Notice of Meeting & Agenda
design coordinates, inc. suite 202, itc bldg., 337 gil puyat ave., makati city, phone: 896-1981 to 84, fax: 899-9276, e-mail: [email protected]
date : 07 February 2011
ref.no. : SWGH-MCM-NOM-075
to : Mylene Co
Robert Uy
Willie ChuaOlivia Soriano
Bobit Aragoza
Jun Orlino
Rolando Sanchez
Ivy Almario/Manny Samson
Jay-R Rivera
Pai Barrios
Martin Ruby
Rishma Dhutti
SUNWEST GROUP (SGC) SGC WYC ARKITEKTURE (WYC) ARTEC Design (ARTEC) Meinhardt Phils., Inc. (MPI) GENESIS Hotel & Resort (GHR) RBS Consulting Engineers (RBS) Samson + Almario (S+A) DQA RLB C-Lao Y&R
fax no :
from : Arch. Jonathan Biona
Construction Project Manager
cc: JOSalvacion
Trade Contractors
project : MIDAS HOTEL & CASINO
(Hyatt Redevelopment Project)
Roxas Blvd., Pasay City
number of pages including this cover sheet : 3
Please inform us at the earliest if pages received are not clear. If you are not the intended recipient
of this facsimile, kindly notify the sender and destroy this document immediately.
Meeting : Management Coordination Meeting No. 075
Date : 09 February 2011, Wednesday Time : 2:00pm
Venue : FUNCTION ROOM PENTHOUSE LEVEL MIDAS HOTEL & CASINO
Roxas Blvd., Pasay City
Agenda :
Item Responsible
1.Schedule Management
a.Review of Project Checklist
b.Follow-up on Submission of Works Schedule
c.Target Milestones vs. Actual Accomplishment
d.Completion of Mock-up at 3rd Guestroom Floor
2.Contract and Cost Management/Update
a.Procurement Update:
- Follow-up/Confirmation: Official Advice on Revision
of Swimming Pool + Landscape
DCI/All Concerned
All Contractors
SGC/DCI/All
AAA
SGC
thru e-mail
8/7/2019 SWGH-MCM-NOM-075
2/3
Management Coordination Meeting
Ref.No. SWGH-MCM-NOM-075
DCI-NOM rev. 00 Page 2 of 3
Notice of Meeting & Agenda
design coordinates, inc. suite 202, itc bldg., 337 gil puyat ave., makati city, phone: 896-1981 to 84, fax: 899-9276, e-mail: [email protected]
- Elevated Car Parking (at rear)
b.OSM Monitoring: Confirmation of Deliverables
- Floor Carpet and Wall Paper- EE Devices (including additional items)
- FCUs and Accessories
- Fans and Blowers/ and FAHUs
- Furniture and Furnishings (i.e. fabric)
- Others
c.Issuance of OSM Checklist
d.Other Items for Testing (3rd party)
e.Status of (Progressive) Submission of As-Built Drawings >
for recon of PMIs/Change Orders prior to Progress Billing
f. Follow-up on Securing of CARI by Contractors
g.Recon Update for ARTECs proposal for PAGCORs offices
h.Cost Reconciliation Update/PMIs/Change Orders
i. Confirmation of Preparation of Cost Planj. (Running) Cost Assessment Report
k.Imposition of Penalties
l. Commissioning of other Contractors
3.Project and Quality Management
a.Design Concerns/Design Coordination
1.MEPF and ID/AR Review
- 2nd Floor
- Upper Basement/Kitchen
- Executive Lounge and Royal Suite
- Permanent Casino
2.(Follow-up) Interior Signages - Location Plan and Details
3.Swimming Pool + Landscape
4.Lighting Design
4.12nd Floor Lighting (including circuiting-zoning)
4.2Permanent Casino
4.3Japanese Restaurant
5.Submittals
5.1Submission of Test Reports/Results (Follow-up)
5.2As-Built Drawings
5.3Samples/Shopdrawings
b.Outstanding Items for Immediate Action
1.Mechanical and Electrical
1.1Transfer Ducts at 3rd and 4th Floor1.2Wires and Cables/EE Devices at 3rd and 4th Floor
1.3Replacement of EE Devices at Kitchen(s)
1.4Installation of Delivered AHUs/FAHUs
1.5Grounding for Equipment at LB
1.6Lightning Arrester at Roofdeck
SGC
SGC
SGC
All Contractors
All Contractors
RLB/ARTEC
RLB/DCI
SGC/RLBRLB
RLB
SGC/DCI
S+A/MPI
Y&R/S+A
SGC/DQA
C-Lao
All Concerned
Contractors
ASTIASTI
ASTI
ASTI
ASTI
ASTI
8/7/2019 SWGH-MCM-NOM-075
3/3
Management Coordination Meeting
Ref.No. SWGH-MCM-NOM-075
DCI-NOM rev. 00 Page 3 of 3
Notice of Meeting & Agenda
design coordinates, inc. suite 202, itc bldg., 337 gil puyat ave., makati city, phone: 896-1981 to 84, fax: 899-9276, e-mail: [email protected]
1.7Duct Risers (replacement)
1.8Integration of FCU w/ Keycard at 8th to 10th Floor
1.9Relocation of Cable tray at Penthouse1.10New Exhaust System at Toilets at Penthouse
1.11Supply and Installation of Air Grilles
1.12Refurbishment of Elevator Machine Room
2.Plumbing and Sanitary Works
2.1Collector-Drain pipe works at 2nd Floor
2.2Provision of Drain at Pump Room at RD
3.Contractors Update Ongoing and Pending Works
3.1ME/EE Works
3.2P/S Works
3.3Fire Protection
3.4FDAS
3.5Auxiliary System
3.6LPG System3.7Fit-out Works
3.8Floor Carpet and Wall Paper Works
3.9Kitchens
3.10Lighting
3.11Elevators
3.12Chillers
3.13Cooling Tower
3.14Genset
3.15LVSG
3.16Other equipment
c.Hotel Operators Concerns
d.Construction Update (Photo Update)1.9th and 10th Floor
2.3rd and 4th Floor
3.2nd Floor Midas Cafe, etc.
4.Upper and Lower Basements/Back-of-the-House
5.Ground Floor and Mezzanine Casino
6.Kitchens
7.Close-out of Punchlists/Balance of Works
7.1Status of Close-out
4.Other Matters
ASTI
ASTI
ASTIASTI
ASTI
Otis
All Contractors
GHR/All Concerned
DCI
All Contractors
All Concerned