Table 5.3 Strategic plan for irrigation development proposed under PMKSY District - Sundargarh Sl No Name of the Blocks/ Sub Districts Concerned Ministry/ Department Component Activity Total Number Irrigation Potential (Ha) Estimated cost (Rs. in Crore) 1 2 3 4 5 6 7 8 1 MoWR AIBP Irrigation 0 0 0 2 MoWR Medium Irrigation 05 6950 73.00 3 MoWR Surface Minor Irrigation 85 1594 34.447 Sub Total AIBP 90 8544 107.447 4 MoWR Har Khet Ko Pani Community Lift Irrigation Project 658 13160 131.60 5 MoWR Revival of Community Lift Irrigation Points 200 4000 30.00 6 MoWR Extension of distribution system of community lift Irrigation points 300 1500 6.00 7 MoWR Construction of New deep bore well 5000 20000 200.00 8 MoWR Revival of defective bore well 1000 1000 5.00 9 MoWR Installation of solar pump in bore well 200 16.00 10 MoWR Ground water Development (Dugwell ) 10000 4000 150.00 11 MoWR RRR of Water Bodies (Minor Irrigation ) 100 7781.87 159.705 12 MoWR CADA Construction of field channel 98 10000 147.00 13 MoWR Renovation of village Tank 2000 2000 100.00 14 MoWR Farm Pond 10000 4000 108.274 15 MoWR Minor irrigation (C.D) 371 11114.13 146.00 Sub Total HKKP 29929 78556 1199.579 16 MOA &FW- DAC&FW Non -DPAP Drip 14000 0 140 17 MOA &FW- DAC&FW Per drop more crop Non -DPAP Sprinkler 20000 0 58.58

Table 5.3 Strategic plan for irrigation development proposed under ...ordistportalcontent.nic.in/storeddata/notification/ORISUN_NOTF... · Table 5.3 Strategic plan for irrigation

  • Upload
    buikhue

  • View
    223

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Table 5.3 Strategic plan for irrigation development proposed under ...ordistportalcontent.nic.in/storeddata/notification/ORISUN_NOTF... · Table 5.3 Strategic plan for irrigation

Table 5.3 Strategic plan for irrigation development proposed under PMKSY

District - Sundargarh

Sl No

Name of

the

Blocks/

Sub

Districts

Concerned

Ministry/

Department

Component Activity Total

Number

Irrigation

Potential

(Ha)

Estimated cost

(Rs. in Crore)

1 2 3 4 5 6 7 8

1

MoWR AIBP

Irrigation 0 0 0

2

MoWR Medium Irrigation 05 6950 73.00

3

MoWR

Surface Minor Irrigation 85 1594 34.447

Sub Total AIBP 90 8544 107.447

4

MoWR Har Khet Ko Pani Community Lift Irrigation Project 658 13160 131.60

5

MoWR

Revival of Community Lift Irrigation Points 200 4000 30.00

6

MoWR

Extension of distribution system of

community lift Irrigation points 300 1500 6.00

7

MoWR

Construction of New deep bore well 5000 20000 200.00

8

MoWR

Revival of defective bore well 1000 1000 5.00

9

MoWR

Installation of solar pump in bore well 200

16.00

10

MoWR

Ground water Development (Dugwell ) 10000 4000 150.00

11

MoWR

RRR of Water Bodies (Minor Irrigation ) 100 7781.87 159.705

12

MoWR

CADA Construction of field channel 98 10000 147.00

13

MoWR

Renovation of village Tank 2000 2000 100.00

14

MoWR

Farm Pond 10000 4000 108.274

15

MoWR

Minor irrigation (C.D) 371 11114.13 146.00

Sub Total HKKP 29929 78556 1199.579

16

MOA &FW-

DAC&FW Non -DPAP Drip 14000 0 140

17

MOA &FW-

DAC&FW

Per drop more crop Non -DPAP Sprinkler 20000 0 58.58

Page 2: Table 5.3 Strategic plan for irrigation development proposed under ...ordistportalcontent.nic.in/storeddata/notification/ORISUN_NOTF... · Table 5.3 Strategic plan for irrigation

18

MOA &FW-

DAC&FW

(Supplementary water

management activities)

Micro lift 80 00 0.28

Sub Total PDMC 34080 00 198.86

19

DoLR-MoRD PMKSY Watershed Newly created WHS 2000 5000 100.00

20

DoLR-MoRD

Farm Ponds 2000 400 1.00

21

DoLR-MoRD

Check Dam 200 1000 20.00

22

DoLR-MoRD

Renovated WHS 1000 2000 10.00

23

DoLR-MoRD

Check Dams 50 100 1.00

24

DoLR-MoRD

Percolation Tanks 600 3000 30

Sub Total Watershed 5850 11500 162.00

Total PMKSY - - 1667.886

25

DoLR-MoRD Convergence with

MGNREGA Land Development 10000 0 50.00

Sub Total Convergence 10000 0 50

26

DoWR, Odisha State Plan Mega lift 31 39500 581.00

Sub Total state plan 31 39500 581.00

GRAND TOTAL

79980 138100 2298.886

Page 3: Table 5.3 Strategic plan for irrigation development proposed under ...ordistportalcontent.nic.in/storeddata/notification/ORISUN_NOTF... · Table 5.3 Strategic plan for irrigation

2016-17 2017-18 2018-19 2019-20 2020-21

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

1

Major/Medium Phulbari Phulbari Sapai

Instream

storage

structure

ISS-23 New 500 1250 250 400 400 200 0

2Major/Medium 7 Nos 47 Nos.

Rukura

Nala

Dam & Canal

systemMed-1

On

going 4392.00 5596.53 1865.51 1865.51 1865.51 1865.51

3 Major/Medium Narendra 17 Nos.Rukura

Nala

Dam & Canal

systemMed-1

On

going

Project

1071.00 1827.85 1014.46 519.32 294.07

Bargaon

Gurundia

Bonai

DISTRICT IRRIGATION PLAN, SUNDARGARH (MAJOR , MEDIUM )

Sl.No Name of the Block Name of the G.PLocation/

Village

Name of

River/ Nala

Type of the

Project

Nomencl

ature of

project

Nature

of work

Potential to

be created

in Ha

Approxima

te cost of

the project

in Lakhs

Requirement of funds in Lakhs

Page 4: Table 5.3 Strategic plan for irrigation development proposed under ...ordistportalcontent.nic.in/storeddata/notification/ORISUN_NOTF... · Table 5.3 Strategic plan for irrigation

Major/Medium Raidihi Raidihi BasundharaInstream storage

structureISS-21 New 800 2000 400 600 600 400

Total 7 800 2000.00 400.00 600.00 600.00 400.00

Major/Medium Rutkpedi Kundurukhunt DeoInstream

storage ISS-24 New 700 1750 350 500 500 350 0

Total 2 700 1750 350 500 500 350 0

6 Major/Medium Kinjirma Kinjirma SafaiConstruction of

BarrageMed-12 New 1200 3000 600 800 1000 600 0

Sundargarh

Lephripada

4

5

Nuagaon

Page 5: Table 5.3 Strategic plan for irrigation development proposed under ...ordistportalcontent.nic.in/storeddata/notification/ORISUN_NOTF... · Table 5.3 Strategic plan for irrigation

2016-17 2017-18 2018-19 2019-20 2020-21

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1

Major/Mediu

mBalisankara Telijore Ib

Dam & Canal

systemMaj-1 New 40000 250000 400.00

Project cost

includes L.A,

R&R and F.C

cost.

Balisankara Ghoghar IbConstruction of

BarrageMed-9 New 9000 8000 1600 1600 1600 1600 1600

Balisankara Balisankara Dungajor Instream storage

structureISS-11 New 400 1000 200 200 200 200 200

Deobhubanpur Rasti Kukuda Instream storage

structureISS-12 New 200 500 100 200 200 0 0

Tildega Jabladihi Kukuda Instream storage

structureISS-13 New 450 1200 240 240 240 240 240

Tumlia Tumulia BandajorInstream storage

structureISS-14 New 250 625 150 250 225 0 0

Ghoghar Ib Megalift M.L-15 New 500 1000 200 300 300 200 0

Kusumura Ib Megalift M.L-16 New 500 1000 200 300 300 200 0

CAD Work 1 No 4 Nos TIP CAD Work TIP Existing 544 303.10 160.00 143.10 0.00 0.00 0.00Stabilization

of canal

system

Total 9 51844 263628.10 3250.00 3233.10 3065.00 2440.00 2040.00

2

Major/Mediu

mPhulbari Phulbari Sapai

Instream

storage

structure

ISS-23 New 500 1250 250 400 400 200 0

Megalift Phulbari Phulbari Sapai Megalift M.L-28 New 1200 3000 600 800 800 800 0

Bargaon Bargaon Sapai Megalift M.L-29 New 700 1750 400 600 500 250 0

Total 3 2400 6000 1250 1800 1700 1250 0

DISTRICT IRRIGATION PLAN, SUNDARGARH (MAJOR , MEDIUM,MEGA LIFT & CAD WORK)

Sl.NoName of

the BlockName of the G.P

Location/

Village

Name of

River/ Nala

Type of the

Project

Nomencl

ature of

project

Nature

of work

Potential to

be created

in Ha

Approxima

te cost of

the project

in Lakhs

Requirement of funds in Lakhs

Remarks

Balisankara

Balance will be expensed as per work

programme.

Megalift

Bargaon

Page 6: Table 5.3 Strategic plan for irrigation development proposed under ...ordistportalcontent.nic.in/storeddata/notification/ORISUN_NOTF... · Table 5.3 Strategic plan for irrigation

3

Badabamua Badabamua KoelInstream storage

structureISS-2 New 1600 4000.00 800 800 800 800 800

Manko Barsuan KoelInstream storage

structureISS-25 New 800 2000.00 400 400 400 400 400

Jhirpani Jhirpani KoelConstruction of

BarrageMed-7 New 2500 6200.00 1240 1240 1240 1240 1240

Jamsara Koel Megalift M.L-4 New 1200 2400.00 400 600 800 600 0

Masarikudar Koel Megalift M.L-5 New 900 1800.00 500 700 600 0 0

Ursu Koel Megalift M.L-6 New 800 1600.00 500 500 600 0 0

Total 6 7800 18000.00 3840 4240 4440 3040 2440

4

7 Nos 47 Nos.Rukura

Nala

Dam & Canal

systemMed-1

On

going 4392.00 5596.53 1865.51 1865.51 1865.51 1865.51

RugudaBarghat & 10

other villagesKarapani

Dam & Canal

systemMed-2 New 1136 2840.00 400.00 600.00 600.00 800.00 440.00

Project cost

includes L.A,

R&R and F.C

cost.

Megalift Ruguda Jangla Brahmani Megalift M.L-2 New 1000 2000.00 500.00 500.00 500.00 500.00

Total 3 6528.00 10436.53 2765.51 2965.51 2965.51 3165.51

5

Narendra 17 Nos.Rukura

Nala

Dam & Canal

systemMed-1

On

going

Project

1071.00 1827.85 1014.46 519.32 294.07

Megalift Satkuta Satkuta Brahmani Megalift M.L-1New

600.00 1200.00 300.00 300.00 300.00 300.00

Total 1 1671.00 3027.85 1314.46 819.32 594.07 300.00

6

Jamdihi Jamdihi SamijDam & Canal

systemMed-8

New

3200 7500 600 1600 1800 1800 1700

Project cost

includes L.A,

R&R and F.C

cost.

Koira Nadikasira KaroInstream storage

structureISS-6 New 80 200.00 80.00 80.00 40.00 0.00 0.00

Kalta Kusumdihi KaroInstream storage

structureISS-7 New 70 175.00 40.00 50.00 60.00 25.00 0.00

Malda Gopasahi SunaInstream storage

structureISS-8 New 100 175.00 40.00 50.00 60.00 25.00 0.00

Malda Kolmong SunaInstream storage

structureISS-9 New 70 175.00 40.00 50.00 60.00 25.00 0.00

Major/Mediu

m

Koira

Bisra

Major/Mediu

m

Megalift

Major/Mediu

m

Gurundia

Major/Mediu

m

Bonai

Page 7: Table 5.3 Strategic plan for irrigation development proposed under ...ordistportalcontent.nic.in/storeddata/notification/ORISUN_NOTF... · Table 5.3 Strategic plan for irrigation

Malda Sargigarh TeheraiInstream storage

structureISS-10 New 60 150.00 40.00 50.00 60.00 0.00 0.00

Total 6 3580 8375.00 840.00 1880.00 2080.00 1875.00 1700.00

Major/Mediu

m

Page 8: Table 5.3 Strategic plan for irrigation development proposed under ...ordistportalcontent.nic.in/storeddata/notification/ORISUN_NOTF... · Table 5.3 Strategic plan for irrigation

7

Rangabira-1 Sankha Megalift M.L-9 New 1125 2250.00 400.00 500.00 500.00 550.00 300.00

Rangabira-2 Sankha Megalift M.L-10 New 1975 3950.00 500.00 700.00 1000.00 1000.00 750.00

Kautenposh Sankha Megalift M.L-11 New 700 1400.00 300.00 300.00 400.00 400.00 0.00

Salangbahal Sankha Megalift M.L-12 New 900 1800.00 400.00 400.00 500.00 500.00 0.00

Mitikundiri Deo Megalift M.L-13 New 1200 2400.00 300.00 500.00 500.00 600.00 500.00

Riughat Koel Megalift M.L-14 New 880 1760.00 300.00 300.00 600.00 560.00 0.00

Total 6 6780 13560.00 2200.00 2700.00 3500.00 3610.00 1550.00

8

Megalift Laxmiposh Sankha Megalift M.L-30 New 1950 3900 800 1000 700 700 700

Total 1 1950 3900 800 1000 700 700 700

9

Major/

Medium

Haladikudar/Khut

ugaon13Nos Karapani

Dam & Canal

systemMed-2 New 2364 5910.00 600.00 1400.00 1500.00 1500.00 910.00

Megalift Biritola Brahmani Megalift M.L-3 New 3000 6000.00 500.00 800.00 1000.00 700.00

Total 1 5364 11910.00 1100.00 2200.00 2500.00 2200.00 910.00

10

Jhartarang Vedvyas KoelConstruction of

BarrageMed-3 New 600 2500.00 500 500 500 500 500

Jhartarang Gopapali SankhaInstream storage

structureISS-1 New 1000 2500.00 500 500 500 500 500

Canal Lining KIP New 490 1936.00 400 400 550 586

Ramjodi DolakudarHatibura

Nala

Dam & Canal

systemMed-4 New 3450 10400.00 0 400 3000 3500 3500

Project cost

includes L.A,

R&R and F.C

cost.

Bad dalki & 3

others

Gailo & 37

other villagesChandrinala

Dam & Canal

systemMed-5 New 5000 12500.00 0 1000 4000 4500 3000

Project cost

includes L.A,

R&R and F.C

cost.

Total 5 10540 29836.00 1400.00 2800.00 8550.00 9586.00 7500.00

Lathikata

Major/

Medium

Kuarmunda

Megalift

Kutra

Lahunipada

Page 9: Table 5.3 Strategic plan for irrigation development proposed under ...ordistportalcontent.nic.in/storeddata/notification/ORISUN_NOTF... · Table 5.3 Strategic plan for irrigation

11

Major/Mediu

mLefripada Lefripada Ichha

Instream storage

structureISS-18 New 300 750 200 250 250 100

Ujalpur Jhariapali Ichha Instream storage

structureISS-19 New 300 750 200 250 250 100

Badbanga Bharatpur Ichha Instream storage

structureISS-20 New 400 1000 250 300 300 150

Raidihi Raidihi BasundharaInstream storage

structureISS-21 New 800 2000 400 600 600 400

Darlipali Darlipali BasundharaInstream storage

structureISS-22 New 800 2000 400 600 600 400

Megalift Badbanga Bharatpur Ichha Instream storage

structureM.L-25 New 700 1400 300 400 500 200

CAD Work 2Nos 6 Nos SIP CAD Work SIP Existing 509 489.60 100.00 150.00 100.00 139.60Stabilization

of canal

systemTotal 7 3809 8389.60 1850.00 2550.00 2600.00 1489.60

12Major/Mediu

mRutkpedi Kundurukhunt Deo

Instream

storage ISS-24 New 700 1750 350 500 500 350 0

Megalift Madhupur Deo Megalift M.L-31 New 800 1600 400 400 400 400 0

Total 2 1500 3350 750 900 900 750 0

13

Major/Mediu

mKeseramal Keseramal Naktijore

Instream Storage

structureISS-3 New 200 500.00 100 100 100 100 100

Kulmur Jamdihi NaktijoreInstream Storage

structureISS-4 New 240 600.00 120 120 120 120 120

Canal Lining KIP New 342 1350.00 300 300 400 350

Stabilization

of canal

system

Keseramal Pada PadaInstream Storage

structureISS-5 New 150 500.00 100 100 100 100 100

Khairidihi-1 Sankha Megalift M.L-7 New 1375 2750.00 400 500 600 700 550

Khairidihi-2 Sankha Megalift M.L-8 New 1900 3800.00 700 900 1000 600 600

Total 6 4207 9500.00 1720.00 2020.00 2320.00 1970.00 1470.00

Nuagaon

Rajgangpur

Lephripada

Megalift

Page 10: Table 5.3 Strategic plan for irrigation development proposed under ...ordistportalcontent.nic.in/storeddata/notification/ORISUN_NOTF... · Table 5.3 Strategic plan for irrigation

14

Gangpurgarh Dainidihi IbConstruction of

BarrageMed-9 New 2200 5500 0 1500 2000 2000 0

Subdega SubdegaSanbandajo

rInstreamstorage

structureISS-15 New 400 1000 200 200 200 200 200

Gangpurgarh Dainidihi Ib Megalift M.L-17 New 2000 4000 800 1000 1200 1000 0

Dumerbahal Katingdihi Ib Megalift M.L-18 New 2000 4000 800 1000 1200 1000 0

Total 4 6600 14500.00 1800.00 3700.00 4600.00 4200.00 200.00

15Major/Mediu

mMasnikani Kudabaga Ib

Construction of

BarrageMed-10 New 3000 12000 2400 2400 2400 2400 2400

Lankahuda Kopsingha IbConstruction of

BarrageMed-11 New 1800 14000 2800 2800 2800 2800 2800

Kundukela Kaintara SafaiInstream storage

structureISS-16 New 700 1750 350 350 350 350 350

Majhapada Amsranga SafaiInstream storage

structureISS-17 New 800 2000 400 700 500 400 0

Kinjirma Kinjirma SafaiConstruction of

BarrageMed-12 New 1200 3000 600 800 1000 600 0

Megalift Majhapada Amsranga Safai Megalift M.L-19 New 1400 2800 800 800 800 400 0

Majhapada Badakachhar Safai Megalift M.L-20 New 1200 2400 800 800 800 0 0

Lankahuda Semina-1 Ib Megalift M.L-22 New 2000 4000 1000 1000 1000 1000 0

Lankahuda Semina-2 Ib Megalift M.L-23 New 2000 4000 1000 1000 1000 1000 0

Majhapada Tileimalti Safai Megalift M.L-24 New 1000 2000 400 700 500 400 0

Total 10 15100 47950 10550 11350 11150 9350 5550

16

Megalift Jogimal Bileigarh-1 Ib Megalift M.L-26 New 2000 4000 1000 1000 1000 1000

Jogimal Bileigarh-2 Ib Megalift M.L-27 New 2000 4000 1000 1000 1000 1000

Mahulpali Bandhapali Ib Megalift M.L-21 New 1300 2600 800 600 600 600 0

Total 3 5300 10600 2800 2600 2600 2600

Grand TotalTotal No. of

project 73 134973.00 462963.00

Megalift

Sundargarh

Tangarpali

Subdega

Major/

Medium

Page 11: Table 5.3 Strategic plan for irrigation development proposed under ...ordistportalcontent.nic.in/storeddata/notification/ORISUN_NOTF... · Table 5.3 Strategic plan for irrigation

BlockGram

PanchayatVillage

Co

mm

un

ity

LIP

Req

uir

emen

t o

f F

un

d

( i

n L

ak

h)

Po

ten

tia

l to

be

Cre

ate

d (

in H

a)

Rep

air

ing

/ R

eno

va

tio

n

of

Co

mm

un

ity

LIP

Req

uir

emen

t o

f F

un

d

( i

n L

ak

h)

Po

ten

tia

l to

be

Cre

ate

d (

in H

a)

Clu

ster

Mic

ro R

iver

Lif

t

Pro

ject

No

s o

f P

roje

ct

Req

uir

emen

t o

f F

un

d

( i

n L

ak

h)

Po

ten

tia

l to

be

Cre

ate

d (

in H

a)

Mic

ro I

riig

ati

on

sy

stem

(S

pli

nk

er

/Dri

p)

No

s o

f P

roje

ct

Req

uir

emen

t o

f F

un

d

( i

n L

ak

h)

Pu

mp

set

Req

uir

emen

t o

f F

un

d

( i

n L

ak

h)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

1 Sundargarh Baragad Dhaulakhaman Dhaulakhaman 20 16

Gadiajore-III 24.5 16

Gadiajore-IV 26 16

3 Sundargarh Baragad Kendamal Kendmal-II 17 16

4 Sundargarh Bhasma Bhasma Bhasma 1 10 2

5 Sundargarh Bhasma Kainsara Kainsara 1 16

Talburei 17 16

Mundapara 20 16 Palidihi 2 16 Biribira 1 10 2 Biribira 1 0.35

7 Sundargarh Birbira Khuntdarah Khuntdarah-II 26 16

8 Sundargarh Birbira Talsara Talsara 1 10 2

9 Sundargarh Deuli Deuli Deuli 1 10 2 Deuli 1 0.35

10 Sundargarh Deuli Rengalbud Rengalbud 21.5 16

11 Sundargarh Kinjirma Ghantbud Ghantibud-III 17 16

12 Sundargarh Kinjirma Kinjirma Taldihi 17 16 Kinjirma 1 10 2 Kinjirma 1 0.35

13 Sundargarh Kulta Fillingibahal Filllingibahal 6 16

14 Sundargarh Kulta Ghumunda Ghumunda 2 20 4 Ghumunda 1 0.35

15 Sundargarh Kulta Lamti Lamti-V 23 16 Lamti 3 30 6 Lamti 2 0.7

16 Sundargarh Kundukela Kaintara Kaintara 2 20 4 Kaintara 1 0.35

17 Sundargarh Kundukela Kundukala Kundukala 1 10 2 Kundukala 1 0.35

18 Sundargarh Lahandabud Anangapani Anangapani 24.5 16

DISTRICT IRRIGATION PLAN(2016-2023)

Agency: O.A.I.C.Ltd., Sundargarh

OFFICE OF THE DISTRICT MANAGER, THE ODISHA AGRO INDUSTRIES CORPORATION LIMITED, SUNDARGARH

280 30.80

2

6

Sector

Sl

No

Location

BiribiraBirbiraSundargarh

GadiajoreBaragadSundargarh

Page 12: Table 5.3 Strategic plan for irrigation development proposed under ...ordistportalcontent.nic.in/storeddata/notification/ORISUN_NOTF... · Table 5.3 Strategic plan for irrigation

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

19 Sundargarh Lahandabud Baghenipani Baghenipani 26 16

20 Sundargarh Lahandabud Ghantbud Ghantbud 2 20 4 Ghantbud 1 0.35

21 Sundargarh Ledhimong Bandubahal Bandubahal 1 10 2

22 Sundargarh Ledhimong Tileimalti Tileimalti 17 16 Tileimalti 1 10 2 Tileimalti 1 0.35

23 Sundargarh Majhapara Amasaranga Amasaranga 2 16 Amasaranga 1 10 2

24 Sundargarh Majhapara Aunlajore Aunlajore 1 10 2

25 Sundargarh Masanikani Kudabaga Kudabaga 1 10 2 Kudabaga 1 0.35

26 Sundargarh Masanikani Tilingapali Tilingapali 3.5 16 Tilingapali 1 10 2

Manamunda-II 17 16

Manamunda-III 23 16

28 Sundargarh Salepali Jarmal Jarmal 1 10 2 Jarmal 1 0.35

29 Sundargarh Salepali Kumutimunda Kumutimunda 1 10 2

30 Tangarpali Jogimal Bilaigarh Bilaigarh 2 20 4 Bilaigarh 2 0.7

31 Tangarpali Jogimal Dambahal Dambahal 2 20 4 Dambahal 1 0.35

32 Tangarpali Jogimal Saradhapali Saradhapali 1 10 2 Saradhapali 1 0.35

Jamunadhipa-I 21.5 16

Jamunadhipa-II 23 16

33 Tangarpali Kiripsira Kepse Kepse 1 10 2

34 Tangarpali Kiripsira Khamarbahal Khamarbahal 2 20 4 Khamarbahal 2 0.7

35 Tangarpali Kiripsira Kiripsira Kiripsira 1.5 16 Kiripsira 2 20 4 Kiripsira 1 0.35

36 Tangarpali Kiripsira Suruda Suruda 2 20 4 Suruda 1 0.35

37 Tangarpali Mahulpali Chakramal Chakramal 20.00 16 Chakramal 2 20 4 Chakramal 1 0.35

38 Tangarpali Mahulpali Kurga Kurga 6 60 12 Kurga 2 0.7

39 Tangarpali Mangaspur Daldali Daldali 6 60 12 Daldali 3 1.05

40 Tangarpali Mangaspur Dhauraadha Dhauraadha 1 10 2 0

41 Tangarpali Mangaspur Mangaspur Mangaspur 1 10 2 Mangaspur 1 0.35

42 Tangarpali Mangaspur Renda Renda 1 10 2 Renda 1 0.35

43 Tangarpali Meghdega Budabahal Budabahal 2 20 4 Budabahal 1 0.35

44 Tangarpali Meghdega Katra Katra 1 10 2

45 Tangarpali Meghdega Meghdega Meghdega 2 20 4 Meghdega 2 0.7

280 30.80

27

2

280

Jamunadhipa 1 10JamunadhipaKiripsiraTangarpali

Bad SalepaliSalepaliSundargarh

30.80

Page 13: Table 5.3 Strategic plan for irrigation development proposed under ...ordistportalcontent.nic.in/storeddata/notification/ORISUN_NOTF... · Table 5.3 Strategic plan for irrigation

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

46 Tangarpali Meghdega Parbatberna Parbatberna 3 16 Parbatberna 2 20 4 Parbatberna 1 0.35

47 Tangarpali Nialipali Dumerkud Dumerkud 3 30 6 Dumerkud 2 0.7

48 Tangarpali Nialipali Jhimermahul Jhimermahul 18.5 16 Jhimermahul 1 10 2

49 Tangarpali Nialipali Nialipali Nialipali 2 20 4 Nialipali 1 0.35

50 Tangarpali Nialipali Telipali Telipali 3 30 6 Telipali 2 0.7

51 Tangarpali Ratanpur Ratanapur Ratanapur 2 20 4 Ratanapur 1 0.35

Tangarbhadi-III 20 16

Tangarbhadi-IV 26 16 Tangarmunda

53 Tangarpali Remenda Remenda Remenda 2 20 4 Remenda 1 0.35

54 Tangarpali Sanpatrapali Aleikera Aleikera 1.5 16 Aleikera 2 20 4 Aleikera 1 0.35

55 Tangarpali Sanpatrapali Khuntgaon Khuntgaon 2 20 4 Khuntgaon 1 0.35

56 Tangarpali Sanpatrapali Sanpatrapali Sanpatrapali 4 40 8 Sanpatrapali 2 0.7

57 Tangarpali Tangarpali Rangiamunda Rangiamunda 3 30 6 Rangiamunda 1 0.35

58 Tangarpali Tangarpali Rupabahal Rupabahal 2 20 4 Rupabahal 1 0.35

59 Tangarpali Tangarpali Kuanboga Chanaguda 17 16

60 Tangarpali Tasaladihi Kalobahal Kalobahal 1 10 2 Kalobahal 1 0.35

61 Tangarpali Ujalpur Fuldhudi Fuldhudi 1 10 2

62 Lephripara Badbanga Bharatpur Bharatpur 17 16 Bharatpur 1 10 2

63 Lephripara Badbanga Dharuadihi Dharuadihi 5 16

64 Lephripara Chhatenpali Chauramahul Chauramahul 2 20 4 Chauramahul 1 0.35

65 Lephripara Chhatenpali Chhatenpali Chhatenpali 3 30 6 Chhatenpali 1 0.35

66 Lephripara Chhatenpali Suruguda Bhogarapara 17 16 Suruguda 1 10 2 Suruguda 1 0.35

67 Lephripara Dumabahal Dumabahal Dumabahal 3 30 6

68 Lephripara Dumabahal Karanjkhol Karanjkhol 21.5 16 Karanjkhol 1 10 2

69 Lephripara Dumabahal Luthurkend Luthurkend 23 16 Luthurkend 1 10 2

70 Lephripara Giringkela Bairagibahal Bendujharia 3 16

71 Lephripara Giringkela Bendujharia Bendujharia 1 10 2

72 Lephripara Giringkela Giringkela Giringkela 26 16 Giringkela 2 20 4 Giringkela 1 0.35

73 Lephripara Giringkela Satjoria Satjoria-III 24.5 16 Satjoria 3 16 Satjoria 2 20 4

74 Lephripara Giringkela Telendihi Telendihi 1 10 2

75 Lephripara Hurmei Suanjore Suanjore 1 10 2 Suanjore 1 0.35

52 1 10 2

280

RatanpurTangarpali Tangarmunda

30.80

30.80280

Page 14: Table 5.3 Strategic plan for irrigation development proposed under ...ordistportalcontent.nic.in/storeddata/notification/ORISUN_NOTF... · Table 5.3 Strategic plan for irrigation

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

76 Lephripara Jhurimal Diamunda Diamunda 3 30 6 Diamunda 2 0.7

77 Lephripara Jhurimal Jhulendihi Jhulendihi 1 10 2 Jhulendihi 1 0.35

78 Lephripara Jhurimal Kuturuma Kuturuma 1 10 2

79 Lephripara Lephripara Badgaonmal Badgaonmal 1 10 2 Badgaonmal 1 0.35

80 Lephripara Lephripara Lephripara Lephripara 20 16 Lephripara 1 10 2 Lephripara 1 0.35

81 Lephripara Lephripara Suarijore Suarijore 21.5 16 Suarijore 1 10 2

82 Lephripara Masabira Masabira Masabira 26 16 Masabira 1 10 2 Masabira 1 0.35

83 Lephripara Raidihi Raidihi Raidihi 23 16

84 Lephripara Rajbahal Bandega Bandega 1 10 2 Bandega 1 0.35

85 Lephripara Rajbahal Bilaibahal Bilaibahal 1 10 2 Bilaibahal 1 0.35

86 Lephripara Rajbahal Juniani Juniani 1 10 2 Juniani 1 0.35

87 Lephripara Rajbahal Rajbahal Rajbahal-II 26 16 Rajbahal 2 20 4 Rajbahal 1 0.35

88 Lephripara Saraphgarh Bichhuabahal Bichhuabahal 1 10 2 Bichhuabahal 1 0.35

89 Lephripara Saraphgarh Kaniaghati Kaniaghati 24.5 16 Kaniaghati 1 10 2 Kaniaghati 1 0.35

90 Lephripara Saraphgarh Kasaijharan Kasaijharan 1 10 2 Kasaijharan 1 0.35

91 Lephripara Sargipali Dhelsara Banjaribar 18.5 16 Dhelsara 1 10 2 Dhelsara 1 0.35

92 Lephripara Sargipali Sargipali Sargipali 2 20 4 Sargipali 2 0.7

93 Hemgir Ankelbira Daghora Daghora 1 10 2 Daghora 1 0.35

94 Hemgir Ankelbira Kaudarh Kaudarh 1 10 2

95 Hemgir Ankelbira Rohini Rohini 1 10 2

96 Hemgir Garjanjore Bileimunda Bileimunda 1 10 2 Bileimunda 1 0.35

97 Hemgir Garjanjore Kuarkela Kuarkela 4 40 8 Kuarkela 1 0.35

98 Hemgir Gopalpur Gopalpur Gopalpur 1 10 2 Gopalpur 1 0.35

99 Hemgir Gopalpur San Rampia San Rampia 1 10 2 San Rampia 1 0.35

100 Hemgir Julumbahal Beheramunda Beheramunda 3 30 6 Beheramunda 3 1.05

101 Hemgir Julumbahal Khajuribahal Khajuribahal 4 40 8 Khajuribahal 1 0.35

Khursi-III 20 16

Khursi-IV 26 16 Khursi 3 30 6 Khursi 3 1.05

103 Hemgir Julumbahal Tumbapali Tumbapali 1 10 2 Tumbapali 1 0.35

104 Hemgir Kanaktura Kanaktora Kanaktora 1 10 2

102 KhursiJulumbahalHemgir

30.80

30.80

280

280

Page 15: Table 5.3 Strategic plan for irrigation development proposed under ...ordistportalcontent.nic.in/storeddata/notification/ORISUN_NOTF... · Table 5.3 Strategic plan for irrigation

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

105 Hemgir Kanaktura Ratakhandi Ratakhandi 1 10 2 Ratakhandi 1 0.35

106 Hemgir Kanika Tangardihi Ghinachal 17 16 Tangardihi 1 10 2 Tangardihi 1 0.35

107 Hemgir Kendudihi Kodbahal Kodbahal 17 16 Kodbahal 3 30 6 Kodbahal 1 0.35

108 Hemgir Kuchedega Daldali Daldali 1 10 2 Daldali 1 0.35

109 Hemgir Kuchedega Dhanrasi Dhanrasi 18.5 16 Dhanrasi 1 10 2

110 Hemgir Kuchedega Khadu Kuchedega 1 10 2 Kuchedega 1 0.35

111 Hemgir Kuchedega Kuchedega Pandiapali 1 10 2

112 Hemgir Kuchedega Ramlata Ramlata 1 10 2 Ramlata 1 0.35

113 Hemgir Kuchedega Surulata Surulata 1 10 2 Surulata 1 0.35

114 Hemgir Laikera Laikera Laikera 1 10 2

115 Hemgir Laikera Nangalkata Nangalkata 3 16 Nangalkata 1 10 2 Nangalkata 1 0.35

116 Hemgir Munderkhet Munderkhet Munderkhet 1 10 2 Munderkhet 1 0.35

117 Hemgir Tapria Chandarpur Chandarpur 18.5 16 Chandarpur 1 10 2 Chandarpur 1 0.35

118 Hemgir Tapria Samarpinda Samarpinda 23 16

119 Damkuda-II 23 16

120 Damkuda-II 24.5 16 Damkuda 1 10 2 Damkuda 1 0.35

Bhagapali-IV 20 16

Bhagapali-V 24.5 16

Bhagapali-VI 26 16 Bhagapali 3 30 6 Bhagapali 1 0.35

122 Subdega Hamirpur Chhatasargi Chhatasargi 1 10 2 Chhatasargi 1 0.35

123 Subdega Hamirpur Hamirpur Hamirpur 24.5 16 Hamirpur 1 10 2

124 Subdega Hamirpur Jagannathposh Jagannathposh 23 16 Jagannathposh 1 10 2 Jagannathposh 1 0.35

125 Subdega Hamirpur Panchamahala Panchamahala 26 16 Panchamahala 1 10 2

126 Subdega Hamirpur Sudarsanpur Sudarsanpur 20 16 Sudarsanpur 1 10 2

127 Subdega Hamirpur Tiljore Tiljore 1 10 2 Tiljore 1 0.35

128 Subdega Jaisar Gailo Gailo 1 10 2 Gailo 1 0.35

129 Subdega Jaisar Jaisar Jaisar 8 16 Jaisar 1 10 2 Jaisar 1 0.35

130 Subdega Jaisar Rasipatra Rasipatra 1 10 2

131 Subdega Jamuna Jamuna Jamuna 1 10 2 Jamuna 1 0.35

132 Subdega Karamdihi Badmal Badmal 23 16 Badmal 1 10 2 Badmal 1 0.35

133 Subdega Karamdihi Gilkudar Gilkudar-II 20 16 Gilkudar 1 10 2 Gilkudar 1 0.35

280

BhagapaliHamirpurSubdega

Damkuda

121

DamkudaSubdega

30.80

30.80

280

Page 16: Table 5.3 Strategic plan for irrigation development proposed under ...ordistportalcontent.nic.in/storeddata/notification/ORISUN_NOTF... · Table 5.3 Strategic plan for irrigation

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

134 Subdega Karamdihi Karamdihi Karamdihi 1 10 2

135 Subdega Kiralaga Kiralaga Kiralaga 18.5 16 Kiralaga 3 30 6 Kiralaga 2 0.7

136 Subdega Kukuridihi Gangpurgarh Gangpurgarh 21.5 16 Gangpurgarh 2 20 4 Gangpurgarh 1 0.35

Kukuridihi-IV 21.5 16

Kukuridihi-V 23 16 Kukuridihi 1 10 2 Kukuridihi 1 0.35

138 Subdega Kurumkel Kainsara Kainsara 1 10 2 Kainsara 1 0.35

139 Subdega Kurumkel Kurumkel Kurumkel 1 10 2 Kurumkel 1 0.35

140 Subdega Rajpur Dainidihi Dainidihi 18.5 16 Dainidihi 1 10 2 Dainidihi 1 0.35

141 Subdega Rajpur Kanika Kanika 3 30 6 Kanika 3 1.05

142 Subdega Rajpur Rebedamal Rebedamal 23 16 Rebedamal 1 10 2 Rebedamal 1 0.35

143 Subdega Rajpur Tedegamuhan Tedegamuhan 1 10 2

144 Subdega Subalaya Bhojapur Bhojapur 3 16 Bhojapur 1 10 2

145 Subdega Subalaya Jagatgarh Jagatgarh 1 10 2

146 Balisankara Balisankara Telijore Telijore 2 20 4 Telijore 2 0.7

147 Balisankara Bandega Bandega Bandega 2 20 4 Bandega 2 0.7

148 Balisankara Bandhbahal Bandhbahal Bandhabahal-II 20 16 Bandhbahal 1 10 2 Bandhbahal 1 0.35

149 Balisankara Bandhbahal Bankidihi Bankidihi 1 10 2 Bankidihi 1 0.35

150 Balisankara Bandhbahal Bijagarh Bijagarh 1 10 2 Bijagarh 1 0.35

151 Balisankara Bandhbahal Kinikibandh Kinikibandh 26 16 Kinikibandh 1 10 2 Kinikibandh 1 0.35

152 Balisankara Bandhbahal Peruaada Peruaada 24.5 16 Peruaada 1 10 2 Peruaada 1 0.35

153 Balisankara Birkaldihi Birkaldihi Birkaldihi 21.5 16 Birkaldihi 2 20 4

154 Balisankara Birkaldihi Putudihi Putudihi 1 10 2 Putudihi 1 0.35

155 Balisankara Karuabahal Kaintara Kaintara 1 10 2 Kaintara 1 0.35

Karuabahal 17 16

Gosainpara 26 16 Karuabahal 2 20 4 Karuabahal 1 0.35

157 Balisankara Kusumura Kusumara Kusumura 26 16 Kusumara 2 20 4 Kusumara 1 0.35

158 Balisankara Kusumura Raidihi Raidihi 2 20 4 Raidihi 1 0.35

159 Balisankara Rampur Kurei Kurei 1 10 2 Kurei 1 0.35

160 Balisankara Saunamara Saunamara Saunamara 18.5 16 Saunamara 2 20 4 Saunamara 1 0.35

161 Balisankara Talsara Rauldega Rauldega 1 10 2 Rauldega 1 0.35

162 Balisankara Tileikani Sikajore Sikajore 2 20 4 Sikajore 1 0.35

280

137

280

KaruabahalKaruabahal156 Balisankara

KukuridihiSubdega Kukuridihi

30.80

30.80

Page 17: Table 5.3 Strategic plan for irrigation development proposed under ...ordistportalcontent.nic.in/storeddata/notification/ORISUN_NOTF... · Table 5.3 Strategic plan for irrigation

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

163 Balisankara Tileikani Tileikani Tileikani 1 10 2 Tileikani 1 0.35

164 Bargaon Barangakachhar Patuabeda Patuabeda 3 16 Patuabeda 1 10 2 Patuabeda 1 0.35

165 Bargaon Bargaon Bargaon Bargaon 2 20 4 Bargaon 1 0.35

Kinjirkela-I 20 16

Kinjirkela-II 24.5 16

Kinjirkela-III 26 16 Kinjirkela 1 10 2 Kinjirkela 1 0.35

167 Bargaon Bhoipali Bhoipali Bhoipali 2 20 4 Bhoipali 1 0.35

168 Bargaon Bhoipali Kharikamunda Kharikamunda 1 10 2 Kharikamunda 1 0.35

169 Bargaon Bhoipali Raidihi Raidihi 1 10 2 Raidihi 1 0.35

170 Bargaon Ekma Bamdera Bamdera 2 16 Bamdera 1 10 2

171 Bargaon Ekma Bansikar Bansikar 18.5 16 Bansikar 1 10 2

172 Bargaon Ekma Ekma Ekma 1 10 2 Ekma 1 0.35

173 Bargaon Ekma Padampur Padampur 17.00 16 Padampur 1 10 2 Padampur 1 0.35

174 Bargaon Fulbari Bausen Bamdera 1 10 2 Bausen 1 0.35

175 Bargaon Fulbari Chamunda Chamunda 3 30 6 Chamunda 1 0.35

176 Bargaon Fulbari Fulbari Fulbari 2 20 4 Fulbari 1 0.35

177 Bargaon Fulbari Mahapada Mahapada 3 30 6 Mahapada 2 0.7

178 Bargaon Fulbari Turiposh Turiposh 1 10 2 Turiposh 1 0.35

179 Bargaon Itma Bhikampur Bhikampur 23 16 Bhikampur 1 10 2 Bhikampur 1 0.35

180 Bargaon Itma Salbira Salbira 18.5 16 Salbira 1 10 2 Salbira 1 0.35

181 Bargaon Jarangloi Baliposh Baliposh 2 20 4 Baliposh 1 0.35

182 Bargaon Jarangloi Beheramal Beheramal 1 10 2 Beheramal 1 0.35

183 Bargaon Jarangloi Jarangloi Jarangloi 1 10 2 Jarangloi 1 0.35

184 Bargaon Jarangloi Kustuna Kustuna 26 16 Kustuna 1 10 2

185 Bargaon Pamra Pamra Pamra 1 10 2 Pamra 1 0.35

186 Bargaon Rungaon Badkhaman Badkhaman 1 10 2

187 Bargaon Sahajbahal Jhantalbud Jhantalbud 2 20 4 Jhantalbud 2 0.7

188 Bargaon Sahajbahal Manchamara Manchamara 1 10 2 Manchamara 1 0.35

189 Bargaon Sahajbahal Manoharpur Manoharpur 21.5 16 Manoharpur 1 10 2 Manoharpur 1 0.35

190 Bargaon Tiklipara Panderpali Panderpali 1 10 2 Panderpali 1 0.35

30.80

166

280

KinjirkelaBargaonBargaon

280 30.80

Page 18: Table 5.3 Strategic plan for irrigation development proposed under ...ordistportalcontent.nic.in/storeddata/notification/ORISUN_NOTF... · Table 5.3 Strategic plan for irrigation

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

191 Bargaon Tudalaga Jangli Jangli 1 10 2 Jangli 1 0.35

192 Kutra Amgova Amgova Amgova 2 20 4 Amgova 1 0.35

193 Kutra Amgova Elga Elga-I 6 16 Elga 2 20 4 Elga 2 0.7

Mangarkunda-I 4 16

Mangarkunda-II 4 16

Jharapada 3.5 16

Nuatoli 3.5 16

195 Kutra Amgova Kahapani Kahapani 3 30 6 Kahapani 2 0.7

196 Kutra Amgova Samlaimunda Samlaimunda-III 18.5 16 Samlaimunda 2 20 4

197 Kutra Gangajal Khuntmunda Khuntmunda-II 21.5 16

198 Kutra Gyanpali Laxmiposh Laxmiposh 20 16 Laxmiposh 2 20 4 Laxmiposh 2 0.7

199 Kutra Jharbeda Jharbeda Jharbeda 1 10 2 Jharbeda 1 0.35

200 Kutra Katang Katang Katang 1 10 2 Katang 1 0.35

201 Kutra Khatkurbahal Kulenbahal Kulenbahal 26 16 Kulenbahal 1 10 2 Kulenbahal 1 0.35

202 Kutra Khatkurbahal San Barcha San Barcha 1 10 2 San Barcha 1 0.35

203 Kutra Kundeimunda Kandeimunda Koronga 1 10 2 Koronga 1 0.35

204 Kutra Nuagaon Nuagaon Nuagaon 2 20 4 Nuagaon 2 0.7

205 Kutra Rajabasa Rajabasa Rajabasa-V 23 16 Rajabasa 2 20 4 Rajabasa 2 0.7

206 Kutra Tarkera Pangniabahal Pangniabahal 1 10 2 Pangniabahal 1 0.35

207 Kutra Tarkera Tarkera Tarkera 1 10 2 Tarkera 1 0.35

208 Kutra Tarkera Udurma Udurma 1 10 2 Udurma 1 0.35

209 Kutra Tunmura Tunmura Tunmura 1 10 2 Tunmura 1 0.35

210 Rajgangpur Chungimati Chungimati Chungimati 18.5 16 Chungimati 2 20 4 Chungimati 1 0.35

211 Rajgangpur Jareikela Jareikela Jareikela 26 16 Jareikela 1 10 2 Jareikela 1 0.35

30.80

30.80

194

280

280

280 30.80

JauramundaKutra Amgova

16

220 4

24.5Jauramunda-III

Jauramunda-IV 26

Jauramunda 2

16

0.7Jauramunda