Systems Engineerin g DSIG UML for SE Roadmap INCOSE International Workshop Tampa, FL February 4, 2003 Roger Burkhart (John Deere)

Systems Engineering DSIG UML for SE Roadmap INCOSE International Workshop Tampa, FL February 4, 2003 Roger Burkhart (John Deere)

Embed Size (px)

Citation preview

Page 1: Systems Engineering DSIG UML for SE Roadmap INCOSE International Workshop Tampa, FL February 4, 2003 Roger Burkhart (John Deere)

SystemsEngineering DSIG

UML for SE Roadmap

INCOSE International WorkshopTampa, FL

February 4, 2003Roger Burkhart (John Deere)

Page 2: Systems Engineering DSIG UML for SE Roadmap INCOSE International Workshop Tampa, FL February 4, 2003 Roger Burkhart (John Deere)

UML for SE RoadmapFebruary 4, 2003

2SystemsEngineering DSIG

RFP Process for SE UML

• Systems Engineering Domain Special Interest Group (SE DSIG) drafts RFP

• Analysis & Design Platform Task Force (ADTF) votes to issue RFP

• Submitters respond with initial & revised submissions according to submission schedule

• SE DSIG and ADTF evaluate RFP and vote on adoption

• Architecture Board and Platform Technical Committee (PTC) also review and vote

Page 3: Systems Engineering DSIG UML for SE Roadmap INCOSE International Workshop Tampa, FL February 4, 2003 Roger Burkhart (John Deere)

UML for SE RoadmapFebruary 4, 2003

3SystemsEngineering DSIG

The Road So Far (Key Milestones)Sep01

Oct01

Nov01

Dec01

Jan02

Feb02

Mar02

Apr02

May02

Jun02

Jul02

Aug02

Oct02

Sep02

Nov02

DSIG kickoff(Toronto) RFI Issued, working

groups organized (Anaheim) RFI Responses, Review of

SE Reqts, SE Prototype and SE Conceptual Model (Orlando)

RFI Responses, Review of Work in Progress (Helsinki)

Start of RFP Drafting and Continued Review of Inputs (Washington)

Page 4: Systems Engineering DSIG UML for SE Roadmap INCOSE International Workshop Tampa, FL February 4, 2003 Roger Burkhart (John Deere)

UML for SE RoadmapFebruary 4, 2003

4SystemsEngineering DSIG

The Road to SE UMLDec02

Jan03

Feb03

Mar03

Apr03

May03

Jun03

Jul03

Aug03

Sep03

Oct03

Dec03

Nov03

Jan04

Draft RFP for Review (Burlingame)

Possible Earliest UML 2.0 Adoptions(Orlando)

AP-233 Text- and Property-based Reqts in Beta/Alpha Release

AP-233 Structures Module Set in Alpha Release

AP-233 Second Two Behavioral Module Sets in Alpha Release

AP-233 First Two Behavioral Module Sets in Alpha Release

Review Draft RFP at INCOSE Int’l Workshop (Tampa)

Vote to Issue RFP (Orlando)

Page 5: Systems Engineering DSIG UML for SE Roadmap INCOSE International Workshop Tampa, FL February 4, 2003 Roger Burkhart (John Deere)

UML for SE RoadmapFebruary 4, 2003

5SystemsEngineering DSIG

Jan04

Feb04

Mar04

Apr 04

May04

Jun04

Jul 04

Initial Submissions Due(for February Meeting)

The Road to SE UML

Submission Presentations and Evaluation(February-June Meetings)

Possible Vote to Adopt(June Meeting)

Revised Submissions Due(for March Meeting)

Page 6: Systems Engineering DSIG UML for SE Roadmap INCOSE International Workshop Tampa, FL February 4, 2003 Roger Burkhart (John Deere)

UML for SE RoadmapFebruary 4, 2003

6SystemsEngineering DSIG

UML for SE RFP Milestones

• Draft RFP (Jan 20, 2003)– OMG Doc # syseng/2003-01-02 – http://syseng.omg.org/SE_UML_Profile_RFP.htm

• Scheduled reviews– OMG Meeting – Jan 28 – 30, 2003– INCOSE IW – Feb 4-5, 2003

• Issue at OMG Orlando Meeting – March 28, 2003

• Initial Submissions to RFP – Jan 12, 2004