Survey on construction delay

Embed Size (px)

Citation preview

  • 8/17/2019 Survey on construction delay

    1/18

    This survey aims to gather data about the most relevant causes for constructiondelays. It is being distributed to various parties involved in construction includingbut not limited to owners, consultants, contractors and sub-contractors.Thesecauses will then be analyzed to provide relevant solutions to minimize constructiondelay. Thank you for taking time to participate in the survey.

    For the purpose of this study, please consider the following definitions.

    1. Owner: An owner/client is the party responsible for the inception of a project. Their role

    includes conveying the design idea to the architect, making major aesthetic decisions and funding

    the project.

    2. Consultant: A consultant is the Architect/Engineer. They have the calling shots on thematerials used, design, inspections and/or Quality Assurance/Quality Control.

    3. Contractor: A contractor is the party who manages the construction of the project. They are

    responsible for providing the workforce and materials and overseeing the completion of a projecton schedule and in budget.

    4. Subcontractor: A subcontractor is the party that works for the project in agreement with thecontractor. Each subcontractor is specialized in his/her own field of work.

    Additional definitions:

    Contract: A binding legal document that lays out the terms and conditions for the project.

    Construction Delay Analysis

    Construction Delay Analysis

    1

  • 8/17/2019 Survey on construction delay

    2/18

    Basic Information

    Construction Delay Analysis

    1. Please select your role in construction.*

    Owner

    Consultant

    Contractor

    Subcontractor

    Other (please specify)

    2. Please provide you name. (All responses are kept anonymous. This information is only for the purposeof analysis and data sorting)

    *

    3. Please mention the name of your firm. (All responses are kept anonymous. This information is only for the purpose of analysis and data sorting)

    4. Please mention your experience in the construction industry in years.

    5. Please select the country where most of your projects are located.

    2

  • 8/17/2019 Survey on construction delay

    3/18

    Project Size

    Construction Delay Analysis

    Please describe the average project cost and area for the project size you selected.

    6. Please select the most relevant project size you would like to answer about.*

    Small Projects

    Medium Projects

    Large Projects

    3

  • 8/17/2019 Survey on construction delay

    4/18

    Project Type

    Construction Delay Analysis

    7. Please select the most relevant project type you deal with*

    Single Owner Residential Projects

    Multiple Owner Residential Projects

    Commercial Projects (like office buildings, etc.)

    Industrial Projects (like factories, manufacturing units, etc.)

    Public Projects (like roads, government projects, etc.)

    Other (please specify)

    4

  • 8/17/2019 Survey on construction delay

    5/18

    Software Use

    Construction Delay Analysis

    8. Do you/your firm use software for design/project management and coordination?*

    Yes

    No

    5

  • 8/17/2019 Survey on construction delay

    6/18

    Software Use

    Construction Delay Analysis

    9. Which of the following software tools do you use on a regular basis (e.g., at least once a month) for design and/or project management?

    AutoCAD

    ArchiCAD

    Solidworks

    Revit

    Primevera

    Microsoft Project

    Cloud Based Services (E.g., Procore, BuilderTrend, Prologis etc)

    N/A - Do not use software

    Other software solutions for any other operations (please specify)

    Extremely Useful Very Useful Useful Not very useful Not at all useful Not Applicable

    10. From your experience in using construction software, how useful do you think software is in reducingconstruction delays? (Please answer this question only if you have used construction management

    software)

    *

    6

  • 8/17/2019 Survey on construction delay

    7/18

    Construction Delay Analysis

    Not at all important Slightly importantSomewhatimportant Very important Extremely important

    Contract

    Owner/Client

    Design Consultant(Engineering and

    Architecture)

    Contractor

    Materials

    Coordination

    Labor/Equipment

    City/Government Approvals

    External

    Safety

    Please mention any other factors you think would be a cause of construction delay

    11. One a scale of 1 to 5 , please rate each factor on its contribution in construction delay. Further

    subcategories are mentioned ahead in the survey.

    *

    7

  • 8/17/2019 Survey on construction delay

    8/18

    Contract

    Construction Delay Analysis

    Not at allimportant

    Slightlyimportant

    Somewhatimportant Very important

    Extremelyimportant

    N/A - Do not usecontracts

    Original contract durationis too short/unrealistic.

    Mistakes anddiscrepancies in contractdocument

    Legal disputes betweenvarious parties

    Type of contract

    Ineffectiveincentives/disincentives

    300 character limit. Please specify a few changes that you think would be most effective to reduce delays related to this particular cause - this is optional. Separate different suggestions using a semicolon.

    12. On a scale of 1 to 5, how would you rate the following factors related to delays caused by contract?*

    8

  • 8/17/2019 Survey on construction delay

    9/18

    Client/Owner

    Construction Delay Analysis

    Not at all important Slightly importantSomewhatimportant Very important Extremely important

    Finance and payment of completed work

    Owner Interference

    Slow decision making

    Conflicts between joint-ownership of project

    Suspension of work byowner

    300 character limit. Please specify a few changes that you think would be most effective to reduce delays related to this particular cause - this is optional. Separate different suggestions using a semicolon.

    13. On a scale of 1 to 5, how would you rate the following factors related to delays caused by client/owner?*

    9

  • 8/17/2019 Survey on construction delay

    10/18

    Design Consultant

    Construction Delay Analysis

    Not at all important Slightly importantSomewhatimportant Very important Extremely important

    Mistakes/discrepanciesin design documents

    Preparation andapproval of documents

    Insufficient level of detailin drawings

    Complexity of projectdesign

    Qualityassurance/control

    Green BuildingDesign/Certification

    300 character limit. Please specify a few changes that you think would be most effective to reduce delays related to this particular cause - this is optional. Separate different suggestions using a semicolon.

    14. On a scale of 1 to 5, how would you rate the following factors related to delays caused by the designconsultant/engineer?

    *

    10

  • 8/17/2019 Survey on construction delay

    11/18

    Contractor

    Construction Delay Analysis

    Not at all important Slightly importantSomewhatimportant Very important Extremely important

    Inadequatefinances/funds by thecontractor

    Subcontractors

    Poor site management

    Improper constructionmethods

    Inadequate supervisionexperience/training

    300 character limit. Please specify a few changes that you think would be most effective to reduce delays related to this particular cause - this is optional. Separate different suggestions using a semicolon.

    15. On a scale of 1 to 5, how would rate the following factors related to delays caused by contractor?*

    11

  • 8/17/2019 Survey on construction delay

    12/18

    Materials

    Construction Delay Analysis

    Not at all important Slightly importantSomewhatimportant Very important Extremely important

    Shortage of constructionmaterials in market

    Changes in materialtypes and specificationsduring construction

    Delay in materialdelivery/procurement

    Damage of storedmaterial

    Late selection of finishmaterials

    300 character limit. Please specify a few changes that you think would be most effective to reduce delays related to this particular cause - this is optional. Separate different suggestions using a semicolon.

    16. On a scale of 1 to 5 , how would rate the following factors related to delays caused by materials?*

    12

  • 8/17/2019 Survey on construction delay

    13/18

    Coordination

    Construction Delay Analysis

    Not at all important Slightly importantSomewhatimportant Very important Extremely important

    Delay in approvingmajor changes in thescope of work

    Delay in performinginspection and testing

    Lack of communicationbetween parties

    Lack of regular meetings

    Inability to handle toomany projects at once

    Use of different softwareby different parties

    300 character limit. Please specify a few changes that you think would be most effective to reduce delays related to this particular cause - this is optional. Separate different suggestions using a semicolon.

    17. On a scale of 1 to 5, how would rate the following factors related to delays caused due to coordination?*

    13

  • 8/17/2019 Survey on construction delay

    14/18

    Labor/Equipment

    Construction Delay Analysis

    Not at all important Slightly importantSomewhatimportant Very important Extremely important

    Shortage of workforce

    Unqualified/unproductivelabor

    Personal conflictsamong labor

    Equipment availabilityand failure

    Improper use of available equipment

    300 character limit. Please specify a few changes that you think would be most effective to reduce delays related to this particular cause - this is optional. Separate different suggestions using a semicolon.

    18. On a scale of 1 to 5, how would rate the following factors related to delays caused because of labor/equipment?

    *

    14

  • 8/17/2019 Survey on construction delay

    15/18

    City/Government Approvals

    Construction Delay Analysis

    Not at all important Slightly importantSomewhatimportant Very important Extremely important

    Delays in submittingdesign documents/shopdrawings

    Delays in reviewing andapproving designdocuments by the city

    Revising the existingrules/codes

    Green Building Approvals

    300 character limit. Please specify a few changes that you think would be most effective to reduce delays related to this particular cause - this is optional. Separate different suggestions using a semicolon.

    19. On a scale of 1 to 5, how would rate the following factors related to delays caused because of city/government/other approvals?

    *

    15

  • 8/17/2019 Survey on construction delay

    16/18

    External Factors

    Construction Delay Analysis

    Not at all important Slightly importantSomewhatimportant Very important Extremely important

    Surface/subsurfaceconditions

    Weather conditions

    Accidents duringconstruction

    Effect of social, culturaland political factors

    Delay in providingservices from the utilitiesdepartments (such aswater, electricity,telephone, etc.)

    300 character limit. Please specify a few changes that you think would be most effective to reduce delays related to this particular cause - this is optional. Separate different suggestions using a semicolon.

    20. On a scale of 1 to 5, how would rate the following factors relating to delays caused because of externalreasons?

    *

    16

  • 8/17/2019 Survey on construction delay

    17/18

    Construction Delay Analysis

    Not at all important Slightly importantSomewhatimportant Very important Extremely important

    Lack of proper safetytraining/education

    Lack of proper PersonalProtective Equipment(PPE) , Material SafetyData Sheet (MSDS),etc,.

    Employer negligence inproviding proper safetygear

    Employee negligence inusing provided safetygear

    MalfunctioningEquipment

    300 character limit. Please specify a few changes that you think would be most effective to reduce delays related to this particular cause - this is optional. Separate different suggestions using a semicolon.

    21. On a scale of 1 to 5, how would rate the following factors relating to delays caused because of

    safety reasons?

    *

    17

  • 8/17/2019 Survey on construction delay

    18/18

    Thank you!

    Construction Delay Analysis

    If yes, please enter any relevant data in the comment box below.

    22. Thank you for taking time to answer the survey. Would you like to provide additional data for theresearch?

    Yes

    No