Sydney Opera Utzon

Embed Size (px)

Citation preview

  • 8/4/2019 Sydney Opera Utzon

    1/10

    CASE STUDY OF SPACE STRUCTURES SYDNEY OPERA Submitted bySUPARNA DASGUPTABA08ARC-0037

  • 8/4/2019 Sydney Opera Utzon

    2/10

  • 8/4/2019 Sydney Opera Utzon

    3/10

  • 8/4/2019 Sydney Opera Utzon

    4/10

  • 8/4/2019 Sydney Opera Utzon

    5/10

  • 8/4/2019 Sydney Opera Utzon

    6/10

    DESIGN AND LAB. TEST OF MODEL

    CONSTRUCTION TYPE - PRECAST IN SITU

    TIME SPAN -14 (16) YEARS

    THE SHELLS

    VIEW ATA

    A

    1

    2

    3

    4

    5

    6

    1

    2 3 4

  • 8/4/2019 Sydney Opera Utzon

    7/10

  • 8/4/2019 Sydney Opera Utzon

    8/10

  • 8/4/2019 Sydney Opera Utzon

    9/10

  • 8/4/2019 Sydney Opera Utzon

    10/10