CONCRETING FROM NRJ AURORA-OZAMIS CITY ROAD LEADING TO KAUSWAGAN WATERFALLS, AURORA,ZAMBOANGA DEL SUR

Road Concreting

km

GAA 3 30,000.00 30,000.00 30,000.00 90,000.00

360. ROAD UPGRADING FROM NRJ LANAO-PAGADIAN-ZAMBOANGA CITY ROAD LEADING TO NATURE LAGOON,BRGY. ACAD TO BRGY. NAPO,AURORA, ZAMBOANGA DEL SUR

Road Concreting

km

GAA 3 25,000.00 25,000.00 25,000.00 75,000.00

361. ROAD UPGRADING FROM NRJ LANAO-PAGADIAN-ZAMBOANGA CITY ROAD LEADING TO LOWER SANG-AN BEACH RESORT, LABANGAN, ZAMBOANGA DEL SUR

Road Concreting

km

GAA 3 25,000.00 25,000.00 25,000.00 75,000.00

362. ROAD CONCRETING FROM NRJ LANAO-PAGADIAN-ZAMBOANGA CITY ROAD LEADING TO BULANIT BEACH RESORT, LABANGAN, ZAMBOANGA DEL SUR

Road Concreting

km

GAA 3 30,000.00 30,000.00 30,000.00 90,000.00

Chapter 19-1-DPWH IX-ZDS 1DEOPage 33 of 58

Page 359: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Basis for Implementation RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location

(Province/ Municipality/

City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

363. ROAD UPGRADING FROM NRJ LANAO-PAGADIAN-ZAMBOANGA CITY ROAD LEADING TO BANGLADESH BEACH RESORT, LOWER CAMPO ISLAM, LABANGAN, ZAMBOANGA DEL SUR

Road Concreting

km

GAA 3 30,000.00 30,000.00 30,000.00 90,000.00

364. ROAD UPGRADING FROM NRJ AURORA-MONTE ALEGRE-JCT.LABANGAN ROAD LEADING TO APOLONIO WATERFALLS,BRGY. WATERFALLS, AURORA, ZAMBOANGA DEL SUR

Road Concreting

km

GAA 3 40,000.00 40,000.00 40,000.00 120,000.00

365. ROAD CONCRETING FROM NATIONAL HIGHWAY LEADING TO NANGKA BEACH RESORT, BRGY. LOWER CAMPO ISLAM, LABANGAN, ZAMBOANGA DEL SUR

Road Concreting

km

GAA 3 40,000.00 40,000.00 40,000.00 120,000.00

366. ROAD CONCRETING FROM NATIONAL HIGHWAY LEADING TO DIMASANGCA BEACH RESORT, BRGY. DIMASANGCA, LABANGAN, ZAMBOANGA DEL SUR

Road Concreting

km

GAA 3 40,000.00 40,000.00 40,000.00 120,000.00

367. ROAD UPGRADING JCT. NATIONAL HIGHWAY LEADING TO BOKONG MOUNTAIN RESORT, LABANGAN, ZAMBOANGA DEL SUR

Road Concreting

km

GAA 3 30,000.00 30,000.00 30,000.00 90,000.00

368. ROAD UPGRADING (GRAVEL TO PAVED)JCT. NATIONAL HIGHWAY LEADING TO BINAYAN WATERFALLS, LABANGAN, ZAMBOANGA DEL SUR

Road Concreting

km

GAA 3 30,000.00 30,000.00 30,000.00 90,000.00

Chapter 19-1-DPWH IX-ZDS 1DEOPage 34 of 58

Page 360: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Basis for Implementation RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location

(Province/ Municipality/

City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

369. ROAD CONCRETING FROM BOGO CAPALARAN GOING TO LOWER DIMALINAO TO BOUNDARY OF BRGY. PELOCOBAN, MOLAVE, ZAMBOANGA DEL SUR

Road Concreting

km

GAA 3 30,000.00 30,000.00 30,000.00 90,000.00

370. ROAD CONCRETING FROM JCT. PARASAN-BRGY. DONTULAN LEADING TO PARASAN WATERFALLS, BRGY. PARASAN, MOLAVE, ZAMBOANGA DEL SUR

Road Concreting

km

GAA 3 15,400.00 15,400.00 15,400.00 46,200.00

371. ROAD UPGRADING FROM NRJ PAGADIAN CITY -ZAMBOANGA CITY ROAD LEADING TO ALEGRIA FALLS, PAGADIAN CITY , ZAMBOANGA DEL SUR

Road Concreting

km

GAA 3 6,000.00 6,000.00 6,000.00 18,000.00

372. ROAD UPGRADING FROM NRJ PAGADIAN CITY -ZAMBOANGA CITY ROAD LEADING TO TAWAGAN SPRING RESORT, PAGADIAN CITY , ZAMBOANGA DEL SUR

Road Concreting

km

GAA 3 30,000.00 30,000.00 30,000.00 90,000.00

373. ROAD UPGRADING FROM NRJ PAGADIAN CITY -ZAMBOANGA CITY ROAD LEADING TO PALPALAN PEAK, PAGADIAN CITY , ZAMBOANGA DEL SUR

Road Concreting

km

GAA 3 38,000.00 38,000.00 38,000.00 114,000.00

374. ROAD UPGRADING FROM NRJ PAGADIAN CITY -ZAMBOANGA CITY ROAD LEADING TO DITURAY FALLS, PAGADIAN CITY, ZAMBOANGA DEL SUR

Road Concreting

km

GAA 3 25,000.00 25,000.00 25,000.00 75,000.00

375. ROAD UPGRADING FROM NRJ PAGADIAN CITY -ZAMBOANGA CITY ROAD LEADING TO SUSONG DALAGA, PAGADIAN CITY, ZAMBOANGA DEL SUR

Road Concreting

km

GAA 3 30,000.00 30,000.00 30,000.00 90,000.00

Chapter 19-1-DPWH IX-ZDS 1DEOPage 35 of 58

Page 361: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Basis for Implementation RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location

(Province/ Municipality/

City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

376. ROAD UPGRADING FROM NRJ PAGADIAN CITY -ZAMBOANGA CITY ROAD LEADING TO MANGA SERENITY PARK AND FALLS, PAGADIAN CITY, ZAMBOANGA DEL SUR

Road Concreting

km

GAA 3 25,000.00 25,000.00 25,000.00 75,000.00

377. ROAD UPGRADING FROM NRJ SWITCH-JCT. MONTE ALEGRE ROAD LEADING TO CANIANGAN WATERFALLS, RAMON MAGSAYSAY, ZAMBOANGA DEL SUR

Road Concreting

km

GAA 3 40,000.00 40,000.00 40,000.00 120,000.00

378. ROAD UPGRADING JCT. NATIONAL HIGHWAY LEADING TO PELOCUBAN RESORT, TAMBULIG, ZAMBOANGA DEL SUR

Road Concreting

km

GAA 3 30,000.00 30,000.00 30,000.00 90,000.00

379. ROAD UPGRADING JCT. NATIONAL HIGHWAY LEADING TO SOMINOT CATHEDRAL CAVE AND WHITE ROCKS SPRING, UPPER SICPAO, SOMINOT, ZAMBOANGA DEL SUR

Road Concreting

km

GAA 3 30,000.00 30,000.00 30,000.00 90,000.00

2. Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Seaports - 380. Access Road leading to Pagadian

Port, incl. ROW, Zamboanga del Sur

Road Concreting km

POW, Plans and Contract GAA 3 - 4,650.00 4,650.00

3. Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones - 381. NRJ to Brgy. Bobongan to Brgy.

Poblacion in support of Engineered Bamboo, Ramon Magsaysay, Zamboanga del Sur

Road Concreting

km

POW, Plans and Contract GAA 3 20,000.00 30,000.00 30,000.00 30,000.00 110,000.00

382. NRJ BALINTAWAK-COMMONWEALTH NRJ LEADING TO AURORA IN SUPPORT OF VIRGIN COCONUT OIL INDUSTRY, ZAMBOANGA DEL SUR

Road Concreting

km

POW, Plans and Contract GAA 3 30,000.00 30,000.00 30,000.00 90,000.00

Chapter 19-1-DPWH IX-ZDS 1DEOPage 36 of 58

Page 362: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Basis for Implementation RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location

(Province/ Municipality/

City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

383. BEMPOSA-ALEGRIA-MAGUIKAY-LIBERTAD NRJ LEADING TO AURORA IN SUPPORT OF VIRGIN COCONUT OIL INDUSTRY, ZAMBOANGA DEL SUR

Road Concreting

km

POW, Plans and Contract GAA 3 40,000.00 40,000.00 40,000.00 120,000.00

384. DULIAN-MACASING-VALENCIA-POBLACION DUMINGAG IN SUPPORT OF THE ORGANIC FOOD AND ABACA INDUSTRY,ZAMBOANGA DEL SUR

Road Concreting

km

POW, Plans and Contract GAA 3 40,000.00 40,000.00 40,000.00 120,000.00

385. LABANGAN-DATU TUTUKAN-DANLUGAN-MACASING-TAGUN-TAMURAYAN-VALENCIA JUNCTION NATIONAL HIGHWAY IN SUPPORT OF ORGANIC FOOD,ABACA AND WEARABLES & HOMESTYLE INDUSTRY IN DUMINGAG, ZAMBOANGA DEL SUR

Road Concreting

km

POW, Plans and Contract GAA 3 40,000.00 40,000.00 40,000.00 120,000.00

386. MARANGAN-UPPER TIMONAN-SAN PABLO-JUNCTION NATIONAL HIGHWAY IN SUPPORT OF ORGANIC FOOD, ABACA AND WEARABLES & HOMESTYLE INDUSTRY IN DUMINGAG, ZAMBOANGA DEL SUR

Road Concreting

km

POW, Plans and Contract GAA 3 40,000.00 40,000.00 40,000.00 120,000.00

387. SINONOK-DAPIWAK-DITULAN-JUNCTION NATIONAL HIGHWAY IN SUPPORT OF ORGANIC FOOD, ABACA AND WEARABLES & HOMESTYLE INDUSTRY IN DUMINGAG, ZAMBOANGA DEL SUR

Road Concreting

km

POW, Plans and Contract GAA 3 40,000.00 40,000.00 40,000.00 120,000.00

Chapter 19-1-DPWH IX-ZDS 1DEOPage 37 of 58

Page 363: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Basis for Implementation RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location

(Province/ Municipality/

City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

388. ALICIA(MOLAVE)-SIMATA(MOLAVE)-JUNCTION OF CONCRETE ROAD OF BRGY. MANSANAS IN SUPPORT OF THE ABACA INDUSTRY,JOSEFINA, ZAMBOANGA DEL SUR

Road Concreting

km

POW, Plans and Contract GAA 3 40,000.00 40,000.00 40,000.00 120,000.00

389. JUNCTION UPPER DIMOROK-UPPER BAG-ONG TUDELA-JCT.NATIONAL HIGHWAY IN SUPPORT OF THE ABACA INDUSTRY, JOSEFINA, ZAMBOANGA DEL SUR

Road Concreting

km

POW, Plans and Contract GAA 3 35,000.00 35,000.00 35,000.00 105,000.00

390. SAN ISIDRO-BALIMBINGAN-JUNCTION NATIONAL HIGHWAY LEADING TO LABANGAN IN SUPPORT OF THE ORGANIC FERTILIZER INDUSTRY, ZAMBOANGA DEL SUR

Road Concreting

km

POW, Plans and Contract GAA 3 40,000.00 40,000.00 40,000.00 120,000.00

391. DIMASANGCA-JCT.NATIONAL HIGHWAY LEADING TO LABANGAN IN SUPPORT OF THE ORGANIC FERTILIZER INDUSTRY, ZAMBOANGA DEL SUR

Road Concreting

km

POW, Plans and Contract GAA 3 30,000.00 30,000.00 30,000.00 90,000.00

392. BALANAN-TUBURAN-POBLACION MAHAYAG IN SUPPORT OF TABLEA PROCESSING, ZAMBOANGA DEL SUR

Road Concreting

km

POW, Plans and Contract GAA 3 40,000.00 40,000.00 40,000.00 120,000.00

393. PARAISO-GURIPAN-UPPER SALUG DAKU NRJ TO MAHAYAG IN SUPPORT OF THE ORGANIC FERTILIZER INDUSTRY, ZAMBOANGA DEL SUR

Road Concreting

km

POW, Plans and Contract GAA 3 40,000.00 40,000.00 40,000.00 120,000.00

394. BAGONG ARGAO-GONUSAN-PARASAN IN SUPPORT OF VILLAGE TECHNOCRAFT, ZAMBOANGA DEL SUR

Road Concreting

km

POW, Plans and Contract GAA 3 30,000.00 30,000.00 30,000.00 90,000.00

Chapter 19-1-DPWH IX-ZDS 1DEOPage 38 of 58

Page 364: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Basis for Implementation RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location

(Province/ Municipality/

City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

395. BOUNDARY TAMBULIG-TABUGON(TAMBULIG)-JUNCTION PROVINCIAL ROAD DALAON(MOLAVE)-JUCTION BOGO KAPALARAN(MOLAVE) TO LOWER DUMALINAO IN SUPPORT OF THE ABACA INDUSTRY, MOLAVE, ZAMBOANGA DEL SUR

Road Concreting

km

POW, Plans and Contract GAA 3 40,000.00 40,000.00 40,000.00 120,000.00

396. JUNCTION BOGO CALABAT(TAMBULIG) -DONTULAN(MOLAVE)-PARASAN JUCTION PROVINCIAL ROAD (MOLAVE) LEADING TO PARASAN LAMKANAY HANDICRAFT AND VILLAGE TECHNOCRAFT,ZAMBOANGA DEL SUR

Road Concreting

km

POW, Plans and Contract GAA 3 35,000.00 35,000.00 35,000.00 105,000.00

397. BOGO KAPALARAN(MOLAVE)-LOWER DUMALINAO(MOLAVE)-KAUSWAGAN(TAMBULIG) IN SUPPORT OF THE ABACA INDUSTRY , MOLAVE, ZAMBOANGA DEL SUR

Road Concreting

km

POW, Plans and Contract GAA 3 40,000.00 40,000.00 40,000.00 120,000.00

398. SAWA-LUMANGOY-STO.NINO-LIBERTAD-POBLACION IN SUPPORT OF COCONUT INDUSTRY, SOMINOT, ZAMBOANGA DEL SUR

Road Concreting

km

POW, Plans and Contract GAA 3 30,000.00 30,000.00 30,000.00 90,000.00

399. BOUNDARY-MARANGAN(DUMINGAG)-TUNGAWAN(SOMINOT) LEADING TO POBLACION IN SUPPORT OF COCONUT INDUSTRY,SOMINOT, ZAMBOANGA DEL SUR

Road Concreting

km

POW, Plans and Contract GAA 3 30,000.00 30,000.00 30,000.00 90,000.00

Chapter 19-1-DPWH IX-ZDS 1DEOPage 39 of 58

Page 365: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Basis for Implementation RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location

(Province/ Municipality/

City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

400. PICTORAN-BAG-ONG BAROY-JUNCTION STO.NINO LEADING TO POBLACION IN SUPPORT OF COCONUT INDUSTRY,SOMINOT, ZAMBOANGA DEL SUR

Road Concreting

km

POW, Plans and Contract GAA 3 40,000.00 40,000.00 40,000.00 120,000.00

401. JUNCTION BAGONG OROQUITA-LANTAWAN-RIZAL-JUNCTION NATIONAL HIGHWAY LEADING TO POBLACION IN SUPPORT OF COCONUT INDUSTRY, SOMINOT, ZAMBOANGA DEL SUR

Road Concreting

km

POW, Plans and Contract GAA 3 40,000.00 40,000.00 40,000.00 120,000.00

402. GUINABOT-POBLACION NRJ LEADING TO MIDSALIP IN SUPPORT OF THE WEARABLES AND HOMESTYLE INDUSTRY, ZAMBOANGA DEL SUR

Road Concreting

km

POW, Plans and Contract GAA 3 30,000.00 30,000.00 30,000.00 90,000.00

403. BULORON-BIBILOP NRJ LEADING TO MIDSALIP IN SUPPORT OF THE WEARABLES AND HOMESTYLE INDUSTRY, ZAMBOANGA DEL SUR

Road Concreting

km

POW, Plans and Contract GAA 3 40,000.00 40,000.00 40,000.00 120,000.00

404. CABALURAN-JUNCTION COMAROM LEADING TO MIDSALIP IN SUPPORT OF THE WEARABLES AND HOMESTYLE INDUSTRY, ZAMBOANGA DEL SUR

Road Concreting

km

POW, Plans and Contract GAA 3 30,000.00 30,000.00 30,000.00 90,000.00

405. IMPROVEMENT/CONCRETING OF BEMPOSA-ALEGRIA-MAGUIKAY-LIBERTAD NRJ ROAD CONNECTING BEMPOSA AND LIBERTAD NRJ ROAD IN SUPPORT OF THE COCONUT OIL INDUSTRY, AURORA, ZAMBOANGA DEL SUR

Road Concreting

km

POW, Plans and Contract GAA 3 30,000.00 30,000.00 30,000.00 90,000.00

Chapter 19-1-DPWH IX-ZDS 1DEOPage 40 of 58

Page 366: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Basis for Implementation RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location

(Province/ Municipality/

City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

406. IMPROVEMENT/CONCRETING OF NRJ BALINTAWAK-COMMONWEALTH CONNECTING BALINTAWAK AND COMMONWEALTH ROAD IN SUPPORT OF THE COCONUT OIL INDUSTRY, AURORA, ZAMBOANGA DEL SUR

Road Concreting

km

POW, Plans and Contract GAA 3 40,000.00 40,000.00 40,000.00 120,000.00

407. IMPROVEMENT/CONCRETING OF DULIAN-MACASING-VALENCIA-POBLACION DUMINGAG ROAD CONNECTING DULIAN AND POBLACION ROAD IN SUPPORT OF THE PROCESSED FOOD AND ABACA INDUSTRY,DUMINGAG, ZAMBOANGA DEL SUR

Road Concreting

km

POW, Plans and Contract GAA 3 40,000.00 40,000.00 40,000.00 120,000.00

408. IMPROVEMENT/CONCRETING OF LABANGON-DATU TUTUKAN-DANLUGAN-MACASING-TAGUN-TAMORAYAN-VALENCIA ROAD CONNECTING LABANGON AND JUNCTION NATIONAL HIGHWAY ROAD IN SUPPORT OF PROCESSED FOOD AND ABACA INDUSTRY,DUMINGAG, ZAMBOANGA DEL SUR

Road Concreting

km

POW, Plans and Contract GAA 3 40,000.00 40,000.00 40,000.00 120,000.00

409. IMPROVEMENT/CONCRETING OF MARANGAN-UPPER TIMONAN-SAN PABLO ROAD CONNECTING MARANGAN AND JUCTION NATIONAL HIGHWAY IN SUPPORT OF THE PROCESSED FOOD, ABACA AND WEARABLES & HOMESTYLE INDUSTRY,DUMINGAG, ZAMBOANGA DEL SUR

Road Concreting

km

POW, Plans and Contract GAA 3 40,000.00 40,000.00 40,000.00 120,000.00

Chapter 19-1-DPWH IX-ZDS 1DEOPage 41 of 58

Page 367: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Basis for Implementation RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location

(Province/ Municipality/

City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

410. IMPROVEMENT/CONCRETING OF SINONOK-DAPIWAK-DITULAN ROAD CONNECTING SINONOK AND JUNCTION NATIONAL HIGHWAY IN SUPPORT OF THE ORGANIC FOOD,ABACA AND WEARABLES & HOMESTYLE INDUSTRY IN DUMINGAG, ZAMBOANGA DEL SUR

Road Concreting

km

POW, Plans and Contract GAA 3 40,000.00 40,000.00 40,000.00 120,000.00

411. IMPROVEMENT/CONCRETING OF BAGONG ARGAO-GONUSAN ROAD CONNECTING BAGONG ARGAO AND PARASAN ROAD IN SUPPORT OF WEARABLES & HOMESTYLE INDUSTRY, ZAMBOANGA DEL SUR

Road Concreting

km

POW, Plans and Contract GAA 3 40,000.00 40,000.00 40,000.00 120,000.00

412. IMPROVEMENT/CONCRETING OF BOGO KAPALARAN(MOLAVE)-LOWER DUMALINAO (MOLAVE)-KAUSWAGAN(TAMBULIG) ROAD IN SUPPORT OF ABACA INDUSTRY, MOLAVE, ZAMBOANGA DEL SUR

Road Concreting

km

POW, Plans and Contract GAA 3 40,000.00 40,000.00 40,000.00 120,000.00

413. IMPROVEMENT/CONCRETING OF JUNCTION BOGO CALABAT(TAMBULIG)-DANTOLAN (MOLAVE)-PARASAN JUNCTION PROVINCIAL ROAD(MOLAVE) IN SUPPORT OF WEARABLES & HOMESTYLE INDUSTRY, MOLAVE, ZAMBOANGA DEL SUR

Road Concreting

km

POW, Plans and Contract GAA 3 40,000.00 40,000.00 40,000.00 120,000.00

Chapter 19-1-DPWH IX-ZDS 1DEOPage 42 of 58

Page 368: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Basis for Implementation RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location

(Province/ Municipality/

City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

414. IMPROVEMENT/CONCRETING OF PICTORAN-BAG-ONG BARY-JUNCTION STO. NINO ROAD CONNECTING PICTORAN AND BRGY. POBLACION, SOMINOT ROAD IN SUPPORT OF COCONUT INDUSTRY IN SOMINOT, ZAMBOANGA DEL SUR

Road Concreting

km

POW, Plans and Contract GAA 3 40,000.00 40,000.00 40,000.00 120,000.00

415. NRJ to Brgy. San Juan, Aurora-Brgy. Man-ilan, in support of Tukuran Coco Activated Carbon, Zamboanga del Sur

Road Concreting

km

POW, Plans and Contract GAA 3 20,000.00 20,000.00 40,000.00 40,000.00 40,000.00 160,000.00

416. NRJ to Brgy. Gapasan in support of Engineered Bamboo, Ramon Magsaysay, Zamboanga del Sur

Road Concreting km

POW, Plans and Contract GAA 3 20,000.00 30,000.00 30,000.00 30,000.00 110,000.00

417. NRJ to Brgy. Parasan in support of Village Technocraft, Molave, Zamboanga del Sur

Road Concreting

km

POW, Plans and Contract GAA 3 20,000.00 20,000.00 40,000.00 40,000.00 40,000.00 160,000.00

418. NRJ to Brgy. Upper Timonan-Marangan-Kahayagan-Palili-Timbaboy in support of Abaca Handicraft Processing, Zamboanga del Sur

Road Concreting

km

POW, Plans and Contract GAA 3 20,000.00 20,000.00 40,000.00 40,000.00 40,000.00 160,000.00

419. NRJ to Brgy. Kahayagan West-Brgy. Pasingkalan in support to Virgin Coconut Oil Processing, Aurora and Ramon Magsaysay, Zamboanga del Sur

Road Concreting

km

POW, Plans and Contract GAA 3 20,000.00 20,000.00 40,000.00 40,000.00 40,000.00 160,000.00

No. of Proj. = - 332,650.00 180,000.00 2,874,400.00 3,003,700.00 2,874,400.00 9,135,850.00 A. Locally-Funded Projects

(i) National Bridge Construction/ Replacement Program (Design and Build Bridges)a. National Bridges

420. Militar Br. 2 along Tucuran Jct-Karomatan Jct Rd

Construction of two lane Bridge

Tukuran, ZDS sq.m.439.20

Plans and POW GAA 293,150.00

93,150.00

421. Demorok Br. (FVR) (B01546MN) along Jct Blancia-Molave-Josefina Rd

Replacement of bridge

including improvement of approaches

Josefina, ZDS sq.m.

695.40

Plans and POW GAA 2

93,150.00 93,150.00 93,150.00

279,450.00

CSSP- Subtotal

Chapter 19-1-DPWH IX-ZDS 1DEOPage 43 of 58

Page 369: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Basis for Implementation RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location

(Province/ Municipality/

City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

422. Lower Landing Bridge along Dumingag Road, Zamboanga del Sur

Replacement of bridge Dumingag, ZDS sq.m.

183.00 Plans and POW GAA 2

33,150.00 33,150.00

423. Calumangi Br. 1 along Eastern Bobongan-Sominot-Midsalip-Dumingag Rd.

Construction of Bridge Dumingag, ZDS sq.m.

183.00 Plans and POW GAA 2

30,000.00 30,000.00

424. Calumangi Br. 2 along Lanao-Pagadian-Zamboanga City Rd.

Construction of Bridge Dumingag, ZDS sq.m.

168.36 Plans and POW GAA 2

30,000.00 30,000.00

(ii) Buildings And Other Structuresa. Multipurpose / Facilities

425. Construction (Completion) of DPWH Building, Zamboanga del Sur 1st DEO Compound, Pagadian City

Completion of building

Pagadian City No. of Building 1.0 Plans and POW GAA 2 2,000.00 2,000.00

426. Construction of DPWH Staff House Building, Zamboanga del Sur 1st DEO, Dao, Pagadian City

Constrution of building Pagadian City No. of Building 1.0 Plans and POW GAA 2 6,000.00 6,000.00

427. Construction/ Improvement of Office Building DPWH 1st DEO, Pagadian City

Construction of Multi-Purpose

building Pagadian City No. of Building 1.0 Plans and POW GAA 2 48,000.00 48,000.00

B. GAD - 428. Construction of 5-seaters Toilet

with Waiting Shed along National Road (K1641+000), Barangay Monte Alegre, Aurora, Zamboanga del Sur

Construction of Toilet with

Waiting Shed

Aurora, Zamboanga del Sur

Plans and POW GAA 2 1,000.00 - - - 1,000.00

429. Construction of 5-seaters Toilet with Waiting Shed along National Road (K1646+700), Barangay Switch, Ramon Magsaysay, Zamboanga del Sur

Construction of Toilet with

Waiting Shed

Ramon Magsaysay, Zamboanga del Sur

Plans and POW GAA 2 1,000.00 - - - 1,000.00

430. Construction of 5-seaters Toilet with Waiting Shed along National Road (K1657+600), Jct. Labangan, Labangan, Zamboanga del Sur

Construction of Toilet with

Waiting Shed

Labangan, Zamboanga del Sur

Plans and POW GAA 2 1,000.00 - - - 1,000.00

431. Construction of 5-seaters Toilet with Waiting Shed along National Road (K1659+300), Poblacion, Mahayag, Zamboanga del Sur

Construction of Toilet with

Waiting Shed

Mahayag, Zamboanga del Sur

Plans and POW GAA 2 1,000.00 - - - 1,000.00

Chapter 19-1-DPWH IX-ZDS 1DEOPage 44 of 58

Page 370: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Basis for Implementation RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location

(Province/ Municipality/

City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

432. Construction of 5-seaters Toilet with Waiting Shed along National Road (K1670+600), Dumingag, Zamboanga del Sur

Construction of Toilet with

Waiting Shed

Dumingag, Zamboanga del Sur

Plans and POW GAA 2 1,000.00 - - - 1,000.00

433. Provision/Construction of Restroom along National Roada. Tukuran-Karomatan Road K1648+(-262) to 1656+227b. Aurora-Ozamis City Road K1630+(-771) to K1659+921

Construction of Restroom Pagadian City Plans and POW GAA 2 772.21 - - - 772.21

434. Provision of Reflectorized Thermoplastic Pavement Markings, installation of guardrails, installation of reflective studs and road signages Jct. Tukuran-Karomatan Road K1648+(-262) to K1656+227

Provision of Reflectorized Thermoplastic

Pavement Marking

Pagadian City Plans and POW GAA 2 5,578.00 - - - 5,578.00

435. Provision of Reflectorized Thermoplastic Pavement Markings, installation of guardrails, installation of reflective studs, road signages and installation of CCTV Pagadian City-Zamboanga City Road K1662+(-223) to K1674+971

Provision of Reflectorized Thermoplastic

Pavement Marking

Pagadian City Plans and POW GAA 2 9,628.00 - - - 9,628.00

436. Provision of Reflectorized Thermoplastic Pavement Markings, installation of guardrails, installation of reflective studs and road signages Lanao-Pagadian-Zamboanga City Road K1623+(-303) to K1661+780

Provision of Reflectorized Thermoplastic

Pavement Marking

Pagadian City Plans and POW GAA 2 26,922.00 - - - 26,922.00

437. Provision of Reflectorized Thermoplastic Pavement Markings, installation of guardrails, installation of reflective studs and road signages Jct. Aurora-Ozamis City Road K1630+(-771) to K1659+921

Provision of Reflectorized Thermoplastic

Pavement Marking

Pagadian City Plans and POW GAA 2 20,875.00 - - - 20,875.00

Chapter 19-1-DPWH IX-ZDS 1DEOPage 45 of 58

Page 371: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Basis for Implementation RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location

(Province/ Municipality/

City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

C. Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects - Roads and Bridges - a. Local Roads -

438. Concreting of Access Road from Junction, Barangay Upper Sicpao to Cathedral Cave/White Rock Spring Resort, Sitio Puting Bato, Barangay Upper Sicpao, Municipality of Sominot, Zamboanga del Sur

Construction of concrete Road

Sominot, ZDS km. 0.40 Plans and POW GAA 2

10,000.00

10,000.00

439. Concreting of Bonifacio Extension from Parish Convent to Poor Claire Monastery of our Lady of the Poor, Municipality of Josefina, Zamboanga del Sur

Construction of concrete Road

Josefina, ZDS km. 0.40 Plans and POW GAA 2

10,000.00

10,000.00

440. Road Upgrading (Gravel to Concrete) from Junction National Highway leading to Alegria Falls, Pagadian City, Zamboanga del Sur

Construction of concrete Road

Pagadian City km. 0.16 Plans and POW GAA 2

4,000.00

4,000.00

441. Road Upgrading (Gravel to Concrete) from Junction National Highway leading to Calolot Mountain Resort, Tambulig, Zamboanga del Sur

Construction of concrete Road

Tambulig, ZDS km. 0.16 Plans and POW GAA 2

4,000.00

4,000.00

442. Road Upgrading (Gravel to Concrete) from Junction National Highway leading to Mabait Beach Resort, Zamboanga del Sur

Construction of concrete Road

Pagadian City km. 0.68 Plans and POW GAA 2

17,000.00

17,000.00

443. Road Upgrading (Gravel to Concrete) from Junction National Highway leading to Tukuran Beach Resort, Zamboanga del Sur

Construction of concrete Road

Tukuran, ZDS km. 0.74 Plans and POW GAA 2

18,500.00

18,500.00

444. Road Upgrading (gravel to paved) Sominot-Dumingag Road (New Carmen-Marangan)

Construction of Concrete Road Sominot, ZDS Plans and POW GAA 2 175,000.00 75,000.00 75,000.00 25,000.00 350,000.00

445. Road Upgrading (gravel to paved) Sominot-Mahayag Road (Lantawan-Lower Sicpao)

Construction of Concrete Road Mahayag, ZDS Plans and POW GAA 2 167,500.00 75,000.00 32,500.00 - 275,000.00

Chapter 19-1-DPWH IX-ZDS 1DEOPage 46 of 58

Page 372: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Basis for Implementation RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location

(Province/ Municipality/

City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

446. Road Upgrading (gravel to paved) Bagalupa, Labangan-Gubang, Pagadian City Road

Construction of Concrete Road Pagadian City Plans and POW GAA 2 37,000.00 - - - 37,000.00

447. Construction of Tukuran-Aurora Road (Brgy. Man-ilan to San Juan)

Construction of Concrete Road San Pablo, ZDS Plans and POW GAA 2 75,000.00 100,000.00 100,000.00 - 275,000.00

448. Construction of Labangan-Sominot Road (Sitio Kalatong, Binayan to Brgy. Pictoran)

Construction of Concrete Road Sominot, ZDS Plans and POW GAA 2 175,000.00 50,000.00 50,000.00 50,000.00 325,000.00

449. Road Upgrading of Ramon Magsaysay-Aurora Road (Brgy. Caniangan to Brgy. Campo IV)

Construction of Concrete Road Ramon

Magsaysay, ZDS Plans and POW GAA 2 60,000.00 15,000.00 15,000.00 - 90,000.00

450. Road Upgrading of Aurora-Tambulig Road (Brgy. Pasingkalan to Brgy. Tungawan)

Construction of Concrete Road Ramon

Magsaysay, ZDS Plans and POW GAA 2 75,000.00 37,000.00 37,000.00 - 149,000.00

451. Construction of Midsalip-Dumingag Road (Brgy. Palili)

Construction of Concrete Road Midsalip, ZDS Plans and POW GAA 2 160,000.00 80,000.00 80,000.00 80,000.00 400,000.00

452. Construction of Dumingag, Zamboanga del Sur to Katipunan, Zamboanga del Norte Boundary Road

Construction of Concrete Road

Dumingag, ZDS Plans and POW GAA 2 240,000.00 160,000.00 160,000.00 160,000.00 720,000.00

453. Road Upgrading of Sominot-Ramon Magsaysay-Tukuran Road (Eastern Poblacion-Dipalusan-Laperian-Navalan)

Construction of Concrete Road Sominot, Ramon

Magsaysay, ZDS Plans and POW GAA 2 75,000.00 125,000.00 125,000.00 - 325,000.00

454. Upgrading/Concreting of Canipay Sur-Sigapod-Matalang-Pisumpongan-Piwan RoadNL = 20.9 kms.

Construction of Concrete Road

Plans and POW GAA 2 78,500.00 78,500.00 78,500.00 78,500.00 314,000.00

455. Upgrading/Concreting of Campo I-Gubaan-Tagolalo-Lintugop RoadNL = 9.8 kms.

Construction of Concrete Road

Plans and POW GAA 2 36,750.00 36,750.00 36,750.00 36,750.00 147,000.00

456. Upgrading/Concreting of Lourdes (Pagadian City)-Diana Country Side(Tigbao)-Lacupayan Road

Construction of Concrete Road Plans and POW GAA 2 - - - - -

457. Upgrading/Concreting of Bobongan-Ramon Magsaysay Road , ZDS

Construction of Concrete Road Plans and POW GAA 2 45,000.00 45,000.00 45,000.00 - 135,000.00

458. Upgrading/Concreting of Dumingag-Bagong Valencia Road

Construction of Concrete Road Plans and POW GAA 2 30,375.00 30,375.00 30,375.00 30,375.00 121,500.00

Chapter 19-1-DPWH IX-ZDS 1DEOPage 47 of 58

Page 373: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Basis for Implementation RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location

(Province/ Municipality/

City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

459. Upgrading/Concreting of Pulacan-Bokong-Langapod-Pagadian City Road

Construction of Concrete Road Plans and POW GAA 2 81,750.00 81,750.00 81,750.00 81,750.00 327,000.00

460. Improvement/Concreting Poblacion-St. Claire Monastery, Josefina, ZDS, 2.00 kms

Construction of Concrete Road Plans and POW GAA 2 20,827.00 - - - 20,827.00

461. Road Upgrading (Gravel to Concrete) from Junction National Highway leading to Calolot Mountain Resort, Tambulig, Zamboanga del Sur]

Construction of Concrete Road

Plans and POW GAA 2

10,000.00

10,000.00

462. Road Upgrading (Gravel to Concrete) from Junction National Highway leading to Tukuran Beach Resort, Zamboanga del Sur

Construction of ConcreteRoad

Plans and POW GAA 2

10,000.00

10,000.00

463. Road Upgrading (Gravel to Concrete) from Junction National Highway leading to Mabait Beach Resort, Zamboanga del Sur

Construction of ConcreteRoad

Plans and POW GAA 2

10,000.00

10,000.00

464. Road Upgrading (Gravel to Concrete) from Junction National Highway leading to Alegria Falls, Pagadian City, Zamboanga del Sur

Construction of ConcreteRoad

Plans and POW GAA 2

20,000.00

20,000.00

b. Bridges GAA 2 - 465. Salug Dacu Bridge and

Approaches including Right-of-Way including Right-of-Way Acquisition along Molave Road, Zamboanga del Sur

Molave, Zamboanga del Sur

Plans and POW GAA 2 - - 93,150.00 93,150.00 - 186,300.00

466. Dipolo Daku Bridge and Approaches including Right-of-Way Acquisition along Dumingag Road, Zamboanga del Sur

Dumingag, Zamboanga del Sur

Plans and POW GAA 2 - - 93,150.00 93,150.00 - 186,300.00

467. Lower Landing Bridge and Approaches including Right-of-Way along Dumingag Road, Zamboanga del Sur

Dumingag, Zamboanga del Sur

Plans and POW GAA 2 - - 93,150.00 93,150.00 - 186,300.00

c. Water Management

Chapter 19-1-DPWH IX-ZDS 1DEOPage 48 of 58

Page 374: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Basis for Implementation RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location

(Province/ Municipality/

City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

468. Construction of Water Supply Project, Tukuran, Zamboanga del Sur

Construction of water Supply System

No. of Water Supply 1.0 Plans and POW GAA 2 43,000.00 43,000.00

D. Local Infrastructure Program - Buildings and Other Structures - a. Multipurpose/Facilities -

469. Construction of Multipurpose Building at Brgy Dumalinao, Midsalip, Zamboanga del Sur

Const. of Multi-Purpose Buliding

Midsalip, ZDS No. of Building 1.0 Plans and POW GAA 2 2,000.00 - - - - - 2,000.00

470. Construction of Multipurpose Building at Brgy Upper Salug Daku, Mahayag, Zamboanga del Sur

Const. of Multi-Purpose Buliding Mahayag, ZDS No. of Building 1.0 Plans and POW GAA 2 2,000.00 - - - - - 2,000.00

471. Construction of Multipurpose Building at Brgy Sumalig, Tambulig, Zamboanga del Sur

Const. of Multi-Purpose Buliding

Tambulig, ZDS No. of Building 1.0 Plans and POW GAA 2 2,000.00 - - - - - 2,000.00

472. Construction of Multipurpose Building at Brgy Camanga, Tukuran, Zamboanga del Sur

Const. of Multi-Purpose Buliding

Tukuran, ZDS No. of Building 1.0 Plans and POW GAA 2 2,000.00 - - - - - 2,000.00

473. Construction of Multipurpose Building at Brgy Sambulawan, Tukuran, Zamboanga del Sur

Const. of Multi-Purpose Buliding

Tukuran, ZDS No. of Building 1.0 Plans and POW GAA 2 2,000.00 - - - - - 2,000.00

474. Construction of Multipurpose Building at Brgy Upper Sicpao, Sominot, Zamboanga del Sur

Const. of Multi-Purpose Buliding

Sominot, ZDS No. of Building 1.0 Plans and POW GAA 2 2,000.00 - - - - - 2,000.00

475. Construction of Multipurpose Building at Brgy Poblacion, Dumingag, Zamboanga del Sur

Const. of Multi-Purpose Buliding

Dumingag, ZDS No. of Building 1.0 Plans and POW GAA 2 - - 2,000.00 2,000.00 - 4,000.00

476. Construction of Multipurpose Building at Brgy Sapa Luboc, Aurora, Zamboanga del Sur

Const. of Multi-Purpose Buliding

Aurora, ZDS No. of Building 1.0 Plans and POW GAA 2 - - 2,000.00 2,000.00 - 4,000.00

477. Construction of Multipurpose Building at Brgy Lantungan, Aurora, Zamboanga del Sur

Const. of Multi-Purpose Buliding

Aurora, ZDS No. of Building 1.0 Plans and POW GAA 2 2,000.00 - - - - - 2,000.00

478. Construction of Multipurpose Building at Brgy Simata, Molave, Zamboanga del Sur

Const. of Multi-Purpose Buliding

Molave, Zamboanga del Sur

No. of Building 1.0 Plans and POW GAA 2 2,000.00 - - - - - 2,000.00

479. Construction of Multipurpose Building at Brgy Sudlon, Molave, Zamboanga del Sur

Const. of Multi-Purpose Buliding

Molave, Zamboanga del Sur

No. of Building 1.0 Plans and POW GAA 2 2,000.00 - - - - - 2,000.00

480. Construction of Multipurpose Building at Brgy Canibongan, Dumingag, Zamboanga del Sur

Const. of Multi-Purpose Buliding

Dumingag, ZDS No. of Building 1.0 Plans and POW GAA 2 - - 2,000.00 2,000.00 - 4,000.00

Chapter 19-1-DPWH IX-ZDS 1DEOPage 49 of 58

Page 375: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Basis for Implementation RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location

(Province/ Municipality/

City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

481. Construction of Multipurpose Building at Brgy White Beach, Pagadian City, Zamboanga del Sur

Const. of Multi-Purpose Buliding Pagadian City No. of Building 1.0 Plans and POW GAA 2 2,000.00 - - - - - 2,000.00

482. Construction of Multipurpose Building at Brgy Poblacion, Josefina, Zamboanga del Sur

Const. of Multi-Purpose Buliding

Josefina, ZDS No. of Building 1.0 Plans and POW GAA 2 2,000.00 - - - - - 2,000.00

483. Construction of Multipurpose Building at Brgy Deborok, Pagadian City, Zamboanga del Sur

Const. of Multi-Purpose Buliding Pagadian City No. of Building 1.0 Plans and POW GAA 2 2,000.00 - - - - - 2,000.00

484. Repair/Rehabilitation of Multipurpose Building (Dumingag Municipal Hall), Dumingag, Zamboanga del Sur

Const. of Multi-Purpose Buliding Dumingag, ZDS No. of Building 1.0 Plans and POW GAA 2 4,000.00 4,000.00

485. Construction of Multipurpose Building at Brgy. Bemposa, Aurora, Zamboanga del Sur

Const. of Multi-Purpose Buliding

Aurora, ZDS No. of Building 1.0 Plans and POW GAA 22,000.00

2,000.00

486. Construction of Multipurpose Building at Brgy. Resthouse, Aurora, Zamboanga del Sur

Const. of Multi-Purpose Buliding

Aurora, ZDS No. of Building 1.0 Plans and POW GAA 22,000.00

2,000.00

487. Construction of Multipurpose Building at Brgy. San Juan, Aurora, Zamboanga del Sur

Const. of Multi-Purpose Buliding

Aurora, ZDS No. of Building 1.0 Plans and POW GAA 22,000.00

2,000.00

488. Construction of Multipurpose Building at Brgy. Lantian, Labangan, Zamboanga del Sur

Const. of Multi-Purpose Buliding

Labangan, ZDS No. of Building 1.0 Plans and POW GAA 22,000.00

2,000.00

489. Construction of Multipurpose Building at Brgy. Balucot, Tambulig, Zamboanga del Sur

Const. of Multi-Purpose Buliding

Tambulig, ZDS No. of Building 1.0 Plans and POW GAA 22,000.00

2,000.00

490. Construction of Multipurpose Building at Brgy. Eastern Poblacion, Sominot, Zamboanga del Sur

Const. of Multi-Purpose Buliding Sominot, ZDS No. of Building 1.0 Plans and POW GAA 2

2,000.00

2,000.00

491. Construction of Multipurpose Building at Brgy. Sta. Maria, Pagadian City, Zamboanga del Sur

Const. of Multi-Purpose Buliding

Pagadian City, ZDS No. of Building 1.0 Plans and POW GAA 2

2,000.00

2,000.00

492. Construction of Multipurpose Building at Brgy. Lourdes, Pagadian City, Zamboanga del Sur

Const. of Multi-Purpose Buliding

Pagadian City, ZDS No. of Building 1.0 Plans and POW GAA 2

2,000.00

2,000.00

Chapter 19-1-DPWH IX-ZDS 1DEOPage 50 of 58

Page 376: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Basis for Implementation RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location

(Province/ Municipality/

City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

493. Construction of Multipurpose Building at Brgy. Bogo, Pagadian City, Zamboanga del Sur

Const. of Multi-Purpose Buliding

Pagadian City, ZDS No. of Building 1.0 Plans and POW GAA 2

2,000.00 2,000.00

494. Construction of Multipurpose Building at Brgy. Kalasan, Pagadian City, Zamboanga del Sur

Const. of Multi-Purpose Buliding

Pagadian City, ZDS No. of Building 1.0 Plans and POW GAA 2

2,000.00

2,000.00

495. Construction of Multipurpose Building at Brgy. Palpalan, Pagadian City, Zamboanga del Sur

Const. of Multi-Purpose Buliding

Pagadian City, ZDS No. of Building 1.0 Plans and POW GAA 2

2,000.00

2,000.00

496. Construction of Multipurpose Building at Brgy Sta Lucia, Pagadian City, Zamboanga del Sur

Construction of Multi-Purpose building Pagadian City No. of Building 1.0 Plans and POW GAA 2 - - 20,000.00 20,000.00 - 40,000.00

497. Construction of Multipurpose Building, Cogonan, Labangan, Zamboanga Del Sur 1st LD

Construction of Multi-Purpose building Labangan, ZDS No. of Building 1.0 Plans and POW GAA 2 - - 2,000.00 2,000.00 - 4,000.00

498. Construction of DPWH RO Building, Dao, Pagadian City (Phase I)

Construction of Multi-Purpose building Pagadian City No. of Building 1.0 Plans and POW GAA 2 30,000.00 30,000.00 30,000.00 90,000.00

499. Construction (Completion) of Multipurpose Building, Libertad, Sominot, Zamboanga del Sur

Construction of multi-purpose

buildingLibertad, Sominot, ZDS No. of Building 1.0 Plans and POW GAA 2

2,000.00

2,000.00

500. Construction/Renovation of Gymnasium, Zamboanga del Sur National High School, Barangay Sta. Maria, Pagadian City, Zamboanga del Sur

Construction of multi-purpose

building

Zamboanga del Sur National High School, Barangay Sta. Maria, Pagadian City, ZDS

No. of Building 1.0 Plans and POW GAA 2

5,000.00

5,000.00

501. Construction of Multipurpose Building, Alegria, Pagadian City, Zamboanga del Sur

Construction of multi-purpose

building

Alegria, Pagadian City, ZDS

No. of Building 1.0 Plans and POW GAA 2

2,000.00

2,000.00

502. Construction of Multipurpose Building, Bokong, Labangan, Zamboanga del Sur

Construction of multi-purpose

buildingBokong, Labangan, ZDS No. of Building 1.0 Plans and POW GAA 2

2,000.00

2,000.00

Chapter 19-1-DPWH IX-ZDS 1DEOPage 51 of 58

Page 377: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Basis for Implementation RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location

(Province/ Municipality/

City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

503. Construction of Multipurpose Building, Bomba, Pagadian City, Zamboanga del Sur

Construction of multi-purpose

buildingBomba, Pagadian City, ZDS No. of Building 1.0 Plans and POW GAA 2

2,000.00

2,000.00

504. Construction of Multipurpose Building, Boniao, Mahayag, Zamboanga del Sur

Construction of multi-purpose

buildingBoniao, Mahayag, ZDS No. of Building 1.0 Plans and POW GAA 2

2,000.00

2,000.00

505. Construction of Multipurpose Building, Cumarom, Midsalip, Zamboanga del Sur

Construction of multi-purpose

buildingCumarom, Midsalip, ZDS No. of Building 1.0 Plans and POW GAA 2

2,000.00

2,000.00

506. Construction of Multipurpose Building, Daniel C. Mantos, Mahayag, Zamboanga del Sur

Construction of multi-purpose

building

Daniel C. Mantos, Mahayag, ZDS

No. of Building 1.0 Plans and POW GAA 2

1,000.00

1,000.00

507. Construction of Multipurpose Building, Barangay Poblacion, Municipality of Josefina, Zamboanga del Sur

Construction of multi-purpose

building

Barangay Poblacion, Municipality of Josefina, ZDS

No. of Building 1.0 Plans and POW GAA 2

2,000.00

2,000.00

508. Construction of Multipurpose Building, Delosum, Mahayag, Zamboanga del Sur

Construction of multi-purpose

buildingDelosum, Mahayag, ZDS No. of Building 1.0 Plans and POW GAA 2

2,000.00

2,000.00

509. Construction of Multipurpose Building, Ditulan, Dumingag, Zamboanga del Sur

Construction of multi-purpose

buildingDitulan, Dumingag, ZDS No. of Building 1.0 Plans and POW GAA 2

2,000.00

2,000.00

510. Construction of Multipurpose Building, Kapalaran, Tambulig, Zamboanga del Sur

Construction of multi-purpose

buildingKapalaran, Tambulig, ZDS No. of Building 1.0 Plans and POW GAA 2

2,000.00

2,000.00

511. Construction of Multipurpose Building, La Victoria, Aurora, Zamboanga del Sur

Construction of multi-purpose

buildingLa Victoria, Aurora, ZDS No. of Building 1.0 Plans and POW GAA 2

2,000.00

2,000.00

512. Construction of Multipurpose Building, Lourmah, Mahayag, Zamboanga del Sur

Construction of multi-purpose

buildingLourmah, Mahayag, ZDS No. of Building 1.0 Plans and POW GAA 2

2,000.00

2,000.00

Chapter 19-1-DPWH IX-ZDS 1DEOPage 52 of 58

Page 378: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Basis for Implementation RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location

(Province/ Municipality/

City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

513. Construction of Multipurpose Building, Lower Bayao, Tukuran, Zamboanga del Sur

Construction of multi-purpose

buildingLower Bayao, Tukuran, ZDS No. of Building 1.0 Plans and POW GAA 2

2,000.00

2,000.00

514. Construction of Multipurpose Building, Lower Sibatang, Pagadian City, Zamboanga del Sur

Construction of multi-purpose

building

Lower Sibatang, Pagadian City, ZDS

No. of Building 1.0 Plans and POW GAA 2

2,000.00

2,000.00

515. Construction/Renovation of Multipurpose Building, Brgy. Tiguma, Pagadian City, Zamboanga del Sur

Construction of multi-purpose

building

Brgy. Tiguma, Pagadian City, ZDS

No. of Building 1.0 Plans and POW GAA 2

2,000.00

2,000.00

516. Construction of Multipurpose Building, Lower Usugan, Tambulig, Zamboanga del Sur

Construction of multi-purpose

buildingLower Usugan, Tambulig, ZDS No. of Building 1.0 Plans and POW GAA 2

2,000.00

2,000.00

517. Construction of Multipurpose Building, Makugihon, Molave, Zamboanga del Sur

Construction of multi-purpose

buildingMakugihon, Molave, ZDS No. of Building 1.0 Plans and POW GAA 2

2,000.00

2,000.00

518. Construction of Multipurpose Building, Barangay Bucayan, Municipality of Dumingag, Zamboanga del Sur

Construction of multi-purpose

building

Barangay Bucayan, Municipality of Dumingag, ZDS

No. of Building 1.0 Plans and POW GAA 2

2,000.00

2,000.00

519. Construction of Multipurpose Building, New Labangan, Labangan, Zamboanga del Sur

Construction of multi-purpose

buildingNew Labangan, Labangan, ZDS No. of Building 1.0 Plans and POW GAA 2

2,000.00

2,000.00

520. Construction of Multipurpose Building, Palili, Midsalip, Zamboanga del Sur

Construction of multi-purpose

buildingPalili, Midsalip, ZDS No. of Building 1.0 Plans and POW GAA 2

2,000.00

2,000.00

521. Construction of Multipurpose Building, Poblacion, Ramon Magsaysay, Zamboanga del Sur

Construction of multi-purpose

building

Poblacion, Ramon Magsaysay, ZDS

No. of Building 1.0 Plans and POW GAA 2

2,000.00

2,000.00

522. Construction of Multipurpose Building, Poblacion, Sominot, Zamboanga del Sur

Construction of multi-purpose

buildingPoblacion, Sominot, ZDS No. of Building 1.0 Plans and POW GAA 2

2,000.00

2,000.00

Chapter 19-1-DPWH IX-ZDS 1DEOPage 53 of 58

Page 379: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Basis for Implementation RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location

(Province/ Municipality/

City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

523. Construction of Multipurpose Building, Proposed Municipal Hospital Site, Romarante, Aurora, Zamboanga del Sur

Construction of multi-purpose

building

Proposed Municipal Hospital Site, Romarante, Aurora, ZDS

No. of Building 1.0 Plans and POW GAA 2

2,000.00

2,000.00

524. Construction of Multipurpose Building, Rizal, Molave, Zamboanga del Sur

Construction of multi-purpose

buildingRizal, Molave, ZDS No. of Building 1.0 Plans and POW GAA 2

2,000.00

2,000.00

525. Construction of Multipurpose Building, Romarate, Aurora, Zamboanga del Sur

Construction of multi-purpose

buildingRomarate, Aurora, ZDS No. of Building 1.0 Plans and POW GAA 2

2,000.00

2,000.00

526. Construction of Multipurpose Building, Sagrada Familia, Tambulig, Zamboanga del Sur

Construction of multi-purpose

buildingSagrada Familia, Tambulig, ZDS No. of Building 1.0 Plans and POW GAA 2

2,000.00

2,000.00

527. Construction of Multipurpose Building, San Pedro, Pagadian City, Zamboanga del Sur

Construction of multi-purpose

building

San Pedro, Pagadian City, ZDS

No. of Building 1.0 Plans and POW GAA 2

1,000.00

1,000.00

528. Construction of Multipurpose Building, Santo Niño, Tukuran, Zamboanga del Sur

Construction of multi-purpose

buildingSanto Niño, Tukuran, ZDS No. of Building 1.0 Plans and POW GAA 2

2,000.00

2,000.00

529. Construction of Multipurpose Building, Sigapod, Midsalip, Zamboanga del Sur

Construction of multi-purpose

buildingSigapod, Midsalip, ZDS No. of Building 1.0 Plans and POW GAA 2

2,000.00

2,000.00

530. Construction of Multipurpose Building, Sta. Cruz, Labangan, Zamboanga del Sur

Construction of multi-purpose

buildingSta. Cruz, Labangan, ZDS No. of Building 1.0 Plans and POW GAA 2

2,000.00

2,000.00

531. Construction of Multipurpose Building, Tagulo, Tukuran, Zamboanga del Sur

Construction of multi-purpose

buildingTagulo, Tukuran, ZDS No. of Building 1.0 Plans and POW GAA 2

2,000.00

2,000.00

532. Completion of Multipurpose Building, Brgy. Upper Bagong Tudela, Municipality of Josefina, Zamboanga del Sur

Construction of multi-purpose

building

Brgy. Upper Bagong Tudela, Municipality of Josefina, ZDS

No. of Building 1.0 Plans and POW GAA 2

1,000.00

1,000.00

Chapter 19-1-DPWH IX-ZDS 1DEOPage 54 of 58

Page 380: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Basis for Implementation RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location

(Province/ Municipality/

City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

533. Construction of Multipurpose Building, Tulawas, Pagadian City, Zamboanga del Sur

Construction of multi-purpose

building

Tulawas, Pagadian City, ZDS

No. of Building 1.0 Plans and POW GAA 2

2,000.00

2,000.00

Regionwide - Local Infrastructure Program - a. Local Roads -

534. Road Concreting of Brgy. Road, Brgy. Dapiwak, Dumingag, Zamboanga del Sur

Road Upgrading Gravel to Paved

Brgy. Dapiwak, Dumingag, ZDS km. 0.50 Plans and POW GAA 2 5,000.00 5,000.00

535. Concreting of Road, Brgy. Calulot, Tambulig, Zamboanga del Sur Brgy. Calulot,

Tambulig, ZDS Plans and POW GAA 2-

10,000.00 10,000.00

536. Concreting of Road, Brgy. Sudlon, Molave, Zamboanga del Sur Brgy. Sudlon,

Molave, ZDS Plans and POW GAA 2-

10,000.00 10,000.00

537. Construction of Road of Purok Tugas, Balangasan, Pagadian City Balangasan, ZDS Plans and POW GAA 2

- 2,000.00 2,000.00

b. Multipurpose/Facilities GAA 2 - 538. Construction of Multipurpose

Building, Lantawan, Sominot, Zamboanga Del Sur 1st LD

Construction of Multi-Purpose building Sominot, ZDS No. of Building 1.0 Plans and POW GAA 2 2,000.00 - - - - - 2,000.00

539. Construction of Multipurpose Building, Brgy. Langapod, Labangan, Zamboanga Del Sur

Construction of Multi-Purpose building

Brgy. Langapod, Labangan, ZDS No. of Building 1.0 Plans and POW GAA 2 2,000.00 2,000.00

540. Construction of Multipurpose Building, Tumapic, Mahayag, Zamboanga Del Sur 1st LD

Construction of Multi-Purpose building Mahayag, ZDS No. of Building 1.0 Plans and POW GAA 2 2,000.00 - - - - - 2,000.00

541. Construction of Multipurpose Building, Cabagan, Tambulig, Zamboanga Del Sur 1st LD

Construction of Multi-Purpose building Tambulig, ZDS No. of Building 1.0 Plans and POW GAA 2 2,000.00 - - - - - 2,000.00

542. Construction of Multipurpose Building, Bobongan, Ramon Magsaysay, Zamboanga Del Sur 1st LD

Construction of Multi-Purpose building

Ramon Magsaysay No. of Building 1.0 Plans and POW GAA 2 2,000.00 - - - - - 2,000.00

Chapter 19-1-DPWH IX-ZDS 1DEOPage 55 of 58

Page 381: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Basis for Implementation RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location

(Province/ Municipality/

City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

543. Construction of Multipurpose Building, Brgy. Nuboran, Labangan, Zamboanga del Sur 1st LD

Construction of Multi-Purpose building Labangan No. of Building 1.0 Plans and POW GAA 2 2,000.00 - - - - - 2,000.00

544. Construction of Multi-Purpose Building at Brgy. Poblacion B, Midsalip, Zamboanga del Sur 1st LD

Construction of Multi-Purpose building Midsalip No. of Building 1.0 Plans and POW GAA 2 4,000.00 - - - - - 4,000.00

545. Construction of Multi Purpose Building (Learning Center) for Saniel Integrated Farm, Sandal, San Isidro, Mahayag, Zamboanga del Sur

Construction of Multi-Purpose building

Sandal, San Isidro, Mahayag, ZDS

No. of Building 1.0 Plans and POW GAA 2

2,500.00

2,500.00

546. Construction of Multi Purpose Building for Brgy. Panduma, Tukuran, Zamboanga del Sur

Construction of Multi-Purpose building Tukuran, ZDS No. of Building 1.0 Plans and POW GAA 2

2,000.00

2,000.00

547. Construction of Activity Center/Covered Court, Pagadian City, Zamboanga del Sur

Construction of Multi-Purpose building

Pagadian City, ZDS No. of Building 1.0 Plans and POW GAA 2

5,000.00

5,000.00

548. Construction of Activity Center/Covered Court, Municipality of Barangay Dao, Pagadian City, Zamboanga Del Sur

Construction of Multi-Purpose building

Municipality of Barangay Dao, Pagadian City, ZDS

No. of Building 1.0 Plans and POW GAA 2

5,000.00

5,000.00

549. Construction of Multi-Purpose Bldg., Balintawak, Aurora, Zamboanga Del Sur

Construction of Multi-Purpose building

Balintawak, Aurora, ZDS Plans and POW GAA 2

-

2,500.00 2,500.00

550. Construction of Multi-Purpose Building (PNP Police Station), Caridad, Dumingag, Zamboanga Del Sur

Construction of Multi-Purpose building

Caridad, Dumingag, ZDS Plans and POW GAA 2

-

2,500.00 2,500.00

551. Construction of Multi-Purpose Bldg., Old Labangan, Labangan, Zamboanga Del Sur

Construction of Multi-Purpose building

Old Labangan, Labangan, ZDS Plans and POW GAA 2

-

2,500.00 2,500.00

552. Construction of Multi-Purpose Bldg., Parasan, Molave, Zamboanga Del Sur

Construction of Multi-Purpose building

Parasan, Molave, ZDS Plans and POW GAA 2

-

2,500.00 2,500.00

Chapter 19-1-DPWH IX-ZDS 1DEOPage 56 of 58

Page 382: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Basis for Implementation RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location

(Province/ Municipality/

City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

553. Construction of Multi-Purpose Building in Poblacion, Mahayag, Zamboanga del Sur

Construction of Multi-Purpose building Mahayag, ZDS Plans and POW GAA 2

-

4,000.00 4,000.00

554. Construction of multi-purpose building, Brgy. Balugo, Tambulig, Zamboanga del Sur

Construction of Multi-Purpose building

Brgy. Balugo, Tambulig, ZDS Plans and POW GAA 2

-

2,500.00 2,500.00

555. Construction of Multi-Purpose Building, Brgy. Blancia, Molave, Zamboanga Del Sur

Construction of Multi-Purpose building

Brgy. Blancia, Molave, ZDS Plans and POW GAA 2

-

2,000.00 2,000.00

556. Construction of Multi-Purpose Building, Brgy. Campo V, Ramon Magsaysay, Zamboanga Del Sur

Construction of Multi-Purpose building

Brgy. Campo V, Ramon Magsaysay, ZDS

Plans and POW GAA 2

-

2,000.00 2,000.00

557. Construction of Multi-Purpose Building, Brgy. Labangon, Dumingag, Zamboanga del Sur

Construction of Multi-Purpose building

Brgy. Labangan, Dumingag, ZDS Plans and POW GAA 2

-

2,500.00 2,500.00

558. Construction of Multi-purpose Building, Brgy. Esperanza, Ramon Magsaysay, Zamboanga Del Sur

Construction of Multi-Purpose building

Brgy. Esperanza, Ramon Magsaysay, ZDS

Plans and POW GAA 2

-

2,500.00 2,500.00

559. Construction of multi-purpose building, Brgy. Montela, Aurora, Zamboanga del Sur

Construction of Multi-Purpose building

Brgy. Montela, Aurora, ZDS Plans and POW GAA 2

-

2,500.00 2,500.00

560. Construction of Multi-purpose Building, Brgy. Muricay, Pagadian City, Zamboanga Del Sur

Construction of Multi-Purpose building

Brgy. Muricay, Pagadian City, ZDS

Plans and POW GAA 2

-

2,500.00 2,500.00

561. Construction of Multi-Purpose Building, Brgy. Upper Pulacan, Labangan, Zamboanga del Sur

Construction of Multi-Purpose building

Brgy. Upper Pulacan, Labangan, ZDS

Plans and POW GAA 2

-

2,500.00 2,500.00

562. Construction of multi-purpose building, Brgy. Lower Liaison, Tambulig, Zamboanga del Sur

Construction of Multi-Purpose building

Brgy. Lower Liaison, Tambulig, ZDS

Plans and POW GAA 2

-

2,000.00 2,000.00

Chapter 19-1-DPWH IX-ZDS 1DEOPage 57 of 58

Page 383: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Basis for Implementation RemarksMode of

Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location

(Province/ Municipality/

City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

563. Construction of Multi-Purpose Building, Brgy. Madasigon, Molave, Zamboanga Del Sur

Construction of Multi-Purpose building

Brgy. Madasigon, Molave, ZDS

Plans and POW GAA 2

-

2,500.00 2,500.00

564. Construction of Barangay Hall, Brgy. Bagalupa, Labangan, Zamboanga del Sur

Construction of Multi-Purpose building Labangan, ZDS Plans and POW GAA 2 1,600.00 1,600.00

565. Construction of Covered Court, Barangay Bagalupa, Labangan, Zamboanga del Sur

Construction of Multi-Purpose building Labangan, ZDS Plans and POW GAA 2 2,500.00 2,500.00

566. Construction of Multi-Purpose Covered Court, Purok Alta, Napolan, Pagadian City

Construction of Multi-Purpose building Pagadian City Plans and POW GAA 2 2,500.00 2,500.00

457,950.00 249,000.00 1,631,477.21 1,426,575.00 1,377,475.00 542,375.00 5,684,852.21 1,940,805.00 2,723,514.00 3,361,894.21 13,486,147.00 24,882,875.00 11,419,775.00 61,902,510.21

Subtotal GRAND TOTAL

Chapter 19-1-DPWH IX-ZDS 1DEOPage 58 of 58

Page 384: Table of Contents (By Chapter)

Updated Zamboanga Peninsula Regional Development Investment Program (RDIP), 2017-2022

Agency: DPWH IXChapter 19: Accelerating Infrastructure Development

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

ZAMBOANGA DEL SUR 2ND DEO, GUIPOSZAMBOANGA DEL SUR 2ND LEGISLATIVE DISTRICTa. OO1: Ensure Safe and Reliable National Road System

(i) Asset Preservation of National Roads1. Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development Management-4 (HDM-4)

a. Primary Road1. Pagadian City-Zamboanga City

RoadConcrete Reconstruction (Asphalt to concrete)

Dumalinao, Tigbao, Kumalarang ZDS

km. Plans and POW GAA 3 -

b. Tertiary Road - 2. Imelda-Bayog-Kumalarang-

Lapuyan-Margosatubig Road Kumalarang ZDS km. Plans and POW GAA 3 -

S01451MN (Imelda-Bayog Section) -

S01175MN ( Jct. Diplo-Kumalarang-Bayog Section) -

S01176MN (Kumalarang-Lapuyan-Margosatubig Section) -

S01184MN (Cont. Kumalarang-Lapuyan-Margosatubig Section) -

3. Jct. Dumalinao-Margosatubig SectionK1679+(-1111) - K1679+842K1681+626 - K1683+053K1684+696 - K1685+420

Concrete Reconstruction (Asphalt to concrete)

Guipos, San Miguel, Margosatubig ZDS

km. 4.072 Plans and POW GAA 3 122,160.00 122,160.00

4. Jct. Dumalinao-Margosatubig SectionK1685+420 - K1685+925K1685+1000 - K1689+301

Concrete Reconstruction (Asphalt to concrete)

Guipos, San Miguel, Margosatubig ZDS

km. 3.814 Plans and POW GAA 3 114,420.00 114,420.00

5. Jct. Dumalinao-Margosatubig SectionK1689+371 - K1692+1096

Concrete Reconstruction (Asphalt to concrete)

Guipos, San Miguel, Margosatubig ZDS

km. 3.73 Plans and POW GAA 3 112,110.00 112,110.00

6. Jct. Dumalinao-Margosatubig SectionK1695+600 - K1696+078K1696+125 - K1696+595K1700+898 - K1701+332K1714+823 - K1717+000

Concrete Reconstruction (Asphalt to concrete)

Guipos, San Miguel, Margosatubig ZDS

km. 3.57 Plans and POW GAA 3 107,100.00 107,100.00

7. Jct. Dumalinao-Margosatubig SectionK1717+000 - K1719+459K1719+474 - K1719+789

Concrete Reconstruction (Asphalt to concrete)

Guipos, San Miguel, Margosatubig ZDS

km. 2.776 Plans and POW GAA 3 84,000.00 84,000.00

Concrete Reconstruction

(Asphalt to concrete)

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Page 385: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

8. Jct. Tubod-Lakewood Road Concrete Reconstruction (Asphalt to concrete)

Lakewood ZDS km. Plans and POW GAA 3 -

9. Lakewood-Bayog-Sindangan Road Concrete Reconstruction (Asphalt to concrete)

Bayog ZDS km. Plans and POW GAA 3 -

10. Dumalinao-San Pablo Road (Dumalinao-Rebokon Section) including Drainage S01101MN a. C. 0 - C. 3000 with exception: 1577 - 1611.7 (Paglaum Bridge)

Concrete Reconstruction (Asphalt to concrete) km. Plans and POW GAA 3 -

11. Dumalinao-San Pablo Road (Dumalinao-Rebokon Section) including Drainage S01101MN a. C. 0 - C. 1577, L=1,577

km. Plans and POW GAA 3 -

b. C. 1610 - C. 4610, L=3,000 - c. C. 4610 - C. 7610, L=3,000 - d. C. 7610 - C. 8873, L=1,263 -

12. Zamboanga del Sur Coastal Rd - (S01101MN) Chainage 240 - Chainage 873

Reconstruction from Concrete to Concrete

km. 0.63 Plans and POW GAA 3 25,219.00 262,598.00 287,817.00

2. Preventive Maintenance based on Pavement Management System - a. Primary Road -

13. Pagadian City-Zamboanga City Road Preventive

Maintenance

Dumalinao, Tigbao, Kumalarang ZDS

km. Plans and POW GAA 3 364,418.00 364,418.00

14. Pagadian City-Zamboanga City RoadK1675+(-696) - K1676+685K1676+722 - K1676+774K1680+435 - K1682+115K1684+934 - K1689+236

Preventive Maintenance km. 8.4 Plans and POW GAA 3 117,600.00 117,600.00

15. Pagadian City-Zamboanga City RoadK1690+871 - K1691+760K1691+798 - K1694+827K1694+856 - K1699+000

Preventive Maintenance km. 8.034 Plans and POW GAA 3 112,746.00 112,746.00

16. Pagadian City-Zamboanga City RoadK1699+000 - K1700+106K1700+415 - K1705+938K1708+508 - K1710+000

Preventive Maintenance km. 8.099 Plans and POW GAA 3 113,386.00 113,386.00

Concrete Reconstruction (Asphalt to concrete)

Chapter 19-1-DPWH IX-ZDS 2DEOPage 2 of 46

Page 386: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

17. Pagadian City-Zamboanga City RoadK1710+000 - K1713+477K1713+496 - K1716+000K1717+000 - K1719+294

Preventive Maintenance km. 8.235 Plans and POW GAA 3 115,290.00 115,290.00

b. Tertiary Road - 18. Imelda-Bayog-Kumalarang-

Lapuyan-Margosatubig RoadPreventive Maintenance Kumalarang ZDS km. Plans and POW GAA 3 -

S01451MN (Imelda-Bayog Section) Plans and POW GAA 3 -

S01175MN ( Jct. Diplo-Kumalarang-Bayog Section) Plans and POW GAA 3 -

S01176MN (Kumalarang-Lapuyan-Margosatubig Section) Plans and POW GAA 3 -

S01184MN (Cont. Kumalarang-Lapuyan-Margosatubig Section) Plans and POW GAA 3 -

19. Jct. Dumalinao-Margosatubig Section

Preventive Maintenance Guipos, San

Miguel, Margosatubig ZDS

km. Plans and POW GAA 3 27,227.00 27,227.00

20. Jct. Dumalinao-Margosatubig SectionK1683+053 - K1684+000K1701+332 - K1707+113

Preventive Maintenance Guipos, San

Miguel, Margosatubig ZDS

km. 6.757 Plans and POW GAA 3 102,000.00 102,000.00

21. Jct. Dumalinao-Margosatubig SectionK1707+128 - K1714+823

Preventive Maintenance Guipos, San

Miguel, Margosatubig ZDS

km. 6.769 Plans and POW GAA 3 102,000.00 102,000.00

22. Jct. Tubod-Lakewood RoadK1701+(-849) - K1701+092K1701+107 - K1701+330K1704+240 - K1712+3006

Preventive Maintenance

Lakewood ZDS km. 11.854 Plans and POW GAA 3 166,000.00 166,000.00

23. Sindangan - Bayog - Lakewood RoadK1716+(-234) - K1718+253K1719+300 - K1725+084K1725+640 - K1727+190K1728+129 - K1729+368

Preventive Maintenance

Bayog ZDS km. 11.06 Plans and POW GAA 3 165,900.00 165,900.00

24. Sindangan - Bayog - Lakewood RoadK1729+380 - K1730+530K1730+564 - K1731+233K1732+934 - K1734+362K1734+418 - K1740+388

Preventive Maintenance

Bayog ZDS km. 9.866 Plans and POW GAA 3 147,990.00 147,990.00

3. Construction/Upgrading/Rehabilitation of Drainage along National Roads - a. Primary Road -

Chapter 19-1-DPWH IX-ZDS 2DEOPage 3 of 46

Page 387: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

24. Pagadian City-Zamboanga City Road

Construction/Upgrading/Rehabilitation of Drainage

Dumalinao, Tigbao, Kumalarang ZDS

km. Plans and POW GAA 3 17,650.00 17,650.00

b. Tertiary Road - 25. Imelda-Bayog-Kumalarang-

Lapuyan-Margosatubig Road S01451MN (Imelda-Bayog Section)

Construction/Upgrading/Rehabilitation of Drainage

Kumalarang ZDS km. Plans and POW GAA 3 -

26. Jct. Dumalinao-Margosatubig Section

Construction/Upgrading/Rehabilitation of Drainage

Guipos, San Miguel, Margosatubig ZDS

km. Plans and POW GAA 3 -

4. Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - a. Primary Road -

27. Pagadian City-Zamboanga City Road

Road Slope Tigbao, Kumalarang ZDS ln.m. Plans and POW GAA 3 44,780.00 18,730.00 63,510.00

b. Tertiary Road - 28. Imelda-Bayog-Kumalarang-

Lapuyan-Margosatubig RoadRoad Slope

ln.m. Plans and POW GAA 3 -

29. Jct. Tubod-Lakewood Road Road Slope

Lakewood ZDS ln.m. Plans and POW GAA 3 61,971.00 10,000.00 10,000.00 10,000.00 91,971.00

30. Lakewood-Bayog-Sindangan Road Road SlopeBayog ZDS ln.m. Plans and POW GAA 3 10,000.00 60,000.00 60,000.00 130,000.00

31. Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide along Jct. Dumalinao-Margosatubig Road (Camanga)Sta. K1678+393 - Sta. K1678+502

Road Slope

ln.m. Plans and POW GAA 3 2,500.00 2,500.00 5,000.00 10,000.00

32. Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide along Jct. Dumalinao-Margosatubig Road (Tikwas)Sta. K1682+331 - Sta. K1682+587Sta. K1682+712 - Sta. K1682+943

Road Slope

Lakewood ZDS ln.m. Plans and POW GAA 3 11,100.00 106,000.00 108,000.00 225,100.00

33. Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide along Jct. Dumalinao-Margosatubig Road (Katipunan)Sta. K1689+500 - Sta. K1689+600

Road Slope

ln.m. Plans and POW GAA 3 2,300.00 104,000.00 105,000.00 211,300.00

Chapter 19-1-DPWH IX-ZDS 2DEOPage 4 of 46

Page 388: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

34. Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide along Jct. Dumalinao-Margosatubig Road (Bagong Oroquieta)Sta. K1690+934 - Sta. K1691+000

Road Slope

Lakewood ZDS ln.m. Plans and POW GAA 3 1,600.00 102,000.00 103,000.00 206,600.00

35. Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide along Jct. Dumalinao-Margosatubig Road (Dao-an)Sta. K1697+545 - Sta. K1697+645

Road Slope

Bayog ZDS ln.m. Plans and POW GAA 3 2,300.00 105,000.00 107,000.00 214,300.00

36. Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide along Jct. Dumalinao-Margosatubig Road (Molum)Sta. K1704+721 - Sta. K1705+035

Road Slope

ln.m. Plans and POW GAA 3 7,400.00 104,000.00 108,000.00 219,400.00

37. Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide along Jct. Dumalinao-Margosatubig Road (Limbatong)Sta. K1710+723 - Sta. K1710+873Sta. K1710+753 - Sta. K1710+950Sta. K1711+017 - Sta. K1711+080Sta. K1710+828 - sta. K1710+936

Road Slope

Lakewood ZDS ln.m. Plans and POW GAA 3 12,000.00 107,000.00 109,000.00 228,000.00

38. Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide along Jct. Dumalinao-Margosatubig Road (Lumbog)Sta. K1716+653 - Sta. K1716+785Sta. K1716+000 - Sta. K1716+390Sta. K1716+390 - Sta. K1716+545Sta. K1716+710 - Sta.K1716+758Sta. K1716+855 - Sta. K1716+938

Road Slope

Bayog ZDS ln.m. Plans and POW GAA 3 18,500.00 109,000.00 120,000.00 247,500.00

(ii) Network Development - 1. Improvement/Widening of National Roads -

a. Primary Road -

Chapter 19-1-DPWH IX-ZDS 2DEOPage 5 of 46

Page 389: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

39. Pagadian City-Zamboanga City Road

Road Upgrading Dumalinao ZDS km. Plans and POW GAA 3 71,000.00 450,000.00 521,000.00

40. Pagadian City-Zamboanga City RoadK1708+000 - K1711+500

Road Upgrading

Dumalinao ZDS km. 3.494 Plans and POW GAA 3 140,000.00 140,000.00

41. Pagadian City-Zamboanga City RoadK1711+500 - K1715+000

Road Upgrading

Dumalinao ZDS km. 3.49 Plans and POW GAA 3 140,000.00 140,000.00

42. Pagadian City-Zamboanga City RoadK1715+000 - K1718+500

Road Upgrading

Dumalinao ZDS km. 3.489 Plans and POW GAA 3 140,000.00 140,000.00

43. Pagadian City-Zamboanga City RoadK1718+500 - K1720+250

Road Upgrading

Dumalinao ZDS km. 1.748 Plans and POW GAA 3 70,000.00 70,000.00

b. Tertiary Road - 44. Jct. Dumalinao-Margosatubig

SectionRoad Upgrading

Katipunan-Bagong Oroquieta Section, Guipos, ZDS

km. Plans and POW GAA 3 183,240.00 183,240.00

45. Jct. Dumalinao-Margosatubig SectionK1698+000 - K1700+850

Road Upgrading

Katipunan-Bagong Oroquieta Section, Guipos, ZDS

km. 2.857 Plans and POW GAA 3 114,280.00 114,280.00

46. Jct. Dumalinao-Margosatubig SectionK1701+520 - K1704+800

Road Upgrading

Katipunan-Bagong Oroquieta Section, Guipos, ZDS

km. 3.29 Plans and POW GAA 3 131,600.00 131,600.00

47. Jct. Dumalinao-Margosatubig SectionK1704+800 - K1708+000

Road Upgrading

Katipunan-Bagong Oroquieta Section, Guipos, ZDS

km. 3.221 Plans and POW GAA 3 128,840.00 128,840.00

48. Jct. Dumalinao-Margosatubig SectionK1708+000 - K1711+700

Road Upgrading

Katipunan-Bagong Oroquieta Section, Guipos, ZDS

km. 3.711 Plans and POW GAA 3 148,440.00 148,440.00

49. Jct. Dumalinao-Margosatubig SectionK1711+700 - K1715+500

Road Upgrading

Katipunan-Bagong Oroquieta Section, Guipos, ZDS

km. 3.81 Plans and POW GAA 3 152,400.00 152,400.00

50. Jct. Dumalinao-Margosatubig SectionK1715+500 - K1719+789

Road Upgrading

Katipunan-Bagong Oroquieta Section, Guipos, ZDS

km. Plans and POW GAA 3 171,760.00 171,760.00

51. Sindangan - Bayog - Lakewood Roaad K1736+559 - K1740+388

Road Upgrading

km. 3.831 Plans and POW GAA 3 153,240.00 153,240.00

52. Sindangan - Bayog - Lakewood Roaad K1732+249 - K1735+000K1735+385 - K1736+000

Road Upgrading

km. 3.367 Plans and POW GAA 3 134,680.00 134,680.00

53. Sindangan - Bayog - Lakewood Roaad K1729+000 - K1732+220

Road Upgrading

km. 3.221 Plans and POW GAA 3 128,940.00 128,940.00

2. Construction of By-Passes/Diversion Roads, including ROW Plans and POW GAA 3 -

Chapter 19-1-DPWH IX-ZDS 2DEOPage 6 of 46

Page 390: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

54. NRJ Sindangan - Bayog - Lakewood Road - NRJ Sindangan - Bayog - Lakewood Road ( Kahayagan-Supon-CampBlessing-NRJDatagan-Buboan Section) Package 1

Construction of Bypass & Diversion Road

Bayog ZDS km. 4.33 Plans and POW GAA 3 130,000 130,000.00

55. NRJ Sindangan - Bayog - Lakewood Road - NRJ Sindangan - Bayog - Lakewood Road ( Kahayagan-Supon-CampBlessing-NRJDatagan-Buboan Section) Package 2

Construction of Bypass & Diversion Road

Bayog ZDS km. 4.33 Plans and POW GAA 3 130,000 130,000.00

56. NRJ Sindangan - Bayog - Lakewood Road - NRJ Sindangan - Bayog - Lakewood Road ( Kahayagan-Supon-CampBlessing-NRJDatagan-Buboan Section) Package 3

Construction of Bypass & Diversion Road

Bayog ZDS km. 4.33 Plans and POW GAA 3 130,000 130,000.00

57. NRJ Sindangan - Bayog - Lakewood Road - NRJ Sindangan - Bayog - Lakewood Road ( Kahayagan-Supon-CampBlessing-NRJDatagan-Buboan Section) Package 4

Construction of Bypass & Diversion Road

Bayog ZDS km. 2.10 Plans and POW GAA 3 63,000 63,000.00

58. Jct. Imelda-Bayog-Kumalarang- Lapuyan- Margosatubig Road - NRJ Sindangan - Bayog - Lakewood Road (Dipili-PulangBato-Dimalinao-Bantal-Liba-Kahayagan Section) Package 1

Construction of Bypass & Diversion Road

Bayog ZDS km. 5.00 Plans and POW GAA 3 150,000 150,000.00

59. Jct. Imelda-Bayog-Kumalarang- Lapuyan- Margosatubig Road - NRJ Sindangan - Bayog - Lakewood Road (Dipili-PulangBato-Dimalinao-Bantal-Liba-Kahayagan Section) Package 2

Construction of Bypass & Diversion Road

Bayog ZDS km. 4.67 Plans and POW GAA 3 140,000 140,000.00

60. Jct. Imelda-Bayog-Kumalarang- Lapuyan- Margosatubig Road - NRJ Sindangan - Bayog - Lakewood Road (Dipili-PulangBato-Dimalinao-Bantal-Liba-Kahayagan Section) Package 3

Construction of Bypass & Diversion Road

Bayog ZDS km. 2.83 Plans and POW GAA 3 85,000 85,000.00

Chapter 19-1-DPWH IX-ZDS 2DEOPage 7 of 46

Page 391: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

61. NRJ Zamboanga Del Sur Coastal Road - NRJ Zamboanga Del Sur Coastal Road (Pob.-Lower Dimaya-Bacawan-CRJ Proper Dimaya Section) Package 1

Construction of Bypass & Diversion Road Dinas, Dimataling

ZDS km. 5.00 Plans and POW GAA 3 150,000 150,000.00

62. NRJ Zamboanga Del Sur Coastal Road - NRJ Zamboanga Del Sur Coastal Road (Pob.-Lower Dimaya-Bacawan-CRJ Proper Dimaya Section) Package 2

Construction of Bypass & Diversion Road Dinas, Dimataling

ZDS km. 2.00 Plans and POW GAA 3 60,000 60,000.00

63. Jct. Dumalinao-Margosatubig Section - NRJ Zamboanga Del Sur Coastal Road (Pob. San Miguel-Beray-Legarda II-Legarda I-Nangka-Lower Dimaya-Don Jose Section) Package 1

Construction of Bypass & Diversion Road

Dinas, Dimataling ZDS km. 4.00 Plans and POW GAA 3 120,000 120,000.00

64. Jct. Dumalinao-Margosatubig Section - NRJ Zamboanga Del Sur Coastal Road (Pob. San Miguel-Beray-Legarda II-Legarda I-Nangka-Lower Dimaya-Don Jose Section) Package 2

Construction of Bypass & Diversion Road

Dinas, Dimataling ZDS km. 4.00 Plans and POW GAA 3 120,000 120,000.00

65. Jct. Dumalinao-Margosatubig Section - NRJ Zamboanga Del Sur Coastal Road (Pob. San Miguel-Beray-Legarda II-Legarda I-Nangka-Lower Dimaya-Don Jose Section) Package 3

Construction of Bypass & Diversion Road

Dinas, Dimataling ZDS km. 2.00 Plans and POW GAA 3 60,000 60,000.00

66. NRJ Zamboanga Del Sur Coastal Road - NRJ Zamboanga Del Sur Coastal Road (Mahayag-Ludiong-Libertad-Baluno-Lalab-San Roque-CRJ Salawagan Section) Package 1

Construction of Bypass & Diversion Road

Dimataling km. 5.00 Plans and POW GAA 3 150,000 150,000.00

67. NRJ Zamboanga Del Sur Coastal Road - NRJ Zamboanga Del Sur Coastal Road (Mahayag-Ludiong-Libertad-Baluno-Lalab-San Roque-CRJ Salawagan Section) Package 2

Construction of Bypass & Diversion Road

Dimataling km. 4.50 Plans and POW GAA 3 135,000 135,000.00

68. NRJ Zamboanga Del Sur Coastal Road - NRJ Zamboanga Del Sur Coastal Road (Mahayag-Ludiong-Libertad-Baluno-Lalab-San Roque-CRJ Salawagan Section) Package 3

Construction of Bypass & Diversion Road

Dimataling km. 4.50 Plans and POW GAA 3 135,000 135,000.00

Chapter 19-1-DPWH IX-ZDS 2DEOPage 8 of 46

Page 392: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

69. NRJ Zamboanga Del Sur Coastal Road - NRJ Zamboanga Del Sur Coastal Road (Molum-Magahis-Binuay-Baluno-Lalab-San Roque-CRJ Salawagan Section) Package 1

Construction of Bypass & Diversion Road

Dimataling km. 5.00 Plans and POW GAA 3 150,000 150,000.00

70. NRJ Zamboanga Del Sur Coastal Road - NRJ Zamboanga Del Sur Coastal Road (Molum-Magahis-Binuay-Baluno-Lalab-San Roque-CRJ Salawagan Section) Package 2

Construction of Bypass & Diversion Road

Dimataling km. 3.00 Plans and POW GAA 3 90,000 90,000.00

71. NRJ Zamboanga Del Sur Coastal Road - NRJ Zamboanga Del Sur Coastal Road (Sugbay Uno-Kagawasan-CRJ Buburay Section) Package 1

Construction of Bypass & Diversion Road

Dimataling km. 5.00 Plans and POW GAA 3 150,000 150,000.00

72. NRJ Zamboanga Del Sur Coastal Road - NRJ Zamboanga Del Sur Coastal Road (Sugbay Uno-Kagawasan-CRJ Buburay Section) Package 2

Construction of Bypass & Diversion Road

Dimataling km. 3.00 Plans and POW GAA 3 90,000 90,000.00

73. NRJ Zamboanga Del Sur Coastal Road - NRJ Zamboanga Del Sur Coastal Road (Diplo-Kitaan Dagat-Limamawan- Suminalom Section) Package 1

Construction of Bypass & Diversion Road

Kumalarang km. 3.50 Plans and POW GAA 3 105,000 105,000.00

74. NRJ Zamboanga Del Sur Coastal Road - NRJ Zamboanga Del Sur Coastal Road (Diplo-Kitaan Dagat-Limamawan- Suminalom Section) Package 2

Construction of Bypass & Diversion Road

Kumalarang km. 3.50 Plans and POW GAA 3 105,000 105,000.00

75. NRJ Zamboanga Del Sur Coastal Road - NRJ Zamboanga Del Sur Coastal Road (Diplo-Kitaan Dagat-Limamawan- Suminalom Section) Package 3

Construction of Bypass & Diversion Road

Kumalarang km. 2.00 Plans and POW GAA 3 60,000 60,000.00

76. NRJ Zamboanga Del Sur Coastal Road - NRJ Pagadian City-Zamboanga City Road (Diplo-Kitaan Dagat-Limamawan-NRJ Bogayo Section) Package 1

Construction of Bypass & Diversion Road Kumalarang km. 4.33 Plans and POW GAA 3 130,000 130,000.00

77. NRJ Zamboanga Del Sur Coastal Road - NRJ Pagadian City-Zamboanga City Road (Diplo-Kitaan Dagat-Limamawan-NRJ Bogayo Section) Package 2

Construction of Bypass & Diversion Road Kumalarang km. 1.67 Plans and POW GAA 3 50,000 50,000.00

Chapter 19-1-DPWH IX-ZDS 2DEOPage 9 of 46

Page 393: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

78. NRJ Pagadian City-Zamboanga City Road - Jct. Dumalinao-Margosatubig Section (Bogayo-Gawil-Bolisong-Tiguha-Dumalian-Concepcion- Calube-NRJ Mate Section) Package 1

Construction of Bypass & Diversion Road

Kumalarang km. 4.67 Plans and POW GAA 3 140,000 140,000.00

79. NRJ Pagadian City-Zamboanga City Road - Jct. Dumalinao-Margosatubig Section (Bogayo-Gawil-Bolisong-Tiguha-Dumalian-Concepcion- Calube-NRJ Mate Section) Package 2

Construction of Bypass & Diversion Road

Kumalarang km. 4.67 Plans and POW GAA 3 140,000 140,000.00

80. NRJ Pagadian City-Zamboanga City Road - Jct. Dumalinao-Margosatubig Section (Bogayo-Gawil-Bolisong-Tiguha-Dumalian-Concepcion- Calube-NRJ Mate Section) Package 3

Construction of Bypass & Diversion Road

Kumalarang km. 1.67 Plans and POW GAA 3 50,000 50,000.00

81. NRJ Pagadian City-Zamboanga City Road - NRJ Lanao - Pagadian - Zamboanga City Road (Picanan-Boyugan West-Gusom-NRJ Bdry. Buug Section) Package 1

Construction of Bypass & Diversion Road

Kumalarang km. 4.33 Plans and POW GAA 3 130,000 130,000.00

82. NRJ Pagadian City-Zamboanga City Road - NRJ Lanao - Pagadian - Zamboanga City Road (Picanan-Boyugan West-Gusom-NRJ Bdry. Buug Section) Package 2

Construction of Bypass & Diversion Road

Kumalarang km. 4.33 Plans and POW GAA 3 130,000 130,000.00

83. NRJ Pagadian City-Zamboanga City Road - NRJ Lanao - Pagadian - Zamboanga City Road (Picanan-Boyugan West-Gusom-NRJ Bdry. Buug Section) Package 3

Construction of Bypass & Diversion Road

Kumalarang km. 4.33 Plans and POW GAA 3 130,000 130,000.00

84. NRJ Pagadian City-Zamboanga City Road - NRJ Lanao - Pagadian - Zamboanga City Road (Picanan-Boyugan West-Gusom-NRJ Bdry. Buug Section) Package 4

Construction of Bypass & Diversion Road

Kumalarang km. 2.00 Plans and POW GAA 3 60,000 60,000.00

Chapter 19-1-DPWH IX-ZDS 2DEOPage 10 of 46

Page 394: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

85. NRJ Pagadian City-Zamboanga City Road - NRJ Pagadian City-Zamboanga City Road (Gatub-Bolisong-Gawil-NRJ Bogayo Section) Package 1

Construction of Bypass & Diversion Road

Kumalarang km. 5.00 Plans and POW GAA 3 150,000 150,000.00

86. NRJ Pagadian City-Zamboanga City Road - NRJ Pagadian City-Zamboanga City Road (Gatub-Bolisong-Gawil-NRJ Bogayo Section) Package 2

Construction of Bypass & Diversion Road

Kumalarang km. 2.00 Plans and POW GAA 3 60,000 60,000.00

87. NRJ Sindangan - Bayog - Lakewood Road - NRJ Sindangan - Bayog - Lakewood Road (Poblacion-Baking-Dagum-Matalang-NRJ Sigacad Section) Package 1

Construction of Bypass & Diversion Road

Lakewood ZDS km. 5.00 Plans and POW GAA 3 150,000 150,000.00

88. NRJ Sindangan - Bayog - Lakewood Road - NRJ Sindangan - Bayog - Lakewood Road (Poblacion-Baking-Dagum-Matalang-NRJ Sigacad Section) Package 2

Construction of Bypass & Diversion Road

Lakewood ZDS km. 4.67 Plans and POW GAA 3 140,000 140,000.00

89. NRJ Sindangan - Bayog - Lakewood Road - NRJ Sindangan - Bayog - Lakewood Road (Poblacion-Baking-Dagum-Matalang-NRJ Sigacad Section) Package 3

Construction of Bypass & Diversion Road

Lakewood ZDS km. 2.83 Plans and POW GAA 3 85,000 85,000.00

90. Jct. Dumalinao-Margosatubig Section - Jct. Dumalinao-Margosatubig Section (Poblacion-So. Magallupan-Tiguian-NRJ Limbatong Section)Package 1

Construction of Bypass & Diversion Road

Margosatubig ZDS km. 3.67 Plans and POW GAA 3 110,000 110,000.00

91. Jct. Dumalinao-Margosatubig Section - Jct. Dumalinao-Margosatubig Section (Poblacion-So. Magallupan-Tiguian-NRJ Limbatong Section)Package 2

Construction of Bypass & Diversion Road

Margosatubig ZDS km. 3.67 Plans and POW GAA 3 110,000 110,000.00

92. Jct. Dumalinao-Margosatubig Section - Jct. Dumalinao-Margosatubig Section (Poblacion-So. Magallupan-Tiguian-NRJ Limbatong Section)Package 3

Construction of Bypass & Diversion Road

Margosatubig ZDS km. 1.67 Plans and POW GAA 3 50,000 50,000.00

Chapter 19-1-DPWH IX-ZDS 2DEOPage 11 of 46

Page 395: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

93. NRJ Zamboanga Del Sur Coastal Road - NRJ Zamboanga Del Sur Coastal Road (Liguac-Poblacion-Panubigan-Lower Panikian-Punta Flecha- Limbayan- Baganian Section) Package 1

Construction of Bypass & Diversion Road

Pitogo, ZDS km. 4.33 Plans and POW GAA 3 130,000 130,000.00

94. NRJ Zamboanga Del Sur Coastal Road - NRJ Zamboanga Del Sur Coastal Road (Liguac-Poblacion-Panubigan-Lower Panikian-Punta Flecha- Limbayan- Baganian Section) Package 1

Construction of Bypass & Diversion Road

Pitogo, ZDS km. 1.33 Plans and POW GAA 3 130,000 130,000.00

95. NRJ Zamboanga Del Sur Coastal Road - NRJ Zamboanga Del Sur Coastal Road (Liguac-Poblacion-Panubigan-Lower Panikian-Punta Flecha- Limbayan- Baganian Section) Package 1

Construction of Bypass & Diversion Road

Pitogo, ZDS km. 1.83 Plans and POW GAA 3 55,000 55,000.00

96. NRJ Zamboanga Del Sur Coastal Road - NRJ Zamboanga Del Sur Coastal Road (Pob.-Malim-Concepcion Section) Package 1

Construction of Bypass & Diversion Road Tabina km. 3.83 Plans and POW GAA 3 115,000 115,000.00

97. NRJ Zamboanga Del Sur Coastal Road - NRJ Zamboanga Del Sur Coastal Road (Pob.-Malim-Concepcion Section) Package 2

Construction of Bypass & Diversion Road Tabina km. 3.83 Plans and POW GAA 3 115,000 115,000.00

98. NRJ Zamboanga Del Sur Coastal Road - NRJ Zamboanga Del Sur Coastal Road (Pob.-Malim-Concepcion Section) Package 3

Construction of Bypass & Diversion Road Tabina km. 2.10 Plans and POW GAA 3 63,100 63,100.00

99. NRJ Zamboanga Del Sur Coastal Road - NRJ Zamboanga Del Sur Coastal Road Tungao-So. San Agustin-Culabay- Abong-Abong Section) Package 1

Construction of Bypass & Diversion Road

Tabina km. 4.33 Plans and POW GAA 3 130,000 130,000.00

100. NRJ Zamboanga Del Sur Coastal Road - NRJ Zamboanga Del Sur Coastal Road Tungao-So. San Agustin-Culabay- Abong-Abong Section) Package 2

Construction of Bypass & Diversion Road

Tabina km. 1.67 Plans and POW GAA 3 50,000 50,000.00

101. Jct. Tubod-Lakewood Road - Jct. Midsalip - Bubuan Road (Pob. Tigbao-Lacarayan-Nangan-nangan-Lison Valley-Lourdes-Noburan Section) Package 1

Construction of Bypass & Diversion Road

Tigabao km. 4.00 Plans and POW GAA 3 120,000 120,000.00

Chapter 19-1-DPWH IX-ZDS 2DEOPage 12 of 46

Page 396: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

102. Jct. Tubod-Lakewood Road - Jct. Midsalip - Bubuan Road (Pob. Tigbao-Lacarayan-Nangan-nangan-Lison Valley-Lourdes-Noburan Section) Package 2

Construction of Bypass & Diversion Road

Tigabao km. 4.00 Plans and POW GAA 3 120,000 120,000.00

103. Jct. Tubod-Lakewood Road - Jct. Midsalip - Bubuan Road (Pob. Tigbao-Lacarayan-Nangan-nangan-Lison Valley-Lourdes-Noburan Section) Package 3

Construction of Bypass & Diversion Road

Tigabao km. 2.00 Plans and POW GAA 3 60,000 60,000.00

2. Construction of Missing Gaps connecting National Roads, including ROW Plans and POW GAA 3 - 104. Sindangan - Bayog - Lakewood

Roaad K1753+753 - K1755+853

Construction of Missing Gaps

Titik km. 2.1 Plans and POW GAA 3 105,000.00 105,000.00

105. Sindangan - Bayog - Lakewood Roaad K1755+583 - K1757+953

Construction of Missing Gaps

Titik km. 2.1 Plans and POW GAA 3 105,000.00 105,000.00

106. Lakewood-Bayog-Sindangan Road (Deporehan-Bdry. Titik Section) S01173MN

Construction of Missing Gaps Titik km. Plans and POW GAA 3 150,000.00 150,000.00 150,000.00 450,000.00

107. Lakewood-Bayog-Sindangan Road (Brgy. Penoles - Brgy. Datagan Section) S01173MN, L=10,412

Construction of Missing Gaps

km. Plans and POW GAA 3 150,000.00 150,000.00 150,000.00 450,000.00

108. Zamboanga Del Sur Coastal Road, Zamboanga Del Sur 2nd LD Package 1,2,3,4

Construction of Missing Gaps km. Plans and POW GAA 3 490,000.00 651,261.00 600,000.00 600,000.00 2,341,261.00

109. Midsalip - Bayog Road, (Midsalip Boundary - Bobuan)

Construction of Missing Gaps km. Plans and POW GAA 3 450,000.00 450,000.00 900,000.00

110. Zamboanga del Sur Coastal Road (Package 1,2,3,4), Liasan-Sugbay Uno-Tipange Section, Zamboanga del Sur, Chainage 23508-Chainage 30534. TL=7,026 km.

Construction of Missing Gaps Liasan, Pitogo ang

Sugbay Uno to Tipange, Zambo Sur

km. Plans and POW GAA 3 200,000.00 200,000.00 400,000.00

As per Instruction by 2nd District Representative

(iii) Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - b. Tertiary Road -

110. Imelda-Bayog-Kumalarang-Lapuyan-Margosatubig RoadS01451MN

Road Upgrading

Dipili-Damit Section, Kumalarang ZDS

km. Plans and POW GAA 3 150,000.00 150,000.00 150,000.00 450,000.00

111. Imelda-Bayog-Kumalarang-Lapuyan-Margosatubig RoadS01174MN (Imelda-Bayog Section)

Road Upgrading Kumalarang ZDS km. Plans and POW GAA 3 - 97,020.00 105,000.00 105,000.00 307,020.00

112. Imelda-Bayog-Kumalarang-Lapuyan-Margosatubig Road S01175MN ( Jct. Diplo-Kumalarang-Bayog Section)

Road Upgrading Kumalarang ZDS km. Plans and POW GAA 3 45,000.00 - 45,000.00

Chapter 19-1-DPWH IX-ZDS 2DEOPage 13 of 46

Page 397: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

113. Imelda-Bayog-Kumalarang- Lapuyan- Margosatubig Road (Kumalarang-Lapuyan Section) (S01184MN)

Road Upgrading Kumalarang ZDS km. Plans and POW GAA 3 354,980.00 - 30,000.00 384,980.00

a. C. 1796 - C. 3400, L=1.604 - - b. C. 6370 - C. 7780, L=1.410 - - c. C. 9380 - C. 11999, L=2.619 km. - -

d. C. 13559 - C. 14556, L=957 - - e. C. 16256 - C. 17099, L=843 - - f. C. 23074 - C. 23157, L=.083 - -

114.Lakewood-Bayog-Sindangan Road Road

Upgrading Bayog ZDS km. Plans and POW GAA 3 52,500.00 - 150,000.00 300,000.00 300,000.00 802,500.00

115. Sindangan - Bayog - Lakewood RoadK1742+302 - K1746+582

Road Upgrading Bayog ZDS km. 4.28 Plans and POW GAA 3 150,000.00 150,000.00 300,000.00

116. Sindangan - Bayog - Lakewood RoadK1746+582 - K1750+700

Road Upgrading Bayog ZDS km. 4.118 Plans and POW GAA 3 145,000.00 145,000.00 290,000.00

117. Zamboanga Del Sur Coastal Road S01167MN (Culasian-Dinas Proper Section)

Road Upgrading San Pablo ZDS km. Plans and POW GAA 3 100,000.00 150,000.00 150,000.00 150,000.00 550,000.00

Project # 1118. Zamboanga del Sur Coastal Road

(Culasian-Dinas Proper Section) SO1167MN Section 1 Chainage 7060 to Chainage 7521, Section 2 Chainage 14888 to Chainage 16791, Chainage 18571 to Chainage 20371. TL= 4164 km.

Road Upgrading

Poblacion, San Pablo and Guinicolalay, Dinas

km. Plans and POW GAA 3 -

Project # 2 duplicates Project # 1 due to unrealize project of Gaa 2018

119. Zamboanga Del Sur Coastal Road S01186MN (Sagucan-Biu-os Section)

Road Upgrading

Vicenzo Sagun, ZDS km. Plans and POW GAA 3 50,000.00 287,661.00 300,000.00 300,000.00 937,661.00

120. Zamboanga del Sur Coastal Road S01187MN (Dinas-Dimataling Section)

Road Upgrading

Dinas, Dimataling ZDS km. Plans and POW GAA 3 150,000.00 150,000.00

121. Zamboanga del Sur Coastal Road S01168MN (Dimataling-Tabina Section)

Road Upgrading Dimataling ZDS km. Plans and POW GAA 3 150,000.00 150,000.00

122. Zamboanga Del Sur Coastal Road S01169MN (Tabina-Pitogo Section)

Road Upgrading Tabina ZDS km. Plans and POW GAA 3 250,000.00 250,000.00

123. Zamboanga Del Sur Coastal Road S01169MN (Tabina-Pitogo Section) Section 1: Chainage 0 to Chainage 2500, Section 2: Chainage 4498 to Chainage 5198

Road Upgrading Tabina ZDS km. Plans and POW GAA 3 105,000.00 105,000.00 210,000.00

As per Instruction by 2nd District Representative

124. Lakewood - Bayog - Sindangan Road Upgrading km. Plans and POW GAA 3 -

Chapter 19-1-DPWH IX-ZDS 2DEOPage 14 of 46

Page 398: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

125. Zamboanga Del Sur Coastal RoadKulot - Margosatubig Section Road

Upgrading Pitogo, ZDS km. Plans and POW GAA 3 -

126. Zamboanga Del Sur Coastal Road S01326MN (Vicenzo Sagun Section)

Road Upgrading Margosatubig ZDS km. Plans and POW GAA 3 100,000.00 100,000.00

(iv) Construction and Maintenance of Bridges along National Roads - 1. Construction of New Bridges -

127. Banisilon Br. along Zamboanga Del Sur Coastal Road Construction of

New Bridges ln.m. Plans and POW GAA 3 30,840.00 30,840.00

128. Datu-Lumok Br. along Zamboanga Del Sur Coastal Road Construction of

New Bridges Lapuyan, ZDS ln.m. Plans and POW GAA 3 60,840.00 60,840.00

129. Kumalarang Br. 3 along Imelda-Bayog-Kumalarang-Lapuyan-Margosatubig Road

Construction of New Bridges Kumalarang, ZDS ln.m. Plans and POW GAA 3 120,840.00 120,840.00

130. Construction of Upper Dumalinao Bridge), S01101MN, along the Zamboanga del Sur Coastal Road, Dumalinao-San Pablo Section, Dumalinao, Zamboanga del Sur

Replacement of Bridges from Temporary to Permanent

Rebokon, Dumalinao ZDS ln.m. Plans and POW GAA 3 31,840.00 31,840.00 31,840.00 95,520.00

131. Construction of Culasian Bridge (S01167MN) along Zamboanga del Sur Coastal Road, San Pablo,ZDS.

Replacement of Bridges from Temporary to Permanent

Rebokon, Dumalinao ZDS ln.m. Plans and POW GAA 3 30,000.00 30,000.00 30,000.00 90,000.00

132. Construction of Baluno Bridge 1 (S01175MN) along Imelda-Bayog-Kumalarang-Lapuyan-Margosatubig Road, Kumalarang, Zamboanga del Sur

Replacement of Bridges from Temporary to Permanent

Rebokon, Dumalinao ZDS ln.m. Plans and POW GAA 3 25,840.00 25,840.00 25,840.00 77,520.00

133. Construction of Diplo Bridge 2 (S01175MN) along Imelda-Bayog-Kumalarang-Lapuyan-Margosatubig Road, Kumalarang, Zamboanga del Sur

Replacement of Bridges from Temporary to Permanent

Rebokon, Dumalinao ZDS ln.m. Plans and POW GAA 3 20,840.00 20,840.00 20,840.00 62,520.00

134. Construction of Maruing Bridge 1 (S01184MN) along Imelda-Bayog-Kumalarang-Lapuyan-Margosatubig Road, Lapuyan, Zamboanga del Sur

Replacement of Bridges from Temporary to Permanent

Rebokon, Dumalinao ZDS ln.m. Plans and POW GAA 3 30,840.00 30,840.00 30,840.00 92,520.00

135. Construction of Maruing Bridge 2 (S01184MN) along Imelda-Bayog-Kumalarang-Lapuyan-Margosatubig Road, Lapuyan, Zamboanga del Sur

Replacement of Bridges from Temporary to Permanent

Rebokon, Dumalinao ZDS ln.m. Plans and POW GAA 3 40,840.00 40,840.00 40,840.00 122,520.00

136. Construction of Tipange Bridge along Liasan-Sugbay Uno-Sumbato-Tipange-Salawagan-Grap-Sagucan, Dimataling, Zamboanga del Sur

Replacement of Bridges from Temporary to Permanent

Rebokon, Dumalinao ZDS ln.m. Plans and POW GAA 3 25,000.00 25,000.00 25,000.00 75,000.00

Chapter 19-1-DPWH IX-ZDS 2DEOPage 15 of 46

Page 399: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

137. Construction of Datagan Bridge along Bululawan-Datagan-Upper Conacon Road, Bayog, Zamboanga del Sur

Replacement of Bridges from Temporary to Permanent

Rebokon, Dumalinao ZDS ln.m. Plans and POW GAA 3 75,000.00 75,000.00 75,000.00 225,000.00

138. Construction of Deporehan Bridge (S01173MN) along Lakewood-Bayog-Sindangan Road, Bayog, Zamboanga del Sur

Replacement of Bridges from Temporary to Permanent

Rebokon, Dumalinao ZDS ln.m. Plans and POW GAA 3 60,840.00 60,840.00 60,840.00 182,520.00

139. Construction of Sagucan Bridge (S01186MN) along Sagucan to Biu-os Section, V. Sagun,ZDS

Replacement of Bridges from Temporary to Permanent

Rebokon, Dumalinao ZDS ln.m. Plans and POW GAA 3 50,000.00 50,000.00 50,000.00 150,000.00

140. Construction of Benuatan Bridge along Don Jose-Benuatan-Pisaan-Sungayan-Mahayag-Codilog-Buburay (Missing Gap)

Replacement of Bridges from Temporary to Permanent

Rebokon, Dumalinao ZDS ln.m. Plans and POW GAA 3 40,000.00 40,000.00 40,000.00 120,000.00

141. Construction of Pisaan Bridge along Don Jose-Benuatan-Pisaan-Sungayan-Mahayag-Codilog-Buburay (Missing Gap)

Replacement of Bridges from Temporary to Permanent

Rebokon, Dumalinao ZDS ln.m. Plans and POW GAA 3 120,000.00 120,000.00 120,000.00 360,000.00

142. Construction of Mahayag Bridge along Don Jose-Benuatan-Pisaan-Sungayan-Mahayag-Codilog-Buburay (Missing Gap)

Replacement of Bridges from Temporary to Permanent

Rebokon, Dumalinao ZDS ln.m. Plans and POW GAA 3 30,000.00 30,000.00 30,000.00 90,000.00

143. Construction of Dumanpunas Bridge along Lapuyan-Margosatubig Road (Missing Gap)

Replacement of Bridges from Temporary to Permanent

Rebokon, Dumalinao ZDS ln.m. Plans and POW GAA 3 80,000.00 80,000.00 80,000.00 240,000.00

144. Construction of Asinan Bridge along Lapuyan-Margosatubig Road (Missing Gap)

Replacement of Bridges from Temporary to Permanent

Rebokon, Dumalinao ZDS ln.m. Plans and POW GAA 3 40,000.00 40,000.00 40,000.00 120,000.00

145. Construction of Tiguian Bridge along Lapuyan-Margosatubig Road (Missing Gap)

Replacement of Bridges from Temporary to Permanent

Rebokon, Dumalinao ZDS ln.m. Plans and POW GAA 3 30,000.00 30,000.00 30,000.00 90,000.00

146. Construction of Margosatubig Bridge along Lapuyan-Margosatubig Road (Missing Gap)

Replacement of Bridges from Temporary to Permanent

Rebokon, Dumalinao ZDS ln.m. Plans and POW GAA 3 40,000.00 40,000.00 40,000.00 120,000.00

2. Replacement of Bridges from Temporary to Permanent -

Chapter 19-1-DPWH IX-ZDS 2DEOPage 16 of 46

Page 400: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

147. Rebokon Bridge (SO1101MN) along Dumalinao-San Pablo Road Length = 30.84 ln.m.

Replacement of Bridges from Temporary to Permanent

Rebokon, Dumalinao ZDS ln.m. Plans and POW GAA 3 30,840.00 30,840.00 30,840.00 92,520.00

148. Sagucan Bridge (SO1186MN) along Dimataling-Vincenzo Sagun Road Length = 20.84 ln.m.

Replacement of Bridges from Temporary to Permanent

Dimataling,Zamboanga del Sur ln.m. Plans and POW GAA 3 20,840.00 20,840.00 20,840.00 62,520.00

149. Baganian Bridge 2 (SO1107MN) along Tabina-Pitogo 2 Road Length = 20.84 ln.m.

Replacement of Bridges from Temporary to Permanent

Tabina,Zamboanga del Sur ln.m. Plans and POW GAA 3 20,840.00 20,840.00 20,840.00 62,520.00

150. Baluno Bridge 1 (SO1175MN) along Imelda-Bayog-Kumalarang-Lapuyan-Margosatubig Road Length = 25.84 ln.m.

Replacement of Bridges from Temporary to Permanent

Kumalarang,Zamboanga del Sur ln.m. Plans and POW GAA 3 30,000.00 30,000.00 30,000.00 90,000.00

151. Replacement/Construction of San Juan Bridge (Box Culvert to Permanent Bridge), S01167MN, along the Zamboanga del Sur Coastal Road, Culasian-Jct. Brgy. Aplayan Section, San Pablo, Zamboanga del Sur

Replacement of Bridges from Temporary to Permanent

Kumalarang,Zamboanga del Sur ln.m. Plans and POW GAA 3 20,000.00 20,000.00 20,000.00 60,000.00

152. Replacement/Construction of Miasin Bridge (Box Culvert to Permanent Bridge), S01167MN, along the Zamboanga del Sur Coastal Road, Culasian-Jct. Brgy. Aplayan Section, San Pablo, Zamboanga del Sur

Replacement of Bridges from Temporary to Permanent

Kumalarang,Zamboanga del Sur ln.m. Plans and POW GAA 3 20,000.00 20,000.00 20,000.00 60,000.00

3. Rehabilitation of Permanent Bridges - 153. Bobuan Br. (B01561MN) along

Sindangan-Bayog-Lakewood RdRehabilitation of Permanent Bridges

ln.m. Plans and POW GAA 3 - 2,000.00 2,000.00

154. Depase Br. (B01559MN) along Sindangan-Bayog-Lakewood Rd

Rehabilitation of Permanent Bridges

ln.m. Plans and POW GAA 3 - 2,000.00 2,000.00

155. Kumalarang Br. 2 (B01585MN) along Imelda-Bayog-Kumalarang-Lapuyan-Margosatubig Rd

Rehabilitation of Permanent Bridges

ln.m. Plans and POW GAA 3 - 2,000.00 2,000.00

156. Salagmanok Br. (B01556MN) along Sindangan-Bayog-Lakewood Rd

Rehabilitation of Permanent Bridges

ln.m. Plans and POW GAA 3 - 1,000.00 1,000.00

157. San Pablo Br. 1 (B01703MN) along Zamboanga del Sur Coastal Rd

Rehabilitation of Permanent Bridges

ln.m. Plans and POW GAA 3 - 2,000.00 2,000.00

158. San Pablo Br. 2 (B01704MN) along Zamboanga del Sur Coastal Rd

Rehabilitation of Permanent Bridges

ln.m. Plans and POW GAA 3 - 2,000.00 2,000.00

a All Along Pagadian-Zamboanga City Road -

Chapter 19-1-DPWH IX-ZDS 2DEOPage 17 of 46

Page 401: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

159. BOYUGAN BR. (BOO553MN) Rehabilitation of Permanent Bridges

Kumalarang ZDS ln.m. Plans and POW GAA 3 10,000.00 10,000.00

4. Retrofitting/Strengthening of Permanent Bridges - 160. Maragang Br. (B00546MN) along

Pagadian City-Zamboanga City RdRetrofitting/Strengthening of Permanent Bridges

ln.m. Plans and POW GAA 3 - 2,824.00 2,824.00

161. Retrofitting/ Strengthening of Permanent Bridge-Dinas Bridge (B00538MN), 75.85 ln.m.

Retrofitting/Strengthening of Permanent Bridges

Tigbao ln.m. Plans and POW GAA 3 25,000.00 25,000.00 25,000.00 75,000.00

162. Retrofitting/ Strengthening of Permanent Bridge-Sibul Bridge (B01710MN), 36.50 ln.m.

Retrofitting/Strengthening of Permanent Bridges

Tigbao ln.m. Plans and POW GAA 3 9,000.00 9,000.00 9,000.00 27,000.00

163. Retrofitting/ Strengthening of Permanent Bridge-Tubod Bridge (B00542MN) 15.30 ln.m.

Retrofitting/Strengthening of Permanent Bridges

Tigbao ln.m. Plans and POW GAA 3 3,800.00 3,800.00 3,800.00 11,400.00

164. Retrofitting/ Strengthening of Permanent Bridge-Dumanguilas Bridge (B00541MN), 15.55 ln.m.

Retrofitting/Strengthening of Permanent Bridges

Tigbao ln.m. Plans and POW GAA 3 3,800.00 3,800.00 3,800.00 11,400.00

165. Retrofitting/ Strengthening of Permanent Bridge-Gapo Bridge (B00548MN), 28.70 ln.m.

Retrofitting/Strengthening of Permanent Bridges

Tigbao ln.m. Plans and POW GAA 3 7,000.00 7,000.00 7,000.00 21,000.00

166. Retrofitting/ Strengthening of Permanent Bridge-Dimaya Bridge (B01709MN), 25.50 ln.m.

Retrofitting/Strengthening of Permanent Bridges

Tigbao ln.m. Plans and POW GAA 3 5,000.00 5,000.00 5,000.00 15,000.00

5. Widening of Permanent Bridges - 167. Widening of Maragang Bridge

(S01453MN) along Pagadian City- Zamboanga City Road,Tigbao, Zamboanga del Sur

Widening of Permanent Bridges

Tigbao ln.m. Plans and POW GAA 3 19,000.00 19,000.00 19,000.00 57,000.00

168. Widening of Nilo Bridge (S01453MN) along Pagadian City- Zamboanga City Road,Tigbao, Zamboanga del Sur

Widening of Permanent Bridges

Tigbao ln.m. Plans and POW GAA 3 19,000.00 19,000.00 19,000.00 57,000.00

169. Widening of Gapo Bridge (S01453MN) along Pagadian City- Zamboanga City Road,Tigbao, Zamboanga del Sur

Widening of Permanent Bridges

Tigbao ln.m. Plans and POW GAA 3 -

170. Widening of Kumalarang Bridge 1 (S01453MN) along Pagadian City- Zamboanga City Road,Kumalarang, Zamboanga del Sur

Widening of Permanent Bridges

Kumalarang ln.m. Plans and POW GAA 3 70,000.00 70,000.00 70,000.00 210,000.00

Chapter 19-1-DPWH IX-ZDS 2DEOPage 18 of 46

Page 402: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

171. Widening of Sayao Bridge (S01453MN) along Pagadian City- Zamboanga City Road,Kumalarang, Zamboanga del Sur

Widening of Permanent Bridges

Kumalarang ln.m. Plans and POW GAA 3 - -

172. Widening of Diplo Bridge (S01453MN) along Pagadian City- Zamboanga City Road,Kumalarang, Zamboanga del Sur

Widening of Permanent Bridges

Kumalarang ln.m. Plans and POW GAA 3 - -

173. Widening of Picanan Bridge (S01453MN) along Pagadian City- Zamboanga City Road,Kumalarang, Zamboanga del Sur

Widening of Permanent Bridges

Kumalarang ln.m. Plans and POW GAA 3 - -

174. Widening of Boyugan Bridge (S01453MN) along Pagadian City- Zamboanga City Road,Kumalarang, Zamboanga del Sur

Widening of Permanent Bridges

Kumalarang ln.m. Plans and POW GAA 3 - -

2,142,751.00 - 135,000.00 4,266,708.00 13,156,622.00 5,536,180.00 25,237,261.00 OO2: Protect Lives and Properties Against Major Floods

1. Construction/Maintenance of Flood Mitigation Structures and Drainage System - 175. Construction of Damit Flood

Control Project (Phase-II), Brgy. Damit, Bayog, Zamboanga del Sur

Construction/Maintenance of Flood Mitigation Structures and Drainage System

ln.m. Plans and POW GAA 3 50,000.00 110,000.00 110,000.00 270,000.00

176. Construction of Flood Control Project, Brgy. Kahayagan, Bayog, ZDS.

Construction/Maintenance of Flood Mitigation Structures and Drainage System

ln.m. Plans and POW GAA 3 150,000.00 150,000.00 150,000.00 450,000.00

177. Construction/improvement/Rehabilitation/Repair of Sibuguey River Flood Control Project along Brgy. Poblacion - Brgy. Lamare, Bayog, ZDS.

Construction/Maintenance of Flood Mitigation Structures and Drainage System

ln.m. Plans and POW GAA 3 100,000.00 110,000.00 110,000.00 320,000.00

178. Construction/improvement/Rehabilitation/Repair of Sibuguey River Flood Control Project Phase III, Poblacion, Bayog, ZDS.

Construction/Maintenance of Flood Mitigation Structures and Drainage System

ln.m. Plans and POW GAA 3 100,000.00 110,000.00 110,000.00 320,000.00

OO1- Subtotal

Chapter 19-1-DPWH IX-ZDS 2DEOPage 19 of 46

Page 403: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

179. Construction of Dinas Manicaan Flood Control Project, Brgy. Manicaan, Tabina, Zamboanga del Sur

Construction/Maintenance of Flood Mitigation Structures and Drainage System

ln.m. Plans and POW GAA 3 50,000.00 105,000.00 105,000.00 260,000.00

180. Construction/Improvement/Rehabilitation of Sicade River Flood Control Project, Kumalarang, Zamboanga del Sur

Construction/Maintenance of Flood Mitigation Structures and Drainage System

ln.m. Plans and POW GAA 3 50,000.00 150,000.00 150,000.00 350,000.00

181. Construction/Improvement/Rehabilitation of Kumalarang River Flood Control Project (Phase-II), Kumalarang, Zamboanga del Sur, De-clogging, Re-chanelling, Dredging of Creeks and Rivers)

Construction/Maintenance of Flood Mitigation Structures and Drainage System

ln.m. Plans and POW GAA 3 150,000.00 150,000.00 150,000.00 450,000.00

182. Construction of Rebokon Flood Control Project, Brgy. Rebokon, Dumalinao, Zamboanga del Sur, L=2,163 ln. m. (Both Side)

Construction/Maintenance of Flood Mitigation Structures and Drainage System

ln.m. Plans and POW GAA 3 95,000.00 102,000.00 112,000.00 309,000.00

183. Construction of Flood Control along Boyugan River, Boyugan West, Kumalarang, Zamboanga del Sur

Construction/Maintenance of Flood Mitigation Structures and Drainage System

ln.m. Plans and POW GAA 3 150,000.00 150,000.00 150,000.00 450,000.00

184. Construction of Flood Control Structure along Bogayo River, Brgy Bogao, Kumalarang, Zamboanga Del Sur

Construction/Maintenance of Flood Mitigation Structures and Drainage System

ln.m. Plans and POW GAA 3 47,250.00 106,000.00 108,000.00 261,250.00

185. Construction/Improvement/Rehabilitation/Repair of Sibuguey River Flood Control Project, Phase I

Construction/Maintenance of Flood Mitigation Structures and Drainage System

Brgy. Poblacion, Bayog, ZDS ln.m. Plans and POW GAA 3 45,000.00 45,000.00

Chapter 19-1-DPWH IX-ZDS 2DEOPage 20 of 46

Page 404: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

186. Construction of Flood MitigationStructure-Construction of DinasRiver Flood Control Brgy.Balongating, Guipos, Zamboangadel Sur

Construction/Maintenance of Flood Mitigation Structures and Drainage System

Balongating, Guipos, ZDS ln.m. Plans and POW GAA 3 50,000.00 50,000.00

As per Instruction by 2nd District Representative

45,000.00 - - 942,250.00 1,293,000.00 1,255,000.00 3,535,250.00 c. Convergence and Special Support Program -

1. Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - 187. CRJ-Mabuhay-Lumbia-Malim

leading to Talisay Beach Resort, Tabina, Zamboanga del Sur

Construction/Improvement of Access Roads leading to Seaports

km. Plans and POW GAA 3 10,000.00 10,000.00

188. CRJ-Tultulan-Concepcion leading Tubod Spring, Tabina, Zamboanga del Sur

Construction/Improvement of Access Roads leading to Seaports

km. Plans and POW GAA 3 20,000.00 20,000.00

189. NRJ leading to Tubo Tubo Beach, Tabina, Zamboanga del Sur

Construction/Improvement of Access Roads leading to Seaports

km. Plans and POW GAA 3 - 10,000.00 10,000.00

190. Improvement/Construction/Concreting from NRJ Zamboanga del sur Coastal Road leading to Bat Sanctuary, (Guinicolalay - Nian - Tarakan - Bubual Road) Dinas and San Pablo Zamboanga del Sur

Construction/Improvement of Access Roads leading to Seaports

km. Plans and POW GAA 3 65,000.00 65,000.00 65,000.00 195,000.00

191. Improvement/Construction/Concreting from NRJ Zamboanga del sur Coastal Road leading to Mount Dupongan, (Legarda l - Legarda lll, New Mirapao - Old Mirapao Road), DInas, Zamboanga del Sur

Construction/Improvement of Access Roads leading to Seaports

km. Plans and POW GAA 3 30,000.00 30,000.00 30,000.00 90,000.00

192. Improvement/Concreting of Road from NRJ Zamboanga del sur Coastal Road leading to Ptekan River Falls, (Sambulawan - San Isidro Road), Dinas, Zamboanga del Sur

Construction/Improvement of Access Roads leading to Seaports

km. Plans and POW GAA 3 - 90,000.00 90,000.00 90,000.00 270,000.00

193. Improvement / Concreting of Road from NRJ Imelda-Bayog-Kumalarang-Lapuyan-Margosatubig Road Leading to Lapuyan Waterfalls, Lapuyan, Zamboanga del Sur

Construction/Improvement of Access Roads leading to Seaports

km. Plans and POW GAA 3 54,400.00 54,400.00 54,400.00 163,200.00

OO2 - Subtotal

Chapter 19-1-DPWH IX-ZDS 2DEOPage 21 of 46

Page 405: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

194. Improvement/Concreting of Road from NRJ Jct. Dumalinao-Margosatubig Road leading to Lake Dasay, (Poblacion, San Miguel - Fatima - Lantawan Road), San Miguel, Zamboanga del Sur

Construction/Improvement of Access Roads leading to Seaports

km. Plans and POW GAA 3 73,000.00 73,000.00 73,000.00 219,000.00

195. Improvement/Concreting of Road from National Highway Coastal Rd. - Baganian - Giwanon Connecting to Tubo Tubo beach, Tabina, Zamboanga del Sur

Construction/Improvement of Access Roads leading to Seaports

km. Plans and POW GAA 3 - 42,000.00 42,000.00 42,000.00 126,000.00

196. Improvement/Concreting of Road from NRJ Zamboanga del sur Coastal Road Leading to Tambunan Marine Protected Area and Beach Complex (Pob. Tanina-Tambunan Road) , Tabina, Zamboanga del Sur

Construction/Improvement of Access Roads leading to Seaports

km. Plans and POW GAA 3 73,500.00 73,500.00 73,500.00 220,500.00

197. Imprvement / Concreting of CRJ-Tultulan-Concepcion leading Tubod Spring, Tabina, Zamboanga del Sur

Construction/Improvement of Access Roads leading to Seaports

km. Plans and POW GAA 3 84,000.00 84,000.00 84,000.00 252,000.00

198. Improvement / Concreting of CRJ-Mabuhay-Lumbia-Malim leading to Talisay Beach Resort, Tabina, Zamboanga del Sur

Construction/Improvement of Access Roads leading to Seaports

km. Plans and POW GAA 3 - 75,000.00 75,000.00 75,000.00 225,000.00

199. Expansion/Concreting of Road from NRJ Jct. Tubod-Lakewood Road Leading to Municipal Wharf (Lakeport) , Lakewood, Zamboanga del Sur

Construction/Improvement of Access Roads leading to Seaports

km. Plans and POW GAA 3 25,200.00 25,200.00 25,200.00 75,600.00

200. Construction/Improvement/Concreting of Circumferential Road from NRJ Jct. Tubod-Lakewood Road leading to Wood Lake along Biswangan- Purok 12, Poblacion Lakewood, Lakewood, Zamboanga del Sur

Construction/Improvement of Access Roads leading to Seaports

km. Plans and POW GAA 3 85,000.00 85,000.00 85,000.00 255,000.00

201. Improvement/Concreting of Road from NRJ Zamboanga del sur Coastal Road Leading to Panikian Island Shoreline, along Pob. Pitogo-Panubigan-Lower Panikian Road, Pitogo, Zamboanga del Sur

Construction/Improvement of Access Roads leading to Seaports

km. Plans and POW GAA 3 - 71,000.00 71,000.00 71,000.00 213,000.00

202. Improvement of Seaport Raod leading to Panikian Island, Pitogo, Zamboanga del Sur

Construction/Improvement of Access Roads leading to Seaports

km. Plans and POW GAA 3 13,350.00 13,350.00 13,350.00 40,050.00

Chapter 19-1-DPWH IX-ZDS 2DEOPage 22 of 46

Page 406: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

203. Improvement/Concreting of Road from NRJ Zamboanga del sur Coastal Road leading to Puting Balas Wetland and Mari-Culture Park (Ambulon Beach), (Kabatan-Limason-Ambulon Road), Vincezo Sagun , Zamboanga del Sur

Construction/Improvement of Access Roads leading to Seaports

km. Plans and POW GAA 3 80,000.00 80,000.00 80,000.00 240,000.00

204. Improvement/Concreting of Road from NRJ Zamboanga del sur Coastal Road leading to Triton Island, (Maraya-Lumbal-Baybay Road), Vincenzo Sagun, Zamboanga del Sur

Construction/Improvement of Access Roads leading to Seaports

km. Plans and POW GAA 3 - 72,000.00 72,000.00 72,000.00 216,000.00

205. Improvement/Concreting of Road from NRJ Zamboanga del sur Coastal Road leading to Liangan Cove Deep Sea Garden, (Kapatagan-Lunib-Liangan Road) Vincenzo Sagun, Zamboanga del Sur

Construction/Improvement of Access Roads leading to Seaports

km. Plans and POW GAA 3 50,000.00 50,000.00 50,000.00 150,000.00

206. Improvement/Concreting of Road from NRJ Zamboanga del sur Coastal Road leading to Danan Scenic Area, Danan, Vincezo Sagun, Zamboanga del Sur

Construction/Improvement of Access Roads leading to Seaports

km. Plans and POW GAA 3 41,000.00 41,000.00 41,000.00 123,000.00

207. Improvement /Concreting of Road from NRJ Jct. Dumalinao-Margosatubig Road leading to Guipos Cave, Guipos, Zamboanga del Sur

Construction/Improvement of Access Roads leading to Seaports

km. Plans and POW GAA 3 - 95,100.00 95,100.00 95,100.00 285,300.00

208. Improvement/Construction/Concreting of Road from NRJ Pagadian-Zamboanga city road leading to Mt. Timolan Protected Landscape,passing through Tuburan Falls of New Tuburan, Lake Dasay of Lantawan, San Miguel, ZDS., (Pob. Tigbao-New Tuburan-Bulisong-Dumalian-Maralag-Fatima-Lantawan Road) San Miguel, Zamboanga del Sur

Construction/Improvement of Access Roads leading to Seaports

km. Plans and POW GAA 3 43,000.00 43,000.00 43,000.00 129,000.00

209. Improvement/Concreting of Road from NRJ Pagadian-Zamboanga city road leading to Mt. Timolan Protected Landscape, (Lacupayan-Limas-Guinlin Road), Tigbao, Zamboanga Del Sur

Construction/Improvement of Access Roads leading to Seaports

km. Plans and POW GAA 3 80,000.00 80,000.00 80,000.00 240,000.00

210. Improvement/Concreting of Road from NRJ Pagadian-Zamboanga city Road leading to Lake Maragang, Tigbao, Zamboanga del Sur

Construction/Improvement of Access Roads leading to Seaports

km. Plans and POW GAA 3 - 90,000.00 90,000.00 90,000.00 270,000.00

Chapter 19-1-DPWH IX-ZDS 2DEOPage 23 of 46

Page 407: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

211. Improvement/Concreting of Road from NRJ Pagadian-Zamboanga city Road leading to Timolan Lake, Tigbao, Zamboanga del Sur

Construction/Improvement of Access Roads leading to Seaports

km. Plans and POW GAA 3 62,400.00 62,400.00 62,400.00 187,200.00

212. Improvement/Concreting of Road from NRJ Zamboanga del sur Coastal Road leading to Rebi Resort, (Rebocon-Kapalaran-Tubo-pait-Sacbulan-Sagasan NRJ-Rebi Road) San Pablo, Zamboanga del Sur

Construction/Improvement of Access Roads leading to Seaports

km. Plans and POW GAA 3 30,000.00 30,000.00 30,000.00 90,000.00

213. Improvement/Concreting of Road from NRJ Zamboanga del sur Coastal Road leading to Buton Sand Bar, (Tandubuay-Buton Road), San Pablo , Zamboanga del Sur

Construction/Improvement of Access Roads leading to Seaports

km. Plans and POW GAA 3 - 50,000.00 50,000.00 50,000.00 150,000.00

214. NRJ Kahayagan leading to Boko Falls, Bayog, Zamboanga del Sur

Construction/Improvement of Access Roads leading to Tourism Destinations

Bayog ZDS km. 2.60 Plans and POW GAA 3 - 78,000.00 78,000.00

215. NRJ Kahayagan-Supon-Camp Blessing-Conacon-Datagan leading to Lupisan Falls, Bayog, Zamboanga del Sur

Construction/Improvement of Access Roads leading to Tourism Destinations

Bayog ZDS km. 1.50 Plans and POW GAA 3 - 45,000.00 45,000.00

216. CRJ Tipangi-Libertad leading to Libertad Falls, Dimataling, Zamboanga del Sur

Construction/Improvement of Access Roads leading to Tourism Destinations

Dimataling km. 2.00 Plans and POW GAA 3 - 60,000.00 60,000.00

217. Malim leading to Talisay Beach, Tabina, Zamboanga del Sur

Construction/Improvement of Access Roads leading to Tourism Destinations

Tabina km. 1.31 Plans and POW GAA 3 - 39,300.00 39,300.00

2. Construction/Improvement of Access Roads leading to Seaports - 218. Upgrading/Concreting of Kabatan

(V.Sagun)-Linoguayan-Bularong Road (Leading to Margosatubig National Port)

Construction of Access Road km. Plans and POW GAA 3 92,650.00 92,650.00 92,650.00 277,950.00

219. Upgrading/Concreting of NRJ Kapatagan-Lunib-Liangan Road (Sitio Liangan) Road (Leading to Liangan Fishing/Commercial Port) (with exception)

Construction of Access Road km. Plans and POW GAA 3 110,000.00 110,000.00 110,000.00 330,000.00

Chapter 19-1-DPWH IX-ZDS 2DEOPage 24 of 46

Page 408: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

220. Upgrading/Concreting of Baluno - Salawagan Road (Road leading to Salawagan Port)

Construction of Access Road San Pablo ZDS km. Plans and POW GAA 3 202,000.00 202,000.00 202,000.00 606,000.00

221. Upgrading/Concreting of Rebokon-Palaran-Tubo Pait-Sacbulan-Senior-Sagasan Road (Road leading to San Pablo Port)

Construction/Improvement of Access Roads leading to Seaports

km. Plans and POW GAA 3 294,100.00 294,100.00 294,100.00 882,300.00

222. Improvement/Concreting of Access Road leading to Wood Lake along NRJ to Purok 12 (Lakeside) Poblacion, Lakewood, Zamboanga del Sur

Construction of Access Road km. Plans and POW GAA 3 50,000.00 50,000.00 50,000.00 150,000.00

223. Construction/ Improvement of Access Roads leading to Seaport, Tikwas-Tina-Calingayan-Baga-San Agustin Road, Pantad Port, Dumalinao, Zamboanga del SurL=8.122Km.

Construction of Access Road km. Plans and POW GAA 3 10,000.00 10,000.00 10,000.00 30,000.00

224. Construction/ Improvement of Access Roads leading to Seaport, Lakupayan-Limas-Guinlin-Baguitan-Balongating-Guling-Kuwatro Kuwatro-Rebokon Road, Baroi Port, Rebokon, Dumalinao, Zamboanga del SurL=29.851Km.

Construction of Access Road San Pablo ZDS km. Plans and POW GAA 3 20,000.00 20,000.00 20,000.00 60,000.00

225. Construction/ Improvement of Access Roads leading to Seaport, Sacbulan-Bagong Misamis-Bagong Silao-Bibilik Road, Bibilik Port, Dumalinao, Zamboanga del SurL=6.693Km.

Construction of Access Road km. Plans and POW GAA 3 5,000.00 5,000.00 5,000.00 15,000.00

226. Construction/ Improvement of Access Roads leading to Seaport, Sacbulan-San Juan-Tiniapan Road, Tiniapan Port, San Pablo, Zamboanga del SurL=5.147Km.

Construction of Access Road km. Plans and POW GAA 3 7,000.00 7,000.00 7,000.00 21,000.00

227. Construction/ Improvement of Access Roads leading to Seaport, Guiniculalay-Nian-Tarakan-Bubual-Buton-Tandubuay Road, Tarakan Port, Dinas, Zamboanga del SurL=13.285Km.

Construction of Access Road San Pablo ZDS km. Plans and POW GAA 3 10,000.00 10,000.00 10,000.00 30,000.00

Chapter 19-1-DPWH IX-ZDS 2DEOPage 25 of 46

Page 409: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

228. Construction/ Improvement of Access Roads leading to Seaport, New Tuburan-Datagan-Magting-Pob. Guipos-Singclot-Sagacad-Dungos-Old Mirapao Road, Tarakan Port, Dinas, Zamboanga del SurL=25.168Km.

Construction/Improvement of Access Roads leading to Seaports

km. Plans and POW GAA 3 20,000.00 20,000.00 20,000.00 60,000.00

229. Construction/ Improvement of Access Roads leading to Seaport, Pob. San Miguel-Legarda Uno-Legarda Tres-New Mirapao-Old Mirapao Road, Tarakan Port, Dinas, Zamboanga del SurL=12.812Km.

Construction of Access Road km. Plans and POW GAA 3 10,000.00 10,000.00 10,000.00 30,000.00

230. Construction/ Improvement of Access Roads leading to Seaport, Baluno-Libertad-Upper Ludiong-Mahayag-Tiniguangan-Cudilog-Old Poblacion Dimataling-Bacayawan Road, Bacayawan Port, Dimataling, Zamboanga del SurL=15.937Km.

Construction of Access Road km. Plans and POW GAA 3 11,000.00 11,000.00 11,000.00 33,000.00

231. Construction/ Improvement of Access Roads leading to Seaport, NRJ Sto. Dumingo-Malim-San Andres-Pob. Tabina Road, Tabina Port, Tabina, Zamboanga del SurL=9.89Km.

Construction of Access Road San Pablo ZDS km. Plans and POW GAA 3 7,000.00 7,000.00 7,000.00 21,000.00

232. Construction/ Improvement of Access Roads leading to Seaport, Panubigan-Panikian-Punta Flecha-Limbayan-Baganian Road, Baganian Port, Tabina, Zamboanga del SurL=16.311Km.

Construction/Improvement of Access Roads leading to Seaports

km. Plans and POW GAA 3 11,000.00 11,000.00 11,000.00 33,000.00

233. Construction/ Improvement of Access Roads leading to Seaport, Culabay-Tungao-Panubigan-Pob. Pitogo Road, Panubigan Port, Pitogo, Zamboanga del SurL=11.054Km.

Construction of Access Road km. Plans and POW GAA 3 7,500.00 7,500.00 7,500.00 22,500.00

234. Construction/ Improvement of Access Roads leading to Seaport, Buburay-Balanagan-Colojo-Liguac-Pob. Pitogo Road, Pitogo Port, Pitogo, Zamboanga del SurL=7.723Km.

Construction of Access Road km. Plans and POW GAA 3 5,500.00 5,500.00 5,500.00 16,500.00

Chapter 19-1-DPWH IX-ZDS 2DEOPage 26 of 46

Page 410: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

235. Construction/ Improvement of Access Roads leading to Seaport, Kapatagan-Lunib-Liangan Road, Liangan Port, V. Sagun, Zamboanga del SurL=4.933Km.

Construction of Access Road San Pablo ZDS km. Plans and POW GAA 3 2,500.00 2,500.00 2,500.00 7,500.00

236. Construction/ Improvement of Access Roads leading to Seaport, Kabatan-Linuguayan-Limamawan-Pob. margosatubig Road, Margosatubig Port, Margosatubig, Zamboanga del SurL=9.472Km.

Construction/Improvement of Access Roads leading to Seaports

km. Plans and POW GAA 3 5,000.00 5,000.00 5,000.00 15,000.00

237. Construction/ Improvement of Access Roads leading to Seaport, Lantawan-Karpoc-Mahalengeb-Tugaya-Tabon-Maruing Road, Pampang Port, Lapuyan, Zamboanga del SurL=16.238Km.

Construction of Access Road km. Plans and POW GAA 3 12,000.00 12,000.00 12,000.00 36,000.00

238. Construction/ Improvement of Access Roads leading to Seaport, Pob. San Miguel-Libuganan-Lantawan-Fatima-San Isedro-Maralag-Talabob-Balobo-San Jose-Luanan-Bualan Road, Bualan Port, Kumalarang, Zamboanga del SurL=25.453Km.

Construction of Access Road km. Plans and POW GAA 3 20,000.00 20,000.00 20,000.00 60,000.00

239. Construction/Improvement Roads Leading to Salawagan Seaport, Dimataling, Zamboanga del Sur, Mulom-Magahis-Binuay-Baluno-Lalab-Salawagan RoadChainage 0.000 - Chainage 13521, L=13.521Km.

Construction of Access Road San Pablo ZDS km. Plans and POW GAA 3 12,000.00 12,000.00 12,000.00 36,000.00

240. Construction/Improvement of Access Roads Leading to Margosatubig Seaport, Tigbao-Lapuyan-Margosatubig RoadChainage 0.000 - Chainage 41480, L=41.480Km.

Construction/Improvement of Access Roads leading to Seaports

km. Plans and POW GAA 3 30,000.00 30,000.00 30,000.00 90,000.00

241. Access Road leading to Liangan Port, Zamboanga Del Sur 2nd LD Construction of

Access Road km. Plans and POW GAA 3 15,100.00 15,100.00

242. Access Road leading to Saloagan Port, Zamboanga Del Sur 2nd LD Construction of

Access Road km. Plans and POW GAA 3 3,776.00 3,776.00

243. Access Road leading to San Pablo Port, Zamboanga Del Sur 2nd LD Construction of

Access Road San Pablo ZDS km. Plans and POW GAA 3 27,500.00 27,500.00

Chapter 19-1-DPWH IX-ZDS 2DEOPage 27 of 46

Page 411: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

244. Upgrading/Concreting of Rebokon-Palaran-Tubo Pait-Sacbulan-Senior-Sagasan Road (Road leading to San Pablo Port)

Construction/Improvement of Access Roads leading to Seaports

km. Plans and POW GAA 3 3,000.00 3,000.00

245. Upgrading/Concreting of NRJ Canunan-Guling-Payag-Mabuhay-Pongapong-Poblacion-San Pablo Port Road, (with exceptions), Zamboanga del Sur

Construction/Improvement of Access Roads leading to Seaports

km. Plans and POW GAA 3 29,000.00 29,000.00

246. Upgrading/Concreting of Kabatan (V.Sagun)-Danan Road (Leading to Margosatubig National Port)

Construction/Improvement of Access Roads leading to Seaports

km. Plans and POW GAA 3 - 3,000.00 3,000.00

3. Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones - 247. Improvement/Concreting of Roads

Jct. National Highways to Poblacion San Miguel to San Isidro leading to Corn Harvest Facility and Processing Plant, Zamboanga del Sur

Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones

km. Plans and POW GAA 3 90,000.00 90,000.00 90,000.00 270,000.00

248. Improvement/Concreting of Roads Jct. National Highways to Dao-an - Fatima, San Miguel leading to Corn Post Harvest Facility and Processing Plant, Zamboanga del Sur

Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones

km. Plans and POW GAA 3 90,000.00 90,000.00 90,000.00 270,000.00

249. Improvement/Concreting of Roads Jct. National Highways to Legarda tres-Legarda dos-Ignacio garrata,Dinas leading to Coco-Coir Twine Processing Industry, Zamboanga del Sur

Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones

km. Plans and POW GAA 3 90,000.00 90,000.00 90,000.00 270,000.00

250. Improvement/Concreting of Roads Jct. National Highways to Bagong Kahayag-Bululawan-Penoles-Sibuguey,Lakewood leading to Furniture Industry, Zamboanga del Sur

Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones

km. Plans and POW GAA 3 85,000.00 85,000.00 85,000.00 255,000.00

Chapter 19-1-DPWH IX-ZDS 2DEOPage 28 of 46

Page 412: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

251. Opening/Construction of Roads Jct. National Highways to Tubod Production areas, Lakewood leading to Rubber Plantation and Processing Plant, Zamboanga del Sur

Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones

km. Plans and POW GAA 3 60,000.00 60,000.00 60,000.00 180,000.00

252. Improvement/Concreting of Roads Jct. National Highways to Poblacion Lapuyan-Karpok-Tolabob-Tiguha leading to CoCo oil Processing Industry, Zamboanga del Sur

Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones

km. Plans and POW GAA 3 76,000.00 76,000.00 76,000.00 228,000.00

253. Improvement/Concreting of Roads Jct. National Highways to Poblacion-Legarda2-Biray-Upper Sibol-Baluno-Salawagan leading to Coco Coir Twine Processing and Dried Seaweed Processing Industry, Zamboanga del Sur

Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones

km. Plans and POW GAA 3 85,000.00 85,000.00 85,000.00 255,000.00

254. Improvement/Concreting of Roads Jct. National Highways to Singclot-Sagacad-Dongos-Old Mirapao leading to Coco-coir Twine Processing Industry, Zamboanga del Sur

Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones

km. Plans and POW GAA 3 81,764.00 81,764.00 81,764.00 245,292.00

255. Opening/Construction of Roads Jct. National Highways to Lukuan-Libayoy-Mate-Nangan nagan-Lisson Valley leading to Rubber Processing Industry, Zamboanga del Sur

Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones

km. Plans and POW GAA 3 94,500.00 94,500.00 94,500.00 283,500.00

256. Improvement/Concreting of Roads Jct. National Highways to Sagacad leading to Abaca Handicraft Processing, Zamboanga del Sur

Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones

km. Plans and POW GAA 3 75,000.00 75,000.00 75,000.00 225,000.00

Chapter 19-1-DPWH IX-ZDS 2DEOPage 29 of 46

Page 413: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

257. Improvement/Concreting of Roads Jct. National Highways to Bolisong-Gawil Bogayo, Kumalarang leading to Tubod Rubber Processing Plant, Zamboanga del Sur

Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones

km. Plans and POW GAA 3 60,000.00 60,000.00 60,000.00 180,000.00

258. Improvement/Concreting of Roads Jct. National Highways to Poblacion San Miguel - Dumalian leading to Corn Harvest Facility and Processing Plant , Zamboanga del Sur

Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones

km. Plans and POW GAA 3 73,444.00 73,444.00 73,444.00 220,332.00

259. Improvement/Concreting of road from Bacayawan-crossing Poblacion-junction Tiniguangan connecting Bacayawan and Poblacion road in support of the Dried Seaweeds Industry in Bacayawan, Dimataling, Zamboanga del Sur

Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones

km. Plans and POW GAA 3 50,000.00 50,000.00 50,000.00 150,000.00

260. Improvement/Concreting og Ignacia Garata-Old Mirapao road connecting Ignacio Garata and National Highway in support of the Coco Coir Induistry in Legarda I, Dinas, Zamboanga del Sur

Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones

km. Plans and POW GAA 3 40,000.00 40,000.00 40,000.00 120,000.00

261. Improvement/Concreting of Upper Sibul-Kinakap-Legarda I road connecting Upper Sibul and Legarda I road in support of the Coco Coir Industry in Legarda I, Dinas, Zamboanga del Sur

Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones

km. Plans and POW GAA 3 50,000.00 50,000.00 50,000.00 150,000.00

262. Improvement/Concreting of Tina-Baloboan road connecting to Baloboan-Canunan road in support of the Coco Coir Industry in Sebucao, Dumalinao, Zamboanga del Sur

Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones

km. Plans and POW GAA 3 35,000.00 35,000.00 35,000.00 105,000.00

Chapter 19-1-DPWH IX-ZDS 2DEOPage 30 of 46

Page 414: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

263. Improvement/Concreting of Malasik to Tickwas NRJ Sebucao road in support of the Coco Coir Industry in Sebucao, Dumalinao, Zamboanga del Sur

Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones

km. Plans and POW GAA 3 30,000.00 30,000.00 30,000.00 90,000.00

264. Improvement/Concreting of NRJ Sebucao to Sebucao Road in support of the Coco Coir Industry in Sebucao, Dumalinao, Zamboanga del Sur

Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones

km. Plans and POW GAA 3 3,250.00 3,250.00 3,250.00 9,750.00

265. Improvement/Concreting of Bolisong-Bogayo road in support of the Abaca and Wearables and Homestyles Industry in Bolisong, Kumalarang, Zamboanga del Sur

Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones

km. Plans and POW GAA 3 50,000.00 50,000.00 50,000.00 150,000.00

266. Improvement/Concreting of Gawil junction to Poblacion road in support of the Wearables and Homestyles Industry in Poblacion, Kumalarang, Zamboanga del Sur

Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones

km. Plans and POW GAA 3 45,000.00 45,000.00 45,000.00 135,000.00

267. Improvement/Concreting of Penoles-Bululawan-Bag-ong Kahayag road connecting Penoles and Junction National Highway in support of the Wearables and Homestyles and rubber Industry in Lakewood, Zamboanga del Sur

Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones

km. Plans and POW GAA 3 40,000.00 40,000.00 40,000.00 120,000.00

268. Improvement/Concreting of Sebugey to Bululawan road in support of the Wearables and Homestyles and rubber Industry in Tubod, Lakewood, Zamboanga del Sur

Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones

km. Plans and POW GAA 3 57,500.00 57,500.00 57,500.00 172,500.00

Chapter 19-1-DPWH IX-ZDS 2DEOPage 31 of 46

Page 415: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

269. Improvement/Concreting of New Tuburan to Junction National Highway in support of Wearables and Homestyle Industry in Tubod, Lakewood, Zamboanga del Sur

Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones

km. Plans and POW GAA 3 50,000.00 50,000.00 50,000.00 150,000.00

270. Improvement/Concreting of Tiguha-Talabog-Karpok-Poblacion road in support of Abaca and Coco Coir industry in Bulawan, Lapuyan, Zamboanga del Sur

Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones

km. Plans and POW GAA 3 50,000.00 50,000.00 50,000.00 150,000.00

271. Improvement/Concreting of Sitio Asinan-Tulapok-Kalian-National Highway in support of the Coconut Industry in Lumbog, Margosatubig, Zamboanga del Sur

Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones

km. Plans and POW GAA 3 50,000.00 50,000.00 50,000.00 150,000.00

272. Improvement/Concreting of road from Tig-an to National Highway road in support of the coconut industry in Lumbog, Margosatubig, Zamboanga del Sur

Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones

km. Plans and POW GAA 3 60,000.00 60,000.00 60,000.00 180,000.00

273. Improvement/Concreting of Limbatong - National Highway Road in support of the Coco Oil Industry in Lumbog, Margosatubig, Zamboanga del Sur

Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones

km. Plans and POW GAA 3 37,500.00 37,500.00 37,500.00 112,500.00

2. Construction/ Improvement of Various Infrastructure in support of National Security - 274. Construction of Concrete Road,

Leon Postigo to Bayog, Zamboanga del Sur

Construction of Access Road km. Plans and POW GAA 3 - - 100,000.00 100,000.00 100,000.00 300,000.00

46,376.00 - 75,000.00 4,138,158.00 4,360,458.00 4,138,158.00 12,758,150.00 A. Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects -

Roads and Bridges - a. Local Roads -

275. Road Opening/Concreting of Jct. Diplo - Mahayahay Road Road Opening Kumalarang, ZDS km. Plans & POW GAA 2 50,000.00 60,000.00 110,000.00

276. Bululawan - Datagan - Upper Conacon Road Opening with Concreting (PCCP)

Road upgrading gravel to paved

Bayog, ZDS

km.

Plans & POW GAA 2 30,000.00 60,000.00 60,000.00 73,320.00 73,320.00 296,640.00

CSSP - Subtotal

Chapter 19-1-DPWH IX-ZDS 2DEOPage 32 of 46

Page 416: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

277. Jct. Lanao - Pagadian - Zamboanga City Rd, Buug (Brgy. Maras) - Bayog/Buug RdNL = 2 km

Road Upgrading

km.

Plans & POW GAA 2 50,000.00 - 60,000.00 60,000.00 170,000.00

278. 2. Upgrading/Concreting of Pob. Tigbao-Timolan-New Tuburan-Bolisong-Tiguha-Sitio Balobo-Carpok-Lantawan-Libuganan-Pob. San Miguel RoadNL = 30.60 kms

Road Upgrading

km.

Plans & POW GAA 2 114,750.00 114,750.00 114,750.00 114,750.00 459,000.00

279. 3. Upgrading/Concreting of Nangan-nangan-Gasa Road

Road Upgrading km. Plans & POW GAA 2 21,000.00 21,000.00 21,000.00 21,000.00 84,000.00

280. 6. Upgrading/Concreting of Lourdes (Pagadian City)-Diana Country Side(Tigbao)-Lacupayan Road

Road Upgrading

km.

Plans & POW GAA 2 - - - - -

281. 7. Upgrading/Concreting of Culabay-Tabina RoadNL = 4.6 km

Road Upgrading km.

Plans & POW GAA 2 19,125.00 19,125.00 19,125.00 19,125.00 76,500.00

282. 8. Upgrading/Concreting of Poblacion- Buburay-Dimataling Road

Road Upgrading km.

Plans & POW GAA 2 21,375.00 21,375.00 21,375.00 21,375.00 85,500.00

283. 9. Upgrading/Concreting of Pob. Kumalarang-Dumara (Lapuyan)-Tiguha-Dumalian-San Isidro (San Miguel)-Fatima-Concepcion-Calubi-Mati Road

Road Upgrading

km.

Plans & POW GAA 2 97,162.50 97,162.50 97,162.50 97,162.50 388,650.00

284. 10. Upgrading/Concreting of Kagawasan-Pitogo Road

Road Upgrading km. Plans & POW GAA 2 27,000.00 27,000.00 27,000.00 27,000.00 108,000.00

285. 15. Upgrading/Concreting of Guinicolalay-Nian-Tarakan-Bubual (San Pablo)-Buton-Tandubuay Road

Road Upgrading

km.

Plans & POW GAA 2 45,676.75 45,676.75 45,676.75 45,676.75 182,707.00

286. 16. Upgrading/Concreting of Rebocon-Tubo Pait (Dumalinao)-Tubo Pait (San Pablo)-Sacbulan-Senior-Sagasan Road

Road Upgrading

km.

Plans & POW GAA 2 149,539.00 149,539.00 149,539.00 149,539.00 598,156.02

287. 17. Upgrading/Concreting of Mahayag (Lulutan) – Libertad-Baluno-Salawagan Port Road, Dimataling, ZDS

Road Upgrading

km.

Plans & POW GAA 2 84,886.15 84,886.15 84,886.15 84,886.15 339,544.60

288. 18. Upgrading/ Concreting (with exceptions) of NRJ Bulawan-Poblacion Lapuyan-Pampang Port Road, Lapuyan, ZDS

Road Upgrading

km.

Plans & POW GAA 2 51,881.65 51,881.65 51,881.65 51,881.65 207,526.60

289. 19. Upgrading/Concreting of Kabatan (V. Sagun) Danan Road (Leading to Margosatubig National Port) Project, ZDS

Road Upgrading

km.

Plans & POW GAA 2 22,027.78 22,027.78 22,027.78 22,027.78 88,111.10

290. 20. Upgrading/Concreting (with exceptions) of Kagawasan- Culabay-Capisan-Tultulan-Baganian Port Road, Dimataling & Tabina, ZDS

Road Upgrading

km.

Plans & POW GAA 2 91,720.90 91,720.90 91,720.90 91,720.90 366,883.60

Chapter 19-1-DPWH IX-ZDS 2DEOPage 33 of 46

Page 417: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

291. 30. Improvement/Concreting of Poblacion San Miguel-Legarda II-Beray-Upper Sibul-Baluno-Salawagan Road

Road Upgrading

km.

Plans & POW GAA 2 72,300.00 72,300.00 72,300.00 72,300.00 289,200.00

292. 31. Improvement/Concreting of Lower Pulacan-Bokong Road

Road Upgrading km. Plans & POW GAA 2 13,125.00 13,125.00 13,125.00 13,125.00 52,500.00

293. 33. Improvement/Concreting of Coastal Junction Road-Mabuhay-Lumbia-Malim Road

Road Upgrading km.

Plans & POW GAA 2 17,853.73 17,853.73 17,853.73 17,853.73 71,414.90

294. 34. Improvement/Concreting of Kabatan-Limason-Ambulon Road

Road Upgrading km. Plans & POW GAA 2 29,186.20 - - - 29,186.20

295. 35. Improvement/Concreting of Coastal Road Junction-Buton-Bubual Road

Road Upgrading km.

Plans & POW GAA 2 34,097.20 - - - 34,097.20

296. 36. Improvement/Concreting of Rebocon-Sitio Palaran, Dumalinao-Tubo Pait-Sacbulan-Sagaran (NHT)- Rebi Barangay Road

Road Upgrading

km.

Plans & POW GAA 2 34,446.00 34,446.00 34,446.00 34,446.00 137,784.00

297. 38. Improvement/Concreting of National Highway Coastal Road-Baganian- Giwanon Road, Tabina, ZDS, 2.00 kms

Road Upgrading

km.

Plans & POW GAA 2 27,525.20 - - - 27,525.20

298. 39. Improvement/Concreting of Kabatan-Sitio Liangan Road, V. Sagun, ZDS, 2.50 kms

Road Upgrading km.

Plans & POW GAA 2 29,186.20 - - - 29,186.20

299. 40. Improvement/ Concreting of CRJ Tultulan – Concepcion Road, Tabina, Zamboanga del Sur

Road Upgrading

km.

Plans & POW GAA 2 30,000.00 30,000.00 - - 60,000.00

300. Concreting of Cuatro-Cuatro-Guling Dumalinao Road, Zamboanga del Sur

Construction of Concrete Road

km.5.00 Plans & POW GAA 2 50,000.00 50,000.00

b. Bridges - 301. Construction of Baking Bridge Local Bridge Bayog, ZDS Plans & POW GAA 2 60,000.00 60,000.00

C. Local Infrastructure Program - Buildings and Other Structures - a. Flood Control -

302. Construction of Flood Control, Brgy. East Migpulao,Dinas, Zamboanga del Sur

Construction of Flood Control Dinas

ln.m.Plans & POW GAA 2 - 20,000.00 - - 20,000.00

303. Construction of Flood Control, Brgy. Benuatan,Dinas, Zamboanga del Sur

Construction of Flood Control Dinas

ln.m.Plans & POW GAA 2 - 20,000.00 - - 20,000.00

304. Const./Repair of Flood Control Project along Lakewood - Bayog - Sindangan Rd., Kahayagan - Pob. Bayog Section

Construction of Flood Control

ln.m.

Plans & POW GAA 2 - 60,000.00 60,000.00

305. Const./Repair of Flood Control Project along Lakewood - Bayog - Sindangan Rd., Bayog - Lamare Section

Construction of Flood Control

ln.m.

Plans & POW GAA 2 - 125,000.00 125,000.00

b. Farm to Market Road GAA 2 -

Chapter 19-1-DPWH IX-ZDS 2DEOPage 34 of 46

Page 418: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

306. Concreting of Farm to Market Road, Brgy. East Migpulao, Dinas, ZDS. L= 4.0 KM

Road Concreting km

Plans & POW GAA 2 - 40,000.00 - - 40,000.00

307. Concreting of Farm to Market Road, Brgy. Nian-Sumiloan, Dinas,ZDS. L= 3.0 KM

Road Concreting km

Plans & POW GAA 2 - 30,000.00 - - 30,000.00

308. Concreting of Farm to Market Road, Brgy. Ludiong, Dinas,ZDS. L= 4.0 KM

Road Concreting km

Plans & POW GAA 2 - 40,000.00 - - 40,000.00

309. Concreting of Farm to Market Road, Sitio 5 Madasigon, Brgy. Singclot, Guipos,ZDS. L= 2.0 KM

Road Concreting

km

Plans & POW GAA 2 - 20,000.00 - - 20,000.00

c. Multipurpose/Facilities - 310. Improvement of Multipurpose

Building (Municipal Gymnasium) at Brgy Pag-asa, Dumalinao, Zamboanga del Sur

Construction of Multi-Purpose Building

Dumalinao, ZDS

No. of Project

Plans & POW GAA 2 20,000.00 10,000.00 - - - - 30,000.00

311. Rehabilitation of Multipurpose Building at Brgy Pag-asa, Dumalinao, Zamboanga del Sur

Construction of Multi-Purpose Building

Dumalinao, ZDS

No. of Project

Plans & POW GAA 2 5,000.00 - - - - - 5,000.00

312. Construction of Multipurpose Building at Brgy Bacayawan, Dimataling, Zamboanga del Sur

Construction of Multi-Purpose Building

Dimataling ZDS

No. of Project

Plans & POW GAA 2 2,500.00 - - - - - 2,500.00

313. Construction of Multipurpose Building at Brgy Sagacad, Dinas, Zamboanga del Sur

Construction of Multi-Purpose Building

Dinas, Dimataling ZDS

No. of Project

Plans & POW GAA 2 2,500.00 - - - - - 2,500.00

314. Construction of Multipurpose Building at Proper Dimaya Elementary School, Brgy. Proper Dimaya, Dinas, Zamboanga del Sur

Construction of Multi-Purpose Building

Dinas, Dimataling ZDS

No. of Project

Plans & POW GAA 2 2,500.00 - - - - - 2,500.00

315. Construction of Multipurpose Building at Brgy Mecolong, Dumalinao, Zamboanga del Sur

Construction of Multi-Purpose Building

Dumalinao, ZDS

No. of Project

Plans & POW GAA 2 - - - 4,600.00 - 4,600.00

316. Construction of Multipurpose Building at Poblacion Comprehensive National High School, Brgy. Poblacion, Lakewood, Zamboanga del Sur

Construction of Multi-Purpose Building

Lakewood ZDS

No. of Project

Plans & POW GAA 2 2,500.00 - - - - - 2,500.00

317. Construction of Multipurpose Building at Brgy Tipasan, Lapuyan, Zamboanga del Sur

Construction of Multi-Purpose Building

Lapuyan, ZDS

No. of Project

Plans & POW GAA 2 - - 2,500.00 - - 2,500.00

318. Construction of Multipurpose Building at Brgy Kalian, Margosatubig, Zamboanga del Sur

Construction of Multi-Purpose Building

Margosatubig ZDS

No. of Project

Plans & POW GAA 2 2,500.00 - - - - - 2,500.00

Chapter 19-1-DPWH IX-ZDS 2DEOPage 35 of 46

Page 419: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

319. Construction of Multipurpose Building at Brgy Sugbay Dos, Pitogo, Zamboanga del Sur

Construction of Multi-Purpose Building

Pitogo, ZDS

No. of Project

Plans & POW GAA 2 2,500.00 - - - - - 2,500.00

320. Construction of Multipurpose Building at Brgy Culabay, Tabina, Zamboanga del Sur

Construction of Multi-Purpose Building

Tabina, ZDS

No. of Project

Plans & POW GAA 2 2,500.00 - - - - - 2,500.00

321. Construction of Multipurpose Building at Betinan National High School, Brgy. Betinan, San Miguel, Zamboanga del Sur

Construction of Multi-Purpose Building No. of Project

Plans & POW GAA 2 2,500.00 2,500.00

322. Construction of Multipurpose Building Guling National High School, Brgy. Guling, Guipos, Zamboanga del Sur

Construction of Multi-Purpose Building No. of Project

Plans & POW GAA 2 2,500.00 2,500.00

323. Construction of Multipurpose Building at Lapuyan National High School, Brgy. Poblacion, Lapuyan, Zamboanga del Sur

Construction of Multi-Purpose Building No. of Project

Plans & POW GAA 2 2,500.00 4,600.00 7,100.00

324. Construction of Multipurpose Building at Brgy Begong, Tigbao, Zamboanga del Sur

Construction of Multi-Purpose Building

Tigbao, ZDS

No. of Project

Plans & POW GAA 2 - - 2,500.00 4,600.00 - 7,100.00

325. Construction of Covered Court, Dinas National High School, Dinas, Zamboanga del Sur

Construction of Covered Court No. of Project

Plans & POW GAA 2 - 3,000.00 3,000.00 - 6,000.00

326. Construction of Covered Court, Dinas Elementary School School, Dinas, Zamboanga del Sur

Construction of Covered Court No. of Project

Plans & POW GAA 2 - 3,000.00 3,000.00 - 6,000.00

327. Construction of 2 Storey 4 Classroom School Building at Benuatan Elementary School at Brgy. Benuatan, Dinas, Zamboanga del Sur

Construction of School Building

No. of Project

Plans & POW GAA 2 - 6,980.00 10,675.00 - 17,655.00

328. Construction of 2 Storey 4 Classroom School Building at Nangka Elementary School at Brgy. Nangka, Dinas, Zamboanga del Sur

Construction of School Building

No. of Project

Plans & POW GAA 2 - 6,980.00 10,675.00 - 17,655.00

329. Construction of of Farmers Training Center, LGU Dinas, Zamboanga del Sur

Construction of Multi-Purpose Building No. of Project

Plans & POW GAA 2 - 3,000.00 5,000.00 - 8,000.00

330. Construction of Covered Court, Brgy. Guinicolalay, Dinas, Zamboanga del Sur

Construction of Covered Court No. of Project

Plans & POW GAA 2 - 3,000.00 - - 3,000.00

331. Construction of Multi-Purpose Bldg. of ZAMSURGOFEMCO, Dinas, Zamboanga del Sur

Construction of Multi-Purpose Building No. of Project

Plans & POW GAA 2 - 3,000.00 - - 3,000.00

332. Construction of Multi-Purpose Bldg. of Dinas Community Multi-Purpose Cooperative, Dinas, Zamboanga del Sur

Construction of Multi-Purpose Building No. of Project

Plans & POW GAA 2 - 3,000.00 - - 3,000.00

Chapter 19-1-DPWH IX-ZDS 2DEOPage 36 of 46

Page 420: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

333. Construction of Health Center Bldg. at Don Jose, Dinas,Zamboanga del Sur

Construction of Health Center No. of Project

Plans & POW GAA 2 - 2,000.00 2,500.00 - 4,500.00

334. Improvement/Repair of Lakewood Multi-Purpose Building

Rehabilitation of Multi-Purpose Building No. of Project

Plans & POW GAA 2 - 5,500.00 5,500.00 - 11,000.00

335. Improvement/Repair of Tigbao Multi-Purpose Building

Rehabilitation of Multi-Purpose Building No. of Project

Plans & POW GAA 2 - 5,500.00 5,500.00 - 11,000.00

336. Improvement/Repair of Guipos Multi-Purpose Building

Rehabilitation of Multi-Purpose Building No. of Project

Plans & POW GAA 2 - 6,000.00 6,000.00 - 12,000.00

337. Construction of Multi-Purpose Building (Covered Court) Tipasan ES, Lapuyan, Zamboanga del Sur

Construction of Multi-Purpose Building No. of Project

Plans & POW GAA 2 - 2,500.00 - - 2,500.00

338. Construction of Multi-Purpose Building (Covered Court) Antonio NHS, Tigbao, Zamboanga del Sur

Construction of Multi-Purpose Building No. of Project

Plans & POW GAA 2 - 2,500.00 - - 2,500.00

339. Construction of Multi-Purpose Building (Covered Court) Bobuan, Bayog, Zamboanga del Sur

Construction of Multi-Purpose Building No. of Project

Plans & POW GAA 2 - 3,000.00 4,600.00 - 7,600.00

340. Construction of Multi-Purpose Building (Covered Court) Depore, Bayog, Zamboanga del Sur

Construction of Multi-Purpose Building No. of Project

Plans & POW GAA 2 - 3,000.00 4,600.00 - 7,600.00

341. Construction of Multi-Purpose Building (Covered Court) Poblacion, Bayog, Zamboanga del Sur

Construction of Multi-Purpose Building No. of Project

Plans & POW GAA 2 - 3,000.00 4,600.00 - 7,600.00

342. Construction of Multi-Purpose Building (Covered Court) Rebokon, Dumalinao, Zamboanga del Sur

Construction of Multi-Purpose Building No. of Project

Plans & POW GAA 2 - 3,000.00 4,600.00 - 7,600.00

343. Construction of Multi-Purpose Building (Covered Court) Kamalig, Dumalinao, Zamboanga del Sur

Construction of Multi-Purpose Building No. of Project

Plans & POW GAA 2 - 3,000.00 4,600.00 - 7,600.00

344. Construction of Multi-Purpose Building (Covered Court) Sebucao, Dumalinao, Zamboanga del Sur

Construction of Multi-Purpose Building No. of Project

Plans & POW GAA 2 - 3,000.00 3,500.00 - 6,500.00

345. Construction of Multi-Purpose Building (Covered Court) Anonang, Dumalinao, Zamboanga del Sur

Construction of Multi-Purpose Building No. of Project

Plans & POW GAA 2 - 3,000.00 - - 3,000.00

346. Construction of Multi-Purpose Building (Covered Court) Poblacion, Dinas, Zamboanga del Sur

Construction of Multi-Purpose Building No. of Project

Plans & POW GAA 2 - 3,000.00 - - 3,000.00

Chapter 19-1-DPWH IX-ZDS 2DEOPage 37 of 46

Page 421: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

347. Construction of Multi-Purpose Building (Covered Court) Don Jose, Dinas, Zamboanga del Sur

Construction of Multi-Purpose Building No. of Project

Plans & POW GAA 2 - 3,000.00 - - 3,000.00

348. Construction of Multi-Purpose Building (Covered Court) Poblacion, Kumalarang, Zamboanga del Sur

Construction of Multi-Purpose Building No. of Project

Plans & POW GAA 2 - 3,000.00 4,500.00 - 7,500.00

349. Construction of Multi-Purpose Building (Covered Court) Picanan, Kumalarang, Zamboanga del Sur

Construction of Multi-Purpose Building No. of Project

Plans & POW GAA 2 - 3,000.00 - - 3,000.00

350. Construction of Multi-Purpose Building (Covered Court) Sicade, Kumalarang, Zamboanga del Sur

Construction of Multi-Purpose Building No. of Project

Plans & POW GAA 2 - 3,000.00 - - 3,000.00

351. Construction of Multi-Purpose Building (Covered Court) Bogayo, Kumalarang, Zamboanga del Sur

Construction of Multi-Purpose Building No. of Project

Plans & POW GAA 2 - 3,000.00 - - 3,000.00

352. Construction of Multi-Purpose Building (Covered Court) Poblacion, Margosatubig, Zamboanga del Sur

Construction of Multi-Purpose Building No. of Project

Plans & POW GAA 2 - 3,000.00 4,500.00 - 7,500.00

353. Construction of Multi-Purpose Building (Covered Court) Digon, Margosatubig, Zamboanga del Sur

Construction of Multi-Purpose Building No. of Project

Plans & POW GAA 2 - 3,000.00 - - 3,000.00

354. Construction of Multi-Purpose Building (Covered Court) Tiguian, Margosatubig, Zamboanga del Sur

Construction of Multi-Purpose Building No. of Project

Plans & POW GAA 2 - 3,000.00 4,500.00 - 7,500.00

355. Construction of Multi-Purpose Building (Covered Court) at Tarakan Elem. School, Brgy. Tarakan, Dinas, Zamboanga del Sur

Construction of Multi-Purpose Building

No. of Project

Plans & POW GAA 2 - 3,000.00 3,000.00 - 6,000.00

356. Construction of Multi-Purpose Building (Covered Court) at East Migpulao Elem. School, Brgy. East Migpulao, Dinas, Zamboanga del Sur

Construction of Multi-Purpose Building

No. of Project

Plans & POW GAA 2 - 3,000.00 3,000.00 - 6,000.00

357. Construction of Multi-Purpose Building (Covered Court) at Bacawan Elem. School, Brgy. Bacawan, Dinas, Zamboanga del Sur

Construction of Multi-Purpose Building

No. of Project

Plans & POW GAA 2 - 3,000.00 3,000.00 - 6,000.00

358. Construction of Multi-Purpose Building (Covered Court) at Lower Dimaya Elem. School, Brgy. Lower Dimaya, Dinas, Zamboanga del Sur

Construction of Multi-Purpose Building

No. of Project

Plans & POW GAA 2 - 3,000.00 3,000.00 - 6,000.00

Chapter 19-1-DPWH IX-ZDS 2DEOPage 38 of 46

Page 422: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

359. Construction of Multi-Purpose Building (Covered Court) at Brgy. Sagacad, Dinas, Zamboanga del Sur

Construction of Multi-Purpose Building No. of Project

Plans & POW GAA 2 - 3,000.00 4,500.00 - 7,500.00

360. Construction of Multi-Purpose Building (Covered Court) at Brgy. Guinicolalay, Dinas, Zamboanga del Sur

Construction of Multi-Purpose Building No. of Project

Plans & POW GAA 2 - 3,000.00 - - 3,000.00

361. Construction of Multi-Purpose Building (Covered Court) at Brgy. San Isidro, Dinas, Zamboanga del Sur

Construction of Multi-Purpose Building No. of Project

Plans & POW GAA 2 - 3,000.00 - - 3,000.00

362. Construction of Multi-Purpose Building (Covered Court) at Brgy. San Isidro Elem. School, Brgy. San Isidro, Dinas, Zamboanga del Sur

Construction of Multi-Purpose Building

No. of Project

Plans & POW GAA 2 - 3,000.00 3,000.00 - 6,000.00

363. Construction of Multi-Purpose Building (Covered Court) at Sagucan National High School, Brgy. Sagucan, V. Sagun, Zamboanga del Sur

Construction of Multi-Purpose Building

No. of Project

Plans & POW GAA 2 - 3,000.00 3,000.00 - 6,000.00

364. Construction of Multi-Purpose Building (Covered Court) at Lobregat National High School, Brgy.Tikwas, Dumalinao, Zamboanga del Sur

Construction of Multi-Purpose Building

No. of Project

Plans & POW GAA 2 - 3,000.00 - - 3,000.00

365. Construction of Multi-Purpose Building (Covered Court) at Mecolong National High School, Brgy.Mecolong, Dumalinao, Zamboanga del Sur

Construction of Multi-Purpose Building

No. of Project

Plans & POW GAA 2 - 3,000.00 - - 3,000.00

366. Construction of Multi-Purpose Building (Covered Court) at Mama Elementary School, Brgy.Mama, Dumalinao, Zamboanga del Sur

Construction of Multi-Purpose Building

No. of Project

Plans & POW GAA 2 - 3,000.00 4,200.00 - 7,200.00

367. Construction of Multi-Purpose Building (Covered Court) at Brgy.Silao, Dumalinao, Zamboanga del Sur

Construction of Multi-Purpose Building No. of Project

Plans & POW GAA 2 - 3,000.00 5,700.00 - 8,700.00

368. Construction of Multi-Purpose Building (Covered Court) at Brgy.Sugbay Dos, Pitogo, Zamboanga del Sur

Construction of Multi-Purpose Building No. of Project

Plans & POW GAA 2 - 3,000.00 - - 3,000.00

369. Construction of Multi-Purpose Building (Covered Court) at Limbayan Elementary School, Brgy. Limbayan, Pitogo, Zamboanga del Sur

Construction of Multi-Purpose Building

No. of Project

Plans & POW GAA 2 - 3,000.00 - - 3,000.00

370. Construction of Multi-Purpose Building (Covered Court) at Salambuyan Elementary School, Brgy. Salambuyan, Lapuyan, Zamboanga del Sur

Construction of Multi-Purpose Building

No. of Project

Plans & POW GAA 2 - 3,000.00 3,000.00 - 6,000.00

Chapter 19-1-DPWH IX-ZDS 2DEOPage 39 of 46

Page 423: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

371. Construction of Multi-Purpose Building (Covered Court) at Brgy. Dansal, Lapuyan, Zamboanga del Sur

Construction of Multi-Purpose Building No. of Project

Plans & POW GAA 2 - 3,000.00 4,600.00 - 7,600.00

372. Construction of Multi-Purpose Building (Covered Court) at Sayog Elementary School, Brgy. Sayog, Lapuyan, Zamboanga del Sur

Construction of Multi-Purpose Building

No. of Project

Plans & POW GAA 2 - 3,000.00 3,000.00 - 6,000.00

373. Construction of Multi-Purpose Building (Covered Court) at Tubod National High School, Tubod, Lakewood, Zamboanga del Sur

Construction of Multi-Purpose Building

No. of Project

Plans & POW GAA 2 - 3,000.00 3,000.00 - 6,000.00

374. Construction of Multi-Purpose Building (Covered Court) at Brgy. Bag-ong Kahayag, Lakewood, Zamboanga del Sur

Construction of Multi-Purpose Building No. of Project

Plans & POW GAA 2 - 3,000.00 3,000.00 - 6,000.00

375. Construction of Multi-Purpose Building (Covered Court) at Mataga Elementary School, Brgy. Mataga, Bayog, Zamboanga del Sur

Construction of Multi-Purpose Building

No. of Project

Plans & POW GAA 2 - 3,000.00 3,000.00 - 6,000.00

376. Construction of Multi-Purpose Building (Covered Court) at Bayog National High School, Bayog, Zamboanga del Sur

Construction of Multi-Purpose Building No. of Project

Plans & POW GAA 2 - 3,000.00 - - 3,000.00

377. Construction of Multi-Purpose Building (Covered Court) at Libayoy National High School, Brgy. Libayoy, Tigbao, Zamboanga del Sur

Construction of Multi-Purpose Building

No. of Project

Plans & POW GAA 2 - 3,000.00 3,500.00 - 6,500.00

378. Construction of Multi-Purpose Building (Covered Court) at , Brgy. Sugbay Uno, Dimataling, Zamboanga del Sur

Construction of Multi-Purpose Building No. of Project

Plans & POW GAA 2 - 3,000.00 4,500.00 - 7,500.00

379. Construction of Multi-Purpose Building (Covered Court) at , Brgy. Malim, Tabina, Zamboanga del Sur

Construction of Multi-Purpose Building No. of Project

Plans & POW GAA 2 - 3,000.00 4,600.00 - 7,600.00

380. Construction of Multi-Purpose Building (Covered Court) at , Brgy. Poblacion, Guipos, Zamboanga del Sur

Construction of Multi-Purpose Building No. of Project

Plans & POW GAA 2 - 3,000.00 - - 3,000.00

381. Construction of Multi-Purpose Building (Covered Court) at Toribio Minor National High School, Brgy. Toribio Minor, Margosatubig, Zamboanga del Sur

Construction of Multi-Purpose Building

No. of Project

Plans & POW GAA 2 - 3,000.00 - - 3,000.00

382. Repair and Rehabilitation of Municipal Gymnasium at Vincenzo A. Sagun, ZDS

Construction of Multi-Purpose Building No. of Project

Plans & POW GAA 2 - 20,000.00 5,000.00 - 25,000.00

Chapter 19-1-DPWH IX-ZDS 2DEOPage 40 of 46

Page 424: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

383. Construction of Senior Citizen Building at Brgy. Bag-ong Kahayag, Lakewood, ZDS

Construction of Multi-Purpose Building No. of Project

Plans & POW GAA 2 - 5,000.00 3,500.00 - 8,500.00

384. Construction of Multi-purpose Building at Brgy. Matalang, Lakewood, ZDS

Construction of Multi-Purpose Building No. of Project

Plans & POW GAA 2 - 3,000.00 6,500.00 - 9,500.00

385. Completion of Multi-Purpose Building (Covered Court) at Dumalinao National High School, Dumalinao, ZDS.

Construction of Multi-Purpose Building No. of Project

Plans & POW GAA 2 - 2,500.00 2,500.00 - 5,000.00

386. Construction of Multi-purpose Building at Dumalinao Gym (Phase IV), Dumalinao,ZDS.

Construction of Multi-Purpose Building No. of Project

Plans & POW GAA 2 - 20,000.00 - - 20,000.00

387. Construction/Improvement of DPWH ZDS 2nd DEO Building and Facilities, Guipos, ZDS.

Construction of Multi-Purpose Building No. of Project

Plans & POW GAA 2 - 80,000.00 120,000.00 - 200,000.00

388. Construction of Mini Multipurpose Covered Court, Baganian Elementary School, Brgy. Baganian, Tabina, Zamboanga del Sur

Construction of Multi-Purpose Building

No. of Project

Plans & POW GAA 2

1,600.00

2,500.00 4,100.00

389. Construction of Mini Multipurpose Covered Court, Brgy. Maragang, Tigbao, Zamboanga del Sur

Construction of Multi-Purpose Building No. of Project

Plans & POW GAA 2

1,600.00

1,600.00

390. Construction of Mini Multipurpose Covered Court, Limbayan Elementary School, Brgy. Limbayan, Pitogo, Zamboanga del Sur

Construction of Multi-Purpose Building

No. of Project

Plans & POW GAA 2

1,600.00

1,600.00

391. Construction of Mini Multipurpose Covered Court, Ma. Clara Lobregat National High School, Brgy. Tickwas, Dumalinao, Zamboanga del Sur

Construction of Multi-Purpose Building

No. of Project

Plans & POW GAA 2

1,600.00

1,600.00

392. Construction of Mini Multipurpose Covered Court, Old Mirapao National High School, Brgy Old Mirapao, Brgy. Old Mirapao, Dinas, Zamboanga del Sur

Construction of Multi-Purpose Building

No. of Project

Plans & POW GAA 2

1,600.00

1,600.00

393. Construction of Multipurpose Covered Court at Betinan National High School, Brgy. Betinan, San Miguel, Zamboanga del Sur

Construction of Multi-Purpose Building

No. of Project

Plans & POW GAA 2

3,500.00

3,500.00

394. Construction of Multipurpose Covered Court at Brgy. Baganian, Tabina, Zamboanga del Sur2

Construction of Multi-Purpose Building No. of Project

Plans & POW GAA 2

3,000.00

3,000.00

Chapter 19-1-DPWH IX-ZDS 2DEOPage 41 of 46

Page 425: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

395. Construction of Multipurpose Covered Court at Brgy. Limonan, San Miguel, Zamboanga del Sur

Construction of Multi-Purpose Building No. of Project

Plans & POW GAA 2

3,000.00

3,000.00

396. Construction of Multipurpose Covered Court at Brgy. Pongapong, San Pablo, Zamboanga del Sur

Construction of Multi-Purpose Building No. of Project

Plans & POW GAA 2

3,000.00

4,500.00 7,500.00

397. Construction of Multipurpose Covered Court at Brgy. Secade, Kumalarang, Zamboanga del Sur

Construction of Multi-Purpose Building No. of Project

Plans & POW GAA 2

3,000.00

4,500.00 7,500.00

398. Construction of Multipurpose Covered Court, Bayog National High School, Brgy. Kahayagan, Bayog, Zamboanga del Sur

Construction of Multi-Purpose Building No. of Project

Plans & POW GAA 2

3,500.00

3,500.00

399. Construction of Multipurpose Covered Court, Brgy. Don Jose, Dinas, Zamboanga del Sur

Construction of Multi-Purpose Building No. of Project

Plans & POW GAA 2

3,000.00

3,000.00

400. Construction of Multipurpose Covered Court, Brgy. Poblacion, Bayog, Zamboanga del Sur

Construction of Multi-Purpose Building No. of Project

Plans & POW GAA 2

3,000.00

4,600.00 7,600.00

401. Construction of Multipurpose Covered Court, Brgy. Poblacion, Guipos, Zamboanga del Sur

Construction of Multi-Purpose Building No. of Project

Plans & POW GAA 2

3,000.00

3,000.00

402. Construction of Multipurpose Covered Court, Brgy. Poblacion, Lapuyan, Zamboanga del Sur

Construction of Multi-Purpose Building No. of Project

Plans & POW GAA 2

3,000.00

12,000.00 15,000.00

403. Construction of Multipurpose Covered Court, Toribio Minor National High School, Brgy. Poblacion, Margosatubig, Zamboanga del Sur

Construction of Multi-Purpose Building

No. of Project

Plans & POW GAA 2

3,000.00

3,000.00

404. Construction of Multipurpose Hall, Brgy. Bibilik, Dumalinao, Zamboanga del Sur

Construction of Multi-Purpose Building No. of Project

Plans & POW GAA 2

2,000.00

6,800.00 8,800.00

405. Rehabilitation of Multipurpose Building (Municipal Gymnasium), Brgy. Kabatan, Vincenzo Sagun, Zamboanga del Sur

Rehabilitation of Multi-Purpose Building

No. of Project

Plans & POW GAA 2

2,500.00

2,500.00

406. Construction (Completion) of Multipurpose Building (Public Market), Brgy. Pag-asa, Dumalinao, Zamboanga del Sur

Rehabilitation of Multi-Purpose Building No. of Project

Plans & POW GAA 2

5,000.00

5,000.00

407. Rehabilitation of Municipal Gymnasium, Brgy. Poblacion, Lakewood, Zamboanga del Sur

Rehabilitation of Multi-Purpose Building No. of Project

Plans & POW GAA 2

2,000.00

5,000.00 7,000.00

Chapter 19-1-DPWH IX-ZDS 2DEOPage 42 of 46

Page 426: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

408. Rehabilitation of Municipal Gymnasium, Brgy. Tigbao, Tigbao, Zamboanga del Sur

Rehabilitation of Multi-Purpose Building No. of Project

Plans & POW GAA 2

2,000.00

5,000.00 7,000.00

d. Seawall - 409. Construction of Seawall at

Dimataling, Zamboanga del Sur Construction of Seawall ln.m. Plans & POW Contract - 10,000.00 - - 10,000.00

410. Construction of Seawall at Dinas, Zamboanga del Sur

Construction of Seawall ln.m. Plans & POW Contract - 10,000.00 - - 10,000.00

411. Construction of Seawall at Dumalinao, Zamboanga del Sur

Construction of Seawall ln.m. Plans & POW Contract - 10,000.00 - - 10,000.00

412. Construction of Seawall at Margosatubig, Zamboanga del Sur Construction of

Seawall ln.m.Plans & POW Contract - 10,000.00 - - 10,000.00

413. Construction of Seawall at Pitogo, Zamboanga del Sur

Construction of Seawall ln.m. Plans & POW Contract - 10,000.00 - - 10,000.00

414. Construction of Seawall at San Pablo, Zamboanga del Sur

Construction of Seawall ln.m. Plans & POW Contract - 10,000.00 - - 10,000.00

415. Construction of Seawall at Tabina, Zamboanga del Sur

Construction of Seawall ln.m. Plans & POW Contract - 10,000.00 - - 10,000.00

416. Construction of Seawall at Vincenzo Sagun, Zamboanga del Sur

Construction of Seawall ln.m.

Plans & POW Contract - 10,000.00 - - 10,000.00

e. Water Supply - 417. Construction/Water System at

Brgy. Sebugay, Lakewood, ZDS. Construction of Water System No. of Project

Plans & POW GAA 2 - 2,000.00 - - 2,000.00

418. Construction/Water System at Brgy. Gatub, Lakewood, ZDS. Construction of

Water System No. of ProjectPlans & POW GAA 2 - 2,000.00 - - 2,000.00

419. Construction/Water System at Brgy. Bagong Kahayag, Lakewood, ZDS.

Construction of Water System No. of Project

Plans & POW GAA 2 - 2,000.00 - - 2,000.00

420. Construction/Water System at Bayog National High School, Bayog, ZDS.

Construction of Water System No. of Project

Plans & POW GAA 2 - 2,000.00 - - 2,000.00

421. Construction/Water System at Brgy. Suminalom, Kumalarang, ZDS.

Construction of Water System No. of Project

Plans & POW GAA 2 - 2,000.00 - - 2,000.00

422. Construction/Water System at Brgy. Limbatong, Margosatubig, ZDS.

Construction of Water System No. of Project

Plans & POW GAA 2 - 2,000.00 - - 2,000.00

423. Construction of Water and Sanitation Facilities at Nanganangan E.S., Tigbao, ZDS

Construction of Water System No. of Project

Plans & POW GAA 2 - 3,000.00 - - 3,000.00

424. Construction of Water System at Brgy. Bag-ong Kahayag, Lakewood, ZDS

Construction of Water System No. of Project

Plans & POW GAA 2 - 3,000.00 - - 3,000.00

425. Construction of Spring Development at Brgy. Gasa, Lakewood, ZDS

Construction of Water System No. of Project

Plans & POW GAA 2 - 3,000.00 - - 3,000.00

426. Construction of Spring Development at Brgy. Biswangan, Lakewood, ZDS

Construction of Water System No. of Project

Plans & POW GAA 2 - 3,000.00 - - 3,000.00

Chapter 19-1-DPWH IX-ZDS 2DEOPage 43 of 46

Page 427: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

427. Construction of Spring Development at Brgy. Lukuan, Lakewood, ZDS

Construction of Water System No. of Project

Plans & POW GAA 2 - 3,000.00 - - 3,000.00

428. Provision/Construction of Rain Water Collection (30 Units) Construction of

Water System No. of ProjectPlans & POW GAA 2 - 7,500.00 - - 7,500.00

f. School Building - 429. Construction of 2 Storey 6

Classroom School Building at Binuay National High School at Brgy. Binuay, Dinas, Zamboanga del Sur

Construction of School Building

No. of Project

Plans & POW GAA 2 - 10,000.00 - - 10,000.00

430. Construction of 1 Storey 3 Classroom School Building at Dongos Elementary School, Brgy. Dongos, Dinas,ZDS

Construction of School Building No. of Project

Plans & POW GAA 2 - 3,000.00 - - 3,000.00

431. Construction of 1 Storey 3 Classroom School Building at Nian Elementary School, Brgy. Nian, Dinas,ZDS

Construction of School Building No. of Project

Plans & POW GAA 2 - 3,000.00 - - 3,000.00

432. Construction of 1 Storey 3 Classroom School Building at Upper Sibul Elementary School, Brgy. Upper Sibul, Dinas,ZDS

Construction of School Building No. of Project

Plans & POW GAA 2 - 3,000.00 - - 3,000.00

433. Construction of 1 Storey 3 Classroom School Building at Legarda Dos Elementary School, Brgy. Legarda Dos, Dinas,ZDS

Construction of School Building No. of Project

Plans & POW GAA 2 - 3,000.00 - - 3,000.00

434. Construction of 1 Storey 7 Classroom School Building at Guinicolalay Elementary School, Brgy. Guinicolalay, Dinas,ZDS

Construction of School Building No. of Project

Plans & POW GAA 2 - 5,000.00 - - 5,000.00

435. Construction of 1 Storey 7 Classroom School Building at Antonio National High School, Brgy. Antonio, Tigbao, ZDS

Construction of School Building No. of Project

Plans & POW GAA 2 - 5,000.00 - - 5,000.00

436. Construction of 1 Storey 10 Classroom School Building at Libayoy National High School, Brgy. Libayoy Tigbao, ZDS

Construction of School Building No. of Project

Plans & POW GAA 2 - 8,000.00 - - 8,000.00

437. Construction of Computer Classroom and Science Laboratory at Punta Flecha National High School, Pitogo, ZDS

Construction of School Building

No. of Project

Plans & POW GAA 2 - 2,000.00 - - 2,000.00

438. Construction of 1 Storey 10 Classroom School Building at Toribio Minor National High School- Digon Extension, Toribio Minor, Margosatubig, ZDS

Construction of School Building

No. of Project

Plans & POW GAA 2 - 8,000.00 - - 8,000.00

g. Concrete Road - 439. Road Concreting at Brgy. Tubo-

Pait, Dumalinao, ZDSRehabilitation of concrete Road km.

Plans & POW GAA 2 - 30,000.00 - - 30,000.00

Chapter 19-1-DPWH IX-ZDS 2DEOPage 44 of 46

Page 428: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

440. Road Rehab./Repair at Brgy. Sapang Penoles, Lapuyan, ZDS

Rehabilitation of concrete Road km.

Plans & POW GAA 2 - 30,000.00 - - 30,000.00

441. Construction of Slope Protection and Road Concreting at Brgy. Danan, Vincenzo A. Sagun, ZDS

Rehabilitation of concrete Road km.

Plans & POW GAA 2 - 30,000.00 - - 30,000.00

442. Rehabilitation of Road, Brgy. Magahis, Margosatubig, Zamboanga del Sur

Rehabilitation of concrete Road km.

Plans & POW GAA 2 4,500.00 4,500.00

h. Spillway/Bridge - 443. Construction of Spillway at Brgy.

Sibuguey, Lakewood, ZDSConstruction of Spillway ln.m Plans & POW GAA 2 - 2,000.00 - - 2,000.00

444. Construction of Spillway at Brgy. Sagacad(Sitio Simuyak), Dinas, ZDS

Construction of Spillway ln.m

Plans & POW GAA 2 - 3,000.00 - - 3,000.00

445. Construction of Hanging Bridge at Brgy. Baking, Lakewood, ZDS ln.m Plans & POW GAA 2 - 2,000.00 - - 2,000.00

D. GAD Projects - 446. Construction of Rest Areas 5,800.00 5,800.00

a. Brgy. Lacupayan, Tigbao, ZDS K1687+950

Construction of Rest Areas km Plans & POW GAA 2 -

b. Jct. Tubod Lakewood, ZDS K1170+650

Construction of Rest Areas km Plans & POW GAA 2 -

c. Brgy. Bogayo, Kumalarang, ZDS K1706+100

Construction of Rest Areas km Plans & POW GAA 2 -

d. Brgy. Sicade, Kumalarang ZDS K1707+700

Construction of Rest Areas km Plans & POW GAA 2 -

447. Construction of Waiting Shed 1,382.00 1,382.00 a. Brgy. Maragang, Tigbao, ZDS K1690+050 Construction of

Waiting Shed Plans & POW GAA 2 -

b. Brgy. Upper Nilo, Tigbao, ZDS K1692+050 Construction of

Waiting Shed Plans & POW GAA 2 -

c. Brgy. Bogayo, Kumalarang, ZDS K1706+100 Construction of

Waiting Shed Plans & POW GAA 2 -

REGIONWIDE - A. Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects -

Local Roads - 448. Improvement/Concreting of

Culabay-Capisan Road, Tabina, Zamboanga Del Sur

Improvement/Concreting km Plans & POW GAA 2

- 37,000.00 37,000.00

Local Infrastructure Program - Buildings and Other Structures - a. Multipurpose/Facilities -

449. Construction of Multi-Purpose Building of Brgy. Poblacion, Bayog, Zamboanga del Sur

Multipurpose/Facilities Plans & POW GAA 2

- 4,000.00 4,000.00

450. Construction of Multi-Purpose Building of Dinas Community MPC in Brgy. Don Jose, Dinas, Zamboanga del Sur

Multipurpose/Facilities

Plans & POW GAA 2

-

3,000.00 3,000.00

b. Roads and Bridges - Local Roads -

Chapter 19-1-DPWH IX-ZDS 2DEOPage 45 of 46

Page 429: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

451. Concreting of Road from Santan to Daisy, Brgy. Locuban, Dumalinao, Zamboanga Del Sur

Rehabilitation of concrete Road km

Plans & POW GAA 2 2,000.00 2,000.00

452. Concreting of Local Road, Barangay Sugbay to Barangay Balong, Pitogo, Zamboanga del Sur

Rehabilitation of concrete Road km

Plans & POW GAA 2 10,000.00 10,000.00

92,000.00 164,000.00 1,253,864.25 1,978,011.45 1,369,839.45 1,017,189.45 5,874,904.62 2,326,127.00 164,000.00 1,463,864.25 11,325,127.45 20,179,919.45 11,946,527.45 47,405,565.62 GRAND TOTAL

Local - Subtotal

Chapter 19-1-DPWH IX-ZDS 2DEOPage 46 of 46

Page 430: Table of Contents (By Chapter)

Updated Zamboanga Peninsula Regional Development Investment Program (RDIP), 2017-2022

Agency: DPWH IXChapter 19: Accelerating Infrastructure Development

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

ZAMBOANGA SIBUGAY 1ST DEO, DIPLAHANZAMBOANGA SIBUGAY 1ST LEGISLATIVE DISTRICTa. OO1: Ensure Safe and Reliable National Road System

(i) Asset Preservation of National Roads1. Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development Management-4 (HDM-4)

a. Primary Road1. Lanao - Pagadian - Zamboanga

City RoadRehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads

Buug, Diplahan km. Plans and POW GAA 3 12,959.00 9,650.00 37,041.00 37,041.00 96,691.00

2. Lanao - Pagadian - Zamboanga City Road

Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads

Buug, Diplahan km. Plans and POW GA 3 50,000.00 50,000.00 100,000.00 T2 T2

b. Tertiary Road - 3. Imelda - Bayug - Kumalarang -

Lapuyan Road (S01145MN)Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads

Diplahan km. Plans and POW GAA 3 50,000.00 50,000.00 100,000.00

4. Imelda - Bayug - Kumalarang - Lapuyan Road (S01111MN)

Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads

Diplahan km. Plans and POW GA 3 50,000.00 50,000.00 100,000.00

5. Diplahan Jct. - Malangas Port Road (S01109MN)

Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads

Malangas km. Plans and POW GAA 3 20,000.00 20,000.00 40,000.00

6. Diplahan Jct. - Malangas Port Road (S01138MN)

Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads

Malangas km. Plans and POW GA 3 20,000.00 20,000.00 40,000.00

7. Jct. Imelda - Alicia Road Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads

Imelda, Alicia km. Plans and POW GAA 3 20,000.00 20,000.00 40,000.00

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Page 431: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

2. Preventive Maintenance based on Pavement Management System - a. Primary Road -

8. Lanao - Pagadian - Zamboanga City Road

Preventive Maintenance based on Pavement Management System

Buug, Diplahan km. Plans and POW GAA 3 100,000.00 7,614.00 50,000.00 50,000.00 207,614.00 T1 and T2 same amount

T1 and T2 same amount

b. Tertiary Road - 9. Imelda - Bayug - Kumalarang -

Lapuyan Road (S01145MN)Preventive Maintenance based on Pavement Management System

Diplahan km. Plans and POW GAA 3 20,000.00 20,000.00 40,000.00

10. Imelda - Bayug - Kumalarang - Lapuyan Road (S01111MN)

Preventive Maintenance based on Pavement Management System

Diplahan km. Plans and POW GAA 3 35,000.00 35,000.00 70,000.00

11. Diplahan Jct. - Malangas Port Road (S01109MN)

Preventive Maintenance based on Pavement Management System

Malangas km. Plans and POW GAA 3 28,000.00 5,000.00 5,000.00 38,000.00

12. Diplahan Jct. - Malangas Port Road (S01138MN)

Preventive Maintenance based on Pavement Management System

Malangas km. Plans and POW GAA 3 20,000.00 20,000.00 40,000.00

13. Jct. Imelda - Alicia Road Preventive Maintenance based on Pavement Management System

Imelda, Alicia km. Plans and POW GAA 3 20,000.00 20,000.00 40,000.00

3. Construction/Upgrading/Rehabilitation of Drainage along National Roads - a. Primary Road -

14. Lanao - Pagadian - Zamboanga City Road Construction/Upgra

ding/Rehabilitation of Drainage along National Roads

Buug, Diplahan km. Plans and POW GAA 3 10,000.00 10,000.00 20,000.00

15. Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads - Lanao - Pagadian - Zamboanga City Road - K1724+124 - K1726+433, K1726+246 - K1726+433 & K1727+179 - K1729+666

Construction/Upgrading/Rehabilitation of Drainage along National Roads

Buug, Diplahan km. Plans and POW GAA 3 20,000.00 20,000.00 40,000.00

b. Tertiary Road -

Chapter 19-1-DPWH IX-ZS 1DEOPage 2 of 43

Page 432: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

16. Imelda - Bayug - Kumalarang - Lapuyan Road (S01145MN) Construction/Upgra

ding/Rehabilitation of Drainage along National Roads

Diplahan km. Plans and POW GAA 3 5,000.00 5,000.00 10,000.00

17. Imelda - Bayug - Kumalarang - Lapuyan Road (S01111MN) Construction/Upgra

ding/Rehabilitation of Drainage along National Roads

Diplahan km. Plans and POW GAA 3 5,000.00 5,000.00 10,000.00

18. Diplahan Jct. - Malangas Port Road (S01109MN) Construction/Upgra

ding/Rehabilitation of Drainage along National Roads

Diplahan km. Plans and POW GAA 3 2,000.00 2,000.00 4,000.00

19. Diplahan Jct. - Malangas Port Road (S01138MN) Construction/Upgra

ding/Rehabilitation of Drainage along National Roads

Diplahan km. Plans and POW GAA 3 -

20. Jct. Imelda - Alicia RoadConstruction/Upgrading/Rehabilitation of Drainage along National Roads

Diplahan km. Plans and POW GAA 3 2,000.00 2,000.00 4,000.00

4. Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - a. Primary Road -

21. Lanao - Pagadian - Zamboanga City Road Road Slope Buug, Diplahan km. Plans and POW GAA 3 230,000.00 115,000.00 82,240.00 82,240.00 509,480.00

b. Tertiary Road - 22. Imelda - Bayug - Kumalarang -

Lapuyan Road (S01145MN) Road Slope Diplahan km. Plans and POW GAA 3 37,000.00 10,000.00 10,000.00 57,000.00

23. Imelda - Bayug - Kumalarang - Lapuyan Road (S01111MN) Road Slope Diplahan km. Plans and POW GAA 3 -

24. Diplahan Jct. - Malangas Port Road (S01109MN) Road Slope Malangas km. Plans and POW GAA 3 10,000.00 10,000.00 20,000.00

25. Diplahan Jct. - Malangas Port Road (S01138MN) Road Slope Malangas km. Plans and POW GAA 3 10,000.00 10,000.00

26. Jct. Imelda - Alicia Road Road Slope Imelda, Alicia km. Plans and POW GAA 3 48,000.00 50,000.00 5,000.00 5,000.00 108,000.00 (ii) Network Development - 1. Improvement/Widening of National Roads -

a. Primary Road - 27. Lanao - Pagadian - Zamboanga

City RoadImprovement/Widening of National Roads

Buug, Diplahan km. Plans and POW GAA 3 300,000.00 305,000.00 120,000.00 305,000.00 305,000.00 1,335,000.00

28. Lanao - Pagadian - Zamboanga City Road

Improvement/Widening of National Roads

Buug, Diplahan km. Plans and POW GAA 3 300,000.00 280,474.00 280,474.00 860,948.00 T2 T2

b. Tertiary Road -

Chapter 19-1-DPWH IX-ZS 1DEOPage 3 of 43

Page 433: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

29. Imelda - Bayug - Kumalarang - Lapuyan Road (S01145MN)

Improvement/Widening of National Roads

Diplahan km. Plans and POW GAA 3 -

30. Imelda - Bayug - Kumalarang - Lapuyan Road (S01111MN)

Improvement/Widening of National Roads

Diplahan km. Plans and POW GAA 3 -

31. Diplahan Jct. - Malangas Port Road, Wye Length (S01109MN)

Improvement/Widening of National Roads

Malangas km. Plans and POW GAA 3 - -

32. Diplahan Jct. - Malangas Port Road (S01138MN)

Improvement/Widening of National Roads

Malangas km. Plans and POW GAA 3 15,000.00 58,950.00 75,000.00 75,000.00 223,950.00

33. Jct. Imelda - Alicia Road Improvement/Widening of National Roads

Imelda, Alicia km. Plans and POW GAA 3 49,701.00 31,050.00 63,604.00 63,604.00 207,959.00

34. Jct. Imelda - Alicia Road (including Drainage)

Improvement/Widening of National Roads

Imelda, Alicia km. Plans and POW GAA 3 - 75,000.00 75,000.00 150,000.00

2. Off-Carriageway Improvement including Drainage - 35. Imelada-Bayog-Kumalarang-

Lapuyan-Margosatubig Road Bayog km. Plans and POW GAA 3 91,000.00 91,000.00

(iii) Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - a. Tertiary Road -

36. Imelda - Bayug - Kumalarang - Lapuyan Road (S01145MN) Road Upgrading Diplahan km. Plans and POW GAA 3 -

37. Imelda - Bayug - Kumalarang - Lapuyan Road (S01111MN) Road Upgrading Diplahan km. Plans and POW GAA 3 135,846.00 43,185.00 179,031.00

38. Diplahan Jct. - Malangas Port Road (S01109MN) Road Upgrading Malangas km. Plans and POW GAA 3 - - -

39. Diplahan Jct. - Malangas Port Road (S01138MN) Road Upgrading Malangas km. Plans and POW GAA 3 - - -

40. Jct. Imelda - Alicia Road Road Upgrading Imelda, Alicia km. Plans and POW GAA 3 - - - 41. Road Upgrading(Gravel tp

Concrete) along Jct. Lanao-Pagadian-Zamboanga City Road at Poblacion Buug-Bayog Road, K1728+700-K1741+400

Road Upgrading Buug, Zamboanga Sibugay Province km. Plans and POW GAA 3 - - -

42. Road Upgrading(Gravel tp Concrete) along Jct. Imelda-Alicia Road at Guintolan, Payao-Binangonan-Salinding-Kimos Road, K1756+160-K1773+92

Road Upgrading Payao, Zamboanga Sibugay Province km. Plans and POW GAA 3 - - -

43. Road Upgrading(Gravel tp Concrete) along Jct. Lanao-Pagadian-Zamboanga City Road at Poblacion Buug-Villacastor-Gaulan-Kauswagan-Diplahan Road, K1728+700-K1755+878

Road UpgradingBuug-Diplahan Zamboanga Sibugay Province

km. Plans and POW GAA 3 - - -

Chapter 19-1-DPWH IX-ZS 1DEOPage 4 of 43

Page 434: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

44. Road Upgrading(Gravel tp Concrete) along Jct. Lanao-Pagadian-Zamboanga City Road at Labasan-Camanga-Buyogan-Sampoli Road, 00+000-000+220

Road UpgradingDiplahan, Zamboanga Sibugay Province

km. Plans and POW GAA 3 - - -

(iv) Construction and Maintenance of Bridges along National Roads - 1. Construction of New Bridges -

45. Construction of New Permanent Bridge along Sibuguey River at Brgy. Villacastor, Buug, Zamboanga Sibugay

Construction of 3 spans 60ln.m PSCG Bridge at Sibuguey River including approaches, Brgy. Villacastor, Buug, Z.SP

Brgy. Villacastor, Buug, Zamboanga Sibugay Province

ln.m. Plans and POW GAA 3 -

46. Construction of New Permanent Bridge at Pulog River at Brgy. Pulog, Buug, Zamboanga Sibugay

Construction of 3 spans 40ln.m RCDG Bridge at Pulog River including approaches, Brgy. Pulog, Buug, Z.SP

Brgy. Pulog, Buug, Zamboanga Sibugay Province

ln.m. Plans and POW GAA 3 -

47. Construction of New Permanent Bridge along Sibuguey River at Brgy. Paradise, Diplahan, Zamboanga Sibugay

Construction of 3 spans 60ln.m PSCG Bridge at Paradise River including approaches, Brgy. Paradise, Diplahan, Z.S.P

Brgy. Paradise, Diplahan, Zamboanga Sibugay Province

ln.m. Plans and POW GAA 3 -

48. Construction of New Permanent Bridge along Sibuguey River at Brgy. Lumpanac, Imelda, Zamboanga Sibugay

Construction of 3 spans 60ln.m PSCG Bridge along Sibuguey River including approaches, Brgy. Lumpanac, Imelda, Z.S.P

Brgy. Lumpanac, Imelda, Zamboanga Sibugay Province

ln.m. Plans and POW GAA 3 -

49. Construction of New Permanent Bridge along Agutayan River at Brgy. Agutayan, Buug, Zamboanga Sibugay

Construction of 2 spans 30ln.m RCDG Bridge along Agutayan River including approaches, Brgy. Agutayan, Buug, Z.S.P

Brgy. Agutayan, Buug, Zamboanga Sibugay Province

ln.m. Plans and POW GAA 3 -

2. Retrofitting/Strenghtening of Permanent Bridges - Primary Road - All along Lanao - Pagadian - Zamboanga City Road (SO1115MN) -

Chapter 19-1-DPWH IX-ZS 1DEOPage 5 of 43

Page 435: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

50. Up. Boyugan Br. (BOO475MN) Retrofitting/Strenghtening of Permanent Bridges

Buug, Diplahan ln.m. Plans and POW GAA 3 16,000.00 16,000.00

51. Muyo Br. (BOO476MN) Retrofitting/Strenghtening of Permanent Bridges

Buug, Diplahan ln.m. Plans and POW GAA 3 3,000.00 3,000.00

52. Gondong Br. 1 (BOO478MN) Retrofitting/Strenghtening of Permanent Bridges

Buug, Diplahan ln.m. Plans and POW GAA 3 - - 9,850.00 9,850.00

53. Gondong Br. 2 (BOO479MN) Retrofitting/Strenghtening of Permanent Bridges

Buug, Diplahan ln.m. Plans and POW GAA 3 14,400.00 14,400.00

54. Sibugay Br. (BOO480MN) Retrofitting/Strenghtening of Permanent Bridges

Buug, Diplahan ln.m. Plans and POW GAA 3 - 11,000.00 11,000.00

55. San Jose Br. (BOO481MN) Retrofitting/Strenghtening of Permanent Bridges

Buug, Diplahan ln.m. Plans and POW GAA 3 36,000.00 36,000.00

56. Gandiangan Br. (BOO42MN) Retrofitting/Strenghtening of Permanent Bridges

Buug, Diplahan ln.m. Plans and POW GAA 3 - - -

Chapter 19-1-DPWH IX-ZS 1DEOPage 6 of 43

Page 436: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Tertiary Road - All along Jct. Imelda - Alicia Road (SO1114MN) - 57. Baluran Br. (BOO471MN) Retrofitting/Strengh

tening of Permanent Bridges

Imelda, Alicia ln.m. Plans and POW GAA 3 - - 14,000.00 14,000.00

58. Lutiman Br. (BOO472MN) Retrofitting/Strenghtening of Permanent Bridges

Imelda, Alicia ln.m. Plans and POW GAA 3 - - 15,000.00 15,000.00

59. Lambuyugan Br. (BOO473MN) Retrofitting/Strenghtening of Permanent Bridges

Imelda, Alicia ln.m. Plans and POW GAA 3 - - -

60. Bomba Br. (BOO474MN) Retrofitting/Strenghtening of Permanent Bridges

Imelda, Alicia ln.m. Plans and POW GAA 3 16,000.00 16,000.00

c. Along Diplahan - Malangas Road (SO1139MN) - 61. La Dicha Br. ((BOO515MN) Retrofitting/Strengh

tening of Permanent Bridges

Malangas ln.m. Plans and POW GAA 3 - - -

3. Widening of Permanent Bridges - I. Primary Road - a. All along Lanao - Pagadian - Zamboanga City Road (SO1115MN) -

62. Up. Boyugan Br. (BOO475MN) Widening of Permanent Bridges Buug, Diplahan ln.m. Plans and POW GAA 3 -

63. Muyo Br. (BOO476MN) Widening of Permanent Bridges Buug, Diplahan ln.m. Plans and POW GAA 3 34,000.00 34,000.00 68,000.00

64. Goling Br. (BOO477MN) Widening of Permanent Bridges Buug, Diplahan ln.m. Plans and POW GAA 3 39,000.00 39,000.00 78,000.00

65. Gondong Br. 1 (BOO478MN) Widening of Permanent Bridges Buug, Diplahan ln.m. Plans and POW GAA 3 31,680.00 31,680.00

66. Gondong Br. 2 (BOO479MN) Widening of Permanent Bridges Buug, Diplahan ln.m. Plans and POW GAA 3 39,000.00 39,000.00

67. Sibugay Br. (BOO480MN) Widening of Permanent Bridges Buug, Diplahan ln.m. Plans and POW GAA 3 82,000.00 82,000.00 164,000.00

68. San Jose Br. (BOO481MN) Widening of Permanent Bridges Buug, Diplahan ln.m. Plans and POW GAA 3 42,000.00 42,000.00 84,000.00

69. Gandiangan Br. (BOO42MN) Widening of Permanent Bridges Buug, Diplahan ln.m. Plans and POW GAA 3 48,000.00 48,000.00 96,000.00

II. Tertiary Road - a. All along Imelda - Bayug - Kumalarang - Lapuyan - Margosatubig Road -

70. Minsulao Br. (S01145MN) Widening of Permanent Bridges Diplahan ln.m. Plans and POW GAA 3 -

71. Sampuli Br. (S01144MN) Widening of Permanent Bridges Diplahan ln.m. Plans and POW GAA 3 -

Chapter 19-1-DPWH IX-ZS 1DEOPage 7 of 43

Page 437: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

b. All along Jct. Imelda - Alicia Road (SO1114MN) - 72. Baluran Br. (BOO471MN) Widening of

Permanent Bridges Imelda, Alicia ln.m. Plans and POW GAA 3 -

73. Lutiman Br. (BOO472MN) Widening of Permanent Bridges Imelda, Alicia ln.m. Plans and POW GAA 3 -

74. Lambuyugan Br. (BOO473MN) Widening of Permanent Bridges Imelda, Alicia ln.m. Plans and POW GAA 3 -

75. Bomba Br. (BOO474MN) Widening of Permanent Bridges Imelda, Alicia ln.m. Plans and POW GAA 3 -

c. Along Diplahan - Malangas Road (SO1139MN) - 76. La Dicha Br. ((BOO515MN) Widening of

Permanent Bridges Malangas ln.m. Plans and POW GAA 3 -

939,547.00 1,058,824.00 305,514.00 1,592,359.00 1,592,359.00 - 5,488,603.00 OO2: Protect Lives and Properties Against Major Floods

1. Construction/Maintenance of Flood Mitigation Structures and Drainage System - 77. Construction of Flood Control

Structure along Lanao - Pagadian - Zamboanga City Road, part of Sibuguey River, Barangay Balugo, Imelda, Zamboanga Sibugay

Flood Control Imelda ln.m. Plans and POW GAA 3 40,075.00 34,064.00 105,000.00 110,000.00 289,139.00

78. Construction of Flood Control along Lanao - Pagadian - Zamboanga City Road, part of Sibuguey River, Barangay Balugo, Imelda, Zamboanga Sibugay

Flood Control Imelda ln.m. Plans and POW GAA 3 34,470.00 30,000.00 10,000.00 110,000.00 112,000.00 296,470.00

79. Construction of Flood Control along Imelda - Bayog - Kumalarang - Lapuyan - Margosatubig Road, part of Sibuguey River, Barangay Paradise, Diplahan, Zamboanga Sibugay

Flood Control Diplahan ln.m. Plans and POW GAA 3 33,905.00 6,301.00 115,000.00 120,000.00 275,206.00

80. Construction of Flood Control along Jct. Imelda - Alicia Road, part of Sibuguey River, Barangay Bulawan, Payao, Zamboanga Sibugay

Flood Control Payao ln.m. Plans and POW GAA 3 33,427.00 107,000.00 125,000.00 265,427.00

81. Construction of Flood Control along Imelda - Bayog - Kumalarang - Lapuyan - Margosatubig Road, part of Sibuguey River, Barangay Pilar, Diplahan, Zamboanga Sibugay

Flood Control Diplahan ln.m. Plans and POW GAA 3 30,215.00 104,000.00 106,000.00 240,215.00

82. Construction/Extension of Flood Control Structure along Sibuguey River, Bulawan, Payao, Zamboanga Sibugay

Flood Control Payao ln.m. Plans and POW GAA 3 45,230.00 55,457.00 108,000.00 110,000.00 318,687.00

OO 1- Subtotal

Chapter 19-1-DPWH IX-ZS 1DEOPage 8 of 43

Page 438: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

83. Construction/Extension of Flood Control Structure along Sibuguey River, Bulawan, Payao, Zamboanga Sibugay

Flood Control Payao ln.m. Plans and POW GAA 3 47,000.00 20,000.00 110,000.00 112,000.00 289,000.00

84. Construction of Flood Control Structure (Revetment Wall) along Sibuguey River, Barangay Bulawan, Payao, Zamboanga Sibugay

Flood Control Payao ln.m. Plans and POW GAA 3 13,543.00 109,000.00 112,000.00 234,543.00

85. Construction of Flood Control Structure (Revetment Wall) along Sibuguey River, Barangay Paradise, Diplahan, Zamboanga Sibugay

Flood Control Diplahan ln.m. Plans and POW GAA 3 42,199.00 82,791.00 115,000.00 115,000.00 354,990.00

86. Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Flood Control Structure (Revetment Wall) along Sibuguey River, Brgy. Poblacion, Imelda, Zamboanga Sibugay

Flood Control Diplahan ln.m. Plans and POW GAA 3 150,000.00 150,000.00 150,000.00 450,000.00

87. Construction of Flood Control Structure (Revetment Wall) along Sibuguey River, Balugo, Imelda

Flood Control Imelda ln.m. Plans and POW GAA 3 27,000.00 47,000.00 74,000.00

88. Construction of Flood Control Structure (Revetment Wall) along Sibuguey River, Diplahan (Phase II)

Flood Control Diplahan ln.m. Plans and POW GAA 3 75,000.00 75,000.00 75,000.00 225,000.00

89. Construction of Flood Control Structure (Revetment Wall) along Sibuguey River, Brgy. Pilar, Diplahan, (upstream)

Flood Control Diplahan ln.m. Plans and POW GAA 3 60,000.00 60,000.00

90. Construction of concrete Protection Dike, Sta. 00+000 - Sta. 00+183.49, Brgy. Guiwan, Payao, Zamboanga Sibugay

Construction of Flood Mitigation Structure

ln.m. Plans and POW GAA 3 20,000.00 20,000.00

91. Construction of Flood Control Structure (Boulevard) along Sibuguey River, Imelda, Zamboanga Sibugay (Sta. 00+000 - Sta. 00+252)

Construction of Flood Mitigation Structure

ln.m. Plans and POW GAA 3 27,500.00 27,500.00

92. Construction of Flood Control Structure (Revetment Wall) along Sibuguey River, Brgy. Concepcion, Alicia, Zamboanga Sibugay (Sta. 00+000 - Sta. 00+247)

Construction of Flood Mitigation Structure

ln.m. Plans and POW GAA 3 27,000.00 27,000.00 54,000.00

Chapter 19-1-DPWH IX-ZS 1DEOPage 9 of 43

Page 439: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

93. Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control Structure (Revetment Wall) along Sibuguey River, Diplahan

Flood Control Diplahan ln.m. Plans and POW GAA 3 105,000.00 105,000.00 105,000.00 315,000.00

94. Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control Structure (Revetment Wall) along Sibuguey River, Diplahan (Phase II)

Flood Control Diplahan ln.m. Plans and POW GAA 3 131,904.00 130,000.00 130,000.00 391,904.00

95. Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control Structure (Revetment Wall) along Sibuguey River, Brgy. Pilar, Diplahan, (upstream)

Flood Control Diplahan ln.m. Plans and POW GAA 3 120,000.00 120,000.00 120,000.00 360,000.00

96. Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of La Dicha Bridge River Control Downstream, Malangas, Zamboanga Sibugay

Flood Control Diplahan ln.m. Plans and POW GAA 3 30,000.00 30,000.00 30,000.00 90,000.00

97. Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control along Imelda-Bayog-Kumalarang-Lapuyan-Margosatubig Road, part of Sibuguey River (Upstream), Brgy. Paradise, Diplahan, Zamboanga Sibugay

Flood Control Diplahan ln.m. Plans and POW GAA 3 6,301.00 6,301.00 10,000.00 22,602.00

98. Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control along Lanao-Pagadian- Zamboanga City Road, part of Sibuguey River (downstream), Brgy. Balugo, Imelda, Zambaoanga Sibugay

Flood Control Diplahan ln.m. Plans and POW GAA 3 30,000.00 30,000.00 30,000.00 90,000.00

99. Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control Structure (revetment wall) along Sibuguey River (upstream), Brgy. Conception, Alicia, Zamboanga Sibugay

Flood Control Diplahan ln.m. Plans and POW GAA 3 27,000.00 27,000.00 27,000.00 81,000.00

Chapter 19-1-DPWH IX-ZS 1DEOPage 10 of 43

Page 440: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

100. Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Contsruction of Flood Control Structure (Revetment Wall) along Sibuguey River, Balugo, Imelda, Zamboanga Sibugay

Flood Control Diplahan ln.m. Plans and POW GAA 3 47,000.00 47,000.00 47,000.00 141,000.00

2. Rehabilitation of Flood Control Structures - 101. Rehabilitation of Flood Control

Structure (Revetment Wall) along Sibuguey River, Barangay Pilar, Diplahan, Zamboanga Sibugay

Flood Control Diplahan ln.m. Plans and POW GAA 3 18,334.00 30,000.00 80,678.00 129,012.00

102. Rehabilitation/improvement of flood control for prevention and mitigation along Brgy. San Jose-Poblacion Imelda, part of Sibuguey River, 0+020.00-0+025.00, 0+037.00-0+640.00, 0+640.00-0+735.00, Imelda, Zamboanga Sibugay

Flood Control Diplahan ln.m. Plans and POW GAA 3 116,617.00 116,617.00

103. Rehabilitation of Flood Control Structure (Revetment Wall) along Imelda - Bayog - Kumalarang - Lapuyan - Margosatubig Road, Barangay Pilar, Diplahan, Zamboanga Sibugay

Flood Control Diplahan ln.m. Plans and POW GAA 3 10,000.00 30,000.00 40,000.00

348,398.00 333,258.00 398,150.00 722,205.00 1,703,301.00 1,746,000.00 5,251,312.00 OO 2- Subtotal

Chapter 19-1-DPWH IX-ZS 1DEOPage 11 of 43

Page 441: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

c. Convergence and Special Support Program - 1. Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations -

104. Improvement/Concreting of National Road Junction Leading to Baluran Falls

Concreting Imelda km. Plans and POW GAA 3 60,500.00 60,500.00

105. Improvement/Concreting of National Road Junction Leading to Payao Wharf (Including Payao Wharf & Pandilusan Island Wharf

Concreting Payao km. Plans and POW GAA 3 46,200.00 46,200.00

106. Improvement/Concreting of National Road Junction Leading to Litayon Island

Concreting Alicia km. Plans and POW GAA 3 100,000.00 100,000.00 100,000.00 300,000.00

107. Improvement/Concreting of National Road (Lutiman-Guicam) & (Mabuhay-Talusan-Olutanga) Leading to Sea Snake Sanctuary

Concreting Olutanga km. Plans and POW GAA 3 60,000.00 60,000.00

108. Improvement/Concreting of Poblacion-Samonte Barangay Road Leading to Bat Cave

Concreting Talusan km. Plans and POW GAA 3 75,000.00 75,000.00

109. Improvement/Concreting of National Road Junction to Bawang Provincial Road Leading to Silupa Concreting Buug km. Plans and POW GAA 3 80,000.00 100,000.00 100,000.00 100,000.00 380,000.00

110. Access Road leading to Malangas Port, Zamboanga Sibugay Concreting Malangas km. Plans and POW GAA 3 1,050.00 1,050.00

111. Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - Road Improvement / Concreting from National Road Junction leading to Talairan Falls, Buug, Zamboanga Sibugay

Concreting Imelda km. Plans and POW GAA 3 82,340.00 82,340.00 82,340.00 247,020.00

112. Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - Road Improvement / Concreting from National Road Junction leading to Muyo Cave and Falls, Buug Zamboanga Sibugay

Concreting Payao km. Plans and POW GAA 3 100,000.00 100,000.00 100,000.00 300,000.00

113. Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - Road Improvement / Concreting from National Road Junction leading to Buug Bat Cave, Buug, Zamboanga Sibugay

Concreting Imelda km. Plans and POW GAA 3 50,000.00 50,000.00 50,000.00 150,000.00

Chapter 19-1-DPWH IX-ZS 1DEOPage 12 of 43

Page 442: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

114. Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - Road Improvement / Concreting from National Road Junction leading to Pamintayan Beach, Buug, Zamboanga Sibugay

Concreting Payao km. Plans and POW GAA 3 100,000.00 100,000.00 100,000.00 300,000.00

115. Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - Road Improvement / Concreting from National Road Junction to Silupa Beach, Buug , Zamboanga Sibugay

Concreting Imelda km. Plans and POW GAA 3 50,000.00 50,000.00 50,000.00 150,000.00

116. Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - Improvement / Concreting of National Road Junction Leading to Guinoman Cave and Waterfalls, Diplahan, Zamboanga Sibugay

Concreting Payao km. Plans and POW GAA 3 50,000.00 50,000.00 50,000.00 150,000.00

117. Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - Road Improvement / Concreting from National Road Junction leading to Mali Little Baguio Eco Tourism Park, Imelda, Zamboanga Sibugay

Concreting Imelda km. Plans and POW GAA 3 50,000.00 50,000.00 50,000.00 150,000.00

118. Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - Road Improvement / Concreting from National Road Junction to Dumpok-Baluyan Eco Tourism Park, Imelda, Zamboanga Sibugay

Concreting Payao km. Plans and POW GAA 3 50,000.00 50,000.00 50,000.00 150,000.00

119. Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - Road Improvement / Concreting from National Road Junction leading to Lampinigan Island, Mabuhay, Zamboanga Sibugay

Concreting Imelda km. Plans and POW GAA 3 50,000.00 50,000.00 50,000.00 150,000.00

Chapter 19-1-DPWH IX-ZS 1DEOPage 13 of 43

Page 443: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

120. Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - Road Improvement / Concreting from National Road Junction Leading to Sioton Island Beach Resort, Mabuhay, Zamboanga Sibugay

Concreting Payao km. Plans and POW GAA 3 50,000.00 50,000.00 50,000.00 150,000.00

121. Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - Road Improvement / Concreting from National Road Junction leading to Kigay Sand Bar Beach, Malangas, Zamboanga Sibugay

Concreting Imelda km. Plans and POW GAA 3 50,000.00 50,000.00 50,000.00 150,000.00

122. Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - Road Improvement / Concreting from National Road Junction Leading to Malangas Boulevard, Malangas, Zamboanga Sibugay

Concreting Payao km. Plans and POW GAA 3 50,000.00 50,000.00 50,000.00 150,000.00

123. Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - Road Improvement / Concreting from National Road Junction leading to Buntong Highland Agri Tourism Park, Malangas, Zamboanga Sibugay

Concreting Imelda km. Plans and POW GAA 3 50,000.00 50,000.00 50,000.00 150,000.00

124. Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - Improvement / Concreting of National Road Junction to Dansulao Red Beach Resort, Malangas, Zamboanga Sibugay

Concreting Payao km. Plans and POW GAA 3 50,000.00 50,000.00 50,000.00 150,000.00

125. Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - Road Improvement / Concreting from National Road Junction leading to Isla Muyong, Malangas, Zamboanga Sibugay

Concreting Imelda km. Plans and POW GAA 3 50,000.00 50,000.00 50,000.00 150,000.00

Chapter 19-1-DPWH IX-ZS 1DEOPage 14 of 43

Page 444: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

126. Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - Improvement / Concreting of National Road Junction Leading to Pulo Mabao Island, Olutanga, Zamboanga Sibugay

Concreting Payao km. Plans and POW GAA 3 50,000.00 50,000.00 50,000.00 150,000.00

127. Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - Road Improvement / Concreting of National Road Junction leading to Panggalamatan Beach, Payao, Zamboanga Sibugay

Concreting Imelda km. Plans and POW GAA 3 50,000.00 50,000.00 50,000.00 150,000.00

128. Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - Road Improvement / Concreting of National Road Junction leading to Moalboal Beach, Talusan, Zamboanga Sibugay

Concreting Payao km. Plans and POW GAA 3 50,000.00 50,000.00 50,000.00 150,000.00

129. Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - Road Improvement / Concreting from National Road Junction leading to Oysukan Beach, Talusan, Zamboanga Sibugay

Concreting Imelda km. Plans and POW GAA 3 50,000.00 50,000.00 50,000.00 150,000.00

130. Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - Improvement/Concreting of Jct. Imelda-Alicia Road leading Talisay Beach,Talusan, Z.S

Concreting Payao km. Plans and POW GAA 3 50,000.00 50,000.00 50,000.00 150,000.00

131. Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - Improvement/Concreting of Jct. Imelda-Alicia Road leading to Takut Siari Marine Protected Area, Talusan, Zamboanga Sibugay

Concreting Imelda km. Plans and POW GAA 3 50,000.00 50,000.00 50,000.00 150,000.00

Chapter 19-1-DPWH IX-ZS 1DEOPage 15 of 43

Page 445: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

132. Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - Improvement/Concreting of Jct. Imelda-Alicia Road leading to Dao Beach, Baganipay, Talusan

Concreting Payao km. Plans and POW GAA 3 50,000.00 50,000.00 50,000.00 150,000.00

2. Construction/Improvement of Access Roads leading to Seaports - 133. NRJ leading to Payao Wharf,

Payao, Zamboanga Sibugay Concreting km. Plans and POW GAA 3 25,000.00 25,000.00

2. Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones - 134. Construction/Improvement of

Access Roads leading to Trades, Industries and Economic Zones - Road Upgrading (Gravel to Paved) of Brgy. Tuburan-Moalboal Road connecting Brgy. Tuburan and Mabuhay Port in Talusan, Zamboanga Sibugay in support to Seaweeds andCoconut Industries, Talusan, Zamboanga Sibugay

Convergence and Special Support Program

Buug km. Plans and POW GAA 3 - 50,000.00 50,000.00 50,000.00 150,000.00

135. Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones - Road Upgrading (Gravel to Paved) of Sagay-Mahayahay Road Talusan, connecting Mahayahay and Poblacion Talusan road in support of the coconut industry, Talusan, Zamboanga Sibugay

Convergence and Special Support Program

Buug km. Plans and POW GAA 3 - 50,000.00 50,000.00 50,000.00 150,000.00

136. Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones - Road Upgrading (Gravel to Paved) of Laparay-Calais Road connecting Laparay and Calais road in support of Coconut, Seaweeds and Fish Industries, Talusan, ZamboangaSibugay

Convergence and Special Support Program

Buug km. Plans and POW GAA 3 - 50,000.00 50,000.00 50,000.00 150,000.00

137. Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones - Road Upgrading (Gravel to Paved) of Aurora Road connecting Barangay Aurora and Poblacion Talusan road in Support of Coconut and Seaweeds Industries, Talusan, Zamboanga Sibugay

Convergence and Special Support Program

Buug km. Plans and POW GAA 3 - 50,000.00 50,000.00 50,000.00 150,000.00

Chapter 19-1-DPWH IX-ZS 1DEOPage 16 of 43

Page 446: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

138. Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones - Improvement/Concreting @ Brgy. Fatima in Support to Coal Industry, Seaweeds and Coconut, leading to Provincial Road and National Highway in Payao, Zamboanga Sibugay

Convergence and Special Support Program

Buug km. Plans and POW GAA 3 - 100,000.00 100,000.00 100,000.00 300,000.00

139. Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones - Road Upgrading (Gravel to Paved) of Brgy. Silal, Payao, connecting Barangay Silal and Provincial Road and National Highway Road in Support to Rubber and Coal Industries, Zamboanga Sibugay

Convergence and Special Support Program

Buug km. Plans and POW GAA 3 - 100,000.00 100,000.00 100,000.00 300,000.00

140. Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones - Improvement/Concreting of Jct. Imelda-Alicia, Lutiman-Guicam Road, Connecting Jct. Imelda and Brgy. Sawa, Support of Seaweeds and Coconut Industry, Mabuhay, Zamboanga Sibugay

Convergence and Special Support Program

Buug km. Plans and POW GAA 3 - 50,000.00 50,000.00 50,000.00 150,000.00

141. Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones - Improvement/Concreting of Jct. Imelda-Alicia, Lutiman-Guicam Road, Connecting Brgy Ligaya in Support of Seaweeds and Coconut Industry, Mabuhay, Zamboanga Sibugay

Convergence and Special Support Program

Buug km. Plans and POW GAA 3 - 50,000.00 50,000.00 50,000.00 150,000.00

142. Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones - Improvement/Concreting of Jct. Imelda-Alicia-Lutiman-Guicam Road, Connecting Brgy Kauswagan in Support of Seaweeds, Mabuhay, Zamboanga Sibugay

Convergence and Special Support Program

Buug km. Plans and POW GAA 3 - 50,000.00 50,000.00 50,000.00 150,000.00

Chapter 19-1-DPWH IX-ZS 1DEOPage 17 of 43

Page 447: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

143. Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones - Improvement/Concreting of Jct. Alicia-Guicam Road, Connecting Brgy. Dawa- Dawa-Brgy. Lapaz in Support of Coconut and Seaweeds Industries, Alicia, Zamboanga Sibugay

Convergence and Special Support Program

Buug km. Plans and POW GAA 3 - 74,650.00 74,650.00 74,650.00 223,950.00

144. Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones - Road Upgrading (Gravel to Paved) of Jct. Imelda-Alicia Road Connecting Brgy. Naga-Naga-Brgy Kapatagan and Junction Imelda-Alicia Road in Support of Coconut, Abaca& Rubber Industries, Alicia, Zamboanga Sibugay

Convergence and Special Support Program

Buug km. Plans and POW GAA 3 - 75,000.00 75,000.00 75,000.00 225,000.00

145. Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones - Road Upgrading (Gravel to Paved) of Kauswagan-Sitio Malubog Road connecting Junction Lanao Pagadian-Zamboanga City Road and Kauswagan- Sitio Malubog Road in Support of Rice Mill, Diplahan, Zamboanga Sibugay

Convergence and Special Support Program

Buug km. Plans and POW GAA 3 - 75,000.00 75,000.00 75,000.00 225,000.00

146. Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones - Road Upgrading (Gravel to Concrete) of Gandiangan-Israel road connecting Barangay Gandiangan and National Highway road in support of the Coal, Seaweeds and Coconut Industries in Imelda, Zamboanga Sibugay

Convergence and Special Support Program

Buug km. Plans and POW GAA 3 - 87,500.00 87,500.00 87,500.00 262,500.00

147. Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones - Road Upgrading (Gravel to Concrete) of La Victoria road connecting La Victoria and Imelda National Highway road in support of the Coal Industry in Imelda, Zamboanga Sibugay

Convergence and Special Support Program

Buug km. Plans and POW GAA 3 - 50,000.00 50,000.00 50,000.00 150,000.00

Chapter 19-1-DPWH IX-ZS 1DEOPage 18 of 43

Page 448: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

148. Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones - Road Upgrading (Gravel to Paved) of Sta. Barbara-Rebocon Connecting Brgy Sta. Barbara and Brgy. Rebocon (Malangas) in Support of Rubber and Coconut Industry, Imelda, Zamboanga Sibugay

Convergence and Special Support Program

Buug km. Plans and POW GAA 3 - 50,000.00 50,000.00 50,000.00 150,000.00

149. Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones - Road Upgrading (Gravel to Paved) of Upper Baluran Road Connecting Brgy. Upper Baluran-Brgy. Overland (Malangas) in support of Rubber and Coconut Industry, Imelda, Zamboanga Sibugay

Convergence and Special Support Program

Buug km. Plans and POW GAA 3 - 52,500.00 52,500.00 52,500.00 157,500.00

150. Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones - Road Upgrading (Gravel to Concrete) of Mali-Little Baguio Road connecting Brgy. Gandiangan-Jct. National Highway and Brgy. Mali-Little Baguio, in support of Rubber and Coconut Industries in Imelda, Zamboanga Sibugay

Convergence and Special Support Program

Buug km. Plans and POW GAA 3 - 50,000.00 50,000.00 50,000.00 150,000.00

151. Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones - Road Upgrading (Gravel to concrete) of Brgy. Canaan road connecting Brgy Guintolan- Brgy Dumpoc-Brgy Baluyan, in Support of Coconut and Rubber Industries in Imelda, Zamboanga Sibugay

Convergence and Special Support Program

Buug km. Plans and POW GAA 3 - 60,000.00 60,000.00 60,000.00 180,000.00

152. Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones - Road Upgrading (Gravel to Paved) of San Vicente road connecting San Vicente and National Highway in support of Coal, Coconut and Seaweeds Industry in Malangas, Zamboanga Sibugay

Convergence and Special Support Program

Buug km. Plans and POW GAA 3 - 50,000.00 50,000.00 50,000.00 150,000.00

Chapter 19-1-DPWH IX-ZS 1DEOPage 19 of 43

Page 449: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

153. Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones - Road Upgrading (Gravel to Paved) of Brgy. Noque road connecting Barangay Noque and Olutanga Municipal road in support of the coconut and Seaweeds Industries in Olutanga, Zamboanga Sibugay

Convergence and Special Support Program

Buug km. Plans and POW GAA 3 - 50,000.00 50,000.00 50,000.00 150,000.00

154. Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones - Road Upgrading (Gravel to Paved) of Brgy. Villacorte road connecting Brgy. Villacorte and Olutanga Municipal road in Support of Coconut and Seaweed Industries, Olutanga, Zamboanga Sibugay

Convergence and Special Support Program

Buug km. Plans and POW GAA 3 - 50,000.00 50,000.00 50,000.00 150,000.00

155. Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones - Road Upgrading (Gravel to Concrete) of Gandaan Road Phase III connecting Brgy. Solar and Brgy. Gandaan road in support of the Seaweeds and Coconut Industry in Olutanga, Zamboanga Sibugay

Convergence and Special Support Program

Buug km. Plans and POW GAA 3 - 50,000.00 50,000.00 50,000.00 150,000.00

156. Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones - Road Upgrading (Gravel to Concrete) of Brgy Fama- Brgy. Kahayagan- brgy. Sta Maria Road connecting Brgy. Fama and Brgy. Sta Maria in support of Seaweeds and Coconut industries in Olutanga, Zamboanga Sibugay

Convergence and Special Support Program

Buug km. Plans and POW GAA 3 - 40,000.00 40,000.00 40,000.00 120,000.00

157. Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones - Road Upgrading (Gravel to Concrete) of Brgy Bateria to Brgy. Calais road in support of Coconut and seaweeds industries in Olutanga, Zamboanga Sibugay

Convergence and Special Support Program

Buug km. Plans and POW GAA 3 - 40,000.00 40,000.00 40,000.00 120,000.00

Chapter 19-1-DPWH IX-ZS 1DEOPage 20 of 43

Page 450: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

158. Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones - Road Upgrading(Gravel to Concrete) of Brgy Calais to Brgy Galas Road connecting Brgy. Calais and Poblacion,Olutanga in support of Coconut and seaweeds industriesin Olutanga, Zamboanga Sibugay

Convergence and Special Support Program

Buug km. Plans and POW GAA 3 - 40,000.00 40,000.00 40,000.00 120,000.00

159. Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones - Road Upgrading (Gravel to Concrete) of Brgy Solar to Brgy Matim Road connecting Brgy. Matim and Brgy. Solar in support to Coconut and seaweeds industries in Olutanga, Zamboanga Sibugay

Convergence and Special Support Program

Buug km. Plans and POW GAA 3 - 37,500.00 37,500.00 37,500.00 112,500.00

160. Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones - Road Upgrading (Gravel to Paved) of Kauswagan-Sitio Malubog Road connecting Junction Lanao Pagadian-Zamboanga City Road and Kauswagan- Sitio Malubog Road in Support of Rubber and Coconut Industries, Diplahan, Zamboanga Sibugay

Convergence and Special Support Program

Buug km. Plans and POW GAA 3 - 40,000.00 40,000.00 40,000.00 120,000.00

161. Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones - Road Upgrading (Gravel to Paved) of Brgy. Fatima road connecting Barangay Fatima and Provincial Road and National Highway Road in Support to Coal, Seaweeds and Coconut Industries in Payao, Zamboanga Sibugay

Convergence and Special Support Program

Buug km. Plans and POW GAA 3 - 50,000.00 50,000.00 50,000.00 150,000.00

162. Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones - Improvement/Expansion of Pulo Malbao Rock Causeway connecting Pulo Mabao and Olutanga Wharf in support to Coconut and Seaweeds Industries In Olutanga, Zamboanga Sibugay

Convergence and Special Support Program

Buug km. Plans and POW GAA 3 - 12,500.00 12,500.00 12,500.00 37,500.00

Chapter 19-1-DPWH IX-ZS 1DEOPage 21 of 43

Page 451: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

163. Improvement/Concreting of Jct. Lanao-Pagadian-Zamboanga City Road connecting Brgy. Poblacion-Bliss Road in support to the production of Banana Cracker, Buug, Zamboanga Sibugay

Convergence and Special Support Program

Buug km. Plans and POW GAA 3 - 25,000.00 25,000.00

164. Improvement/Concreting of Jct. Lanao-Pagadian-Zamboanga City Road connecting Brgy. Del Monte-Muyo Road in support to the production of Coconut Coffee, Buug, Zamboanga Sibugay

Convergence and Special Support Program

Buug km. Plans and POW GAA 3 - 60,000.00 60,000.00

165. Improvement/Concreting of Jct. Lanao – Pagadian - Zamboanga City Road connecting Brgy. Guminta Road in support to the production of Cassava Cracker, Buug, Zamboanga, Sibugay

Convergence and Special Support Program

Buug km. Plans and POW GAA 3 - 50,000.00 50,000.00

166. Improvement/Concreting of Jct.Lanao-Pagadian-Zamboanga City Road Connecting Lower-Upper Butong Road in Support of Rubber and Coconut Processing, Diplahan, Zamboanga Sibugay.

Convergence and Special Support Program

Diplahan km. Plans and POW GAA 3 - 55,822.00 55,822.00

167. Road Upgrading(gravel to paved) of Jct. Imelda-Alicia Road connecting Dawa-Dawa-Tampalan Road in support to the production of raw seaweeds to drying facilities, Alicia, Zamboanga Sibugay.

Convergence and Special Support Program

Alicia km. Plans and POW GAA 3 - 50,000.00 50,000.00

168. Jct. Lanao-Pagadian-Zamboanga City Road to Brgy. La Dicha Road in support of Rubber Processing, Malangas, Zamboanga Sibugay

Convergence and Special Support Program

Malangas km. Plans and POW GAA 3 5,000.00 5,000.00

1,050.00 111,700.00 480,822.00 3,016,990.00 3,016,990.00 3,016,990.00 9,644,542.00 A. Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects -

Roads and Bridges - a. Local Roads -

169. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Lantawan - Manlin Road

Z.Sibugay 10,000.00 10,000.00

CSSP- Subtotal

Chapter 19-1-DPWH IX-ZS 1DEOPage 22 of 43

Page 452: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

170. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Guminta Road

Z.Sibugay 10,000.00 10,000.00

171. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Rehabilitation of Basalem Road

Z.Sibugay 10,000.00 10,000.00

172. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Delmonte - Guitom Road

Z.Sibugay 10,000.00 10,000.00

173. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Barangay Guinoman - Sitio Sacaon Farm to Market Road

Z.Sibugay 15,000.00 15,000.00

174. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Road Construction with Gravelled Pavement at Brgy. Dumaguit, Malangas

Z.Sibugay 15,000.00 15,000.00

175. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Road Concreting of Guintolan - Dumpoc Farm to Market Road

Z.Sibugay 15,000.00 15,000.00

176. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Road Concreting of San Jose - Sitio Ligatuan Farm to Market Road

Z.Sibugay 22,750.00 22,750.00

Chapter 19-1-DPWH IX-ZS 1DEOPage 23 of 43

Page 453: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

177. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Road Concreting of Sta. Barbara to Rebokon (Malangas) Farm to Market Road

Z.Sibugay 41,900.00 41,900.00

178. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Lumbog Farm to Market Road

Z.Sibugay 25,000.00 25,000.00

179. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Israel Farm to Market Road

Z.Sibugay 15,000.00 15,000.00

180. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Lower Baluran to Mt. View Farm to Market Road

Z.Sibugay 36,000.00 36,000.00

181. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Lower Baluran to Lumpanac Farm to Market Road

Z.Sibugay 49,450.00 49,450.00

182. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Upper Baluran to Overland Farm to Market Road

Z.Sibugay 41,000.00 41,000.00

183. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Gandiangan to Mali - Little Baguio Farm to Market Road

Z.Sibugay 30,000.00 30,000.00

Chapter 19-1-DPWH IX-ZS 1DEOPage 24 of 43

Page 454: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

184. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Mabuhay-Danlugan Road

Z.Sibugay 10,000.00 10,000.00 20,000.00

185. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Bag-ong Borbon Road

Z.Sibugay 10,000.00 10,000.00 20,000.00

186. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Barangay Gaulan Farm to Market Road

Z.Sibugay 20,000.00 20,000.00 40,000.00

187. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Barangay Lindang - Barangay Songcuya FMR

Z.Sibugay 20,000.00 20,000.00 40,000.00

188. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concretng of Tuburan Road

Z.Sibugay 10,000.00 10,000.00 20,000.00

189. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Concrete Pavement, Malangas

Z.Sibugay 18,000.00 18,000.00 36,000.00

190. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Concrete Pavement, Brgy. Buntong, Malangas

Z.Sibugay 10,000.00 10,000.00 20,000.00

191. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Concrete Pavement, Overland, Malangas

Z.Sibugay 8,000.00 8,000.00 16,000.00

Chapter 19-1-DPWH IX-ZS 1DEOPage 25 of 43

Page 455: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

192. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Concrete Pavement, Malangas

Z.Sibugay 7,000.00 7,000.00 14,000.00

193. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Concrete Pavement, Malangas

Z.Sibugay 9,000.00 9,000.00 18,000.00

194. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of San Jose - Compostela Road

Z.Sibugay 10,000.00 10,000.00 20,000.00

195. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Rehabilitation of Bulaan Road

Z.Sibugay 10,000.00 10,000.00 20,000.00

196. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Sitio Tinago, Ditay Farm to Market Road

Z.Sibugay 20,000.00 20,000.00 40,000.00

197. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Concrete Pavement

Z.Sibugay 25,000.00 25,000.00 50,000.00

198. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Concrete Pavement at Brgy. IAD Kauswagan, Diplahan, Zamboanga Sibugay

Z.Sibugay 10,000.00 10,000.00 20,000.00

Chapter 19-1-DPWH IX-ZS 1DEOPage 26 of 43

Page 456: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

199. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Concrete Pavement- Jct. Lanao-Pagadian-Zamboanga City Road leading to Sarabia Street - Brgy. Poblacion, Imelda, Zamboanga Sibugay

Z.Sibugay 14,000.00 14,000.00 28,000.00

200. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Concrete Pavement

Z.Sibugay 12,000.00 12,000.00 24,000.00

201. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Concrete Pavement

Z.Sibugay 6,000.00 6,000.00 12,000.00

202. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Bolungisan to Sitio New Bohol Farm to Market Road

Z.Sibugay 32,250.00 32,250.00 64,500.00

203. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Dumpoc - Juntion to Canaan Farm to Market Road

Z.Sibugay 35,560.00 35,560.00 71,120.00

204. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Dumpoc - Baluyan Farm to Market Road

Z.Sibugay 47,500.00 47,500.00 95,000.00

205. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of San Jose to Mali - Little Baguio Farm to Market Road

Z.Sibugay 46,800.00 46,800.00 93,600.00

Chapter 19-1-DPWH IX-ZS 1DEOPage 27 of 43

Page 457: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

206. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of La Victoria Farm to Market Road

Z.Sibugay 15,000.00 15,000.00 30,000.00

207. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Naga-Naga - Kapatagan, Alicia Road Section

Z.Sibugay 80,000.00 80,000.00 160,000.00

208. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Kawayan - Sitio Tantawan, Alicia Coastal Road Section

Z.Sibugay 80,000.00 80,000.00 160,000.00

209. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Municipal Core Road Section (Poblacion to Pandan-Pandan, Alicia)

Z.Sibugay 160,000.00 160,000.00 320,000.00

210. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Guinoman - Sitio Sacaon - Sitio Mahyahay, Diplahan FMR

Z.Sibugay 80,000.00 80,000.00 160,000.00

211. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Municipal Street from Barangay Kauswagan to Purok Lapu-Lapu, Poblacion, Diplahan

Z.Sibugay 80,000.00 80,000.00 160,000.00

212. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Buug - Bayog (Talamimi Road Section)

Z.Sibugay 40,000.00 40,000.00 80,000.00

Chapter 19-1-DPWH IX-ZS 1DEOPage 28 of 43

Page 458: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

213. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Mabuhay - Olutanga Road SectionL = 13.10 km

Z.Sibugay 40,000.00 40,000.00 80,000.00

214. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Mabuhay - Talusan Road Section

Z.Sibugay 43,750.00 43,750.00 87,500.00

215. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Sta. Barbara, Imelda - Rebocon - Overland, Malangas Road Section

Z.Sibugay 57,100.00 57,100.00 114,200.00

216. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Payao - Alicia (Bulacan - Balian - Kawayan Road Section)

Z.Sibugay 65,500.00 65,500.00 131,000.00

217. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Sitio Tinago, Ditay Farm to Market Road

Z.Sibugay 20,000.00 20,000.00 40,000.00

218. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Tinongtongan - Goling Farm to Market Road

Z.Sibugay 20,000.00 20,000.00 40,000.00

219. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Poblacion Diplahan Municipal Streets

Z.Sibugay 20,000.00 20,000.00 40,000.00

Chapter 19-1-DPWH IX-ZS 1DEOPage 29 of 43

Page 459: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

220. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Brgy. Mejo - Sitio San Isidro - Kauswagan

Z.Sibugay 30,000.00 30,000.00 60,000.00

221. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Sampoli B - Paradise Farm to Market Road

Z.Sibugay 30,000.00 30,000.00 60,000.00

222. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Mahayahay to Sagay Road

Z.Sibugay 50,000.00 50,000.00 100,000.00

223. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Kawilan - Samonte - Moalboal Road

Z.Sibugay 40,000.00 40,000.00 80,000.00

224. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Aurora - Kasigpitan Road

Z.Sibugay 24,000.00 24,000.00 48,000.00

225. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Moalboal - Samonte - Bolingan Road

Z.Sibugay 70,000.00 70,000.00 140,000.00

226. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Jct. Lanao - Pagadian - Zamboanga City Rd, Buug (Poblacion - Talamimi) - Bayog/Buug Rd

Z.Sibugay 75,000.00 75,000.00 150,000.00

Chapter 19-1-DPWH IX-ZS 1DEOPage 30 of 43

Page 460: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

227. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Jct. Lanao - Pagadian - Zamboanga City, Buug - Labrador - Villacastor - Gaulan - Kauswagan RdNL = 25 km

Z.Sibugay 50,000.00 50,000.00 100,000.00

228. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Jct. Imelda - Alicia Rd, Guintolan - Payao - Bingangonan - Balucanan RdNL = 75 km

Z.Sibugay 50,000.00 50,000.00 100,000.00

229. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Jct. Lanao - Pagadian - Zamboanga City Rd., Buug - Pamintayan - Bawang - Poblacion Rd

Z.Sibugay 40,000.00 40,000.00 80,000.00

230. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Mabuhay - Talusan - Olutanga Circumferential Road

Z.Sibugay 50,000.00 50,000.00 100,000.00

231. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Jct. Lanao - Pagadian - Zamboanga City Rd., Labasan - Camanga - Boyugan - Sampoli B Rd.

Z.Sibugay 62,500.00 62,500.00 125,000.00

232. Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects at Brgy. Diplahan, Zamboanga Sibugay

Z.Sibugay 56,250.00 56,250.00 112,500.00

b. Bridges -

Chapter 19-1-DPWH IX-ZS 1DEOPage 31 of 43

Page 461: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

233. Local Roads and Bridges - Local Bridges - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Brgy. Mejo Bridge (Landslide prone are)

Z.Sibugay 20,000.00 20,000.00 40,000.00

234. Local Roads and Bridges - Local Bridges - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Single-Lane Reinforced Concrete Deck Girder Bridge connecting Barangay Lumpanac and Barangay Gandiangan, Imelda, Zamboanga Sibugay,

Z.Sibugay 50,000.00 50,000.00 100,000.00

235. Local Roads and Bridges - Local Bridges - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Single-Lane Reinforced Concrete Deck Girder Bridge connecting Barangay Upper Baluran-Bolungisan, Imelda, Zamboanga Sibugay,

Z.Sibugay 30,000.00 30,000.00 60,000.00

236. Local Roads and Bridges - Local Bridges - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Gaulan - Muyo Bridge

Z.Sibugay 20,000.00 20,000.00 40,000.00

237. Local Roads and Bridges - Local Bridges - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Brgy. Mejo Bridge(Landslide prone area)

Z.Sibugay 20,000.00 20,000.00 40,000.00

238. Local Roads and Bridges - Local Bridges - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Bridge connecting the Island of Olutanga and Mainland

Z.Sibugay 40,000.00 40,000.00 80,000.00

Chapter 19-1-DPWH IX-ZS 1DEOPage 32 of 43

Page 462: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

239. Local Roads and Bridges - Local Bridges - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Lumpanac RCDG Br.

Z.Sibugay 30,000.00 30,000.00 60,000.00

240. Local Roads and Bridges - Local Bridges - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Paradise RCDG Br.

Z.Sibugay 30,000.00 30,000.00 60,000.00

241. Local Roads and Bridges - Local Bridges - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Villacastor RCDG Br.

Z.Sibugay 30,000.00 30,000.00 60,000.00

242. Local Roads and Bridges - Local Bridges - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Pulog RCDG Br.

Z.Sibugay 15,000.00 15,000.00 30,000.00

243. Local Roads and Bridges - Local Bridges - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Agutayan RCDG Bridge

Z.Sibugay 7,500.00 7,500.00 15,000.00

244. Local Roads and Bridges - Local Bridges - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Balungisan RCDG Br.

Z.Sibugay 15,000.00 15,000.00 30,000.00

245. Local Roads and Bridges - Local Bridges - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Payongan RCDG Br.

Z.Sibugay 10,000.00 10,000.00 20,000.00

246. Local Roads and Bridges - Local Bridges - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Maganay RCDG Br.

Z.Sibugay 10,000.00 20,000.00 30,000.00

Chapter 19-1-DPWH IX-ZS 1DEOPage 33 of 43

Page 463: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

247. Local Roads and Bridges - Local Bridges - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Kapatagan RCDG Br.

Z.Sibugay 10,000.00 10,000.00 20,000.00

248. Local Roads and Bridges - Local Bridges - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Milagrosa RCDG Br.

Z.Sibugay 10,000.00 10,000.00 20,000.00

249. Local Roads and Bridges - Local Bridges - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Concrete Bridge at Palalian, Malangas

Z.Sibugay 12,000.00 12,000.00

c. Construction of Flood Control/ Drainage Structures - 250. Construction of Flood

Control/Diversion Road, Barangay Balugo - Poblacion (Sta. Fe) Imelda, Samboanga Sibugay

50,000.00 50,000.00 100,000.00

251. Construction of Flood Control, Phase II, Sta. Fe Creek, Poblacion, Imelda, Zamboanga Sibugay 60,000.00 60,000.00 120,000.00

252. Construction of Flood Control at Lower Baluran River, Lower Baluran, Imelda, Zamboanga Sibugay

20,000.00 20,000.00 40,000.00

253. Construction of Flood Control at Lumbog Creek, Lumbog, Imelda, Zamboanga Sibugay

15,000.00 15,000.00 30,000.00

254. Construction of Flood Control at Sitio Malipayon River, Alicia, Zamboanga Sibugay

20,000.00 20,000.00 40,000.00

255. Construction of Box Culvert at Dumaguit, Malongon, Malangas 3,000.00 3,000.00

d. Water Supply - 256. Water Management Facilities -

Water Supply - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Buug Water System

- - 12,500.00 12,500.00 25,000.00

Chapter 19-1-DPWH IX-ZS 1DEOPage 34 of 43

Page 464: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

257. Water Management Facilities - Water Supply - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Imelda Water System

- - 12,500.00 12,500.00 25,000.00

258. Water Management Facilities - Water Supply - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Diplahan Water System

- - 12,500.00 12,500.00 25,000.00

259. Water Management Facilities - Water Supply - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Malangas Water System

- - 12,500.00 12,500.00 25,000.00

260. Water Management Facilities - Water Supply - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Expansion and Upgrading of Water Supply System Level II, Imelda, Zamboanga Sibugay

- - 45,000.00 45,000.00 90,000.00

261. Water Management Facilities - Water Supply - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Expansion and Upgrading of Water Supply System , Diplahan, Zamboanga Sibugay

- - 48,000.00 48,000.00 96,000.00

262. Construction of Water Supply Project, Mabuhay, Zamboanga Sibugay

Construction of Water Supply System

No. Water Supply 1.0 Plans & POW Contract 56,000.00 56,000.00

263. Construction of Water Supply Project, Payao, Zamboanga Sibugay

Construction of Water Supply System

No. Water Supply 1.0 Plans & POW Contract 70,000.00 70,000.00

264. Construction/Rehabilitation of Water System, Brgy. Naga - Naga, Alicia, Zamboanga Sibugay

Construction of Water Supply System

No. Water Supply 1.0 Plans & POW Contract 20,000.00 20,000.00

e. Multipurpose/Facilities - 265. Construction of Multipurpose

Building at Brgy Maganay, Buug, Zamboanga Sibugay

Construction of Multi-purpose Building

Buug, ZS 2,000.00 - 2,000.00

Chapter 19-1-DPWH IX-ZS 1DEOPage 35 of 43

Page 465: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

266. Construction of Multipurpose Building at Brgy Basalem, Buug, Zamboanga Sibugay

Construction of Multi-purpose Building

Buug, ZS 2,000.00 - 2,000.00

267. Construction of Multipurpose Building at Brgy Songcuya, Diplahan, Zamboanga Sibugay

Construction of Multi-purpose Building

Diplahan 2,000.00 - 2,000.00

268. Construction of Multipurpose Building at Brgy Pilar, Diplahan, Zamboanga Sibugay

Construction of Multi-purpose Building

Diplahan 2,000.00 - 2,000.00

269. Construction of Multipurpose Building at Brgy Sta. Cruz, Diplahan, Zamboanga Sibugay

Construction of Multi-purpose Building

Diplahan 2,000.00 - 2,000.00

270. Construction of Multipurpose Building at Brgy Camanga, Malangas, Zamboanga Sibugay

Construction of Multi-purpose Building

Malangas 2,000.00 - 2,000.00

271. Construction of Multipurpose Building at Brgy Mabini, Malangas, Zamboanga Sibugay

Construction of Multi-purpose Building

Malangas 2,000.00 - 2,000.00

272. Construction of Multipurpose Building at Brgy Catituan, Malangas, Zamboanga Sibugay

Construction of Multi-purpose Building

Malangas 2,000.00 - 2,000.00

273. Construction of Multipurpose Building at Brgy Balugo, Imelda, Zamboanga Sibugay

Construction of Multi-purpose Building

Imelda 2,000.00 - 2,000.00

274. Construction of Multipurpose Building at Brgy San Jose, Imelda, Zamboanga Sibugay

Construction of Multi-purpose Building

Imelda 2,000.00 - 2,000.00

275. Construction of Multipurpose Building at Brgy Sta Barbara, Imelda, Zamboanga Sibugay

Construction of Multi-purpose Building

Imelda 2,000.00 - 2,000.00

276. Construction of Multipurpose Building at Brgy Lambuyogan, Alicia, Zamboanga Sibugay

Construction of Multi-purpose Building

Alicia 2,000.00 - 2,000.00

277. Construction of Multipurpose Building at Brgy Timbang-Timbang, Alicia, Zamboanga Sibugay

Construction of Multi-purpose Building Alicia 2,000.00 - 2,000.00

278. Construction of Multipurpose Building at Brgy Ilisan, Alicia, Zamboanga Sibugay

Construction of Multi-purpose Building

Alicia 2,000.00 - 2,000.00

279. Construction of Multipurpose Building at Brgy Lutiman, Alicia, Zamboanga Sibugay

Construction of Multi-purpose Building

Alicia 2,000.00 - 2,000.00

280. Construction of Multipurpose Building at Brgy Balungisan, Payao, Zamboanga Sibugay

Construction of Multi-purpose Building

Payao 2,000.00 - 2,000.00

281. Construction of Multipurpose Building at Brgy San Isidro, Payao, Zamboanga Sibugay

Construction of Multi-purpose Building

Payao 2,000.00 - 2,000.00

282. Construction of Multipurpose Building at Brgy Bulawan, Payao, Zamboanga Sibugay

Construction of Multi-purpose Building

Payao 2,000.00 - 2,000.00

Chapter 19-1-DPWH IX-ZS 1DEOPage 36 of 43

Page 466: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

283. Construction of Multipurpose Building at Brgy Kasigpitan, Talusan, Zamboanga Sibugay

Construction of Multi-purpose Building

Talusan 2,000.00 - 2,000.00

284. Construction of Multipurpose Building at Brgy Aurora, Talusan, Zamboanga Sibugay

Construction of Multi-purpose Building

Talusan 2,000.00 - 2,000.00

285. Construction of Multipurpose Building at Brgy Solar, Olutanga, Zamboanga Sibugay

Construction of Multi-purpose Building

Olutanga 2,000.00 - 2,000.00

286. Construction of Multipurpose Building at Brgy Tambanan, Olutanga, Zamboanga Sibugay

Construction of Multi-purpose Building

Olutanga 2,000.00 - 2,000.00

287. Construction of Multipurpose Building at Brgy Noque, Olutanga, Zamboanga Sibugay

Construction of Multi-purpose Building

Olutanga 2,000.00 - 2,000.00

288. Construction of Multipurpose Building at Brgy Caliran, Mabuhay, Zamboanga Sibugay

Construction of Multi-purpose Building

Mabuhay 2,000.00 - 2,000.00

289. Construction of Multipurpose Building at Brgy Abunda, Mabuhay, Zamboanga Sibugay

Construction of Multi-purpose Building

Mabuhay 2,000.00 - 2,000.00

290. Construction of Multipurpose Building, Bateria, Olutanga, Zamboanga Sibugay

Construction of Multi-purpose Building

No. of Building 1.0 2,000.00 2,000.00

291. Construction of Multipurpose Building, Binangonan, Payao, Zamboanga Sibugay

Construction of Multi-purpose Building

No. of Building 1.0 2,000.00 2,000.00

292. Construction of Multipurpose Building, Butong, Diplahan, Zamboanga Sibugay

Construction of Multi-purpose Building

No. of Building 1.0 2,000.00 2,000.00

293. Construction of Multipurpose Building, Cana-an, Imelda, Zamboanga Sibugay

Construction of Multi-purpose Building

No. of Building 1.0 2,000.00 2,000.00

294. Construction of Multipurpose Building, Cawilan, Talusan, Zamboanga Sibugay

Construction of Multi-purpose Building

No. of Building 1.0 2,000.00 2,000.00

295. Construction of Multipurpose Building, Datu Panas, Buug, Zamboanga Sibugay

Construction of Multi-purpose Building

No. of Building 1.0 2,000.00 2,000.00

296. Construction of Multipurpose Building, Del Pilar, Malangas, Zamboanga Sibugay

Construction of Multi-purpose Building

No. of Building 1.0 2,000.00 2,000.00

297. Construction of Multipurpose Building, Gandaan, Olutanga, Zamboanga Sibugay

Construction of Multi-purpose Building

No. of Building 1.0 2,000.00 2,000.00

298. Construction of Multipurpose Building, Guiwan, Payao, Zamboanga Sibugay

Construction of Multi-purpose Building

No. of Building 1.0 2,000.00 2,000.00

299. Construction of Multipurpose Building, Israel, Imelda, Zamboanga Sibugay

Construction of Multi-purpose Building

No. of Building 1.0 2,000.00 2,000.00

Chapter 19-1-DPWH IX-ZS 1DEOPage 37 of 43

Page 467: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

300. Construction of Multipurpose Building, Lipacan, Malangas, Zamboanga Sibugay

Construction of Multi-purpose Building

No. of Building 1.0 2,000.00 2,000.00

301. Construction of Multipurpose Building, Litayon, Alicia, Zamboanga Sibugay

Construction of Multi-purpose Building

No. of Building 1.0 2,000.00 2,000.00

302. Construction of Multipurpose Building, Looc Sapi, Olutanga, Zamboanga Sibugay

Construction of Multi-purpose Building

No. of Building 1.0 2,000.00 2,000.00

303. Construction of Multipurpose Building, Lower Baluran, Imelda, Zamboanga Sibugay

Construction of Multi-purpose Building

No. of Building 1.0 2,000.00 2,000.00

304. Construction of Multipurpose Building, Mali Little Baguio, Imelda, Zamboanga Sibugay

Construction of Multi-purpose Building

No. of Building 1.0 2,000.00 2,000.00

305. Construction of Multipurpose Building, Malinao, Mabuhay, Zamboanga Sibugay

Construction of Multi-purpose Building

No. of Building 1.0 2,000.00 2,000.00

306. Construction of Multipurpose Building, Mejo, Diplahan, Zamboanga Sibugay

Construction of Multi-purpose Building

No. of Building 1.0 2,000.00 2,000.00

307. Construction of Multipurpose Building, Mountain View, Payao, Zamboanga Sibugay

Construction of Multi-purpose Building

No. of Building 1.0 2,000.00 2,000.00

308. Construction of Multipurpose Building, Pamansaan, Mabuhay, Zamboanga Sibugay

Construction of Multi-purpose Building

No. of Building 1.0 2,000.00 2,000.00

309. Construction of Multipurpose Building, Pamintayan, Buug, Zamboanga Sibugay

Construction of Multi-purpose Building

No. of Building 1.0 2,000.00 2,000.00

310. Construction of Multipurpose Building, Pandan-Pandan, Alicia, Zamboanga Sibugay

Construction of Multi-purpose Building

No. of Building 1.0 2,000.00 2,000.00

311. Construction of Multipurpose Building, Payag, Malangas, Zamboanga Sibugay

Construction of Multi-purpose Building

No. of Building 1.0 2,000.00 2,000.00

312. Construction of Multipurpose Building, Payongan, Alicia, Zamboanga Sibugay

Construction of Multi-purpose Building

No. of Building 1.0 2,000.00 2,000.00

313. Construction of Multipurpose Building, Pling, Buug, Zamboanga Sibugay

Construction of Multi-purpose Building

No. of Building 1.0 2,000.00 2,000.00

314. Construction of Multipurpose Building, Poblacion, Payao, Zamboanga Sibugay

Construction of Multi-purpose Building

No. of Building 1.0 2,000.00 2,000.00

315. Construction of Multipurpose Building, Pulog, Buug, Zamboanga Sibugay

Construction of Multi-purpose Building

No. of Building 1.0 2,000.00 2,000.00

316. Construction of Multipurpose Building, Sagay, Talusan, Zamboanga Sibugay

Construction of Multi-purpose Building

No. of Building 1.0 2,000.00 2,000.00

Chapter 19-1-DPWH IX-ZS 1DEOPage 38 of 43

Page 468: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

317. Construction of Multipurpose Building, San Roque, Mabuhay, Zamboanga Sibugay

Construction of Multi-purpose Building

No. of Building 1.0 2,000.00 2,000.00

318. Construction of Multipurpose Building, Sawa, Mabuhay, Zamboanga Sibugay

Construction of Multi-purpose Building

No. of Building 1.0 2,000.00 2,000.00

319. Construction of Multipurpose Building, Sinusayan, Malangas, Zamboanga Sibugay

Construction of Multi-purpose Building

No. of Building 1.0 2,000.00 2,000.00

320. Construction of Multipurpose Building, Tandiong Muslim, Alicia, Zamboanga Sibugay

Construction of Multi-purpose Building

No. of Building 1.0 2,000.00 2,000.00

321. Construction of Multipurpose Building, Tigabon, Malangas, Zamboanga Sibugay

Construction of Multi-purpose Building

No. of Building 1.0 2,000.00 2,000.00

322. Construction of Multipurpose Building, Tinongtongan, Diplahan, Zamboanga Sibugay

Construction of Multi-purpose Building

No. of Building 1.0 2,000.00 2,000.00

323. Construction of Multipurpose Building, Tuburan, Talusan, Zamboanga Sibugay

Construction of Multi-purpose Building

No. of Building 1.0 2,000.00 2,000.00

324. Construction of Multipurpose Building, Villacorte, Olutanga, Zamboanga Sibugay

Construction of Multi-purpose Building

No. of Building 1.0 2,000.00 2,000.00

325. Construction of a Multi-purpose Building (Barangay Health Center), Barangay Balungisan, Payao, Zamboanga Sibugay

Construction of Multi-purpose Building No. of Building 1.0 1,500.00 1,500.00

326. Construction of Multi-Purpose Building, Brgy. Poblacion, Diplahan, Zamboanga Sibugay

Construction of Multi-purpose Building

No. of Building 1.0 5,000.00 5,000.00

327. Construction of Multi-Purpose Building, Imelda, Zamboanga Sibugay

Construction of Multi-purpose Building

Buug, ZS - 2,000.00 2,000.00

328. Construction of Multi-Purpose Building Bella, Alicia Zamboanga Sibugay

Construction of Multi-purpose Building

Buug, ZS - 2,500.00 2,500.00

329. Construction of Multi-Purpose Building, Bagong Borbon, Buug, Zamboanga Sibugay

Construction of Multi-purpose Building

Diplahan - 2,500.00 2,500.00

330. Construction of Multi-Purpose Building, Balogo, Payao, Zamboanga Sibugay

Construction of Multi-purpose Building

Diplahan - 2,500.00 2,500.00

331. Construction of Multi-Purpose Building, Basak Bawang, Malangas, Zamboanga Sibugay

Construction of Multi-purpose Building

Diplahan - 2,500.00 2,500.00

332. Construction of Multi-Purpose Building, Brgy. Agutayan, Buug, Zamboanga Sibugay

Construction of Multi-purpose Building

Malangas - 2,000.00 2,000.00

333. Construction of Multi-Purpose Building, Brgy. Bacao, Malangas, Zamboanga Sibugay

Construction of Multi-purpose Building

Buug, ZS - 2,000.00 2,000.00

Chapter 19-1-DPWH IX-ZS 1DEOPage 39 of 43

Page 469: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

334. Construction of Multi-Purpose Building, Brgy. Baganipay, Talusan, Zamboanga Sibugay

Construction of Multi-purpose Building

Buug, ZS - 2,000.00 2,000.00

335. Construction of Multi-Purpose Building, Brgy. Balungisan, Imelda, Zamboanga Sibugay

Construction of Multi-purpose Building

Diplahan - 2,000.00 2,000.00

336. Construction of Multi-Purpose Building, Brgy. Baluyan, Imelda, Zamboanga Sibugay

Construction of Multi-purpose Building

Diplahan - 2,000.00 2,000.00

337. Construction of Multi-Purpose Building, Brgy. Bangkaw-Bangkaw, Mabuhay, Zamboanga Sibugay

Construction of Multi-purpose Building Diplahan - 2,000.00 2,000.00

338. Construction of Multi-Purpose Building, Brgy. Calades, Alicia, Zamboanga Sibugay

Construction of Multi-purpose Building

Malangas - 2,000.00 2,000.00

339. Construction of Multi-Purpose Building, Brgy. Catipan, Mabuhay, Zamboanga Sibugay

Construction of Multi-purpose Building

Malangas - 2,000.00 2,000.00

340. Construction of Multi-Purpose Building, Brgy. Concepcion, Alicia, Zamboanga Sibugay

Construction of Multi-purpose Building

Malangas - 2,000.00 2,000.00

341. Construction of Multi-Purpose Building, Brgy. Goling, Diplahan, Zamboanga Sibugay

Construction of Multi-purpose Building

Imelda - 2,000.00 2,000.00

342. Construction of Multi-Purpose Building, Brgy. Guintolan, Payao, Zamboanga Sibugay

Construction of Multi-purpose Building

Imelda - 2,000.00 2,000.00

343. Construction of Multi-Purpose Building, Brgy. Gulayon, Alicia, Zamboanga Sibugay

Construction of Multi-purpose Building

Imelda - 2,000.00 2,000.00

344. Construction of Multi-Purpose Building, Brgy. Guminta, Buug, Zamboanga Sibugay

Construction of Multi-purpose Building

Alicia - 2,000.00 2,000.00

345. Construction of Multi-Purpose Building, Brgy. Katipunan, Payao, Zamboanga Sibugay

Construction of Multi-purpose Building

Alicia - 2,000.00 2,000.00

346. Construction of Multi-Purpose Building, Brgy. Kauswagan, Alicia, Zamboanga Sibugay

Construction of Multi-purpose Building

Alicia - 2,000.00 2,000.00

347. Construction of Multi-Purpose Building, Brgy. Kauswagan, Diplahan, Zamboanga Sibugay

Construction of Multi-purpose Building

Alicia - 2,000.00 2,000.00

348. Construction of Multi-Purpose Building, Brgy. Lantawan, Buug, Zamboanga Sibugay

Construction of Multi-purpose Building

Payao - 2,000.00 2,000.00

349. Construction of Multi-Purpose Building, Brgy. Luop, Diplahan, Zamboanga Sibugay

Construction of Multi-purpose Building

Payao - 2,000.00 2,000.00

350. Construction of Multi-Purpose Building, Brgy. Mabuhay, Buug, Zamboanga Sibugay

Construction of Multi-purpose Building

Payao - 2,000.00 2,000.00

Chapter 19-1-DPWH IX-ZS 1DEOPage 40 of 43

Page 470: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

351. Construction of Multi-Purpose Building, Brgy. Malungon, Malangas, Zamboanga Sibugay

Construction of Multi-purpose Building

Talusan - 2,000.00 2,000.00

352. Construction of Multi-Purpose Building, Brgy. Moalboal, Talusan, Zamboanga Sibugay

Construction of Multi-purpose Building

Talusan - 2,000.00 2,000.00

353. Construction of Multi-Purpose Building, Brgy. Mountain View, Imelda, Zamboanga Sibugay

Construction of Multi-purpose Building

Olutanga - 2,000.00 2,000.00

354. Construction of Multi-Purpose Building, Brgy. Mulom, Malangas, Zamboanga Sibugay

Construction of Multi-purpose Building

Olutanga - 2,000.00 2,000.00

355. Construction of Multi-Purpose Building, Brgy. Nanan, Payao, Zamboanga Sibugay

Construction of Multi-purpose Building

Olutanga - 2,000.00 2,000.00

356. Construction of Multi-Purpose Building, Brgy. Natan, Diplahan, Zamboanga Sibugay

Construction of Multi-purpose Building

Mabuhay - 2,000.00 2,000.00

357. Construction of Multi-Purpose Building, Brgy. Poblacion, Mabuhay, Zamboanga Sibugay

Construction of Multi-purpose Building

Mabuhay - 2,000.00 2,000.00

358. Construction of Multi-Purpose Building, Brgy. Punawan, Mabuhay, Zamboanga Sibugay

Construction of Multi-purpose Building

Buug, ZS - 2,000.00 2,000.00

359. Construction of Multi-Purpose Building, Brgy. Samonte, Talusan, Zamboanga Sibugay

Construction of Multi-purpose Building

Buug, ZS - 2,000.00 2,000.00

360. Construction of Multi-Purpose Building, Brgy. San Isidro, Olutanga, Zamboanga Sibugay

Construction of Multi-purpose Building

Diplahan - 2,000.00 2,000.00

361. Construction of Multi-Purpose Building, Brgy. San Jose, Olutanga, Zamboanga Sibugay

Construction of Multi-purpose Building

Diplahan - 2,000.00 2,000.00

362. Construction of Multi-Purpose Building, Brgy. San Vicente, Malangas, Zamboanga Sibugay

Construction of Multi-purpose Building

Diplahan - 2,000.00 2,000.00

363. Construction of Multi-Purpose Building, Brgy. San Vicente, Payao, Zamboanga Sibugay

Construction of Multi-purpose Building

Malangas - 2,000.00 2,000.00

364. Construction of Multi-Purpose Building, Brgy. Santa Maria, Olutanga, Zamboanga Sibugay

Construction of Multi-purpose Building

Malangas - 2,000.00 2,000.00

365. Construction of Multi-Purpose Building, Brgy. Upper Baluran, Imelda, Zamboanga Sibugay

Construction of Multi-purpose Building

Malangas - 2,000.00 2,000.00

366. Construction of Multi-Purpose Building, Brgy. Villagonzalo, Olutanga, Zamboanga Sibugay

Construction of Multi-purpose Building

Imelda - 2,000.00 2,000.00

367. Construction of Multi-Purpose Building, Dalama, Payao, Zamboanga Sibugay

Construction of Multi-purpose Building

Imelda - 2,500.00 2,500.00

Chapter 19-1-DPWH IX-ZS 1DEOPage 41 of 43

Page 471: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

368. Construction of Multi-Purpose Building, Ditay, Diplahan, Zamboanga Sibugay

Construction of Multi-purpose Building

Imelda - 2,500.00 2,500.00

369. Construction of Multi-Purpose Building, Fatima, Payao, Zamboanga Sibugay

Construction of Multi-purpose Building

Alicia - 2,500.00 2,500.00

370. Construction of Multi-Purpose Building, Guinoman, Diplahan, Zamboanga Sibugay

Construction of Multi-purpose Building

Alicia - 2,500.00 2,500.00

371. Construction of Multi-Purpose Building, Guitom, Buug, Zamboanga Sibugay

Construction of Multi-purpose Building

Alicia - 2,500.00 2,500.00

372. Construction of Multi-Purpose Building, Kahayagan, Olutanga, Zamboanga Sibugay

Construction of Multi-purpose Building

Alicia - 2,500.00 2,500.00

373. Construction of Multi-Purpose Building, La Dicha, Malangas, Zamboanga Sibugay

Construction of Multi-purpose Building

Payao - 2,500.00 2,500.00

374. Construction of Multi-Purpose Building, Labatan, Payao, Zamboanga Sibugay

Construction of Multi-purpose Building

Payao - 2,500.00 2,500.00

375. Construction of Multi-Purpose Building, Labrador, Buug, Zamboanga Sibugay

Construction of Multi-purpose Building

Payao - 2,500.00 2,500.00

376. Construction of Multi-Purpose Building, Lobing, Diplahan, Zamboanga Sibugay

Construction of Multi-purpose Building

Talusan - 2,500.00 2,500.00

377. Construction of Multi-Purpose Building, Looc Barlac, Mabuhay, Zamboanga Sibugay

Construction of Multi-purpose Building

Talusan - 2,500.00 2,500.00

378. Construction of Multi-Purpose Building, Mayabao, Payao, Zamboanga Sibugay

Construction of Multi-purpose Building

Olutanga - 2,500.00 2,500.00

379. Construction of Multi-Purpose Building, Muyo, Buug, Zamboanga Sibugay

Construction of Multi-purpose Building

Olutanga - 2,500.00 2,500.00

380. Construction of Multi-Purpose Building, Poblacion, Alicia, Zamboanga Sibugay

Construction of Multi-purpose Building

Olutanga - 2,500.00 2,500.00

381. Construction of Multi-Purpose Building, Talamimi, Buug, Zamboanga Sibugay

Construction of Multi-purpose Building

Mabuhay - 2,500.00 2,500.00

382. Construction of Multi-Purpose Building, Upper Sumilong, Payao, Zamboanga Sibugay

Construction of Multi-purpose Building

Mabuhay - 2,500.00 2,500.00

Chapter 19-1-DPWH IX-ZS 1DEOPage 42 of 43

Page 472: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

383. Buildings and Other Structures - Multipurpose / Facilities - Local Infrastructure Program - Construction of 2- units rest area/ Comfort rooms along arterial national roads (Area= 5m x 7m ) Lanao-Pagadian-Zamboanga City National Road (Brgy. Boyugan, buug K1724+(-564) Right side and Brgy. Mirangan, Imelda K1756+236, left side, Zamboanga Sibugay)

Construction of Multi-purpose Building

- 6,640.00 6,640.00 13,280.00

384. Buildings and Other Structures - Multipurpose / Facilities - Local Infrastructure Program - Construction of turn-outs (loading and unloading) along Lanao-Pagadian-zamboanga city National road (60 lm length and 5.6 m width, includes 2.0 m flatform/sidewalk)Brgy. Kauswagan, K1738+290, right side and Brgy. Poblacion Imelda K1749+900, left side, Zamboanga Sibugay

Construction of Multi-purpose Building

- 7,100.00 7,100.00 14,200.00

385. Buildings and Other Structures - Multipurpose / Facilities - Local Infrastructure Program - Construction of 1-unit waiting shed and comfort room along national highway (Area = 4.0m x 3.70m)K1739+290 (left side) at Brgy. Kauswagan, Diplahan Section

Construction of Multi-purpose Building

- 4,440.00 4,440.00 8,880.00

386. Construction of MPB, Brgy. Poblacion, Diplahan, Zamboanga Sibugay 1st LD

Construction of Multi-purpose Building

Diplahan 2,000.00 - 2,000.00

387. Construction of Multi-Purpose Building (Covered Court/ Evacuation Center) in Malangas, Zamboanga Sibugay

Construction of Multi-purpose Building Malangas 5,000.00 5,000.00

388. Completion of Multi-Purpose Building (Gymnasium), Poblacion, Payao, Zamboanga Sibugay

Construction of Multi-purpose Building Payao 5,000.00 5,000.00

62,000.00 222,500.00 122,000.00 2,493,890.00 2,864,990.00 - 5,765,380.00 1,350,995.00 1,726,282.00 1,306,486.00 7,825,444.00 9,177,640.00 4,762,990.00 26,149,837.00

Subtotal GRAND TOTAL

Chapter 19-1-DPWH IX-ZS 1DEOPage 43 of 43

Page 473: Table of Contents (By Chapter)

Updated Zamboanga Peninsula Regional Development Investment Program (RDIP), 2017-2022

Agency: DPWH IXChapter 19: Accelerating Infrastructure Development

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

ZAMBOANGA SIBUGAY 2ND DEO, IPILZAMBOANGA SIBUGAY 2ND LEGISLATIVE DISTRICTa. OO1: Ensure Safe and Reliable National Road System

(i) Asset Preservation of National Roads1. Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development Management-4 (HDM-4)

a. Primary Road1. Asphalt to Concrete Paving of National Road

along Ipil - Liloy - Sindangan Road Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved

National Roads Titay km. Plans and POW GAA 3 54,292 54,292 108,584

K2003+737 - K2004+454 (Poblacion Muslim Section) km. Plans and POW GAA 3 39,270 39,270

K2004+737 - K2005+846 (Poblacion Muslim Section) km. Plans and POW GAA 3 -

K2011+887 - K2012+000 (Poblacion Muslim Section) km. Plans and POW GAA 3 -

2. Lanao-Pagadian-Zamboanga City RoadRehabilitation/ Reconstruction/ Upgrading of Damaged Paved

National Roads

Siay, Kabasalan, Naga, Ipil, R.T. Lim, Tungawan

km. Plans and POW GAA 3 - - 100,000 100,000 200,000

3. Ipil-Liloy-Sindangan RoadRehabilitation/ Reconstruction/ Upgrading of Damaged Paved

National Roads Titay, Ipil, ZS km. Plans and POW GAA 3 - - 8,965 50,000 50,000 108,965

4. Ipil-Liloy-Sindangan RoadRehabilitation/ Reconstruction/ Upgrading of Damaged Paved

National Roads Titay, Ipil, ZS km. Plans and POW GAA 3 - - 50,000 50,000 100,000 T2 T2

b. Tertiary Road - 5. Crossing Sta. Clara-Sandayong Road

Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved

National Roads Naga,ZS km. Plans and POW GAA 3 - - 20,000 20,000 40,000

6. Crossing Sta. Clara-Sandayong RoadRehabilitation/ Reconstruction/ Upgrading of Damaged Paved

National Roads Naga,ZS km. Plans and POW GAA 3 - - 20,000 20,000 40,000 T2 T2

7. Imelda-Bayog-Kumalarang-Lapuyan-Margosatubig Road Rehabilitation/ Reconstruction/

Upgrading of Damaged Paved National Roads

Siay, ZS km. Plans and POW GAA 3 - - 10,000 10,000 20,000

8. Ipil Magdaup Wharf RoadRehabilitation/ Reconstruction/ Upgrading of Damaged Paved

National Roads Ipil, ZS km. Plans and POW GAA 3 - - -

2. Preventive Maintenance based on Pavement Management System - a. Primary Road -

9. Lanao-Pagadian-Zamboanga City Road Preventive Maintenance based on Pavement Management

System

Siay, Kabasalan, Naga, Ipil, R.T. Lim, Tungawan

km. Plans and POW GAA 3 - 31,362 100,000 100,000 231,362

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Page 474: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

10. Ipil-Liloy-Sindangan Road Preventive Maintenance based on Pavement Management

SystemTitay, Ipil, ZS km. Plans and POW GAA 3 - 4,509 100,000 100,000 204,509

b. Tertiary Road - 11. Crossing Sta. Clara-Sandayong Road Preventive Maintenance based

on Pavement Management System

Naga,ZS km. Plans and POW GAA 3 - - 50,000 50,000 100,000

12. Crossing Sta. Clara-Sandayong Road Preventive Maintenance based on Pavement Management

SystemNaga,ZS km. Plans and POW GAA 3 - - 50,000 50,000 100,000 T2 T2

13. Imelda-Bayog-Kumalarang-Lapuyan-Margosatubig Road

Preventive Maintenance based on Pavement Management

SystemSiay, ZS km. Plans and POW GAA 3 - - 50,000 50,000 100,000

14. Imelda-Bayog-Kumalarang-Lapuyan-Margosatubig Road

Preventive Maintenance based on Pavement Management

SystemSiay, ZS km. Plans and POW GAA 3 - - 50,000 50,000 100,000 T2 T2

15. Ipil Magdaup Wharf Road Preventive Maintenance based on Pavement Management

SystemIpil, ZS km. Plans and POW GAA 3 - - 5,000 5,000 10,000

16. Ipil Magdaup Wharf Road Preventive Maintenance based on Pavement Management

SystemIpil, ZS km. Plans and POW GAA 3 - - 5,000 5,000 10,000 T2 T2

3. Construction/Upgrading/Rehabilitation of Drainage along National Roads - a. Primary Road -

12. Lanao-Pagadian-Zamboanga City Road Construction/Upgrading/Rehabilitation of Drainage along

National Roads

Siay, Kabasalan, Naga, Ipil, R.T. Lim, Tungawan

ln.m. Plans and POW GAA 3 50,000 - 20,000 20,000 90,000

13. Ipil-Liloy-Sindangan Road Construction/Upgrading/Rehabilitation of Drainage along

National RoadsTitay, Ipil, ZS ln.m. Plans and POW GAA 3 10,000 - 10,000 10,000 30,000

b. Tertiary Road - 14. Metro Brgy. Of Don Andres, Ipil Construction/Upgrading/Rehabil

itation of Drainage along National Roads

Ipil, ZS ln.m. Plans and POW GAA 3 60,000 60,000 120,000

15. Lower Taway, Ipil Construction/Upgrading/Rehabilitation of Drainage along

National RoadsIpil, ZS ln.m. Plans and POW GAA 3 30,000 30,000 60,000

16. Sanito, Ipil Construction/Upgrading/Rehabilitation of Drainage along

National RoadsIpil, ZS ln.m. Plans and POW GAA 3 30,000 30,000 60,000

17. Tupilac, Tungawan, ZS Construction/Upgrading/Rehabilitation of Drainage along

National RoadsTungawan, ZS ln.m. Plans and POW GAA 3 3,500 3,500 7,000

18. Poblacion Titay, Titay ZS Construction/Upgrading/Rehabilitation of Drainage along

National RoadsTitay ln.m. Plans and POW GAA 3 30,000 30,000 60,000

19. Poblacion, Bangkerohan, Ipil Construction/Upgrading/Rehabilitation of Drainage along

National RoadsIpil, ZS ln.m. Plans and POW GAA 3 30,000 30,000 60,000

20. Brgy. Poblacion, Naga Construction/Upgrading/Rehabilitation of Drainage along

National RoadsZ. Sibugay ln.m. Plans and POW GAA 3 25,000 25,000 50,000

21. Crossing Sta. Clara-Sandayong Road Construction/Upgrading/Rehabilitation of Drainage along

National RoadsNaga,ZS ln.m. Plans and POW GAA 3 - - 30,000 30,000 60,000

Chapter 19-1-DPWH IX-ZS 2DEOPage 2 of 26

Page 475: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

22. Ipil Magdaup Wharf Road Construction/Upgrading/Rehabilitation of Drainage along

National RoadsIpil, ZS ln.m. Plans and POW GAA 3 10,000 - 10,000 10,000 30,000

4. Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - a. Primary Road -

23. Lanao - Pagadian - Zamboanga City Road ln.m. Plans and POW GAA 3 8,500 250,000 250,000 508,500 K1837+800 - K1837+820 (Right Side) Tungawan ln.m. Plans and POW GAA 3 - K1837+960 - K1837+975 (Right Side) Tungawan ln.m. Plans and POW GAA 3 - K1762+306 - K1762+352 (Left Side) Siay ln.m. Plans and POW GAA 3 - K1762+581 - K1762+620 (Right Side) Siay ln.m. Plans and POW GAA 3 - K1837+300 - K1837+320 (Right Side) Tungawan ln.m. Plans and POW GAA 3 - K1848+438 - K1848+458 (Right Side) Tungawan ln.m. Plans and POW GAA 3 -

24. Crossing Sta. Clara-Sandayong Road Plans and POW GAA 3 5,875 5,875 TERTIARY ROADK1806+290 - K1806+380 (Left Side) Naga ln.m. Plans and POW GAA 3 - K1809+490 - K1809+520 (Left Side) Naga ln.m. Plans and POW GAA 3 - K1809+565 - K1809+625 (Left Side) Naga ln.m. Plans and POW GAA 3 - K1809+598 - K1809+990 (Right Side) Naga ln.m. Plans and POW GAA 3 - K1810+070 - K1810+177 (Both Side) Naga ln.m. Plans and POW GAA 3 - K1810+197 - K1810+220 (Left Side) Naga ln.m. Plans and POW GAA 3 - K1809+755 - K1810+055 (Left Side) Naga ln.m. Plans and POW GAA 3 -

25. Ipil-Liloy-Sindangan Road Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide

Titay, Ipil, ZS ln.m. Plans and POW GAA 3 - - 5,000 5,000 10,000

26. Ipil-Liloy-Sindangan Road Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide

Titay, Ipil, ZS ln.m. Plans and POW GAA 3 - - 27,213 27,213 NEP W/ ERRATA 2019

K1996 + (-863) - K1996 + (-656) Titay, Ipil, ZS ln.m. Plans and POW GAA 3 - K2002 + 643 - K2002 + 963 Titay, Ipil, ZS ln.m. Plans and POW GAA 3 - K2011 + 846 -K2012 + 097 Titay, Ipil, ZS ln.m. Plans and POW GAA 3 -

b. Tertiary Road - 27. Crossing Sta. Clara-Sandayong Road Rehabilitation/ Reconstruction

of National Roads with Slips, Slope Collapse, and Landslide

Naga,ZS ln.m. Plans and POW GAA 3 - 43,000 58,000 58,000 159,000

28. Crossing Sta. Clara-Sandayong Road Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide

Naga,ZS ln.m. Plans and POW GAA 3 - 5,000 5,000 10,000 T2 T2

29. Imelda-Bayog-Kumalarang-Lapuyan-Margosatubig Road

Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide

Siay, ZS ln.m. Plans and POW GAA 3 - 10,000 10,000 20,000

30. Ipil Magdaup Wharf Road Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide

Ipil, ZS ln.m. Plans and POW GAA 3 - - -

(ii) Network Development - 1. Improvement/Widening of National Roads -

a. Primary Road - 31. Lanao-Pagadian-Zamboanga City Road

Improvement/Widening of National Roads

Siay, Kabasalan, Naga, Ipil, R.T. Lim, Tungawan

km. Plans and POW GAA 3 200,000 - 108,000 1,070,593 600,000 600,000 2,578,593

32. Lanao-Pagadian-Zamboanga City Road - (K1843 + 221 - K1843 + 493) Improvement/Widening of

National Roads

Siay, Kabasalan, Naga, Ipil, R.T. Lim, Tungawan

km. Plans and POW GAA 3 25,400 25,400 NEP W/ ERRATA 2019

33. Ipil-Liloy-Sindangan Road Improvement/Widening of National Roads Titay, Ipil, ZS km. Plans and POW GAA 3 52,298 315,000 300,000 300,000 967,298

b. Tertiary Road - 34. Crossing Sta. Clara-Sandayong Road Improvement/Widening of

National Roads Naga,ZS km. Plans and POW GAA 3 - - -

Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide

Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide

Chapter 19-1-DPWH IX-ZS 2DEOPage 3 of 26

Page 476: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

35. Imelda-Bayog-Kumalarang-Lapuyan-Margosatubig Road

Improvement/Widening of National Roads Siay, ZS km. Plans and POW GAA 3 - - -

36. Ipil Magdaup Wharf Road Improvement/Widening of National Roads Ipil, ZS km. Plans and POW GAA 3 17,790 - 17,790

2. Construction of By-Passes/Diversion Roads, including ROW - a. Primary Road -

37. Completion of Poblacion Titay - Dalangin - Dalangin Muslim - Achasol - San Antonio - Tugop - Banco - Boundary Kalawit

Construction of By-Passes/Diversion Roads,

including ROWTitay, ZS km. Plans and POW GAA 3 - - 300,000 300,000 300,000 900,000

38. Completion of the Jct. Nat'l Highway in R.T. Lim, Zamboanga Sibugay to Jct. Nat'l Highway Siocon, Zamboanga del Norte

Construction of By-Passes/Diversion Roads,

including ROWR.T. Lim, ZS km. Plans and POW GAA 3 250,000 300,000 550,000

39. Ipil Circumferential Rd., Veterans - Tiayon - Don Andres Section

Construction of By-Passes/Diversion Roads,

including ROWIpil, ZS km. Plans and POW GAA 3 91,200 150,000 138,000 325,000 300,000 300,000 1,304,200

40. Road Opening/Concreting of Jct. Nat'l Highway Brgy. Goodyear-Banker-Dacagan-Tampilisan-Diampak-Siolan, Kabasalan, Zamboanga Sibugay

Construction of By-Passes/Diversion Roads,

including ROWIpil km. Plans and POW GAA 3 - 150,000 150,000 150,000 450,000

41. Concreting of Jct. Nat'l Highway Brgy. Buayan-Lacnapan, Kabasalan, Zamboanga Sibugay

Construction of By-Passes/Diversion Roads,

including ROWTitay, ZS km. Plans and POW GAA 3 - - 150,000 150,000 150,000 450,000

42. Cayamcam - Sirawai Road Construction of By-Passes/Diversion Roads,

including ROWR.T. Lim, ZS km. Plans and POW GAA 3 120,000 150,000 150,000 420,000

43. Zamboanga City - Pagadian City Coastal Road (Ipil Section)

Construction of By-Passes/Diversion Roads,

including ROWIpil, ZS km. Plans and POW GAA 3 100,000 100,000 100,000 300,000

(iii) Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - a. Primary Road - b. Tertiary Road -

44. Crossing Sta. Clara-Sandayong Road Road Upgrading Naga,ZS Plans and POW GAA 3 - - 45. Crossing Sta. Clara-Sandayong Road Road Upgrading Naga,ZS Plans and POW GAA 3 - 9,249 9,249 NEP W/ ERRATA 2019

K1795 + 589 - K1795 + 624 ln.m. Plans and POW GAA 3 - K1796 + 682 - K1796 + 767 ln.m. Plans and POW GAA 3 - K1796 + 789 - K1796 + 860 ln.m. Plans and POW GAA 3 - K1801 + 877 - K1802 + 000 ln.m. Plans and POW GAA 3 - K1810 + 415 - K1810 + 523 ln.m. Plans and POW GAA 3 -

46. Imelda-Bayog-Kumalarang-Lapuyan-Margosatubig Road Road Upgrading Siay, ZS Plans and POW GAA 3 - - -

47. Ipil Magdaup Wharf Road Road Upgrading Ipil, ZS Plans and POW GAA 3 - - - (iv) Construction and Maintenance of Bridges along National Roads - 1. Construction of New Bridge -

48. Construction of Bauyan Bridge II along Lanao - Pagadian - Zamboanga City Road SectionK1775+139 - K1775+202 Construction of New Bridge Siay, ZS ln.m. Plans and POW GAA 3 40,000 40,000

49. Construction of New Permanent Bridges- Buayan Br. II (Parallel Bridge) along Lanao-Pagadian-Zamboanga City Rd (Phase II)

Construction of New Bridge Siay, ZS ln.m. Plans and POW GAA 3 23,000 23,000 NEP W/ ERRATA 2019

2. Rehabilitation of Permanent Bridges - a. All Along Lanao-Pagadian-Zamboanga City -

50. COLOY BR. (BOO483MN) Rehabilitation of Permanent Bridges Siay, ZS ln.m. Plans and POW GAA 3 8,391 - 8,391

51. COLORAN BR. (BOO484MN) Rehabilitation of Permanent Bridges Siay, ZS ln.m. Plans and POW GAA 3 1,400 - 1,400

Chapter 19-1-DPWH IX-ZS 2DEOPage 4 of 26

Page 477: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

52. SULUAN BR. (BOO485MN) Rehabilitation of Permanent Bridges Siay, ZS ln.m. Plans and POW GAA 3 9,570 - 9,570

53. BALUNUAN BR. (BOO486MN) Rehabilitation of Permanent Bridges Siay, ZS ln.m. Plans and POW GAA 3 7,230 - 7,230

54. GUSAWAN BR. (BOO487MN) Rehabilitation of Permanent Bridges Siay, ZS ln.m. Plans and POW GAA 3 - - -

55. BATU BR. (BOO488MN) Rehabilitation of Permanent Bridges Kabasalan, ZS ln.m. Plans and POW GAA 3 - - -

56. CALAPAN BR. (BOO489MN) Rehabilitation of Permanent Bridges Kabasalan, ZS ln.m. Plans and POW GAA 3 - - -

57. BUAYAN BR. (BOO490MN) Rehabilitation of Permanent Bridges Kabasalan, ZS ln.m. Plans and POW GAA 3 19,404 - 19,404

58. DIPALA BR. (BOO491MN) Rehabilitation of Permanent Bridges Kabasalan, ZS ln.m. Plans and POW GAA 3 - - -

59. LUMBAYAO BR. (BOO492MN) Rehabilitation of Permanent Bridges Naga, ZS ln.m. Plans and POW GAA 3 8,100 - 8,100

60. KABASALAN BR. (BOO493MN) Rehabilitation of Permanent Bridges Naga, ZS ln.m. Plans and POW GAA 3 - - -

61. BANISAN BR. (BOO494MN) Rehabilitation of Permanent Bridges Naga, ZS ln.m. Plans and POW GAA 3 - - -

62. BAGA BR. (BOO495MN) Rehabilitation of Permanent Bridges Naga, ZS ln.m. Plans and POW GAA 3 15,564 - 15,564

63. TAMBANAN BR. (BOO496MN) Rehabilitation of Permanent Bridges Ipil, ZS ln.m. Plans and POW GAA 3 7,758 - 7,758

64. BACALAN BR. (BOO497MN) Rehabilitation of Permanent Bridges Ipil, ZS ln.m. Plans and POW GAA 3 - - 21,330 21,330

65. PANGI BR. (BOO498MN) Rehabilitation of Permanent Bridges Ipil, ZS ln.m. Plans and POW GAA 3 12,540 - 12,540

66. SANITO BR. (BOO499MN) Rehabilitation of Permanent Bridges Ipil, ZS ln.m. Plans and POW GAA 3 15,249 - 15,249

67. TIAYON BR. (BOO500MN) Rehabilitation of Permanent Bridges Ipil, ZS ln.m. Plans and POW GAA 3 6,390 - 6,390

68. CAPARAN BR. (BOO501MN) Rehabilitation of Permanent Bridges Ipil, ZS ln.m. Plans and POW GAA 3 8,502 - 8,502

69. BULUAN BR. (BOO502MN) Rehabilitation of Permanent Bridges R.T. Lim, ZS ln.m. Plans and POW GAA 3 10,200 - 10,200

70. GANGO BR. (BOO503MN) Rehabilitation of Permanent Bridges R.T. Lim, ZS ln.m. Plans and POW GAA 3 7,491 7,491

71. TIGBALABAG BR. (BOO504MN) Rehabilitation of Permanent Bridges R.T. Lim, ZS ln.m. Plans and POW GAA 3 12,156 - 12,156

72. SILINGAN BR. (BOO505MN) Rehabilitation of Permanent Bridges R.T. Lim, ZS ln.m. Plans and POW GAA 3 12,630 - 12,630

73. SURABAY BR. (BOO506MN) Rehabilitation of Permanent Bridges R.T. Lim, ZS ln.m. Plans and POW GAA 3 16,842 - 16,842

74. TUPILAC BR. (BOO507MN) Rehabilitation of Permanent Bridges Tungawan, ZS ln.m. Plans and POW GAA 3 12,063 - 12,063

75. TUNGAWAN BR. (BOO508MN) Rehabilitation of Permanent Bridges Tungawan, ZS ln.m. Plans and POW GAA 3 7,968 - 7,968

76. TIGBANUANG BR. (BOO509MN) Rehabilitation of Permanent Bridges Tungawan, ZS ln.m. Plans and POW GAA 3 8,370 - 8,370

77. UPPER TUNGAWAN BR. (BOO510MN) Rehabilitation of Permanent Bridges Tungawan, ZS ln.m. Plans and POW GAA 3 - - -

78. GULLINAN BR. TIGPALAY BR. (BOO511MN)

Rehabilitation of Permanent Bridges Tungawan, ZS ln.m. Plans and POW GAA 3 - 25,000 25,000

79. TIGPALAY BR. (BOO512MN) Rehabilitation of Permanent Bridges Tungawan, ZS ln.m. Plans and POW GAA 3 - - -

Chapter 19-1-DPWH IX-ZS 2DEOPage 5 of 26

Page 478: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

3. Widening of Permanent Bridges - a. All Along Lanao-Pagadian-Zamboanga City -

80. COLOY BR. (BOO483MN)Widening of Permanent Bridges Siay, ZS ln.m. Plans and POW GAA 3 -

81. COLORAN BR. (BOO484MN)Widening of Permanent Bridges Siay, ZS ln.m. Plans and POW GAA 3 -

82. COLORAN BR. (BOO484MN)Widening of Permanent Bridges Siay, ZS ln.m. Plans and POW GAA 3 29,800 29,800 NEP W/ ERRATA 2019

83. SULUAN BR. (BOO485MN)Widening of Permanent Bridges Siay, ZS ln.m. Plans and POW GAA 3 -

84. SULUAN BR. (BOO485MN)Widening of Permanent Bridges Siay, ZS ln.m. Plans and POW GAA 3 31,900 31,900 NEP W/ ERRATA 2019

85. BALUNUAN BR. (BOO486MN)Widening of Permanent Bridges Siay, ZS ln.m. Plans and POW GAA 3 -

86. Balunuan Br. (Cantilever) (B00486MN)Widening of Permanent Bridges Siay, ZS ln.m. Plans and POW GAA 3 24,100 24,100 NEP W/ ERRATA 2019

87. GUSAWAN BR. (BOO487MN)Widening of Permanent Bridges Siay, ZS ln.m. Plans and POW GAA 3 -

88. GUSAWAN BR. (BOO487MN)Widening of Permanent Bridges Siay, ZS ln.m. Plans and POW GAA 3 24,200 24,200 NEP W/ ERRATA 2019

89. BATU BR. (BOO488MN)Widening of Permanent Bridges Kabasalan, ZS ln.m. Plans and POW GAA 3 36,530 36,530

90. CALAPAN BR. (BOO489MN)Widening of Permanent Bridges Kabasalan, ZS ln.m. Plans and POW GAA 3 27,900 27,900

91. BUAYAN BR. (BOO490MN)Widening of Permanent Bridges Kabasalan, ZS ln.m. Plans and POW GAA 3 -

92. DIPALA BR. (BOO491MN)Widening of Permanent Bridges Kabasalan, ZS ln.m. Plans and POW GAA 3 27,810 27,810

93. LUMBAYAO BR. (BOO492MN)Widening of Permanent Bridges Naga, ZS ln.m. Plans and POW GAA 3 25,900 25,900

94. KABASALAN BR. (BOO493MN)Widening of Permanent Bridges Naga, ZS ln.m. Plans and POW GAA 3 -

95. BANISAN BR. (BOO494MN)Widening of Permanent Bridges Naga, ZS ln.m. Plans and POW GAA 3 28,060 28,060 56,120

96. BAGA BR. (BOO495MN)Widening of Permanent Bridges Naga, ZS ln.m. Plans and POW GAA 3 51,880 51,880 103,760

97. TAMBANAN BR. (BOO496MN)Widening of Permanent Bridges Ipil, ZS ln.m. Plans and POW GAA 3 25,860 25,860 51,720

98. BACALAN BR. (BOO497MN)Widening of Permanent Bridges Ipil, ZS ln.m. Plans and POW GAA 3 71,100 71,100 142,200

99. PANGI BR. (BOO498MN)Widening of Permanent Bridges Ipil, ZS ln.m. Plans and POW GAA 3 -

100. SANITO BR. (BOO499MN)Widening of Permanent Bridges Ipil, ZS ln.m. Plans and POW GAA 3 -

101. TIAYON BR. (BOO500MN)Widening of Permanent Bridges Ipil, ZS ln.m. Plans and POW GAA 3 14,770 14,770

102. CAPARAN BR. (BOO501MN)Widening of Permanent Bridges Ipil, ZS ln.m. Plans and POW GAA 3 -

103. BULUAN BR. (BOO502MN)Widening of Permanent Bridges R.T. Lim, ZS ln.m. Plans and POW GAA 3 -

104. GANGO BR. (BOO503MN)Widening of Permanent Bridges R.T. Lim, ZS ln.m. Plans and POW GAA 3 -

105. TIGBALABAG BR. (BOO504MN)Widening of Permanent Bridges R.T. Lim, ZS ln.m. Plans and POW GAA 3 -

106. SILINGAN BR. (BOO505MN)Widening of Permanent Bridges R.T. Lim, ZS ln.m. Plans and POW GAA 3 -

Chapter 19-1-DPWH IX-ZS 2DEOPage 6 of 26

Page 479: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

107. SURABAY BR. (BOO506MN)Widening of Permanent Bridges R.T. Lim, ZS ln.m. Plans and POW GAA 3 -

108. TUPILAC BR. (BOO507MN)Widening of Permanent Bridges Tungawan, ZS ln.m. Plans and POW GAA 3 -

109. TUNGAWAN BR. (BOO508MN)Widening of Permanent Bridges Tungawan, ZS ln.m. Plans and POW GAA 3 -

110. TIGBANUANG BR. (BOO509MN)Widening of Permanent Bridges Tungawan, ZS ln.m. Plans and POW GAA 3 -

111. UPPER TUNGAWAN BR. (BOO510MN)Widening of Permanent Bridges Tungawan, ZS ln.m. Plans and POW GAA 3 -

112. GULLINAN BR. TIGPALAY BR. (BOO511MN) Widening of Permanent Bridges Tungawan, ZS ln.m. Plans and POW GAA 3 -

113. TIGPALAY BR. (BOO512MN)Widening of Permanent Bridges Tungawan, ZS ln.m. Plans and POW GAA 3 -

b. Along Diplahan JCT-Malangas Port Road ln.m. Plans and POW - 114. TIGBONGABONG BR. (BOO513MN)

Widening of Permanent Bridges Tungawan, ZS ln.m. Plans and POW GAA 3 -

c All Along Ipil-Liloy-Sindangan Road ln.m. Plans and POW - 115. CAMANGA BR. (BOO515MN)

Widening of Permanent Bridges Titay, ZS ln.m. Plans and POW GAA 3 -

116 SANITO BR. (BO1205MN)Widening of Permanent Bridges Ipil, ZS ln.m. Plans and POW GAA 3 -

117. TAWAY BR. (BO1207MN)Widening of Permanent Bridges Ipil, ZS ln.m. Plans and POW GAA 3 -

889,106 1,027,011 344,710 3,713,285 3,742,554 2,050,000 11,766,666 OO2: Protect Lives and Properties Against Major Floods -

1. Construction/Maintenance of Flood Mitigation Structures and Drainage System - 118. Construction/Improvement of Flood Control

Structure along Sibugay River Basin (Phase II) Flood Control Brgy. Sibugay, Siay, ZS ln.m. Plans and POW GAA 3 40,000 - 105,000 105,000 250,000

119. Improvement of Flood Control along Lanao-Pagadian-Zamboanga City Road, Buayan River

Flood Control Buayan, Kabasalan, ZS ln.m. Plans and POW GAA 3 40,000 - 100,000 100,000 240,000

120. Flood Control Structure along Sibuguey River Basin - Rehabilitation/ Improvement of flood control (Phase II) along Sibugay River Basin Flood Control Brgy. Sibugay,

Siay, ZS ln.m. Plans and POW GAA 3 45,000 - 45,000

121. Const. of Control Structure along Kabasalan River Flood Control FL Pena, Kabasalan ln.m. Plans and POW GAA 3 - 21,000 167,000 120,000 120,000 428,000

122. Const. of Flood Control Project from Veterans Village to Don Andres Flood Control Ipil, ZS ln.m. Plans and POW GAA 3 - 25,000 50,000 50,000 125,000

123. Construction of Drainage Structure - Construction of Flood Control Project from Veterans Village to Don Andres, Zamboanga Sibugay

Flood Control Ipil, ZS ln.m. Plans and POW GAA 3 - 101,000 101,000 NEP W/ ERRATA 2019

123. Sanito River Flood Control Project (Sanito - Bankerohan) Flood Control Bryg. Sanito, Ipil ln.m. Plans and POW GAA 3 20,000 50,000 50,000 120,000

124. Construction of Flood Control Structure along Sanito River (Phase II), Brgy. Sanito, Ipil, Zamboanga Sibugay

Flood Control Bryg. Sanito, Ipil ln.m. Plans and POW GAA 3 20,000 25,000 45,000 NEP W/ ERRATA 2019

124. Guintoloan Flood Control Flood Control Naga,ZS ln.m. Plans and POW GAA 3 25,000 25,000 125. Libertad Flood Control,Tungawan Flood Control Tungawan, ZS ln.m. Plans and POW GAA 3 10,000 10,000 20,000 126. Upper Tungawan Flood Control, Tungawan Flood Control Tungawan, ZS ln.m. Plans and POW GAA 3 7,000 7,000 127. Sto Nino Flood Control, Tungawan Flood Control Tungawan, ZS ln.m. Plans and POW GAA 3 2,000 2,000 4,000 128. Kabasalan River Control, Kabasalan Flood Control Kabasalan, ZS ln.m. Plans and POW GAA 3 21,000 21,000 42,000 129. Sibugey River Control, Siay Flood Control Siay, ZS ln.m. Plans and POW GAA 3 - -

OO 1- Subtotal

Chapter 19-1-DPWH IX-ZS 2DEOPage 7 of 26

Page 480: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

130. Comprehensive Drainage System within Metro Ipil Area, Ipil, Zamboanga Sibugay Construction of drainage Ipil ln.m. Plans and POW GAA 3 25,000 25,000 Comma Correction

131. Construction of Flood Control along Kabasalan River, FL Pena, Kabasalan, Zamboanga Sibugay

Construction of Flood Mitigation Structure Kabasalan, ZS ln.m. Plans and POW GAA 3 25,000 167,000 150,000 150,000 492,000

132. Construction of Flood Control along Kabasalan River (Phase II), FL Pena, Kabasalan, Zamboanga Sibugay

Construction of Flood Mitigation Structure Kabasalan, ZS ln.m. Plans and POW GAA 3 102,000 102,000 NEP W/ ERRATA 2019

132. Kabasalan River Control, Kabasalan Construction of Flood Mitigation Structure Kabasalan, ZS ln.m. Plans and POW GAA 3 1,000 50,000 51,000 SMALL AMOUNT FOR

FLOOD CONTROL133. Sibuguey River Control, Siay Construction of Flood

Mitigation Structure Siay ln.m. Plans and POW GAA 3 50,000 50,000 100,000

134. Rehabilitation/Improvement of 7 km Flood Protection Dike cum Farm to M Brgy. Lagting, Siay, Zamboanga Sibugay

Construction of Flood Mitigation Structure Siay ln.m. Plans and POW GAA 3 50,000 50,000 100,000

135. Construction of River Bank Protection, Brgy. Guintolan, Naga, Zamboanga Sibugay

Construction of Flood Mitigation Structure Kabasalan, ZS ln.m. Plans and POW GAA 3 30,000 30,000 60,000

136. Const. of Flood Control Project from Veterans Village to Don Andres

Construction of Flood Mitigation Structure Ipil ln.m. Plans and POW GAA 3 50,000 50,000 100,000

137. Construction of Flood Control Structure along Sibuguey River (Phase XVI) Siay, Zamboanga Sibugay

Construction of Flood Mitigation Structure Siay ln.m. Plans and POW GAA 3 50,000 110,000 110,000 270,000

138. Construction of Flood Control Structure along Sibuguey River (Phase XVII) Siay, Zamboanga Sibugay

Construction of Flood Mitigation Structure Siay ln.m. Plans and POW GAA 3 45,000 115,000 115,000 275,000

139. Construction of Flood Control Structure along Sibuguey River (Phase VIII) Siay, Zamboanga Sibugay

Construction of Flood Mitigation Structure Siay ln.m. Plans and POW GAA 3 37,850 37,850 NEP W/ ERRATA 2019

140. Construction of Flood Control Structure along Sibuguey River (Phase IX) Siay, Zamboanga Sibugay

Construction of Flood Mitigation Structure Siay ln.m. Plans and POW GAA 3 30,000 30,000 NEP W/ ERRATA 2019

141. Construction of Flood Control Structure along Sibuguey River (Phase XII) Siay, Zamboanga Sibugay

Construction of Flood Mitigation Structure Siay ln.m. Plans and POW GAA 3 50,000 108,000 108,000 266,000

142. Construction of Flood Control Structure along Sibuguey River (Phase XIII) Siay, Zamboanga Sibugay

Construction of Flood Mitigation Structure Siay ln.m. Plans and POW GAA 3 45,000 114,000 116,000 275,000

143. Construction of Flood Control Structure along Sibuguey River (Phase XIV) Siay, Zamboanga Sibugay

Construction of Flood Mitigation Structure Siay ln.m. Plans and POW GAA 3 55,000 120,000 120,000 295,000

144. Construction of Flood Control Structure along Sibuguey River (Phase XV) Siay, Zamboanga Sibugay

Construction of Flood Mitigation Structure Siay ln.m. Plans and POW GAA 3 50,000 112,000 112,000 274,000

145. Flood Control Project Phase II in Metro Brgys. Of Ipil, Ipil, Zamboanga Sibugay

Construction of Flood Mitigation Structure Ipil ln.m. Plans and POW GAA 3 50,000 50,000 NEP W/ ERRATA 2019

146. Flood Control Project Phase III in Metro Brgys. Of Ipil, Ipil, Zamboanga Sibugay

Construction of Flood Mitigation Structure Ipil ln.m. Plans and POW GAA 3 50,000 116,000 116,000 282,000

147. Construction of Flood control Control, Brgy. Sta. Clara, Naga, Zamboanga Sibugay

Construction of Flood Mitigation Structure Kabasalan, ZS ln.m. Plans and POW GAA 3 120,000 120,000 120,000 360,000

148. Construction of Flood Control, Brgy. Poblacion, Naga, Zamboanga Sibugay

Construction of Flood Mitigation Structure Kabasalan, ZS ln.m. Plans and POW GAA 3 25,000 106,000 110,000 241,000

149. Construction of Flood Control, Brgy. Sta. Clara, Naga, Zamboanga Sibugay

Construction of Flood Mitigation Structure Kabasalan, ZS ln.m. Plans and POW GAA 3 30,000 110,000 110,000 250,000

150. Construction of Libertad Flood Control Structure along Tungawan River, Tungawan, Zamboanga Sibugay

Construction of Flood Mitigation Structure Ipil ln.m. Plans and POW GAA 3 10,000 105,000 105,000 220,000

Chapter 19-1-DPWH IX-ZS 2DEOPage 8 of 26

Page 481: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

151. Construction of Sto. Niño Flood Control Structure along Tungawan River, Tungawan, Zamboanga Sibugay

Construction of Flood Mitigation Structure Ipil ln.m. Plans and POW GAA 3 2,000 115,000 115,000 232,000

152. Flood Control Project Phase I in Metro Brgys. of Ipil, (Don Andres, Lower Taway, Sanito, Poblacion/Bangkerohan), Ipil, Zamboanga Sibugay

Construction of Flood Mitigation Structure Kabasalan, ZS ln.m. Plans and POW GAA 3 30,000 120,000 120,000 270,000

153. Construction of Flood Control Structure along Tupilac River (Phase II) R.T. Lim, Zamboanga Sibugay

Construction of Flood Mitigation Structure Siay ln.m. Plans and POW GAA 3 28,743 28,743 NEP W/ ERRATA 2019

154. Construction of Flood Control Structure along Tupilac River (Phase III) R.T. Lim, Zamboanga Sibugay

Construction of Flood Mitigation Structure Siay ln.m. Plans and POW GAA 3 30,000 30,000 30,000 90,000

155. Construction of Flood Mitigation Structure - Construction of Upper Tungawan Flood Control Structure along Tungawan River (Phase II) Tungawan, Zamboanga Sibugay

Construction of Flood Mitigation Structure Siay ln.m. Plans and POW GAA 3 104,000 104,000

156. Construction of Upper Tungawan Flood Control Structure along Tungawan River (Phase III) Tungawan, Zamboanga Sibugay

Construction of Flood Mitigation Structure Siay ln.m. Plans and POW GAA 3 50,000 50,000 50,000 150,000

157. Guintoloan Flood Control - Phase II Construction of Flood Mitigation Structure ln.m. Plans and POW GAA 3 25,000 25,000 25,000 75,000

158. Construction of Flood Control along Kabasalan River (Phase III), FL Pena, Kabasalan, Zamboanga Sibugay

Construction of Flood Mitigation Structure Kabasalan, ZS ln.m. Plans and POW GAA 3 150,000 150,000 150,000 450,000

159. Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Kabasalan River (Phase II) Canacan, Kabasalan, Zamboanga Sibugay

Construction of Flood Mitigation Structure ln.m. Plans and POW GAA 3 103,000 103,000

160. Construction of Flood Control Structure along Kabasalan River (Phase IV), Canacan, Kabasalan, Zamboanga Sibugay

Construction of Flood Mitigation Structure Kabasalan, ZS ln.m. Plans and POW GAA 3 150,000 150,000 150,000 450,000

161. Construction of Upper Tungawan Flood Control Structure along Tungawan River (Phase IV), Tungawan, Zamboanga Sibugay

Construction of Flood Mitigation Structure ln.m. Plans and POW GAA 3 150,000 150,000 150,000 450,000

162. Construction of Flood Control Structure along Sibuguey River (Phase VII), Siay, Zamboanga Sibugay

Construction of Flood Mitigation Structure Ipil ln.m. Plans and POW GAA 3 45,000 65,000 65,000 65,000 240,000

163. Construction of Flood Control Structure along Sibuguey River (Phase VI), Siay, Zamboanga Sibugay

Construction of Flood Mitigation Structure

(Revetment)Ipil ln.m. Plans and POW GAA 3 40,000 80,000 80,000 80,000 280,000

164. Construction of Flood Control, Brgy. Tigbanuang, Tungawan, Zamboanga Sibugay

Construction of Flood Mitigation Structure

(Revetment)Kabasalan, ZS ln.m. Plans and POW GAA 3 25,000 25,000 NEP W/ ERRATA 2019

125,000 350,000 - 1,913,000 3,615,593 2,552,000 8,555,593 c. Convergence and Special Support Program -

1. Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones - 165. Road Upgrading (Gravel to Concrete) of Road

connecting Jct. National Highway at Brgy. Coloran to Brgy. Paruk in support of Rubber Industry, Siay, Zamboanga Sibugay.

Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones

Upper Pangi, Ipil km. Plans and POW GAA 2 175,000 175,000 175,000 525,000

166. Road Upgrading (Gravel to Concrete) of Road connecting Jct. National Highway at Brgy. Dacanay to Brgy. Princesa Sumama in support of Rubber and Coconut Industry, Siay, Zamboanga Sibugay.

Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones

Poblacion, Siay km. Plans and POW GAA 2 162,500 162,500 162,500 487,500

OO 2- Subtotal

Chapter 19-1-DPWH IX-ZS 2DEOPage 9 of 26

Page 482: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

167. Road Upgrading (Gravel to Concrete) of Road connecting Jct. National Highway at Brgy. Mirangan to Brgy. Balucanan in support of Calamansi Processing, Siay, Zamboanga Sibugay

Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones

Buluan, Ipil km. Plans and POW GAA 2 137,500 137,500 137,500 412,500

168. Road Upgrading (Gravel to concrete) of Barangay Road Connecting Junction National Highway and Upper Pangi in Support of Abaca Handicrafts, Upper Pangi, Ipil, Zamboanga Sibugay.

Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones

Tiayon, Ipil km. Plans and POW GAA 2 125,000 125,000 125,000 375,000

169. Concreting of Barangay Road Connecting IMAVEMCO to Junction National Highway in Support of Noodles Processing, Tiayon, Ipil, Zamboanga Sibugay.

Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones

Kimos, Siay km. Plans and POW GAA 2 70,000 70,000 70,000 210,000

170. Road Upgrading (Gravel to Concrete) of Barangay Road Connecting Barangay Buluan to Junction National Highway in Support of Processed Fish Industry, Buluan, Ipil, Zamboanga Sibugay.

Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones

Upper Pangi, Ipil km. Plans and POW GAA 2 50,000 50,000 50,000 150,000

171. Road Upgrading (Gravel to Concrete) of Barangay Road Connecting Bangkerohan Road and Sanito Road in Support of Wearables/Housewares, Sanito, Ipil, Zamboanga Sibugay.

Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones

Poblacion, Siay km. Plans and POW GAA 2 45,000 45,000 45,000 135,000

172. Concreting of Barangay Road Connecting Tire King Rubber Products Company Road and Junction National Highway in Support of Rubber Processing, Taway, Ipil, Zamboanga Sibugay.

Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones

Upper Pangi, Ipil km. Plans and POW GAA 2 17,500 17,500 17,500 52,500

173. Concreting of Barangay Road Connecting PPRPC to Junction National Highway in Support of Rubber Processing, La Paz, Naga, Zamboanga Sibugay.

Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones

Poblacion, Siay km. Plans and POW GAA 2 16,250 16,250 16,250 48,750

174. Road Upgrading (Gravel to Concrete) of Barangay Road Connecting Zamboanga Sibugay High Value Crops Marketing Cooperative Road and existing Barangay Road in Support of Calamansi Processing, Poblacion, Siay, Zamboanga Sibugay.

Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones

Buluan, Ipil km. Plans and POW GAA 2 7,500 7,500 7,500 22,500

175. Construction of concrete road from NRJ Connecting Katipunan ng mga May Kapansanan sa Ipil, Inc (KAMPIL) to Existing Barangay Road in Support of Wearables/Housewares, Poblacion, Ipil, Zamboanga Sibugay.

Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones

Tiayon, Ipil km. Plans and POW GAA 2 5,000 5,000 5,000 15,000

176. Concreting of Barangay Road Connecting Phesalabuhan Subanen De Siay to Junction National Highway in Support of Food Processing, Kimos, Siay, Zamboanga Sibugay

Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones

Kimos, Siay km. Plans and POW GAA 2 3,750 3,750 3,750 11,250

177. Road Upgrading (Gravel to Concrete) of Sitio Botong Road connecting Junction National Highway and Brgy Sulo in Support of Rubber Industry , Naga, Zamboanga Sibugay

Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones

Upper Pangi, Ipil km. Plans and POW GAA 2 50,000 50,000 50,000 150,000

Chapter 19-1-DPWH IX-ZS 2DEOPage 10 of 26

Page 483: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

178. Road Upgrading (Gravel to Paved) Brgy Sulitan Road connecting Brgy Sulitan and Junction National Highway in Support of Rubber and Coconut Industries, Naga, Zamboanga Sibugay

Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones

Poblacion, Siay km. Plans and POW GAA 2 40,000 40,000 40,000 120,000

179. Road Upgrading (Gravel to Paved) Barangay Tipan Road connecting Barangay Tipan and Junction National Highway in support of Cacao Industry in Naga, Zamboanga Sibugay

Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones

Buluan, Ipil km. Plans and POW GAA 2 40,000 40,000 40,000 120,000

180. Concreting Barangay Tigbucay road connecting Barangay Tigbucay (Coastal) and Junction National Highway (Brgy. Langon Exit) in support of Seaweeds and Coconut Industries, Tungawan, Zamboanga Sibugay

Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones

Tiayon, Ipil km. Plans and POW GAA 2 15,000 15,000 15,000 45,000

181. Concreting of Barangay Langon Road connecting Sitio Maricol, Barangay Langon and Junction National Highway in support of Bamboo, Rubber and Coconut Industries, Tungawan, Zamboanga Sibugay

Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones

Kimos, Siay km. Plans and POW GAA 2 15,000 15,000 15,000 45,000

182. Concreting of Barangay Timbabauan Access Road connecting Barangay Timbabauan and Junction National Highway in support of Rubber, Coconut and Bamboo Industries, Tungawan, Zamboanga Sibugay

Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones

Upper Pangi, Ipil km. Plans and POW GAA 2 50,000 50,000 50,000 150,000

183. Concreting of Brgy Road-Sitio Tambis-Tambis-Brgy. Batungan road connecting Brgy Road-Sitio Tambis-Tambis-Brgy. Batungan and Jct. National Highway in support of Rubber, Coconut and Palm Oil Industries, Tungawan, Zamboanga Sibugay

Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones

Poblacion, Siay km. Plans and POW GAA 2 50,000 50,000 50,000 150,000

184. Concreting of Brgy Road Sitio Payat, Brgy Lower Tungawan Road connecting Brgy Road Sitio Payat-Brgy Lower Tungawan and Jct. National Highway in support of Coconut, Rubber and Bamboo Industries, Tungawan, Zamboanga Sibugay

Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones

Buluan, Ipil km. Plans and POW GAA 2 50,000 50,000 50,000 150,000

185. Concreting of Sitio Teras-Brgy San Pedro Road connecting Sitio Teras-Brgy San Pedro and Junction National Highway in support of Coconut and Rubber Industries, Tungawan, Zamboanga Sibugay

Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones

Tiayon, Ipil km. Plans and POW GAA 2 50,000 50,000 50,000 150,000

186. Road Upgrading (Gravel to Paved) of Brgy. Tigbangagan Road connecting Brgy. Tigbangagan and Jct. National Highway in support of Rubber Industry, Kabasalan, Zamboanga Sibugay

Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones

Kimos, Siay km. Plans and POW GAA 2 50,000 50,000 50,000 150,000

187. Road Upgrading (Gravel to Paved) of Lacnapan Road connecting Lacnapan and Jct. National Highway in support of Abaca Industry, Kabasalan, Zamboanga Sibugay

Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones

Upper Pangi, Ipil km. Plans and POW GAA 2 50,000 50,000 50,000 150,000

188. Road Upgrading (Gravel to Concrete) Timalang Road connecting Barangay Timalang and Jct. National Highway road in support of Rubber Industry, Ipil, Zamboanga Sibugay

Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones

Poblacion, Siay km. Plans and POW GAA 2 50,000 50,000 50,000 150,000

Chapter 19-1-DPWH IX-ZS 2DEOPage 11 of 26

Page 484: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

189. Road Upgrading (Gravel to Concrete) of Road connecting Jct. National Highway at Brgy. Batu and Brgy. Maligaya in support of Rubber and Siay Industries in Siay, Zamboanga Sibugay

Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones

Buluan, Ipil km. Plans and POW GAA 2 50,000 50,000 50,000 150,000

190. Concreting of Brgy. Mirangan to Brgy. Balucanan Road connecting Jct. National Highway Brgy Mirangan and Brgy Balucananan Road in support of Processed Fruit, Rubber, Rice Industries, Siay, Zamboanga Sibugay

Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones

Tiayon, Ipil km. Plans and POW GAA 2 50,000 50,000 50,000 150,000

191. Concreting of of Palomoc-Culasian Road with RCDG bridge leading to Agro-Economic Zone (AEZ)

Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones

Kimos, Siay km. Plans and POW GAA 2 50,000 50,000 50,000 150,000

192. Concreting of Barangay Road Connecting PPRPC to Junction National Highway in Support of Rubber Processing, La Paz, Naga, Zamboanga Sibugay

Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones

La Paz, Naga km. Plans and POW GAA 2 25,000 25,000 25,000 75,000

193. Road Upgrading (Gravel to Concrete) of Brgy. Kaliantana Road connecting Brgy. Kaliantana and Junction National Highway in support of Seaweeds and Coconut Industries, Naga, Zamboanga Sibugay

Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones

Inc (KAMPIL) to Existing Barangay Road in Support of Wearables/Housewares, Poblacion, Ipil

km. Plans and POW GAA 2 17,450 50,000 50,000 50,000 167,450

194. Road Upgrading (Gravel to Concrete) of Brgy. Tambanan Road connecting Brgy. Tambanan and Junction National Highway in support of Rubber Industry, Naga, Zamboanga Sibugay

Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones

Inc (KAMPIL) to Existing Barangay Road in Support of Wearables/Housewares, Poblacion, Ipil

km. Plans and POW GAA 2 17,465 50,000 50,000 50,000 167,465

2. Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - 195. Access Road Leading to Airport (Ipil Airport),

Ipil, Zamboanga Sibugay (Phase III) Concreting Sanito, Ipil km. Plans and POW GAA 2 50,000 50,000 100,000 Proposed

196. Access Road Leading to Seaports (Magdaup Wharf), Ipil, Zamboanga Sibugay (Phase III) Concreting Magdaup, Ipil km. Plans and POW GAA 2 150,000 150,000 300,000 Proposed

197. Concreting of Road from Nat'l. Highway Leading toLooc Labuan, Tungawan, ZS

Concreting Tungawan km. Plans and POW GAA 2 25,000 25,000 COMPLETED

198. Impv't./Concreting of Nat'l. Road Junction Leading to Buluan WharfNote: Including Buluan Wharf & Buluan Island Wharf

Concreting km. Plans and POW GAA 2 20,000 20,000 20,000 20,000 80,000 ON-GOING

199. Construction of Concrete Road from NRJ Leading to Tipan Cave and Walo-Balut Cave, Barangay Tipan, Naga, Zamboanga Sibugay Concreting Naga km. Plans and POW GAA 2 350,000 350,000 350,000 1,050,000

200. Construction of Concrete Road from NRJ leading to Malagandis Falls, Barangay Malagandis, Titay, Zamboanga Sibugay.

Concreting Titay km. Plans and POW GAA 2 214,750 214,750 214,750 644,250

Chapter 19-1-DPWH IX-ZS 2DEOPage 12 of 26

Page 485: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

201. Improvement/Concreting of Road from NRJ leading to Mangroove Areas & Bat Kingdom, Siay, Zamboanga Sibugay.

Concreting Siay km. Plans and POW GAA 2 62,500 62,500 62,500 187,500

202. Improvement/Concreting of Road from NRJ leading to Malubal Falls, RT Lim, Zamboanga Sibugay.

Concreting RT Lim km. Plans and POW GAA 2 50,000 50,000 50,000 150,000

203. Construction of Concrete road from NRJ leading to Basay Falls, Barangay Culasian, Titay, Zamboanga Sibugay.

Concreting Titay km. Plans and POW GAA 2 177,750 177,750 177,750 533,250

204. Improvement/Concreting of Road from Jct. Lanao-Pagadian-Zamboanga City leading to Log Pond Wharf (jump off point to Siay-Kabasalan Wetlands), Siay, Zamboanga Sibugay.

Concreting Siay km. Plans and POW GAA 2 50,000 50,000 50,000 150,000

205. Concreting of Road from Nat'l. Highway Leading toLooc Labuan, Tungawan, ZS

Concreting Tungawan km. Plans and POW GAA 2 57,750 57,750 57,750 173,250

206. Road Improvement / Concreting from National Road Junction leading to Maasin Cave, Ipil, Zamboanga Sibugay

Concreting Ipil km. Plans and POW GAA 2 30,000 30,000 30,000 90,000

207. Construction of Road from Ipil-Magdaup Wharf Road leading to Ipil Comprehensive Mangrove Boardwalk, Zamboanga Sibugay

Concreting km. Plans and POW GAA 2 16,500 16,500 16,500 49,500

208. Road Improvement / concreting from National Road Junction leading to Palid Beach, Ipil, Zamboanga Sibugay

Concreting Ipil km. Plans and POW GAA 2 50,000 50,000 50,000 150,000

209. Improvement/Concreting of Road from NRJ Ipil-Liloy- Sindangan Road leading to Timalang Falls, Ipil, Zamboanga Sibugay

Concreting Ipil km. Plans and POW GAA 2 30,000 30,000 30,000 90,000

210. Improvement/Concreting of NRJ leading to Naga-Kabasalan Eco Tourism, Naga, Kabasalan,Zamboanga Sibugay

Concreting Naga, Kabasalan km. Plans and POW GAA 2 40,000 40,000 40,000 120,000

211. Road Improvement / concreting from National Road Junction leading to Jump Off Point for Diosan Island, RT Lim, Zamboanga Sibugay Concreting RT Lim km. Plans and POW GAA 2 75,000 75,000 75,000 225,000

212. Road Improvement / concreting from National Road Junction leading to Jump Off Point for Diosan Island, RT Lim, Zamboanga Sibugay Concreting RT Lim km. Plans and POW GAA 2 75,000 75,000 75,000 225,000

213. Road Improvement / Concreting from National Road Junction leading to Kila Cave, New Canaan, Titay, Zamboanga Sibugay Concreting Titay km. Plans and POW GAA 2 30,000 30,000 30,000 90,000

214. Road Improvement / Concreting from National Road Junction leading to Kabakob Falls, Kipit, Titay, Zamboanga Sibugay

Concreting Titay km. Plans and POW GAA 2 30,000 30,000 30,000 90,000

215. Road Improvement / Concreting from National Road Junction leading to Moalboal Cave, Titay, Zamboanga Sibugay

Concreting Titay km. Plans and POW GAA 2 50,000 50,000 50,000 150,000

216. Road Improvement / Concreting from National Road Junction leading to Dalisay Falls, Titay, Zamboanga Sibugay

Concreting Titay km. Plans and POW GAA 2 50,000 50,000 50,000 150,000

217. Road Improvement / Concreting from National Road Junction leading to Malungon Falls, Tungawan, Zamboanga Sibugay Concreting Tungawan km. Plans and POW GAA 2 20,000 20,000 20,000 60,000

Chapter 19-1-DPWH IX-ZS 2DEOPage 13 of 26

Page 486: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

218. Improvement/Concreting of Road from NRJ leading to Makasap Falls, Tungawan, Zamboanga Sibugay

Concreting Tungawan km. Plans and POW GAA 2 30,000 30,000 30,000 90,000

219. Road Improvement / Concreting from National Road Junction leading to Tungawan Brisa Marina, Tungawan, Zamboanga Sibugay Concreting Tungawan km. Plans and POW GAA 2 30,000 30,000 30,000 90,000

220. Improvement/Concreting of Road from NRJ leading to Batungan-Makasap Falls, Tungawan, Zamboanga Sibugay

Concreting Tungawan km. Plans and POW GAA 2 35,000 35,000 35,000 105,000

- 25,000 54,915 3,174,250 3,374,250 3,374,250 10,002,665 A. National Bridge Construction/ Replacement Program (Design and Build Bridges) -

Roads and Bridges - a. National Bridges -

221. Coloy Br. 2 along Lanao-Pagadian-Zamboanga City Rd, Zamboanga Sibugay Construction of Bridge ln.m. Plans & Pow GAA 2 69,077.00 69,077

222. Tibongabong Bridge and Approaches including Right-of-Way Acquisition along Lanao-Pagadian-Zamboanga City, Tungawan, Zamboanga Sibugay

Construction of Bridge Tungawan ln.m. Plans & Pow GAA 2 45,647.00 45,647

B. Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects - Roads and Bridges - a. Local Roads -

223. Concreting of Roads from NRJ to Brgy. Concepcion and Brgy. Little Baguio, Kabasalan, Zamboanga SibugaySta. 0+000 - Sta. 2+000

Construction of Concrete Road

Kabasalan

km. Plans & Pow GAA 2 50,000.00 50,000

224. Concreting of Road from Crossing Sta. Clara Sandayong Road to Brgy. Aguinaldo, Naga, Zamboanga SibugaySta. 0+000 - Sta. 2+000

Construction of Concrete Road

Naga,ZS

km. Plans & Pow GAA 2 50,000.00 50,000

225. Concreting of Road from RT Lim - Siocon Road to Brgy. Siawang, RT Lim, Zamboanga SibugaySta. 0+000 - Sta. 2+000

Construction of Concrete Road

R.T. Lim, ZS

km. Plans & Pow GAA 2 50,000.00 50,000

226. Concreting of Road from PRDP Road - Brgy. Prinsesa Sumama - Brgy. Villagrasya, Siay, Zamboanga SibugaySta. 0+000 - Sta. 2+000

Construction of Concrete Road

Siay, ZS

km. Plans & Pow GAA 2 50,000.00 50,000

227. Concreting of Malagandis Road, Brgy. Malagandis, Titay, Zamboanga SibugaySta. 0+000 - Sta. 2+000

Construction of Concrete RoadTitay, ZS

km. Plans & Pow GAA 2 50,000.00 50,000

228. Construction of Access Road to Terminal Building of Ipil Airport Construction of Concrete Road Ipil km. Plans & Pow GAA 2 50,000.00 50,000

229. Concreting of Poblacion – Sitio Mangga – Azusano – Bangco Farm-to-Market Road, Titay, Zamboanga Sibugay

Construction of Concrete RoadTitay, ZS

km. Plans & Pow GAA 2 50,000.00 50,000

230. Concreting of Jct. Nat’l Highway to Sitio Balibaan Namnama, Titay, Zamboanga Sibugay

Construction of Concrete RoadTitay, ZS

km. Plans & Pow GAA 2 50,000.00 50,000

231. Concreting of Jct. Nat’l Highway to Sitio Angay – Angay, Namnama, Titay, Zamboanga Sibugay

Construction of Concrete RoadTitay, ZS

km. Plans & Pow GAA 2 50,000.00 50,000

232. Construction of Provincial Road Connecting Brgys. Canacan, Sininan, Banker, Tampilisan, Diampak and Shiolan, Kabasalan, Zamboanga Sibugay (Package 1)

Construction of Concrete Road Siay km. Plans & Pow GAA 2 30,000.00 110,000.00 140,000

CSSP- Subtotal

Chapter 19-1-DPWH IX-ZS 2DEOPage 14 of 26

Page 487: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

233. Concreting of Road leading to NIA and Cedera Rice Granary Catchment, Siay Construction of Concrete Road Siay km. Plans & Pow GAA 2 30,000.00 70,000.00 100,000

234. Concreting of Brgy. Road at Lower Tungawan to Sitio Dungcaan, Tungawan, Zamboanga Sibugay

Construction of Concrete Road Tungawan km. Plans & Pow GAA 2 20,000.00 20,000.00 40,000

235. Construction of Access Road leading to Zamboanga Sibugay Provincial Hospital including Perimeter Fence and Site Development, Brgy. Tenan, Ipil

Construction of Concrete Road Ipil km. Plans & Pow GAA 2 40,000.00 40,000.00 80,000

236. Road Upgrading (Unpaved to Paved) Jct. National Highway at Kabasalan-Sanghanan-Banker-Tampilisan-Diampak-Shiolan including RROW

Construction of Concrete Road km. Plans & Pow GAA 2 40,000.00 110,000.00 150,000

237. Road Upgrading (Unpaved to Paved) Jct. National Highway at Kabasalan-Buayan-Tigbangagan-Palinta-Penaranda-Lacnapan including RROW

Construction of Concrete Road km. Plans & Pow GAA 2 40,000.00 110,000.00 150,000

238. Road Upgrading(Unpaved to Paved) along Crossing Sta. Clara - Baluno, Naga Construction of Concrete Road km. Plans & Pow GAA 2 40,000.00 125,000.00 165,000

239. Core Local Access RoadBrgy. Lower Taway Construction of Concrete Road km. Plans & Pow GAA 2 1,600.00 1,600.00 3,200

240. Core Local Access RoadBrgy. Lumbia Construction of Concrete Road km. Plans & Pow GAA 2 9,000.00 9,000.00 18,000

241. Core Local Access RoadBrgy. Tirso Barbiera - Ipil Heights Construction of Concrete Road Ipil km. Plans & Pow GAA 2 2,268.00 2,268.00 4,536

242. Core Local Road Access Sitio Manga, Brgy. Poblacion Construction of Concrete Road km. Plans & Pow GAA 2 11,540.00 11,540.00 23,080

243. Core Local Road AccessBrgy. Camanga Construction of Concrete Road km. Plans & Pow GAA 2 14,348.00 14,348.00 28,696

244. Core Local Road AccessLower Tungawan, Zamboanga Sibugay Construction of Concrete Road km. Plans & Pow GAA 2 5,500.00 5,500.00 11,000

245. Core Local Road AccessLogpond Libertad, Tungawan, Zamboanga Sibugay

Construction of Concrete Road Tungawan km. Plans & Pow GAA 2 5,615.00 5,615.00 11,230

246. Core Local Road AccessBrgy. Poblacion Construction of Concrete Road km. Plans & Pow GAA 2 5,918.00 5,918.00 11,836

247. Road Upgrading and Construction of NIA and Barangay Roads in Siay, Zamboanga Sibugay Connecting to Imelda - Bayog - Kumalarang - Lapuyan - Margosatubig Road

Construction of Concrete Road km. Plans & Pow GAA 2 40,000.00 100,000.00 140,000

248. Jct. Lanao - Pagadian - Zamboanga City Road, Tungawan - Malungon Rd Construction of Concrete Road Tungawan km. Plans & Pow GAA 2 50,000.00 150,000.00 200,000

249. Jct. ipil - Liloy - Sindangan Rd., Titay (Poblacion) - Malagandis - Bacalan - Tenan Road

Construction of Concrete Road km. Plans & Pow GAA 2 40,000.00 131,250.00 171,250

250. Jct. Lanao - Pagadian - Zamboanga City Rd., Buayan - Lacnapan Rd. Construction of Concrete Road km. Plans & Pow GAA 2 50,000.00 206,250.00 256,250

251. Jct. Ipil - Liloy - Sindangan Rd., Titay (Poblacion) - San Antonio - Kipit - Sto. Rosario - Silingan Rd.

Construction of Concrete Road km. Plans & Pow GAA 2 50,000.00 200,000.00 250,000

252. Jct. Lanao - Pagadian - Zamboanga City Rd., Labasan - Camanga - Boyugan - Sampoli B Rd.

Construction of Concrete Road km. Plans & Pow GAA 2 62,500.00 62,500.00 125,000

253. Jct. Ipil - Liloy - Sindangan Rd., Poblacion (Ipil) - Timalang - Maasin - Tiayon Rd. Construction of Concrete Road km. Plans & Pow GAA 2 40,000.00 100,000.00 140,000

Chapter 19-1-DPWH IX-ZS 2DEOPage 15 of 26

Page 488: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

254. Jct. Lanao - Pagadian - Zamboanga City Road, Kabasalan (Poblacion) - Sanghanan - Shiolan - Godod Rd.

Construction of Concrete Road km. Plans & Pow GAA 2 50,000.00 175,000.00 225,000

255. Ipil - Liloy - Sindangan Rd., Taway - Suclema - Mate - Dalangin Rd. Construction of Concrete Road km. Plans & Pow GAA 2 40,000.00 100,000.00 140,000

256. Ipil - Liloy - Sindangan Rd., Titay (Poblacion) - Dalangin - Bangco - Gatas Rd. Construction of Concrete Road km. Plans & Pow GAA 2 56,250.00 56,250.00 112,500

257. Road Concreting of 6 Kms. Batu to Maligaya Road, Siay, Zamboanga Sibugay Construction of Concrete Road km. Plans & Pow GAA 2 50,000.00 50,000.00 100,000

258. Opening/Concrete Paving of Maasin - Labe - Dona Josefa - Tomitom - Buluan Farm to Market Road

Construction of Concrete Road km. Plans & Pow GAA 2 30,000.00 169,500.00 199,500

259. Opening/Concrete Paving of Upper Pangi - Bacalan Farm to Market Road Construction of Concrete Road km. Plans & Pow GAA 2 75,000.00 75,000.00 150,000

260. Concrete Paving of Lower Ipil Heights - Ipil Heights to Junction Suclema & Taway Road Construction of Concrete Road km. Plans & Pow GAA 2 40,000.00 40,000.00 80,000

261. Concrete Paving of Existing Access Road at Barangay Don Andres, Ipil, Zamboanga Sibugay

Construction of Concrete Road km. Plans & Pow GAA 2 40,000.00 66,700.00 106,700

262. Concrete Paving of Access Road at Barangay Upper Pangi - Logan - Bacalan, Ipil, Zamboanga Sibugay

Construction of Concrete Road km. Plans & Pow GAA 2 40,000.00 123,000.00 163,000

263. Concrete Paving of Pangi - Guituan - Taway Road Construction of Concrete Road km. Plans & Pow GAA 2 30,000.00 30,000.00 60,000

264. Construction of Concrete Retaining Wall including Road of Ipil Water System Project Construction of Concrete Road km. Plans & Pow GAA 2 20,000.00 20,000.00 40,000

265. Construction of Poblacion Titay Dalangin-Dalangin Muslim-Achasol-San Antonio Tugop-Banco-Boundary Kalawit, Zamboanga Sibugay 2nd LD

Construction of Concrete Road Zamboanga Sibugay km. Plans & Pow GAA 2 50,000.00 - 50,000

266. Improvement/Construction/Concreting of Labasan - Camaga Road, Siay, Zamboanga Sibugay (Phase II)

Construction of Concrete Road Ipil, ZS km. Plans & Pow GAA 2 - 50,000.00 50,000.00 100,000

267. Construction of Access Road leading to Veterans-Lumbia-Timalang (Phase II), Ipil, Zamboanga Sibugay

Construction of Concrete Road km. Plans & Pow GAA 2 100,000.00 100,000.00 200,000

268. Upgrading/Concrete Paving of Access Road to IBT Circumferential Road going to Taway (Phase II), Ipil, Zamboanga Sibugay

Construction of Concrete Road km. Plans & Pow GAA 2 75,000.00 75,000.00 150,000

269. Concreting of Labasan-Camanga Road, Siay, Zamboanga Sibugay Construction of Concrete Road km. Plans & Pow GAA 2 50,000.00 50,000

270. Construction of Poblacion Titay - Dalanging - Dalangin Muslim - Achasol - San Antonio - Tugop - Banco - Boundary Kalawit (Phase III), Zamboanga SibugayK5+532 - K6+732

Construction of Concrete Road km. 1.2 Plans & POW GAA 2 30,000.00 30,000.00 60,000

271. Improvement/Construction/Concreting of Labasan - Camaga Road, Siay, Zamboanga Sibugay (Phase II)K3+111.00 - K4+711.00

Construction of Concrete Road km. 1.6 Plans & POW GAA 2 30,000.00 30,000.00 60,000

b. Bridges GAA 2 - 272. Sto. Nino RCDG Br. Construction of Bridge ln.m. GAA 2 7,500.00 7,500.00 15,000 273. Payongan RCDG Br. Construction of Bridge ln.m. GAA 2 10,000.00 10,000.00 20,000 274. Sanghanan RCDG Br. Construction of Bridge ln.m. GAA 2 20,000.00 20,000.00 40,000 275. Casacon RCDG Br. Construction of Bridge ln.m. GAA 2 15,000.00 15,000.00 30,000

Chapter 19-1-DPWH IX-ZS 2DEOPage 16 of 26

Page 489: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

276. Sto. Nino RCDG Br. Construction of Bridge ln.m. GAA 2 7,500.00 7,500.00 15,000 277. Kulasian RCDG Br. Construction of Bridge ln.m. GAA 2 20,000.00 20,000.00 40,000 278. Tiayon RCDG Br. Construction of Bridge ln.m. GAA 2 15,000.00 15,000.00 30,000

c. Water Supply - 279. Ipil Water System Construction of Water Supply

Systems 25,000.00 25,000.00 50,000

280. Titay Water System Construction of Water Supply Systems 12,500.00 12,500.00 25,000

281. Construction of Water Supply Project, Kabasalan, Zamboanga Sibugay Construction of Water Supply

Systems

No. of Water Supply Systems

1.0 Plans & Pow GAA 2 68,000.00 68,000

282. Construction of Water Supply Project, Naga, Zamboanga Sibugay Construction of Water Supply

Systems

No. of Water Supply Systems

1.0 Plans & Pow GAA 2 74,000.00 74,000

283. Construction of Water Supply Project, Roseller Lim, Zamboanga Sibugay Construction of Water Supply

Systems

No. of Water Supply Systems

1.0 Plans & Pow GAA 2 91,000.00 91,000

284. Construction of Water Supply Project, Siay, Zamboanga Sibugay Construction of Water Supply

Systems

No. of Water Supply Systems

1.0 Plans & Pow GAA 2 92,000.00 92,000

285. Construction of Water Supply Project, Tungawan, Zamboanga Sibugay Construction of Water Supply

Systems

No. of Water Supply Systems

1.0 Plans & Pow GAA 2 85,000.00 85,000

d. Flood Control and Drainage - 286. Construction of Flood Control at Barangay

Bangkerohan, Ipil, Zamboanga Sibugay Flood Control and Drainage sq.m. Plans & Pow GAA 2 -

287. Construction of Drainage Canal at Barangay Don Andres, Ipil, Zamboanga Sibugay Flood Control and Drainage sq.m. Plans & Pow GAA 2 -

288. Construction of Drainage Canal at barangay Lower Taway, Ipil, Zamboanga Sibugay Flood Control and Drainage sq.m. Plans & Pow GAA 2 -

C. Local Infrastructure Program - Buildings and Other Structures - a. Multipurpose/Facilities -

289. Construction of Multi-Purpose Building (Covered Court) Brgy. Upper Pangil, Ipil, Zamboanga Sibugay

Construction of Multi-purpose Building Ipil No. of

Building 1.0 Plans & POW GAA 2 2,000.00 - 2,000

290. Construction of Bleachers Ipil Covered Court, Brgy. Poblacion, Ipil, Zamboanga Sibugay Construction of Multi-purpose

Building Ipil No. of Building 1.0 Plans & POW GAA 2 2,000.00 - 2,000

291. Construction of Barangay Road (Phase 2), Brgy. Poblacion, Ipil, Zamboanga Sibugay

Construction of Multi-purpose Building Ipil No. of

Building 1.0 Plans & POW GAA 2 1,000.00 - 1,000

292. Construction of Multi-Purpose Building (Covered Court) John Donton Elementary School, Bgry. Conception, Kabasalan, Zamboanga Sibugay

Construction of Multi-purpose Building Kabasalan, ZS No. of

Building 1.0 Plans & POW GAA 2 2,000.00 - 2,000

293. Construction of Barangay Road, Brgy. Sta Cruz, Kabasalan, Zamboanga Sibugay

Construction of Multi-purpose Building Kabasalan, ZS No. of

Building 1.0 Plans & POW GAA 2 1,000.00 - 1,000

294. Construction of Multipurpose Building (Covered Court), Brgy. Siolan, Kabasalan, Zamboanga Sibugay

Construction of Multi-purpose Building Kabasalan, ZS No. of

Building 1.0 Plans & POW GAA 2 2,000.00 - 2,000

295. Construction of Multipurpose Building (Stage and Bleacher), Kabasalan National High School, Brgy. FL Pena, Kabasalan, Zamboanga Sibugay

Construction of Multi-purpose Building Kabasalan, ZS No. of

Building 1.0 Plans & POW GAA 2 1,000.00 - 1,000

Chapter 19-1-DPWH IX-ZS 2DEOPage 17 of 26

Page 490: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

296. Construction of Multipurpose Building (Canteen), Buayan National High School, Brgy. Buayan, Kabasalan, Zamboanga Sibugay

Construction of Multi-purpose Building Kabasalan, ZS No. of

Building 1.0 Plans & POW GAA 2 1,000.00 - 1,000

297. Completion of Multipurpose Building (Stage of Covered Court and Marker), Brgy. Tilubog, Naga, Zamboanga Sibugay

Construction of Multi-purpose Building Naga No. of

Building 1.0 Plans & POW GAA 2 2,000.00 - 2,000

298. Construction of Multipurpose Building (Covered Court), Brgy. Marsolo, Naga, Zamboanga Sibugay

Construction of Multi-purpose Building Naga No. of

Building 1.0 Plans & POW GAA 2 2,000.00 - 2,000

299. Construction of Multipurpose Building (Covered Court), Brgy. Tilasan, R.T. Lim, Zamboanga Sibugay

Construction of Multi-purpose Building RT Lim No. of

Building 1.0 Plans & POW GAA 2 2,000.00 - 2,000

300. Construction of Multipurpose Building (Covered Court), Brgy. New Sagay, R.T. Lim, Zamboanga Sibugay

Construction of Multi-purpose Building RT Lim No. of

Building 1.0 Plans & POW GAA 2 2,000.00 - 2,000

301. Construction of Multipurpose Building (Covered Court), Brgy. Surabay, R.T. Lim, Zamboanga Sibugay

Construction of Multi-purpose Building RT Lim No. of

Building 1.0 Plans & POW GAA 2 2,000.00 - 2,000

302. Construction of Multipurpose Building (Covered Court), Brgy. Malubal, R.T. Lim, Zamboanga Sibugay

Construction of Multi-purpose Building RT Lim No. of

Building 1.0 Plans & POW GAA 2 2,000.00 - 2,000

303. Construction of Multipurpose Building (Covered Court), Brgy. Sto. Rosario, R.T. Lim, Zamboanga Sibugay

Construction of Multi-purpose Building RT Lim No. of

Building 1.0 Plans & POW GAA 2 2,000.00 - 2,000

304. Construction of Multipurpose Building (Covered Court), Brgy. Coloran, Siay, Zamboanga Sibugay

Construction of Multi-purpose Building Siay No. of

Building 1.0 Plans & POW GAA 2 2,000.00 - 2,000

305. Construction of Multipurpose Building (Covered Court), Brgy. Poblacion, Siay, Zamboanga Sibugay

Construction of Multi-purpose Building Siay No. of

Building 1.0 Plans & POW GAA 2 2,000.00 - 2,000

306. Construction of Multipurpose Building (Covered Court), Siay National High School, Brgy. Poblacion, Siay, Zamboanga Sibugay

Construction of Multi-purpose Building Siay No. of

Building 1.0 Plans & POW GAA 2 2,000.00 - 2,000

307. Construction of Multipurpose Building (Barangay Hall) Brgy. Magsaysay, Siay, Zamboanga Sibugay

Construction of Multi-purpose Building Siay No. of

Building 1.0 Plans & POW GAA 2 2,000.00 - 2,000

308. Construction of Multipurpose Building (Covered Court), Brgy. La Libertad, Titay, Zamboanga Sibugay

Construction of Multi-purpose Building Titay No. of

Building 1.0 Plans & POW GAA 2 2,000.00 - 2,000

309. Construction of Multipurpose Building (Barangay Hall), Brgy. Camanga, Titay, Zamboanga Sibugay

Construction of Multi-purpose Building Titay No. of

Building 1.0 Plans & POW GAA 2 2,000.00 - 2,000

310. Construction of Multipurpose Building (Barangay Hall), Brgy. Supit, Titay, Zamboanga Sibugay

Construction of Multi-purpose Building Titay No. of

Building 1.0 Plans & POW GAA 2 2,000.00 - 2,000

311. Construction of Multipurpose Building (Barangay Hall), Brgy. Azusano, Titay, Zamboanga Sibugay

Construction of Multi-purpose Building Titay No. of

Building 1.0 Plans & POW GAA 2 2,000.00 - 2,000

312. Construction of Multipurpose Building (Barangay Hall), Brgy. Culasian, Titay, Zamboanga Sibugay

Construction of Multi-purpose Building Titay No. of

Building 1.0 Plans & POW GAA 2 2,000.00 - 2,000

313. Construction of Multipurpose Building (Covered Court) San Pedro National High School, San Pedro, Tungawan, Zamboanga Sibugay

Construction of Multi-purpose Building Tungawan No. of

Building 1.0 Plans & POW GAA 2 2,000.00 - 2,000

Chapter 19-1-DPWH IX-ZS 2DEOPage 18 of 26

Page 491: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

314. Construction of Multipurpose Building (Barangay Hall), Brgy. Langon, Tungawan, Zamboanga Sibugay

Construction of Multi-purpose Building Tungawan No. of

Building 1.0 Plans & POW GAA 2 2,000.00 - 2,000

315. Construction of Multipurpose Building (Barangay Hall), Brgy. Masao, Tungawan, Zamboanga Sibugay

Construction of Multi-purpose Building Tungawan No. of

Building 1.0 Plans & POW GAA 2 2,000.00 - 2,000

316. Construction of Multi-Purpose Building (Barangay Hall), Brgy. Baluran, Tungawan, Zamboanga Sibugay

Construction of Multi-purpose Building Tungawan No. of

Building 1.0 Plans & POW GAA 2 1,500.00 1,500

317. Construction of Multipurpose Building (Barangay Hall), Brgy. Guintoloan, Naga, Zamboanga Sibugay

Construction of Multi-purpose Building Naga No. of

Building 1.0 Plans & POW GAA 2 1,500.00 1,500

318. Construction of Multi-Purpose Building (Barangay Hall), Brgy. Loboc, Tungawan, Zamboanga Sibugay

Construction of Multi-purpose Building Tungawan No. of

Building 1.0 Plans & POW GAA 2 1,500.00 1,500

319. Construction of Multipurpose Building (Barangay Hall), Brgy. Logpond, Siay, Zamboanga Sibugay

Construction of Multi-purpose Building Siay No. of

Building 1.0 Plans & POW GAA 2 1,500.00 1,500

320. Construction of Multipurpose Building (Barangay Hall), Brgy. Lower Sulitan, Naga, Zamboanga Sibugay

Construction of Multi-purpose Building Naga No. of

Building 1.0 Plans & POW GAA 2 1,500.00 1,500

321. Construction of Multipurpose Building (Barangay Hall), Brgy. Minsulao, Siay, Zamboanga Sibugay

Construction of Multi-purpose Building Siay No. of

Building 1.0 Plans & POW GAA 2 1,500.00 1,500

322. Construction of Multipurpose Building (Barangay Hall), Brgy. Mirangan, Siay, Zamboanga Sibugay

Construction of Multi-purpose Building Siay No. of

Building 1.0 Plans & POW GAA 2 1,500.00 1,500

323. Construction of Multipurpose Building (Barangay Hall), Brgy. Pulidan, Titay, Zamboanga Sibugay

Construction of Multi-purpose Building Titay No. of

Building 1.0 Plans & POW GAA 2 1,500.00 1,500

324. Construction of Multipurpose Building (Barangay Hall), Brgy. San Isidro, Tungawan, Zamboanga Sibugay

Construction of Multi-purpose Building Tungawan No. of

Building 1.0 Plans & POW GAA 2 1,500.00 1,500

325. Construction of Multi-Purpose Building (Barangay Hall), Brgy. San Vicente, Tungawan, Zamboanga Sibugay

Construction of Multi-purpose Building Tungawan No. of

Building 1.0 Plans & POW GAA 2 1,500.00 1,500

326. Construction of Multipurpose Building (Barangay Hall), Brgy. Siawang, R.T. Lim, Zamboanga Sibugay

Construction of Multi-purpose Building RT Lim No. of

Building 1.0 Plans & POW GAA 2 1,500.00 1,500

327. Construction of Multi-Purpose Building (Barangay Hall), Brgy. Taglibas, Tungawan, Zamboanga Sibugay

Construction of Multi-purpose Building Tungawan No. of

Building 1.0 Plans & POW GAA 2 1,500.00 1,500

328. Construction of Multipurpose Building (Barangay Hall), Brgy. Tambanan, Naga, Zamboanga Sibugay

Construction of Multi-purpose Building Naga No. of

Building 1.0 Plans & POW GAA 2 1,500.00 1,500

329. Construction of Multipurpose Building (Barangay Hall), Brgy. Tigpalay, Tungawan, Zamboanga Sibugay

Construction of Multi-purpose Building Tungawan No. of

Building 1.0 Plans & POW GAA 2 1,500.00 1,500

330. Construction of Multipurpose Building (Barangay Hall), Brgy. Upper Sulitan, Naga, Zamboanga Sibugay

Construction of Multi-purpose Building Naga No. of

Building 1.0 Plans & POW GAA 2 1,500.00 1,500

331. Construction of Multipurpose Building (Covered Court), Brgy. Bacalan, Ipil, Zamboanga Sibugay

Construction of Multi-purpose Building Ipil No. of

Building 1.0 Plans & POW GAA 2 2,000.00 2,000

332. Construction of Multipurpose Building (Covered Court), Brgy. Balansag, R.T. Lim, Zamboanga Sibugay

Construction of Multi-purpose Building RT Lim No. of

Building 1.0 Plans & POW GAA 2 2,000.00 2,000

Chapter 19-1-DPWH IX-ZS 2DEOPage 19 of 26

Page 492: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

333. Construction of Multipurpose Building (Covered Court), Brgy. Calapan, Kabasalan, Zamboanga Sibugay

Construction of Multi-purpose Building Kabasalan No. of

Building 1.0 Plans & POW GAA 2 2,000.00 2,000

334. Construction of Multi-Purpose Building (Covered Court), Brgy. Cayamcam, Tungawan, Zamboanga Sibugay

Construction of Multi-purpose Building Tungawan No. of

Building 1.0 Plans & POW GAA 2 2,000.00 2,000

335. Construction of Multipurpose Building (Covered Court), Brgy. Kipit, Titay, Zamboanga Sibugay

Construction of Multi-purpose Building Titay No. of

Building 1.0 Plans & POW GAA 2 2,000.00 2,000

336. Construction of Multi-Purpose Building (Covered Court), Brgy. Little Margos, Tungawan, Zamboanga Sibugay

Construction of Multi-purpose Building Tungawan No. of

Building 1.0 Plans & POW GAA 2 2,000.00 2,000

337. Construction of Multipurpose Building (Covered Court), Brgy. Longilog, Titay, Zamboanga Sibugay

Construction of Multi-purpose Building Titay No. of

Building 1.0 Plans & POW GAA 2 2,000.00 2,000

338. Construction of Multipurpose Building (Covered Court), Brgy. Penaranda, Kabasalan, Zamboanga Sibugay

Construction of Multi-purpose Building Kabasalan No. of

Building 1.0 Plans & POW GAA 2 2,000.00 2,000

339. Construction of Multipurpose Building (Covered Court), Brgy. Riverside, Kabasalan, Zamboanga Sibugay

Construction of Multi-purpose Building Kabasalan No. of

Building 1.0 Plans & POW GAA 2 2,000.00 2,000

340. Construction of Multipurpose Building (Covered Court), Brgy. San Antonio, R.T. Lim, Zamboanga Sibugay

Construction of Multi-purpose Building RT Lim No. of

Building 1.0 Plans & POW GAA 2 2,000.00 2,000

341. Construction of Multi-Purpose Building (Covered Court), Brgy. Sisay, Tungawan, Zamboanga Sibugay

Construction of Multi-purpose Building Tungawan No. of

Building 1.0 Plans & POW GAA 2 2,000.00 2,000

342. Construction of Multi-Purpose Building (Covered Court), Brgy. Sto. Nino, Tungawan, Zamboanga Sibugay

Construction of Multi-purpose Building Tungawan No. of

Building 1.0 Plans & POW GAA 2 2,000.00 2,000

343. Construction of Multipurpose Building (Covered Court), Brgy. Tamin, Kabasalan, Zamboanga Sibugay

Construction of Multi-purpose Building Kabasalan No. of

Building 1.0 Plans & POW GAA 2 2,000.00 2,000

344. Construction of Multi-Purpose Building (Covered Court), Brgy. Upper Tungawan, Tungawan, Zamboanga Sibugay

Construction of Multi-purpose Building Tungawan No. of

Building 1.0 Plans & POW GAA 2 2,000.00 2,000

345. Construction of Multipurpose Building (Covered Court), Ipil SPED School, Brgy. Poblacion, Ipil, Zamboanga Sibugay

Construction of Multi-purpose Building Ipil No. of

Building 1.0 Plans & POW GAA 2 2,000.00 2,000

346. Construction of Multipurpose Building (Covered Court), San Antonio NHS, Brgy. San Antonio, Titay, Zamboanga Sibugay

Construction of Multi-purpose Building Titay No. of

Building 1.0 Plans & POW GAA 2 2,000.00 2,000

347. Construction of Multi-Purpose Building (Covered Court), Special Forces Compound, Brgy. Libertad, Tungawan, Zamboanga Sibugay

Construction of Multi-purpose Building Tungawan No. of

Building 1.0 Plans & POW GAA 2 2,000.00 2,000

348. Construction of Multipurpose Building (Covered Court), Surabay NHS, Brgy. Surabay, R.T. Lim, Zamboanga Sibugay

Construction of Multi-purpose Building RT Lim No. of

Building 1.0 Plans & POW GAA 2 2,000.00 2,000

349. Construction of Multipurpose Building (Covered Court), Tungawan NHS, Brgy. Libertad, Tungawan, Zamboanga Sibugay

Construction of Multi-purpose Building Tungawan No. of

Building 1.0 Plans & POW GAA 2 2,000.00 2,000

350. Construction of Multipurpose Building (Covered Hall), Brgy. Siloh, Siay, Zamboanga Sibugay

Construction of Multi-purpose Building Siay No. of

Building 1.0 Plans & POW GAA 2 2,000.00 2,000

Chapter 19-1-DPWH IX-ZS 2DEOPage 20 of 26

Page 493: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

351. Construction of Multi-Purpose Building (Flea Market), Brgy. Lower Tungawan, Tungawan, Zamboanga Sibugay

Construction of Multi-purpose Building Tungawan No. of

Building 1.0 Plans & POW GAA 2 1,500.00 1,500

352. Construction of Multipurpose Building (Function Hall), Brgy. Laih, Siay, Zamboanga Sibugay

Construction of Multi-purpose Building Siay No. of

Building 1.0 Plans & POW GAA 2 2,000.00 2,000

353. Construction of Multipurpose Building (Library), Kabasalan NHS, Brgy. FL Pena, Kabasalan, Zamboanga Sibugay

Construction of Multi-purpose Building Kabasalan No. of

Building 1.0 Plans & POW GAA 2 1,000.00 1,000

354. Rehabilitation of Multipurpose Building, Brgy. Kitabog, Titay, Zamboanga Sibugay

Construction of Multi-purpose Building Titay No. of

Building 1.0 Plans & POW GAA 2 1,000.00 1,000

355. Rehabilitation of Multipurpose Buildling, Brgy. Palomoc, Titay, Zamboanga Sibugay

Construction of Multi-purpose Building Titay No. of

Building 1.0 Plans & POW GAA 2 500.00 500

356. Rehabilitation of Multi-Purpose Buildling, Brgy. San Pedro, Tungawan, Zamboanga Sibugay

Construction of Multi-purpose Building Tungawan No. of

Building 1.0 Plans & POW GAA 2 500.00 500

357. Rehabilitation of Municipal Hall, Brgy. Poblacion, Titay, Zamboanga Sibugay

Construction of Multi-purpose Building Titay No. of

Building 1.0 Plans & POW GAA 2 1,000.00 1,000

358. Rehabilitation of Public Market (Phase 2), Brgy. Don Andres, Ipil, Zamboanga Sibugay

Construction of Multi-purpose Building Ipil No. of

Building 1.0 Plans & POW GAA 2 2,000.00 2,000

359. Rehabilitation of RTC Building, Brgy. Poblacion, Ipil, Zamboanga Sibugay

Construction of Multi-purpose Building Ipil No. of

Building 1.0 Plans & POW GAA 2 1,500.00 1,500

360. Rehabilitation of NBI Building, Brgy. Poblacion, Ipil, Zamboanga Sibugay

Construction of Multi-purpose Building Ipil No. of

Building 1.0 Plans & POW GAA 2 1,000.00 1,000

361. Construction/Completion of a Multi-purpose Building at Barangay Tambanan, Naga, Zamboanga Sibugay

Construction of Multi-purpose Building Naga No. of

Building 1.0 Plans & POW GAA 2 3,000.00 3,000

362. Construction of Multi-Purpose Building, Mabini Street, Lower Taway, Ipil, Zamboanga Sibugay

Construction of Multi-purpose Building Ipil No. of

Building 1.0 Plans & POW GAA 2 2,000.00 2,000

363. Construction of Multi-Purpose Building, Brgy. New Sagay, R.T. Lim, Zamboanga Sibugay Construction of Multi-purpose

Building RT Lim No. of Building 1.0 Plans & POW GAA 2 2,000.00 2,000

364. Construction of a Subanen Cultural Heritage Center at Barangay Kimos, Municipality of Siay, Zamboanga Sibugay

Construction of Multi-purpose Building Ipil No. of

Building 1.0 Plans & POW GAA 2 - 4,000.00 4,000

365. Construction of Commercial Center, Brgy. Dacanay, Municipality of Siay, Zamboanga Sibugay

Construction of Multi-purpose Building Ipil No. of

Building 1.0 Plans & POW GAA 2 - 2,000.00 2,000

366. Construction of Covered Court at Malagandis NHS, Brgy. Malagandis, Municipality of Titay, Zamboanga Sibugay

Construction of Multi-purpose Building Ipil No. of

Building 1.0 Plans & POW GAA 2 - 2,000.00 2,000

367. Construction of Covered Court NHS, Brgy. Sulo, Municipality of Naga, Zamboanga Sibugay

Construction of Multi-purpose Building Kabasalan, ZS No. of

Building 1.0 Plans & POW GAA 2 - 2,000.00 2,000

368. Construction of Covered Court, Brgy Taytay Manubo, Municipality of Naga, Zamboanga Sibugay

Construction of Multi-purpose Building Kabasalan, ZS No. of

Building 1.0 Plans & POW GAA 2 - 2,000.00 2,000

369. Construction of Covered Court, Brgy, Aguinaldo, Municipality of Naga, Zamboanga Sibugay

Construction of Multi-purpose Building Kabasalan, ZS No. of

Building 1.0 Plans & POW GAA 2 - 2,000.00 2,000

370. Construction of Covered Court, Brgy. Banker, Municipality of Kabasalan, Zamboanga Sibugay

Construction of Multi-purpose Building Ipil No. of

Building 1.0 Plans & POW GAA 2 - 2,000.00 2,000

371. Construction of Covered Court, Brgy. Dalangin Muslim, Municipality of Titay, Zamboanga Sibugay

Construction of Multi-purpose Building Ipil No. of

Building 1.0 Plans & POW GAA 2 - 2,000.00 2,000

Chapter 19-1-DPWH IX-ZS 2DEOPage 21 of 26

Page 494: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

372. Construction of Covered Court, Brgy. Dalisay, Municipality of Titay, Zamboanga Sibugay Construction of Multi-purpose

Building Ipil No. of Building 1.0 Plans & POW GAA 2 - 2,000.00 2,000

373. Construction of Covered Court, Brgy. Diampak, Municipality of Kabasalan, Zamboanga Sibugay

Construction of Multi-purpose Building Kabasalan, ZS No. of

Building 1.0 Plans & POW GAA 2 - 2,000.00 2,000

374. Construction of Covered Court, Brgy. Kulambugan, Municipality of R.T.Lim, Zamboanga Sibugay

Construction of Multi-purpose Building Kabasalan, ZS No. of

Building 1.0 Plans & POW GAA 2 - 2,000.00 2,000

375. Construction of Covered Court, Brgy. Lapaz, Municipality of Naga, Zamboanga Sibugay Construction of Multi-purpose

Building Kabasalan, ZS No. of Building 1.0 Plans & POW GAA 2 - 2,000.00 2,000

376. Construction of Covered Court, Brgy. Lumbia, Municipality of Ipil, Zamboanga, Sibugay Construction of Multi-purpose

Building Kabasalan, ZS No. of Building 1.0 Plans & POW GAA 2 - 2,000.00 2,000

377. Construction of Covered Court, Brgy. Maasin, Municipality of Ipil, Zamboanga Sibugay Construction of Multi-purpose

Building Kabasalan, ZS No. of Building 1.0 Plans & POW GAA 2 - 2,000.00 2,000

378. Construction of Covered Court, Brgy. Magsaysay, Municipality of R.T.Lim, Zamboanga, Sibugay

Construction of Multi-purpose Building Naga No. of

Building 1.0 Plans & POW GAA 2 - 2,000.00 2,000

379. Construction of Covered Court, Brgy. New Canaan, Municipality of Titay, Zamboanga Sibugay

Construction of Multi-purpose Building Naga No. of

Building 1.0 Plans & POW GAA 2 - 2,000.00 2,000

380. Construction of Covered Court, Brgy. Palomoc, Municipality of Titay, Zamboanga Sibugay

Construction of Multi-purpose Building Ipil No. of

Building 1.0 Plans & POW GAA 2 - 2,000.00 2,000

381. Construction of Covered Court, Brgy. Poblacion Muslim, Municipality of Titay, Zamboanga Sibugay

Construction of Multi-purpose Building Ipil No. of

Building 1.0 Plans & POW GAA 2 - 2,000.00 2,000

382. Construction of Covered Court, Brgy. Remedios, Municipality of R.T.Lim, Zamboanga Sibugay

Construction of Multi-purpose Building Ipil No. of

Building 1.0 Plans & POW GAA 2 - 2,000.00 2,000

383. Construction of Covered Court, Brgy. Tampilisan, Municipality of Kabasalan, Zamboanga Sibugay

Construction of Multi-purpose Building Kabasalan, ZS No. of

Building 1.0 Plans & POW GAA 2 - 2,000.00 2,000

384. Construction of Evacuation Center, Purok Nangka, Brgy. Veterans Village, Municipality of Ipil, Zamboanga Sibugay

Construction of Multi-purpose Building Kabasalan, ZS No. of

Building 1.0 Plans & POW GAA 2 - 3,000.00 3,000

385. Construction of MPB (Barangay Hall) Brgy. Monching, Municipality of Siay, Zamboanga Sibugay

Construction of Multi-purpose Building Kabasalan, ZS No. of

Building 1.0 Plans & POW GAA 2 - 1,500.00 1,500

386. Construction of MPB (Barangay Hall), Brgy. Ali Alsree, Minicipality of R.T.Lim, Zamboanga Sibugay

Construction of Multi-purpose Building Kabasalan, ZS No. of

Building 1.0 Plans & POW GAA 2 - 1,500.00 1,500

387. Construction of MPB (Barangay Hall), Brgy. Bagong Silang, Municipality of Siay, Zamboanga Sibugay

Construction of Multi-purpose Building Kabasalan, ZS No. of

Building 1.0 Plans & POW GAA 2 - 1,500.00 1,500

388. Construction of MPB (Barangay Hall), Brgy. Balingasan, Municipality of Siay, Zamboanga Sibuhay

Construction of Multi-purpose Building Naga No. of

Building 1.0 Plans & POW GAA 2 - 1,500.00 1,500

389. Construction of MPB (Barangay Hall), Brgy. Bangco, Municipality of Titay, Zamboanga Sibugay

Construction of Multi-purpose Building Naga No. of

Building 1.0 Plans & POW GAA 2 - 1,500.00 1,500

390. Construction of MPB (Barangay Hall), Brgy. Buluan, Municipality of Ipil, Zamboanga Sibugay

Construction of Multi-purpose Building Ipil No. of

Building 1.0 Plans & POW GAA 2 - 1,500.00 1,500

Chapter 19-1-DPWH IX-ZS 2DEOPage 22 of 26

Page 495: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

391. Construction of MPB (Barangay Hall), Brgy. Camanga, Municipality of Siay, Zamboanga Sibugay

Construction of Multi-purpose Building Ipil No. of

Building 1.0 Plans & POW GAA 2 - 1,500.00 1,500

392. Construction of MPB (Barangay Hall), Brgy. Casacon, Municipality of Zamboanga Sibugay Construction of Multi-purpose

Building Ipil No. of Building 1.0 Plans & POW GAA 2 - 1,500.00 1,500

393. Construction of MPB (Barangay Hall), Brgy. Crossing Sta. Clara, Municipality of Naga, Zamboanga Sibugay

Construction of Multi-purpose Building Kabasalan, ZS No. of

Building 1.0 Plans & POW GAA 2 - 1,500.00 1,500

394. Construction of MPB (Barangay Hall), Brgy. Gomotoc, Municipality of Titay, Zamboanga Sibugay

Construction of Multi-purpose Building Kabasalan, ZS No. of

Building 1.0 Plans & POW GAA 2 - 1,500.00 1,500

395. Construction of MPB (Barangay Hall), Brgy. Gubawang, Municipality of Naga, Zamboanga Sibugay

Construction of Multi-purpose Building Kabasalan, ZS No. of

Building 1.0 Plans & POW GAA 2 - 1,500.00 1,500

396. Construction of MPB (Barangay Hall), Brgy. Imelda, Municipality of Titay, Zamboanga Sibugay

Construction of Multi-purpose Building Kabasalan, ZS No. of

Building 1.0 Plans & POW GAA 2 - 1,500.00 1,500

397. Construction of MPB (Barangay Hall), Brgy. Lagting, Municipality of Siay, Zamboanga Sibugay

Construction of Multi-purpose Building Kabasalan, ZS No. of

Building 1.0 Plans & POW GAA 2 - 1,500.00 1,500

398. Construction of MPB (Barangay Hall), Brgy. Mamagon, Municipality of Naga, Zamboanga Sibugay

Construction of Multi-purpose Building Naga No. of

Building 1.0 Plans & POW GAA 2 - 1,500.00 1,500

399. Construction of MPB (Barangay Hall), Brgy. Moalboal, Municipality of Titay, Zamboanga Sibugay

Construction of Multi-purpose Building Naga No. of

Building 1.0 Plans & POW GAA 2 - 1,500.00 1,500

400. Construction of MPB (Barangay Hall), Brgy. Palmera, Municipality of R.T. Lim, Zamboanga Sibugay

Construction of Multi-purpose Building Ipil No. of

Building 1.0 Plans & POW GAA 2 - 1,500.00 1,500

401. Construction of MPB (Barangay Hall), Brgy. San Jose, Municipality of R.T. Lim, Zamboanga Sibugay

Construction of Multi-purpose Building Ipil No. of

Building 1.0 Plans & POW GAA 2 - 1,500.00 1,500

402. Construction of MPB (Barangay Hall), Brgy. Sandayon, Municipality of Naga, Zamboanga Sibugay

Construction of Multi-purpose Building Ipil No. of

Building 1.0 Plans & POW GAA 2 - 1,500.00 1,500

403. Construction of MPB (Barangay Hall), Brgy. Sayao, Municipality of Kabasalan, Zamboanga Sibugay

Construction of Multi-purpose Building Kabasalan, ZS No. of

Building 1.0 Plans & POW GAA 2 - 1,500.00 1,500

404. Construction of MPB (Barangay Hall), Brgy. Sininan, Municipality of Kabasalan, Zamboanga Sibugay

Construction of Multi-purpose Building Kabasalan, ZS No. of

Building 1.0 Plans & POW GAA 2 - 1,500.00 1,500

405. Construction of MPB (Barangay Hall), Brgy. Sta Clara, Municipality of Naga, Zamboanga Sibugay

Construction of Multi-purpose Building Kabasalan, ZS No. of

Building 1.0 Plans & POW GAA 2 - 1,500.00 1,500

406. Construction of MPB (Barangay Hall), Brgy. Sta Fe, Municipality of Titay, Zamboanga Sibugay

Construction of Multi-purpose Building Kabasalan, ZS No. of

Building 1.0 Plans & POW GAA 2 - 1,500.00 1,500

407. Construction of MPB (Barangay Hall), Brgy. Taway, Municipality of Ipil, Zamboanga Sibugay

Construction of Multi-purpose Building Kabasalan, ZS No. of

Building 1.0 Plans & POW GAA 2 - 1,500.00 1,500

408. Construction of MPB (Barangay Hall), Brgy. Tiayon, Municipality of Ipil, Zamboanga, Sibugay

Construction of Multi-purpose Building Naga No. of

Building 1.0 Plans & POW GAA 2 - 1,500.00 1,500

409. Construction of MPB (Barangay Hall), Brgy. Tilubog, Municipality of Naga, Zamboanga Sibugay

Construction of Multi-purpose Building Naga No. of

Building 1.0 Plans & POW GAA 2 - 1,500.00 1,500

Chapter 19-1-DPWH IX-ZS 2DEOPage 23 of 26

Page 496: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

410. Construction of MPB (Barangay Hall), Brgy. Tipan, Municipality of Naga, Zamboanga Sibugay

Construction of Multi-purpose Building Ipil No. of

Building 1.0 Plans & POW GAA 2 - 1,500.00 1,500

411. Construction of MPB (Barangay Hall), Brgy. Tugop Muslim, Municipality of Titay, Zamboanga Sibugay

Construction of Multi-purpose Building Ipil No. of

Building 1.0 Plans & POW GAA 2 - 1,500.00 1,500

412. Construction of Multipurpose Building at Barangay Timbabawan, Municipality of Tungawan, Zamboanga Sibugay

Construction of Multi-purpose Building Ipil No. of

Building 1.0 Plans & POW GAA 2 - 3,000.00 3,000

413. Construction of Multi-Purpose Building, Barangay Hall, Barangay Lacnapan, Kabasalan, Zamboanga Sibugay

Construction of Multi-purpose Building Kabasalan, ZS No. of

Building 1.0 Plans & POW GAA 2 - 1,500.00 1,500

414. Construction of Multi-Purpose Building, Barangay Hall, Barangay Linguisan, Tungawan, Zamboanga Sibugay

Construction of Multi-purpose Building Kabasalan, ZS No. of

Building 1.0 Plans & POW GAA 2 - 1,500.00 1,500

415. Construction of Multi-Purpose Building, Barangay Hall, Barangay Longilog, Municipality of Titay, Zamboanga Sibugay

Construction of Multi-purpose Building Kabasalan, ZS No. of

Building 1.0 Plans & POW GAA 2 - 1,500.00 1,500

416. Construction of Multi-Purpose Building, Barangay Hall, Barangay Looc Labuan, Municipality of Tungawan, Zamboanga Sibugay

Construction of Multi-purpose Building Kabasalan, ZS No. of

Building 1.0 Plans & POW GAA 2 - 1,500.00 1,500

417. Construction of Multi-Purpose Building, Barangay Hall, Barangay New Antique, R.T. Lim, Zamboanga Sibugay

Construction of Multi-purpose Building Kabasalan, ZS No. of

Building 1.0 Plans & POW GAA 2 - 1,500.00 1,500

418. Construction of Multi-Purpose Building, Barangay Hall, Barangay Paruk, Municipality of Siay, Zamboanga Sibugay

Construction of Multi-purpose Building Naga No. of

Building 1.0 Plans & POW GAA 2 - 1,500.00 1,500

419. Construction of Multi-Purpose Building, Barangay Hall, Barangay Salinding, Municipality of Siay, Zamboanga Sibugay

Construction of Multi-purpose Building Naga No. of

Building 1.0 Plans & POW GAA 2 - 1,500.00 1,500

420. Construction of Multi-Purpose Building, Barangay Hall, Barangay San Isidro, Municipality of Titay, Zamboanga Sibugay

Construction of Multi-purpose Building Ipil No. of

Building 1.0 Plans & POW GAA 2 - 1,500.00 1,500

421. Construction of Multi-Purpose Building, Barangay Hall, Barangay Suclema, Municipality of Ipil, Zamboanga Sibugay

Construction of Multi-purpose Building Ipil No. of

Building 1.0 Plans & POW GAA 2 - 1,500.00 1,500

422. Construction of Multi-Purpose Building, Barangay Salipyasin, Municipality of Kabasalan, Zamboanga Sibugay

Construction of Multi-purpose Building Ipil No. of

Building 1.0 Plans & POW GAA 2 - 1,500.00 1,500

423. Construction of Multi-Purpose Building, Birthing Center, Barangay Tugop, Municipality of Titay, Zamboanga Sibugay

Construction of Multi-purpose Building Kabasalan, ZS No. of

Building 1.0 Plans & POW GAA 2 - 2,000.00 2,000

424. Construction of Multi-Purpose Building, Covered Court, Barangay Masao, Municipality of Tungawan, Zamboanga Sibugay

Construction of Multi-purpose Building Kabasalan, ZS No. of

Building 1.0 Plans & POW GAA 2 - 2,000.00 2,000

425. Construction of Multi-Purpose Building, Senior Citizen Building, Barangay Gacbusan, Municipality of Kabasalan, Zamboanga Sibugay

Construction of Multi-purpose Building Kabasalan, ZS No. of

Building 1.0 Plans & POW GAA 2 - 1,500.00 1,500

426. Construction of Multi-Purpose Hall for IPs, Brgy. Baluran, Municipality of Tungawan, Zambonga Sibugay

Construction of Multi-purpose Building Kabasalan, ZS No. of

Building 1.0 Plans & POW GAA 2 - 1,500.00 1,500

427. Extention of Covered Court at Titay NHS, Brgy. Poblacion, Municipality of Titay, Zamboanga Sibugay

Construction of Multi-purpose Building Kabasalan, ZS No. of

Building 1.0 Plans & POW GAA 2 - 1,500.00 1,500

Chapter 19-1-DPWH IX-ZS 2DEOPage 24 of 26

Page 497: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

428. Improvement of MPB (Barangay Hall) Two Storey, Brgy. Tomitom, Munisipality Ipil, Zamboanga Sibugay

Construction of Multi-purpose Building Naga No. of

Building 1.0 Plans & POW GAA 2 - 1,500.00 1,500

429. Rehabilitation of Covered Court, Brgy. Nazareth, Municipality of Kabasalan, Zamboanga Sibugay

Construction of Multi-purpose Building Naga No. of

Building 1.0 Plans & POW GAA 2 - 2,000.00 2,000

b. Local Roads GAA 2 - 430. Construction of Catwalk in Kabug and GMRS

Island Mangrove Forests, Siay, Zamboanga Sibugay

Construction of Concrete Road Siay km. 0.15 Plans & POW GAA 2 2,000.00 2,000

431. Construction of local road, Barangay Laih, Siay, Zamboanga Sibugay Construction of Concrete Road Siay km. 0.10 Plans & POW GAA 2 3,000.00 3,000

432. Construction of local road, Barangay Makilas, Ipil, Zamboanga Sibugay Construction of Concrete Road Ipil km. 0.10 Plans & POW GAA 2 1,500.00 1,500

433. Construction of local road, Barangay Malagandis, Titay, Zamboanga Sibugay Construction of Concrete Road Titay km. 0.15 Plans & POW GAA 2 3,000.00 3,000

434. Construction of Road (Pathway) at Surabay NHS, Brgy. Surabay, Municipality of R.T. Lim, Zamboanga Sibugay

Construction of Concrete Road RT Lim km. 0.10 Plans & POW GAA 2 1,000.00 1,000

435. Construction of road, Barangay Aguinaldo, Naga, Zamboanga Sibugay Construction of Concrete Road Naga km. 0.10 Plans & POW GAA 2 5,000.00 5,000

436. Construction of road, Barangay Bangco, Titay, Zamboanga Sibugay Construction of Concrete Road Titay km. 0.15 Plans & POW GAA 2 5,000.00 5,000

437. Construction of road, Barangay Little Baguio, Kabasalan, Zamboanga Sibugay Construction of Concrete Road Kabasalan km. 0.10 Plans & POW GAA 2 7,000.00 7,000

438. Construction of road, Barangay Veterans Village, Ipil, Zamboanga Sibugay Construction of Concrete Road Ipil km. 0.10 Plans & POW GAA 2 5,000.00 5,000

439. Construction of Barangay Road, Brgy. Concepcion, Kabasalan, Zamboanga Sibugay Construction of Concrete Road Kabasalan km. 0.15 Plans & POW GAA 2 1,500.00 1,500

440. Construction of Barangay Road, Brgy. Don Andres, Ipil, Zamboanga Sibugay Construction of Concrete Road Ipil km. 0.10 Plans & POW GAA 2 1,000.00 1,000

441. Construction of Barangay Road, Brgy. Labe, Ipil, Zamboanga Sibugay Construction of Concrete Road Ipil km. 0.10 Plans & POW GAA 2 1,000.00 1,000

c. Bridges - 442. Rehabilitation of Foot Bridge, Brgy. Poblacion

Ipil, Ipil, Zamboanga Sibugay Rehab. of Bridge Ipil No. of Bridge 1.0 Plans & POW GAA 2 2,000.00 2,000

Regionwide - Local Infrastructure Program - a. Local Roads -

443. Road Concreting of Yakal St., Brgy. Tirso Babiera, Ipil City, Zamboanga Sibugay Construction of Concrete Road Ipil km Plans & POW GAA 2 3,000.00 - 3,000

444. Construction of Local Roads for Mabini Street, Lower Taway, Ipil, Zamboanga Sibugay

Construction of Concrete Road Ipil km Plans & POW GAA 2 2,000.00 - 2,000

445. Construction/Rehabilitation of Local Road, Barangay Tigbangagan to Barangay Palinta, Kabasalan, Zamboanga Sibugay

Construction of Concrete Road Kabasalan km Plans & POW GAA 2 5,000.00 - 5,000

b. Multipurpose/Facilities - 446. Construction of Multi-Purpose Building at

Brgy. Kimus, Siay, Zamboanga Sibugay 2nd LD

Construction of Multi-purpose Building Siay No. of

Building 1.0 Plans & POW GAA 2 2,000.00 - 2,000

447. Construction of Multi-Purpose Building (Multi-Purpose Building), RT Lim, Zamboanga Sibugay

Construction of Multi-purpose Building RT Lim No. of

Building 1.0 Plans & POW GAA 2 5,000.00 - 5,000

Chapter 19-1-DPWH IX-ZS 2DEOPage 25 of 26

Page 498: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

448. Construction of Multi-Purpose Building (Covered Court), RT Lim, Zamboanga Sibugay

Construction of Multi-purpose Building RT Lim No. of

Building 1.0 Plans & POW GAA 2 5,000.00 - 5,000

449. Construction of Multi-Purpose Building (Gymnasium), Poblacion, Kabasalan, Zamboanga Sibugay

Construction of Multi-purpose Building Kabasalan, ZS No. of

Building 1.0 Plans & POW GAA 2 5,000.00 - 5,000

450. Construction of Multipurpose Building (Gymnasium), Poblacion, Siay, Zamboanga Sibugay

Construction of Multi-purpose Building Siay No. of

Building 1.0 Plans & POW GAA 2 2,500.00 - 2,500

451. Construction of Multi-Purpose Building (Gymnasium), Balucanan, Siay, Zamboanga Sibugay

Construction of Multi-purpose Building Siay No. of

Building 1.0 Plans & POW GAA 2 2,500.00 - 2,500

296,724 557,000 178,000 1,427,039 3,363,739 - 5,822,502 1,310,830 1,959,011 577,625 10,227,574 14,096,136 7,976,250 36,147,426 GRAND TOTAL

Subtotal

Chapter 19-1-DPWH IX-ZS 2DEOPage 26 of 26

Page 499: Table of Contents (By Chapter)

Updated Zamboanga Peninsula Regional Development Investment Program (RDIP), 2017-2022

Agency: DPWH IXChapter 19: Accelerating Infrastructure Development

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

ZAMBOANGA CITY DEOZAMBOANGA CITY 1ST LEGISLATIVE DISTRICTa. OO1: Ensure Safe and Reliable National Road System

(i) Asset Preservation of National Roads1. Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development Management-4 (HDM-4)

a. Secondary Road1. Zamboanga City-Labuan-Limpapa

Rd Concrete Reconstruction with 280mm Slab with Drainage

Brgy. Talisayan, Brgy. San Ramon, Brgy. Sinubung,

Brgy. Tinuba, Brgy. Patalon along

Zamboanga City Labuan-Limpapa

Road (S01185MN) , Zamboanga City

Lane KM 7.05 Plans and POW GAA 49,900 7,649 - 57,549

b. Tertiary Road - - 2. Old Road (Ayala - Talisayan) Slab Replacement Brgy. Ayala, Brgy,

Talisayan along Old Rd. (Ayala-

Talisayan), Zamboanga City

Lane KM 0.50 Plans and POW GAA 2017 9,000 - 9,000

3. Southern Command Reblocking Calarian, Zamboanga City

Lane KM 0.20 Plans and POW - - -

2. Preventive Maintenance based on Pavement Management System/Highway Development and Management-4 (HDM-4) - - a. Secondary Road - -

4. Zamboanga City-Labuan-Limpapa Rd

Preventive Maintenance of Road: Asphalt Overlay (w/ 50mm with correction)

Brgy. Ayala - Brgy. Talisayan along

Zamboanga City- Labuan - Limpapa Rd, Zamboanga

City

Lane KM Plans and POW GAA - 90,000 110,000 110,000 310,000

b. Tertiary Road - - 5. Edwin Andrew's Air Base Preventive

Maintenance of Road: Asphalt Overlay

EAAB - Sta. Maria, Zamboanga City

Lane KM 0.45 Plans and POW GAA 3,500 - 3,400 3,400 3,400 13,700

6. Gen. V. Alvarez Street Preventive Maintenance of Road: Asphalt Overlay

Zone IV, Zamboanga City

Lane KM 0.15 Plans and POW - - -

7. Gov. Lim Avenue Preventive Maintenance of Road: Asphalt Overlay

Zone I and Zone III, Zamboanga

City

Lane KM 0.15 Plans and POW - - -

8. Old Rd (Ayala-Talisayan) Preventive Maintenance of Road: Asphalt Overlay

Ayala-Talisayan, Zamboanga City

Lane KM Plans and POW GAA - 6,500 6,500 6,500 19,500

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

LGU Proponent RemarksMode of

Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

Page 500: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

LGU Proponent RemarksMode of

Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

9. Rizal Street Preventive Maintenance of Road: Asphalt Overlay

Zone IV, Zamboanga City

Lane KM 0.15 Plans and POW GAA - 2,000 2,000 2,000 6,000

10. Rizal Street Dual Preventive Maintenance of Road: Asphalt Overlay

Zone IV, Zamboanga City

Lane KM 0.15 Plans and POW - - -

11. R. T. Lim Boulevard Preventive Maintenance of Road: Asphalt Overlay

Zone I, Zamboanga City

Lane KM 0.75 Plans and POW GAA - 10,000 10,000 10,000 30,000

12. R. T. Lim Boulevard Dual Preventive Maintenance of Road: Asphalt Overlay

Cawa-Cawa, Zamboanga City

Lane KM 0.38 Plans and POW GAA - 5,000 5,000 5,000 15,000

13. San Ramon Penal Colony Road Preventive Maintenance of Road: Asphalt Overlay

San Ramon, Zamboanga City

Lane KM 0.15 Plans and POW GAA - 2,300 2,300 2,300 6,900

14. Southern Command Main Road Preventive Maintenance of Road: Asphalt Overlay

Calarian, Zamboanga City

Lane KM 0.15 Plans and POW GAA - 2,000 2,000 4,000

15. Southern Command Main Road Loop

Preventive Maintenance of Road: Asphalt Overlay

Calarian, Zamboanga City

Lane KM 0.08 Plans and POW GAA - 2,000 2,000 2,000 6,000

16. Southern Support Command Road Preventive Maintenance of Road: Asphalt Overlay

Calarian, Zamboanga City

Lane KM 0.08 Plans and POW GAA - 2,000 2,000 2,000 6,000

17. Veterans Avenue Preventive Maintenance of Road: Asphalt Overlay

Zone IV, Zamboanga City

Lane KM 1.50 Plans and POW - - -

3. Construction/Upgrading/Rehabilitation of Drainage along National Roads - - a. Secondary Road - -

18. Zamboanga City - Labuan - Limpapa Road

Construction of Drainage Structure along Road

Brgy. Upper Calarian along

Zamboanga City Labuan-Limpapa Rd., Zamboanga

City

ln.m. 216.70 Plans and POW GAA 15,600 13,820 10,000 10,000 10,000 59,420

b. Tertiary Road - - 19. Edwin Andrew's Air Base Construction of

Drainage Structure along Road

Sta. Maria, Malagutay,

Zamboanga City

ln.m. 27.78 Plans and POW GAA - - -

20. Gen. V. Alvarez Street Construction of Drainage Structure along Road

Zone IV, Zamboanga City

ln.m. 27.78 Plans and POW GAA - - -

21. Gov. Lim Avenue Construction of Drainage Structure along Road

Zone I and Zone III, Zamboanga

City

ln.m. 27.78 Plans and POW GAA - - -

Chapter 19-1-DPWH IX-ZC DEO 1LDPage 2 of 36

Page 501: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

LGU Proponent RemarksMode of

Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

22. Southern Command Main Road Construction of Drainage Structure along Road

Calarian, Zamboanga City

ln.m. 27.78 Plans and POW GAA - - -

23. Southern Command Main Road Loop

Construction of Drainage Structure along Road

Calarian, Zamboanga City

ln.m. 27.78 Plans and POW GAA - -

24. Southern Support Command Road Construction of Drainage Structure along Road

Calarian,Zamboanga City

ln.m. 27.78 Plans and POW GAA - - -

25. Veterans Avenue Construction of Drainage Structure along Road

Zone IV, Zamboanga City

ln.m. 27.78 Plans and POW GAA - - -

4. Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - - a. Secondary Road - -

26. Zamboanga City-Labuan-Limpapa Rd

Construction of Road Slope Protection Structure

Brgy. Labuan-Latap-Limpapa

along Zamboanga City Labuan-

Limpapa Road, Zamboanga City

ln.m. 100.00 Plans and POW GAA 22,000 50,000 50,000 50,000 172,000

5. Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - - a. Primary Road - -

27. Preventive Maintenance of Road: Asphalt Overlay along Pagadian City - Zamboanga City Road K1955+321 - K1955+500, K1958+274 - K1959+000, K1959+567 - K1959+630, K1960+776 - K1961+000, K1962+000 - K1963+000, K1963+000 - K1963+271, K1963+297 - K1963+398, K1963+769 - K1963+949, K1963+949 - K1964+119, K1964+135 - K1965+000, K1965+000 - K1966+000, K1966+000 - K1967+000, K1972+964 - K1973+207, K1973+976 - K1974+000, K1974+000 - K1974+985 (TL = 7,131 m)

Reconstruction to Concrete Pavement

Brgy. Ayala, San Ramon, Lubugan, Sinubung, Busugan, Tarling, Malandi, Miluao, Patalon, Lawingan and Labuan, along Zamboanga City Labuan-Limpapa Road, Zamboanga City

Lane KM 14.26 Plans and POW GAA 106,000 106,000 212,000.00

(ii) Network Development - - 1. Improvement/Widening of National Roads - -

a. Primary Road - - 28. Pagadian - Zamboanga City Road Widening/Conc. Veterans Avenue,

Zamboanga CityLane KM 0.66 Plans and POW GAA 200,000 - - 200,000.00

b. Secondary Road - - 29. Zamboanga City - Labuan -

Limpapa RoadWidening/Conc. Limpapa,

Zamboanga CityLane KM 5.30 Plans and POW GAA 209,121 114,596 - 150,916 150,916 150,916 776,465.00

30. Airport Road - (S01208MN) Chainage 000 - Chainage 493, (S01208MN) Chainage 493 - Chainage 670

Road Widening including Drainage

Camins, Zamboanga City

Lane KM 0.67 Plans and POW GAA 93,190 - 93,190.00

Chapter 19-1-DPWH IX-ZC DEO 1LDPage 3 of 36

Page 502: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

LGU Proponent RemarksMode of

Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

31. R.T. Lim Boulevard, Baliwasan - Kampung Islam Section including RROW

Road Widening including Drainage and RROW

Baliwasan, Zamboanga City

Lane KM Plans and POW GAA 50,000 10,000 10,000 10,000 80,000.00

32. Widening of Veterans Avenue Crossing to LTO including Drainage and RROW

Road Widening including Drainage and RROW

Veterans, Zamboanga City

Lane KM 0.46 Plans and POW GAA 50,000 - - 50,000.00

33. Improvement of Jct Zamboanga City - Labuan - Limpapa Road and Airport Road and Road leading to Seaport including ROW

Road Widening including Drainage and RROW

Baliwasan, Zamboanga City

Lane KM 0.94 Plans and POW - - -

34. Junction Vitaliano Agan - Gov. Camins Road,Chainage 450 - Chainage 710

Road Widening including Drainage and RROW

Camins, Zamboanga City

Lane KM 1.32 Plans and POW - - -

35. Gov. Camins Road Road Widening including Drainage and RROW

Camins, Zamboanga City

Lane KM 1.55 Plans and POW GAA 49,000 75,436 - - 124,436.00

36. Junction Airport Rd. - Baliwasan Chico (Major C.A. Fernandez) along Zamboanga City - Labuan - Limpapa Rd.

Road Widening including Drainage and RROW

Baliwasan, Zamboanga City

Lane KM 0.67 Plans and POW - - -

37. Zamboanga City By-Pass Road(Tumaga - Pasonanca - Cabatangan Section)

Road Widening including Drainage and RROW

Pasonanca, Zamboanga City

Lane KM Plans and POW - - -

38. Widening of Baliwasan - San Jose Gusu Road including RROW along Zamboanga City-Labuan-Limpapa Road

Road Widening including Drainage and RROW

Baliwasan, Zamboanga City

Lane KM Plans and POW - -

39. NS Valderosa St - (S01205MN) Chainage 000 - Chainage 678

Road Widening including Drainage

Zone IV, Zamboanga City

Lane KM 0.68 Plans and POW - -

40. Wharf Rd - (S01206MN) Chainage 000 - Chainage 189

Road Widening including Drainage

Zone IV, Zamboanga City

Lane KM 0.19 Plans and POW - -

c. Tertiary Road - - 41. RT Lim Blvd incl. ROW - K1940

+ 280 - K1940 + 2000 (TL = 1.62 KM)

Road Widening Brgy. Talisayan-Busugan-Tarling-Malandi-Miluao

along Zamboanga City Labuan-

Limpapa Road (S01185MN) ,

Zamboanga City

Lane KM 3.24 Plans and POW GAA 2018 50,000.00 - - 50,000.00

42. Veterans Ave incl. ROW - (S01207MN) - Chainage 000 - Chainage 316, Chainage 000 - Chainage 316 (TL = 0.316 KM)

Road Widening Brgy. Miluao-Patalon-Lawingan along Zamboanga

City Labuan-Limpapa Road (S01185MN) ,

Zamboanga City

Lane KM 0.63 Plans and POW GAA 2018 50,000.00 - - 50,000.00

2. Construction of By-Passes/Diversion Roads, including ROW - - 43. Zamboanga City By-Pass Road,

(Culianan - Patalon Section) (TL = 1.19 KM)

Road Upgrading Patalon, Zamboanga City

Lane KM 2.38 Plans and POW GAA 2017 350,000 300,000 300,000 300,000 1,250,000.00

44. Zamboanga City By-Pass Road, Patalon (West), Package 3

Road Upgrading Patalon, Zamboanga City

Plans and POW GAA 2018 200,000 200,000 200,000 600,000.00

a. Construction of Line Canal and Slope Protection (gouted riprap)

Slope Protection Tumaga, Zamboanga City

ln.m. Plans and POW GAA 182,350 - 182,350.00

Chapter 19-1-DPWH IX-ZC DEO 1LDPage 4 of 36

Page 503: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

LGU Proponent RemarksMode of

Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

b. Widening Lane KM - - - 45. Zamboanga City Bypass Road

(Tumaga Section), incl. Bridge, Zamboanga City

Road&BridgeWidening

Tumaga, Zamboanga City

Lane KM/ln.m. Plans and POW GAA 260,000 - 260,000.00

46. Widening/Improvement of Alternate Road at Jct. Gov. Ramos (Cabatangan Road) to By Pass Road (Cabatangan Section) , Zamboanga City - Including ROW

Road Upgrading Patalon, Zamboanga City

Plans and POW GAA 100,000 100,000 100,000 300,000.00

3. Construction of Fly-Overs/Interchanges - - 47. Governor Camins/MCLL Highway

and Veterans AvenueFlyover incl. ROW, Zamboanga City

Construction of Flyover

Governor Camins/MCLL Highway and

Veterans Avenue, Zamboanga City

Sq.m. 1,825.00 Plans and POW GAA 2018 300,000 - - 300,000.00

48. Jct. T. Taupan Street (Suterville/Gavilan) Flyover, incl. ROW, Zamboanga City

Construction of Flyover

Jct. T. Taupan Street

(Suterville/Gavilan), Zamboanga City

Sq.m. 1,826.00 Plans and POW GAA 2018 290,000 - - 290,000.00

(iii) Construction and Maintenance of Bridges along National Roads - - 1. Rehabilitation of Permanent Bridge - -

II. Secondary Road - - a. Along Gov. Camins Road (SO1201MN) - -

49. San Ignacio Br. (BOO555MN) Rehabilitation / Major Repair of Bridge

Canelar, Zamboanga City

Number of Bridges

1.00 Plans and POW GAA 3,000 - 3,000.00

2. Widening of Permanent Bridges - - II. Secondary Road - - a. Along Gov. Camins Road (SO1201MN) - -

50. San Ignacio Br. (BOO555MN) Widening of Bridge Canelar, Zamboanga City

Sq.m. 176.11 Plans and POW GAA 18,000 - 18,000.00

b. All along Zamboanga City - Labuan - Limpapa Road (SO1185MN) ` - - 51. San Ramon Br. 1 (BO1161MN) Widening of Bridge San Ramon,

Zamboanga CitySq.m. 333.00 Plans and POW GAA 35,000 - 35,000.00

52. San Ramon Br. 2 (BO1162MN) Widening of Bridge San Ramon, Zamboanga City

ln.m. 973.00 Plans and POW GAA 102,000 - 102,000.00

53. Sinubong Br. (BO1163MN) Widening of Bridge Sinubong, Zamboanga City

ln.m. 236.00 Plans and POW GAA 30,000 - 30,000.00

54. Busugan Br. (BO1164MN) Widening of Bridge Busugan, Zamboanga City

ln.m. 415.00 Plans and POW GAA 45,000 - 45,000.00

55. Tarling Br. (BO1165MN) Widening of Bridge Tarling, Zamboanga City

ln.m. 143.00 Plans and POW GAA 15,000 - 15,000.00

56. Miluiao Br. (BO1166MN) Widening of Bridge Miluao, Zamboanga City

ln.m. 149.11 Plans and POW GAA 16,000 - 16,000.00

57. Patalon Br. 1 (BO1167MN) Widening of Bridge Patalon, Zamboanga City

ln.m. 167.90 Plans and POW GAA 17,600 - 17,600.00

58. Patalon Br. 2 (BO1168MN) Widening of Bridge Patalon, Zamboanga City

ln.m. 213.70 Plans and POW GAA 22,400 - 22,400.00

59. Bangayan Br. (BO1169MN) Widening of Bridge Bangayan, Zamboanga City

ln.m. 267.12 Plans and POW GAA 37,000 37,000 37,000 111,000.00

60. Latap Br. (BO1170MN) Widening of Bridge Latap, Zamboanga City

ln.m. 181.26 Plans and POW GAA 22,800 22,800 22,800 68,400.00

Chapter 19-1-DPWH IX-ZC DEO 1LDPage 5 of 36

Page 504: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

LGU Proponent RemarksMode of

Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

61. Limpapa Br. (BO1171MN) Widening of Bridge Limpapa, Zamboanga City

ln.m. Plans and POW GAA - -

62. Labuan Bridge Widening of Bridge Labuan, Zamboanga City

ln.m. 429.30 Plans and POW GAA - 54,000 54,000 54,000 162,000.00

916,121.00 1,825,392.00 7,649.00 1,057,916.00 1,185,916.00 1,185,916.00 6,178,910.00 OO2: Protect Lives and Properties Against Major Floods - -

1. Construction/Maintenance of Flood Mitigation Structures and Drainage System - 63. Construction of Flood Control

Structure along Ayala River, Ayala Section (both side), Zamboanga City

Construction of Flood Mitigation Structure

Ayala, Zamboanga City

ln.m. Plans and POW GAA 35,000 20,000 15,000 25,000 25,000 25,000 145,000.00

64. Construction of Flood Control Structure along Ayala River, Tulungatung Section , Zamboanga City

Construction of Flood Mitigation Structure

Tulungatung, Zamboanga City

ln.m. Plans and POW GAA 40,000 20,000 10,000 25,000 25,000 25,000 145,000.00

65. Construction of Flood Control Structure along San Roque River, Zamboanga City

Construction of Flood Mitigation Structure

San Roque, Zamboanga City

ln.m. Plans and POW GAA 35,000 15,000 20,000 20,000 20,000 110,000.00

66. Construction of Flood Control Structure along Limpapa River, (Including Right of Way Acquisition), Limpapa, Zamboanga City

Construction of Flood Mitigation Structure

Limpapa, Zamboanga City

ln.m. Plans and POW GAA 25,000 18,000 18,000 18,000 79,000.00

67. Construction of Flood Control at Busugan River Sinubong, Zamboanga City

Construction of Flood Mitigation Structure

Sinubong, Zamboanga City

ln.m. Plans and POW GAA 20,000 - 20,000.00

68. Construction of Shoreline Protection at Limpapa Section, Zamboanga City

Construction of Flood Mitigation Structure

Pasonanca, Zamboanga City

ln.m. Plans and POW GAA - - 40,000 40,000 40,000 120,000.00

69. Construction of Shoreline Protection at Labuan Section, Zamboanga City

Construction of Flood Mitigation Structure

Pasonanca, Zamboanga City

ln.m. Plans and POW GAA - 21,500 50,000 50,000 50,000 171,500.00

70. Construction of Shoreline Protection at Patalon Section, Zamboanga City

Construction of Flood Mitigation Structure

Pasonanca, Zamboanga City

ln.m. Plans and POW GAA - - 40,000 40,000 40,000 120,000.00

71. Construction of Shoreline Protection at Ayala Section, Zamboanga City

Construction of Flood Mitigation Structure

Pasonanca, Zamboanga City

ln.m. Plans and POW GAA - - 40,000 40,000 40,000 120,000.00

72. Construction of Shoreline Protection at Talisayan Section, Zamboanga City

Construction of Flood Mitigation Structure

Pasonanca, Zamboanga City

ln.m. Plans and POW GAA - - 40,000 40,000 40,000 120,000.00

73. Construction of Flood Control Structure at Latap River, Zamboanga City

Construction of Flood Mitigation Structure

Pasonanca, Zamboanga City

ln.m. Plans and POW GAA - - 15,000 15,000 15,000 45,000.00

74. Construction of Flood Control Structure at Miluao River, Zamboanga City

Construction of Flood Mitigation Structure

Pasonanca, Zamboanga City

ln.m. Plans and POW GAA - - 20,000 20,000 20,000 60,000.00

75. Construction of Flood Control Structure at Tarling River, Zamboanga City

Construction of Flood Mitigation Structure

Zamboanga City ln.m. Plans and POW GAA - - 15,000 15,000 15,000 45,000.00

76. Construction of Flood Control at Maasin Creek, (Including Right of Way Acquisition), Zamboanga City

Construction of Flood Mitigation Structure

Maasin, Zamboanga City

ln.m. Plans and POW GAA 25,000 15,000 - 40,000.00

OO1- Subtotal

Chapter 19-1-DPWH IX-ZC DEO 1LDPage 6 of 36

Page 505: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

LGU Proponent RemarksMode of

Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

77. Construction of Flood Control at Sinunuc River, (Including Right of Way Acquisition), Zamboanga City

Construction of Flood Mitigation Structure

Sinunuc, Zamboanga City

ln.m. Plans and POW GAA 20,000 15,000 - 35,000.00

78. Construction/Extension of Flood Control at Saaz River (Including Right of Way Acquisition), San Ramon, Zamboanga City

Construction of Flood Mitigation Structure

San Ramon, Zamboanga City

ln.m. Plans and POW GAA 30,000 20,000 30,000 30,000 30,000 140,000.00

79. Construction/Extension of Flood Control along San Jose Creek (Including Right of Way Acquisition), Baliwasan - San Jose Gusu Section, Zamboanga City

Construction of Flood Mitigation Structure

San Jose, Zamboanga City

ln.m. Plans and POW GAA 8,000 - 8,000.00

80. Construction of Flood Control at Labuan River, Labuan Section (Including Right of Way Acquisition), Zamboanga City

Construction of Flood Mitigation Structure

Labuan, Zamboanga City

ln.m. Plans and POW GAA 28,500 20,000 21,500 - 70,000.00

81. Construction of Flood Control at Patalon River, (Including Right of Way Acquisition) Patalon Section, Zamboanga City

Construction of Flood Mitigation Structure

Patalon, Zamboanga City

ln.m. Plans and POW GAA 10,000 15,000 20,000 20,000 20,000 85,000.00

82. Construction of Flood Control Structure at Tumaga River Basin (Including Right of Way Acquisition) Sta. Maria Section, Zamboanga City

Construction of Flood Mitigation Structure

Sta. Maria, Zamboanga City

ln.m. Plans and POW GAA 30,000 - 30,000.00

83. Construction of Flood Control Structure at Tumaga River Basin (Including Right of Way Acquisition) Tumaga Section, Zamboanga City

Construction of Flood Mitigation Structure

Tumaga, Zamboanga City

ln.m. Plans and POW GAA 30,000 - 30,000.00

84. Construction of Flood Control Structure at Tumaga River Basin (Including Right of Way Acquisition) Pasonanca - Sta. Maria Section, Zamboanga City

Construction of Flood Mitigation Structure

Sta. Maria, Zamboanga City

ln.m. Plans and POW GAA 40,000 - 40,000.00

85. Construction of Flood Control at Cawit River, Cawit, Zamboanga City

Construction of Flood Mitigation Structure

Cawit,Zamboanga City

ln.m. Plans and POW GAA 20,000 10,000 - 30,000.00

86. Construction of Flood Control Structure at Talisayan, Zamboanga City

Construction of Flood Mitigation Structure

Talisayan, Zamboanga City

ln.m. Plans and POW GAA 20,000 20,000 20,000 20,000 80,000.00

87. Repair/Improvement of Sinunuc Shore Line Protection, Sinunuc, Zamboanga City

Construction of Flood Mitigation Structure

Sinunuc, Zamboanga City

ln.m. Plans and POW GAA 15,000 40,000 40,000 40,000 135,000.00

88. Feasibility Study on Water Impounding Dam

Feasibility Study Pasonanca ln.m. Plans and POW GAA - - -

89. Flood Control for Urban Core of Zamboanga City to include Pumping Station, Zamboanga City (Package 1 & 2)

Construction of Flood Mitigation Structure

Sta. Catalina, Zamboanga City

ln.m. Plans and POW GAA 360,000 - 550,000 550,000 550,000 2,010,000.00

90. Construction of Flood Control Structure at Tinuba River Sinubong, Zamboanga City

Construction of Flood Mitigation Structure

Tinuba River, Brgy. Sinubong, Zamboanga City

ln.m. Plans and POW GAA 10,000 - 10,000.00

366,500.00 575,000.00 78,000.00 1,008,000.00 1,008,000.00 1,008,000.00 4,043,500.00 OO2- Subtotal

Chapter 19-1-DPWH IX-ZC DEO 1LDPage 7 of 36

Page 506: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

LGU Proponent RemarksMode of

Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

c. Convergence and Special Support Program - - 1. Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Seaports -

91. Jct. Zamboanga City- Labuan-Limpapa Road (San Jose) to Jct. R. T. Lim Boulevard leading to Zamboanga City Port, Zamboanga City

Impvt/Concreting Zamboanga City Lane KM Plans and POW 10,000 - 10,000.00

2. Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - - 92. Road from Junction Highway to

Ayala-La Paz Road leading to La Paz Resort (Package 1 & 2)

Impvt/Concreting La Paz, Zamboanga City

Lane KM Plans and POW GAA 200,000 150,000 60,000 250,000 250,000 250,000 1,160,000.00

93. Road from Junction Highway to Ayala-La Paz Road leading to La Paz Resort (GAP)

Impvt/Concreting La Paz, Zamboanga City

Lane KM Plans and POW GAA 15,000 15,000 30,000.00

94. Construction of Stairway to Nancy Falls Barangay La Paz Zamboanga City (Including Road Right of Way)

Construction La Paz, Zamboanga City

Lane KM Plans and POW GAA - 10,000 10,000 10,000 30,000.00

95. Improvement of Zamboanga City-Labuan-Limpapa Road Junct. Pamucutan to Sitio Papaya Road Zamboanga City (Including Drainage and Road Right of Way)

Impvt/Concreting Pamucutan, Zamboanga City

Lane KM Plans and POW GAA - 70,800 70,800 70,800 212,400.00

96. Road Widening / Improvement leading to Parola (Lighthouse), Limpapa, Zamboanga City

Impvt/Concreting Pamucutan, Zamboanga City

Lane KM Plans and POW GAA - 150,000 150,000 150,000 450,000.00

3. Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones - - 97. Road Network of the First

Philippine Halal Hub-The Asian Halal Center (Zamboanga Economic Zone), Talisayan, Zamboanga City

Impvt/Concreting Talisayan Lane KM Plans and POW GAA 125,000 - - 125,000.00

98. Impvt/Rehabilitation of Taupan Street from Jct. Zamboanga City-Labuan-Limpapa Road (San Jose Gusu Section) to Jct. R.T. Lim Boulevard, Zamboanga City in support of Marine products, coconut oil and chemical products, Taupan Street, Zamboanga City

Impvt/Concreting San Jose Gusu Lane KM Plans and POW GAA - 25,000 25,000 25,000 75,000.00

99. Impvt/Rehabilitation of Tulungatong Road from Jct. Zamboanga City-Labuan-Limpapa Rd.(Ayala Section) to Tulungatong,Zamboanga City in support of Livestock and poultry Industries, Tulungatong, Zamboanga City

Impvt/Concreting Tulungatong Lane KM Plans and POW GAA - 90,000 90,000 90,000 270,000.00

100. Improvement/Rehabilitation of Road from Junction Ayala, Ayala-Talisayan Old Road to Junction Talisayan-Labuan-Limpapa Rd. leading to Canned Sardines and Support Industries, Talisayan, Zamboanga City

Impvt/Concreting Talisayan, Zamboanga City

Lane KM Plans and POW GAA - - -

Chapter 19-1-DPWH IX-ZC DEO 1LDPage 8 of 36

Page 507: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

LGU Proponent RemarksMode of

Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

101. Improvement/Rehabilitation of Major C.A. Fernandez Road from Junction Zamboanga City-Labuan-Limpapa Road(San Jose Gusu Section) to Junction R.T. Lim Boulevard, Zamboanga City in Support of Marine products, coconut oil and chemical products, Baliwasan Chico, Zamboanga City

Impvt/Concreting Baliwasan, Zamboanga City

Lane KM Plans and POW GAA - 30,000 30,000 30,000 90,000.00

102. Concreting of Existing Old Logging Road (Phase 1) Connecting Upper La Paz and Limpapa in support of agri-business industry, Upper La Paz, Zamboanga City 1st LD

Impvt/Concreting La Paz, Zamboanga City

Lane KM Plans and POW GAA - 175,000 175,000 175,000 525,000.00

103. Access Road at Sitio Anuling, Pamucutan to Sta. Rita in support of High Value Crops (Abaca, Cacao, Rubber and Coffee), Upper La Paz, Zamboanga City

Impvt/Concreting La Paz, Zamboanga City

Lane KM Plans and POW GAA 125,000 - - 125,000.00

(iii) Construction/ Improvement of Various Infrastructure in support of National Security - - 104. Rehabilitation/Improvement of

Road From Jct. Zamboanga City-Labuan - Limpapa Road (Malagutay Road) leading to Camp Enrile, Zamboanga City (TL = 1,200.00 m)

Improvement / Rehabilitation

Brgy. Malagutay, Zamboanga City

Lane KM 2.40 Plans and POW GAA 2020 50,000.00 50,000.00 50,000 150,000.00

105. Repair of 16MICO Barracks, Officers Quarters, Fence, and Carpark, 16th Military Intelligence Company, 1MIB, 1st Infantry Division, Philippine Army, Camp Gen. Arturo T. Enrile, Malagutay, Zamboanga City

Repair / Rehabilitation

Brgy. Malagutay, Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2020 6,500.00 6,500.00 6,500 19,500.00

106. Repair of Western Mindanao Command Gymnasium, Camp Navarro, Upper Calarian, Zamboanga City

Repair / Rehabilitation

Brgy. Upper Calarian,

Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2020 7,000.00 7,000.00 7,000 21,000.00

107. Construction of 2 Storey 50 Bed Capacity Hospital at Westmincom ,Camp Navarro,Upper Calarian, Zamboanga City

Construction of Hospital

Brgy. Upper Calarian,

Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2020 180,000.00 180,000.00 180,000 540,000.00

108. Concreting of Road from Jct By Pass ( Cabatangan Section) leading to Philippine Navy (Marines) Training Area, Zamboanga City (TL = 400.00 m)

Construction ofConcrete Road

Brgy. Cabatangan, Zamboanga City

Lane KM 8.00 Plans and POW GAA 2020 150,000.00 150,000.00 150,000 450,000.00

109. Repair of Western Mindanao Command (WMC) Grandstand, Zamboanga City

Rehabilitation / Major Repair of Multi Purpose Building

Brgy. Upper Calarian,

Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 5,000.00 5,000 10,000.00 Additional Projects for DND-DPWH Convergence Program

Chapter 19-1-DPWH IX-ZC DEO 1LDPage 9 of 36

Page 508: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

LGU Proponent RemarksMode of

Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

110. Repair of Western Mindanao Command (WMC) - Badminton Court, Zamboanga City

Rehabilitation / Major Repair of Multi Purpose Building

Brgy. Upper Calarian,

Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 7,000.00 7,000 14,000.00 Additional Projects for DND-DPWH Convergence Program

111. Repair of Western Mindanao Command (WMC) - Married Officers' Quarter (MOQ), Zamboanga City

Rehabilitation / Major Repair of Multi Purpose Building

Brgy. Upper Calarian,

Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 9,600.00 9,600 19,200.00 Additional Projects for DND-DPWH Convergence Program

112. Proposed Perimeter Fence at Western Mindanao Command (WMC), Zamboanga City

Construction of Other Facilities

Brgy. Upper Calarian,

Zamboanga City

Number of Facilities

1.00 Plans and POW GAA 2021 10,000.00 10,000 20,000.00 Additional Projects for DND-DPWH Convergence Program

113. Repair of Elevated (Circular) Water Tank at Western Mindanao Command (WMC), Zamboanga City

Rehabilitation / Major Repair of Multi Purpose Building

Brgy. Upper Calarian,

Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 50,000.00 50,000 100,000.00 Additional Projects for DND-DPWH Convergence Program

114. Repair of Firing Range at Western Mindanao Command (WMC), Zamboanga City

Rehabilitation / Major Repair of Multi Purpose Building

Brgy. Upper Calarian,

Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 3,000.00 3,000 6,000.00 Additional Projects for DND-DPWH Convergence Program

115. Construction of Two (2) Storey Multipurpose Building (MPB) HHSG, Western Mindanao Command (WMC), Zamboanga City

Construction of Multi-purpose Building

Brgy. Upper Calarian,

Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 3,000.00 3,000 6,000.00 Additional Projects for DND-DPWH Convergence Program

116. Construction of Drainage System at Western Mindanao Command (WMC), Zamboanga City

Construction of Multi-purpose Building

Brgy. Upper Calarian,

Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 15,000.00 15,000 30,000.00 Additional Projects for DND-DPWH Convergence Program

117. Construction of Ammunition Dump, Western Mindanao Command (WMC), Zamboanga City

Construction of Multi-purpose Building

Brgy. Upper Calarian,

Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 15,000.00 15,000 30,000.00 Additional Projects for DND-DPWH Convergence Program

118. Construction of Access Road at Western Mindanao Command (WMC), Zamboanga City (TL = 500.00 m)

Construction of Concrete Road

Brgy. Upper Calarian,

Zamboanga City

Lane Km 1.00 Plans and POW GAA 2021 20,000.00 20,000 40,000.00 Additional Projects for DND-DPWH Convergence Program

119. Repair & Renovation of Power House, Western Mindanao Command (WMC), Zamboanga City

Rehabilitation / Major Repair of Multi Purpose Building

Brgy. Upper Calarian,

Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 1,500.00 1,500 3,000.00 Additional Projects for DND-DPWH Convergence Program

120. 14. Repair & Renovation of Conference Building at Western Mindanao Command (WMC), Zamboanga City

Rehabilitation / Major Repair of Multi Purpose Building

Brgy. Upper Calarian,

Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 10,800.00 10,800 21,600.00 Additional Projects for DND-DPWH Convergence Program

Chapter 19-1-DPWH IX-ZC DEO 1LDPage 10 of 36

Page 509: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

LGU Proponent RemarksMode of

Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

121. Repair of U2 Admin Building at Western Mindanao Command (WMC), Zamboanga City

Rehabilitation / Major Repair of Multi Purpose Building

Brgy. Upper Calarian,

Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 5,000.00 5,000 10,000.00 Additional Projects for DND-DPWH Convergence Program

122. Enhancement of U2 Female Barracks at Western Mindanao Command (WMC), Zamboanga City

Rehabilitation / Major Repair of Multi Purpose Building

Brgy. Upper Calarian,

Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 5,000.00 5,000 10,000.00 Additional Projects for DND-DPWH Convergence Program

123. Construction of Male Barracks, Western Mindanao Command (WMC), Zamboanga City

Construction of Multi-purpose Building

Brgy. Upper Calarian,

Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 5,000.00 5,000 10,000.00 Additional Projects for DND-DPWH Convergence Program

124. Repair of U2 Quarter, Western Mindanao Command (WMC), Zamboanga City

Rehabilitation / Major Repair of Multi Purpose Building

Brgy. Upper Calarian,

Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 5,000.00 5,000 10,000.00 Additional Projects for DND-DPWH Convergence Program

125. Repair and Renovation of Office Relocation Judge Advocate General Office (JAGO), Command Public Information Office (CPIO), Provost Marshall (PROVO) and Office of the Command Engineer (OCE), Western Mindanao Command (WMC), Zamboanga City

Rehabilitation / Major Repair of Multi Purpose Building

Brgy. Upper Calarian,

Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 8,000.00 8,000 16,000.00 Additional Projects for DND-DPWH Convergence Program

126. Repair/Repainting of Mosque, Western Mindanao Command (WMC), Zamboanga City

Rehabilitation / Major Repair of Multi Purpose Building

Brgy. Upper Calarian,

Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 3,500.00 3,500 7,000.00 Additional Projects for DND-DPWH Convergence Program

127. Repair of 16th Finance Building, Camp Don Basilio Navarro, Calarian, Zamboanga City

Rehabilitation / Major Repair of Multi Purpose Building

Brgy. Upper Calarian,

Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 7,600.00 7,600 15,200.00 Additional Projects for DND-DPWH Convergence Program

128. Repair of U6 Building, Western Mindanao Command (WMC), Zamboanga City

Rehabilitation / Major Repair of Multi Purpose Building

Brgy. Upper Calarian,

Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 7,000.00 7,000 14,000.00 Additional Projects for DND-DPWH Convergence Program

129. Repair of 404th Armed Forces of the Philippines Procurement Services (AFPPS) - Accounting and Auditor's Building, Western Mindanao Command (WMC), Zamboanga City

Rehabilitation / Major Repair of Multi Purpose Building

Brgy. Upper Calarian,

Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 11,500.00 11,500 23,000.00 Additional Projects for DND-DPWH Convergence Program

130. 24.Repair and Renovation of HWESTMINCOM Building, Western Mindanao Command (WMC), Zamboanga City

Rehabilitation / Major Repair of Multi Purpose Building

Brgy. Upper Calarian,

Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 50,000.00 50,000 100,000.00 Additional Projects for DND-DPWH Convergence Program

Chapter 19-1-DPWH IX-ZC DEO 1LDPage 11 of 36

Page 510: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

LGU Proponent RemarksMode of

Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

131. Repair and Renovation of Officers' Club House at Westerm Mindanao Command (WMC), Zamboanga City

Rehabilitation / Major Repair of Multi Purpose Building

Brgy. Upper Calarian,

Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 20,000.00 20,000 40,000.00 Additional Projects for DND-DPWH Convergence Program

132. Construction of Naval Station Romulo Espaldon (NSRE) Hangar at Bagong Calarian, Zamboanga City

Construction of Multi-purpose Building

Brgy. Bagong Calarian,

Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 5,000.00 5,000 10,000.00 Additional Projects for DND-DPWH Convergence Program

133. Concreting of Naval Station Romulo Espaldon (NSRE) Road Networks at NSRE, Bagong Calarian, Zamboanga City (TL=1,066.66 m)

Construction of Concrete Road

Brgy. Bagong Calarian,

Zamboanga City

Lane Km 2.13 Plans and POW GAA 2021 40,000.00 40,000 80,000.00 Additional Projects for DND-DPWH Convergence Program

134. Concreting of Access Road Leading to Naval Station Romulo Espaldon (NSRE) Main Gate (Lagoon) at Camp Navarro Calarian, Zamboanga City (TL=320.00 m)

Construction of Concrete Road

Camp Navarro, Upper Calarian, Zamboanga City

Lane Km 0.64 Plans and POW GAA 2021 12,000.00 12,000 24,000.00 Additional Projects for DND-DPWH Convergence Program

135. Construction of Naval Station Romulo Espaldon (NSRE) Staging Area, Bagong Calarian, Zamboanga City

Construction of Multi-purpose Building

Brgy. Bagong Calarian,

Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 30,000.00 30,000 60,000.00 Additional Projects for DND-DPWH Convergence Program

136. Repair of Naval Supply Depot Zamboanga (NSDZ) - Warehouse, Bagong Calarian, Zamboanga City

Construction of Multi-purpose Building

Brgy. Bagong Calarian,

Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 3,000.00 3,000 6,000.00 Additional Projects for DND-DPWH Convergence Program

137. Construction of Naval Station Romulo Espaldon (NSRE) Warehouse, Bagong Calarian, Zamboanga City

Construction of Multi-purpose Building

Brgy. Bagong Calarian,

Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 4,000.00 4,000 8,000.00 Additional Projects for DND-DPWH Convergence Program

138. Construction of Naval Station Rio Hondo (NSRH) Warehouse, Rio Hondo, Zamboanga City

Construction of Multi-purpose Building

Brgy. Rio Hondo, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 4,000.00 4,000 8,000.00 Additional Projects for DND-DPWH Convergence Program

139. Construction of SPU Boat Shed at Naval Station Romulo Espaldon (NSRE), Bagong Calarian, Zamboanga City

Construction of Multi-purpose Building

Brgy. Bagong Calarian,

Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 2,000.00 2,000 4,000.00 Additional Projects for DND-DPWH Convergence Program

140. Repair of Ensign Majini Pier at Naval Station Romulo Espaldon (NSRE), Bagong Calarian, Zamboanga City

Construction of Multi-purpose Building

Brgy. Bagong Calarian,

Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 50,000.00 50,000 100,000.00 Additional Projects for DND-DPWH Convergence Program

141. Installation of Naval Station Romulo Espaldon (NSRE) Break Water at Bagong Calarian, Zamboanga City

Construction of Multi-purpose Building

Brgy. Bagong Calarian,

Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 200,000.00 200,000 400,000.00 Additional Projects for DND-DPWH Convergence Program

Chapter 19-1-DPWH IX-ZC DEO 1LDPage 12 of 36

Page 511: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

LGU Proponent RemarksMode of

Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

142. Extension of Naval Station Rio Hondo (NSRH) Pier at Rio Hondo, Zamboanga City

Construction of Multi-purpose Building

Brgy. Bagong Calarian,

Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 50,000.00 50,000 100,000.00 Additional Projects for DND-DPWH Convergence Program

143. Construction of Naval Station Romulo Espaldon (NSRE) Covered Court, Bagong Calarian, Zamboanga City

Construction of Multi-purpose Building

Brgy. Bagong Calarian,

Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 3,000.00 3,000 6,000.00 Additional Projects for DND-DPWH Convergence Program

144. Renovation of Littoral Monitoring Station (LMS) Zamboanga at NSRE, Bagong Calarian, Zamboanga City

Construction of Multi-purpose Building

Brgy. Bagong Calarian,

Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 4,000.00 4,000 8,000.00 Additional Projects for DND-DPWH Convergence Program

145. Construction of Hardened Typhoon Shelter Hangar of Rotary Aircraft, Edwin Andrews Air Base, Zamboanga City

Construction of Multi-purpose Building

Brgy. Sta. Maria, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 33,000.00 33,000 66,000.00 Additional Projects for DND-DPWH Convergence Program

146. Construction of Hardened Typhoon Shelter Hangar for UAV Aircraft, Edwin Andrews Air Base, Zamboanga City

Construction of Multi-purpose Building

Brgy. Sta. Maria, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 65,000.00 65,000 130,000.00 Additional Projects for DND-DPWH Convergence Program

147. Construction of Parking Ramp, Edwin Andrews Air Base, Zamboanga City

Construction of Other Facilities

Brgy. Sta. Maria, Zamboanga City

Number of Facilities

1.00 Plans and POW GAA 2021 177,000.00 177,000 354,000.00 Additional Projects for DND-DPWH Convergence Program

148. Construction of Headquarters Building (Group), Hill 900, Zamboanga City

Construction of Multi-purpose Building

Camp Susana, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 18,900.00 18,900 37,800.00 Additional Projects for DND-DPWH Convergence Program

149. Construction of Command and Control Center for Radar 1, Hill 900, Zamboanga City

Construction of Multi-purpose Building

Camp Susana, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 15,000.00 15,000 30,000.00 Additional Projects for DND-DPWH Convergence Program

150. Construction of Command and Control Center for Radar 2, Hill 900, Zamboanga City

Construction of Multi-purpose Building

Camp Susana, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 10,000.00 10,000 20,000.00 Additional Projects for DND-DPWH Convergence Program

151. Construction of Helipad (2 units), Hill 900, Zamboanga City

Construction of Multi-purpose Building

Camp Susana, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 2,000.00 2,000 4,000.00 Additional Projects for DND-DPWH Convergence Program

152. Construction of Supply Storage (Standard), Hill 900, Zamboanga City

Construction of Multi-purpose Building

Camp Susana, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 8,000.00 8,000 16,000.00 Additional Projects for DND-DPWH Convergence Program

Chapter 19-1-DPWH IX-ZC DEO 1LDPage 13 of 36

Page 512: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

LGU Proponent RemarksMode of

Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

153. Construction of Motorpool Facility, Hill 900, Zamboanga City

Construction of Multi-purpose Building

Camp Susana, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 3,000.00 3,000 6,000.00 Additional Projects for DND-DPWH Convergence Program

154. Construction of Fuel Storage Facility, Hill 900, Zamboanga City

Construction of Multi-purpose Building

Camp Susana, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 3,000.00 3,000 6,000.00 Additional Projects for DND-DPWH Convergence Program

155. Construction of Medical/Dental Facility, Hill 900, Zamboanga City

Construction of Multi-purpose Building

Camp Susana, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 10,000.00 10,000 20,000.00 Additional Projects for DND-DPWH Convergence Program

156. Construction of Troop Housing for Officers, Hill 900, Zamboanga City

Construction of Multi-purpose Building

Camp Susana, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 15,000.00 15,000 30,000.00 Additional Projects for DND-DPWH Convergence Program

157. Construction of Troop Housing for Enlisted Personnels, Hill 900, Zamboanga City

Construction of Multi-purpose Building

Camp Susana, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 10,000.00 10,000 20,000.00 Additional Projects for DND-DPWH Convergence Program

158. Construction of Multipurpose Hall, Hill 900, Zamboanga City

Construction of Multi-purpose Building

Camp Susana, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 5,000.00 5,000 10,000.00 Additional Projects for DND-DPWH Convergence Program

159. Construction of Road Network and Drainage System, Hill 900, Zamboanga City (TL=8,000.00m)

Construction of Concrete Road (with Drainage Structure)

Camp Susana, Zamboanga City

Lane Km 16.00 Plans and POW GAA 2021 352,000.00 352,000 704,000.00 Additional Projects for DND-DPWH Convergence Program

160. Construction of Water System, Hill 900, Zamboanga City

Construction of Multi-purpose Building

Camp Susana, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 10,000.00 10,000 20,000.00 Additional Projects for DND-DPWH Convergence Program

161. Construction of Task Force Zamboanga (TFZ) Commander 1ID Quarter, Camp Arturo Enrile, Malagutay, Zamboanga City

Construction of Multi-purpose Building

Brgy. Malagutay, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 5,000.00 5,000 10,000.00 Additional Projects for DND-DPWH Convergence Program

162. Improvement of Task Force Zamboanga (TFZ) Admin Building, Camp Arturo Enrile, Malagutay, Zamboanga City

Rehabilitation / Major Repair of Multi Purpose Building

Brgy. Malagutay, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 10,000.00 10,000 20,000.00 Additional Projects for DND-DPWH Convergence Program

163. Concreting of Road Inside Camp Arturo Enrile, Malagutay, Zamboanga City (TL=186.67m)

Construction of Concrete Road

Brgy. Malagutay, Zamboanga City

Lane Km 0.19 Plans and POW GAA 2021 3,500.00 3,500 7,000.00 Additional Projects for DND-DPWH Convergence Program

Chapter 19-1-DPWH IX-ZC DEO 1LDPage 14 of 36

Page 513: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

LGU Proponent RemarksMode of

Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

164. Construction of Gate 1, Camp Arturo Enrile, Malagutay, Zamboanga City

Construction of Other Facilities

Brgy. Malagutay, Zamboanga City

Number of Facilities

1.00 Plans and POW GAA 2021 1,500.00 1,500 3,000.00 Additional Projects for DND-DPWH Convergence Program

165. Repair/Improvement of Task Force Zamboanga (TFZ) ACP Building, Camp Arturo Enrile, Malagutay, Zamboanga City

Rehabilitation / Major Repair of Multi Purpose Building

Brgy. Malagutay, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 5,000.00 5,000 10,000.00 Additional Projects for DND-DPWH Convergence Program

166. Construction of Task Force Zamboanga (TFZ) Office Building, Camp Arturo Enrile, Malagutay, Zamboanga City

Construction of Multi-purpose Building

Brgy. Malagutay, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 8,000.00 8,000 16,000.00 Additional Projects for DND-DPWH Convergence Program

167. Repair/Rehabilitation of First Army Training Group (ATG) - Admin Building, Camp Arturo Enrile, Malagutay, Zamboanga City

Rehabilitation / Major Repair of Multi Purpose Building

Brgy. Malagutay, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 4,000.00 4,000 8,000.00 Additional Projects for DND-DPWH Convergence Program

168. Construction of Two (2) Storey Officers' Barracks, Camp Arturo Enrile, Malagutay, Zamboanga City

Construction of Multi-purpose Building

Brgy. Malagutay, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 14,000.00 14,000 28,000.00 Additional Projects for DND-DPWH Convergence Program

169. Construction of Two (2) Storey Female Barracks, Camp Arturo Enrile, Malagutay, Zamboanga City

Construction of Multi-purpose Building

Brgy. Malagutay, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 12,000.00 12,000 24,000.00 Additional Projects for DND-DPWH Convergence Program

170. Construction of TFZ Motor Pool (Car Park), Camp Arturo Enrile, Malagutay, Zamboanga City

Construction of Other Facilities

Brgy. Malagutay, Zamboanga City

Number of Facilities

1.00 Plans and POW GAA 2021 5,000.00 5,000 10,000.00 Additional Projects for DND-DPWH Convergence Program

171. Construction of TFZ Gym Building, Camp Arturo Enrile, Malagutay, Zamboanga City

Construction of Multi-purpose Building

Brgy. Malagutay, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 5,000.00 5,000 10,000.00 Additional Projects for DND-DPWH Convergence Program

172. 66. Repair/Improvement of Camp Gen Arturo T. Enrile Perimeter Fence, Malagutay, Zamboanga City

Construction of Other Facilities

Brgy. Malagutay, Zamboanga City

Number of Facilities

1.00 Plans and POW GAA 2021 30,000.00 30,000 60,000.00 Additional Projects for DND-DPWH Convergence Program

173. 67. Repair of Finance Service Support Unit (FSSU) - Admin Building, Camp Arturo Enrile, Malagutay, Zamboanga City

Rehabilitation / Major Repair of Multi Purpose Building

Brgy. Malagutay, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 8,000.00 8,000 16,000.00 Additional Projects for DND-DPWH Convergence Program

174. Construction of Finance Service Support Unit (FSSU) - Maintenance Building, Camp Arturo Enrile, Malagutay, Zamboanga City

Construction of Multi-purpose Building

Brgy. Malagutay, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 13,000.00 13,000 26,000.00 Additional Projects for DND-DPWH Convergence Program

Chapter 19-1-DPWH IX-ZC DEO 1LDPage 15 of 36

Page 514: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

LGU Proponent RemarksMode of

Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

175. Construction of Finance Service Support Unit (FSSU) - Two (2) Storey Multipurpose Building (Transient), Camp Arturo Enrile, Malagutay, Zamboanga City

Construction of Multi-purpose Building

Brgy. Malagutay, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 15,000.00 15,000 30,000.00 Additional Projects for DND-DPWH Convergence Program

176. Concreting of Finance Service Support Unit (FSSU) Ammo Complex Road Network, Camp Arturo Enrile, Malagutay, Zamboanga City (TL=3,733.33m)

Construction of Concrete Road

Brgy. Malagutay, Zamboanga City

Lane Km 3.73 Plans and POW GAA 2021 70,000.00 70,000 140,000.00 Additional Projects for DND-DPWH Convergence Program

177. Repair of Finance Service Support Unit (FSSU) Bachelors' Officers Quarter (BOQ), Camp Arturo Enrile, Malagutay, Zamboanga City

Rehabilitation / Major Repair of Multi Purpose Building

Brgy. Malagutay, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 1,500.00 1,500 3,000.00 Additional Projects for DND-DPWH Convergence Program

178. Construction of Finance Service Support Unit (FSSU) CO's (Commanding Officer) Quarter, Camp Arturo Enrile, Malagutay, Zamboanga City

Construction of Multi-purpose Building

Brgy. Malagutay, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 1,500.00 1,500 3,000.00 Additional Projects for DND-DPWH Convergence Program

179. Construction of Finance Service Support Unit (FSSU) - Two (2) Storey Multipurpose Building - Enlisted Personels Barrack, Camp Arturo Enrile, Malagutay, Zamboanga City

Construction of Multi-purpose Building

Brgy. Malagutay, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 15,000.00 15,000 30,000.00 Additional Projects for DND-DPWH Convergence Program

180. Construction of 1CAV Two (2) Storey Multipurpose Building (Barracks), Camp Arturo Enrile, Malagutay, Zamboanga City

Construction of Multi-purpose Building

Brgy. Malagutay, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 15,000.00 15,000 30,000.00 Additional Projects for DND-DPWH Convergence Program

181. Construction of 1CAV Admin Building, Camp Arturo Enrile, Malagutay, Zamboanga City

Construction of Multi-purpose Building

Brgy. Malagutay, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 8,000.00 8,000 16,000.00 Additional Projects for DND-DPWH Convergence Program

182. Construction of 1CAV Motorpool (Car park), Camp Arturo Enrile, Malagutay, Zamboanga City

Construction of Multi-purpose Building

Brgy. Malagutay, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 5,000.00 5,000 10,000.00 Additional Projects for DND-DPWH Convergence Program

183. Construction of 1CAV CO's (Commanding Officer) Quarter, Camp Arturo Enrile, Malagutay, Zamboanga City

Construction of Multi-purpose Building

Brgy. Malagutay, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 2,000.00 2,000 4,000.00 Additional Projects for DND-DPWH Convergence Program

184. Construction of Bridgade Headquarters - Enlisted Personnels' Barracks, Cabatangan, Zamboanga City

Construction of Multi-purpose Building

Brgy. Cabatangan, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 10,000.00 10,000 20,000.00 Additional Projects for DND-DPWH Convergence Program

185. Construction of Bridgade Headquarters - Officers Quarters, Cabatangan, Zamboanga City

Construction of Multi-purpose Building

Brgy. Cabatangan, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 15,000.00 15,000 30,000.00 Additional Projects for DND-DPWH Convergence Program

Chapter 19-1-DPWH IX-ZC DEO 1LDPage 16 of 36

Page 515: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

LGU Proponent RemarksMode of

Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

186. Construction of Bridgade Headquarters - Grandstand, Cabatangan, Zamboanga City

Construction of Multi-purpose Building

Brgy. Cabatangan, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 47,000.00 47,000 94,000.00 Additional Projects for DND-DPWH Convergence Program

187. Construction of Bridgade Headquarters - Warehouse, Cabatangan, Zamboanga City

Construction of Multi-purpose Building

Brgy. Cabatangan, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 10,000.00 10,000 20,000.00 Additional Projects for DND-DPWH Convergence Program

188. Construction of Bridgade Headquarters - Parking Shed/Path Walk, Cabatangan, Zamboanga City

Construction of Other Facilities

Brgy. Cabatangan, Zamboanga City

Number of Facilities

1.00 Plans and POW GAA 2021 2,000.00 2,000 4,000.00 Additional Projects for DND-DPWH Convergence Program

189. Construction of Bridgade Headquarters - Water Harvesting Facility, Cabatangan, Zamboanga City

Construction of Multi-purpose Building

Brgy. Cabatangan, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 10,000.00 10,000 20,000.00 Additional Projects for DND-DPWH Convergence Program

190. Rehabilitation/ Reconstruction of Bridgade Headquarters - Road Networks, Cabatangan, Zamboanga City (TL=960m)

Construction of Concrete Road

Brgy. Cabatangan, Zamboanga City

Lane Km 0.96 Plans and POW GAA 2021 18,000.00 18,000 36,000.00 Additional Projects for DND-DPWH Convergence Program

191. Construction Bridgade Headquarters - Civilian Employees Quarters, Cabatangan, Zamboanga City

Construction of Multi-purpose Building

Brgy. Cabatangan, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 15,000.00 15,000 30,000.00 Additional Projects for DND-DPWH Convergence Program

192. Construction of Bridgade Headquarters - Brigade Chapels, Cabatangan, Zamboanga City

Construction of Multi-purpose Building

Brgy. Cabatangan, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 10,000.00 10,000 20,000.00 Additional Projects for DND-DPWH Convergence Program

193. Construction of Bridgade Headquarters - Headquarters and Headquarters Company Admin Building, Cabatangan, Zamboanga City

Construction of Multi-purpose Building

Brgy. Cabatangan, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 5,000.00 5,000 10,000.00 Additional Projects for DND-DPWH Convergence Program

194. Construction of Bridgade Headquarters - Perimeter Lights, Cabatangan, Zamboanga City

Construction of Other Facilities

Brgy. Cabatangan, Zamboanga City

Number of Facilities

1.00 Plans and POW GAA 2021 5,000.00 5,000 10,000.00 Additional Projects for DND-DPWH Convergence Program

195. Construction of Bridgade Headquarters - Ammo Dumps, Cabatangan, Zamboanga City

Construction of Multi-purpose Building

Brgy. Cabatangan, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 6,500.00 6,500 13,000.00 Additional Projects for DND-DPWH Convergence Program

196. Construction of Bridgade Headquarters - Brigade Retraining Facilities (BRF) and Ground Development, Cabatangan, Zamboanga City

Construction of Other Facilities

Brgy. Cabatangan, Zamboanga City

Number of Facilities

1.00 Plans and POW GAA 2021 10,000.00 10,000 20,000.00 Additional Projects for DND-DPWH Convergence Program

Chapter 19-1-DPWH IX-ZC DEO 1LDPage 17 of 36

Page 516: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

LGU Proponent RemarksMode of

Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

197. Construction of Bridgade Headquarters - Garbade Collection Points/Material Recovery Facilities, Cabatangan, Zamboanga City

Construction of Other Facilities

Brgy. Cabatangan, Zamboanga City

Number of Facilities

1.00 Plans and POW GAA 2021 5,000.00 5,000 10,000.00 Additional Projects for DND-DPWH Convergence Program

198. Construction of Bridgade Headquarters - 10 Door Female Officers Quarters, Cabatangan, Zamboanga City

Construction of Multi-purpose Building

Brgy. Cabatangan, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 15,000.00 15,000 30,000.00 Additional Projects for DND-DPWH Convergence Program

199. Construction of Bridgade Headquarters - 60 Cap Female Barracks, Cabatangan, Zamboanga City

Construction of Multi-purpose Building

Brgy. Cabatangan, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 8,000.00 8,000 16,000.00 Additional Projects for DND-DPWH Convergence Program

200. Construction of Bridgade Headquarters - Reservoir (4 units), Cabatangan, Zamboanga City

Construction of Water Supply Systems

Brgy. Cabatangan, Zamboanga City

Number of Water Supply

Systems

1.00 Plans and POW GAA 2021 10,000.00 10,000 20,000.00 Additional Projects for DND-DPWH Convergence Program

201. Construction of Bridgade Headquarters - Commissary Building, Cabatangan, Zamboanga City

Construction of Multi-purpose Building

Brgy. Cabatangan, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 10,000.00 10,000 20,000.00 Additional Projects for DND-DPWH Convergence Program

202. Construction of Bridgade Headquarters - Parking Shed, Cabatangan, Zamboanga City

Construction of Other Facilities

Brgy. Cabatangan, Zamboanga City

Number of Facilities

1.00 Plans and POW GAA 2021 5,000.00 5,000 10,000.00 Additional Projects for DND-DPWH Convergence Program

203. Construction of Bridgade Headquarters - Brigade Training School (Admin Building) w/ Ground Development, Cabatangan, Zamboanga City

Construction of Multi-purpose Building

Brgy. Cabatangan, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 8,000.00 8,000 16,000.00 Additional Projects for DND-DPWH Convergence Program

204. Construction of HEADQUARTERS, 545th ENGINEER BATTALION - Enlisted Personnel Barracks, Malagutay, Zamboanga City

Construction of Multi-purpose Building

Brgy. Malagutay, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 25,000.00 25,000 50,000.00 Additional Projects for DND-DPWH Convergence Program

205. Construction of HEADQUARTERS, 545th ENGINEER BATTALION - Barracks for Officers, Malagutay, Zamboanga City

Construction of Multi-purpose Building

Brgy. Malagutay, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 35,000.00 35,000 70,000.00 Additional Projects for DND-DPWH Convergence Program

206. Construction of HEADQUARTERS, 545th ENGINEER BATTALION - EEMC Barracks, Malagutay, Zamboanga City

Construction of Multi-purpose Building

Brgy. Malagutay, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 15,000.00 15,000 30,000.00 Additional Projects for DND-DPWH Convergence Program

207. Construction of HEADQUARTERS, 545th ENGINEER BATTALION - Multipurpose Bldg, (Covered Court), Malagutay, Zamboanga City

Construction of Multi-purpose Building

Brgy. Malagutay, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 10,000.00 10,000 20,000.00 Additional Projects for DND-DPWH Convergence Program

Chapter 19-1-DPWH IX-ZC DEO 1LDPage 18 of 36

Page 517: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

LGU Proponent RemarksMode of

Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

208. Construction of HEADQUARTERS, 545th ENGINEER BATTALION - Warehouse, Malagutay, Zamboanga City

Construction of Multi-purpose Building

Brgy. Malagutay, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 6,000.00 6,000 12,000.00 Additional Projects for DND-DPWH Convergence Program

209. Construction of HEADQUARTERS, 545th ENGINEER BATTALION - Maintenance Buildin with Three (3) Bay, Malagutay, Zamboanga City

Construction of Multi-purpose Building

Brgy. Malagutay, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 3,500.00 3,500 7,000.00 Additional Projects for DND-DPWH Convergence Program

210. Construction of HEADQUARTERS, 545th ENGINEER BATTALION - Water System, Malagutay, Zamboanga City

Construction of Water Supply Systems

Brgy. Malagutay, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 10,000.00 10,000 20,000.00 Additional Projects for DND-DPWH Convergence Program

211. Construction of HEADQUARTERS, 545th ENGINEER BATTALION - Messhall, Malagutay, Zamboanga City

Construction of Multi-purpose Building

Brgy. Malagutay, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 3,500.00 3,500 7,000.00 Additional Projects for DND-DPWH Convergence Program

212. Construction of HEADQUARTERS, 545th ENGINEER BATTALION - Admin Bldg., Malagutay, Zamboanga City

Construction of Multi-purpose Building

Brgy. Malagutay, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 15,000.00 15,000 30,000.00 Additional Projects for DND-DPWH Convergence Program

213. Construction of HEADQUARTERS, 545th ENGINEER BATTALION - Parking Shed, Malagutay, Zamboanga City

Construction of Other Facilities

Brgy. Malagutay, Zamboanga City

Number of Facilities

1.00 Plans and POW GAA 2021 3,500.00 3,500 7,000.00 Additional Projects for DND-DPWH Convergence Program

214. Construction of Naval Forces Western Mindanao - MPAC Boathouse and Slipway at NAVFORWEM AOR, Bagong Calarian, Zamboanga City

Construction of Other Facilities

Brgy. Bagong Calarian,

Zamboanga City

Number of Facilities

1.00 Plans and POW GAA 2021 145,000.00 145,000 290,000.00 Additional Projects for DND-DPWH Convergence Program

215. Construction of Road Network inside Headquarters Marine Base Arturo Asuncion (HMBAA), Cabatangan, Zamboanga City (TL=1,600.00m)

Construction of Concrete Road

Brgy. Cabatangan, Zamboanga City

Lane Km 1.60 Plans and POW GAA 2021 30,000.00 30,000 60,000.00 Additional Projects for DND-DPWH Convergence Program

216. Repair of Marine Corps Force Development (MCFDC) Training Center Bldg. 1, Headquarters Marine Base Arturo Asuncion (HMBAA), Cabatangan, Zamboanga City

Rehabilitation / Major Repair of Multi Purpose Building

Brgy. Cabatangan, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 5,000.00 5,000 10,000.00 Additional Projects for DND-DPWH Convergence Program

217. Repair of Marine Corps Force Development (MCFDC) Training Center Bldg. 2, Headquarters Marine Base Arturo Asuncion (HMBAA), Cabatangan, Zamboanga City

Rehabilitation / Major Repair of Multi Purpose Building

Brgy. Cabatangan, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 5,000.00 5,000 10,000.00 Additional Projects for DND-DPWH Convergence Program

Chapter 19-1-DPWH IX-ZC DEO 1LDPage 19 of 36

Page 518: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

LGU Proponent RemarksMode of

Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

218. Construction of Marine Corps Force Development Center (MCFDC) Admin Building, Headquarters Marine Base Arturo Asuncion (HMBAA), Cabatangan, Zamboanga City

Construction of Multi-purpose Building

Brgy. Cabatangan, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 4,500.00 4,500 9,000.00 Additional Projects for DND-DPWH Convergence Program

219. Construction of Marine Corps Force Development Center (MCFDC) Instructor Barracks, Headquarters Marine Base Arturo Asuncion (HMBAA), Cabatangan, Zamboanga City

Construction of Multi-purpose Building

Brgy. Cabatangan, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 7,500.00 7,500 15,000.00 Additional Projects for DND-DPWH Convergence Program

220. Construction of Marine Corps Force Development Center (MCFDC) Student/Trainee Barracks, Headquarters Marine Base Arturo Asuncion (HMBAA), Cabatangan, Zamboanga City

Construction of Multi-purpose Building

Brgy. Cabatangan, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 7,500.00 7,500 15,000.00 Additional Projects for DND-DPWH Convergence Program

221. Construction of Two (2) Storey Multipurpose Building (Barracks), Headquarters Marine Base Arturo Asuncion (HMBAA), Cabatangan, Zamboanga City

Construction of Multi-purpose Building

Brgy. Cabatangan, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 15,000.00 15,000 30,000.00 Additional Projects for DND-DPWH Convergence Program

222. Construction of Liaison Building, Headquarters Marine Base Arturo Asuncion (HMBAA), Cabatangan, Zamboanga City

Construction of Multi-purpose Building

Brgy. Cabatangan, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 37,000.00 37,000 74,000.00 Additional Projects for DND-DPWH Convergence Program

223. Construction of Grandstand, Headquarters Marine Base Arturo Asuncion (HMBAA), Cabatangan, Zamboanga City

Construction of Multi-purpose Building

Brgy. Cabatangan, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 47,000.00 47,000 94,000.00 Additional Projects for DND-DPWH Convergence Program

224. Construction of Mess Hall, Headquarters Marine Base Arturo Asuncion (HMBAA), Cabatangan, Zamboanga City

Construction of Multi-purpose Building

Brgy. Cabatangan, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 5,800.00 5,800 11,600.00 Additional Projects for DND-DPWH Convergence Program

225. Costruction of Water System with Elevated Water Tank, Headquarters Marine Base Arturo Asuncion (HMBAA), Cabatangan, Zamboanga City

Construction of Water Supply Systems

Brgy. Cabatangan, Zamboanga City

Number of Water Supply

Systems

1.00 Plans and POW GAA 2021 50,000.00 50,000 100,000.00 Additional Projects for DND-DPWH Convergence Program

226. Construction of Motor Pool, Headquarters Marine Base Arturo Asuncion (HMBAA), Cabatangan, Zamboanga City

Construction of Other Facilities

Brgy. Cabatangan, Zamboanga City

Number of Facilities

1.00 Plans and POW GAA 2021 5,000.00 5,000 10,000.00 Additional Projects for DND-DPWH Convergence Program

227. Construction of Combat and Service Support Brigade (CSSBDE), Philippine Marine Corps - Female Barracks (2 Storey), Cabatangan, Zamboanga City

Construction of Multi-purpose Building

Brgy. Cabatangan, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 9,000.00 9,000 18,000.00 Additional Projects for DND-DPWH Convergence Program

Chapter 19-1-DPWH IX-ZC DEO 1LDPage 20 of 36

Page 519: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

LGU Proponent RemarksMode of

Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

228. Construction of Combat and Service Support Brigade (CSSBDE), Philippine Marine Corps - SNCO Barracks (2 Storey), Cabatangan, Zamboanga City

Construction of Multi-purpose Building

Brgy. Cabatangan, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 9,000.00 9,000 18,000.00 Additional Projects for DND-DPWH Convergence Program

229. Construction of Combat and Service Support Brigade (CSSBDE), Philippine Marine Corps - Mini Gym (2 Storey), Cabatangan, Zamboanga City

Construction of Multi-purpose Building

Brgy. Cabatangan, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 15,000.00 15,000 30,000.00 Additional Projects for DND-DPWH Convergence Program

230. Construction of Combat and Service Support Brigade (CSSBDE), Philippine Marine Corps - Two (2)Storey Enlisted Personnels' Barracks, Cabatangan, Zamboanga City

Construction of Multi-purpose Building

Brgy. Cabatangan, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 15,000.00 15,000 30,000.00 Additional Projects for DND-DPWH Convergence Program

231. Construction of Combat and Service Support Brigade (CSSBDE), Philippine Marine Corps - Married Officers' Quarters (MOQ) Barracks (1 Storey), Cabatangan, Zamboanga City

Construction of Multi-purpose Building

Brgy. Cabatangan, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 11,000.00 11,000 22,000.00 Additional Projects for DND-DPWH Convergence Program

232. Construction of Combat and Service Support Brigade (CSSBDE), Philippine Marine Corps - Headquarters (HQS) Admin Building and Officers' Quarters (2 Storey), Cabatangan, Zamboanga City

Construction of Multi-purpose Building

Brgy. Cabatangan, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 17,000.00 17,000 34,000.00 Additional Projects for DND-DPWH Convergence Program

233. Construction of Service Support Battalion, Philippine Marine Corps - HQS Admin Building (2 Storey), Cabatangan, Zamboanga City

Construction of Multi-purpose Building

Brgy. Cabatangan, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 15,000.00 15,000 30,000.00 Additional Projects for DND-DPWH Convergence Program

234. Construction of Service Support Battalion, Philippine Marine Corps - Enlisted Personnel Barracks (2 Storey), Cabatangan, Zamboanga City

Construction of Multi-purpose Building

Brgy. Cabatangan, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 15,000.00 15,000 30,000.00 Additional Projects for DND-DPWH Convergence Program

235. Construction of Service Support Battalion - Officers' Barracks (1 Storey), Cabatangan, Zamboanga City

Construction of Multi-purpose Building

Brgy. Cabatangan, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 5,000.00 5,000 10,000.00 Additional Projects for DND-DPWH Convergence Program

236. Construction of Service Support Battalion, Philippine Marine Corps - EOD Laboratory (1 Storey), Cabatangan, Zamboanga City

Construction of Multi-purpose Building

Brgy. Cabatangan, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 5,000.00 5,000 10,000.00 Additional Projects for DND-DPWH Convergence Program

237. Construction of Service Support Battalion, Philippine Marine Corps - K-9 Veterinary Clinic (1 Storey), Cabatanagan, Zamboanga City

Construction of Multi-purpose Building

Brgy. Cabatangan, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 5,000.00 5,000 10,000.00 Additional Projects for DND-DPWH Convergence Program

Chapter 19-1-DPWH IX-ZC DEO 1LDPage 21 of 36

Page 520: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

LGU Proponent RemarksMode of

Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

238. Construction of Service Support Battalion, Philippine Marine Corps - Company Headquarters Office (2 Storey), Cabatangan, Zamboanga City

Construction of Multi-purpose Building

Brgy. Cabatangan, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 45,000.00 45,000 90,000.00 Additional Projects for DND-DPWH Convergence Program

239. Construction of Inshore Boat Battalion, Philippine Marine Corps - HQS Admin Building (2 Storey), Upper Calarian, Zamboanga City

Construction of Multi-purpose Building

Brgy. Upper Calarian,

Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 17,000.00 17,000 34,000.00 Additional Projects for DND-DPWH Convergence Program

240. Construction of Inshore Boat Battalion, Philippine Marine Corps - Enlisted Personnel Barracks (3 Storey), Upper Calarian, Zamboanga City

Construction of Multi-purpose Building

Brgy. Upper Calarian,

Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 22,000.00 22,000 44,000.00 Additional Projects for DND-DPWH Convergence Program

241. Construction of Motor Transport Maintenance Battalion, Philippine Marine Corps - HQS Admin Building (2 Storey), Cabatangan, Zamboanga City

Construction of Multi-purpose Building

Brgy. Cabatangan, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 16,500.00 16,500 33,000.00 Additional Projects for DND-DPWH Convergence Program

242. Construction of Motor Transport Maintenance Battalion, Philippine Marine Corps - Enlisted Personnel Barracks (2 Storey), Cabatangan, Zamboanga City

Construction of Multi-purpose Building

Brgy. Cabatangan, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 15,000.00 15,000 30,000.00 Additional Projects for DND-DPWH Convergence Program

243. Construction of Motor Transport Maintenance Battalion, Philippine Marine Corps - Galley and Mess Hall (2 Storey), Cabatangan, Zamboanga City

Construction of Multi-purpose Building

Brgy. Cabatangan, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 13,000.00 13,000 26,000.00 Additional Projects for DND-DPWH Convergence Program

244. Construction of Motor Transport Maintenance Battalion, Philippine Marine Corps - Parking Bay for KM 450, KM240 and TCV, Cabatangan, Zamboanga City

Construction of Other Facilities

Brgy. Cabatangan, Zamboanga City

Number of Facilities

1.00 Plans and POW GAA 2021 20,000.00 20,000 40,000.00 Additional Projects for DND-DPWH Convergence Program

245. Construction of Assault Armor Battalion, Philippine Marine Corps - Enlisted Personnel Barracks of 75MC (1 Storey), Upper Calarian, Zamboanga City

Construction of Multi-purpose Building

Brgy. Upper Calarian

Zamboanga City

Number of Building

1.00 Plans and POW GAA 2021 5,000.00 5,000 10,000.00 Additional Projects for DND-DPWH Convergence Program

200,000.00 410,000.00 60,000.00 1,194,300.00 3,877,500.00 3,877,500.00 9,619,300.00 A. Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects -

Roads and Bridges - a. Local Roads -

246. Site Development of Sucabon(conc. Railings including lamp post)

Construction of Concrete Road

Sucabon, City Proper

Lane KM 1.00 Plans and POW GAA 2020 4 3,000.00 - 3,000.00

247. Concreting of Cabatangan Road, Cabatangan, Zamboanga City (TL=530.00 m)

Construction ofConcrete Road

Brgy. Cabatangan, Zamboanga City

Lane KM 1.06 Plans and POW GAA 20185,300.00 -

- 5,300.00 Repeating Project for No. 3

248. Concreting of Cabatangan Road, Cabatangan, Zamboanga City (TL=500.00 m)

Construction of Concrete Road

Brgy. Cabatangan, Zamboanga City

Lane KM 1.00 Plans and POW GAA 20195,300.00 5,300.00

- 10,600.00 Repeating Project for No. 2

249. Concreting of Galvez Drive, Sta. Maria, Zamboanga City (TL = 200.00 m)

Construction ofConcrete Road

Galvez Dr., Brgy. Sta. Maria,

Zamboanga City

Lane KM 0.40 Plans and POW GAA 20182,000.00

- 2,000.00 Repeating Project for No. 5

CSSP- Subtotal

Chapter 19-1-DPWH IX-ZC DEO 1LDPage 22 of 36

Page 521: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

LGU Proponent RemarksMode of

Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

250. Concreting of Galvez Drive, Sta. Maria, Zamboanga City (TL=200.00m)

Construction of Concrete Road

Galvez Dr., Brgy. Sta. Maria,

Zamboanga City

Lane KM 0.40 Plans and POW GAA 20192,000.00 2,000.00

- 4,000.00 Repeating Project for Mo. 4

251. Concreting of San Roque Road, San Roque, Zamboanga City (TL = 300.00 m)

Construction ofConcrete Road

Brgy. San Roque, Zamboanga City

Lane KM 0.60 Plans and POW GAA 20183,000.00

- 3,000.00 Repeating Project for No. 7

252. Concreting of San Roque Road, San Roque, Zamboanga City Sta.0+000 Sta.0+ 240 (TL = 240.00 m)

Construction of Concrete Road

Brgy. San Roque, Zamboanga City

Lane KM 0.48 Plans and POW GAA 2020 4

3,000.00 3,000.00

- 6,000.00 Repeating Project for No. 6

253. Concreting of road ( near Papitos Restaurant )at Jct. Forest Lake-Presa Mayor along Tumaga-Luyahan Road., Zamboanga City (TL=320.00 m)

Construction of Concrete Road

Forest Lake-Presa Mayor along

Tumaga-Luyahan Road, Zamboanga

City

Lane KM 0.64 Plans and POW GAA 2019

4,000.00

- 4,000.00

254. Concreting of road at Aliganga Drive,Tumaga (TL=320.00m)

Construction of Concrete Road

Alinganga Dr., Tumaga,

Zamboanga City

Lane KM 0.64 Plans and POW GAA 20194,000.00

- 4,000.00

255. Road Widening of Local Roads Connecting By-Pass Road, Zamboanga City (Sta. Maria Section) (TL = 3,500.00m)

Construction of Concrete Road

Sta. Maria, Zamboanga City

Lane KM 7.00 Plans and POW GAA 2019

45,614.00

- 45,614.00

256. Concreting of Perimeter Road inside Westmincom, Upper Calarian, Zamboanga City, Zamboanga del Sur (TL=850.00 m)

Construction ofConcrete Road

Brgy. Upper Calarian,

Zamboanga City

Lane KM 1.70 Plans and POW GAA 2019

8,500.00

- 8,500.00

257. Concreting of Road along Perimeter Fence along Phil. Airforce Security Outpost at EAAB/ZIA, Zamboanga City, Zamboanga del Sur (TL=1,293.00m)

Construction ofConcrete Road

EAAB/ZIA, Zamboanga City

Lane KM 2.59 Plans and POW GAA 2019

20,000.00

- 20,000.00

258. Construction of Farm-to-Market Road at Sitio Mountain View, Barangay Sinubong,Zamboanga City Sta.0 + 000 Sta. 0 + 800 (TL = 800.00 m)

Construction of Concrete Road

Brgy. Sinubong, Zamboanga City

Lane KM 1.60 Plans and POW GAA 2020 4

10,000.00 10,000.00

10,000.00 30,000.00

259. Road Widening at Maasin Road Sta.0+000 Sta. 3+ 261 (TL = 3,261.00 m)

Road Widening Brgy. Maasin, Zamboanga City

Lane KM 6.52 Plans and POW GAA 2020 440,770.00 40,770.00

40,770.00 122,310.00

260. Road Widening at Flamingo Road - Malagutay Sta.0+000 Sta.12 + 000 (TL = 12000.00 m)

Road Widening Brgy. Malagutay, Zamboanga City

Lane KM 24.00 Plans and POW GAA 2020 4151,560.00 151,560.00

151,560.00 454,680.00

261. Road Widening at Ayala-La Paz Road Sta.0+000 Sta.11+ 948 (TL = 11,948.00 m)

Road Widening Brgy. Maasin, Zamboanga City

Lane KM 23.90 Plans and POW GAA 2020 4149,355.00 149,355.00

149,355.00 448,065.00

262. Road Widening at Pamucutan Road Sta.0+000 Sta.12+ 650 (TL = 12,650.00 m)

Road Widening Brgy. Maasin, Zamboanga City

Lane KM 25.30 Plans and POW GAA 2020 4158,130.00 158,130.00

158,130.00 474,390.00

Chapter 19-1-DPWH IX-ZC DEO 1LDPage 23 of 36

Page 522: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

LGU Proponent RemarksMode of

Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

263. Concreting of San Roque Road, San Roque, Zamboanga City Sta.0+000 Sta.0+ 240 (TL = 240.00 m)

Construction of Concrete Road

Brgy. San Roque, Zamboanga City

Lane KM 0.48 Plans and POW GAA 2021 2

3,000.00

3,000.00 6,000.00

264. Site Development of Sucabon(conc. Railings including lamp post)

Construction of Concrete Road

Sucabon, City Proper

Lane KM 1.00 Plans and POW GAA 2020 23,000.00

3,000.00 6,000.00

265. Jct. San Roque - Gov. Ramos AveRoad Widening

Zamboanga City Lane KM Plans and POW GAA 20212 175,000.00

175,000.00 350,000.00

266. Mayor Vitaliano Agan Avenue - Gov. Ramos Road Road Opening

Zamboanga City Lane KM Plans and POW GAA 20212 59,500.00

59,500.00 119,000.00

267. Flamingo Rd. Malagutay - By-pass Road Road Widening

Zamboanga City Lane KM Plans and POW GAA 20212 168,000.00

168,000.00 336,000.00

268. Gov. Ramos - Luyahan Road Road Opening Zamboanga City Lane KM Plans and POW GAA 2021 2 53,000.00 53,000.00 106,000.00 269. Pasonanca - Lantawan -

Cabatangan Road Widening Zamboanga CityLane KM Plans and POW GAA 2021

2 125,000.00 125,000.00 250,000.00

270. Ayala - La Paz Rd. By-pass Rd. Road Widening Zamboanga City Lane KM Plans and POW GAA 2021 2 165,500.00 165,500.00 331,000.00 271. Maasin Rd. - By-pass Road Widening Zamboanga City Lane KM Plans and POW GAA 2021 2 45,000.00 45,000.00 90,000.00 272. Pamucutan Rd. - By-pass Rd. Road Widening Zamboanga City Lane KM Plans and POW GAA 2021 2 175,500.00 175,500.00 351,000.00

b. Local Bridge - - 273. Construction of Bridge (Spillway),

Brgy. Cabatangan, Zamboanga City Construction of Concrete Bridge

Brgy. Cabatangan, Zamboanga City

Numner of Bridge

1.00 Plans and POW GAA 2017 8,000.00 - 8,000.00

c. GAD Projects - - 274. Construction of 2 units of

Restroom, waiting shed and turn-outs along Zamboanga City By-pass road - Patalon Section

Construction of Other Building

Zamboanga City Number of Buildings

1.00 Plans and POW GAA 2020 4

5,000.00 5,000.00 5,000.00

5,000.00 20,000.00

275. Construction of 2 units of Restroom, waiting shed and turn-outs along Zamboanga City-Labuan Road - Caragasan

Construction of Other Building

Zamboanga City Number of Buildings

1.00 Plans and POW GAA 2020 4

4,500.00 4,500.00 4,500.00

4,500.00 18,000.00

276. Construction of 2 Bicycle Lanes (left and Right) along Zamboanga City By-Pass road with a road scale of 34.71994 km. Patalon Section Sta.0+000 Sta.0 + 500 (TL = 500.00 m)

Construction of Bicycle Lane

Zamboanga City Number of Projects

1.00 Plans and POW GAA 2020 4

5,000.00 5,000.00 5,000.00

5,000.00 20,000.00

277. Provision (1) unit safety and wellness facilities DPWH-IX, Regional Office Compounda. 2 Unit Treadmillsb. 2 Unit Stationary Bikesc. 3 Unit Wellness Mats

Construction of Multi Purpose Building

Zamboanga City Number of Buildings

1.00 Plans and POW GAA 2020 4

4,500.00 4,500.00 4,500.00

4,500.00 18,000.00

278. Construction of Waiting Shed, Restrooms and Turn-out at the following sections, viz;Patalon Section

Construction of Multi Purpose Building

Zamboanga City Number of Buildings

1.00 Plans and POW GAA 2020 4

2,000.00 2,000.00 2,000.00

2,000.00 8,000.00

Projects - - A2, A5 Projects - - (i) Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects - -

a. Construction of Flood Control - -

Chapter 19-1-DPWH IX-ZC DEO 1LDPage 24 of 36

Page 523: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

LGU Proponent RemarksMode of

Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

279. Feasibility Study and Master Plan for Flood Control Projects for Urban Core in Sta. Barbara

Feasibility Study Sta. Barbara, Zamboanga City

Plans and POW GAA 2020 412,000.00 12,000.00

12,000.00 36,000.00

280. Construction of Flood Control of the Urban Core in Zamboanga City to include pumping station & RROW (TL=1,200.00m)

Construction of Flood Mitigation Structure

Sta. Barbara, Zamboanga City

Ln.m. 1,200.00 Plans and POW GAA 2020 4

480,000.00 480,000.00

480,000.00 1,440,000.00

281. Construction of Drainage Facilities at Villahermosa Housing, Luyahan, Pasonanca, Zamboanga City (TL=800.00m)

Construction of Drainage Structure

Pasonanca, Zamboanga City

Ln.m. 800.00 Plans and POW GAA 2020 4

5,000.00 5,000.00

5,000.00 15,000.00

282. Construction of Drainage Facilities at Villahermosa Housing, Luyahan, Pasonanca, Zamboanga City

Construction of Drainage Structure

Brgy. Pasonanca, Zamboanga City

Ln.m. 4.16 Plans and POW GAA 2018

5,000.00

- 5,000.00

281. Construction of Flood Control at Sta. Maria Creek, Sta. Maria, Zamboanga City

Construction of Drainage Structure

Sta. Maria, Zamboanga City

Ln.m. 2.50 Plans and POW GAA 20183,000.00

- 3,000.00

282. Construction of Flood Control at Sta. Maria Creek, Sta. Maria, Zamboanga City Sta.0+194.62 Sta.0 + 400

Construction of Flood Mitigation Structure

Brgy. Sta. Maria, Zamboanga City

Ln.m. 205.38 Plans and POW GAA 2020 4

8,000.00 8,000.00

8,000.00 24,000.00

b. Drainage / Protection Works - - 283. Construction of Drainage System

and Outfall at RT Lim Boulevard, Campo Islam, Lower Calarian, Zamboanga City

Construction of Flood Mitigation Structure

RT Lim Boulevard, Campo Islam,

Lower Calarian, Zamboanga City

Ln.m. 133.40 Plans and POW GAA 2019

4,000.00

- 4,000.00

c. Multi-purpose Building - - 284. Repair/ Improvement of Dental

Building, Camp Arturo Enrile, Malagutay, Zamboanga City

Repair / Rehabilitation

Brgy. Malagutay, Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2020 45,000.00 5,000.00

5,000.00 15,000.00

285. Repair/ Improvement of Military Police Barracks , Camp Arturo Enrile, Malagutay, Zamboanga City

Repair / Rehabilitation

Brgy. Malagutay, Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2020 4

5,000.00 5,000.00

5,000.00 15,000.00

286. Construction of MPB at DPWH - Regional Office IX,Tumaga Zamboanga City

Construction of Multi Purpose Building

Brgy. Tumaga, Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2020 415,000.00 15,000.00

15,000.00 45,000.00

287. Construction of MPB (Dormitory) at Western Mindanao State University (WMSU), Normal Road, Zamboanga City

Construction of Multi Purpose Building

Zamboanga City Number of Buildings

1.00 Plans and POW GAA 2020 4

65,000.00 65,000.00

65,000.00 195,000.00

288. Construction of MPB (Dormitory) at Zamboanga State College of Marine Science and Technology (ZSCMST), Sta. Barbara St. Zamboanga City

Construction of Multi Purpose Building

Brgy. Sta. Barbara, Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2020 4

55,000.00 55,000.00

55,000.00 165,000.00

289. Construction of MPB (Dormitory) at Zamboanga City State Polytechnic College, R.T.Lim Boulevard, Zamboanga City

Construction of Other Building

R.T.Lim Boulevard, Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2020 4

60,000.00 60,000.00

60,000.00 180,000.00

290. Repair/Rehabilitation of Zamboanga Convention Center in Pasonanca, Zamboanga City

Repair / Rehabilitation

Brgy. Pasonanca, Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2020 450,000.00 50,000.00

50,000.00 150,000.00

Chapter 19-1-DPWH IX-ZC DEO 1LDPage 25 of 36

Page 524: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

LGU Proponent RemarksMode of

Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

291. Construction of MPB (Covered Court) TFZ, Camp, Enrile, Malagutay Zamboanga City

Construction of Multi Purpose Building

Brgy. Malagutay, Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2020 46,000.00 6,000.00

6,000.00 18,000.00

292. Repair of Western Mindanao Command Granstand, Camp Navarro, Upper Calarian,Zamboanga City

Repair / Rehabilitation

Brgy. Upper Calarian,

Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2020 4

2,500.00 2,500.00

2,500.00 7,500.00

293. Repair of Western Mindanao Command Badminton Court, Camp Navarro, Upper Calarian, Zamboanga City

Repair / Rehabilitation

Brgy. Upper Calarian,

Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2020 4

2,500.00 2,500.00

2,500.00 7,500.00

294. Repair of MOQ-Western Mindanao Command , Camp Navarro, Upper Calarian, Zamboanga City

Repair / Rehabilitation

Brgy. Upper Calarian,

Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2020 4

3,700.00 3,700.00

3,700.00 11,100.00

295. Repair/Rehabilitation of Three (3) Units Classrooms, Camp Enrile, Malagutay, Zamboanga City

Rehabilitation /Major Repair of

1-StoreyClassrooms

Camp Enrile, Brgy. Malagutay,

Zamboanga City

Number of1-Storey

Classrooms

1.00 Plans and POW GAA 2019

1,500.00

- 1,500.00

296. Repair/Rehabilitation of Multi-purpose Building (Senior Officers Quarters), Camp Don BasilioNavarro, Barangay Calarian, Zamboanga City

Rehabilitation /Major Repair ofMulti Purpose

Building

Camp Don Basilio Navarro, Brgy.

Calarian, Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2019

2,000.00

- 2,000.00

297. Repair/Rehabilitation of Multi-purpose Building (Advance Command Post Building), CampDon Basilio Navarro, Barangay Calarian, Zamboanga City

Rehabilitation /Major Repair ofMulti Purpose

Building

Camp Don Basilio Navarro, Brgy.

Calarian, Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2019

2,000.00

- 2,000.00

298. Repair/Rehabilitation of Multi-purpose Building (Officer's Clubhouse), Camp Don BasilioNavarro, Barangay Calarian, Zamboanga City

Rehabilitation /Major Repair ofMulti Purpose

Building

Camp Don Basilio Navarro, Brgy.

Calarian, Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2019

1,500.00

- 1,500.00

299. Construction of Multi-purpose Building (Enlisted Personnel Barracks), Camp Enrile, BarangayMalagutay, Zamboanga City

Construction of Multi Purpose Building

Camp Enrile, Brgy. Malagutay,

Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2019

5,000.00

- 5,000.00

300. Repair/Rehabilitation of Library and Administrative Buildings, Camp Enrile, BarangayMalagutay, Zamboanga City

Rehabilitation /Major Repair ofMulti Purpose

Building

Camp Enrile, Brgy. Malagutay,

Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2019

1,000.00

- 1,000.00

301. Repair/Rehabilitation of Multi-purpose Building (Enlisted Personnel Barracks 2), Camp Enrile, Barangay Malagutay, Zamboanga City

Rehabilitation /Major Repair ofMulti Purpose

Building

Camp Enrile, Brgy. Malagutay,

Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2019

2,500.00

- 2,500.00

302. Repair/Rehabilitation of Multi-purpose Building (Conference Building), Camp Batalla, RT Lim Boulevard, Zamboanga City

Rehabilitation /Major Repair ofMulti Purpose

Building

Camp Batalla, RT Lim Boulevard, Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2019

2,000.00

- 2,000.00

Chapter 19-1-DPWH IX-ZC DEO 1LDPage 26 of 36

Page 525: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

LGU Proponent RemarksMode of

Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

303. Repair/Rehabilitation of Multi-purpose Building, Camp Batalla, RT Lim Boulevard, Zamboanga City

Rehabilitation /Major Repair ofMulti Purpose

Building

Camp Batalla, RT Lim Boulevard, Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2019

5,000.00

- 5,000.00

304. Repair/Rehabilitation of Multi-purpose Building (Electronics and Communication Building), Camp Batalla, RT Lim Boulevard, Zamboanga City

Rehabilitation /Major Repair ofMulti Purpose

Building

Camp Batalla, RT Lim Boulevard, Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2019

1,500.00

- 1,500.00

305. Repair/Rehabilitation of Multi-purpose Building (Phil. Airforce Reservist Cadets Training Center), EAAB, Sta. Maria, Zamboanga City

Rehabilitation /Major Repair ofMulti Purpose

Building

Brgy. Sta. Maria, Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2019

2,000.00

- 2,000.00

306. Construction of Multi-purpose Building (Phil. Airforce Reservist Cadets Training Barracks), EAAB, Sta. Maria, Zamboanga City

Construction of Multi Purpose Building

Brgy. Sta. Maria, Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2019

10,000.00

- 10,000.00

307. Construction of Multi-purpose Building (Covered Court), Sinunuc Elementary School, Sinunuc, Zamboanga City

Construction of Multi Purpose Building

Brgy. Sinunuc, Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2019

10,000.00

- 10,000.00

308. Repair/Improvement of Campo Islam Multi-Purpose Building, Campo Islam (additional one bay),Zamboanga City

Construction of Multi Purpose Building

Campo Islam, Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2019

4,000.00 4,000.00 4,000.00

4,000.00 16,000.00

309. Construction of 2 Storey Multi-Purpose Building for PNP Public Safety College (PPSC), Pasonanca, Zamboanga City

Construction of Multi Purpose Building

Brgy. Pasonanca, Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2018

8,700.00 8,700.00

- 17,400.00

310. Construction of 2 Storey MPB at PPSC, Pasonanca, Zamboanga City

Construction of Multi Purpose Building

Brgy. Pasonanca, Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2020 4

8,700.00 8,700.00

8,700.00 26,100.00

311. Repair/Rehabilitation of MPB (Gymnasium) at Don Pablo Memorial High School

Construction of Multi Purpose Building

Sta. Maria, Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 201912,000.00 12,000.00 12,000.00

12,000.00 48,000.00

312. Construction of Covered Court with bleacher at San Roque, Zamboanga City

Construction of Multi Purpose Building

San Roque, Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2020 46,000.00

- 6,000.00

313. Construction of Covered Court with bleacher at Luyahan Housing Project Pasonanca, Zamboanga City

Construction of Multi Purpose Building

Luyahan Housing Project Pasonanca, Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2021

6,000.00

- 6,000.00

314. Repair/Rehabilitation of Zamboanga Convention Center in Pasonanca, Zamboanga City

Construction of Multi Purpose Building

Pasonanca, Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 202250,000.00

- 50,000.00

315. Construction of MPB (Covered Court) at Rio Hondo, Zamboanga City

Construction of Multi Purpose Building

Rio Hondo, Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2020 46,000.00 6,000.00

6,000.00 18,000.00

316. Construction of Multi-purpose Building (Weightlifting Training Center), Barangay Baliwasan, Zamboanga City, Zamboanga del Sur

Construction of Multi Purpose Building

Baliwasan, Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2017 22,000.00 - - - - 22,000.00

Chapter 19-1-DPWH IX-ZC DEO 1LDPage 27 of 36

Page 526: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

LGU Proponent RemarksMode of

Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

317. Repair/ Improvement of Military Police Barracks , Camp Arturo Enrile, Malagutay, Zamboanga City

Repair / Rehabilitation

Brgy. Malagutay, Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2021 5,000.00 5,000.00 5,000.00 15,000.00

318. Construction of MPB at DPWH - Regional Office IX,Tumaga Zamboanga City

Construction of Multi Purpose Building

Brgy. Tumaga, Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2021 15,000.00 15,000.00 15,000.00 45,000.00

319. Construction of MPB (Dormitory) at Western Mindanao State University (WMSU), Normal Road, Zamboanga City

Construction of Multi Purpose Building

Zamboanga City Number of Buildings

1.00 Plans and POW GAA 2021 65,000.00 65,000.00 65,000.00 195,000.00

320. Construction of MPB (Dormitory) at Zamboanga State College of Marine Science and Technology (ZSCMST), Sta. Barbara St. Zamboanga City

Construction of Multi Purpose Building

Brgy. Sta. Barbara, Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2021 55,000.00 55,000.00 55,000.00 165,000.00

321. Construction of MPB (Dormitory) at Zamboanga City State Polytechnic College, R.T.Lim Boulevard, Zamboanga City

Construction of Other Building

R.T.Lim Boulevard, Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2021 60,000.00 60,000.00 60,000.00 180,000.00

322. Repair/Rehabilitation of Zamboanga Convention Center in Pasonanca, Zamboanga City

Repair / Rehabilitation

Brgy. Pasonanca, Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2021 50,000.00 50,000.00 50,000.00 150,000.00

(ii) Local Infrastructure Program - - a. Construction of Flood Control - -

323. Construction/Rehabilitation of Drainage Facilities, Brgy. Baliwasan, Zamboanga City

Construction ofDrainage Structure

Brgy. Baliwasan, Zamboanga City

Ln.m. 250.00 Plans and POW GAA 20183,000.00

- 3,000.00

324. Construction/Rehabilitation of Drainage Facilities, Brgy. Camino Nuevo, Zamboanga City

Construction ofDrainage Structure

Brgy. CaminoNuevo, Zamboanga

City

Ln.m. 170.00 Plans and POW GAA 20182,000.00

- 2,000.00

b. Flood Control Structures/Facilities - - 325. Construction of Drainage Facilities

at San Roque, Zamboanga CityConstruction of

Drainage StructureBrgy. San Roque, Zamboanga City

Ln.m. 205.00 Plans and POW GAA 2018 - 3,000.00 - - -

- 3,000.00

326. Improvement on River Protection of Sucabon Creek, Brgy. Zone 2, Zamboanga City

Construction ofDrainage Structure

Brgy. Zone 2, Zamboanga City

Ln.m. 140.00 Plans and POW GAA 2018 - 2,000.00 - - -

- 2,000.00

327. Construction of Drainage Facilities at Southcom Village, Upper Calarian, Zamboanga City

Construction ofDrainage Structure

Brgy. Upper Calarian,

Zamboanga City

Ln.m. 290.00 Plans and POW GAA 2018 - 3,500.00 - - -

- 3,500.00

c. Drainage / Protection Works - - 328. Construction/Rehabilitation of

Drainage Facilities, Barangay Baliwasan, Zamboanga City

Rehabilitation / Major Repair of Drainage

Structure along Road

Brgy. Baliwasan, Zamboanga City

Ln.m. 250.00 Plans and POW GAA 2019

5,000.00

- 5,000.00

329. Construction/Rehabilitation of Drainage Facilities, Barangay Tumaga, Zamboanga City

Rehabilitation / Major Repair of Drainage

Structure along Road

Brgy. Tumaga, Zamboanga City

Ln.m. 628.04 Plans and POW GAA 2019

6,000.00

- 6,000.00

330. Construction/Rehabilitation of Drainage Facilities, Barangay Upper Calarian, Zamboanga City

Rehabilitation / Major Repair of Drainage

Structure along Road

Brgy. Upper Calarian,

Zamboanga City

Ln.m. 225.00 Plans and POW GAA 2019

4,500.00

- 4,500.00

a. Multipurpose/Facilities - -

Chapter 19-1-DPWH IX-ZC DEO 1LDPage 28 of 36

Page 527: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

LGU Proponent RemarksMode of

Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

331. Construction of 2 storey Multi-purpose Building (Staff House/Dormitory) at Zamboanga City Red Cross, Barangay Zone IV, Zamboanga City

Construction of Other Building

Brgy. Zone IV, Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2019

15,000.00

- 15,000.00

332. Construction of 3 Storey Multi-Purpose Building (Laboratory Building), Baliwasan Senior HighSchool, Brgy. Baliwasan, Zamboanga City

Construction of Multi Purpose Building

Brgy. Baliwasan, Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2019

15,000.00

- 15,000.00

333. Construction of 3 Storey Multi-Purpose Building (Laboratory Building), San Roque NationalHigh School, Brgy. San Roque, Zamboanga City

Construction of Multi Purpose Building

Brgy. San Roque, Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2019

15,000.00

- 15,000.00

334. Construction of 2 storey Multi-purpose Building (Home Management Building) at Don Pablo Lorenzo Memorial High School, Barangay Sta. Maria/San Jose Gusu, Zamboanga City

Rehabilitation /Major Repair ofMulti Purpose

Building

Brgy. Sta. Maria/San Jose

Gusu, Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2019

8,000.00

- 8,000.00

335. Construction of 2 storey Multi-purpose Building (Science and Computer Laboratory Building)at San Roque Elementary School, Barangay San Roque, Zamboanga City

Rehabilitation /Major Repair ofMulti Purpose

Building

Brgy. San Roque, Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2019

9,500.00

- 9,500.00

336. Rehabilitation of Multi-purpose Building (Red Cross Bodega) at Zamboanga City Red Cross, Barangay Zone IV, Zamboanga City

Rehabilitation /Major Repair ofMulti Purpose

Building

Brgy. Zone IV, Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2019

2,000.00

- 2,000.00

337. Construction of 2-storey Multi-Purpose Building (Training Center with Barracks) at PNP PublicSafety College, Pasonanca, Zamboanga City

Construction of Other Building

Brgy. Pasonanca, Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2019

12,000.00

- 12,000.00

338. Construction of Multi-Purpose Building (covered court) at Labuan CS, Labuan, Zamboanga City

Construction of Multi Purpose Building

Brgy. Labuan, Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2019

10,000.00

- 10,000.00

339. Repair of HQ and Training Facility, MIG9, CTIF, ISAFP, 90 Upper Calarian, Zamboanga City

Rehabilitation /Major Repair ofMulti Purpose

Building

Brgy. Upper Calarian,

Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2019

3,000.00

- 3,000.00

340. Construction of Multipurpose Building, Naval Intelligence and Security Group, Naval ForcesWestern Mindanao, Lower Calarian, Zamboanga City

Construction of Multi Purpose Building

Brgy. Lower Calarian,

Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2019

3,000.00

- 3,000.00

Chapter 19-1-DPWH IX-ZC DEO 1LDPage 29 of 36

Page 528: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

LGU Proponent RemarksMode of

Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

341. Repair and Maintenance of existing Forward Operating Base (FOB), Joint Special Operations Group HQ and Forward Operating Base (FOB),Camp Basilio Navarro, Upper Calarian, Zamboanga City

Rehabilitation /Major Repair ofMulti Purpose

Building

Brgy. Upper Calarian,

Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2019

1,000.00

- 1,000.00

342. Construction (Completion) of 3 storey Multipurpose Building at San Roque National High School, San Roque, Zamboanga City

Construction of Multi-Purpose Building

Brgy. San Roque, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2018 -

400.00

- 400.00

343. Construction of 1 storey Multipurpose Building (4 training rooms) at Camp Arturo Enrile, Malagutay, Zamboanga City

Construction of Multi-Purpose Building

Brgy. Malagutay, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2018 -

4,800.00

- 4,800.00

344. Construction of Multi-Purpose Building (Science Laboratory), Sto. Niño Elementary School, Sinunoc, Zamboanga City

Construction of Multi-Purpose Building

Brgy. Sinunoc, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2018 -

2,000.00

- 2,000.00

345. Rehabilitation of Multipurpose Building (Covered Court), Pasonanca, Zamboanga City

Construction of Multi-Purpose Building

Brgy. Pasonanca, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2018 - 1,000.00

- 1,000.00

346. Repair/Rehabilitation of Multi-Purpose Building at Don Pablo Memorial High School, Sta. Maria, Zamboanga City

Construction of Multi-Purpose Building

Brgy. Sta. Maria, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2018 -

10,000.00

- 10,000.00

347. Repair/Improvement of Campo Islam Multi-Purpose Building, Brgy. Campo Islam, Zamboanga City

Construction of Multi-Purpose Building

Brgy. Campo Islam, Zamboanga

City

Number of Building

1.00 Plans and POW GAA 2018 -

4,000.00

- 4,000.00

348. Construction Multi-Purpose Building (Student Center) at Zamboanga City State Polythecnic College, Brgy. Baliwasan, Zamboanga City

Construction of Multi-Purpose Building

Brgy. Baliwasan, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2018 -

4,000.00

- 4,000.00

349. Construction of a Multi-purpose Building, Zamboanga City

Construction of Multi-Purpose Building

Zamboanga City Number of Building

1.00 Plans and POW GAA 20185,000.00

- 5,000.00

350. Construction of MPB (Covered Court) at Brgy Rio Hondo, Zamboanga City

Const. of Multi-Purpose Buliding

Rio Hondo, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2017 6,000.00 - 6,000.00

351. Construction of 3-storey Multi Purpose Building at San Roque National High School, Brgy. San Roque, Zamboanga City, Zamboanga del Sur

Const. of Multi-Purpose Buliding

San Roque, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2017 18,000.00 - 18,000.00

352. Construction of 3-storey Multi Purpose Building (for Science Lab; Computer Lab; and Industrial Arts Lab)at Ayala Central School, Brgy. Ayala, Zamboanga City, Zamboanga del Sur

Const. of Multi-Purpose Buliding

Ayala, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2017 10,000.00 - 10,000.00

353. Construction of Multi-Purpose Building, Zone 1, Barangay San Roque, Zamboanga City

Const. of Multi-Purpose Buliding

Brgy. San Roque, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2017 2,000.00 - 2,000.00

b. Local Roads - -

Chapter 19-1-DPWH IX-ZC DEO 1LDPage 30 of 36

Page 529: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

LGU Proponent RemarksMode of

Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

354. Concreting of Road at Barangay Capisan, Zamboanga City (TL = 800.00 m)

Construction of Concrete Road

Brgy. Capisan, Zamboanga City

Lane KM 1.60 Plans and POW GAA 2020 4

10,000.00 10,000.00

10,000.00 30,000.00 Projects with the

355. Concreting of Road at Barangay Baluno, Zamboanga City (TL = 800.00 m)

Construction of Concrete Road

Brgy. Baluno, Zamboanga City

Lane KM 1.60 Plans and POW GAA 2020 4

10,000.00 10,000.00

10,000.00 30,000.00

356. Concreting of Road at Barangay Limpapa, Zamboanga City (TL = 800.00 m)

Construction of Concrete Road

Brgy. Limpapa, Zamboanga City

Lane KM 1.60 Plans and POW GAA 2020 4

10,000.00 10,000.00

10,000.00 30,000.00

357. Concreting of Road at Barangay Labuan, Zamboanga City (TL = 800.00 m)

Construction of Concrete Road

Brgy. Labuan, Zamboanga City

Lane KM 1.60 Plans and POW GAA 2020 410,000.00 10,000.00

10,000.00 30,000.00

358. Concreting of Road at Barangay Sinubong, Zamboanga City (TL = 800.00 m)

Construction of Concrete Road

Brgy. Sinubong, Zamboanga City

Lane KM 1.60 Plans and POW GAA 2020 410,000.00 10,000.00

10,000.00 30,000.00

359. Concreting of Road at Barangay Cawit, Zamboanga City (TL = 800.00 m)

Construction of Concrete Road

Brgy. Cawit, Zamboanga City

Lane KM 1.60 Plans and POW GAA 2020 4

10,000.00 10,000.00

10,000.00 30,000.00

360. Concreting of Road including Drainage Facilities at Dona Luisa Barangay Cabatangan, Zamboanga City (TL = 800.00 m)

Construction of Concrete Road

Brgy. Cabatangan, Zamboanga City

Lane KM 1.60 Plans and POW GAA 2020 4

10,000.00 10,000.00

10,000.00 30,000.00

361. Road Widening at San Jose-Navarro-CawaCawa, Zamboanga City (TL = 1,260.00 m)

Road Widening San Jose-Navarro-CawaCawa,

Zamboanga City

Lane KM 2.52 Plans and POW GAA 2020 4

15,780.00 15,780.00

15,780.00 47,340.00

362. Road Widening at Canelar Moret-San Jose Road, Zamboanga City (TL = 1,780.00 m)

Road Widening Canelar Moret-San Jose Road,

Zamboanga City

Lane KM 3.56 Plans and POW GAA 2020 4

22,230.00 22,230.00

22,230.00 66,690.00

363. Road Widening at Canelar Moret-Triplett-San Jose, Zamboanga City (TL = 1,930.00 m)

Road Widening Canelar Moret-Triplett-San Jose, Zamboanga City

Lane KM 3.86 Plans and POW GAA 2020 4

24,150.00 24,150.00

24,150.00 72,450.00

364. Road Widening at Canelar Moret, Zamboanga City (TL = 4,195.00 m)

Road Widening Brgy. Canelar, Zamboanga City

Lane KM 8.39 Plans and POW GAA 2020 4

52,425.00 52,425.00

52,425.00 157,275.00

365. Road Widening at Cabatangan-San Roque-Motorpool, Zamboanga City (TL = 1,550.00 m)

Road Widening Brgy. San Roque - Brgy. Cabatangan, Zamboanga City

Lane KM 3.10 Plans and POW GAA 2020 4

19,380.00 19,380.00

19,380.00 58,140.00

366. Road Widening at Alfredo Estrada Drive, San Roque-Uwak-Cabatangan, ZamboangaCity (TL = 2,885.00 m)

Road Widening Brgy. San Roque - Brgy. Cabatangan, Zamboanga City

Lane KM 5.77 Plans and POW GAA 2020 4

36,090.00 36,090.00

36,090.00 108,270.00

Chapter 19-1-DPWH IX-ZC DEO 1LDPage 31 of 36

Page 530: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

LGU Proponent RemarksMode of

Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

367. Construction of Road at Tumaga-Villa Sta. Maria, Zamboanga City (TL = 2,920.00 m)

Construction of Concrete Road

Brgy. Sta. Maria, Zamboanga City

Lane KM 5.84 Plans and POW GAA 2020 4

36,500.00 36,500.00

36,500.00 109,500.00

368. Construction of Road at Cabatangan Road - Talungon Drive, Zamboanga City (TL = 4,825.00 m)

Construction of Concrete Road

Brgy. Cabatangan, Zamboanga City

Lane KM 9.65 Plans and POW GAA 2020 4

60,300.00 60,300.00

60,300.00 180,900.00

369. Construction of Road at V. Agan Ave (Nuñez Ext.) - Veterans Ave., Zamboanga City (TL = 1,145.00 m)

Construction of Concrete Road

Veterans Ave., Zamboanga City

Lane KM 2.29 Plans and POW GAA 2020 4

41,300.00 41,300.00

41,300.00 123,900.00

370. Construction of Road at V. Agan Ave (Nuñez Ext.) - Mayor Jaldon., Zamboanga City (TL = 1,105.00 m)

Construction of Concrete Road

Mayor Jaldon., Zamboanga City

Lane KM 2.21 Plans and POW GAA 2020 4

13,800.00 13,800.00

13,800.00 41,400.00

371. Road Widening at Buenavista - Gov. Alvarez - Alfaro, Zamboanga City (TL = 15,500.00 m)

Road Widening Buenavista - Gov. Alvarez - Alfaro, Zamboanga City

Lane KM 31.00 Plans and POW GAA 2020 4

193,950.00 193,950.00

193,950.00 581,850.00

372. Road Widening at San Jose Road - San Roque Junction, Zamboanga City (TL = 13,880.00 m)

Road Widening Brgy. San Roque, Zamboanga City

Lane KM 27.76 Plans and POW GAA 2020 4

173,520.00 173,520.00

173,520.00 520,560.00

373. Road Widening at Putik - Tumaga, Zamboanga City (TL = 12,000.00 m)

Road Widening Brgy. Putik - Brgy. Tumaga,

Zamboanga City

Lane KM 24.00 Plans and POW GAA 2020 4

150,000.00 150,000.00

150,000.00 450,000.00

374. Construction of Road at Cabatangan Road, Zamboanga City (TL = 8,790.00 m)

Construction of Concrete Road

Brgy. Cabatangan, Zamboanga City

Lane KM 17.58 Plans and POW GAA 2020 4

109,860.00 109,860.00

109,860.00 329,580.00

375. Concreting of Road at Fortunato, Barangay La Paz, Zamboanga City

Construction ofConcrete Road

Brgy. La Paz, Zamboanga City

Lane KM 0.93 Plans and POW GAA 20198,000.00

- 8,000.00

376. Concreting of Road at Purok 3, Barangay Malagutay, Zamboanga City

Construction ofConcrete Road

Brgy. Malagutay, Zamboanga City

Lane KM 0.80 Plans and POW GAA 20194,000.00

- 4,000.00

377. Concreting of road at Barangay Baluno, Zamboanga City

Construction ofConcrete Road

Brgy. Baluno, Zamboanga City

Lane KM 0.62 Plans and POW GAA 20196,000.00

- 6,000.00

378. Concreting of road at Barangay Capisan, Zamboanga City

Construction ofConcrete Road

Brgy. Capisan, Zamboanga City

Lane KM 1.20 Plans and POW GAA 201910,000.00

- 10,000.00

379. Concreting of road at Barangay Cawit, Zamboanga City

Construction ofConcrete Road

Brgy. Cawit, Zamboanga City

Lane KM 0.64 Plans and POW GAA 20196,000.00

- 6,000.00

380. Concreting of road at Barangay Upper Pasonanca, Zamboanga City

Construction ofConcrete Road

Brgy. Upper Pasonanca,

Zamboanga City

Lane KM 0.55 Plans and POW GAA 20196,000.00

- 6,000.00

Chapter 19-1-DPWH IX-ZC DEO 1LDPage 32 of 36

Page 531: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

LGU Proponent RemarksMode of

Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

381. Concreating of Road at Brgy. Recodo at Zamboanga City

Construction ofConcrete Road

Brgy. Recodo, Zamboanga City

Lane KM 0.00 Plans and POW GAA 20195,000.00

- 5,000.00

382. Concreting of Road at Camp Arturo Enrile, Malagutay, Zamboanga City (TL = 1.00 KM)

Construction ofConcrete Road

Brgy. Malagutay, Zamboanga City

Lane KM 2.00 Plans and POW GAA 2018 - 10,000.00

- 10,000.00

383. Concreting of Road including drainage facilities at Carillo drive, Tumanga, Zamboanga City (TL = 0.40 KM)

Construction ofConcrete Road

Brgy. Tumanga, Zamboanga City

Lane KM 0.80 Plans and POW GAA 2018 -

4,000.00

- 4,000.00

384. Concreting of Road Including Drainage Facilities Tumaga-Aurora, Tumaga, Zamboanga City

Construction ofConcrete Road

Brgy. Tumaga, Zamboanga City

Lane KM 2.26 Plans and POW GAA 2018 - 11,300.00

- 11,300.00

385. Concreting of Road Leading to San Roque National High School (including drainage facilities), San Roque, Zamboanga City (TL = 1.50 KM)

Construction ofConcrete Road

Brgy. San Roque, Zamboanga City

Lane KM 3.00 Plans and POW GAA 2018 -

15,000.00

- 15,000.00

386. Concreting of Road, Malagutay, Zamboanga City (TL = 0.50 KM)

Construction ofConcrete Road

Brgy. Malagutay, Zamboanga City

Lane KM 1.00 Plans and POW GAA 2018 - 5,000.00

- 5,000.00

387. Road Concreting including drainage facilities, Brgy. Baluno, Zamboanga City (TL = 0.50 KM)

Construction ofConcrete Road

Brgy. Baluno, Zamboanga City

Lane KM 1.00 Plans and POW GAA 2018 - 5,000.00

- 5,000.00

388. Road Concreting, Brgy. Cawit, Zamboanga City (TL = 0.22 KM)

Construction ofConcrete Road

Brgy. Cawit, Zamboanga City

Lane KM 0.44 Plans and POW GAA 2018 - 3,000.00

- 3,000.00

389. Road Concreting, Brgy. Limpapa, Zamboanga City (TL = 0.30 KM)

Construction ofConcrete Road

Brgy. Limpapa, Zamboanga City

Lane KM 0.60 Plans and POW GAA 2018 - 4,000.00

- 4,000.00

390. Road Concreting, Brgy. Recodo, Zamboanga City (TL = 0.25 KM)

Construction ofConcrete Road

Brgy. Recodo, Zamboanga City

Lane KM 0.50 Plans and POW GAA 2018 - 3,000.00

- 3,000.00

391. Concreting of La Paz Pole Diutay-Pole Grande Road at Brgy La Paz Pole Diutay-Pole Grande, Zamboanga City (TL = 0.80 KM)

Road Upgrading Gravel to Paved

Brgy La Paz Pole Diutay-Pole

Grande, Zamboanga City

Lane KM 1.60 Plans and POW GAA 2017 8,000.00 - 8,000.00

392. Construction/Rehabilitation of Road at Shanty Town in Brgy Pasonanca, Zamboanga City (TL = 1.00 KM)

Const./ rehabilitation of road

Brgy. Pasonanca, Zamboanga City

Lane KM 2.00 Plans and POW GAA 2017 10,000.00 - 10,000.00

393. Concreting of Road in Brgy Pamucutan, Zamboanga City (TL = 0.40 KM)

Road Upgrading Gravel to Paved

Brgy. Pamucutan, Zamboanga City

Lane KM 0.80 Plans and POW GAA 2017 4,000.00 - 4,000.00

394. Concreting of Road along Jct. Luyahan-Pasonaca to Jct. By-Pass Road in Brgy Pasonanca, Zamboanga City (TL = 0.50 KM)

Road Upgrading Gravel to Paved

Brgy. Pasonanca, Zamboanga City

Lane KM 1.00 Plans and POW GAA 2017 5,000.00 - 5,000.00

395. Concreting of Cawit Baluno Road in Brgy Cawit/Baluno, Zamboanga City (TL = 0.40 KM)

Road Upgrading Gravel to Paved

Brgy. Cawit/Baluno,

Zamboanga City

Lane KM 0.80 Plans and POW GAA 2017 4,000.00 - 4,000.00

b. Local Bridge - - 396. Construction of Bridge (Spillway)

at Brgy Cabatangan, Zamboanga City

Construction of Concrete Bridge

Brgy. Cabatangan, Zamboanga City

Number of Bridges

1.00 Plans and POW GAA 2017 2,000.00 - 2,000.00

397. Construction/Improvement of Drainage Facilities at Southcom Village in Brgy Upper Calarian, Zamboanga City 1st LD (L = 500 m)

Construction/ improvement of Flood

mitigation structure

Brgy. Upper Calarian,

Zamboanga City

Ln.m. 500.00 Plans and POW GAA 2017 5,000.00

- - - -

- 5,000.00

Chapter 19-1-DPWH IX-ZC DEO 1LDPage 33 of 36

Page 532: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

LGU Proponent RemarksMode of

Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

398. Construction of Drainage System at Brgy Malagutay, Zamboanga City 1st LD (L = 200 m)

Construction/ improvement of Flood

mitigation structure

Brgy. Malagutay, Zamboanga City

Ln.m. 200.00 Plans and POW GAA 2017 2,000.00

- - - -

- 2,000.00

399. Construction of Drainage System at Brgy Canelar, Zamboanga City 1st LD (L = 200 m)

Construction/ improvement of Flood

mitigation structure

Brgy. Canelar, Zamboanga City

Ln.m. 200.00 Plans and POW GAA 2017 2,000.00

- - - -

- 2,000.00

400. Construction of Drainage System at Brgy Kampo Islam, Zamboanga City 1st LD (L = 200 m)

Construction/ improvement of Flood

mitigation structure

Brgy. Kampo Islam, Zamboanga

City

Ln.m. 200.00 Plans and POW GAA 2017 2,000.00

- - - -

- 2,000.00

401. Concreting of Road at Barangay Capisan, Zamboanga City (TL = 800.00 m)

Construction of Concrete Road

Brgy. Capisan, Zamboanga City

Lane KM 1.60 Plans and POW GAA 2021 10,000.00 10,000.00 20,000.00

402. Concreting of Road at Barangay Baluno, Zamboanga City (TL = 800.00 m)

Construction of Concrete Road

Brgy. Baluno, Zamboanga City

Lane KM 1.60 Plans and POW GAA 2021 10,000.00 10,000.00 20,000.00

403. Concreting of Road at Barangay Limpapa, Zamboanga City (TL = 800.00 m)

Road Widening Brgy. Limpapa, Zamboanga City

Lane KM 1.60 Plans and POW GAA 2021 10,000.00 10,000.00 20,000.00

404. Concreting of Road at Barangay Labuan, Zamboanga City (TL = 800.00 m)

Construction of Bicycle Lane

Brgy. Labuan, Zamboanga City

Lane KM 1.60 Plans and POW GAA 2021 10,000.00 10,000.00 20,000.00

405. Concreting of Road at Barangay Sinubong, Zamboanga City (TL = 800.00 m)

Road Widening Brgy. Sinubong, Zamboanga City

Lane KM 1.60 Plans and POW GAA 2021 10,000.00 10,000.00 20,000.00

406. Concreting of Road at Barangay Cawit, Zamboanga City (TL = 800.00 m)

Road Widening Brgy. Cawit, Zamboanga City

Lane KM 1.60 Plans and POW GAA 2021 10,000.00 10,000.00 20,000.00

407. Concreting of Road including Drainage Facilities at Dona Luisa Barangay Cabatangan, Zamboanga City (TL = 800.00 m)

Road Widening Brgy. Cabatangan, Zamboanga City

Lane KM 1.60 Plans and POW GAA 2021 10,000.00 10,000.00 20,000.00

408. Road Widening at San Jose-Navarro-CawaCawa, Zamboanga City (TL = 1,260.00 m)

Road Widening Zamboanga City Lane KM 2.52 Plans and POW GAA 2021 15,780.00 15,780.00 31,560.00

409. Road Widening at Canelar Moret-San Jose Road, Zamboanga City (TL = 1,780.00 m)

Road Widening Zamboanga City Lane KM 3.56 Plans and POW GAA 2021 22,230.00 22,230.00 44,460.00

410. Road Widening at Canelar Moret-Triplett-San Jose, Zamboanga City (TL = 1,930.00 m)

Road Widening Zamboanga City Lane KM 3.86 Plans and POW GAA 2021 24,150.00 24,150.00 48,300.00

411. Road Widening at Canelar Moret, Zamboanga City (TL = 4,195.00 m)

Road Widening Brgy. Canelar, Zamboanga City

Lane KM 8.39 Plans and POW GAA 2021 52,425.00 52,425.00 104,850.00

Chapter 19-1-DPWH IX-ZC DEO 1LDPage 34 of 36

Page 533: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

LGU Proponent RemarksMode of

Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

412. Road Widening at Cabatangan-San Roque-Motorpool, Zamboanga City (TL = 1,550.00 m)

Road Widening Brgy. San Roque - Brgy. Cabatangan, Zamboanga City

Lane KM 3.10 Plans and POW GAA 2021 19,380.00 19,380.00 38,760.00

413. Road Widening at Alfredo Estrada Drive, San Roque-Uwak-Cabatangan, ZamboangaCity (TL = 2,885.00 m)

Road Widening Brgy. San Roque - Brgy. Cabatangan, Zamboanga City

Lane KM 5.77 Plans and POW GAA 2021 36,090.00 36,090.00 72,180.00

414. Construction of Road at Tumaga-Villa Sta. Maria, Zamboanga City (TL = 2,920.00 m)

Road Widening Brgy. Sta. Maria, Zamboanga City

Lane KM 5.84 Plans and POW GAA 2021 36,500.00 36,500.00 73,000.00

415. Construction of Road at Cabatangan Road - Talungon Drive, Zamboanga City (TL = 4,825.00 m)

Construction of Concrete Road

Brgy. Cabatangan, Zamboanga City

Lane KM 9.65 Plans and POW GAA 2021 60,300.00 60,300.00 120,600.00

416. Construction of Road at V. Agan Ave (Nuñez Ext.) - Veterans Ave., Zamboanga City (TL = 1,145.00 m)

Construction of Concrete Road

Veterans Ave., Zamboanga City

Lane KM 2.29 Plans and POW GAA 2021 41,300.00 41,300.00 82,600.00

417. Construction of Road at V. Agan Ave (Nuñez Ext.) - Mayor Jaldon., Zamboanga City (TL = 1,105.00 m)

Construction of Concrete Road

Zamboanga City Lane KM 2.21 Plans and POW GAA 2021 13,800.00 13,800.00 27,600.00

418. Road Widening at Buenavista - Gov. Alvarez - Alfaro, Zamboanga City (TL = 15,500.00 m)

Road Widening Zamboanga City Lane KM 31.00 Plans and POW GAA 2021 193,950.00 193,950.00 387,900.00

419. Road Widening at San Jose Road - San Roque Junction, Zamboanga City (TL = 13,880.00 m)

Road Widening Brgy. San Roque, Zamboanga City

Lane KM 27.76 Plans and POW GAA 2021 173,520.00 173,520.00 347,040.00

420. Road Widening at Putik - Tumaga, Zamboanga City (TL = 12,000.00 m)

Road Widening Brgy. Putik - Brgy. Tumaga, Zamboanga City

Lane KM 24.00 Plans and POW GAA 2021 150,000.00 150,000.00 300,000.00

421. Construction of Road at Cabatangan Road, Zamboanga City (TL = 8,790.00 m)

Construction of Concrete Road

Brgy. Cabatangan, Zamboanga City

Lane KM 17.58 Plans and POW GAA 2021 109,860.00 109,860.00 219,720.00

422. Construction of Concrete Road at Malasiga, Talungun, Brgy. San Roque, Zamboanga City (TL=0.25m)

Construction of Concrete Road

Malasiga, Talungun, Brgy. San Roque, Zamboanga City

Lane Km. 0.50 Plans and POW GAA 2021 4,000.00 4,000.00 8,000.00

423. Construction of Concrete Road at Hipolito Dr., Brgy. San Roque, Zamboanga City (TL=0.25m)

Construction of Concrete Road

Hipolito Dr. Brgy. San Roque, Zamboanga City

Lane Km. 0.50 Plans and POW GAA 2021 4,000.00 4,000.00 8,000.00

424. Construction of Concrete Road at Estrada Dr., Brgy. San Roque, Zamboanga City (TL=0.25m)

Construction of Concrete Road

Estrada Dr., Brgy. San Roque, Zamboanga City

Lane Km. 0.50 Plans and POW GAA 2021 4,000.00 4,000.00 8,000.00

Chapter 19-1-DPWH IX-ZC DEO 1LDPage 35 of 36

Page 534: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Basis for Implementation

LGU Proponent RemarksMode of

Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

425. Construction of Concrete Road at Wingo (Pantano), Brgy. San Roque, Zamboanga City (TL=0.25m)

Construction of Concrete Road

Wingro (Pantano), Zamboanga City

Lane Km. 0.50 Plans and POW GAA 2021 4,000.00 4,000.00 8,000.00

426. Construction of Concrete Road at Zone I, Feliciano Dr., Zamboanga City (TL=0.25m)

Construction of Concrete Road

Zone I, Feliciano Dr., Zamboanga City

Lane Km. 0.50 Plans and POW GAA 2021 4,000.00 4,000.00 8,000.00

427. Construction of Concrete Road at Greenfield Home Owners, Zamboanga City (TL=0.25m)

Construction of Concrete Road

Greenfield Home Owners, Zamboanga City

Lane Km. 0.50 Plans and POW GAA 2021 4,000.00 4,000.00 8,000.00

` 3. Local Roads and Bridges - - a. Local Bridges - Construction / Repair / Rehabilitation /Improvement of Various Infrastructure including Local Projects - -

Repair/Rehabilitation/Reconstruction of Existing Bridge Taluksangay, Zamboanga City

Rehabilitation / Major Repair of Bridge

Brgy. Taluksangay, Zamboanga City

No. of Bridges 1.00 Plans and POW GAA 2021 30,000.00 30,000.00 60,000.00

- - c. Water Supply - -

429. Construction of Water Supply System Level II (Water Works) at Dulian-Cabatangan, Zamboanga City

Construction of Water Supply Systems

Brgy. Dulian-Cabatangan,

Zamboanga City

Number ofWaterSupply

Systems

1.00 Plans and POW GAA 2019

- 8,000.00 - -

- 8,000.00

Regionwide - - Local Infrastructure Program - - a. Multipurpose/Facilities - -

430. Improvement of Multipurpose Covered Court, Brgy. Recodo, Zamboanga City 1st LD

Improvement of Multi-Purpose building

Brgy. Recodo, Zamboanga City

Number of Multi-purpose

Building

1.00 Plans and POW GAA 2017 1,000.00 - - - -

- 1,000.00

431. Improvement of Multipurpose Covered Court, Brgy. Cabatangan, Zamboanga City 1st LD

Improvement of Multi-Purpose building

Brgy. Cabatangan, Zamboanga City

Number of Multi-purpose

Building

1.00 Plans and POW GAA 2017 1,700.00

- - - -

- 1,700.00

432. Improvement of Multipurpose Covered Court, Brgy. Sta. Barbara, Zamboanga City

Improvement of Multi-Purpose building

Brgy. Sta. Barbara, Zamboanga City

Number of Multi-purpose

Building

1.00 Plans and POW GAA 2017 1,000.00 - 1,000.00

433. Improvement of Multipurpose Covered Court, Brgy. Maasin, Zamboanga City

Improvement of Multi-Purpose building

Brgy. Maasin, Zamboanga City

Number of Multi-purpose

Building

1.00 Plans and POW GAA 2017 1,300.00 - 1,300.00

b. Local Road - - 434. Concreting of Road at Barangay

Malagutay, Zamboanga City (TL=160.00m)

Road Upgrading Gravel to Paved

Barangay Malagutay,

Zamboanga City

Lane KM 0.32 Plans and POW GAA 2017 2,000.00 - 2,000.00 #NAME?

c. Drainage/Protection Works - - 435. Construction of Multi-Segment

Comprehensive Drainage System, Brgy. San Jose Gusu, Zamboanga City 1st LD (TL=1,600.00m)

Construction of Drainage Structure

Brgy. San Jose Gusu, Zamboanga

City

Ln.m. 1,600.00 Plans and POW GAA 2017 10,000.00

- - - -

- 10,000.00

No. of Proj. = 127,000.00 132,000.00 412,114.00 2,618,800.00 4,651,285.00 4,651,285.00 12,592,484.00 - - - - - 1,609,621.00 2,942,392.00 557,763.00 5,879,016.00 10,722,701.00 10,722,701.00 32,434,194.00 - GRAND TOTAL

428.

Subtotal

Chapter 19-1-DPWH IX-ZC DEO 1LDPage 36 of 36

Page 535: Table of Contents (By Chapter)

Updated Zamboanga Peninsula Regional Development Investment Program (RDIP), 2017-2022

Agency: DPWH IXChapter 19: Accelerating Infrastructure Development

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

ZAMBOANGA CITY DEOZAMBOANGA CITY District 2 LEGISLATIVE DISTRICTa. OO1: Ensure Safe and Reliable National Road System

(i) Asset Preservation of National Roads1. Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development Management-4 (HDM-4)

a. Primary Road1. Pagadian - Zamboanga City Road Rehabilitation/

ReconstructionZamboanga City Lane KM Plans and POW GAA 9,000 73,800 - 82,800

2. Pagadian City- Zamboanga City Road K 1909 + 989 - K1909 + 1035, K1909 + 1042 - K 1911 + 314

Rehabilitation/ Reconstruction

Zamboanga City Lane KM Plans and POW GAA - - -

2. Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - - a. Primary Road - -

3. Preventive Maintenance of Road: Asphalt Overlay along Pagadian City - Zamboanga City Road K1859+200 - K1859+900, K1860+500 - K1860+800, K1865+400 - K1866+940, K1867+600 - K1868+400, K1868+550 - K1868+80, K1870+100 - K1871+200, K1889+000 - K1890+000, K1894+500 - K1897+950, K1897+900 - K1897+950, K1922+500 - K1923+100 (L = 4,971.00 m)

Reconstruction to Concrete Pavement Brgy. Quiniput,

Brgy. Guisao, Brgy. Putik, Brgy.Guiwan

along Pagadian City - Zamboanga

City Road, Zamboanga City

Lane KM Plans and POW GAA 2021 3 71,829 71,829 143,658

4. Preventive Maintenance of Road: Asphalt Overlay along Pagadian City - Zamboanga City Road K19000+000 - K1902+000, K1916+000 - K1917+500, K1927+600 - K1929+500 (L =5,425.00 m)

Reconstruction to Concrete Pavement

Brgy. Quiniput, Brgy. Guisao, Brgy. Putik, Brgy.Guiwan

along Pagadian City - Zamboanga

City Road, Zamboanga City

Lane KM Plans and POW GAA 2021 3 100,000 100,000 200,000

5. Pagadian - Zamboanga City Road, K1911+959 - K1912+140, K1912 + 421 - K1913+ 030, K1914+000 to K1915+261(TL = 1963.00 m)

Reconstruction from Concrete to Concrete

Brgy. Victoria - Manicahan,

Zamboanga CityLane KM

3.93

Plans and POW GAA 2021 3 12,500 12,500 25,000

6. Pagadian - Zamboanga City Road, K1909+989 - K1909+1035, K1909+1042 -K1911+314(TL = 1963.00 m)

Reconstruction from Concrete to Concrete Brgy. Sangali,

Zamboanga City Lane KM

2.74

Plans and POW GAA 2021 3 28,010 28,010 56,020

3. Preventive Maintenance based on Pavement Management System/Highway Development and Management-4 (HDM-4) - - a. Primary Road - -

7. Pagadian - Zamboanga City Road Preventive Maintenance of Road: Asphalt Overlay

Zamboanga City Lane KM Plans and POW GAA 11,500 11,500 11,500 34,500

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Page 536: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

8. Preventive Maintenance of Road: Asphalt Overlay along Pagadian City - Zamboanga City Road K1851+050 - K1855+000, K1856+000 - K1856+630, K1857+000 - K1857+500, K1858+600 - K1858+800, K1859+200 - K1859+900, K1860+200 - K1860+300, K1860+500 - K1860+800, K1875+900 - K1882+800, K1887+700 - K1888+600 (TL = 12,996.00)

Preventive Maintenance of Road: Asphalt Overlay

Brgy. Quiniput, Brgy. Curuan,

Brgy. Latuan, Brgy. Buenavista,

Tagasilay, Brgy. Muti, Brgy.

Taguiti, Brgy. Tigbalabag, Brgy. Mangusu, Brgy.

Vitali, Brgy. Licomo along

Pagadian City - Zamboanga City

Road, Zamboanga City

Lane KM Plans and POW GAA 2021 3 97,516 97,516 195,032

9. Preventive Maintenance of Road: Asphalt Overlay along Pagadian City - Zamboanga City Road K1890+000 - K1899+000, K1922+500 - K1923+100, K1933+800 - K1936+920 (TL = 9,174.00)

Preventive Maintenance of Road: Asphalt Overlay

Brgy. Quiniput, Brgy. Guisao, Brgy. Putik, Brgy.Guiwan

along Pagadian City - Zamboanga

City Road, Zamboanga City

Lane KM Plans and POW GAA 2021 3 82,200 82,200 164,400

4. Construction/Upgrading/Rehabilitation of Drainage along National Roads - - 10. Pagadian City-Zamboanga City Rd - K1933

+ 000 - K1934 + 200Improvement/ construction of drainage system(B/S)

Zamboanga City Lane KM Plans and POW GAA 20,000 - 20,000

5. Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - - 11. Pagadian City - Zamboanga City Road Construction of

Road Slope Protection Structure

Plans and POW GAA 200,000 - 200,000

(ii) Network Development - - 1. Improvement/Widening of National Roads - -

a. Primary Road - - 12. Pagadian - Zamboanga City Road Road Widening Zamboanga City Lane KM Plans and POW GAA 150,000 100,000 391,477 - 641,477 13. Pagadian - Zamboanga City Road

(Licomo to Lubigan Section) Road Widening Zamboanga City Lane KM Plans and POW GAA - -

14. Widening of Jct. Sta. Cruz to Coca-Cola including ROW Road Widening Lane KM Plans and POW GAA - -

a. ROW - - b. Civil Works - -

15. Road Widening along Pagadian - Zamboanga City Road K1906 + 029 - K1907 + 000 (L = 970.00 m)

Road Widening

Brgy Bolong along Pagadian City - Zamboanga City

Road, Zamboanga City Lane KM 1.94 Plans and POW GAA 2021

3 27,685 27,685 55,370

16. Road Widening along Pagadian - Zamboanga City Road (Licomo to Lubigan Section) K1869+000 - K1872+270 (L = 3,150.00 m)

Road Widening

Brgy. Tigbalabag - Matawis along Pagadian City - Zamboanga City

Road, Zamboanga City Lane KM 6.3 Plans and POW GAA 2021

3 120,000 120,000 240,000

Chapter 19-1-DPWH IX-ZC DEO 2LDPage 2 of 30

Page 537: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

17. Road Widening along Pagadian - Zamboanga City Road K1865 + 097.03 - K1867 + 500 (L = 2,402.00 m)

Road Widening

Brgy. Mangusu along Pagadian

City - Zamboanga City Road,

Zamboanga City Lane KM 4.8 Plans and POW GAA 2021

3 84,069 84,069 168,138

18. Road Widening along Pagadian - Zamboanga City Road K1867 + 500 - K1870 + 700 (L = 3,166.00 m)

Road Widening

Brgy. Tigbalabag along Pagadian

City - Zamboanga City Road,

Zamboanga City Lane KM 6.33 Plans and POW GAA 2021

3 110,810 110,810 221,620

19. Road Widening along Pagadian - Zamboanga City Road (Licomo to Lubigan Section) K1858 + 978 - K1861+ 424 (L = 2,496.00 m)

Road Widening

Brgy. Tictapul along Pagadian

City - Zamboanga City Road,

Zamboanga City Lane KM 4.99 Plans and POW GAA 2021

3 87,360 87,360 174,720

20. Road Widening along Pagadian - Zamboanga City Road (Package 1) K1905 + 810 - 1907 + 531 (L = 1,717.00 m)

Road Widening

Brgy. Tictapul along Pagadian

City - Zamboanga City Road,

Zamboanga City Lane KM 3.43 Plans and POW GAA 2021

3 125,371 125,371 250,742

21. Road Widening along Pagadian - Zamboanga City Road (Package 2) K1907 + 616 - 1909 + 1161 (L = 1,500.00 m)

Road Widening

Brgy. Sangali along Pagadian City - Zamboanga City

Road, Zamboanga City Lane KM 3 Plans and POW GAA 2021

3 125,371 125,371 250,742

22. Road Widening along Pagadian - Zamboanga City Road (Package 3) K1909 + 116 - K1910 + 561 w/ exception (L = 1,500.00 m)

Road Widening

Brgy. Sangali along Pagadian City - Zamboanga City

Road, Zamboanga City Lane KM 3 Plans and POW GAA 2021

3 125,371 125,371 250,742

23. Road Widening along Pagadian - Zamboanga City Road (Package 4) K1910 + 561 - K1911 + 965(L = 1,400.00 m)

Road Widening

Brgy. Sangali along Pagadian City - Zamboanga City

Road, Zamboanga City Lane KM 2.8 Plans and POW GAA 2021

3 125,092 125,092 250,184

24. Road Widening along Pagadian - Zamboanga City RoadK1872+270 - K1875+420 (L = 3,150.00 m)

Road Widening

Brgy. Sangali along Pagadian City - Zamboanga City

Road, Zamboanga City Lane KM 6.3 Plans and POW GAA 2021

3 120,000 120,000 240,000

25. Widening of Pagadian City - Zamboanga City Road ( Divisoria- Putik Section)K1931+400 to K1932+500 : L= 0.900 KM (TL = 1,098.00 m)

Road Widening

Brgy. Putik - Divisoria,

Zamboanga CityLane KM 2.2 Plans and POW GAA 2021

3 31,500 31,500 63,000

26. Widening of Pagadian City - Zamboanga City Road ( Sangali - Victoria Section)K1912+000 to K1914+000 : (TL = 1,906.00 m) Road Widening

Brgy. Sangali - Victoria,

Zambonga CityLane KM 3.81 Plans and POW GAA 2021

3 80,000 80,000 160,000

27. Widening /Rehabilitation of Bridge Approach at Cabaluay, Zamboanga City (Abut A.K1919 +550 to K1919 + 708.70 , Abut B. K1919 +737.30 to K1919 +780) (TL = 201.00 m) Road Widening

Brgy. Cabaluay, Zamboanga City

Lane KM 0.81 Plans and POW GAA 2021

3 9,500 9,500 19,000

Chapter 19-1-DPWH IX-ZC DEO 2LDPage 3 of 30

Page 538: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

28. Pagadian - Zamboanga City Road (Licomo to Lubigan Section) K1852+(-967) -K1857+000; (TL = 5,959.00 m)

Road Widening

Brgy. Licomo - Lubingan,

Zamboanga CityLane KM 0.64 Plans and POW GAA 2021

3 175,000 175,000 350,000

29. Pagadian - Zamboanga City Road (Licomo to Lubigan Section) K1884+000 -K1889+500; (TL = 5,465.00 m)

Road Widening

Brgy. Licomo - Lubingan,

Zamboanga CityLane KM 10.93 Plans and POW GAA 2021

3 192,500 192,500 385,000

30. Pagadian - Zamboanga City Road (Licomo to Lubigan Section) K1895+000 -K1900+500; (TL = 5,402.00 m)

Road Widening

Brgy. Licomo - Lubingan,

Zamboanga CityLane KM 10.8 Plans and POW GAA 2021

3 192,500 192,500 385,000

2. Construction of By-Passes/Diversion Roads, including ROW - - 31. Construction of Diversion Road including

ROW Zamboanga City (Cabaluay-Zambowood-Mampang Section), Packege 1 to 3

Zamboanga City Lane KM Plans and POW GAA 150,000 515,000 120,000 - 785,000

32. Zamboanga City Diversion Road (Zambowood-Mampang Section), Zamboanga City

Road Concreting Lane KM Plans and POW GAA 140,000 - 140,000

33. Vitali - Sibulao By-Pass Road Project (Alternate Road of N1) Package 1 to 3

Vitali, Zamboanga City Lane KM Plans and POW GAA 300,000 - - 300,000

34. Vitali-Sibulao- Bypass Road Project (Alternate Road of N1), package 4, Zamboanga City

Road Concreting Vitali, Zamboanga

City Lane KM Plans and POW GAA 86,000 - 86,000

35. Zamboanga City By-Pass Road, Culianan - Patalon Road, Construction of line canal and slope protection (grouted riprap)

Zamboanga City Lane KM Plans and POW GAA 120,000 - 120,000

a. Construction of Line Canal and Slope Protection (grouted riprap) Lane KM Plans and POW GAA - -

b. Widening of Roads including Bridges Lane KM Plans and POW GAA - - 36. Widening of Mampang to Jct. Veterans

Avenue including ROWRoad Concreting Zamboanga City Lane KM Plans and POW GAA - -

37. Construction of Zambowood to Mampang Coastal Road (Viaduct)K1927+900 to K1928+300

Road Concreting Zamboanga City Lane KM Plans and POW GAA - -

38. Construction of Mampang to Sta. Catalina (Coastal Road)K1928+30 to K1932+300

Road Concreting Zamboanga City Lane KM Plans and POW GAA 140,000 120,000 - 260,000

39. Construction of Buenavista - Bolong Bypass Road, Zamboanga City (Package 1)

Road WideningZamboanga City Lane KM Plans and POW GAA 320,700 320,700 641,400

40. Construction of Buenavista - Bolong Bypass Road, Zamboanga City (Package 2)

Road WideningZamboanga City Lane KM Plans and POW GAA 320,700 320,700 641,400

41. Construction of Buenavista - Bolong Bypass Road, Zamboanga City (Package 3)

Road WideningZamboanga City Lane KM Plans and POW GAA 320,700 320,700 641,400

42. Construction of Zamboanga City Diversion Road(Package 1)

Road WideningZamboanga City Lane KM Plans and POW GAA 139,850 139,850 279,700

43. Construction of Zamboanga City Diversion Road(Package 2)

Road WideningZamboanga City Lane KM Plans and POW GAA 139,850 139,850 279,700

Chapter 19-1-DPWH IX-ZC DEO 2LDPage 4 of 30

Page 539: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

44. Construction of Zamboanga City Diversion Road(Package 3)

Road WideningZamboanga City Lane KM Plans and POW GAA 139,850 139,850 279,700

45. Construction of Buenavista - Bolong Bypass Road, Zamboanga City (Package 3) K1895+923 -K1898+723 (L = 2,800.00 m)

Construction of Concrete Road

Brgy. Buenavista - Bolong K1895+923 - K1898+723, Zamboanga City

Lane KM 5.6 Plans and POW GAA 2021

3 150,000 150,000 300,000

46. Construction of Buenavista - Bolong Bypass Road, Zamboanga City (Package 4) K1894+200 -K1895+923, Sta.0+000 - Sta.0+030, (L = 1,720.00 m)

Construction of Concrete Road, Construction of Bridge, ROW Acquisition

Brgy. Buenavista - Bolong K1894+200 - K1895+923, Sta.0+000 - Sta.0+030 , Zamboanga City

Lane KM Sq.m. Sq.m.3.44 286.20 3,440.00Plans and POW GAA 2021

3 150,000 150,000 300,000

47. Construction of Zamboanga City Diversion Road (Cabaluay - Zambowood - Mampang Section) Zamboanga City Sta. 0+040 - Sta. 3+122.34 (L = 3,082.34m)

Construction of Concrete Road, ROW Acquisition

Brgy. Cabaluay - Zambowood - Mampang Sta. 0+040 - Sta. 3+122.34, Zamboanga City

Lane KM Sq.m. 6.17 29,898.70Plans and POW GAA 2021

3 170,000 170,000 340,000

48. Construction of Zamboanga City Diversion Road (Cabaluay - Zambowood - Mampang Section) Zamboanga City Sta. 3+122.34 -Sta. 6+642.34, STA.9+230 STA.9+250 (L = 3,520.00 m)

Construction of Concrete Road, Construction of Bridge

Brgy. Cabaluay - Zambowood - Mampang Sta. 3+122.34 - Sta. 6+642.34, STA.9+230 STA.9+250, Zamboanga City

Lane KM Sq.m.7.04 190.80Plans and POW GAA 2021

3 189,405 189,405 378,810

49. Construction of Zamboanga City Diversion Road (Cabaluay - Zambowood - Mampang Section) Zamboanga City STA.9+600 - STA.9+660 (L = 60.00 m)

Construction of Bridge, ROW Acquisition

Brgy. Cabaluay - Zambowood - Mampang STA.9+600 -STA.9+660, Zamboanga City

Sq.m. Sq.m.572.40 582.00

Plans and POW GAA 2021

3 148,215 148,215 296,430

50. Construction of Zamboanga City Diversion Road (Mampang - Sta. Catalina Section) Zamboanga City Sta. 10+096 - Sta. 10+396, STA.10+190 - STA.10+280 (L = 300.00 m)

Construction of Concrete Road, Construction of Bridge, ROW Acquisition

Brgy. Mampang - Sta. Catalina Sta. 10+096 - Sta. 10+396, STA.10+190 - STA.10+280, Zamboanga City

Lane KM Sq.m. Sq.m.0.60 858.60 2,910.00Plans and POW GAA 2021

3 238,044 238,044 476,088

51. onstruction of Sta. Catalina - Rio Hondo (Viaduct) STA.0+000 - STA.0+400 (L = 400.00 m)

Construction of Concrete Road

Brgy. Sta. Catalina - Rio Hondo STA.0+000 - STA.0+400 , Zamboanga City

Lane KM 0.8 Plans and POW GAA 2021

3 150,000 150,000 300,000

52. Construction of Mampang - Sta. Catalina (Veterans - Morning Breeze Section) Diversion Road (PACKAGE 1) K009+250 -K13+000 (L = 3,750.00 m)

Construction of Concrete Road

Brgy. Mampang - Sta. Catalina ( Veterans - Morning Breeze Section) K009+250 K13+000, Zamboanga City

Lane KM 7.5 Plans and POW GAA 2021

3 150,000 150,000 300,000

Chapter 19-1-DPWH IX-ZC DEO 2LDPage 5 of 30

Page 540: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

53. Construction of Zambowood to Mampang Coastal Road (Viaduct) K1927+900 to K1928+300 150,000.00 12 (L = 400.00 m)

Construction of Concrete Road

Brgy. Zambowood to Mampang K1927+900 to K1928+300 150,000.00 12. , Zamboanga City

Lane KM 0.8 Plans and POW GAA 2021

3 150,000 150,000 300,000

54. Construction of Buenavista - Bolong Bypass Road, Zamboanga City (Package 1) K1888+600 - K1890+600, K1887+700 - K1887+784, K1889+800 - K1889+842, K1888+600 - K1890+600 (L = 2000.00 m)

Construction of Concrete Road, Construction of Bridge, ROW Acquisition

Brgy. Buenavista - Bolong K1888+600 - K1890+600, K1887+700 - K1887+784, K1889+800 - K1889+842, K1888+600 - K1890+600 Zamboanga City

Lane KM Sq.m. Sq.m. Sq.m.0.40 801.36 400.68 19,400.00Plans and POW GAA 2021

3 147,000 147,000 294,000

55. Construction of Buenavista - Bolong Bypass Road, Zamboanga City (Package 2) K1890+600-K1894+200, K1890+800 K1890+874, K1890+600 K1894+200 (L = 3,600.00 m)

Construction of Concrete Road, Construction of Bridge, ROW Acquisition

Brgy. Buenavista - Bolong K1888+600 - K1890+600, K1887+700 - K1887+784, K1889+800 - K1889+842, K1888+600 - K1890+600 Zamboanga City

Lane KM Sq.m. Sq.m.0.60 858.60 2,910.00Plans and POW GAA 2021

3 215,000 215,000 430,000

56. Construction of By-Passes/Diversion Roads, including ROW ,Curuan Bridge No.1 (Coastal)(TL = 40.00 m)

Construction of Bridge

Brgy. Curuan, Zamboanga City

Square meter 381.6 Plans and POW GAA 20213 40,000 40,000 80,000

57. Construction of By-Passes/Diversion Roads, including ROW ,Curuan Bridge No.2 (Coastal) (TL = 20.00 m)

Construction of Bridge

Brgy. Curuan, Zamboanga City

Square meter 190.8 Plans and POW GAA 20213 20,000 20,000 40,000

58. Construction of By-Passes/Diversion Roads, including ROW ,Quiniput Bridge (Coastal), (TL = 30.00 m)

Construction of Bridge

Brgy. Quiniput, Zamboanga City

Square meter 286.2 Plans and POW GAA 20213 30,000 30,000 60,000

59. Construction of By-Passes/Diversion Roads, including ROW ,Bolong Bridge(Coastal), L=30ln.m. (TL = 30.00 m)

Construction of Bridge

Brgy. Bolong, Zambanga City

Square meter 286.2 Plans and POW GAA 20213 30,000 30,000 60,000

60. 124. Construction of By-Passes/Diversion Roads, including ROW ,Bolong Bridge(Coastal), (TL = 4000.00 m)

Construction of Concrete Road

Brgy. Bolong, Zambanga City

Lane KM 8 Plans and POW GAA 2021

3 50,000 50,000 100,000

61. Construction of Cabaluay to Zambowood Coastal Road (Alternative Highway Route)Cabaluay - Taluksangay K010+840 - K014+840 (TL = 4000.00 m)

Construction of Concrete Road

Brgy. Cabaluay - Zambowood - Taluksangay, Zamboanga City

Lane KM 8 Plans and POW GAA 2021

3 50,000 50,000 100,000

62. Widening of Mampang to Jct. Veterans Avenue including ROW (K1597+560 -K1600+560) (TL = 3000.00 m)

Road Widening Veterans Avenue, Zamboanga City

Lane KM 6 Plans and POW GAA 2021

3 150,000 150,000 300,000

Chapter 19-1-DPWH IX-ZC DEO 2LDPage 6 of 30

Page 541: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

63. Construction of Bridges (within Cabaluay to Zamboanga Coastal Road AlternativeHighway) - Cabaluay Bridge Coastal (1) (TL = 45.00 m)

Construction of Bridge

Brgy. Cabaluay, Zamboanga City

Square meter 429.3 Plans and POW GAA 2021

3 45,000 45,000 90,000

64. Construction of Bridges (within Cabaluay to Zamboanga Coastal Road AlternativeHighway) - Cabaluay Bridge Coastal (2) (TL = 20.00 m)

Construction of Bridge

Brgy. Cabaluay, Zamboanga City

Square meter 190.8 Plans and POW GAA 2021

3 20,000 20,000 40,000

65. 129. Construction of Bridges (within Cabaluay to Zamboanga Coastal Road AlternativeHighway) - Culianan Bridge (Coastal) (TL = 30.00 m)

Construction of Bridge

Brgy. Culianan, Zamboanga City

Square meter 286.2 Plans and POW GAA 2021

3 30,000 30,000 60,000

66. Construction of Bridges (within Cabaluay to Zamboanga Coastal Road AlternativeHighway) - Mercedes Bridge (Coastal) (TL = 60.00 m)

Construction of Bridge

Brgy. Mercedes, Zamboanga City

Square meter 572.4 Plans and POW GAA 2021

3 60,000 60,000 120,000

67. Construction of Divisoria - Tugbungan Diversion Road (PHASE 2) (TL = 2,200.00 m)

Construction of Concrete Road

Brgy. Tugbungan, Zamboanga City

Lane KM 4.4 Plans and POW GAA 20213 110,000 110,000 220,000

68. Construction of By-Passes/Diversion Roads, including ROW (ZC Integrated Bus Terminal to Zamboanga City By-Pass Road) Package 1 (TL = 2,100.00 m)

Construction of Concrete Road

Brgy. Divisoria, Zamboanga City

Lane KM 4.2 Plans and POW GAA 2021

3 105,000 105,000 210,000

69. Construction of Cabaluay to Zambowood Coastal Road (Alternative Highway Route)Taluksangay to Zambowood K014+840 - K018+840 (TL = 4,000.00 m)

Construction of Concrete Road

Brgy. Cabaluay - Zambowood - Taluksangay, Zamboanga City

Lane KM 8 Plans and POW GAA 2021

3 50,000 50,000 100,000

70. Construction of Sacol Island Circumferential Road (Inner BarangaysInter-Connection) Landang Gua to Landang Laum to Busay (TL = 3,000.00 m)

Construction of Concrete Road

Brgy. Landang Gua to Brgy. Landang Laum, Zamboanga City

Lane KM 6 Plans and POW GAA 2021

3 150,000 150,000 300,000

71. Construction of Sacol Island Circumferential Road (Inner BarangaysInter-Connection) Busay to Tambac to Landang Gua (TL = 3,000.00 m)

Construction of Concrete Road

Brgy. Busay - Tambac - Landang Gua, Zamboanga City

Lane KM 6 Plans and POW GAA 2021

3 150,000 150,000 300,000

72. 136. Construction of Sangali Diversion Road (Bungiao / Lamisahan including three (3)bridges) (TL = 100.00 m)

Construction of Bridge

Brgy. Bungiao - Lamisahan, Zamboanga City

Square meter 954 Plans and POW GAA 2021

3 100,000 100,000 200,000

73. Construction of Divisoria - Tugbungan Diversion Road (PHASE 1) (TL = 2,400.00 m)

Construction of Concrete Road

Brgy. Tugbungan - Divisoria, Zamboanga City

Lane KM 4.8 Plans and POW GAA 20213 120,000 120,000 240,000

74. Construction of Jct. MCLL Highway (Divisoria Section) to By-Pass Road (LumbanganSection) (TL = 1,700.00 m)

Construction of Concrete Road

Brgy. Tugbungan - Divisoria, Zamboanga City

Lane KM 3.4 Plans and POW GAA 2021

3 85,000 85,000 170,000

75. Widening of Jct. Sta. Cruz to Coca-Cola including ROW (TL = 356.00 m)

Road Widening Zamboanga City Lane KM 0.71 Plans and POW GAA 20213 100,000 100,000 200,000

Chapter 19-1-DPWH IX-ZC DEO 2LDPage 7 of 30

Page 542: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

76. Construction of Buenavista (Binaluy Bridge- reckoning start) to Bolong Coastal Road (Alternate Highway)K1887+277 to K1906+000

Road Concreting

- -

a. Buenavista to Curuan Section(w/ Bridge exceptions; Basagan & two(2) Curuan Bridges; Net Length=80Ln.m.K1887+277 to K1892+977

Ln.m. Plans and POW GAA 142,000 - 142,000

b. Lubigan to Mala Section w/ Bridge Exceptions: Mala Bridge = 20 Ln.m.K1898+677 - K1904+377

Ln.m. Plans and POW GAA 140,000 120,000 - 260,000

77. Construction of Buenavista (Binaluy Bridge- reckoning start) to Bolong Coastal Road (Alternate Highway)K1887+277 to K1906+000

Road Concreting

150,000 - 150,000

a. Curuan to Lubigan Section, (w/ Bridge exception; Quinipot Bridge 30 Ln.m.)K1892+977-K1898+677

Ln.m. Plans and POW GAA 140,000 - 140,000

b. Mala to Bolong Section (w/ Bridge exception - Bolong Bridge 20 Ln.m.)K1904+377-K1906+000

Ln.m. Plans and POW GAA 140,000 - 140,000

78. Construction of Bridges (RCDG) Type Bridge - - a. Basagan Bridge (Coastal), L=20 Ln.m. Bridge Ln.m. Plans and POW GAA - - b. Curuan Bridge No.1 (Coastal),L=40Ln.m.

BridgeLn.m. Plans and POW GAA - -

c. Curuan Bridge No.2 (Coastal),L=20Ln.m. BridgeLn.m. Plans and POW GAA - -

d. Quiniput Bridge (Coastal), L=30Ln.m. Bridge Ln.m. Plans and POW GAA - - e. Mala Bridge (Coastal), L=30Ln.m. Bridge Ln.m. Plans and POW GAA - - f. Bolong Bridge (Coastal), L=30Ln.m. Bridge Ln.m. Plans and POW GAA - -

79. Construction of Cabaluay to Zambowood Coastal Road (Alternative Highway Route)(w/ Bridge exceptions; Culianan, 2 Cabaluay Bridges & Mercedes)Bridge Length=155Ln.m.K1915+900 to K1929+900

170,000 - 170,000

a. Manicahan - Cabaluay K1915+900 to K1919+900 Lane KM Plans and POW GAA - -

b. Cabaluay - Taluksangay K1919+900 to K1923+900 Lane KM Plans and POW GAA - -

c. Taluksangay to ZambowoodK1923+900 to K1927+900 Lane KM Plans and POW GAA - -

80. Construction of Sacol Island Circumferential Road (Inner Barangays Inter-Connection)

- -

a. Landang Gua to Landang Laum to Busay- -

b. Busay to Tambac to Landang Gua - - 81. Construction of Bridges (within Cabaluay to

Zamboanga Coastal Road Alternative Highway)

- -

a. Cabaluay Bridge Coastal (1), L=45 Ln.m.Bridge Ln.m. Plans and POW GAA - -

Chapter 19-1-DPWH IX-ZC DEO 2LDPage 8 of 30

Page 543: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

b. Cabaluay Bridge Coastal (2), L=20 Ln.m.Bridge Ln.m. Plans and POW GAA - -

c. Culianan Bridge (Coastal),L=30 Ln.m. Bridge Ln.m. Plans and POW GAA - - d. Mercedes Bridge (Coastal), L=60 Ln.m.

Bridge Ln.m. Plans and POW GAA 50,000 - 50,000

82. Construction of Sta. Catalina - Rio Hondo (Viaduct) Bridge Ln.m. Plans and POW GAA - -

(iv) Construction and Maintenance of Bridges along National Roads - - 1. Construction of New Bridge - -

a. Along Pagadian - Zamboanga City Road - - 83. Togtobo Br. 2

Construction of New Bridge

Vitali, Zamboanga City Ln.m. Plans and POW GAA 25,000 - 25,000

2. Replacement of Damaged Permanent Bridges - - a. Along Pagadian - Zamboanga City Road - -

84. Togtobo Br. (BOO560MN) Replacement of Damaged Permanent Bridges

Vitali, Zamboanga City Ln.m. Plans and POW GAA 25,000 - 25,000

85. Vitali Br. (BOO561MN) Replacement of Damaged Permanent Bridges

Vitali, Zamboanga City Ln.m. Plans and POW GAA 95,000 - 95,000

86. Mala Br. (BOO567MN) Replacement of Damaged Permanent Bridges

Mialim, Zamboanga City Ln.m. Plans and POW GAA 21,000 21,000 21,000 63,000

4. Retrofitting/Strenghtening of Permanent Bridges - - I. Primary Road - -

87. San Bernardino Br. 2 (B01278MN) along Pagadian City-Zamboanga City Rd

Retrofitting/Strenghtening of Permanent Bridges

Tictapul, Zamboanga City Ln.m. Plans and POW GAA 5,200 - 5,200

Chapter 19-1-DPWH IX-ZC DEO 2LDPage 9 of 30

Page 544: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

a. All along Pagadian - Zamboanga City Road (SO1315MN) - - 88. Tictapul Br. (BOO557MN) Retrofitting/Str

enghtening of Permanent Bridges

Tictapul, Zamboanga City Ln.m. Plans and POW GAA 6,000 - 6,000

89. Taloptap Br. (BOO558MN) Retrofitting/Strenghtening of Permanent Bridges

Taloptap, Zamboanga City Ln.m. Plans and POW GAA 2,000 - 2,000

90. Quiniput Br. (BOO566MN) Retrofitting/Strenghtening of Permanent Bridges

Quiniput, Zamboanga City Ln.m. Plans and POW GAA 3,000 - 3,000

91. Bolong Br. (BOO568MN) Retrofitting/Strenghtening of Permanent Bridges

Bolong, Zamboanga City Ln.m. Plans and POW GAA 3,000 - 3,000

92. Putik Br. (BOO580MN) Retrofitting/Strenghtening of Permanent Bridges

Putik, Zamboanga City Ln.m. Plans and POW GAA 3,000 - 3,000

5. Rehabilitation/ Major Repair of Permanent Bridges - - I. Primary Road - -

93. Binaluy Br. (B00562MN) along Pagadian City-Zamboanga City Rd

Widening of Permanent Bridges

Tigbao, Zamboanga City Ln.m. Plans and POW GAA 10,000 - 10,000

a. All along Pagadian - Zamboanga City Road (SO1315MN) - - 6. Widening of Permanent Bridges - -

I. Primary Road - - a. All along Pagadian - Zamboanga City Road (SO1315MN) - -

94. Tigbao Br. (BOO556MN) Widening of Permanent Bridges

Tigbao, Zamboanga City Ln.m. Plans and POW GAA 125,000 - 125,000

95. Tictapul Br. (BOO557MN) Widening of Permanent Bridges

Tictapul, Zamboanga City Ln.m. Plans and POW GAA 45,520 56,000 56,000 56,000 213,520

96. Taloptap Br. (BOO558MN) Widening of Permanent Bridges

Taloptap, Zamboanga City Ln.m. Plans and POW GAA 12,200 18,000 21,000 21,000 72,200

97. Mialim Br. (BOO559MN) Widening of Permanent Bridges

Mialim, Zamboanga City Ln.m. Plans and POW GAA 20,000 - 20,000

98. Vitali Br. (BOO561MN) Widening of Permanent Bridges

Vitali, Zamboanga City Ln.m. Plans and POW GAA 60,000 - 60,000

99. Binaluy Br. (BOO562MN) Widening of Permanent Bridges

Binaluy, Zamboanga City Ln.m. Plans and POW GAA 50,000 50,000 100,000

100. Basagan Br. (BOO563MN) Widening of Permanent Bridges

Basagan, Zamboanga City Ln.m. Plans and POW GAA - -

101. Curuan Br. 2 (BOO564MN) Widening of Permanent Bridges

Curuan, Zamboanga City Ln.m. Plans and POW GAA 16,000 16,000 32,000

102. Curuan Br. 1 (BOO565MN) Widening of Permanent Bridges

Curuan, Zamboanga City Ln.m. Plans and POW GAA 36,000 36,000 72,000

Chapter 19-1-DPWH IX-ZC DEO 2LDPage 10 of 30

Page 545: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

103. Quiniput Br. (BOO566MN) Widening of Permanent Bridges

Quiniput, Zamboanga City Ln.m. Plans and POW GAA 21,000 26,000 26,000 73,000

104. Mala Br. (BOO567MN) Widening of Permanent Bridges

Mala, Zamboanga City Ln.m. Plans and POW GAA 20,000 - 20,000

105. Bolong Br. (BOO568MN) Widening of Permanent Bridges

Bolong, Zamboanga City Ln.m. Plans and POW GAA - -

106. Pamingitan Br. 2 (BOO569MN) Widening of Permanent Bridges

Pamingitan, Zamboanga City Ln.m. Plans and POW GAA 16,000 20,000 20,000 56,000

107. Pamingitan Br. 1 (BOO570MN) Widening of Permanent Bridges

Pamingitan, Zamboanga City Ln.m. Plans and POW GAA 16,000 - 16,000

108. Calibato Br. (BOO573MN) Widening of Permanent Bridges

Sangali, Zamboanga City Ln.m. Plans and POW GAA - -

109. Manicahan Br. (BOO574MN) Widening of Permanent Bridges

Manicahan, Zamboanga City Ln.m. Plans and POW GAA 120,000 - 120,000

110. Calibato Bridge Widening of Permanent Bridges

Ln.m. Plans and POW GAA 9,000 9,000 18,000

111. Victoria Bridge Widening of Permanent Bridges

Ln.m. Plans and POW GAA 24,000 24,000 48,000

896,000 1,863,000 1,241,197 426,500 7,148,998 7,148,998 18,724,693 OO2: Protect Lives and Properties Against Major Floods 18,724,693

1. Construction/Maintenance of Flood Mitigation Structures and Drainage System - 112. Construcion of Flood Control Structure,

Sibulao River at Sibulao Section, (Including Right of Way Acquisition)

Flood Control Sibulao Ln.m. Plans and POW GAA 50,000 - 50,000

113. Construcion of Flood Control Structure at Vitali River, Vitali Section, Zamboanga City

Flood Control Vitali, Zamboanga City Ln.m. Plans and POW GAA 30,000 50,000 - 80,000

114. Channelization of Putik River with Major Training Works, Zamboanga City Flood Control Vitali, Zamboanga

City Ln.m. Plans and POW GAA 61,870 - 61,870

115. Construction of Flood Control at Tumaga River Basin, Zamboanga City

Construction of Flood Mitigation StructureBrgy. Tumaga, Zamboanga City

Ln.m. 1500 Plans and POW GAA 20213 150,000 150,000 300,000

116. Channelization of Putik River with Major Training Works, Zamboanga City

Construction of Flood Mitigation StructureBrgy. Putik, Zamboanga City

Ln.m. 1500 Plans and POW GAA 20213 150,000 150,000 300,000

117. Channelization of Putik River with Major Training Works, Zamboanga City

Construction of Flood Mitigation StructureBrgy. Putik, Zamboanga City

Ln.m. 1500 Plans and POW GAA 20213 150,000 150,000 300,000

117. Construction of Flood Control Structure at Vitali River, Vitali, Zamboanga City

Construction of Flood Mitigation StructureBrgy. Vitali, Zamboanga City

Ln.m. 1500 Plans and POW GAA 20213 150,000 150,000 300,000

118. Construction of Flood Control at Tumaga River Basin, Zamboanga City

Construction of Flood Mitigation StructureBrgy. Tumaga, Zamboanga City

Ln.m. 1500 Plans and POW GAA 20213 150,000 150,000 300,000

119. Construction of Flood Control at Tumaga River (Tetuan / Tugbungan Section),Zamboanga City(TL = 150.00 m)

Construction of Flood Mitigation StructureBrgy. Tetuan - Tugbungan, Zamboanga City

Ln.m. 150 Plans and POW GAA 2021

3 150,000 150,000 300,000

120. Construction of Flood Control at Tumaga River Basin, Tetuan Section, ZamboangaCity (TL = 120.00 m)

Construction of Flood Mitigation StructureBrgy. Tetuan, Zamboanga City

Ln.m. 120 Plans and POW GAA 2021

3 120,000 120,000 240,000

OO1 - Subtotal

Chapter 19-1-DPWH IX-ZC DEO 2LDPage 11 of 30

Page 546: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

121. Construction of Flood Control at Tumaga River (Guiwan / Tugbungan Section), Zamboanga City(TL = 150.00 m)

Construction of Flood Mitigation StructureBrgy. Guiwan - Tugbungan, Zamboanga City

Ln.m. 150 Plans and POW GAA 2021

3 150,000 150,000 300,000

122. Construction of Flood Control Structure at Curuan, Zamboanga City(TL = 150.00 m)

Construction of Flood Mitigation StructureBrgy. Curuan, Zamboanga City

Ln.m. 150 Plans and POW GAA 20213 150,000 150,000 300,000

2. Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - - 123. Construction of Flood Control at Tumaga

River Basin, Tetuan Section, Zamboanga City

Flood Control Vitali, Zamboanga City Ln.m. Plans and POW GAA 20,843 - 20,843

124. Construction of Flood Control at Tumaga River Basin, Tetuan-Tugbungan Section, Zamboanga City

Construction of Flood Mitigation Structure

Tugbungan, Zamboanga City Ln.m. Plans and POW GAA 20,000 154,000 50,000 - 224,000

50,000.00 254,000.00 132,713.00 - 1,320,000.00 1,320,000.00 3,076,713.00 c. Convergence and Special Support Program - -

1. Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - - 125. Jct. Tagasilay along MCLL Hoghway

Tagasilay - Vitali Section leading to Merloquet Falls, Vitali, Zamboanga City

Road Concreting Vitali, Zamboanga

City Lane KM Plans and POW GAA 150,000 - 150,000

126. Improvement of MCLL Highway Junct. Latuan to Latuan Cave Zamboanga City (Including Drainage and Road Right of Way)

Road Concreting Latuan, Zamboanga

City Lane KM Plans and POW GAA 100,000 105,000 105,000 310,000

127. Construction of Catwalk to Pader Cave Barangay Victoria Zamboanga City (Including Road Right of Way)

Road Concreting Victoria,

Zamboanga City Lane KM Plans and POW GAA - -

128. Access Road leading to Panubigan Wharf, Zamboanga City

Road Concreting

Victoria, Zamboanga City Lane KM Plans and POW GAA 15,000 - 15,000

129. Road widening / Improvement leading to Linduman Falls, Vitali, Zamboanga City(TL = 5,710.00 m) Road Widening

Brgy. Vitali, Zamboanga City Lane KM 5.71 Plans and POW GAA 2021

3 100,000 100,000 200,000

130. Road Widening / Improvement of Road at Taguiti, Barangay Vitali, Zamboanga City(TL = 2,280.00 m) Road Widening

Brgy. Vitali, Zamboanga City Lane KM 2.8 Plans and POW GAA 2021

3 40,000 40,000 80,000

131. Road Widening / Improvement of Panubigan-Bolong Coastal, Zamboanga City(TL = 2,280.00 m) Road Widening

Brgy. Panubigan, Zamboanga City Lane KM 2.8 Plans and POW GAA 2021

3 40,000 40,000 80,000

132. Road Widening / Improvement leading to Pader Cave, Victoria, Zamboanga City(TL = 5,710.00 m) Road Widening

Brgy.Victoria, Zamboanga City Lane KM 5.71 Plans and POW GAA 2021

3 100,000 100,000 200,000

133. Road widening / Improvement leading to Fuerta Pedra Falls, Upper Dulian,Bunguiao, Zamboanga City(TL = 5,710.00 m) Road Widening

Brgy. Upeer Dulian, Zamboanga City Lane KM 5.71 Plans and POW GAA 2021

3 100,000 100,000 200,000

2. Construction/Improvement of Access Roads leading to Airports and Seaports - - 134. Improvement of MCLL Highway Junct.

Panubigan to Panubigan Wharf Zamboanga City (Including Drainage and Road Right of Way)

Road Concreting Panubigan,

Zamboanga City Lane KM Plans and POW GAA 24,600 84,600 84,600 84,600 278,400

3. Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones - - 135. Junction Sangali Road, Sangali Fishing Port

in support of Ship Building, Canned Sardines, and Fisheries, Sangali, Zamboanga City

Road Concreting Sangali,

Zamboanga City Lane KM Plans and POW GAA 17,190 - - - 17,190

OO2- Subtotal

Chapter 19-1-DPWH IX-ZC DEO 2LDPage 12 of 30

Page 547: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

136. Improvement /Rehabilitation of Road from Junction Mercedes to Taluksangay in Support of Processed Fish and Seaweeds Manufacturer, Taluksangay, Zamboanga City

Road Concreting

Taluksangay,Zamboanga City Lane KM Plans and POW GAA 80,000 48,000 48,000 176,000

137. Improvement/Rehabilitation/ Widening of Road From Junction Boalan to Tala in Support of Oil Mill Manufacturer, Tala, Zamboanga City

Road Concreting Tala, Zamboanga

City Lane KM Plans and POW GAA - -

138. Improvement/Rehabilitation/ Widening of Road From Junction Boalan to Zambowood in Support of Plywood Manufacturer, Zambowood, Zamboanga City

Road Concreting

Zambowood, Zamboanga City Lane KM Plans and POW GAA - -

139. Improvement /Rehabilitation of Road from Junction Mercedes to Taluksangay in Support of Processed Fish and Seaweeds Manufacturer, Taluksangay, Zamboanga City (TL = 2,855.00 m)

Construction of Concrete Road

Brgy. Mercedes - Taluksangay, Zamboanga City

Lane KM 5.71 Plans and POW GAA 2021

3 100,000 100,000 200,000

140. Improvement/Rehabilitation of Road from Junction Veterans Avenue, Pagadian City- Zamboanga City Road to Talon- Talon- Mampang-Arena Blanco Road in support to Dried Fish and Seaweeds Manufacturing ,Arena Blanco ,Zamboanga City (TL = 2,855.00 m)

Construction of Concrete Road

Brgy. Talon- Talon- Mampang-Arena Blanco, Zamboanga City

Lane KM 5.71 Plans and POW GAA 2021

3 100,000 100,000 200,000

141. Reconstruction/ Improvement/ Rehabilitation of Mercedes-Talabaan-TaluksangayRoad connecting Talabaan and Taluksangay and Pagadian City-Zamboanga CityRoad (Mercedes Section) in support processed fish, seaweeds and otheragri-business industries, ZamboangaCity 2nd LD(TL = 8,570.00 m)

Construction of Concrete Road

Brgy. Mercedes-Talabaan-Taluksangay, Zamboanga City

Lane KM 8.57 Plans and POW GAA 2021

3 150,000 150,000 300,000

142. Reconstruction/ Improvement of Sinoropan Road connecting Sitio Sinoropan andPagadian City-Zamboanga City Road (Licomo Section) in support of rubber industry,Zamboanga City 2nd LD(TL = 7,000.00 m)

Construction of Concrete Road

Sitio Sinoropan, Zamboanga City

Lane KM 7 Plans and POW GAA 2021

3 122,500 122,500 245,000

143. Improvement/ Rehabilitation/ Widening of Zambowood Road Connecting Mega Plywood Mill and Pagadian City-Zamboanga City Road (Boalan Section) in supportof construction (plywood) industry, Zamboanga City 2nd LD(TL = 3,820.00 m)

Road Widening Brgy. Boalan - Zambowood, Zamboanga City

Lane KM 3.82 Plans and POW GAA 2021

3 66,900 66,900 133,800

Chapter 19-1-DPWH IX-ZC DEO 2LDPage 13 of 30

Page 548: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

144. Improvement/ Rehabilitation/ Widening of Sta.Catalina-Talon-Talon-Mampang-Arena Blanco Road Connecting Arena Blanco andMampang, Talon-Talon, and Veterans Avenue (Sta. Catalina Section), in support ofdried fish and seaweeds industries, Zamboanga City 2nd LD(TL = 8,570.00 m)

Road Widening Brgy. Sta.Catalina-Talon-Talon-Mampang-Arena Blanco, Zamboanga City

Lane KM 8.57 Plans and POW GAA 2021

3 155,000 155,000 310,000

145. Improvement/Rehabilitation of Road from Junction Veterans Avenue, Pagadian City- Zamboanga City Road to Talon- Talon- Mampang-Arena Blanco Road in support to Dried Fish and Seaweeds Manufacturing ,Arena Blanco ,Zamboanga City

Road Concreting

Arena Blanco, Zamboanga City Lane KM Plans and POW GAA 60,000 116,100 116,100 292,200

150,000.00 41,790.00 15,000.00 324,600.00 1,428,100.00 1,428,100.00 3,387,590.00 A. Locally-Funded Projects -

National Building Program - a. Multipurpose/Facilities -

146. Construction of Zamboanga City DEO, Divisoria, Zamboanga City

Construction of multipurpose

building

Brgy. Divisoria, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2017

40,000.00 - 40,000

147. Construction of DPWH Multi-Purpose Building of Zamboanga City DEO, Divisoria, ZamboangaCity

Construction ofMulti Purpose

Building

Barangay Divisoria, Zamboanga City

No. of Buildings

1.00 Plans and POW GAA 2019

5,000.00 - 5,000

148. Construction/Improvement/Rehabilitation of Zamboanga City DEO, 9th RES Base Shop Complex, Divisoria, Zamboanga City

Construction of multipurpose

building

Brgy. Divisoria, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2017

7,480.00 - 7,480

B. Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects - - Roads and Bridges - - a. Local Roads - -

149. Concreting of Road, Brgy. Manalipa, Zamboanga City

Construction ofConcrete Road

Zamboanga City Lane KM 0.34 Plans and POW GAA 2019

1,500.00 - 1,500

150. Concreting of Road, Brgy. Taguiti, Zamboanga City

Construction ofConcrete Road

Zamboanga City Lane KM 0.30 Plans and POW GAA 2019

1,500.00 - 1,500

151. Concreting of Road, Brgy. Tolosa, Zamboanga City

Construction ofConcrete Road

Zamboanga City Lane KM 0.13 Plans and POW GAA 2019

500.00 - 500

152. Concreting of Road, Brgy. Tumitus, Zamboanga City

Construction ofConcrete Road

Zamboanga City Lane KM 0.40 Plans and POW GAA 2019

3,500.00 - 3,500

153. Concreting of Road, Brgy. Victoria, Zamboanga City

Construction ofConcrete Road

Zamboanga City Lane KM 0.30 Plans and POW GAA 2019

1,500.00 - 1,500

CSSP - Subtotal

Chapter 19-1-DPWH IX-ZC DEO 2LDPage 14 of 30

Page 549: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

154. Concreting of Road, Brgy. Zambowood, Zamboanga City

Construction ofConcrete Road

Zamboanga City Lane KM 0.40 Plans and POW GAA 2019

3,500.00 - 3,500

155. Concreting of Road, Culianan, Zamboanga City

Construction ofConcrete Road

Zamboanga City Lane KM 0.13 Plans and POW GAA 2019

1,000.00 - 1,000

156. Concreting of Road, Lapakan, Zamboanga City

Construction ofConcrete Road

Zamboanga City Lane KM 0.20 Plans and POW GAA 2019

3,000.00 - 3,000

157. Concreting of Road, Lumayang, Zamboanga City

Construction ofConcrete Road

Zamboanga City Lane KM 0.26 Plans and POW GAA 2019

1,500.00 - 1,500

158. Concreting of Road, Lumbangan, Zamboanga City

Construction ofConcrete Road

Zamboanga City Lane KM 0.34 Plans and POW GAA 2019

1,500.00 - 1,500

159. Concreting of Road, Muti, Zamboanga City Construction ofConcrete Road

Zamboanga City Lane KM 0.10 Plans and POW GAA 2019

1,000.00 - 1,000

160. Concreting of Road, Quiniput, Zamboanga City

Construction ofConcrete Road

Zamboanga City Lane KM 0..1 Plans and POW GAA 2019

1,000.00 - 1,000

161. Concreting of Road, Tigbalabag, Zamboanga City

Construction ofConcrete Road

Zamboanga City Lane KM 0.40 Plans and POW GAA 2019

3,500.00 - 3,500

162. Construction of 2nd and 4th St., Aurora Village, Guiwan, Zamboanga City

Construction ofConcrete Road

Brgy. Guiwan, Zamboanga City

Lane KM 2.00 Plans and POW GAA 2018

10,000.00 - 10,000

163. Construction of Farm to Market Road Lapakan, Zamboanga City

Construction of Concrete Road

Brgy. Lapakan, Zamboanga City

Lane Km. 1.60 Plans and POW GAA 202010,000.00 10,000.00 10,000.00 30,000

164. Construction of Farm to Market Road Bunguiao, Zamboanga City

Construction of Concrete Road

Brgy. Bungiao, Zamboanga City

Lane Km. 0.80 Plans and POW GAA 20203,000.00 5,000.00 5,000.00 5,000.00 18,000

165. Construction of Farm to Market Road Tigbalabag, Zamboanga City

Construction of Concrete Road

Brgy. Tigbalabag, Zamboanga City

Lane Km. 1.60 Plans and POW GAA 202010,000.00 10,000.00 10,000.00 30,000

166. Construction of Farm to Market Road Tumitus, Zamboanga City

Construction of Concrete Road

Brgy. Tumitus, Zamboanga City

Lane Km. 1.60 Plans and POW GAA 202010,000.00 10,000.00 10,000.00 30,000

167. Construction of Farm to Market Road Upper Dulian, Zamboanga City

Construction of Concrete Road

Brgy. Upper Dulian, Zamboanga

City

Lane Km. 1.60 Plans and POW GAA 20205,000.00 10,000.00 10,000.00 10,000.00 35,000

168. Construction of Farm to Market Road Zambowood, Zamboanga City

Construction of Concrete Road

Brgy. Zambowood, Zamboanga City

Lane Km. 1.60 Plans and POW GAA 202010,000.00 10,000.00 10,000.00 30,000

169. Construction of Farm to Market Road Salaan, Zamboanga City

Construction of Concrete Road

Brgy. Salaan, Zamboanga City

Lane Km. 0.80 Plans and POW GAA 20203,000.00 5,000.00 5,000.00 5,000.00 18,000

Chapter 19-1-DPWH IX-ZC DEO 2LDPage 15 of 30

Page 550: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

170. Construction of Farm to Market Road Manalipa, Zamboanga City

Construction of Concrete Road

Brgy. Manalipa, Zamboanga City

Lane Km. 0.80 Plans and POW GAA 20205,000.00 5,000.00 5,000.00 15,000

171. Construction of Farm to Market Road Panubigan to Bolong, Zamboanga City

Construction of Concrete Road

Brgy. Bolong, Zamboanga City

Lane Km. 1.60 Plans and POW GAA 202010,000.00 10,000.00 10,000.00 10,000.00 40,000

172. Construction of Farm to Market Road Lumbangan, Zamboanga City

Construction of Concrete Road

Brgy. Lumbangan, Zamboanga City

Lane Km. 0.80 Plans and POW GAA 20205,000.00 5,000.00 5,000.00 15,000

173. Construction of Farm to Market Road Boalan, Zamboanga City

Construction of Concrete Road

Brgy. Boalan, Zamboanga City

Lane Km. 0.80 Plans and POW GAA 20203,000.00 5,000.00 5,000.00 5,000.00 18,000

174. Construction of Farm to Market Road Muti, Zamboanga City

Construction of Concrete Road

Brgy. Muti, Zamboanga City

Lane Km. 0.80 Plans and POW GAA 20205,000.00 5,000.00 5,000.00 15,000

175. Construction of Farm to Market Road Lumayang, Zamboanga City

Construction of Concrete Road

Brgy. Lumayang, Zamboanga City

Lane Km. 0.80 Plans and POW GAA 20205,000.00 5,000.00 5,000.00 15,000

176. Construction of Farm to Market Road Taguiti, Zamboanga City

Construction of Concrete Road

Brgy. Taguiti, Zamboanga City

Lane Km. 0.80 Plans and POW GAA 20205,000.00 5,000.00 5,000.00 15,000

177. Concreting of Road at Zone IV,Victoria, Zamboanga City

Construction of Concrete Road

Brgy. IV,Victoria, Zamboanga City

Lane Km. 0.48 Plans and POW GAA 20203,000.00 3,000.00 3,000.00 9,000

178. Construction of Farm to Market Road Mercedes, Zamboanga City

Construction of Concrete Road

Brgy. Mercedes, Zamboanga City

Lane Km. 1.60 Plans and POW GAA 20205,000.00 10,000.00 10,000.00 10,000.00 35,000

179. Construction of Farm to Market Road Talabaan, Zamboanga City

Construction of Concrete Road

Brgy. Talabaan, Zamboanga City

Lane Km. 1.60 Plans and POW GAA 20205,000.00 10,000.00 10,000.00 10,000.00 35,000

180. Construction of Farm to Market Road Taluksangay, Zamboanga City

Construction of Concrete Road

Brgy. Taluksangay, Zamboanga City

Lane Km. 1.60 Plans and POW GAA 20205,000.00 10,000.00 10,000.00 10,000.00 35,000

181. Construction of Farm to Market Road Curuan, Zamboanga City

Construction of Concrete Road

Brgy. Curuan, Zamboanga City

Lane Km. 0.80 Plans and POW GAA 20203,000.00 5,000.00 5,000.00 5,000.00 18,000

182. Construction of Farm to Market Road Tagasilay, Zamboanga City

Construction of Concrete Road

Brgy. Tagasilay, Zamboanga City

Lane Km. 0.80 Plans and POW GAA 20203,000.00 5,000.00 5,000.00 5,000.00 18,000

183. Construction of Farm to Market Road Cabaluay, Zamboanga City

Construction of Concrete Road

Brgy. Cabaluay, Zamboanga City

Lane Km. 0.80 Plans and POW GAA 20202,000.00 5,000.00 5,000.00 5,000.00 17,000

184. Construction of Farm to Market Road Guisao, Zamboanga City

Construction of Concrete Road

Brgy. Guisao, Zamboanga City

Lane Km. 0.80 Plans and POW GAA 20202,000.00 5,000.00 5,000.00 5,000.00 17,000

185. Construction of Farm to Market Road Calabasa, Zamboanga City

Construction of Concrete Road

Brgy. Calabasa, Zamboanga City

Lane Km. 0.80 Plans and POW GAA 20203,000.00 5,000.00 5,000.00 5,000.00 18,000

186. Construction of Farm to Market Road Tolosa, Zamboanga City

Construction of Concrete Road

Brgy. Tolosa, Zamboanga City

Lane Km. 0.80 Plans and POW GAA 20205,000.00 5,000.00 5,000.00 15,000

187. Construction of Farm to Market Road Buenavista, Zamboanga City

Construction of Concrete Road

Brgy. Buenavista, Zamboanga City

Lane Km. 0.80 Plans and POW GAA 20203,000.00 5,000.00 5,000.00 5,000.00 18,000

188. Junction Aliganga Drive along Tumaga - Putik Road, Zamboanga City

Construction of Concrete Road

Brgy.Tumaga-Putik, Zamboanga

City

Lane Km. 1.60 Plans and POW GAA 20205,000.00 10,000.00 10,000.00 10,000.00 35,000

Chapter 19-1-DPWH IX-ZC DEO 2LDPage 16 of 30

Page 551: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

189. Concreting of Road, Culianan, Zamboanga City

Construction of Concrete Road

Brgy. Culianan, Zamboanga City

Lane Km. 0.80 Plans and POW GAA 20205,000.00 5,000.00 5,000.00 15,000

190. Construction of Farm to Market Road , Quiniput, Zamboanga City

Construction of Concrete Road

Brgy. Quiniput, Zamboanga City

Lane Km. 0.80 Plans and POW GAA 20205,000.00 5,000.00 5,000.00 15,000

191. Concreting of Putik Brgy. Road, Putik Zamboanga City

Construction of Concrete Road

Brgy. Putik Zamboanga City

Lane Km. 1.60 Plans and POW GAA 202010,000.00 10,000.00 10,000.00 30,000

192. Concreting of Road at Zone VII, Victoria, Zamboanga City

Construction of Concrete Road

Brgy. Victoria, Zamboanga City

Lane Km. 1.28 Plans and POW GAA 20208,000.00 8,000.00 8,000.00 24,000

193. Concreting of Road at Block 5, Serafin Cobarubias, Divisoria, Zamboanga City

Construction of Concrete Road

Brgy. Divisoria, Zamboanga City

Lane Km. 0.48 Plans and POW GAA 20203,000.00 3,000.00 3,000.00 9,000

194. Concreting of Road at Coloma Dr., Brgy. Boalan, Zamboanga City

Construction of Concrete Road

Brgy. Boalan, Zamboanga City

Lane Km. 0.48 Plans and POW GAA 20203,000.00 3,000.00 3,000.00 9,000

195. Concreting of Road at ACI Road, Lumiyap, Brgy. Divisoria, Zamboanga City

Construction of Concrete Road

Brgy. Divisoria, Zamboanga City

Lane Km. 0.48 Plans and POW GAA 20203,000.00 3,000.00 3,000.00 9,000

196. Road Widening of Local Roads Connecting By-Pass Road, Zamboanga City (Lunzuran, Lumbangan, Tala, Salaan Section)

Construction of Concrete Road

Lunzuran, Lumbangan, Tala,

Salaan, Zamboanga City

Lane Km. 5.00 Plans and POW GAA 2019

45,614.00 45,614.00 45,614.00 136,842

197. Coastal Road, Zamboanga CityConstruction of Concrete Road

Zamboanga City Lane Km. 8.00 Plans and POW GAA 2019134,300.00 134,300.00 134,300.00 402,900

- - b. Bridges - -

198. Repair/Rehab/Reconstruction of Existing Bridge Lamisahan, Zamboanga City

Rehabilitation / Major Repair

of Bridge

Brgy. Lamisahan, Zamboanga City

No. of Bridges 1.00 Plans and POW GAA 2020

45,000.00 45,000.00 45,000.00 45,000.00 180,000

199. Repair/Rehab/Reconstruction of Existing Bridge Taguiti, Zamboanga City

Rehabilitation / Major Repair

of Bridge

Brgy. Taguiti, Zamboanga City

No. of Bridges 1.00 Plans and POW GAA 2020

7,000.00 7,000.00 7,000.00 7,000.00 28,000

200. Construction of Footbridge at Curuan, Zamboanga City

Construction of Bridge

Brgy. Curuan, Zamboanga City

Sq.m. 45.00 Plans and POW GAA 20213,500.00 3,500.00 7,000

C. Local Infrastructure Program - - Buildings and Other Structures - - a. Multipurpose/Facilities - -

201. Construction of MPB (Day Care), Arena Blanco, Zamboanga City

Construction of multipurpose

building

Brgy. Arena Blanco,

Zamboanga City

Number of Building

1.00 Plans and POW GAA 2017

1,000.00 - - - 1,000

202. Construction of MPB (Day Care), Curuan, Zamboanga City

Construction of multipurpose

building

Brgy. Curuan, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2017

1,000.00 - - - 1,000

203. Construction of MPB (Covered Court), Cabaluay, Zamboanga City

Construction of multipurpose

building

Brgy. Cabaluay, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2017

3,000.00 - 3,000

Chapter 19-1-DPWH IX-ZC DEO 2LDPage 17 of 30

Page 552: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

204. Construction of MPB (Covered Court), Calabasa, Zamboanga City

Construction of multipurpose

building

Brgy. Calabasa, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2017

3,000.00 - 3,000

205. Construction of MPB (Covered Court), Tictapul, Zamboanga City

Construction of multipurpose

building

Brgy. Tictapul, Zamboanga City

Number of Building

1.00 Plans and POW GAA 2017

3,000.00 - 3,000

206. Construction (Completion) of Multipurpose Building, Baragangay Dita, Zamboanga City

Construction of Multi-Purpose

Building

Brgy. Dita, Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2018

- 1,000.00 - - - - 1,000

207. Construction of Multipurpose Building (Covered Court), Barangay Latuan, Zamboanga City

Construction of Multi-Purpose

Building

Brgy. Latuan, Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2018

- 2,000.00 - - - - 2,000

208. Construction of Multipurpose Building, Barangay Lubigan, Zamboanga City

Construction of Multi-Purpose

Building

Brgy. Lubigan, Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2018

- 2,000.00 - - - - 2,000

209. Costruction of Multipurpose Building, Brgy. Guisao, Zamboanga City

Construction of Multi-Purpose

Building

Brgy. Guisao, Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2018

- 2,000.00 - - - - 2,000

210. Costruction of Multipurpose Building, Brgy. Landang Gua, Zamboanga City

Construction of Multi-Purpose

Building

Brgy. Landang Gua, Zamboanga

City

Number of Buildings

1.00 Plans and POW GAA 2018

- 1,500.00 - - - - 1,500

211. Construction of Multi-Purpose Building, Brgy. Pasilmanta, Zamboanga City

Construction of Multi-Purpose

Building

Brgy. Pasilmanta, Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2018

- 1,500.00 - - - - 1,500

212. Construction of Multi-Purpose Building (Day Care Center), Brgy. Tigtabon, Zamboanga City

Construction of Multi-Purpose

Building

Brgy. Brgy. Tigtabon,

Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2018

- 1,500.00 - - - - 1,500

213. Construction of Multi-Purpose Building, Brgy. Manalipa, Zamboanga City

Construction of Multi-Purpose

Building

Brgy. Manalipa, Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2018

- 1,500.00 - - - - 1,500

214. Construction of Multi-Purpose Building (Phase II), Sitio Buenakapok, Brgy. Lanzones, Zamboanga City

Construction of Multi-Purpose

Building

Brgy. Lanzones, Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2018

- 5,000.00 - - - - 5,000

215. Construction of Multi-Purpose Building, Barangay Taluksangay, Zamboanga City

Construction ofMulti Purpose

Building

Barangay Taluksangay,

Zamboanga City

No. of Buildings

1.00 Plans and POW GAA 2019

1,000.00 - 1,000

216. Construction of Multi-Purpose Building (Covered Court) at Barangay Cacao, Zamboanga City

Construction ofMulti Purpose

Building

Barangay Cacao, Zamboanga CIty

No. of Buildings

1.00 Plans and POW GAA 2019

3,000.00 - 3,000

217. Construction of Multi-Purpose Building (Covered Court) at Cabaluay National High School,Barangay Cabaluay, Zamboanga City

Construction ofMulti Purpose

Building

Barangay Cabaluay,

Zamboanga City

No. of Buildings

1.00 Plans and POW GAA 2019

3,000.00 - 3,000

Chapter 19-1-DPWH IX-ZC DEO 2LDPage 18 of 30

Page 553: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

218. Construction of Multi-Purpose Building (Covered Court) at Tagasilay Elementary School,Barangay Tagasilay, Zamboanga City

Construction ofMulti Purpose

Building

Barangay Tagasilay,

Zamboanga City

No. of Buildings

1.00 Plans and POW GAA 2019

3,000.00 - 3,000

219. Construction of Multi-Purpose Building (Day Care Center) at Kapuk Drive, Barangay Mampang, Zamboanga City

Construction ofMulti Purpose

Building

BarangayMampang,

Zamboanga City

No. of Buildings

1.00 Plans and POW GAA 2019

1,500.00 - 1,500

220. Construction of Multi-Purpose Building (Day Care Center) at Faustino Drive, Barangay Mampang, Zamboanga City

Construction ofMulti Purpose

Building

BarangayMampang,

Zamboanga City

No. of Buildings

1.00 Plans and POW GAA 2019

1,500.00 - 1,500

221. Improvement of Multi-Purpose Building (Day Care Center) at Barangay Lunzuran, ZamboangaCity

Rehabilitation /Major Repair

ofMulti Purpose

Building

Barangay Lunzuran,

Zamboanga City

No. of Buildings

1.00 Plans and POW GAA 2019

1,500.00 - 1,500

222. Rehabilitation of Multi-Purpose Building (Day Care Center) at Quiniput Elementary School,Barangay Quiniput, Zamboanga City

Rehabilitation /Major Repair

ofMulti Purpose

Building

Barangay Quiniput, Zambaonga City

No. of Buildings

1.00 Plans and POW GAA 2019

1,500.00 - 1,500

223. Construction of MPB (Evacuation Center), Brgy. Vitali, Zamboanga City

Construction of Multi Purpose

Building

Brgy. Vitali, Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2020

50,000.00 50,000.00 50,000.00 150,000

224. Construction of MPB (Evacuation Center), Brgy. Curuan, Zamboanga City

Construction of Multi Purpose

Building

Brgy. Curuan, Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2020

50,000.00 50,000.00 50,000.00 150,000

225. Construction of MPB (Evacuation Center), Brgy. Mampang, Zamboanga City

Construction of Multi Purpose

Building

Brgy. Mampang, Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2020

50,000.00 50,000.00 50,000.00 150,000

b. School Buildings - - 226. Construction of 2 Storey 6 Classroom

School Building, Barangay Mampang, Zamboanga City

Construction ofSchool

Buildings

Barangay Mampang,

Zamboanga City

No. of School Buildings

1.00 Plans and POW GAA 2019

- 9,000.00 - - - 9,000

Project Requested for Completion of the School Building.

227. Construction of 2-storey 4-classroom School Building at Barangay Lumayang, Zamboanga City

Construction ofSchool

Buildings

Barangay Lumayang,

Zamboanga City

No. of School Buildings

1.00 Plans and POW GAA 2019

6,000.00 - 6,000

Project Requested for Completion of the School Building.

228. Construction of School Building Three (3) Storey Twenty-Four (24) Classroom at Brgy Tetuan, Zamboanga City 2nd LD

Construction ofSchool

Buildings

Tetuan, Zamboanga City

No. of School Buildings

2.00 Plans and POW GAA 2020

- 33,600.00 - - - 33,600

Chapter 19-1-DPWH IX-ZC DEO 2LDPage 19 of 30

Page 554: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

229. Construction of School Building Two (2) Storey Twelve (12) Classroom at Brgy Vitali, Zamboanga City 2nd LD

Construction ofSchool

Buildings

Vitali, Zamboanga City

No. of School Buildings

3.00 Plans and POW GAA 2021

- 16,400.00 - - - 16,400

230. Construction of School Building Two (2) Storey Ten (10) Classroom at Mercedes ES, Zamboanga City

Construction of School

Buildings

Brgy. Mercedes, Zamboanga City

No. of School Building

1.00 Plans and POW GAA 202012,000.00 12,000.00 12,000.00 12,000.00 48,000

231. Construction of School Building Two (2) Storey Ten (10) Classroom at Curuan NHS, Zamboanga City

Construction of School

Buildings

Brgy. Curuan, Zamboanga City

No. of School Building

1.00 Plans and POW GAA 202012,000.00 12,000.00 12,000.00 12,000.00 48,000

232. Construction of School Building Two (2) Storey Six (6) Classroom at Landang Gua NHS, Zamboanga City

Construction of School

Buildings

Brgy. Landang Gua, Zamboanga

City

No. of School Building

1.00 Plans and POW GAA 202010,000.00 10,000.00 10,000.00 10,000.00 40,000

233. Construction of School Building Two (2) Storey Six (6) Classroom at Imelda, Zamboanga City

Construction of School

Buildings

Imelda, Zamboanga City

No. of School Building

1.00 Plans and POW GAA 202010,000.00 10,000.00 10,000.00 10,000.00 40,000

234. Construction of School Building Two (2) Storey Ten (10) Classroom at Zambowood, Zamboanga City

Construction of School

Buildings

Brgy. Zambowood, Zamboanga City

No. of School Building

1.00 Plans and POW GAA 202012,000.00 12,000.00 12,000.00 12,000.00 48,000

235. Construction of School Building Two (2) Storey Six (6) Classroom at Manalipa NHS, Zamboanga City

Construction of School

Buildings

Brgy. Manalipa, Zamboanga City

No. of School Building

1.00 Plans and POW GAA 202010,000.00 10,000.00 10,000.00 10,000.00 40,000

236. Construction of School Building One (1) Storey Five (5) Classroom at Panubigan, Zamboanga City

Construction of School

Buildings

Brgy. Panubigan, Zamboanga City

No. of School Building

1.00 Plans and POW GAA 20208,000.00 8,000.00 8,000.00 8,000.00 32,000

237. Construction of School Building Two (2) Storey Ten (10) Classroom at Putik, Zamboanga City

Construction of School

Buildings

Brgy. Putik, Zamboanga City

No. of School Building

1.00 Plans and POW GAA 20207,800.00 7,800.00 7,800.00 7,800.00 31,200

238. Construction of School Building Two (2) Storey Six (6) Classroom at Tictabon, Zamboanga City

Construction of School

Buildings

Brgy. Tictabon, Zamboanga City

No. of School Building

1.00 Plans and POW GAA 202010,000.00 10,000.00 10,000.00 10,000.00 40,000

239. Construction of School Building Two (2) Storey Six (6) Classroom at Mangusu, Zamboanga City

Construction of School

Buildings

Brgy. Mangusu, Zamboanga City

No. of School Building

1.00 Plans and POW GAA 202010,000.00 10,000.00 10,000.00 10,000.00 40,000

240. Construction of Multipurpose Building for the Reception and Study Center for Abandoned Children

Construction of Multi Purpose

Building

Zamboanga City No. of Buildings

1.00 Plans and POW GAA 2020

10,000.00 10,000.00 10,000.00 10,000.00 40,000

241. Construction of School Building Two (2) Storey Ten (10) Classroom at Mercedes ES, Zamboanga City

Construction of School Buildings

Brgy. Mercedes, Zamboanga City

No. of School Building

1.00 Plans and POW GAA 2021 12,000.0012,000.00 24,000

242. Construction of School Building Two (2) Storey Ten (10) Classroom at Curuan NHS, Zamboanga City

Construction of School Buildings

Brgy. Curuan, Zamboanga City

No. of School Building

1.00 Plans and POW GAA 2021 12,000.0012,000.00 24,000

243. Construction of School Building Two (2) Storey Six (6) Classroom at Landang Gua NHS, Zamboanga City

Construction of School Buildings

Brgy. Landang Gua, Zamboanga City

No. of School Building

1.00 Plans and POW GAA 2021 10,000.0010,000.00 20,000

244. Construction of School Building Two (2) Storey Six (6) Classroom at Imelda, Zamboanga City

Construction of School Buildings

Imelda, Zamboanga City

No. of School Building

1.00 Plans and POW GAA 2021 10,000.00

10,000.00 20,000

245. Construction of School Building Two (2) Storey Ten (10) Classroom at Zambowood, Zamboanga City

Construction of School Buildings

Brgy. Zambowood, Zamboanga City

No. of School Building

1.00 Plans and POW GAA 2021 12,000.0012,000.00 24,000

246. Construction of School Building Two (2) Storey Six (6) Classroom at Manalipa NHS, Zamboanga City

Construction of School Buildings

Brgy. Manalipa, Zamboanga City

No. of School Building

1.00 Plans and POW GAA 2021 10,000.0010,000.00 20,000

Chapter 19-1-DPWH IX-ZC DEO 2LDPage 20 of 30

Page 555: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

247. Construction of School Building One (1) Storey Five (5) Classroom at Panubigan, Zamboanga City

Construction of School Buildings

Brgy. Panubigan, Zamboanga City

No. of School Building

1.00 Plans and POW GAA 2021 8,000.008,000.00 16,000

248. Construction of School Building Two (2) Storey Ten (10) Classroom at Putik, Zamboanga City

Construction of School Buildings

Brgy. Putik, Zamboanga City

No. of School Building

1.00 Plans and POW GAA 2021 7,800.007,800.00 15,600

249. Construction of School Building Two (2) Storey Six (6) Classroom at Tictabon, Zamboanga City

Construction of School Buildings

Brgy. Tictabon, Zamboanga City

No. of School Building

1.00 Plans and POW GAA 2021 10,000.0010,000.00 20,000

250. Construction of School Building Two (2) Storey Six (6) Classroom at Mangusu, Zamboanga City

Construction of School Buildings

Brgy. Mangusu, Zamboanga City

No. of School Building

1.00 Plans and POW GAA 2021 10,000.0010,000.00 20,000

251. Construction of School Building Two (2) Storey Six (6) Classroom, Brgy. Mampang, Zamboanga City

Construction of School Buildings

Brgy. Mampang, Zamboanga City

No. of School Building

1.00 Plans and POW GAA 2021 1,800.001,800.00 3,600

252. Construction of School Building Two (2) Storey Four (4) Classroom, Brgy. Lumayang, Zamboanga City

Construction of School Buildings

Brgy. Lumayang, Zamboanga City

No. of School Building

1.00 Plans and POW GAA 2021 1,600.001,600.00 3,200

- - c. Flood Control - -

253. Construction of Drainage System, Brgy. Boalan, Zamboanga City

Construction of Drainage Structure

Brgy. Boalan, Zamboanga City

Lineal Meters 14.10 Plans and POW GAA 20181,000.00 - - 1,000

254. Construction of Drainage System, Bungiao, Zamboanga City

Construction of Drainage Structure

Brgy. Bungiao, Zamboanga City

Lineal Meters 27.78 Plans and POW GAA 20182,000.00 - - 2,000

255. Construction of Drainage System, Kasanyangan, Zamboanga City

Construction of Drainage Structure

Brgy. Kasanyangan,

Zamboanga City

Lineal Meters 27.78 Plans and POW GAA 20182,000.00 - - 2,000

256. Construction of Drainage System, Sangali, Zamboanga City

Construction of Drainage Structure

Brgy. Sangali, Zamboanga City

Lineal Meters 27.78 Plans and POW GAA 20182,000.00 - - 2,000

257. Construction of Drainage System, Sta. Catalina, Zamboanga City

Construction of Drainage Structure

Brgy. Sta. Catalina,

Zamboanga City

Lineal Meters 27.78 Plans and POW GAA 20181,500.00 - - 1,500

258. Construction of Drainage System, Talon-Talon, Zamboanga City

Construction of Drainage Structure

Brgy. Talon-Talon, Zamboanga City

Lineal Meters 27.78 Plans and POW GAA 20182,000.00 - - 2,000

259. Construction of Drainage System, Tetuan, Zamboanga City

Construction of Drainage Structure

Brgy. Tetuan, Zamboanga City

Lineal Meters 27.78 Plans and POW GAA 20183,000.00 - - 3,000

260. Construction of Drainage System, Tugbungan, Zamboanga City

Construction of Drainage Structure

Brgy. Tugbungan, Zamboanga City

Lineal Meters 27.78 Plans and POW GAA 20182,000.00 - - 2,000

261. Construction of Flood Control, Quiniput, Zamboanga City

Construction of Flood

Mitigation Structure

Brgy. Quiniput, Zamboanga City

Lineal meter 1,400.00 Plans and POW GAA 2020

5,000.00 105,000.00 105,000.00 105,000.00 320,000

262. Construction of Flood Control, Zambowood Zamboanga City

Construction of Flood

Mitigation Structure

Brgy. Zambowood, Zamboanga City

Lineal meter 1,600.00 Plans and POW GAA 2020

5,000.00 120,000.00 120,000.00 120,000.00 365,000

263. Construction of Drainage System/Slope ProtectionPutik, Zamboanga City

Construction of Drainage

Structure

Brgy. Putik, Zamboanga City

Lineal meter 300.00 Plans and POW GAA 20205,000.00 30,000.00 30,000.00 30,000.00 95,000

Chapter 19-1-DPWH IX-ZC DEO 2LDPage 21 of 30

Page 556: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

264. Construction of Drainage System/Slope ProtectionLumayang, Zamboanga City

Construction of Drainage Structure

Brgy. Lumayang, Zamboanga City

Lineal meter 300.00 Plans and POW GAA 20205,000.00 30,000.00 30,000.00 30,000.00 95,000

265. Construction of Drainage System/Slope ProtectionVictoria, Zamboanga City

Construction of Drainage

Structure

Brgy. Victoria, Zamboanga City

Lineal meter 300.00 Plans and POW GAA 20205,000.00 30,000.00 30,000.00 30,000.00 95,000

266. Construction of Drainage System/Slope ProtectionTugbungan, Zamboanga City

Construction of Drainage

Structure

Brgy. Tugbungan, Zamboanga City

Lineal meter 300.00 Plans and POW GAA 20205,000.00 30,000.00 30,000.00 30,000.00 95,000

267. Construction of Drainage System/Slope ProtectionBolong, Zamboanga City

Construction of Drainage

Structure

Brgy. Bolong, Zamboanga City

Lineal meter 300.00 Plans and POW GAA 20205,000.00 30,000.00 30,000.00 30,000.00 95,000

268. Construction of Drainage System/Slope Protection Lunzuran, Zamboanga City

Construction of Drainage

Structure

Brgy. Lunzuran, Zamboanga City

Lineal meter 300.00 Plans and POW GAA 20205,000.00 30,000.00 30,000.00 30,000.00 95,000

269. Construction of Drainage Structure along Guiwan (Daisy Rd.) - Tugbungan Rd., Zamboanga City

Construction of Drainage Structure

Brgy. Guiwan-Tugbungan, Zamboanga City

Ln.m. 370.00 Plans and POW GAA 20212 5,000.00 5,000.00 10,000

270. Construction of Drainage Structure along Purok 5, Sto. Niño, San Jose, Zamboanga City

Construction of Drainage Structure

Brgy. San Jose Zamboanga City

Ln.m. 370.00 Plans and POW GAA 20212 5,000.00 5,000.00 10,000

269. Construction of Seawall Arena Blanco, Zamboanga City

Construction of Flood

Mitigation Structure

Brgy. Arena Blanco,

Zamboanga City

Lineal meter 400.00 Plans and POW GAA 2020

10,000.00 40,000.00 40,000.00 40,000.00 130,000

d. Flood Control Structures/Facilities - - 270. Construction of Flood Control, Brgy.

Boalan, Zamboanga CityConstruction of

Drainage Structure

Brgy. Boalan, Zamboanga City

Lineal Meters 27.78 Plans and POW GAA 20181,000.00 - - 1,000

271. Construction of flood control at Barangay Sibulao, Zamboanga City

Construction ofFlood

MitigationStructure

Barngay Sibulao, Zamboanga City

Lineal meters 869.26 Plans and POW GAA 2019

15,000.00 - 15,000

e. Local Roads - - 272. Road Concreting, Tetuan, Zamboanga City

(TL = 0.20 KM)Road

Upgrading gravel to paved

Brgy. Tetuan, Zamboanga City

Lane KM 0.40 Plans and POW GAA 2017

2,000.00 - 2,000

273. Road Concreting, Culianan, Zamboanga City (TL = 0.30 KM)

Road Upgrading

gravel to paved

Brgy. Culianan, Zamboanga City

Lane KM 0.60 Plans and POW GAA 2017

3,000.00 - 3,000

274. Road Concreting, Curuan, Zamboanga City (TL = 0.30 KM)

Road Upgrading

gravel to paved

Brgy. Curuan, Zamboanga City

Lane KM 0.60 Plans and POW GAA 2017

3,000.00 - 3,000

275. Road Concreting, Lamisahan, Zamboanga City (TL = 0.30 KM)

Road Upgrading

gravel to paved

Brgy. Lamisahan, Zamboanga City

Lane KM 0.60 Plans and POW GAA 2017

3,000.00 - 3,000

276. Road Concreting, Lanzones, Zamboanga City (TL = 0.30 KM)

Road Upgrading

gravel to paved

Brgy. Lanzones, Zamboanga City

Lane KM 0.60 Plans and POW GAA 2017

3,000.00 - 3,000

Chapter 19-1-DPWH IX-ZC DEO 2LDPage 22 of 30

Page 557: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

277. Road Concreting, Lunzuran, Zamboanga City (TL = 0.30 KM)

Road Upgrading

gravel to paved

Brgy. Lunzuran, Zamboanga City

Lane KM 0.60 Plans and POW GAA 2017

3,000.00 - 3,000

278. Road Concreting, Divisoria, Zamboanga City (TL = 0.30 KM)

Road Upgrading

gravel to paved

Brgy. Divisoria, Zamboanga City

Lane KM 0.60 Plans and POW GAA 2017

3,000.00 - 3,000

279. Road Concreting, Salaan, Zamboanga City (TL = 0.30 KM)

Road Upgrading

gravel to paved

Brgy. Salaan, Zamboanga City

Lane KM 0.60 Plans and POW GAA 2017

3,000.00 - 3,000

280. Road Concreting, Sibulao, Zamboanga City (TL = 0.30 KM)

Road Upgrading

gravel to paved

Brgy. Sibulao, Zamboanga City

Lane KM 0.60 Plans and POW GAA 2017

3,000.00 - 3,000

281. Road Concreting, Putik, Zamboanga City (TL = 0.30 KM)

Road Upgrading

gravel to paved

Brgy. Putik, Zamboanga City

Lane KM 0.60 Plans and POW GAA 2017

3,000.00 - 3,000

282. Concreting of Road, Blanco, Zamboanga City

Construction ofConcrete Road

Brgy. Blanco, Zamboanga City

Lane KM 0.40 Plans and POW GAA 2018

2,000.00 - - 2,000

283. Concreting of Road, Brgy. Bolong, Zamboanga City

Construction ofConcrete Road

Brgy. Bolong, Zamboanga City

Lane KM 0.40 Plans and POW GAA 2018

2,000.00 - - 2,000

284. Concreting of Road, Brgy. Lamisahan, Zamboanga City

Construction ofConcrete Road

Brgy. Lamisahan, Zamboanga City

Lane KM 0.40 Plans and POW GAA 2018

2,000.00 - - 2,000

285. Concreting of Road, Brgy. Limaong, Zamboanga City

Construction ofConcrete Road

Brgy. Limaong, Zamboanga City

Lane KM 0.30 Plans and POW GAA 2018

1,500.00 - - 1,500

286. Concreting of Road, Brgy. Pasabolong, Zamboanga City

Construction ofConcrete Road

Brgy. Pasabolong, Zamboanga City

Lane KM 0.30 Plans and POW GAA 2018

1,500.00 - - 1,500

287. Concreting of Road, Brgy. Taguiti, Zamboanga City

Construction ofConcrete Road

Brgy. Taguiti, Zamboanga City

Lane KM 0.30 Plans and POW GAA 2018

1,500.00 - - 1,500

288. Concreting of Road, Brgy. Tolosa, Zamboanga City

Construction ofConcrete Road

Brgy. Tolosa, Zamboanga City

Lane KM 0.30 Plans and POW GAA 2018

1,500.00 - - 1,500

289. Concreting of Road, Brgy. Tumalutab, Zamboanga City

Construction ofConcrete Road

Brgy. Tumalutab, Zamboanga City

Lane KM 0.30 Plans and POW GAA 2018

1,500.00 - - 1,500

290. Concreting of Road, Brgy. Tumitus, Zamboanga City

Construction ofConcrete Road

Brgy. Tumitus, Zamboanga City

Lane KM 0.30 Plans and POW GAA 2018

1,500.00 - - 1,500

Chapter 19-1-DPWH IX-ZC DEO 2LDPage 23 of 30

Page 558: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

291. Concreting of Road, Brgy. Victoria, Zamboanga City

Construction ofConcrete Road

Brgy. Victoria, Zamboanga City

Lane KM 0.30 Plans and POW GAA 2018

1,500.00 - - 1,500

292. Concreting of Road, Brgy. Zambowood, Zamboanga City

Construction ofConcrete Road

Brgy. Zambowood, Zamboanga City

Lane KM 0.30 Plans and POW GAA 2018

1,500.00 - - 1,500

293. Concreting of Road, Cabaluay, Zamboanga City

Construction ofConcrete Road

Brgy. Cabaluay, Zamboanga City

Lane KM 0.30 Plans and POW GAA 2018

1,500.00 - - 1,500

294. Concreting of Road, Cacao, Zamboanga City

Construction ofConcrete Road

Brgy. Cacao, Zamboanga City

Lane KM 0.40 Plans and POW GAA 2018

2,000.00 - - 2,000

295. Concreting of Road, Culianan, Zamboanga City

Construction ofConcrete Road

Brgy. Culianan, Zamboanga City

Lane KM 0.40 Plans and POW GAA 2018

2,000.00 - - 2,000

296. Concreting of Road, Lapakan, Zamboanga City

Construction ofConcrete Road

Brgy. Lapakan, Zamboanga City

Lane KM 0.40 Plans and POW GAA 2018

2,000.00 - - 2,000

297. Concreting of Road, Lumayang, Zamboanga City

Construction ofConcrete Road

Brgy. Lumayang, Zamboanga City

Lane KM 0.30 Plans and POW GAA 2018

1,500.00 - - 1,500

298. Concreting of Road, Lumbangan, Zamboanga City

Construction ofConcrete Road

Brgy. Lumbangan, Zamboanga City

Lane KM 0.30 Plans and POW GAA 2018

1,500.00 - - 1,500

299. Concreting of Road, Mampang, Zamboanga City

Construction ofConcrete Road

Brgy. Mampang, Zamboanga City

Lane KM 0.40 Plans and POW GAA 2018

2,000.00 - - 2,000

300. Concreting of Road, Muti, Zamboanga City Construction ofConcrete Road

Brgy. Muti, Zamboanga City

Lane KM 0.40 Plans and POW GAA 2018

2,000.00 - - 2,000

301. Concreting of Road, Panubigan, Zamboanga City

Construction ofConcrete Road

Brgy. Panubigan, Zamboanga City

Lane KM 0.30 Plans and POW GAA 2018

1,500.00 - - 1,500

302. Concreting of Road, Quiniput, Zamboanga City

Construction ofConcrete Road

Brgy. Quiniput, Zamboanga City

Lane KM 0.40 Plans and POW GAA 2018

2,000.00 - - 2,000

303. Concreting of Road, Sibulao, Zamboanga City

Construction ofConcrete Road

Brgy. Sibulao, Zamboanga City

Lane KM 0.30 Plans and POW GAA 2018

1,500.00 - - 1,500

304. Concreting of Road, Tigbalabag, Zamboanga City

Construction ofConcrete Road

Brgy. Tigbalabag, Zamboanga City

Lane KM 0.30 Plans and POW GAA 2018

1,500.00 - - 1,500

Chapter 19-1-DPWH IX-ZC DEO 2LDPage 24 of 30

Page 559: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

305. Road Concreting, Barangay Divisoria, Zamboanga City

Construction ofConcrete Road

Barangay Divisoria, Zamboanga City

Lane Km. 0.24 Plans and POW GAA 2019

2,000.00 - 2,000

306. Road Concreting, Barangay Landang Laum, Zamboanga City

Construction ofConcrete Road

Barangay Landang Laum, Zamboanga

City

Lane Km. 0.23 Plans and POW GAA 2019

2,000.00 - 2,000

307. Road Concreting, Barangay Lanzones, Zamboanga City

Construction ofConcrete Road

Barangay Lanzones,

Zamboanga City

Lane Km. 0.27 Plans and POW GAA 2019

2,000.00 - 2,000

308. Road Concreting, Barangay Lapakan, Zamboanga City

Construction ofConcrete Road

Barangay Lapakan, Zamboanga City

Lane Km. 0.20 Plans and POW GAA 2019

2,000.00 - 2,000

309. Road Concreting, Barangay Licomo, Zamboanga City

Construction ofConcrete Road

Barangay Licomo, Zamboanga City

Lane Km. 0.34 Plans and POW GAA 2019

2,000.00 - 2,000

310. Road Concreting, Barangay Limaong, Zamboanga City

Construction ofConcrete Road

Barangay Limaong, Zamboanga City

Lane Km. 0.40 Plans and POW GAA 2019

2,000.00 - 2,000

311. Road Concreting, Barangay Lumayang, Zamboanga City

Construction ofConcrete Road

Barangay Lumayang,

Zamboanga City

Lane Km. 0.26 Plans and POW GAA 2019

1,500.00 - 1,500

312. Road Concreting, Barangay Lumbangan, Zamboanga City

Construction ofConcrete Road

Barangay Lumbangan,

Zamboanga City

Lane Km. 0.34 Plans and POW GAA 2019

2,000.00 - 2,000

313. Road Concreting, Barangay Mercedes, Zamboanga City

Construction ofConcrete Road

Barangay Mercedes,

Zamboanga City

Lane Km. 0.26 Plans and POW GAA 2019

2,000.00 - 2,000

314. Road Concreting, Barangay Sibulao, Zamboanga City

Construction ofConcrete Road

Barangay Sibulao, Zamboanga City

Lane Km. 0.27 Plans and POW GAA 2019

2,000.00 - 2,000

315. Road Concreting, Barangay Calabasa, Zamboanga City

Construction ofConcrete Road

Barangay Calabasa, Zamboanga City

Lane Km. 0.35 Plans and POW GAA 2019

2,000.00 - 2,000

316. Road Concreting, Barangay Lamisahan, Zamboanga City

Construction ofConcrete Road

Barangay Lamisahan,

Zamboanga City

Lane Km. 0.24 Plans and POW GAA 2019

2,000.00 - 2,000

317. Road Concreting, Barangay Manalipa, Zamboanga City

Construction ofConcrete Road

Barangay Manalipa,

Zamboanga City

Lane Km. 0.34 Plans and POW GAA 2019

1,500.00 - 1,500

318. Road Concreting, Barangay Tolosa, Zamboanga City

Construction ofConcrete Road

Barangay Tolosa, Zamboanga City

Lane Km. 0.13 Plans and POW GAA 2019

1,500.00 - 1,500

Chapter 19-1-DPWH IX-ZC DEO 2LDPage 25 of 30

Page 560: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

319. Road Concreting, Barangay Victoria, Zamboanga City

Construction ofConcrete Road

Barangay Victoria, Zamboanga City

Lane Km. 0.20 Plans and POW GAA 2019

1,000.00 - 1,000

320. Road Concreting, Barangay Vitali, Zamboanga City

Construction ofConcrete Road

Barangay Vitali, Zamboanga City

Lane Km. 0.35 Plans and POW GAA 2019

2,000.00 - 2,000

321. Road Concreting, Barangay Busay, Zamboanga City

Construction ofConcrete Road

Barangay Busay, Zamboanga City

Lane Km. 0.85 Plans and POW GAA 2019

1,000.00 - 1,000

322. Road Concreting, Barangay Dita, Zamboanga City

Construction ofConcrete Road

Barangay Dita, Zamboanga City

Lane Km. 0.16 Plans and POW GAA 2019

2,000.00 - 2,000

323. Road Concreting, Barangay Landang Gua, Zamboanga City

Construction ofConcrete Road

Barangay Landang Gua, Zamboanga

City

Lane Km. 0.17 Plans and POW GAA 2019

1,500.00 - 1,500

324. Road Concreting, Barangay Muti, Zamboanga City

Construction ofConcrete Road

Barangay Muti, Zamboanga City

Lane Km. 0.19 Plans and POW GAA 2019

2,000.00 - 2,000

325. Road Concreting, Barangay Pangapuyan, Zamboanga City

Construction ofConcrete Road

Barangay Pangapuyan,

Zamboanga City

Lane Km. 0.14 Plans and POW GAA 2019

1,000.00 - 1,000

326. Road Concreting, Barangay Pasilmanta, Zamboanga City

Construction ofConcrete Road

Barangay Pasilmanta,

Zamboanga City

Lane Km. 0.14 Plans and POW GAA 2019

1,500.00 - 1,500

327. Road Concreting, Barangay Tumitus, Zamboanga City

Construction ofConcrete Road

Barangay Tumitus, Zamboanga City

Lane Km. 0.40 Plans and POW GAA 2019

2,000.00 - 2,000

328. Road Concreting at Barangay Talabaan, Zamboanga City

Construction ofConcrete Road

Barangay Talabaan, Zamboanga City

Lane Km. 0.18 Plans and POW GAA 2019

1,500.00 - 1,500

329. Road Concreting, Sitio Busug, Barangay Manicahan, Zamboanga City

Construction ofConcrete Road

Barangay Manicahan,

Zamboanga City

Lane Km. 0.13 Plans and POW GAA 2019

1,500.00 - 1,500

330. Opening and Construction of Farm-To-Market Road at Sitio Licopon, Barangay Bolong, Zamboanga City

Construction of Concrete Road

Sitio Licopon, Brgy. Bolong,

Zamboanga City

Lane Km. 8.00 Plans and POW GAA 202050,000.00 50,000.00 50,000.00 150,000

331. Construction /Rehabilitation /Improvement of Farm-to-Market Road at Sitios Waray-Waray, Mangga, San Isidro, Siguinan, Udjung, Calingac, Piña and Baluno, Barangay Bunguaio, Zamboanga City

Construction of Concrete Road

Sitios Waray-Waray, Mangga,

San Isidro, Siguinan, Udjung, Calingac, Piña and Baluno, Barangay

Bunguaio, Zamboanga City

Lane Km. 6.40 Plans and POW GAA 2020

40,000.00 40,000.00 40,000.00 120,000

Chapter 19-1-DPWH IX-ZC DEO 2LDPage 26 of 30

Page 561: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

332. Construction of Farm-to-Market Road at Sitio Kapuk, Barangay Lamisahan, Zamboanga City

Construction of Concrete Road

Sitio Kapuk, Barangay

Lamisahan, Zamboanga City

Lane Km. 8.00 Plans and POW GAA 2020

50,000.00 50,000.00 50,000.00 150,000

333. Construction of Farm-to-Market Road at Busugan going to Poblacion, Barangay Manicahan, Zamboanga City

Construction of Concrete Road

Busugan - Poblacion, Brgy.

Manicahan, Zamboanga City

Lane Km. 8.00 Plans and POW GAA 2020

50,000.00 50,000.00 50,000.00 150,000

334. Construction/ Rehabilitation/ Improvement of Farm-to-Market Road at Barangay Panubigan, Zamboanga City

Construction of Concrete Road

Barangay Panubigan,

Zamboanga City

Lane Km. 8.80 Plans and POW GAA 202055,000.00 55,000.00 55,000.00 165,000

335. Road Widening at Pasobolong Road, Pasobolong, Zamboanga City

Road Widening Pasobolong, Zamboanga City

Lane Km. 8.26 Plans and POW GAA 202051,615.00 51,615.00 51,615.00 154,845

336. Road Widening at Buenagatas Road-Boalan Zamboanga City

Road Widening Sitio Buenagatas, Brgy. Boalan

Zamboanga City

Lane Km. 19.60 Plans and POW GAA 2020122,490.00 122,490.00 122,490.00 367,470

337. Road Widening at Divisoria-Lumbangan Road, Zamboanga City

Road Widening Brgy. Divisoria - Lumbangan,

Zamboanga City

Lane Km. 15.64 Plans and POW GAA 202097,740.00 97,740.00 97,740.00 293,220

338. Road Widening at Zambowood Road, Zambowood,Zamboanga City

Road Widening Brgy. Zambowood, Zamboanga City

Lane Km. 11.40 Plans and POW GAA 202071,280.00 71,280.00 71,280.00 213,840

339. Road Widening at Socorro- Mercedes Road, Zamboanga City

Road Widening Brgy. Socorro - Mercedes,

Zamboanga City

Lane Km. 17.91 Plans and POW GAA 2020111,960.00 111,960.00 111,960.00 335,880

340. Construction/ Rehabilitation/ Improvement of Farm-to-Market Road at Sitio Cuatro Ojos (West Basilan and Sta. Fe), Vitali, Zamboanga City

Construction of Concrete Road

Sitio Cuatro Ojos (West Basilan and

Sta. Fe), Vitali, Zamboanga City

Lane Km. 11.03 Plans and POW GAA 2020

68,952.00 68,952.00 68,952.00 206,856

341. Road Widening at Putik-Lunzuran Road, Zamboanga City

Road Widening Brgy. Putik - Lunzuran,

Zamboanga City

Lane Km. 11.43 Plans and POW GAA 202071,415.00 71,415.00 71,415.00 214,245

f. Local Bridges - - 342. Construction of Footbridge, Mangusu,

Zamboanga City (L = 27.78 lm)Construction of

FootbridgeBrgy. Mangusu, Zamboanga City

Ln.m. 23.53 Plans and POW GAA 20172,000.00 - 2,000

343. Construction of Concrete Bridge, Barangay Taguiti, Zamboanga City

Construction ofBridge

Barangay Taguiti, Zamboanga City

Square meters 1,428.57 Plans and POW GAA 20195,000.00 - 5,000

344. Construction of Foot Bridge, Barangay Mangusu, Zamboanga City

Construction ofBridge

Barangay Mangusu, Zamboanga City

Square meters 571.43 Plans and POW GAA 20192,000.00 - 2,000

g. Flood Control Structures/Facilities - - 345. Construction of Slope Protection, Quiniput,

Zamboanga City (L = 27.78 m)Construction of

Flood Mitigation Structure

Brgy. Quiniput, Zamboanga City

Ln.m. 27.78 Plans and POW GAA 2017

2,000.00 - 2,000

346. Construction of Slope Protection, Guisao, Zamboanga City (L = 41.67 m)

Construction of Flood

Mitigation Structure

Brgy. Guisao, Zamboanga City

Ln.m. 41.67 Plans and POW GAA 2017

3,000.00 - 3,000

h. Drainage/Protection Works - - 347. Construction of Drainage, Guiwan,

Zamboanga City (L = 41.67 m)Construction of

Flood Mitigation Structure

Brgy. Guiwan, Zamboanga City

Ln.m. 41.67 Plans and POW GAA 2017

3,000.00 - 3,000

Chapter 19-1-DPWH IX-ZC DEO 2LDPage 27 of 30

Page 562: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

348. Construction of Drainage System, Barangay Kasanyangan, Zamboanga City

Construction ofDrainageStructure

Barangay Kasanyangan,

Zamboanga City

Lineal meters 148.00 Plans and POW GAA 2019

2,000.00 - 2,000

349. Construction of Drainage System, Barangay Guiwan, Zamboanga City

Construction ofDrainageStructure

Barangay Guiwan, Zamboanga City

Lineal meters 200.00 Plans and POW GAA 2019

2,000.00 - 2,000

350. Construction of Drainage System, Barangay Culianan, Zamboanga City

Construction ofDrainageStructure

Barangay Culianan, Zamboanga City

Lineal meters 420.00 Plans and POW GAA 2019

2,000.00 - 2,000

351. Construction of Drainage System at MC Enriquez Drive, Barangay Tetuan, Zamboanga City

Construction ofDrainageStructure

Barangay Tetuan, Zamboanga City

Lineal meters 150.00 Plans and POW GAA 2019

2,000.00 - 2,000

352. Construction of Drainage System at Barangay Manicahan, Zamboanga City

Construction ofDrainageStructure

Barangay Manicahan,

Zamboanga City

Lineal meters 220.00 Plans and POW GAA 2019

2,000.00 - 2,000

353. Construction of Drainage System at Barangay Sta. Catalina, Zamboanga City

Construction ofDrainageStructure

Barangay Sta. Catalina,

Zamboanga City

Lineal meters 150.00 Plans and POW GAA 2019

2,000.00 - 2,000

354. Construction of Drainage System at AS Alvarez Drive, Barangay Tetuan, Zamboanga City

Construction ofDrainageStructure

Barangay Tetuan, Zamboanga City

Lineal meters 410.00 Plans and POW GAA 2019

2,500.00 - 2,500

355. Construction of Drainage System at Dona Maria Drive, Barangay Tetuan, Zamboanga City

Construction ofDrainageStructure

Barangay Tetuan, Zamboanga City

Lineal meters 245.00 Plans and POW GAA 2019

2,500.00 - 2,500

356. Construction of Drainage System at Tugbungan Elementary School, Barangay Tugbungan, Zamboanga City

Construction ofDrainageStructure

Barangay Tugbungan,

Zamboanga City

Lineal meters 315.00 Plans and POW GAA 2019

2,000.00 - 2,000

i. Water Supply - - 357. Construction of Water Supply System

(Water Works), Brgy. Dulian Upper Bungiao, Zamboanga City

Construction of Water Supply

Systems

Brgy. Dulian Upper Bungiao,

Zamboanga City

Number ofWaterSupplySystems

1.00 Plans and POW GAA 2018

1,500.00 - - 1,500

358. Construction of Water System, Barangay Dulian Upper Bunguiao, Zamboanga City

Construction ofWater Supply

Systems

Barangay Dulian Upper Bunguiao, Zamboanga City

Number ofWaterSupplySystems

1.00 Plans and POW GAA 2019

1,000.00 - 1,000

359. Construction of Water System at Barangay Salaan, Zamboanga City

Construction ofWater Supply

Systems

Barangay Salaan, Zamboanga City

Number ofWaterSupplySystems

1.00 Plans and POW GAA 2019

1,500.00 - 1,500

360. Construction of Water System, Barangay Tigbalabag, Zamboanga City

Construction ofWater Supply

Systems

Barangay Tigbalabag,

Zamboanga City

Number ofWaterSupplySystems

1.00 Plans and POW GAA 2019

2,000.00 - 2,000

C. GAD Projects - -

Chapter 19-1-DPWH IX-ZC DEO 2LDPage 28 of 30

Page 563: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

361. Construction of 2 units of Restroom, waiting shed and turn-outs along ZC By-pass roadCulianan Section

Construction of Multi Purpose

Building

Brgy. Culiananm, Zamboanga City

No. of Buildings

1.00 Plans and POW GAA 2020

5,000.00 5,000.00 5,000.00 5,000.00 20,000

362. Construction of 2 units of Restroom, waiting shed and turn-outs along ZC-Pagadian City Road San Bernardino Section

Construction of Multi Purpose

Building

Brgy. Guiwan, Zamboanga City

No. of Buildings

1.00 Plans and POW GAA 2020

5,000.00 5,000.00 5,000.00 5,000.00 20,000

363. Construction of 2 Bicycle Lanes (left and Right) along ZC By-Pass road with a road scale of 34.71994 km. Culianan Section

Off-Carriageway

Improvement: Construction of

Bike Lanes

Zamboanga City No. of Projects 1.00 Plans and POW GAA 2020

5,000.00 5,000.00 5,000.00 5,000.00 20,000

364. Construction of Restrooms at Vitali, Zambo. City

Construction of Multi Purpose

Building

Brgy. Vitali, Zamboanga City

No. of Buildings

1.00 Plans and POW GAA 2020

1,000.00 1,000.00 1,000.00 1,000.00 4,000

365. Construction of (1) unit safety and wellness Multi Purpose Building for employees physical fitness activities

Construction of Multi Purpose

Building

Zamboanga City No. of Buildings

1.00 Plans and POW GAA 2020

1,200.00 1,200.00 1,200.00 1,200.00 4,800

366. Construction of Waiting Shed, Restrooms and Turn-out at the following sections, viz;a. San Bernardo Section, Tetuanb. Santa Cruz Section, Tetuanc. Culianan Section

Construction of Multi Purpose

Building

Brgy. Tetuan - Culianan,

Zamboanga City

No. of Buildings

1.00 Plans and POW GAA 2020

6,000.00 6,000.00 6,000.00 6,000.00 24,000

367. Construction of 2 units of Restroom, waiting shed and turn-outs along Zamboanga City By-pass roadCulianan Section

Construction of Multi Purpose Building

Brgy. Culiananm, Zamboanga City

No. of Buildings

1.00 Plans and POW GAA 2021 5,000.00

5,000.00 10,000

368. Construction of 2 units of Restroom, waiting shed and turn-outs along Zamboanga City-Pagadian City Road San Bernardino Section

Construction of Multi Purpose Building

Brgy. Guiwan, Zamboanga City

No. of Buildings

1.00 Plans and POW GAA 2021 5,000.00

5,000.00 10,000

369. Construction of Restrooms at Vitali, Zamboanga City

Construction of Multi Purpose Building

Brgy. Vitali, Zamboanga City

No. of Buildings

1.00 Plans and POW GAA 2021 1,000.00

1,000.00 2,000

370. Construction of (1) unit safety and wellness Multi Purpose Building for employees physical fitness activities

Construction of Multi Purpose Building

Zamboanga City No. of Buildings

1.00 Plans and POW GAA 2021 1,200.00

1,200.00 2,400

371. Construction of Waiting Shed, Restrooms and Turn-out at the following sections,viz;a. San Bernardo Section, Tetuanb. Santa Cruz Section, Tetuanc. Culianan Section

Construction of Multi Purpose Building

Brgy. Tetuan - Culianan, Zamboanga City

No. of Buildings

1.00 Plans and POW GAA 2021 6,000.00

6,000.00 12,000

372. Construction of Multipurpose Building for the Reception and Study Center for Abandoned Children

Construction of Multi Purpose Building

Zamboanga City No. of Buildings

1.00 Plans and POW GAA 2021 10,000.00

10,000.00 20,000

- - Regionwide - -

Local Infrastructure Program - - a. Multipurpose/Facilities - -

Chapter 19-1-DPWH IX-ZC DEO 2LDPage 29 of 30

Page 564: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for

2020 - 2022 Projects only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

373. Construction of Multi Purpose Building (Learning Center) for Purok 1, Brgy. Muti, Zamboanga City

Construction of multipurpose

building

Brgy. Muti, Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2017

2,000.00 - 2,000

374. Improvement of Management Building, DPWH Regional Office IX Compound, Veterans Avenue Extension, Tetuan, Zamboanga City

Rehabilitation /Major Repair

of MultiPurpose Building

Brgy. Tetuan, Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2018 -

1,465.00 - 1,465

375. Renovation of Annex "A" Building, DPWH Regional Office IX Compound, Veterans Avenue Extension, Tetuan, Zamboanga City

Rehabilitation /Major Repair

of MultiPurpose Building

Brgy. Tetuan, Zamboanga City

Number of Buildings

1.00 Plans and POW GAA 2018 -

4,186.00 - 4,186

99,480.00 90,651.00 676,414.00 1,837,452.00 2,164,266.00 2,164,266.00 7,032,529.00

1,195,480.00 2,249,441.00 2,065,324.00 2,588,552.00 12,061,363.95 12,061,363.95 32,221,524.90

Subtotal

GRAND TOTAL

Chapter 19-1-DPWH IX-ZC DEO 2LDPage 30 of 30

Page 565: Table of Contents (By Chapter)

Updated Zamboanga Peninsula Regional Development Investment Program (RDIP), 2017-2022

Agency: DPWH IXChapter 19: Accelerating Infrastructure Development

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

ISABELA CITYBASILAN LONE DISTRICTa. OO1: Ensure Safe and Reliable National Road System

(i) Asset Preservation of National Roads1. Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development Management-4 (HDM-4)

Secondary Road1. Basilan Circumferential Road Isabela -

Lamitan Road (S00005BL)K 1+(-570) - K 1+(0244) - 0.326 km.K 1+189 - K 1+242 - 0.053 km.,K 1+645 - K 2+000 - 0.399 km.,K 2+000 - K 2+879 - 0.879 km.,K 2+910 - K 3+035 - 0148 km.,K 4+737 - K 5+553 - 0.812 km.,K 6+997 - K 7+000 - 0.500 km.,K 7+000 - K 7+393 - 0.393 km.,K 9+000 - K 9+120 - 0.120 km.

Isabela City POW, Plans & contract GAA 3 99,202.00 99,202.00

2. Asphalt Overlay of Widened Road (Isabela-Maluso Road Section) K0000+000-K0002+000 Isabela City,Basilan

Isabela City POW, Plans & contract GAA 3 67,500.00 102,000.00 102,000.00 271,500.00

3. Asphalt Overlay of Widened Road (Isabela-Lamitan Road Section) K0004+860-K0007+643 Isabela City,Basilan

Isabela City POW, Plans & contract GAA 3 70,000.00 105,000.00 105,000.00 280,000.00

2. Preventive Maintenance based on Pavement Management System - - Secondary Road - - 4. Basilan Circumferential Rd - K0011 +

140 - K0012 + 300Slab

Replacement 280 mm

Isabela City POW, Plans & contract GAA 3 49,948.00 63,930.00 - 113,878.00

5. Asphalt Overlay K0006+580 0 K0007+982 along Isabela - Maluso Road

Slab Replacement 280

mmIsabela City POW, Plans &

contract GAA 3 28,670.00 28,670.00 28,670.00 86,010.00

6. Asphalt Overlay K0012+080 0 K0013+800 along Isabela - Maluso Road

Slab Replacement 280

mmIsabela City POW, Plans &

contract GAA 3 29,100.00 29,100.00 29,100.00 87,300.00

- - 3. Construction/Upgrading/Rehabilitation of Drainage along National Roads - -

Secondary Road - -

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

Page 566: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

7. Construction of Drainage with Sidewalk at Veterans Ave., Eastside Brgy., Isabela City

Construction of Sidewalk and Drainage System Isabela City POW, Plans &

contract GAA 3 60,000.00 110,000.00 110,000.00 280,000.00

8. Construction of Drainage with Sidewalk along Isabela-Maluso Road Section (S00002BL) K0001+520-K0002+150 Bothside,0.630 km,K0006+000-K0006+900 Leftside,0.900 km,K0006+050-K0006+500 Rightside,0.450 km,K0006+600-K0006+800 Rightside,0.200 km,K0007+050-K0007+500 Leftside,0.450 km,K0007+800-K0007+900 Rightside,0.100 km,K0008+200-K0008+700 Leftside,0.500 km,K0013+100-K0013+300 Rightside,0.200 km,K0013+400-K0013+500 Rightside,0.100 km

Isabela City POW, Plans & contract GAA 3 29,000.00 29,000.00 58,000.00

9. Construction of Drainage with Sidewalk along Isabela-Lamitan Road Section (S00005BL) K0004+800-K0005+500 Rightside,0.700 km,K0006+500-K0006+700 Rightside,0.200 km

Isabela City POW, Plans & contract 9,000.00 9,000.00 18,000.00

9. Construction/ Improvement of Drainage at Legaspi Road-Tugung Road, Isabela City

Construction of Sidewalk and Drainage System Isabela City POW, Plans &

contract 60,000.00 60,000.00 60,000.00 180,000.00

10. Construction of Line U-Canal/Drainage along BCR, Isabela-Maluso Road K 028+330-K 028+650 Both Sides

Construction of Sidewalk and Drainage System Isabela City POW, Plans &

contract 60,000.00 60,000.00 60,000.00 180,000.00

11. Construction of Slope Protection along BCr, Isabela-Maluso Road

Construction of Sidewalk and Drainage System Isabela City POW, Plans &

contract 70,000.00 70,000.00 70,000.00 210,000.00

12. Basilan Circumferential Road Isabela - Balagtasan Section S00005BL

Construction of Sidewalk and Drainage System Isabela City POW, Plans &

contract - -

- - 4. Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - -

Secondary Road - - 13. Basilan Circumferential Road Isabela -

Balagtasan Section S00005BL Slope Protection Isabela City POW, Plans & contract - 10,000.00 - 171,710.00 150,000.00 150,000.00 481,710.00

14. Basilan Circumferential Road Isabela - Maluso Road S00002BL Slope Protection Isabela City POW, Plans &

contract 98,000.00 110,000.00 110,000.00 318,000.00

(ii) Network Development - - 1. Construction of By-Passes/Diversion Roads, including ROW - -

15. Brgy. Menzi to Brgy. Lanote, Isabela City, Basilan Province Isabela City POW, Plans &

contract 100,000.00 120,000.00 120,000.00 340,000.00

- - 2. Improvement/Widening of National Roads - -

Chapter 19-1-DPWH IX-ICPage 2 of 13

Page 567: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

16. Basilan Circumferential Rd - K0005 + 000 - K0008 + 000

Road Widening including Drainage

Isabela City POW, Plans & contract 99,682.00 110,000.00 130,000.00 130,000.00 469,682.00

17. Basilan Circumferential Rd - K0011+500 - K0014+500

Road Widening including Drainage

Isabela City POW, Plans & contract 90,090.00 - 90,090.00

- - (iii) Construction and Maintenance of Bridges along National Roads - - 1. Construction of New Bridges - -

18. Upper Cabengbeng Bridge, K 061+075 with approaches along Basilan Circumferential Road

Construction of New Bridges Sumisip, Basilan POW, Plans &

contract - 45,000.00 45,000.00 45,000.00 135,000.00

19. Pali Bridge, with approaches and Detour along Basilan Circumferential Road Construction of

New Bridges Maluso, Basilan POW, Plans & contract - 36,000.00 36,000.00 36,000.00 108,000.00

- - 2. Rehabilitation of Permanent Bridges - -

a. Along Basilan Circumferential Road - - 20. Binuangan Br. (B00008BL) along Basilan

Circumferential RdRehabilitation/ Major repair of bridge

Isabela City POW, Plans & contract 9,579.00 - 9,579.00

- - 3. Retrofitting/Strenghtening of Permanent Bridges - -

21. Balagtasan Br. (B00010BL) along Basilan Circumferential Road 23,630.00 - 23,630.00

22. Kumalarang Br. (New) (B00014BL) along Basilan Circumferential Rd - 25,000.00 - 25,000.00

9,579.00 273,350.00 188,132.00 1,005,980.00 1,193,770.00 1,193,770.00 3,864,581.00 OO2: Protect Lives and Properties Against Major Floods -

1. Construction/Maintenance of Flood Mitigation Structures and Drainage System - 23. Construction of Flood Control (Grouted

Riprap) at Binuangan Bridge (K 03+927) Upstream (100 l.m. Both Sides), Downstream (100 l.m. Both Sides), Isabela-Lamitan Road Section, Isabela City, Basilan

Construction of Flood Mitigation

StructureIsabela City POW, Plans &

contract 35,000.00 35,000.00

24. Construction of Revetment, Kumalarang River, Isabela City

Construction of Flood Mitigation

Structure Isabela City POW, Plans & contract 150,000.00 150,000.00 150,000.00 450,000.00

25. Construction of Flood Control Drainage at Isabela City

Construction of Flood Mitigation

Structure Isabela City POW, Plans & contract 20,696.00 150,000.00 150,000.00 150,000.00 470,696.00

26. Construction of Flood Control (Revetment) at Lunot Bridge, Isabela City, Basilan

Construction of Flood Mitigation

Structure Isabela City POW, Plans & contract 10,000.00 35,000.00 - 45,000.00

27. Construction of Flood Control (Revetment) at Balagtasan Bridge, Isabela City, Basilan

Construction of Flood Mitigation

Structure Isabela City POW, Plans & contract 15,000.00 - 15,000.00

OO1- Subtotal

Chapter 19-1-DPWH IX-ICPage 3 of 13

Page 568: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

28. Construction of Flood Control (Revetment) Busay Bridge, Isabela City, Basilan

Construction of Flood Mitigation

Structure Isabela City POW, Plans & contract 10,000.00 - 10,000.00

29. Construction of Flood Control (Revetment) at Lunot Bridge Isabela City POW, Plans &

contract - - -

30. Construction of Flood control Structure along Basilan Circumferential Road (BCR) Isabela to Maluso Road Section,(K004+600 - K005+075), Isabela City, Basilan

Construction of Flood Mitigation

Structure Isabela City POW, Plans & contract 50,000.00 - 50,000.00

31. Construction of Flood Control Structure (Isabela-Maluso Road Section),K0008+080

Construction of Flood Mitigation

Structure Isabela City POW, Plans & contract 20,000.00 20,000.00 20,000.00 60,000.00

32. Construction of Flood Control Structure (Isabela-Maluso Road Section),K0006+800

Construction of Flood Mitigation

Structure Isabela City POW, Plans & contract 30,000.00 30,000.00 30,000.00 90,000.00

10,000.00 145,000.00 20,696.00 350,000.00 350,000.00 350,000.00 1,225,696.00 c. Convergence and Special Support Program -

1. Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - 33. Concreting of Road leading to White

Beach, Malamawi Island, Isabela City Road Concreting Isabela City POW, Plans & contract - - 75,000.00 108,000.00 108,000.00 291,000.00

34. Concreting of Road leading to Hami Beach, Latuan Barangay, Isabela City Road Concreting Isabela City POW, Plans &

contract - - 85,000.00 104,000.00 104,000.00 293,000.00

35. Concreting of Road leading to Isawad Resort, Panunsulan Barangay, Isabela City

Road Concreting Isabela City POW, Plans & contract - - - -

Funded GAA 20192. Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones - -

36. Concreting of UWARBMPC Roads @ Brgy. Cabunbata, Isabela City, Basilan Province Road Concreting Isabela City POW, Plans &

contract - 125,000.00 125,000.00 125,000.00 375,000.00

- - - 285,000.00 337,000.00 337,000.00 959,000.00 A. Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects -

Roads and Bridges - a. Roads -

37. Construction of road including Right-of-Way for the proposed By-pass National Road along Sumagdang-Menzi-Lanote, Isabela City, Basilan

250,000.00 - 250,000.00

38. Road widening along Basilan Circumferential Road (BCR) Isabela-Maluso Road, Isabela City, Basilan including road Right of Way (ROW) K0002+000-K0005+000

120,000.00 - 120,000.00

39. Road widening along Basilan Circumferential Road (BCR) Isabela-Maluso Road, Isabela City, Basilan including road Right of Way (ROW) K0008+000-K0011+500

120,000.00 - 120,000.00

OO2- Subtotal

CSSP- Subtotal

Chapter 19-1-DPWH IX-ICPage 4 of 13

Page 569: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

40. Rehabilitation of Concrete Road along Basilan Circumferential Road (BCR), Isabela - Maluso Rd., Isabela City, Basilan, K05+150-K05+950

Isabela City 40,000.00 - 40,000.00

41. Rehabilitation of Concrete Road along Basilan Circumferential Road (BCR), Isabela - Maluso Rd., Isabela City, Basilan, K09+000-K09+800

Isabela City 40,000.00 - 40,000.00

42. Rehabilitation of Concrete Road along Basilan Circumferential Road (BCR), Isabela - Maluso Rd., Isabela City, Basilan, K13+800 - K14+600

Isabela City 40,000.00 - 40,000.00

43. Rehabilitation of Concrete Road along Basilan Circumferential Road (BCR), Isabela - Maluso, Maluso, Basilan, K18+000-K18+600

Isabela City 30,000.00 - 30,000.00

44. Rehabilitation of Concrete Road along Basilan Circumferential Road (BCR), Isabela - Maluso, Maluso, Basilan, K21+600-K22+500

Isabela City 45,000.00 - 45,000.00

45. Rehabilitation of Concrete Road along Basilan Circumferential Road (BCR), Isabela - Maluso, Maluso, Basilan, K25+500-K26+400

Isabela City 45,000.00 - 45,000.00

46. Widening of National Roads, Isabela-Lamitan Road, Lamitan City, Basilan, K09+000 - K13+500

Isabela City 135,000.00 - 135,000.00

47. Rehabilitation of Concrete Road along Basilan Circumferential Road (BCR), Isabela - Lamitan Rd., Lamitan City, Basilan, K21+300-K22+050

Isabela City 37,500.00 - 37,500.00

48. Rehabilitation of Concrete Road along Basilan Circumferential Road (BCR), Isabela - Lamitan Rd., Lamitan City, Basilan, K35+100-K35+850

Isabela City 37,500.00 - 37,500.00

49. Widening with Shoulder Paving of National Roads, Isabela-Maluso Road, Isabela-Lamitan, Basilan, K04+000 - K09+000

Isabela City 50,000.00 150,000.00 150,000.00 350,000.00

50. Widening with Shoulder Paving of National Roads, Isabela-Maluso Road, Isabela-Lamitan, Basilan, K09+000 - K12+000

Isabela City 40,000.00 150,000.00 150,000.00 340,000.00

51. Widening of National Roads, Isabela-Lamitan Road, Lamitan City, Basilan, K09+000 - K13+500

Isabela City 35,000.00 150,000.00 150,000.00 335,000.00

52. Widening of National Roads, Isabela-Lamitan Road, Lamitan City, Basilan, K13+500 - K15+500

Isabela City 25,000.00 150,000.00 150,000.00 325,000.00

53. Concreting of Interior Roads in Brgy Sumagdang, City of Isabela, Basilan Isabela City 23,000.00 105,000.00 105,000.00 233,000.00

54. Concreting of Brgy. Calvario to Brgy. Maligue,K16+000 - K19+000

Isabela City 51,000.00 120,000.00 120,000.00 291,000.00

Chapter 19-1-DPWH IX-ICPage 5 of 13

Page 570: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

55. Concreting of Brgy. Panunsulan to Brgy. Calvario,K09+000 - K12+000

Isabela City 51,000.00 120,000.00 120,000.00 291,000.00

56. Concreting of Brgy. Busay to Brgy. Panunsulan,K06+000 - K09+000

Isabela City 51,000.00 120,000.00 120,000.00 291,000.00

57. Concreting of Brgy. Balanban to Brgy. Panunsulan,K08+000 - K11+000

Isabela City 51,000.00 120,000.00 120,000.00 291,000.00

58. Concreting of Brgy. Mariki to Brgy. Kumalarang,K18+000 - K21+000

Isabela City 51,000.00 120,000.00 120,000.00 291,000.00

59. Concreting of Brgy. San Rafael to Brgy. Sumagdang,K01+000 - K03+000

Isabela City 34,000.00 120,000.00 120,000.00 274,000.00

60. Concreting of Brgy. Balatanay,K18+000 - K21+000 Isabela City 51,000.00 120,000.00 120,000.00 291,000.00

61. Concreting of Brgy. Boracan to Brgy. Tabiawan,K03+000 - K05+000

Isabela City 34,000.00 120,000.00 120,000.00 274,000.00

62. Concreting of Brgy. Baluno,K08+000 - K11+000 Isabela City 51,000.00 120,000.00 120,000.00 291,000.00

63. Concreting of Brgy. Binuangan,K03+000 - K06+000 Isabela City 51,000.00 120,000.00 120,000.00 291,000.00

64. Concreting of Brgy. Eastside to Brgy. Binuangan,K01+000 - K05+000

Isabela City 68,000.00 120,000.00 120,000.00 308,000.00

65. Concreting of Brgy. Barbara to Brgy. Lukbuton Isabela City 51,000.00 120,000.00 120,000.00 291,000.00

66. Concreting of Brgy. Lukbuton to Brgy. Panigayan,K03+000 - K08+000

Isabela City 35,000.00 120,000.00 120,000.00 275,000.00

67. Concreting of Brgy. Purok Ekong to Brgy. Maligue,K09+000 - K11+000

Isabela City 34,000.00 120,000.00 120,000.00 274,000.00

68. Concreting of Brgy. Lanote to Brgy. Calvario,K03+000 - K06+000

Isabela City 51,000.00 120,000.00 120,000.00 291,000.00

69. Concreting of Brgy. Calvario to Brgy. Kapatagan Grande,K16+000 - K19+000

Isabela City 51,000.00 120,000.00 120,000.00 291,000.00

70. Concreting of Brgy. Kapatagan Grande to Brgy. Brgy. Masola,K18+000 - K21+000

Isabela City 51,000.00 51,000.00 51,000.00 153,000.00

71. Concreting of Brgy. Calvario to Brgy. Small Kapatagan,K14+000 - K17+000

Isabela City 51,000.00 51,000.00 51,000.00 153,000.00

72. Concreting of Brgy. Small Kapatagan to Brgy. Kapatagan Grande,K20+000 - K22+000

Isabela City 34,000.00 34,000.00 34,000.00 102,000.00

73. Concreting of Brgy. Pangaraan to Brgy. Cabunbata,K07+000 - K09+500

Isabela City 42,500.00 42,500.00 42,500.00 127,500.00

74. Concreting of Brgy. Lumbang to Brgy. Kumalarang,K09+000 - K12+000

Isabela City 51,000.00 51,000.00 51,000.00 153,000.00

Chapter 19-1-DPWH IX-ICPage 6 of 13

Page 571: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

75. Concreting of Brgy. Campo Barns to Brgy. Lumbang,K20+000 - K25+000

Isabela City 35,000.00 35,000.00 35,000.00 105,000.00

76. Concreting of Brgy. Kapayawan,K18+000 - K22+000 Isabela City 30,000.00 30,000.00 30,000.00 90,000.00

77. Rehabilitation/Improvement/Construction/Concreting of Maligue - Calvario Road

Isabela City 25,000.00 25,000.00 25,000.00 75,000.00

78. Concreting of Begang - Pinunsilan RoadIsabela City 25,000.00 25,000.00 25,000.00 75,000.00

79. Concreting of Brgy. Panunsulan to Brgy. Calvario, Isabela City Isabela City 50,000.00 50,000.00 50,000.00 150,000.00

80. Concreting of Brgy. Mariki to Brgy. Balawatin, Isabela City Isabela City 75,000.00 75,000.00 75,000.00 225,000.00

81. Concreting of Purok 4 to Purok 3, Brgy. Cabunbata, Isabela City Isabela City 20,000.00 20,000.00 20,000.00 60,000.00

82. Concreting of Road at Brgy. Baluno, Isabela City Isabela City 50,000.00 50,000.00 50,000.00 150,000.00

83. Concreting of Brgy. Eastside to Brgy. Binuangan, Isabela City Isabela City 75,000.00 75,000.00 75,000.00 225,000.00

84. Concreting of Brgy. Lanote to Brgy. Calvario, Isabela City Isabela City 50,000.00 50,000.00 50,000.00 150,000.00

85. Concreting of Brgy. Calvario to Brgy. Kapatagan Grande, Isabela City Isabela City 75,000.00 75,000.00 75,000.00 225,000.00

86. Concreting of Brgy. Pangaraan to Brgy. Cabunbata, Isabela City Isabela City 25,000.00 25,000.00 25,000.00 75,000.00

87. Concreting of Brgy. Kapayawan to Campo Barn, Isabela City Isabela City 50,000.00 50,000.00 50,000.00 150,000.00

88. Rehabilitation/Improvement/Construction Concreting of Maligue - Calvario Road,Isabela City Isabela City 25,000.00 25,000.00 25,000.00 75,000.00

89. Concreting of Begang - Panunsulan Road, Isabela City Isabela City 25,000.00 25,000.00 25,000.00 75,000.00

90. Concreting of Road at Junction Isabela-Maluso Road Section to Sitio Birada Ekong,Maligue Brgy, Isabela City

Isabela City 25,000.00 25,000.00 25,000.00 75,000.00

91. Concreting of Maligue - Kapatagan - Masola Road, Isabela City Isabela City 75,000.00 75,000.00 75,000.00 225,000.00

92. Concreting of Road at Brgy. Tabuk, Isabela City, Basilan Isabela City 5,000.00 5,000.00 5,000.00 15,000.00

93. Aguada-Lanote Road Aguada and Lanote Barangay, Isabela City

50,500.00 50,500.00 50,500.00 151,500.00

94. Panunsulan-Calvario-Maligue (East-West Access Road 2) Panunsulan,

Calvario and Maligue Barangay, Isabela City

23,800.00 23,800.00 23,800.00 71,400.00

95. Lanote-Calvario-Kapatagan-Masola Road (Isabela City to Sumisip) (Spillway)

Lanote, Calvario, Kapatagan & Masola Barangay, Isabela City

60,000.00 60,000.00 60,000.00 180,000.00

Chapter 19-1-DPWH IX-ICPage 7 of 13

Page 572: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

96. Tabiawan-Burakan-Baluno Road (Proposed Light Industrial Park and Economic Zone/BLIP-EZ Access Road)

Tabiawan & Baluno Barangay, Isabela City

50,000.00 50,000.00 50,000.00 150,000.00

97. Construction/Rehab. of Roads Isabela City 20,000.00 20,000.00 20,000.00 60,000.00 98. Construction of Sidewalks along National

Highway Road (Sunrise-Begang) Sunrise & Begang Barangay 10,000.00 10,000.00 10,000.00 30,000.00

99. Construction/rehab. of Pathways in different barangays Isabela City 1,000.00 1,000.00 1,000.00 3,000.00

100. Construction of Sumagdang Coastal Highway, Isabela City, Basilan Isabela City 50,000.00 150,000.00 150,000.00 150,000.00 500,000.00

101. Concreting of Road leading to Isawad Resort, Panunsulan Barangay, Isabela City

Isabela City 40,000.00 40,000.00 40,000.00 120,000.00

102. Isawad Resort, Panunsulan Brgy., Isabela City, Basilan Province Isabela City 40,000.00 40,000.00 40,000.00 120,000.00

103. Malamawi White Beach, Brgy. Lukbuton, Isabela City, Basilan Isabela City 30,000.00 30,000.00 30,000.00 90,000.00

104. Concreting of Road at Diki Barangay , Malamawi Island, Isabela City, BasilanProvince

Isabela City 150,000.00 150,000.00 150,000.00 450,000.00

105. Concreting of Road at National Highway to Brgy. Panunsulan, Isabela City, BasilanProvince Isabela City 60,000.00 60,000.00 60,000.00 180,000.00

106. Concreting of Begang - Panunsulan RoadIsabela City 25,000.00 25,000.00 25,000.00 75,000.00

b. Bridges - - 107. Construction of Concrete Footbridge at

Brgy. Riverside Isabela City 5,000.00 5,000.00 5,000.00 15,000.00

108. Construction of Concrete Footbridge at Brgy. Marang-marang - Sta. Barbara Isabela City 5,000.00 5,000.00 5,000.00 15,000.00

109. Construction of Masola Bridge Masola Barangay, Isabela City 20,000.00 20,000.00 20,000.00 60,000.00

110. Retrofitting/Strengthening of Garlayan Bridge K0024+650,24.0 Ln.M along Isabela-Maluso Road Section, Basilan Circumferential Road

Retrofitting/Strengthening

Basilan Circumferential Road 10,000.00 10,000.00 20,000.00

111. Retrofitting/Strengthening of Garlayan Bridge K0026+450,23.45 Ln.M along Isabela-Maluso Road Section, Basilan Circumferential Road

Retrofitting/Strengthening

Basilan Circumferential Road 10,000.00 10,000.00 20,000.00

112. Retrofitting/Strengthening of Maluso Bridge K0028+6328,46.37Ln.M along Isabela-Maluso Road Section, Basilan Circumferential Road

Retrofitting/Strengthening

Basilan Circumferential Road 9,750.00 9,750.00 19,500.00

113. Retrofitting/Strengthening of Garlayan Bridge K0024+650,24.0 Ln.M along Isabela-Maluso Road Section, Basilan Circumferential Road

Retrofitting/Strengthening

Basilan Circumferential Road 19,800.00 19,800.00 39,600.00

114. Construction of Concrete Footbridge at Brgy. Tabuk Isabela City 5,000.00 5,000.00 5,000.00 15,000.00

115. Construction of Concrete Footbridge at Brgy. Port Area Isabela City 5,000.00 5,000.00 5,000.00 15,000.00

c. Flood Control and Drainage System - -

Chapter 19-1-DPWH IX-ICPage 8 of 13

Page 573: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

116. Construction of flood control-drainage at Isabela City Proper, Isabela City, Basilan Isabela City 135,000.00 - 135,000.00

117. Drainage System at Isabela Proper - Marketside (Legaspi St.-I. Magno St.) to Port Area

Isabela City 1,500.00 1,500.00 1,500.00 4,500.00

118. Construction of Sidewalk and drainage at Veterans Avenue Isabela City 2,000.00 2,000.00 2,000.00 6,000.00

119. Construction of Sidewalk and drainage along Roxas Avenue Isabela City 7,200.00 7,200.00 7,200.00 21,600.00

120. Construction of Draiange System and Sidewalk along U.U Tugung Street (Kaumpurnah Z-I, Z-II & Marketside)

Isabela City 1,000.00 1,000.00 1,000.00 3,000.00

121. Construction of Draiange System at Crossing Veterans Ave. - Roxas Ave. to PEO Drive

Isabela City 1,000.00 1,000.00 1,000.00 3,000.00

122. Rehabilitation of Drainage canal at Mallari Santos Road Isabela City 1,000.00 1,000.00 1,000.00 3,000.00

123. Construction/Rehab. Of Overflow along Brgy. Balanban to Brgy. Panunsulan Isabela City 5,000.00 5,000.00 5,000.00 15,000.00

124. Riverbank/Slope Protection and dredging at Balagtasan River

Brgy. Baluno, Isabela City 5,000.00 5,000.00 5,000.00 15,000.00

125. Construction of Sidewalk with drainage facilities (National Highway) along Valderosa

Isabela City 5,000.00 5,000.00 5,000.00 15,000.00

126. Construction of Sidewalk with drainage facilities (National Highway) along Rizal Avenue

Isabela City 5,000.00 5,000.00 5,000.00 15,000.00

127. Construction fo Sidewalk with drainage faicilities (National Highway) along JS Alano

Isabela City 2,000.00 2,000.00 2,000.00 6,000.00

128. Const. of Concrete Footbridge at Brgy. Kaumpurnah Zone I Isabela City 5,000.00 5,000.00 5,000.00 15,000.00

129. Const. of Concrete Footbridge at Brgy. Kaumpurnah Zone II Isabela City 5,000.00 5,000.00 5,000.00 15,000.00

130. Const. of Concrete Footbridge at Brgy. Kaumpurnah Zone III Isabela City 5,000.00 5,000.00 5,000.00 15,000.00

131. Const. of Concrete Footbridge at Brgy. Timpul Isabela City 5,000.00 5,000.00 5,000.00 15,000.00

132. Construction of Sidewalk with Drainage Facilities (National Highway)

Valderosa St., Rizal Avenue, JS Alano St., Isabela City

1,000.00 1,000.00 1,000.00 3,000.00

133. Const./Rehab. of Drainage Canal in Different Barangays Isabela City 2,000.00 2,000.00 2,000.00 6,000.00

d. Water Supply - - 134. Construction of Level II Water System

along Brgy. Kumalarang Isabela City 2,000.00 2,000.00 2,000.00 6,000.00

135. Construction of Level II Water System along Brgy. Kapatagan Grande Isabela City 2,000.00 2,000.00 2,000.00 6,000.00

136. Construction of Level II Water System along Brgy. Kapayawan Isabela City 500.00 500.00 500.00 1,500.00

137. Const. of water tank for the improvement of water system at Brgy. Balatanay Isabela City 2,000.00 2,000.00 2,000.00 6,000.00

Chapter 19-1-DPWH IX-ICPage 9 of 13

Page 574: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

138. Extension of Potable Water System Level III at Brgy. Baluno Isabela City 2,000.00 2,000.00 2,000.00 6,000.00

139. Construction of Multi-purpose Building, Brgy. Kapayawan, Isabela City, Basilan Isabela City 8,000.00 8,000.00 8,000.00 24,000.00

140. Construction of Multi-Purpose Building at DPWH Compund, Tabuk, Isabela City Isabela City 10,000.00 10,000.00 10,000.00 30,000.00

141. Construction of Covered Court, Cabunbata Brgy., Isabela City Isabela City 6,000.00 6,000.00 6,000.00 18,000.00

142. Construction of Covered Court, Maligue Brgy., Isabela City Isabela City 6,000.00 6,000.00 6,000.00 18,000.00

143. Construction of Covered Court with Stage at DPWH Compund, Tabuk, Isabela City

Isabela City 10,000.00 10,000.00 10,000.00 30,000.00

144. Level II Water System for Panigayan & Marang-Marang Barangay 500.00 500.00 500.00 1,500.00

145. Construction of Water Supply (Underwater Pipeline) to Malamawi, Isabela City

150,000.00 150,000.00 150,000.00 450,000.00

146. Level II Water System for Panigayan & Marang-Marang Barangay

Panigayan and Marang-Marang Barangay

- -

147. Construction of Water System Level III at Sumagdang, Isabela City, Basilan

Panigayan and Marang-Marang Barangay

20,000.00 - 20,000.00

B. Local Infrastructure Program - - a. Multipurpose/Facilities - -

148. Construction of Multipurpose Building in Brgy Isabela City , City of Isabela, Basilan

Isabela City 25,000.00 - 25,000.00

149. Construction of Multipurpose Building in Brgy Sumagdang, City of Isabela, Basilan Isabela City 2,000.00 - 2,000.00

150. Construction of Covered Court, Brgy. Lukbuton, Isabela City, Basilan Isabela City - 3,000.00 - - - - 3,000.00

151. Construction of Covered Court, Brgy. Masola, Isabela City, Basilan Isabela City - 3,000.00 - - - - 3,000.00

152. Construction of Multi-purpose Building, Brgy. Kapayawan, Isabela City, Basilan Isabela City - 2,000.00 - - - - 2,000.00

153. Construction of Multi-purpose Building, Brgy. Lampinigan, Isabela City, Basilan Isabela City - 2,000.00 - - - - 2,000.00

154. Construction of Multi-purpose Building, Brgy. Lukbuton, Isabela City, Basilan Isabela City - 2,000.00 - - - - 2,000.00

155. Construction of Multi-purpose Building, Brgy. Masola, Isabela City, Basilan Isabela City - 2,000.00 - - - - 2,000.00

156. Construction of Multi-Purpose Building (Covered Court), Brgy. Menzi, Isabela City, Basilan

Isabela City - 4,000.00 - - - - 4,000.00

157. Construction of Multi-Purpose Building (Covered Court), Brgy. San Rafael, Isabela City, Basilan

Isabela City - 4,000.00 - - - - 4,000.00

Chapter 19-1-DPWH IX-ICPage 10 of 13

Page 575: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

158. Construction of Multi-Purpose Building (Covered Court), Brgy. Binuanga, Isabela City, Basilan

Isabela City - 2,000.00 - - - - 2,000.00

159. Construction of Multi-Purpose Building (Covered Court), Brgy. Busay, Isabela City, Basilan

Isabela City - 2,000.00 - - - - 2,000.00

160. Construction of Multi-Purpose Building (Covered Court), Brgy. Sta. Barbara, Isabela City, Basilan

Isabela City - 3,000.00 - - - - 3,000.00

161. Construction of Multi-Purpose Building (Covered Court), Brgy. Sumagdang, Isabela City, Basilan

Isabela City - 4,000.00 - - - - 4,000.00

162. Construction of Multi-Purpose Building (Covered Court), Brgy. Calvario, Isabela City, Basilan

Isabela City - 4,000.00 - - - - 4,000.00

163. Construction of Multipurpose Building in Brgy Isabela City , City of Isabela, Basilan

Isabela City - 25,000.00 25,000.00 25,000.00 75,000.00

164. Construction of Multipurpose Building in Brgy Sumagdang, City of Isabela, Basilan Isabela City - 2,000.00 2,000.00 2,000.00 6,000.00

165. Rehabilitation of BNHS Grandstand Oval and Bleachers (Standard Size & Drainage Eastside Barangay,

Isabela City 250,000.00 250,000.00 500,000.00

166. Construction/Rehabilitation of StreetlightIsabela City 3,000.00 3,000.00 3,000.00 9,000.00

167. Improvement of Boulevard (Existing Wooden Wharf) beside the Philippine Coast Guard at Port Area Barangay

Port Area Barangay, Isabela City

1,500.00 1,500.00 1,500.00 4,500.00

168. Construction of Covered Court at Barangay Baluno

Baluno Barangay, Isabela City 4,000.00 4,000.00 4,000.00 12,000.00

169. Construction of Covered Court at Barangay Binuangan

Binuangan Barangay, Isabela City

4,000.00 4,000.00 4,000.00 12,000.00

170. Construction of Covered Court at Barangay Tabiawan

Tabiawan Barangay, Isabela City

4,000.00 4,000.00 4,000.00 12,000.00

171. Construction of Covered Court at Barangay Busay

Busay Barangay, Isabela City 4,000.00 4,000.00 4,000.00 12,000.00

172. Construction of Covered Court at Barangay Cabunbata

Cabunbata Barangay, Isabela City

4,000.00 4,000.00 4,000.00 12,000.00

173. Construction of Covered Court at Barangay Maligue Maligue Barangay,

Isabela City 4,000.00 4,000.00 4,000.00 12,000.00

174. Construction of Covered Court at Barangay Makiri

Makiri Barangay, Isabela City 4,000.00 4,000.00 4,000.00 12,000.00

175. Construction of Covered Court at Barangay Balatanay

Balatanay Barangay, Isabela City

4,000.00 4,000.00 4,000.00 12,000.00

176. Construction of Covered Court at Barangay Panunsulan

Panunsulan Barangay, Isabela City

4,000.00 4,000.00 4,000.00 12,000.00

177. Construction. of 2-Storey Barangay Hall Sta. Cruz Barangay, Isabela City

3,000.00 3,000.00 3,000.00 9,000.00

Chapter 19-1-DPWH IX-ICPage 11 of 13

Page 576: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

178. Construction. of 2-Storey Barangay Hall Seaside Barangay, Isabela City 3,000.00 3,000.00 3,000.00 9,000.00

179. Construction. of 2-Storey Barangay Hall Baluno Barangay, Isabela City 3,000.00 3,000.00 3,000.00 9,000.00

180. Construction. of 2-Storey Barangay Hall Kapayawan Barangay, Isabela City

3,000.00 3,000.00 3,000.00 9,000.00

181. Construction. of 2-Storey Barangay Hall Small Kapatagan Barangay, Isabela City

3,000.00 3,000.00 3,000.00 9,000.00

182. Construction. of 2-Storey Barangay Hall Masola Barangay, Isabela City 3,000.00 3,000.00 3,000.00 9,000.00

183. Construction. of 2-Storey Barangay Hall Makiri Barangay, Isabela City 3,000.00 3,000.00 3,000.00 9,000.00

184. Construction. of 2-Storey Barangay Hall Tampalan Barangay, Isabela City

3,000.00 3,000.00 3,000.00 9,000.00

185. Construction. of 2-Storey Barangay Hall Diki Barangay, Isabela City 3,000.00 3,000.00 3,000.00 9,000.00

186. Construction of 1 unit Basketball Court Isabela City 500.00 500.00 500.00 1,500.00 187. Expansion of Isabela City PPA Terminal Port Area

Barangay, Isabela City

1,500.00 1,500.00 1,500.00 4,500.00

188. Expansion of Isabela City PPA Wharf Port Area Barangay, Isabela City

20,000.00 20,000.00 20,000.00 60,000.00

189. Socialized Housing (lot) Project at Menzi Barangay (Phase II & Prop. Phase II) Menzi Barangay,

Isabela City 15,000.00 15,000.00 15,000.00 45,000.00

190. Construction of Isabela City Cultural and Tourism Center Isabela City 5,000.00 5,000.00 5,000.00 15,000.00

191. Construction of Baluno Air Strip Baluno barangay, Isabela City 10,000.00 10,000.00 10,000.00 30,000.00

192. Construction of 2 units 2-Storey 10 classrooms School Building

Basilan National High School, Isabela City

20,800.00 20,800.00 20,800.00 62,400.00

193. Construction of 1 unit 2-Storey 10 classrooms School Building Malamawi National

High School, Isabela City

20,800.00 20,800.00 20,800.00 62,400.00

194. Construction of 1 unit 2-Storey 10 classrooms School Building

Begang National High School, Isabela City

20,800.00 20,800.00 20,800.00 62,400.00

195. Construction of 1 unit 2-Storey 10 classrooms School Building

Kumalarang National High School, Isabela City

20,800.00 20,800.00 20,800.00 62,400.00

196. Construction of 2-Storey 10 classrooms School Building

Baluno National High School, Isabela City

20,800.00 20,800.00 20,800.00 62,400.00

197. Construction of 2-Storey 10 classrooms School Building

Calvario Peak National High School, Isabela City

20,800.00 20,800.00 20,800.00 62,400.00

Chapter 19-1-DPWH IX-ICPage 12 of 13

Page 577: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

RemarksMode of Funding

Level of Readiness (for 2020 -

2022 Projects

only

Investment Requirements (in exact amount PhP)

LGU Proponent

Basis for Implementation

Chapter Outcome/Project Title

Project Description/ Objectives

Specific Location(Province/

Municipality/ City/ Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output

198. Construction of 2-Storey 10 classrooms School Building

Isabela Central Elementary Pilot School, Isabela City

20,800.00 20,800.00 20,800.00 62,400.00

199. Construction of 1unit 1-Storey 5 classrooms School Building Isabela East Central

Elementary School 10,400.00 10,400.00 10,400.00 31,200.00

200. Construction of 1unit 1-Storey 5 classrooms School Building Begang Central

Elementary School, Isabela City

10,400.00 10,400.00 10,400.00 31,200.00

201. Construction of 1unit 1-Storey 5 classrooms School Building Kaumpurnah

Elementary School, Isabela City

10,400.00 10,400.00 10,400.00 31,200.00

202. Construction of 2 units with 2 classrooms School Building

Balatanay Brgy and Makiri Brgy, Isabela City

8,333.00 8,333.00 8,333.00 24,999.00

b. Local Roads - - 203. Concreting of Interior Roads in Brgy

Sumagdang, City of Isabela, Basilan Isabela City 23,000.00 - 23,000.00

204. Concreting of road in Barangay Balamban and construction of box culvert in Isabela City, Basilan

Isabela City 30,000.00 - 30,000.00

205. Concreting of Brgy. Small Kapatagan to Brgy. Kapatagan Grande,K20+000 - K22+000

Isabela City 5,000.00 - 5,000.00

206. Concreting of Tabuk to Sunset Barangay Road, Isabela City, Basilan Isabela City 6,000.00 - 6,000.00

207. Concreting of Brgy. Baluno,K08+000 - K11+000 Isabela City 9,000.00 - 9,000.00

c. Local Bridges - - 208. Construction of Concrete Footbridge at

Brgy. Marang-marang - Sta. Barbara Isabela City 8,000.00 - 8,000.00

209. Construction of Palasanan Bridge, Brgy. Kapatagan Grande, Isabela City, Basilan Isabela City 5,000.00 - - 5,000.00

REGIONWIDE - - Local Infrastructure Program - -

a. Buildings and Other Structures - - 210. Construction of Multi Purpose Building

(Multi Purpose Center) for Brgy. Buli Buli, Sumisip, Basilan

Isabela City 5,000.00 - 5,000.00

211. Construction of Multi Purpose Building (Multi Purpose Hall) for Brgy. Bohe-Suyak, Ungkaya Pukan, Basilan

Isabela City 2,000.00 - 2,000.00

b. Roads and Bridges - - 212. Construction of Local Roads for

Tabiawan, Isabela, Basilan Isabela City 15,000.00 - 15,000.00

522,000.00 695,000.00 100,000.00 3,743,133.00 5,799,683.00 5,799,683.00 16,659,499.00

541,579.00 1,113,350.00 308,828.00 5,384,113.00 7,680,453.00 7,680,453.00 22,708,776.00

Subtotal

GRAND TOTAL

Chapter 19-1-DPWH IX-ICPage 13 of 13

Page 578: Table of Contents (By Chapter)

UPDATED ZAMBOANGA PENINSULA REGIONAL DEVELOPMENT INVESTMENT PROGRAM (RDIP) 2017-2022

Agency: Civil Aviation Authority of the Philippines IX Chapter 19: Accelerating Infrastructure Development

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-endorsed)

2021(Proposed)

2022(Proposed)

Total Remarks

Chapter 19

CAAP- IX

Zamboanga International Airport (Sub-Total) - - 91,000.00 130,000.00 180,000.00 20,000.00 421,000.00

Construction of Logistic Bldg. & Maintenance Repair Shop 3,000.00 3,000.00 on-Going Upgrading of Concrete Taxiway 14,000.00 14,000.00 on-Going Upgrading of ANS Facilities & Runway Lights 74,000.00 74,000.00 on-Going Construction of Administration Building 30,000.00 30,000.00 Expansion/Improvement of Existing Terminal Building 100,000.00 100,000.00 Construction of New Control Tower Building 65,000.00 65,000.00

Transfer/Construction of Power Plant ANS Building 15,000.00 15,000.00 Construction of New CFR Building 10,000.00 10,000.00 Expansion of Vehicular Parking Area 30,000.00 30,000.00 Expansion of Concrete Apron 30,000.00 30,000.00 Construction of General Taxiway 10,000.00 10,000.00

Construction of Access Road leading to RWY 09 20,000.00 20,000.00 Replacement/Construction of Perimeter Fence Road at southwest portion of RWY 09 20,000.00 20,000.00

Dipolog Airport (Sub-Total) - 1,000.00 2,000.00 3,000.00 30,000.00 115,000.00 151,000.00

Rehab./Extension of Existing Fire Station Building 1,000.00 1,000.00 Construction of Perimeter Fence 2,000.00 2,000.00 Construction of CSIS Building 3,000.00 3,000.00 Expansion of Concrete Apron 30,000.00 30,000.00 Expansion of Vehicular Parking Area 15,000.00 15,000.00 Provision of Runway lights 100,000.00 100,000.00

Pagadian Airport (Sub-Total) 2,500.00 1,000.00 3,000.00 3,000.00 43,000.00 100,000.00 152,500.00

CHAPTER/ RLA/ SUC

INVESTMENT REQUIREMENTS (in Thousand Pesos)

Chapter 19-2-CAAP IXPage 1 of 2

Page 579: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-endorsed)

2021(Proposed)

2022(Proposed)

Total RemarksCHAPTER/ RLA/ SUC

INVESTMENT REQUIREMENTS (in Thousand Pesos)

Construction of Logistic Building 2,500.00 2,500.00

Rehab./Extension of Existing Fire Station Building 1,000.00 1,000.00

Construction of Staffhouse 3,000.00 3,000.00

Construction of CSIS Building 3,000.00 3,000.00

Constuction of Perimeter Fence 10,000.00 10,000.00

Expansion of Concrete Apron 30,000.00 30,000.00

Construction of Covered Pathway 3,000.00 3,000.00

Provision of Runway lights 100,000.00 100,000.00

Ipil Airport (Sub-Total) - - 55,000.00 4,000.00 - - 59,000.00

Construction of Fire Station Building 5,000.00 5,000.00

Construction of Concrete Apron 45,000.00 45,000.00

Construction of Taxiway 5,000.00 5,000.00

Construction of Security Fence 4,000.00 4,000.00

Liloy Airport (Sub-Total) - - - 55,000.00 10,000.00 30,000.00 95,000.00

Construction of Perimeter Fence 5,000.00 5,000.00

Construction of Concrete Runway 50,000.00 50,000.00

Construction of Concrete Taxiway 10,000.00 10,000.00

Construction of Concrete Apron 30,000.00 30,000.00

Siocon Airport (Sub-Total) - - - 55,000.00 10,000.00 30,000.00 95,000.00

Construction of Perimeter Fence 5,000.00 5,000.00

Construction of Concrete Runway 50,000.00 50,000.00

Construction of Concrete Taxiway 10,000.00 10,000.00

Construction of Concrete Apron 30,000.00 30,000.00

GRAND TOTAL 2,500.00 2,000.00 151,000.00 250,000.00 273,000.00 295,000.00 973,500.00

Chapter 19-2-CAAP IXPage 2 of 2

Page 580: Table of Contents (By Chapter)

Agency: National Irrigation AdministrationChapter: 19 - Accelerating Infrastructure Development

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Isabela CityTABIAWAN CIS Basilan RRECIS RRECIS 5,000.00 5,000.00 Sumagdang CIS Basilan RRECIS RRECIS-Repair of

D.W. & Canal Lining 15,000.00 15,000.00

Isabela PIP Basilan Resto CIS Resto-CIS-Installation of Pump, Construction of Groundlevel Reservoir & Installation of Pipeline

3,000.00 3,000.00

Makiri SIP Basilan SIP SIP 15,000.00 15,000.00 TOTAL 5,000.00 15,000.00 - 3,000.00 15,000.00 - 38,000.00

Zamboanga CityDistrict 1Sta. Rita CIP Zamboanga

CityCARP IC CARP-IC

8,000.00 8,000.00

Patalon SIP Zamboanga City

FS/DE FS/DE 330.00 330.00

Ayala CIS Zamboanga City

RRECIS RRECIS 3,000.00 3,000.00

La Paz CIS Zamboanga City

RRECIS RRECIS 2,000.00 2,000.00

Malagutay CIS Zamboanga City

RRECIS RRECIS 3,000.00 3,000.00

Sta. Rita CIS Zamboanga City

RRECIS RRECIS 5,000.00 5,000.00

Talisayan CIS Zamboanga City

RRECIS RRECIS 3,000.00 3,000.00

Patalon SIP Zamboanga City

SIP SIP10,000.00

10,000.00

Limpapa SIP Zamboanga City

FS/DE Conduct of F.S. & D.E. activities

500.00 500.00

Preza Mayor CIS Zamboanga City

RRECIS RRECIS-Repair of Dam

15,000.00 15,000.00

Preza Mayor CIS Zamboanga City

RRECIS RRECIS-Improvement of IS Facilities

10,000.00 10,000.00

Talisayan CIS Zamboanga City

RRECIS RRECIS-RRECIS-Concreting of canals

5,000.00 5,000.00

Updated Zamboanga Peninsula Regional Development Investment Program (RDIP), 2017-2022

Chapter Outcome/ Project Title Project Description/ Objectives

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (PhP '000)

LGU Proponent Remarks

Chapter 19-3-NIA IXPage 1 of 40

Page 581: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title Project Description/ Objectives

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (PhP '000)

LGU Proponent Remarks

Baluno SIP Zamboanga City

SIP SIP-Const'n of new Irrig. System 5,000.00

5,000.00

Labuan SIP Zamboanga City

SIP SIP-Const'n of new Irrig. System 3,000.00

3,000.00

Preza Mayor CIS Zamboanga City

Repair CIS REPAIR-CIS 4,400.00 4,400.00

Preza Mayor CIS Zamboanga City

Resto CIS RESTO-CIS 600.00 600.00

Limpapa SIP Zamboanga City

SIP SIP 4,000.00 4,000.00

Ayala CIS Zamboanga City

Repair CIS Repair-CIS-Repair of Headworks & Canalization of Canal Lining

4,000.00 4,000.00

Talisayan CIS Zamboanga City

Repair CIS Repair-CIS-Repair of Headworks, Construction of Canalization, Ground Level Reservoir & Installation of Pipeline

4,000.00 4,000.00

Labuan SIP Zamboanga City

Resto CIS Resto-CIS-Construction of Ground Level Reservoir & Installation of Pipeline

2,500.00 2,500.00

PATALON SIP Zamboanga City

Resto CIS Resto-CIS-Construction of Ground Level Reservoir & Installation of Pipeline

4,500.00 4,500.00

Linduman SIP Zamboanga City

SIP SIP-Construction of Intake Structure, Ground Level Reservoir & Installation of Pipeline

35,000.00 35,000.00

Talisayan CIS Zamboanga City

Repair CIS Repair CIS 4,000.00 4,000.00

Sinubong SIP Zamboanga City

SIP SIP 5,250.00 5,250.00

Capisan SIP Zamboanga City

SIP SIP 17,850.00 17,850.00

Chapter 19-3-NIA IXPage 2 of 40

Page 582: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title Project Description/ Objectives

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (PhP '000)

LGU Proponent Remarks

Patalon Mapsacara SIP Zamboanga City

SIP SIP 14,000.00 14,000.00

Dulian SIP Zamboanga City

SIP SIP 7,000.00 7,000.00

Pamucutan SIP Zamboanga City

SIP SIP 21,000.00 21,000.00

Latap SIP Zamboanga City

FS/DE FS/DE 25,000.00 25,000.00

TOTAL 34,330.00 38,500.00 9,000.00 50,000.00 69,100.00 25,000.00 225,930.00 District 2Sinuropan CIS Extn. Zamboanga

CityExtension CIS CIS Extension 5,000.00 5,000.00

Tictapol CIS Extn. Zamboanga City

Extension CIS CIS Extension 15,000.00 15,000.00

Licomo SIP Zamboanga City

FS/DE FS/DE 335.00 335.00

Lower Tigbao SIP Zamboanga City

FS/DE FS/DE 335.00 335.00

Boalan CIS Zamboanga City

RRECIS RRECIS 2,000.00 2,000.00

Bolong CIS Zamboanga City

RRECIS RRECIS 5,000.00 5,000.00

Buenavista CIS Zamboanga City

RRECIS RRECIS 3,000.00 3,000.00

Curuan CIS Zamboanga City

RRECIS RRECIS 2,000.00 2,000.00

Dabuy CIS Zamboanga City

RRECIS RRECIS 2,000.00 2,000.00

Manga CIS Zamboanga City

RRECIS RRECIS 3,000.00 3,000.00

Manicahan CIS Zamboanga City

RRECIS RRECIS 2,000.00 2,000.00

Mercedes CIS Zamboanga City

RRECIS RRECIS 10,000.00 10,000.00

Quinipot CIS Zamboanga City

RRECIS RRECIS 5,000.00 5,000.00

San Isidro Bunguiao CIS Zamboanga City

RRECIS RRECIS 5,000.00 5,000.00

Seguinan Bungiao CIS Zamboanga City

RRECIS RRECIS 5,000.00 5,000.00

Taloptap CIS Zamboanga City

RRECIS RRECIS 10,000.00 10,000.00

Chapter 19-3-NIA IXPage 3 of 40

Page 583: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title Project Description/ Objectives

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (PhP '000)

LGU Proponent Remarks

Vitali CIS Zamboanga City

RRECIS RRECIS 10,000.00 10,000.00

Guisao SIP Zamboanga City

SIP SIP5,000.00

5,000.00

Licomo SIP Zamboanga City

SIP SIP10,000.00

10,000.00

Lower Tigbao SIP Zamboanga City

SIP SIP5,000.00

5,000.00

Curuan CIS Extn. Zamboanga City

Extension CIS CIS Extn-Const'n of ext'n facilities 15,000.00

15,000.00

Mercedes IP (Supplemental Source)

Zamboanga City

Mercedes IP Conduct of F.S. & D.E. activities

1,865.00 50,000.00 51,865.00

Boalan CIS Zamboanga City

RRECIS RRECIS-Improvement of IS Facilities

3,000.00 3,000.00

Bolong CIS Zamboanga City

RRECIS RRECIS-Improvement of IS Facilities

3,000.00 3,000.00

Curuan CIS Zamboanga City

RRECIS RRECIS-Improvement of IS Facilities

3,000.00 3,000.00

Dabuy CIS Zamboanga City

RRECIS RRECIS-Improvement of IS Facilities

5,000.00 5,000.00

Manicahan CIS Zamboanga City

RRECIS RRECIS-Improvement of IS Facilities

4,000.00 4,000.00

Mercedes CIS Zamboanga City

RRECIS RRECIS-Improvement of IS Facilities

14,000.00 14,000.00

Quinipot CIS Zamboanga City

RRECIS RRECIS-Improvement of IS Facilities

8,000.00 8,000.00

Tictapol CIS Zamboanga City

RRECIS RRECIS-Improvement of IS Facilities

8,000.00 8,000.00

Vitali CIS Zamboanga City

RRECIS RRECIS-Improvement of IS Facilities

4,000.00 4,000.00

Lower Tigbao Licomo SIP Zamboanga City

SIP SIP-Const'n of new Irrig. System 27,000.00

27,000.00

Lumayang CPIP Zamboanga City

CARP IC CARP-IC 5,000.00 5,000.00

Curuan CIS Extn. Zamboanga City

Extension CIS CIS EXTENSION 3,000.00 3,000.00

Sinuropan CIS Extn. Zamboanga City

Extension CIS CIS EXTENSION 25,000.00 25,000.00

CURUAN CIS Zamboanga City

Extension CIS CIS EXTENSION 3,000.00 3,000.00

SINUROPAN CIS Zamboanga City

Extension CIS CIS EXTENSION 5,000.00 5,000.00

Chapter 19-3-NIA IXPage 4 of 40

Page 584: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title Project Description/ Objectives

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (PhP '000)

LGU Proponent Remarks

LINDUMAN SIP Zamboanga City

FS/DE FS/DE 300.00 300.00

MANGGA BUNGUIAO SIP Zamboanga City

FS/DE FS/DE 300.00 300.00

Curuan CIS Zamboanga City

Repair CIS REPAIR-CIS 2,800.00 2,800.00

Mercedes CIS Zamboanga City

Repair CIS REPAIR-CIS 7,300.00 7,300.00

Mercedes CIS Zamboanga City

Resto CIS RESTO-CIS 3,000.00 3,000.00

MERCEDES CIS Zamboanga City

Repair CIS REPAIR-CIS 9,000.00 9,000.00

LOWER TIGBAO LICOMO SIP Zamboanga City

SIP SIP 35,000.00 35,000.00

Seguinan CIS Zamboanga City

Extension CIS CIS Extn-Construction of Intake Structure, Canalization & Canal Structures

3,050.00 3,050.00

Manga-Bunguiao CIS Zamboanga City

Repair CIS Repair-CIS-Repair of Headworks & Construction of Canalization

4,100.00 4,100.00

Buenavista PIS/Upper Buenavista CIS

Zamboanga City

Repair CIS Repair-GPIS-CIS-Installation Solar Water Pump & Pipeline

5,500.00 5,500.00

Vitali CIS Zamboanga City

Resto CIS Resto-CIS-Construction of Canalization & Canal Structures

5,000.00 5,000.00

Curuan CIS Ext. Zamboanga City

Extension CIS Extension CIS 5,000.00 5,000.00

Latap SIP Zamboanga City

FS/DE FS/DE 600.00 600.00

Sinunuc SIP Zamboanga City

FS/DE FS/DE 300.00 300.00

Lapakan SIP Zamboanga City

FS/DE FS/DE 600.00 600.00

Mangga Bunguiao CIS Zamboanga City

Repair CIS Repair CIS 5,000.00 5,000.00

Guiwan CIS Zamboanga City

SIP SIP 14,000.00 14,000.00

Chapter 19-3-NIA IXPage 5 of 40

Page 585: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title Project Description/ Objectives

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (PhP '000)

LGU Proponent Remarks

Latuan SIP Zamboanga City

SIP SIP 17,500.00 17,500.00

Lumbangan CIS Zamboanga City

SIP SIP 17,500.00 17,500.00

Upper Licomo SIP Zamboanga City

SIP SIP 7,000.00 7,000.00

Vitali CIS (Source Augmentation) Zamboanga City

SIP SIP 17,500.00 17,500.00

Limaong CIS Zamboanga City

SIP SIP 10,500.00 10,500.00

Tumitus SIP Zamboanga City

SIP SIP 10,500.00 10,500.00

Salaan SIP Zamboanga City

SIP SIP 5,250.00 5,250.00

Upper Masaba SIP Zamboanga City

SIP SIP 10,500.00 10,500.00

Sinunuc SIP Zamboanga City

FS/DE FS/DE 7,500.00 7,500.00

Lapakan SIP Zamboanga City

FS/DE FS/DE 25,000.00 25,000.00

TOTAL 104,670.00 95,865.00 98,700.00 17,650.00 171,750.00 32,500.00 521,135.00 Zamboanga del NorteDistrict 1 - San Isidro SIP Zamboanga

del NorteFS/DE FS/DE 300.00 300.00

Sinay SIP Zamboanga del Norte

FS/DE FS/DE 300.00 300.00

Balubuhan CIS Zamboanga del Norte

RRECIS RRECIS 10,000.00 10,000.00

Dapitan CIS (Ilaya Area) Zamboanga del Norte

RRECIS RRECIS 5,000.00 5,000.00

Guinles CIS Zamboanga del Norte

RRECIS RRECIS 6,000.00 6,000.00

La Esperanza CIS Zamboanga del Norte

RRECIS RRECIS 10,000.00 10,000.00

Sebaca CIS Zamboanga del Norte

RRECIS RRECIS 3,549.00 3,549.00

Sto. Nino CIS Zamboanga del Norte

RRECIS RRECIS 3,000.00 3,000.00

Mutia SIP Zamboanga del Norte

SIP SIP10,000.00

10,000.00

Chapter 19-3-NIA IXPage 6 of 40

Page 586: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title Project Description/ Objectives

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (PhP '000)

LGU Proponent Remarks

Diwan SIP Zamboanga del Norte

Coconet CIS Coconet-CIS-Installation of coconet

1,500.00 1,500.00

Lagag SIP Zamboanga del Norte

Coconet CIS Coconet-CIS-Installation of coconet

1,000.00 1,000.00

San Jose SIP Zamboanga del Norte

Coconet CIS Coconet-CIS-Installation of coconet

1,000.00 1,000.00

Kinas SIP Zamboanga del Norte

FS/DEFS/DE

500.00 500.00

Patunan SIP Zamboanga del Norte

FS/DEFS/DE

1,860.00 1,860.00

Titik SIP Zamboanga del Norte

FS/DEFS/DE

500.00 500.00

Bacuyong CIS Zamboanga del Norte

RRECIS RRECIS-Improvement of IS Facilities

2,000.00 2,000.00

Lapayan Baja CIS Zamboanga del Norte

RRECIS RRECIS-Improvement of IS Facilities

8,000.00 8,000.00

Ma. Cristina CIS Zamboanga del Norte

RRECIS RRECIS-Improvement of IS Facilities

1,252.00 1,252.00

Mutia SIP Zamboanga del Norte

SIP SIP-Const'n of new Irrig. System 5,000.00

5,000.00

San Isidro SIP Zamboanga del Norte

SIP SIP-Const'n of new Irrig. System 20,000.00

20,000.00

Guinles CIS Zamboanga del Norte

Repair CIS REPAIR-CIS 6,675.00 6,675.00

Bacuyong CIS Zamboanga del Norte

Repair CIS REPAIR-CIS 3,220.00 3,220.00

Lapayan Baja CIS Zamboanga del Norte

Resto CIS RESTO-CIS 2,500.00 2,500.00

LAPAYAN BAJA CIS Zamboanga del Norte

Resto CIS RESTO-CIS 26,000.00 26,000.00

San Isidro SIP Zamboanga del Norte

SIP SIP 24,000.00 24,000.00

Lapayan Baja CIS Zamboanga del Norte

Repair CIS Repair-CIS-Rehabilitation of Diversion Works and Construction of Protection Works

25,000.00 25,000.00

Dapitan CIS Zamboanga del Norte

Resto CIS Resto-CIS-Construction of Canalization and Canal Structures

5,000.00 5,000.00

Chapter 19-3-NIA IXPage 7 of 40

Page 587: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title Project Description/ Objectives

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (PhP '000)

LGU Proponent Remarks

Dipolog CIS Zamboanga del Norte

Resto CIS Resto-CIS-Construction of Canalization and Canal Structures

10,000.00 10,000.00

Dapitan CIS Zamboanga del Norte

Service Roads CIS

Service Roads-CIS-Improvement of Existing Road

1,650.00 1,650.00

Pian SIP Zamboanga del Norte

FS/DE FS/DE 300.00 300.00

Yabo SIP Zamboanga del Norte

FS/DE FS/DE 250.00 250.00

Lower Malala CIS Zamboanga del Norte

Repair CIS Repair CIS 10,000.00 10,000.00

Dipolog CIS (Polanco Area) Zamboanga del Norte

Repair CIS Repair CIS 10,000.00 10,000.00

Antipolo CIS Zamboanga del Norte

Repair CIS Repair CIS 5,000.00 5,000.00

Lapayan Baja CIS Zamboanga del Norte

Repair CIS Repair CIS 30,000.00 30,000.00

Ma. Uray CIS Zamboanga del Norte

Resto CIS Resto CIS 10,000.00 10,000.00

Dapitan CIS Zamboanga del Norte

Resto CIS Resto CIS 5,000.00 5,000.00

Guinles CIS Zamboanga del Norte

Resto CIS Resto CIS 35,000.00 35,000.00

Sto. Niño CIS Zamboanga del Norte

Resto CIS Resto CIS 13,000.00 13,000.00

Antipolo SIP Zamboanga del Norte

Solar Pump Solar Pump 3,000.00 3,000.00

Sulangon SIP Zamboanga del Norte

Solar Pump Solar Pump 16,000.00 16,000.00

Pian SIP Zamboanga del Norte

Solar Pump Solar Pump 20,000.00 20,000.00

Bacuyong CIS Zamboanga del Norte

Resto CIS Resto CIS 10,000.00 10,000.00

Lapayan Baja CIS Zamboanga del Norte

Resto CIS Resto CIS 20,000.00 20,000.00

Lapayan Baja CIS Zamboanga del Norte

Repair CIS Repair CIS 70,000.00 70,000.00

San Isidro SIP Zamboanga del Norte

SIP SIP 30,431.00 30,431.00

Chapter 19-3-NIA IXPage 8 of 40

Page 588: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title Project Description/ Objectives

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (PhP '000)

LGU Proponent Remarks

Yabo SIP Zamboanga del Norte

FS/DE FS/DE 250.00 250.00

San Juan SIP Zamboanga del Norte

FS/DE FS/DE 400.00 400.00

TOTAL 48,149.00 42,612.00 62,395.00 41,650.00 157,550.00 131,081.00 483,437.00 District 2Siayan SIP Zamboanga

del NorteFS/DE FS/DE 350.00 350.00

Sinuyak CIS Zamboanga del Norte

RRECIS RRECIS 5,000.00 5,000.00

Diwan SIP Zamboanga del Norte

SIP SIP5,040.00

5,040.00

Pamansalan SIP Zamboanga del Norte

SIP SIP16,900.00

16,900.00

Dohinob CIS Zamboanga del Norte

RRECIS RRECIS-Improvement of IS Facilities

8,000.00 8,000.00

Don Jose Aguirre CIS Zamboanga del Norte

RRECIS RRECIS-Improvement of IS Facilities

2,500.00 2,500.00

Inuman CIS Zamboanga del Norte

RRECIS RRECIS-Improvement of IS Facilities

8,000.00 8,000.00

Sindangan CIS Zamboanga del Norte

RRECIS RRECIS-Improvement of IS Facilities

4,000.00 4,000.00

Sinuyak CIS Zamboanga del Norte

RRECIS RRECIS-Improvement of IS Facilities

1,000.00 1,000.00

Disakan SIP Zamboanga del Norte

SIP SIP-Const'n of new Irrig. System 10,000.00

10,000.00

Lagag SIP Zamboanga del Norte

SIP SIP-Const'n of new Irrig. System 20,000.00

20,000.00

Patunan SIP Zamboanga del Norte

SIP SIP-Const'n of new Irrig. System 20,000.00

20,000.00

San Jose SIP Zamboanga del Norte

SIP SIP-Const'n of new Irrig. System 10,000.00

10,000.00

Siayan SIP Zamboanga del Norte

SIP SIP-Const'n of new Irrig. System 20,000.00

20,000.00

Titik SIP Zamboanga del Norte

SIP SIP-Const'n of new Irrig. System 12,000.00

12,000.00

Sindangan CIS Zamboanga del Norte

Repair CIS REPAIR-CIS 7,875.00 7,875.00

Sinuyak CIS Zamboanga del Norte

Resto CIS RESTO-CIS 1,000.00 1,000.00

Sindangan CIS Zamboanga del Norte

Resto CIS RESTO-CIS 4,866.67 4,866.67

Chapter 19-3-NIA IXPage 9 of 40

Page 589: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title Project Description/ Objectives

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (PhP '000)

LGU Proponent Remarks

Disakan SIP Zamboanga del Norte

SIP SIP 5,600.00 5,600.00

Pamansalan SIP Zamboanga del Norte

SIP SIP 5,600.00 5,600.00

Lagag SIP Zamboanga del Norte

SIP SIP 13,000.00 13,000.00

Patunan SIP Zamboanga del Norte

SIP SIP 4,000.00 4,000.00

Titik SIP Zamboanga del Norte

SIP SIP 31,752.00 31,752.00

Siayan SIP Zamboanga del Norte

SIP SIP 24,000.00 24,000.00

Lagag SIP Zamboanga del Norte

SIP SIP-Construction of Diversion Works

26,000.00 26,000.00

Disud SIP Zamboanga del Norte

FS/DE FS/DE 300.00 300.00

Denoman SIP Zamboanga del Norte

FS/DE FS/DE 300.00 300.00

Sto Niño Katipunan SIP Zamboanga del Norte

FS/DE FS/DE 300.00 300.00

Seres CIS Zamboanga del Norte

Repair CIS Repair CIS 3,000.00 3,000.00

Sinuyak CIS Zamboanga del Norte

Repair CIS Repair CIS 3,000.00 3,000.00

Sindangan CIS Zamboanga del Norte

Resto CIS Resto CIS 10,000.00 10,000.00

Dipolog CIS Zamboanga del Norte

Resto CIS Resto CIS 16,000.00 16,000.00

Dohinob CIS Zamboanga del Norte

Resto CIS Resto CIS 8,000.00 8,000.00

Diwan SIP Zamboanga del Norte

SIP SIP 25,000.00 25,000.00

Pamansalan SIP Zamboanga del Norte

SIP SIP 15,000.00 15,000.00

San Jose SIP Zamboanga del Norte

SIP SIP 5,000.00 5,000.00

Talinga SIP Zamboanga del Norte

SIP SIP 25,000.00 25,000.00

Chapter 19-3-NIA IXPage 10 of 40

Page 590: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title Project Description/ Objectives

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (PhP '000)

LGU Proponent Remarks

Lagag SIP Zamboanga del Norte

SIP SIP 20,000.00 20,000.00

Siayan SIP Zamboanga del Norte

SIP SIP 20,000.00 20,000.00

Lugdungan PIS Zamboanga del Norte

Solar Pump Solar Pump 9,000.00 9,000.00

Malugas PIS Zamboanga del Norte

Solar Pump Solar Pump 11,500.00 11,500.00

Siari PIS Zamboanga del Norte

Solar Pump Solar Pump 8,000.00 8,000.00

Sinaman SIP Zamboanga del Norte

Solar Pump Solar Pump 6,500.00 6,500.00

Inuman CIS Zamboanga del Norte

Repair CIS Repair CIS 30,000.00 30,000.00

Mandih CIS Zamboanga del Norte

Repair CIS Repair CIS 30,000.00 30,000.00

Titik SIP Zamboanga del Norte

SIP SIP 10,000.00 10,000.00

Kinas SIP Zamboanga del Norte

SIP SIP 20,000.00 20,000.00

Disud SIP Zamboanga del Norte

SIP SIP 15,000.00 15,000.00

Denoman SIP Zamboanga del Norte

SIP SIP 15,000.00 15,000.00

Sto Niño Katipunan SIP Zamboanga del Norte

SIP SIP 10,000.00 10,000.00

Lower Mias SIP Zamboanga del Norte

Solar Pump Solar Pump 30,000.00 30,000.00

Basagan SIP Zamboanga del Norte

Solar Pump Solar Pump 30,000.00 30,000.00

Disud SIP Zamboanga del Norte

FS/DE FS/DE 300.00 300.00

Denoman SIP Zamboanga del Norte

FS/DE FS/DE 300.00 300.00

Sto Niño Katipunan SIP Zamboanga del Norte

FS/DE FS/DE 300.00 300.00

TOTAL 27,290.00 115,500.00 97,693.67 26,000.00 185,900.00 190,900.00 643,283.67 District 3San Pedro CIP Zamboanga

del NorteCARP IC CARP-IC

6,500.00 6,500.00

San Pedro SIP Zamboanga del Norte

FS/DE FS/DE 300.00 300.00

Chapter 19-3-NIA IXPage 11 of 40

Page 591: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title Project Description/ Objectives

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (PhP '000)

LGU Proponent Remarks

Dansalan CIS Zamboanga del Norte

RRECIS RRECIS 4,000.00 4,000.00

Lanawan CIS Zamboanga del Norte

RRECIS RRECIS 10,000.00 10,000.00

Panabutan CIS Zamboanga del Norte

RRECIS RRECIS 15,000.00 15,000.00

Piacan CIS Zamboanga del Norte

RRECIS RRECIS 38,000.00 38,000.00

Diculum SIP Zamboanga del Norte

SIP SIP5,000.00

5,000.00

Pisawak CIS Zamboanga del Norte

Extension CIS CIS Extn-Const'n of ext'n facilities

5,000.00 5,000.00

Siocon CIS & Ext'n Zamboanga del Norte

Extension CIS CIS Extn-Const'n of ext'n facilities

10,000.00 10,000.00

Lituban CIS Zamboanga del Norte

Coconet CIS Coconet-CIS-Installation of coconet

1,500.00 1,500.00

Lunday CIS Zamboanga del Norte

Coconet CIS Coconet-CIS-Installation of coconet

1,500.00 1,500.00

Canuto S Enerio SIP Zamboanga del Norte

FS/DEFS/DE

250.00 250.00

Kipit SIP Zamboanga del Norte

FS/DEFS/DE

250.00 250.00

Nasibak SIP Zamboanga del Norte

FS/DEFS/DE

250.00 250.00

Sipakong SIP Zamboanga del Norte

FS/DEFS/DE

250.00 250.00

Tampilisan SIP Zamboanga del Norte

FS/DEFS/DE

250.00 250.00

Timankayok SIP Zamboanga del Norte

FS/DEFS/DE

300.00 300.00

Titik SIP Zamboanga del Norte

FS/DEFS/DE

500.00 500.00

Bacungan CIS Zamboanga del Norte

RRECIS RRECIS-Improvement of IS Facilities

3,000.00 3,000.00

Bulacan CIS Zamboanga del Norte

RRECIS RRECIS-Improvement of IS Facilities

2,500.00 2,500.00

Dansalan CIS Zamboanga del Norte

RRECIS RRECIS-Improvement of IS Facilities

2,000.00 2,000.00

Labason CIS Ext'n. Zamboanga del Norte

RRECIS RRECIS-Improvement of IS Facilities

3,500.00 3,500.00

Lituban CIS Zamboanga del Norte

RRECIS RRECIS-Improvement of IS Facilities

6,000.00 6,000.00

Chapter 19-3-NIA IXPage 12 of 40

Page 592: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title Project Description/ Objectives

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (PhP '000)

LGU Proponent Remarks

Lower Bobongan CIS Zamboanga del Norte

RRECIS RRECIS-Improvement of IS Facilities

8,000.00 8,000.00

S. Cabral CIS Zamboanga del Norte

RRECIS RRECIS-Improvement of IS Facilities

2,000.00 2,000.00

Siocon CIS Zamboanga del Norte

RRECIS RRECIS-Improvement of IS Facilities

2,000.00 2,000.00

Upper Bobongan CIS Zamboanga del Norte

RRECIS RRECIS-Improvement of IS Facilities

6,000.00 6,000.00

Lanawan SIP Zamboanga del Norte

SIP SIP-Const'n of new Irrig. System 23,470.00

23,470.00

Liloy SIP Zamboanga del Norte

SIP SIP-Const'n of new Irrig. System 8,000.00

8,000.00

Pisawak SIP/ Kalayuhan Zamboanga del Norte

SIP SIP-Const'n of new Irrig. System 15,000.00

15,000.00

San Pedro SIP Zamboanga del Norte

SIP SIP-Const'n of new Irrig. System 15,000.00

15,000.00

Labason CIS Main Zamboanga del Norte

Repair CIS REPAIR-CIS 6,675.00 6,675.00

Osukan CIS Zamboanga del Norte

Resto CIS RESTO-CIS 2,766.67 2,766.67

Lomogom CIS Zamboanga del Norte

Resto CIS RESTO-CIS 2,000.00 2,000.00

Lituban CIS Zamboanga del Norte

Repair CIS REPAIR-CIS 5,466.67 5,466.67

Lanawan SIP Zamboanga del Norte

SIP SIP 24,000.00 24,000.00

Liloy SIP Zamboanga del Norte

SIP SIP 5,600.00 5,600.00

San Pedro SIP (Gutayan) Zamboanga del Norte

SIP SIP 17,500.00 17,500.00

Diculum SIP Zamboanga del Norte

SIP SIP 3,200.00 3,200.00

Labason CIS Extension Zamboanga del Norte

Repair CIS Repair-CIS-Construction of Canalization and Construction Works

5,000.00 5,000.00

Siocon CIS Zamboanga del Norte

Resto CIS Resto-CIS-Restoration of Diversion Works and Construction of Canalization and Canal Structures

20,000.00 20,000.00

Chapter 19-3-NIA IXPage 13 of 40

Page 593: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title Project Description/ Objectives

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (PhP '000)

LGU Proponent Remarks

Lituban CIS & Extension Zamboanga del Norte

Resto CIS Resto-CIS-Construction of Protection Works, Canalization and Canal Structures

20,000.00 20,000.00

Dansalan CIS Zamboanga del Norte

Resto CIS Resto-CIS-Construction of Canalization and Canal Structures

8,000.00 8,000.00

Lanawan SIP Zamboanga del Norte

SIP SIP-Construction of Diversion Works and Canal Structures

20,000.00 20,000.00

San Pedro CIP Zamboanga del Norte

CARP IC CARP-IC 5,000.00 5,000.00

Sianan SIP Zamboanga del Norte

FS/DE FS/DE 300.00 300.00

Baliguian SIP Zamboanga del Norte

FS/DE FS/DE 500.00 500.00

Loay SIP Zamboanga del Norte

FS/DE FS/DE 300.00 300.00

Makiang SIP Zamboanga del Norte

FS/DE FS/DE 300.00 300.00

Kilalaban SIP Zamboanga del Norte

FS/DE FS/DE 300.00 300.00

Balyangan SIP Zamboanga del Norte

FS/DE FS/DE 300.00 300.00

Latabon SIP Zamboanga del Norte

FS/DE FS/DE 300.00 300.00

Bacungan CIS Zamboanga del Norte

Repair CIS Repair CIS 3,000.00 3,000.00

Lower Bobongan CIS Zamboanga del Norte

Repair CIS Repair CIS 5,000.00 5,000.00

Upper Bobongan CIS Zamboanga del Norte

Repair CIS Repair CIS 2,000.00 2,000.00

Lituban CIS Zamboanga del Norte

Repair CIS Repair CIS 10,000.00 10,000.00

Siocon CIS Zamboanga del Norte

Repair CIS Repair CIS 61,030.00 61,030.00

Gumbus CIS Zamboanga del Norte

Repair CIS Repair CIS 5,000.00 5,000.00

Batayan I CIS Zamboanga del Norte

Resto CIS Resto CIS 20,000.00 20,000.00

Chapter 19-3-NIA IXPage 14 of 40

Page 594: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title Project Description/ Objectives

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (PhP '000)

LGU Proponent Remarks

Bulacan CIS Zamboanga del Norte

Resto CIS Resto CIS 6,000.00 6,000.00

Lunday CIS Zamboanga del Norte

Resto CIS Resto CIS 8,000.00 8,000.00

Gumbus CIS Zamboanga del Norte

Resto CIS Resto CIS 5,000.00 5,000.00

Batayan I CIS Zamboanga del Norte

Service Roads CIS

Roads CIS 10,000.00 10,000.00

Piacan CIS Zamboanga del Norte

SIP SIP 35,000.00 35,000.00

Lanawan SIP Zamboanga del Norte

SIP SIP 13,000.00 13,000.00

Kalayuhan SIP Zamboanga del Norte

SIP SIP 20,000.00 20,000.00

Pisawak SIP Zamboanga del Norte

SIP SIP 22,500.00 22,500.00

Kipit SIP Zamboanga del Norte

SIP SIP 15,000.00 15,000.00

Nasibak SIP Zamboanga del Norte

SIP SIP 15,000.00 15,000.00

Sipakong SIP Zamboanga del Norte

SIP SIP 15,000.00 15,000.00

Timan - kayok SIP Zamboanga del Norte

SIP SIP 10,000.00 10,000.00

Laksa SIP Zamboanga del Norte

SIP SIP 7,500.00 7,500.00

Panabutan SIP Zamboanga del Norte

SIP SIP 35,000.00 35,000.00

Timan - kayok SIP Zamboanga del Norte

Solar Pump Solar Pump 8,000.00 8,000.00

Tampilisan SIP Zamboanga del Norte

Solar Pump Solar Pump 65,625.00 65,625.00

La - Libertad CIS Zamboanga del Norte

Solar Pump Solar Pump 24,000.00 24,000.00

Gumbus CIS Zamboanga del Norte

Solar Pump Solar Pump 4,000.00 4,000.00

Lawagan CIS Zamboanga del Norte

Solar Pump Solar Pump 4,000.00 4,000.00

Melidan SIP Zamboanga del Norte

Solar Pump Solar Pump 3,000.00 3,000.00

Bulacan CIS Zamboanga del Norte

Solar Pump Solar Pump 8,000.00 8,000.00

Chapter 19-3-NIA IXPage 15 of 40

Page 595: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title Project Description/ Objectives

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (PhP '000)

LGU Proponent Remarks

Labason CIS Main Zamboanga del Norte

Resto CIS Resto CIS 5,000.00 5,000.00

Labason CIS Ext'n. Zamboanga del Norte

Repair CIS Repair CIS 3,500.00 3,500.00

Osukan CIS Zamboanga del Norte

Resto CIS Resto CIS 5,000.00 5,000.00

Siocon CIS Zamboanga del Norte

Resto CIS Resto CIS 30,000.00 30,000.00

Gumbus CIS Zamboanga del Norte

Resto CIS Resto CIS 5,000.00 5,000.00

Lituban CIS Zamboanga del Norte

Repair CIS Repair CIS 20,000.00 20,000.00

Siocon CIS Zamboanga del Norte

Repair CIS Repair CIS 21,970.00 21,970.00

Diculum SIP Zamboanga del Norte

SIP SIP 4,000.00 4,000.00

Canuto S. Enerio SIP Zamboanga del Norte

SIP SIP 15,000.00 15,000.00

Kipit SIP Zamboanga del Norte

SIP SIP 10,000.00 10,000.00

Nasibak SIP Zamboanga del Norte

SIP SIP 10,000.00 10,000.00

Tampilisan SIP Zamboanga del Norte

SIP SIP 15,000.00 15,000.00

Sianan SIP Zamboanga del Norte

SIP SIP 10,000.00 10,000.00

Baliguian SIP Zamboanga del Norte

SIP SIP 20,000.00 20,000.00

Balyangan SIP Zamboanga del Norte

SIP SIP 20,000.00 20,000.00

Loay SIP Zamboanga del Norte

FS/DE FS/DE 300.00 300.00

Makiang SIP Zamboanga del Norte

FS/DE FS/DE 300.00 300.00

Kilalaban SIP Zamboanga del Norte

FS/DE FS/DE 300.00 300.00

Balyangan SIP Zamboanga del Norte

FS/DE FS/DE 300.00 300.00

Latabon SIP Zamboanga del Norte

FS/DE FS/DE 300.00 300.00

TOTAL 78,800.00 116,520.00 67,208.34 73,000.00 446,955.00 195,970.00 978,453.34 Zamboanga del Sur

Chapter 19-3-NIA IXPage 16 of 40

Page 596: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title Project Description/ Objectives

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (PhP '000)

LGU Proponent Remarks

District 1 - Labangan River Irrigation System Zamboanga

del SurCCAW NIS CCAW-NIS 2,000.00 2,000.00

Katipunan CIS Ext'n Zamboanga del Sur

Extension CIS CIS Extension 10,000.00 10,000.00

Canipay SIP Zamboanga del Sur

FS/DE FS/DE 350.00 350.00

Ditoray - Upper Sibatang SIP Zamboanga del Sur

FS/DE FS/DE 300.00 300.00

Lourdes SIP Zamboanga del Sur

FS/DE FS/DE 300.00 300.00

Region 9: 1 Unit Wheeled Excavator

Zamboanga del Sur

H.E. for Irrig. H.E. for Irrig.6,500.00

6,500.00

Dipolo RIS Zamboanga del Sur

IMTSS IMTSS293.00

293.00

Regional Office- Region 9 Zamboanga del Sur

IMTSS IMTSS930.00

930.00

Salug River Irrigation System Zamboanga del Sur

IMTSS IMTSS1,301.00

1,301.00

Lison Valley Irrigation Project Zamboanga del Sur

Lison Valley LineProjects-LFP22,000.00

22,000.00

Manga (Tulawas) CIS Zamboanga del Sur

RRECIS RRECIS 2,000.00 2,000.00

Navalan CIS Zamboanga del Sur

RRECIS RRECIS 5,000.00 5,000.00

Sta. Cruz - Boniao CIS Zamboanga del Sur

RRECIS RRECIS 5,000.00 5,000.00

Tukuran CIS Zamboanga del Sur

RRECIS RRECIS 5,000.00 5,000.00

Dipolo River Irrigation System Zamboanga del Sur

RRENIS RRENIS 20,000.00 20,000.00

Labangan River Irrigation System Zamboanga del Sur

RRENIS RRENIS 10,147.00 10,147.00

Salug River Irrigation System Zamboanga del Sur

RRENIS RRENIS 10,000.00 10,000.00

Salug River Irrigation System Zamboanga del Sur

RRENIS RRENIS 10,000.00 10,000.00

Salug River Irrigation System Zamboanga del Sur

RRENIS RRENIS 10,000.00 10,000.00

Labangan River Irrigation System Zamboanga del Sur

Service Roads NIS

ServiceRoads NIS 2,000.00 2,000.00

Chapter 19-3-NIA IXPage 17 of 40

Page 597: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title Project Description/ Objectives

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (PhP '000)

LGU Proponent Remarks

Salug River Irrigation System Zamboanga del Sur

Service Roads NIS

ServiceRoads NIS 2,000.00 2,000.00

Canipay SIP Zamboanga del Sur

SIP SIP25,000.00

25,000.00

Ditoray - Upper Sibatang SIP Zamboanga del Sur

SIP SIP13,000.00

13,000.00

Regionwide GIS Based Mapping Zamboanga del Sur

CCAW NIS CCAW NIS1,000.00

1,000.00

Katipunan CIS Ext'n Zamboanga del Sur

Extension CIS CIS Extn-Const'n of ext'n facilities

7,500.00 7,500.00

Labangan RIS Zamboanga del Sur

CCAW NIS CCAW-Siltation Control Project (bench flume)

10,500.00 10,500.00

Salug RIS Zamboanga del Sur

CCAW NIS CCAW-Flood Protection Works

24,000.00 24,000.00

Labangan RIS Zamboanga del Sur

Coconet NIS Coconet-NIS-Coconet Slope Protection

4,000.00 4,000.00

Salug RIS Zamboanga del Sur

Coconet NIS Coconet-NIS-Coconet Slope Protection

4,650.00 4,650.00

Regional Office - Region 9 Zamboanga del Sur

H.E. for Irrig. Heavy Equipt.-1 Unit @ (Wheeled Excavator, Dump Truck, Wheeled Loader, Crawler Dozer)

34,500.00 34,500.00

Dipolo RIS Zamboanga del Sur

IMTSS Irrigation Management Transfer Support Services (IMTSS)

337.00 337.00

Labangan RIS Zamboanga del Sur

IMTSS Irrigation Management Transfer Support Services (IMTSS)

650.00 650.00

Regional Office - Region 9 Zamboanga del Sur

IMTSS Irrigation Management Transfer Support Services (IMTSS)

472.00 472.00

Salug RIS Zamboanga del Sur

IMTSS Irrigation Management Transfer Support Services (IMTSS)

1,410.00 1,410.00

Bibilop CIS Zamboanga del Sur

RRECIS RRECIS-Improvement of IS Facilities

1,500.00 1,500.00

Boloron CIS Zamboanga del Sur

RRECIS RRECIS-Improvement of IS Facilities

11,000.00 11,000.00

Chapter 19-3-NIA IXPage 18 of 40

Page 598: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title Project Description/ Objectives

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (PhP '000)

LGU Proponent Remarks

Gubaan CIS Zamboanga del Sur

RRECIS RRECIS-Improvement of IS Facilities

1,000.00 1,000.00

Katipunan CIS Zamboanga del Sur

RRECIS RRECIS-Improvement of IS Facilities

3,000.00 3,000.00

Liargao CIS Zamboanga del Sur

RRECIS RRECIS-Improvement of IS Facilities

1,000.00 1,000.00

Manga CIS Zamboanga del Sur

RRECIS RRECIS-Improvement of IS Facilities

4,000.00 4,000.00

SAN VICENTE CIS Zamboanga del Sur

RRECIS RRECIS-Improvement of IS Facilities

2,000.00 2,000.00

Sicpao CIS Zamboanga del Sur

RRECIS RRECIS-Improvement of IS Facilities

3,000.00 3,000.00

Sicpao CIS Extn Zamboanga del Sur

RRECIS RRECIS-Improvement of IS Facilities

1,000.00 1,000.00

Sta. Cruz - Boniao CIS Zamboanga del Sur

RRECIS RRECIS-Improvement of IS Facilities

2,000.00 2,000.00

Tambulig Zamboanga del Sur

RRECIS RRECIS-Improvement of IS Facilities

2,000.00 2,000.00

Timbaboy CIS Zamboanga del Sur

RRECIS RRECIS-Improvement of IS Facilities

4,000.00 4,000.00

TUKURAN CIS Zamboanga del Sur

RRECIS RRECIS-Improvement of IS Facilities

10,000.00 10,000.00

Dipolo RIS Zamboanga del Sur

RRENIS RRENIS-Improvement of NIS Facilities 20,654.00

20,654.00

Labangan RIS Zamboanga del Sur

RRENIS RRENIS-Improvement of NIS Facilities 38,000.00

38,000.00

Salug RIS Zamboanga del Sur

RRENIS RRENIS-Improvement of NIS Facilities 48,500.00

48,500.00

Dipolo RIS Zamboanga del Sur

Service Roads NIS

Improvement of service road-NIS 2,320.00

2,320.00

Labangan RIS Zamboanga del Sur

Service Roads NIS

Improvement of service road-NIS 6,380.00

6,380.00

Labangan RIS Zamboanga del Sur

Service Roads NIS

Improvement of service road-NIS 8,000.00

8,000.00

Salug RIS Zamboanga del Sur

Service Roads NIS

Improvement of service road-NIS 6,380.00

6,380.00

Canipay SIP Zamboanga del Sur

SIP SIP-Const'n of new Irrig. System 15,000.00

15,000.00

Ditoray - Upper Sibatang SIP Zamboanga del Sur

SIP SIP-Const'n of new Irrig. System 5,000.00

5,000.00

Guripan SIP Zamboanga del Sur

SIP SIP-Const'n of new Irrig. System 8,000.00

8,000.00

Chapter 19-3-NIA IXPage 19 of 40

Page 599: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title Project Description/ Objectives

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (PhP '000)

LGU Proponent Remarks

Kasandal SIP Zamboanga del Sur

SIP SIP-Const'n of new Irrig. System 10,000.00

10,000.00

Lourdes SIP Zamboanga del Sur

SIP SIP-Const'n of new Irrig. System 8,000.00

8,000.00

Lower Sibatang SIP Zamboanga del Sur

SIP SIP-Const'n of new Irrig. System 4,000.00

4,000.00

Switch SIP Zamboanga del Sur

SIP SIP-Const'n of new Irrig. System 3,000.00

3,000.00

Liargao CIS Zamboanga del Sur

Extension CIS CIS EXTENSION 5,000.00 5,000.00

Navalan CIS Extn. Zamboanga del Sur

Extension CIS CIS EXTENSION 5,000.00 5,000.00

Guma CIS Zamboanga del Sur

Extension CIS CIS EXTENSION 5,000.00 5,000.00

Dipolo River Irrigation System Zamboanga del Sur

CCAW NIS ClimateChange-NIS 3,400.00 3,400.00

Labangan River Irrigation System Zamboanga del Sur

CCAW NIS ClimateChange-NIS 4,400.00 4,400.00

Regionwide GIS Based Mapping Zamboanga del Sur

CCAW NIS ClimateChange-NIS 400.00 400.00

Salug River Irrigation System Zamboanga del Sur

CCAW NIS ClimateChange-NIS 11,138.00 11,138.00

Dipolo River Irrigation System Zamboanga del Sur

IMTSS IMTSS 397.07 397.07

Labangan River Irrigation System Zamboanga del Sur

IMTSS IMTSS 753.30 753.30

Salug River Irrigation System Zamboanga del Sur

IMTSS IMTSS 1,600.43 1,600.43

Regional Office- Region 9 Zamboanga del Sur

IMTSS IMTSS 809.77 809.77

Dipolo River Irrigation System Zamboanga del Sur

Repair NIS REPAIR-NIS 8,500.00 8,500.00

Labangan River Irrigation System Zamboanga del Sur

Repair NIS REPAIR-NIS 3,000.00 3,000.00

Salug River Irrigation System Zamboanga del Sur

Repair NIS REPAIR-NIS 25,350.00 25,350.00

Diwan CIS Zamboanga del Sur

Resto CIS RESTO-CIS 1,619.00 1,619.00

Dipolo River Irrigation System Zamboanga del Sur

Resto NIS RESTO-NIS 1,500.00 1,500.00

Chapter 19-3-NIA IXPage 20 of 40

Page 600: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title Project Description/ Objectives

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (PhP '000)

LGU Proponent Remarks

Labangan River Irrigation System Zamboanga del Sur

Resto NIS RESTO-NIS 4,561.00 4,561.00

Salug River Irrigation System Zamboanga del Sur

Resto NIS RESTO-NIS 4,365.00 4,365.00

Guripan SIP Zamboanga del Sur

SIP SIP 7,500.00 7,500.00

Lourdes SIP Zamboanga del Sur

SIP SIP 5,000.00 5,000.00

Canipay SIP Zamboanga del Sur

SIP SIP 26,000.00 26,000.00

Ditoray Upper Sibatang SIP Zamboanga del Sur

SIP SIP 6,900.00 6,900.00

Dipolo RIS Zamboanga del Sur

CCAW NIS CCAW-NIS 4,200.00 4,200.00

Salug RIS Zamboanga del Sur

CCAW NIS CCAW-NIS 15,000.00 15,000.00

Labangan RIS Zamboanga del Sur

CCAW NIS CCAW-NIS 5,000.00 5,000.00

Guma CIS Zamboanga del Sur

Extension CIS CIS Extn-Const. of Canal & canal Structure

5,000.00 5,000.00

Navalan Extension CIS Zamboanga del Sur

Extension CIS CIS Extn 4,700.00 4,700.00

Regional Irrigation Office-IX Zamboanga del Sur

IMTSS IMTSS 300.00 300.00

Labangan RIS Zamboanga del Sur

IMTSS IMTSS 626.55 626.55

DIPRIS Zamboanga del Sur

IMTSS IMTSS 244.81 244.81

SARIS Zamboanga del Sur

IMTSS IMTSS 602.14 602.14

Bibilop CIS Zamboanga del Sur

Repair CIS Repair-CIS-Construction of Slope Protection of Diversion Dam

5,000.00 5,000.00

Tukuran CIS Zamboanga del Sur

Repair CIS Repair-CIS-Construction of Slope Protection of Diversion Dam

10,000.00 10,000.00

Labangan RIS Zamboanga del Sur

Repair NIS Repair-NIS 31,800.00 31,800.00

Chapter 19-3-NIA IXPage 21 of 40

Page 601: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title Project Description/ Objectives

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (PhP '000)

LGU Proponent Remarks

Salug RIS Zamboanga del Sur

Repair NIS Repair-NIS 50,000.00 50,000.00

Dipolo RIS Zamboanga del Sur

Repair NIS Repair-NIS 6,000.00 6,000.00

Boloron CIS Zamboanga del Sur

Resto CIS Resto-CIS-Concreting/Extension of Unlined Canal

8,000.00 8,000.00

Salug RIS Zamboanga del Sur

Resto NIS Resto-NIS-Canalization 12,000.00 12,000.00

Labangan RIS Zamboanga del Sur

Resto NIS Resto-NIS-Canalization 5,000.00 5,000.00

Dipolo RIS Zamboanga del Sur

Resto NIS Resto-NIS-Canalization 4,000.00 4,000.00

Guma CIS Zamboanga del Sur

Service Roads CIS

Service Roads-CIS 3,900.00 3,900.00

Salug RIS Zamboanga del Sur

Service Roads NIS

Service Roads-NIS 13,950.00 13,950.00

Labangan RIS Zamboanga del Sur

Service Roads NIS

Service Roads-NIS 8,000.00 8,000.00

Dipolo RIS Zamboanga del Sur

Service Roads NIS

Service Roads-NIS 5,000.00 5,000.00

KASANDAL SIP Zamboanga del Sur

SIP SIP-Construction of Canal @ Main Canal & Lateral A and Canal Structures

3,000.00 3,000.00

CANIPAY SIP PHASE VI Zamboanga del Sur

SIP SIP-Construction of steel pipe siphon @ main canal

27,000.00 27,000.00

Lower Sibatang Extn. Zamboanga del Sur

Extension CIS Extension CIS 10,000.00 10,000.00

San Vicente CIS Extension Zamboanga del Sur

Extension CIS Extension CIS 5,000.00 5,000.00

Navalan CIS Extension Zamboanga del Sur

Extension CIS Extension CIS 3,000.00 3,000.00

Kaangayan SIP Zamboanga del Sur

FS/DE FS/DE 300.00 300.00

San Jose SIP Zamboanga del Sur

FS/DE FS/DE 300.00 300.00

Macasing SIP Zamboanga del Sur

FS/DE FS/DE 300.00 300.00

Campo II SIP Zamboanga del Sur

FS/DE FS/DE 300.00 300.00

Chapter 19-3-NIA IXPage 22 of 40

Page 602: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title Project Description/ Objectives

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (PhP '000)

LGU Proponent Remarks

Tambulig CIS Zamboanga del Sur

Repair CIS Repair CIS 3,000.00 3,000.00

Sicpao CIS Zamboanga del Sur

Repair CIS Repair CIS 5,000.00 5,000.00

Sta. Cruz Boniao CIS Zamboanga del Sur

Repair CIS Repair CIS 10,000.00 10,000.00

Boloron CIS Zamboanga del Sur

Repair CIS Repair CIS 7,000.00 7,000.00

Guma CIS Zamboanga del Sur

Repair CIS Repair CIS 7,500.00 7,500.00

Labangan River Irrigation System Zamboanga del Sur

Resto NIS Resto NIS 30,000.00 30,000.00

Labangan River Irrigation System Zamboanga del Sur

Repair NIS Repair NIS 30,000.00 30,000.00

Labangan River Irrigation System Zamboanga del Sur

CCAW NIS CCAW NIS 20,000.00 20,000.00

Labangan River Irrigation System Zamboanga del Sur

Service Roads NIS

Roads NIS 20,000.00 20,000.00

Dipolo River Irrigation System Zamboanga del Sur

Resto NIS Resto NIS 30,000.00 30,000.00

Dipolo River Irrigation System Zamboanga del Sur

Repair NIS Repair NIS 20,000.00 20,000.00

Dipolo River Irrigation System Zamboanga del Sur

CCAW NIS CCAW NIS 10,000.00 10,000.00

Salug River Irrigation System Zamboanga del Sur

Resto NIS Resto NIS 50,000.00 50,000.00

Salug River Irrigation System Zamboanga del Sur

Repair NIS Repair NIS 20,000.00 20,000.00

Salug River Irrigation System Zamboanga del Sur

CCAW NIS CCAW NIS 15,000.00 15,000.00

Canipay SIP Zamboanga del Sur

SIP SIP 30,000.00 30,000.00

Dawa SIP Zamboanga del Sur

SIP SIP 15,000.00 15,000.00

San Fernando SIP Zamboanga del Sur

SIP SIP 5,000.00 5,000.00

Gonusan SIP Zamboanga del Sur

SIP SIP 10,000.00 10,000.00

Chapter 19-3-NIA IXPage 23 of 40

Page 603: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title Project Description/ Objectives

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (PhP '000)

LGU Proponent Remarks

Mabuhay SIP Zamboanga del Sur

SIP SIP 4,500.00 4,500.00

Katipunan Lower Guipos SIP Phase II

Zamboanga del Sur

SIP SIP 3,000.00 3,000.00

Mabuhay SIP Zamboanga del Sur

FS/DE FS/DE 300.00 300.00

Dona Josefina Zamboanga del Sur

FS/DE FS/DE 300.00 300.00

Canipay SIP Zamboanga del Sur

SIP SIP 30,000.00 30,000.00

Kaangayan SIP Zamboanga del Sur

SIP SIP 6,750.00 6,750.00

San Jose SIP Zamboanga del Sur

SIP SIP 18,000.00 18,000.00

Macasing SIP Zamboanga del Sur

SIP SIP 15,750.00 15,750.00

Campo II SIP Zamboanga del Sur

SIP SIP 18,000.00 18,000.00

Katipunan CIS Zamboanga del Sur

Extension CIS Extension CIS 5,000.00 5,000.00

Guma CIS Extension Zamboanga del Sur

Extension CIS Extension CIS 4,000.00 4,000.00

Diwan CIS Zamboanga del Sur

Repair CIS Repair CIS 16,000.00 16,000.00

Campo IV SIP Zamboanga del Sur

FS/DE FS/DE 300.00 300.00

Campo V SIP Zamboanga del Sur

FS/DE FS/DE 300.00 300.00

Depore CIS Zamboanga del Sur

Resto CIS Resto CIS 3,000.00 3,000.00

Diplo CIS Zamboanga del Sur

Resto CIS Resto CIS 6,000.00 6,000.00

TOTAL 164,121.00 316,753.00 132,193.57 228,323.50 364,200.00 123,700.00 1,329,291.07 District 2Dongos SIP Zamboanga

del SurFS/DE FSDE 300.00 300.00

Pangi-Mahayahay CIS Zamboanga del Sur

RRECIS RRECIS 10,000.00 10,000.00

Dongos SIP Zamboanga del Sur

SIP SIP10,000.00

10,000.00

Chapter 19-3-NIA IXPage 24 of 40

Page 604: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title Project Description/ Objectives

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (PhP '000)

LGU Proponent Remarks

Sibuguey Valley IS Zamboanga del Sur

Coconet NIS Coconet-NIS-Coconet Slope Protection (Bayog Area)

9,500.00 9,500.00

Dimataling SIP Zamboanga del Sur

FS/DE Conduct of F.S. & D.E. Activities

1,860.00 1,860.00

Sibuguey Valley IS Zamboanga del Sur

IMTSS Irrigation Management Transfer Support Services (IMTSS)

700.00 700.00

Biswangan CIS Zamboanga del Sur

RRECIS RRECIS-Improvement of IS Facilities

5,000.00 5,000.00

Bogayo CIS Zamboanga del Sur

RRECIS RRECIS-Improvement of IS Facilities

2,000.00 2,000.00

Bogwac I CIS Zamboanga del Sur

RRECIS RRECIS-Improvement of IS Facilities

2,000.00 2,000.00

Canunan Balongating Zamboanga del Sur

RRECIS RRECIS-Improvement of IS Facilities

2,000.00 2,000.00

Dumalinao CIS Zamboanga del Sur

RRECIS RRECIS-Improvement of IS Facilities

2,500.00 2,500.00

Kumalarang CIS Zamboanga del Sur

RRECIS RRECIS-Improvement of IS Facilities

1,000.00 1,000.00

Libayoy CIS Zamboanga del Sur

RRECIS RRECIS-Improvement of IS Facilities

2,500.00 2,500.00

Limas CIS Zamboanga del Sur

RRECIS RRECIS-Improvement of IS Facilities

2,000.00 2,000.00

Sibuguey Valley IS Zamboanga del Sur

RRENIS RRENIS-Improvement of NIS Facilities 10,000.00 10,000.00

Bagong Kahayag SIP Zamboanga del Sur

SIP SIP-Const'n of new Irrig. System 8,000.00 8,000.00

Baking SIP Zamboanga del Sur

SIPSIP 13,000.00 13,000.00

Culasian SIP Zamboanga del Sur

SIP SIP-Const'n of new Irrig. System 10,000.00 10,000.00

Dongos SIP Zamboanga del Sur

SIP SIP-Const'n of new Irrig. System 28,000.00 28,000.00

Dongos SIP Zamboanga del Sur

SIP SIP-Const'n of new Irrig. System 5,000.00

5,000.00

Gawil SIP Zamboanga del Sur

SIP SIP-Const'n of new Irrig. System

-

Katipunan SIP Zamboanga del Sur

SIP SIP-Const'n of new Irrig. System 7,500.00

7,500.00

MARAGANG SIP Zamboanga del Sur

SIP SIP-Construction of Dam and Canalization 10,000.00

10,000.00

Chapter 19-3-NIA IXPage 25 of 40

Page 605: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title Project Description/ Objectives

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (PhP '000)

LGU Proponent Remarks

Pob. Lakewood SIP Zamboanga del Sur

SIP SIP-Const'n of new Irrig. System

-

POBLACION TIGBAO SIP Zamboanga del Sur

SIP SIP-Construction of Dam and Canalization 10,000.00

10,000.00

Upper Nilo SIP Zamboanga del Sur

SIP SIP-Const'n of new Irrig. System 7,500.00

7,500.00

Rebokon CIS Ext'n Zamboanga del Sur

Extension CIS CIS EXTENSION 5,363.00 5,363.00

Limas CIS Zamboanga del Sur

Repair CIS REPAIR-CIS 5,000.00 5,000.00

Guipos CIS Zamboanga del Sur

Repair CIS REPAIR-CIS 7,100.00 7,100.00

Bagong Kahayag SIP Zamboanga del Sur

SIP SIP 2,500.00 2,500.00

Baking SIP Zamboanga del Sur

SIP SIP 5,000.00 5,000.00

Upper Nilo SIP Zamboanga del Sur

SIP SIP 4,000.00 4,000.00

San Isidro CIP Zamboanga del Sur

CARP IC CARP-IC 15,000.00 15,000.00

Sibuguey Valley Irrigation System Zamboanga del Sur

CCAW NIS ClimateChange-NIS 4,400.00 4,400.00

Balanagan SIP Zamboanga del Sur

Extension CIS CIS Extn 5,000.00 5,000.00

Lapuyan CIS Zamboanga del Sur

Extension CIS CIS Extn 7,000.00 7,000.00

Bobuan CIS Zamboanga del Sur

Repair CIS 8,000.00 8,000.00

Buburay CIS Extension Zamboanga del Sur

Repair CIS Repair-CIS-Repair of Cut & Cover @ Diversion Dam

7,000.00 7,000.00

Libayoy SIS Zamboanga del Sur

Resto CIS Resto-CIS 7,500.00 7,500.00

Kumalarang CIS Zamboanga del Sur

Resto CIS Resto-CIS 5,500.00 5,500.00

Sibuguey Valley IS Zamboanga del Sur

Resto NIS Resto-NIS-Construction of Check Structures and Earth Canal

6,500.00 6,500.00

KATIPUNAN LOWER GUIPOS Zamboanga del Sur

SIP SIP-Construction of Main Canal & Canal Structures

3,000.00 3,000.00

Chapter 19-3-NIA IXPage 26 of 40

Page 606: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title Project Description/ Objectives

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (PhP '000)

LGU Proponent Remarks

Dimataling IP Zamboanga del Sur

Dimataling IP Line Project - Dimataling IP 100,000.00 100,000.00 200,000.00

Lubusan SIP Zamboanga del Sur

CARP IC CARP-IC 8,000.00 8,000.00

Dagohoy CIS Extension Zamboanga del Sur

Extension CIS Extension CIS 5,000.00 5,000.00

Datagan SIP Zamboanga del Sur

FS/DE FS/DE 300.00 300.00

Suppon SIP Zamboanga del Sur

FS/DE FS/DE 300.00 300.00

Matunog SIP Zamboanga del Sur

FS/DE FS/DE 300.00 300.00

Dagum SIP Zamboanga del Sur

FS/DE FS/DE 300.00 300.00

Bobuan CIS Zamboanga del Sur

Repair CIS Repair CIS 10,000.00 10,000.00

Bobuan CIS Zamboanga del Sur

Resto CIS Resto CIS 7,500.00 7,500.00

Biswangan CIS Zamboanga del Sur

Resto CIS Resto CIS 3,000.00 3,000.00

Salagmanok CIS Zamboanga del Sur

Resto CIS Resto CIS 5,000.00 5,000.00

SIBUGUEY VALLEY IRRIGATION SYSTEM

Zamboanga del Sur

Resto NIS Resto NIS 1,500.00 1,500.00

Maragang II SIP Zamboanga del Sur

SIP SIP 10,000.00 10,000.00

Goling SIP Zamboanga del Sur

SIP SIP 15,000.00 15,000.00

Boyugan East SIP Zamboanga del Sur

SIP SIP 15,000.00 15,000.00

Upper Sibuguey RIS Ext'n Zamboanga del Sur

Upper Sib Upper Sib 12,250.00 12,250.00

Dongos SIP Zamboanga del Sur

SIP SIP 30,000.00 30,000.00

Baganian SIP Zamboanga del Sur

FS/DE FS/DE 300.00 300.00

Balukbahan SIP Zamboanga del Sur

FS/DE FS/DE 300.00 300.00

Dagatan SIP Zamboanga del Sur

SIP SIP 9,000.00 9,000.00

Suppon SIP Zamboanga del Sur

SIP SIP 9,000.00 9,000.00

Chapter 19-3-NIA IXPage 27 of 40

Page 607: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title Project Description/ Objectives

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (PhP '000)

LGU Proponent Remarks

Dagum SIP Zamboanga del Sur

SIP SIP 6,750.00 6,750.00

Rebokon CIS EXTENSION (TALIRAN)

Zamboanga del Sur

Extension CIS Extension CIS 15,000.00 15,000.00

Lapuyan CIS Zamboanga del Sur

Repair CIS Repair CIS 6,000.00 6,000.00

Dumalinao CIS Zamboanga del Sur

Repair CIS Repair CIS 8,000.00 8,000.00

Bogwac CIS Zamboanga del Sur

Repair CIS Repair CIS 5,000.00 5,000.00

Sta. Cruz Boniao Zamboanga del Sur

CARP IC CARP-IC 7,500.00 7,500.00

TOTAL 20,300.00 140,060.00 48,363.00 49,500.00 223,450.00 166,850.00 648,523.00 Zamboanga SibugayDistrict 1 - Lower Sibuguey I RIS Zamboanga

SibugayCCAW NIS CCAW NIS 21,765.00 21,765.00

Upper Sibuguey RIS Zamboanga Sibugay

CCAW NIS CCAW NIS 3,220.00 3,220.00

Lower Sibuguey 1 RIS (Moyo Source)

Zamboanga Sibugay

Coconet NIS Coconet NIS 1,200.00 1,200.00

Upper Sibuguey RIS Zamboanga Sibugay

Coconet NIS Coconet NIS 1,200.00 1,200.00

Dansulao PIP Zamboanga Sibugay

EGPIP EGPIP2,000.00

2,000.00

Pandan Pandan PIP Zamboanga Sibugay

EGPIP EGPIP6,000.00

6,000.00

Natan SIP Zamboanga Sibugay

FS/DE FS/DE 200.00 200.00

Sibuguey Valley IS Zamboanga Sibugay

IMTSS IMTSS576.00

576.00

Lower Sibuguey I RIS Extension Project

Zamboanga Sibugay

Lower Sib 1 Line Programs-Ext'n - Lower Sibuguey I 140,000.00 150,000.00 137,337.00 38,000.00 465,337.00

Upper Sibuguey RIS Extension Project

Zamboanga Sibugay

Upper Sib Line Programs-Ext'n - Upper Sibuguey RIS 69,443.00

12,250.00 35,300.00 116,993.00

Ilisan SIP Zamboanga Sibugay

RRECIS RRECIS 10,000.00 10,000.00

Sibuguey Valley Drainage System Zamboanga Sibugay

RRENIS RRENIS 25,000.00 25,000.00

Sibuguey Valley Irrigation System Zamboanga Sibugay

RRENIS RRENIS 15,000.00 15,000.00

Chapter 19-3-NIA IXPage 28 of 40

Page 608: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title Project Description/ Objectives

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (PhP '000)

LGU Proponent Remarks

Sibuguey Valley Irrigation System Zamboanga Sibugay

RRENIS RRENIS 15,000.00 15,000.00

Sibuguey Valley Irrigation System Zamboanga Sibugay

Service Roads NIS

ServiceRoads-NIS 2,000.00 2,000.00

La Fortuna CIS Zamboanga Sibugay

SIP SIP10,000.00

10,000.00

Natan SIP Zamboanga Sibugay

SIP SIP15,000.00

15,000.00

La Dicha SIP Zamboanga Sibugay

Coconet CIS Coconet-CIS-Construction of Canalization and Coconet Slope Protection

1,000.00 1,000.00

La Fortuna SIP Zamboanga Sibugay

Coconet CIS Coconet-CIS-Construction of Canalization and Coconet Slope Protection

1,000.00 1,000.00

Lumpanac CIS Zamboanga Sibugay

Coconet CIS Coconet-CIS-Coconet-CIS-Construction of Canalization and Coconet Slope Protection

1,000.00 1,000.00

Sibuguey Valley IS Zamboanga Sibugay

Coconet NIS Coconet-NIS-Coconet Slope Protection (Diplahan Area)

7,500.00 7,500.00

Upper Sibuguey RIS Extension Project

Zamboanga Sibugay

FS/DE FSDE 1,865.00 1,865.00

Upper Sibuguey RIS Extension Project

Zamboanga Sibugay

IMTSS Irrigation Management Transfer Support Services (IMTSS)

18.00 18.00

Bella CIS Zamboanga Sibugay

RRECIS RRECIS-Construction of Canalization and Canal Structures

1,000.00 1,000.00

La Fortuna CIS Zamboanga Sibugay

RRECIS Construction of Canalization and Canal Structures

1,000.00 1,000.00

Lambuyogan CIS Zamboanga Sibugay

RRECIS Construction of Canalization and Canal Structures

-

Chapter 19-3-NIA IXPage 29 of 40

Page 609: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title Project Description/ Objectives

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (PhP '000)

LGU Proponent Remarks

Lower Labrador CIS Zamboanga Sibugay

RRECIS Construction of Canalization and Canal Structures 2,000.00

2,000.00

Lumpanac CIS Zamboanga Sibugay

RRECIS Construction of Canalization and Canal Structures 1,000.00

1,000.00

Lutiman CIS Zamboanga Sibugay

RRECIS Construction of Canalization and Canal Structures

-

Lower Labrador CIS Zamboanga Sibugay

RRECIS1,000.00

1,000.00

Upper Labrador CIS Zamboanga Sibugay

RRECIS RRECIS-Construction of Canalization and Canal Structures 2,000.00

2,000.00

Sibuguey Valley IS Zamboanga Sibugay

RRENIS RRENIS-Construction of Canalization and Desilting of Canal 14,000.00

14,000.00

Sibuguey Valley IS Zamboanga Sibugay

Service Roads NIS

Improvement of service road-NIS 3,000.00

3,000.00

Catituan SIP Zamboanga Sibugay

SIP SIP-Construction of Diversion Works 4,000.00

4,000.00

Gandiangan SIP Zamboanga Sibugay

SIP SIP-Construction of Diversion Works 7,000.00

7,000.00

Guilawa SIP Zamboanga Sibugay

SIP SIP-Construction of Canalization and Canal Structures 4,000.00

4,000.00

Ilisan SIP Zamboanga Sibugay

SIP SIP-Construction of Diversion Works, Canalization and Canal Structures 10,000.00

10,000.00

La Victoria SIP Zamboanga Sibugay

SIP SIP-Construction of Slope Protection 4,000.00

4,000.00

Lipacan SIP Zamboanga Sibugay

SIP SIP-Construction of Diversion Works 4,000.00

4,000.00

Payongan SIP Zamboanga Sibugay

SIP SIP-Construction of Canalization and Canal Structures 1,000.00

1,000.00

Sibuguey Valley Irrigation System Zamboanga Sibugay

IMTSS IMTSS 622.97 622.97

Upper Sibuguey Irrigation System Zamboanga Sibugay

IMTSS IMTSS 23.46 23.46

Chapter 19-3-NIA IXPage 30 of 40

Page 610: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title Project Description/ Objectives

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (PhP '000)

LGU Proponent Remarks

Bella CIS Zamboanga Sibugay

REPAIR CIS REPAIR CIS 2,800.00 2,800.00

Bulawan CIS & Ext'n Zamboanga Sibugay

REPAIR CIS REPAIR CIS 2,900.00 2,900.00

Sibuguey Valley Irrigation System Zamboanga Sibugay

REPAIR NIS REPAIR NIS 14,400.00 14,400.00

Lower Labrador CIS Zamboanga Sibugay

REPAIR CIS REPAIR CIS 3,000.00 3,000.00

Upper Labrador CIS Zamboanga Sibugay

REPAIR CIS REPAIR CIS 3,000.00 3,000.00

Catituan SIP Zamboanga Sibugay

SIP SIP 12,600.00 12,600.00

La Victoria SIP Zamboanga Sibugay

SIP SIP 13,700.00 13,700.00

Ilisan SIP Zamboanga Sibugay

SIP SIP 12,000.00 12,000.00

Payongan SIP Zamboanga Sibugay

SIP SIP 14,400.00 14,400.00

Ilisan SIP Zamboanga Sibugay

SIP SIP 5,000.00 5,000.00

Lipacan SIP Zamboanga Sibugay

SIP SIP 8,000.00 8,000.00

Catituan SIP Zamboanga Sibugay

SIP SIP 3,500.00 3,500.00

Guilawa SIP Zamboanga Sibugay

SIP SIP 3,500.00 3,500.00

Lumpanac CIS Zamboanga Sibugay

CARP IC CARP-IC 7,000.00 7,000.00

Sibuguey Valley IS Zamboanga Sibugay

CCAW NIS CCAW-NIS-Protection works and canal structures

3,500.00 3,500.00

Sibuguey Valley IS Zamboanga Sibugay

CCAW NIS CCAW-NIS-Protection works and canal structures

3,300.00 3,300.00

Sibuguey Valley IS Zamboanga Sibugay

CCAW NIS CCAW-NIS-Protection works and canal structures

3,000.00 3,000.00

Lower Sibuguey-1 Zamboanga Sibugay

IMTSS IMTSS 63.46 63.46

Upper Sibuguey Zamboanga Sibugay

IMTSS IMTSS 74.49 74.49

Chapter 19-3-NIA IXPage 31 of 40

Page 611: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title Project Description/ Objectives

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (PhP '000)

LGU Proponent Remarks

Sibuguey Valley Irrigation System Zamboanga Sibugay

IMTSS IMTSS 566.55 566.55

Lower Labrador CIS & Extension

Zamboanga Sibugay

Repair CIS Repair-CIS-Construction of Slope Protection at Diversion Works

4,000.00 4,000.00

Upper Labrador CIS Zamboanga Sibugay

Repair CIS Repair-CIS-Construction Protection Works and Fabrication, Installation & Delivery of Steel Gates

3,000.00 3,000.00

Sibuguey Valley IS Zamboanga Sibugay

Repair NIS Repair-NIS-Installation of PVC Pipes, Desilting of Canal and Construction of Canal Structures

15,000.00 15,000.00

Bella CIS Zamboanga Sibugay

Resto CIS Resto-CIS-Construction of Canal Lining and Canal Structures

4,000.00 4,000.00

La Fortuna CIS Zamboanga Sibugay

Service Roads CIS

Service Roads-CIS-Construction of Road

1,200.00 1,200.00

Gandiangan SIP Zamboanga Sibugay

SIP SIP-Construction of Canalization and Canal Structure

12,000.00 12,000.00

Lipacan SIP Zamboanga Sibugay

SIP SIP-Construction of Canalization and Canal Structure

11,898.00 11,898.00

Guilawa SIP Zamboanga Sibugay

SIP SIP-Construction of Canal Lining and Canal Structure

1,400.00 1,400.00

Ilisan SIP Zamboanga Sibugay

SIP SIP-Construction of Canalization and Canal Structure

4,750.00 4,750.00

DANSULAO PIP Zamboanga Sibugay

EGPIP EGPIP 5,745.00 5,745.00

VILLACASTOR PIP Zamboanga Sibugay

EGPIP EGPIP 11,441.00 11,441.00

Chapter 19-3-NIA IXPage 32 of 40

Page 612: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title Project Description/ Objectives

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (PhP '000)

LGU Proponent Remarks

CALAPE SIP Zamboanga Sibugay

FS/DE FS/DE 200.00 200.00

STA. MARIA PIP Zamboanga Sibugay

FS/DE FS/DE 200.00 200.00

TALUSAN PIP Zamboanga Sibugay

FS/DE FS/DE 200.00 200.00

CANDIIS SIP Zamboanga Sibugay

FS/DE FS/DE 370.00 370.00

LAMBUYOGAN CIS Zamboanga Sibugay

Repair CIS Repair CIS 1,500.00 1,500.00

LA VICTORIA CIS Zamboanga Sibugay

Repair CIS Repair CIS 1,000.00 1,000.00

BULAWAN CIS EXTENSION Zamboanga Sibugay

Repair CIS Repair CIS 3,000.00 3,000.00

LOWER LABRADOR CIS & EXTENSION

Zamboanga Sibugay

Repair CIS Repair CIS 3,000.00 3,000.00

UPPER LABRADOR CIS & EXTENSION

Zamboanga Sibugay

Repair CIS Repair CIS 2,000.00 2,000.00

DITAY-GUINOMAN CIS & EXTENSION

Zamboanga Sibugay

Repair CIS Repair CIS 12,000.00 12,000.00

BALAGON CIS Zamboanga Sibugay

Repair CIS Repair CIS 5,000.00 5,000.00

BUAYAN-CALAPAN CIS Zamboanga Sibugay

Repair CIS Repair CIS 5,500.00 5,500.00

SIBUGUEY VALLEY IRRIGATION SYSTEM

Zamboanga Sibugay

Repair NIS Repair NIS 7,000.00 7,000.00

SIBUGUEY VALLEY IRRIGATION SYSTEM

Zamboanga Sibugay

Repair NIS Repair NIS 10,000.00 10,000.00

SIBUGUEY VALLEY IRRIGATION SYSTEM

Zamboanga Sibugay

CCAW NIS CCAW NIS 20,000.00 20,000.00

BELLA CIS Zamboanga Sibugay

Resto CIS Resto CIS 1,760.00 1,760.00

PAYONGAN CIS Zamboanga Sibugay

Resto CIS Resto CIS 1,000.00 1,000.00

LA DICHA CIS Zamboanga Sibugay

Resto CIS Resto CIS 2,520.00 2,520.00

LA FORTUNA SIP Zamboanga Sibugay

Service Roads CIS

Roads CIS 2,800.00 2,800.00

LA DICHA SIP Zamboanga Sibugay

Service Roads CIS

Roads CIS 4,000.00 4,000.00

BALIAN SIP Zamboanga Sibugay

SIP SIP 10,500.00 10,500.00

Chapter 19-3-NIA IXPage 33 of 40

Page 613: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title Project Description/ Objectives

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (PhP '000)

LGU Proponent Remarks

BELLA CIS Zamboanga Sibugay

Repair CIS Repair CIS 1,000.00 1,000.00

PAYONGAN CIS Zamboanga Sibugay

Repair CIS Repair CIS 1,000.00 1,000.00

LA VICTORIA CIS Zamboanga Sibugay

Repair CIS Repair CIS 1,000.00 1,000.00

LOWER LABRADOR CIS & EXTENSION

Zamboanga Sibugay

Repair CIS Repair CIS 2,000.00 2,000.00

UPPER LABRADOR CIS & EXTENSION

Zamboanga Sibugay

Repair CIS Repair CIS 2,000.00 2,000.00

LUTIMAN CIS Zamboanga Sibugay

Repair CIS Repair CIS 2,000.00 2,000.00

BALIAN SIP Zamboanga Sibugay

SIP SIP 10,500.00 10,500.00

CANDIIS SIP Zamboanga Sibugay

SIP SIP 5,250.00 5,250.00

CALAPE SIP Zamboanga Sibugay

SIP SIP 10,500.00 10,500.00

SIBUGUEY VALLEY IRRIGATION SYSTEM

Zamboanga Sibugay

Repair NIS Repair NIS 14,400.00 14,400.00

SIBUGUEY VALLEY IRRIGATION SYSTEM

Zamboanga Sibugay

Repair NIS Repair NIS 9,600.00 9,600.00

MOLOM SIP Zamboanga Sibugay

FS/DE FS/DE 200.00 200.00

MALONGON SIP Zamboanga Sibugay

FS/DE FS/DE 200.00 200.00

AGUTAYAN SIP Zamboanga Sibugay

FS/DE FS/DE 200.00 200.00

STA. MARIA PIP Zamboanga Sibugay

EGPIP EGPIP 2,000.00 2,000.00

TALUSAN PIP Zamboanga Sibugay

EGPIP EGPIP 5,000.00 5,000.00

TOTAL 337,604.00 221,383.00 243,783.43 105,752.50 122,986.00 102,150.00 1,133,658.93 District 2Sibuguey Valley IS Zamboanga

SibugayCCAW NIS CCAW-NIS-Protection

works and canal structures

10,000.00 10,000.00

Sibuguey Valley RIS Zamboanga Sibugay

Coconet NIS Coconet NIS 2,398.00 2,398.00

Boyugan SIP Zamboanga Sibugay

FS/DE FS/DE 300.00 300.00

Chapter 19-3-NIA IXPage 34 of 40

Page 614: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title Project Description/ Objectives

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (PhP '000)

LGU Proponent Remarks

Ipil SIP Zamboanga Sibugay

FS/DE FS/DE 300.00 300.00

R.T. Lim SIP Zamboanga Sibugay

FS/DE FS/DE 150.00 150.00

Sanito SIP Zamboanga Sibugay

FS/DE FS/DE 300.00 300.00

Lower Sibuguey II RIS Ext'n. Project

Zamboanga Sibugay

Lower Sib 2 Line Programs-Ext'n - Lower Sibuguey II 150,000.00 165,215.00 50,000.00 50,000.00 415,215.00

Balagon SIP Zamboanga Sibugay

RRECIS RRECIS 10,000.00 10,000.00

Balingasan CIS Zamboanga Sibugay

RRECIS RRECIS 5,000.00 5,000.00

Bangco PIP Zamboanga Sibugay

RRECIS RRECIS 20,000.00 20,000.00

Buayan-Calapan CIS Zamboanga Sibugay

RRECIS RRECIS 2,000.00 2,000.00

Camanga I CIS Zamboanga Sibugay

RRECIS RRECIS 2,000.00 2,000.00

Camanga II CIS Zamboanga Sibugay

RRECIS RRECIS 2,000.00 2,000.00

Kalawit CIS (Titay Area) Zamboanga Sibugay

RRECIS RRECIS 2,000.00 2,000.00

Maniha CIS Zamboanga Sibugay

RRECIS RRECIS 2,000.00 2,000.00

Namnama CIS Zamboanga Sibugay

RRECIS RRECIS 2,000.00 2,000.00

Pangi CIS Zamboanga Sibugay

RRECIS RRECIS 2,000.00 2,000.00

Siay CIS Zamboanga Sibugay

RRECIS RRECIS 2,000.00 2,000.00

Soluan-Coloran CIS Zamboanga Sibugay

RRECIS RRECIS 2,000.00 2,000.00

Titay CIS Zamboanga Sibugay

RRECIS RRECIS 2,000.00 2,000.00

Sibuguey Valley RIS Zamboanga Sibugay

RRENIS RRENIS 15,000.00 15,000.00

Baluran-Tupilac SIP Zamboanga Sibugay

SIP SIP15,000.00

15,000.00

Ipil SIP Zamboanga Sibugay

SIP SIP10,662.00

10,662.00

Sanito SIP Zamboanga Sibugay

SIP SIP20,000.00

20,000.00

Chapter 19-3-NIA IXPage 35 of 40

Page 615: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title Project Description/ Objectives

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (PhP '000)

LGU Proponent Remarks

Baluran-Tupilac SIP Zamboanga Sibugay

Coconet CIS Coconet-CIS-Construction of Canalization and Coconet Slope Protection

2,604.00 2,604.00

Batayan CIS Extension & Existing Zamboanga Sibugay

Coconet CIS Coconet-CIS-Construction of Canalization and Coconet Slope Protection

1,300.00 1,300.00

Kabasalan CIS Zamboanga Sibugay

Coconet CIS Construction of Canalization and Coconet Slope Protection

1,300.00 1,300.00

Namnama CIS Zamboanga Sibugay

Coconet CIS Coconet-CIS-Construction of Canalization and Coconet Slope Protection

1,000.00 1,000.00

Sibuguey Valley IS Zamboanga Sibugay

Coconet CIS Coconet-NIS-Coconet Slope Protection (Siay Area)

4,000.00 4,000.00

Tungawan SIP Zamboanga Sibugay

FS/DEFS/DE

1,000.00 1,000.00

Achasol- Bangco Irrigation System

Zamboanga Sibugay

RRECIS RRECIS-Drainage System 20,000.00

20,000.00

Azusano CIS Zamboanga Sibugay

RRECIS RRECIS-Construction of Canalization, Canal Structures & Slope Protection 2,000.00

2,000.00

Batayan II CIS Existing Zamboanga Sibugay

RRECIS RRECIS-Construction of Canalization and Canal Structures 2,500.00

2,500.00

Batayan II CIS Extension Zamboanga Sibugay

RRECIS RRECIS-Construction of Canalization and Canal Structures

-

Buayan-Calapan CIS Zamboanga Sibugay

RRECIS RRECIS-Construction of Slope Protection 3,000.00

3,000.00

Kabasalan CIS Zamboanga Sibugay

RRECIS Construction of Slope Protection 1,000.00

1,000.00

Kalawit CIS (Titay Area) Zamboanga Sibugay

RRECIS Construction of Slope Protection 2,500.00

2,500.00

Chapter 19-3-NIA IXPage 36 of 40

Page 616: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title Project Description/ Objectives

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (PhP '000)

LGU Proponent Remarks

Lower Tungawan CIS Zamboanga Sibugay

RRECIS RRECIS-Construction of Canalization and Canal Structures 1,000.00

1,000.00

Soluan-Coloran CIS Zamboanga Sibugay

RRECIS RRECIS-Construction of Canalization and Canal Structures

-

Tungawan CIS Zamboanga Sibugay

RRECIS RRECIS-Construction of Canalization and Canal Structures 1,000.00

1,000.00

Upper Tungawan CIS Zamboanga Sibugay

RRECIS RRECIS-Construction of Canalization and Canal Structures 1,500.00

1,500.00

Sibuguey Valley IS Zamboanga Sibugay

RRECIS RRENIS-Construction of Canalization and Canal Structures 14,000.00

14,000.00

Sibuguey Valley IS Zamboanga Sibugay

Service Roads NIS

Improvement of service road-NIS 5,000.00

5,000.00

Balagon SIP Zamboanga Sibugay

SIP Construction of Canalization and Canal Structures 5,000.00

5,000.00

Ipil SIP Zamboanga Sibugay

SIP SIP7,000.00

7,000.00

Magsaysay SIP Zamboanga Sibugay

SIP SIP-Construction of Diversion Works 10,000.00

10,000.00

R.T. Lim SIP Zamboanga Sibugay

SIP SIP-Construction of Diversion Works 4,000.00

4,000.00

Sanito SIP Zamboanga Sibugay

SIP SIP-Construction of Canalization and Canal Structures 5,000.00

5,000.00

Namnama CIS Zamboanga Sibugay

Repair CIS REPAIR-CIS 7,800.00 7,800.00

Sibuguey Valley Irrigation System Zamboanga Sibugay

Repair NIS REPAIR-NIS 25,200.00 25,200.00

Tungawan CIS Zamboanga Sibugay

Repair CIS REPAIR-CIS 2,000.00 2,000.00

Upper Tungawan CIS Zamboanga Sibugay

Repair CIS REPAIR-CIS 2,000.00 2,000.00

Lower Tungawan CIS Zamboanga Sibugay

Repair CIS REPAIR-CIS 2,000.00 2,000.00

Baluran-Tupilac SIP Zamboanga Sibugay

SIP SIP 6,200.00 6,200.00

Chapter 19-3-NIA IXPage 37 of 40

Page 617: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title Project Description/ Objectives

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (PhP '000)

LGU Proponent Remarks

R.T. Lim SIP Zamboanga Sibugay

SIP SIP 10,800.00 10,800.00

Ipil SIP Zamboanga Sibugay

SIP SIP 17,600.00 17,600.00

Sanito SIP Zamboanga Sibugay

SIP SIP 28,823.00 28,823.00

Sanito SIP Zamboanga Sibugay

SIP SIP 3,000.00 3,000.00

R.T. Lim Zamboanga Sibugay

SIP SIP 5,500.00 5,500.00

Baluran-Tupilac SIP Zamboanga Sibugay

SIP SIP 5,500.00 5,500.00

Ipil SIP Zamboanga Sibugay

SIP SIP 6,000.00 6,000.00

Lower Sibuguey II RIS Extension Project

Zamboanga Sibugay

Lower Sib 2 LinePrograms-EEEIS Lower Sib-2

33,380.00 33,380.00

Lower Tungawan CIS Zamboanga Sibugay

Repair CIS Repair-CIS-Repair of Slope Protection at Diversion Works

5,000.00 5,000.00

Titay CIS Zamboanga Sibugay

Repair CIS Repair-CIS-Repair of Diversion works and construction of protection dike

5,000.00 5,000.00

Sibuguey Valley IS Zamboanga Sibugay

Repair NIS Repair-NIS-Installation of PVC Pipes, Desilting of Canal and Construction of Canal Structures

9,400.00 9,400.00

Camanga I CIS Zamboanga Sibugay

Resto CIS Resto-CIS-Construction of Canal Lining and Canal Structures

2,000.00 2,000.00

Balagon SIP Zamboanga Sibugay

Service Roads CIS

Service Roads-CIS-Construction of Road

1,500.00 1,500.00

Sibuguey Valley IS Zamboanga Sibugay

SIP SIP-Concrete Road Construction

8,800.00 8,800.00

Magsaysay SIP Zamboanga Sibugay

SIP SIP-Construction of Canalization and Canal Structure

5,500.00 5,500.00

Chapter 19-3-NIA IXPage 38 of 40

Page 618: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title Project Description/ Objectives

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (PhP '000)

LGU Proponent Remarks

Ipil SIP Zamboanga Sibugay

SIP SIP-Construction of Canalization and Canal Structure

6,200.00 6,200.00

Sanito SIP Zamboanga Sibugay

SIP SIP-Construction of Drainage

3,532.00 3,532.00

Baluran-Tupilac SIPZamboanga Sibugay

SIP SIP-Construction of Canalization and Canal Structure

1,720.00 1,720.00

Titay SRIPZamboanga Sibugay

Titay SRIP Titay SRIP 150,000.00 200,000.00 350,000.00

TUNGAWAN PIP Zamboanga Sibugay EGPIP EGPIP 10,000.00 10,000.00

Lower Sibuguey -II RIS Ext'n Zamboanga Sibugay Lower Sib 2 Lower Sib-2 50,000.00 50,000.00 100,000.00

SIAY CIS Zamboanga Sibugay Repair CIS Repair CIS 3,000.00 3,000.00

MANIHA CIS Zamboanga Sibugay Repair CIS Repair CIS 7,000.00 7,000.00

BALINGASAN CIS Zamboanga Sibugay Repair CIS Repair CIS 3,000.00 3,000.00

KABASALAN CIS Zamboanga Sibugay Repair CIS Repair CIS 8,000.00 8,000.00

PANGI CIS Zamboanga Sibugay Repair CIS Repair CIS 1,500.00 1,500.00

KALAWIT CIS (TITAY AREA) Zamboanga Sibugay Repair CIS Repair CIS 4,000.00 4,000.00

AZUSANO CIS Zamboanga Sibugay Repair CIS Repair CIS 2,000.00 2,000.00

BATAYAN II CIS EXT'N Zamboanga Sibugay Repair CIS Repair CIS 10,000.00 10,000.00

BATAYAN II CIS EXISTING Zamboanga Sibugay Repair CIS Repair CIS 10,000.00 10,000.00

UPPER TUNGAWAN CIS Zamboanga Sibugay Repair CIS Repair CIS 4,000.00 4,000.00

TUNGAWAN CIS Zamboanga Sibugay Repair CIS Repair CIS 3,000.00 3,000.00

SOLUAN-COLORAN CIS Zamboanga Sibugay Repair CIS Repair CIS 5,000.00 5,000.00

SIBUGUEY VALLEY IRRIGATION SYSTEM

Zamboanga Sibugay Repair NIS Repair NIS 10,000.00 10,000.00

BALAGON SIP Zamboanga Sibugay

Service Roads CIS Roads CIS 2,770.00 2,770.00

Chapter 19-3-NIA IXPage 39 of 40

Page 619: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title Project Description/ Objectives

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (PhP '000)

LGU Proponent Remarks

UPPER TUNGAWAN CIS Zamboanga Sibugay

Service Roads CIS Roads CIS 4,000.00 4,000.00

SIBUGUEY VALLEY IRRIGATION SYSTEM

Zamboanga Sibugay

Service Roads NIS Roads NIS 8,800.00 8,800.00

SOLUAN-COLORAN CIS Zamboanga Sibugay Resto CIS Resto CIS 2,000.00 2,000.00

SIAY CIS Zamboanga Sibugay Repair CIS Repair CIS 2,000.00 2,000.00

CAMANGA II CIS Zamboanga Sibugay Repair CIS Repair CIS 2,000.00 2,000.00

CAMANGA I CIS Zamboanga Sibugay Repair CIS Repair CIS 2,000.00 2,000.00

MANIHA CIS Zamboanga Sibugay Repair CIS Repair CIS 3,000.00 3,000.00

BUAYAN-CALAPAN CIS Zamboanga Sibugay Repair CIS Repair CIS 2,000.00 2,000.00

KABASALAN CIS Zamboanga Sibugay Repair CIS Repair CIS 2,000.00 2,000.00

TITAY CIS Zamboanga Sibugay Repair CIS Repair CIS 2,000.00 2,000.00

NAMNAMA CIS Zamboanga Sibugay Repair CIS Repair CIS 2,000.00 2,000.00

KALAWIT CIS (TITAY AREA) Zamboanga Sibugay Repair CIS Repair CIS 2,000.00 2,000.00

BATAYAN II CIS EXT'N Zamboanga Sibugay Repair CIS Repair CIS 3,000.00 3,000.00

BATAYAN II CIS EXISTING Zamboanga Sibugay Repair CIS Repair CIS 3,000.00 3,000.00

LOWER TUNGAWAN CIS Zamboanga Sibugay Repair CIS Repair CIS 2,500.00 2,500.00

SIBUGUEY VALLEY DRAINAGE SYSTEM

Zamboanga Sibugay Repair NIS Repair NIS 5,000.00 5,000.00

TIGPALAY SIP Zamboanga Sibugay

FS/DE FS/DE 200.00 200.00

TUNGAWAN PIP Zamboanga Sibugay EGPIP EGPIP 12,438.00 12,438.00

TOTAL 269,110.00 260,919.00 155,803.00 58,652.00 346,070.00 347,138.00 1,437,692.00 FSDE Various Location within Region

FS/DE FS/DE 8,672.00 8,672.00

GRAND TOTAL 1,089,374.00 1,363,112.00 915,140.01 662,200.00 2,102,961.00 1,315,289.00 7,448,076.01

Chapter 19-3-NIA IXPage 40 of 40

Page 620: Table of Contents (By Chapter)

UPDATED ZAMBOANGA PENINSULA REGIONAL DEVELOPMENT INVESTMENT PROGRAM (RDIP) 2017-2022

Agency: Civil Aviation Authority of the Philippines IX Chapter 19: Accelerating Infrastructure Development

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-endorsed)

2021(RDC-Endorsed)

2022(Proposed)

Total

Chapter 19 DOTr-Aviation and Airport Sector Zamboanga International Airport (Sub-Total) 50,000.00 - 94,325.00 - 2,800,000.00 - 2,944,325.00 Upgrading of Runway (overlay) 50,000.00 50,000.00 completed (DOTr project)Grading of Runway Shoulder (bothsides) 94,325.00 94,325.00 On-Going (DOTr project)Lot Acquisition for new ZIA 2,800,000.00 2,800,000.00

Dipolog Airport (Sub-Total) - - - - 80,000.00 - 80,000.00

Dipolog airport development 80,000.00 80,000.00

Pagadian Airport (Sub-Total) - - - - - - -

Ipil Airport (Sub-Total) - 13,000.00 65,000.00 - 166,000.00 - 244,000.00 Construction of New Terminal Building 13,000.00 13,000.00 completed (DOTr project)

Extension of Concrete Runway 65,000.00 65,000.00 On-Going (DOTr project)

Construction of apron and vehicular parking area 166,000.00 166,000.00

Liloy Airport (Sub-Total) - - - - - - -

Siocon Airport (Sub-Total) - - - - - - - Total for Aviation and Airports 50,000.00 13,000.00 159,325.00 - 3,046,000.00 - 3,268,325.00

Maritime and Ports SectorCons. Brgy. Diki Port, Isabela City 50,000 50,000.00 Cons. Brgy. Manalipa Port, Zamboanga City 35,000 35,000.00 Cons. Brgy. Pasilanta Port, Zamboanga City 35,000 35,000.00 Cons. Brgy. Limaong Port, Zamboanga City 35,000 35,000.00 Total for Maritime and Ports 155,000 155,000.00 GRAND TOTAL 50,000 13,000 159,325.00 3,201,000.00 3,423,325.00

CHAPTER/ RLA/ SUCINVESTMENT REQUIREMENTS (in Thousand Pesos)

Remarks

Chapter 19-4-DOTrPage 1 of 1

Page 621: Table of Contents (By Chapter)

Updated Zamboanga Peninsula Regional Development Investment Program (RDIP), 2017-2022Agency: Department of Environment and Natural Resources, Region IXChapter: 20 Ensuring Ecological Integrity, Clean and Healthy Environment

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (RDC-endorsed)

2021 (Proposed)

2022 (Proposed) Total

(1) (3) (4) (5) (9) (10) (11) (12) (13) (14) (15) (16)

1. Biodiversity and functioning of ecosystem services sustained

Forest cover increased (ha)

Regional Total Plantation established and maintained (ha) 482,324,000 452,829,000 166,755,000 453,879,000 408,810,000 307,781,000 2,272,378,000

Regionwide 162,085,000 162,085,000 Zamboanga del Norte 111,541,000 149,354,000 70,345,000 167,560,000 149,570,000 121,934,000 770,304,000 Provincewide 3,531,000 2,340,000 5,871,000 District 1 27,644,000 21,851,000 14,845,000 33,939,000 33,063,000 27,088,000 158,430,000 District 2 31,015,000 59,392,000 24,560,000 46,235,000 39,493,000 30,458,000 231,153,000 District 3 49,351,000 65,771,000 30,940,000 87,386,000 77,014,000 64,388,000 374,850,000 Zamboanga del Sur 64,404,000 55,459,000 36,095,000 98,062,000 143,117,000 77,572,000 474,709,000 Provincewide 1,892,000 1,892,000 District 1 30,390,000 26,143,000 16,350,000 45,079,000 44,841,000 37,501,000 200,304,000 District 2 32,122,000 29,316,000 19,745,000 52,983,000 98,276,000 40,071,000 272,513,000 Zamboanga Sibugay 58,672,000 148,748,000 46,670,000 86,857,000 70,096,000 58,475,000 469,518,000 Provincewide 2,755,000 1,957,000 4,712,000 District 1 28,210,000 68,069,000 18,465,000 40,107,000 28,947,000 23,066,000 206,864,000 District 2 27,707,000 78,722,000 28,205,000 46,750,000 41,149,000 35,409,000 257,942,000 Zamboanga City 84,242,000 84,568,000 11,135,000 98,110,000 23,013,000 24,900,000 325,968,000 District 1 2,830,000 44,682,000 1,600,000 49,112,000 District 2 81,412,000 39,886,000 11,135,000 96,510,000 23,013,000 24,900,000 276,856,000

Zamboanga del Sur Province

Investment Requirements (in exact amount PhP)

1.1 Expanded National Greening Program (eNGP)

LGU Proponent

Ecological integrity ensured and socioeconomic condition of resource-based communities improved

Chapter Outcome/Project Title

Specific Location (Province/City/Municipality/

Barangay)

RDP ResultsMatrices

IndicatorsAddressed

Expected Output

Chapter 20-1-DENR IXPage 1 of 22

Page 622: Table of Contents (By Chapter)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (RDC-endorsed)

2021 (Proposed)

2022 (Proposed) Total

Investment Requirements (in exact amount PhP)

LGU ProponentChapter Outcome/Project Title

Specific Location (Province/City/Municipality/

Barangay)

RDP ResultsMatrices

IndicatorsAddressed

Expected Output

Isabela City 1,380,000 14,700,000 2,510,000 3,290,000 23,014,000 24,900,000 69,794,000

Zamboanga del Sur - District 1 (Josefina)

Seedlings provided (MMFN) (no) - Dimataling, Zamboanga

del Sur

Zamboanga del Sur - District 2 (Dimataling)

Clonal Nurseries & Forest Tree Seed Nurseries establised (no)

2,000,000 2,000,000 Dimataling, Zamboanga del Sur

Regional Total

Forest and Biodiversity Protection Systemroute patrolled (km) - Includes hiring of Forest Protection Officers (FPOs)

- 7,800,000 13,732,000 15,856,000 18,895,000 18,895,000 75,178,000

Regionwide 4,000 4,000 4,000 4,000 4,000 20,000 Zamboanga del Norte - 3,318,000 4,972,000 5,620,000 9,132,000 9,132,000 32,174,000 Provincewide 106,000 55,000 4,000 208,000 208,000 581,000 District 1 803,000 1,139,000 1,302,000 2,027,000 2,027,000 7,298,000 District 2 803,000 1,445,000 1,608,000 2,537,000 2,537,000 8,930,000 District 3 1,606,000 2,333,000 2,706,000 4,360,000 4,360,000 15,365,000 Zamboanga del Sur - 2,102,000 2,947,000 3,496,000 2,998,000 2,998,000 14,541,000 Provincewide 208,000 55,000 4,000 208,000 208,000 683,000 District 1 859,000 1,221,000 1,494,000 1,170,000 1,170,000 5,914,000 District 2 1,035,000 1,671,000 1,998,000 1,620,000 1,620,000 7,944,000 Zamboanga Sibugay - 1,362,000 2,494,000 2,806,000 3,402,000 3,402,000 13,466,000 Provincewide 106,000 55,000 4,000 208,000 208,000 581,000 District 1 628,000 1,182,000 1,398,000 1,750,000 1,750,000 6,708,000 District 2 628,000 1,257,000 1,404,000 1,444,000 1,444,000 6,177,000 Zamboanga City 1,014,000 3,315,000 3,930,000 3,359,000 3,359,000 14,977,000 District 1 507,000 1,658,000 1,965,000 1,680,000 1,680,000 7,490,000 District 2 507,000 1,657,000 1,965,000 1,679,000 1,679,000 7,487,000

1.2 LAWIN Forest and Biodiversity Protection System

Chapter 20-1-DENR IXPage 2 of 22

Page 623: Table of Contents (By Chapter)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (RDC-endorsed)

2021 (Proposed)

2022 (Proposed) Total

Investment Requirements (in exact amount PhP)

LGU ProponentChapter Outcome/Project Title

Specific Location (Province/City/Municipality/

Barangay)

RDP ResultsMatrices

IndicatorsAddressed

Expected Output

Quality of coastal and marine habitats improved (ha) -

Regional Total

Assessment and mapping activities conducted (ha) - Biophysical profile of coral reef area with health status prepared and submitted to BMB

Milestone:- dialogue with the coastal LGUs- reconnaissance survey/site identification- coral mapping (CPCe)- detailed survey/assessment- monitoring of previous permanent monitoring station

1,061,000 1,390,000 - - 3,310,000 3,003,000 8,764,000

Regional TotalArea of coral reef assessed and mapped (ha)

- 735,000 - - 2,006,000 1,960,000 4,701,000

Regionwide 1,948,000 1,948,000 Zamboanga del Norte 288,000 295,000 583,000 Zamboanga del Sur 735,000 356,000 365,000 1,456,000 Zamboanga Sibugay 927,000 952,000 1,879,000 Zamboanga City - Coral Reefs 435,000 348,000 783,000

Regional TotalArea of sea grass beds assessed and mapped (ha)

- 655,000 - - 1,304,000 1,043,000 3,002,000

Zamboanga del Norte 226,000 181,000 407,000 Zamboanga del Sur 655,000 230,000 184,000 1,069,000 Zamboanga Sibugay 413,000 330,000 743,000 Zamboanga City 435,000 348,000 783,000

1.3 Assessment and Mapping of coastal habitats (outside NIPAS MPAs)

Chapter 20-1-DENR IXPage 3 of 22

Page 624: Table of Contents (By Chapter)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (RDC-endorsed)

2021 (Proposed)

2022 (Proposed) Total

Investment Requirements (in exact amount PhP)

LGU ProponentChapter Outcome/Project Title

Specific Location (Province/City/Municipality/

Barangay)

RDP ResultsMatrices

IndicatorsAddressed

Expected Output

Regional TotalArea of mangrove assessed and mapped (ha)

1,061,000 - - - - - 1,061,000

Regionwide 1,061,000 1,061,000 Zamboanga del Sur -

1.4 Inventory and assessment of mangrove within abandoned, undeveloped and underutilized fishpond

Zamboanga City Mangrove inventoried & assessed (ha) 1,750,000 1,750,000

1.5 Marine Protected Areas Networking (locally-managed) Regional Total

MPA network/Alliance established (no)

Milestone Targets:- dialogue with concerned MLGUs & PLGU- consultative meetings/orientation- reorganization of alliance- organization of the different committee/identification of roles & functions- preparation/draft MOU and MOA- capacity building & team building

1,000,000 - 300,000 2,500,000 4,320,000 - 8,120,000

Regionwide 300,000 300,000

Zamboanga del Norte -

Zamboanga del Sur 1,820,000 1,820,000 Dimataling, Zamboanga del Sur

Zamboanga Sibugay 1,000,000 1,000,000 Zamboanga City 2,500,000 2,500,000 5,000,000

Chapter 20-1-DENR IXPage 4 of 22

Page 625: Table of Contents (By Chapter)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (RDC-endorsed)

2021 (Proposed)

2022 (Proposed) Total

Investment Requirements (in exact amount PhP)

LGU ProponentChapter Outcome/Project Title

Specific Location (Province/City/Municipality/

Barangay)

RDP ResultsMatrices

IndicatorsAddressed

Expected Output

Regional Total

Stakeholders and MPA managers consultation/meetings conducted (no) - MPA network strengthened - signing and adaption of MOA and MOUMilestone:- Learning Event on MPA Strengthening/Training on Coastal Laws- Site Visit (managed/model MPAN)

- 600,000 - 600,000 800,000 800,000 2,800,000

Zamboanga del Norte 200,000 600,000 600,000 1,400,000

Zamboanga Sibugay 600,000 400,000 200,000 200,000 1,400,000

Regional Total MPA updated using MEAT (no) - - - 700,000 600,000 850,000 2,150,000

Zamboanga del Norte 250,000 300,000 250,000 800,000 Zamboanga del Sur 300,000 300,000 300,000 900,000 Zamboanga Sibugay 150,000 300,000 450,000

- Number of Protected Areas (marine) with high biodiversity values effectively managed

-

Regional Total

PA (marine) maintained and protected with report submitted (no)Milestone:- Monitoring of Artificial Reef (AR) module status - Conduct of beach profiling- Patrolling and documentation- Dialogue/Feedback with the PAMB

3,476,000 1,039,000 4,972,000 3,412,000 3,412,000 3,412,000 19,723,000

Zamboanga de Norte 1,737,000 242,000 596,000 2,072,000 2,072,000 2,072,000 8,791,000 District 1 1,158,000 1,544,000 1,544,000 1,544,000 5,790,000

Chapter 20-1-DENR IXPage 5 of 22

Page 626: Table of Contents (By Chapter)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (RDC-endorsed)

2021 (Proposed)

2022 (Proposed) Total

Investment Requirements (in exact amount PhP)

LGU ProponentChapter Outcome/Project Title

Specific Location (Province/City/Municipality/

Barangay)

RDP ResultsMatrices

IndicatorsAddressed

Expected Output

Aliguay Island Protected Landscape & Seascape - Dapitan City

579,000 24,100 729,000 845,000 845,000 845,000 3,867,100

Selinog Island Protected Landscape & Seascape - Dapitan City

579,000 241,000 564,000 699,000 699,000 699,000 3,481,000

District 3 - Murceilagos Island Protected Landscape & Seascape - Antonino, Labason

579,000 242,000 596,000 528,000 528,000 528,000 3,001,000

Zamboanga del Sur - - District 2 - Dumanquillas Bay Protected Landscape & Seascape - Buug, Kumalarang, Margosatubig & Lapuyan

579,000 369,000 1,368,000 450,000 450,000 450,000 3,666,000

Zamboanga City - District 1 - Great & little Sta. Cruz Islands PLS - Sta. Barbara

580,000 168,000 1,032,000 390,000 390,000 390,000 2,950,000

ARMM - Turtle Islands Wildlife Sanctuary -Tawi-Tawi

580,000 260,000 1,976,000 500,000 500,000 500,000 4,316,000

Number of Protected Areas (terrestrial) with high biodiversity values effectively managed

-

1.7 Conduct of Protected Area Suitability Assessment (PASA)

Zamboanga del Sur - District 2 (Dimataling)

Protected Area Suitability Assessment (PASA) conducted (no)

205,000 205,000 Dimataling, Zamboanga del Sur

Regional Total BMS site monitored (no) 1,680,000 1,980,000 2,500,000 1,800,000 3,000,000 3,000,000 13,960,000

1.6 Maintenance & protection of coastal & marine ecosystems (including reduction of threats and pressures identified)

Chapter 20-1-DENR IXPage 6 of 22

Page 627: Table of Contents (By Chapter)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (RDC-endorsed)

2021 (Proposed)

2022 (Proposed) Total

Investment Requirements (in exact amount PhP)

LGU ProponentChapter Outcome/Project Title

Specific Location (Province/City/Municipality/

Barangay)

RDP ResultsMatrices

IndicatorsAddressed

Expected Output

Zamboanga del Norte 480,000 750,000 750,000 750,000 1,250,000 1,250,000 5,230,000 District 1 480,000 750,000 750,000 450,000 750,000 750,000 3,930,000 - Aliguay Island Protected Landscape and Seascape - Aliguay, Dapitan City

160,000 250,000 250,000 150,000 250,000 250,000 1,310,000

- Selinog Island Protected Landscape & Seascape -Selinog, Dapitan City

160,000 250,000 250,000 150,000 250,000 250,000 1,310,000

- Jose Rizal Memorial PL -Talisay, Santo Niño & Taguilon, Dapitan City

160,000 250,000 250,000 150,000 250,000 250,000 1,310,000

District 3 300,000 500,000 500,000 1,300,000 - Murceilagos Island Protected Landscape & Seascape - Antonino, Labason

160,000 250,000 250,000 150,000 250,000 250,000 1,310,000

- Siocon Resource Reserve - D. Riconalla, Pangian, Latabon & AL Micubo, Siocon

160,000 250,000 250,000 150,000 250,000 250,000 1,310,000

Zamboanga Del Sur - District 2 400,000 500,000 500,000 300,000 500,000 500,000 2,700,000 - Mt. Timolan Protected Landscape 200,000 250,000 250,000 150,000 250,000 250,000 1,350,000

- Dumanquillas Bay Protected Landscape & Seascape

200,000 250,000 250,000 150,000 250,000 250,000 1,350,000

Zamboanga Sibugay - District 1 - Buug Natural Biotic Area 200,000 120,000 250,000 150,000 250,000 250,000 1,220,000

Zamboanga City - District 1 400,000 300,000 500,000 300,000 500,000 500,000 2,500,000 - Great & Little Sta. Cruz Islands Protected Landscape & Seascape

200,000 100,000 250,000 150,000 250,000 250,000 1,200,000

- Pasonanca Natural Park - Pasonanca, Lunzuran, Lumayang Cacao, Lapacan, Lamisan, Bungiao, La Paz, Baluno & Dulian, Zamboanga City Sibuco, Siocon ZDN

200,000 200,000 250,000 150,000 250,000 250,000 1,300,000

Isabela City - Basilan Natural Biotic Area - Lamitan, Basilan

60,000 250,000 150,000 250,000 250,000 960,000

1.8 Implementation of Biodiversity Monitoring System (BMS)

Chapter 20-1-DENR IXPage 7 of 22

Page 628: Table of Contents (By Chapter)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (RDC-endorsed)

2021 (Proposed)

2022 (Proposed) Total

Investment Requirements (in exact amount PhP)

LGU ProponentChapter Outcome/Project Title

Specific Location (Province/City/Municipality/

Barangay)

RDP ResultsMatrices

IndicatorsAddressed

Expected Output

ARMM - Turtle Islands Wildlife Sanctuary -Tawi-Tawi

200,000 250,000 250,000 150,000 250,000 250,000 1,350,000

Number of Inland wetlands effectively managed -

1.9 Conservation of Inland Wetlands -

Regional TotalInland wetlands inventoried and mapped (no)

100,000 350,000 225,000 100,000 240,000 245,000 1,260,000

Regionwide 30,000 35,000 65,000 Zamboanga del Norte 50,000 200,000 180,000 50,000 - - 480,000 District 1 50,000 50,000 50,000 150,000 District 2 50,000 45,000 95,000 District 3 100,000 135,000 235,000 Zamboanga del Sur - Provincewide 50,000 50,000 Zamboanga Sibugay 50,000 150,000 45,000 50,000 160,000 160,000 615,000 Provincewide 50,000 150,000 45,000 50,000 60,000 60,000 415,000 District 1 50,000 50,000 100,000 District 2 50,000 50,000 100,000 Zamboanga City 50,000 50,000 100,000

1.9.2 Assessment and profiling of priority inland wetland

Regional TotalPriority wetland profiled with geotagged photos submitted to BMB (no)

600,000 - - - 200,000 200,000 1,000,000

Regionwide 30,000 30,000 Zamboanga del Norte 190,000 - - - - - 190,000

District 1 -

District 2 190,000 190,000

Zamboanga del Sur - Provincewide 190,000 190,000 Zamboanga Sibugay - Provincewide 190,000 200,000 200,000 590,000

1.10 Management of Caves and Cave Resources

Number of caves with high conservation value effectively managed increased

- -

1.9.1 Inventory and mapping of inland wetlands

Chapter 20-1-DENR IXPage 8 of 22

Page 629: Table of Contents (By Chapter)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (RDC-endorsed)

2021 (Proposed)

2022 (Proposed) Total

Investment Requirements (in exact amount PhP)

LGU ProponentChapter Outcome/Project Title

Specific Location (Province/City/Municipality/

Barangay)

RDP ResultsMatrices

IndicatorsAddressed

Expected Output

1.10.1 Inventory and mapping of caves Regional Total

Caves inventoried/identified (no)

500,000 550,000 - - 500,000 550,000 2,100,000

Regionwide 100,000 100,000 Zamboanga del Norte 250,000 500,000 - - 400,000 400,000 1,550,000 District 1 100,000 50,000 50,000 200,000 District 2 200,000 200,000 200,000 600,000 District 3 250,000 200,000 150,000 150,000 750,000 Zamboanga del Sur - Provincewide 50,000 50,000 Zamboanga Sibugay - Provincewide

100,000 50,000 150,000

Zamboanga City 100,000 150,000 250,000

1.10.2 Cave assessment and classification Regional Total

Caves assessed with recommended classifications and mapsprepared (no)

1,897,000 1,390,000 1,905,000 3,200,000 2,000,000 2,250,000 12,642,000

Regionwide 100,000 100,000 Zamboanga del Norte 760,000 600,000 680,000 1,200,000 600,000 700,000 4,540,000 District 1 190,000 100,000 95,000 385,000 District 2 285,000 300,000 295,000 800,000 400,000 400,000 2,480,000 District 3 285,000 200,000 290,000 400,000 200,000 300,000 1,675,000 Zamboanga del Sur 377,000 500,000 490,000 800,000 500,000 500,000 3,167,000 District 1 189,000 250,000 245,000 400,000 250,000 250,000 1,584,000 District 2 188,000 250,000 245,000 400,000 250,000 250,000 1,583,000 Zamboanga Sibugay 475,000 220,000 490,000 800,000 600,000 700,000 3,285,000 District 1 190,000 70,000 245,000 400,000 300,000 350,000 1,555,000 District 2 285,000 150,000 245,000 400,000 300,000 350,000 1,730,000 Zamboanga City District 2 285,000 70,000 245,000 400,000 300,000 350,000 1,650,000

Area of residential free patents issued increased (ha) -

1.11 Land Disposition/ Distribution and Survey 0 -

Regional TotalPatents issued (no)- Applications processed- Includes survey

1,694,000 2,016,000 850,000 572,000 462,000 409,000 6,003,000

Zamboanga del Norte 566,000 896,000 237,000 129,000 125,000 125,000 2,078,000

Chapter 20-1-DENR IXPage 9 of 22

Page 630: Table of Contents (By Chapter)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (RDC-endorsed)

2021 (Proposed)

2022 (Proposed) Total

Investment Requirements (in exact amount PhP)

LGU ProponentChapter Outcome/Project Title

Specific Location (Province/City/Municipality/

Barangay)

RDP ResultsMatrices

IndicatorsAddressed

Expected Output

District 1 148,000 224,000 39,000 39,000 39,000 39,000 528,000 District 2 149,000 224,000 117,000 39,000 39,000 39,000 607,000 District 3 269,000 448,000 81,000 51,000 47,000 47,000 943,000 Zamboanga del Sur 564,000 448,000 244,000 232,000 180,000 180,000 1,848,000 District 1 282,000 224,000 116,000 116,000 90,000 90,000 918,000 District 2 282,000 224,000 128,000 116,000 90,000 90,000 930,000 Zamboanga Sibugay 376,000 448,000 354,000 195,000 141,000 88,000 1,602,000 District 1 188,000 224,000 185,000 77,000 62,000 47,000 783,000 District 2 188,000 224,000 169,000 118,000 79,000 41,000 819,000 Zamboanga City 188,000 224,000 15,000 16,000 16,000 16,000 475,000 District 1 94,000 112,000 7,000 8,000 8,000 8,000 237,000 District 2 94,000 112,000 8,000 8,000 8,000 8,000 238,000 Isabela City -

Employment from sustainable resource-based industries increased

-

Regional Total

Jobs generated from reforestation & non-timber/agroforestry enterprises - eNGP

-

Zamboanga del Norte - District 1 - District 2 - District 3 - Zamboanga del Sur - District 1 - District 2 - Zamboanga Sibugay - District 1 - District 2 - Isabela City -

2. Adaptive capacities and resilience of ecosystems and communities increased

-

Number of reviewed Climate Change (CC)/Disaster Risk Reduction Management (DRRM)-enhanced plans increased

-

- Residential Free Patent disposed under Republic Act No. 10023

1.12 Number of jobs generated from reforestation & non- timber/agroforestry enterprises

Chapter 20-1-DENR IXPage 10 of 22

Page 631: Table of Contents (By Chapter)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (RDC-endorsed)

2021 (Proposed)

2022 (Proposed) Total

Investment Requirements (in exact amount PhP)

LGU ProponentChapter Outcome/Project Title

Specific Location (Province/City/Municipality/

Barangay)

RDP ResultsMatrices

IndicatorsAddressed

Expected Output

2.1 Watershed management planning 0 0 -

Regional Total IWMP prepared and submitted (no) 800,000 920,000 340,000 1,360,000 1,360,000 1,700,000 6,480,000

Regionwide - 0 340,000 340,000 680,000 340,000 1,700,000 Vitali River Watershed (21,002.00 ha) 340,000 340,000

Ingin River Watershed (8,563.00 ha) Sindangan, ZDN

340,000 340,000

Tumaga River Watershed (17,650.00 ha) Zamboanga City

-

Sibuguey River Basin (94,221.08 ha) - ZSP: Buug, Diplahan, Imelda, Siay, Payao & Kabasalan, Malangas - ZDN: Siayan & Leon Postigo

-

Panganuran River Watershed 340,000 340,000

Anongan River Watershed 340,000 340,000

Salug River Watershed - 340,000 340,000

Zamboanga del Norte 340,000 340,000 0 680,000 340,000 0 1,700,000

District 1 340,000 - - - 340,000 - 680,000

Layawan River WatershedsA= 10,308.44 ha 340,000 340,000

- Dapitan River Watershed

340,000 340,000

Chapter 20-1-DENR IXPage 11 of 22

Page 632: Table of Contents (By Chapter)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (RDC-endorsed)

2021 (Proposed)

2022 (Proposed) Total

Investment Requirements (in exact amount PhP)

LGU ProponentChapter Outcome/Project Title

Specific Location (Province/City/Municipality/

Barangay)

RDP ResultsMatrices

IndicatorsAddressed

Expected Output

District 2 - Kabasalan River Watershed (22,306.70 ha)

340,000 340,000

District 3 - 340,000 - 680,000 - - 1,020,000

Malayal River Watershed (2,151.00 ha) Sebuco, ZDN

340,000 340,000

Lituban River Watershed A= (57,277.17 ha)

340,000 340,000

- Palandok River Watershed A=22,774 ha 340,000 340,000

- Lapatan River Watershed (1,416 ha) - Labason, Zamboanga del Norte

-

Zamboanga del Sur 340,000 240,000 0 340,000 340,000 680,000 1,940,000 District 1 340,000 240,000 0 0 340,000 340,000 1,260,000

- Mt. Sugarloaf/Susong Dalaga A= 6,135.13 ha 120,000 120,000

- Guitran River Sub-Watershed A= 7,635 ha 120,000 120,000

Bokong River 340,000 340,000

Tukuran River Watershed (Midaslip-Sominot-Tukuran)

340,000 340,000

Labangan River Watershed A= 47,713 ha

340,000 340,000

District 2 - 0 0 340,000 0 340,000 680,000

2.1.1 Preparation of Integrated Watershed Management Plan

Chapter 20-1-DENR IXPage 12 of 22

Page 633: Table of Contents (By Chapter)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (RDC-endorsed)

2021 (Proposed)

2022 (Proposed) Total

Investment Requirements (in exact amount PhP)

LGU ProponentChapter Outcome/Project Title

Specific Location (Province/City/Municipality/

Barangay)

RDP ResultsMatrices

IndicatorsAddressed

Expected Output

Diplo Watershed (8,046.53 ha) -Diplo, Kumalarang,ZDS -

Bogayo Watershed (13,494.38 ha) - Bogayo, Kumalarang, ZDS

340,000 340,000

Lapuyan River Watershed 340,000 340,000

Zamboanga Sibugay -

District 2 120,000 340,000 0 0 0 680,000 1,140,000

- Palomoc Watershed 340,000 340,000

Surabay River Watershed 340,000 340,000

Guilinan River Watershed 340,000 340,000

Doña Josefa Watershed A= 2,538.74. ha 120,000 120,000

RegionwideIWMP reviewed/updated & submitted (no)

340,000 340,000

- Doña Josefa Watershed

340,000 340,000

Dipolo/Salug Valley Watershed

340,000 340,000

Chapter 20-1-DENR IXPage 13 of 22

Page 634: Table of Contents (By Chapter)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (RDC-endorsed)

2021 (Proposed)

2022 (Proposed) Total

Investment Requirements (in exact amount PhP)

LGU ProponentChapter Outcome/Project Title

Specific Location (Province/City/Municipality/

Barangay)

RDP ResultsMatrices

IndicatorsAddressed

Expected Output

Regional Total

FLUP prepared/drafted (no) Milestone Target: Preparatory activities (%) - IEC & production of IEC materials - Capability building (%) - Situational analysis (no) - Plan formulation/ drafting (no) - Review/deliberation

1,200,000 4,000,000 3,200,000 1,600,000 4,400,000 0 14,400,000

Regionwide 152,000 1,600,000 1,752,000

Zamboanga del Norte 400,000 1,200,000 2,000,000 0 2,000,000 0 5,600,000 District 1 - La Libertad - Mutia

800,000 800,000 1,600,000

District 2 - Sindangan 1,200,000 800,000 400,000 2,400,000

District 3 - Labason - Siocon

400,000 400,000 800,000 1,600,000

Zamboanga Del Sur 400,000 1,048,000 800,000 0 2,000,000 4,248,000 District 1 - Dumingag 400,000 400,000 400,000 400,000 1,600,000

2.2 Preparation of FLUP

Chapter 20-1-DENR IXPage 14 of 22

Page 635: Table of Contents (By Chapter)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (RDC-endorsed)

2021 (Proposed)

2022 (Proposed) Total

Investment Requirements (in exact amount PhP)

LGU ProponentChapter Outcome/Project Title

Specific Location (Province/City/Municipality/

Barangay)

RDP ResultsMatrices

IndicatorsAddressed

Expected Output

District 2 - Dinas - Guipos - Pitogo - San Pablo

648,000 400,000 1,600,000 2,648,000

Zamboanga Sibugay 400,000 800,000 400,000 - 400,000 - 2,000,000 District 1 400,000 400,000

District 2 - RT Lim 400,000 400,000 400,000 400,000 1,600,000

Zamboanga City 800,000 800,000

Regional TotalCRMF and 5-year workplanprepared/updated (no)

450,000 810,000 1,305,000 810,000 1,100,000 800,000 5,275,000

Regionwide 45,000 900,000 945,000

Zamboanga del Norte 180,000 90,000 540,000 315,000 400,000 250,000 1,775,000

District 1 - San Isidro Tinago, Sergio Osmeña, ZDN - Sinai, Sergio Osmeña, SR. ZDN - Don Eleno, Sergio Osmeña, Sr., ZDN - Buenavista, Sergio Osmeña, SR., ZDN - Wilben, Sergio Osmeña, SR., ZDN

45,000 180,000 90,000 50,000 365,000

District 2 45,000 45,000 90,000 90,000 100,000 50,000 420,000

2.3 Preparation/Updating of Community Resource Management Framework

Chapter 20-1-DENR IXPage 15 of 22

Page 636: Table of Contents (By Chapter)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (RDC-endorsed)

2021 (Proposed)

2022 (Proposed) Total

Investment Requirements (in exact amount PhP)

LGU ProponentChapter Outcome/Project Title

Specific Location (Province/City/Municipality/

Barangay)

RDP ResultsMatrices

IndicatorsAddressed

Expected Output

District 3 - Balangasan, Kalawit, ZDN - Sas. Balas, Monob, Daniel Kalawit, ZDN - Botong, Kalawit, ZDN - Daniel Maing, Kalawit, ZDN - Lumanon , Batayan Kalawit, ZDN - Gacsod, Map, Gutalac, ZDN - Map, Gutalac, ZDN - Pitogo, Gutalac, ZDN - Sitio Cuyan, Siocon,ZDN - Panabutan, Sirawai, ZDN - Malayal , Sibuco, ZDN

90,000 45,000 270,000 135,000 250,000 200,000 990,000

Zamboanga del Sur 90,000 135,000 135,000 135,000 250,000 200,000 945,000 District 1 - Sinonok, Dumingag, ZDS - Salvador, Dumingag, ZDS - Dilud, Dumingag, ZDS - Lipawan, ZDS

45,000 90,000 90,000 45,000 100,000 50,000 420,000

District 2 - Picanan, ZDS - Gawil, Kumalarang, ZDS - Magpangi, Bolisong, Kumalarang, ZDS - Buyogan West, Kumalarang, ZDS - Gatub, Lakewood, ZDS - Dipili, Bayog, ZDS - Depase, Bayog, ZDS - Bayog, ZDS - Diplo,Kumalarang, ZDS

45,000 45,000 45,000 90,000 150,000 150,000 525,000

Zamboanga Sibugay 90,000 360,000 450,000 180,000 300,000 250,000 1,630,000 District 1 - Ditay, Diplahan, ZS - Sacaon, Guinoman, Diplahan, ZS - Agutayan, Buug, ZS - San Isidro, Payao - Lipacan, Malangas - Punawan, Mabuhay - Timbang-Timbang, Alicia - Dansulao, Malangas

45,000 180,000 180,000 90,000 100,000 100,000 695,000

including map and 5-year workplan

Chapter 20-1-DENR IXPage 16 of 22

Page 637: Table of Contents (By Chapter)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (RDC-endorsed)

2021 (Proposed)

2022 (Proposed) Total

Investment Requirements (in exact amount PhP)

LGU ProponentChapter Outcome/Project Title

Specific Location (Province/City/Municipality/

Barangay)

RDP ResultsMatrices

IndicatorsAddressed

Expected Output

District 2 - Calula, R.T. Lim., ZS - New Antique, R.T. Lim, ZS - St. Rosario, R. T. Lim, ZS - Tibuclis & Tigbakaka, RT Lim, ZS - Sandayong, Naga, ZS - Tipan, Naga, ZS - Sandayong, Naga, ZS

45,000 180,000 270,000 90,000 200,000 150,000 935,000

Zamboanga City 45,000 225,000 180,000 180,000 150,000 100,000 880,000

District 1 - Tictapul, ZC - Pat Parao, Upper Sibulao, ZC

45,000 225,000 90,000 90,000 150,000 100,000 700,000

District 2 - Tibalabag, Vitali, ZC - Upper Vitali, ZC - Upper Tagpangi, Vitali, ZC - Vitali, Zambo. City

90,000 90,000 180,000

Isabela City - Kapatagan, Isabela City, Basilan

-

2.4 Preparation/updating of Protected Area Management Plans

Regional Total PAMP updated (no) 1,500,000 200,000 0 700,000 620,000 620,000 3,640,000

Zamboanga del Norte 1,000,000 - - 300,000 - 620,000 1,920,000

District 1 200,000 200,000

- AIPLS 500,000 620,000 1,120,000

- SIPLS 100,000 100,000 - JRMPL 100,000 100,000 District 3 - MIPLS 500,000 100,000 600,000

Zamboanga del Sur - District 2 1,000,000 1,000,000 Zamboanga Sibugay 500,000 - - 100,000 620,000 - 1,220,000

District 1 500,000 500,000 District 2 - Naga-Kabasalan PL 100,000 620,000 720,000

Zamboanga City 500,000 500,000

Chapter 20-1-DENR IXPage 17 of 22

Page 638: Table of Contents (By Chapter)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (RDC-endorsed)

2021 (Proposed)

2022 (Proposed) Total

Investment Requirements (in exact amount PhP)

LGU ProponentChapter Outcome/Project Title

Specific Location (Province/City/Municipality/

Barangay)

RDP ResultsMatrices

IndicatorsAddressed

Expected Output

Isabela City - Basilan Natural Biotic Area - Lamitan, Basilan

300,000 300,000

ARMM - Turtle Islands Wildlife Sanctuary -Tawi-Tawi

200,000 200,000

Zamboanga Sibugay Initial PA Plan (IPAP) prepared and submitted to RO (no)

-

District 2 - Naga-Kabasalan PL 105,000 105,000

2.5 Ecotourism Development

ARMM - Turtle Islands Wildlife Sanctuary -Tawi-Tawi

Ecotourism Development Plan approved by REC and PAMB (no)

-

Zamboanga del Sur - District 2

Business plan for ecotourismproduct and services prepared and endorsed to PAMB for approval (no)Intervening Activity:- community operational mechanism established- community fee-sharing system established - Mt. Timolan PL

750,000 750,000

Regional Total

PA Ecotourism Management Plan endorsed to Sec. thru BMB for affirmation (no)

- 300,000 - - 500,000 - 800,000

Zamboanga del Norte - District 1 *AIPLS

500,000 500,000

Zamboanga Sibugay - District 1 - Buug NBA 300,000 300,000

Chapter 20-1-DENR IXPage 18 of 22

Page 639: Table of Contents (By Chapter)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (RDC-endorsed)

2021 (Proposed)

2022 (Proposed) Total

Investment Requirements (in exact amount PhP)

LGU ProponentChapter Outcome/Project Title

Specific Location (Province/City/Municipality/

Barangay)

RDP ResultsMatrices

IndicatorsAddressed

Expected Output

Regional Total Cave management plans prepared/updated (no) 500,000 1,100,000 1,225,000 1,050,000 2,000,000 2,000,000 7,875,000

Regionwide 50,000 50,000 Zamboanga del Norte 150,000 1,000,000 980,000 600,000 750,000 750,000 4,230,000 District 1 250,000 245,000 150,000 250,000 250,000 1,145,000 District 2 150,000 250,000 245,000 150,000 250,000 250,000 1,295,000 District 3 500,000 490,000 300,000 250,000 250,000 1,790,000 Zamboanga del Sur 150,000 300,000 500,000 500,000 1,450,000 District 1 250,000 245,000 150,000 250,000 250,000 1,145,000 District 2 150,000 250,000 245,000 150,000 250,000 250,000 1,295,000 Zamboanga Sibugay - Provincewide 150,000 100,000 245,000 150,000 750,000 750,000 2,145,000

2.7 Preparation of site management plan Regional Total

Inland Wetland Management Plan prepared (integrated to PAMP, as appropriate) and submitted (no)

150,000 300,000 300,000 - 250,000 - 1,000,000

Regionwide 15,000 15,000 Zamboanga del Norte - 150,000 - - 250,000 - 400,000

- District 2 150,000 150,000

- District 3 250,000 250,000

Zamboanga del Sur - Provincewide 150,000 150,000 300,000

Zamboanga Sibugay - Provincewide 135,000 150,000 285,000

3. Construction of InfrastructureInfrastructures constructed (no)

- - -

67,200,000

- 67,200,000

3.1 Wildlife Rescue Center (Tier 2) Zamboanga City 5,700,000

5,700,000 RDC-9/Zamboanga City

3.2 Bird Care Facility (Tier 2) Zamboanga del Sur District 2 3,500,000

3,500,000 Tigbao, Zamboanga del Sur

2.6 Preparation of site management plans for classified caves

Chapter 20-1-DENR IXPage 19 of 22

Page 640: Table of Contents (By Chapter)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (RDC-endorsed)

2021 (Proposed)

2022 (Proposed) Total

Investment Requirements (in exact amount PhP)

LGU ProponentChapter Outcome/Project Title

Specific Location (Province/City/Municipality/

Barangay)

RDP ResultsMatrices

IndicatorsAddressed

Expected Output

3.3Turtle Sanctuary Development (Tier 2) - Observatory/Admin. Building - Mini Wharf

Zamboanga del Sur District 2 - Panikian Island, Pitogo, ZDS 50,000,000

50,000,000 Pitogo, Zamboanga del Sur

3.4 Improvement of DENR Center (Tier 2)

Zamboanga Sibugay - Lantawan 5,000,000

5,000,000

3.5 Renovation/ repair/ improvement of ENR Field Office (priority project) (Tier 2)

Isabela City

3,000,000

3,000,000

3.6 Structural Measure -

3.6.1 Small Water Impounding System (SWIS)

Regional Total 14,650,000 51,275,000 54,938,000 120,863,000

Regionwide - - 60,390,000 - - - 60,390,000 - Sindangan River Watershed 14,650,000 14,650,000

- Labangan River Watershed 14,650,000 14,650,000

- Dipolo/Salug River Watershed 4,395,000 4,395,000

- Sibuguey River Watershed & 16,440,000 16,440,000

Doña Josefa Watershed 10,255,000 10,255,000 Zamboanga del Norte - - - - 14,650,000 40,288,000 54,938,000 District 1 - Dapitan River Watershed (48,952.61 ha) Dipolog City, Dapitan City Polanco, Piñan, La Libertad & Osmeña, ZDN

14,650,000 14,650,000

District 3 - 14,650,000 25,638,000 40,288,000 - Salug River Watershed (11, 669.44 ha) Salug & Godod, ZDN

- 10,988,000 10,988,000

- Palandok Watershed (23,040.12 ha) Leon Postigo, Salug & Godod, ZDN

14,650,000 - 14,650,000

Chapter 20-1-DENR IXPage 20 of 22

Page 641: Table of Contents (By Chapter)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (RDC-endorsed)

2021 (Proposed)

2022 (Proposed) Total

Investment Requirements (in exact amount PhP)

LGU ProponentChapter Outcome/Project Title

Specific Location (Province/City/Municipality/

Barangay)

RDP ResultsMatrices

IndicatorsAddressed

Expected Output

- Lituban River Watershed (57,277.17 ha) Siocon, ZDN, Tungawan & RT Lim, ZSP

- 14,650,000 14,650,000

Zamboanga del Sur - - - - 21,975,000 14,650,000 36,625,000

District 1 Dipolo/Salug Valley Watershed (119,649.37 ha) Sergion Osmeña, ZDN, Aurora, Ramon Magsaysay, Sominot, Midsalip, Dumingag, Mahayag, Molave, Tambulig & Josefina, ZDS

21,975,000 21,975,000

District 2 - Dinas River Watershed (44,752.81 ha) Guipos, San Miguel, Dimataling, Dinas, San Pablo, Dumalinao, Tigbao, ZDS & Pagadian City

14,650,000 14,650,000

Zamboanga Sibugay - District 2 - Kabasalan River Watershed (22,306.68 ha) Kabasalan & Siay, ZSP, Bayog, ZDS & Salug & Godod, ZDN

14,650,000 14,650,000

Zamboanga City (Tumaga River Watershed (17,560.00 ha.)

14,650,000 14,650,000

3.6.2 Checkdam Regional Total - - - 1,440,000 1,440,000 2,360,000 5,240,000 Zamboanga del Norte - - - 240,000 320,000 760,000 1,320,000 District 1 - - - - Dapitan River Watershed (48,952.61 ha) Dipolog City, Dapitan City Polanco, Piñan, La Libertad & Osmeña, ZDN

80,000 160,000 160,000 400,000

District 2 - - -

Chapter 20-1-DENR IXPage 21 of 22

Page 642: Table of Contents (By Chapter)

2017 (Actual) 2018 (Actual) 2019 (Actual) 2020 (RDC-endorsed)

2021 (Proposed)

2022 (Proposed) Total

Investment Requirements (in exact amount PhP)

LGU ProponentChapter Outcome/Project Title

Specific Location (Province/City/Municipality/

Barangay)

RDP ResultsMatrices

IndicatorsAddressed

Expected Output

- Sindangan River Basin 160,000 160,000 600,000 920,000 Zamboanga del Sur 480,000 400,000 760,000 1,640,000 District 1 320,000 320,000 760,000 1,400,000 - Labangan River Watershed 160,000 160,000 600,000 920,000

- Dipolo/Salug Valley Watershed (119,649.37 ha) (Sergion Osmeña, ZDN, Aurora, Ramon Magsaysay, Sominot, Midsalip, Dumingag, Mahayag, Molave, Tambulig & Josefina, ZDS

160,000 160,000 160,000 480,000

District 2 - - Dinas River Watershed (44,752.81 ha) Guipos, San Miguel, Dimataling, Dinas, San Pablo, Dumalinao, Tigbao, ZDS & Pagadian City

160,000 80,000 - 240,000

Zamboanga Sibugay - District 2 240,000 240,000 600,000 1,080,000 - Kabasalan River Watershed (12,219.00 ha) (Kabasalan & Siay, ZSP, Bayog, ZDS & Salug & Godod, ZDN)

80,000 80,000 - 160,000

- Sibuguey River Basin 160,000 160,000 600,000 920,000 Zamboanga City - - - 480,000 480,000 240,000 1,200,000 - Tumaga River Watershed (17,560.00 ha.) 80,000 80,000 - 160,000

- Vitali-Taguite River Watershed (21,002.00 ha)

80,000 80,000 80,000 240,000

- Curuan River Watershed (5,499.88 ha) 80,000 80,000 80,000 240,000

- Bolong River Watershed (3,280.00 ha) 80,000 80,000 - 160,000

- Manicahan River Watershed (4,035.00 ha) 80,000 80,000 80,000 240,000

- Ayala River Watershed (1,469.00 ha) 80,000 80,000 - 160,000

498,932,000 477,274,000 197,609,000 504,229,000 578,899,000 404,153,000 2,661,096,000 GRAND TOTAL

Chapter 20-1-DENR IXPage 22 of 22

Page 643: Table of Contents (By Chapter)

Updated Zamboanga Peninsula Regional Development Investment Program (RDIP), 2017-2022

Agency: Mines and Geosciences Bureau IXEcological Integrity, Clean and

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15)Outcome 1: Issuance of Mining Contracts/Permits and other mining related permits

mining permits that are issued by MGBRO Region IX

Reports, Permits issued GAA - 9,000.00 45,000.00 114,000.00 125,000 137,500 430,500

Assistance to PCMRB/LGUs/Other StakeholdersDevelopment of Small Scale Mining

Number of of provinces where an inventory of PSSM/MB Areas and Quarry/SAG/SSM sites within the region

Inventory Reports GAA - 202,000.00 93,000.00 102,000.00 112,000 123,200 632,200

Mining Rights monitored

Mining rights monitored

Integrated SHES Monitoring Report endorsed to RD 239,000.00 141,000.00 155,100 170,610 705,710

Number of Monitoring conducted

Total number of monitoring conducted on the Mining Permits/Contracts/Patents/JOAs

SHES Monitoring Reports endorsed to the RD 867,000.00 312,000.00 191,000.00 417,000.00 458,700 504,570 2,750,270

Resolution of Complaints/Cases/Conflcts

complaints/cases/conflicts that were filed by various stakeholders

Report of Investigation, Action letter 167,000.00 246,000.00 47,000.00 125,000.00 137,500 151,250 873,750

Subtotal for Outcome 1 1,034,000.00 1,008,000.00 376,000.00 899,000.00 988,300.00 1,087,130.00 5,392,430

Outcome 2:OO3: Geological Assessment for Risk Reduction and Resiliency Program

Vulnerability and Risk Assessment(VRA)

number of LGUs(municipalities/cities) assessed for vulnerability and risk to geohazards particularly landslides and flooding

Technical Report with Exposure Maps 4,990,000.00 8,547,000.00 7,149,000.00 7,864,000.00 8,650,400 9,515,440 46,715,840

Basis for Implementat

ionChapter Outcome/ Project Title Project Description/

Objectives

Specific Location

(Province/ City / Municipality /

Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output Mode of Funding

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (in exact amount PhP)

Page 1 of 2

Page 644: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC-

endorsed)

2021(Proposed)

2022(Proposed) Total

Basis for Implementat

ionChapter Outcome/ Project Title Project Description/

Objectives

Specific Location

(Province/ City / Municipality /

Barangay)

RDP Results Matrices

Indicators Addressed

Expected Output Mode of Funding

Level of Readiness

(for 2020-2022 projects only)

Investment Requirements (in exact amount PhP)

Sub-Surface Assessment

number of municipalities/cities assessed for sub-surface geohazards particularly sinkholes and subsidence

Assessment/Exit Report; Technical Report with Subsidence Hazard maps 300,000.00 351,000.00 242,000.00 266,000.00 292,600 321,860 1,773,460

Conduct of Intensive IEC Campaign to LGU

number of seminars/workshops conducted by the MGBRO for LGUs

Program of Activities; Attendance Sheet; Photo Documentation 676,000.00 2,326,000.00 2,141,000.00 2,355,000.00 2,590,500 2,849,550 12,938,050

Coastal Geohazard Assessment

number of coastal municipalities/cities monitored for coastal geohazards in the 1:10K scale Activity Report 144,000.00 1,530,000.00 No Target 1,851,000.00 2,036,100 2,239,710 7,800,810

Geological Mapping(Quadrangle)

number of quadrangeles surveyed and mapped for its geology

Geologic Survey Report 402,000.00 2,652,000.00 2,208,000.00 2,428,000.00 2,670,800 2,937,880 13,298,680

Groundwater Resource Vulnerability Assessment

number of LGUs(Province/City/Municipality) assessed for groundwater resources

Groundwater Assessment Report 1,338,000.00 No Target 1,662,000.00 1,828,000.00 2,010,800 2,211,880 9,050,680

Subtotal for Outcome 2 7,850,000.00 15,406,000.00 13,402,000.00 16,592,000.00 18,251,200.00 20,076,320.00 91,577,520.00 GRAND TOTAL 8,884,000.00 16,414,000.00 13,778,000.00 17,491,000.00 19,239,500.00 21,163,450.00 96,969,950.00

Page 2 of 2

Page 645: Table of Contents (By Chapter)

Updated Zamboanga Peninsula Regional Development Investment Program (RDIP), 2017-2022

Chapter 20 Ensuring Ecological Integrity, Clean and Healthy EnvironmentAgency: ENVIRONMENTAL MANAGEMENT BUREAU - IX

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

(1) (2) (4) (5) (9) (10) (11) (12) (13) (14) (15)Outcome : CLEAN AND HEALTHY ENVIRONMENTProgram 1 :ENVIRONMENTAL ASSESSMENT AND PROTECTION PROGRAMSub-Program 1 : Pollution Research and Laboratory Services

1. Analysis of Samples

To generate scientific data in support to monitoring & enforcement & permitting activities

Full Operationalization of monitoring and enforcement and permitting services

Laboratory results 1,718,000.00 1,794,000.00 1,651,000.00 2,500,000.00 2,500,000.00 2,500,000.00 12,663,000.00

2. Calibration of Laboratory Equipment

To ensure proper maintenance of lab equipments

Laboratory equipment maintained

Functional laboratory equipment

200,000.00 150,000.00 150,000.00 250,000.00 250,000.00 250,000.00 1,250,000.00

3. Procurement/Replacement of Laboratory Equipment

To upgrade laboratory equipment

Upgrading and Maintenance of laboratory equipment

Upgraded laboratory equipment

- 2,540,000.00 1,780,000.00 7,850,000.00 7,850,000.00 7,190,000.00 27,210,000.00

4. ISO 2005:17025 (General Requirements for the Competence of Testing & Calibration Laboratories)

To adhere to international standards for testing and calibration services and provide quality laboratory services

Full implementation of ISO 2005:17025

ISO 2005:17025 Certification - - - 500,000.00 200,000.00 700,000.00

Sub-Program 2 : Environmental Education and Information

1. Conduct of special events for the national environmental celebrations

To promote and strengthen good environmental practices

Wider information dissemination of environmental laws and good practices

Accomplishment reports on the conduct of special events

210,000.00 120,000.00 120,000.00 180,000.00 180,000.00 180,000.00 990,000.00

2. Production and dissemination of localized IEC Materials

To generate awareness on environmental protection

Wider information dissemination of environmental laws and good practices

IEC materials 20,000.00 136,000.00 253,000.00 200,000.00 200,000.00 200,000.00 1,009,000.00

Sub-Program 3 : Environmental Impact Assessment

1. Issuance of ECC To ensure compliance to PD 1586

Compliance in the implementation of PD 1586

Issuance of ECC 50,000.00 100,000.00 50,000.00 100,000.00 100,000.00 100,000.00 500,000.00

2. Identification/Survey of projects operating without ECC

To determine projects with with the requirement to comply ECC permits

Compliance in the implementation of PD 1586

Survey reports 60,000.00 120,000.00 90,000.00 250,000.00 250,000.00 250,000.00 1,020,000.00

3. Monitoring of ECC Projects in compliance with ECC conditions and EMP

To ensure compliance to PD 1586

Compliance in the implementation of PD 1586

Monitoring reports 519,000.00 549,000.00 485,000.00 875,000.00 875,000.00 875,000.00 4,178,000.00

Chapter Outcome/ Project Title

Project Description/ Objectives

RDP Results Matrices Indicators

Addressed

Expected Output

Investment Requirements (in exact amount PhP)

Chapter 20-3-EMB IXPage 1 of 6

Page 646: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title

Project Description/ Objectives

RDP Results Matrices Indicators

Addressed

Expected Output

Investment Requirements (in exact amount PhP)

Subtotal 2,777,000.00 5,509,000.00 4,579,000.00 12,205,000.00 12,705,000.00 11,745,000.00 49,520,000.00 Program 2 :ENVIRONMENTAL MANAGEMENT AND POLLUTION CONTROLSub-Program 1 : Implementation of Clean Air Regulations

1. Issuance of Permit to Operate To ensure compliance to RA 8749

Firms/ establishment compliance in the implementationn of RA 8749

Permit to Operate (POA) 176,000.00 176,000.00 234,000.00 200,000.00 200,000.00 200,000.00 1,186,000.00

2. Identification/survey of established firms/industries and commercial establishments operating without permits

To identify possible air pollution source installation

Firms/ establishment compliance in the implementationn of RA 8749

Survey reports 48,000.00 75,000.00 150,000.00 250,000.00 250,000.00 250,000.00 1,023,000.00

3. Ambient Air Monitoring To determine air quality Full Operationalization of Air Quality Monitoring Stations

Air monitoring results 40,000.00 40,000.00 160,000.00 100,000.00 200,000.00 200,000.00 740,000.00

4. Maintenance/Calibration of the Air Quality Monitoring Stations equipment

To maintain its efficieny and accuracy on gathering data of air quality

Full Operationalization of Air Quality Monitoring Stations

Accurate Monitoring Results Functional Air Quality Monitoring Stations

800,000.00 795,000.00 1,616,000.00 1,000,000.00 2,000,000.00 2,000,000.00 8,211,000.00

5. Industrial Compliance Monitoring

To ensure compliance to RA 8749

Firms/ establishment compliance in the implementationn of RA 8749

Monitoring/ inspection reports 746,000.00 615,000.00 606,000.00 1,025,000.00 1,100,000.00 1,100,000.00 5,192,000.00

Chapter 20-3-EMB IXPage 2 of 6

Page 647: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title

Project Description/ Objectives

RDP Results Matrices Indicators

Addressed

Expected Output

Investment Requirements (in exact amount PhP)

6. Air Dispersion Modelling

To identify strategic locations for installation of air quality monitoring stations. To identify areas that are greatly affected by air pollutants thus serve as basis for future plans of putting up public infrastructures or residential areas. To provide baseline data in the design of effective control strategies to reduce emissions of harmful air pollutants.

Full implementation of air quality monitoring stations

- air quality monitoring stations installed - baseline data

- - 500,000.00 600,000.00 2,000,000.00 500,000.00 3,600,000.00

Sub-Program 2 : Implementation of Clean Water Regulations

1. Issuance of Wastewater Discharge Permit

To ensure compliance to RA 9275

Firms/ establishmens compliance in the implementation of RA 9275

Wastewater discharge permit 65,000.00 65,000.00 130,000.00 100,000.00 100,000.00 100,000.00 560,000.00

2. Identification/survey of established firms/industries and commercial establishments operating without permits

To identify possible waste water discharge

No. of identified/ surveyed established firms/industries and commercial establishments operating without permits

Survey reports 40,000.00 45,000.00 75,000.00 125,000.00 125,000.00 125,000.00 535,000.00

3. Ambient Water Quality Monitoring

To determine quality of waterbodies Water quality monitored

Water quality monitoring results/ laboratory results

592,000.00 1,248,000.00 1,860,000.00 2,000,000.00 2,200,000.00 2,200,000.00 10,100,000.00

Chapter 20-3-EMB IXPage 3 of 6

Page 648: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title

Project Description/ Objectives

RDP Results Matrices Indicators

Addressed

Expected Output

Investment Requirements (in exact amount PhP)

4. Adopt-an-Estero/Waterbody Program

To bring together the collaborative efforts of communities living near the waterbodies and donor partners in achieving a cleaner and healthier environment

Improved water quality of adopted esteros

Quarterly report and annual assessment report

656,000.00 493,000.00 600,000.00 250,000.00 500,000.00 500,000.00 2,999,000.00

5. Classification of Water Bodies To determine waterbody classification and its usage

Classifiaction of water quality and its usage

Monthly water quality monitoring results Waterbody classification memorandum circular

214,000.00 1,200,000.00 515,000.00 400,000.00 500,000.00 500,000.00 3,329,000.00

6. Operationalization of Water Quality Management Areas

To address water quality issues and problems in WQMAs for better water quality of the said waterbody

Full operationalization of Water quality management areas

WQMA Governing Board Quarterly Meeting reports Action plan implementation reports

1,600,000.00 1,400,000.00 829,000.00 2,000,000.00 2,000,000.00 2,000,000.00 9,829,000.00

7. Compliance Monitoring of Regulated and Industrial Establishments

To ensure compliance to RA 9275

Firms/ establishments compliance in the implementation of RA 9275

Monitoring reports 300,000.00 282,000.00 240,000.00 470,000.00 500,000.00 500,000.00 2,292,000.00

Sub-Program 3 : Implementation of Ecological Solid Waste Management Regulations

1. Monitoring of Implementation of Closure and Rehabilitation Plan

To ensure compliance to RA 9003 (implementation of closure and rehabilitation plan)

Closure of all Open Dumpsites and Controlled Disposal Facilities

Approved Closure and Rehabilitation Plan Monitoring reports

100,000.00 143,000.00 55,000.00 150,000.00 200,000.00 200,000.00 848,000.00

Chapter 20-3-EMB IXPage 4 of 6

Page 649: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title

Project Description/ Objectives

RDP Results Matrices Indicators

Addressed

Expected Output

Investment Requirements (in exact amount PhP)

2. Monitoring of Compliant LGUsTo ensure LGUs' compliance to RA 9003

LGU compliance in the implementation of RA 9003

Monitoring reports 160,000.00 50,000.00 - 150,000.00 200,000.00 200,000.00 760,000.00

3. Monitoring of Materials Recovery Facilities

To achieve waste diversion goal of 25% based on RA 9003

LGU compliance in the implementation of RA 9003

Monitoring reports 210,000.00 140,000.00 150,000.00 150,000.00 200,000.00 200,000.00 1,050,000.00

4. Feasibility Study for the Establishment of Recycling Plant

The establishment of a recycling plant will encourage the public to segregate wastes at source and recycle them since recyclables are of higher value as it is processed locally.To encourage LGUs to segregate wastes at source and recover recyclable materials.To provide avenue for income generation.

LGUs compliance in the implementation of RA 9003

Recycling plant established - - - 10,000,000.00 10,000,000.00 10,000,000.00 30,000,000.00

5. Plastic Densifier for LGUs

To convert post-consumer waste polystyrene, commonly known as styropor packaging materials and plastic sandobags into rigid functional products. To provide additional technology for wastes diversion specially for LGUs not capable of establishing sanitary landfill facility

LGUs compliance in the implementation of RA 9003

Grant of financial assistance to LGUs for procurement of plastic densifier

- - - 5,000,000.00 5,000,000.00 5,000,000.00 15,000,000.00

Sub-Program 4 : Implementation of Toxic Substances and Hazardous Waste Management Regulations

Chapter 20-3-EMB IXPage 5 of 6

Page 650: Table of Contents (By Chapter)

2017(Actual)

2018(Actual)

2019(Actual)

2020(RDC- endorsed)

2021(Proposed)

2022(Proposed) Total

Chapter Outcome/ Project Title

Project Description/ Objectives

RDP Results Matrices Indicators

Addressed

Expected Output

Investment Requirements (in exact amount PhP)

1. Registration of Industries under Chemical Control Order (CCO)

To ensure compliance to RA 6969

Industries compliance in the implementation of RA 6969

CCO Registration 3,000.00 3,000.00 6,000.00 5,000.00 5,000.00 5,000.00 27,000.00

2. Clearance for ODS Chemical Dealers

To ensure compliance to RA 6969

Compliance in the implementation of RA 6969

ODS Chemical dealers clearance 4,000.00 4,000.00 8,000.00 5,000.00 5,000.00 5,000.00 31,000.00

3. Survey of importers, manufacturers ( firms) , distributors/dealers, users

To determine potential sources for toxic chemicals

Compliance in the implementation of RA 6969

Survey reports 10,000.00 10,000.00 13,000.00 25,000.00 25,000.00 25,000.00 108,000.00

4. Chemical Management monitoring of Industries

To ensure compliance to RA 6969

Industries compliance in the implementation of RA 6969

Monitoring reports 30,000.00 30,000.00 38,000.00 45,000.00 45,000.00 45,000.00 233,000.00

5. Monitoring of PCB Management Plan implementation

To ensure implementation of PCB management plan and compliance to RA 6969

Compliance in the implementation of RA 6969

Monitoring reports 50,000.00 26,000.00 33,000.00 45,000.00 45,000.00 45,000.00 244,000.00

6. Registration of Hazardous Waste Generators (HWG)

To ensure compliance to RA 6969

Compliance in the implementation of RA 6969

HWG Registration 6,000.00 6,000.00 6,000.00 10,000.00 10,000.00 10,000.00 48,000.00

7. Survey of potential hazardous wastes generators and importers of recyclable materials

To identify potential sources of hazardous wastes and importers of recyclable materials

Compliance in the implementation of RA 6969

Survey reports 14,000.00 20,000.00 20,000.00 25,000.00 25,000.00 25,000.00 129,000.00

8. Compliance monitoring of HWGs

To ensure compliance to RA 6969

Compliance in the implementation of RA 6969

Monitoring/ inspection reports 430,000.00 450,000.00 309,000.00 562,500.00 562,500.00 562,500.00 2,876,500.00

Subtotal 6,294,000.00 7,316,000.00 8,153,000.00 24,692,500.00 27,997,500.00 26,497,500.00 100,950,500.00 TOTAL 9,071,000.00 12,825,000.00 12,732,000.00 36,897,500.00 40,702,500.00 38,242,500.00 150,470,500.00

Chapter 20-3-EMB IXPage 6 of 6