    Supporting

    Water Operators Partnershipsin Indonesia

    Presentationby

    Javier Coloma Brotons, Urban Development Specialist, ADB

  • 7/31/2019 Supporting Water Operators Partnerships in Indonesia

    2/21

    Outline dari Presentasi

    Tantangan didalam penyediaan air bersihdi Indonesia

    Program Kemitraan para operator air

    (WOPs) Twinning partnerships

  • 7/31/2019 Supporting Water Operators Partnerships in Indonesia

    3/21

    LATAR BELAKANG

    Sebagian besar para operator air di Asia-Pacific termasuk di

    Indonesia (PDAM/PD PAL) memiliki : Infrastruktur yang kurang memadai dan sudah tua

    Lemah dalam hal organisasi

    Kinerja pelayanan yang kurang baik

    Kinerja keuangan yang lemah

    Hubungan dengan pelanggan yang kurang baik

    Tipikal tersebut diatas berdampak kepada :

    Tingginya tingkat kehilangan air (NRW)

    Cakupan dan tingkat pelayanan yang kurang memadai

    Pendapatan yang kecil

    Sistem sanitasi yang tidak tepat dan kurang memadai

  • 7/31/2019 Supporting Water Operators Partnerships in Indonesia

    4/21

    45%Rata-rata NRW di Indonesia

    Penurunan NRW harus menjadi prioritas utama

  • 7/31/2019 Supporting Water Operators Partnerships in Indonesia

    5/21

    5%Cakupan pelayanan air limbahperkotaan.

    Hanya beberapa kota yang memiliki jaringan air limbah

  • 7/31/2019 Supporting Water Operators Partnerships in Indonesia

    6/21

    35%Besarnya biaya operasional untukenergy

    Sistem operasi yang tidak efiktif membuat biaya operasionaltinggi

  • 7/31/2019 Supporting Water Operators Partnerships in Indonesia

    7/21

    PROGRAM WOP ADB DI INDONESIA

    Executing Agency Kementerian PU

    Pendanaan bekerja sama dengan AusAID Durasi pelaksanaan January 2010 to 30 December 2012

    Tujuan: Memperbaiki kinerja operasional dan keuangan PDAM . Menyediakan lingkungan yang memadai agar PDAM dapat

    mengidentifikasi kebutuhan investasi jangka menengah danjangka panjang. Melengkapi inisiatip yang sedang berjalan didalam penyusunan

    rencana bisnis PDAM.

    Output yang diusulkan :

    5 regional twinning partnerships dalam bidang NRW dan 2Sanitasi

    2 domestik twinning partnerships dalam bidang NRW Workshop, training dan produk pengetahuan.

  • 7/31/2019 Supporting Water Operators Partnerships in Indonesia

    8/21

    TWINNING PARTNERSHIPS

    No Perusahaan penerima MentorAIR BERSIH1 PDAM Kabupaten Serang Ranhill, Malaysia2 PDAM Kabupaten Bandung Emasesa, Spain6 PDAM Kota Pekalongan PBA, Penang, Malaysia4 PDAM Kabupaten Bogor Water Corp. Australia5 PDAM Kota Banjarmasin K-Water, KoreaSANITASI6 PD PAL Kota Banjarmasin K-Water, Korea7 PDAM Kota Surakarta Emasesa, SpainTWINNING DOMESTIK8 PDAM Kabupaten Ciamis PDAM Palembang-Penang9 PDAM Kabupaten Tasikmalaya PDAM Palembang-Penang

  • 7/31/2019 Supporting Water Operators Partnerships in Indonesia

    9/21

    KARAKTERISTIK PROGRAM TWINNING

    Durasi 12-18 bulan

    Diawali oleh kunjungan diagnosa selama satu minggu oleh mentor dan

    ADB

    Hasil diagnosa berupa rencana kerja dan MOU.

    Rencana kerja fokus kepada inisiatip daerah percontohan (pilot area)

    Kunjungan penerima kepada mentor untuk melihat yang dapat

    diimplementasikan di tempat penerima.

    Kunjungan 2 - 3 kali Mentor kepada penerima untuk pelaksanaan on-

    the-job training

    Penerima melaksanakan ' pekerjaan rumah ' diantara beberapakunjungan.

    Program Twinning harus menghasilkan penurunan tingkat NRW di pilot

    area atau perbaikan yang terukur di pengolahan air limbah.

  • 7/31/2019 Supporting Water Operators Partnerships in Indonesia

    10/21

    Contoh : RANHILL-SERANG Twinning (NRW)

    Tujuan

    Pembentukan 4 DMA percontohan.

    Memastikan 24/7 penyediaan air dengan perbaikan pengelolaantekanan.

    Menentukan sistem pelaporan agar NRW dapat dipantau setiap

    waktu.

    Mengidentifikasi faktor NRW & mengukur dampak dari upayapenurunannya.

    Aktivitas Kontrol Kebocoran air secara aktif

    PDAM menyediakan:

    Alat deteksi kebocoran, meter DMA, alat ukut tekanan dan debityang kompatibel dengan data logger.

    Data loggers (dual channel flow & pressure)

  • 7/31/2019 Supporting Water Operators Partnerships in Indonesia

    11/21

    CONTOH: K-WATER - PD PAL BANJARMASIN (SANITASI)

    Tujuan

    Membantu perbaikan operational dalam pengolahana air limbah

    dan sistem pengumpulan di pilot area.

    Mereview master plan air limbah & memberikan saran untuk

    investasi rencana pengembangan lebih lanjut untuk pengolahan air

    limbah dan jaringan sistem pengumpul.

    PD PAL Banjarmasin diminta untuk:

    Memperbaik i kualitas data untuk kualitas air limbah.

    Menyediakan investasi untuk data sampling dan alat untuk

    pemeriksaan kualitas air.

    Mempertimbangkan alternatif untuk pengembangan lebih lanjut

    terhadap sistem yang ada dengan penambahan 8 pengolahan air

    skala kecil.

  • 7/31/2019 Supporting Water Operators Partnerships in Indonesia

    12/21

    TERIMA KASIH

    ADB weblink:http://www.adb.org/water/wop/wop.asp

    WaterLinks website:http://www.waterlinks.org

    ADB Project Officer:

    Javier Coloma Brotons [email protected]

  • 7/31/2019 Supporting Water Operators Partnerships in Indonesia

    13/21

    Scope:

    - Energy Audit / Electricity Distribution / CO2 Emission:

    Energy Conservation Measures

    Transformer, Energy Motor / Pump Efficiency Test

    Upgrade Equipment / New Technology

    Review Operation Procedures (Standard and Sector specific)

    - Other EE:

    Demand Management: NRW and Water Conservancy

    Economic Diameter of Distribution Pipes

    ENERGY EFFICIENT WATER MANAGEMENT

  • 7/31/2019 Supporting Water Operators Partnerships in Indonesia

    14/21

    Methodology

    Assess New technologies based on electricity consumption

    Calculate payback and recommend EE investment plan

    Due Diligence: Equipment, References, Budget in each site Output

    Decision to focus only on water production and not ondistribution, pending redesign (ring main vs. dedicatedpipelines) and hydraulic modeling of the network

    ENERGY EFFICIENT WATER MANAGEMENT

  • 7/31/2019 Supporting Water Operators Partnerships in Indonesia

    15/21

    Reliability

    Safety

    Energy Efficiency

    Guarantee delivery

    water service

    Prevent Asset Damage & EnforceOHAS/ISO 18001

    Enforce Asset Management

    & ISO 24512

    Steps

    - Electricity Distribution Survey

    - Linkage to ISO Certification and Continuous ImprovementProcess

    - Critical Review of Process and Operation Procedures and linkageto CAPEX Investment Plan

    - Preventative Maintenance Plan supporting EE

    ENERGY EFFICIENT WATER MANAGEMENT

  • 7/31/2019 Supporting Water Operators Partnerships in Indonesia

    16/21

    Conclusions:

    Studies & audits are usually conservative: Greater savingsand shorter payback should be expected

    Need for Combined Energy Audit with Process and Operation

    Diagnostic (sector specific)

    Refurbishment: Difficulty in shifting OPEX into CAPEX

    Payback of investment: Is Grant funding warranted? How to

    help financing EE in private projects?

    Streamline energy efficiency into operations

    Linkage with CDM, Climate Change

    ENERGY EFFICIENT WATER MANAGEMENT

  • 7/31/2019 Supporting Water Operators Partnerships in Indonesia

    17/21

    AusAID and ADB have agreed to explore the development of an

    PDAM training/accreditation institute Initially focused on water supply, the institute would include

    wastewater training as the sector develops

    The institute will offer PDAM specific technical, managerial,financial management, planning and institutional/policy training

    The institute will target PDAM managers and technical staff,sanitation operators, and local government decision-makers

    The institute will have a central training center, complemented bysatellite regional centers, and potentially offer e-learning

    The institute would work closely with PERPAMSI and other relevant(training) organizations

    The institute should be able to funds its operations through fees

    RATIONALE FOR A WATER ACADEMY

  • 7/31/2019 Supporting Water Operators Partnerships in Indonesia

    18/21

  • 7/31/2019 Supporting Water Operators Partnerships in Indonesia

    19/21

    Management Training

    Water Supply and Sanitation Utilities Management Water & Waste Water Management

    Management SchoolMedium Level Professional Training (Operations)

    Water Production

    -Water Balance

    -Storage

    Water Distribution

    -GIS

    -Hydraulic Modeling

    -Pressure Management

    Sewerage

    -Hydraulic Modeling

    -Pipe rehabilitation and

    cleansing

    Water Treatment

    Waste Water Treatment

    -Process efficiency

    -Electromechanical

    -Automation

    Clients Management

    -Customer attention

    -Billing and payment

    Organization and Control of Water

    Network Installation (Foreman)Installation & Maintenance of Water

    Network s or Sewers (Operator)

    Water Treatment Plant

    Waste Water Treatment Plant (Operator)

    Medium Level Operators Training (TechnicalSpecialization)

    Technical Operators Training (Short Duration)

    Training in Labor Risk Prevention

    - Health

    - Safety

    -Confined spaces work

    Training for Foreman & Operators

    - Welding

    - Pump Maintenance

    - Basic Hydraulics

    - Basic Electricity

    -

    Basic IT

  • 7/31/2019 Supporting Water Operators Partnerships in Indonesia

    20/21

    INITIAL KEY STEPS FOR WATER ACADEMY

    Determine relevant training initiatives currently provided byPERPAMSI, domestic universities,(international) organizations

    Review training mechanisms/modalities in Indonesia thatcould complement traditional classroom training

    Determine current/future capacity building needs of PDAMsand PD PALs

    Draft a curriculum and curriculum management plan

    Determine capacity of existing organizations to take upmanagement of water academy (e.g., PERPAMSI, ITB)

    Develop a detailed three year budget and options for revenuegeneration

    Determine appropriate management/legal structure

  • 7/31/2019 Supporting Water Operators Partnerships in Indonesia

    21/21

    THANK YOU