2
iv Table of content Page REPORT COVER LETTER…………………………………………………………………………………………… i ACKNOWLEDGEMENTS…………………………………………………………………………………………….. ii ABSTRACT……………………….……………………………………………………………………………………….. iii TABLE OF CONTENTS………………………………………………………………………………………………. iv LIST OF TABLES……………………………………………………………………………………………………….. vi LIST OF FIGURES……………………………………………………………………………………………………… vii LIST OF ABBREVIATIONS………………………………………………………………………………………….. xi CHAPTER I Introduction…………………………………………………………….……………. 1.1. Objective. 1.2. Company Profile. 1.3. 10 Safety Guidelines. 1.4. Knowledge backgrounds training 1 1 1 2 2 CHAPTER II Training Overview………………………………….………………………………. 2.1. Training in Artificial lift operator. 2.1.1. Installing and commissioning beam pump. 2.1.2 Jet-pump Reading. 2.1.3. Maintenance Prime mover motor. 2.2. Training in Test and Production operator. 2.2.1. BS&W cut test procedure. 2.2.2. API gravity test procedure 2.2.3 SG gas test procedure. 2.2.4 Crude oil loading procedure 11 11 11 17 18 19 20 21 21 22 CHAPTER III Assignment………………………………………………………………………………. 3.1. Solving the leakage of the W300H by changing the Packing. 3.1.1. Why Packing Fails. 3.1.2. Packing type. 3.1.3. Packing Selection. 3.1.4. Packing Size Selection. 3.1.5. Procedure to changing the packing of pump W300H. 3.1.6. Result. 23 23 23 24 25 26 27 40

Table

Embed Size (px)

Citation preview

  • iv

    Table of content

    Page

    REPORT COVER LETTER i ACKNOWLEDGEMENTS.. ii ABSTRACT... iii TABLE OF CONTENTS. iv LIST OF TABLES.. vi LIST OF FIGURES vii LIST OF ABBREVIATIONS.. xi CHAPTER I Introduction..

    1.1. Objective. 1.2. Company Profile. 1.3. 10 Safety Guidelines. 1.4. Knowledge backgrounds training

    1 1 1 2 2

    CHAPTER II Training Overview.. 2.1. Training in Artificial lift operator.

    2.1.1. Installing and commissioning beam pump. 2.1.2 Jet-pump Reading. 2.1.3. Maintenance Prime mover motor.

    2.2. Training in Test and Production operator. 2.2.1. BS&W cut test procedure. 2.2.2. API gravity test procedure 2.2.3 SG gas test procedure.

    2.2.4 Crude oil loading procedure

    11 11 11 17 18 19 20 21 21 22

    CHAPTER III Assignment. 3.1. Solving the leakage of the W300H by changing the Packing.

    3.1.1. Why Packing Fails. 3.1.2. Packing type. 3.1.3. Packing Selection. 3.1.4. Packing Size Selection. 3.1.5. Procedure to changing the packing of pump W300H. 3.1.6. Result.

    23 23 23 24 25 26 27 40

  • v

    TABLE OF CONTENTS (Continued)

    Page 3.2. Valve type and categories.

    3.2.1. Linear motion valve (Multi-turn valve). 3.2.2. Rotary motion valves (Quarter-Turn valves).

    3.3. Process connection type. 3.3.1. Flange. 3.3.2. Hammer Union. 3.3.3. Fitting. 3.3.4. Tubing. 3.3.5. Gaskets.

    41 41 46 50 50 54 58 60 63

    CHAPTER IV Conclusion.. 67 REFERENCES. 68 Appendix Appendix A Appendix B. Appendix c.

    70 71 84 90