14
Surveillance Analysis: SASS-C 1 Surveillance Services Info Days Brussels, 6-7 December 2017 Surveillance Analysis: SASS-C Yvan Zeebroek on behalf of Emmanuel Voet SASS-C Support TLP: GREEN

Surveillance Analysis: SASS-C - Eurocontrol · Surveillance Analysis: SASS-C 1 ... Distribution System) with EUROCONTROL’s current ... coverage result 3D WAM position measurement

  • Upload
    lammien

  • View
    229

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Surveillance Analysis: SASS-C - Eurocontrol · Surveillance Analysis: SASS-C 1 ... Distribution System) with EUROCONTROL’s current ... coverage result 3D WAM position measurement

Surveillance Analysis: SASS-C 1

Surveillance Services Info Days

Brussels, 6-7 December 2017

Surveillance Analysis: SASS-C

Yvan Zeebroek on behalf of Emmanuel Voet

SASS-C Support

TLP: GREEN

Page 2: Surveillance Analysis: SASS-C - Eurocontrol · Surveillance Analysis: SASS-C 1 ... Distribution System) with EUROCONTROL’s current ... coverage result 3D WAM position measurement

SASS-C Suite

Surveillance Analysis: SASS-C 2/xx

URVEILLANCE

NALYSIS

UPPORT

YSTEM for ATC

ENTRE

Page 3: Surveillance Analysis: SASS-C - Eurocontrol · Surveillance Analysis: SASS-C 1 ... Distribution System) with EUROCONTROL’s current ... coverage result 3D WAM position measurement

SASS-C function

Objectives

• to verify the compliance of the surveillance infrastructure (ATM

Surveillance Sensors and Surveillance Data Processing and

Distribution System) with EUROCONTROL’s current

surveillance standards and specifications

• to support air incident investigation, with a particular focus on

surveillance aspects

• to support the development and implementation of new ATM

surveillance systems.

3 Surveillance Analysis: SASS-C

Page 4: Surveillance Analysis: SASS-C - Eurocontrol · Surveillance Analysis: SASS-C 1 ... Distribution System) with EUROCONTROL’s current ... coverage result 3D WAM position measurement

What is a Surveillance Infrastructure Evaluation

A Surveillance Infrastructure

Evaluation permits

Specific Technical

Performance Requirements

to be compared to

the

the Actual Performance of the System

by measuring and/or calculating certain parameters

4

Infrastructure

Requirements

Analysis

Surveillance Analysis: SASS-C

Page 5: Surveillance Analysis: SASS-C - Eurocontrol · Surveillance Analysis: SASS-C 1 ... Distribution System) with EUROCONTROL’s current ... coverage result 3D WAM position measurement

PREDICTion VERIFication Surveillance

Infrastructure

SCDB SASS-C Data Base

Surveillance

Infrastructure

Performance…

Functions & Architecture

Surveillance Analysis: SASS-C 5

Page 6: Surveillance Analysis: SASS-C - Eurocontrol · Surveillance Analysis: SASS-C 1 ... Distribution System) with EUROCONTROL’s current ... coverage result 3D WAM position measurement

VERIFication V8+

modular, open and evolutive architecture

Surveillance Analysis: SASS-C 6/xx

programs

SCDB

supervision

analysis/comparison

common

services

investigation display

reporting

acquisition/import

actions

… reference reconstruction

Page 7: Surveillance Analysis: SASS-C - Eurocontrol · Surveillance Analysis: SASS-C 1 ... Distribution System) with EUROCONTROL’s current ... coverage result 3D WAM position measurement

VERIFication Control Center

Surveillance Analysis: SASS-C 7/xx

Folder

organisation of work

Evaluation

content in

term of tasks

Page 8: Surveillance Analysis: SASS-C - Eurocontrol · Surveillance Analysis: SASS-C 1 ... Distribution System) with EUROCONTROL’s current ... coverage result 3D WAM position measurement

VERIFication

Examples of display

Surveillance Analysis: SASS-C 8

Page 9: Surveillance Analysis: SASS-C - Eurocontrol · Surveillance Analysis: SASS-C 1 ... Distribution System) with EUROCONTROL’s current ... coverage result 3D WAM position measurement

PREDICTion

Coverage and Performance

raw (Line-of-Sight)

coverage based on

Digital Terrain Data and obstacles

Performance Restricted (PR) coverage maps

(ADS-B\TIS-B\WAM only)

Coverage Multiplicity among any

coverage result

3D WAM position

measurement accuracy

3D ADS-B probability of

message reception

considering various types

of interferences (other aircraft, RF pollution)

Surveillance Analysis: SASS-C 9

Calculation and display (2D or 2,5D) of

Page 10: Surveillance Analysis: SASS-C - Eurocontrol · Surveillance Analysis: SASS-C 1 ... Distribution System) with EUROCONTROL’s current ... coverage result 3D WAM position measurement

SASS-C deployment

Surveillance Analysis: SASS-C 10

Non EUROCONTROL Member States

Organisations

• Brazil, Canada, Honduras,

Malaysia, Indonesia, New Zealand,

South-Africa

• ongoing discussion with

Singapore, Vietnam, USA,

ASECNA, etc.

EUROCONTROL Member

States Organisations

widely distributed to civil and military ANSP’s, R&D organisations and industrial partners

Page 11: Surveillance Analysis: SASS-C - Eurocontrol · Surveillance Analysis: SASS-C 1 ... Distribution System) with EUROCONTROL’s current ... coverage result 3D WAM position measurement

Funding and Partnership

CEF/INEA (2016-2019)

• Deployment of harmonised and interoperable high performance European Surveillance System

• Partnership (NAV-PT and ANS CR)

SESAR (2016-2020)

• WP PJ.14-04-01: Surveillance Performance Monitoring (including ground surveillance)

• Partnership (LEONARDO, COOPANS, THALES AIR SYSTEMS, THALES ELECTRON IC SYSTEMS, INDRA, ENAIRE, NAV-PT)

Surveillance Analysis: SASS-C 11

Page 12: Surveillance Analysis: SASS-C - Eurocontrol · Surveillance Analysis: SASS-C 1 ... Distribution System) with EUROCONTROL’s current ... coverage result 3D WAM position measurement

SRS (INEA) Roadmap (SASS-C)

• Improved trajectory reconstruction

•capability handling very high volume of data

• improved capability for the estimation of systematic sensor errors

Support to FAB (Q1 2018)

•Performance assessment of heterogeneous surveillance infrastructure comprising Surface Movement Surveillance (SMS)

G2G – Support to SMS analysis (Q4 2018)

•Assessment of compliance to ESASSP version 2.0 (and all current standards for current technologies)

ESASSP evolution (Q3 2019)

•Performance assessment of heterogeneous surveillance infrastructure comprising Independent Non Cooperative Surveillance (INCS) sensors –e.g. Multi Static Primary Surveillance (MSPSR)

G2G – Support to MSPSR analysis (Q1 2020)

Surveillance Analysis: SASS-C 12

Page 13: Surveillance Analysis: SASS-C - Eurocontrol · Surveillance Analysis: SASS-C 1 ... Distribution System) with EUROCONTROL’s current ... coverage result 3D WAM position measurement

SESAR 2020 - PJ.14.04.01

Surveillance Performance Monitoring

• ED129B (ADSB)

• ED142A* (WAM)

• ED117A (MLAT)

• THALES-ES is leader

Task: Cooperative Surveillance (between Q3/2018-Q1/2019)

• ED116* (SMR) (expected mid 2019)

• INDRA will be leader

Task: Non-Cooperative Surveillance (between Q4/2018-Q2/2019)

• ED87D (A-SMGCS)

• GEN-SUR-SPR … ESASSP V2 (Enroute/TMA Service to Controller)

• EUROCONTROL will be leader

Task: End-to-End (between Q3/2018-Q2/2019)

Surveillance Analysis: SASS-C 13

Page 14: Surveillance Analysis: SASS-C - Eurocontrol · Surveillance Analysis: SASS-C 1 ... Distribution System) with EUROCONTROL’s current ... coverage result 3D WAM position measurement

Questions?

Surveillance Analysis: SASS-C 14