SystemsEngineering DSIG
UML for SE Roadmap
INCOSE International WorkshopTampa, FL
February 4, 2003Roger Burkhart (John Deere)
UML for SE RoadmapFebruary 4, 2003
2SystemsEngineering DSIG
RFP Process for SE UML
• Systems Engineering Domain Special Interest Group (SE DSIG) drafts RFP
• Analysis & Design Platform Task Force (ADTF) votes to issue RFP
• Submitters respond with initial & revised submissions according to submission schedule
• SE DSIG and ADTF evaluate RFP and vote on adoption
• Architecture Board and Platform Technical Committee (PTC) also review and vote
UML for SE RoadmapFebruary 4, 2003
3SystemsEngineering DSIG
The Road So Far (Key Milestones)Sep01
Oct01
Nov01
Dec01
Jan02
Feb02
Mar02
Apr02
May02
Jun02
Jul02
Aug02
Oct02
Sep02
Nov02
DSIG kickoff(Toronto) RFI Issued, working
groups organized (Anaheim) RFI Responses, Review of
SE Reqts, SE Prototype and SE Conceptual Model (Orlando)
RFI Responses, Review of Work in Progress (Helsinki)
Start of RFP Drafting and Continued Review of Inputs (Washington)
UML for SE RoadmapFebruary 4, 2003
4SystemsEngineering DSIG
The Road to SE UMLDec02
Jan03
Feb03
Mar03
Apr03
May03
Jun03
Jul03
Aug03
Sep03
Oct03
Dec03
Nov03
Jan04
Draft RFP for Review (Burlingame)
Possible Earliest UML 2.0 Adoptions(Orlando)
AP-233 Text- and Property-based Reqts in Beta/Alpha Release
AP-233 Structures Module Set in Alpha Release
AP-233 Second Two Behavioral Module Sets in Alpha Release
AP-233 First Two Behavioral Module Sets in Alpha Release
Review Draft RFP at INCOSE Int’l Workshop (Tampa)
Vote to Issue RFP (Orlando)
UML for SE RoadmapFebruary 4, 2003
5SystemsEngineering DSIG
Jan04
Feb04
Mar04
Apr 04
May04
Jun04
Jul 04
Initial Submissions Due(for February Meeting)
The Road to SE UML
Submission Presentations and Evaluation(February-June Meetings)
Possible Vote to Adopt(June Meeting)
Revised Submissions Due(for March Meeting)
UML for SE RoadmapFebruary 4, 2003
6SystemsEngineering DSIG
UML for SE RFP Milestones
• Draft RFP (Jan 20, 2003)– OMG Doc # syseng/2003-01-02 – http://syseng.omg.org/SE_UML_Profile_RFP.htm
• Scheduled reviews– OMG Meeting – Jan 28 – 30, 2003– INCOSE IW – Feb 4-5, 2003
• Issue at OMG Orlando Meeting – March 28, 2003
• Initial Submissions to RFP – Jan 12, 2004