SWGH-MCM-NOM-075

Embed Size (px)

Citation preview

  • 8/7/2019 SWGH-MCM-NOM-075

    1/3

    DCI-NOM rev. 01 Page 1 of 2

    Notice of Meeting & Agenda

    design coordinates, inc. suite 202, itc bldg., 337 gil puyat ave., makati city, phone: 896-1981 to 84, fax: 899-9276, e-mail: [email protected]

    date : 07 February 2011

    ref.no. : SWGH-MCM-NOM-075

    to : Mylene Co

    Robert Uy

    Willie ChuaOlivia Soriano

    Bobit Aragoza

    Jun Orlino

    Rolando Sanchez

    Ivy Almario/Manny Samson

    Jay-R Rivera

    Pai Barrios

    Martin Ruby

    Rishma Dhutti

    SUNWEST GROUP (SGC) SGC WYC ARKITEKTURE (WYC) ARTEC Design (ARTEC) Meinhardt Phils., Inc. (MPI) GENESIS Hotel & Resort (GHR) RBS Consulting Engineers (RBS) Samson + Almario (S+A) DQA RLB C-Lao Y&R

    fax no :

    from : Arch. Jonathan Biona

    Construction Project Manager

    cc: JOSalvacion

    Trade Contractors

    project : MIDAS HOTEL & CASINO

    (Hyatt Redevelopment Project)

    Roxas Blvd., Pasay City

    number of pages including this cover sheet : 3

    Please inform us at the earliest if pages received are not clear. If you are not the intended recipient

    of this facsimile, kindly notify the sender and destroy this document immediately.

    Meeting : Management Coordination Meeting No. 075

    Date : 09 February 2011, Wednesday Time : 2:00pm

    Venue : FUNCTION ROOM PENTHOUSE LEVEL MIDAS HOTEL & CASINO

    Roxas Blvd., Pasay City

    Agenda :

    Item Responsible

    1.Schedule Management

    a.Review of Project Checklist

    b.Follow-up on Submission of Works Schedule

    c.Target Milestones vs. Actual Accomplishment

    d.Completion of Mock-up at 3rd Guestroom Floor

    2.Contract and Cost Management/Update

    a.Procurement Update:

    - Follow-up/Confirmation: Official Advice on Revision

    of Swimming Pool + Landscape

    DCI/All Concerned

    All Contractors

    SGC/DCI/All

    AAA

    SGC

    thru e-mail

  • 8/7/2019 SWGH-MCM-NOM-075

    2/3

    Management Coordination Meeting

    Ref.No. SWGH-MCM-NOM-075

    DCI-NOM rev. 00 Page 2 of 3

    Notice of Meeting & Agenda

    design coordinates, inc. suite 202, itc bldg., 337 gil puyat ave., makati city, phone: 896-1981 to 84, fax: 899-9276, e-mail: [email protected]

    - Elevated Car Parking (at rear)

    b.OSM Monitoring: Confirmation of Deliverables

    - Floor Carpet and Wall Paper- EE Devices (including additional items)

    - FCUs and Accessories

    - Fans and Blowers/ and FAHUs

    - Furniture and Furnishings (i.e. fabric)

    - Others

    c.Issuance of OSM Checklist

    d.Other Items for Testing (3rd party)

    e.Status of (Progressive) Submission of As-Built Drawings >

    for recon of PMIs/Change Orders prior to Progress Billing

    f. Follow-up on Securing of CARI by Contractors

    g.Recon Update for ARTECs proposal for PAGCORs offices

    h.Cost Reconciliation Update/PMIs/Change Orders

    i. Confirmation of Preparation of Cost Planj. (Running) Cost Assessment Report

    k.Imposition of Penalties

    l. Commissioning of other Contractors

    3.Project and Quality Management

    a.Design Concerns/Design Coordination

    1.MEPF and ID/AR Review

    - 2nd Floor

    - Upper Basement/Kitchen

    - Executive Lounge and Royal Suite

    - Permanent Casino

    2.(Follow-up) Interior Signages - Location Plan and Details

    3.Swimming Pool + Landscape

    4.Lighting Design

    4.12nd Floor Lighting (including circuiting-zoning)

    4.2Permanent Casino

    4.3Japanese Restaurant

    5.Submittals

    5.1Submission of Test Reports/Results (Follow-up)

    5.2As-Built Drawings

    5.3Samples/Shopdrawings

    b.Outstanding Items for Immediate Action

    1.Mechanical and Electrical

    1.1Transfer Ducts at 3rd and 4th Floor1.2Wires and Cables/EE Devices at 3rd and 4th Floor

    1.3Replacement of EE Devices at Kitchen(s)

    1.4Installation of Delivered AHUs/FAHUs

    1.5Grounding for Equipment at LB

    1.6Lightning Arrester at Roofdeck

    SGC

    SGC

    SGC

    All Contractors

    All Contractors

    RLB/ARTEC

    RLB/DCI

    SGC/RLBRLB

    RLB

    SGC/DCI

    S+A/MPI

    Y&R/S+A

    SGC/DQA

    C-Lao

    All Concerned

    Contractors

    ASTIASTI

    ASTI

    ASTI

    ASTI

    ASTI

  • 8/7/2019 SWGH-MCM-NOM-075

    3/3

    Management Coordination Meeting

    Ref.No. SWGH-MCM-NOM-075

    DCI-NOM rev. 00 Page 3 of 3

    Notice of Meeting & Agenda

    design coordinates, inc. suite 202, itc bldg., 337 gil puyat ave., makati city, phone: 896-1981 to 84, fax: 899-9276, e-mail: [email protected]

    1.7Duct Risers (replacement)

    1.8Integration of FCU w/ Keycard at 8th to 10th Floor

    1.9Relocation of Cable tray at Penthouse1.10New Exhaust System at Toilets at Penthouse

    1.11Supply and Installation of Air Grilles

    1.12Refurbishment of Elevator Machine Room

    2.Plumbing and Sanitary Works

    2.1Collector-Drain pipe works at 2nd Floor

    2.2Provision of Drain at Pump Room at RD

    3.Contractors Update Ongoing and Pending Works

    3.1ME/EE Works

    3.2P/S Works

    3.3Fire Protection

    3.4FDAS

    3.5Auxiliary System

    3.6LPG System3.7Fit-out Works

    3.8Floor Carpet and Wall Paper Works

    3.9Kitchens

    3.10Lighting

    3.11Elevators

    3.12Chillers

    3.13Cooling Tower

    3.14Genset

    3.15LVSG

    3.16Other equipment

    c.Hotel Operators Concerns

    d.Construction Update (Photo Update)1.9th and 10th Floor

    2.3rd and 4th Floor

    3.2nd Floor Midas Cafe, etc.

    4.Upper and Lower Basements/Back-of-the-House

    5.Ground Floor and Mezzanine Casino

    6.Kitchens

    7.Close-out of Punchlists/Balance of Works

    7.1Status of Close-out

    4.Other Matters

    ASTI

    ASTI

    ASTIASTI

    ASTI

    Otis

    All Contractors

    GHR/All Concerned

    DCI

    All Contractors

    All Concerned