295
1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April 2009) PREPARED BY: BRAJ K. SHARMA, INTERNATIONAL ENERGY COMMERCIAL EXPERT ICE WORKING GROUP

TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

 

TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE)

TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT)

(April 2009)

PREPARED BY:

BRAJ K. SHARMA,

INTERNATIONAL ENERGY COMMERCIAL EXPERT

ICE WORKING GROUP

Page 2: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

                                                                           Annex 1                            

Table: Activities Undertaken by the ICE Secretariat/Commercial Advisory Team

 

Tasks Assigned as per TOR Activities undertaken by the ICE Team Comments/Remarks

Establishment of the ICE Secretariat (Component 1)

1. Establish ICE secretariat operation based at MEW, including procurement of office equipment and technically competent local and international consultants.

Established ICE Secretariat (physical); recruited local consultants, office manager and office staff; procured office equipment, furniture, and supplies; and established office procedures

None

2. Provide a formal setting in which in which interministerial dialogue and information exchange can be conducted regularly.

Held consultation/discussion sessions with ministries (MEW, MOM, MRRD) and government agencies (DABM/S, CSO) on development of energy database; Organized discussion sessions on power purchase agreements and participated in these; Organized working meetings and made presentations on DABS Articles of Incorporation.

None

3. Enhance the government ability to interact with donors and potential investors as a coordinated counterpart through regular meetings and review of energy assistance portfolios.

Developed energy database for use by potential investors and planners; Conducted discussion sessions on power purchase agreements including pointers on negotiations

None

4. Provide regularly published information updates through a national energy awareness campaign and maintain an ICE website.

This activity was not undertaken ICE website was not established as the person responsible for developing/ maintaining website was not available. Software simulation experience was added to this position by ADB but since ICE was not extended by six months as planned, the position remained vacant .

 

Page 3: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

                                                                           Annex 1                            

Table: Activities Undertaken by the ICE Secretariat/Commercial Advisory Team

 

Tasks Assigned as per TOR Activities undertaken by the ICE Team Comments/Remarks

5. Encourage participation of other government entities, Afghan citizens and sector operators to disseminate how the sector is being developed for the long term, community by community.

This activity has not started yet None

B. Establishment of Commercial Advisory team to help build energy sector strategic planning and commercial capacity (Component 2)

6. Establish a quality on the ground technical advisory team comprised of International and Afghan experts within the ICE secretariat to facilitate capacity building that leads to the development of baseline market-sector strategic information.

Identified and recruited local experts, translators and other office staff .

International experts were recruited by ADB

7. Coordinate ministry, donor, sector and key stakeholder energy activities

Facilitated extensive coordination among Office of the President, MEW,Ministry of Justice, Ministry of Economy, DABM, and others during the drafting and approval of DABS Articles of Incorporation; facilitated coordination between various stakeholders during drafting of power purchase agreements with Tajikistan/Uzbekistan and subsequent negotiations; established dialogue between various parties during the drafting of ANDS and costing of projects

 

Page 4: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

                                                                           Annex 1                            

Table: Activities Undertaken by the ICE Secretariat/Commercial Advisory Team

 

Tasks Assigned as per TOR Activities undertaken by the ICE Team Comments/Remarks

8. Compile and review of existing energy information; identify information gaps; and review past and current projects funded by the Government, Donors and Private Sector

Developed an Energy Database with extensive consultation with energy sector organizations (MEW, MOM, MRRD, DABS, others). Its objective is to provide data for planning of energy projects as well as to provide important information for potential investors for making investment decisions. The Database documents the following: all projects/activities completed as of Government of Afghanistan's fiscal year 1387 (2008-2009) and those activities planned during the next five years (1388-1392) in the energy sector comprised of electric power, renewable energy (solar, wind, micro hydro, etc), coal, oil, and gas; actual consumptions, supply and demand of electricity; resources available for generating electric power; and population information for estimating demand.

The Database should be continuously updated and maintained for which an inter-ministerial task force should be created to coordinate the effort; the actual update and the maintenance should be the responsibility of the respective ministries and agencies. The TOR required the Energy Commercial Expert to prepare a private sector energy database based on available data. Since there were no data available and there was no time and resources to conduct an indepth survey, this was not done. Instead, as it was and also it was more relevant for planning and investment purpose to develop an overall energy database covering all subsectors (electric power, renewable energy, coal, natural gas, oil, etc), the said expert put a lot of effort to complete it.

 

Page 5: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

                                                                           Annex 1                            

Table: Activities Undertaken by the ICE Secretariat/Commercial Advisory Team

 

Tasks Assigned as per TOR Activities undertaken by the ICE Team Comments/Remarks

9. Review existing governance , legal and regulatory frameworks and recommend areas for improvements

Drafted, edited, presented and explained Articles of Incorporation of DABS. Several working meetings and presentations were done for MOF, MEW, MOJ officials including Ministers and Deputy Ministers. ICE Team also explained the Articles to the Legal Subcommittee of Cabinet, attended by Vice-President, Minister of Finance, Minister of Economy, Minister of Energy, Minister of Justice and Minister of Religious Affairs. Provided other extensive inputs, as follows: Prepared a paper titled ‘Status of Afghan Energy Sector Regulation’ which documented the of the energy sector, legal and regulatory aspects; reviewed ‘Hydrocarbons Law (Bill) and Regulations’; and drafted Independent Power Producer Framework;

Cabinet approved the Articles of Incorporation

10. Assist in improving financial aspects in the energy sector and train personnel

- Provided technical assistance in selection and procurement of Accounting package for DABM/S - Assisted DABM to prepare financial statements for 2007 (it was the first time that data was collected from Breshnas, summarized and a trial balance and financial statement prepared) - Provided technical assistance in gathering

 

Page 6: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

                                                                           Annex 1                            

Table: Activities Undertaken by the ICE Secretariat/Commercial Advisory Team

 

data and maintaining fixed assets register of DABM and Breshnas - Drafted TOR for external auditing of DABM, attended meetings with MOF and ARDS on inviting proposals, and assisted in evaluating these items

11. Update Power Sector Master Plan (PSMP) developed by the Norwegian consulting firm Norconsult in 2003.

Developed and submitted for ADB consideration a detailed proposal to update the PSMP including resources required, timeline and budget. The update is quite an extensive undertaking for the Energy Commercial Consultant to handle.

ADB has realized this oversight and is now considering how to go about it.

12. Prepare an emergency fuel strategy for 2006-2007, including assessment of diesel use, coal supply and transport, kerosene and other fuel sources for winter;

This activity was cancelled (see Comments and Remarks section)

The activity became redundant as the period for the emergency fuel strategy had already elapsed.

13. Develop specific energy sector planning skills to conduct economic assessments and budget planning utilizing existing date.

Assisted in drafting of Afghan National Development Strategy for Energy including several revisions and data gathering.; developed a five-year investment plan for the power sector prior to and after the Paris Donor’s meeting as requested by the Ministry of Finance; prepared a list of priority projects for MEW.

Assisted the Planning Department of the MEW

 

Page 7: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

                                                                           Annex 1                            

Table: Activities Undertaken by the ICE Secretariat/Commercial Advisory Team

 

Tasks Assigned as per TOR Activities undertaken by the ICE Team Comments/Remarks

14. Prepare sector plans and corresponding budget based demand.

Assisted ANDS and MEW on preparing the national energy sector strategy; assisted ANDS/MEW and the Ministry of Finance on preparing 5 –year costing of power projects and adjusting the costing after Paris Donors Meeting in June 2008; submitted proposal to ADB for updating the power sector master plan developed by Norconsult in 2003.

None

15. Promote regional and provincial participation in energy planning resulting in the production of energy plans.

Met with Provincial Reconstruction Teams of Parwan, Kapisa, Nangarhar, and others to determine energy requirement, to connect distribution systems and transmission lines from substations to provinces, repair of Darunta HPP including discussions with USAID

None

16. Actively disseminate sector strategies to key government donor, and private sector player.

Worked actively with MOF, ANDS and MEW during the drafting of the Energy Sector Strategy and the development of ANDS costing before and after the Paris Donor’s Conference in June 2008; advised ADB of assistance through Weekly/Monthly reports; participated actively in the General ICE Meetings on a monthly basis.

None

 

Page 8: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

                                                                           Annex 1                            

Table: Activities Undertaken by the ICE Secretariat/Commercial Advisory Team

 

 

Tasks Assigned as per TOR Activities undertaken by the ICE Team Comments/Remarks

17. Adopt and issue sector plans for public consumption.

ICE Working Group is not authorized to issue the sector plans for public consumption

None

18. Develop sufficient legal and contracting skills.

Strengthened capacity of MEW in the development of Power Purchase Agreements and its negotiations; also oriented MEW on development of Independent Power Producer framework.

None

19. Prepare Inception Report, Weekly Report, Monthly Report and Final Report to inform ADB and others of the progress of the TA and the outputs.

These reports were prepared and submitted to ADB. Monthly reports were also submitted to other stakeholders.

None

Page 9: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

 

Support to Inter-ministerial Commission for Energy (ICE)

TA Evaluation Report

Table of Contents

Introduction

Activities Undertaken, Outputs Produced and Objectives Met by ICE Team

Description of Major Activities Project Constraints Recommendations

Annex 1 - Activities Undertaken by the ICE Secretariat/Commercial Advisory Team

Annex 2 - Proposed Consulting Approach, Organization, and

Estimated Budget for Updating PSMP Prepared by ICE Commercial Advisory Team

Page 10: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

 

TA – 4918 (AFG): Support to Inter-ministerial Commission for Energy (ICE)

TA Evaluation Report

1. Introduction The Government of Afghanistan approved the establishment of the Interministerial Commission for Energy (ICE) to serve as a coordinating and policy-making body for energy sector activities in Afghanistan through the enactment of a Presidential Decree dated 2 November 2006. The Asian Development Bank (ADB) approved the Government request for Technical Assistance to support ICE on 31 January 2007. The overall objective of the Technical Assistance to support ICE (TA-ICE) is to establish a central and credible government body to support, develop and facilitate a coherent energy and power strategy for Afghanistan. These objectives are realized through the following two components of TA-ICE: establishment of the ICE Secretariat and the establishment of the Commercial Advisory Team within the Secretariat. Specifically the TA project was implemented to achieve the following:

• Coordinate ministry, donor, sector, and key stakeholders energy activities; • Develop commercial understanding and planning skills among government and

energy sector leaders including sector governance and legal, financial and technical capacity;

• Prepare sector plans and corresponding budgets based on demand; • Support the development of regulatory functions, including market –based

contracting and oversight; and • Build local capacity to oversee and monitor energy planning and development in

Afghanistan through transfer of international know how.

The ICE Secretariat/Commercial Advisory Team, collectively called the Team started ICE activities with the appointment of the Energy Legal and Governance Expert in July 2007 followed by the appointment of other international consultants: Energy Finance Expert in August 2007, the Executive Director in November 2007 and the Energy Commercial Expert in May 2008, almost a year after the TA start-up. The report is prepared by Braj K. Sharma, the International Energy Commercial Expert in the absence of the other three experts who completed their assignment and left the project on the following dates: Executive Director - 1 March 2009 Energy Finance Expert - 6 September 2008 Energy Legal and Governance Expert- 30 June 2008

Page 11: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

 

The report summarizes the activity undertaken, outputs produced, and the objectives met by the Team and the constraints faced and provide several recommendations. Annex 1 summarizes the activities undertaken vis-à-vis the tasks assigned in the TOR and Annex 2 provides a proposal to update the Power Sector Master Plan.

2. Activities Undertaken, Outputs Produced and Objectives Met by ICE Team The Tasks assigned to ICE Secretariat / Commercial Advisory Team (Team) as per the TOR in the ADB TA Report dated December 2006 and the corresponding list of activities undertaken by the Team are detailed in Annex 1. It is presented according to the two ICE components: (A) Establishment of the ICE Secretariat; and (B) Establishment of a Commercial Advisory Team within the ICE Secretariat to help build energy sector strategic planning and commercial capacity. Any comments/remarks are presented in the third column. As seen in the Table in the next page, the Team met many of the TA objectives and completed assigned tasks (for detailed report on activities undertaken and accomplishment, see Annex 1).

Table: Activity Undertaken, Output Produced and Objective Met (Referenced to ADB Technical Assistance Report)

Activity

Undertaken/Accomplishment Output Produced Objective Met

Established fully operational ICE Secretariat based at MEW including recruitment of local consultants/staff, procurement of office equipment/furniture and establishment of office procedures

Established Office within MEW to serve as a point of contact and to liaise effectively with stakeholders

Set up fully operational ICE Secretariat/operations

Implemented all reporting requirement of ICE:

Inception Report, Weekly Report, Monthly Report and TA Evaluation Report. (Monthly Report to ICE Chairman and MEW Deputy Minister; all reports to ADB)

Inform and build local capacity to monitor developments in the energy sector

Page 12: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

 

Assisted in drafting of Afghanistan National Development Strategy for energy and preparation of five-year investment plan taking into consideration the annual development budget for 1387(2008-2009) working closely with MEW

Annual budget planning and preparation (ANDS and five-year investment plans/ projects costing)

-Develop planning skills among government/energy sector leaders;

-Prepare sector plans and corresponding budgets

Performed data gathering and analysis for Energy Database covering all sub sectors: electricity, coal, gas, oil, and renewable energy through extensive coordination with ministries and agencies involved in the energy sector, that is, MEW, MOM, MRRD, DABS and others; Submitted to Deputy Minister of MEW and MOM, and to ADB

ADB has introduced simulation software for planning of power projects

Energy Database – national energy generation, resources available for energy, use and demand covering electricity, coal, gas, oil and renewable energy, population / household data

Provided Plexos simulation software and trained two staff members, one each from MEW and DABS

-Develop commercial understanding and planning skills among government/energy sector leaders

-Build local capacity to oversee and monitor energy planning and development

- Strengthen planning capacity

Prepared proposal to update Power Sector Master Plan (PSMP) which would facilitate the actual update. This activity is comprehensive and could not be done by one consultant.

Proposal to update Power Sector Master Plan

Objective partially achieved – proposal will facilitate the update as it provides an approach, the expertise required for both international and domestic consultants, and estimated budget for the study

No activity was performed in developing the Emergency Energy Fuel Strategy for 2007/08 winter

None Objective not met - this requirement became redundant since the International Energy Commercial Expert was recruited after 2007/08 winter

Page 13: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

 

Provided on the job training to counterpart staff and local consultant on national energy strategy, five-year investment plans, and developing energy database.

Training to counterpart staff on energy strategy, planning of energy projects, governance and legal, and data gathering

-Develop commercial understanding and planning skills among government /energy sector leaders

-Build local capacity to oversee and monitor energy planning and development

Team assisted in selection, procurement, and installation of Accounting package for DABM; assisted in preparing financial statement for 2007; provided technical help in developing a fixed asset register for DABM and Breshnas; and helped in recruiting an external auditor for DABM

-Accounting software package for DABM

- Financial statement for 2007

- Fixed asset register for DABM/Breshnas

- Recruitment of DABM external auditor

Instituted financial management improvements in the energy sector

Team was not able to launch ICE website

None, could not find the webmaster

Objective not met - launching of ICE Website to present a national energy awareness campaign

Team assisted and worked closely with various ministries and agencies in accomplishing/assisting in the following: drafting of Independent Power Producer Framework; review of power purchase agreement; drafting and approval of DABS Articles of Incorporation; development of Energy Database;

-Independent Power producer Framework

-DABS Articles of Incorporation

-Comments on Power Purchase Agreement

- Energy Database (draft)

- Afghanistan National Development Strategy/Costing of projects; Five-year investment plans

-Coordinate ministry, donor, sector and key stakeholders energy activities

-Develop commercial understanding /planning skills among government/energy sector leaders including legal, financial, and technical capacity

Page 14: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

 

Reviewed and supported the development of legal and regulatory functions by preparing a paper titled ‘Status of Afghan Energy Sector Regulations’, reviewed hydrocarbon law, drafted independent power producer framework, and others.

-Status of Afghan energy sector regulations

- Review of Hydrocarbon law

-Independent Power Producer Framework (Draft)

- Review of existing governance, legal and regulatory framework

Provided planning assistance to MEW Planning Department

-Developed TOR for feasibility study on electrification of Sheendand and Andraskan districts in Herat province

-Developed TOR for feasibility study of Baharak HPP in Badakshan

-Review of TOR for Olambagh HPP

-Develop commercial understanding and planning skills at MEW

3. Description of Major Activities

3.1 Coordination with energy sector agencies/coordination among agencies and donors

• The Commercial Advisory Team (Team) worked with all energy sector agencies, namely, Office of the President, MEW, MOM, MRRD (NSP, NABDP), MOCI, DABM/S, MOF, Ministry of Justice (MOJ) and the Central Statistics Organization for demographic data. The coordination covered various areas: development of energy sector strategy, costing of development projects, development of Energy Database, drafting and approval of Articles of Incorporation, among others.

• Likewise, the Team facilitated coordination among these agencies and between the agencies and the donors.

3.2 Assistance in developing energy strategy and planning

• The Team assisted MEW in drafting of Afghanistan National Development Strategy (ANDS) for energy including preparation of several revisions of the ANDS; assisted MEW in identifying power projects to fit the strategy; developed costing of the projects for five-years as required by MOF and ANDS office before

Page 15: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

 

Paris Donors Meeting in June 2008, and adjustment of the investment plan after the Paris Conference to reflect Donors’ amount approved; and assisted MEW in developing a list of priority projects for inclusion in the strategy.

• The Ministry of Energy has emphasized the update of the power sector master plan as a top priority project of the Government. This is also realized by the donors. Realizing this, the Team submitted a proposal to ADB for the update of the PSMP which proposed an approach and methodology, the expertise required, and estimated a budget for the study. ADB has not responded to the consultant’s proposal. Originally the update was included in the TOR of the Commercial Energy Expert without realizing the extent of work involved. The update work requires several international and domestic consultants and data gathering and validation process is critical. This oversight was realized by ADB.

• In promoting regional and provincial participation in energy planning, the team consulted with Provincial Reconstruction Teams from Parwan, Kapisa, Nangarhar, and others on energy requirement, connection of transmission/distribution lines from substations to provinces, and repair of HPP projects.

• Provided planning assistance to MEW planning department in the following: developed the TOR for the feasibility study for electrification of Sheendand and Andraskan districts in Herat Province; developed TOR for feasibility study of Baharak HPP in Badaskhan Province; review of TOR for feasibility study for Olambagh HPP; and review of TOR for Operation and Maintenance contract of North East Power Systems (NEPS).

3.3 Development of an Energy Database covering all subsectors of energy

The Commercial Advisory Team developed an Energy Database (Database) covering all subsectors of energy. The objectives are to provide data for planning of energy projects and provide valuable information to potential investors for making investment decisions. The Database documents the following: all projects/activities completed as of Government of Afghanistan's fiscal year 1387 (2008-2009) and those activities planned during the next five years (1388-1392) in the energy sector comprised of electric power, renewable energy (solar, wind, micro hydro, etc), coal, oil, and gas; actual consumptions, supply and demand of electricity; resources available for generating electric power; and population information for estimating demand. The ICE mandate was to gather data from existing and secondary sources. However, except for MRRD’s National Solidarity Program (NSP), the data was not readily available. Thus the Team developed information through extensive consultation with all organizations involved in the energy, as noted in Section 3.1 above. Draft Database was submitted to ADB/TASU, Deputy Minister Energy, MEW and Deputy Minister, Ministry of Mines.

Page 16: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

 

3.4 Assistance in Governance and Regulations

The Team assisted energy sector ministries and agencies in legal and regulatory functions. The Team prepared the following deliverables:

• Paper titled ‘Status of Afghan Energy Sector Regulation’ which outlines the existing governance of the energy sector, legal and regulatory aspects, implications of a non-regulated Afghan energy market, and regulatory requirements;

• Reviewed and commented on the Hydrocarbon Law (Bill) and Regulations;

• Drafted Independent Power Producer Framework; • Drafted, reviewed and discussed DABS Articles of Incorporation with

Ministry of Justice, MOF, High Council of Economic Affairs and Special Committee of the Cabinet; and

• Reviewed power purchase agreement 3.5 Project Administration and Reporting

• Establishment of ICE Secretariat in MEW - The Team established the ICE Secretariat at the MEW as a point of contact for all energy sector organizations on office space provided by the MEW. The Team recruited all local consultants and staff, procured office equipment, furniture, and supplies, and established office procedures.

• With respect to routine reporting requirement, the Team submitted the following reports: inception report, weekly update report, monthly report and the TA evaluation report.

• The Team attended the general ICE meetings held once a month which was attended by all donors and sector ministries/organizations.

4. Project Constraints

In general, the low institutional capacity in the country has affected ICE like other projects in the country. A major constraint has been the weak management and technical capability of the three most important organizations in the sector, namely, the Ministry of Energy and Water, the Ministry of Mines, and the electric utility DABS. The ongoing and planned capacity building effort by the donors should alleviate some of the deficiencies. Some of the ICE -specific constraints are summarized below.

• Only a few energy sector organizations have taken advantage of the ICE consultant’s coordination role to the extent feasible. The concept of assigning counterparts to work with the consultants to receive on-the-job training is attractive and should be taken advantage of by these organizations.

Page 17: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

10 

 

• Limited staff capability exists in the ministries/agencies but those qualified and capable staff is demanded by both the donors and consultants to work with them. Thus the capable staff is overloaded while the vast majority remains idle.

• It was difficult to find qualified domestic consultants in the energy sector to work with the team. As a result, a number domestic consultant positions remained vacant. The Team was forced to use one MEW senior staff as one of the domestic consultants. In spite of him having joined ICE, he had at the same time some ministry assigned responsibilities which he had to complete.

• Data gathering for the Energy Database at the DABS, MEW and more so at MOM was extremely difficult. Extensive consultations were necessary to develop the Database as the Management Information Systems (MIS) was non-existing. The data that was available were very disorganized and time consuming technique had to be used to extract the data. Furthermore, data gathered had to be validated as these were not fully reliable.

• Substantial delays in recruiting the Energy Commercial Expert resulted in lack of coordination between him and the other two international consultants. Such a project should have all international consultants start at the same time because of the extensive coordination required. Ideally this would have been achieved by recruiting a firm rather than independent consultants which would have not only facilitated coordination among consultants but would have also addressed many administrative problems as discussed below.

• The project faced a few administrative problems, such as delay in procuring office equipment because of unavailability of funds in a timely manner, delay in receive office operation and travel advances, delay in payment to consultants/staff, etc. Such deficiencies resulted in delays in various activities. Use of a firm would have avoided such delays as it would have been responsible for planning for funds.

5. Recommendations

5.1 Strengthening of Planning Function at MEW and MOM

While all aspects of operation of the three important energy sector organizations, namely, MEW, DABS and MOM needs strengthening, the planning function should be given a top priority in all three organizations. It is vital that reliable and quick data be made available to planners and potential investors. ADB provided Plexos simulation software is such as planning tool for updating power sector master plan, energy database and other planning aspects. MEW and DABS should be responsible for fully utilizing the software. ADB recently trained two employees on the software, one each from MEW and DABS.

Page 18: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

11 

 

5.2 Power Sector Master Plan Update

There is an urgent need to update the power sector master plan (PSMP), a top priority of the MEW and the donor community. The PSMP prepared by the Norwegian firm Norconsult back in 2003, although a comprehensive document, it was completed at a time when data available was insufficient and in addition significant infrastructure and institutional changes have been introduced in to the Afghan power sector that should now be considered in the overall sector planning.

A proposal to update the PSMP is presented in Annex 2. Ideally, a Utility Planner should lead the effort. The proposal includes a proposed approach, consulting organization showing international and domestic expertise required, inputs required from MEW/DABS and the estimated budget for the study.

5.3 Continuing Update of Energy Database

The draft Energy Database must be continuously updated. The update and maintenance of the Database should be the responsibility of individual organizations responsible for generating data, that is, the MEW, MOM, DABS, MRRD/NSP and the CSO for population data. Because it involves various organizations, it is suggested that an interministerial task force, led by the Ministry of Finance be responsible for coordinating the update/maintenance of the Database.

5.4 Legal and Regulatory Framework – Power Sector

Recommendations on Legal and Regulatory Framework are presented in the ICE Team’s Report titled ‘Status of Afghan Energy Sector Regulation’ dated February 2008 referred in this report.

Page 19: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

 

 

ASIAN  DEVELOPMENT  BANK 

TA‐4918 (AFG) – SUPPORT TO INTER‐MINISTERIAL COMMISSION FOR ENERGY (ICE) 

 

 

 

ENERGY DATABASE 

(March 2009) 

Prepared by: 

International Energy Commercial Expert 

ICE Working Group 

Page 20: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

 

Support to Inter-ministerial Commission for Energy (ICE)

Energy Database

Table of Contents

Page

Introduction

Objectives

Key Features of the Database

Database Coverage, Description and Assumptions/Comments

Recommendations for Updating Database

Section 1 - Tables (by Region and Province)

Table 1‐A ‐   Projects Completed (as of 1387) and Ongoing/Future (1388‐1392) Projects‐ Generation/Transmission/ Distribution  

Table 1‐B ‐   Projects Completed (as of 1387) and Ongoing/Future (1388‐1392) Projects – Coal‐fired, Gas‐fired and Diesel‐fired 

 Table 1‐C ‐   Projects Completed (as of 1387) and Ongoing/Future 

(1388‐1392) Projects‐ Renewable energy   Table 2‐ A‐  Resources Available for Energy‐ Hydropower 

Page 21: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

 

Table 2‐ B‐  Resources Available for Energy‐ Coal, Gas and Oil 

Table 2‐C‐  Resources Available for Energy‐ Renewable Energy 

Table 3 ‐  Table 3 ‐ Population Data by Province/District 

Section 2 Tables (by Country-wide and Province)

Table 4 - Supply (Actual Capacity) and Demand of Electricity, and                                 Surplus/Deficiency (MW) by Province (1386)  

Table 5 ‐    Supply (Actual Capacity) and Demand of Electricity, and                                      Surplus/Deficiency (MW) by Province (1387)  

Table 6 - Supply (Actual Capacity) and Demand of Electricity, and Surplus/Deficiency (MW) by Province (1390)      Table 7- Projected Supply and Demand of Other Energy Sources,

and Surplus/Deficiency by Province

Table 8- Projected Supply and Demand of Renewable Energy Sources, and Surplus/Deficiency by Province

Table 9 ‐   Private Sector Involvement in Energy Development 

Projects  Completed (as of 1387) and Planned (1388‐1392) ‐ Generation/Transmission/Distribution Projects  

                                 Table10 - Private Sector Involvement in Energy Development

Projects Completed (as of 1387) and Planned (1388-1392) - Coal-fired / Gas- fired/Small diesel

Table11 - Private Sector Involvement in Energy Development

Projects Completed (as of 1387) and Planned (1388-1392) - Renewable energy

Table12 - Private Sector Production of Resources Used in Energy Generation Projects as of 1387 and Planned Projects (1388-1392) - Coal, gas, oil

Table13-A - Energy Firms Doing/Interested in Business in Afghanistan

– Electric Power

Page 22: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

 

Table13-B- Energy Firms Doing/Interested in Business in Afghanistan

- Coal/gas/oil  Table13-C - Energy Firms Doing/Interested in Business in Afghanistan

- Renewable Energy  Table14- - Number of Customers, Consumption and Tariffs by

Province - Residential Customers ( 1387)  Table14-B - Number of Customers, Consumption and Tariffs by Province - Government, NGOs and Holy Places (1387) Table14-C - Number of Customers, Consumption and Tariffs by Province - Industrial and Commercial Category (1387) 

Page 23: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

 

Draft

Asian Development Bank

TA-4918 (AFG) - Support to Inter-Ministerial Commission for Energy

Energy Database

(March 2009)

A. Introduction

The Energy Database is developed by the Working Group of the ADB-assisted Inter-ministerial Commission for Energy (ICE), in accordance with the terms of reference of the ADB. It was prepared by Braj K. Sharma, the ICE International Energy Commercial Expert who was supported by Eng. Mohammad Hashim Alimi, the local Strategic Planning Expert, and Sher Agha Nassiry, the local Commercial Expert.

The Energy Database (Database) covers all sub-sectors related to the energy sector: electric power, renewable energy, coal, natural gas, and diesel/oil. The data was gathered through extensive interaction with ministries/agencies involved in the energy sector, such as, the Ministry of Energy and Water (MEW), Ministry of Mines (MOM), Da Afghanistan Breshna Sherkat (DABS) offices in Kabul and four provinces, and the Ministry of Rural Rehabilitation and Development (MRRD) including the Ministry’s National Solidarity Program (NSP) and the National Area Based Development Program (NABDP), and the Central Statistical Organization (CSO). Existing documents and reports relating to energy sector were also reviewed. Additionally, a brief survey/data gathering was conducted in four provinces, especially on existing use of assets or planned acquisition of assets for electric power generation, transmission, and distribution, and supply and consumption of electricity. The ICE mandate was to gather data from existing and secondary sources. However except for MRRD’s NSP which maintained some data on renewable energy, other data were not available readily and had to be developed with extensive consultation with responsible ministries/agencies.

Page 24: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

 

The Database is presented in the following three parts:

• A write-up on the Database including objectives, key features of the Database, and description of each table, assumptions used and comments on data availability, and recommendations for updating the Database;

• Section1 - Detailed data by province/region covering generation, transmission, distribution, energy resources, and population; and

• Section 2 - Integrated national data or data by province – Actual capacity (supply) and demand for electricity, projected supply and demand of other energy sources, private sector involvement in generation of electricity and other energy sources, listing of firms interested in energy projects in Afghanistan, and electricity consumption and tariffs for various categories of customers by province.

B. Objective

The objective of the Energy Database (Database) is to provide data for planning of energy projects as well as to provide important information for potential investors for making investment decisions. The Database documents the following: all projects/activities completed as of Government of Afghanistan's fiscal year 1387 (2008-2009) and those activities planned during the next five years (1388-1392) in the energy sector comprised of electric power, renewable energy (solar, wind, micro hydro, etc), coal, oil, and gas; actual consumptions, supply and demand of electricity; resources available for generating electric power; and population information for estimating demand.

C. Key Features of the Database

The Database provides important information for users engaged in planning of energy projects, especially power projects, and those who are interested in general in knowing the energy situation in the country. Attempt has been made to bring data across the energy sector in one document.

Key features of the Database are as follows:

• Compiles available data required in planning of energy projects under one document and provides recommendations for update of the Database;

Page 25: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

 

• Provides an up to date inventory of completed power projects by province including hydropower, thermal power, imported power, diesel/oil-fired, micro hydro, solar, transmission lines and distribution networks, and substations;.

• Resources available for generating energy by province including hydropower, coal, gas, oil, and renewable energy resources;

• Actual capacity (supply) and estimated demand for electric power for 1386 (2007-2008), 1387 (2008-2009) and 1390 (2011-2012);

• Projected supply and demand of other energy sources (natural gas, coal, oil, renewable energy);

• Electric power consumption and average tariffs by category of customers (residential, government, commercial and industrial) for each province;

• Comprehensive list of firms (engineering, consulting, and construction) interested in doing business in Afghanistan in electric power, coal, natural gas, oil and renewable energy; and

• Existing (1387) and projected (1390) population by province and each district within the province.

D. Database Coverage, Description and Assumptions/Comments

The Data was developed using either existing information or through extensive interaction and discussions with organizations/agencies in the energy sectors, primarily, MEW, MOM, MRRD, DABM/S, and the CSO. This data is presented in two sections: Section 1 covers detailed information by province / region and Section 2 provides either integrated national data or data by province. The coverage of each section is presented below. Section 1 – Data by Province/Region - Generation, Transmission, Distribution, Energy Resources, and Population The data is presented in Tables 1-A through 3 for each province within each DABS region consisting of the following:

Page 26: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

 

Region Province Kabul - Kabul province Central - Bamyan, Kapisa, Panjsher, Parwan, and Wardak North - Balkh, Faryab, Jawzjan, Samangan and Saripul North-East - Badakhshan, Baghlan, Kunduz and Takhar Eastern - Kunar, Laghman, Nangharar and Nuristan South-East - Gazni, Khost, Loghar, Paktia and Paktika South - Dikundi, Helmand, Kandahar, Uruzgan and Zabul West - Badghis, Farah, Ghor, Herat and Nimroz Each region is separated by a divider sheet and each province within the region is likewise separated by a divider sheet for easy referral. The tables are described in detail below including assumptions used and the availability of Data. Table 1-A Completed (as of 1387) and Ongoing/Future (1388-1392) Projects -Generation/Transmission/Distribution Projects Covers hydropower, diesel generated power, imported power, transmission projects, distribution projects, and substations, and their location/details. The information covered for projects completed to date (1387) and those to be completed by 1392, are as follows: installed and actual capacity for generation projects in MW; transmission lines (Kms./KV); distribution projects (capacity MVA/KV network), substation projects (capacity MVA/KV); project completion cost and annual operation/maintenance costs for completed projects; and estimated costs for projects to be completed in the next five years. Assumptions:

1. Projects expected to be completed beyond 1392 are excluded even though implementation started within 1388-1392.

2. Project costs (both actual and estimated for future projects) in most cases are not available.

Page 27: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

 

3. Larger diesel projects are included in this table where as small diesel plants are included in Table 1-B Completed (as of 1387) and Ongoing/Future (1388-1392) Projects – Coal-fired/Gas-fired/Small diesel -fired

Information Availability: Yes, through extensive data gathering process; annual O & M costs are not available.

Table 1-B Completed (as of 1387) and Ongoing/Future (1388-1392) Projects – Coal-fired/Gas-fired/Small diesel Covers power generation from gas-fired, coal-fired, small diesel-fired and their location/details. The information covered are as follows: installed and actual capacity in MW; project completion cost and annual operation/maintenance costs for completed projects; and estimated costs for projects to be completed in the next five years. Information Availability: Information on small diesel-fired projects is available. Except for the fertilizer plant in Balkh, no other projects (coal/gas-fired exist). Table 1-C Completed (as of 1387) and Ongoing/Future (1388-1392) Projects – Renewable energy Covers power generation from micro-hydro, solar, wind, wood, and other sources and their location/details. The information covered are as follows: installed and actual capacity in KW/MW; project completion cost and annual operation/maintenance costs for completed projects; and estimated costs for projects to be completed in the next five years. Assumptions: 1. Renewable energy project consist mostly of micro-hydro and solar energy projects; small

diesel plants are included in Table 1-B under small diesel projects.. Information Availability: Yes, through MRRD’s National Solidarity Program and others; annual O &M Costs are not available. Table 2-A Resources Available for Energy - Hydropower Covers hydropower generation potential, existing production, and their location/details. The information covered is as follows: total hydropower potential for each project/river and existing production in MW, if any. Assumptions:

Page 28: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

10 

 

1. All future HPP potential projects with known information are included.

Table 2- B Resources Available for Energy – Coal, gas, and oil

Covers coal mines, gas wells, and oil wells, existing production for each and their location/details. The information covered are as follows: details on each coal mines including total potential and existing production in Metric Tons; details on each gas well including total potential and existing production for each in Cubic Meters; details on each oil well including total potential and existing production for each in Metric Tons. Information availability: Yes, through extensive effort at the Ministry of Mines office in Kabul and field visits to Sheberghan, Puli Khumri, Herat and Kunduz.

Table 2- C Resources Available for Energy – Renewable energy

Covers resources available for micro-hydro, solar, wind, geothermal, and others, and their location/details. Since this information is not available, the table is left blank.

Information availability: None, table not filled up as no information exist but should be developed through detailed survey.

Table 3 –Population Data by District/Province

Covers population data by province and each district within the province for 1387 as provided by the Central Statistical Organization(CSO), projected population in 1390 based on growth rate provided by the CSO, and the number of households for each province/district based on 7 members per household across all provinces used in planning of power projects to date.

Assumptions:

1. 1390 projections are based on annual growth rate of 2.03 from 1387 to1390 as provided by the CSO.

2. A Household is comprised of seven (7) members as per assumptions used by MEW in the past for feasibility studies.

Data availability: Yes

Page 29: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

11 

 

Section 2 – Integrated National Data or Data by Province– Actual capacity (supply) and demand for electricity, projected supply and demand of other energy sources, private sector involvement in generation of electricity and other energy sources, listing of firms interested in energy projects in Afghanistan, and electricity consumption and tariffs for various categories of customers by province.

The following tables provide detailed information:

Table 4 Supply (Actual Capacity) and Demand of Electricity, and Surplus/Deficiency (MW) by Province for 1386 Covers actual capacity (supply) of electricity, estimated demand based on base year (1387) demand, and deficiency (demand over supply) by each province in 1386 (2007-2008). Assumptions:

1. Refer to Table 5 (1387) for Base Year assumptions and calculations. 2. Demand is assumed at 85 % of the Base Year demand. 3. Actual capacity (supply) is assumed the same as Base Year (1387) since it is assumed

that there is no change in the generation capacity between 1386 and 1387 based on information available.

Information Availability: Demand information not available

Table 5 - Supply (Actual Capacity) and Demand of Electricity, and Surplus/Deficiency (MW) by Province for 1387 Covers actual capacity (supply) of electricity, estimated demand based on 1387 household population, and deficiency (demand over supply) by each province in 1387 (2007-2008). Assumptions:

1. 1387 is assumed as the Base Year for Demand calculations. Demand is calculated based on the following parameters: for residential household customers, demand of 1 KW per household for 60% of households and 0.5 KW for 40% households; 7 % of total demand for government customers; and 7% and 6% of total for industrial and commercial customers, respectively. Population and number of households are presented in Table 3.

2. Actual capacity is based on completed generation projects as presented in Table 1-A for each province.

3. As expected, there is a deficiency in each province as shown in the Table.

Page 30: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

12 

 

Information Availability: Population information available as per CSO; other information based on assumptions. Table 6 - Supply (Actual Capacity) and Demand of Electricity, and Surplus/Deficiency (MW) by Province for 1390 Covers actual capacity (supply) of electricity, estimated demand based on 1387 demand population, and deficiency (demand over supply) by each province in 1390 (2007-2008). Assumptions:

1. Demand is assumed to increase by 15 % in each of the years 1388 and 1389, and by 5 % in 1390 as more customers would have been connected and thus demand would arrive closer to their real demand.

2. Projected actual capacity is calculated based on more generation facilities coming into operation by 1390 as presented in the table. Additional capacities are: 333 MWs in Kabul, 42 MWs in Heart (Salma HPP), 12.5 MWs in Nangarhar (Darunta HPP), 2.1 MWs in Badakhshan (Baharak HPP), and others (see Table 6).

Information Availability: Yes Table 7- Projected Supply and Demand of Other Energy Sources, and Surplus/Deficiency by Province for 1387 Covers estimated demand and supply of coal, natural gas, and oil/diesel, and surplus/deficiency for 1387 Information Availability: Supply and Demand are both not available. Supply in terms of existing production of coal, gas and oil is available (see Table 2B) but reliable numbers in imports are not available. Table 8- Projected Supply and Demand of Renewable Energy Sources, and Surplus/Deficiency by Province for 1390 Covers supply and demand of renewable energy sources comprised of micro-hydro, solar, wind, wood and others. Information Availability: Existing supply in terms of micro hydro (KWs) and Solar (Watts) as presented in Table 2-C in Section 1 is represented. Demand information is not available. Table 9- Private Sector Involvement in Energy Development Projects - Completed (as of 1387) and Planned (1388- 1392) - Generation/Transmission/Distribution Projects

Page 31: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

13 

 

Covers hydropower, diesel generated power, imported power, transmission projects, distribution projects, and substations, and their location/details initiated by the private sector. The information covered are as follows: installed and actual capacity for generation projects in MW; transmission lines (Kms./KV); distribution projects (capacity MVA/KV network), substation projects (capacity MVA/KV); project completion cost and annual operation / maintenance costs for completed projects; and estimated costs for projects to be completed in the next five years. Information Availability: Private sector information not applicable/not available Table 10 Private Sector Involvement in Energy Development Projects - Completed (as of 1387) and Planned (1388-1392) - Coal-fired/Gas-fired/Small diesel Covers power generation from gas-fired, coal-fired, small diesel and their location/details initiated by the private sector. The information covered are as follows: installed and actual capacity in MW; project completion cost and annual operation/maintenance costs for completed projects; and estimated costs for projects to be completed in the next five years. Information Availability: Private sector information not applicable/not available Table 11 Private Sector Involvement in Energy Development Projects - Completed (as of 1387) and Planned (1388-1392) - Renewable energy Covers power generation from micro-hydro, solar, wind, wood, and other sources and their location/details. The information covered are as follows: installed and actual capacity in MW; project completion cost and annual operation/maintenance costs for completed projects; and estimated costs for projects to be completed in the next five years. Information Availability: Private sector information not applicable/not available Table 12 Private Sector Production of Resources Used in Energy Generation Projects as of 1387 and Planned Projects (1388-1392) – Coal/gas/oil Covers coal mines, gas wells, and oil wells, existing production for each and their location/details initiated by the private sector. The information covered are as follows: details on each coal mines including total potential and existing production in Metric Tons; details on each gas well including total potential and existing production for each in Cubic Meters; details on each oil well including total potential and existing production for each in Metric Tons. Information Availability: Private sector information not applicable/not available

Page 32: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

14 

 

Table 13-A Energy Firms Doing/Interested in Business in Afghanistan - Electric Power Covers the following information on firms (consulting, engineering, construction, etc) engaged in electric power which have experience or are interested in doing business in Afghanistan: name of firm/contact address, its expertise in power sector, size of firm (latest revenues/staff complement), description of experience, ranking of firm based on actual experience (Number 1 is the most qualified). Information Availability: Contact address and size of firm (revenue, staffing), and ranking not available Table 13-B Energy Firms Doing/Interested in Business in Afghanistan - Coal/gas/oil Covers the following information on firms (consulting, engineering, construction, etc) engaged in development/exploration/ extraction of coal, gas, and oil which have experience or are interested in doing business in Afghanistan: name of firm/contact address, its expertise in power sector, size of firm (latest revenues/staff complement), description of experience, ranking of firm based on actual experience (Number 1 is the most qualified). Information Availability: Contact address not available, size of firm (revenue, staffing) not available for some of the firms; experience of the firms not available; ranking of firms not done. Table 13-C Energy Firms Doing/Interested in Business in Afghanistan - Renewable Energy Covers the following information on firms (consulting, engineering, construction, etc) engaged in renewable energy projects which have experience or are interested in doing business in Afghanistan: name of firm/contact address, its expertise in renewable energy, size of firm (latest revenues/staff complement), description of experience, ranking of firm based on actual experience (Number 1 is the most qualified). Information Availability: Contact address not available, size of firm (revenue, staffing) not available for some of the firms; experience of the firms not available; ranking of firms not done. Table 14- A Number of Customers, Consumption and Tariffs by Province – Residential Customers (1387)

Page 33: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

15 

 

Provides the following information on province to province basis on residential (household) customers : source of power generation (hydro, imports, thermal, etc), number of household customers, total consumption in the province in KWH, average consumption/household customer in KWH, and average tariffs/customer (in AFG). Information Availability: Number of households and total consumption available. Consumption by level of consumption, that is, 0-300 KWH, 301-700 KWH, over 700 KWH) not available Table 14 -B Number of Customers, Consumption and Tariffs by Province - Government, NGOs and Holy Places Provides the following information on province to province basis on general government category of customers consisting of government, non-government (NGO), and holy places: source of power generation (hydro, imports, thermal, etc), number of government/NGO/holy places, household customers, total consumption in the province in KWH, average consumption/government customer in KWH, and average tariffs/customer (in AFG). Information Availability: Only total consumption under the government category (government, NGOs, and holy places) available, separate consumption numbers not available. Table 14 -C Number of Customers, Consumption and Tariffs by Province - Industrial and Commercial Category Provides the following information on province to province basis on industrial and commercial customers: source of power generation (hydro, imports, thermal, etc); number of industrial customers, total consumption (KWH) and average consumption/customer(KWH); number of commercial customers, total consumption (KWH), and average consumption/customer(KWH); and average tariffs/customer. Information Availability: Information available.

E. Recommendations for Maintaining/Updating Database

It is strongly recommended that an inter-ministerial task force, led by the Ministry of Finance and comprised of all ministries/agencies engaged in the energy sector, be responsible for coordinating the maintenance/update of the Database. However the actual update and data

Page 34: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

16 

 

gathering must be the responsibility of the planning function of individual ministries and agencies identified in the tables and further outlined below. The Tables which are blank or are partially filled should be given top priority by the respective organizations as shown below. These data should be captured through surveys using sampling techniques. The table below lists the responsibility for maintaining/updating the Database for each Table in Sections 1 and 2, identifies the basis for such information, and the extent of priority for the update.

Table: Responsibility for Maintaining/Updating the Energy Database

Database Information as

per Table

Responsible Organization Basis for Data Gathering/Update

Priority

Primary Secondary

Table 1 -A MEW DABS Existing information High, continuously

Table 1 -B MEW MOM Survey / existing information

High, continuously

Table 1 -C MRRD MEW Existing information High, continuously

Table 2-A MEW Survey / study Medium

Table 2 -B MOM Existing information / survey High

Table 2-C MRRD MEW Survey High

Table 3 CSO Population census High

Table 4, Table 5, Table 6 MEW DABS

Existing information / survey High

Table 7 MOM MOCI Existing information / survey High

Table 8 MRRD MEW Survey / existing information High

Table 9 MEW DABS Survey Medium

Page 35: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

17 

 

Table 10 MEW MOM Survey Medium

Table 11 MRRD MEW Survey Medium

Table 12 MOM Survey High

Table 13 -A MEW DABS Existing information Low

Table 13 -B MOM Existing information Low

Table 13 -C MRRD MEW Existing Information Low

Table 14 -A DABS Survey / existing information High

Table 14 -B DABS Survey/existing information High

Table 14 -C DABS Survey/existing information High

Page 36: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

 

Energy Database  

Section – 1   ‐ Generation, Transmission, Distribution, Energy Resources, and Population 

 

Data by Province/Region 1. Kabul ‐      Kabul Province 

 2. Central Region‐   Bamyan, Kapisa, Panjsher, Parwan, and Wardak  

   3. North Region ‐    Balkh, Faryab, Jawzjan, Samangan and Saripul  

 4. North‐East Region ‐   Badakhshan, Baghlan, Kunduz and Takhar 

 5. Eastern Region ‐   Kunar, Laghman, Nangharar and Nuristan 

 6. South‐East Region ‐  Gazni, Khost, Loghar, Paktia and Paktika 

 7. South Region ‐    Dikundi, Helmand, Kandahar, Uruzgan and Zabul 

 8. West Region ‐    Badghis, Farah, Ghor, Herat and Nimroz 

Page 37: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Name of District1387 (2008‐2009) in Thousands ('000)

1390 (2011‐2012) in Thousands ('000)

Estimated 1390 no. of Households in Thousands 

('000)

Total 3449.8 3738.4 534.05

Kabul Center (Kabul ) 2831.4 3068.2 438.32

DehSabz 49.1 53.2 7.60

Mir Bacha kot 47.6 51.6 7.37

Kalakan 27.6 29.9 4.27

Qara Bagh 69.5 75.3 10.76

Farza 19.6 21.2 3.03

Estalef 30.6 33.2 4.74

Inter‐ministerial Commission for EnergyEnergy Database

Table 3 ‐ Population Data by District  Province: Kabul Province

Guldara 20.9 22.6 3.24

Shakar Dara 74.9 81.2 11.60

Paghman 110.0 119.2 17.03

Chahar Asyab 33.3 36.1 5.16

Musahi 21.3 23.1 3.30

Khak –i-Jabar 13.0 14.1 2.01

Bagrami 50.5 54.7 7.82

Surubi 50.5 54.7 7.82

2.  1390 figures based on growth rates provided by CSO (7 members/household)1. 1387 figures from Central Statistics Office (CSO)

Page 38: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Hydro power  Nanghlo HPP 100 95 NA

Sarobi HPP 22 25 NA

Mahipar HPP 66 38 NA

Diesel‐fired Kabul East Diesel generator (USAID)

108 275

Iran 2x25MW Thermal Units 50 NA

Thermal Units (2 Units) 50 42 NA

Imported Power  Uzbekistan 300 150 NA 150

Tajikistan 300

Turkmmenistan 300

Transmission projects 

Double circuit transmission  line from Puli Khumri to Chimtala SS,Kabul for 

electrification of Kabul and  Southern/Eastern provinces

202/220 NA 86

From chimtala to NW Substation

3/110 NA

From NW to North 10/110

From NW to Kabul 9/110 NA

Distribution Capacity       

(KVA network) 

Substation Capacity/ 

Transformers     Kv/MWA 

Name of Project*Project Details (Describe each project and list their 

components)

                                                                           Inter‐ministerial Commission for Energy                                                                              Energy Database

         Table 1 ‐ A   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)  ‐ Generation, Transmission and Distribution  projects                             Province: KABUL

Planned Capacity / Power Input    

(MW)

Transmission Length (Kms/KV)

Ongoing and Future Projects (1388‐1392)

Installed Capacity (MW)

Actual Capacity (MW)

Transmission Length (Kms/KV) 

Substation Capacity  /MVA

Project Completion  

Cost (USD Mil)

Completed Project (As of 1387)

Distribution Capacity MVA/KV network)

Estimated project cost (USD Mil)

1386 Annual O&M Cost    (USD Mil)

From Chimtala to South Kabul 25/220

From North to diesel generator 

14/110 NA

Page 39: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

From diesel generator plant to Kabul East SS

14/110 NA

from Nanglo to East SS 44.5/110 NA

From Nanglo to Sarobi 12/110 NA

From Sarobi to Breshnakot 66/110 NA

From Nanglo 110 kV line to Pulli Charkhi

3.85/110 NA

From Breshnakot to kabul South

12/220

From 110kV to Botkhak 0.15/110

From South of Kabul to Loghar 62/220

From Nanglo to Jalalabad 96/110From 110 kV Connection to 

Mahipar4.5/110 NA

Distribution projects Kabul City  Network 

Rehabilitation300‐20/0.4 NA

Distribution netwoks in Ozben, Tezyen and Jedgalak

10‐20/0.4 NA

Kabul City Network 481.7‐15/0.4 NA

kabul City network 120‐20/0.4 NA

Substation projects  Chimtala Substation 2x160‐220/110 NAChimtala Substation 2x40‐110/20 NA

NW Substation 2x25+20‐110/15 NA/NW SS 2x40 ‐ 110/20 NA

North SS 2x40‐110/15 NA

North SS 2x40‐110/20/15 NA

Kabul East SS 25+40‐110/20/15 NABreshnakot SS 2x25‐110/20/15 NAKabul South SS 50‐220/110 NAKabul South SS 25‐220/20 NAPullicharkhi SS 2x6.3‐110/10 NABotkhak SS 2x40‐110/20 NA

350

Responsbile Organization: MEW planning Department and DABM

Page 40: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

         Table 1 ‐ B   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ Coal fired, Gas fired and Diesel fired Projects

Gas‐ fired projects(2) None

Coal‐ fired projects(3)  None

Small Diesel/oil‐fired(1)

Charasyab destrict 1 project 34.4 KW 34.4 KW  $                  36,787 

Deh Sabz destrict 1 project 66 KW 66 KW  $                  33,028 

Gul dara destrict 1 project 10 KW 10 KW  $                  20,932 

Paghman destrict 27 projects 1535 KW 1535 KW  $                704,406 

Qarabagh destrict 27 projects 1313 KW 1313 KW  $                617,964 

Shakar dara destrict 18 projects 947 KW 947 KW  $                443,315 

Project Details    (Describe each project and list their components)

Installed Capacity (MW)

Actual Capacity (MW)

Project Completion  

Cost       (USD )

                                                                           Inter‐ministerial Commission for Energy                                                                                Energy Database

Estimated project cost 

(USD )

1386 Annual O&M Cost    (USD )

Planned Capacity    (MW)

Name of Projects*

Completed Project (As of 1386) Ongoing and Future Projects (1387‐1392)

(1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)(2)Responsible organization:MoM, MEW/DABM (3)Responsible organization:MoM, MEW/DABM 

Page 41: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Microhydro

Farza destrict 3 projects 49 KW 49 KW  $                          83,091 

Guld dara destrict 9 projects 89 KW 89 KW  $                        175,724 

Astalif desrtict 1 project 18 KW 18 KW  $                          51,383 

Paghman destrict 1 project 22 KW 22 KW  $                          40,004 

Qara bagh destrict 3 projects 74 KW 74 KW  $                          64,373 

Shakar dara destrict 5 projects 72 KW 72 KW  $                        177,405 

Solar energry

Bagrami destrict 3 projects 392 W 392 W  $                        149,933 

Char asyab 1 project 26 W 26 W  $                          14,286 

Deh sabz destrict 2 projects 100 W 100 W  $                          38,167 

Province:  KABUL

Estimated project cost (USD)

Project Completion  Cost       (USD )

1386 Annual O&M Cost    (USD)

         Table 1 ‐ C   Completed ( as of 13817 and Ongoing/Future Projects (1388‐1392)‐ Renewable energy    Energy Database

 Renewable Energy Projects*

Project Details        (Describe each project 

and list their components)

Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)

Planned Capacity    (KW)

Installed Capacity (KW)

Actual Capacity (KW)

                                                                           Inter‐ministerial Commission for Energy                                                                              

Farza destrict 1 project 125 W 125 W  $                          50,016 

Guld dara destrict 5  projects 116 W 116 W  $                          36,592 

Kalakan destrict 1 project 20 W 20 W  $                          10,860 

Khak Jabar destrict 21 projects 804 W 804 W  $                        296,604 Musayi destrict 39 projects 2065 W 2065 W  $                        779,965 Paghman destrict 1 project 58 w 58 w  $                          23,000 

others

Responsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department

Page 42: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

 Resources Available for Energy Generation

Location/Source Description*

Total Potential (MW) Existing Production

Hydropower potential (MW) Sarobi 2 on Kabul River 200 22

Province: KABUL

Responsible Organiztion:DABMs, MEW Planning Department

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐A    Resources Available for Energy (Hydropower)

Page 43: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

 Resources Available for Energy Generation

Location/Source Description* Total Potential Existing Production

Diesel/oil(1)

Gas(2) 

Coal(3)

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐B   Resources Available for Energy (Coal, Gas and Oil) Province: KABUL

(1)Responsible Organization:(2)Responsible Organization: MoM(3)Responsible Organization: MoM

MoM

Page 44: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

B. Resources Available for Energy Generation            ( Renewable Energy)

Location/Source Description*

Total Potential Existing Production

Micro‐hydro (KW) NA

  Geothermal None

Solar  NA

wind (metre/sec) NA

Province: KABUL

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐C   Resources Available for Energy(Renewable Energy)

Wood (Cu.M) NA

OthersResponsible Organization: MRRD(NSP,NABDP), MEW Renewable Department 

Page 45: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Hydro power  None

Imported Power  None

Transmission projects  None

Distribution projects  None

Substation projects  None

other projects(list) None

                                       Inter‐ministerial Commission for Energy                                                             

Name of Project*Distribution Capacity MVA/KV network)

Planned Capacity / Power Input    

(MW)

Completed Project (As of 1387)

Transmission Length (Kms)

1386 Annual O&M Cost    (USD Mil)

Ongoing and Future Projects (1388‐1392)

Estimated project cost (USD Mil)

                                                                      Table 1 ‐ A   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)   ‐ Generation/Transmission/Distribution                                            

Substation Capacity/ 

Transformers    Kv/MWA 

Installed Capacity (MW)

Responsbile Organization: MEW planning Department and DABM

    Energy Database

Project Completion  

Cost (USD Mil)

Actual Capacity (MW)

Project Details       (Describe each project 

and list their components  )

Transmission Length (Kms) 

Distribution Capacity       

(KVA network) 

Substation Capacity  /MVA

Page 46: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Coal fired None

Gas fired None

Small Diesel/oil‐(1)

Bamyan destirict 23 projects 696 KW 696 KW  $                        314,618 

Kahmad destrict 1 project  25 KW 25 KW  $                          15,800 

Syaghan destrict 17 projects 505 KW 505 KW  $                        157,030 

Shibar destrict 1 project  6 KW 6 KW  $                             6,000 

Waras destrict 1 project  23 KW 23 KW  $                             9,800 

Yakwalang destrict 7 projects 139 KW 139 KW  $                          76,911 

                                                                           Inter‐ministerial Commission for Energy                                                                                  Energy Database

Substation Capacity/ 

Transformers     Kv/MWA 

Estimated project cost (USD )

1386 Annual O&M Cost    (USD )

Planned Capacity    (MW)

Name of Projects*

Completed Project (As of 1386) Ongoing and Future Projects (1387‐1392)

Province:  BAMYAN

Project Details        (Describe each project and list their components)

Installed Capacity (MW)

Actual Capacity (MW)

Project Completion  Cost       (USD )

         Table 1 ‐ B   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ Coal fired, Gas fired and Diesel fired Projects

(1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)(2)Responsible (3)Responsible organization:MoM, MEW/DABM 

Page 47: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Microhydro

Bamyan destrict 19 projects 346 KW 346 KW  $          382,807 

Kahmard district 20 projects 369 KW 369 KW  $          440,203 

Panjab District 11 projects 135.4 KW 135.4 KW  s 

Sayghan district 9 projects 67.77 KW 67.77 KW  $          105,012 

Shirbar destrict 35 projects 451.5 KW 451.5 KW  $          552,445 

Waras district 12 projects 192 KW 192 KW  $          286,750 

Yakawlang  35 projects 529 89 KW 529 89 KW $ 679 523

Ongoing and Future Projects (1388‐1392)

Installed Capacity (KW)

Actual Capacity (KW)

Project Completion  Cost (USD )

1386 Annual O&M Cost    (USD)

Planned Capacity    (KW)

Substation Capacity/ 

Transformers    Kv/MWA 

Estimated project cost 

(USD)

                                                                           Inter‐ministerial Commission for Energy                                                                                  Energy Database

         Table 1 ‐ C   Completed ( as of 13817 and Ongoing/Future Projects (1388‐1392)‐ Renewable energy Province:  BAMYAN

 Renewable Energy 

Projects*

Project Details (Describe each project and list 

their components)

Completed Project (As of 1387)

gdistrict

35 projects 529.89 KW 529.89 KW $          679,523 

Solar

Bamyan destrict 38 projects 2060 KW 2060 KW  $          816,784 Kahmard  4 projects 148 KW 148 KW  $             58,796 

Panjab Destrict 33 projects 2235 KW 2235 KW  $          956,912 

Sayghan destrict 3 projects 8 KW 8 KW  $             21,858 

Shirbar destrict 805 projects 805 KW 805 KW  $          417,008 

Waras destrict 50 projects 2941 KW 2941 KW  $       1,133,534 Yakawlang destrict

80 projects 2690 KW 2690 KW  $       1,234,813 

others

Responsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department

Page 48: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production

Hydropower potential (MW) None

Province: BAMYAN

Responsible Organiztion:DABMs, MEW Planning Department

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐A    Resources Available for Energy‐ Hydropower

Page 49: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation Location/Source Description*

Total Extractable Potential, MT

Existing Production,MT

Diesel/oil(1) NA NA NA

Gas(2)  NA NA NA

Coal(3)

Doab and Kalich Mines in Kuhmard District, Bamyan. Large deposits but not explored. Production started before exploration. Strength of coal is more than 7,200 kilo calories per Kg. NA

99,000 MT (1387); 55,000 MT (1386)

Ashpusta Mines in Kuhmard District, Bamyan. Strength of coal is more than 7,200 kilo calories  12,700 MT (1387); 7,700 

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐B   Resources Available for Energy‐ Coal, Gas and Oil Province: Bamyan

per Kg. 2,000,000 MT MT (1386)

(2)Responsible Organization: MOM

(3)Responsible Organization: MOM

(1)Responsible Organization: MOM

Page 50: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation (Renewable Energy) Location/Source Description* Total Potential Existing ProductionMicro‐hydro (KW) NA

  Geothermal None

Solar  NA

wind (metre/sec) NA

Wood (Cu.M) NA

Others NA

Province: Bamyan

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐C   Resources Available for Energy‐ Renewable Engery

Responsible Organization: MRRD (NSP,NABDP), MEW Renewable Energy Department

Page 51: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Name of District1387 (2008/2009) in Thousands ('000)

Estimated 1390 (2011/2012) in Thousands ('000)

Estimated 1390 N0. of Households in Thousands('000)

Total 398.0 431.3 61.61Bamyan Center (Bamyan ) 75.5 81.8 13.64

Shebar 26.8 29.0 4.84

Saighan 21.8 23.6 3.94

Kahmard 33.1 35.9 5.98

Yakawlang 79.5 86.2 14.36

Panjab 62.0 67.2 11.20

Waras 99.3 107.6 17.93

1. 1387 figures from Central Statistics Office  (CSO)

2. 1390 figures based on growth rates provided by CSO (7 members/household)

Inter‐ministerial Commission for EnergyEnergy Database

Table 3 ‐ Population Data by District  Province: Bamyan

Page 52: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Hydro power  None

Imported Power  None

Transmission projects 

None

Distribution projects 

None

Substation  None

other 

Project Completion  Cost  

(USD Mil)

Actual Capacity (MW)

         Table 1 ‐ A   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ Generation, transmission and Distribution                                                 Province: Kapisa 

Planned Capacity / Power Input    

(MW)

No Information Available

Estimated project cost (USD Mil)

Installed Capacity (MW)

Transmission Length     (Kms)

Distribution Capacity       (Kv 

network) 

Distribution Capacity     (Kv 

network)

Transmission Length (Kms) 

Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)

                                                                           Inter‐ministerial Commission for Energy                                                                                   Energy Database

Name of Project*Substation Capacity/ 

Transformers     Kv/MWA 

1386 Annual O&M Cost    (USD 

Mil)

Project Details     (Describe each project and list 

their components  )

Substation Capacity  Kv/MWA

Responsbile Organization: MEW planning Department and DABM

Page 53: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

         Table 1 ‐ B   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ Coal fired, Gas fired and Diesel fired Proje Province:  KAPISA

Coal‐ fired projects(3)  None

Gas‐ fired projects(2) None

Small Diesel/oil‐fired(1)

Alasay destrict 26 projects 357 KW 357 KW  $        258,564 

Hisa Alwal‐e‐ Kuhistan 24 projects 730 KW 730 KW  $        345,453 

Koh band 4 projects  78 KW 78 KW  $          58,831 

Mamod Raqi 5 projects 124 KW 124 KW  $          80,349 

Nijrab 3 projects 57 KW 57 KW  $          32,944 

45 projects 1090 KW 1090 KW  $        668,002 

Planned Capacity    (KW)

Name of Projects*

Completed Project (As of 1387)Ongoing and Future Projects (1388‐1392)Project Details        

(Describe each project and list their components)

Installed Capacity (KW)

Actual Capacity (KW)

Project Completion  

Cost       (USD)

Estimated project cost 

(USD)

1386 Annual 

O&M Cost   (USD)

                                                                           Inter‐ministerial Commission for Energy                                                                                  Energy Database

(1)Responsible organization: MEW DABM/S, MRRD(NSP,NABDP)

(3)Responsible organization:MoM, MEW/DABM 

(2)Responsible organization:MoM, MEW/DABM 

Page 54: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Province: KAPISA

MicrohydroHisa Awal‐e‐ Kuhistan

20 projects 273 KW 273 KW  $        519,250 

Koh band 5 projects 45 KW 45 KW  $          46,854 

Mahmod Raqi 2 projects 26 KW 26 KW  $          73,679 

Nijrab destrict 76 projects 405 KW 405 KW  $        990,077 

SolarHisa Dowum‐e‐ Kuhistan

4 projects 197 KW 197 KW  $          55,428 

Koh band 1 projects 80 KW 80 KW  $          17,975 

Nijrab destrict 10 projects 470 KW 470 KW  $        181,169 

G th l

Completed Project (As of 1387)Project Details    (Describe each project and list 

their components)

 Renewable Energy Projects*

Actual Capacity (KW)

Installed Capacity (KW)

                                                                       Inter‐ministerial Commission for Energy                                                                              Energy Database

Estimated project cost 

(USD)

Project Completion  

Cost       (USD)

1386 Annual 

O&M Cost  (USD)

         Table 1 ‐ C   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐  Renewable Ene

Planned Capacity   (KW)

Ongoing and Future Projects (1388‐1392)

Geothermal  

Wind

Wood

others

Responsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department

Page 55: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation

Location/Source Description* Total Potential Existing Production

Hydropower potential (MW) Gulbahar HPP on Panjser River 120 MW None

Capar HPP on Panjser River 116 MW None

Baghdara HPP 280 MW None

Responsible Organiztion:DABMs, MEW Planning Department

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐A    Resources Available for Energy‐ HydorpowerProvince:  KAPISA

Page 56: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation

Location/Source Description* Total Potential

Existing Production

Diesel/oil(1) None

Gas(2)  None

Coal3) None

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐B   Resources Available for Energy‐ Coal, Gas and Oil Province: KAPISA

(1)Responsible Organization:

(2)Responsible Organization: MoM

(3)Responsible Organization: MoM

MoM

Page 57: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Province: KAPISA

B. Resources Available for Energy Generation            ( Renewable Energy)

Location/Source Description*

Total Potential Existing Production

Micro‐hydro (KW) NA

  Geothermal None

Solar  NA

wind (metre/sec) NA

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐C   Resources Available for Energy‐ Renewable Energy

Wood (Cu.M) NA

Others

Responsible Organization: MRRD(NSP,NABDP), MEW Renewable Department 

Page 58: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Province: KAPISA

Name of District1387 (2008‐2009) in Thousands ('000)

1390 (2011‐2012) in Thousands ('000)

Estimated 1390 no. of Households in Thousands ('000)

Total 392.9425.8 60.82

Kapisa Center (Mahmood Raqi)

58.463.3 9.04

Hissa-i-Duwumi Kohistan

40.944.3 6.33

Hissa-i-Awali Kohistan 61.967.1 9.58

Nijrab 102.3110.9 15.84

Koh Band 21.423.2 3.31

b 73 6

Inter‐ministerial Commission for EnergyEnergy Database

Table 3 ‐ Population Data by District 

Tagab 73.679.8 11.39

Alasai 34.437.3 5.33

1. 1387 figures from Central Statistics organization  (CSO)2. 1390 figures based on growth rates provided by CSO (7 members/household)

Page 59: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Hydro power  None

Imported Power  None

Transmission projects  None

Distribution projects  None                  

Substation projects  None

other projects(list)

Project Completion  Cost  

(USD Mil)

Actual Capacity (MW)

Project Details     (Describe each project and list 

their components  )

Substation Capacity  Kv/MWA

Substation Capacity/ 

Transformers   Kv/MWA 

Distribution Capacity       

(Kv network) 

Distribution Capacity  (Kv network)

Transmission Length (Kms) 

Transmission Length     (Kms)

Planned Capacity / Power Input    

(MW)

Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)

                                                                           Inter‐ministerial Commission for Energy                                                                                   Energy Database

                                                                              Table 1 ‐ A   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)   ‐ Generation, Transmission and Distribution              Province: PANJSHIR

Name of Project* Estimated project cost (USD Mil)

Installed Capacity (MW)

1386 Annual O&M Cost    (USD 

Mil)

Responsbile Organization: MEW planning Department and DABM

Page 60: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

         Table 1 ‐ B   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ Coal fired, Gas fired and Diesel fired Projects Province:  Panjshir 

Gas‐ fired projects(2) None

Coal‐ fired projects(3)  None

Small Diesel/oil‐fired(1)

Bazarak destrict 1 Project 36  KW 36  KW  $                    17,855 

Dara destrict 1 Project 65 KW 65 KW  $                    40,886 

Hisa Awal‐i‐ Panjshir 1 project 120 KW 120 KW  $                    50,789 

Shutul 1 Project 36 KW 36 KW  NA 

Unaba 8 projects 239 KW 236 KW  $                  250,150 

(2)

Estimated project cost 

(USD )

                                                                           Inter‐ministerial Commission for Energy                                                                                   Energy Database

Name of Projects*

Project Details        (Describe each project and list their components)

Completed Project (As of 1386) Ongoing and Future Projects 

Installed Capacity (MW)

Actual Capacity (MW)

Project Completion  Cost 

(USD )

1386 Annual O&M Cost    (USD )

Planned Capacity    (MW)

Gas‐ fired projects(2)

Coal‐ fired projects(3) 

(3)Responsible organization:MoM, MEW/DABM 

(1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)(2)Responsible organization:MoM, MEW/DABM 

Page 61: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Bazaral destrict 10 projects 357 KW 357 KW 367830

Dara destrict 12 projects 331 KW 331 KW  $               585,019 

Hisa Awal‐e‐ Pamjshir

47 projects 1341 KW 1341 KW  $          96,772,227 

Paryan destrict 9 projects 233 KW 233 KW  $          23,302,649 

Rukha destrict 11 projects 251 KW 251 KW  $               443,355 

Shutul destrict 7 projects 174 KW 174 KW  $               212,011 

Unaba destrict 1  project 12 KW 12 KW  $                 20,000 

Solar energy  

P d t i t 1 j t 48 W 48 W $ 16 738

                                                                          Inter‐ministerial Commission for Energy                                                                            

         Table 1 ‐ C   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) ‐Renewable EnergyProvince: Panjshir

Installed Capacity (KW)

Actual Capacity (KW)

Project Completion  Cost       (USD)

1387 Annual 

O&M Cost  (USD)

Planned Capacity   (KW)

                                                    Energy Database

 Renewable Energy Projects*

Project Details    (Describe each project and list 

their components)

Completed Projects (as of 1387)Ongoing and Future Projects 

(1388‐1392)

Estimated project cost 

(USD)

Paryan destrict 1 project 48 W 48 W $                 16,738 

Rukha destrict 2 projects 102 W 102 W  $                 73,822 

Shutul destrict 2 projects 39 W 39 W  $                 31,510 

Unaba destrict 7 projects 257 W 257 W  $               172,978 

Wind

Wood

others

Responsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department

Page 62: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

 Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production

Hydropower potential (MW) None

Province: PANJSHIR

Responsible Organiztion:DABMs, MEW Planning Department

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐A    Resources Available for Energy‐ Hydorpower

Page 63: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production

Diesel/oil(1) None

Gas(2)  None

Coal(3) None

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐B   Resources Available for Energy‐Renewable Energy Province: PANJSHIR

(1)Responsible Organization:(2)Responsible Organization: MoM(3)Responsible Organization: MoM

MoM 

Page 64: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Province:PANJSHIR

 Resources Available for Energy Generation            ( Renewable Energy)

Location/Source Description*

Total Potential Existing Production

Micro‐hydro (KW) NA

  Geothermal None

Solar  NA

wind (metre/sec) NA

Wood (Cu.M) NA

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐C   Resources Available for Energy‐ Renewable Energy

Others

Responsible Organization: MRRD(NSP,NABDP), MEW Renewable Department 

Page 65: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Name of District1387 (2008‐2009) in Thousands ('000)

Estimated 1390 (2011‐2012) in Thousands ('000)

Estimated 1390 No. of Households in Thousands ('000)

Total 136.7 148.1 21.16Panjsher Center (Bazarak)

17.1 18.5 2.65

Rukha 20.9 22.6 3.24

Unaba 16.3 17.7 2.52

Darah 22.7 24.6 3.51

Hissa-i- Awal (Khing) 36.4 39.4 5.63

Shutul 9.9 10.7 1.53

Paryan 13.4 14.5 2.07

1. 1387 figures from Central Statistics Office (CSO)

2.  1390 figures based on growth rates provided by CSO (7 members/household)

Inter‐ministerial Commission for EnergyEnergy Database

Table 3 ‐ Population Data by District  Province: PANJSHIR

Page 66: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

 

                                                                           Inter‐ministerial Commission for Energy                                                                                   Energy Database Province: PARWAN

         Table 1 ‐ B   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ Coal fired, Gas fired and Diesel fired projects

Name of Projects*Project Details (Describeeach project and list their

components)

Completed Project (As of 1387)Ongoing and Future Projects (1388

1392)  

Installed Capacity (KW)

Actual Capacity (KW)

Project Completion

Cost       (USD'000l)

  1386 AnnuaO&M Cost(USD'000)

l     

Planned Capacity  (KW)

Estimated projectcost (USD'000)

  

Gas‐ fired projects(2)

Coal‐ fired projects(3) 

Small Diesel/oil‐fired(1)

Baghram destrict 44 projects 2561 KW 2561 KW  $   1,124,399 

Charikar destrict 3 projects 157 KW 157 KW  $         73,798 

Jabalusiraj destrict 9 projects 368 KW 368 KW  $       169,127 

Salang destrict 3 projects 60 KW 60 KW  $         23,555 

(1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)(2)Responsible organization:MoM, MEW/DABM (3)Responsible organization:MoM, MEW/DABM 

Page 67: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

        Province: PARWA

 (1388‐1392)

 

 

Substation Capacity/ 

Transformers    Kv/MWA 

Estimated project cost (USD Mil)

                                                                         Inter‐ministerial Commission for Energy                                                                          Energy Database

                                                                                                                   Table 1 ‐ A   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)  ‐ Generation, Transmission and Distribution  projects

Name of Project*

Project De(Describe project an

theircomponen

tails    Completed Project (As of 1387) Ongoing and Future Projects

InstaCapacit

each d list  ts  )

lled y (MW)

Actua TrLe

l Capacity (MW)

ansmission ngth (Kms) 

Distribution Capacity MVA/KV network)

SubstatioCapacity  /M

n VA

ProjeComple

Cost (USD

ct tion   Mil)

1386 O&M(USD

CaPow

Annual  Cost     Mil)

Planned pacity / er Input    (MW)

Transmission Length (Kms)

DistributionCapacity       

(KVA network)

Hydro power RehabilitatiJabalsaraj 

HPP

on of Small  2.4 0.5 NA

Parwan HPP 3x0.8  2.4 2.4 NA

Ghorband 3x0.1 1 NA

Imported Power 

Transmission projects Pulli Khumri to 

Charikar144/220 NA

Charikar to Chimtala

58/220 NA

Distribution projects  Parwan Electricity  10.22-6/0.4Ghorband  0.525‐6/0.4

Substation projects  Charikar SS 2x16‐220/20

other projects(list)

Responsbile Organization: MEW planning Department and DABM

Page 68: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

 

           

 

                                                                       Inter‐ministerial Commission for Energy                                                                    Energy Database Province:  Parwan

         Table 1 ‐ C   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) ‐ Renewable Energy

 Renewable Energy 

Projects*

Project Details  (Describe each 

project and list thecomponents)

    Completed Project (As of 1387) Ongoing and Future Projects

(1388‐1392)

ir  Installed Capacity (KW)

Actual Capacity (KW

ProjectCompletio

Cost       (US)

 n  D)

1386 AnnO&M Co(USD)

ual st    

PlannCapac(KW

Estimated projectcost (USD)

ed ity    )

Microhydro

Bagram district 1 project 17 KW 17 KW  $         33,550 

Charikar district 4 projects 174 KW 174 KW  $         33,550 

Ghorband district 4 projects 42 KW 42 KW  $       131,463 

Jabalusiraj district 14 projects 251 KW 251 KW  $       372,744 

Kohi safi district 7 projects 47 KW 47 KW  $       119,530 

Salang district 28 projects 623 KW 623 KW  $       562,280 

Sayed khil district 3 projects 19 KW 19 KW  $         37,247 

Shekh Ali district 16 projects 160 KW 160 KW  $       308,271 

Surkhi Parsa district 44 projects 771 KW 771 KW  $       974,120 

Solar energy  

Charikar district 8 projects 696 W 696 W  $       344,479 

Ghorband district 22 projects 1693 W 1693 W  $       714,418 

Jabalusiraj district 9 projects 504 W 504 W  $       195,682 

Sayed khil district 16 projects 763 KW 763 KW  $       259,950 

Shekh Ali district 9 projects 611 KW 611 KW  $       195,205 

Surkhi Parsa district 35 projects 1413 KW 1413 KW  $       642,696 

Wind NA

Wood NA

others NoneResponsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department

Page 69: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐A    Resources Available for Energy‐ Hydropower Province: PARWAN

B. Resources Available for Energy Generation

Location/Source Description* Total Potential Existing Production

Hydropower potential (MW) None

Responsible Organiztion:DABM/S, MEW Planning Department

Page 70: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐B   Resources Available for Energy‐ Coal, Gas and Oil Province: PARWAN

B. Resources Available for EnergyGeneration

 Location/Source Description* Total Potential Existing Production

Diesel/oil(1) None

Gas(2)  None

Coal(3) None

(1)Responsible Organization: MoM

(2)Responsible Organization: MoM

(3)Responsible Organization: MoM

Page 71: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐C   Resources Available for Energy‐ Renewable Energy Province: PARWAN

B. Resources Available foEnergy Generation     ( Renewable Energy)

r        

Location/SouDescription

rce *

Total Potential Existing Production

Micro‐hydro (KW) NA

  Geothermal NA

Solar  NA

wind (metre/sec) NA

Wood (Cu.M) NA

OthersResponsible Organization: MRRD(NSP,NABDP), MEW Renewable Department 

Page 72: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

88.1

Inter‐ministerial Commission for Energy Province: ParwanEnergy Database

Table 3 ‐ Population Data by District

Name of District1387 (2008‐2009) in Thousa('000)

nds Estimated 1392012) in Thous('000)

0 (2011‐ands 

Estimated 1390 No. of Households in Thousands ('000)

Total 589.7639.0 91.29

Parwan Center (Charikar )

158.8172.1 24.58

Sayyid Khel 41.545.0 6.42

Jabulussaraj 58.163.0 8.99

Salang 23.725.7 3.67

Shinwari 37.440.5 5.79

syahgird syahgird ('Ghurband)

88.195.5 13.64

Bagram 94.3102.2 14.60

Koh- i- Safi 28.230.6 4.37

Shaykh Ali 22.424.3 3.47

Surkhi parsa 37.240.3 5.76

1. 1387 figures from Central Statistics organization  (CSO)

2. 1390 figures based on growth rates provided by CSO (7 members/household)

Page 73: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Hydro power  Chak ‐I Wardak HPP 3x1.1 0.5 NA NA3.3 (after 

rehabilitation)NA

Diesel GeneratorsMaidanshar Diesel 

plant0.5 0.5 NA NA

Transmission projects 

Distribution projects Maidanshar Distribution 1-0.4

NA

Maidanshar  4‐20/0.4 NA

Substation projects 

other projects(list)

Transmission Length     (Kms)

Responsbile Organization: MEW planning Department and DABM

1386 Annual O&M Cost    (USD Mil)

Actual Capacity (MW)

     Energy Database                                                                                                        Table 1 ‐ A   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) ‐ Generation, Transmission and Distribution  Projects                                            Province: WARDAK

Installed Capacity (MW)

Project Completion  Cost       (USD Mil)

Transmission Length (Kms) 

Substation Capacity  /MVA

                                                                           Inter‐ministerial Commission for Energy                                                                              

Name of Project*

Project Details       (Describe each 

project and list their components  )

Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)

Planned Capacity / Power Input    

(MW)

Distribution Capacity       (KVA 

network) 

Substation Capacity/ 

Transformers     Kv/MWA 

Estimated project cost (USD Mil)

Distribution Capacity MVA/KV 

network)

Page 74: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Province: WARDAK

Gas‐ fired projects(2)

Coal‐ fired projects(3) 

Small Diesel/oil‐fired(1)

Jalrez destrict 14 projects 906 KW 906 KW  $       402,860  NA

Markazi behsud destrict 4 projects 148 KW 148 KW  $         37,934  NA

Maydan Shahr destrict 31 projects 1408 KW 1408 KW  $       543,684  NA

Nirkh destrict 308 projects 308 KW 308 KW  $       202,579  NA

Sayed Abad destrict 66 projects 3016 KW 3016 KW  $   1,262,128  NA

Project Details        (Describe each project and list their components)

Installed Capacity (KW)

Actual Capacity (KW)

Project Completion  

Cost       (USD)

        Table 1 ‐ B   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ Coal fired, Gas fired and Diesel fired projects

                                                                           Inter‐ministerial Commission for Energy                                                                                   Energy Database

Estimated project cost 

(USD)

1386 Annual O&M Cost    (USD)

Planned Capacity    (KW)

Name of Projects*

Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)

(2)Responsible organization:MoM, MEW/DABM (3)Responsible organization:MoM, MEW/DABM 

(1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)

Page 75: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

MicrohydroChaki wardak 2 projects 20 KW 20 KW  $         34,680 

Deh Mirdad 12 projects 78 KW 78 KW  $       203,056 

Jalriz destrict 7 projects 65 KW 65 KW  $       156,079 

Markazi behsud 11 projects 145 KW 145 KW  $       261,442 

Maydan Shahr destrict 4 projects 40 KW 40 KW  $         51,543 

Nirkh destrict 1 project 10 KW 10 KW  $         22,200 

Solar energy

Chaki wardak 53 projects 1433 W 1433 W  $       662,320 

Deh Mirdad 33 projects 762 W 762 W  $       396,019 

Hisa awali behsud 26 projects 373 W 373 W $ 157,217

                                                                          Inter‐ministerial Commission for Energy                                                                            

Province: WARDAK

 Renewable Energy 

Projects*

Project Details      (Describe each 

project and list their components)

Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)

Installed Capacity (KW)

Actual Capacity (KW)

     Energy Database         Table 1 ‐ C   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ renewable energy 

Project Completion  

Cost       (USD)

1386 Annual O&M Cost    (USD)

Planned Capacity    (KW)

Estimated project cost (USD)

Hisa awali behsud 26 projects 373 W 373 W $       157,217 

Jalriz destrict 20 projects 981 W 981 W  $       446,675 

Markazi behsud 75 projects 1920 W 1920 W  $    1,212,462 

Maidan Shahr  10 projects 837 W 837 W  $       218,079 

Nirkh destrict 56 projects 2891 W 2891 W  $    1,159,148 

Sayed Abad  52 projects 4052 W 4052 W  $    1,910,613 

Wind None

Wood None

othersResponsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department

Page 76: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

B. Resources Available for Energy Generation

Location/Source Description* Total Potential Existing Production

Hydropower potential (MW) None

Province: WARDAK

Responsible Organiztion:DABMs, MEW Planning Department

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐A    Resources Available for Energy‐ Hydropower

Page 77: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

B. Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production

Diesel/oil(1) NA

Gas2)  None

Coal(3) None

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐B   Resources Available for Energy‐ Coal, Gas and Oil Province: WARDAK

(1)Responsible Organization:(2)Responsible Organization: MoM(3)Responsible Organization: MoM

MoM

Page 78: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

B. Resources Available for Energy Generation ( Renewable Energy)

Location/Source Description*

Total Potential Existing Production

Micro‐hydro (KW) NA

  Geothermal None

Solar  NA

wind (metre/sec) NA

Wood (Cu.M) NA

Province: WARDAK

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐C   Resources Available for Energy‐ Renewable Energy

Others NoneResponsible Organization: MRRD(NSP,NABDP), MEW Renewable Department 

Page 79: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Name of District1387 (2008‐2009) in Thousands ('000)

Estimated 1390 (2011‐2012) in Thousands ('000)

Estimated 1390 No. of Households in Thousands ('000)

Total 531.2575.6 82.23

Wardak Center (Maidan Shahr)

36.639.7 5.67

Jalrez 48.252.2 7.46

Hissa-i- awali Behsud 33.736.5 5.22

Markaz-i- Behsud 108.6117.7 16.81

Daimir Dad 28.230.6 4.37

Jaghatu 41.6

Inter‐ministerial Commission for Energy Province: WardakEnergy Database

Table 3 ‐ Population Data by District 

Jaghatu 41.645.1 6.44

Chak-i- Wardak 76.883.2 11.89

Sayyid Abad 105.7114.5 16.36

Nerkh 51.856.1 8.02

2. 1390 figures based on growth rates provided by the CSO (7 members/household)

1.  1387 figures from Central Statistics Organization (CSO)

Page 80: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Hydro power  None

Imported Power  power from Uzbekistan 7626 (because of low substation 

capacity)NA

Transmission LinesTransmission line from 

Hairatan‐Mazar80 40 84/110 NA

Transmission line from Hairatan‐Naibabad‐Mazar

300 76.5/220kV NA

Transmission Line from Naibabbad ‐Khulm‐ 600 78/220kV NA

From Andkhoy to Shebergan and 

Sheberghan to Naibabad (220kV)

300MW 231/220kV NA

Transmission line from Cod‐e‐Barq to Mazar

17.5/35kV NA

Transmission Line from Cod‐e‐Barq to Balkh  14.2/35kV NA

Transmission Line from 110kV substation to 35  18/35kV NA

Estimated project 

cost (USD Mil)

Distribution Capacity MVA/KV network)

Transmission Length (Kms) 

Project Completion  

Cost       (USD Mil)

Actual Capacity (MW)

Transmission Length     (Kms)

1386 Annual O&M Cost    (USD Mil)

Project Details (Describe each project and list their 

components)

Substation Capacity  /MVA

Planned Capacity / Power Input   

(MW)

         Table 1 ‐ A   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)  ‐ Generation, Transmission and Distribution  projects                             Province: BALKH

Installed Capacity (MW)

     Energy Database

Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)

                                                                           Inter‐ministerial Commission for Energy                                                                              

Name of Project*Substation Capacity/ 

Transformers  Kv/MWA 

Distribution Capacity     (KVA 

network) 

0kV substation to 35kV substation in Mazar

8/35kV NA

Distribution projects Balkh Electricity Authority 134.9‐6/0.4 NA

Hairatan 28.763‐ NA

Khulm 7.367‐6/0.4 NA

Mazare‐Sharif 40‐20/0.4 NA

Khulm 8‐20/0.4 NA

Substation projects  Mazar32‐

110/35/6NA

Mazar 32‐35/6 NA

Mazar 50‐220/110 NA 2 circuits; 300 MW

mazar 16‐220/20 NA

Mazar 50‐220/20 KV NA

Khulm 16‐220/20kV NA

Responsbile Organization: MEW planning Department and DABM

Page 81: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Coal‐ fired projects(3)  None

Gas‐ fired projects(2) Gas from Sheberghan for Cod‐e‐Barq Fertilizer plant 

48 MW 12 MW $7,788,000  36 MW NA

Diesel/oil‐fired(1)

Chimtala destrict 19 Projects 1137 KW 1137 KW  $       481,468 

Dawlat abad destrict 47 Projects 3585 KW 3585 KW  $   2,123,771 

Kishindih Destrict 16 projects 1236 KW 1236 KW  $       363,416 

                                                                           Inter‐ministerial Commission for Energy                                                                                Energy Database

Estimated project cost (USD Mil)

1386 Annual O&M Cost    (USD )

         Table 1 ‐ B   Completed ( as of 1386) and Ongoing/Future Projects (1387‐1392)

(2)  Responsible organization: Cod‐e‐Barq Fertilizer Plant

Planned Capacity    (MW)

Name of Projects*

Completed Project (As of 1387) Ongoing and Future Projects 

(1)Responsible organization: MRRD (NSP)

Project Details        (Describe each project and list their components)

Installed Capacity (MW)

Actual Capacity (MW)

Project Completion  Cost       (USD 

)

Page 82: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Microhydro

Kishindih destric 4 projects 60 KW 60 KW  $        83,195  NA NA

Sholgara destrict 3 projects 50 KW 50 KW  $        82,314  NA NA

Zari destrict 6 projects 100 KW 100 KW  $      227,669  NA NA

Solar NA NA

Chahar Bolak destrict

1 project 58 KW 58 KW  $        26,000  NA NA

Chahar Kint destrict

12 projects 337 KW 337 KW  $      157,247  NA NA

Khulm destrict 3 projects 71 KW 71 KW  $        36,769  NA NA

Nahri Shahi destrict 1 project 55 KW 55 KW  $        20,178  NA NA

Sholgara destrict 20 projects 1658 KW 1658 KW  $        20,178  NA NA

Z i d t i t 5 j t 569 KW 569 KW $ 307 268 NA NA

Estimated project cost (USD Mil)

Project Completion  Cost       (USD 

Mil)

1386 Annual O&M Cost    (USD Mil)

     Table 1 ‐ C   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ Renewable Energ

                                                                      Inter‐ministerial Commission for Energy                                                                             Energy Database

 Renewable Energy 

Projects*

Project Details      (Describe each 

project and list their components)

Completed Project (As of 1387)Ongoing and Future Projects 

(1388‐1392)

Planned Capacity    (MW)

Installed Capacity (MW)

Actual Capacity (MW)

Province:  Balkh

Zari destrict 5 projects 569 KW 569 KW $      307,268  NA NA

Wind None

Wood NA

others NA

Responsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department

Page 83: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation Location/Source Description*

Total Potential (MW)

Existing Production (MW)

Hydropower potential (MW)Polebarak Akhkobrok in Sholgara 

District 100 MW None

Chasme Shafa District  20 MW None

Province: Balkh

Responsible Organiztion:DABMs, MEW Planning Department

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐A    Resources Available for Energy (Hydropower)

Page 84: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production

Diesel/oil(1) None

Gas(2)  None

Coal(3) None

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐B   Resources Available for Energy (Coal, Gas and Oil) Province: Balkh

(1)Responsible Organization:(2)Responsible Organization: MoM(3)Responsible Organization: MoM

MoM 

Page 85: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation  ( Renewable Energy)

Location/Source Description*

Total Potential Existing Production

Micro‐hydro (KW) NA

  Geothermal None

Solar  NA

wind (metre/sec) NA

Wood (Cu.M) NA

Province: BALKH

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐C   Resources Available for Energy ‐ (Renewable Energy)

OthersResponsible Organization: MRRD(NSP,NABDP), MEW Renewable Department 

Page 86: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Province: Balkh

Name of District

1387 (2008‐2009) in Thousands ('000)

Estimated 1390 (2011‐2012) in Thousands ('000)

Estimated 1390 no. of Households in Thousands ('000)

Total 1144.81240.6 177.22

Balkh Center (Mazar-i- sharif)

326.1353.4 50.48

Dehdadi 61.366.4 9.49

Nahri Shahi 40.944.3 6.33

Marmul 10.311.2 1.59

Khulm 63.568.8 9.83

Kaldar 18.219.7 2.82

Shortepa 36.039.0 5.57

Dawlat Abad 95.0102.9 14.71

Balkh 108.4117 5 16 78

Inter‐ministerial Commission for EnergyEnergy Database

Table 3 ‐ Population Data by District 

117.5 16.78Char Bolak 73.6

79.8 11.39Chimtal 83.5

90.5 12.93Sholgara 103.3

111.9 15.99Char kent 40.5

43.9 6.27Kishindeh 44.3

48.0 6.86Zari 39.9

43.2 6.18

1. 1387 figures from Central Statistics Organization (CSO)

2.  1390 figures based on growth rates provided by CSO  (7 members/household)

Page 87: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Hydro power 

Imported Power Import from Turkmenistan

80 40 NA NA

Transmission projects Transmission line from Jarqudook to  72/110kV NA

Transmission line fro Aquina to Andkhoy

42/500 NA

Transmission line from  Andkhoy to 

sheberghan69/220kV NA

Transmission line from Andkhoy to 

Maimana137/110kV NA

Transmission line from Turkmenistan b d A dkh

42/110kV NA

Distribution projects  Qarkin distribution  10‐20/0.4 NA

Completed Project (As of 1387)

Installed Capacity (MW)

Estimated project 

cost (USD Mil)

Project Completion  

Cost       (USD Mil)

Planned Capacity / Power Input   

(MW)

                                                                           Inter‐ministerial Commission for Energy                                                                                   Energy Database

         Table 1 ‐ A   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)  ‐ Generation, Transmission and Distribution  projects                             Province: FARYAB

Name of Project*

Project Details       (Describe each 

project and list their components  )

Actual Capacity (MW)

Substation Capacity/ 

Transformers  Kv/MWA 

1386 Annual O&M Cost    (USD Mil)

Ongoing and Future Projects (1388‐1392)

Transmission Length (Kms) 

Distribution Capacity MVA/KV network)

Substation Capacity  /MVA

Transmission Length     (Kms)

Distribution Capacity     (KVA 

network) 

Distribution projects  0 0/0.4 NA

khamab distribution  10‐20/0.4 NA

Andkhoy distribution  21.321‐6/0.4 NA

Faryab Distribution 12.85‐20/0.4 NA

Substation projects  Andkhoy substation 10‐110/.6 NA

Andkhoy substation 400‐500/220 NA

Jumabazar 8‐110/20 NA

ShrienTagab 10‐110/20 NA

Responsbile Organization: MEW planning Department and DABM

Page 88: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

         Table 1 ‐ B   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) 

Diesel/oil‐fired(1) None None

Gas‐ fired projects(2) None None

Coal‐ fired projects(3)  None None

                                                                           Inter‐ministerial Commission for Energy                                                                                   Energy Database

Estimated project cost (USD Mil)

1386 Annual O&M Cost    (USD Mil)

Planned Capacity    (MW)

Name of Projects*

Completed Project (As of 1387)Ongoing and Future Projects 

(1388‐1392)

Installed Capacity (MW)

Actual Capacity (MW)

Project Completion  Cost       (USD 

Mil)

Project Details        (Describe each project and list their components)

(1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)(2)Responsible organization:MoM, MEW/DABM (3)Responsible organization:MoM, MEW/DABM 

Page 89: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Microhydro

Almar destrict 1project 6.4 KW 6.4 KW  $        11,600  None

Solar Energy Almar destrict 2 projecrts 276  W 276  W  $        65,707  NoneShiring Tagab 4 projects 281 W 281 W  $        76,381  None

Geothermal None

Wind None

Wood None

others None

                                                                        Inter‐ministerial Commission for Energy                                                                               Energy Database

 Renewable Energy 

Projects*

Project Details (Describe each 

project and list their components)

Completed Project (As of 1387)Ongoing and Future Projects (1388‐

1392)

Planned Capacity    (KW)

Installed Capacity (KW)

Actual Capacity (KW)

Province: FARYAB     Table 1 ‐ C   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ Renewable Energ

Estimated project cost (USD)

Project Completion  

Cost       (USD)

1386 Annual O&M Cost    (USD)

Responsible organization: MRRD(NSP NABDP) DABM/S MEW Renewable Engergy DepartmentResponsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department

Page 90: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production

Hydropower potential (MW) None

Province: FARYAB

Responsible Organiztion:DABMs, MEW Planning Department

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐A    Resources Available for Energy (Hydropower)

Page 91: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production

Diesel/oil(1) None

Gas(2)  None

Coal(3) None

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐B   Resources Available for Energy (Coal, Gas and Oil) Province: FARYAB

(1)Responsible Organization:(2)Responsible Organization: MoM(3)Responsible Organization: MoM

MoM 

Page 92: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

B. Resources Available for Energy Generation                       

( Renewable Energy)

Location/Source Description*

Total Potential Existing Production

Mini‐hydro (KW) NA

Micro‐hydro (KW) NA

  Geothermal NA

Solar  NA

wind (metre/sec) NA

Province: FARYAB

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐C   Resources Available for Energy (Renewable Energy)

Wood (Cu.M) NA

Others NAResponsible Organization: MRRD(NSP,NABDP), MEW Renewable Department 

Page 93: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Name of District1387 (2008‐2009) in Thousands ('000)

Estimated 1390 (2011‐2012) in Thousands ('000)

Estimated 1390 no. of Households in Thousands ('000)

Total 884.4

958.4 136.91Faryab Center (Maimana)

71.5

77.5 11.07Pashtun kot 171.7

186.1 26.58Khwaja Sabz Poshi Wali 46.2

50.1 7.15Almar 63.9

69.2 9.89Qaisar 129.6

140.4 20.06Kohistan 49.6

53.7 7.68Gurziwan 69.0

74.8 10.68Bil hi h 47 5

Energy DatabaseTable 3 ‐ Population Data by District  Province: FARYAB

Bilchiragh 47.5

51.5 7.35Shirin Tagab 74.1

80.3 11.47Dawlat Abad 44.1

47.8 6.83Qaram Qul 17.9

19.4 2.77Khani Charbagh 21.1

22.9 3.27Andkhoy 35.3

38.3 5.46Qurghan 42.9

46.5 6.64

1. 1387 figures from Central Statistics Organization (CSO)

2.  1390 figures based on growth rates provided by CSO  (7 members/household)

Page 94: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production

Hydropower potential (MW) None

Province: JAWZJAN

*Responsible Organiztion:DABMs, MEW Planning Department

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐A    Resources Available for Energy (Hydropower)

Page 95: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Hydro power 

Gas‐fired power  generation

Sheberghan Gas Power Project

105 200

Imported Power  Electricity from  80 40 NA NA

Transmission projects from Andkhoy to Jarqudook SS

72/110 NA NA

from Jarqudook to Khajadoko

3/110 NA NA

from Jarqudook to Sarepul

58/110 NA NA

From Sheberghan to Mazar e Sharif

162/220 NA

From Jarqudook to Mazar e Sharif

142/110 (not operating now)

NA NA

Distribution projects Jaujhan Electricity 

Authority 35 9-6/0 4NA NA

                                                                           Inter‐ministerial Commission for Energy                                                                             Energy Database

         Table 1 ‐ A   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)  ‐ Generation, Transmission and Distribution  projects                             Province: JAWZJAN

Name of Project*

Project Details       (Describe each 

project and list their components  )

Planned Capacity / Power Input    

(MW)

Transmission Length     (Kms)

Substation Capacity  MVA/KV

Project Completion  

Cost       (USD Mil)

Completed Project (As of 1387)

Distribution Capacity MVA/KV network)

Ongoing and Future Projects (1388‐1392)

Installed Capacity (MW)

Actual Capacity (MW)

Transmission Length (Kms) 

Estimated project cost (USD Mil)

1386 Annual O&M Cost    (USD Mil)

Distribution Capacity       (KVA 

network) 

Substation Capacity/ 

Transformers     Kv/MWA 

Authority 35.9-6/0.4Jaujhan Electricity 

Authority16‐20/0.4 NA

NA

Substation projects  Jarqudook/Shebergh 32‐110/35/6 NA NA

Sheberghan SS 9‐35/6 NA NA

Khajadoko SS 2.5‐110/6 NA NA

Sheberghan SS 2x50‐220/110 NA

Sheberghan SS 16‐220/20 NA

Responsbile Organization: MEW planning Department and DABM

Page 96: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

         Table 1 ‐ B   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) 

Coal‐ fired projects(3)  None None None

Gas‐ fired projects(2) None None None

Small Diesel/oil‐fired(1) NA

Darzab destrict 16 projects 447 KW 447 KW  $       367,456 

Fayzabad destrict 1 projecs 20 KW 20 KW  $           8,264 

Mardyan destrict 2 projects 60 KW 60 KW  $         47,216 

Mingajik destrict 13 projects 541 KW 541 KW  $       485,740 

                                                                           Inter‐ministerial Commission for Energy                                                                                   Energy Database

Estimated project cost (USD Mil)

1386 Annual O&M Cost    (USD Mil)

Planned Capacity    (MW)

Name of Projects*

Completed Project (As of 1387Ongoing and Future Projects 

(1388‐1392)

Province: JAWZJAN

Project Details        (Describe each project and list their components)

Installed Capacity (KW)

Actual Capacity (KW)

Project Completion  Cost       (USD 

Mil)

(3)Responsible organization:MoM, MEW/DABM 

* Insert rows as necessary under each category  

(1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)(2)Responsible organization:MoM, MEW/DABM 

Page 97: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Microhydro

Solar EnergyDarzab destrict 3 projects 241 W 241 W  $        90,085 

Khamyab destrict 1 projecs 0 0  $        32,219 

Qush Tepa desrtict 1 projecs 0 0  $        25,319 

Geothermal

Province: JAWZJAN

                                                                        Inter‐ministerial Commission for Energy                                                                               Energy Database

 Renewable Energy 

Projects*

Project Details      (Describe each 

project and list their components)

Completed Project (As of 1387)Ongoing and Future Projects (1388‐

1392)

Planned Capacity    (KW)

         Table 1 ‐ C   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ Renewable Energy

Estimated project cost (USD,000)

Project Completion  

Cost       (USD'000)

1386 Annual O&M Cost    (USD,000)

Installed Capacity (KW)

Actual Capacity (KW)

WindWoodothersResponsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department

Page 98: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation Location/Source Description*

Total Potential (in Million Cubic Meters or mCUM)

Approved ExtractableQuantity  (in Million Cubic Meters or mCUM)

Current Production/Day (in Million Cubic Meters or mCUM)

Gas(2) 

Yatim Taq 7.5 mCUM 5.9  mCUMKhwaja Gogirdak 57.8 mCUM 54.87  mCUM

Jarquduq 26.79 mCUM 26.0   mCUM

   Subtotal Yatim Taq Block 92.09 mCUM 86.77 mCUM 0.4 mCUM/DayKhwaja Bolan 2.54 mCUM 2.5 mCUM 0

Juma 14.0 mCUM 21.4 mCUM 0Jangal‐e‐ Kalan 8.1 mCUM 8 mCUM 0Bashi Koot 12.7 mCUM 5.9 mCUM 0

Table 2‐B   Resources Available for Energy (Coal, Gas and Oil)

0.4 mCUM/Day

Three Gas Fields in the Province , namely, Yatim Taq, Khwaja Gogirdak, and Jarquduq are classified as one Block which is presently producing 

gas 

Inter‐ministerial Commission for EnergyEnergy Database

12.7 mCUM 5.9 mCUM 0Cheghchi 3.0  mCUM 3 mCUM 0

Total Gas Deposits 132.43 mCUM 127.57mCUM 0.4 mCUM/Day

Coal3) No  Deposits in Province

Page 99: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Diesel/oil(1) No Deposits in Province

(1)Responsible Organization:(2)Responsible Organization: MoM(3)Responsible Organization: MoM

MoM 

Page 100: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Province: Jawzjan

Page 101: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation                       

( Renewable Energy)

Location/Source Description*

Total Potential Existing Production

Micro‐hydro (KW) NA

  Geothermal NA

Solar  NA

wind (metre/sec) NA

Wood (Cu.M) NA

province: JAWZJAN

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐C   Resources Available for Energy (Renewable Energy)

OthersResponsible Organization: MRRD(NSP,NABDP), MEW Renewable Department 

Page 102: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Name of District1387 (2008‐2009) in Thousands ('000)

Estimated 1390 (2011‐2012) in Thousands ('000)

Estimated 1390 no. of Households in Thousands ('000)

Total 476.7516.6 73.80

Jawzjan Center (Sheberghan)

149.5162.0 23.14

Aqchah 53.958.4 8.34

Faizabad                  37.941.1 5.87

Mardyan 35.138.0 5.43

Mingajik 39.042.3 6.04

Qarqin 22.224.1 3.44

Khamyab 12.713.8 1.97

Qush Tepa 21.423.2 3.31

Darzab 44.748.4 6.92

Khwaja Dukoh 24.526.5 3.79

Khanaqa 35.838.8 5.54

1. 1387 figures from Central Statistics Organization (CSO)

2.  1390 figures based on growth rates provided by CSO  (7 members/household)

Inter‐ministerial Commission for Energy Province: JawzjanEnergy Database

Table 3 ‐ Population Data by District

Page 103: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Hydro power 

Diesel Generator Diegel generator  1.6 1.6 NA

Imported Power 

Transmission projects one circuit from 

Naibabad to Aybak178/220 NA

From Aybak to Pulli khumri

86/220 NA

Distribution projects  Aybak distribution  2‐20/0.4 NA

Aybak distribution  16‐20/0.4 NA

Substation projects  Aybak SS 16‐220/20 NA

Completed Project (As of 1387)

Substation Capacity  /MVA

Installed Capacity (MW)

1386 Annual O&M Cost    (USD Mil)

                                                                           Inter‐ministerial Commission for Energy                                                                             Energy Database

         Table 1 ‐ A   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)  ‐ Generation, Transmission and Distribution  projects                             Province: SAMANGAN

Name of Project*

Project Details       (Describe each 

project and list their components  )

Project Completion  Cost       (USD 

Mil)

Ongoing and Future Projects (1388‐1392)

Planned Capacity / Power Input   

(MW)

Actual Capacity (MW)

Transmission Length     (Kms)

Distribution Capacity     (KVA 

network) 

Substation Capacity/ 

Transformers   Kv/MWA 

Estimated project cost (USD Mil)

Transmission Length (Kms) 

Distribution Capacity MVA/KV network)

other projects(list)

Responsbile Organization: MEW planning Department and DABM

Page 104: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Table 1 ‐ B   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ Coal fired, Gas fired and Diesel fired projects

Coal‐ fired projects(3)  None None

Gas‐ fired projects(2) None None

Diesel/oil‐fired(1)

Dara Sufi Bala 13 projects 345 KW 345 KW  $       173,862 

Dara Sufi Payin 6 projects 155 KW 155 KW  $         68,316 

Feroz Nakhchir 6 projects 180 KW 180 KW  $         98,498 

Hazrati Sultan 17 projects 515 KW 515 KW  $       324,958 

Khuram wa sarbagh 8 projects 182 KW 182 KW  $       140,968 

                                                                           Inter‐ministerial Commission for Energy                                                                              

Estimated project cost 

(USD)

1386 Annual O&M Cost    (USD)

Planned Capacity    (KW)

 Renewable Energy 

Projects*

Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)Project Details        

(Describe each project and list their components)

Installed Capacity (KW)

Actual Capacity (KW)

Project Completion  

Cost       (USD)

                                               Energy Database

(1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)(2)Responsible organization:MoM, MEW/DABM (3)Responsible organization:MoM, MEW/DABM 

Page 105: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Microhydro None

Aibak Destrict 4 projects 70 KW 70 KW  $      178,832 

Dara Sufi Bala 10 projects 171 KW 171 KW  $      396,590 

Khuram wa Sarbagh

15 projects 632 KW 632 KW  $      459,959 

Ruyi Du Ab 21 projects 214 KW 214 KW  $      700,291 

Solar Energy  None

Dara Sufi Bala 3 projects 179 W 179 W  $        78,480 Dara Sufi Payin 3 projects 11 W 11 W  $          7,101 

Geothermal None None

Actual Capacity (KW)

Estimated project cost (USD)

Project Completion  

Cost       (USD)

1386 Annual O&M Cost    (USD)

                                                         Energy Database                                                                        Inter‐ministerial Commission for Energy                                                                          

 Renewable Energy 

Projects*

Project Details      (Describe each 

project and list their components)

Completed Project (As of 1387)Ongoing and Future Projects (1388‐

1392)

Planned Capacity    (KW)

Installed Capacity (KW)

         Table 1 ‐ C   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) ‐ Rene wable Energy

Wind None None

Wood None None

others None None

Responsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department

Page 106: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

 Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production

Hydropower potential (MW) None

Province: SAMANAGAN

Responsible Organiztion:DABMs, MEW Planning Department

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐A    Resources Available for Energy (Hydropower)

Page 107: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation Location/Source Description*Total Extractable Potential Existing Production

Diesel/oil(1)

No oil deposits

Gas(2) 

No gas deposits

Coal(3)

Dahantor Mines, strength of more than 7000 kilo calories/kg 8,000,000 MT 2,000 MTShabashak Mines in Dara e Souf District, strength of more than 7,600 kilo calories/kg 4,000,000 MT

No existing production; 35,000 MT (planned for 1387)

Darwazah Mines  in Dara e Souf District, strength of more than 8,000 Kilo calories/Kg 16,000,000 MT NALaili Mines  in Dara e Souf 

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐B   Resources Available for Energy ‐ Coal, Gas and Oil) Province: SAMANGAN

District, strength of more than 8,000 Kilo calories/Kg 12,000,000 MT NA

Sarasia Mines in Dara e Souf District, strength of about 7,400 Kilo calories/Kg 4,700,000 MT NA

(1)Responsible Organization:

(2)Responsible Organization: MoM

(3)Responsible Organization: MoM

MoM 

Page 108: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation ( Renewable Energy)

Location/Source 

Description*Total Potential Existing Production

Micro‐hydro (KW) NA

  Geothermal NA

Solar  NA

wind (metre/sec) NA

Wood (Cu.M) NA

Province: SAMANGAN

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐C   Resources Available for Energy

OthersResponsible Organization: MRRD(NSP,NABDP), MEW Renewable Department 

Page 109: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Name of District1387 (2008‐2009)  in Thousands ('000)

 Estimated 1390 (2011‐2012) in Thousands ('000)

Estimated 1390 no. of Households in Thousands ('000)

Total 344.4373.2 53.32

Samangan Center (Aybak)

93.2101.0 14.43

Hazrat –i-Sultan 37.740.9 5.84

Feroz Nakhcheer 11.912.9 1.84

Dara –i-soof-i- Bala 58.863.7 9.10

Dara –i-soof-i- Payin

65.070.4 10.06

Rui- Do- Ab 41.545.0 6.42

Inter‐ministerial Commission for Energy Province: SAMANGANEnergy Database

Table 3 ‐ Population Data by District 

Khuram Wa Sarbagh 36.339.3 5.62

1. 1387 figures from Central Statistics Organization (CSO)

2.  1390 figures based on growth rates provided by CSO (7 members/household)

Page 110: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Hydro power 

Imported Power 

From Turkmenistan 40 16 NA

Transmission projects  From Sheberghan to Saripul 58/110kV NA

Distribution projects  Saripul distribution network 16‐6/0.4 NA

Saripul distribution network 16‐20/0.4kV NA

Substation projects  Saripul SS 16‐110/35/6 NA

Saripul SS 16‐110/20 NA

other projects(list)

Project Details (Describe each project and list their components)

Completed Project (As of 1387)

Distribution Capacity       

(KVA network) 

Substation Capacity/ 

Transformers  Kv/MWA 

Ongoing and Future Projects (1388‐1392)

Installed Capacity (MW)

Actual Capacity (MW)

Transmission Length (Kms) 

Distribution Capacity MVA/KV network)

Substation Capacity  /MVA

Project Completion  Cost       (USD 

Mil)

Transmission Length     (Kms)

                                                                           Inter‐ministerial Commission for Energy                                                                                   Energy Database

         Table 1 ‐ A   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)  ‐ Generation, Transmission and Distribution  projects                             Province: SAR‐E‐PUL

1386 Annual O&M Cost    (USD Mil)

Planned Capacity / Power Input   

(MW)

Name of Project* Estimated project cost (USD Mil)

Responsbile Organization: MEW planning Department and DABM

Page 111: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

         Table 1 ‐ B   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ Coal fired, Gas fired and Diesel fired projects

Diesel/oil‐fired(1)

Kohistanat Destrict 2 projects 100 KW 100 KW  $         43,195 

Sangcharak Destrict 4 projects 200 KW 200 KW  $         82,403 

Sari Pul City 1 projects 50 KW 50 KW  $         20,833 

Sayyad Destrict 11 projects 484 KW 484 KW  $       274,976 

Gas‐ fired projects(2) None

Coal‐ fired projects(3)  None

                                                                           Inter‐ministerial Commission for Energy                                                                              

Estimated project cost (USD Mil)

1386 Annual O&M Cost    (USD Mil)

Name of Projects*

Completed Project (As of 1387Ongoing and Future Projects 

(1388‐1392)Project Details        (Describe each project and list their components)

Installed Capacity (MW)

Province: Sar‐e‐pulEnergy Database

Actual Capacity (MW)

Project Completion  Cost       (USD 

Mil)

Planned Capacity    (MW)

(1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)(2)Responsible organization:MoM, MEW/DABM (3)Responsible organization:MoM, MEW/DABM 

Page 112: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

         Table 1 ‐ C   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ Renewabl Energy

Microhydro

Balkhab destrict 23 projects 307 KW 307 KW  $      346,517 

Kohistanat 2 projects 35 KW 35 KW  $        25,199 

Geothermal None

Wind None

Wood None

others None

Installed Capacity (KW)

Province: SAR‐E‐PUL

Estimated project cost (USD)

Project Completion  

Cost       (USD)

1386 Annual O&M Cost    (USD)

Actual Capacity (KW)

Responsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department

                                                                          Inter‐ministerial Commission for Energy                                                                                 Energy Database

 Renewable Energy 

Projects*

Project Details      (Describe each 

project and list their components)

Completed Project (As of 1387)Ongoing and Future Projects (1388‐

1392)

Planned Capacity    (KW)

Page 113: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

 Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production

Hydropower potential (MW) None

Province: SAR‐E‐ PUL

Responsible Organiztion:DABMs, MEW Planning Department

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐A    Resources Available for Energy (Hydropower)

Page 114: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation

Location/Source Description*

Total Potential (Million Metric Tons, mMT)

Approved Extractable Quantity (Million Metric Tons, mMT)

Existing Production (Million Metric Tons, mMT)

Diesel/oil(1)

Three (3) oil fields in Angoot, Aqdarya and Qashqary are classified as Qashqary Block which is presently under bidding Angoot 7.10 mMT 2.06 mMT 0

Aqdarya 5.96 mMT 1.84 mMT 0

Qashqary 19.60mMT 6.38mMT 0

Subtotal Qashqary Block 32.66mMT 10.28mMT 0

Bazar Kami 1.65mMT 0.61mMT 0

Ali Gul 0.58mMT 0.17mMT 0

Zamarud  Sai 9.19mMT 3.40mMT 0

Total Potential and Approved Extractable Quantity for all Mines 44.08mMT 14.46mMT 0

(2)

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐B   Resources Available for Energy (Coal, Gas and Oil) Province: SAR‐E‐PUL

Gas(2)  No Deposits

Coal(3) No Deposits

(1)Responsible Organization:(2)Responsible Organization: MoM(3)Responsible Organization: MoM

MoM 

Page 115: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

 Resources Available for Energy Generation ( Renewable Energy)

Location/Source 

Description*Total Potential Existing Production

Micro‐hydro (KW) NA

  Geothermal NA

Solar  NA

wind (metre/sec) NA

Province: SAR‐E‐PUL

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐C   Resources Available for Energy (Renewable Energy)

Wood (Cu.M) NA

Others NA

Responsible Organization: MRRD(NSP,NABDP), MEW Renewable Department 

Page 116: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Name of District1387 (2008‐2009) in Thousands ('000)

Estimated 1390 (2011‐2012) in Thousands ('000)

Estimated 1390 no. of Households in Thousands ('000)

Total 496.9

538.5 76.92Saripul Center       (Sar‐i‐Pul)

140.3

152.0 21.72Sozma Qala 45.0

48.8 6.97Sayyad 49.7

53.9 7.69Kohistanat 72.8

78.9 11.27Balkhab 45.8

49.6 7.09Sancharak 91.7

Inter‐ministerial Commission for EnergyEnergy Database

Table 3 ‐ Population Data by District  Province: SAR‐E‐PUL

99.4 14.20Gosfandi 51.6

0.00

1. 1387 figures from Central Statistics Organization (CSO)

2.  1390 figures based on growth rates provided by CSO  (7 members/household)

Page 117: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

         Table 1 ‐ A   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)  ‐ Generation, Transmission and Distribution  projects                             Province: LAGHMA

Hydro power Baharak  micro hydropower 

0.2 0.145 NA

Faizabad HPP 0.255 0.05 NA

Baharak Small HPP 2.1 $11.80 

Transmission projects  From Taloqan to Faizabad 175/220 NA

From Baharak to Faizabad 70/35

Distribution projects 

Distribution grid to connect Baharak  

Hydropower to Baharak and Jurm districts

Baharak distribution network

2‐20/0.4 NA

F i b d di t ib ti

Transmission Length (Kms) 

Distribution Capacity MVA/KV network)

Estimated project cost (USD Mil)

     Energy Database                                                                           Inter‐ministerial Commission for Energy                                                                              

Name of Project*Project Details       

(Describe each project and list their components  )

Province: BADAKHSHAN

Substation Capacity/ 

Transformers  Kv/MWA 

Transmission Length     

(Kms/KV)

Distribution Capacity     (KVA 

network) 

Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)

Installed Capacity (MW)

Actual Capacity (MW)

1386 Annual O&M Cost    (USD Mil)

Planned Capacity / Power Input   

(MW)

Substation Capacity  /MVA

Project Completion  Cost       (USD 

Mil)

Faizabad distribution network

5‐20/0.4 NA

Substation projects  Faizabad SS 16‐220/20 NA

other projects(list)

Responsbile Organization: MEW planning Department and DABM

Page 118: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

         Table 1 ‐ B   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) 

Coal‐ fired projects(3) 

Gas‐ fired projects(2)

Small Diesel/oil‐fired(1)

Faiz Abad city 4 projects 490 KW 490 KW  $       108,106 

Shghanan destrict 1 project 25 KW 25 KW  $         17,923 

Yamgan (Girwan) 1 project 40 KW 40 KW  $         12,000 

                                                                           Inter‐ministerial Commission for Energy                                                                                   Energy Database

Estimated project cost (USD Mil)

1386 Annual O&M Cost    (USD Mil)

Planned Capacity    (MW)

Name of Projects*

Completed Project (As of 1387)Ongoing and Future Projects 

(1388‐1392)Project Details        (Describe each project and list their components)

Installed Capacity (MW)

Actual Capacity (MW)

Project Completion  Cost       (USD 

Mil)

(3)Responsible organization:MoM, MEW/DABM (2)Responsible organization:MoM, MEW/DABM (1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)

Page 119: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Table 1 ‐ C   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)  (Renewable Energy) Province: BADAKHSHAN

MicrohydroArghanj Khwa 3 projects _ _  $        38,200 

Argo detsrict 18 projects 471 KW 471 KW  $      485,273 Baharak destrict 30 projects 424 KW 424 KW  $      621,397 Darwaz destrict 2 projects 28 KW  28 KW   $        33,600 Faiz Abad city 2 projects 34 KW  $        83,115 Ishkashim destrict 7 projects 125 KW  $      134,200 Jurm destrict 8 projects 214 KW  $      228,200 Khash destrict 5 projects 115 KW  $      227,800 

Kishm destrict 1 project 22 KW

Kuhistan destrict 7 projects 86 KW  $      152,699 

Kuf Ab 4 projects 74 KW  $      149,200 

Kuran wa Munjan 9 projects 109 KW  $      234,000 

Ragh destrict 13 projects 127 KW  $      240,673 

Shiki destrict 3 projects 115 KW  $        71,200 

Shuhada destrict 17 projects  218 KW   $      295,583 

Tagab (Kishmi Bala) 3 projects _ _  $        44,400 

Tishkan destrict 3 projects _ _  $        57,453 

Warduj destrict  30 projects 396 KW 396 KW  $      519,970 

Yaftali Sufla destrict 3 projects 24 KW 24 KW  $        68,478 

Yamgan (Girwan) 4 projects 165 KW 165 KW  $      103,745 

Zebak Destrict 10 projects 78 KW 78 KW  $        97,800 

Future Various Micro HPP Projects

Various 0.5 MW  NA 

Solar EnergyArgo detsrict 10 projects 588 W  $      334,400 Baharak destrict 5 projects 571 W  $      128,600 

Faiz Abad city 9 projects 989 W  $      227,752 Ishkashim destrict 1 project 46 W $        15,200 Khash destrict 4 projects 630 W  $      206,000 Kishm destrict 3 projects 396 W  $      113,089 Kuhistan destrict 7 projects 219 W  $        81,242 

R h d t i t 4 j t 481 W $ 31 881

Planned Capacity    (MW)

Installed Capacity 

Actual Capacity 

Estimated project cost (USD Mil)

Project Completion  Cost       (USD 

Mil)

1386 Annual O&M Cost    (USD Mil)

                                                                         Inter‐ministerial Commission for Energy                                                                                Energy Database

 Renewable Energy 

Projects*

Project Details (Describe each 

project and list their components)

Completed Project (As of 1387)Ongoing and Future Projects (1388‐

1392)

Ragh destrict 4 projects 481 W $        31,881 

Shahri buzurg  11 projects 1109 W  $      311,807 

Yaftali Sufla destrict 3 projects 152 W  $        55,588 

Zebak Destrict 4 projects 143 W  $        74,200 

Wind none

Wood none

others none

Responsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department

Page 120: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

 Resources Available for Energy Generation Location/Source Description*

Total Potential (MW)

Existing Production(MW)

Hydropower potential (MW) Khurabad District on Kokcha River 350 None

Faizabad District on Kokcha River 200 None

Responsible Organiztion:DABMs, MEW Planning Department

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐A    Resources Available for Energy (Hydropower)

Province:  BADAKHSHAN

Page 121: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production

Diesel/oil(1) None

Gas(2)  None

Coal(3) None

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐B   Resources Available for Energy (Coal, Gas and Oil) Province: BADAKHSHAN

(1)Responsible Organization:(2)Responsible Organization: MoM(3)Responsible Organization: MoM

MoM 

Page 122: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation ( Renewable Energy)

Location/Source 

Description*Total Potential Existing Production

Micro‐hydro (KW) NA

  Geothermal NA

Solar  NA

wind (metre/sec) NA

Wood (Cu.M) NA

Province: BADAKHSHAN

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐C   Resources Available for Energy (Renewable Energy)

OthersResponsible Organization: MRRD(NSP,NABDP), MEW Renewable Department 

Page 123: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Name of District1387 (2008‐2009) in Thousands 

('000)1390 (2011‐2012) in Thousands ('000)

Estimated 1390 no. of Households in Thousands 

('000)

Total 845.9916.7 130.95

Badakhshan center (Faiz Abad)

59.864.8 9.26

Yaftal- i-Sufla 48.152.1 7.45

Argo 71.377.3 11.04

Darayim 56.060.7 8.67

Khash 34.637.5 5.36

Jurm 34.137.0 5.28

Wardooj 19.921.6 3.08

Baharak 26.228.4 4.06

Shuhada 31.434.0 4.86

Kohistan 15.116.4 2.34

Yawan 29.532.0 4.57

Shahri Buzurg 47.651.6 7.37

Kishm 73.579.6 11.38

Tagab 25.5

Inter‐ministerial Commission for EnergyEnergy Database

Table 3 ‐ Population Data by District Province: Badakshan

Tagab 25.527.6 3.95

Tashkan 27.229.5 4.21

Kiran Wa Menjan

8.79.4 1.35

Zebak 7.17.7 1.10

Eshkashim 12.613.7 1.95

Wakhan 13.614.7 2.11

Shighnan 25.327.4 3.92

Arghanj Khwah 14.715.9 2.28

Raghistan 36.039.0 5.57

Khwahan 15.116.4 2.34

Kufab 20.422.1 3.16

Yamgan 23.425.4 3.62

Darwaz- i- Bala ( Nesay)

21.122.9 3.27

Darwaz-i- Payin (Mamay)

24.126.1 3.73

Shiki 24.026.0 3.72

1. 1387 figures from Central Statistics Organization (CSO)

2.  1390 figures based on growth rates provided by CSO  (7 members/household)

Page 124: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Hydro power Hydropower in Puli‐e‐

Khumri canal9 7 NA

Hydropower in Puli‐e‐Khumri canal by Cement Factory

4.8 4.8 NA

Imported Power from Tajikistan

12 12 NA

Transmission projects 

Transmission Line from Kunduz to 

Baghlan‐Puli Khumri104/220 NA

Transmission Line from Samangan to 

Puli‐e Khumri86/220kV NA

Transmission Line from Pulli Khumri to 

Charikar144/220kV NA

Distribution projects Puli‐e‐ Khuri city ,new 

Baghlan and old Baghlan

25.308/6kV NA

Puli‐e‐ Khuri city ,new Baghlan and old 

Baghlan40/20kV NA

Project Details       (Describe each project 

and list their components)

Completed Project (As of 1387)

Transmission Length 

(Kms/KV) 

Distribution Capacity MVA/KV network)

1386 Annual O&M Cost    (USD Mil)

                                                                           Inter‐ministerial Commission for Energy                                                                                  Energy Database

         Table 1 ‐ A   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)  ‐ Generation, Transmission and Distribution  projects                             Province: BAGHLAN

Name of Project*Substation Capacity  /MVA

Project Completion  Cost       (USD 

Mil)

Ongoing and Future Projects (1388‐1392)

Installed Capacity (MW)

Planned Capacity / Power Input   

(MW)

Transmission Length     

(Kms/KV)

Distribution Capacity      (KVA 

network) 

Substation Capacity/ 

Transformers   Kv/MWA 

Estimated project cost (USD Mil)

Actual Capacity (MW)

Distribution network in Khanjan/Doshi

4/20kV NA

Substation projects  Puli‐e‐ Khumri  16‐220/20

Puli‐e‐ Khumri  16‐220/20 NA

Puli‐e‐ Khumri  25‐220/20 NA

Baghlan 4‐220/20 NA

Khanjan

other projects(list)

Responsbile Organization: MEW planning Department and DABM

Page 125: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

         Table 1 ‐ B   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)  Province: BAGHLAN

Coal‐ fired projects(3)  None

Gas‐ fired projects(2) None

Small Diesel/oil‐fired(1)

Andarab district 2 projects 55 KW 55 KW  $         42,607 

Dahana‐i‐Ghori district 2 projects 41 KW 41 KW  $         49,960 

Nahrin District 14 projects 874 KW 874 KW  $       369,322 

Ongoing and Future Projects (1388‐1392)

(2)Responsible organization:MoM MEW/DABM(1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)

Project Details        (Describe each project and list their components)

Installed Capacity (MW)

Actual Capacity (MW)

Project Completion  Cost       (USD 

Mil)

                                                                           Inter‐ministerial Commission for Energy                                                                                   Energy Database

Substation Capacity/ 

Transformers  Kv/MWA 

Estimated project cost (USD Mil)

1386 Annual O&M Cost    (USD Mil)

Planned Capacity    (MW)

Name of Projects*

Completed Project (As of 1387)

(3)Responsible organization:MoM, MEW/DABM (2)Responsible organization:MoM, MEW/DABM 

Page 126: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Microhydro

Andarab district 21 projects 422 KW 422 KW  $     809,143 Dahana‐i‐Ghori District

2 project 22.5 KW 22.5 KW  $        46,378 

Dushi district 3 projects 21.74 KW 21.74 KW  $     170,784 Farang wa Gharu district

6 projects  $     221,423 

Guzargah‐i‐Noor district

12 projects 10 KW 10 KW  $     301,600 

Khust wa firing district

7 projects  $     243,200 

Khwaja hijran (jilga nahin)

1 project  $        36,808 

Tala wa barfak  1 project  $        52,000 Khinjan district 7 projects 147 KW 147 KW  $     281,744 

SolarAndarab district 6 projects 320 W 320 W  $     126,773 Baghlan‐i‐Jadid 11 projects 409 W 409 W  $     206,969 Dahana‐i‐Ghori District

1 project 43 W  $        16,069 

Dushi district 19 projects 1332 W 1332 W  $     537,202 Khinjan district 2 project 206 W 206 W  $        86,156 Khwaja hijran (jilga nahin)

5 projects 212 W 212 W  $     109,688 

Nahrin district 5 projects 243 W 243 W  $        94,044 Tala wa barfak  17 projects 1374 W 1374 W  $     525,725 Puli Khumir city 1 project 62 W 62 W  $        28,000 

Wind NA

Planned Capacity    (MW)

Substation Capacity/ 

Transformers   Kv/MWA 

Installed Capacity (MW)

Actual Capacity (MW)

Estimated project cost (USD Mil)

Project Completion  Cost       (USD 

Mil)

1386 Annual O&M Cost    (USD Mil)

Province: BAGHLAN         Table 1 ‐ C   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) ‐ Renewable Energy

                                                                           Inter‐ministerial Commission for Energy                                                                                  Energy Database

 Renewable 

Energy Projects*

Project Details      (Describe each project and list 

their components)

Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)

Wood NA

others

Responsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department

Page 127: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

 Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production

Hydropower potential (MW) Kilagai HPP on Baghlan River 60 None

Province: BAGHALAN

Responsible Organiztion:DABMs, MEW Planning Department

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐A    Resources Available for Energy (Hydropower)

Page 128: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation Location/Source Description*

Total Extractable Potential Existing Production

Diesel/oil(1) None

Gas(2)  None

Coal(3)

Karkar Mines in Pulikhumri  District, Baghlan. Coal strength varies from 7,900‐7,000 kilo calorie/Kg.  3,200,000 MT

20,833 MT (1387); 20,566 MT (1386)

Doodkash Mines in Pulikhumri  District, Baghlan. Coal strength varies from 7,900‐7,000 kilo calorie/Kg.  1,040,000 MT

12,350 MT (1387); 11,300 MT (1386)

.Tala o Barfak Mines in Baghlan. Quality of coal not available.

Large deposits but not explored 

40,200 MT (1387); 29,300 MT (1386)

Ahendara  Mines in Pulikhumri  District, Baghlan. Coal strength not available.  No exploration done

5,200 MT (1387); 6,100 MT (1386)

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐B   Resources Available for Energy‐ Coal, Gas and Oil) Province :BAGHLAN

p

Nahrayn Mines in Baghlan. Coal strength not available.

Large deposits but not explored 

40,650 MT (1387); 31,900 MT (13860

(1)Responsible Organization:(2)Responsible Organization: MoM(3)Responsible Organization: MoM

MoM 

Page 129: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

B. Resources Available for Energy Generation ( Renewable Energy)

Location/Source 

Description*Total Potential Existing Production

Micro‐hydro (KW) NA

  Geothermal NA

Solar  NA

wind (metre/sec) NA

Wood (Cu.M) NA

Province: BAGHLAN

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐C   Resources Available for Energy ( Renwable Energy)

Others NA

Responsible Organization: MRRD(NSP,NABDP), MEW Renewable Department 

Page 130: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Name of District1387 (2008‐2009) in Thousands ('000)

Estimated 1390 (2011‐2012) in Thousands ('000)

Estimated 1390 no. of Households in Thousands ('000)

Total 804.0871.3 124.46

Baghlan Center       (Pul ‐i‐Khumri)

188.0203.7 29.10

Baghlan‐i‐  Jadeed 154.9167.9 23.98

Dahana‐i‐Ghuri 53.558.0 8.28

Dushi 60.865.9 9.41

Khinjan 27.730.0 4.29

Andarab 23.225.1 3.59

Nahreen 62.868.1 9.72

Burka 47.951.9 7.42

Tala Wa Barfak 27.529.8 4.26

Pul –i‐Hisar 25.227.3 3.90

Deh  Salah 29.1

Inter‐ministerial Commission for EnergyEnergy Database

Table 3 ‐ Population Data by District  Province: BAGHLAN

31.5 4.50Jalga 21.7

23.5 3.36Khost Wa Firing 57.4

62.2 8.89Firing Wa Gharu 15.1

16.4 2.34Gozargah‐i‐ Noor 9.2

10.0 1.42

1. 1387 figures from Central Statistics Organization (CSO)

2.  1390 figures based on growth rates provided by CSO  (7 members/household)

Page 131: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Hydro power Khanabad HPP 2 0 2

Khanabad HPP 10

Imported Power  From Tajkistan 60 40 NA

From Tajkistan 300/220KV NA

Transmission projects From Sherkhan to 

Kunduz60/110kV NA

From Sherkhan to Kunduz

60/220kV NA

from   switching station  to Imam 

Sahib20/110KV NA

from Sherkhan bandhar to qala‐zal

20/110kV NA

Kunduz to Puli‐khumri

104/220kV NA

From Kunduz to Taloqan

67/220kV NA

Substation Capacity/ 

Transformers  Kv/MWA 

Estimated project cost (USD Mil)

Substation Capacity  /MVA

Project Completion  

Cost       (USD Mil)

Actual Capacity (MW)

Transmission Length (Kms) 

Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)

                                                                           Inter‐ministerial Commission for Energy                                                                                      Energy Database

         Table 1 ‐ A   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)  ‐ Generation, Transmission and Distribution  projects                             Province: KUNDUZ

Planned Capacity / Power Input   

(MW)

Installed Capacity (MW)

Distribution Capacity     (KVA 

network) 

Distribution Capacity MVA/KV network)

Transmission Length     (Kms)

1386 Annual O&M Cost    (USD Mil)

Name of Project*

Project Details (Describe each 

project and list their components)

Taloqan/

Distribution projects  Kunduz city 44/6 and10  NA

Imam sahib  4/20kV NA

Qala Zal and Aq teipa 8/20kV NA

Kunduz city 25/20kV NA

Substation projects  Kunduz city 25‐220/20 NA

Imam sahib 4‐110/20 NA

Qala Zal and Aq teipa 16‐110/20 NA

Responsbile Organization: MEW planning Department and DABM

Page 132: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Coal‐ fired projects(3)  None

Gas‐ fired projects(2) None

Small Diesel/oil‐fired(1)

Khanabad District 8 projects 418 KV 418 KV  $         228,086 

Project Details        (Describe each project and list their components)

Installed Capacity (MW)

Actual Capacity (MW)

Project Completion  

Cost       (USD )

                                                                           Inter‐ministerial Commission for Energy                                                                                   Energy Database

Estimated project cost (USD Mil)

1386 Annual O&M Cost    (USD )

Planned Capacity    (MW)

Name of Projects*

Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)

         Table 1 ‐ B   Completed ( as of 1386) and Ongoing/Future Projects (1387‐1392) 

(1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)(2)Responsible organization:MoM, MEW/DABM (3)Responsible organization:MoM, MEW/DABM 

Page 133: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

         Table 1 ‐ C   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ Renewable EnerProvince: KUNDUZ

Microhydro

Archi district 4 projects NA NA  NA 

Solar

Ali abad district 17 projects 1331 w 1331 w  $        308,921 

Chardara district 1 project 25 w 25 w  $             5,019 

Imam sahib 2 projects 266 w 266 w  $           65,200 

Qala‐i‐Zal district 16 projects 2010 w 2010 w  $        670,600 

Khan abad district 3 projects 426 w 426 w  $           85,407 

Kunduz City 2 projects 208 w 208 w  $           44,219 

Solar None

Estimated project cost (USD Mil)

Project Completion  

Cost       (USD )

1386 Annual O&M Cost    (USD Mil)

                                                                  Inter‐ministerial Commission for Energy                                                                         Energy Database

 Renewable Energy 

Projects*

Project Details      (Describe each 

project and list their components)

Completed Project (As of 1386)Ongoing and Future Projects (1387‐1392)

Planned Capacity    (MW)

Installed Capacity (Watts)

Actual Capacity (Watts)

Wind None

Wood NoneResponsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department

Page 134: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production

Diesel/oil(1) None

Gas(2)  None

Coal(3) None

(1)Responsible Organization:

(2)Responsible Organization: MoM, DABMs

MoM, DABMs,MRRD(NSP,NABDP) 

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐B   Resources Available for Energy (Coal, Gas and Oil) Province: KUNDUZ

(2)Responsible Organization: MoM, DABMs

(3)Responsible Organization: MoM, DABMs

Page 135: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production

Hydropower potential (MW) None

Province: KUNDUZ

Responsible Organiztion:DABMs, MEW Planning Department

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐A    Resources Available for Energy (Hydopower)

Page 136: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation  ( Renewable Energy)

Location/Source 

Description*Total Potential Existing Production

Micro‐hydro (KW) NA

  Geothermal NA

Solar  NA

wind (metre/sec) NA

Wood (Cu.M) NA

Province: KUNDUZ

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐C   Resources Available for Energy (Renewable Energy)

OthersResponsible Organization: MRRD(NSP,NABDP), MEW Renewable Department 

Page 137: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Name of District1387 (2008‐2009) in Thousands ('000)

Estimated 1390 (2011‐2012) in Thousands 

('000)

Estimated 1390 no. of Households in 

Thousands ('000)Total 882.9

956.8 136.68Kunduz Center (Kunduz)

277.9301.1 43.02

Hazrati Imam Sahib 210.5228.1 32.59

Qala –i-Zal 62.767.9 9.71

Chahar Darah 66.872.4 10.34

Ali Abad 42.946.5 6.64

Khan Abad 145 2

Inter‐ministerial Commission for Energy Province: KUNDUZEnergy Database

Table 3 ‐ Population Data by District 

Khan Abad 145.2157.3 22.48

Dasht-i- Archi 76.983.3 11.90

1. 1387 figures from Central Statistics Organization (CSO)

2.  1390 figures based on growth rates provided by CSO  (7 members/household)

Page 138: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Hydro power  Taloquan River 10.5

Diesel Generation Taloqan City 1.6 1.6

Transmission projects  Kunduz to Taloqan 70/220

Distribution projects Taloqan City network

3 MVA‐20/0.4 KV

    Energy Database

Installed Capacity (MW)

Distribution Capacity     (MVA/KV network) 

Project Completion  

Cost       (USD Mil)

Estimated project cost (USD Mil)

Transmission Length     

(Kms/KV)

Ongoing and Future Projects (1388‐1392)

Substation Capacity/ 

Transformers  Kv/KV 

1386 Annual O&M Cost    (USD Mil)

Planned Capacity / Power Input   

(MW)

Completed Project (As of 1387)

Transmission Length (Kms) 

Distribution Capacity MVA/KV network)

Substation Capacity  /MVA

Actual Capacity (MW)

                                                                           Inter‐ministerial Commission for Energy                                                                         

         Table 1 ‐ A   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)  ‐ Generation, Transmission and Distribution  projects                             Province:TAKHA

Name of Project*

Project Details       (Describe each 

project and list their components  )

Substation projects  Taloqan 220KV/20KV

Responsbile Organization: MEW planning Department and DABM

Page 139: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

         Table 1 ‐ B   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)  Coal, Gas, and Small Diesel‐fired

Coal‐ fired projects(3)  None

Gas‐ fired projects(2) None

Small Diesel/oil‐fired(1)

Frarkhar destrict 5 projects 142 KW 142 KW  $         87,291 

Ishkashim destrict 38 projects 1383 KW 1383 KW  $       636,936 

Khwaja Ghar destrict 30 projects 953 KW 953 KW  $       482,011 

Warsaj destrict 18 projects 945 KW 945 KW  $       229,791 

Project Details        (Describe each project and list their components)

Installed Capacity (MW)

Actual Capacity (MW)

Project Completion  Cost       (USD 

Mil)

                                                                           Inter‐ministerial Commission for Energy                                                                                   Energy Database

Estimated project cost (USD Mil)

1386 Annual O&M Cost    (USD Mil)

Planned Capacity    (MW)

Name of Projects*

Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)

(3)Responsible organization:MoM, MEW/DABM 

(1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)(2)Responsible organization:MoM, MEW/DABM 

Page 140: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Microhydro NA

Bangi destrict 18 projects 176 KW 176 KW  $      583,406 

Chal destrict 6 projects 103 KW 103 KW  $      234,400 Farkhar destrict 42 projects 792 KW 792 KW  $   1,408,515 

Ishkashim destrict 4 projects 46 KW 46 KW  $        52,277 

Khwaja Ghar 2 projects 40 KW 40 KW  $        12,939 Rustaq destrict 3 projects 15 KW 15 KW  $      101,595 Taluqan city 6 projects 69 KW 69 KW  $      213,521 Warsaj destrict 38 projects 1573 KW 1573 KW  $      723,901 

Yangi Gala destrict 1 project 10 KW 10 KW  $        16,086 

Solar NAChal destrict 1 project 45 W 45 W  $        15,800 Farkhar destrict 3 projects 131 W 131 W  $        77,800 

Estimated project cost (USD Mil)

Project Completion  Cost       (USD 

Mil)

1386 Annual O&M Cost    (USD Mil)

 Renewable 

Energy Projects*

Project Details      (Describe each 

project and list their components)

Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)

Planned Capacity    (MW)

Substation Capacity/ 

Transformers   Kv/MWA 

Province: TAKHAR         Table 1 ‐ C   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ Renewable Energy

                                                                           Inter‐ministerial Commission for Energy                                                                                  Energy Database

Installed Capacity (MW)

Actual Capacity (MW)

Kalafgan destrict 18 projects 1552 W 1552 W  $      680,826 

Rustaq destrict 3 projects 236 W 236 W  $      113,200 

Wind None NA

Wood None NA

others None NA

Responsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department

Page 141: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Province:  TAKHAR

Resources Available for Energy Generation Location/Source Description*

Total Potential (MW)

Existing Production (MW)

Hydropower potential (MW) Artinjilan HPP 550 None

Memked 170 None

Galavan 550 None

Akimamaj 65 None

kokcha 22 None

Responsible Organiztion:DABM/S, MEW Planning Department

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐A    Resources Available for Energy (Hydropower)

Page 142: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

 Resources Available for Energy Generation Location/Source Description*

Total Extractable Potential Existing Production

Diesel/oil(1) None None None

Gas(2)  None None None

Coal(3)

Namakab Mines, strength of coal is 6,000 kilo Calorie per Kg 4,000,000MT Not AvailableKaishkaton Mines in Takhar Province. Strength of coal is 7,500 kilo Calorie per Kg 1,600,000 MT Not available

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐B   Resources Available for Energy (Coal, Gas and Oil) Province: TAKHAR

(1)Responsible Organization:(2)Responsible Organization: MoM(3)Responsible Organization: MoM

MoM 

Page 143: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

 Resources Available for Energy Generation                       

( Renewable Energy)

Location/Source Description*

Total Potential Existing Production

Micro‐hydro (KW) NA

  Geothermal NA

Solar  NA

wind (metre/sec) NA

Wood (Cu.M) NA

Others NA

Responsible Organization:

Provine: TAKHAR

MRRD(NSP,NABDP), MEW Renewable Department 

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐C   Resources Available for Energy (Reneabl Energy)

Page 144: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Name of District1387 (2008‐2009) in Thousands ('000)

Estimated 1390 (2011‐2012) in Thousands ('000)

Estimated 1390 no. of Households in Thousands ('000)

Total 870.9943.8 134.82

Takhar  Center       203.3220.3 31.47

Hazar Sumuch 12.513.5 1.94

Baharak 28.130.5 4.35

Khwaja Ghar 60.865.9 9.41

Bangi 31.934.6 4.94

Eshkamesh 53.758.2 8.31

Chal 25.727.8 3.98

Namak Ab 11.112.0 1.72

Farkhar 42.546.1 6.58

Kalafgan 32.034 7 4 95

Inter‐ministerial Commission for EnergyEnergy Database

Table 3 ‐ Population Data by District Province: Takhar

34.7 4.95Rustaq 149.0

161.5 23.07Chahab 70.8

76.7 10.96Yangi Qala 40.2

43.6 6.22Khwaja Bahawuddin 21.2

23.0 3.28Darqad 24.5

26.5 3.79Dashti Qala 29.1

31.5 4.50Warsaj 34.5

37.4 5.34

1. 1387 figures from Central Statistics Organization (CSO)

2.  1390 figures based on growth rates provided by CSO (7 members/household)

Page 145: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Hydro power  None

Transmission projects  None

Distribution projects Kunar distribution 

network 1.9-20/0.4NA

Kunar distribution network

3‐20/0.4 NA

Substation projects 

other projects(list)

    Energy Database                                                                           Inter‐ministerial Commission for Energy                                                                         

         Table 1 ‐ A   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)  ‐ Generation, Transmission and Distribution  projects                             Province: KUNA

Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)

Distribution Capacity     (KVA 

network) 

Substation Capacity/ 

Transformers  Kv/MWA 

Estimated project 

cost (USD Mil)

1386 Annual O&M Cost    (USD Mil)

Planned Capacity / Power Input   

(MW)

Transmission Length     (Kms)

Distribution Capacity MVA/KV network)

Substation Capacity  /MVA

Project Completion  

Cost       (USD Mil)

Responsbile Organization: MEW planning Department and DABM

Name of Project*

Project Details       (Describe each 

project and list their components  )

Installed Capacity (MW)

Actual Capacity (MW)

Transmission Length (Kms) 

Page 146: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

         Table 1 ‐ B   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) 

Coal‐ fired projects(3)  None

Gas‐ fired projects(2) None

Small Diesel/oil‐fired(1)

Chawkay 16 projects 595 W 595 W  $           196,790 

Khas kunar 3 projects 84 KW 84 KW  $             36,139 

Narang 22 projects 906 KW 906 KW  $           320,991 

Sirkanay 12 projects 302 KW 302 KW  $           144,288 

Name of Projects*

Completed Project (As of 1387)Ongoing and Future Projects 

(1388‐1392)Project Details        (Describe each project and list their components)

Installed Capacity (KW)

Actual Capacity (KW)

                                                                           Inter‐ministerial Commission for Energy                                                                                  Energy Database

Estimated project cost (USD'000)

1386 Annual O&M Cost    (USD'000)

Planned Capacity    (KW)

Province: Kunar

Project Completion  

Cost       (USD)'000

(1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)(2)Responsible organization:MoM, MEW/DABM (3)Responsible organization:MoM, MEW/DABM 

Page 147: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Microhydro

Kunar microhydro 2x350 KW 300 KW NA

Chawkay 16 projects 16 KW 16 KW $         14,525 Darah Pech 8 projects 60 KW 60 KW $       161,904 Khas Kunar 11 projects 195 KW 195 KW  $       215,308 

Narang 1 project 6.5 KW 6.5 KW $            7,959 Nurgal 7 projects 6.8 KW 6.8 KW $       237,427 Shygal wa Shittan 1 project 10.8 KW 10.8 KW $         28,000 Sirkanay 3 projects 105 KW 105 KW $         73,986 

Various Microhydro  upto 100 kW NA

Province: KUNAR

Installed Capacity (KW)

Actual Capacity (KW)

Estimated project cost (USD)

Project Completion  

Cost       (USD)

1386 Annual O&M Cost    (USD)

         Table 1 ‐ C   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ Renewable Energy 

                                                                           Inter‐ministerial Commission for Energy                                                                                  Energy Database

 Renewable Energy 

Projects*

Project Details (Describe each project 

and list their components)

Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)

Planned Capacity    (KW)

projects Various 

SolarAsadabad 1 project 29 W 29 W  $         14,733 

Darah Pech 3 projects 530 W 530 W  $       106,000 

Marawara 1 project 61 W 61 W  _ 

Nurgal 1 project 121 W 121 W  $         24,200 

Sirkanay 1 project 35 W 35 W  _ 

Geothermal None

Wind NoneWood NoneothersResponsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department

Page 148: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production

Hydropower potential (MW) Kama on Kunar River 45  MW

Kunar A on Kunar River 366 MW

Kunar H on Kunar River 165 MW

Province: KUNAR

Responsible Organiztion:DABMs, MEW Planning Department

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐A    Resources Available for Energy‐ Hydropower

Page 149: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production

Diesel/oil(1) None

Gas(2)  None

Coal(3) None

(1)Responsible Organization:

(2)Responsible Organization: MoM

(3)Responsible Organization: MoM

MoM

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐B   Resources Available for Energy (Coal, Gas and Oil) Province: KUNAR

Page 150: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation (Rewable Energy)

Location/Source Description*

Total Potential Existing Production

Micro‐hydro (KW) NA

  Geothermal NA

Solar  NA

wind (metre/sec) NA

Wood (Cu.M) NA

OthersResponsible Organization:

Province: KUNAR

MRRD(NSP,NABDP), MEW Renewable Department 

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐C   Resources Available for Energy (Renewable Energy)

Page 151: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Name of District1387 (2008‐2009) in Thousands 

('000)

Estimated 1390 (2011‐2012) in 

Thousands ('000)

Estimated 1390 No. of Households in Thousands ('000)

Total 401.0434.5 62.08

Kunarha Center     (Asad Abad)

30.032.5 4.64

Watapoor 24.927.0 3.85

Dara‐i ‐ Pech 49.854.0 7.71

Narang Wa Badil 27.529.8 4.26

Sar Kani 24.826.9 3.84

Mara wara 18.620.2 2.88

Dangam 15.416.7 2.38

Bar Kunar 20.021.7 3.10

Shigal Wa Sheltan 26.628.8 4.12

Chapa Dara 28.230.6 4.37

N l

Inter‐ministerial Commission for EnergyEnergy Database

Table 3‐ Population Data by District Province: KUNAR

Noorgal 28.831.2 4.46

Sawkai 32.535.2 5.03

Khas Kunar    31.834.5 4.92

Nari 25.127.2 3.89

Ghazi Abad 17.018.4 2.63

1.  1387 figures from Central Statistics Organization (CSO)

2. 1390 figures based on growth rates provided by the CSO (7members/household)

Page 152: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Diesel generatorsDiesel generator 

plants(4)1.18 1 NA

Transmission projects from Jalalabad to 

Mehtarlan32/110 NA

Distribution projects Laghman 

distribution network1.4‐11/0.4

NA

Mehterlan and Qargai

16‐20/0.4 NA

Substation projects  Mehterlan SS 16‐110/20 NA

other projects(list)

                                                                           Inter‐ministerial Commission for Energy                                                                             Energy Database

Project Completion  

Cost       (USD Mil)

1386 Annual O&M Cost    (USD Mil)

         Table 1 ‐ A   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)  ‐ Generation, Transmission and Distribution  projects                             Province: LAGHMAN

Name of Project*

Project Details (Describe each 

project and list their components)

Completed Project (As of 1387)

Distribution Capacity     (KVA 

network) 

Substation Capacity/ 

Transformers  Kv/MWA 

Estimated project 

cost (USD Mil)

Distribution Capacity MVA/KV network)

Substation Capacity  /MVA

Ongoing and Future Projects (1388‐1392)

Installed Capacity (MW)

Actual Capacity (MW)

Transmission Length (Kms) 

Planned Capacity / Power Input   

(MW)

Transmission Length     (Kms)

Responsbile Organization: MEW planning Department and DABM

Page 153: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

         Table 1 ‐ B   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) 

Coal‐ fired projects(3)  None

Gas‐ fired projects(2) None

Small Diesel/oil‐fired(1)

Alingar destrict 23 projects 240 KW 195 KW  $           100,323 

Alishing destrict 11 projects 195 KW 195 KW  $             85,650 

Name of Projects*

Completed Project (As of 1387) Ongoing and Future Projects 

Project Details (Describe each project and list their components)

Installed Capacity (KW)

Actual Capacity (KW)

Project Completion  Cost       (USD)

                                                                           Inter‐ministerial Commission for Energy                                                                                   Energy Database

Estimated project cost 

(USD)

1386 Annual O&M Cost    (USD)

Planned Capacity    (KW)

Province: Laghman

(2)Responsible organization:MoM, MEW/DABM (3)Responsible organization:MoM, MEW/DABM 

(1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)

Page 154: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Microhydro

Alinga destrict 21 projects 180 KW 180 KW  $       278,707 Alishing destrict 19 projects 186 KW 186 KW  $       172,542 

Dawlat shah 4 projects 45 KW 45 KW  $         30,443 

Mihtar lam destrict 12 projects 90 KW 90 KW  $       238,539 

Qarghayi destrict 5 projects 34 KW 34 KW  $         77,785 

Solar EnergyMehtar lam destrict

10 projects  763 KW 763 KW  $       242,889 

Qarghayi destrict 3 projecrts 295 KW 295 KW  $         86,440 

Geothermal NA

Estimated project cost (USD'000)

Project Completion  

Cost       (USD'000)

1386 Annual O&M Cost    (USD'000)

Installed Capacity (KW)

Actual Capacity (KW)

Province: LAGHMAN         Table 1 ‐ C   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ Renewable Energy

                                                                           Inter‐ministerial Commission for Energy                                                                                  Energy Database

 Renewable Energy 

Projects*

Project Details      (Describe each 

project and list their components)

Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)

Planned Capacity    (KW)

Wind NA

Wood NA

others NA

Responsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department

Page 155: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

B. Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production

Hydropower potential (MW) None

Province: LAGHMAN

Responsible Organiztion:DABMs, MEW Planning Department

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐A    Resources Available for Energy (Hydropower)

Page 156: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

B. Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production

Diesel/oil(1) None

Gas(2)  None

Coal(3) None

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐B   Resources Available for Energy (Coal, Gas and Oil) Province: LAGHMAN

(1)Responsible Organization:(2)Responsible Organization: MoM(3)Responsible Organization: MoM

MoM

Page 157: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

 Resources Available for Energy Generation ( Renewable Energy)

Location/Source Description*

Total Potential Existing Production

Micro‐hydro (KW) NA

  Geothermal None

Solar  NA

wind (metre/sec) NA

Wood (Cu.M) NA

Province: LAGHMAN

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐C   Resources Available for Energy

OthersResponsible Organization: MRRD(NSP,NABDP), MEW Renewable Department 

Page 158: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Name of District1387 (2008‐2009) in Thousands ('000)

Estimated 1390 (2011‐2012) in Thousands ('000)

Estimated 1390 No. of Households in Thousands ('000)

Total 396.8430.0 61.43

Laghman Center (Mehterlam)

124.5134.9 19.27

Qarghayee 89.296.7 13.81

Alingar 88.095.4 13.62

Alishing 64.970.3 10.05

Dawlat Shah 30.232.7 4.68

Inter‐ministerial Commission for Energy Province: LaghmanEnergy Database

Table 3 ‐ Population Data by District 

1.  1387 figures from Central Statistics Organization (CSO)

2. 1390 figures based on growth rates provided by the CSO (7 members/household)

Page 159: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Hydro power 

Darunta HPP 11.55 8 NA 11.55 15

Diesel GeneratorsDiesel generator 

plants (3)2.712 2.712 NA

Transmission projects  Nanglo to Jalalabad NA 75/110 NA

From Darunta to Jalalabad SS

16.9/35 NA

Distribution projects Nangarhar Electricity 

Authority 31.2-6/0.4NA

Nangarhar Electricity Authority

16‐20/0.4 NA

Substation projects  Jalalabad Substation 16‐110/20 NA

other projects(list)

                                                                           Inter‐ministerial Commission for Energy                                                                             Energy Database

Substation Capacity  /MVA

Project Completion  

Cost       (USD Mil)

1386 Annual O&M Cost    (USD Mil)

Planned Capacity / Power Input   

(MW)

Transmission Length     (Kms)

Substation Capacity/ 

Transformers  Kv/MWA 

Estimated project cost (USD Mil)

Actual Capacity (MW)

Transmission Length (Kms) 

Distribution Capacity MVA/KV network)

         Table 1 ‐ A   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)  ‐ Generation, Transmission and Distribution  projects                        Province: NANGARHA

Name of Project*

Project Details       (Describe each 

project and list their components  )

Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)

Installed Capacity (MW)

Distribution Capacity     (KVA 

network) 

other projects(list)

Responsbile Organization: MEW planning Department and DABM

Page 160: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

         Table 1 ‐ B   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) 

Coal fired (3) None None

Gas‐ fired projects(2) None None

Small Diesel/oil‐fired(1)

Achin district 6  projects 110 KW 110 KW  $             60,367 

Behsud district 1 project  $             35,476 

Chaparhar district 25 projects 341 KW 341 KW  $           237,226 

Muhmand dara district 1 project  $             28,115 

Rodat district 9 projects 155 KW 155 KW  $           104,022 

Surkhrud district 24 projects 943 KW 943 KW  $           847,792 

Name of Projects*

Completed Project (As of 1387)Ongoing and Future Projects 

(1388‐1392)Project Details        (Describe each project and list their components)

Installed Capacity (KW)

Actual Capacity (KW)

Project Completion  Cost       (USD)

                                                                           Inter‐ministerial Commission for Energy                                                                                   Energy Database

Estimated project cost 

(USD)

1386 Annual O&M Cost    (USD)

Planned Capacity    (KW)

(2)Responsible organization:MoM, MEW/DABM (3)Responsible organization:MoM, MEW/DABM 

(1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)

Page 161: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Province: NANGARHAR

MicrohydroAchin disrtict 10 projects 128 KW 128 KW  $       217,163 Bati Kot district 6 projects 49 KW 49 KW  $       175,611 Behsud district 1 project 18 KW  $          45,091 Dara Noor district 8 projects 72 KW  $       166,012 Dhi bala  8  projects 93 KW 93 KW  $       211,339 Dur baba  2  projects 33 KW 33 KW  $          59,868 Hisarak district 2 projects  $          76,997 Kama district 1 project 9 KW 9 KW  $          22,262 Kuz kunar 5 projects 62 KW 62 KW  $       176,125 Nazyan 12 projects 152 KW 152 KW  $       309,453 Pachir wa agam 6 projects 40 KW 40 kw  $       157,013 Surkha rud destrict 11 projects 93 KW 93 KW  $       276,600 

Solar Energy Achin disrtict 2 projects 62 W 62 W  $          37,842 Bati Kot district 4 projects 193 W 193 W  $       114,565 Bihsud dstrict 19 projects 1497 W 1497 W  $       842,536 Chaparhar 12 projects 400 W 400 W  $       229,732 

Dara Noor destrict 6 projects 452 W 452 W  $       281,526 

Installed Capacity (KW)

Actual Capacity (KW)

Estimated project cost ($) 

Project Completion  Cost ($)      

1386 Annual O&M Cost ($) 

                                                                      Inter‐ministerial Commission for Energy                                                                                  Energy Database

 Renewable Energy 

Projects*

Project Details (Describe each 

project and list their components)

Completed Project (As of 1387)Ongoing and Future Projects (1388‐

1392)

Planned Capacity    (KW)

         Table 1 ‐ C   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ Reneable Energy

Dhi bala  4 projects 101 W  101 W   $          59,307 Goshta  10 projects 1081 W 1081 W  $       393,412 Kama district 37 Projects 3624 W 3624 W  $    1,346,681 Kuz kunar 21 projects 2478 W 2478 W  $       775,233 Nazyan 7 projects  329 W 329 W  $       204,776 Rodat district 11 projects 47 W 47 W  $          30,355 Surkh Rud 31 projects  1870 W 1870 W  $    1,047,660 

Geothermal None

Wind None

Wood None

others None

Responsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department

Page 162: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production

Hydropower potential (MW) None

Province: NANGARHAR

Responsible Organiztion:DABMs, MEW Planning Department

Inter‐ministerial Commission for EnergyEnergy Database

 Table 2‐A    Resources Available for Energy (Hydropower)

Page 163: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation Location/Source Description Total Potential Existing Production

Diesel/oil(1) None

Gas(2)  None

Coal(3) None

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐B   Resources Available for Energy (Coal, Gas and Oil) Province: NANGARHAR

(1)Responsible Organization:(2)Responsible Organization: MoM(3)Responsible Organization: MoM

MoM

Page 164: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

 Resources Available for Energy Generation ( Renewable Energy)

Location/Source Description*

Total Potential Existing Production

Micro‐hydro (KW) NA

  Geothermal None

Solar  NA

wind (metre/sec) NA

Province: NANGARHAR

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐C   Resources Available for Energy (Renewable Energy)

Wood (Cu.M) NA

OthersResponsible Organization:

*List each depoint source and location ( province/districts 

MRRD(NSP,NABDP), MEW Renewable Department 

Page 165: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Name of District1387 (2008‐2009) in Thousands ('000)

Estimated 1390 (2011‐2012) in Thousands ('000)

Estimated 1390 No. of Households in Thousands ('000)

Tatol 1333.5 1445.0206.44

Nangarhar Center (Jalalabad)

183.0 198.328.33

Behsud 103.4 112.016.01

Surkh Rud 109.6 118.816.97

Chapar har 54.8 59.48.48

Rodat 62.9 68.29.74

Kama 69.9 75.710.82

Kuzkunar 50.1 54.37.76

Darah -i- Noor 36.7 39.85.68

Sher Zad 60.3 65.39.33

Hesarak 28.0 30.34.33

Khugyani 118.6 128.518.36

Energy DatabaseTable 3 ‐ Population Data by District  Province: NANGARHAR

Pachir Wagam 38.7 41.95.99

Deh Bala 36.7 39.85.68

Kot 47.4 51.47.34

Achin 91.2 98.814.12

Nazyan 13.3 14.42.06

Dur Baba 21.2 23.03.28

Shinwar 54.5 59.18.44

Bati Kot 68.9 74.710.67

Muhmandِِ Dara 40.9 44.36.33

Goshta 24.8 26.93.84

Lalpoor 18.6 20.22.88

1.  1387 figures from Central Statistics Organization (CSO)

2. 1390 figures based on growth rates provided by the CSO (7 members/household)

Page 166: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Hydro power  None

Imported Power  None

Transmission projects  None

Distribution projects  NA

Substation projects  NA

Project Details (Describe each 

project and list their components)

Completed Project (As of 1387)

Transmission Length (Kms) 

Distribution Capacity MVA/KV network)

1386 Annual O&M Cost    (USD Mil)

                                                                           Inter‐ministerial Commission for Energy                                                                             Energy Database

         Table 1 ‐ A   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)  ‐ Generation, Transmission and Distribution  projects                             Province: NOORISTAN

Name of Project*Substation Capacity  /MVA

Project Completion  

Cost       (USD Mil)

Ongoing and Future Projects (1388‐1392)

Installed Capacity (MW)

Planned Capacity / Power Input   

(MW)

Transmission Length     (Kms)

Distribution Capacity     (KVA 

network) 

Substation Capacity/ 

Transformers  Kv/MWA 

Estimated project cost (USD Mil)

Actual Capacity (MW)

other projects(list) NA

Responsbile Organization: MEW planning Department and DABM

Page 167: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

         Table 1 ‐ B   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) 

Coal‐ fired projects(3)  None

Gas‐ fired projects(2) None

Small Diesel/oil‐fired(1)

Bargi Matal desrtict 12 projects 176 KW 176 KW  $           171,438 

Du Ab destrict 18 projects 168 KW 168 KW  $           186,108 

Kamdesh destrict 9 projects 185 KW 185 KW  $           218,201 

Nurgaram destrict 11 projects 95 KW 95 KW  $           113,766 

Wama destrict 13 project 194 KW 194 KW  $           309,276 

Waygal destrict 5 projects 175 KW 195 KW  $           221,098 

Ongoing and Future Projects (1388‐1392)

Province: Nooristan

Project Details (Describe each project and list their components)

Installed Capacity (KW)

Actual Capacity (KW)

Project Completion  Cost       (USD)

                                                                           Inter‐ministerial Commission for Energy                                                                                   Energy Database

Estimated project cost (USD)

1386 Annual O&M Cost    (USD)

Planned Capacity    (KW)

Name of Projects*

Completed Project (As of 1387)

(1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)(2)Responsible organization:MoM, MEW/DABM (3)Responsible organization:MoM, MEW/DABM 

Page 168: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

         Table 1 ‐ C   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ Renewable Energy Province: NOORISTAN

Microhydro

Chawkay 1 project 16 KW 16 KW  $         14,000 Darah Pech 8 projects 60 KW 60 KW  $       161,904 

Khas Kunar 11 projects 195 KW 195 KW  $       215,308 

Narang 1 project 6.5 KW 6.5 KW  $            7,959 Nurgal 7 projects 6.8 KW 6.8 KW  $       237,427 Shygal wa Shittan 1 project 10.8 KW 10.8 KW  $         28,000 Sirkanay 3 projects 105 KW 105 KW  $         73,986 

SolarAsadabad 1 project 29 W 29 W  $         14,733 

Darah Pech 3 projects 530 W 530 W  $       106,000 

Marawara 1 project 61 W 61 W  _ 

Nurgal 1 project 121 W 121 W  $         24,200 

Sirkanay 1 project 35 W 35 W  _ 

Ongoing and Future Projects (1388‐1392)

Planned Capacity    (KW)

Substation Capacity/ 

Transformers   Kv/MWA 

Installed Capacity (KW)

Actual Capacity (KW)

Estimated project cost (USD)

Project Completion  

Cost       (USD)

1386 Annual O&M Cost    (USD)

                                                                           Inter‐ministerial Commission for Energy                                                                                  Energy Database

 Renewable Energy 

Projects*

Project Details      (Describe each 

project and list their components)

Completed Project (As of 1387)

j _

Geothermal None

Wind None

Wood None

others None

Responsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department

Page 169: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

B. Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production

Hydropower potential (MW) None

Province: NOORISTAN

Responsible Organiztion:DABMs, MEW Planning Department

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐A    Resources Available for Energy ( Hydropower)

Page 170: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production

Diesel/oil(1) None

Gas(2)  None

Coal(3) None

(1)Responsible Organization:

(2)Responsible Organization: MoM

(3)Responsible Organization: MoM

MoM

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐B   Resources Available for Energy (Coal, Gas and Oil) Povince: NOORISTAN

Page 171: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

 Resources Available for Energy Generation ( Renewable Energy)

Location/Source Description*

Total Potential Existing Production

Micro‐hydro (KW) NA

  Geothermal None

Solar  NA

wind (metre/sec) NA

Wood (Cu.M) NA

Province: NOORISTAN

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐C   Resources Available for Energy (Renewable Energy)

OthersResponsible Organization: MRRD(NSP,NABDP), MEW Renewable Department 

Page 172: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Name of District1387 (2008‐2009) in Thousands 

('000)Estimated 1390 (2011‐

2012) in Thousands ('000)

Estimated 1390 no. of Households in 

Thousands ('000)

Total 131.9 142.9 20.42Nooristan Center (Paroon) 12.3 13.3 1.90

Noor Gram 29.4 31.9 4.55

Duab 7.1 7.7 1.10

Waygal 17.8 19.3 2.76

Wama 10 0

Inter‐ministerial Commission for EnergyEnergy Database

Table 3 ‐ Population Data by District  Province: NOORISTAN

Wama 10.0 10.8 1.55

Mandol 18.0 19.5 2.79

Kamdesh 23.1 25.0 3.58

Bargi Matal 14.2 15.4 2.20

1.  1387 figures from Central Statistics Organization (CSO)

2. 1390 figures based on growth rates provided by the CSO (7 members/household)

Page 173: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Hydro power 

Diesel‐fired Small diesel plants 3x500 kVA 1.2 NA

3x550kVA 1.32 NA

200 kVA 0 NA

Transmission projects Transmission line from Gardez to 

Gazni 75/220

Transmission line from  Gazni to Zabul

170/220

Distribution projects Gazni Distribution 

network 3-20/0.4

Gazni Distribution network

16‐20/0.4

Distribution Capacity (KVA 

network) 

Substation Capacity/ 

Transformers Kv/MWA 

Estimated project cost (USD Mil)

                                                                           Inter‐ministerial Commission for Energy                                                                             Energy Database

         Table 1 ‐ A   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)  ‐ Generation, Transmission and Distribution  projects                             Province: GHAZN

Name of Project*Substation Capacity  /MVA

Project Completion  

Cost       (USD Mil)

Ongoing and Future Projects (1388‐1392)

Installed Capacity Transmission 

Length     (Kms/KV)

1386 Annual O&M Cost    (USD Mil)

Planned Capacity / Power Input   

(MW)

Project Details       (Describe each 

project and list their components  )

Completed Project (As of 1387)

Transmission Length 

(Kms/KV) 

Distribution Capacity MVA/KV network)

Actual Capacity (MW)

Substation projects  Gazni SS 16‐220/20

other projects(list)

Responsbile Organization: MEW planning Department and DABM

Page 174: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Coal‐ fired projects(3)  None

Gas‐ fired projects(2) None

Small Diesel‐l fired projects(1)Bahrami Shaid (Jaghatu) 31 projects 628 KW 628 KW  $       213,859 

Dih Yak destrict 6 projects 324 KW 324 KW  $         73,104 

Ghazni city 12 projects 315 KW 315 KW  $       138,396 

Khwaja Umari destrict 29 projects 725 KW 725 KW  $       219,789 

Malistan destrict 58 projects 1527 KW 1527 KW  $       575,353 

Rashidan destrict 1 project 10 KW 10 KW  $           5,875 

                                                Energy Database

Name of Projects*

Completed Project (As of 1387)Ongoing and Future Projects 

(1388‐1392)Project Details        (Describe each project and list their components)

Installed Capacity (MW)

Actual Capacity (MW)

                                                                           Inter‐ministerial Commission for Energy                                                                            

Estimated project cost 

(USD )

1386 Annual O&M Cost    (USD )

Planned Capacity    (MW)

Project Completion  Cost       (USD 

)

         Table 1 ‐ B   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) ‐ Coal, gas and diesel‐fired

(2)Responsible organization:MoM, MEW/DABM (3)Responsible organization:MoM, MEW/DABM 

(1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)

Page 175: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Microhydro

Baharmi Shahdi(Jaghatu)

1 project 7.5 KW 7.5 KW  $        11,000 

Jaghuri Destrict 7 projects 36 KW 36 KW  $        59,600 

Malistan destrict 35 projects 388 KW 388 KW  $      398,615 

Nawur destrict 16 projects 78 KW 78 KW  $      333,430 

SolarBaharmi Shahdi(Jaghatu)

24 projects 487 W 487 W  $      227,236 

Ghazni City 10 projects 865 W 865 W  $      369,649 Jaghuri Destrict 18 projects 542 W 542 W  $      197,134 Malistan destrict 7 projects 126 W 126 W  $        72,041 Nawur destrict 28 projects 824 W 824 W $ 312 822

Ongoing and Future Projects (1388‐1392)

Planned Capacity (KW)

Province: Ghazni

Estimated project cost (USD)

Project Completion  

Cost       (USD)

1386 Annual O&M Cost    (USD)

Installed Capacity (KW)

Actual Capacity (KW)

         Table 1 ‐ C   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ Renewable Energy

                                                                        Inter‐ministerial Commission for Energy                                                                               Energy Database

 Renewable Energy 

Projects*

Project Details (Describe each 

project and list their components)

Completed Project (As of 1387)

Nawur destrict 28 projects 824 W 824 W $      312,822 

Geothermal None

Wind None

Wood None

others None

Responsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department

Page 176: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production

Hydropower potential (MW) None

Province: GHAZNI

Responsible Organiztion:DABMs, MEW Planning Department

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐A    Resources Available for Energy (Hydropower)

Page 177: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production

Diesel/oil(1) None

Gas(2)  None

Coal(3) None

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐B   Resources Available for Energy (Coal, Gas and Oil) Province: GHAZNI

(1)Responsible Organization:

(2)Responsible Organization: MoM

(3)Responsible Organization: MoM

MoM

Page 178: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

 Resources Available for Energy Generation  ( Renewable Energy)

Location/Source 

Description*Total Potential Existing Production

Micro‐hydro (KW) NA

  Geothermal None

Solar  NA

wind (metre/sec) None

Wood (Cu.M) NA

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐C   Resources Available for Energy (Renewable Energy)

OthersResponsible Organization: MRRD(NSP,NABDP), MEW Renewable Department 

Page 179: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Name of District

1387 (2008‐2009) in Thousands ('000)

Estimated 1390 (2011‐2012) in Thousands ('000)

Estimated 1390 no. of Households in Thousands ('000)

Total 1092.61184.0 169.14

 Ghazni Center       (Ghazni)

146.2158.4 22.63

Deh Yak 44.548.2 6.89

Zanakhan 11.512.5 1.78

Khwaja Omari 17.318.7 2.68

Rashidan 16.317.7 2.52

Wali M                shahid (khugyani)

18.319.8 2.83

Jaghatu 28.931.3 4.47

Waghaz 35.138.0 5.43

Qara Bagh 129.9140.8 20.11

Giro 33.2

Inter‐ministerial Commission for EnergyEnergy Database

Table 3‐ Population Data by District  Province: Ghazni

36.0 5.14Andar 113.5

123.0 17.57Nawur 86.0

93.2 13.31Ajristan 26.2

28.4 4.06Malistan 74.6

80.8 11.55Jaghuri 160.6

174.0 24.86Muqur 45.7

49.5 7.07Ab Band 25.0

27.1 3.87Gelan 52.7

57.1 8.16Nawa 27.1

29.4 4.20

2.  1390 figures based on growth rates provided by CSO (7 members/household)

1. 1387 figures from central Statistics Organization (CSO)

Page 180: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Hydro power  None

Diesel‐firedSmall diesel plants 

(5)1.4 1.4 NA

Transmission projects Transmission line 

from Paktia to Khost90/220 NA

Distribution projects Khost distribution 

network 1.4-20/0.4NA

Khost distribution network

16‐20/0.4 NA

Substation projects  Khost SS 16‐220/20 NA

other projects(list)

                                                                           Inter‐ministerial Commission for Energy                                                                             Energy Database

         Table 1 ‐ A   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)  ‐ Generation, Transmission and Distribution  projects                             Province: KHOS

Planned Capacity / Power Input   

(MW)

Name of Project*

Project Details (Describe each 

project and list their components)

Substation Capacity  /MVA

Project Completion Cost (USD 

Mil)

Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)

Installed Capacity (MW)

Actual Capacity (MW)

Transmission Length (Kms) 

Distribution Capacity MVA/KV network)

Transmission Length     (Kms)

Distribution Capacity     (KVA 

network) 

Substation Capacity/ 

Transformers    Kv/MWA 

Estimated project cost (USD Mil)

1386 Annual O&M Cost (USD Mil)

Responsbile Organization: MEW planning Department and DABM

Page 181: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

         Table 1 ‐ B   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) 

Coal‐ fired projects(3)  None

Gas‐ fired projects(2) NoneSmall Diel fired projects(1) 

Khost Matun 22 projects  894 KW 894 KW  $       484,013 

Mando Zayi destrict 18 projects 402 KW 402 KW  $       316,984 

Musa Khel destrict 1 project 15 KW 15 KW  $         14,531 

Spera destrict 9 projects 120 KW 120 KW  $         94,207 

Installed Capacity (MW)

Actual Capacity (MW)

Project Completion  Cost       (USD 

)

                                                                           Inter‐ministerial Commission for Energy                                                                                   Energy Database

Estimated project cost (USD Mil)

1386 Annual O&M Cost    (USD)

Planned Capacity    (MW)

Name of Projects*

Completed Project (As of 1387Ongoing and Future Projects 

(1388‐1392)

Province: Khost

Project Details        (Describe each project and list their components)

(1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)(2)Responsible organization:MoM, MEW/DABM (3)Responsible organization:MoM, MEW/DABM 

Page 182: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Microhydro

Jaji Maydan 1 project 8 KW 8 KW  $        11,800 

Spera  2 projects 20 KW 20 KW  $        16,776 

Tani destrict 1 project 10 KW 10 KW  $        25,064 

SolarGurbuz destrict 9 projects 0 0  $      341,600 Jaji Maydan destrict

26 projects 1145 W 1145 W  $      671,933 

Geothermal None

Wind None

Ongoing and Future Projects (1388‐1392)

Planned Capacity    (KW)

Province: KHOST

Estimated project cost (USD)

Project Completion  

Cost       (USD)

1386 Annual O&M Cost    (USD)

Installed Capacity (KW)

Actual Capacity (KW)

     Table 1 ‐ C   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ Renewable Energ

                                                                        Inter‐ministerial Commission for Energy                                                                               Energy Database

 Renewable Energy 

Projects*

Project Details      (Describe each 

project and list their components)

Completed Project (As of 1387)

Wind None

Wood None

others None

Responsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department

Page 183: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production

Hydropower potential (MW) None

Province: KHOST

Responsible Organization:  DABM/S, MEW Planning Department

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐A    Resources Available for Energy ( Hydropower)

Page 184: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation

Location/Source Description* Total Potential

Existing Production

Diesel/oil(1) None

Gas(2)  None

Coal3) None

(1)Responsible Organization:(2)Responsible Organization: MoM(3)Responsible Organization: MoM

MoM 

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐B   Resources Available for Energy (Coal, Gas and Oil) Province: KHOST

Page 185: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation ( Renewable Energy)

Location/Source 

Description*Total Potential Existing Production

Micro‐hydro (KW) NA

  Geothermal None

Solar  NA

wind (metre/sec) None

Wood (Cu.M) NA

Province: KHOST

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐C   Resources Available for Energy (Renewble Energy)

OthersResponsible Organization: MRRD(NSP,NABDP), MEW Renewable Department 

Page 186: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Name of District1387 (2008‐2009) in Thousands ('000)

Estimated 1390 (2011‐2012) in Thousands ('000)

Estimated 1390 no. of Households in Thousands ('000)

Total 511.6554.4 79.20

Khost Center (Khost) 124.9135.3 19.34

Trayzayee (Ali Sher )

40.744.1 6.30

Baak 20.121.8 3.11

Jaji Maidan 21.923.7 3.39

Sabari (Yaqubi) 64.569.9 9.99

Musa khel 37.340.4 5.77

Qalandar 9.310.1 1.44

Nadir Shah kot 29.031.4 4.49

Manduzay (Esmayel khil)

51.355.6 7.94

Shamul 12.413.4 1.92

Spera 22.224.1 3.44

Tanay 54.258.7 8.39

Gurbuz 23.825.8 3.68

Inter‐ministerial Commission for EnergyEnergy Database

Table 3 ‐ Population Data by District Province: KHOST

1. 1387 figures from ntral Statistics Organization (CSO)

2.  1390 figures based on growth rates provided by CSO (7 members/household)

Page 187: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Hydro power  None

Diesel GeneratorDiesel generation plants (4 plants)

1.4 1 NA

Transmission projects Transmission line from South Kabul to Logar 

62/220 NA

Distribution projects Logar Electricity 

Authority 0.8/0.4NA

Loghar Electricity Authority

16‐20/0.4 NA

Substation projects  Pulle‐Alam SS 2x16‐220/20 NA

other projects(list)

1386 Annual O&M Cost    (USD Mil)

Planned Capacity / Power Input   

(MW)

Substation Capacity/ 

Transformers  Kv/MWA 

Estimated project cost (USD Mil)

Transmission Length     (Kms)

Distribution Capacity      (KVA 

network) 

Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)

Installed Capacity (MW)

Actual Capacity (MW)

Transmission Length (Kms) 

Distribution Capacity MVA/KV network)

                                                                           Inter‐ministerial Commission for Energy                                                                             Energy Database

         Table 1 ‐ A   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)  ‐ Generation, Transmission and Distribution  projects                             Province: LOGA

Name of Project*

Project Details (Describe each project 

and list their components)

Substation Capacity  /MVA

Project Completion  

Cost       (USD Mil)

Responsbile Organization: MEW planning Department and DABM

Page 188: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

                              Table 1 ‐ B   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) 

Coal‐ fired projects(3)  None

Gas‐ fired projects(2) None

Small Diel fired projects(1)

Baraki Barak district 41 projects 2521 KW 2521 KW  $   1,223,977 

Khushi district 13 projects 268 KW 268 KW  $       176,819 

Muhammad Agha district 73 projects 3576 KW 3576 KW  $   1,662,533 

                                                                           Inter‐ministerial Commission for Energy                                                                                   Energy Database

Estimated project cost 

(USD )

1386 Annual O&M Cost (USD 

)

Planned Capacity (MW)

Name of Projects*

Completed Project (As of 1387Ongoing and Future Projects 

(1388‐1392)

Province: LOGAR

Installed Capacity (MW)

Actual Capacity (MW)

Project Completion  Cost (USD )

Project Details (Describe each project and list their 

components)

(1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)(2)Responsible organization:MoM, MEW/DABM (3)Responsible organization:MoM, MEW/DABM 

Page 189: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Microhydro

Azra district 23 projects 234 KW 234 KW  $      480,551 M<uhammad Agha district 

5 projects  41 KW 41 KW  $        86,126 

Puli Alam district 1 project 20 KW 20 KW  $        30,352 

SolarAzra district 2 projecs 84 W 84 W  $        46,400 Baraki Barak district 18 projects 757 W 757 W  $        34,178 Charkh district 7 projects 483 W 483 W  $      238,675 Khushi district 3 projects 67 W 67 W  $        22,419 Muhammad Agha district

10 projects 302 W 302 W

Puli Alam district 83 projects 6157 W 6157 W  $   3,109,603 

Province: LOGAR                                                                           Inter‐ministerial Commission for Energy                                                                             

     Energy Database

 Renewable Energy 

Projects*

Project Details (Describe each 

project and list their components)

Completed Project (As of 1387) Ongoing and Future Projects (1388‐

Planned Capacity (KW)

Installed Capacity (KW)

Actual Capacity (KW)

         Table 1 ‐ C   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ Renewable Energy

Estimated project cost (USD)

Project Completion  Cost (USD)

1386 Annual O&M Cost (USD)

Geothermal None

Wind None

Wood None

others None

Responsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department

Page 190: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation Location/Source Description Total Potential Existing Production

Hydropower potential (MW) None

Province: LOGAR

Responsible Organiztion:DABMs, MEW Planning Department

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐A    Resources Available for Energy (Hydropower)

Page 191: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

 Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production

Diesel/oil(1) None

Gas(2)  None

Coal(3) None

(1)Responsible Organization:(2)Responsible Organization: MoM(3)Responsible Organization: MoM

MoM

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐B   Resources Available for Energy (Coal, Gas and Oil) Province: LOGAR

Page 192: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation ( Renewable Energy)

Location/Source Description*

Total Potential Existing Production

Micro‐hydro (KW) NA

  Geothermal None

Solar  NA

wind (metre/sec) None

Wood (Cu.M) None

Province: LOGAR

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐C   Resources Available for Energy (Renewable Energy)

OthersResponsible Organization: MRRD(NSP,NABDP), MEW Renewable Department 

Page 193: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Name of District1387 (2008‐2009) in Thousands

1390 (2011‐2012) in Thousands ('000)

Estimated 1390 no. of Households in Thousands ('000)

Total 349.0378.2 54.03

Logar Center           (Puli Alam)

96.0104.0 14.86

Baraki Barak 79.686.3 12.32

Charkh 40.443.8 6.25

khushi 21.923.7 3.39

Mohammad Agha 68.774.4 10.64

Khar war 23.925.9 3.70

Inter‐ministerial Commission for EnergyEnergy Database

Table 3 ‐ Population Data by District  Province: LOGAR

25.9 3.70Azra 18.5

20.0 2.86

2.  1390 figures based on growth rates provided by the CSO (7 members/household)

1. 1387 figures from Central Statistics organization (CSO)

Page 194: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Hydro power Samkany Minihydro 

Project2x0.25 NA

Diesel‐fired Small diesel plants(2) 0.98 0.9 NA

Transmission projects Transmission line from  Pul‐e‐Alam to Gardez

51/220NA

Gardez to Khost 90/220 NA

Gardez to Gazni 75/220 NA

From Gardez to Gazni transmission line 

connection to Sharan16/220 NA

Transmission Length     

(Kms/KV)

Distribution Capacity       (KVA 

network) 

Substation Capacity/ 

Transformers   Kv/MWA 

Estimated project cost (USD Mil)

Installed Capacity (MW)

Actual Capacity (MW)

Transmission Length (Kms/KV) 

Distribution Capacity MVA/KV network)

Substation Capacity  /MVA

Project Completion  

Cost       (USD Mil)

1386 Annual O&M Cost    (USD Mil)

Planned Capacity / Power Input   

(MW)

                                                                           Inter‐ministerial Commission for Energy                                                                             Energy Database

         Table 1 ‐ A   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)  ‐ Generation, Transmission and Distribution  projects                             Province: PAKTIA

Name of Project*

Project Details (Describe each project 

and list their components)

Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)

Distribution projects  Gardez City network1-20/0.4

NA

Gardez City network 16‐20/0.4 NA

Substation projects  Gardez SS 2x16‐220/20 NA

other projects(list)

Responsbile Organization: MEW planning Department and DABM

Page 195: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

                                      Table 1 ‐ B   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) 

Coal‐ fired projects(3)  None

Gas‐ fired projects(2) None

 Small Diel fired projects (1)

Ahmadabad destrict 15 projects 308 KW 308 KW  $       127,662 

Jaji destrict 5 projects 71 KW 71 KW  $         46,599 

Lija Ahmad Khel destrict 3 projects 17.5 KW 17.5 KW  $         18,683 

Sayid Karam destrict 3 projects 34.5 KW 34.5 KW  $         17,970 

Shwak destrict 1 projects 12 KW 12 KW  $         11,400 

Zurmat destrict 18 projects 228 KW 228 KW  $       204,904 

                                                                           Inter‐ministerial Commission for Energy                                                                                   Energy Database

Estimated project cost 

(USD )

1386 Annual O&M Cost (USD )

Planned Capacity    (MW)

Name of Projects*

Completed Project (As of 1387Ongoing and Future Projects 

(1388‐1392)

Installed Capacity (MW)

Actual Capacity (MW)

Project Completion  Cost (USD )

Project Details (Describe each project and list their 

components)

(1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)(2)Responsible organization:MoM, MEW/DABM (3)Responsible organization:MoM, MEW/DABM 

Page 196: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Microhydro

Ahmadabad destrict 3 projects 23 KW 23 KW  $        97,678 Chamkanay destrict 7 projects 40 KW 40 KW  $      114,954 

Dand wa Patan  2 projects 24.5 KW 24.5 KW  $        67,605 

Jaji destrict 16 projects 164 KW 164 KW  $      250,042 

Leja Ahmad Khel 20 projects 167 KW 167 KW  $      262,320 

Sayed Karam destrict 11 projects 209 KW 209 KW  $      131,025 

Shwak destrict 1 project 7.5 KW 7.5 KW  $        15,400 

SolarChamkanay destrict 28 projects 866 W 866 W  $      440,934 Dand wa Patan  32 Projects 1402 W 1402 W  $      544,496 Gardez destrict 15 projects 741 W 741 W $      326,331 

Province:  Paktia                                                                           Inter‐ministerial Commission for Energy                                                                             

     Energy Database

 Renewable Energy 

Projects*

Project Details      (Describe each 

project and list their components)

Completed Project (As of 1387)Ongoing and Future Projects (1388‐

1392)

Planned Capacity    (KW)

Installed Capacity (KW)

Actual Capacity (KW)

         Table 1 ‐ C   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ Renewable Energy

Estimated project cost (USD,000)

Project Completion  

Cost       (USD'000)

1386 Annual O&M Cost    (USD,000)

Gardez destrict 15 projects 741 W 741 W $      326,331 Jaji destrict 17 projects 999 W 999 W  $      409,676 Leja Ahmad Khel 33 projects 365  W 365  W  $      209,410 Sayed Karam destrict 4 projects 62 W 62 W  $        31,587 

Zurmat Destrict 41 projects 912 W 912 W  $      298,737 

Geothermal None

Wind None

Wood None

others None

Responsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Energy Department

Page 197: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production

Hydropower potential (MW) None

Province: PAKTIA

Responsible Organiztion:DABM/S, MEW Planning Department

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐A    Resources Available for Energy (Hydropower)

Page 198: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

 Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production

Diesel/oil(1) none

Gas(2)  None

Coal(3) None

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐B   Resources Available for Energy (Coal, Gas and Oil) Province: PAKTIA

(1)Responsible Organization:(2)Responsible Organization: MoM(3)Responsible Organization: MoM

MoM

Page 199: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

 Resources Available for Energy Generation ( Renewable Energy)

Location/Source 

Description*Total Potential Existing Production

Micro‐hydro (KW) NA

  Geothermal NA

Solar  NA

wind (metre/sec) NA

Wood (Cu.M) NA

Province: PAKTIA

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐C   Resources Available for Energy (Renewable Energy)

Others NA

Responsible Organization: MRRD(NSP,NABDP), MEW Renewable Department 

Page 200: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Name of District

1387 (2008‐2009) in Thousands ('000)

1390 (2011‐2012) in Thousands ('000)

Estimated 1390 no. of Households in Thousands ('000)

Total 490.9532.0 75.99

Paktya Center (Gardez)

75.381.6 11.66

Sayyid Karam 58.463.3 9.04

Zurmat 97.8106.0 15.14

Shwak 5.15.5 0.79

Wuza Jadran 32.335.0 5.00

Laja Ahmad khel 20.822.5 3.22

Jani Khel 31.834.5 4.92

Dand Patan 24.226.2 3.75

Samkani 45.549.3 7.04

Jaji 57.362 1 8 87

Inter‐ministerial Commission for EnergyEnergy Database

Table 3 ‐ Population Data by District  Province: PAKTIA

62.1 8.87Ahmadaba 25.3

27.4 3.92laja mangel 17.1

18.5 2.65

2.    1390 figures based on growth provided by the CSO (7 members/household)

1.  1387 figures from Central Statistice Organization

Page 201: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Hydro power 

Diesel‐fired Small diesel plants 0.5 0.5 NA

Imported Power 

Transmission projects 

From transmission line between Gazni and gardez connection to 

Sharan

16/220 NA

Distribution projects Distribution network in 

Sharan

0.5-0.4Distribution network in 

Sharan16‐20/0.4 NA

                                                                           Inter‐ministerial Commission for Energy                                                                         

    Energy Database         Table 1 ‐ A   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)  ‐ Generation, Transmission and Distribution  projects                             Province: PAKTIKA

Name of Project*Project Details (Describe each project and list their 

components)

Substation Capacity/ 

Transformers    Kv/MWA 

Estimated project cost (USD Mil)

Transmission Length (Kms) 

Distribution Capacity MVA/KV network)

Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)

Installed Capacity (MW)

Actual Capacity (MW)

Transmission Length     (Kms)

Distribution Capacity     (KVA 

network) 

Substation Capacity  /MVA

Project Completion  Cost  

(USD Mil)

1386 Annual O&M Cost    (USD Mil)

Planned Capacity / Power Input   

(MW)

Substation projects  Sharan SS 16‐220/20 NA

other projects(list)

Responsbile Organization: MEW planning Department and DABM

Page 202: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

         Table 1 ‐ B   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) 

Coal‐ fired projects(3)  None

Gas‐ fired projects(2) None

Small Diel fired projects (1)

Mata Khan destrict 3 projects 113 KW 113 KW  $         67,213 

Sare Hawza destrict 12 projects 411 KW 411 KW  $       300,631 

Sharan Destrict 21 projects 55f4 KW 554 KW  $       327,330 

Urgun destrict 18 projects 517 KW 517 KW  $       339,738 

Yahya Khel  6 projects 192 KW 192 KW  $       135,619 

Ongoing and Future Projects (1388‐1392)

Province: Paktika

Project Details (Describe each project and list their 

components)Installed Capacity (MW)

Actual Capacity (MW)

Project Completion  Cost       (USD 

)

                                                                           Inter‐ministerial Commission for Energy                                                                                   Energy Database

Estimated project cost 

(USD 

1386 Annual O&M Cost    (USD )

Planned Capacity    (MW)

Name of Projects*

Completed Project (As of 1387

(1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)(2)Responsible organization:MoM, MEW/DABM (3)Responsible organization:MoM, MEW/DABM 

Page 203: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Microhydro None

SolarMata Khan destrict 14 projects 32 KW 32 KW  $        17,209 Omna Destrict 23 Projects 47 KW 47 KW  $        34,096 Sare Hawza  4 projects 14 KW 14 KW  $          8,759 

Sarobi destrict 23 projects 404 KW 404 KW  $      176,406 Sharan destrict 33 projects 330 KW 330 KW  $      183,984 Urgun destrict 17 projects 401 KW 401 KW  $      248,132 

Yahya Khel destrict 50 projects 407 KW 407 KW  $      187,595 

Yosuf Khel destrict 33 projects 590 KW 590 KW  $      306,509 

Zarghon Shahr  25 projects 565 KW 565 KW $      319,764 

                                                                           Inter‐ministerial Commission for Energy                                                                                  Energy Database

 Renewable Energy 

Projects*

Project Details      (Describe each 

project and list their components)

Completed Project (As of 1387)Ongoing and Future Projects (1388‐

1392)

Planned Capacity    (KW)

Installed Capacity (KW)

Actual Capacity (KW)

Province: PAKTIKA

Estimated project cost (USD)

Project Completion  

Cost       (USD)

1386 Annual O&M Cost    (USD)

         Table 1 ‐ C   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ Renewable Energy

Zarghon Shahr  25 projects 565 KW 565 KW $      319,764 

Geothermal None

Wind NoneWood Noneothers None

Responsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department

Page 204: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production

Hydropower potential (MW) none

Province: PAKTIKA

Responsible Organiztion:DABM/S, MEW Planning Department

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐A    Resources Available for Energy (Hydropower)

Page 205: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production

Diesel/oil(1) None

Gas(2)  None

Coal(3) None

(1)Responsible Organization:

(2)Responsible Organization: MoM

(3)Responsible Organization: MoM

MoM

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐B   Resources Available for Energy (Coal, Gas and Oil) Province: PAKTIKA

Page 206: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation ( Renewable Energy)

Location/Source 

Description*Total Potential Existing Production

Micro‐hydro (KW) None

  Geothermal None

Solar  NA

NA

wind (metre/sec)

Wood (Cu.M) NA

Province: PAKTIKA

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐C   Resources Available for Energy (Renewable Energy)

OthersResponsible Organization: MRRD(NSP,NABDP), MEW Renewable Department 

Page 207: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Name of District1387 (2008‐2009) in Thousands ('000)

Estimated 1390 (2011‐2012) in Thousands ('000)

Estimated 1390 no. of Households in Thousands ('000)

Total 387.3419.7 59.96

Paktika Center (Sharan) 45.549.3 7.04

Mata Khan 22.724.6 3.51

Yosuf Khel 12.313.3 1.90

Yahya Khel 15.817.1 2.45

Omna 11.011.9 1.70

Sar Rawza 21.122.9 3.27

Zarghun Shahr 27.229.5 4.21

Jani Khel 21.823.6 3.37

Gomal 7.07.6 1.08

Surubi 11.412.4 1.76

Urgoon 50.354.5 7.79

Ziruk 17.519 0 2 71

Inter‐ministerial Commission for EnergyEnergy Database

Table 3‐ Population Data by District  Province: Paktika

19.0 2.71Nika 11.3

12.2 1.75DilaWa Khushamand 22.9

24.8 3.55Wazakhwah 21.1

22.9 3.27Turwo 2.0

2.2 0.31Wormamay 3.2

3.5 0.50Barmal 31.6

34.2 4.89Giyan 31.6

34.2 4.89

2.  1390 figures based on growth rates provided by the CSO (7 members/household)

1.  1387 figures from Central Statistics Organization

Page 208: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Hydro power  Per Master  Plan 25 NA

Transmission projects  None

Distribution projects  None

Substation projects  None

other projects(list) None

Substation Capacity/ 

Transformers  Kv/MWA 

Estimated project 

cost (USD Mil)

Substation Capacity  /MVA

Project Completion  

Cost       (USD Mil)

1386 Annual O&M Cost    (USD Mil)

Planned Capacity / Power Input   

(MW)

Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)

Installed Capacity (MW)

Actual Capacity (MW)

Transmission Length (Kms) 

Distribution Capacity MVA/KV network)

                                                                           Inter‐ministerial Commission for Energy                                                                             Energy Database

         Table 1 ‐ A   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)  ‐ Generation, Transmission and Distribution  projects                             Province: DIKUND

Responsible Organization: MEW planning Department and DABM/S

Transmission Length     (Kms)

Distribution Capacity     (KVA 

network) 

Name of Project*

Project Details       (Describe each 

project and list their components  )

Page 209: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

         Table 1 ‐ B   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) 

Coal‐ fired projects(3)  None

Gas‐ fired projects(2) NoneSmall Diesel fired projects (1)

Ishtarlay destrict 3 projects 45 KW 45 KW  $             60,826 

Khadir destrict 11 projects 252 KW 252 KW  $           185,095 

Miramor destrict 28 projects 666 KW 666 KW  $           457,060 

Shahristan destrict 20 projects 586 KW 586 KW  $           354,686 

                                                                           Inter‐ministerial Commission for Energy                                                                                   Energy Database

Estimated project cost 

(USD )

1386 Annual O&M Cost    (USD)

Planned Capacity    (MW)

Name of Projects*

Completed Project (As of 1387)Ongoing and Future Projects 

(1388‐1392)

Project Details (Describe each project and list their 

components)Installed Capacity (MW)

Actual Capacity (MW)

Project Completion  

Cost       (USD )

(2)Responsible organization:MoM, MEW/DABM (3)Responsible organization:MoM, MEW/DABM 

(1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)

Page 210: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Microhydro None

SolarMiramor destrict 1 projects 50 W 50 W  NA Nilli destrict 16 projects 1823 W 1823 W  $      563,800 

Shahristan destrict 7 projects 593 W 593 W  $      187,140 

Geothermal None

Wind None

Wood None

others none

PROVINCE: DIKUNDI

                                                                        Inter‐ministerial Commission for Energy                                                                               Energy Database

 Renewable Energy 

Projects*

Project Details (Describe each 

project and list their components)

Completed Project (As of 1387)Ongoing and Future Projects (1388‐

1392)

Planned Capacity    (KW)

Installed Capacity (KW)

Actual Capacity (KW)

         Table 1 ‐ C   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ Renewable Energy

Estimated project cost (USD)

Project Completion  

Cost       (USD)

1386 Annual O&M Cost    (USD)

Responsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department

Page 211: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production

Hydropower potential (MW) None

Provnce: DIKUNDI

Responsible Organization: DABM/S, MEW Planning Department

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐A    Resources Available for Energy (Hydropower)

Page 212: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation

Location/Source Description* Total Potential Existing Production

Diesel/oil1) None

Gas(2)  None

Coal(3) None

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐B   Resources Available for Energy (Coal, Gas and Oil) Province: DIKUNDI

(1)Responsible Organization:

(2)Responsible Organization: MoM

(3)Responsible Organization: MoM

MoM

Page 213: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation  ( Renewable Energy)

Location/Source 

Description*Total Potential Existing Production

Micro‐hydro (KW) NA

  Geothermal None

Solar  NA

wind (metre/sec) None

Wood (Cu.M) NA

Province: DIKUNDI

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐C   Resources Available for Energy (Renewable Energy)

Others NA

Responsible Organization: MRRD(NSP,NABDP), MEW Renewable Department 

Page 214: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Name of District1387 (2008‐2009) in Thousands ('000)

Estimated 1390 (2011‐2012) in Thousands ('000)

Estimated 1390 no. of Households in Thousands ('000)

Total 410.3

444.6 63.52Daykundi Center (Nili) 37.1

40.2 5.74Shahristan 60.5

65.6 9.37Miramor 57.0

61.8 8.82Ishterlai 43.4

47.0 6.72Sang‐i‐ Takht 46.1

50.0 7.14Khedir 42.4

45.9 6.56Kejran 31.9

34.6 4.94Kiti 30.5

33.1 4.72Gizab 61.4

66.5 9.51

Inter‐ministerial Commission for Energy Province: DikundiEnergy Database

Table 3 ‐ Population Data by District 

66.5 9.51

1. 1387 figures from Central Statistics Organization (CSO)

2.  1390 figures based on growth rates provided by CSO (7 members/household)

Page 215: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Hydro power  Kajaki 2 HPP 100 225

Kajaki auxillary service

18.5 18

Kajaki HPP 33 16 NA

Grishk HPP 2.4 1.2 NA

Transmission projects Kazaki to Kandahar 

110/220 kV171/110 NA

From Junction to Lashkargah SS

48/110 NA

From Helmand to Kandahar

170/220 NA

From Helmand to Farah

200/220 NA

Distribution projects kajaki Electricity 

Authority 48.7-20/0.4NA

Transmission Length 

(Kms/KV) 

Completed Project (As of 1387)

Planned Capacity / Power Input   

(MW)

Distribution Capacity MVA/KV network)

                                                                           Inter‐ministerial Commission for Energy                                                                                   Energy Database

         Table 1 ‐ A   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)  ‐ Generation, Transmission and Distribution  projects                             Province: HELMAND

Name of Project*

Project Details (Describe each 

project and list their components)

Substation Capacity  /MVA

Project Completion  

Cost       (USD Mil)

Ongoing and Future Projects (1388‐1392)

Installed Capacity (MW)

Actual Capacity (MW)

Transmission Length     

(Kms/KV)

Distribution Capacity     (KVA 

network) 

Substation Capacity/ 

Transformers  Kv/MWA 

Estimated project cost (USD Mil)

1386 Annual O&M Cost    (USD Mil)

Authority 48.7 20/0.4

Helmand Electricity Authority 19.7‐3.3/0.4

NA

Grishk Electricity Authority

5.18‐3.3/0.4 NA

Extension of Helmand Electricity 

Authority16‐20/0.4 NA

Substation projects  Lashkargah SS 10‐110/44 NA

Lashkargah SS 5‐44/3.3 NA

Sangin SS 4‐110/20 NA

other projects(list)

Responsbile Organization: MEW planning Department and DABM

Page 216: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

         Table 1 ‐ B   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) 

Coal‐ fired projects(3) 

Gas‐ fired projects(2)

Small Diel fired projects (1)

Garmser district 60 Projects 1421 KW 1421 KW  $   1,198,754 

Nahri Sarraj 51 projects 1339 KW 1339 KW  $   1,118,319 

Naw Zad district 15 projects 824 KW 824 KW  $       407,351 

Project Details (Describe each project and list their 

components)Installed Capacity (MW)

Actual Capacity (MW)

Project Completion  Cost       (USD 

)

                                                                           Inter‐ministerial Commission for Energy                                                                                 Energy Database

Estimated project cost 

(USD )

1386 Annual O&M Cost    (USD )

Planned Capacity    (MW)

Name of Projects*

Completed Project (As of 1387)Ongoing and Future Projects 

(1388‐1392)

Province: HELMAND

(2)Responsible organization:MoM, MEW/DABM (3)Responsible organization:MoM, MEW/DABM 

(1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)

Page 217: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Microhydro

Garm Ser district 4 projects 100 KW 100 KW  $      116,291 

SolarLashkar gah city 1 project 58 W 58 W  $        26,497 Nahri Sarraj 1 project 31W 31W  $        13,600 

Nawa‐i‐ Barakzayi 21 projects 2786 W 2786 W  $      999,366 

Geothermal None

Wind None

Wood None

h

Installed Capacity (KW)

Estimated project cost (USD)

Project Completion  

Cost       (USD)

1386 Annual O&M Cost    (USD)

Actual Capacity (KW)

Province: HELMAND     Table 1 ‐ C   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) ‐ Renewable Energ

                                                                        Inter‐ministerial Commission for Energy                                                                               Energy Database

 Renewable Energy 

Projects*

Project Details      (Describe each 

project and list their components)

Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)

Planned Capacity    (KW)

others None

Responsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department

Page 218: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production

Hydropower potential (MW) Kajaki Extension on Helmand River 51.5 33

Kajaki addition  on Helmand River 100

Olambagh on Helmand River 90

Kamal Khan on Helmand River 10

Province: HELMAND

Responsible Organiztion:DABM/S, MEW Planning Department

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐A    Resources Available for Energy (Hydropower)

Page 219: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

B. Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production

Diesel/oil(1) None

Gas(2)  None

Coal(3) None

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐B   Resources Available for Energy (Coal, Gas and Oil) Province: HELMAND

(1)Responsible Organization:(2)Responsible Organization: MoM(3)Responsible Organization: MoM

MoM

Page 220: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation  ( Renewable Energy)

Location/Source Description*

Total Potential Existing Production

Micro‐hydro (KW) NA

  Geothermal None

Solar  NA

wind (metre/sec) NA

Wood (Cu.M) NA

Province: HELMAND

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐C   Resources Available for Energy (Renewable Energy)

OthersResponsible Organization: MRRD(NSP,NABDP), MEW Renewable Department 

Page 221: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Name of District1387 (2008‐2009) in Thousands ('000)

Estimated 1390 (2011‐2012) in Thousands ('000)

Estimated 1390 no. of Households in Thousands ('000)

Total 821.8890.5 127.22

Helmand Center (Lashkargah)

92.7100.5 14.35

Nahr‐i‐ Saraj 106.5115.4 16.49

Nad Ali 107.5116.5 16.64

Nawa‐i‐ Barikzayi 84.691.7 13.10

Garm Ser 80.086.7 12.38

Sangin              54.459.0 8.42

Kajaki 65.070.4 10.06

Baghran          74.280.4 11.49

Musa Qala 53.858.3 8.33

Nawzad 46.350.2 7.17

Inter‐ministerial Commission for Energy Province: HelmandEnergy Database

Table 3 ‐ Population Data by District 

Washer 14.215.4 2.20

Reg‐i‐ Khan Nishin 24.026.0 3.72

Dishu 18.620.2 2.88

1. 1387 figures from Central Statistics Organization (CSO)

2.  1390 figures based on growth rates provided by CSO (7 members/household)

Page 222: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Hydro power  Filico HPP 2x0.32 0 NA

Babaiwali HPP 0.25 0 NA

Diesel plants in Kandahar‐completed in 1387

Kandahar diesel plants

6.8 6.8 NA

Kandahar diesel  3.4 3.4 NA

Kandahar diesel  8.8 8.8 NA

Transmission projects 220 kV single circuit line from Kazaki to 

Kandahar171/220 NA

110 kV single circuit line from Kazaki to 

Kandahar171/110 NA

From Kandahar to Zabul

120/220 NA

From Kandahar to 110/110 NA

                                                                           Inter‐ministerial Commission for Energy                                                                                   Energy Database

         Table 1 ‐ A   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)  ‐ Generation, Transmission and Distribution  projects                             Province: KANDAHAR

Name of Project*

Project Details (Describe each 

project and list their components)

Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)

Installed Capacity (MW)

Actual Capacity (MW)

Transmission Length 

(Kms/KV) 

Distribution Capacity MVA/KV network)

Transmission Length     

(Kms/KV)

Distribution Capacity       (KVA 

network) 

Substation Capacity/ 

Transformers  Kv/MWA 

Estimated project 

cost (USD Mil)

Substation Capacity  /MVA

Project Completion  Cost       (USD 

Mil)

1386 Annual O&M Cost    (USD Mil)

Planned Capacity / Power Input   

(MW)

Tarinkot110/110 NA

Distribution projects  Kandahar  80‐20/0.4  NA

Kandahar Electricity  70-20/0.4 NA

Substation projects  Pashtun substation 4‐110/20 NA

Kandahar SS 25‐110/20 NA

Kandahar SS2x25‐

220/110/20NA

other projects(list)

Responsbile Organization: MEW planning Department and DABM

Page 223: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

         Table 1 ‐ B   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) 

Coal‐ fired projects(3)  None

Gas‐ fired projects(2) None

Small Diel fired projectsArghandab destrict 3 projects 67 KW 67 KW  $         76,335 

Daman Destrict 13 projects 1035 KW 1035 KW  $       282,035 

Kandahar City 23 projects 1400 KW 1400 KW  $       733,931 

                                                                           Inter‐ministerial Commission for Energy                                                                                   Energy Database

Estimated project cost 

(USD )

1386 Annual O&M Cost    (USD )

Planned Capacity    (MW)

Name of Projects*

Completed Project (As of 1387)Ongoing and Future Projects 

(1388‐1392)

Province: KANDAHAR

Project Details (Describe each project and list their 

components) Installed Capacity 

Actual Capacity 

Project Completion  Cost       (USD 

)

(2)Responsible organization:MoM(3)Responsible organization:MoM

(1)Responsible organization: MoM

Page 224: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Microhydro None

SolarKandahar city 2 projects 70 W 70 W  $        27,475 

Maywand Destrict 1 project 25 W 25 W  $        11,921 

Spin Boldak destrict

8 projects 535 W 535 W  $      248,600 

Zhari destrict 5 projects 515 W 515 W  $      231,961 

Geothermal None

Wind None

W d NA

Province:  Kandahar                                                                        Inter‐ministerial Commission for Energy                                                                          

     Energy Database

 Renewable Energy 

Projects*

Project Details      (Describe each 

project and list their components)

Completed Project (As of 1387)Ongoing and Future Projects (1388‐

1392)

Planned Capacity    (KW)

Installed Capacity (KW)

Actual Capacity (KW)

         Table 1 ‐ C   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) ‐ Renewable Energy

Estimated project cost (USD)

Project Completion  

Cost       (USD)

1386 Annual O&M Cost    (USD)

Wood NA

others NA

Responsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department

Page 225: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production

Hydropower potential (MW) None

Province: KANDAHAR

Responsible Organization:DABM/S, MEW Planning Department

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐A    Resources Available for Energy (Hydropower)

Page 226: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production

Diesel/oil(1) None

Gas(2)  None

Coal(3) None

(1)Responsible Organization:

(2)Responsible Organization: MoM

(3)Responsible Organization: MoM

MoM

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐B   Resources Available for Energy‐ (Coal, Gas and Oil) Province: KANDAHAR

Page 227: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation

Location/Source Description Total Potential Existing Production

Micro‐hydro (KW) None

  Geothermal None

Solar  NA

wind (metre/sec) NA

Wood (Cu.M) NA

Province: KANDAHAR

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐C   Resources Available for Energy ( Renewable Energy)

OthersResponsible Organization: MRRD(NSP,NABDP), MEW Renewable Department 

Page 228: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Name of District

1387 (2008‐2009) in Thousands ('000)

Estimated 1390 (2011‐2012) in Thousands 

('000)

Estimated 1390 no. of Households in Thousands 

('000)

Total 1057.5

1146.0 163.71Kandahar Center (Kandahar)

481.1

521.3 74.48Daman 31.5

34.1 4.88Shah Wali Kot 39.4

42.7 6.10Arghandab 56.4

61.1 8.73Khakrez 20.8

22.5 3.22Ghorak 8.8

9.5 1.36Maiwand 53.4

57.9 8.27Zhire 78.1

84.6 12.09Panjwayee 79.2

85.8 12.26

Inter‐ministerial Commission for EnergyEnergy Database

Table 3 ‐ Population Data by District  Province: Kandahar

Reg 8.2

8.9 1.27Shorabak 10.4

11.3 1.61Spin Boldak 103.0

111.6 15.95Arghistan 31.3

33.9 4.85Maruf 30.0

32.5 4.64Miyanishin 13.7

14.8 2.12Nesh 12.2

13.2 1.89

1. 1387 figures from Central Statistics Organization (CSO)

2.  1390 figures based on growth rates provided by CSO (7 members/household)

Page 229: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Hydro power 

Diesel GeneratorDiesel generator 

plants (2)1 1

Transmission projects Transmission line from Kandahar to 

Trinkot164/110 NA

Distribution projects Trinkot distribution 

system 1-20/0.4NA

Trinkot distribution system

6‐20/0.4 NA

Substation projects  Trinkot SS 10‐110/20 NA

Planned Capacity / Power Input   

(MW)

Transmission Length     

(Kms/KV)

Transmission Length (Kms) 

Distribution Capacity MVA/KV network)

Substation Capacity  /MVA

                                                                           Inter‐ministerial Commission for Energy                                                                             Energy Database

         Table 1 ‐ A   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)  ‐ Generation, Transmission and Distribution  projects                             Province: URUZGAN

Name of Project*Estimated project cost (USD Mil)

Project Details (Describe each 

project and list their components)

Completed Project (As of 1387)

Project Completion  

Cost       (USD Mil)

Ongoing and Future Projects (1388‐1392)

Installed Capacity (MW)

Actual Capacity (MW)

1386 Annual O&M Cost    (USD Mil)

Distribution Capacity       

(KVA network) 

Substation Capacity/ 

Transformers    Kv/MWA 

other projects(list)

Responsbile Organization: MEW planning Department and DABM

Page 230: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Coal‐ fired projects(3)  None

Gas‐ fired projects(2) None

Small Diesel/oil‐fired(1) None

                                                                           Inter‐ministerial Commission for Energy                                                                                   Energy Database

Project Details        (Describe each project 

and list their components)

Installed Capacity (MW)

Actual Capacity (MW)

Project Completion  Cost       (USD 

Mil)

         Table 1 ‐ B   Completed ( as of 1386) and Ongoing/Future Projects (1387‐1392)‐Coal, Gas, and Diesel‐firedProvince: Uruzgan

Estimated project cost (USD Mil)

1386 Annual O&M Cost    (USD Mil)

Planned Capacity    (MW)

Name of Projects*

Completed Project (As of 1386) Ongoing and Future Projects 

(1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)(2)Responsible organization:MoM, MEW/DABM (3)Responsible organization:MoM, MEW/DABM 

Page 231: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Microhydro None

SolarUrozgan City  4 projects 109 W 109 W  $        65,000 

Geothermal None

Wind NA

Wood NA

others NA

Province: Uruzgan                                                                           Inter‐ministerial Commission for Energy                                                                             

     Energy Database

 Renewable Energy 

Projects*

Project Details (Describe each project and list their components)

Completed Project (As of 1387) Ongoing and Future Projects (1388‐

Planned Capacity    (KW)

Installed Capacity (KW)

Actual Capacity (KW)

         Table 1 ‐ C   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) ‐ Renewable Energy

Estimated project cost (USD)

Project Completion  

Cost       (USD)

1386 Annual O&M Cost    (USD)

Responsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department

Page 232: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

B. Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production

Hydropower potential (MW) None

Province: URUZGAN

Responsible Organiztion:DABM/S, MEW Planning Department

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐A    Resources Available for Energy (Hydropower)

Page 233: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production

Diesel/oil(1) None

Gas(2)  None

Coal(3) None

(1)Responsible Organization:(2)Responsible Organization: MoM(3)Responsible Organization: MoM

MoM

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐B   Resources Available for Energy (Coal, Gas and Oil) Province: URUZGAN

Page 234: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation ( Renewable Energy)

Location/Source 

Description*Total Potential Existing Production

Micro‐hydro (KW) NA

  Geothermal None

Solar  NA

wind (metre/sec) NA

Wood (Cu.M) NA

OthersResponsible Organization:

Province: URUZGAN

MRRD(NSP,NABDP), MEW Renewable Department 

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐C   Resources Available for Energy (Renewable Energy)

Page 235: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Name of District

1387 (2008‐2009) in Thousands ('000)

Estimated 1390 (2011‐2012) in Thousands 

('000)Estimated 1390 no. of Households in 

Thousands ('000)

Total 311.9338.0 48.28

Urozgan Center (Tirinkot)

93.2101.0 14.43

Chora 46.550.4 7.20

Khas Urozgan 51.455.7 7.96

Shahidhassas 53.758.2 8.31

Dehraoud 55.460.0 8.58

 Chinarto 11.7

Inter‐ministerial Commission for EnergyEnergy Database

Table 3‐ Population Data by District  Province: URUZGAN

12.7 1.81

1. 1387 figures from Central Statistics Organization (CSO)

2.  1390 figures based on growth rates provided by CSO (7 members/household)

Page 236: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Hydro power 

Diesel Generator Diesel generation plants 1.7 1.7 NA

Transmission projects  From Gazni to Zabul 170/220 NA

From zabul to Kandahar 120/220 NA

Distribution projects Rehabilitation and expansion of city networks in Zabul

4‐20/0.4 NA

Qalat City Network2‐20/0.4

NA

Substation projects  NA

other projects(list)

Project Details (Describe each project and list their components)

Completed Project (As of 1387)

Transmission Length (Kms) 

Distribution Capacity MVA/KV network)

1386 Annual O&M Cost    (USD Mil)

                                                                           Inter‐ministerial Commission for Energy                                                                             Energy Database

         Table 1 ‐ A   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)  ‐ Generation, Transmission and Distribution  projects                             Province: ZABU

Name of Project*Substation Capacity  /MVA

Project Completion  Cost       (USD 

Mil)

Ongoing and Future Projects (1388‐1392)

Installed Capacity (MW)

Planned Capacity / Power Input   

(MW)

Transmission Length     (Kms)

Distribution Capacity      (KVA 

network) 

Substation Capacity/ 

Transformers   Kv/MWA 

Estimated project cost (USD 

Mil)

Actual Capacity (MW)

other projects(list)

Responsbile Organization: MEW planning Department and DABM

Page 237: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

         Table 1 ‐ B   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) 

Coal‐ fired projects(3) 

Gas‐ fired projects(2)

Small Diel fired projectsShahjoy district 6 projects 562 KW 562 KW  $      102,900 

Completed Project (As of 1387Ongoing and Future Projects 

(1388‐1392)

Province: ZABUL

Project Details (Describe each project and list their 

components)Installed Capacity (MW)

Actual Capacity (MW)

Project Completion  Cost       (USD 

)

                                                                           Inter‐ministerial Commission for Energy                                                                                   Energy Database

Estimated project cost 

(USD )

1386 Annual O&M Cost    (USD )

Planned Capacity    (MW)

Name of Projects*

(2)Responsible organization:MoM, MEW/DABM (3)Responsible organization:MoM, MEW/DABM 

(1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)

Page 238: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Microhydro NA

SolarShah joy destrict 1 project 68 W 68 W  $        28,779 Tarnak wa Jaldak destrict

7 projects 287 W 287 W  $        64,232 

Geothermal None

Wind NA

Wood NA

others NA

Responsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department

Province: ZABUL

Estimated project cost (USD)

Project Completion  

Cost       (USD)

1386 Annual O&M Cost    (USD)

         Table 1 ‐ C   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) ‐ Renewable Energy) 

                                                                           Inter‐ministerial Commission for Energy                                                                                  Energy Database

 Renewable Energy 

Projects*

Project Details (Describe each project 

and list their components)

Completed Project (As of 1387)Ongoing and Future Projects (1388‐

1392)

Planned Capacity    (KW)

Installed Capacity (KW)

Actual Capacity (KW)

p g ( , ), / , g gy p

Page 239: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production

Hydropower potential (MW) None

Province: ZABUL

Responsible Organiztion:DABM/S, MEW Planning Department

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐A    Resources Available for Energy‐ Hydropower

Page 240: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production

Diesel/oil(1) None

Gas(2)  None

Coal(3) None

(1)Responsible Organization:(2)Responsible Organization: MoM(3)Responsible Organization: MoM

MoM 

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐B   Resources Available for Energy (Coal, Gas and Oil) Province: ZABUL

Page 241: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation  ( Renewable Energy)

Location/Source Description*

Total Potential Existing Production

Micro‐hydro (KW) NA

  Geothermal NA

Solar  NA

wind (metre/sec) NA

Wood (Cu.M) NA

Others

Responsible Organization:

Province: ZABUL

MRRD(NSP,NABDP), MEW Renewable Department 

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐C   Resources Available for Energy (Renewable Energy)

Page 242: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Name of District1387 (2008‐2009) in Thousands ('000)

Estimated 1390 (2011‐2012) in Thousands ('000)

Estimated 1390 no. of Households in Thousands ('000)

Total 270.6293.2 41.89

Zabul Center (Qalat) 31.934.6 4.94

Shah Joi 53.257.7 8.24

Arghandab 29.732.2 4.60

Kakar 21.923.7 3.39

Daichopan 35.838.8 5.54

Mizan 12.513.5 1.94

Tarang Wa Jaldak 15.616.9 2.41

Shinkai 21.423.2 3.31

Atghar 7.98.6 1.22

Shemel Zayi 23 5

Inter‐ministerial Commission for EnergyEnergy Database

Table 3 ‐ Population Data by District  Province: Zabul

Shemel Zayi 23.525.5 3.64

Naw Bahar 17.218.6 2.66

1. 1387 figures from Central Statistics Organization (CSO)

2.  1390 figures based on growth rates provided by CSO (7 members/household)

Page 243: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Hydro power  None

Diesel GeneratorsDiesel generator 

plants(4)1.48 1.48 NA

Imported Power Imported power from Turkmenistan toQarkin 

and Khamahab20 NA

Transmission projects  From Faryab to Badghis 140/220 NA

From Badghis to Herat 160/220 NA

Distribution projects  Kalainaw distribution 

system0.5-0.4

NA

 Kalainaw distribution system

10/20/0.4 NA

                                                                           Inter‐ministerial Commission for Energy                                                                                   Energy Database

         Table 1 ‐ A   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)  ‐ Generation, Transmission and Distribution  projects                  Province: BADGHIS

Planned Capacity / Power Input    

(MW)

Name of Project*Project Details (Describe each project and list their 

components)Substation 

Capacity  /MVA

Project Completion  Cost 

(USD Mil)

Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)

Installed Capacity (MW)

Actual Capacity (MW)

Transmission Length 

(Kms/KV) 

Distribution Capacity MVA/KV network)

Transmission Length     

(Kms/KV)

Distribution Capacity      (KVA 

network) 

Substation Capacity/ 

Transformers    Kv/MWA 

Estimated project cost (USD Mil)

1386 Annual O&M Cost    (USD Mil)

Khamahab and qarkin city network

6‐20/0.4 NA

Substation projects  Substation in Kalainaw 16‐220/20 NA

other projects(list)

Responsbile Organization: MEW planning Department and DABM

Page 244: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

         Table 1 ‐ B   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) 

Coal‐ fired projects(3)  None

Gas‐ fired projects(2) None

Small Diesel/oil‐fired(1)

Ab Kamari 18 projects 668 KW 668 KW 288,324.00$    

Jawand destrict 4 projects 91 KW 91 KW 46,584.00$       

Qadis destrict 18 projects 964 KW 964 KW 272,824.00$    

                                                                           Inter‐ministerial Commission for Energy                                                                                   Energy Database

Estimated project cost (USD 

)

1386 Annual O&M Cost    (USD )

Planned Capacity    (KW)

Name of Projects*

Completed Project (As of 1387)Ongoing and Future Projects 

(1388‐1392)

Province: BADGHIS

Project Details        (Describe each project 

and list their components)

Installed Capacity (KW)

Actual Capacity (KW)

Project Completion  Cost       (USD 

)

(3)Responsible organization:MoM, MEW/DABM (2)Responsible organization:MoM, MEW/DABM (1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)

Page 245: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

         Table 1 ‐ C   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ Renewable Energy Province: BADGHIS

MicrohydroQadis destrict 1 project 10 KW 10 KW $   26,436.00 

Solar NA

Geothermal None

Wind None

Wood NA

others NA

Actual Capacity (MW)

Estimated project cost (USD)

Project Completion  Cost       (USD 

)

1386 Annual O&M Cost    (USD )

Responsible organization: MRRD(NSP NABDP) DABM/S MEW Renewable Engergy Department

                                                                       Inter‐ministerial Commission for Energy                                                                               Energy Database

 Renewable Energy 

Projects*

Project Details (Describe each 

project and list their components)

Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)

Planned Capacity    (MW)

Installed Capacity (MW)

Responsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department

Page 246: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

 Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production

Hydropower potential (MW) None

Province: BADGHIS

Responsible Organiztion:DABM/S, MEW Planning Department

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐A    Resources Available for Energy (Hydropwer)

Page 247: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production

Diesel/oil(1) None

Gas(2)  None

Coal(3) None

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐B   Resources Available for Energy (Coal, Gas and Oil) Province: BADGHIS

(1)Responsible Organization:(2)Responsible Organization: MoM(3)Responsible Organization: MoM

MoM

Page 248: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation ( Renewable Energy)

Location/Source Description*

Total Potential Existing Production

Micro‐hydro (KW) NA

  Geothermal NA

Solar  NA

wind (metre/sec) NA

Wood (Cu.M) NA

Province: BADGHIS

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐C   Resources Available for Energy (Renewable Energy)

OthersResponsible Organization: MRRD(NSP,NABDP), MEW Renewable Department 

Page 249: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Name of District

1387 (2008‐2009) in Thousands ('000)

Estimated 1390 (2011‐2012) in Thousands ('000)

Estimated 1390 no. of Households in Thousands 

('000)

Total 441.4478.3 68.33

Badghis Center (Qala-i- Now)

59.864.8 9.26

Muqur 21.623.4 3.34

Ab Kamari 66.972.5 10.36

Qadis 82.889.7 12.82

Jawand 71.877.8 11.12

Ghormach 50.1

Inter‐ministerial Commission for EnergyEnergy Database

Table 3 ‐ Population Data by District  Province: BADGHIS

54.3 7.76Murghab (Bala Murghab)

88.495.8 13.68

1. 1387 figures from Central Statistics Office

2‐ 1390 figures based on growth rates provided by CSO (7 members/household)

Page 250: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Hydro power 

Diesel GeneratorsDiesel generator plants 

(4)1.3 1.3 NA

Imported Power  Import from Iran 40 NA

Transmission projects Transmission line from 

Iran110/132kV NA

Distribution projects Electrification of Farah 

City including city network and substation  

16‐20/0.4 NA

Farah distribution network 1‐20/0.4 NA

Substation projects  Substation in Farah City 16‐132/20 NA

                                                                           Inter‐ministerial Commission for Energy                                                                                   Energy Database

         Table 1 ‐ A   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)  ‐ Generation, Transmission and Distribution  projects                             Province: FARAH

Planned Capacity / Power Input    

(MW)

Name of Project*Project Details (Describe each project and list their components)

Substation Capacity  /MVA

Project Completion  Cost 

(USD Mil)

Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)

Installed Capacity (MW)

Actual Capacity (MW)

Transmission Length (Kms) 

Distribution Capacity MVA/KV 

network)

Transmission Length     

(Kms/KV)

Distribution Capacity     (KVA 

network) 

Substation Capacity/ 

Transformers     Kv/MWA 

Estimated project cost (USD Mil)

1386 Annual O&M Cost    (USD 

Mil)

other projects(list)

Responsbile Organization: MEW planning Department and DABM

Page 251: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Coal‐ fired projects(3)  None

Gas‐ fired projects(2) None

Small Diel fired projects(1)

Anar dara district 10 projects 466 KW 466 KW  $            208,654 

Farah City 3 projects 128 KW 128 KW  $               82,613 

Province: Farah

Project Details (Describe each project and list their 

components)Installed Capacity (MW)

Actual Capacity (MW)

Project Completion  Cost  

(USD )

                                                                           Inter‐ministerial Commission for Energy                                                                                   Energy Database

Estimated project cost 

(USD )

1386 Annual O&M Cost    (USD )

Planned Capacity    (MW)

         Table 1 ‐ B   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) ‐ Coal, Gas, and Diesel‐fired

Name of Projects*

Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)

(1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)(2)Responsible organization:MoM, MEW/DABM (3)Responsible organization:MoM, MEW/DABM 

Page 252: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Microhydro None

Solar None

Geothermal None

Wind None

Wood None

others None

Province: Farah

Responsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department

                                                                           Inter‐ministerial Commission for Energy                                                                                  Energy Database

 Renewable Energy 

Projects*

Project Details (Describe each project 

and list their components)

Completed Project (As of 1387)Ongoing and Future Projects (1388‐

1392)

Planned Capacity    (KW)

         Table 1 ‐ C   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ Renewable Energy

Installed Capacity (KW)

Actual Capacity (KW)

Estimated project cost (USD,000)

Project Completion  

Cost       (USD'000)

1386 Annual O&M Cost    (USD,000)

Page 253: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production

Hydropower potential (MW) Farah Rod on Farah  River 40MW None

Province: FARAH

Responsible Organiztion:DABMs, MEW Planning Department

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐A    Resources Available for Energy (Hydropower)

Page 254: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production

Diesel/oil(1) None

Gas(2)  None

Coal(3) None

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐B   Resources Available for Energy (Coal, Gas and Oil) Province: FARAH

(1)Responsible Organization:(2)Responsible Organization: MoM(3)Responsible Organization: MoM

MoM

Page 255: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation (Renewable Energy)

Location/Source 

Description*Total Potential Existing Production

Micro‐hydro (KW) None

  Geothermal None

Solar  None

wind (metre/sec) None

Wood (Cu.M) None

OthersResponsible Organization:

Province: FARAH

MRRD(NSP,NABDP), MEW Renewable Department 

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐C   Resources Available for Energy ( Renewable Energy)

Page 256: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Name of District1387 (2008‐2009) in Thousands ('000)

1390 (2011‐2012) in Thousands ('000)

Estimated 1390 no. of Households in Thousands ('000)

Total 456.6494.8 70.68

Farah Center (Farah)

100.6109.0 15.57

Pushtrud 37.040.1 5.73

Khak-i-safed 27.629.9 4.27

Anar Dara 25.327.4 3.92

Qala-i-kah 28.030.3 4.33

Shibkoh 21.323.1 3.30

Lash-i- Juwayn 25.527.6 3.95

Bakwa 32.335.0 5.00

Bala Buluk 65.070.4 10.06

Gulistan 39.442.7 6.10

Pur Chaman 48.652 7 7 52

Inter‐ministerial Commission for EnergyEnergy Database

Table 3‐ Population Data by District  Province: FARAH

52.7 7.52Dularam 6.0

6.5 0.93

2- 1390 figures based on growth rates provided by CSO (7 members/household)

1- 1387 figures from Central Statistics Organization

Page 257: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Hydro power  Ghor Medium Size HPP 4 NA

Installation of diesel generators ‐

(500+165) kVA

0.5 NA

Transmission projects Transmission Line from 

Herat to Ghor90/110 NA

Distribution projects Electrification of Ghor 

town5‐110/20 NA

Substation projects  Substation projects 4‐110/20 NA

other projects(list)

Transmission Length     

(Kms/KV)

Actual Capacity (MW)

Name of Project*

Completed Project (As of 1387)

Distribution Capacity     (KVA 

network) 

Substation Capacity/ 

Transformers     Kv/MWA 

Estimated project cost (USD Mil)

Project Completion  Cost       (USD 

Mil)

1386 Annual O&M Cost    (USD Mil)

Ongoing and Future Projects (1388‐1392)

Planned Capacity / Power Input    

(MW)

                                                                           Inter‐ministerial Commission for Energy                                                                                   Energy Database

         Table 1 ‐ A   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)  ‐ Generation, Transmission and Distribution  projects                             Province: GHOR

Responsbile Organization: MEW planning Department and DABM

Transmission Length (Kms) 

Distribution Capacity MVA/KV network)

Substation Capacity  /MVA

Project Details (Describe each project and list their components)

Installed Capacity (MW)

p g p g p

Page 258: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

         Table 1 ‐ B   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) 

Coal‐ fired projects(3)  None

Gas‐ fired projects(2) None

Small Diel fired projects (1)

Chaghcharan City 1 project 15 KW 15 KW  $           8,481 

Lal wa Sarjangal 18 Projects 190 KW 190 KW  $       117,472 

Shahrak  5 projects 85 KW 85 KW  $         69,239 

Ongoing and Future Projects (1388‐1392)

Province: GHOR

Project Details (Describe each project and list their 

components)Installed Capacity (MW)

Actual Capacity (MW)

Project Completion  Cost       (USD 

)

                                                                           Inter‐ministerial Commission for Energy                                                                                   Energy Database

Estimated project cost 

(USD)

1386 Annual O&M Cost    (USD 

)

Planned Capacity    (MW)

Name of Projects*

Completed Project (As of 1387

(1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)(2)Responsible organization:MoM, MEW/DABM (3)Responsible organization:MoM, MEW/DABM 

Page 259: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Microhydro

Charghcharan City 14 projects 218 KW 218 KW  $      569,825 Charsadra destrict 6 projects 124 KW 124 KW  $      270,203 

Dawlat Yar destrict 10 proejcts 170 KW 170 KW  $      446,171 

Lal wa sarjangal  3 prjects 25 KW 25 KW  $        19,400 

Saghar  1 project 24 KW 24 KW  $        44,545 

Saghar  7 projects 124 KW 124 KW  $      183,124 

Tulak  1 project 19 KW 19 KW  $        41,836 

SolarChaghcharan 37 projects 1267 KW 1267 KW  $      863,539 Charsadra destrict 6 projects 415 KW 415 KW  $      224,176 Dawlat Yar destrict 24  projects 1412 KW 1412 KW  $      630,034 Du layna 6 projects na na $ 225 013

Province: GHOR                                                                           Inter‐ministerial Commission for Energy                                                                             

     Energy Database

 Renewable Energy 

Projects*

Project Details (Describe each project 

and list their components)

Completed Project (As of 1387)Ongoing and Future Projects (1388‐

1392)

Planned Capacity    (KW)

         Table 1 ‐ C   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ Renewable Energy

Installed Capacity (KW)

Actual Capacity (KW)

Estimated project cost (USD)

Project Completion  

Cost       (USD)

1386 Annual O&M Cost    (USD)

Du layna  6 projects na  na  $      225,013 Lal wa sarjangal  20 projects 479 KW 479 KW  $      364,032 Saghar  6 projects 1477 KW 1477 KW  $      283,539 

Shahrak  20 projects 300 KW 300 KW  $      188,090 

Tulak  10 proejcts 405 KW 405 KW  $      168,648 

Geothermal None

Wind None

Wood None

others None

Responsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department

Page 260: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production

Hydropower potential (MW) None

Province: GHOR

Responsible Organiztion:DABMs, MEW Planning Department

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐A    Resources Available for Energy (Hydropower)

Page 261: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production

Diesel/oil(1) None

Gas2)  None

Coal(3) None

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐B   Resources Available for Energy (Coal, Gas and Oil) Province: GHOR

(1)Responsible Organization:(2)Responsible Organization: MoM(3)Responsible Organization: MoM

MoM

Page 262: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation ( Renewable Energy)

Location/Source 

Description*Total Potential Existing Production

Micro‐hydro (KW) NA

  Geothermal None

Solar  NA

wind (metre/sec) NA

Wood (Cu.M) NA

f

Province: GHOR

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐C   Resources Available for Energy ( Renewable Energy)

OthersResponsible Organization: MRRD(NSP,NABDP), MEW Renewable Department 

Page 263: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Name of District1387 (2008‐2009) in Thousands ('000)

1390 (2011‐2012) in Thousands ('000)

Estimated 1390 no. of Households in Thousands ('000)

Total 614.9666.3 95.19

Ghor  Center (Chighcheran)

123.1133.4 19.06

Dawlatyar 29.832.3 4.61

Char Sada 24.927.0 3.85

Shahrak 54.459.0 8.42

Duleena 32.835.5 5.08

Pasaband 86.393.5 13.36

Lal Wa         SarJangal 101.9110.4 15.77

Tulak 46.950.8 7.26

Saghar 31.634.2 4.89

Taywara 83.290.2 12.88

Inter‐ministerial Commission for EnergyEnergy Database

Table 3 ‐ Population Data by District  Province: Ghor

1.  1387 figures from Central Statistics organization (CSO)

2.  1390 figures based on growth rates provided by the CSO (7 members/household)

Page 264: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Hydro power 

Chalwarcha MHP Enjeel District 

0.1 0 NA 0.1

Salma HPP Chest Disrtict

42 NA

Imported Power 

110 kv transmission line from Turkmenistan to  

Herat City  100 25 NA

10 kv transmission to Turghundi from Trukmenistan

3 3 NA

132 kv transmission line from Iran to  Herat City

100 48 NA

20 kv transmission from Iran to Kohsan district

15 5 NA

Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)

1386 Annual O&M Cost    (USD Mil)

Planned Capacity / Power Input    (MW)

                                                                           Inter‐ministerial Commission for Energy                                                                                Energy Database

         Table 1 ‐ A   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)  ‐ Generation, Transmission and Distribution  projects                             Province: HERAT

Name of Project*

Project Details (Describe each project 

and list their components)

Installed Capacity (MW)

Actual Capacity (MW)

Transmission Length     

(Kms/KV)

Distribution Capacity       (KVA 

network) 

Substation Capacity/ 

Transformers     Kv/MWA 

Estimated project cost (USD Mil)

Transmission Length (Kms/KV) 

Distribution Capacity MVA/KV network)

Substation Capacity  /MVA

Project Completion  Cost  

(USD Mil)

Iran to  Kohsan district 

Transmission projects 

 transmission line   from Trukmenistan for Hirat 

City

402 km (102 km in Afghanistan and 300 

km in Turkamenistan)/110

kV

NA

10 kv transmission to Turghundi from Trukmenistan

5 km/10kV NA

Page 265: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

 transmission line to Herat City from Iran

212 km ( 100 km  in Afghanistan and 112 km in Iran)/132 kV

NA

 transmission line for Kohsan district from 

Iran45 km/20kV NA

Transmission line from salma HP to Herat

175km/110kV NA

Transmission line from Shindand to Kandahar

NA/220kV NA

Transmission line from Herat to Shindand

120km/220kV NA

Distribution projects

Hirat City and the Districts power 

networks199.3‐20/0.4 NA

Heart City 50‐20/0.4 NA

Robat Sangi Distribution network

16‐20/0.4kV NA

Substation projects Noor‐ul‐Jehad 110/20 kv SS in Hirat City

80 ‐110/20 NA

Shuhadae 24 Hoot 132/20 kv SS in Hirat  60‐132/20  NA132/20 kv SS in Hirat 

City60 132/20  NA

Ghooriyan 132/20 kv SS in Ghooriyan district

30‐132/20  NA

Robat Sangi 220/110/20 kv SS in Robat Sangi 

District15 ‐220/110/20 NA

Noor‐ul‐Jehad 220/110/20 kv SS in 

Hirat City40‐220/20 NA

Shuhadae 24 Hoot 132/20 kv SS in Hirat 

City30‐132/20 NA

Andrascan SS 16‐220 (110)/20 NA

Responsbile Organization: MEW planning Department and DABMS

Page 266: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

         Table 1 ‐ B   Completed ( as of 1386) and Ongoing/Future Projects (1387‐1392) 

Diesel/oil‐fired(1)

Guzara district 8 projects  930 KW 930 KW 154,002.00$               

Zenda jan district 4 projects 206 KW 206 KW 31,015.00$                  

Injil district 1 project 12 KW 12 KW 186,906.00$               

Gas‐ fired projects(2)  None

Coal‐ fired projects(3)  None

                                                                           Inter‐ministerial Commission for Energy                                                                                   Energy Database

Estimated project cost (USD )

1386 Annual O&M Cost    (USD 

)

Planned Capacity    (MW)

Name of Projects*

Completed Project (As of 1386)Ongoing and Future Projects 

(1387‐1392)Project Details (Describe each project and list their 

components)Installed Capacity (MW)

Actual Capacity (MW)

Project Completion  Cost  (USD )

(1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)(2)Responsible organization:MoM, MEW/DABM (3)Responsible organization:MoM, MEW/DABM 

Page 267: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

         Table 1 ‐ C   Completed ( as of 1386) and Ongoing/Future Projects (1387‐1392)‐ Renewable Energy

Diesel

Farsi district 1 project 0 0  $            28,926.00 

Karukh district 1 project 6 KW 6 KW  $            10,600.00 

Obe district 1 project 8 KW  8 KW  $            21,784.00 

Solar

Adraskan district 3 projects  $            87,020.00 

Geothermal None

Wind NA

Wood NA

                                                                           Inter‐ministerial Commission for Energy                                                                                  Energy Database

 Renewable Energy 

Projects*Project Details (Describe each project and list 

their components)

Completed Project (As of 1386) Ongoing and Future Projects 

Planned Capacity    (MW)

Installed Capacity (MW)

Actual Capacity (MW)

Province:  Heart

Estimated project cost (USD )

Project Completion  Cost 

(USD )

1386 Annual O&M Cost    (USD )

Wood NA

others NAResponsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department

Page 268: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

 Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production

Hydropower potential (MW) None

Province: Herat

Responsible Organiztion:DABMs, MEW Planning Department

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐A    Resources Available for Energy (Hydropower)

Page 269: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation Location/Source Description*

Total Extractable Potential Existing Production

Diesel/oil(1) None

Gas(2)  None

Coal(3)

Sabzak Mines in Karukh District; strength more than7000 KiloCalory/Kg  7,600,000 MT 71,000 MT

(1)R ibl O i ti M M

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐B   Resources Available for Energy (Coal, Gas and Oil) Province: HERAT

(1)Responsible Organization:(2)Responsible Organization: MoM(3)Responsible Organization: MoM

MoM

Page 270: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation  ( Renewable Energy)

Location/Source 

Description*Total Potential Existing Production

Micro‐hydro (KW) NA

  Geothermal NA

Solar  NA

wind (metre/sec) NA

Wood (Cu.M) NA

Province: HERAT

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐C   Resources Available for Energy (Renewable Energy)

OthersResponsible Organization:

*List each depoint source and location ( province/districts 

MRRD(NSP,NABDP), MEW Renewable Department 

Page 271: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Name of District1387 (2008‐2009) in Thousands ('000)

1390 (2011‐2012) in Thousands ('000)

Estimated 1390 no. of Households in Thousands ('000)

Total 1642.71780.1 254.30

 Herat  Center       (Herat)

386.6418.9 59.85

Enjil 222.5241.1 34.44

Guzera            (Nizam‐i‐ Shahid)

133.6144.8 20.68

Pashtun Zarghun 91.298.8 14.12

Karrukh 57.962.7 8.96

Kushk                         (Rubat‐i‐Sangi)

112.7122.1 17.45

Gulran 85.792.9 13.27

Kohsan 49.553.6 7.66

Ghoryan 79.686.3 12.32

Zendahjan 52.056.3 8.05

Adraskan 48.953 0 7 57

Inter‐ministerial Commission for EnergyEnergy Database

Table 3 ‐ Population Data by District ‐ Province: HERAT

53.0 7.57Shindand 162.6

176.2 25.17Fersi 27.9

30.2 4.32Obe 68.8

74.6 10.65Chishti Sharif 21.6

23.4 3.34Kushk‐i‐ Kuhna 41.6

45.1 6.44

1.  1387 figures from Central Statistics Organization (CSO)

2.  1390 figures based on growrh rates provided by the CSO ()7 members/household

Page 272: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Hydro power  None

Imported Power  Import from Iran  10 6 NA

Transmission projects 

Distribution projects Nemroz Electricity 

Authority 35-20/0.4NA

Substation projects 

other projects(list)

                                                                           Inter‐ministerial Commission for Energy                                                                             Energy Database

         Table 1 ‐ A   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)  ‐ Generation, Transmission and Distribution  projects                             Province: NIMRO

Name of Project*

Project Details (Describe each 

project and list their components)

Completed Project (As of 1387) Ongoing and Future Projects

Installed Capacity (MW)

Actual Capacity (MW)

Transmission Length 

(Kms/KV) 

Distribution Capacity MVA/KV 

network)

Responsbile Organization: MEW planning Department and DABM

Transmission Length     

(Kms/KV)

Distribution Capacity       

(KVA network) 

Substation Capacity  /MVA

Project Completion  Cost  

(USD Mil)

1386 Annual O&M Cost    (USD 

Mil)

Planned Capacity / Power Input    

(MW)

Page 273: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

O

s (1388‐1392)

Substation Capacity/ 

Transformers     Kv/MWA 

Estimated project cost (USD Mil)

Page 274: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

         Table 1 ‐ B   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392) 

Coal‐ fired projects(3)  None

Gas‐ fired projects(2) None

Small Diesel fired projectsChakhansur destrict 26 projects 354 KW 354 KW  $                      114,401 

Kang destrict 24 Projects 502 KW 502 KW  $                      190,024 

Zaranj destrict 6 projects 162 KW 162 KW  $                         32,784 

Project Details (Describe each project and list their 

components)

Installed Capacity (MW)

Actual Capacity (MW)

Project Completion Cost (USD )

                                                                           Inter‐ministerial Commission for Energy                                                                                   Energy Database

Substation Capacity/ 

Transformers     Kv/MWA 

Estimated project cost (USD )

1386 Annual O&M Cost    (USD 

)

Planned Capacity    (MW)

Name of Projects*

Completed Project (As of 1387 Ongoing and Future Projects (1388‐1392)

Province: NIMROZ

(3)Responsible organization:MoM, MEW/DABM 

(1)Responsible organization: MoM, MEW DABM/S, MRRD(NSP,NABDP)(2)Responsible organization:MoM, MEW/DABM 

Page 275: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Microhydro

Zaranj destrict 1 project 5 KW 5 KW  $                 6,400 

Solar NA

Geothermal None

Wind NA

Wood NA

others NA

Responsible organization: MRRD(NSP,NABDP), DABM/S, MEW Renewable Engergy Department

Province: NIMROZ

Estimated project cost (USD)

Project Completion  Cost  

(USD)

1386 Annual O&M Cost    (USD)

         Table 1 ‐ C   Completed ( as of 1387) and Ongoing/Future Projects (1388‐1392)‐ Renewable Energy

                                                                           Inter‐ministerial Commission for Energy                                                                                  Energy Database

 Renewable Energy 

Projects*

Project Details (Describe each 

project and list their components)

Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)

Planned Capacity    (KW)

Substation Capacity/ 

Transformers     Kv/MWA 

Installed Capacity (KW)

Actual Capacity (KW)

Page 276: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production

Hydropower potential (MW) None

Province: NIMROZ

Responsible Organiztion:DABMs, MEW Planning Department

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐A    Resources Available for Energy (Hydropower)

Page 277: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation Location/Source Description* Total Potential Existing Production

Diesel/oil(1) None

Gas(2)  None

Coal(3) None

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐B   Resources Available for Energy (Coal, Gas and Oil) Province: NIMROZ

(1)Responsible Organization:(2)Responsible Organization: MoM(3)Responsible Organization: MoM

MoM

Page 278: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Resources Available for Energy Generation ( Renewable Energy)

Location/Source Description*

Total Potential Existing Production

Micro‐hydro (KW) NA

  Geothermal None

Solar  NA

wind (metre/sec) NA

Wood (Cu.M) NA

Province: NIMROZ

Inter‐ministerial Commission for EnergyEnergy Database

Table 2‐C   Resources Available for Energy ( Renewable Energy)

OthersResponsible Organization: MRRD(NSP,NABDP), MEW Renewable Department 

Page 279: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Name of District

1387 (2008‐2009) in Thousands ('000)

1390 (2011‐2012) in Thousands ('000)

Estimated 1390 no. of Households in Thousands 

('000)

Total 139.9

151.6 21.66Nimroz Center (Zaranj) 50.7

54.9 7.85Kang 20.4

22.1 3.16Char Burjak 24.1

26.1 3.73Asl‐i‐chakhansur 21.6

23.4 3.34Khashrod 23.1

25.0 3.58

Inter‐ministerial Commission for EnergyEnergy Database

Table 3 ‐ Population Data by District  Province: NIMROZ

1. 1387 figures from Central Statistics Organization (CSO)

2.  1390 figures based on growth rates provided by CSO (7 members/household)

Page 280: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Energy Database  

  Section – 2  Actual capacity (supply) and demand for electricity, projected supply and demand of other energy sources, private sector data, data on firms interested in energy projects in Afghanistan, and electricity consumption and tariffs. 

 

 

 

Data by Province/Country‐wide 

  

Page 281: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

No. of Customers  Consumption (KwH) Average Consumption per 

Customer (KwH) No. of Customers Consumption (KwH)Average Consumption per Customer (KwH)

KABUL Hydro 1,570 18,840,936                                      12,001 13,877 46,715,390                                                3,366 10

BADAKHSHAN Hydro 91                                    22,464                                                    247 10BAGHLAN  Hydro 9 8,324,209                                                         924,912 1,206 1,243,061                                                                           1,031 10BALKH  Imported (Uzbekistan 10 3,246,866                                                         324,687 4,015 15,482,869                                                                         3,856 8BAMIAN NA 0 ‐                                                                               ‐   0 ‐                                                                                              ‐   0SAMANGAN Diesel 0 ‐                                                                               ‐   1,043 34,718                                                                                      33 35JAWZJAN

Imported (Turkmenistan 167 NA                                                ‐    3,004 1,943,962                                                                                 647  5.5SAR‐I‐PUL

Imported (Turkmenistan 0 ‐                                                                                  ‐    755 529,575                                                                                     701  5.5FARYAB 

Imported (Turkmenistan 0 ‐                                                                                  ‐    1769 1,948,455                                                                             1,101  5.5KAPISA NA 0 ‐                                                                                  ‐    0 0                                                        ‐   

KANDAHAR  Hydro 25 432,607                                                              17,304 4,599 3947651                                                    858 10HELMUND  Hydro 79 893,247                                                              11,307 1,172 4,897,424                                                3,366

URUZGAN  Diesel 0 ‐                                                                               ‐   0 0                                                       ‐  

ZABUL Diesel 0 ‐                                                                               ‐   5 175,666                                                                            35,133I t d (I d

Inter‐ministerial Commission for EnergyEnergy Database

Industrial Customers Commercial customers

Average Tariffs / KWH (Afg)

Table 14 ‐C  Number of Customers, Consumption and Tariffs by Province ‐ Industrial and Commercial Category1387

Province Generation Source

HERAT Imported (Iran and Turkmenistan 609 41,401,926                     67,983                                      7,617 18,466,820                                                                           2,424  6

FARAH  Diesel 0 ‐                                                                               ‐   NA 7,512                                   NA 

BADGHIS Diesel 0 ‐                                                                               ‐   NA NA                                                       ‐  

NIMROZ  Imported (Iran) NA 365,528                         NA NA 1,673,126                            NA  6GHOR Diesel 0 ‐                                                                               ‐   60 7,702                                                                                      128 55PARWAN  Hydro 0 ‐                                                                               ‐   298,134                               NA  10GHAZNI  Diesel 0 ‐                                                                               ‐   NA 33,020                                 NA 

TAKHAR  Diesel 0 ‐                                                                               ‐   430 11,287                                                                                      26 50WARDAK Hydro 0 ‐                                                                               ‐   6 27,924                                                                                4,654 10KHOST  Diesel 0 ‐                                                                               ‐   43,122                                 NA 

KUNAR Hydro 0 ‐                                                                               ‐   125 20,371                                                                                    163 10KUNDUZ  Imported (Tajikistan) 158 2,956,419                                                           11,307 1,933 6,452,872                                                3,338 6LOGAR  Diesel NA NA NA NA 8950 NA  28NURISTAN NA 0 ‐                                                                                       ‐  

NANGAHAR Hydro 22 981,548                                                              44,616 1,494 2,879,452                                                1,927 10PAKTIKA Diesel 0 ‐                                                                               ‐   NA NA                                                       ‐  PAKTIA Diesel 0 ‐                                                                               ‐   NA 7319 NA

NA - Not available

Page 282: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Table 4 ‐  Supply (Actual Capacity) and Demand of Electricity, and Surplus/Deficiency (MW)

Province

Actual Capacity (MW) (Note 1)

Estimated Demand (MW) (Note 2)

Surplus or Deficiency(‐) (MW) (Note 3) 

BADAKHSHAN

0.15 62 ‐61.9BADGHIS 1.5 38 ‐36.5BAGHLAN  23.8 85 ‐61.2BALKH( Mazar city) 26 128 ‐102.0BAMIAN 0 24 ‐24.0BAMYAN 0 34 ‐34.0DIKUNDI 0 35 ‐35.0FARAH  1.3 44 ‐42.7FARYAB  40 89 ‐49.0GHAZNI  2.5 81 ‐78.5GHOR 0.5 59 ‐58.5HELMAND  17.2 102 ‐84.8HERAT 81 212 ‐131.0JAWZJAN 26 59 ‐33.0KABUL 350 425 ‐75.0KANDAHAR  19 181 ‐162.0KHOST 1 4 57 55 6

            Inter‐ministerial Commission for Energy       Energy Database

 by Province (1386)

KHOST  1.4 57 ‐55.6KUNAR 0.3 48 ‐47.7KUNDUZ  26 85 ‐59.0LAGHMAN  1 48 ‐47.0LOGAR  1 35 ‐34.0NANGAHAR 10.7 161 ‐150.3NIMROZ  6 24 ‐18.0PAKTIA 0.9 48 ‐47.1PAKTIKA 0.5 33 ‐32.5PARWAN  3.9 71 ‐67.1SAMANGAN 1.6 38 ‐36.4SAR‐E‐PUL 12 42 ‐30.0TAKHAR  1 102 ‐101.0URUZGAN  1 32 ‐31.0WARDAK 1 53 ‐52.0ZABUL 1.7 30 ‐28.3                 TOTAL 658.95 2565 ‐1906.1Note 1: Actual capacity is based completed projects as presented in Table 1‐A for each ProvinceNote 2: Estimated demand  is based on 1387 population/households as provided in Afghanistan Statistical Yearbook (see detailed assumptions in the narrative)Note 3:  Indicates deficiency in each Province 

Page 283: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Table 5 ‐  Supply (Actual Capacity) and Demand of Electricity, and Surplus/Deficiency (MW) 

Province

Actual Capacity (MW) (Note 1)

Estimated Demand (MW) (Note 2)

Surplus or Deficiency(‐) (MW) (Note 3) 

                 TOTAL 0 0 0.0BADAKHSHAN 0.15 72 ‐71.9BADGHIS 1.5 44 ‐42.5BAGHLAN  23.8 100 ‐76.2BALKH( Mazar city) 26 150 ‐124.0BAMIAN 0 28 ‐28.0BAMYAN 0 39 ‐39.0DIKUNDI 0 40 ‐40.0FARAH  1.3 52 ‐50.7FARYAB  40 105 ‐65.0GHAZNI  2.5 95 ‐92.5GHOR 0.5 70 ‐69.5HELMAND  17.2 120 ‐102.8HERAT 81 250 ‐169.0JAWZJAN 26 70 ‐44.0KABUL 350 500 ‐150.0

Inter‐ministerial Commission for EnergyEnergy Database

by Province (1387)

KANDAHAR  19 213 ‐194.0KHOST  1.4 68 ‐66.6KUNAR 0.3 57 ‐56.7KUNDUZ  26 100 ‐74.0LAGHMAN  1 56 ‐55.0LOGAR  1 42 ‐41.0NANGAHAR 10.7 190 ‐179.3NIMROZ  6 28 ‐22.0PAKTIA 0.9 56 ‐55.1PAKTIKA 0.5 38 ‐37.5PARWAN  3.9 84 ‐80.1SAMANGAN 1.6 45 ‐43.4SAR‐E‐PUL 12 50 ‐38.0TAKHAR  1 120 ‐119.0URUZGAN  1 37 ‐36.0WARDAK 1 62 ‐61.0ZABUL 1.7 34 ‐32.3Note 1: Actual capacity is based completed projects as presented in Table 1‐A for each ProvinceNote 2: Estimated demand  is based on 1387 population/households as provided in Afghanistan Statistical Year(see detailed assumptions in the narrative)Note 3:  Indicates deficiency in each Province 

Page 284: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Table 6 ‐  Supply (Actual Capacity) and Demand of Electricity, and Surplus/Deficiency (MW) 

ProvinceProjected Actual 

Capacity (MW) (Note 1)Estimated Demand (MW) 

(Note 2)Surplus or Deficiency(‐) (MW) (Note 3) 

Remarks/Notes on Projections of Actual Capacity 

BADAKHSHAN

2.25 99 ‐96.75 Includes Baharak HPP (2.1 MW)

BADGHIS 13.5 62 ‐48.5Additional 12 MW imports from Turkmenistan

BAGHLAN  23.8 138 ‐114.2BALKH( Mazar city) 26 206 ‐180BAMIAN 0 40 ‐40BAMYAN 0 55 ‐55

DIKUNDI 0 56 ‐5625 MW HPP will not be commissioned by 1390

FARAH 25.3 72 ‐46.7

Additional imports from Iran of 24 MW

FARYAB  40 150 ‐110GHAZNI  2.5 132 ‐129.5GHOR 2.9 97 ‐94.1HELMAND 

35.7 165 ‐129.3Kazaki Auxilliary Services(18.5 MW)

HERAT 123 338 ‐215 Includes Salma HPP (42 MW)JAWZJAN 26 99 ‐73

KABUL

Projected additional 333 MW  consisting of 108 MW kabul east Diesel Generator, 2x25 MW thermal funded by Iran, 100 MW f U b ki t d 75 MW

Inter‐ministerial Commission for EnergyEnergy Database

by Province (1390)

683 695 ‐12from Uzbekistan and 75 MW from Tajikistan

KANDAHAR  19 296 ‐277 Not availableKHOST  1.4 95 ‐93.6KUNAR

0.8 78 ‐77.2Includes Microhydel projects of 0.5 MW

KUNDUZ  33.2 139 ‐105.8 Includes Khanabad HPPLAGHMAN  1 78 ‐77LOGAR  1 58 ‐57NANGAHAR

23.2 263 ‐239.8Darunta HPP (12.5 MW) to be commissioned

NIMROZ 6 40 ‐34

PAKTIA1.4 77 ‐75.6

Samkany Microhydel Project 0.5 MW

PAKTIKA 0.5 53 ‐52.5PARWAN 

4.4 117 ‐112.6Includes Microhydel projects of 0.5 MW

SAMANGAN 1.6 64 ‐62.4SAR‐E‐PUL

12 103 ‐91TAKHAR  1 157 ‐156URUZGAN  1 53 ‐52WARDAK 2.98 88 ‐85.02ZABUL 1.7 49 ‐47.3                 TOTAL 1116.13 4212 ‐2348.7

Note 1: Projected actual capacity is based on projections made in Table 1‐A for each Province plus additional generations projections up to 1392 as shown in the last column above

Note 3:  Indicates deficiency in each Province Note 2: Estimated demand  is based on 1387 figures and using a demand growth rate of 15 percent each year through 1389 and 5

Page 285: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

                                                                                                                                                                               Inter‐ministerial Commission for Energy                                                                                                                                                                                                     Energy Database                                                                                            Table 7‐ Projected Supply and Demand of Other Energy Sources, and Surplus/Deficiency by Province 

Aَctual consumption

DemandAَctual 

consumptionDemand

Actual consumption

Demand

Baghlan

Balkh

Ghor

Herat

Jawzjan

Kabul

Kandahar

Kunduz

Nangarhar

Parwan

Other Provinces Combined

Natural Gas(Cu. M)

Coal (MT)Oil/ 

Diesel/Petroleum Prodcuts (Litres)

Natural Gas(Cu. M)

Coal (MT)Oil/ 

Diesel/Petroleum Prodcuts (Litres)

                      1387, 1390

Province

 Demand  Supply Surplus/(Deficit)

Natural Gas(Cu. M) Coal (MT)Oil/ Diesel/Petroleum 

Prodcuts (Litres)

MoM,MOCIResponsbile Organization:

Page 286: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Microhydro (KW)

Wind(Meters/sec)Solar (No. of Days of sun)

Wood (CU.M)

Others Microhydro (KW) Wind(Meters/sec)Solar (No. of Days of sun)

Wood (CU.M)

OthersMicrohydro 

(KW)Wind(Meters/sec)

Solar (No. of Days of sun)

Wood (CU.M)

Others

Baghlan

Balkh

Ghori

Herat

Jawzjan

Kabul

Kandahar

Kunduz

Inter‐ministerial Commission for EnergyEnergy Database

Table 8‐   Projected Supply and Demand of Renewable  Energy Sources, and Surplus/Deficiency by Province               

Province

Demand Supply Surplus/Deficit  (‐)

                                      1387, 1390

Nangarhar

Parwan

Other provinces Combined

Responsible Organiztion:  MRRD (NSP,NABDP), MEW Renewable Energy Department

Page 287: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Hydro power 

Large Diesel Projects

Transmission projects 

Distribution projects 

Substation projects 

Project Completion  Cost (USD Mil)

Transmission Length       (Kms/kV)

Name of Project*

Project Details (Describe each project, its 

location/province,  and list their components)

Actual Capacity (MW)

Completed Project (As of 1387)

Transmission Length (Kms/kv) 

Substation Capacity  MVA

Installed Capacity (MW)

Ongoing and Future Projects (1388‐1392)

Distribution Capacity     (MVA/Kv network)

                                                                                                                                                                                                                 Inter‐ministerial Commission for Energy                                                                                                                                                                                                                                   Energy Database                                                                                                                  Table ‐ 9 Private Sector Involvement in Energy Development Projects ‐ Completed (as of 1387) and Planned (1388‐1392)                                 

Substation Capacity/ Transformers     

Kv/MWA 

Estimated project cost (USD Mil)

Latest Annual O&M Cost (USD Mil)

Distribution Capacity       

(MVA/Kv network) 

Planned Capacity / Power Input    

(MW)

Other projects(list)

Responsbile Organization:MEW planning Department and DABM 

Page 288: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

                                                                                                                                     Inter‐ministerial Commission for Energ                                                                                                                                                              Energy Databas

Diesel/oil‐fired(1) NA 

Gas‐fired(2) NA

Coal‐ fired projects(3)  NA

Planned Capacity    

(MW)

Estimated project cost (USD Mil)

Name of Project*

Project Details        (Describe each project, its location/province,  

and list their components)

Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)

Installed Capacity (MW)

Actual Capacity (MW)

Project Completion  Cost(USD Mil)

(1)R ibl i ti M M MEW DABM/S MRRD(NSP NABDP)

                                                       Table 10  Private Sector Involvement in Energy Development Projects ‐ Completed (as of 1387) and Planned (1388‐1392)‐Diesel, Gas &  CoalCOUNTRYWIDE

1386 Annual O&M Cos(USD Mil)

(3)Responsible organization:MoM, MEW/DABM (2)Responsible organization: MoM, MEW/DABM(1)Responsible organization:MoM, MEW DABM/S, MRRD(NSP,NABDP)  

Page 289: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

                                                                            Inter‐ministerial Commission for Energy                                                                                             Energy Database  Table 11  Private Sector Involvement in Energy Development Projects ‐ Completed (as of 1387) and Planned (1388‐1392)

Microhydro NA

Geothermal NA

Solar NA

Wind NA

Wood NA

Estimated project cost (USD Mil)Actual Capacity 

(MW)Project Completion  

Cost(USD Mil)1386 Annual O&M 

Cost(USD Mil)

 Renewable Energy Project*

Project Details        (Describe each project, its 

location/province,  and list their components)

Completed Project (As of 1387) Ongoing and Future Projects (1388‐1392)

Planned Capacity    (MW)

Installed Capacity (MW)

Wood NA

others NA

Responsible organization:MRRD(NSP/NABDP), DABM/S, MEW Renewable Energy Department  

Page 290: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

                                                         Inter‐ministerial Commission for Energy                                                                           Energy DatabaseTable 12  Private Sector Production of Resources Used in Energy Generation Projects as of 1387 

         And Planned Projects (1388‐1392)

Resource CategoryLocation/Source Description /Date

Actual Production as of 1386

Planned Production (1387‐1392) Total Potential

List by project for each category below

Natural gas deposits(Cu. M)1 NA NA NA NA

Coal deposits (MT)2  NA NA NA NA

Oil/diesel/other petroleum Oil/diesel/other petroleum 

products (Litres)3 NA NA NA NA

2‐ Responsible Organization:   MoM 

3‐ Responsible Organization:   MoM

1‐ Responsible Organization:    MoM 

Page 291: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Name of the Firm/Contact Name & Address/E‐mail/Telephone Number Expertise of Firm(1)

List  Project Experience for each area of Expertise (Note 2) Priority Ranking*

Latest Annual Revenue(USD)

Number of Staff

List each firm, name of contact, address if the firm, and contact e‐mail and telephone number

KEC International LtdTransmission line, Sub‐ station and City Network Distribution NA NA

Construction of 220Kv Transmission Line from Hairatan to Pul‐e‐ Khumri;   Construction of 220Kv Transmission Line from Hairatan to Mazar‐e‐ Sharif Construction of 110 Kv Transmission Line from Naghlu to Kabul ;  Construction of 220Kv Transmission Line from Sher Khan border to Pul‐e‐ Khumri ;  Erection of 110 Kv Transmission Line from Sher Khan border to Imam saheb;  Construction of Imam saheb, Taloqan and Sare Pul Sub‐stations including city Distribution Networks ;  Erection of 110 Kv Transmission Line from Naghlu to Jalalabad and Meterlam;  Construction of Jalalabad and Meterlam Sub‐stations including city Networks for Jalalabad, Meterlam, Qarqaie and Sarobi; Rehabilitation and  expansion  of Kabul City Networks (MEW‐300/2); Rehabilitation and  expansion  of Kabul City Networks (MEW‐300/4)

IRCON International Ltd Sub‐ station, Switching station and Distribution Junction NA NA

Naibabad  Switching station;Aibak and Mazar Sharif Sub‐ station

Voit Siemens All Electrical Area NA NA Rehabilitation of Sarobi and Mahipar HPPLahmeyer International GmbH

Consulting service NA NA Consulting service and Supervision of Sarobi and Mahipar HPP

Si (P ki t ) All El t i l A NA NARehabilitation and  Expansion  of Kabul City Networks (MEW‐300/4)

Inter‐ministerial Commission for EnergyEnergy Database

Table 13‐A   Energy Firms Doing/Interested in Business in Afghanistan ‐ Electric Power (Notes Below)

Size of Firm

Siemens (Pakistan) All Electrical Area NA NA 300/4)Safanico Co. All Electrical Area NA NA Expansion of North‐ West and North Sub‐stations

Power Grid  Consulting service NA NAConsulting service and Supervision of Kabul‐ pul‐e‐ Khumri Transmission line and Jemtala Sub‐ station

SMEC International Ltd Consulting service NA NA Consulting service and Supervision of WB Projects

Engineering Consulting Service (ECS) Consulting service NA NA Feasibility Study on Kokcha and Kunar riversFichtner Co. Consulting service NA NA Feasibility Study of Baghdara HPP

Angelique International Ltd All Electrical Area NA NAConstruction and expansion of Kabul and Mazare Sharif distribution systems

Alstom International Ltd

Manufacturing, installation and commissioning of thermal power plants

NA NA Repairing of North‐ West Gas Turbine Power plant

*Priority ranking by MEW /DABS ( state number 1‐10 depanding upon past dealing with the firm and/or expertise) ‐ Not Available 

Source: Ministry of Energy and Water (for hydropower, thermal power, gas‐fired generation, coal‐fired generation, power transmission and distribution projects including substations) 

Page 292: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Name of the Firm/Contact Name & Address/E‐mail/Telephone Number Expertise of Firm(1)

List  Project Experience for each area of Expertise (Note 2)

Priority Ranking*

Latest Annual 

Number of Staff

List each firm, name of contact, address if the firm, and contact e‐mail and telephone number

Etehad Resources, Brian Kennedy> [email protected], <Tahera > [email protected], and <Stewart> [email protected] Gas and Oil production NA NA NA NAANHAM Group, <Toni Christianson> [email protected], <Sardar Roshan> [email protected], <David Martinon> [email protected]  Gas and Oil production NA NA NA NAEnergy Partners, < Huseyin Unal> [email protected]  and <Mehmet Ozten> [email protected] Gas and Oil production NA NA NA NAWAHEZI Limited, <Sayed Karim Wahezi> [email protected][email protected] Gas and Oil production NA NA NA NAWARECO, <Jang Taik> [email protected] Gas and Oil production NA NA NA NA

The Krystal Corporation, <Sadat M Naderi> [email protected] Gas and Oil production NA NA NA NARusebud International, <Chobutiuk Ivan> [email protected] and <Rosemary Stasek>

Inter‐ministerial Commission for EnergyEnergy Database

Table 13‐B   Energy Firms Doing/Interested in Business in Afghanistan ‐ Coal/gas/oil (Notes Below)

Size of Firm

<Rosemary Stasek> [email protected] Gas and Oil production NA  NA NA NACALIK‐EN‐Erji, <Yasar Kesgin>  Gas and Oil production NA NA NA NAAfghan Energy Partners Limited, <Kevin Murphy> [email protected] Gas and Oil production NA NA NA NAUsa TacGroup, <Ray Ozaltin> [email protected] and <Necdet Gurbuz> [email protected] Gas and Oil production NA NA NA NA

Khushak Brothers, Haji deedar, Manadwi street‐ Haji Mohammad Omars Apartment ‐ 0799334334 Coal

Captial = 3 million USD 230 persons   NA NA

Afghan Investment, Sher Khan‐ 10th street‐ Wazir Akbar Khan, House No. 320. phone: 0700276511 and 079411285 Coal 45 Million USD 295 persons NA NAMisaq‐e‐ Sharq, Sayed Ghulam Husain‐ Karte 3 ‐ across the parliament road. Phone: 0799727073 and 0799830286 Coal 4 million USD 265 persons  NA NAMuhmand Shamal Brothers ‐ Mira Jan, 4th Street of Tymani project. Phone: 0778811248 and 0772039308 Coal 3 Million USD 325 persons NA NA

*Priority ranking by MOM not available ( state number 1‐10 depanding upon past dealings with the firm and/or the firm's expertise) 

Source: Ministry of Mines

Page 293: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Name of the Firm/Contact Name & Address/E‐mail/Telephone Number Expertise of Firm(1)

List  Project Experience for each area of Expertise (Note 2)

Priority Ranking*

Latest Annual Revenue(USD)

Number of Staff

List each firm, name of contact, address if the firm, and contact e‐mail and telephone number

Engconsult Ltd Consulting service NA NA

Pre‐ Feaslbility study ofMicro Hydels in Bamyan, Ghoor, Badakhshan and Kunar provinces

Manufacturing, Installation and commissioning of Micro Hydels

Supply, Delivery, Installation and commissioning of Bamyan, Ghorband and 

Size of Firm

Inter‐ministerial Commission for EnergyEnergy Database

Table 13‐C   Energy Firms Doing/Interested in Business in Afghanistan ‐ Renewable Energy (Notes Below)

INSET International Ltdcommissioning of Micro Hydels

NA NAcommissioning of Bamyan, Ghorband and Chamkani Micro Hydels  

Norman International Ltd

Manufacturing, Installation and commissioning of Micro Hydels

NA NA

Supply, Delivery, Installation and commissioning of Asadabad and Panjshir Micro Hydels 

TARNAK Co. Construction of Micro Hydels NA NAConstruction of Bamyan and Chamkani Micro Hydels

*Priority ranking by agencies involved in renewable energy ( state number 1‐10 depanding upon past dealing with the firm and/or expertise) ‐ Not AvailableFor  renewable energy, such as, microhydro, geothermal,solar, wind, wood and other projects (Source: MEW)

Page 294: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Province

Generation Source

No. of Household Customers Total Consumption (KwH)

Average Consumption /Customer (KwH)

Average Tariffs per KwH (AFG)

KABUL

Hydro, thermal

BADAKHSHAN

Hydro 1,955 381,901                                         195 

7.0 AFG for over 700 KwH consumption; 4.0 AFG for 301‐700 KwH ; 1.5 AFG for  upto 300 KwH

BAGHLAN 

Hydro 9,300 7,145,593                                         768 

7.0 AFG for over 700 KwH consumption; 4.0 AFG for 301‐700 KwH ; 1.5 AFG for  upto 300 KwH

BALKH( Mazar city) Imported (Uzbekistan 56,487 75,843,670                                      1,343  3.5

SAMANGAN Diesel 4,825 910,134                                         189  25JAWZJAN Imported 

(Uzbekistan 20,210 13,457,716                                      1,218  2

FARYAB  Imported (Turkmenistan 32,990 33,786,013                                      1,024  2

SAR‐I‐PUL Imported (Turkmenistan 4,471 4,787,381                                      1,071  2

KANDAHAR 

Hydro 36,659 34,512,161                                         941 

7.0 AFG for over 700 KwH consumption; 4.0 AFG for 301‐700 KwH ; 1.5 AFG for  upto 300 KwH

HELMUND  7.0 AFG for over 700 KwH consumption; 4.0 AFG for 

      Inter‐ministerial Commission for Energy

                                        982 

7.0 AFG for over 700 KwH consumption; 4.0 AFG for 301‐700 KwH ; 1.5 AFG for  upto 300 KwH

 Table 14‐ A   Number of Customers, Consumption and Tariffs by Province ‐ Domestic Customers    Energy Database

219,036 214,987,002

1387

Hydro 17,919 42,325,694                                      2,362 

consumption; 4.0 AFG for 301‐700 KwH ; 1.5 AFG for  upto 300 KwH

URUZGAN  Diesel 700                                           ‐   

ZABUL Diesel 691 2,986,302                                     4,322  30

HERATImported (Iran and Turkmenistan 107,403 275,564,675                                      2,566  2

FARAH  Diesel 425 67169                                        158  40

NIMROZ  Imported (Iran) 11,390 27,957,624                                     2,455  2

GHOR Diesel 930 173304                                        186  30

PARWAN 

Hydro 8,668 2,385,548                                      1,218 

7.0 AFG for over 700 KwH consumption; 4.0 AFG for 301‐700 KwH ; 1.5 AFG for  upto 300 KwH

GHAZNI  Diesel 2,520 581,159                                        231  35

TAKHAR  Diesel 571 198658                                        348  40

WARDAK

Hydro 1,562 229,888                                         147 

7.0 AFG for over 700 KwH consumption; 4.0 AFG for 301‐700 KwH ; 1.5 AFG for  upto 300 KwH

KHOST  Diesel 1,529 733,176                                        480  32

KUNAR

Hydro 54 345527                                      6,399 

7.0 AFG for over 700 KwH consumption; 4.0 AFG for 301‐700 KwH ; 1.5 AFG for  upto 300 KwH

KUNDUZ  Imported (Tajikistan) 21,485 24,507,281                                      1,218  2

LAGHMAN  Diesel 862 488067                                        566  28

LOGAR  Diesel 494 161919                                        328  28

NANGAHAR

Hydro 8,867 33,457,698                                      3,773 

7.0 AFG for over 700 KwH consumption; 4.0 AFG for 301‐700 KwH ; 1.5 AFG for  upto 300 KwH

PAKTIA Diesel 1,523 164,696                                        108  25

Page 295: TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL ......1 TA – 4918 (AFG): SUPPORT TO INTER-MINISTERIAL COMMISSION FOR ENERGY (ICE) TECHNICAL ASSISTANCE EVALUATION REPORT (DRAFT) (April

Province Generation SourceNo. of Government Customers

No. of NGO Customers

No. of Holy Places Customers

Total No. of Customers

 Total Consumption, KwH 

Average Consumption 

/Customer (KwH)

Average Tariffs per  KwH (Afg)

KABULHydro, Thermal, Diesel 2,589 Note 1 1,687 4,276                          70,073,085 

16,388 10

BADAKHSHAN Hydro 35 16 24 75                                  44,931  599 10

BAGHLAN  Hydro 113 42 79 234 3,256,402                           13,916 10BALKH  Imported 

(Uzbekistan 296 156 346 798 10,444,555                         13,088 10

BAMIAN NA NA NA NA NA NA NA NASAMANGAN Diesel 40 Note 1 30 70 71,794                                1,026 NAJAWZJAN Imported 

(Turkmenistan 175 38 217 430 3,287,174                            7,645 5.5SAR‐I‐PUL Imported 

(Turkmenistan 99 17 72 188 900,067                               4,788

FARYAB  Imported (Turkmenistan 238 46 342 626 2,095,218                            3,347 5.5

KANDAHAR  Hydro 182 Note 1 487 669 4,215,686                           6,301 HELMUND  Hydro 158 Note 1 225 383 6,725,681                           17,561 10URUZGAN  Diesel NA NA NA NA NA NA NAZABUL Diesel 11 4 NA 15 351,329                              23,422 HERAT Imported 

(Turkmenistan 401 Note 1 46 447 10,723,803                        23,991

6FARAH Diesel 2 Note 1 3 5 7,956 1,591

Table 14 ‐B  Number of Customers, Consumption and Tariffs by Province ‐  Government, NGOs and Holy Places1387

Inter‐ministerial Commission for EnergyEnergy Database

FARAH  Diesel 2 Note 1 3 5 7,956                                  1,591 BADGHIS Diesel 33 Note 1 10 43 - NIMROZ  Import from Iran NA NA NA 3,466,253                           NAGHOR Diesel 55 20 10 85 11,554                                136 55PARWAN  Hydro NA NA NA NA 298,154                              NAGHAZNI  Diesel NA NA NA NA 46,229                                NA 35TAKHAR  Diesel 16 Note 1 1 17 15,803                                930 50WARDAK Diesel NA 1 76 77 29,543                                384 10KHOST  Diesel NA NA NA NA 86,255                                NAKUNAR Hydro 75 Note 1 5 40,605                                NAKUNDUZ  import from 

Tajikistan 106 108 98 312 7,295,438                            23,383 6LAGHMAN  Diesel 46 Note 1 5 51 39,271                                770 28LOGAR  Diesel 28 Note 1 4 32 9,041                                  283 40NANGAHAR Hydro 205 150 140 495 4,359,856                           8,808 10PAKTIA Diesel NA NA NA NA 10,981                                NA

Note 1 ‐ NGO customers included in Government Customers