16
Sustainable Design within BSF: A Case Study of the City of Leicester College Liam Murray (Hulley & Kirkwood)

Sustainable Design within BSF: A Case Study of the City of Leicester College Liam Murray (Hulley & Kirkwood)

Embed Size (px)

Citation preview

Page 1: Sustainable Design within BSF: A Case Study of the City of Leicester College Liam Murray (Hulley & Kirkwood)

Sustainable Design within BSF: A Case

Study of the City of Leicester College

Liam Murray (Hulley & Kirkwood)

Page 2: Sustainable Design within BSF: A Case Study of the City of Leicester College Liam Murray (Hulley & Kirkwood)

City of Leicester College – Leicester BSF

•The current scheme comprises of a complete new build of a predominantly two storey school.

•The school is to accommodate 1500 pupils and is a business specialist college.

•Has received carbon 60 funding of £50/m2 to achieve a carbon reduction of 60% over 2002 levels

Page 3: Sustainable Design within BSF: A Case Study of the City of Leicester College Liam Murray (Hulley & Kirkwood)

Design Philosophy

Page 4: Sustainable Design within BSF: A Case Study of the City of Leicester College Liam Murray (Hulley & Kirkwood)

Education

• Engaged in workshops with students and staff

• Engaged in workshops with De Montfort University

• Visual displays of energy consumption

• Use the energy data for teaching resource

Page 5: Sustainable Design within BSF: A Case Study of the City of Leicester College Liam Murray (Hulley & Kirkwood)

Building Fabric

Massively Improved Fabric:

• Glazing U-value improvement 2.2 to 1.5 W/m2

• Wall U-value improvement 0.35 to 0.15 W/m2

• Roof U-value improvement 0.25 to 0.1 W/m2

• Floor U-value improvement 0.25 to 0.1 W/m2

• Air permeability of 3 m3/hr/m2 @ 50Pa

Page 6: Sustainable Design within BSF: A Case Study of the City of Leicester College Liam Murray (Hulley & Kirkwood)

Building Fabric Impact

Building built to Part L 2006 & 2010 minimum standards peak boiler requirement 1450kW

City of Leicester with improved fabric peak boiler requirement 680kW

53% reduction in boiler size!!!

Page 7: Sustainable Design within BSF: A Case Study of the City of Leicester College Liam Murray (Hulley & Kirkwood)

Solar control

• Dynamic thermal simulation to optimise solar control and building form

• Glazing g-values of 0.36 in area’s of high solar gain

• Internal blinds fitted

• Strategic placement of brise-soliel and roof over hangs

Page 8: Sustainable Design within BSF: A Case Study of the City of Leicester College Liam Murray (Hulley & Kirkwood)

Energy Reduction

• Good daylighting

• Lighting controls – Daylight linking and PIR’s

• Low watt computers – 80w each (50% less than an average PC)

• Low flush WCs

• Mixed Mode - Natural ventilation with boost ventilation during peak summer and peak winter

• Variable speed pumping with remote differential pressure monitoring to reduce pump duty by up to 51%.

Page 9: Sustainable Design within BSF: A Case Study of the City of Leicester College Liam Murray (Hulley & Kirkwood)

Good lighting design impact

• Better working environment for students

• Reduction in FM call outs

• Added security

• 63% reduction in annual lighting energy

Page 10: Sustainable Design within BSF: A Case Study of the City of Leicester College Liam Murray (Hulley & Kirkwood)

Heat recovery & Efficient space conditioning

• All AHU’s to incorporate high efficiency heat recovery some units achieving +70%

• Evaporative cooling within large AHU’s to allow lost cost cooling to air systems

• Future heat input of renewable technologies ASHP, GSHP, Solar thermal catered for within AHU

Page 11: Sustainable Design within BSF: A Case Study of the City of Leicester College Liam Murray (Hulley & Kirkwood)

LZCT Feasibility Study

WIND

+ FITS Benifits

- Site Suitability

GSHP

+ Heating & Cooling

- High capital cost

BIOMASS

+ High carbon savings

- Negative payback

SOLAR PV

+ FITS Benefits

- High £/CO2 install

CHP (BIO-CHP)

+ Produce Heat & Elec

- Maintenance required

SOLAR THERMAL

+ High CSR

- Peak’s in summer

Weighted CO2 savings

-

1,000,000

2,000,000

3,000,000

4,000,000

5,000,000

6,000,000

7,000,000

8,000,000

9,000,000

10,000,000

CH

P

Bio-C

HP

Solar therm

al

GS

HP

- vert

GS

HP

- horiz

AS

HP

Biom

ass

Wei

gh

ted

CO

2 sa

vin

g

Typical School

25, 60 & 100 yr life cycle Saving

-£500,000

£-

£500,000

£1,000,000

£1,500,000

£2,000,000

£2,500,000

£3,000,000

CH

P

Bio-C

HP

Solar therm

al

GS

HP

- vert

GS

HP

- horiz

AS

HP

Biom

ass

60

yr L

CA

25 yr LCA NPV

60 yr LCA NPV

100 yr LCA NPV

15 Yr Net present value

-£500,000

-£400,000

-£300,000

-£200,000

-£100,000

£-

£100,000

£200,000

£300,000

CH

P

Bio

-CH

P

Sola

r therm

al

GS

HP

- vert

GS

HP

- horiz

AS

HP

Bio

massN

PV

(£)

Typical School

Page 12: Sustainable Design within BSF: A Case Study of the City of Leicester College Liam Murray (Hulley & Kirkwood)

Selected LZCT – PPO-CHP

• Pure Plant Oil CHP powered by locally sourced fuel

• Sized to meet the base domestic hot water load

• High efficiency back-up gas fired boilers

• Carbon 60 funding

• Double Renewable obligation certificates - ROC’s

• Excellent £/CO2 (£800 per tonnes)

• Short Payback (6-8 years)

• Energy on demand

Page 13: Sustainable Design within BSF: A Case Study of the City of Leicester College Liam Murray (Hulley & Kirkwood)

LZCT future expansion

Allow for future developments in the renewable market now

Up rated roof structure to take PV

Additional coils in DHW cylinders

Spare tails on LTHW headers

AHU which allow LZCT inputs

May be feasible in a few days/month/years

Page 14: Sustainable Design within BSF: A Case Study of the City of Leicester College Liam Murray (Hulley & Kirkwood)

Packaged M&E Plant

• Allows quick installation which when timetabled can dramatically reduce project impact on students education

• Reduces noise during installation

• Allows most efficient design without restraints of building form and structure

• More cost effective way of providing m² for plant space

• Allow quick and low impact servicing/ replacement of plant

Page 15: Sustainable Design within BSF: A Case Study of the City of Leicester College Liam Murray (Hulley & Kirkwood)

Design estimates

51% reduction in CO2 emission’s over 2006 standards (Stage C energy model)

76% reduction in CO2 emission’s over 2002 standards (carbon calculator)

Page 16: Sustainable Design within BSF: A Case Study of the City of Leicester College Liam Murray (Hulley & Kirkwood)

Liam Murray (Hulley & Kirkwood)

“The sustainable discussion”

Any Questions

[email protected]