28
1 SWLRT/Kenilworth Corridor Virtual Public Meeting September 14, 2021

SWLRT/Kenilworth Corridor Virtual Public Meeting

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SWLRT/Kenilworth Corridor Virtual Public Meeting

1

SWLRT/Kenilworth CorridorVirtual Public Meeting

September 14, 2021

Page 2: SWLRT/Kenilworth Corridor Virtual Public Meeting

2

Today’s Agenda

• Welcome Laura Cederberg, CIDNA Chair Charlie Zelle, Metropolitan

Council Chair

• Project Update Construction Milestones Construction Challenges Kenilworth Area Construction

Update Q&A

Page 3: SWLRT/Kenilworth Corridor Virtual Public Meeting

3

Welcome

Page 4: SWLRT/Kenilworth Corridor Virtual Public Meeting

4

Construction Milestones

Page 5: SWLRT/Kenilworth Corridor Virtual Public Meeting

5

• Project is over 50% complete• First light rail tracks laid at Downtown Hopkins Station• Systems work commencing on west half of alignment• Light rail vehicles: 23 of 27 delivered

SWLRT Construction Milestones

Aug. 24: Senator Tina Smith & FTA Administrator Nuria Fernandez visit SWLRT

Page 6: SWLRT/Kenilworth Corridor Virtual Public Meeting

6

Construction Challenges

Page 7: SWLRT/Kenilworth Corridor Virtual Public Meeting

7

• Corridor Protection Wall Required per BNSF agreement Required environmental clearance

which was completed after civil construction contracting

Added to the Civil Construction Contract by change order

• Secant Wall Unforeseen soil conditions (settling

during initial tunnel construction) necessitated an alternative construction method

Adding to the Civil Construction Contract by change order

• These issues impact other SWLRT contracts and the project schedule

Construction Challenges

Page 8: SWLRT/Kenilworth Corridor Virtual Public Meeting

8

• Both elements are major projects by themselves and have a significant impact on the project’s cost and schedule

• Next steps: Corridor Protection Wall

‒ Continue construction Kenilworth Tunnel

‒ Complete change order processes– Grouting sheet separation: Completed, work is underway– Secant wall– Sheet installation delay– Tunnel construction re-sequencing

Update project schedule‒ Determine impacts to Civil, Systems & SCADA (communications)

contracts‒ Reach agreement on schedule and associated costs‒ Complete change order process to update schedule

Construction Challenges

Page 9: SWLRT/Kenilworth Corridor Virtual Public Meeting

9

Existing and Proposed Trails

Proposed Corridor Protection Wall

ExistingBNSF Track

BNSF Property

Line

Example of section near Bryn Mawr Meadows Right of

WayLine

Trails

Corridor Protection Wall

Page 10: SWLRT/Kenilworth Corridor Virtual Public Meeting

10

Secant Pile Wall

Page 11: SWLRT/Kenilworth Corridor Virtual Public Meeting

11

Sheet Pile Walls on each side of tunnel excavation

Sheet Pile Wall

Secant Pile Wall

Original Plan Modified Plan at Cedar Isles Condominium and Parking Ramp

Secant Pile Wall in Plan ViewSheet Pile Wall in Plan View

Kenilworth Tunnel Construction

Page 12: SWLRT/Kenilworth Corridor Virtual Public Meeting

12

Sheet Pile Walls on each side of tunnel

Sheet Pile Wall

Secant Pile Wall

Modified Plan at Cedar Isles Condominium and Parking Ramp

Original Plan

Kenilworth Tunnel Construction

Page 13: SWLRT/Kenilworth Corridor Virtual Public Meeting

13

Example of Secant Wall Construction

Page 14: SWLRT/Kenilworth Corridor Virtual Public Meeting

14

Kenilworth Area Construction Activities

Page 15: SWLRT/Kenilworth Corridor Virtual Public Meeting

15

Kenilworth Freight Rail Work• Crews upgrading the freight rail near West Lake Street

Station

Page 16: SWLRT/Kenilworth Corridor Virtual Public Meeting

16

Kenilworth Freight Rail Work

Page 17: SWLRT/Kenilworth Corridor Virtual Public Meeting

17

• Anticipated Upcoming Work in 2021: Tie replacement Regular maintenance

• Challenges Coordination with freight rail schedules during regular

working hours• Impacts to Community Noise and occasional vibration from rail maintenance

equipment, such as spiking and tamping, and material (ballast) transfer

Kenilworth Freight Rail Work

Page 18: SWLRT/Kenilworth Corridor Virtual Public Meeting

18

West Lake Street Station Area• Lightweight concrete for soil correction

work where station platform will eventually be constructed

Page 19: SWLRT/Kenilworth Corridor Virtual Public Meeting

19

• Anticipated Upcoming Work in 2021: Station construction Pier protection work at West Lake Street bridge

• Challenges Coordination with freight rail Coordination with private development construction

• Impacts to Community Continued use of temporary trail facilities Hauling traffic through Chowen/Abbott area Constant noise and occasional vibration

West Lake Street Station Area

Page 20: SWLRT/Kenilworth Corridor Virtual Public Meeting

20

Kenilworth LRT Tunnel• Placement

of concrete for the tunnel floor

Page 21: SWLRT/Kenilworth Corridor Virtual Public Meeting

21

• Anticipated Upcoming Work in 2021: Jet-grouting Excavation Concrete (tunnel floor, walls, roof)

• Challenges Access and space limitations Water management

• Impacts to Community Short-term closure of Cedar Lake Parkway Hauling traffic Constant noise and occasional vibration

Kenilworth LRT Tunnel

Page 22: SWLRT/Kenilworth Corridor Virtual Public Meeting

22

Cedar Lake Channel/West 21st

Street Station Area• LRT Bridge Abutments & Deck Formwork

Page 23: SWLRT/Kenilworth Corridor Virtual Public Meeting

23

• Anticipated Upcoming Work in 2021: Cedar Lake Channel LRT bridge beam-setting Excavation Concrete placement 21st Street Station construction

• Challenges Close proximity to residences Water management

• Impacts to Community Short-term fall closure of Cedar Lake Channel, coordinated

with MPRB Occasional noise and vibration

Cedar Lake Channel/W 21st St Station Area

Page 24: SWLRT/Kenilworth Corridor Virtual Public Meeting

24

Bryn Mawr Station Area• Foreground: Excavation for Bryn Mawr pedestrian

bridge pier foundation• Background: Underground water utility relocation

Page 25: SWLRT/Kenilworth Corridor Virtual Public Meeting

25

• Anticipated Upcoming Work in 2021: Bryn Mawr Station construction Corridor protection wall construction

• Challenges Construction adjacent to and over freight rail

• Impacts to Community High-vibration work on retaining walls Continued use of temporary trail facilities Hauling traffic intersecting with trail traffic Noise for Kenwood and Bryn Mawr residents

Bryn Mawr Station Area

Page 26: SWLRT/Kenilworth Corridor Virtual Public Meeting

26

• West Lake Street Station Vertical circulation structures

• LRT Tunnel Construction Long-term closure of Cedar Lake Parkway

• Cedar Lake Channel Trail Bridge• 21st Street Station roadway work• Bryn Mawr Station Pedestrian bridge construction Retaining walls Short-term closure of Wayzata Boulevard and Penn Avenue

for roadwork

Upcoming 2022 Construction Activities

Page 27: SWLRT/Kenilworth Corridor Virtual Public Meeting

27

Q&A

Page 28: SWLRT/Kenilworth Corridor Virtual Public Meeting

28

More InformationOnline: www.SWLRT.org

Email: [email protected]

Twitter:@southwestlrt