Team Hotel: Russel Cabral, Tomi Damo , Ryan Kosak, Vijeta Patel, Lipi Vahanwala Advisors: Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept. Of Chemical Engineering March 8, 2011. Syngas Production from Petroleum Coke Gasification . Mentor Meeting 3/2/11. Agenda - PowerPoint PPT Presentation

Citation preview

Page 1: Syngas Production from Petroleum Coke Gasification

Syngas Production from Petroleum Coke Gasification

Team Hotel:Russel Cabral, Tomi Damo, Ryan Kosak, Vijeta Patel, Lipi Vahanwala

Advisors:Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept. Of Chemical Engineering

March 8, 2011 1

Page 2: Syngas Production from Petroleum Coke Gasification

2

Mentor Meeting 3/2/11

Agenda Recent changes▪ Using Selexol instead of MDEA▪ Chem. Production group wants a second un-

shifted stream Economics▪ Aspen Price Evaluator

Equipment Sizing

Page 3: Syngas Production from Petroleum Coke Gasification

Review from Presentation 2 Discussed the Shell membrane

gasifier Discussed our syngas cleaning

processes Sulfur Removal Claus Process Water Gas Shift

Flow Sheets Early Material and Energy Balances

3

Page 4: Syngas Production from Petroleum Coke Gasification

Today’s Objectives

Flow Sheeting Energy Sinks/Loads Equipment Sizing Costing Aspen Process Estimator

4

Page 5: Syngas Production from Petroleum Coke Gasification

Questions Brought Up Last Time What was the heat rate brought up

in the gasifier comparisons? Why use N2 as a transport gas and

not CO2? How are we absorbing CO2? What is a better definition of the

quench?

5

Page 6: Syngas Production from Petroleum Coke Gasification

Project Purpose

Producing syngas from petcoke to be used by Team Golf for production of acetic acid 2730 tons/day of syngas Desired CO to H2 ratio – 1:2.4 molar ratio Desired C to H ratio – 1:4.4 molar ratio Desired Temperature and Pressure▪ 400°F▪ 290 psia

6

Page 7: Syngas Production from Petroleum Coke Gasification

7

CO2 Sequestration

CO2 in our syngas is absorbed on Selexol to be selectively removed

Page 8: Syngas Production from Petroleum Coke Gasification

8

CO2 Sequestration

Removed from the Selexol through multiple flashes

Page 10: Syngas Production from Petroleum Coke Gasification

10

Flow Sheeting

Page 11: Syngas Production from Petroleum Coke Gasification

11

Energy Balance

Energy Balance

Page 12: Syngas Production from Petroleum Coke Gasification

12

Economics and Sizing

ECON

Page 13: Syngas Production from Petroleum Coke Gasification

13

Energy Sinks / Loads

Page 14: Syngas Production from Petroleum Coke Gasification

Location Victoria, Texas Between Houston

and Corpus Christi 200 acres Kansas City

Southern, Union Pacific, and Burlington Northern Santa Fe railways

Gulf Intracoastal Waterway

Page 15: Syngas Production from Petroleum Coke Gasification

Report Outline

Final Report: Executive Summary IP Discussion IP Recommendations N/A

Appendices Design Basis: Done Block Flow Diagram: Done Process Flow Showing Major Equip.: IP

15

Page 16: Syngas Production from Petroleum Coke Gasification

Report Outline

Appendices (Continued) Material and Energy Balances: IP Calculations: IP Annotated Equip. List: IP Econ. Eval. Factored from Equip. Costs:

IP Utilities: IP Conceptual Control Scheme: N/A Major Equipment Layout: IP

16

Page 17: Syngas Production from Petroleum Coke Gasification

Report Outline

Appendices (Continued) Distribution and End-use Issues:

N/A Constraints Review: IP Applicable Standards: N/A Project Communications File: IP Information Sources and References:

IP

17