11
T E A P a n d T O C s - A s s e s s m e n t 2 0 1 0, M O P - 20, D o h a 1 The TEAP and TOC 2010 Assessment Reports Timelines and issues that will be dealt with

T E A P a n d T O C s - A s s e s s m e n t 2 0 1 0, M O P - 20, D o h a 1 The TEAP and TOC 2010 Assessment Reports Timelines and issues that will be dealt

Embed Size (px)

Citation preview

Page 1: T E A P a n d T O C s - A s s e s s m e n t 2 0 1 0, M O P - 20, D o h a 1 The TEAP and TOC 2010 Assessment Reports Timelines and issues that will be dealt

T E A P a n d T O C s - A s s e s s m e n t 2 0 1 0, M O P - 20, D o h a 1

The TEAP and TOC 2010 Assessment Reports

Timelines and issues that will be dealt with

Page 2: T E A P a n d T O C s - A s s e s s m e n t 2 0 1 0, M O P - 20, D o h a 1 The TEAP and TOC 2010 Assessment Reports Timelines and issues that will be dealt

T E A P a n d T O C s - A s s e s s m e n t 2 0 1 0, M O P - 20, D o h a 2

TEAP and its TOCs

Technology and Economic Assessment Panel

- CTOC: Chemicals TOC

- FTOC: Foams TOC

- HTOC: Halons TOC

- MTOC: Medical TOC

- MBTOC: Methyl bromide TOC

- RTOC: Refrigeration, AC and Heat Pumps TOC

Page 3: T E A P a n d T O C s - A s s e s s m e n t 2 0 1 0, M O P - 20, D o h a 1 The TEAP and TOC 2010 Assessment Reports Timelines and issues that will be dealt

T E A P a n d T O C s - A s s e s s m e n t 2 0 1 0, M O P - 20, D o h a 3

2010 TEAP and TOC Assessment Reports

Timeline of Work:

(2008)-2009:

- Definition of scope and content of the reports

- Designation of chapter lead authors for specific chapters and sections, as well as the entire authorship

- Initial determination of reports structure and layout (TOC meeting)

- Identification of areas needing particular work - development of task-list

- TOC meetings to discuss items and decide on first draft

- First draft of reports (when dependent on specific TOC) and discussions

Page 4: T E A P a n d T O C s - A s s e s s m e n t 2 0 1 0, M O P - 20, D o h a 1 The TEAP and TOC 2010 Assessment Reports Timelines and issues that will be dealt

T E A P a n d T O C s - A s s e s s m e n t 2 0 1 0, M O P - 20, D o h a 4

2010 TEAP and TOC Assessment Reports

Timeline of Work:

2010: - Further compilation and update of necessary information

- Report drafting (new drafts)

- TOC meetings or CLA-TOC meetings to discuss drafts

- Preparation of review drafts (and possible external review)

- Final discussion of comments and review comments (TOC meetings)

- Finalisation of TEAP report

- Submission of reports by 31 December 2010

Page 5: T E A P a n d T O C s - A s s e s s m e n t 2 0 1 0, M O P - 20, D o h a 1 The TEAP and TOC 2010 Assessment Reports Timelines and issues that will be dealt

T E A P a n d T O C s - A s s e s s m e n t 2 0 1 0, M O P - 20, D o h a 5

CTOC 2010 Assessment Report

Process Agents (as a follow up to XVII/6) Laboratory and Analytical Uses nPB; Overview of updates (in response to Decision XIII/7) Feedstocks and emissions from feedstocks Reconciling bottom-up CTC emissions versus emissions derived

from atmospheric measurements Use of solvents and non-medical aerosol propellant applications Update on destruction technologies

Page 6: T E A P a n d T O C s - A s s e s s m e n t 2 0 1 0, M O P - 20, D o h a 1 The TEAP and TOC 2010 Assessment Reports Timelines and issues that will be dealt

T E A P a n d T O C s - A s s e s s m e n t 2 0 1 0, M O P - 20, D o h a 6

FTOC 2010 Assessment Report

Report on transition to zero ODP options in Article 5 and non-Article 5 Parties

Review status of proven in-kind technologies (HCs, HFCs) to replace HCFCs in foam and comparison with not-in-kind options

Evaluation and validation of methodologies to estimate the impact on climate change of HCFC phase-out projects (LCCP, Functional Units, GWP)

Validation of emerging in-kind HCFC replacement technologies as potential alternatives to high GWP HFCs and hydrocarbons (HCs) including: methyl formate, HFC(HFO)-1234ze, other liquid HFCs (HFOs)

Evaluation of pilot projects to assess the emerging technologies Update size of banks and emissions of different ODP GHG blowing

agents Progress in bank management efforts

Page 7: T E A P a n d T O C s - A s s e s s m e n t 2 0 1 0, M O P - 20, D o h a 1 The TEAP and TOC 2010 Assessment Reports Timelines and issues that will be dealt

T E A P a n d T O C s - A s s e s s m e n t 2 0 1 0, M O P - 20, D o h a 7

HTOC 2010 Assessment Report

Update of halon supply and demand particularly with respect to airlines and Article 5 Parties

Assessment of the environmental and fire protection implications of over/ or under supply of halons and functionality of banking mechanisms to supply halons to ongoing critical needs

Page 8: T E A P a n d T O C s - A s s e s s m e n t 2 0 1 0, M O P - 20, D o h a 1 The TEAP and TOC 2010 Assessment Reports Timelines and issues that will be dealt

T E A P a n d T O C s - A s s e s s m e n t 2 0 1 0, M O P - 20, D o h a 8

MTOC 2010 Assessment Report

MDIs Review of available technology Global status of the MDI transition Progress of transition in Article 5 Parties Production of pharmaceutical-grade CFCs Remaining challenges for phase-out of CFC MDIs

Sterilants Review of available technology Global status of the sterilant transition Global use of HCFCs Remaining issues for the phase-out of ODS in sterilisation

Page 9: T E A P a n d T O C s - A s s e s s m e n t 2 0 1 0, M O P - 20, D o h a 1 The TEAP and TOC 2010 Assessment Reports Timelines and issues that will be dealt

T E A P a n d T O C s - A s s e s s m e n t 2 0 1 0, M O P - 20, D o h a 9

MBTOC 2010 Assessment Report

A listing of alternatives successfully adopted in non A5 and A5 Parties for all uses, with particular emphasis on remaining critical uses

Technical, economic and regulatory constraints to the adoption of alternatives to MB for remaining uses (non A5 and A5)

The contribution of MB phase-out to ozone layer protection, human health, sustainable development and the impact of alternatives on climate change, particularly in A5 Parties

An update on the technical and economic feasibility of emission reduction, recovery, reuse and destruction of MB

An analysis of QPS uses Case studies on adoption of alternatives

Page 10: T E A P a n d T O C s - A s s e s s m e n t 2 0 1 0, M O P - 20, D o h a 1 The TEAP and TOC 2010 Assessment Reports Timelines and issues that will be dealt

T E A P a n d T O C s - A s s e s s m e n t 2 0 1 0, M O P - 20, D o h a 10

RTOC 2010 Assessment Report

Report on transition to zero ODP options in Article 5 and non-Article 5 Parties

Review status of replacement technologies (HCs, HFCs, CO2, others) for HCFCs in the refrigeration and AC sub-sectors, specifically commercial and large size refrigeration, unitary AC and chillers

Review status and developments in sub-sectors which have already transitioned to non ODS solutions

Evaluation and validation of methodologies to estimate the impact on climate change of HCFC phase-out projects (LCCP, Functional Units, GWP)

Update size of banks and emissions of different refrigerants in the different refrigeration and AC subsectors

Page 11: T E A P a n d T O C s - A s s e s s m e n t 2 0 1 0, M O P - 20, D o h a 1 The TEAP and TOC 2010 Assessment Reports Timelines and issues that will be dealt

T E A P a n d T O C s - A s s e s s m e n t 2 0 1 0, M O P - 20, D o h a 11

TEAP 2010 Assessment Report

The TEAP 2010 Assessment report will consist of: An executive summary of the executive summaries of all

TOC assessment reports (and will contain all executive summaries of the TOC reports)

Specific assessment of new developments and issues important for the 2010 Synthesis with the SAP and EEAP Assessment Reports