23
Table 8.4.4 (1) Basic Concept Calculation for Coffee Processing Machine (1) Processing Days Total beneficiaries 80 families Total coffee area 40 manzana Yield 120 qq (fresh-bean)/manzana Total Production (fresh-bean) 4,800 qq (fresh-bean) Capacity of processing machine, hand operated 5 qq (fresh-bean)/hr Working hours per day 8 hrs/day Coffee Processing Days 70 days From fresh bean to dry beans 20% From fresh bean to wet beans 30% Total production (beans) 1,440 qq (beans) (2) Drying Yard Capacity of processing machine, hand operated 5 qq (fresh-bean)/hr Working hours per day 8 hrs/day Maximum fresh bean processing per day per machine 40 qq (fresh-bean)/day Wet beans processed per day per machine 12.0 qq(wet beans)/day Required area for drying yard per pulping machine 1.43 m2/qq(wet beans) Required area of drying yard per day per pulping machine 17.2 m2 Drying-up days (1 rotation) 5 days Required area of drying yard per pulping machine 86 m2 Number of pulping machines 6 Total area of drying yard 515 m2 (3) Required Water Required water rate 20 litters/qq(fresh-bean) Average fresh bean processing per day 40 qq (fresh-bean)/day Average water required per day 800 litters/day Required discharge (24hrs average) 0.009 lit./s = 0.56 lit./min Required discharge (8hrs average) 0.028 lit./s = 1.67 lit./min Times of 1 house domestic water consumption 1.3 times of 1 house consumption Note : Domestic Water Consumption Domestic water consumption (1house=6.9person, 90lit/day/person) 621 litters/day/house Average for 24 hours 0.007 lit./s = 0.43 lit./min Average for 8 hours 0.022 lit./s = 1.29 lit./min T - 26

Table 8.4.4 (1) Basic Concept Calculation for Coffee ...open_jicareport.jica.go.jp/pdf/11650215_03.pdf · Table 8.4.4 (1) Basic Concept Calculation for Coffee Processing Machine (1)

  • Upload
    vuhanh

  • View
    225

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Table 8.4.4 (1) Basic Concept Calculation for Coffee ...open_jicareport.jica.go.jp/pdf/11650215_03.pdf · Table 8.4.4 (1) Basic Concept Calculation for Coffee Processing Machine (1)

Table 8.4.4 (1) Basic Concept Calculation for Coffee Processing Machine

(1) Processing DaysTotal beneficiaries 80 families Total coffee area 40 manzanaYield 120 qq (fresh-bean)/manzanaTotal Production (fresh-bean) 4,800 qq (fresh-bean)

Capacity of processing machine, hand operated 5 qq (fresh-bean)/hrWorking hours per day 8 hrs/dayCoffee Processing Days 70 daysFrom fresh bean to dry beans 20%From fresh bean to wet beans 30%Total production (beans) 1,440 qq (beans)

(2) Drying YardCapacity of processing machine, hand operated 5 qq (fresh-bean)/hrWorking hours per day 8 hrs/dayMaximum fresh bean processing per day per machine 40 qq (fresh-bean)/dayWet beans processed per day per machine 12.0 qq(wet beans)/dayRequired area for drying yard per pulping machine 1.43 m2/qq(wet beans)Required area of drying yard per day per pulping machine 17.2 m2Drying-up days (1 rotation) 5 daysRequired area of drying yard per pulping machine 86 m2Number of pulping machines 6Total area of drying yard 515 m2

(3) Required WaterRequired water rate 20 litters/qq(fresh-bean)Average fresh bean processing per day 40 qq (fresh-bean)/dayAverage water required per day 800 litters/dayRequired discharge (24hrs average) 0.009 lit./s = 0.56 lit./minRequired discharge (8hrs average) 0.028 lit./s = 1.67 lit./minTimes of 1 house domestic water consumption 1.3 times of 1 house consumption

Note : Domestic Water Consumption Domestic water consumption(1house=6.9person, 90lit/day/person) 621 litters/day/houseAverage for 24 hours 0.007 lit./s = 0.43 lit./minAverage for 8 hours 0.022 lit./s = 1.29 lit./min

T - 26

Page 2: Table 8.4.4 (1) Basic Concept Calculation for Coffee ...open_jicareport.jica.go.jp/pdf/11650215_03.pdf · Table 8.4.4 (1) Basic Concept Calculation for Coffee Processing Machine (1)

Table 8.4.4 (2) Cost and Benefit Flow for Pulping Coffee in Panyebar

(unit : Q.)

Cost Benefit Net Cash Flow

Year Capital Cost *1 O&M Cost*2 Replacement Cost*3 Total Cost

1 75,370 1,000 76,370 16,800 -59,5702 1,000 2,000 3,000 16,800 13,8003 1,000 2,000 3,000 16,800 13,8004 1,000 2,000 3,000 16,800 13,8005 1,000 2,000 3,000 16,800 13,8006 1,000 2,000 3,000 16,800 13,8007 1,000 2,000 3,000 16,800 13,8008 1,000 2,000 3,000 16,800 13,8009 1,000 2,000 3,000 16,800 13,800

10 1,000 75,370 76,370 16,800 -59,57011 1,000 2,000 3,000 16,800 13,80012 1,000 2,000 3,000 16,800 13,80013 1,000 2,000 3,000 16,800 13,80014 1,000 2,000 3,000 16,800 13,80015 1,000 2,000 3,000 16,800 13,80016 1,000 2,000 3,000 16,800 13,80017 1,000 2,000 3,000 16,800 13,80018 1,000 2,000 3,000 16,800 13,80019 1,000 2,000 3,000 16,800 13,80020 1,000 75,370 76,370 16,800 -59,57021 1,000 2,000 3,000 16,800 13,80022 1,000 2,000 3,000 16,800 13,80023 1,000 2,000 3,000 16,800 13,80024 1,000 2,000 3,000 16,800 13,80025 1,000 2,000 3,000 16,800 13,80026 1,000 2,000 3,000 16,800 13,80027 1,000 2,000 3,000 16,800 13,80028 1,000 2,000 3,000 16,800 13,80029 1,000 2,000 3,000 16,800 13,80030 1,000 2,000 3,000 16,800 13,800

EIRR : 16.7%

Note:

*1 : Capital cost includes labor cost for the unskilled labors provided by the beneficiaries.*2 : O & M Cost consists of cost for lubricant, payment for operators and so on.*3 : Replacement Cost : pulping machines and others facilities, every 10 years.

T - 27

Page 3: Table 8.4.4 (1) Basic Concept Calculation for Coffee ...open_jicareport.jica.go.jp/pdf/11650215_03.pdf · Table 8.4.4 (1) Basic Concept Calculation for Coffee Processing Machine (1)

Tabl

e 8.

5.1

(1)

Proj

ect C

ost o

f Ref

ores

tatio

n Pl

an in

Pac

hum

Item

sSp

ecifi

catio

nA

mou

ntU

nit

Uni

t Pric

eTo

tal (

Q)

Rem

ark

1. N

urse

ry F

acili

ties

1.1

Inst

alla

tion

of ir

rigat

ion

syst

em45

0 lit

re2

unit

896.

001,

792.

001.

2 N

urse

ry C

onst

ruct

ion

10 x

20

x 40

cm10

unit

71.4

771

4.70

1 un

it =

40 b

lock

s1.

3 M

ater

ials

for g

reen

hous

e 4.

0 x

10.0

x 3

.0 m

2un

it2,

890.

805,

781.

601.

4 Pu

rcha

se o

f see

dlin

gs a

nd s

eeds

 1)

See

dW

hite

pin

e0.

5kg

1,25

0.00

625.

00 

2 ) S

eed

Red

pin

e0.

5kg

1,25

0.00

625.

00 

3 ) S

eed

Alde

r0.

5kg

800.

0040

0.00

 4 )

See

dlin

gpe

ach

200

unit

10.0

02,

000.

00 

5 ) S

eedl

ing

avoc

ado

1333

unit

11.0

014

,663

.00

 6 )

Cut

ting

graf

tpe

ach,

avo

cado

350

unit

0.75

262.

501.

5 Se

edlin

g po

t 

1) S

ize

for N

eedl

e-le

af tr

eeD

-4",

H-8

"8,

000

1,00

0 un

it21

.56

172.

48 

2 ) S

ize

for F

ruit

tree

D-6

", H

-12"

2,00

01,

000

unit

37.7

375

.46

1.6 

Purc

hase

of f

arm

ing

tool

s13

kin

ds2

set

5,59

7.50

11,1

95.0

0Su

b-to

tal

38,3

06.7

4

2. S

tora

ge C

onst

ruct

ion

3.0

x 3.

0 x

2.4m

2un

it3,

675.

707,

351.

40

3. P

lant

atio

n To

ols

3 ki

nds

2set

1,76

9.00

3,53

8.00

Sub-

Tota

l of M

ater

ial C

ost

49,1

96.1

4

4. T

rain

ing

60da

y1,

300.

0078

,000

.00

5. S

tud y

Tou

r15

per

sons

/bus

4tim

e2,

147.

008,

588.

00

Sub-

Tota

l of T

rain

ing

Cos

t86

,588

.00

6. T

rans

port

4,91

9.61

10%

of M

ater

ial C

ost

TOTA

L14

0,70

3.75

T - 28

Page 4: Table 8.4.4 (1) Basic Concept Calculation for Coffee ...open_jicareport.jica.go.jp/pdf/11650215_03.pdf · Table 8.4.4 (1) Basic Concept Calculation for Coffee Processing Machine (1)

Tabl

e 8.

5.1

(2)

Impl

emen

tatio

n Sc

hedu

le fo

r Ref

ores

tatio

n Pl

an in

Pac

hum

Pro j

ect N

o:c-

3Pr

ojec

t Nam

eR

efor

esta

tion

Plan

Targ

et C

omm

unity

Pach

úm, S

anta

Mar

ía C

hiqu

imul

a, T

oton

icap

ánG

ener

al w

orks

Ope

ratio

n G

roup

Plan

tatio

n C

omm

ittee

Frui

t tre

ePi

ne, A

lder

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

Dec

1. In

stal

latio

n of

Nur

ser y

Fac

ilitie

s 1

) Fie

ld w

ork

and

conf

irm

atio

n of

wat

er ri

ghts

2

) Con

firm

atio

n of

spec

ies a

nd n

umbe

r of s

eedl

ing

3) P

urch

ase

and

tran

spor

t of m

ater

ials

4) C

onst

ruct

ion

2. N

urse

ry W

orks

1) C

olle

ctio

n an

d pu

rcha

se o

f see

ds 2

) Pre

para

tion

of se

edbe

d 3

) Col

lect

ion

and

tran

spor

t of s

oil f

or se

edbe

d an

d po

t 4

) Dis

infe

ctio

ns o

f soi

l 5

) Sow

ing

6

) Soi

l fill

ing

into

pot

s 7

) Tra

nspl

anta

tion

8) P

urch

ase

of g

rafts

9) G

rafta

ge 1

0) S

eedl

ing

rais

ing

11)

Car

ryin

g ou

t2.

Pla

ntat

ion

1) S

elec

tion

of p

lant

atio

n si

tes

2) P

urch

ase

and

tran

spor

t of s

eedl

ings

3) M

owin

g w

orks

bef

ore

plan

tatio

n 4

) Pla

ntat

ion

wor

ks 5

) Pes

t man

agem

ent (

Inse

cts a

nd fu

ngus

) 3.

Tra

inin

gs 1

) Tec

hnic

al tr

aini

ng a

nd e

nvir

onm

enta

l edu

catio

n 2

) Env

iron

men

tal e

duca

tion

for w

omen

3) E

nvir

onm

enta

l edu

catio

n fo

r stu

dent

s4.

Mon

itorin

g an

d Ev

alua

tion

1) I

nitia

l mon

itori

ng 2

) Per

iodi

c m

eetin

g of

pla

ntat

ion

com

mitt

ee 3

) Gen

eral

mee

ting

4) E

valu

atio

n

To p

rom

ote

soil

cons

erva

tion

in s

teep

farm

land

s an

d pl

anta

tion

in fo

rest

are

as b

y co

nstru

ctio

n of

nur

serie

s an

d im

plem

enta

tion

oftra

inin

gs re

late

d to

soi

l con

serv

atio

n in

ord

er th

at lo

cal p

eopl

e w

ill be

abl

e to

con

serv

e en

viro

nmen

t in

the

area

by

him

self.

Gen

eral

Exp

lana

tions

CO

NTE

NTS

Obj

ectiv

es

2001

2002

T - 29

Page 5: Table 8.4.4 (1) Basic Concept Calculation for Coffee ...open_jicareport.jica.go.jp/pdf/11650215_03.pdf · Table 8.4.4 (1) Basic Concept Calculation for Coffee Processing Machine (1)

Tabl

e 8.

5.1

(3)

Stat

emen

t of B

alan

ce fo

r Nur

sery

Man

agem

ent i

n Pa

chum

(1/4

)

(1) T

otal

Bal

ance

(1/4

)ye

ar2001

2002

2003

2004

2005

2006

2007

2008

2009

2010

Rem

arks

(Inco

me)

(1) S

eedl

ings

Pine

s, A

lder

1,70

020

02,

000

2,00

02,

000

2,00

02,

000

2,00

02,

000

2,00

0Pe

ach

1,60

02,

400

2,40

03,

200

4,80

04,

800

4,80

04,

800

4,80

04,

800

Avoc

ado

2,25

06,

000

6,00

06,

000

9,00

09,

000

9,00

09,

000

9,00

09,

000

Sub-

tota

l (Q

)5,

550

8,60

010

,400

11,2

0015

,800

15,8

0015

,800

15,8

0015

,800

15,8

00(2

) Fru

itsPe

ach

00

035

,000

96,2

5021

8,75

031

5,00

038

5,00

042

0,00

042

0,00

0Av

ocad

o0

563

1,50

04,

502

19,8

5035

,402

50,8

7367

,226

79,0

6594

,828

Sub-

tota

l (Q

)0

563

1,50

039

,502

116,

100

254,

152

365,

873

452,

226

499,

065

514,

828

Tota

l Inc

ome

(Q)

5,55

09,

163

11,9

0050

,702

131,

900

269,

952

381,

673

468,

026

514,

865

530,

628

(Exp

ense

s)(3

) See

dlin

g Pr

oduc

tion

Pine

s, A

lder

00

135

135

135

135

135

135

135

135

Peac

h0

2,29

52,

944

4,05

45,

349

6,45

97,

384

7,75

47,

754

7,75

4Av

ocad

o0

1,92

52,

389

3,31

44,

239

4,97

95,

719

6,08

96,

089

6,08

9Su

b-to

tal (

Q)

04,

220

5,46

87,

503

9,72

311

,573

13,2

3813

,978

13,9

7813

,978

(4) O

& M

Cos

tR

enew

ing

of p

last

ic s

heet

00

1,50

00

01,

500

00

1,50

00

Purc

hase

of F

arm

ing

Tool

s0

00

00

2,50

02,

500

00

0R

epai

ring

of S

tora

ge0

050

00

500

050

0Su

b-to

tal (

Q)

00

1,55

00

04,

050

2,50

00

1,55

00

Tota

l Exp

ense

s (Q

)0

4,22

07,

018

7,50

39,

723

15,6

2315

,738

13,9

7815

,528

13,9

78(A

)TO

TAL

(Q)

5,55

04,

943

4,88

243

,199

122,

178

254,

329

365,

935

454,

049

499,

337

516,

650

(Man

agem

ent F

und

of N

urse

ry)

Inco

me

by s

eedl

ing

5,55

08,

600

10,4

0011

,200

15,8

0015

,800

15,8

0015

,800

15,8

0015

,800

Fund

Sav

ing

/ per

son

/ mon

th0.

500.

500.

501.

002.

005.

005.

005.

005.

005.

00R

evol

ving

Fun

d / y

ear

288

288

288

576

1152

2880

2880

2880

2880

2880

Tota

l (Q

)5,

838

10,5

0614

,176

18,4

5025

,679

28,7

3631

,678

36,3

8139

,533

44,2

35(B

)(B

) - (A

) in

the

next

yea

r1,

618

3,48

86,

674

8,72

710

,056

12,9

9817

,701

20,8

5325

,555

-

T - 30

Page 6: Table 8.4.4 (1) Basic Concept Calculation for Coffee ...open_jicareport.jica.go.jp/pdf/11650215_03.pdf · Table 8.4.4 (1) Basic Concept Calculation for Coffee Processing Machine (1)

Tabl

e 8.

5.1

(3)

Stat

emen

t of B

alan

ce fo

r Nur

sery

Man

agem

ent i

n Pa

chum

(2/4

)

(2) B

alan

ce o

f Pin

es (r

ed a

nd w

hite

) and

Ald

er(2

/4)

year

2001

2002

2003

2004

2005

2006

2007

2008

2009

2010

Rem

arks

(Inco

me)

(1) S

eedl

ing

Amou

nt o

f rai

sed

seed

ling

4,00

04,

000

6,25

06,

250

6,25

06,

250

6,25

06,

250

6,25

06,

250

Ger

min

atio

n ra

te0.

800.

800.

800.

800.

800.

800.

800.

800.

800.

80Am

ount

of p

rodu

ctio

n3,

200

3,20

05,

000

5,00

05,

000

5,00

05,

000

5,00

05,

000

5,00

0Pl

ante

d se

edlin

g (p

rodu

ctio

n)1,

500

3,00

03,

000

3,00

03,

000

3,00

03,

000

3,00

03,

000

3,00

0Pl

ante

d se

edlin

g (p

urch

ase)

1,50

00

00

00

00

00

Amou

nt fo

r pla

ntat

ion

3,00

06,

000

9,00

012

,000

15,0

0018

,000

21,0

0024

,000

27,0

0030

,000

Amou

nt fo

r sal

e1,

700

200

2,00

02,

000

2,00

02,

000

2,00

02,

000

2,00

02,

000

Uni

t pric

e (Q

)1.

01.

01.

01.

01.

01.

01.

01.

01.

01.

0Pr

ocee

ds o

f see

dlin

g (Q

)1,

700

200

2,00

02,

000

2,00

02,

000

2,00

02,

000

2,00

02,

000

Tota

l Inc

ome

(Q)

(Exp

ense

s)(2

) Pur

chas

e of

mat

eria

lsSe

edlin

g po

ts4,

000

4,00

06,

250

6,25

06,

250

6,25

06,

250

6,25

06,

250

6,25

0U

nit p

rice

(Q/1

,000

uni

ts)

00

21.5

621

.56

21.5

621

.56

21.5

621

.56

21.5

621

.56

Cos

t of M

ater

ials

(Q)

00

135

135

135

135

135

135

135

135

Tota

l Exp

ense

s (Q

)0

013

513

513

513

513

513

513

513

5TO

TAL

(Q)

1,70

020

01,

865

1,86

51,

865

1,86

51,

865

1,86

51,

865

1,86

5

T - 31

Page 7: Table 8.4.4 (1) Basic Concept Calculation for Coffee ...open_jicareport.jica.go.jp/pdf/11650215_03.pdf · Table 8.4.4 (1) Basic Concept Calculation for Coffee Processing Machine (1)

Tabl

e 8.

5.1

(3)

Stat

emen

t of B

alan

ce fo

r Nur

sery

Man

agem

ent i

n Pa

chum

(3/4

)

(3) B

alan

ce o

f Fru

it Tr

ee (P

each

)(3

/4)

year

2001

2002

2003

2004

2005

2006

2007

2008

2009

2010

Rem

arks

(Inco

me)

(1) S

eedl

ing

Amou

nt o

f rai

sed

seed

ling

834

1,00

01,

000

1,00

01,

000

1,00

01,

000

1,00

01,

000

1,00

0G

erm

inat

ion

and

graf

t suc

cess

rate

0.60

0.60

0.60

0.60

0.60

0.60

0.60

0.60

0.60

0.60

Amou

nt o

f pro

duct

ion

500

600

600

600

600

600

600

600

600

600

Plan

ted

seed

ling

(pro

duct

ion)

300

300

300

200

00

00

00

Plan

ted

seed

ling

(pur

chas

e)10

00

00

00

00

00

Amou

nt fo

r pla

ntat

ion

400

700

1,00

01,

200

1,20

01,

200

1,20

01,

200

1,20

01,

200

Amou

nt fo

r sal

e20

030

030

040

060

060

060

060

060

060

0U

nit p

rice

(Q)

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

Proc

eeds

of s

eedl

ings

(Q)

1,60

02,

400

2,40

03,

200

4,80

04,

800

4,80

04,

800

4,80

04,

800

(2) H

arve

stC

rop

(qui

ntal

/tree

)0

00

0.25

0.50

1.00

1.00

1.00

1.00

1.00

1 qu

inta

l = 1

00 lb

Amou

nt (q

uint

al)

00

010

0.00

275.

0062

5.00

900.

001,

100.

001,

200.

001,

200.

00Am

ount

for s

ale

(qui

ntal

)0

00

70.0

019

2.50

437.

5063

0.00

770.

0084

0.00

840.

00U

nit p

rice

(Q/lb)

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

1 lb

= 4

5.4

gPr

ocee

ds o

f Fru

its (Q

)0

00

35,0

0096

,250

218,

750

315,

000

385,

000

420,

000

420,

000

Tota

l Inc

ome

(Q)

1,60

02,

400

2,40

038

,200

101,

050

223,

550

319,

800

389,

800

424,

800

424,

800

( (((Ex

pens

es) )))

(3) C

uttin

g G

raft

Num

ber o

f gra

ft83

41,

000

1,00

01,

000

1,00

01,

000

1,00

01,

000

1,00

01,

000

Uni

t pric

e (Q)

0.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

Sub-

tota

l (Q

)0

1,00

01,

000

1,00

01,

000

1,00

01,

000

1,00

01,

000

1,00

0(4

) Pes

t man

agem

ent

Che

mic

als

for s

oil d

isin

fect

ions

00

5656

5656

5656

5656

Inse

ctic

ide

and

fung

icid

e0

1,29

51,

850

2,96

04,

255

5,36

56,

290

6,66

06,

660

6,66

0Su

b-to

tal (

Q)

01,

295

1,90

63,

016

4,31

15,

421

6,34

66,

716

6,71

66,

716

(5) M

ater

ials

Seed

ling

pots

834

1,00

01,

000

1,00

01,

000

1,00

01,

000

1,00

01,

000

1,00

0U

nit p

rice

(Q/1

,000

uni

ts)

0.00

0.00

37.7

337

.73

37.7

337

.73

37.7

337

.73

37.7

337

.73

Cos

t of M

ater

ials

(Q)

00

3838

3838

3838

3838

Tota

l Exp

ense

s (Q

)0

2,29

52,

944

4,05

45,

349

6,45

97,

384

7,75

47,

754

7,75

4TO

TAL

(Q)

1,60

010

5-5

44

34,1

4695

,701

217,

091

312,

416

382,

046

417,

046

417,

046

Not

e :N

umbe

r of p

lant

atio

n of

pea

ch tr

ee p

er fa

mily

is e

qual

to 8

tree

s of

whi

ch 6

tree

s ar

e fo

r agr

o-fo

rest

ry a

nd 2

one

s fo

r gar

den,

and

the

amou

nt is

cal

cula

ted

for 1

50 fa

milie

s in

the

com

mun

ity.

T - 32

Page 8: Table 8.4.4 (1) Basic Concept Calculation for Coffee ...open_jicareport.jica.go.jp/pdf/11650215_03.pdf · Table 8.4.4 (1) Basic Concept Calculation for Coffee Processing Machine (1)

Tabl

e 8.

5.1

(3)

Stat

emen

t of B

alan

ce fo

r Nur

sery

Man

agem

ent i

n Pa

chum

(4/4

)

(4) B

alan

ce o

f Fru

it Tr

ee (A

voca

do)

(4/4

)ye

ar2001

2002

2003

2004

2005

2006

2007

2008

2009

2010

Rem

arks

(Inco

me)

(1) S

eedl

ing

Amou

nt o

f rai

sed

seed

ling

500

1,00

01,

000

1,00

01,

000

1,00

01,

000

1,00

01,

000

1,00

0G

erm

inat

ion

and

graf

t suc

cess

rate

0.60

0.60

0.60

0.60

0.60

0.60

0.60

0.60

0.60

0.60

Amou

nt o

f pro

duct

ion

300

600

600

600

600

600

600

600

600

600

Plan

ted

seed

ling

(pro

duct

ion)

150

200

200

200

00

00

0Pl

ante

d se

edlin

g (p

urch

ase)

150

00

00

00

00

Amou

nt fo

r pla

ntat

ion

300

500

700

900

900

900

900

900

900

900

Amou

nt fo

r sal

e15

040

040

040

060

060

060

060

060

060

0U

nit p

rice

(Q)

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

Proc

eeds

of s

eedl

ings

(Q)

2,25

06,

000

6,00

06,

000

9,00

09,

000

9,00

09,

000

9,00

09,

000

(2) H

arve

stC

rop

(lb/tr

ee)

02.

55

1650

7510

011

2.5

125

150

1 lb

= 4

5.4

gAm

ount

(lb)

075

02,

000

6,00

318

,905

33,7

1648

,450

64,0

2575

,300

90,3

13Am

ount

for s

ale

(lb)

037

51,

000

3,00

113

,234

23,6

0133

,915

44,8

1852

,710

63,2

19U

nit p

rice

(Q/lb)

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

Proc

eeds

of F

ruits

(Q)

056

31,

500

4,50

219

,850

35,4

0250

,873

67,2

2679

,065

94,8

28To

tal I

ncom

e (Q

)2,

250

6,56

37,

500

10,5

0228

,850

44,4

0259

,873

76,2

2688

,065

103,

828

( (((Ex

pens

es) )))

(3) C

uttin

g G

raft

Num

ber o

f gra

ft50

01,

000

1,00

01,

000

1,00

01,

000

1,00

01,

000

1,00

01,

000

Uni

t pric

e (Q)

0.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

Sub-

tota

l (Q

)0

1,00

01,

000

1,00

01,

000

1,00

01,

000

1,00

01,

000

1,00

0(4

) Pes

t man

agem

ent

Che

mic

als

for s

oil d

isin

fect

ions

00

5656

5656

5656

5656

Inse

ctic

ide

and

fung

icid

e0

925

1,29

52,

220

3,14

53,

885

4,62

54,

995

4,99

54,

995

Sub-

tota

l (Q

)0

925

1,35

12,

276

3,20

13,

941

4,68

15,

051

5,05

15,

051

(5) M

ater

ials

Seed

ling

pots

500

1,00

01,

000

1,00

01,

000

1,00

01,

000

1,00

01,

000

1,00

0U

nit p

rice

(Q/1

,000

uni

ts)

0.00

0.00

37.7

337

.73

37.7

337

.73

37.7

337

.73

37.7

337

.73

Cos

t of M

ater

ials

(Q)

00

3838

3838

3838

3838

Tota

l Exp

ense

s (Q

)0

1,92

52,

389

3,31

44,

239

4,97

95,

719

6,08

96,

089

6,08

9TO

TAL

(Q)

2,25

04,

638

5,11

17,

188

24,6

1139

,423

54,1

5470

,137

81,9

7697

,739

Not

e :N

umbe

r of p

lant

atio

n of

avo

cado

tree

per

fam

ily is

equ

al to

6 tr

ees

of w

hich

4 tr

ees

are

for a

gro-

fore

stry

and

2 o

nes

for g

arde

n, a

nd th

eam

ount

is c

alcu

late

d fo

r 150

fam

ilies

in th

e co

mm

unity

.

T - 33

Page 9: Table 8.4.4 (1) Basic Concept Calculation for Coffee ...open_jicareport.jica.go.jp/pdf/11650215_03.pdf · Table 8.4.4 (1) Basic Concept Calculation for Coffee Processing Machine (1)

Table 8.5.2 (1111) Project CostDescription Unit Unit price (Q) total value (Q)18 weeks chicken 200 unit 37 7,400

Feed (concentrated) 264qq 110 29,040

Medicines-colera aviar 400 dosage 0.41 164-newcastle cepa lasota 1,200 dosage 0.12 144- coriza invecuosa 400 dosage 0.12 48-viruela aviar 400 dosage 0.40 160-bronquitis infecciosa 400 dosage 0.12 48-vitamins 4,400 gram 0.41 1,804sub-total 2,368

Hen house materials-lamina(roofing) 4 sheet 300 1,200-iron net 40 yard 18 720-nails 30 lbs. 4 120-nylon net 40yard 10 400-cement(500PSI) 4qq 60 240-feeder 12pcs. 38 456-water container 8 pcs. 25 200-Wooden pillar various 876-Wooden board various 1,320-Nest 40 5 200-Saw dust 20bag 5 100-Labor for hen house construction and transport (2,600)sub-total 8,432

Feeding silo-Feeding silo 4 375 1,500-Labors for construction . 1,800-Transportation of input materials 800sub-total 4,100

Training / NGO technical guidance 22,100Depreciation cost (5% of hen house cost) 422Operational fee (3% of total income) 1,820Total Cost 75,682Suported by the project Q.73,082Born by beneficiaries Q.2,600

T - 34

Page 10: Table 8.4.4 (1) Basic Concept Calculation for Coffee ...open_jicareport.jica.go.jp/pdf/11650215_03.pdf · Table 8.4.4 (1) Basic Concept Calculation for Coffee Processing Machine (1)

T � 35

Table 8.5.2 (2) List of beneficiaries group

Beneficiaries of Group 1 from Sector 1

1. Juana Ico 2. Angelica Marina Lux Ico 3. Maria Teresa Baten 4. Catarina Lux Mejia 5. Antonia Estela Lux Mejia 6. Maria Chiti Lux 7. Maria Mejia Lopez 8. Magdalena Mejia 9. Juana Chiti Lux 10. Ana Lux Castro

Beneficiaries of Group 2 from Sector 1

1. Elia Magdalena Lux Castro 2. Elva Estela Lucas 3. Ana Patricia Muy Gomez 4. Elizabeth Chiti Lopez 5. Magdalena Lopez Joj 6. Antonia Chacaj Tzoy 7. Antonia Lopez Chiti 8. Ana Tosalia Lopez Chiti 9. Celia Ofelia Muz Chiti 10. Vilma Magdalena Muz Chiti

Beneficiaries of Group 1 from Sector 2

1. Juana Lux Lopez 2. Catarina Pu Chacaj 3. Antonia Chiti Lux 4. Maria Chiti Lux Segundo 5. Magdalena Lopez Lux 6. Maria Chiti Lux Tercero 7. Antonia Pu Lopez 8. Magdalena Lux Lopez 9. Maria Pu Lopez 10. Catarina Lux Mejia

Beneficiaries of Group 2 from Sector 2

1. Cristina Lux Uz 2. Ana Muz Lopez 3. Catarina Muz Lopez 4. Maria Chiti Lux 5. Magdalena Lux Lopez 6. Maria Lopez Lux 7. Juan Lux Muz 8. Magdalena Chiti Pu 9. Antonia Luz Lopez 10. Antonia Muz Lopez 11. Magdalena Lopez Ixcoteyac

Page 11: Table 8.4.4 (1) Basic Concept Calculation for Coffee ...open_jicareport.jica.go.jp/pdf/11650215_03.pdf · Table 8.4.4 (1) Basic Concept Calculation for Coffee Processing Machine (1)

Table 8.5.2 (3) Cash Flow Analysis of Layer-Chicken Raising Project

Cycle 1st RemarkStage 4 members (200 chickens)

In-coming1. Production *1 60,6602. Grant from JICA *2 27,9323. Transfer from previous period 04. Provision for Revolving *3 38,8085. Total In-coming 127,400

Out-going1. Project Cost

1) Young Chicken (16 weeks) 7,4002) Feed, medicine and vitamin 31,4083) Labor for Caring Chicken 10,8004) Hen house 5,8325) Training / NGO technical guidance 22,1006) Maintenance & Repair 4227) Administrative charges 1,8208) Sub-total 79,782

2. Contingency5% of total production cost : 1)~2) 1,940

3. Total Out-going 81,722Balance

Current Balance 45,678(Necessary investment for next cycle) 38,808Net Saving 6,870

*1 : 24 eggs/month/chickin x 200 chickins x 1 cycle(18 months) = 86,400 eggs/cycle 86,450 eggs/chickin x 0.65 Q/egg = 56,160 Q 150 old chickins x 30 Q/chickin = 4,500 Q

total 60,660 Q

*2 : Training / NGO technical guidance fee = 22,100 Q Hen house construction ixcluding labor fee = 5,832 Q

total = 27,932 Q

*3 : (Cost for young chickin) + (feed,medicine and vitamin)

T - 36

Page 12: Table 8.4.4 (1) Basic Concept Calculation for Coffee ...open_jicareport.jica.go.jp/pdf/11650215_03.pdf · Table 8.4.4 (1) Basic Concept Calculation for Coffee Processing Machine (1)

Tab

le 8

.5.2

(4)

Impl

eman

tatio

n Sc

hedu

le o

n th

e Pr

ojec

t for

Lay

er-C

hick

en R

aisi

ng f

or W

omen

's G

roup

Proj

ect N

oB

-6N

ame

of P

lan

Proj

ect f

or C

hike

n ra

isin

g by

Vill

age

Wom

en G

rrou

pT

arge

t are

aPa

chum

, San

ta M

aria

Chi

quim

ura,

Tot

onic

apan

Impl

emen

tatio

Age

ncy

Hou

sew

ives

' Gro

up in

Pac

hum

Proj

ect p

urpo

seLa

yer-c

hick

ens a

re ra

sed

by v

illag

e ho

uses

' gro

up a

nd se

ll th

em in

loca

l mar

ket.

Ther

eby,

it p

lans

to im

prov

e th

e in

coe

of th

e lo

cal i

nhab

itant

s.

Proj

ect e

xecu

tion

12

34

56

78

910

1112

12

34

56

78

910

1112

12

3

1) D

etai

l Stu

dies

i )

Det

ail s

tudi

es o

n pr

ojec

t site

s *(

atte

nded

at m

eetin

g w

ith v

illag

ers)

 ii)

Mee

ting

with

vill

age

wom

en *(

Sele

ctio

n of

con

tact

per

sons)

  

 iii

) Cos

ulta

tion

with

MA

GA

stuf

f  2)

  2)

  2)

  2)

Est

ablis

hmen

t of o

rgan

izat

ion

   ⅰ)

Sele

ctio

n of

raisi

ng fa

rmer

s' w

ifves

ⅱ)

Form

atio

n of

chi

cken

rais

ing

grou

p   ⅲ)Role

s, du

ties o

f gro

upm

embe

rs        

3) )))In

trod

uctio

n of

tech

nolo

gies

   ⅰ)

Prog

ram

ing

of T

rain

ing

by M

AG

A

*(

1)   

 *(

2) 

 *(

3)   

  *(4)

*(

5)      *(6)

  

ⅱ)

Perio

dica

l pat

rol

xx

xx

xx

xx

xx

xx

  4 4 4 4

) Rai

sing

act

iviti

es   ⅰ)

Con

stru

ctio

n of

chi

cken

hou

se   ⅱ)

Supp

ly o

f you

ng c

hick

en, f

eed

etc.

  

5) ))) S

ales

of E

gg    ⅰ)C

olle

ctio

n of

egg

from

mem

bers

    ⅱ)E

gg m

arke

ting,

and

acc

ount

ing

        

4) )))M

onito

ring

and

eva

luat

ion

/C

hick

en ra

isin

g fo

r 18

mon

ths/

    ⅰ)E

stab

lishm

ent o

f in

dica

tors

    ⅱ)M

onito

ring

and

eval

uatio

n△

△△

Tra

inin

g by

MA

GA

: (1

) Mod

ern

rais

ing

prac

tices

, (2)

Boo

k ke

epin

g, (3

) Dis

ease

dia

gnos

is a

nd it

s cou

nter

mea

sure

s, (4

) Effe

ctiv

e fe

edin

g, (5

) Sal

es o

f egg

s, (6

) Gro

up a

ccou

ntin

gT

erm

of r

aing

: F

rom

Sep

t. 20

01to

Feb

. 200

3, 1

8 m

onth

sN

o. o

f chi

cken

:100

chi

cken

s per

farm

er, e

xpec

ted

no. o

f egg

s: 5

48 d

ays x

90

% =

493

egg

s/ch

iken

Pero

dica

l pat

rol:

Onc

e pe

r mon

th

2001

2002

2003

T - 37

Page 13: Table 8.4.4 (1) Basic Concept Calculation for Coffee ...open_jicareport.jica.go.jp/pdf/11650215_03.pdf · Table 8.4.4 (1) Basic Concept Calculation for Coffee Processing Machine (1)

Tab

le 8

.5.3

(1) P

roje

ct C

ost

for

Drink

ing

Wat

er Q

ualit

y Im

prove

men

t P

lan

in P

achu

m (1/

3)Tab

le 8

.5.3

(1) P

roje

ct C

ost

for

Drink

ing

Wat

er Q

ualit

y Im

prove

men

t P

lan

in P

achu

m (1/

3)Tab

le 8

.5.3

(1) P

roje

ct C

ost

for

Drink

ing

Wat

er Q

ualit

y Im

prove

men

t P

lan

in P

achu

m (1/

3)Tab

le 8

.5.3

(1) P

roje

ct C

ost

for

Drink

ing

Wat

er Q

ualit

y Im

prove

men

t P

lan

in P

achu

m (1/

3)

Q1.0

0=Yen15.5

Conte

nid

oEsp

ecific

acio

nC

antidad

Unid

adde

Medid

a

Pre

cio

Unitar

io(Q

.)C

ost

o (Q

.)O

bserv

acio

n

Inst

alac

ion d

e E

quip

o D

osi

ficad

or

2

unid

ad16,6

75.7

333,3

51.4

5

Const

ruccio

n d

e T

anque d

e D

istr

ibucio

n

2unid

ad96,9

28.2

2193,8

56.4

4

TO

TA

LTO

TA

LTO

TA

LTO

TA

L227,2

07.8

9227,2

07.8

9227,2

07.8

9227,2

07.8

9

* N

o inclu

ye o

bra

civ

il com

o o

bra

de e

xcav

acio

n, re

lleno, com

pac

tacio

n.

T - 38

Page 14: Table 8.4.4 (1) Basic Concept Calculation for Coffee ...open_jicareport.jica.go.jp/pdf/11650215_03.pdf · Table 8.4.4 (1) Basic Concept Calculation for Coffee Processing Machine (1)

Tab

le 8

.5.3

(1) P

roje

ct C

ost

for

Drink

ing

Wat

er Q

ualit

y Im

prove

men

t P

lan

in P

achu

m (2/

3)Tab

le 8

.5.3

(1) P

roje

ct C

ost

for

Drink

ing

Wat

er Q

ualit

y Im

prove

men

t P

lan

in P

achu

m (2/

3)Tab

le 8

.5.3

(1) P

roje

ct C

ost

for

Drink

ing

Wat

er Q

ualit

y Im

prove

men

t P

lan

in P

achu

m (2/

3)Tab

le 8

.5.3

(1) P

roje

ct C

ost

for

Drink

ing

Wat

er Q

ualit

y Im

prove

men

t P

lan

in P

achu

m (2/

3)

Q1.0

0=Yen15.5

Conte

nid

oEsp

ecific

acio

nC

antidad

Unid

adde

Medid

a

Pre

cio

Unitar

io(Q

.)C

ost

o (Q

.)O

bserv

acio

n

D

OSIF

ICA

DO

R

DSA

310 R

E-IE

1U

nid

ad4,8

86.6

04,8

86.6

0* T

ubo

de a

spirac

ion t

ransp

arente

, 1.2

0m

V

ALV

ULA

ESFER

A

PLA

STIC

A 1

"2

Unid

ad41.0

882.1

6de

lar

go e

quip

ado c

on las

tre y

cre

pina.

M

AN

OM

ETR

OP

RESIO

N 0

-100 P

SI

1U

nid

ad37.4

437.4

4

R

ED

.BU

SH

ING

P

VC

6" x

3"

2U

nid

ad186.6

1373.2

2* L

a m

ano d

e o

bra

no inclu

ye t

raba

jos

de

R

ED

.BU

SH

ING

P

VC

3" x

1"

2U

nid

ad22.1

044.2

0obr

a civ

il.

U

NIO

N U

NIV

ER

SA

L

PV

C 1

"4

Unid

ad28.6

2114.4

8

FIL

TR

O D

E 1

"(A

NIL

LO

S)

MA

RC

A A

ZU

D1

Unid

ad199.0

0199.0

0

TEE

PV

C 6

"2

Unid

ad588.8

21,1

77.6

4

V

ALV

ULA

MA

RIP

OSA

HF 6

" W

D-3010-3

1U

nid

ad1,4

70.5

61,4

70.5

6

B

RID

A6" P

VC

2U

nid

ad324.8

9649.7

8

TO

RN

ILLO

S 5

/8 x

6"

CO

MP

16

Unid

ad11.4

7183.5

29,2

18.6

0

M

AN

O D

E O

BR

A P

OR

IN

STA

LA

CIO

N1

Unid

ad5,0

00.0

05,0

00.0

0

A

RTIC

ULO

S V

AR

IOS Y

MIS

CELA

NEO

S1

Unid

ad1,1

00.0

01,1

00.0

0

C

ASETA

DE T

AN

QU

E D

E D

EP

OSIT

O0.8

x0.8

xH1.2

m1

Unid

ad

B

LO

QU

E D

E C

ON

CR

ETO

Tip

o liv

iano d

e 1

4x1

9x3

9cm

s0.0

96

Mill

ar2,5

46.6

7244.4

8

CEM

EN

TO

Gris

nac

ional

142.5

kg30.1

030.1

0

A

REN

Ade r

io0.8

m3

74.6

259.7

0

LA

MIN

A G

ALV

AN

IZA

DA

LIS

A3'x

8'

1U

nid

ad108.6

3108.6

3

PU

ER

TA

DE P

LYW

OO

D

pino d

e 0

.7x1

.2m

1U

nid

ad400.0

0400.0

0

TA

NQ

UE 5

5 G

LS D

E H

IPO

CLO

RIT

O10%

155G

LS

514.2

2514.2

2

TO

TA

LTO

TA

LTO

TA

LTO

TA

L16,6

75.7

316,6

75.7

316,6

75.7

316,6

75.7

3

T - 39

Page 15: Table 8.4.4 (1) Basic Concept Calculation for Coffee ...open_jicareport.jica.go.jp/pdf/11650215_03.pdf · Table 8.4.4 (1) Basic Concept Calculation for Coffee Processing Machine (1)

Tab

le 8

.5.3

(1) P

roje

ct C

ost

for

Drink

ing

Wat

er Q

ualit

y Im

prove

men

t P

lan

in P

achu

m (3/

3)Tab

le 8

.5.3

(1) P

roje

ct C

ost

for

Drink

ing

Wat

er Q

ualit

y Im

prove

men

t P

lan

in P

achu

m (3/

3)Tab

le 8

.5.3

(1) P

roje

ct C

ost

for

Drink

ing

Wat

er Q

ualit

y Im

prove

men

t P

lan

in P

achu

m (3/

3)Tab

le 8

.5.3

(1) P

roje

ct C

ost

for

Drink

ing

Wat

er Q

ualit

y Im

prove

men

t P

lan

in P

achu

m (3/

3)

Q1.0

0=Yen15.5

Conte

nid

oEsp

ecific

acio

nC

antidad

Unid

adde

Medid

a

Pre

cio

Unitar

io(Q

.)C

ost

o (Q

.)O

bserv

acio

n

Cim

iento

grav

a 3/4"

1.3

5m

3132.5

0178.8

8

Concre

to d

e b

ase

f'c =

2,0

00psi

0.4

5m

31,3

19.7

1593.8

7

Concre

tof'c =

3,0

00psi

20.9

8m

31,3

84.8

429,0

53.9

4

Hie

rro c

orr

uga

do

Gra

do 4

0.0

ksi

66.8

8H

lb507.0

033,9

08.1

6

Par

ada

de a

gua

150m

mP

VC

11.4

1m

l117.0

01,3

34.9

7

Esc

arela

Acero

inoxi

dab

le 5

/8"

10

unid

ad522.6

05,2

26.0

0

Form

aleta

s

58

m2

273.0

015,8

34.0

0

Tap

a de m

anhole

4

unid

ad1,5

60.0

06,2

40.0

0

Obra

de s

oport

e

10

m3

78.0

0780.0

0

Saf

ford

ing

19

m2

156.0

02,9

64.0

0

Sle

eve

s1

Glo

bal

585.0

0585.0

0

Imperm

eab

le20

m2

11.4

7229.4

0

TO

TA

LTO

TA

LTO

TA

LTO

TA

L96,9

28.2

296,9

28.2

296,9

28.2

296,9

28.2

2

* N

o inclu

ye o

bra

civ

il com

o o

bra

de e

xcav

acio

n, re

lleno, com

pac

tacio

n.

T - 40

Page 16: Table 8.4.4 (1) Basic Concept Calculation for Coffee ...open_jicareport.jica.go.jp/pdf/11650215_03.pdf · Table 8.4.4 (1) Basic Concept Calculation for Coffee Processing Machine (1)

A. Summary of CostA. Summary of CostA. Summary of CostA. Summary of CostItems Unit Amount (Q.) Amount (Q.) Amount (Q.)

JICA's fund Benerifiaries JICA+Benerifiaries1. Improved Stove 130 no 114,400.00 13,000.00 127,4002. Temascal-1a (Temascal and conbustion box 10 no 16,200.00 5,600.00 21,8003. Temascal-1b (only combustion box) 30 no 15,000.00 600.00 15,6004. Demonstration and Capacitation - LS 20,400.00 0.00 20,400

total 166,000.00 19,200.00 185,200.00B. BreakdownB. BreakdownB. BreakdownB. Breakdown1. Improved Stove

Items Quantity Unit Unit Cost Amount (Q.) Amount (Q.)JICA's fund Beneficiaries

a. MaterialsMetal Materials (plancha, chimney, Door etc.) LS 215.38 0.00Civil Materials (cement, blocks etc.) LS 420.40 67.50

Sub-Total 635.78 67.50b. Labor and othersmonpower (skilled) 1 day 75 130.00monpower (un-skilled) 1 day 30 30.00Transportion and miscellaneous *15% 95.37

Sub-Total 225.37 30.00Total 861.15 97.50 Total

say, 880.00 100.00 9802. Temascal Type-1a (newly construction of a temascal w/ the combustion box)

Items Quantity Unit Unit Cost Amount (Q.) Amount (Q.)JICA's fund Beneficiaries

a. DomeCivil Materials (cement, blocks etc.) LS 712.00 420.00

Sub-Total 712.00 420.00b. Combustion BoxMetal Materials (plancha, chimney, Door etc.) LS 212.66 0.00Civil Materials (cement, blocks etc.) LS 157.80 13.20

Sub-Total 370.46 13.20c. Labor and othersmonpower (skilled) 4 days 90 360.00monpower (un-skilled) 4 day 30 120.00Transportion and miscellaneous *15% 162.37

Sub-Total 522.37 120.00Total 1,604.83 553.20 Total

say, 1,620.00 560.00 2,1803. Temascal Type-1b (only installation of the conbustion box into an existing temascal)

Items Quantity Unit Unit Cost Amount (Q.) Amount (Q.)JICA's fund Beneficiaries

a. Combustion BoxChimney, Combustion Box etc. LS 382.66 0.00

Sub-Total 382.66 0.00b. Mon-powermonpower (skilled) 0.5 days 90 45.00monpower (un-skilled) 0.5 day 30 15.00Transportion and miscellaneous *15% 57.40

Sub-Total 102.40 15.00Total 485.06 15.00 Total

say, 500.00 20.00 5204. Temascal Type-2 (house-type Temascal w/ combustion box)

Items Quantity Unit Unit Cost Amount (Q.) Amount (Q.)JICA's fund Beneficiaries

a. Temascal HouseCivil Materials (cement, blocks etc.) LS 1,711.49 0.00

Sub-Total 1,711.49 0.00b. Combustion BoxChimney, Combustion Box etc. LS 362.50 0.00

Sub-Total 362.50 0.00c. Labor and Othersmonpower (skilled) 6 days 75 450.00monpower (un-skilled) 6 day 30 180.00Transportion and miscellaneous 15% 311.10

Sub-Total 761.10 180.00Total 2,835.09 180.00 Total

say, 2,840.00 180.00 3,0205. Demonstration and Construction Supervision

Items Quantity Unit Unit Cost Amount (Q.)a. materialsdemonstration temascal Type-1a 1 no 2,180.00 2,180.00demonstration temascal Type-1b 1 no 520.00 520.00demonstration temascal Type-2 1 no 3,020.00 3,020.00

Sub-Total 5,720.00b. Demonstration, capacitation and administrationengineer 30 days 200.00 6,000.00assistants 60 days 100.00 6,000.00Transportation and others *20% 2,658.00

Sub-Total 14,658.00Total 20,378.00

say, 20,400.00

Table 8.5.4 (1) Project Cost : Extansion Use of Improved Cooking Stoves and SaunaTable 8.5.4 (1) Project Cost : Extansion Use of Improved Cooking Stoves and SaunaTable 8.5.4 (1) Project Cost : Extansion Use of Improved Cooking Stoves and SaunaTable 8.5.4 (1) Project Cost : Extansion Use of Improved Cooking Stoves and Sauna Bath"Temascal" Bath"Temascal" Bath"Temascal" Bath"Temascal"

T - 41

Page 17: Table 8.4.4 (1) Basic Concept Calculation for Coffee ...open_jicareport.jica.go.jp/pdf/11650215_03.pdf · Table 8.4.4 (1) Basic Concept Calculation for Coffee Processing Machine (1)

Table 8.5.4 (2) Materials to be Prepared by Beneficiaries

(Unit : Materials for 1 no.)1. Improved Stove

Items Quantity Unit

a. MaterialsAdobe (sun-dried bricks) 20 noWhite sand 3 bagRiver sand 3 bagPanela 3 no

b. Labor and othersmonpower (un-skilled) 1 dayTransportion from unloading place to their house 0.5 day

2. Temascal-1 (newly construction of a temascal w/ the combustion box)Items Quantity Unit

a. DomeAdobe (sun-dried bricks) 210 no

b. StoveWhite sand 3 bagRiver sand 0.5 bag

c. Labor and othersmonpower (un-skilled) 4 dayTransportion from unloading place to their house 0.5 day

3. Temascal-2 (only installation of the conbustion box into an existing temascal)Items Quantity Unit

a. Stove - -

b. Mon-powermonpower (un-skilled) 0.5 dayTransportion from unloading place to their house 0.5 day

T - 42

Page 18: Table 8.4.4 (1) Basic Concept Calculation for Coffee ...open_jicareport.jica.go.jp/pdf/11650215_03.pdf · Table 8.4.4 (1) Basic Concept Calculation for Coffee Processing Machine (1)

Tab

le 8

.5.4

(3) I

mpl

emen

tatio

n Sc

hedu

le :

Im

prov

ed C

ooki

ng S

tove

s and

Sau

na B

ath

"Tem

asca

l"

Item

s20

0120

02A

ugSe

pO

ctN

ovD

ecJa

nFe

bM

arA

prM

ayJu

nJu

lA

ugSe

pO

ct

a. S

elle

ctio

n of

NG

O fo

r the

impl

emen

tatio

n N

GO

Sel

ectio

n an

d C

ontra

ctin

g W

orks

b. D

esig

n an

d D

emon

stra

tion

Stag

ePr

epar

atio

n of

Dem

oC

onst

ruct

ion

of D

emo-

Stov

e an

d Te

mas

cal

Tria

l and

Obs

erva

tion

Perio

dIn

terv

iew

with

Vill

ager

sFi

nal D

ecis

ion

of D

esig

nSe

lect

ion

of B

enef

icia

ries

c. C

onst

ruct

ion

Stag

eA

rran

gem

ent a

nd D

eliv

ery

of M

ater

ial

Con

stru

ctio

n Pe

riod

Cap

acita

tion

and

Lect

ure

for O

&M

d. M

onito

ring

and

Eval

uatio

nIn

itial

Con

didt

ion

Surv

eyM

onito

ring

and

Eval

uatio

n Su

rvey

T - 43

Page 19: Table 8.4.4 (1) Basic Concept Calculation for Coffee ...open_jicareport.jica.go.jp/pdf/11650215_03.pdf · Table 8.4.4 (1) Basic Concept Calculation for Coffee Processing Machine (1)

Table 8.5.4 (4) Expected Project BenefitsProject : Extansion Use of Improved Cooking Stoves and Sauna Bath"Temascal"

- Assumed reduction % of firewood in the Project in a year (*1) 20%- Cost of firewood (*2) : Q.100 / tarea 0.3 Q./piece of firewood

(1 tarea = 300 pieces of firewood) - No. of Facilities to be constructed Stove: 130 nos.

Temascal: 40 nos.

(Without Project)- Consuming rate of firewood :

Cooking with open fire (*3) 26 pcs/day/familyOriginal Temascal (*2) 32 pcs/time/family

- Consuming amount of firewood in a year: Cooking with open fire 9,490 pcs/year/familyOriginal Temascal(*4) 3,338 pcs/year/family

12,828 pcs/year/family- Total cost for firewood in a year

Cooking with open fire 2,847 Q./year/familyOriginal Temascal 1,001 Q./year/family

3,848 pcs/year/family

- Total cost for firewood in a year for the entire projectCooking with open fire 370,110 Q./yearOriginal Temascal 40,056 Q./year

Total 410,166 Q./year

*1: According to a report of the �PRODETOTO�project, its reduction rate of Improved Stove was 46%.*2: Based on the results of the survey made by the Study Team/MAGA.*3: Derived from the report of "PRODETOTO". 1 family = 8persons

(With Project)- Total cost for firewood in a year 328,133 Q./year

20% of reduction rare of firewood

(Benefit per Year) 82,033 Q./year (Initial Project Cost) JICA and Beneficiaries' Cost 185,200 Q. (Rapairing Cost in every 5 years) 17,000 Q.

(Economic Internal Return Rate : EIRR) 78%

EIRR Calculation (unit : Q.)

year Capital Cost O&M Cost Total Cost Benefit Net Cash Flow1 185,200 185,200 82,033 -103,1672 0 82,033 82,0333 0 82,033 82,0334 0 82,033 82,0335 17,000 17,000 82,033 65,0336 0 82,033 82,0337 0 82,033 82,0338 0 82,033 82,0339 0 82,033 82,03310 17,000 17,000 82,033 65,03311 0 82,033 82,03312 0 82,033 82,03313 0 82,033 82,03314 0 82,033 82,03315 0 82,033 82,033

Other Benefits and Effects- Conservation of forestries and watershed- Reducing respiratory diseases caused by smoke- Reducing accidental skin burns around a cooking fire- Improving the health condidions with taking bath more frequently

*4: Frequency of taking a sauna; 2 times per week in average based on the survey made by the Study Team.

T - 44

Page 20: Table 8.4.4 (1) Basic Concept Calculation for Coffee ...open_jicareport.jica.go.jp/pdf/11650215_03.pdf · Table 8.4.4 (1) Basic Concept Calculation for Coffee Processing Machine (1)

T � 45

Table 8.5.5(1) Role and Responsibility of Each Actor for MPU Plan

CDRO (NGO)

(1)Supervision and administration of MPU activities (2)Initial training and regular retraining of health promoter and

committee members (3)Training and supervision of health committee concerning

financing, accounting, stock control and maintenance and operation (Monthly supervision and recording of accounting and stock control done by Health Committee)

(4)Initial provision of essential drugs and equipment (5)Providing the patient with prescription by the doctor visiting

the village weekly (6)Regular monitoring using appropriate indicators (7)Regular purchasing and selling of drugs to MPU

Health Committee

(1)Monthly checking and recording of monthly benefit, kinds of drugs sold, stock control, and allocation of incentives to promoter

(2)Coordination between MPU and CDRO (3)Coordination among health related personnel in the villages

such as health promoter, health guards and heath committee (4)Monitoring MPU activities

Health Promoter

(1)Selling drugs and provide basic first aid treatment at MPU (2)Regular purchasing of drugs with admission from health

committee through CDRO (3)When the patient is in serious situation or when they need

prescription, advice them to go to appropriate health facilities such as Health Center

(4)Checking and recording daily benefit, kinds of drugs sold, stock control

(5)In case there are some problems, contact to CDRO through health committee

(6)Receiving regular retraining from CDRO

Users

(1)Appropriate use of the drugs according to the guidance given by health promoter

(2)Avoid giving the drugs bought to the others (3)Avoid self-treatment and go to the appropriate health facilities

in case symptoms do not disappear

JICA Study Team (1)Supervision of CDRO Activities (2)Financing for initial input (3)Monitoring and Evaluation

Page 21: Table 8.4.4 (1) Basic Concept Calculation for Coffee ...open_jicareport.jica.go.jp/pdf/11650215_03.pdf · Table 8.4.4 (1) Basic Concept Calculation for Coffee Processing Machine (1)

Table 8.5.5(2) Cost Estimation for Plan for Installation of Minimal Pharmacy UnitTable 8.5.5(2) Cost Estimation for Plan for Installation of Minimal Pharmacy UnitTable 8.5.5(2) Cost Estimation for Plan for Installation of Minimal Pharmacy UnitTable 8.5.5(2) Cost Estimation for Plan for Installation of Minimal Pharmacy Unit

Unitprice

Amount Total Particular

1. Training from NGO(CDRO)(1) Training for 1 community promoter First Aid treatment included

Pharmaceutical issuesSalary for trainer 600 10 6,000Material cost 600 2 1,200Transportation/lunch for trainees 50 20 1,000Transportation/lunch for trainers 50 10 500

(2) Training for health committee members one day training accounting methodstransportation/lunch for trainers 100 1 100transportation/lunch for trainees 50 5 250Materials 100 5 500salary for trainer 400 1 400

(4)One day job on training in MPU 500 On the job training at MPU for 1 day

(5) Retraining of community pharmacist and committee members(2 times)

human resource 450 2 900transportation/lunch for trainers 150 2 300transportation/lunch for trainees 50 12 600

(6)Monthly follow-up and monitoring for one year supervision given by NGO

human resource 85 12 1,020transportation 45 12 540

(7)Purchasing of initial drugs and Transportation 1300 1 1,300

subtotal for Training 15,110

2. Drug input 3193 6 19,158 for MPU during 6 months

subtotal for drug input 19,158

3. Equipmenta. essential equipment for first aid,

Mertiolate bottle(for 3 months) 27.9 1 28Cotton(for 3 months) 22 3 661 Thermometer 4.5 1 5Antibacterial soap×2 3.25 2 71 Soap box 2.5 1 31 Stainless steel tray 225 1 2251 Surgeon scissors 24 1 241 Pinze 32 1 32Fabric bandage ( for 3months) 7 5 351 towel 15 1 15

b.Equipment for MPU

Shelf 900 2 1,800

Chair 200 2 400Table 239 1 239

Money Boxes 115 2 230

c. Adminisstration equipment-notebook and pen 50 1 50

5 notebooks and 4 pens

d. Minimal Pharmacy Unit building 13967 1 13,967

subtotal for equipment 17,124

TOTAL 51,392

Items

T - 46

Page 22: Table 8.4.4 (1) Basic Concept Calculation for Coffee ...open_jicareport.jica.go.jp/pdf/11650215_03.pdf · Table 8.4.4 (1) Basic Concept Calculation for Coffee Processing Machine (1)

T � 47

Tabl

e 8.

5.5(

3)

Wor

king

Sch

edul

e fo

r Pl

an fo

r In

stal

latio

n of

Min

imal

Pha

rmac

y U

nit

20

01

2002

It

ems

Aug

Sep

Oct

N

ov

Dec

Ja

n Fe

b M

ar

Apr

May

Ju

n Ju

l Au

g Se

p O

ct

Nov

Tr

aini

ng fo

r Com

mun

ity

Phar

mac

ist

Trai

ning

for c

omm

ittee

mem

bers

Bu

ildin

g of

MPU

Pu

rcha

sing

and

pro

visi

on o

f dru

gs

and

equi

pmen

t

MPU

star

ts fu

nctio

ning

M

onth

ly su

perv

isio

n by

Hea

lth

Com

mitt

ee

Mon

thly

follo

w-u

p an

d m

onito

ring

by

CD

RO

Regu

lar r

etra

inin

g fo

r com

mun

ity

phar

mac

ist a

nd co

mm

ittee

Eval

uatio

n by

JIC

A St

udy

Team

, CD

RO a

nd H

ealth

Com

mitt

ee

Page 23: Table 8.4.4 (1) Basic Concept Calculation for Coffee ...open_jicareport.jica.go.jp/pdf/11650215_03.pdf · Table 8.4.4 (1) Basic Concept Calculation for Coffee Processing Machine (1)

CDRO FIS study unit Initialestimatio estimation Average team price drug

suggestion proam inputacetaminofen 100 mg/ml 167 11 89 2.84 252.29acetaminofen 120 mgs/5ml 167 28 97 2.21 214.55acetaminofen 500 mg tab. 167 165 166 300 0.07 21.00acetaminofen 80 mg tabs 0 0 0 20 0.07 1.40acido folico 333 110 222 0.09 19.95albendazol 200 mgs tab 17 110 63 100 0.11 11.00albendazol 200mgs/5ml suspencion 17 28 22 30 1.35 40.50alcohol isopropilico 8 1 5 2.5 11.79alum. Y mag. Hidroxido/dimetilpolisilox 33 110 72 6.16 441.47amoxicilina 250 mgs/5 ml fco 17 28 22 40 5.52 220.80amoxicilina 500 mgs cap 67 110 88 300 0.36 108.00bencilo benzoato 25% 0 28 14 30 3.12 93.60bromexina 4mg/ml jarabe 0 11 6 20 1.97 39.40cloranfenicol 0.5% sol. Oft gotero 0 0 0 10 2.15 21.50cloranfenicol 1% sol. Oft tubo 0 11 6 2.76 15.18clorfeninamina maleato 2mg/5ml 17 0 8 2.33 19.42clorferinamina maleato 4 mg 17 0 8 0.06 0.50clotrimazol 2% crema tubo 8 28 18 8.5 152.29dimenhidranato 0 28 14 0.24 3.30ferroso sulfato frasco 333 0 167 180 2.98 536.40guayacolato de glicerilo 0 17 8 20 1.66 33.20hidroxido de magnesio 360 ml 0 11 6 6.15 33.83ibuprofen 400 mgs 167 110 138 0.08 11.07ketoconazol 2% crema 0 0 0 10 5.15 51.50ketoconazol 200 mgs tab 0 0 0 30 0.33 9.90mebendazol 100 mgs/5ml 0 11 6 25 0.98 24.50metrodinazol 125mg/5ml 67 28 47 50 1.94 97.00metronidazol 500 mgs tabs 0 110 55 150 0.1 15.00peroxido hidrogeno 3% 0 0 0 5 0.73 3.65ranitidina 150mgs 67 0 33 0.17 5.67salbutamol 2mg/5ml 0 28 14 30 1.12 33.60sro 0 110 55 0.85 46.75secnidazol 500 mgs tabs 0 110 55 75 0.74 55.50sulfacetamida 10% oft 0 28 14 2.4 33.00tinidazol 17 0 8 80 0.28 22.40trimetropin sulfa 160/800 tabs 83 110 97 150 0.2 30.00trimetropin sulfa 40/200 fco 17 55 36 50 2.16 108.00vitaminas multiples capsula 167 275 221 300 0.13 39.00vitaminas multiples gotero 0 110 55 100 3.15 315.00

Total per month 3193

is from Venta Social List.The others are all from Botequine list

Table 8.5.5(4) Variety and amount of drugs for initial inputs in MPU in Pachum

drug

T - 48