MONITORING PROGRESS MECHANICAL, ELECTRICAL & PLUMBING WORKS - PODIUMUpdate : 09 Sep 15
PODIUM ELECTRICAL SERVICES ( ELECTRICAL & ELV - TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD ACCESS, GUARD TOUR, EARTHNING & LIGHTNING) ACMV FIRE FIGHTING
LEVE
L
AREA
NO
.
GRI
D L
INE
LOCATIONBOX INSTALLATION CABLING INSTALLATION VENTILATION FAN FAN COIL UNIT (FCU)
Actual Actual Actual Actual Actual Actual Actual Actual ActualProgress (%)
Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual ActualSTART START START START START START START START START START START START START START START START START START START START
LIFT
CO
RE &
ESC
APE
STAI
RCAS
E
1 1/A Escape staircase S1
2 1/G Escape staircase S2
3 6/G Escape staircase S3
4 5a/D Escape staircase S4
5 1a/B-C Fire/ service lift lobby
6 5a/D Fire/ service lift lobby
7 2/C Hotel lift lobby
8 5/D Service apartment lift lobby
BASE
MEN
T
LIFT
CO
RE
1 01-2/A Hotel store 1,2
4a/C-D Store 3
2 4a-5/C-D Store (service apt.)
3 7/G Carpark store
4 1-2/F-G Staircase lobby
PARK
ING
& D
RIVE
WAY 5 5/C Passage
6 1-7/A-J Car parking
7 1-7/A-J Motor parking
8 4a-E Handicapped parking space
9 1/E Ramp 1
M&
E SE
RVIC
E RO
OM
10 1/C Fan room
11 3a/B Chiller plant room
12 4/B Flood retention tank (below)
13 4a/A-B Sump pit
14 5/A Domestic tank 1, 2 (retail)
15 5/A Pump room 1 (retail)
16 5a/B Pump room 2 (hotel)
17 6/B Pump room 3 (service apt.)
18 6/C-D
19 5a-6/D Pump room 5 (hotel)
20 5b-5c/H Pump room 6 (hotel)
21 5b-5c/J Pump room 7 (retail/ carpark)
22 5a/A AC make up tank 1, 2 (hotel)
23 7/A Domestic tank 3 (hotel)
24 7/B Domestic tank 4 (service apt.)
25 5a-6/C Wet riser tank 1, 2
26 6-7/C Hose reel tank 1, 2
27 7/D Fresh air fanroom (car park)
28 5b/H Sprinkler pump stage 1
29 7/J-K Sprinkler tank 1, 2
30 2/H
31 01/G OSD, on-site detention tank
32 01/F Rain water harvesting tank
LIFT
CO
RE &
ESC
APE
STAI
RCAS
E
1 1/A Escape staircase S1
2 1/G Escape staircase S2
3 6/G Escape staircase S3
4 5a/D Escape staircase S4
5 1a/B-C Fire/ service lift lobby
6 5a/D Fire/ service lift lobby
7 2/C Hotel lift lobby
8 5/D Service apartment lift lobby
LEVE
L1
M&
E AN
D S
ERVI
CE R
OO
M 1 1a/A Store
2 5a/D Janitor
3 5a/D-E Refuse
4 5a-D Refuse bin
5 4a-5B/D-F Store 1, 2,3,4,5
6 1-H Ramp 1
RETA
IL
7 2a-4a/D-L Retail lobby
8 1-6/C-G Passage 1, 2, 3, 4
9 3/M Retail service lift lobby
10 1-7/A-M Retail unit 1,2,3,4,5,6,7,8,9,10
11 4a-5b/C-F Retail male & female toilet
12 4/F Glass lift
13 3a/F Escalator
LIFT
CO
RE &
ESC
APE
STAI
RCAS
E
1 1/A Escape staircase S1
2 1/G Escape staircase S2
3 6/G Escape staircase S3
4 5a/D Escape staircase S4
RISER / SHAFT INSTALLATION
CABLE TRAY / TRUNKING
INSTALLATION
CONDUIT AT COLUMN, WALL & SLAB
INSTALLATIONLOOPING & MERGERING
PANEL INSTALLATION (SUB SWITCHBOARD)
SOCKET OUTLET & LIGHT FITTING INSTALLATION
ELV DEVICES - TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD
ACCESS, GUARD TOUR, EARTHNING & LIGHTNING
DUCTING INSTALLATION -
VERTICAL
DUCTING INSTALLATION -
HORIZONTALCHILL PIPE
INSTALLATIONINSTALLATION
CONDUIT & WIRINGINSTALLATION GRILL &
AC UNITWET RISER SYSTEM PIPE
INSTALLATIONSPRINKLER SYSTEM PIPE
INSTALLATIONHOSE REEL SYSTEM PIPE
INSTALLATIONFIRE ALARM SYSTEM PIPE INSTALLATION
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
TYPI
CAL
COM
MO
N A
REA
- BAS
EMEN
T TO
LE
VEL
36
Pump room 4 (service Apt. + retail)
Grease interceptor system (hotel&retail)
TYPI
CAL
COM
MO
N A
REA
- BAS
EMEN
T TO
LE
VEL
36TY
PICA
L CO
MM
ON
ARE
A - B
ASEM
ENT
TO L
EVEL
36
MONITORING PROGRESS MECHANICAL, ELECTRICAL & PLUMBING WORKS - PODIUMUpdate : 09 Sep 15
PODIUM ELECTRICAL SERVICES ( ELECTRICAL & ELV - TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD ACCESS, GUARD TOUR, EARTHNING & LIGHTNING) ACMV FIRE FIGHTING
LEVE
L
AREA
NO
.
GRI
D L
INE
LOCATIONBOX INSTALLATION CABLING INSTALLATION VENTILATION FAN FAN COIL UNIT (FCU)
Actual Actual Actual Actual Actual Actual Actual Actual ActualProgress (%)
Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual ActualSTART START START START START START START START START START START START START START START START START START START START
RISER / SHAFT INSTALLATION
CABLE TRAY / TRUNKING
INSTALLATION
CONDUIT AT COLUMN, WALL & SLAB
INSTALLATIONLOOPING & MERGERING
PANEL INSTALLATION (SUB SWITCHBOARD)
SOCKET OUTLET & LIGHT FITTING INSTALLATION
ELV DEVICES - TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD
ACCESS, GUARD TOUR, EARTHNING & LIGHTNING
DUCTING INSTALLATION -
VERTICAL
DUCTING INSTALLATION -
HORIZONTALCHILL PIPE
INSTALLATIONINSTALLATION
CONDUIT & WIRINGINSTALLATION GRILL &
AC UNITWET RISER SYSTEM PIPE
INSTALLATIONSPRINKLER SYSTEM PIPE
INSTALLATIONHOSE REEL SYSTEM PIPE
INSTALLATIONFIRE ALARM SYSTEM PIPE INSTALLATION
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
LIFT
CO
RE &
ESC
APE
STAI
RCAS
E
5 1a/B-C Fire/ service lift lobby
6 5a/D Fire/ service lift lobby
7 2/C Hotel lift lobby
8 5/D Service apartment lift lobby
LEVE
L 2
M&
E &
SER
VICE
RO
OM
(HO
TEL)
1 2/C Hotel lobby
2 3/B-C Reception
3 1/C Receiving area & purchasing
4 2/D Luggage room
5 1a/B LPG Farm 1 (hotel)
6 2/B Loading & Unloading bay
7 2a/B Receiving area & platform
8 1/C-D Bin center 1
9 1/C-D Store
M&
E &
SER
VICE
RO
OM
(SER
VICE
APA
RTM
ENT
& R
ETAI
L)
10 5a/E Retail service lift lobby
11 5/C Letter box
12 5a/C Fire control room (retail, apt.)
13 6/C MDF room
14 6/C-D Bin center 2
15 5a-6/D AWCS cable room
16 5a-6/D-E AWCS
17 5a/E CWSP
18 5a/E Full vacuumload station
19 6/E Loading & Unloading
20 5a/F Consumer HT room
21 5a/G TNB room
22 6/G TNB meter room
23 5b/G-H M&E room
24 5c/H Diesel fuel pump room
25 5b/H Bomba vehicle turning circle
26 5b/J LPG Farm 2 (retail)
CIRC
ULA
TIO
N 27 4a/E-F Passage
28 01/B Ramp 2
29 2a-7/A-C Drop off
RETA
IL
30 2b-4a/C-K Retail lobby
31 01-5c/C-M Retail unit 1,2,3,4,5,6,7
32 5/E Retail male & female toilet
33 3b/E Glass lift
34 3/E Escalator
LIFT
CO
RE &
ESC
APE
STAI
RCAS
E
1 1/A Escape staircase S1
2 1/G Escape staircase S2
3 6/G Escape staircase S3
4 5a/D Escape staircase S4
5 1a/B-C Fire/ service lift lobby
6 5a/D Fire/ service lift lobby
7 2/C Hotel lift lobby
8 5/D Service apartment lift lobby
LEVE
L 3A
& 3
B
1 3/J Retail lift lobby
M&
E SE
RVIC
E RO
OM
2 1a/B M&E room
3 1/C Store
4 4/E Smoke spill fan room
5 4a/E Copper pipes compartment
6 1a/F Smoke spill fresh air pump room
CARP
AKIN
G &
DRI
VEW
AY
7 2b-E Pedestrian walk way
8 1-5a/C-J Passage
9 1-7/B-M Car parking
10 2a/C Handicapped parking space
11 3/E-F Stair from 3A to 3B
12 01-6/C-K Ramp
OTH
ER R
OO
MS 13 2-2a/E-F Car park management office
14 1/H Male prayer room
15 2/H Female prayer room
LIFT
CO
RE &
ESC
APE
STAI
RCAS
E
1 1/A Escape staircase S1
2 1/G Escape staircase S2
3 6/G Escape staircase S3
4 5a/D Escape staircase S4
5 1a/B-C Fire/ service lift lobby
6 5a/D Fire/ service lift lobby
TYPI
CAL
COM
MO
N A
REA
- BAS
EMEN
T TO
LEV
EL 3
6TY
PICA
L CO
MM
ON
ARE
A - B
ASEM
ENT
TO
LEVE
L 36
RETA IL
TYPI
CAL
COM
MO
N A
REA
- BAS
EMEN
T TO
LE
VEL
36
MONITORING PROGRESS MECHANICAL, ELECTRICAL & PLUMBING WORKS - PODIUMUpdate : 09 Sep 15
PODIUM ELECTRICAL SERVICES ( ELECTRICAL & ELV - TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD ACCESS, GUARD TOUR, EARTHNING & LIGHTNING) ACMV FIRE FIGHTING
LEVE
L
AREA
NO
.
GRI
D L
INE
LOCATIONBOX INSTALLATION CABLING INSTALLATION VENTILATION FAN FAN COIL UNIT (FCU)
Actual Actual Actual Actual Actual Actual Actual Actual ActualProgress (%)
Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual ActualSTART START START START START START START START START START START START START START START START START START START START
RISER / SHAFT INSTALLATION
CABLE TRAY / TRUNKING
INSTALLATION
CONDUIT AT COLUMN, WALL & SLAB
INSTALLATIONLOOPING & MERGERING
PANEL INSTALLATION (SUB SWITCHBOARD)
SOCKET OUTLET & LIGHT FITTING INSTALLATION
ELV DEVICES - TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD
ACCESS, GUARD TOUR, EARTHNING & LIGHTNING
DUCTING INSTALLATION -
VERTICAL
DUCTING INSTALLATION -
HORIZONTALCHILL PIPE
INSTALLATIONINSTALLATION
CONDUIT & WIRINGINSTALLATION GRILL &
AC UNITWET RISER SYSTEM PIPE
INSTALLATIONSPRINKLER SYSTEM PIPE
INSTALLATIONHOSE REEL SYSTEM PIPE
INSTALLATIONFIRE ALARM SYSTEM PIPE INSTALLATION
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
LIFT
CO
RE &
ESC
APE
STAI
RCAS
E
7 2/C Hotel lift lobby
8 5/D Service apartment lift lobby
LEVE
L 4A
& 4
B
1 1-2/B-C Store 1, 2
2 4a/D-E Store 3
3 3/M Retail lift lobby
PARK
ING
& D
RIVE
WAY
4 1-5/B-M Passage
5 2/E-F Stair from 4A to 4B
6 01-6/C-K Ramp
7 1-7/B-M Car parking
8 2a/B, 5-C Handicaped parking space
9 2-2a/J-M Motocycle
LIFT
CO
RE &
ESC
APE
STAI
RCAS
E
1 1/A Escape staircase S1
2 1/G Escape staircase S2
3 6/G Escape staircase S3
4 5a/D Escape staircase S4
5 1a/B-C Fire/ service lift lobby
6 5a/D Fire/ service lift lobby
7 2/C Hotel lift lobby
8 5/D Service apartment lift lobby
LEVE
L 5A
& 5
B
1 1-2/B-C Store 1, 2
2 4a/D-E Store 3
3 2/B Genset room (hotel)
4 3/M Retail lift lobby
PARK
ING
& D
RIVE
WAY
5 1-5/B-M Passage
6 2/E-F Stair to up from 4A to 4B
7 01-6/C-K Ramp
8 1-7/B-M Car parking
9 2a/B, 5-C Handicaped parking space
10 2-2a/J-M Motocycle
LIFT
CO
RE &
ESC
APE
STAI
RCAS
E
1 1/A Escape staircase S1
2 1/G Escape staircase S2
3 6/G Escape staircase S3
4 5a/D Escape staircase S4
5 1a/B-C Fire/ service lift lobby
6 5a/D Fire/ service lift lobby
7 2/C Hotel lift lobby
8 5/D Service apartment lift lobby
LEVE
L 6A
& 6
B
1 3/M Retail lift lobby
2 1-2/B-C Store 1, 2
3 4a/D-E Store 3
4 6/G Store 4
5 6/E Management office
M&
E
6 2a/B Main switch board room (hotel)
7 2b/B Transformer room (hotel)
8 5a-6/C Transformer (apartment)
9 6/C
10 5a-6/C-D Switch gear room (apartment)
11 4a/E CW pump room
12 5/E EFF & CW. Tank
13 6/H Transformer room (retail)
14 6/J Main switch boardroom (retail)
15 6/K Genset room (retail)
16 1a/F Fire pump room (hotel)
17 1/F HR tank 1, 2
18 2/F WR tank 1, 2
PARK
ING 19 01-6/C-K Ramp
20 5a/B, 2/K Motocycle parking
21 01-7/B-M Car parking
LIFT
CO
RE &
ESC
APE
STAI
RCAS
E
1 1/A Escape staircase S1
2 1/G Escape staircase S2
3 6/G Escape staircase S3
4 5a/D Escape staircase S4
5 1a/B-C Fire/ service lift lobby
6 5a/D Fire/ service lift lobby
7 2/C Hotel lift lobby
TYPI
CAL
COM
MO
N A
REA
- BAS
EMEN
T TO
LE
VEL
36
LIFT
LO
BBY
&
SERV
ICE
R.M
TYPI
CAL
COM
MO
N A
REA
- BAS
EMEN
T TO
LE
VEL
36
LIFT
LO
BBY
&
SERV
ICE
ROO
M
TYPI
CAL
COM
MO
N A
REA
- BAS
EMEN
T TO
LE
VEL
36
LIFT
LO
BBY
& S
ERVI
CE
ROO
M
Main switch board room (apartment)
TYPI
CAL
COM
MO
N A
REA
- BAS
EMEN
T TO
LEV
EL
36
MONITORING PROGRESS MECHANICAL, ELECTRICAL & PLUMBING WORKS - PODIUMUpdate : 09 Sep 15
PODIUM ELECTRICAL SERVICES ( ELECTRICAL & ELV - TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD ACCESS, GUARD TOUR, EARTHNING & LIGHTNING) ACMV FIRE FIGHTING
LEVE
L
AREA
NO
.
GRI
D L
INE
LOCATIONBOX INSTALLATION CABLING INSTALLATION VENTILATION FAN FAN COIL UNIT (FCU)
Actual Actual Actual Actual Actual Actual Actual Actual ActualProgress (%)
Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual ActualSTART START START START START START START START START START START START START START START START START START START START
RISER / SHAFT INSTALLATION
CABLE TRAY / TRUNKING
INSTALLATION
CONDUIT AT COLUMN, WALL & SLAB
INSTALLATIONLOOPING & MERGERING
PANEL INSTALLATION (SUB SWITCHBOARD)
SOCKET OUTLET & LIGHT FITTING INSTALLATION
ELV DEVICES - TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD
ACCESS, GUARD TOUR, EARTHNING & LIGHTNING
DUCTING INSTALLATION -
VERTICAL
DUCTING INSTALLATION -
HORIZONTALCHILL PIPE
INSTALLATIONINSTALLATION
CONDUIT & WIRINGINSTALLATION GRILL &
AC UNITWET RISER SYSTEM PIPE
INSTALLATIONSPRINKLER SYSTEM PIPE
INSTALLATIONHOSE REEL SYSTEM PIPE
INSTALLATIONFIRE ALARM SYSTEM PIPE INSTALLATION
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
LIFT
CO
RE &
ESC
APE
STAI
RCAS
E
8 5/D Service apartment lift lobby
LEVE
L 7
M&
E AN
D S
TORE
1 7/H AV store
2 5a-6/C Spa store
3 5/D-E Store
4 1/C Bins room
5 1/C-D AWCS
6 6/C-D Staircase pressurization room
CUST
OM
ER (H
OTE
L)
7 3a/C Reception & check-in counter
8 3a/B Business center/ library
9 4/B Social space
10 4a/B Idea room
11 2/E Bakery
12 3/G All day dining
13 3c-3d/M Pantry
14 5/E Pre-function room
15 4c-G Function room 1
16 5b/G Function room 2
17 4a-6/B Treatment 1, 2, 3
18 5a-6/B Couple treatment room
19 6-7/B Zacuzzi
20 6/D Male & female toilet
FRO
NT
OF
HO
USE
(HO
TEL)
21 2-2a/B Gen. cash
22 1a/B Storage
23 2-2a/B Account manager
24 2a/B Director finance
25 3/B GM office
26 5/C Sales & marketing
27 4-4a/c-D Hotel front office
28 4-4a/C Manager 1, 2
29 4-4a/D Luggage room
30 5/D Store
MAI
N K
ITCH
EN
31 5c/E Food preparation
32 1-1a/C Dry store
33 1-1a/C-D Walk-in freezer
34 2/C-D Walk-in chiller
35 1/D Freeze
36 1/D Chiller
37 2/D Pastry store
MAI
N K
ITCH
EN
38 1/D-E Meat prep
39 1/E Vege prep
40 2/E Pastry & bakery
41 2/E Chocolate room
42 1/E-F Cold kitchen
43 1/F RM. Service office
44 1/F Chef office
45 1/F Room service
46 1/F-G Steward store
47 1-1a/F-G Pot & pan washing
48 1/G Dish washing
49 2/F Cooking area
50 5/A-B Balcony
51 4b-7/H-M Deck extension for F&B funtions
LIFT
CO
RE &
ESC
APE
STAI
RCAS
E
1 1/A Escape staircase S1
2 1/G Escape staircase S2
3 6/G Escape staircase S3
4 5a/D Escape staircase S4
5 1a/B-C Fire/ service lift lobby
6 5a/D Fire/ service lift lobby
7 2/C Hotel lift lobby
8 5/D Service apartment lift lobby
LEVE
L 7
MEZ
ZAN
INE
M&
E
1 1/C Bin room
2 1/C AWCS
TYPI
CAL
COM
MO
N A
REA
- BAS
EMEN
T TO
LEV
EL
36
LAN
DSC
APE
TYPI
CAL
COM
MO
N A
REA
- BAS
EMEN
T TO
LEV
EL
36
MONITORING PROGRESS MECHANICAL, ELECTRICAL & PLUMBING WORKS - PODIUMUpdate : 09 Sep 15
PODIUM ELECTRICAL SERVICES ( ELECTRICAL & ELV - TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD ACCESS, GUARD TOUR, EARTHNING & LIGHTNING) ACMV FIRE FIGHTING
LEVE
L
AREA
NO
.
GRI
D L
INE
LOCATIONBOX INSTALLATION CABLING INSTALLATION VENTILATION FAN FAN COIL UNIT (FCU)
Actual Actual Actual Actual Actual Actual Actual Actual ActualProgress (%)
Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual ActualSTART START START START START START START START START START START START START START START START START START START START
RISER / SHAFT INSTALLATION
CABLE TRAY / TRUNKING
INSTALLATION
CONDUIT AT COLUMN, WALL & SLAB
INSTALLATIONLOOPING & MERGERING
PANEL INSTALLATION (SUB SWITCHBOARD)
SOCKET OUTLET & LIGHT FITTING INSTALLATION
ELV DEVICES - TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD
ACCESS, GUARD TOUR, EARTHNING & LIGHTNING
DUCTING INSTALLATION -
VERTICAL
DUCTING INSTALLATION -
HORIZONTALCHILL PIPE
INSTALLATIONINSTALLATION
CONDUIT & WIRINGINSTALLATION GRILL &
AC UNITWET RISER SYSTEM PIPE
INSTALLATIONSPRINKLER SYSTEM PIPE
INSTALLATIONHOSE REEL SYSTEM PIPE
INSTALLATIONFIRE ALARM SYSTEM PIPE INSTALLATION
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
LEVE
L 7
MEZ
ZAN
INE
M&
E
3 2/B Ahu room 1
4 1/G Ahu room 2
5 01/F-G Balancing tank
6 01/G Pump room
7 1a/B-C M&E area
OFF
ICE
(BO
H)
8 1a/B I.T. Store
9 2-2a/B-C I.T. office
10 2b/B Server room
11 3/B Uniform issue
12 6/E Function room storage
13 6/H AV room
14 2/E HK manager
15 2/E-F HR. DIR. Office
16 2/E-F F&B DIR. Office
17 2/F-G Executive chef
18 1/F Working area
19 1/E Training/ meeting room
20 1a/D Corridors
SERV
ICE
AREA
(BO
H)
21 1-1a/C Security & receiving area
22 2/D Flower shop
23 2/D House keeping office
24 1/D Soiled linen room
25 1/D Valet laundry
26 1/D-E Clean linen room
27 1/C-D Trolley bay
28 3a/B Clinic
29 4/B
30 5a/B Team dinning room
31 6/B Kitchen
32 6/B-C Kitchen storage
33 6/C Staff social lounge
34 6/D Male & female prayer room
1 1/A Escape staircase S1
2 1/G Escape staircase S2
3 6/G Escape staircase S3
4 5a/D Escape staircase S4
LEVE
L 8
FACI
LITY
11 3a/C Gym
12 3/B Male, female changing room
13 3/F Swimming pool
14 3/J Pantry
15 4d/J Spiral stair
16 2a-4/B-H Deck
17 2a-7/A-D
18 2b-7/B-J Steps
19 2b-7/B-J Ramp
Male & female changing room, toilet
TYPI
CAL
COM
MO
N A
REA
- BAS
EMEN
T TO
LEV
EL
36
LIFT
CO
RE &
ESC
APE
STAI
RCAS
E
Roof top garden for apartment tower
MONITORING PROGRESS MECHANICAL, ELECTRICAL & PLUMBING WORKS - PODIUM
PODIUM
LEVE
L
AREA
NO
.
GRI
D L
INE
LOCATION
LIFT
CO
RE &
ESC
APE
STAI
RCAS
E
1 1/A Escape staircase S1
2 1/G Escape staircase S2
3 6/G Escape staircase S3
4 5a/D Escape staircase S4
5 1a/B-C Fire/ service lift lobby
6 5a/D Fire/ service lift lobby
7 2/C Hotel lift lobby
8 5/D Service apartment lift lobby
BASE
MEN
T
LIFT
CO
RE
1 01-2/A Hotel store 1,2
4a/C-D Store 3
2 4a-5/C-D Store (service apt.)
3 7/G Carpark store
4 1-2/F-G Staircase lobby
PARK
ING
& D
RIVE
WAY 5 5/C Passage
6 1-7/A-J Car parking
7 1-7/A-J Motor parking
8 4a-E Handicapped parking space
9 1/E Ramp 1
M&
E SE
RVIC
E RO
OM
10 1/C Fan room
11 3a/B Chiller plant room
12 4/B Flood retention tank (below)
13 4a/A-B Sump pit
14 5/A Domestic tank 1, 2 (retail)
15 5/A Pump room 1 (retail)
16 5a/B Pump room 2 (hotel)
17 6/B Pump room 3 (service apt.)
18 6/C-D
19 5a-6/D Pump room 5 (hotel)
20 5b-5c/H Pump room 6 (hotel)
21 5b-5c/J Pump room 7 (retail/ carpark)
22 5a/A AC make up tank 1, 2 (hotel)
23 7/A Domestic tank 3 (hotel)
24 7/B Domestic tank 4 (service apt.)
25 5a-6/C Wet riser tank 1, 2
26 6-7/C Hose reel tank 1, 2
27 7/D Fresh air fanroom (car park)
28 5b/H Sprinkler pump stage 1
29 7/J-K Sprinkler tank 1, 2
30 2/H
31 01/G OSD, on-site detention tank
32 01/F Rain water harvesting tank
LIFT
CO
RE &
ESC
APE
STAI
RCAS
E
1 1/A Escape staircase S1
2 1/G Escape staircase S2
3 6/G Escape staircase S3
4 5a/D Escape staircase S4
5 1a/B-C Fire/ service lift lobby
6 5a/D Fire/ service lift lobby
7 2/C Hotel lift lobby
8 5/D Service apartment lift lobby
LEVE
L1
M&
E AN
D S
ERVI
CE R
OO
M 1 1a/A Store
2 5a/D Janitor
3 5a/D-E Refuse
4 5a-D Refuse bin
5 4a-5B/D-F Store 1, 2,3,4,5
6 1-H Ramp 1
RETA
IL
7 2a-4a/D-L Retail lobby
8 1-6/C-G Passage 1, 2, 3, 4
9 3/M Retail service lift lobby
10 1-7/A-M Retail unit 1,2,3,4,5,6,7,8,9,10
11 4a-5b/C-F Retail male & female toilet
12 4/F Glass lift
13 3a/F Escalator
LIFT
CO
RE &
ESC
APE
STAI
RCAS
E
1 1/A Escape staircase S1
2 1/G Escape staircase S2
3 6/G Escape staircase S3
4 5a/D Escape staircase S4
TYPI
CAL
COM
MO
N A
REA
- BAS
EMEN
T TO
LE
VEL
36
Pump room 4 (service Apt. + retail)
Grease interceptor system (hotel&retail)
TYPI
CAL
COM
MO
N A
REA
- BAS
EMEN
T TO
LE
VEL
36TY
PICA
L CO
MM
ON
ARE
A - B
ASEM
ENT
TO L
EVEL
36
FIRE FIGHTING PLUMBING WORKS (COLD WATER, HOT WATER & SANITARY PLUMBING SYSTEM) RAINWATER DOWN PIPE
SANITARY PIPE FITTING BRACKET INSTALLATION GROUTING PIPE DISCHARGE SUMP
Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual ActualSTART START START START START START START START START START START START START START START START START START START
AUTOMATED WASTE COLLECTION SYSTEM
(AWCS)
FIREMAN INTERCOM SYSTEM INSTALLATION
SPRINKLER HEAD INSTALLATION
HOSE REEL DRUMSET INSTALLATION
LANDING VALVE & CANVAS HOSE INSTALLATION
FIRE ALARM ACCESSORIES
INSTALLATION
PREPARE OPENING / SLEEVE AT FLOOR SLAB
& CONCEAL PIPE IN SHEARWALL / COLUMN
TRANFER PIPE INSTALLATION
DROPPER PIPE INSTALLATION
HANGER PIPE INSTALLATION
COLD WATER PIPE FITTING
HOT WATER PIPE FITTING
TRANSPORT PIPE & FITTING
MARKING (BY FASTFLOW) & CORING
ON SLAB (BY UMLB)RISER PIPE
INSTALLATIONDISCHARGE PIPE INSTALLATION
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
MONITORING PROGRESS MECHANICAL, ELECTRICAL & PLUMBING WORKS - PODIUM
PODIUM
LEVE
L
AREA
NO
.
GRI
D L
INE
LOCATION
LIFT
CO
RE &
ESC
APE
STAI
RCAS
E
5 1a/B-C Fire/ service lift lobby
6 5a/D Fire/ service lift lobby
7 2/C Hotel lift lobby
8 5/D Service apartment lift lobby
LEVE
L 2
M&
E &
SER
VICE
RO
OM
(HO
TEL)
1 2/C Hotel lobby
2 3/B-C Reception
3 1/C Receiving area & purchasing
4 2/D Luggage room
5 1a/B LPG Farm 1 (hotel)
6 2/B Loading & Unloading bay
7 2a/B Receiving area & platform
8 1/C-D Bin center 1
9 1/C-D Store
M&
E &
SER
VICE
RO
OM
(SER
VICE
APA
RTM
ENT
& R
ETAI
L)
10 5a/E Retail service lift lobby
11 5/C Letter box
12 5a/C Fire control room (retail, apt.)
13 6/C MDF room
14 6/C-D Bin center 2
15 5a-6/D AWCS cable room
16 5a-6/D-E AWCS
17 5a/E CWSP
18 5a/E Full vacuumload station
19 6/E Loading & Unloading
20 5a/F Consumer HT room
21 5a/G TNB room
22 6/G TNB meter room
23 5b/G-H M&E room
24 5c/H Diesel fuel pump room
25 5b/H Bomba vehicle turning circle
26 5b/J LPG Farm 2 (retail)
CIRC
ULA
TIO
N 27 4a/E-F Passage
28 01/B Ramp 2
29 2a-7/A-C Drop off
RETA
IL
30 2b-4a/C-K Retail lobby
31 01-5c/C-M Retail unit 1,2,3,4,5,6,7
32 5/E Retail male & female toilet
33 3b/E Glass lift
34 3/E Escalator
LIFT
CO
RE &
ESC
APE
STAI
RCAS
E
1 1/A Escape staircase S1
2 1/G Escape staircase S2
3 6/G Escape staircase S3
4 5a/D Escape staircase S4
5 1a/B-C Fire/ service lift lobby
6 5a/D Fire/ service lift lobby
7 2/C Hotel lift lobby
8 5/D Service apartment lift lobby
LEVE
L 3A
& 3
B
1 3/J Retail lift lobby
M&
E SE
RVIC
E RO
OM
2 1a/B M&E room
3 1/C Store
4 4/E Smoke spill fan room
5 4a/E Copper pipes compartment
6 1a/F Smoke spill fresh air pump room
CARP
AKIN
G &
DRI
VEW
AY
7 2b-E Pedestrian walk way
8 1-5a/C-J Passage
9 1-7/B-M Car parking
10 2a/C Handicapped parking space
11 3/E-F Stair from 3A to 3B
12 01-6/C-K Ramp
OTH
ER R
OO
MS 13 2-2a/E-F Car park management office
14 1/H Male prayer room
15 2/H Female prayer room
LIFT
CO
RE &
ESC
APE
STAI
RCAS
E
1 1/A Escape staircase S1
2 1/G Escape staircase S2
3 6/G Escape staircase S3
4 5a/D Escape staircase S4
5 1a/B-C Fire/ service lift lobby
6 5a/D Fire/ service lift lobby
TYPI
CAL
COM
MO
N A
REA
- BAS
EMEN
T TO
LEV
EL 3
6TY
PICA
L CO
MM
ON
ARE
A - B
ASEM
ENT
TO
LEVE
L 36
RETA IL
TYPI
CAL
COM
MO
N A
REA
- BAS
EMEN
T TO
LE
VEL
36
FIRE FIGHTING PLUMBING WORKS (COLD WATER, HOT WATER & SANITARY PLUMBING SYSTEM) RAINWATER DOWN PIPE
SANITARY PIPE FITTING BRACKET INSTALLATION GROUTING PIPE DISCHARGE SUMP
Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual ActualSTART START START START START START START START START START START START START START START START START START START
AUTOMATED WASTE COLLECTION SYSTEM
(AWCS)
FIREMAN INTERCOM SYSTEM INSTALLATION
SPRINKLER HEAD INSTALLATION
HOSE REEL DRUMSET INSTALLATION
LANDING VALVE & CANVAS HOSE INSTALLATION
FIRE ALARM ACCESSORIES
INSTALLATION
PREPARE OPENING / SLEEVE AT FLOOR SLAB
& CONCEAL PIPE IN SHEARWALL / COLUMN
TRANFER PIPE INSTALLATION
DROPPER PIPE INSTALLATION
HANGER PIPE INSTALLATION
COLD WATER PIPE FITTING
HOT WATER PIPE FITTING
TRANSPORT PIPE & FITTING
MARKING (BY FASTFLOW) & CORING
ON SLAB (BY UMLB)RISER PIPE
INSTALLATIONDISCHARGE PIPE INSTALLATION
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
MONITORING PROGRESS MECHANICAL, ELECTRICAL & PLUMBING WORKS - PODIUM
PODIUM
LEVE
L
AREA
NO
.
GRI
D L
INE
LOCATION
LIFT
CO
RE &
ESC
APE
STAI
RCAS
E
7 2/C Hotel lift lobby
8 5/D Service apartment lift lobby
LEVE
L 4A
& 4
B
1 1-2/B-C Store 1, 2
2 4a/D-E Store 3
3 3/M Retail lift lobby
PARK
ING
& D
RIVE
WAY
4 1-5/B-M Passage
5 2/E-F Stair from 4A to 4B
6 01-6/C-K Ramp
7 1-7/B-M Car parking
8 2a/B, 5-C Handicaped parking space
9 2-2a/J-M Motocycle
LIFT
CO
RE &
ESC
APE
STAI
RCAS
E
1 1/A Escape staircase S1
2 1/G Escape staircase S2
3 6/G Escape staircase S3
4 5a/D Escape staircase S4
5 1a/B-C Fire/ service lift lobby
6 5a/D Fire/ service lift lobby
7 2/C Hotel lift lobby
8 5/D Service apartment lift lobby
LEVE
L 5A
& 5
B
1 1-2/B-C Store 1, 2
2 4a/D-E Store 3
3 2/B Genset room (hotel)
4 3/M Retail lift lobby
PARK
ING
& D
RIVE
WAY
5 1-5/B-M Passage
6 2/E-F Stair to up from 4A to 4B
7 01-6/C-K Ramp
8 1-7/B-M Car parking
9 2a/B, 5-C Handicaped parking space
10 2-2a/J-M Motocycle
LIFT
CO
RE &
ESC
APE
STAI
RCAS
E
1 1/A Escape staircase S1
2 1/G Escape staircase S2
3 6/G Escape staircase S3
4 5a/D Escape staircase S4
5 1a/B-C Fire/ service lift lobby
6 5a/D Fire/ service lift lobby
7 2/C Hotel lift lobby
8 5/D Service apartment lift lobby
LEVE
L 6A
& 6
B
1 3/M Retail lift lobby
2 1-2/B-C Store 1, 2
3 4a/D-E Store 3
4 6/G Store 4
5 6/E Management office
M&
E
6 2a/B Main switch board room (hotel)
7 2b/B Transformer room (hotel)
8 5a-6/C Transformer (apartment)
9 6/C
10 5a-6/C-D Switch gear room (apartment)
11 4a/E CW pump room
12 5/E EFF & CW. Tank
13 6/H Transformer room (retail)
14 6/J Main switch boardroom (retail)
15 6/K Genset room (retail)
16 1a/F Fire pump room (hotel)
17 1/F HR tank 1, 2
18 2/F WR tank 1, 2
PARK
ING 19 01-6/C-K Ramp
20 5a/B, 2/K Motocycle parking
21 01-7/B-M Car parking
LIFT
CO
RE &
ESC
APE
STAI
RCAS
E
1 1/A Escape staircase S1
2 1/G Escape staircase S2
3 6/G Escape staircase S3
4 5a/D Escape staircase S4
5 1a/B-C Fire/ service lift lobby
6 5a/D Fire/ service lift lobby
7 2/C Hotel lift lobby
TYPI
CAL
COM
MO
N A
REA
- BAS
EMEN
T TO
LE
VEL
36
LIFT
LO
BBY
&
SERV
ICE
R.M
TYPI
CAL
COM
MO
N A
REA
- BAS
EMEN
T TO
LE
VEL
36
LIFT
LO
BBY
&
SERV
ICE
ROO
M
TYPI
CAL
COM
MO
N A
REA
- BAS
EMEN
T TO
LE
VEL
36
LIFT
LO
BBY
& S
ERVI
CE
ROO
M
Main switch board room (apartment)
TYPI
CAL
COM
MO
N A
REA
- BAS
EMEN
T TO
LEV
EL
36
FIRE FIGHTING PLUMBING WORKS (COLD WATER, HOT WATER & SANITARY PLUMBING SYSTEM) RAINWATER DOWN PIPE
SANITARY PIPE FITTING BRACKET INSTALLATION GROUTING PIPE DISCHARGE SUMP
Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual ActualSTART START START START START START START START START START START START START START START START START START START
AUTOMATED WASTE COLLECTION SYSTEM
(AWCS)
FIREMAN INTERCOM SYSTEM INSTALLATION
SPRINKLER HEAD INSTALLATION
HOSE REEL DRUMSET INSTALLATION
LANDING VALVE & CANVAS HOSE INSTALLATION
FIRE ALARM ACCESSORIES
INSTALLATION
PREPARE OPENING / SLEEVE AT FLOOR SLAB
& CONCEAL PIPE IN SHEARWALL / COLUMN
TRANFER PIPE INSTALLATION
DROPPER PIPE INSTALLATION
HANGER PIPE INSTALLATION
COLD WATER PIPE FITTING
HOT WATER PIPE FITTING
TRANSPORT PIPE & FITTING
MARKING (BY FASTFLOW) & CORING
ON SLAB (BY UMLB)RISER PIPE
INSTALLATIONDISCHARGE PIPE INSTALLATION
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
MONITORING PROGRESS MECHANICAL, ELECTRICAL & PLUMBING WORKS - PODIUM
PODIUM
LEVE
L
AREA
NO
.
GRI
D L
INE
LOCATION
LIFT
CO
RE &
ESC
APE
STAI
RCAS
E
8 5/D Service apartment lift lobby
LEVE
L 7
M&
E AN
D S
TORE
1 7/H AV store
2 5a-6/C Spa store
3 5/D-E Store
4 1/C Bins room
5 1/C-D AWCS
6 6/C-D Staircase pressurization room
CUST
OM
ER (H
OTE
L)
7 3a/C Reception & check-in counter
8 3a/B Business center/ library
9 4/B Social space
10 4a/B Idea room
11 2/E Bakery
12 3/G All day dining
13 3c-3d/M Pantry
14 5/E Pre-function room
15 4c-G Function room 1
16 5b/G Function room 2
17 4a-6/B Treatment 1, 2, 3
18 5a-6/B Couple treatment room
19 6-7/B Zacuzzi
20 6/D Male & female toilet
FRO
NT
OF
HO
USE
(HO
TEL)
21 2-2a/B Gen. cash
22 1a/B Storage
23 2-2a/B Account manager
24 2a/B Director finance
25 3/B GM office
26 5/C Sales & marketing
27 4-4a/c-D Hotel front office
28 4-4a/C Manager 1, 2
29 4-4a/D Luggage room
30 5/D Store
MAI
N K
ITCH
EN
31 5c/E Food preparation
32 1-1a/C Dry store
33 1-1a/C-D Walk-in freezer
34 2/C-D Walk-in chiller
35 1/D Freeze
36 1/D Chiller
37 2/D Pastry store
MAI
N K
ITCH
EN
38 1/D-E Meat prep
39 1/E Vege prep
40 2/E Pastry & bakery
41 2/E Chocolate room
42 1/E-F Cold kitchen
43 1/F RM. Service office
44 1/F Chef office
45 1/F Room service
46 1/F-G Steward store
47 1-1a/F-G Pot & pan washing
48 1/G Dish washing
49 2/F Cooking area
50 5/A-B Balcony
51 4b-7/H-M Deck extension for F&B funtions
LIFT
CO
RE &
ESC
APE
STAI
RCAS
E
1 1/A Escape staircase S1
2 1/G Escape staircase S2
3 6/G Escape staircase S3
4 5a/D Escape staircase S4
5 1a/B-C Fire/ service lift lobby
6 5a/D Fire/ service lift lobby
7 2/C Hotel lift lobby
8 5/D Service apartment lift lobby
LEVE
L 7
MEZ
ZAN
INE
M&
E
1 1/C Bin room
2 1/C AWCS
TYPI
CAL
COM
MO
N A
REA
- BAS
EMEN
T TO
LEV
EL
36
LAN
DSC
APE
TYPI
CAL
COM
MO
N A
REA
- BAS
EMEN
T TO
LEV
EL
36
FIRE FIGHTING PLUMBING WORKS (COLD WATER, HOT WATER & SANITARY PLUMBING SYSTEM) RAINWATER DOWN PIPE
SANITARY PIPE FITTING BRACKET INSTALLATION GROUTING PIPE DISCHARGE SUMP
Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual ActualSTART START START START START START START START START START START START START START START START START START START
AUTOMATED WASTE COLLECTION SYSTEM
(AWCS)
FIREMAN INTERCOM SYSTEM INSTALLATION
SPRINKLER HEAD INSTALLATION
HOSE REEL DRUMSET INSTALLATION
LANDING VALVE & CANVAS HOSE INSTALLATION
FIRE ALARM ACCESSORIES
INSTALLATION
PREPARE OPENING / SLEEVE AT FLOOR SLAB
& CONCEAL PIPE IN SHEARWALL / COLUMN
TRANFER PIPE INSTALLATION
DROPPER PIPE INSTALLATION
HANGER PIPE INSTALLATION
COLD WATER PIPE FITTING
HOT WATER PIPE FITTING
TRANSPORT PIPE & FITTING
MARKING (BY FASTFLOW) & CORING
ON SLAB (BY UMLB)RISER PIPE
INSTALLATIONDISCHARGE PIPE INSTALLATION
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
MONITORING PROGRESS MECHANICAL, ELECTRICAL & PLUMBING WORKS - PODIUM
PODIUM
LEVE
L
AREA
NO
.
GRI
D L
INE
LOCATION
LEVE
L 7
MEZ
ZAN
INE
M&
E
3 2/B Ahu room 1
4 1/G Ahu room 2
5 01/F-G Balancing tank
6 01/G Pump room
7 1a/B-C M&E area
OFF
ICE
(BO
H)
8 1a/B I.T. Store
9 2-2a/B-C I.T. office
10 2b/B Server room
11 3/B Uniform issue
12 6/E Function room storage
13 6/H AV room
14 2/E HK manager
15 2/E-F HR. DIR. Office
16 2/E-F F&B DIR. Office
17 2/F-G Executive chef
18 1/F Working area
19 1/E Training/ meeting room
20 1a/D Corridors
SERV
ICE
AREA
(BO
H)
21 1-1a/C Security & receiving area
22 2/D Flower shop
23 2/D House keeping office
24 1/D Soiled linen room
25 1/D Valet laundry
26 1/D-E Clean linen room
27 1/C-D Trolley bay
28 3a/B Clinic
29 4/B
30 5a/B Team dinning room
31 6/B Kitchen
32 6/B-C Kitchen storage
33 6/C Staff social lounge
34 6/D Male & female prayer room
1 1/A Escape staircase S1
2 1/G Escape staircase S2
3 6/G Escape staircase S3
4 5a/D Escape staircase S4
LEVE
L 8
FACI
LITY
11 3a/C Gym
12 3/B Male, female changing room
13 3/F Swimming pool
14 3/J Pantry
15 4d/J Spiral stair
16 2a-4/B-H Deck
17 2a-7/A-D
18 2b-7/B-J Steps
19 2b-7/B-J Ramp
Male & female changing room, toilet
TYPI
CAL
COM
MO
N A
REA
- BAS
EMEN
T TO
LEV
EL
36
LIFT
CO
RE &
ESC
APE
STAI
RCAS
E
Roof top garden for apartment tower
FIRE FIGHTING PLUMBING WORKS (COLD WATER, HOT WATER & SANITARY PLUMBING SYSTEM) RAINWATER DOWN PIPE
SANITARY PIPE FITTING BRACKET INSTALLATION GROUTING PIPE DISCHARGE SUMP
Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual ActualSTART START START START START START START START START START START START START START START START START START START
AUTOMATED WASTE COLLECTION SYSTEM
(AWCS)
FIREMAN INTERCOM SYSTEM INSTALLATION
SPRINKLER HEAD INSTALLATION
HOSE REEL DRUMSET INSTALLATION
LANDING VALVE & CANVAS HOSE INSTALLATION
FIRE ALARM ACCESSORIES
INSTALLATION
PREPARE OPENING / SLEEVE AT FLOOR SLAB
& CONCEAL PIPE IN SHEARWALL / COLUMN
TRANFER PIPE INSTALLATION
DROPPER PIPE INSTALLATION
HANGER PIPE INSTALLATION
COLD WATER PIPE FITTING
HOT WATER PIPE FITTING
TRANSPORT PIPE & FITTING
MARKING (BY FASTFLOW) & CORING
ON SLAB (BY UMLB)RISER PIPE
INSTALLATIONDISCHARGE PIPE INSTALLATION
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
MONITORING PROGRESS MECHANICAL, ELECTRICAL & PLUMBING WORKS - HOTELUpdate : 09 Sep 15
DESCRIPTION ELECTRICAL SERVICES ( ELECTRICAL & ELV - TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD ACCESS, GUARD TOUR, EARTHNING & LIGHTNING) ACMV
LOCA
TIO
N /
RO
OM
TYP
E
CABLING INSTALLATION BOX INSTALLATION CABLING INSTALLATION LOOPING & MERGERING EXHAUST INSTALLATION GRILL INSTALLATION
Actual Actual Actual Actual Actual Actual Actual Actual ActualProgress (%)
Actual Actual ActualProgress (%)
Actual Actual Actual Actual Actual Actual Actual Actual Actual
START START START START START START START START START START START START START START START START START START START START START
LEVE
L 8
1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K
10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K
1 1/A
2 1/G
7 2/C
1 1a/B Linen room
2 1/C Store
3 1a/C Tel/IT
4 1a/G Smoke lobby
5 2/B, 1-2a/B Balcony
6 1a-2/B-H Hotel corridor
7 1-2a/B-M Hotel room 1-25
LEVE
L 9
1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K
10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K
1 1/A
2 1/G
7 2/C
1 1a/B Linen room
2 1a/G Smoke lobby3 1-2b/B-M Hotel room 1-254 1a-2/B-H Hotel corridor5 2/B, 1-2a/B Balcony
LEVE
L 10
1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K
10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K
1 1/A
2 1/G
7 2/C
1 1a/B Linen room2 1a/G Smoke lobby
LEVE
L /
NAM
E O
F FL
OO
R LE
VELS
AS
PER
CON
STRU
CTIO
N &
AU
THO
RITY
DRA
WIN
GS
NO
. / N
AME
OF
FLO
OR
LEVE
LS F
OR
CON
STRU
CTIO
N &
AU
THO
RITY
DRA
WIN
GS
GRI
D L
INE/
NAM
E O
F FL
OO
R LE
VELS
FO
R SI
GN
AGE
AND
HO
TEL
OPE
RATI
ON RISER / SHAFT
INSTALLATIONCABLE LADDER INSTALLATION
CABLE TRAY / TRUNKING INSTALLATION
CABLE TRAY / TRUNKING INSTALLATION
CONDUIT AT COLUMN, WALL & SLAB
INSTALLATIONPANEL INSTALLATION (SUB SWITCHBOARD)
SOCKET OUTLET & LIGHT FITTING INSTALLATION
ELV DEVICES - TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD ACCESS, GUARD
TOUR, EARTHNING & LIGHTNING
DUCTING INSTALLATION - BEDROOM
DUCTING INSTALLATION - BATHROOM
COPPER PIPE INSTALLATION
DRAIN PIPE INSTALLATION
FLEXIBLE DUCT INSTALLATION -
BEDROOMINSTALLATION CONDUIT
& WIRINGFAN COIL UNIT (FCU) -
DUCT TYPE
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Escape staircase S1 (basement to level 20)
Escape staircase S2 (basement to level 19)
Hotel lift lobby at level 3 to level 18
Escape staircase S1 (basement to level 20)
Escape staircase S2 (basement to level 19)
Hotel lift lobby at level 3 to level 18
Escape staircase S1 (basement to level 20)
Escape staircase S2 (basement to level 19)
Hotel lift lobby at level 3 to level 18
DESCRIPTION ELECTRICAL SERVICES ( ELECTRICAL & ELV - TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD ACCESS, GUARD TOUR, EARTHNING & LIGHTNING) ACMV
LOCA
TIO
N /
RO
OM
TYP
E
CABLING INSTALLATION BOX INSTALLATION CABLING INSTALLATION LOOPING & MERGERING EXHAUST INSTALLATION GRILL INSTALLATION
Actual Actual Actual Actual Actual Actual Actual Actual ActualProgress (%)
Actual Actual ActualProgress (%)
Actual Actual Actual Actual Actual Actual Actual Actual Actual
START START START START START START START START START START START START START START START START START START START START STARTLEVE
L /
NAM
E O
F FL
OO
R LE
VELS
AS
PER
CON
STRU
CTIO
N &
AU
THO
RITY
DRA
WIN
GS
NO
. / N
AME
OF
FLO
OR
LEVE
LS F
OR
CON
STRU
CTIO
N &
AU
THO
RITY
DRA
WIN
GS
GRI
D L
INE/
NAM
E O
F FL
OO
R LE
VELS
FO
R SI
GN
AGE
AND
HO
TEL
OPE
RATI
ON RISER / SHAFT
INSTALLATIONCABLE LADDER INSTALLATION
CABLE TRAY / TRUNKING INSTALLATION
CABLE TRAY / TRUNKING INSTALLATION
CONDUIT AT COLUMN, WALL & SLAB
INSTALLATIONPANEL INSTALLATION (SUB SWITCHBOARD)
SOCKET OUTLET & LIGHT FITTING INSTALLATION
ELV DEVICES - TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD ACCESS, GUARD
TOUR, EARTHNING & LIGHTNING
DUCTING INSTALLATION - BEDROOM
DUCTING INSTALLATION - BATHROOM
COPPER PIPE INSTALLATION
DRAIN PIPE INSTALLATION
FLEXIBLE DUCT INSTALLATION -
BEDROOMINSTALLATION CONDUIT
& WIRINGFAN COIL UNIT (FCU) -
DUCT TYPE
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
LEVE
L 10
3 1-2b/B-M Hotel room 1-254 1a-2/B-H Hotel corridor5 2/B, 1-2a/B Balcony
LEVE
L 11
1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K
10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K
1 1/A
2 1/G
7 2/C
1 1a/B Linen room2 1a/G Smoke lobby3 1-2b/B-M Hotel room 1-254 1a-2/B-H Hotel corridor5 2/B, 1-2a/B Balcony
LEVE
L 12
1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K
10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K
1 1/A
2 1/G
7 2/C
1 1a/B Linen room2 1a/G Smoke lobby3 1-2b/B-M Hotel room 1-254 1a-2/B-H Hotel corridor5 2/B, 1-2a/B Balcony
Escape staircase S1 (basement to level 20)
Escape staircase S2 (basement to level 19)
Hotel lift lobby at level 3 to level 18
Escape staircase S1 (basement to level 20)
Escape staircase S2 (basement to level 19)
Hotel lift lobby at level 3 to level 18
MONITORING PROGRESS MECHANICAL, ELECTRICAL & PLUMBING WORKS - HOTEL
DESCRIPTION
LOCA
TIO
N /
RO
OM
TYP
E
LEVE
L 8
1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K
10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K
1 1/A
2 1/G
7 2/C
1 1a/B Linen room
2 1/C Store
3 1a/C Tel/IT
4 1a/G Smoke lobby
5 2/B, 1-2a/B Balcony
6 1a-2/B-H Hotel corridor
7 1-2a/B-M Hotel room 1-25
LEVE
L 9
1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K
10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K
1 1/A
2 1/G
7 2/C
1 1a/B Linen room
2 1a/G Smoke lobby3 1-2b/B-M Hotel room 1-254 1a-2/B-H Hotel corridor5 2/B, 1-2a/B Balcony
LEVE
L 10
1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K
10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K
1 1/A
2 1/G
7 2/C
1 1a/B Linen room2 1a/G Smoke lobby
LEVE
L /
NAM
E O
F FL
OO
R LE
VELS
AS
PER
CON
STRU
CTIO
N &
AU
THO
RITY
DRA
WIN
GS
NO
. / N
AME
OF
FLO
OR
LEVE
LS F
OR
CON
STRU
CTIO
N &
AU
THO
RITY
DRA
WIN
GS
GRI
D L
INE/
NAM
E O
F FL
OO
R LE
VELS
FO
R SI
GN
AGE
AND
HO
TEL
OPE
RATI
ON
Escape staircase S1 (basement to level 20)
Escape staircase S2 (basement to level 19)
Hotel lift lobby at level 3 to level 18
Escape staircase S1 (basement to level 20)
Escape staircase S2 (basement to level 19)
Hotel lift lobby at level 3 to level 18
Escape staircase S1 (basement to level 20)
Escape staircase S2 (basement to level 19)
Hotel lift lobby at level 3 to level 18
ACMV FIRE FIGHTING PLUMBING WORKS (COLD WATER, HOT WATER & SANITARY PLUMBING SYSTEM) RAINWATER DOWN PIPE
GRILL INSTALLATION SANITARY PIPE FITTING HOT WATER PIPE FITTING OPENING CLEANING PIPE INSTALLATION BRACKET INSTALLATION
Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual
START START START START START START START START START START START START START START START START START START START START START
VENTILATION GRILL - LPAD & SSAD SHAFT
SPRINKLER SYSTEM PIPE INSTALLATION
HOSE REEL SYSTEM PIPE INSTALLATION
WET RISER SYSTEM PIPE INSTALLATION
INSTALLATION CONDUIT & WIRING FOR FA & FI
SPRINKLER HEAD INSTALLATION
HOSE REEL DRUMSET INSTALLATION
LANDING VALVE & CANVAS HOSE INSTALLATION
FIRE ALARM ACCESSORIES
INSTALLATION
SMOKE DETECTOR ACCESSORIES
INSTALLATION
FIREMAN INTERCOM ACCESSORIES
INSTALLATION
PREPARE OPENING / SLEEVE AT FLOOR SLAB &
CONCEAL PIPE IN SHEARWALL / COLUMN
TRANFER PIPE INSTALLATION
DROPPER PIPE INSTALLATION
HANGER PIPE INSTALLATION
COLD WATER PIPE FITTING
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
DESCRIPTION
LOCA
TIO
N /
RO
OM
TYP
E
LEVE
L /
NAM
E O
F FL
OO
R LE
VELS
AS
PER
CON
STRU
CTIO
N &
AU
THO
RITY
DRA
WIN
GS
NO
. / N
AME
OF
FLO
OR
LEVE
LS F
OR
CON
STRU
CTIO
N &
AU
THO
RITY
DRA
WIN
GS
GRI
D L
INE/
NAM
E O
F FL
OO
R LE
VELS
FO
R SI
GN
AGE
AND
HO
TEL
OPE
RATI
ON
LEVE
L 10
3 1-2b/B-M Hotel room 1-254 1a-2/B-H Hotel corridor5 2/B, 1-2a/B Balcony
LEVE
L 11
1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K
10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K
1 1/A
2 1/G
7 2/C
1 1a/B Linen room2 1a/G Smoke lobby3 1-2b/B-M Hotel room 1-254 1a-2/B-H Hotel corridor5 2/B, 1-2a/B Balcony
LEVE
L 12
1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K
10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K
1 1/A
2 1/G
7 2/C
1 1a/B Linen room2 1a/G Smoke lobby3 1-2b/B-M Hotel room 1-254 1a-2/B-H Hotel corridor5 2/B, 1-2a/B Balcony
Escape staircase S1 (basement to level 20)
Escape staircase S2 (basement to level 19)
Hotel lift lobby at level 3 to level 18
Escape staircase S1 (basement to level 20)
Escape staircase S2 (basement to level 19)
Hotel lift lobby at level 3 to level 18
ACMV FIRE FIGHTING PLUMBING WORKS (COLD WATER, HOT WATER & SANITARY PLUMBING SYSTEM) RAINWATER DOWN PIPE
GRILL INSTALLATION SANITARY PIPE FITTING HOT WATER PIPE FITTING OPENING CLEANING PIPE INSTALLATION BRACKET INSTALLATION
Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual
START START START START START START START START START START START START START START START START START START START START START
VENTILATION GRILL - LPAD & SSAD SHAFT
SPRINKLER SYSTEM PIPE INSTALLATION
HOSE REEL SYSTEM PIPE INSTALLATION
WET RISER SYSTEM PIPE INSTALLATION
INSTALLATION CONDUIT & WIRING FOR FA & FI
SPRINKLER HEAD INSTALLATION
HOSE REEL DRUMSET INSTALLATION
LANDING VALVE & CANVAS HOSE INSTALLATION
FIRE ALARM ACCESSORIES
INSTALLATION
SMOKE DETECTOR ACCESSORIES
INSTALLATION
FIREMAN INTERCOM ACCESSORIES
INSTALLATION
PREPARE OPENING / SLEEVE AT FLOOR SLAB &
CONCEAL PIPE IN SHEARWALL / COLUMN
TRANFER PIPE INSTALLATION
DROPPER PIPE INSTALLATION
HANGER PIPE INSTALLATION
COLD WATER PIPE FITTING
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
MONITORING PROGRESS MECHANICAL, ELECTRICAL & PLUMBING WORKS - HOTEL
DESCRIPTION
LOCA
TIO
N /
RO
OM
TYP
E
LEVE
L 8
1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K
10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K
1 1/A
2 1/G
7 2/C
1 1a/B Linen room
2 1/C Store
3 1a/C Tel/IT
4 1a/G Smoke lobby
5 2/B, 1-2a/B Balcony
6 1a-2/B-H Hotel corridor
7 1-2a/B-M Hotel room 1-25
LEVE
L 9
1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K
10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K
1 1/A
2 1/G
7 2/C
1 1a/B Linen room
2 1a/G Smoke lobby3 1-2b/B-M Hotel room 1-254 1a-2/B-H Hotel corridor5 2/B, 1-2a/B Balcony
LEVE
L 10
1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K
10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K
1 1/A
2 1/G
7 2/C
1 1a/B Linen room2 1a/G Smoke lobby
LEVE
L /
NAM
E O
F FL
OO
R LE
VELS
AS
PER
CON
STRU
CTIO
N &
AU
THO
RITY
DRA
WIN
GS
NO
. / N
AME
OF
FLO
OR
LEVE
LS F
OR
CON
STRU
CTIO
N &
AU
THO
RITY
DRA
WIN
GS
GRI
D L
INE/
NAM
E O
F FL
OO
R LE
VELS
FO
R SI
GN
AGE
AND
HO
TEL
OPE
RATI
ON
Escape staircase S1 (basement to level 20)
Escape staircase S2 (basement to level 19)
Hotel lift lobby at level 3 to level 18
Escape staircase S1 (basement to level 20)
Escape staircase S2 (basement to level 19)
Hotel lift lobby at level 3 to level 18
Escape staircase S1 (basement to level 20)
Escape staircase S2 (basement to level 19)
Hotel lift lobby at level 3 to level 18
RAINWATER DOWN PIPE
BRACKET INSTALLATION GROUTING PIPE
Actual Actual
START START
OUTLET & FLOOR TRAP INSTALLATION
Progress (%)
Progress (%)
Progress (%)
DESCRIPTION
LOCA
TIO
N /
RO
OM
TYP
E
LEVE
L /
NAM
E O
F FL
OO
R LE
VELS
AS
PER
CON
STRU
CTIO
N &
AU
THO
RITY
DRA
WIN
GS
NO
. / N
AME
OF
FLO
OR
LEVE
LS F
OR
CON
STRU
CTIO
N &
AU
THO
RITY
DRA
WIN
GS
GRI
D L
INE/
NAM
E O
F FL
OO
R LE
VELS
FO
R SI
GN
AGE
AND
HO
TEL
OPE
RATI
ON
LEVE
L 10
3 1-2b/B-M Hotel room 1-254 1a-2/B-H Hotel corridor5 2/B, 1-2a/B Balcony
LEVE
L 11
1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K
10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K
1 1/A
2 1/G
7 2/C
1 1a/B Linen room2 1a/G Smoke lobby3 1-2b/B-M Hotel room 1-254 1a-2/B-H Hotel corridor5 2/B, 1-2a/B Balcony
LEVE
L 12
1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K
10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K
1 1/A
2 1/G
7 2/C
1 1a/B Linen room2 1a/G Smoke lobby3 1-2b/B-M Hotel room 1-254 1a-2/B-H Hotel corridor5 2/B, 1-2a/B Balcony
Escape staircase S1 (basement to level 20)
Escape staircase S2 (basement to level 19)
Hotel lift lobby at level 3 to level 18
Escape staircase S1 (basement to level 20)
Escape staircase S2 (basement to level 19)
Hotel lift lobby at level 3 to level 18
RAINWATER DOWN PIPE
BRACKET INSTALLATION GROUTING PIPE
Actual Actual
START START
OUTLET & FLOOR TRAP INSTALLATION
Progress (%)
Progress (%)
Progress (%)
MONITORING PROGRESS MECHANICAL, ELECTRICAL & PLUMBING WORKS - APARTMENT FINISHING MONITORING APARTMENTUpdate : 09 Sep 15
DESCRIPTION ELECTRICAL SERVICES ( ELECTRICAL & ELV - TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD ACCESS, GUARD TOUR, EARTHNING & LIGHTNING) ACMV
LEVE
L
AREA
NO
.
GRI
D L
INE CABLING INSTALLATION BOX INSTALLATION CABLING INSTALLATION LOOPING & MERGERING EXHAUST INSTALLATION
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
START START START START START START START START START START START START START START START START START START START START START
LEVE
L 8
APAR
TMEN
T
1 A1
2 A2
3 A3
4 A4
5 A5
6 A6
7 A7
8 B1
9 B2
10 B3
11 B4
12 C1
13 C2
14 6/G
15 5a/D
16 1a/B-C
17 5a/D
18 5/D
19 4d-H RC Flat roof
20 5/C-G Apartment corridor
21 4-7/C-H
LEVE
L 9
APAR
TMEN
T
1 A1
2 A2
3 A3
4 A4
5 A5
6 A6
7 A7
8 B1
9 B2
10 B3
11 B4
12 C1
13 C2
14
6/G
15
5a/D
161a/B-C
17
5a/D
185/D
195/C-G Apartment corridor
204-7/C-H
LEVE
L 10
APAR
TMEN
T
1 A1
2 A2
3 A3
4 A4
5 A5
6 A6
7 A7
8 B1
9 B2
10 B3
11 B4
12 C1
13 C2
14
6/G
15
5a/D
161a/B-C
17
5a/D
185/D
LOCA
TIO
N /
RO
OM
TY
PE
RISER / SHAFT INSTALLATION
CABLE LADDER INSTALLATION
CABLE TRAY / TRUNKING INSTALLATION
CABLE TRAY / TRUNKING INSTALLATION
CONDUIT AT COLUMN, WALL & SLAB
INSTALLATIONPANEL INSTALLATION (SUB SWITCHBOARD)
SOCKET OUTLET & LIGHT FITTING INSTALLATION
ELV DEVICES - TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD
ACCESS, GUARD TOUR, EARTHNING & LIGHTNING
DUCTING INSTALLATION - LIVING ROOM
DUCTING INSTALLATION - BATHROOM
COPPER PIPE INSTALLATION
DRAIN PIPE INSTALLATION
FLEXIBLE DUCT INSTALLATION - LIVING
ROOMINSTALLATION CONDUIT
& WIRING FAN COIL UNIT (FCU) -
DUCT TYPE FAN COIL UNIT (FCU) - CEILING CASSETTE TYPE
Escape staircase S3 (basement to level 34)
Escape staircase S4 (basem.t to lower RC flat roof)
Fire/ service lift lobby at basement to level 19 (hotel)
Fire/ service lift lobby at basement to level 36 (service apartment)
Service apartment lift lobby at level 2 to level 36
Apt. unit (A1a-7a, B1a-4a, C1a-2a)
Escape staircase S3 (basement to level 34)
Escape staircase S4 (basem.t to lower RC flat roof)
Fire/ service lift lobby at basement to level 19 (hotel)
Fire/ service lift lobby at basement to level 36 (service apartment)
Service apartment lift lobby at level 2 to level 36
Apartment units (A1-7, B1-4, C1-2)
Escape staircase S3 (basement to level 34)
Escape staircase S4 (basem.t to lower RC flat roof)
Fire/ service lift lobby at basement to level 19 (hotel)
Fire/ service lift lobby at basement to level 36 (service apartment)
Service apartment lift lobby at level 2 to level 36
DESCRIPTION ELECTRICAL SERVICES ( ELECTRICAL & ELV - TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD ACCESS, GUARD TOUR, EARTHNING & LIGHTNING) ACMV
LEVE
L
AREA
NO
.
GRI
D L
INE CABLING INSTALLATION BOX INSTALLATION CABLING INSTALLATION LOOPING & MERGERING EXHAUST INSTALLATION
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
START START START START START START START START START START START START START START START START START START START START STARTLOCA
TIO
N /
RO
OM
TY
PE
RISER / SHAFT INSTALLATION
CABLE LADDER INSTALLATION
CABLE TRAY / TRUNKING INSTALLATION
CABLE TRAY / TRUNKING INSTALLATION
CONDUIT AT COLUMN, WALL & SLAB
INSTALLATIONPANEL INSTALLATION (SUB SWITCHBOARD)
SOCKET OUTLET & LIGHT FITTING INSTALLATION
ELV DEVICES - TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD
ACCESS, GUARD TOUR, EARTHNING & LIGHTNING
DUCTING INSTALLATION - LIVING ROOM
DUCTING INSTALLATION - BATHROOM
COPPER PIPE INSTALLATION
DRAIN PIPE INSTALLATION
FLEXIBLE DUCT INSTALLATION - LIVING
ROOMINSTALLATION CONDUIT
& WIRING FAN COIL UNIT (FCU) -
DUCT TYPE FAN COIL UNIT (FCU) - CEILING CASSETTE TYPE
LEVE
L 10
APAR
TMEN
T
195/C-G Apartment corridor
204-7/C-H
LEVE
L 11
APAR
TMEN
T
1 A1
2 A2
3 A3
4 A4
5 A5
6 A6
7 A7
8 B1
9 B2
10 B3
11 B4
12 C1
13 C2
14
6/G
15
5a/D
161a/B-C
17
5a/D
185/D
195/C-G Apartment corridor
204-7/C-H
LEVE
L 12
APAR
TMEN
T
1 A1
2 A2
3 A3
4 A4
5 A5
6 A6
7 A7
8 B1
9 B2
10 B3
11 B4
12 C1
13 C2
14
6/G
15
5a/D
161a/B-C
17
5a/D
185/D
195/C-G Apartment corridor
204-7/C-H
Apartment units (A1-7, B1-4, C1-2)
Escape staircase S3 (basement to level 34)
Escape staircase S4 (basem.t to lower RC flat roof)
Fire/ service lift lobby at basement to level 19 (hotel)
Fire/ service lift lobby at basement to level 36 (service apartment)
Service apartment lift lobby at level 2 to level 36
Apartment units (A1-7, B1-4, C1-2)
Escape staircase S3 (basement to level 34)
Escape staircase S4 (basem.t to lower RC flat roof)
Fire/ service lift lobby at basement to level 19 (hotel)
Fire/ service lift lobby at basement to level 36 (service apartment)
Service apartment lift lobby at level 2 to level 36
Apartment units (A1-7, B1-4, C1-2)
MONITORING PROGRESS MECHANICAL, ELECTRICAL & PLUMBING WORKS - APARTMENT
DESCRIPTION
LEVE
L
AREA
NO
.
GRI
D L
INE
LEVE
L 8
APAR
TMEN
T
1 A1
2 A2
3 A3
4 A4
5 A5
6 A6
7 A7
8 B1
9 B2
10 B3
11 B4
12 C1
13 C2
14 6/G
15 5a/D
16 1a/B-C
17 5a/D
18 5/D
19 4d-H RC Flat roof
20 5/C-G Apartment corridor
21 4-7/C-H
LEVE
L 9
APAR
TMEN
T
1 A1
2 A2
3 A3
4 A4
5 A5
6 A6
7 A7
8 B1
9 B2
10 B3
11 B4
12 C1
13 C2
14
6/G
15
5a/D
161a/B-C
17
5a/D
185/D
195/C-G Apartment corridor
204-7/C-H
LEVE
L 10
APAR
TMEN
T
1 A1
2 A2
3 A3
4 A4
5 A5
6 A6
7 A7
8 B1
9 B2
10 B3
11 B4
12 C1
13 C2
14
6/G
15
5a/D
161a/B-C
17
5a/D
185/D
LOCA
TIO
N /
RO
OM
TY
PE
Escape staircase S3 (basement to level 34)
Escape staircase S4 (basem.t to lower RC flat roof)
Fire/ service lift lobby at basement to level 19 (hotel)
Fire/ service lift lobby at basement to level 36 (service apartment)
Service apartment lift lobby at level 2 to level 36
Apt. unit (A1a-7a, B1a-4a, C1a-2a)
Escape staircase S3 (basement to level 34)
Escape staircase S4 (basem.t to lower RC flat roof)
Fire/ service lift lobby at basement to level 19 (hotel)
Fire/ service lift lobby at basement to level 36 (service apartment)
Service apartment lift lobby at level 2 to level 36
Apartment units (A1-7, B1-4, C1-2)
Escape staircase S3 (basement to level 34)
Escape staircase S4 (basem.t to lower RC flat roof)
Fire/ service lift lobby at basement to level 19 (hotel)
Fire/ service lift lobby at basement to level 36 (service apartment)
Service apartment lift lobby at level 2 to level 36
FINISHING MONITORING APARTMENT FINISHING MONITORING APARTMENTUpdate : 09 Sep 15
ACMV FIRE FIGHTING PLUMBING WORKS (COLD WATER, HOT WATER & SANITARY PLUMBING SYSTEM) AUTOMATED WASTE COLLECTION SYSTEM (AWCS) RAINWATER DOWN PIPE
GRILL INSTALLATION SANITARY PIPE FITTING OPENING CLEANING
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
START START START START START START START START START START START START START START START START START START START START START
AC UNIT - WALL MOUNTED
VENTILATION GRILL - LPAD & SSAD SHAFT
HOSE REEL SYSTEM PIPE INSTALLATION
INSTALLATION CONDUIT & WIRING FOR FA & FI
HOSE REEL DRUMSET INSTALLATION
LANDING VALVE & CANVAS HOSE INSTALLATION
FIRE ALARM ACCESSORIES
INSTALLATION
FIREMAN INTERCOM ACCESSORIES
INSTALLATION
PREPARE OPENING / SLEEVE AT FLOOR SLAB &
CONCEAL PIPE IN SHEARWALL / COLUMN
TRANFER PIPE INSTALLATION
DROPPER PIPE INSTALLATION
HANGER PIPE INSTALLATION
COLD WATER PIPE FITTING
HOT WATER PIPE FITTING
VALVES & WATER METER INSTALLATION
TRANSPORT
PIPE & FITTING
STAINLESS STEEL
PIPING & FITTING
HOPPER DOOR INSTALLATION
DESCRIPTION
LEVE
L
AREA
NO
.
GRI
D L
INE
LOCA
TIO
N /
RO
OM
TY
PE
LEVE
L 10
APAR
TMEN
T
195/C-G Apartment corridor
204-7/C-H
LEVE
L 11
APAR
TMEN
T
1 A1
2 A2
3 A3
4 A4
5 A5
6 A6
7 A7
8 B1
9 B2
10 B3
11 B4
12 C1
13 C2
14
6/G
15
5a/D
161a/B-C
17
5a/D
185/D
195/C-G Apartment corridor
204-7/C-H
LEVE
L 12
APAR
TMEN
T
1 A1
2 A2
3 A3
4 A4
5 A5
6 A6
7 A7
8 B1
9 B2
10 B3
11 B4
12 C1
13 C2
14
6/G
15
5a/D
161a/B-C
17
5a/D
185/D
195/C-G Apartment corridor
204-7/C-H
Apartment units (A1-7, B1-4, C1-2)
Escape staircase S3 (basement to level 34)
Escape staircase S4 (basem.t to lower RC flat roof)
Fire/ service lift lobby at basement to level 19 (hotel)
Fire/ service lift lobby at basement to level 36 (service apartment)
Service apartment lift lobby at level 2 to level 36
Apartment units (A1-7, B1-4, C1-2)
Escape staircase S3 (basement to level 34)
Escape staircase S4 (basem.t to lower RC flat roof)
Fire/ service lift lobby at basement to level 19 (hotel)
Fire/ service lift lobby at basement to level 36 (service apartment)
Service apartment lift lobby at level 2 to level 36
Apartment units (A1-7, B1-4, C1-2)
ACMV FIRE FIGHTING PLUMBING WORKS (COLD WATER, HOT WATER & SANITARY PLUMBING SYSTEM) AUTOMATED WASTE COLLECTION SYSTEM (AWCS) RAINWATER DOWN PIPE
GRILL INSTALLATION SANITARY PIPE FITTING OPENING CLEANING
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
START START START START START START START START START START START START START START START START START START START START START
AC UNIT - WALL MOUNTED
VENTILATION GRILL - LPAD & SSAD SHAFT
HOSE REEL SYSTEM PIPE INSTALLATION
INSTALLATION CONDUIT & WIRING FOR FA & FI
HOSE REEL DRUMSET INSTALLATION
LANDING VALVE & CANVAS HOSE INSTALLATION
FIRE ALARM ACCESSORIES
INSTALLATION
FIREMAN INTERCOM ACCESSORIES
INSTALLATION
PREPARE OPENING / SLEEVE AT FLOOR SLAB &
CONCEAL PIPE IN SHEARWALL / COLUMN
TRANFER PIPE INSTALLATION
DROPPER PIPE INSTALLATION
HANGER PIPE INSTALLATION
COLD WATER PIPE FITTING
HOT WATER PIPE FITTING
VALVES & WATER METER INSTALLATION
TRANSPORT
PIPE & FITTING
STAINLESS STEEL
PIPING & FITTING
HOPPER DOOR INSTALLATION
MONITORING PROGRESS MECHANICAL, ELECTRICAL & PLUMBING WORKS - APARTMENT
DESCRIPTION
LEVE
L
AREA
NO
.
GRI
D L
INE
LEVE
L 8
APAR
TMEN
T
1 A1
2 A2
3 A3
4 A4
5 A5
6 A6
7 A7
8 B1
9 B2
10 B3
11 B4
12 C1
13 C2
14 6/G
15 5a/D
16 1a/B-C
17 5a/D
18 5/D
19 4d-H RC Flat roof
20 5/C-G Apartment corridor
21 4-7/C-H
LEVE
L 9
APAR
TMEN
T
1 A1
2 A2
3 A3
4 A4
5 A5
6 A6
7 A7
8 B1
9 B2
10 B3
11 B4
12 C1
13 C2
14
6/G
15
5a/D
161a/B-C
17
5a/D
185/D
195/C-G Apartment corridor
204-7/C-H
LEVE
L 10
APAR
TMEN
T
1 A1
2 A2
3 A3
4 A4
5 A5
6 A6
7 A7
8 B1
9 B2
10 B3
11 B4
12 C1
13 C2
14
6/G
15
5a/D
161a/B-C
17
5a/D
185/D
LOCA
TIO
N /
RO
OM
TY
PE
Escape staircase S3 (basement to level 34)
Escape staircase S4 (basem.t to lower RC flat roof)
Fire/ service lift lobby at basement to level 19 (hotel)
Fire/ service lift lobby at basement to level 36 (service apartment)
Service apartment lift lobby at level 2 to level 36
Apt. unit (A1a-7a, B1a-4a, C1a-2a)
Escape staircase S3 (basement to level 34)
Escape staircase S4 (basem.t to lower RC flat roof)
Fire/ service lift lobby at basement to level 19 (hotel)
Fire/ service lift lobby at basement to level 36 (service apartment)
Service apartment lift lobby at level 2 to level 36
Apartment units (A1-7, B1-4, C1-2)
Escape staircase S3 (basement to level 34)
Escape staircase S4 (basem.t to lower RC flat roof)
Fire/ service lift lobby at basement to level 19 (hotel)
Fire/ service lift lobby at basement to level 36 (service apartment)
Service apartment lift lobby at level 2 to level 36
FINISHING MONITORING APARTMENT
RAINWATER DOWN PIPE
PIPE INSTALLATION BRACKET INSTALLATION GROUTING PIPE
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
START START START START
OUTLET & FLOOR TRAP INSTALLATION
DESCRIPTION
LEVE
L
AREA
NO
.
GRI
D L
INE
LOCA
TIO
N /
RO
OM
TY
PE
LEVE
L 10
APAR
TMEN
T
195/C-G Apartment corridor
204-7/C-H
LEVE
L 11
APAR
TMEN
T
1 A1
2 A2
3 A3
4 A4
5 A5
6 A6
7 A7
8 B1
9 B2
10 B3
11 B4
12 C1
13 C2
14
6/G
15
5a/D
161a/B-C
17
5a/D
185/D
195/C-G Apartment corridor
204-7/C-H
LEVE
L 12
APAR
TMEN
T
1 A1
2 A2
3 A3
4 A4
5 A5
6 A6
7 A7
8 B1
9 B2
10 B3
11 B4
12 C1
13 C2
14
6/G
15
5a/D
161a/B-C
17
5a/D
185/D
195/C-G Apartment corridor
204-7/C-H
Apartment units (A1-7, B1-4, C1-2)
Escape staircase S3 (basement to level 34)
Escape staircase S4 (basem.t to lower RC flat roof)
Fire/ service lift lobby at basement to level 19 (hotel)
Fire/ service lift lobby at basement to level 36 (service apartment)
Service apartment lift lobby at level 2 to level 36
Apartment units (A1-7, B1-4, C1-2)
Escape staircase S3 (basement to level 34)
Escape staircase S4 (basem.t to lower RC flat roof)
Fire/ service lift lobby at basement to level 19 (hotel)
Fire/ service lift lobby at basement to level 36 (service apartment)
Service apartment lift lobby at level 2 to level 36
Apartment units (A1-7, B1-4, C1-2)
RAINWATER DOWN PIPE
PIPE INSTALLATION BRACKET INSTALLATION GROUTING PIPE
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
START START START START
OUTLET & FLOOR TRAP INSTALLATION
MONITORING PROGRESS FINISHING - APARTMENT FINISHING MONITORING APARTMENTUpdate : 09 Sep 15
DESCRIPTION INTERNAL UNIT WORKS (BATHROOM, LIVING ROOM, BEDROOM, KITCHEN)
LEVE
L
AREA
NO
.
GRI
D L
INE WINDOW - SUB FRAME WINDOW - FRAME SLIDING DOOR - FRAME WALL TILE - HT CEILING FRAME FLOOR SCREEDING FLOOR TILE - HT FLOOR SKIRTING - HT KITCHEN - WORKTOP
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualSTART START START START START START START START START START START START START START START START START START START START START START
LEVE
L 8
APAR
TMEN
T
1 A1
2 A2
3 A3
4 A4
5 A5
6 A6
7 A7
8 B1
9 B2
10 B3
11 B4
12 C1
13 C2
14 6/G
15 5a/D
16 1a/B-C
17 5a/D
18 5/D
19 4d-H RC Flat roof
20 5/C-G Apartment corridor
21 4-7/C-H
LEVE
L 9
APAR
TMEN
T
1 A1
2 A2
3 A3
4 A4
5 A5
6 A6
7 A7
8 B1
9 B2
10 B3
11 B4
12 C1
13 C2
14
6/G
15
5a/D
161a/B-C
17
5a/D
185/D
195/C-G Apartment corridor
204-7/C-H
LEVE
L 10
APAR
TMEN
T
1 A1
2 A2
3 A3
4 A4
5 A5
6 A6
7 A7
8 B1
9 B2
10 B3
11 B4
12 C1
13 C2
14
6/G
15
5a/D
161a/B-C
17
5a/D
185/D
LOCA
TIO
N /
RO
OM
TY
PE
STRUCTURE WORKS ADJUSTMENT
WALL - BLOCKWALL STAIRCASE, M&E SHAFT
& RISER
WATERPROOFING ON WET AREA + PONDING
TEST + SCREEDING WALL - SKIMCOAT /
PLASTERING DOOR - SOLID TIMBER
DOOR SUB FRAME SLIDING DOOR - SUB
FRAME LOUVRE ALLUMINIUM -
SUB FRAME WINDOW - LAMINATED
GLASS WINDOW FIX PANEL
SLIDING DOOR - LAMINATED GLASS
SLIDING DOOR WT FIX PANEL
WALL - ACCOUSTIC TREATMENT
WALL - FEATURE WALL TILE - HT - BATHROOM
PAINTING WALL BASED - EMULSION PAINT
FINISH BATHROOM - VANITY
TOP
Escape staircase S3 (basement to level 34)
Escape staircase S4 (basem.t to lower RC flat roof)
Fire/ service lift lobby at basement to level 19 (hotel)
Fire/ service lift lobby at basement to level 36 (service apartment)
Service apartment lift lobby at level 2 to level 36
Apt. unit (A1a-7a, B1a-4a, C1a-2a)
Escape staircase S3 (basement to level 34)
Escape staircase S4 (basem.t to lower RC flat roof)
Fire/ service lift lobby at basement to level 19 (hotel)
Fire/ service lift lobby at basement to level 36 (service apartment)
Service apartment lift lobby at level 2 to level 36
Apartment units (A1-7, B1-4, C1-2)
Escape staircase S3 (basement to level 34)
Escape staircase S4 (basem.t to lower RC flat roof)
Fire/ service lift lobby at basement to level 19 (hotel)
Fire/ service lift lobby at basement to level 36 (service apartment)
Service apartment lift lobby at level 2 to level 36
DESCRIPTION INTERNAL UNIT WORKS (BATHROOM, LIVING ROOM, BEDROOM, KITCHEN)
LEVE
L
AREA
NO
.
GRI
D L
INE WINDOW - SUB FRAME WINDOW - FRAME SLIDING DOOR - FRAME WALL TILE - HT CEILING FRAME FLOOR SCREEDING FLOOR TILE - HT FLOOR SKIRTING - HT KITCHEN - WORKTOP
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualProgress (%)
ActualSTART START START START START START START START START START START START START START START START START START START START START STARTLO
CATI
ON
/ R
OO
M
TYPE
STRUCTURE WORKS ADJUSTMENT
WALL - BLOCKWALL STAIRCASE, M&E SHAFT
& RISER
WATERPROOFING ON WET AREA + PONDING
TEST + SCREEDING WALL - SKIMCOAT /
PLASTERING DOOR - SOLID TIMBER
DOOR SUB FRAME SLIDING DOOR - SUB
FRAME LOUVRE ALLUMINIUM -
SUB FRAME WINDOW - LAMINATED
GLASS WINDOW FIX PANEL
SLIDING DOOR - LAMINATED GLASS
SLIDING DOOR WT FIX PANEL
WALL - ACCOUSTIC TREATMENT
WALL - FEATURE WALL TILE - HT - BATHROOM
PAINTING WALL BASED - EMULSION PAINT
FINISH BATHROOM - VANITY
TOPLE
VEL
10
APAR
TMEN
T
195/C-G Apartment corridor
204-7/C-H
LEVE
L 11
APAR
TMEN
T
1 A1
2 A2
3 A3
4 A4
5 A5
6 A6
7 A7
8 B1
9 B2
10 B3
11 B4
12 C1
13 C2
14
6/G
15
5a/D
161a/B-C
17
5a/D
185/D
195/C-G Apartment corridor
204-7/C-H
LEVE
L 12
APAR
TMEN
T
1 A1
2 A2
3 A3
4 A4
5 A5
6 A6
7 A7
8 B1
9 B2
10 B3
11 B4
12 C1
13 C2
14
6/G
15
5a/D
161a/B-C
17
5a/D
185/D
195/C-G Apartment corridor
204-7/C-H
Apartment units (A1-7, B1-4, C1-2)
Escape staircase S3 (basement to level 34)
Escape staircase S4 (basem.t to lower RC flat roof)
Fire/ service lift lobby at basement to level 19 (hotel)
Fire/ service lift lobby at basement to level 36 (service apartment)
Service apartment lift lobby at level 2 to level 36
Apartment units (A1-7, B1-4, C1-2)
Escape staircase S3 (basement to level 34)
Escape staircase S4 (basem.t to lower RC flat roof)
Fire/ service lift lobby at basement to level 19 (hotel)
Fire/ service lift lobby at basement to level 36 (service apartment)
Service apartment lift lobby at level 2 to level 36
Apartment units (A1-7, B1-4, C1-2)
MONITORING PROGRESS FINISHING - APARTMENT
DESCRIPTION
LEVE
L
AREA
NO
.
GRI
D L
INE
LEVE
L 8
APAR
TMEN
T
1 A1
2 A2
3 A3
4 A4
5 A5
6 A6
7 A7
8 B1
9 B2
10 B3
11 B4
12 C1
13 C2
14 6/G
15 5a/D
16 1a/B-C
17 5a/D
18 5/D
19 4d-H RC Flat roof
20 5/C-G Apartment corridor
21 4-7/C-H
LEVE
L 9
APAR
TMEN
T
1 A1
2 A2
3 A3
4 A4
5 A5
6 A6
7 A7
8 B1
9 B2
10 B3
11 B4
12 C1
13 C2
14
6/G
15
5a/D
161a/B-C
17
5a/D
185/D
195/C-G Apartment corridor
204-7/C-H
LEVE
L 10
APAR
TMEN
T
1 A1
2 A2
3 A3
4 A4
5 A5
6 A6
7 A7
8 B1
9 B2
10 B3
11 B4
12 C1
13 C2
14
6/G
15
5a/D
161a/B-C
17
5a/D
185/D
LOCA
TIO
N /
RO
OM
TY
PE
Escape staircase S3 (basement to level 34)
Escape staircase S4 (basem.t to lower RC flat roof)
Fire/ service lift lobby at basement to level 19 (hotel)
Fire/ service lift lobby at basement to level 36 (service apartment)
Service apartment lift lobby at level 2 to level 36
Apt. unit (A1a-7a, B1a-4a, C1a-2a)
Escape staircase S3 (basement to level 34)
Escape staircase S4 (basem.t to lower RC flat roof)
Fire/ service lift lobby at basement to level 19 (hotel)
Fire/ service lift lobby at basement to level 36 (service apartment)
Service apartment lift lobby at level 2 to level 36
Apartment units (A1-7, B1-4, C1-2)
Escape staircase S3 (basement to level 34)
Escape staircase S4 (basem.t to lower RC flat roof)
Fire/ service lift lobby at basement to level 19 (hotel)
Fire/ service lift lobby at basement to level 36 (service apartment)
Service apartment lift lobby at level 2 to level 36
FINISHING MONITORING APARTMENT FINISHING MONITORING APARTMENTUpdate : 09 Sep 15
INTERNAL UNIT WORKS (BATHROOM, LIVING ROOM, BEDROOM, KITCHEN)
CEILING BOARD LOUVRE ALLUMINIUM IRONMONGERY TIMBER FLOORING - WD SKIRTING - TIMBER BATHROOM - MIRROR
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
START START START START START START START START START START START START START START START START START START START START START
BATHROOM - VANITY TOP
PAINTING CEILING BASED - EMULSION PAINT
FINISH DOOR - SOLID TIMBER
DOOR FRAME DOOR - SOLID TIMBER
DOOR LEAVE RAILING BALCONY - STEEL + LAMINATED
GLASS RAILING PAINTING WALL FINAL - EMULSION PAINT FINISH
PAINTING CEILING FINAL - EMULSION PAINT FINISH
TRESHOLD - ALLUMINIUM
KITCHEN - BACK PAINTED GLASS
BATHROOM - SANITARY FITTING
BATHROOM - TEMPERED CLEAR GLASS
SHOWER SCREEN ID - KITCHEN - CABINET
& SHELF ID - KITCHEN -
APPLIANCES ID - BATHROOM - CABINET & SHELF
ID - BEDROOM - FURNITURE & APPLIANCES
ID - LIVING ROOM - FURNITURE & APPLIANCES
DESCRIPTION
LEVE
L
AREA
NO
.
GRI
D L
INE
LOCA
TIO
N /
RO
OM
TY
PE
LEVE
L 10
APAR
TMEN
T
195/C-G Apartment corridor
204-7/C-H
LEVE
L 11
APAR
TMEN
T
1 A1
2 A2
3 A3
4 A4
5 A5
6 A6
7 A7
8 B1
9 B2
10 B3
11 B4
12 C1
13 C2
14
6/G
15
5a/D
161a/B-C
17
5a/D
185/D
195/C-G Apartment corridor
204-7/C-H
LEVE
L 12
APAR
TMEN
T
1 A1
2 A2
3 A3
4 A4
5 A5
6 A6
7 A7
8 B1
9 B2
10 B3
11 B4
12 C1
13 C2
14
6/G
15
5a/D
161a/B-C
17
5a/D
185/D
195/C-G Apartment corridor
204-7/C-H
Apartment units (A1-7, B1-4, C1-2)
Escape staircase S3 (basement to level 34)
Escape staircase S4 (basem.t to lower RC flat roof)
Fire/ service lift lobby at basement to level 19 (hotel)
Fire/ service lift lobby at basement to level 36 (service apartment)
Service apartment lift lobby at level 2 to level 36
Apartment units (A1-7, B1-4, C1-2)
Escape staircase S3 (basement to level 34)
Escape staircase S4 (basem.t to lower RC flat roof)
Fire/ service lift lobby at basement to level 19 (hotel)
Fire/ service lift lobby at basement to level 36 (service apartment)
Service apartment lift lobby at level 2 to level 36
Apartment units (A1-7, B1-4, C1-2)
INTERNAL UNIT WORKS (BATHROOM, LIVING ROOM, BEDROOM, KITCHEN)
CEILING BOARD LOUVRE ALLUMINIUM IRONMONGERY TIMBER FLOORING - WD SKIRTING - TIMBER BATHROOM - MIRROR
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
START START START START START START START START START START START START START START START START START START START START START
BATHROOM - VANITY TOP
PAINTING CEILING BASED - EMULSION PAINT
FINISH DOOR - SOLID TIMBER
DOOR FRAME DOOR - SOLID TIMBER
DOOR LEAVE RAILING BALCONY - STEEL + LAMINATED
GLASS RAILING PAINTING WALL FINAL - EMULSION PAINT FINISH
PAINTING CEILING FINAL - EMULSION PAINT FINISH
TRESHOLD - ALLUMINIUM
KITCHEN - BACK PAINTED GLASS
BATHROOM - SANITARY FITTING
BATHROOM - TEMPERED CLEAR GLASS
SHOWER SCREEN ID - KITCHEN - CABINET
& SHELF ID - KITCHEN -
APPLIANCES ID - BATHROOM - CABINET & SHELF
ID - BEDROOM - FURNITURE & APPLIANCES
ID - LIVING ROOM - FURNITURE & APPLIANCES
MONITORING PROGRESS FINISHING - APARTMENT
DESCRIPTION
LEVE
L
AREA
NO
.
GRI
D L
INE
LEVE
L 8
APAR
TMEN
T
1 A1
2 A2
3 A3
4 A4
5 A5
6 A6
7 A7
8 B1
9 B2
10 B3
11 B4
12 C1
13 C2
14 6/G
15 5a/D
16 1a/B-C
17 5a/D
18 5/D
19 4d-H RC Flat roof
20 5/C-G Apartment corridor
21 4-7/C-H
LEVE
L 9
APAR
TMEN
T
1 A1
2 A2
3 A3
4 A4
5 A5
6 A6
7 A7
8 B1
9 B2
10 B3
11 B4
12 C1
13 C2
14
6/G
15
5a/D
161a/B-C
17
5a/D
185/D
195/C-G Apartment corridor
204-7/C-H
LEVE
L 10
APAR
TMEN
T
1 A1
2 A2
3 A3
4 A4
5 A5
6 A6
7 A7
8 B1
9 B2
10 B3
11 B4
12 C1
13 C2
14
6/G
15
5a/D
161a/B-C
17
5a/D
185/D
LOCA
TIO
N /
RO
OM
TY
PE
Escape staircase S3 (basement to level 34)
Escape staircase S4 (basem.t to lower RC flat roof)
Fire/ service lift lobby at basement to level 19 (hotel)
Fire/ service lift lobby at basement to level 36 (service apartment)
Service apartment lift lobby at level 2 to level 36
Apt. unit (A1a-7a, B1a-4a, C1a-2a)
Escape staircase S3 (basement to level 34)
Escape staircase S4 (basem.t to lower RC flat roof)
Fire/ service lift lobby at basement to level 19 (hotel)
Fire/ service lift lobby at basement to level 36 (service apartment)
Service apartment lift lobby at level 2 to level 36
Apartment units (A1-7, B1-4, C1-2)
Escape staircase S3 (basement to level 34)
Escape staircase S4 (basem.t to lower RC flat roof)
Fire/ service lift lobby at basement to level 19 (hotel)
Fire/ service lift lobby at basement to level 36 (service apartment)
Service apartment lift lobby at level 2 to level 36
FINISHING MONITORING APARTMENTUpdate : 09 Sep 15
INTERNAL UNIT WORKS (BATHROOM, LIVING ROOM, BEDROOM, KITCHEN) LIFT LOBBY & APARTMENT CORRIDOR M&E RISER AND ROOM (SSAD, HR, ELECT RISER, CW RISER, LPAD, TEL, ELV, WR & AWCS - 10 ROOMS & RISERS)
WALL SKIMCOAT CEMENT SAND SCREED DOOR FRAME DOOR LEAVE IRONMONGERY
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)START START START START START START START START START START START START START START START START START START
ID - LIVING ROOM - FURNITURE & APPLIANCES
CEILING FINISHES - FRAME
WALL EMULSION PAINT - BASED
FLOOR FINISHES - HOMOGENEOUS TILE
SKIRTING - HOMOGENOUS TILE
CEILING FINISHES - GYPSUM BOARD
CEILING FINISHES - FINISH EMULSION PAINT
WALL EMULSION PAINT - FINAL
BACK PAINTED GLASS ON LIFT LOBBY
WALL FINISHES - RENDER / SKIM COAT
CEILING FINISHES - RENDER / SKIM COAT
HOMOGENOUS TILE FOR AWCS
CEILING FINISHES - PAINTING
WALL FINISHING - PAINTING
DESCRIPTION
LEVE
L
AREA
NO
.
GRI
D L
INE
LOCA
TIO
N /
RO
OM
TY
PE
LEVE
L 10
APAR
TMEN
T
195/C-G Apartment corridor
204-7/C-H
LEVE
L 11
APAR
TMEN
T
1 A1
2 A2
3 A3
4 A4
5 A5
6 A6
7 A7
8 B1
9 B2
10 B3
11 B4
12 C1
13 C2
14
6/G
15
5a/D
161a/B-C
17
5a/D
185/D
195/C-G Apartment corridor
204-7/C-H
LEVE
L 12
APAR
TMEN
T
1 A1
2 A2
3 A3
4 A4
5 A5
6 A6
7 A7
8 B1
9 B2
10 B3
11 B4
12 C1
13 C2
14
6/G
15
5a/D
161a/B-C
17
5a/D
185/D
195/C-G Apartment corridor
204-7/C-H
Apartment units (A1-7, B1-4, C1-2)
Escape staircase S3 (basement to level 34)
Escape staircase S4 (basem.t to lower RC flat roof)
Fire/ service lift lobby at basement to level 19 (hotel)
Fire/ service lift lobby at basement to level 36 (service apartment)
Service apartment lift lobby at level 2 to level 36
Apartment units (A1-7, B1-4, C1-2)
Escape staircase S3 (basement to level 34)
Escape staircase S4 (basem.t to lower RC flat roof)
Fire/ service lift lobby at basement to level 19 (hotel)
Fire/ service lift lobby at basement to level 36 (service apartment)
Service apartment lift lobby at level 2 to level 36
Apartment units (A1-7, B1-4, C1-2)
INTERNAL UNIT WORKS (BATHROOM, LIVING ROOM, BEDROOM, KITCHEN) LIFT LOBBY & APARTMENT CORRIDOR M&E RISER AND ROOM (SSAD, HR, ELECT RISER, CW RISER, LPAD, TEL, ELV, WR & AWCS - 10 ROOMS & RISERS)
WALL SKIMCOAT CEMENT SAND SCREED DOOR FRAME DOOR LEAVE IRONMONGERY
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)Actual
Progress (%)START START START START START START START START START START START START START START START START START START
ID - LIVING ROOM - FURNITURE & APPLIANCES
CEILING FINISHES - FRAME
WALL EMULSION PAINT - BASED
FLOOR FINISHES - HOMOGENEOUS TILE
SKIRTING - HOMOGENOUS TILE
CEILING FINISHES - GYPSUM BOARD
CEILING FINISHES - FINISH EMULSION PAINT
WALL EMULSION PAINT - FINAL
BACK PAINTED GLASS ON LIFT LOBBY
WALL FINISHES - RENDER / SKIM COAT
CEILING FINISHES - RENDER / SKIM COAT
HOMOGENOUS TILE FOR AWCS
CEILING FINISHES - PAINTING
WALL FINISHING - PAINTING
MONITORING PROGRESS FINISHING - HOTELUpdate : 09 Sep 15
DESCRIPTION INTERNAL UNIT WORKS (BATHROOM & BEDROOM)
LOCA
TIO
N /
RO
OM
TYP
E
WALL BLOCKWALL WINDOW - SUB FRAME WALL SKIMCOAT CEILING - GYPSUM FRAME WALL PAINTING BASED FLOOR SCREEDING FLOOR TILE SKIRTING - TIMBER CEILING - BASED PAINT IRONMONGERY
Actual Actual Actual Actual Actual Actual Actual Actual ActualProgress (%)
Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual
START START START START START START START START START START START START START START START START START START START START START
LEVE
L 8
1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K
10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K
1 1/A
2 1/G
7 2/C
1 1a/B Linen room
2 1/C Store
3 1a/C Tel/IT
4 1a/G Smoke lobby
5 2/B, 1-2a/B Balcony
6 1a-2/B-H Hotel corridor
7 1-2a/B-M Hotel room 1-25
LEVE
L 9
1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K
10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K
1 1/A
2 1/G
7 2/C
1 1a/B Linen room
2 1a/G Smoke lobby3 1-2b/B-M Hotel room 1-254 1a-2/B-H Hotel corridor5 2/B, 1-2a/B Balcony
LEVE
L 10
1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K
10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K
1 1/A
2 1/G
7 2/C
1 1a/B Linen room2 1a/G Smoke lobby
LEVE
L /
NAM
E O
F FL
OO
R LE
VELS
AS
PER
CON
STRU
CTIO
N &
AU
THO
RITY
DRA
WIN
GS
NO
. / N
AME
OF
FLO
OR
LEVE
LS F
OR
CON
STRU
CTIO
N &
AU
THO
RITY
DRA
WIN
GS
GRI
D L
INE/
NAM
E O
F FL
OO
R LE
VELS
FO
R SI
GN
AGE
AND
HO
TEL
OPE
RATI
ON SLIDING DOOR - SUB
FRAME DOOR ENTRANCE SOLID
TIMBER - SUB FRAME WATERPROOFING ON WET AREA + PONDING
TEST + SCREEDING WINDOW - FRAME +
GLASS WALL TILE - BATHROOM
BATHROOM - VANITY COUNTER
SKIRTING - TILE - BATHROOM
CEILING - GYPSUM BOARD
CEILING TRIM & SHADOW GAP METAL
BEADING DOOR ENTRANCE SOLID TIMBER - FRAME & LEAVE
SLIDING DOOR - FRAME & LEAVE
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Escape staircase S1 (basement to level 20)
Escape staircase S2 (basement to level 19)
Hotel lift lobby at level 3 to level 18
Escape staircase S1 (basement to level 20)
Escape staircase S2 (basement to level 19)
Hotel lift lobby at level 3 to level 18
Escape staircase S1 (basement to level 20)
Escape staircase S2 (basement to level 19)
Hotel lift lobby at level 3 to level 18
DESCRIPTION INTERNAL UNIT WORKS (BATHROOM & BEDROOM)
LOCA
TIO
N /
RO
OM
TYP
E
WALL BLOCKWALL WINDOW - SUB FRAME WALL SKIMCOAT CEILING - GYPSUM FRAME WALL PAINTING BASED FLOOR SCREEDING FLOOR TILE SKIRTING - TIMBER CEILING - BASED PAINT IRONMONGERY
Actual Actual Actual Actual Actual Actual Actual Actual ActualProgress (%)
Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual
START START START START START START START START START START START START START START START START START START START START STARTLEVE
L /
NAM
E O
F FL
OO
R LE
VELS
AS
PER
CON
STRU
CTIO
N &
AU
THO
RITY
DRA
WIN
GS
NO
. / N
AME
OF
FLO
OR
LEVE
LS F
OR
CON
STRU
CTIO
N &
AU
THO
RITY
DRA
WIN
GS
GRI
D L
INE/
NAM
E O
F FL
OO
R LE
VELS
FO
R SI
GN
AGE
AND
HO
TEL
OPE
RATI
ON SLIDING DOOR - SUB
FRAME DOOR ENTRANCE SOLID
TIMBER - SUB FRAME WATERPROOFING ON WET AREA + PONDING
TEST + SCREEDING WINDOW - FRAME +
GLASS WALL TILE - BATHROOM
BATHROOM - VANITY COUNTER
SKIRTING - TILE - BATHROOM
CEILING - GYPSUM BOARD
CEILING TRIM & SHADOW GAP METAL
BEADING DOOR ENTRANCE SOLID TIMBER - FRAME & LEAVE
SLIDING DOOR - FRAME & LEAVE
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
LEVE
L 10
3 1-2b/B-M Hotel room 1-254 1a-2/B-H Hotel corridor5 2/B, 1-2a/B Balcony
LEVE
L 11
1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K
10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K
1 1/A
2 1/G
7 2/C
1 1a/B Linen room2 1a/G Smoke lobby3 1-2b/B-M Hotel room 1-254 1a-2/B-H Hotel corridor5 2/B, 1-2a/B Balcony
LEVE
L 12
1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K
10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K
1 1/A
2 1/G
7 2/C
1 1a/B Linen room2 1a/G Smoke lobby3 1-2b/B-M Hotel room 1-254 1a-2/B-H Hotel corridor5 2/B, 1-2a/B Balcony
Escape staircase S1 (basement to level 20)
Escape staircase S2 (basement to level 19)
Hotel lift lobby at level 3 to level 18
Escape staircase S1 (basement to level 20)
Escape staircase S2 (basement to level 19)
Hotel lift lobby at level 3 to level 18
MONITORING PROGRESS FINISHING - HOTEL
DESCRIPTION
LOCA
TIO
N /
RO
OM
TYP
E
LEVE
L 8
1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K
10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K
1 1/A
2 1/G
7 2/C
1 1a/B Linen room
2 1/C Store
3 1a/C Tel/IT
4 1a/G Smoke lobby
5 2/B, 1-2a/B Balcony
6 1a-2/B-H Hotel corridor
7 1-2a/B-M Hotel room 1-25
LEVE
L 9
1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K
10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K
1 1/A
2 1/G
7 2/C
1 1a/B Linen room
2 1a/G Smoke lobby3 1-2b/B-M Hotel room 1-254 1a-2/B-H Hotel corridor5 2/B, 1-2a/B Balcony
LEVE
L 10
1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K
10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K
1 1/A
2 1/G
7 2/C
1 1a/B Linen room2 1a/G Smoke lobby
LEVE
L /
NAM
E O
F FL
OO
R LE
VELS
AS
PER
CON
STRU
CTIO
N &
AU
THO
RITY
DRA
WIN
GS
NO
. / N
AME
OF
FLO
OR
LEVE
LS F
OR
CON
STRU
CTIO
N &
AU
THO
RITY
DRA
WIN
GS
GRI
D L
INE/
NAM
E O
F FL
OO
R LE
VELS
FO
R SI
GN
AGE
AND
HO
TEL
OPE
RATI
ON
Escape staircase S1 (basement to level 20)
Escape staircase S2 (basement to level 19)
Hotel lift lobby at level 3 to level 18
Escape staircase S1 (basement to level 20)
Escape staircase S2 (basement to level 19)
Hotel lift lobby at level 3 to level 18
Escape staircase S1 (basement to level 20)
Escape staircase S2 (basement to level 19)
Hotel lift lobby at level 3 to level 18
INTERNAL UNIT WORKS (BATHROOM & BEDROOM) LIFT LOBBY & HOTEL CORRIDOR
CEILING - FINISH PAINT WALL PAINTING FINISH BAHTROOM - MIRROR WALL - SKIMCOAT FLOOR - SCREEDING
Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual
START START START START START START START START START START START START START START START START START START START START START
BATHROOM - SANITARY FITTING
BATHROOM - CISTERN MOVEABLE COVER IN
GRANITE FINISH BATHROOM -
ARTWORK BATHROOM -
TEMPERED GLASS SHELVES
ID - BATHROOM - COUNTER DRAWER, VANITY SHELVES IN
SOLID TIMBER FINISH
ID - BEDROOM - ARCHITRAVE IN SOLID
TIMBER FINISH ID - BEDROOM -
DRAPERY
ID - BEDROOM - BEDHEAD FRAME IN
ALUMINIUM & LAMINATE FINISH
ID - BEDROOM - UPHOLSTERED FINISH
ID - BEDROOM - MIRROR WORKS
ID - BEDROOM - FLOOR FINISH CARPET
ID - BEDROOM - FURNITURE & APPLIANCES
CONCRETE CURB ON PIPE CHASE DOOR
CEILING - FRAME INSTALLATION
PIPE CHASE DOOR LOUVRE & TIMBER
HOLLOW CORE - FRAME
PIPE CHASE DOOR LOUVRE & TIMBER
HOLLOW CORE - LEAVE
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
DESCRIPTION
LOCA
TIO
N /
RO
OM
TYP
E
LEVE
L /
NAM
E O
F FL
OO
R LE
VELS
AS
PER
CON
STRU
CTIO
N &
AU
THO
RITY
DRA
WIN
GS
NO
. / N
AME
OF
FLO
OR
LEVE
LS F
OR
CON
STRU
CTIO
N &
AU
THO
RITY
DRA
WIN
GS
GRI
D L
INE/
NAM
E O
F FL
OO
R LE
VELS
FO
R SI
GN
AGE
AND
HO
TEL
OPE
RATI
ON
LEVE
L 10
3 1-2b/B-M Hotel room 1-254 1a-2/B-H Hotel corridor5 2/B, 1-2a/B Balcony
LEVE
L 11
1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K
10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K
1 1/A
2 1/G
7 2/C
1 1a/B Linen room2 1a/G Smoke lobby3 1-2b/B-M Hotel room 1-254 1a-2/B-H Hotel corridor5 2/B, 1-2a/B Balcony
LEVE
L 12
1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K
10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K
1 1/A
2 1/G
7 2/C
1 1a/B Linen room2 1a/G Smoke lobby3 1-2b/B-M Hotel room 1-254 1a-2/B-H Hotel corridor5 2/B, 1-2a/B Balcony
Escape staircase S1 (basement to level 20)
Escape staircase S2 (basement to level 19)
Hotel lift lobby at level 3 to level 18
Escape staircase S1 (basement to level 20)
Escape staircase S2 (basement to level 19)
Hotel lift lobby at level 3 to level 18
INTERNAL UNIT WORKS (BATHROOM & BEDROOM) LIFT LOBBY & HOTEL CORRIDOR
CEILING - FINISH PAINT WALL PAINTING FINISH BAHTROOM - MIRROR WALL - SKIMCOAT FLOOR - SCREEDING
Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual
START START START START START START START START START START START START START START START START START START START START START
BATHROOM - SANITARY FITTING
BATHROOM - CISTERN MOVEABLE COVER IN
GRANITE FINISH BATHROOM -
ARTWORK BATHROOM -
TEMPERED GLASS SHELVES
ID - BATHROOM - COUNTER DRAWER, VANITY SHELVES IN
SOLID TIMBER FINISH
ID - BEDROOM - ARCHITRAVE IN SOLID
TIMBER FINISH ID - BEDROOM -
DRAPERY
ID - BEDROOM - BEDHEAD FRAME IN
ALUMINIUM & LAMINATE FINISH
ID - BEDROOM - UPHOLSTERED FINISH
ID - BEDROOM - MIRROR WORKS
ID - BEDROOM - FLOOR FINISH CARPET
ID - BEDROOM - FURNITURE & APPLIANCES
CONCRETE CURB ON PIPE CHASE DOOR
CEILING - FRAME INSTALLATION
PIPE CHASE DOOR LOUVRE & TIMBER
HOLLOW CORE - FRAME
PIPE CHASE DOOR LOUVRE & TIMBER
HOLLOW CORE - LEAVE
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
MONITORING PROGRESS FINISHING - HOTEL
DESCRIPTION
LOCA
TIO
N /
RO
OM
TYP
E
LEVE
L 8
1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K
10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K
1 1/A
2 1/G
7 2/C
1 1a/B Linen room
2 1/C Store
3 1a/C Tel/IT
4 1a/G Smoke lobby
5 2/B, 1-2a/B Balcony
6 1a-2/B-H Hotel corridor
7 1-2a/B-M Hotel room 1-25
LEVE
L 9
1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K
10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K
1 1/A
2 1/G
7 2/C
1 1a/B Linen room
2 1a/G Smoke lobby3 1-2b/B-M Hotel room 1-254 1a-2/B-H Hotel corridor5 2/B, 1-2a/B Balcony
LEVE
L 10
1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K
10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K
1 1/A
2 1/G
7 2/C
1 1a/B Linen room2 1a/G Smoke lobby
LEVE
L /
NAM
E O
F FL
OO
R LE
VELS
AS
PER
CON
STRU
CTIO
N &
AU
THO
RITY
DRA
WIN
GS
NO
. / N
AME
OF
FLO
OR
LEVE
LS F
OR
CON
STRU
CTIO
N &
AU
THO
RITY
DRA
WIN
GS
GRI
D L
INE/
NAM
E O
F FL
OO
R LE
VELS
FO
R SI
GN
AGE
AND
HO
TEL
OPE
RATI
ON
Escape staircase S1 (basement to level 20)
Escape staircase S2 (basement to level 19)
Hotel lift lobby at level 3 to level 18
Escape staircase S1 (basement to level 20)
Escape staircase S2 (basement to level 19)
Hotel lift lobby at level 3 to level 18
Escape staircase S1 (basement to level 20)
Escape staircase S2 (basement to level 19)
Hotel lift lobby at level 3 to level 18
LIFT LOBBY & HOTEL CORRIDOR M&E RISER AND ROOM
CEILING - PAINTING CEMENT SAND SCREED DOOR FRAME DOOR LEAVE IRONMONGERY
Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual
START START START START START START START START START START START START START START START START
SKIRTING IN SOLID TIMBER
CEILING - GYPSUM BOARD
CEILING - PORTAL CEILING IN BACKPAINTED
GLASS FINISH
WALL - END WALL IN COPPER FREE MIRROR
FINISH ID WALL - IN WALL
COVERING FINISH ID FLOOR - CARPET
INSTALLATION WALL FINISHES -
RENDER / SKIM COAT CEILING FINISHES -
RENDER / SKIM COAT HOMOGENOUS TILE
FOR AWCS CEILING FINISHES -
PAINTING WALL FINISHING -
PAINTING
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
DESCRIPTION
LOCA
TIO
N /
RO
OM
TYP
E
LEVE
L /
NAM
E O
F FL
OO
R LE
VELS
AS
PER
CON
STRU
CTIO
N &
AU
THO
RITY
DRA
WIN
GS
NO
. / N
AME
OF
FLO
OR
LEVE
LS F
OR
CON
STRU
CTIO
N &
AU
THO
RITY
DRA
WIN
GS
GRI
D L
INE/
NAM
E O
F FL
OO
R LE
VELS
FO
R SI
GN
AGE
AND
HO
TEL
OPE
RATI
ON
LEVE
L 10
3 1-2b/B-M Hotel room 1-254 1a-2/B-H Hotel corridor5 2/B, 1-2a/B Balcony
LEVE
L 11
1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K
10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K
1 1/A
2 1/G
7 2/C
1 1a/B Linen room2 1a/G Smoke lobby3 1-2b/B-M Hotel room 1-254 1a-2/B-H Hotel corridor5 2/B, 1-2a/B Balcony
LEVE
L 12
1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K
10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K
1 1/A
2 1/G
7 2/C
1 1a/B Linen room2 1a/G Smoke lobby3 1-2b/B-M Hotel room 1-254 1a-2/B-H Hotel corridor5 2/B, 1-2a/B Balcony
Escape staircase S1 (basement to level 20)
Escape staircase S2 (basement to level 19)
Hotel lift lobby at level 3 to level 18
Escape staircase S1 (basement to level 20)
Escape staircase S2 (basement to level 19)
Hotel lift lobby at level 3 to level 18
LIFT LOBBY & HOTEL CORRIDOR M&E RISER AND ROOM
CEILING - PAINTING CEMENT SAND SCREED DOOR FRAME DOOR LEAVE IRONMONGERY
Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual
START START START START START START START START START START START START START START START START
SKIRTING IN SOLID TIMBER
CEILING - GYPSUM BOARD
CEILING - PORTAL CEILING IN BACKPAINTED
GLASS FINISH
WALL - END WALL IN COPPER FREE MIRROR
FINISH ID WALL - IN WALL
COVERING FINISH ID FLOOR - CARPET
INSTALLATION WALL FINISHES -
RENDER / SKIM COAT CEILING FINISHES -
RENDER / SKIM COAT HOMOGENOUS TILE
FOR AWCS CEILING FINISHES -
PAINTING WALL FINISHING -
PAINTING
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
MONITORING PROGRESS FINISHING - PODIUMUpdate : 09 Sep 15
PODIUMLE
VEL
AREA
NO
.
GRI
D L
INE
LOCATIONBLOCKWALL WALL - GRANITE FLOOR - GRANITE
Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual ActualSTART START START START START START START START START START START START START START START START START START START
LIFT
CO
RE &
ESC
APE
STAI
RCAS
E
1 1/A Escape staircase S1
2 1/G Escape staircase S2
3 6/G Escape staircase S3
4 5a/D Escape staircase S4
5 1a/B-C Fire/ service lift lobby
6 5a/D Fire/ service lift lobby
7 2/C Hotel lift lobby
8 5/D Service apartment lift lobby
BASE
MEN
T
LIFT
CO
RE
1 01-2/A Hotel store 1,2
4a/C-D Store 3
2 4a-5/C-D Store (service apt.)
3 7/G Carpark store
4 1-2/F-G Staircase lobby
PARK
ING
& D
RIVE
WAY
5 5/C Passage
6 1-7/A-J Car parking
7 1-7/A-J Motor parking
8 4a-E Handicapped parking space
9 1/E Ramp 1
M&
E SE
RVIC
E RO
OM
10 1/C Fan room
11 3a/B Chiller plant room
12 4/B Flood retention tank (below)
13 4a/A-B Sump pit
14 5/A Domestic tank 1, 2 (retail)
15 5/A Pump room 1 (retail)
16 5a/B Pump room 2 (hotel)
17 6/B Pump room 3 (service apt.)
18 6/C-D Pump room 4 (service Apt. + retail)
19 5a-6/D Pump room 5 (hotel)
20 5b-5c/H Pump room 6 (hotel)
21 5b-5c/J Pump room 7 (retail/ carpark)
22 5a/A AC make up tank 1, 2 (hotel)
23 7/A Domestic tank 3 (hotel)
24 7/B Domestic tank 4 (service apt.)
25 5a-6/C Wet riser tank 1, 2
26 6-7/C Hose reel tank 1, 2
27 7/D Fresh air fanroom (car park)
28 5b/H Sprinkler pump stage 1
29 7/J-K Sprinkler tank 1, 2
30 2/H
31 01/G OSD, on-site detention tank
32 01/F Rain water harvesting tank
LIFT
CO
RE &
ESC
APE
STAI
RCAS
E
1 1/A Escape staircase S1
2 1/G Escape staircase S2
3 6/G Escape staircase S3
4 5a/D Escape staircase S4
5 1a/B-C Fire/ service lift lobby
6 5a/D Fire/ service lift lobby
7 2/C Hotel lift lobby
8 5/D Service apartment lift lobby
LEVE
L1
M&
E AN
D S
ERVI
CE R
OO
M 1 1a/A Store
2 5a/D Janitor
3 5a/D-E Refuse
4 5a-D Refuse bin
5 4a-5B/D-F Store 1, 2,3,4,5
6 1-H Ramp 1
RETA
IL
7 2a-4a/D-L Retail lobby
8 1-6/C-G Passage 1, 2, 3, 4
9 3/M Retail service lift lobby
10 1-7/A-M Retail unit 1,2,3,4,5,6,7,8,9,10
11 4a-5b/C-F Retail male & female toilet
12 4/F Glass lift
BLOCKWALL M&E SHAFT & RISER
WALL - SKIMCOAT WITH PAINT FINISH
WATERPROOFING + PONDING TEST +
SCREEDINGFIRE RATE TIMBER
DOOR - SUB FRAMESTEEL DOOR - SUB
FRAMETIMBER FLUSH DOOR -
SUB FRAMEWALL - HOMOGENEOUS
TILEWALL - RENDER /
SKIMCOATCEILING - RENDER /
SKIMCOAT
CEILING - RENDER / SKIMCOAT WITH PAINT
FINISH
CEILING - FRAME FOR PLASTER BOARD AND EMULTION PAINTED
FINISH
CEILING - FRAME FOR EXPOSED GRID GYPSUM
CEILING PANELFLOOR - CEMENT SAND
SCREEDFLOOR - FLOWCRETE
COATINGFLOOR -
HOMOGENEOUS TILEFLOOR - RENDER /
SKIMCOAT
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
TYPI
CAL
COM
MO
N A
REA
- BA
SEM
ENT
TO
LEVE
L 36
Grease interceptor system (hotel&retail)
TYPI
CAL
COM
MO
N A
REA
- BA
SEM
ENT
TO
LEVE
L 36
MONITORING PROGRESS FINISHING - PODIUMUpdate : 09 Sep 15
PODIUMLE
VEL
AREA
NO
.
GRI
D L
INE
LOCATIONBLOCKWALL WALL - GRANITE FLOOR - GRANITE
Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual ActualSTART START START START START START START START START START START START START START START START START START START
BLOCKWALL M&E SHAFT & RISER
WALL - SKIMCOAT WITH PAINT FINISH
WATERPROOFING + PONDING TEST +
SCREEDINGFIRE RATE TIMBER
DOOR - SUB FRAMESTEEL DOOR - SUB
FRAMETIMBER FLUSH DOOR -
SUB FRAMEWALL - HOMOGENEOUS
TILEWALL - RENDER /
SKIMCOATCEILING - RENDER /
SKIMCOAT
CEILING - RENDER / SKIMCOAT WITH PAINT
FINISH
CEILING - FRAME FOR PLASTER BOARD AND EMULTION PAINTED
FINISH
CEILING - FRAME FOR EXPOSED GRID GYPSUM
CEILING PANELFLOOR - CEMENT SAND
SCREEDFLOOR - FLOWCRETE
COATINGFLOOR -
HOMOGENEOUS TILEFLOOR - RENDER /
SKIMCOAT
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
LEVE
L1
RETA
IL
13 3a/F Escalator
LIFT
CO
RE &
ESC
APE
STAI
RCAS
E
1 1/A Escape staircase S1
2 1/G Escape staircase S2
3 6/G Escape staircase S3
4 5a/D Escape staircase S4
5 1a/B-C Fire/ service lift lobby
6 5a/D Fire/ service lift lobby
7 2/C Hotel lift lobby
8 5/D Service apartment lift lobby
LEVE
L 2
M&
E &
SER
VICE
RO
OM
(HO
TEL)
1 2/C Hotel lobby
2 3/B-C Reception
3 1/C Receiving area & purchasing
4 2/D Luggage room
5 1a/B LPG Farm 1 (hotel)
6 2/B Loading & Unloading bay
7 2a/B Receiving area & platform
8 1/C-D Bin center 1
9 1/C-D Store
M&
E &
SER
VICE
RO
OM
(SER
VICE
APA
RTM
ENT
& R
ETAI
L)
10 5a/E Retail service lift lobby
11 5/C Letter box
12 5a/C Fire control room (retail, apt.)
13 6/C MDF room
14 6/C-D Bin center 2
15 5a-6/D AWCS cable room
16 5a-6/D-E AWCS
17 5a/E CWSP
18 5a/E Full vacuumload station
19 6/E Loading & Unloading
20 5a/F Consumer HT room
21 5a/G TNB room
22 6/G TNB meter room
23 5b/G-H M&E room
24 5c/H Diesel fuel pump room
25 5b/H Bomba vehicle turning circle
26 5b/J LPG Farm 2 (retail)
CIRC
ULA
TIO
N 27 4a/E-F Passage
28 01/B Ramp 2
29 2a-7/A-C Drop off
RETA
IL
30 2b-4a/C-K Retail lobby
31 01-5c/C-M Retail unit 1,2,3,4,5,6,7
32 5/E Retail male & female toilet
33 3b/E Glass lift
34 3/E Escalator
LIFT
CO
RE &
ESC
APE
STAI
RCAS
E
1 1/A Escape staircase S1
2 1/G Escape staircase S2
3 6/G Escape staircase S3
4 5a/D Escape staircase S4
5 1a/B-C Fire/ service lift lobby
6 5a/D Fire/ service lift lobby
7 2/C Hotel lift lobby
8 5/D Service apartment lift lobby
LEVE
L 3A
& 3
B
1 3/J Retail lift lobby
M&
E SE
RVIC
E RO
OM
2 1a/B M&E room
3 1/C Store
4 4/E Smoke spill fan room
5 4a/E Copper pipes compartment
6 1a/F Smoke spill fresh air pump room
CARP
AKIN
G &
DRI
VEW
AY
7 2b-E Pedestrian walk way
8 1-5a/C-J Passage
9 1-7/B-M Car parking
10 2a/C Handicapped parking space
11 3/E-F Stair from 3A to 3B
12 01-6/C-K Ramp
TYPI
CAL
COM
MO
N A
REA
- BA
SEM
ENT
TO L
EVEL
36
TYPI
CAL
COM
MO
N A
REA
- BA
SEM
ENT
TO
LEVE
L 36
RETA IL
MONITORING PROGRESS FINISHING - PODIUMUpdate : 09 Sep 15
PODIUMLE
VEL
AREA
NO
.
GRI
D L
INE
LOCATIONBLOCKWALL WALL - GRANITE FLOOR - GRANITE
Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual ActualSTART START START START START START START START START START START START START START START START START START START
BLOCKWALL M&E SHAFT & RISER
WALL - SKIMCOAT WITH PAINT FINISH
WATERPROOFING + PONDING TEST +
SCREEDINGFIRE RATE TIMBER
DOOR - SUB FRAMESTEEL DOOR - SUB
FRAMETIMBER FLUSH DOOR -
SUB FRAMEWALL - HOMOGENEOUS
TILEWALL - RENDER /
SKIMCOATCEILING - RENDER /
SKIMCOAT
CEILING - RENDER / SKIMCOAT WITH PAINT
FINISH
CEILING - FRAME FOR PLASTER BOARD AND EMULTION PAINTED
FINISH
CEILING - FRAME FOR EXPOSED GRID GYPSUM
CEILING PANELFLOOR - CEMENT SAND
SCREEDFLOOR - FLOWCRETE
COATINGFLOOR -
HOMOGENEOUS TILEFLOOR - RENDER /
SKIMCOAT
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
LEVE
L 3A
& 3
B
OTH
ER R
OO
MS 13 2-2a/E-F Car park management office
14 1/H Male prayer room
15 2/H Female prayer room
LIFT
CO
RE &
ESC
APE
STAI
RCAS
E
1 1/A Escape staircase S1
2 1/G Escape staircase S2
3 6/G Escape staircase S3
4 5a/D Escape staircase S4
5 1a/B-C Fire/ service lift lobby
6 5a/D Fire/ service lift lobby
7 2/C Hotel lift lobby
8 5/D Service apartment lift lobby
LEVE
L 4A
& 4
B
1 1-2/B-C Store 1, 2
2 4a/D-E Store 3
3 3/M Retail lift lobby
PARK
ING
& D
RIVE
WAY
4 1-5/B-M Passage
5 2/E-F Stair from 4A to 4B
6 01-6/C-K Ramp
7 1-7/B-M Car parking
8 2a/B, 5-C Handicaped parking space
9 2-2a/J-M Motocycle
LIFT
CO
RE &
ESC
APE
STAI
RCAS
E
1 1/A Escape staircase S1
2 1/G Escape staircase S2
3 6/G Escape staircase S3
4 5a/D Escape staircase S4
5 1a/B-C Fire/ service lift lobby
6 5a/D Fire/ service lift lobby
7 2/C Hotel lift lobby
8 5/D Service apartment lift lobby
LEVE
L 5A
& 5
B
1 1-2/B-C Store 1, 2
2 4a/D-E Store 3
3 2/B Genset room (hotel)
4 3/M Retail lift lobby
PARK
ING
& D
RIVE
WAY
5 1-5/B-M Passage
6 2/E-F Stair to up from 4A to 4B
7 01-6/C-K Ramp
8 1-7/B-M Car parking
9 2a/B, 5-C Handicaped parking space
10 2-2a/J-M Motocycle
LIFT
CO
RE &
ESC
APE
STAI
RCAS
E
1 1/A Escape staircase S1
2 1/G Escape staircase S2
3 6/G Escape staircase S3
4 5a/D Escape staircase S4
5 1a/B-C Fire/ service lift lobby
6 5a/D Fire/ service lift lobby
7 2/C Hotel lift lobby
8 5/D Service apartment lift lobby
LEVE
L 6A
& 6
B
1 3/M Retail lift lobby
2 1-2/B-C Store 1, 2
3 4a/D-E Store 3
4 6/G Store 4
5 6/E Management office
M&
E
6 2a/B Main switch board room (hotel)
7 2b/B Transformer room (hotel)
8 5a-6/C Transformer (apartment)
9 6/C
10 5a-6/C-D Switch gear room (apartment)
11 4a/E CW pump room
12 5/E EFF & CW. Tank
13 6/H Transformer room (retail)
14 6/J Main switch boardroom (retail)
15 6/K Genset room (retail)
TYPI
CAL
COM
MO
N A
REA
- BA
SEM
ENT
TO
LEVE
L 36
LIFT
LO
BBY
&
SERV
ICE
R.M
TYPI
CAL
COM
MO
N A
REA
- BA
SEM
ENT
TO
LEVE
L 36
LIFT
LO
BBY
&
SERV
ICE
ROO
M
TYPI
CAL
COM
MO
N A
REA
- BA
SEM
ENT
TO
LEVE
L 36
LIFT
LO
BBY
& S
ERVI
CE
ROO
M
Main switch board room (apartment)
MONITORING PROGRESS FINISHING - PODIUMUpdate : 09 Sep 15
PODIUMLE
VEL
AREA
NO
.
GRI
D L
INE
LOCATIONBLOCKWALL WALL - GRANITE FLOOR - GRANITE
Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual ActualSTART START START START START START START START START START START START START START START START START START START
BLOCKWALL M&E SHAFT & RISER
WALL - SKIMCOAT WITH PAINT FINISH
WATERPROOFING + PONDING TEST +
SCREEDINGFIRE RATE TIMBER
DOOR - SUB FRAMESTEEL DOOR - SUB
FRAMETIMBER FLUSH DOOR -
SUB FRAMEWALL - HOMOGENEOUS
TILEWALL - RENDER /
SKIMCOATCEILING - RENDER /
SKIMCOAT
CEILING - RENDER / SKIMCOAT WITH PAINT
FINISH
CEILING - FRAME FOR PLASTER BOARD AND EMULTION PAINTED
FINISH
CEILING - FRAME FOR EXPOSED GRID GYPSUM
CEILING PANELFLOOR - CEMENT SAND
SCREEDFLOOR - FLOWCRETE
COATINGFLOOR -
HOMOGENEOUS TILEFLOOR - RENDER /
SKIMCOAT
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
LEVE
L 6A
& 6
B
M&
E
16 1a/F Fire pump room (hotel)
17 1/F HR tank 1, 2
18 2/F WR tank 1, 2
PARK
ING 19 01-6/C-K Ramp
20 5a/B, 2/K Motocycle parking
21 01-7/B-M Car parking
TYPI
CAL
COM
MO
N A
REA
- BAS
EMEN
T TO
LEV
EL 3
6
LIFT
CO
RE &
ESC
APE
STAI
RCAS
E
1 1/A Escape staircase S1
2 1/G Escape staircase S2
3 6/G Escape staircase S3
4 5a/D Escape staircase S4
5 1a/B-C Fire/ service lift lobby
6 5a/D Fire/ service lift lobby
7 2/C Hotel lift lobby
8 5/D Service apartment lift lobby
LEVE
L 7
M&
E AN
D S
TORE
1 7/H AV store
2 5a-6/C Spa store
3 5/D-E Store
4 1/C Bins room
5 1/C-D AWCS
6 6/C-D Staircase pressurization room
CUST
OM
ER (H
OTE
L)
7 3a/C Reception & check-in counter
8 3a/B Business center/ library
9 4/B Social space
10 4a/B Idea room
11 2/E Bakery
12 3/G All day dining
13 3c-3d/M Pantry
14 5/E Pre-function room
15 4c-G Function room 1
16 5b/G Function room 2
17 4a-6/B Treatment 1, 2, 3
18 5a-6/B Couple treatment room
19 6-7/B Zacuzzi
20 6/D Male & female toilet
FRO
NT
OF
HO
USE
(HO
TEL)
21 2-2a/B Gen. cash
22 1a/B Storage
23 2-2a/B Account manager
24 2a/B Director finance
25 3/B GM office
26 5/C Sales & marketing
27 4-4a/c-D Hotel front office
28 4-4a/C Manager 1, 2
29 4-4a/D Luggage room
30 5/D Store
MAI
N K
ITCH
EN
31 5c/E Food preparation
32 1-1a/C Dry store
33 1-1a/C-D Walk-in freezer
34 2/C-D Walk-in chiller
35 1/D Freeze
36 1/D Chiller
37 2/D Pastry store
MAI
N K
ITCH
EN
38 1/D-E Meat prep
39 1/E Vege prep
40 2/E Pastry & bakery
41 2/E Chocolate room
42 1/E-F Cold kitchen
43 1/F RM. Service office
44 1/F Chef office
45 1/F Room service
MONITORING PROGRESS FINISHING - PODIUMUpdate : 09 Sep 15
PODIUMLE
VEL
AREA
NO
.
GRI
D L
INE
LOCATIONBLOCKWALL WALL - GRANITE FLOOR - GRANITE
Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual ActualSTART START START START START START START START START START START START START START START START START START START
BLOCKWALL M&E SHAFT & RISER
WALL - SKIMCOAT WITH PAINT FINISH
WATERPROOFING + PONDING TEST +
SCREEDINGFIRE RATE TIMBER
DOOR - SUB FRAMESTEEL DOOR - SUB
FRAMETIMBER FLUSH DOOR -
SUB FRAMEWALL - HOMOGENEOUS
TILEWALL - RENDER /
SKIMCOATCEILING - RENDER /
SKIMCOAT
CEILING - RENDER / SKIMCOAT WITH PAINT
FINISH
CEILING - FRAME FOR PLASTER BOARD AND EMULTION PAINTED
FINISH
CEILING - FRAME FOR EXPOSED GRID GYPSUM
CEILING PANELFLOOR - CEMENT SAND
SCREEDFLOOR - FLOWCRETE
COATINGFLOOR -
HOMOGENEOUS TILEFLOOR - RENDER /
SKIMCOAT
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
LEVE
L 7
MAI
N K
ITCH
EN
46 1/F-G Steward store
47 1-1a/F-G Pot & pan washing
48 1/G Dish washing
49 2/F Cooking area
LAN
DSC
APE
50 5/A-B Balcony
51 4b-7/H-M Deck extension for F&B funtions
TYPI
CAL
COM
MO
N A
REA
- BAS
EMEN
T TO
LEV
EL 3
6
LIFT
CO
RE &
ESC
APE
STAI
RCAS
E
1 1/A Escape staircase S1
2 1/G Escape staircase S2
3 6/G Escape staircase S3
4 5a/D Escape staircase S4
5 1a/B-C Fire/ service lift lobby
6 5a/D Fire/ service lift lobby
7 2/C Hotel lift lobby
8 5/D Service apartment lift lobby
LEVE
L 7
MEZ
ZAN
INE
M&
E
1 1/C Bin room
2 1/C AWCS
3 2/B Ahu room 1
4 1/G Ahu room 2
5 01/F-G Balancing tank
6 01/G Pump room
7 1a/B-C M&E area
OFF
ICE
(BO
H)
8 1a/B I.T. Store
9 2-2a/B-C I.T. office
10 2b/B Server room
11 3/B Uniform issue
12 6/E Function room storage
13 6/H AV room
14 2/E HK manager
15 2/E-F HR. DIR. Office
16 2/E-F F&B DIR. Office
17 2/F-G Executive chef
18 1/F Working area
19 1/E Training/ meeting room
20 1a/D Corridors
SERV
ICE
AREA
(BO
H)
21 1-1a/C Security & receiving area
22 2/D Flower shop
23 2/D House keeping office
24 1/D Soiled linen room
25 1/D Valet laundry
26 1/D-E Clean linen room
27 1/C-D Trolley bay
28 3a/B Clinic
29 4/B
30 5a/B Team dinning room
31 6/B Kitchen
32 6/B-C Kitchen storage
33 6/C Staff social lounge
34 6/D Male & female prayer room
1 1/A Escape staircase S1
2 1/G Escape staircase S2
3 6/G Escape staircase S3
4 5a/D Escape staircase S4
LEVE
L 8
FACI
LITY
11 3a/C Gym
Male & female changing room, toilet
TYPI
CAL
COM
MO
N A
REA
- B
ASE
MEN
T TO
LEV
EL
36
LIFT
CO
RE &
ESC
APE
ST
AIR
CASE
MONITORING PROGRESS FINISHING - PODIUMUpdate : 09 Sep 15
PODIUMLE
VEL
AREA
NO
.
GRI
D L
INE
LOCATIONBLOCKWALL WALL - GRANITE FLOOR - GRANITE
Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual ActualSTART START START START START START START START START START START START START START START START START START START
BLOCKWALL M&E SHAFT & RISER
WALL - SKIMCOAT WITH PAINT FINISH
WATERPROOFING + PONDING TEST +
SCREEDINGFIRE RATE TIMBER
DOOR - SUB FRAMESTEEL DOOR - SUB
FRAMETIMBER FLUSH DOOR -
SUB FRAMEWALL - HOMOGENEOUS
TILEWALL - RENDER /
SKIMCOATCEILING - RENDER /
SKIMCOAT
CEILING - RENDER / SKIMCOAT WITH PAINT
FINISH
CEILING - FRAME FOR PLASTER BOARD AND EMULTION PAINTED
FINISH
CEILING - FRAME FOR EXPOSED GRID GYPSUM
CEILING PANELFLOOR - CEMENT SAND
SCREEDFLOOR - FLOWCRETE
COATINGFLOOR -
HOMOGENEOUS TILEFLOOR - RENDER /
SKIMCOAT
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
LEVE
L 8
FACI
LITY
12 3/B Male, female changing room
13 3/F Swimming pool
14 3/J Pantry
15 4d/J Spiral stair
16 2a-4/B-H Deck
17 2a-7/A-D
18 2b-7/B-J Steps
19 2b-7/B-J Ramp
Roof top garden for apartment tower
MONITORING PROGRESS FINISHING - PODIUM
PODIUMLE
VEL
AREA
NO
.
GRI
D L
INE
LOCATION
LIFT
CO
RE &
ESC
APE
STAI
RCAS
E
1 1/A Escape staircase S1
2 1/G Escape staircase S2
3 6/G Escape staircase S3
4 5a/D Escape staircase S4
5 1a/B-C Fire/ service lift lobby
6 5a/D Fire/ service lift lobby
7 2/C Hotel lift lobby
8 5/D Service apartment lift lobby
BASE
MEN
T
LIFT
CO
RE
1 01-2/A Hotel store 1,2
4a/C-D Store 3
2 4a-5/C-D Store (service apt.)
3 7/G Carpark store
4 1-2/F-G Staircase lobby
PARK
ING
& D
RIVE
WAY
5 5/C Passage
6 1-7/A-J Car parking
7 1-7/A-J Motor parking
8 4a-E Handicapped parking space
9 1/E Ramp 1
M&
E SE
RVIC
E RO
OM
10 1/C Fan room
11 3a/B Chiller plant room
12 4/B Flood retention tank (below)
13 4a/A-B Sump pit
14 5/A Domestic tank 1, 2 (retail)
15 5/A Pump room 1 (retail)
16 5a/B Pump room 2 (hotel)
17 6/B Pump room 3 (service apt.)
18 6/C-D Pump room 4 (service Apt. + retail)
19 5a-6/D Pump room 5 (hotel)
20 5b-5c/H Pump room 6 (hotel)
21 5b-5c/J Pump room 7 (retail/ carpark)
22 5a/A AC make up tank 1, 2 (hotel)
23 7/A Domestic tank 3 (hotel)
24 7/B Domestic tank 4 (service apt.)
25 5a-6/C Wet riser tank 1, 2
26 6-7/C Hose reel tank 1, 2
27 7/D Fresh air fanroom (car park)
28 5b/H Sprinkler pump stage 1
29 7/J-K Sprinkler tank 1, 2
30 2/H
31 01/G OSD, on-site detention tank
32 01/F Rain water harvesting tank
LIFT
CO
RE &
ESC
APE
STAI
RCAS
E
1 1/A Escape staircase S1
2 1/G Escape staircase S2
3 6/G Escape staircase S3
4 5a/D Escape staircase S4
5 1a/B-C Fire/ service lift lobby
6 5a/D Fire/ service lift lobby
7 2/C Hotel lift lobby
8 5/D Service apartment lift lobby
LEVE
L1
M&
E AN
D S
ERVI
CE R
OO
M 1 1a/A Store
2 5a/D Janitor
3 5a/D-E Refuse
4 5a-D Refuse bin
5 4a-5B/D-F Store 1, 2,3,4,5
6 1-H Ramp 1
RETA
IL
7 2a-4a/D-L Retail lobby
8 1-6/C-G Passage 1, 2, 3, 4
9 3/M Retail service lift lobby
10 1-7/A-M Retail unit 1,2,3,4,5,6,7,8,9,10
11 4a-5b/C-F Retail male & female toilet
12 4/F Glass lift
TYPI
CAL
COM
MO
N A
REA
- BA
SEM
ENT
TO
LEVE
L 36
Grease interceptor system (hotel&retail)
TYPI
CAL
COM
MO
N A
REA
- BA
SEM
ENT
TO
LEVE
L 36
MONITORING PROGRESS FINISHING - PODIUM
PODIUM
SKIRTING - TIMBER WALL BASED PAINTING WALL FINAL PAINTING STEEL DOOR - LEAVE STEEL ROLLER SHUTTER
Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual ActualSTART START START START START START START START START START START START START START START START START START
FLOOR - RENDER / SKIMCOAT
SKIRTING - HOMOGENOUS TILE
FLOOR - RENDER / SKIMCOAT WITH PAINT
FINISHFIRE RATE TIMBER
DOOR - LEAVETIMBER FLUSH DOOR -
LEAVE
CEILING - GYPSUM PLASTER BOARD AND EMULTION PAINTED
FINISH
CEILING - EXPOSED GRID GYPSUM CEILING
PANELCEILING BASED
PAINTINGCEILING FINAL
PAINTINGIRONMONGERY - FIRE RATE TIMBER DOOR
IRONMONGERY - TIMBER FLUSH DOOR
IRONMONGERY - STEEL DOOR
IRONMONGERY - STEEL ROLLER SHUTTER
SANITARY WARE - FAUCET
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
MONITORING PROGRESS FINISHING - PODIUM
PODIUMLE
VEL
AREA
NO
.
GRI
D L
INE
LOCATION
LEVE
L1
RETA
IL
13 3a/F Escalator
LIFT
CO
RE &
ESC
APE
STAI
RCAS
E
1 1/A Escape staircase S1
2 1/G Escape staircase S2
3 6/G Escape staircase S3
4 5a/D Escape staircase S4
5 1a/B-C Fire/ service lift lobby
6 5a/D Fire/ service lift lobby
7 2/C Hotel lift lobby
8 5/D Service apartment lift lobby
LEVE
L 2
M&
E &
SER
VICE
RO
OM
(HO
TEL)
1 2/C Hotel lobby
2 3/B-C Reception
3 1/C Receiving area & purchasing
4 2/D Luggage room
5 1a/B LPG Farm 1 (hotel)
6 2/B Loading & Unloading bay
7 2a/B Receiving area & platform
8 1/C-D Bin center 1
9 1/C-D Store
M&
E &
SER
VICE
RO
OM
(SER
VICE
APA
RTM
ENT
& R
ETAI
L)
10 5a/E Retail service lift lobby
11 5/C Letter box
12 5a/C Fire control room (retail, apt.)
13 6/C MDF room
14 6/C-D Bin center 2
15 5a-6/D AWCS cable room
16 5a-6/D-E AWCS
17 5a/E CWSP
18 5a/E Full vacuumload station
19 6/E Loading & Unloading
20 5a/F Consumer HT room
21 5a/G TNB room
22 6/G TNB meter room
23 5b/G-H M&E room
24 5c/H Diesel fuel pump room
25 5b/H Bomba vehicle turning circle
26 5b/J LPG Farm 2 (retail)
CIRC
ULA
TIO
N 27 4a/E-F Passage
28 01/B Ramp 2
29 2a-7/A-C Drop off
RETA
IL
30 2b-4a/C-K Retail lobby
31 01-5c/C-M Retail unit 1,2,3,4,5,6,7
32 5/E Retail male & female toilet
33 3b/E Glass lift
34 3/E Escalator
LIFT
CO
RE &
ESC
APE
STAI
RCAS
E
1 1/A Escape staircase S1
2 1/G Escape staircase S2
3 6/G Escape staircase S3
4 5a/D Escape staircase S4
5 1a/B-C Fire/ service lift lobby
6 5a/D Fire/ service lift lobby
7 2/C Hotel lift lobby
8 5/D Service apartment lift lobby
LEVE
L 3A
& 3
B
1 3/J Retail lift lobby
M&
E SE
RVIC
E RO
OM
2 1a/B M&E room
3 1/C Store
4 4/E Smoke spill fan room
5 4a/E Copper pipes compartment
6 1a/F Smoke spill fresh air pump room
CARP
AKIN
G &
DRI
VEW
AY
7 2b-E Pedestrian walk way
8 1-5a/C-J Passage
9 1-7/B-M Car parking
10 2a/C Handicapped parking space
11 3/E-F Stair from 3A to 3B
12 01-6/C-K Ramp
TYPI
CAL
COM
MO
N A
REA
- BA
SEM
ENT
TO L
EVEL
36
TYPI
CAL
COM
MO
N A
REA
- BA
SEM
ENT
TO
LEVE
L 36
RETA IL
MONITORING PROGRESS FINISHING - PODIUM
PODIUM
SKIRTING - TIMBER WALL BASED PAINTING WALL FINAL PAINTING STEEL DOOR - LEAVE STEEL ROLLER SHUTTER
Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual ActualSTART START START START START START START START START START START START START START START START START START
FLOOR - RENDER / SKIMCOAT
SKIRTING - HOMOGENOUS TILE
FLOOR - RENDER / SKIMCOAT WITH PAINT
FINISHFIRE RATE TIMBER
DOOR - LEAVETIMBER FLUSH DOOR -
LEAVE
CEILING - GYPSUM PLASTER BOARD AND EMULTION PAINTED
FINISH
CEILING - EXPOSED GRID GYPSUM CEILING
PANELCEILING BASED
PAINTINGCEILING FINAL
PAINTINGIRONMONGERY - FIRE RATE TIMBER DOOR
IRONMONGERY - TIMBER FLUSH DOOR
IRONMONGERY - STEEL DOOR
IRONMONGERY - STEEL ROLLER SHUTTER
SANITARY WARE - FAUCET
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
MONITORING PROGRESS FINISHING - PODIUM
PODIUMLE
VEL
AREA
NO
.
GRI
D L
INE
LOCATION
LEVE
L 3A
& 3
B
OTH
ER R
OO
MS 13 2-2a/E-F Car park management office
14 1/H Male prayer room
15 2/H Female prayer room
LIFT
CO
RE &
ESC
APE
STAI
RCAS
E
1 1/A Escape staircase S1
2 1/G Escape staircase S2
3 6/G Escape staircase S3
4 5a/D Escape staircase S4
5 1a/B-C Fire/ service lift lobby
6 5a/D Fire/ service lift lobby
7 2/C Hotel lift lobby
8 5/D Service apartment lift lobby
LEVE
L 4A
& 4
B
1 1-2/B-C Store 1, 2
2 4a/D-E Store 3
3 3/M Retail lift lobby
PARK
ING
& D
RIVE
WAY
4 1-5/B-M Passage
5 2/E-F Stair from 4A to 4B
6 01-6/C-K Ramp
7 1-7/B-M Car parking
8 2a/B, 5-C Handicaped parking space
9 2-2a/J-M Motocycle
LIFT
CO
RE &
ESC
APE
STAI
RCAS
E
1 1/A Escape staircase S1
2 1/G Escape staircase S2
3 6/G Escape staircase S3
4 5a/D Escape staircase S4
5 1a/B-C Fire/ service lift lobby
6 5a/D Fire/ service lift lobby
7 2/C Hotel lift lobby
8 5/D Service apartment lift lobby
LEVE
L 5A
& 5
B
1 1-2/B-C Store 1, 2
2 4a/D-E Store 3
3 2/B Genset room (hotel)
4 3/M Retail lift lobby
PARK
ING
& D
RIVE
WAY
5 1-5/B-M Passage
6 2/E-F Stair to up from 4A to 4B
7 01-6/C-K Ramp
8 1-7/B-M Car parking
9 2a/B, 5-C Handicaped parking space
10 2-2a/J-M Motocycle
LIFT
CO
RE &
ESC
APE
STAI
RCAS
E
1 1/A Escape staircase S1
2 1/G Escape staircase S2
3 6/G Escape staircase S3
4 5a/D Escape staircase S4
5 1a/B-C Fire/ service lift lobby
6 5a/D Fire/ service lift lobby
7 2/C Hotel lift lobby
8 5/D Service apartment lift lobby
LEVE
L 6A
& 6
B
1 3/M Retail lift lobby
2 1-2/B-C Store 1, 2
3 4a/D-E Store 3
4 6/G Store 4
5 6/E Management office
M&
E
6 2a/B Main switch board room (hotel)
7 2b/B Transformer room (hotel)
8 5a-6/C Transformer (apartment)
9 6/C
10 5a-6/C-D Switch gear room (apartment)
11 4a/E CW pump room
12 5/E EFF & CW. Tank
13 6/H Transformer room (retail)
14 6/J Main switch boardroom (retail)
15 6/K Genset room (retail)
TYPI
CAL
COM
MO
N A
REA
- BA
SEM
ENT
TO
LEVE
L 36
LIFT
LO
BBY
&
SERV
ICE
R.M
TYPI
CAL
COM
MO
N A
REA
- BA
SEM
ENT
TO
LEVE
L 36
LIFT
LO
BBY
&
SERV
ICE
ROO
M
TYPI
CAL
COM
MO
N A
REA
- BA
SEM
ENT
TO
LEVE
L 36
LIFT
LO
BBY
& S
ERVI
CE
ROO
M
Main switch board room (apartment)
MONITORING PROGRESS FINISHING - PODIUM
PODIUM
SKIRTING - TIMBER WALL BASED PAINTING WALL FINAL PAINTING STEEL DOOR - LEAVE STEEL ROLLER SHUTTER
Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual ActualSTART START START START START START START START START START START START START START START START START START
FLOOR - RENDER / SKIMCOAT
SKIRTING - HOMOGENOUS TILE
FLOOR - RENDER / SKIMCOAT WITH PAINT
FINISHFIRE RATE TIMBER
DOOR - LEAVETIMBER FLUSH DOOR -
LEAVE
CEILING - GYPSUM PLASTER BOARD AND EMULTION PAINTED
FINISH
CEILING - EXPOSED GRID GYPSUM CEILING
PANELCEILING BASED
PAINTINGCEILING FINAL
PAINTINGIRONMONGERY - FIRE RATE TIMBER DOOR
IRONMONGERY - TIMBER FLUSH DOOR
IRONMONGERY - STEEL DOOR
IRONMONGERY - STEEL ROLLER SHUTTER
SANITARY WARE - FAUCET
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
MONITORING PROGRESS FINISHING - PODIUM
PODIUMLE
VEL
AREA
NO
.
GRI
D L
INE
LOCATION
LEVE
L 6A
& 6
B
M&
E
16 1a/F Fire pump room (hotel)
17 1/F HR tank 1, 2
18 2/F WR tank 1, 2
PARK
ING 19 01-6/C-K Ramp
20 5a/B, 2/K Motocycle parking
21 01-7/B-M Car parking
TYPI
CAL
COM
MO
N A
REA
- BAS
EMEN
T TO
LEV
EL 3
6
LIFT
CO
RE &
ESC
APE
STAI
RCAS
E
1 1/A Escape staircase S1
2 1/G Escape staircase S2
3 6/G Escape staircase S3
4 5a/D Escape staircase S4
5 1a/B-C Fire/ service lift lobby
6 5a/D Fire/ service lift lobby
7 2/C Hotel lift lobby
8 5/D Service apartment lift lobby
LEVE
L 7
M&
E AN
D S
TORE
1 7/H AV store
2 5a-6/C Spa store
3 5/D-E Store
4 1/C Bins room
5 1/C-D AWCS
6 6/C-D Staircase pressurization room
CUST
OM
ER (H
OTE
L)
7 3a/C Reception & check-in counter
8 3a/B Business center/ library
9 4/B Social space
10 4a/B Idea room
11 2/E Bakery
12 3/G All day dining
13 3c-3d/M Pantry
14 5/E Pre-function room
15 4c-G Function room 1
16 5b/G Function room 2
17 4a-6/B Treatment 1, 2, 3
18 5a-6/B Couple treatment room
19 6-7/B Zacuzzi
20 6/D Male & female toilet
FRO
NT
OF
HO
USE
(HO
TEL)
21 2-2a/B Gen. cash
22 1a/B Storage
23 2-2a/B Account manager
24 2a/B Director finance
25 3/B GM office
26 5/C Sales & marketing
27 4-4a/c-D Hotel front office
28 4-4a/C Manager 1, 2
29 4-4a/D Luggage room
30 5/D Store
MAI
N K
ITCH
EN
31 5c/E Food preparation
32 1-1a/C Dry store
33 1-1a/C-D Walk-in freezer
34 2/C-D Walk-in chiller
35 1/D Freeze
36 1/D Chiller
37 2/D Pastry store
MAI
N K
ITCH
EN
38 1/D-E Meat prep
39 1/E Vege prep
40 2/E Pastry & bakery
41 2/E Chocolate room
42 1/E-F Cold kitchen
43 1/F RM. Service office
44 1/F Chef office
45 1/F Room service
MONITORING PROGRESS FINISHING - PODIUM
PODIUM
SKIRTING - TIMBER WALL BASED PAINTING WALL FINAL PAINTING STEEL DOOR - LEAVE STEEL ROLLER SHUTTER
Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual ActualSTART START START START START START START START START START START START START START START START START START
FLOOR - RENDER / SKIMCOAT
SKIRTING - HOMOGENOUS TILE
FLOOR - RENDER / SKIMCOAT WITH PAINT
FINISHFIRE RATE TIMBER
DOOR - LEAVETIMBER FLUSH DOOR -
LEAVE
CEILING - GYPSUM PLASTER BOARD AND EMULTION PAINTED
FINISH
CEILING - EXPOSED GRID GYPSUM CEILING
PANELCEILING BASED
PAINTINGCEILING FINAL
PAINTINGIRONMONGERY - FIRE RATE TIMBER DOOR
IRONMONGERY - TIMBER FLUSH DOOR
IRONMONGERY - STEEL DOOR
IRONMONGERY - STEEL ROLLER SHUTTER
SANITARY WARE - FAUCET
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
MONITORING PROGRESS FINISHING - PODIUM
PODIUMLE
VEL
AREA
NO
.
GRI
D L
INE
LOCATION
LEVE
L 7
MAI
N K
ITCH
EN
46 1/F-G Steward store
47 1-1a/F-G Pot & pan washing
48 1/G Dish washing
49 2/F Cooking area
LAN
DSC
APE
50 5/A-B Balcony
51 4b-7/H-M Deck extension for F&B funtions
TYPI
CAL
COM
MO
N A
REA
- BAS
EMEN
T TO
LEV
EL 3
6
LIFT
CO
RE &
ESC
APE
STAI
RCAS
E
1 1/A Escape staircase S1
2 1/G Escape staircase S2
3 6/G Escape staircase S3
4 5a/D Escape staircase S4
5 1a/B-C Fire/ service lift lobby
6 5a/D Fire/ service lift lobby
7 2/C Hotel lift lobby
8 5/D Service apartment lift lobby
LEVE
L 7
MEZ
ZAN
INE
M&
E
1 1/C Bin room
2 1/C AWCS
3 2/B Ahu room 1
4 1/G Ahu room 2
5 01/F-G Balancing tank
6 01/G Pump room
7 1a/B-C M&E area
OFF
ICE
(BO
H)
8 1a/B I.T. Store
9 2-2a/B-C I.T. office
10 2b/B Server room
11 3/B Uniform issue
12 6/E Function room storage
13 6/H AV room
14 2/E HK manager
15 2/E-F HR. DIR. Office
16 2/E-F F&B DIR. Office
17 2/F-G Executive chef
18 1/F Working area
19 1/E Training/ meeting room
20 1a/D Corridors
SERV
ICE
AREA
(BO
H)
21 1-1a/C Security & receiving area
22 2/D Flower shop
23 2/D House keeping office
24 1/D Soiled linen room
25 1/D Valet laundry
26 1/D-E Clean linen room
27 1/C-D Trolley bay
28 3a/B Clinic
29 4/B
30 5a/B Team dinning room
31 6/B Kitchen
32 6/B-C Kitchen storage
33 6/C Staff social lounge
34 6/D Male & female prayer room
1 1/A Escape staircase S1
2 1/G Escape staircase S2
3 6/G Escape staircase S3
4 5a/D Escape staircase S4
LEVE
L 8
FACI
LITY
11 3a/C Gym
Male & female changing room, toilet
TYPI
CAL
COM
MO
N A
REA
- B
ASE
MEN
T TO
LEV
EL
36
LIFT
CO
RE &
ESC
APE
ST
AIR
CASE
MONITORING PROGRESS FINISHING - PODIUM
PODIUM
SKIRTING - TIMBER WALL BASED PAINTING WALL FINAL PAINTING STEEL DOOR - LEAVE STEEL ROLLER SHUTTER
Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual ActualSTART START START START START START START START START START START START START START START START START START
FLOOR - RENDER / SKIMCOAT
SKIRTING - HOMOGENOUS TILE
FLOOR - RENDER / SKIMCOAT WITH PAINT
FINISHFIRE RATE TIMBER
DOOR - LEAVETIMBER FLUSH DOOR -
LEAVE
CEILING - GYPSUM PLASTER BOARD AND EMULTION PAINTED
FINISH
CEILING - EXPOSED GRID GYPSUM CEILING
PANELCEILING BASED
PAINTINGCEILING FINAL
PAINTINGIRONMONGERY - FIRE RATE TIMBER DOOR
IRONMONGERY - TIMBER FLUSH DOOR
IRONMONGERY - STEEL DOOR
IRONMONGERY - STEEL ROLLER SHUTTER
SANITARY WARE - FAUCET
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
MONITORING PROGRESS FINISHING - PODIUM
PODIUMLE
VEL
AREA
NO
.
GRI
D L
INE
LOCATION
LEVE
L 8
FACI
LITY
12 3/B Male, female changing room
13 3/F Swimming pool
14 3/J Pantry
15 4d/J Spiral stair
16 2a-4/B-H Deck
17 2a-7/A-D
18 2b-7/B-J Steps
19 2b-7/B-J Ramp
Roof top garden for apartment tower
MONITORING PROGRESS FINISHING - PODIUM
PODIUM
SKIRTING - TIMBER WALL BASED PAINTING WALL FINAL PAINTING STEEL DOOR - LEAVE STEEL ROLLER SHUTTER
Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual ActualSTART START START START START START START START START START START START START START START START START START
FLOOR - RENDER / SKIMCOAT
SKIRTING - HOMOGENOUS TILE
FLOOR - RENDER / SKIMCOAT WITH PAINT
FINISHFIRE RATE TIMBER
DOOR - LEAVETIMBER FLUSH DOOR -
LEAVE
CEILING - GYPSUM PLASTER BOARD AND EMULTION PAINTED
FINISH
CEILING - EXPOSED GRID GYPSUM CEILING
PANELCEILING BASED
PAINTINGCEILING FINAL
PAINTINGIRONMONGERY - FIRE RATE TIMBER DOOR
IRONMONGERY - TIMBER FLUSH DOOR
IRONMONGERY - STEEL DOOR
IRONMONGERY - STEEL ROLLER SHUTTER
SANITARY WARE - FAUCET
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
Progress (%)
MONITORING PROGRESS FINISHING - PODIUM
PODIUMLE
VEL
AREA
NO
.
GRI
D L
INE
LOCATION
LIFT
CO
RE &
ESC
APE
STAI
RCAS
E
1 1/A Escape staircase S1
2 1/G Escape staircase S2
3 6/G Escape staircase S3
4 5a/D Escape staircase S4
5 1a/B-C Fire/ service lift lobby
6 5a/D Fire/ service lift lobby
7 2/C Hotel lift lobby
8 5/D Service apartment lift lobby
BASE
MEN
T
LIFT
CO
RE
1 01-2/A Hotel store 1,2
4a/C-D Store 3
2 4a-5/C-D Store (service apt.)
3 7/G Carpark store
4 1-2/F-G Staircase lobby
PARK
ING
& D
RIVE
WAY
5 5/C Passage
6 1-7/A-J Car parking
7 1-7/A-J Motor parking
8 4a-E Handicapped parking space
9 1/E Ramp 1
M&
E SE
RVIC
E RO
OM
10 1/C Fan room
11 3a/B Chiller plant room
12 4/B Flood retention tank (below)
13 4a/A-B Sump pit
14 5/A Domestic tank 1, 2 (retail)
15 5/A Pump room 1 (retail)
16 5a/B Pump room 2 (hotel)
17 6/B Pump room 3 (service apt.)
18 6/C-D Pump room 4 (service Apt. + retail)
19 5a-6/D Pump room 5 (hotel)
20 5b-5c/H Pump room 6 (hotel)
21 5b-5c/J Pump room 7 (retail/ carpark)
22 5a/A AC make up tank 1, 2 (hotel)
23 7/A Domestic tank 3 (hotel)
24 7/B Domestic tank 4 (service apt.)
25 5a-6/C Wet riser tank 1, 2
26 6-7/C Hose reel tank 1, 2
27 7/D Fresh air fanroom (car park)
28 5b/H Sprinkler pump stage 1
29 7/J-K Sprinkler tank 1, 2
30 2/H
31 01/G OSD, on-site detention tank
32 01/F Rain water harvesting tank
LIFT
CO
RE &
ESC
APE
STAI
RCAS
E
1 1/A Escape staircase S1
2 1/G Escape staircase S2
3 6/G Escape staircase S3
4 5a/D Escape staircase S4
5 1a/B-C Fire/ service lift lobby
6 5a/D Fire/ service lift lobby
7 2/C Hotel lift lobby
8 5/D Service apartment lift lobby
LEVE
L1
M&
E AN
D S
ERVI
CE R
OO
M 1 1a/A Store
2 5a/D Janitor
3 5a/D-E Refuse
4 5a-D Refuse bin
5 4a-5B/D-F Store 1, 2,3,4,5
6 1-H Ramp 1
RETA
IL
7 2a-4a/D-L Retail lobby
8 1-6/C-G Passage 1, 2, 3, 4
9 3/M Retail service lift lobby
10 1-7/A-M Retail unit 1,2,3,4,5,6,7,8,9,10
11 4a-5b/C-F Retail male & female toilet
12 4/F Glass lift
TYPI
CAL
COM
MO
N A
REA
- BA
SEM
ENT
TO
LEVE
L 36
Grease interceptor system (hotel&retail)
TYPI
CAL
COM
MO
N A
REA
- BA
SEM
ENT
TO
LEVE
L 36
PODIUM
SANITARY WARE RAILING
Actual Actual Actual ActualSTART START START START
BACK PAINTED GLASS ON LIFT LOBBY APARTMENT
BALUSTRADE / BOLLARD
Progress (%)
Progress (%)
Progress (%)
Progress (%)
MONITORING PROGRESS FINISHING - PODIUM
PODIUMLE
VEL
AREA
NO
.
GRI
D L
INE
LOCATION
LEVE
L1
RETA
IL
13 3a/F Escalator
LIFT
CO
RE &
ESC
APE
STAI
RCAS
E
1 1/A Escape staircase S1
2 1/G Escape staircase S2
3 6/G Escape staircase S3
4 5a/D Escape staircase S4
5 1a/B-C Fire/ service lift lobby
6 5a/D Fire/ service lift lobby
7 2/C Hotel lift lobby
8 5/D Service apartment lift lobby
LEVE
L 2
M&
E &
SER
VICE
RO
OM
(HO
TEL)
1 2/C Hotel lobby
2 3/B-C Reception
3 1/C Receiving area & purchasing
4 2/D Luggage room
5 1a/B LPG Farm 1 (hotel)
6 2/B Loading & Unloading bay
7 2a/B Receiving area & platform
8 1/C-D Bin center 1
9 1/C-D Store
M&
E &
SER
VICE
RO
OM
(SER
VICE
APA
RTM
ENT
& R
ETAI
L)
10 5a/E Retail service lift lobby
11 5/C Letter box
12 5a/C Fire control room (retail, apt.)
13 6/C MDF room
14 6/C-D Bin center 2
15 5a-6/D AWCS cable room
16 5a-6/D-E AWCS
17 5a/E CWSP
18 5a/E Full vacuumload station
19 6/E Loading & Unloading
20 5a/F Consumer HT room
21 5a/G TNB room
22 6/G TNB meter room
23 5b/G-H M&E room
24 5c/H Diesel fuel pump room
25 5b/H Bomba vehicle turning circle
26 5b/J LPG Farm 2 (retail)
CIRC
ULA
TIO
N 27 4a/E-F Passage
28 01/B Ramp 2
29 2a-7/A-C Drop off
RETA
IL
30 2b-4a/C-K Retail lobby
31 01-5c/C-M Retail unit 1,2,3,4,5,6,7
32 5/E Retail male & female toilet
33 3b/E Glass lift
34 3/E Escalator
LIFT
CO
RE &
ESC
APE
STAI
RCAS
E
1 1/A Escape staircase S1
2 1/G Escape staircase S2
3 6/G Escape staircase S3
4 5a/D Escape staircase S4
5 1a/B-C Fire/ service lift lobby
6 5a/D Fire/ service lift lobby
7 2/C Hotel lift lobby
8 5/D Service apartment lift lobby
LEVE
L 3A
& 3
B
1 3/J Retail lift lobby
M&
E SE
RVIC
E RO
OM
2 1a/B M&E room
3 1/C Store
4 4/E Smoke spill fan room
5 4a/E Copper pipes compartment
6 1a/F Smoke spill fresh air pump room
CARP
AKIN
G &
DRI
VEW
AY
7 2b-E Pedestrian walk way
8 1-5a/C-J Passage
9 1-7/B-M Car parking
10 2a/C Handicapped parking space
11 3/E-F Stair from 3A to 3B
12 01-6/C-K Ramp
TYPI
CAL
COM
MO
N A
REA
- BA
SEM
ENT
TO L
EVEL
36
TYPI
CAL
COM
MO
N A
REA
- BA
SEM
ENT
TO
LEVE
L 36
RETA IL
PODIUM
SANITARY WARE RAILING
Actual Actual Actual ActualSTART START START START
BACK PAINTED GLASS ON LIFT LOBBY APARTMENT
BALUSTRADE / BOLLARD
Progress (%)
Progress (%)
Progress (%)
Progress (%)
MONITORING PROGRESS FINISHING - PODIUM
PODIUMLE
VEL
AREA
NO
.
GRI
D L
INE
LOCATION
LEVE
L 3A
& 3
B
OTH
ER R
OO
MS 13 2-2a/E-F Car park management office
14 1/H Male prayer room
15 2/H Female prayer room
LIFT
CO
RE &
ESC
APE
STAI
RCAS
E
1 1/A Escape staircase S1
2 1/G Escape staircase S2
3 6/G Escape staircase S3
4 5a/D Escape staircase S4
5 1a/B-C Fire/ service lift lobby
6 5a/D Fire/ service lift lobby
7 2/C Hotel lift lobby
8 5/D Service apartment lift lobby
LEVE
L 4A
& 4
B
1 1-2/B-C Store 1, 2
2 4a/D-E Store 3
3 3/M Retail lift lobby
PARK
ING
& D
RIVE
WAY
4 1-5/B-M Passage
5 2/E-F Stair from 4A to 4B
6 01-6/C-K Ramp
7 1-7/B-M Car parking
8 2a/B, 5-C Handicaped parking space
9 2-2a/J-M Motocycle
LIFT
CO
RE &
ESC
APE
STAI
RCAS
E
1 1/A Escape staircase S1
2 1/G Escape staircase S2
3 6/G Escape staircase S3
4 5a/D Escape staircase S4
5 1a/B-C Fire/ service lift lobby
6 5a/D Fire/ service lift lobby
7 2/C Hotel lift lobby
8 5/D Service apartment lift lobby
LEVE
L 5A
& 5
B
1 1-2/B-C Store 1, 2
2 4a/D-E Store 3
3 2/B Genset room (hotel)
4 3/M Retail lift lobby
PARK
ING
& D
RIVE
WAY
5 1-5/B-M Passage
6 2/E-F Stair to up from 4A to 4B
7 01-6/C-K Ramp
8 1-7/B-M Car parking
9 2a/B, 5-C Handicaped parking space
10 2-2a/J-M Motocycle
LIFT
CO
RE &
ESC
APE
STAI
RCAS
E
1 1/A Escape staircase S1
2 1/G Escape staircase S2
3 6/G Escape staircase S3
4 5a/D Escape staircase S4
5 1a/B-C Fire/ service lift lobby
6 5a/D Fire/ service lift lobby
7 2/C Hotel lift lobby
8 5/D Service apartment lift lobby
LEVE
L 6A
& 6
B
1 3/M Retail lift lobby
2 1-2/B-C Store 1, 2
3 4a/D-E Store 3
4 6/G Store 4
5 6/E Management office
M&
E
6 2a/B Main switch board room (hotel)
7 2b/B Transformer room (hotel)
8 5a-6/C Transformer (apartment)
9 6/C
10 5a-6/C-D Switch gear room (apartment)
11 4a/E CW pump room
12 5/E EFF & CW. Tank
13 6/H Transformer room (retail)
14 6/J Main switch boardroom (retail)
15 6/K Genset room (retail)
TYPI
CAL
COM
MO
N A
REA
- BA
SEM
ENT
TO
LEVE
L 36
LIFT
LO
BBY
&
SERV
ICE
R.M
TYPI
CAL
COM
MO
N A
REA
- BA
SEM
ENT
TO
LEVE
L 36
LIFT
LO
BBY
&
SERV
ICE
ROO
M
TYPI
CAL
COM
MO
N A
REA
- BA
SEM
ENT
TO
LEVE
L 36
LIFT
LO
BBY
& S
ERVI
CE
ROO
M
Main switch board room (apartment)
PODIUM
SANITARY WARE RAILING
Actual Actual Actual ActualSTART START START START
BACK PAINTED GLASS ON LIFT LOBBY APARTMENT
BALUSTRADE / BOLLARD
Progress (%)
Progress (%)
Progress (%)
Progress (%)
MONITORING PROGRESS FINISHING - PODIUM
PODIUMLE
VEL
AREA
NO
.
GRI
D L
INE
LOCATION
LEVE
L 6A
& 6
B
M&
E
16 1a/F Fire pump room (hotel)
17 1/F HR tank 1, 2
18 2/F WR tank 1, 2
PARK
ING 19 01-6/C-K Ramp
20 5a/B, 2/K Motocycle parking
21 01-7/B-M Car parking
TYPI
CAL
COM
MO
N A
REA
- BAS
EMEN
T TO
LEV
EL 3
6
LIFT
CO
RE &
ESC
APE
STAI
RCAS
E
1 1/A Escape staircase S1
2 1/G Escape staircase S2
3 6/G Escape staircase S3
4 5a/D Escape staircase S4
5 1a/B-C Fire/ service lift lobby
6 5a/D Fire/ service lift lobby
7 2/C Hotel lift lobby
8 5/D Service apartment lift lobby
LEVE
L 7
M&
E AN
D S
TORE
1 7/H AV store
2 5a-6/C Spa store
3 5/D-E Store
4 1/C Bins room
5 1/C-D AWCS
6 6/C-D Staircase pressurization room
CUST
OM
ER (H
OTE
L)
7 3a/C Reception & check-in counter
8 3a/B Business center/ library
9 4/B Social space
10 4a/B Idea room
11 2/E Bakery
12 3/G All day dining
13 3c-3d/M Pantry
14 5/E Pre-function room
15 4c-G Function room 1
16 5b/G Function room 2
17 4a-6/B Treatment 1, 2, 3
18 5a-6/B Couple treatment room
19 6-7/B Zacuzzi
20 6/D Male & female toilet
FRO
NT
OF
HO
USE
(HO
TEL)
21 2-2a/B Gen. cash
22 1a/B Storage
23 2-2a/B Account manager
24 2a/B Director finance
25 3/B GM office
26 5/C Sales & marketing
27 4-4a/c-D Hotel front office
28 4-4a/C Manager 1, 2
29 4-4a/D Luggage room
30 5/D Store
MAI
N K
ITCH
EN
31 5c/E Food preparation
32 1-1a/C Dry store
33 1-1a/C-D Walk-in freezer
34 2/C-D Walk-in chiller
35 1/D Freeze
36 1/D Chiller
37 2/D Pastry store
MAI
N K
ITCH
EN
38 1/D-E Meat prep
39 1/E Vege prep
40 2/E Pastry & bakery
41 2/E Chocolate room
42 1/E-F Cold kitchen
43 1/F RM. Service office
44 1/F Chef office
45 1/F Room service
PODIUM
SANITARY WARE RAILING
Actual Actual Actual ActualSTART START START START
BACK PAINTED GLASS ON LIFT LOBBY APARTMENT
BALUSTRADE / BOLLARD
Progress (%)
Progress (%)
Progress (%)
Progress (%)
MONITORING PROGRESS FINISHING - PODIUM
PODIUMLE
VEL
AREA
NO
.
GRI
D L
INE
LOCATION
LEVE
L 7
MAI
N K
ITCH
EN
46 1/F-G Steward store
47 1-1a/F-G Pot & pan washing
48 1/G Dish washing
49 2/F Cooking area
LAN
DSC
APE
50 5/A-B Balcony
51 4b-7/H-M Deck extension for F&B funtions
TYPI
CAL
COM
MO
N A
REA
- BAS
EMEN
T TO
LEV
EL 3
6
LIFT
CO
RE &
ESC
APE
STAI
RCAS
E
1 1/A Escape staircase S1
2 1/G Escape staircase S2
3 6/G Escape staircase S3
4 5a/D Escape staircase S4
5 1a/B-C Fire/ service lift lobby
6 5a/D Fire/ service lift lobby
7 2/C Hotel lift lobby
8 5/D Service apartment lift lobby
LEVE
L 7
MEZ
ZAN
INE
M&
E
1 1/C Bin room
2 1/C AWCS
3 2/B Ahu room 1
4 1/G Ahu room 2
5 01/F-G Balancing tank
6 01/G Pump room
7 1a/B-C M&E area
OFF
ICE
(BO
H)
8 1a/B I.T. Store
9 2-2a/B-C I.T. office
10 2b/B Server room
11 3/B Uniform issue
12 6/E Function room storage
13 6/H AV room
14 2/E HK manager
15 2/E-F HR. DIR. Office
16 2/E-F F&B DIR. Office
17 2/F-G Executive chef
18 1/F Working area
19 1/E Training/ meeting room
20 1a/D Corridors
SERV
ICE
AREA
(BO
H)
21 1-1a/C Security & receiving area
22 2/D Flower shop
23 2/D House keeping office
24 1/D Soiled linen room
25 1/D Valet laundry
26 1/D-E Clean linen room
27 1/C-D Trolley bay
28 3a/B Clinic
29 4/B
30 5a/B Team dinning room
31 6/B Kitchen
32 6/B-C Kitchen storage
33 6/C Staff social lounge
34 6/D Male & female prayer room
1 1/A Escape staircase S1
2 1/G Escape staircase S2
3 6/G Escape staircase S3
4 5a/D Escape staircase S4
LEVE
L 8
FACI
LITY
11 3a/C Gym
Male & female changing room, toilet
TYPI
CAL
COM
MO
N A
REA
- B
ASE
MEN
T TO
LEV
EL
36
LIFT
CO
RE &
ESC
APE
ST
AIR
CASE
PODIUM
SANITARY WARE RAILING
Actual Actual Actual ActualSTART START START START
BACK PAINTED GLASS ON LIFT LOBBY APARTMENT
BALUSTRADE / BOLLARD
Progress (%)
Progress (%)
Progress (%)
Progress (%)
MONITORING PROGRESS FINISHING - PODIUM
PODIUMLE
VEL
AREA
NO
.
GRI
D L
INE
LOCATION
LEVE
L 8
FACI
LITY
12 3/B Male, female changing room
13 3/F Swimming pool
14 3/J Pantry
15 4d/J Spiral stair
16 2a-4/B-H Deck
17 2a-7/A-D
18 2b-7/B-J Steps
19 2b-7/B-J Ramp
Roof top garden for apartment tower
PODIUM
SANITARY WARE RAILING
Actual Actual Actual ActualSTART START START START
BACK PAINTED GLASS ON LIFT LOBBY APARTMENT
BALUSTRADE / BOLLARD
Progress (%)
Progress (%)
Progress (%)
Progress (%)