Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
SUPERIOR QUALITY HEAT INTERFACE UNITSPUTTING YOU IN CONTROL
Pegler Yorkshire
2
PUTTING YOU IN CONTROLDiverse industry expertise combined with cutting-
edge technological innovation mean Pegler Yorkshire’s
Control solutions help you overcome unique
challenges and meet the highest standards in
both performance and system aesthetics.
PERFORMANCE WITH PRECISIONPegler Yorkshire’s Control products enable you to balance precision fl ow control, energy effi ciency and comfort through innovative products and systems that ensure building performance criteria are met and the resulting installation is easy, effi cient and economical to operate.
Our comprehensive Terrier, Meibes and Ballorex product ranges offer proven energy saving solutions, exceptional accuracy and optimised system performance – so, whatever your project or challenge, you can be sure you’ll always be in control.
GLOBAL EXPERIENCE, COMBINED EXPERTISEWith over 100 years of manufacturing and innovation combined with extensive industry knowledge and worldwide market experience, Pegler Yorkshire offers the most advanced and complete Connect & Control systems on a global scale.
As one of Britain’s largest and most respected manufacturers and suppliers of products for the plumbing and heating industries, Pegler Yorkshire is confi dent we can provide you with all the controls, connections and support your project requires.
For more information visit www.pegleryorkshire.co.uk
Pegler Yorkshire
3
Pegler Yorkshire is pleased to be associated with several infl uential industry organisations:
ENERGY EFFICIENT SOLUTIONS SUITABLE FOR CENTRALISED BOILER PLANTSIntroduction 4A comprehensive range for all applications 4-5Service 6Energy effi ciency with improved SAP ratings 7
A TOTAL SUPPORT PACKAGE FOR SPECIFIERS, CONTRACTORS AND FACILITIES MANAGERSBenefi ts 8Choosing the best system for your application 9-11
PRODUCT DETAILSProduct focus 12-13A2 RX Blu-Climate range 14-17A2 UX Blu-Climate range 18-21A1 RX Blu-Climate range 22-25A1 CX Blu-Climate range 26-29
TECHNICAL GLOSSARY 30-31
DISTRICT HEATING SYSTEMS CLIMATE CONTROL 32-33
CONTENTS
Association ofPlumbing and
Heating Contractors
The BathroomManufacturers
Association
British PlumbingEmployers Council
The CopperDevelopmentAssociation
The UKCopper Board
The Chartered Institution of Building Services Engineers
ThermostaticMixing Valve
ManufacturersAssociation
Institute ofPlumbing
Scottish and Northern IrelandPlumbing Employers
Federation
ConstructionProducts
Association
The Brass Page for specifi ers, designers,
engineers and manufacturers
Brass pecCERTIFICATION LTD
Builders MerchantsFederation
The UK District Energy Association
ENERGY EFFICIENT SOLUTIONS SUITABLE FOR CENTRALISED BOILER PLANTS
4
The Meibes brand and German heritage is renowned for its precision engineering quality and
innovative designs that deliver unparalleled performance, effi ciency and ease of installation.
Meibes Heat Interface Units (HIUs) facilitate the use of centralised systems for space heating and domestic hot water in multi-residential buildings. They are high performing units, engineered with fully tested and approved components, designed to provide optimum performance for end users, while ensuring that they are easy to install and maintain.
The Meibes HIUs offered by Pegler Yorkshire have been designed to meet the specifi c needs of the UK market. For example, Meibes HIUs for the UK are confi gured for top-entry pipework for ease of installation in ceiling voids
Pegler Yorkshire also holds a comprehensive range of spares for fast delivery throughout the UK.
Meibes HIUs are pre-fabricated units linked to the central heat source(s) via a network of three pipes – heating fl ow and return and a separate potable water feed. A zone valve in each unit, linked to a standard timer and room thermostats, controls the space heating for each apartment.
A patented Proportional Modulating (PM) valve intelligently prioritises the requirement for domestic hot water (DHW) over heating, in a similar way to a combi boiler.
A COMPREHENSIVE RANGE FOR ALL APPLICATIONSThe breadth of the Meibes HIU range delivers solutions for all types of centralised heating networks serving multi-residential accommodation, ensuring effective control of heating and DHW in apartments and other spaces. The design of HIUs facilitates a balanced system that delivers consistent performance, irrespective of variation in hot water demands or how far the units are from the plant room.
TYPICAL APPLICATIONS Private apartments
Local Authority accommodation
Housing Associations
Student accommodation
Nurse accommodation
Sheltered housing.
5
DESIGN
Performance
Pegler Yorkshire has various high performance Meibes HIU products that are suitable when designing apartments with multiple bathrooms. These ensure reliable performance for individual use and against the overall building requirements. Guidance on network and temperature fl ow rates can also be provided by the Pegler Yorkshire team.
Allocating design space
Meibes HIU headline A2 RX Indirect Heating and Domestic Hot Water units are compact in size at only 500mm wide, enabling them to be fi tted into minimal cupboard space. This also provides the option to fi t them into an appliance space. Further options are also available for direct heating units at 650mm wide.
UK solution
Pegler Yorkshire ensures that UK experience, system design and installation and practices drive the solution to the product, which is why the Meibes range of HIUs is designed to meet UK needs. As a result there is no need to compromise and adapt to HIU’s with a European confi guration.
BUILD
Installation innovation
The Meibes HIU range is part of Pegler Yorkshire Connect & Control, which fully recognises the importance of minimising installation costs whilst ensuring the building performs effi ciently and optimally. Meibes HIUs were one of the fi rst to be designed with a fi rst fi x rail which is available to aid staged installation, supporting the primary network set-up.
No special commissioning required
Meibes HIUs are designed to remove complications and provide clarity on installation. There is no need to have a specialist for commissioning as the standard installation process requires a competent installer to simply follow the specifi er’s set-up parameters.
Expertise
Pegler Yorkshire is one the leading manufacturers of commercial plumbing and heating systems. Our expertise and experience enables contractors to benefi t signifi cantly when it comes to project costs, and technical and service support, by using a connect and control system they can trust.
“Whatever the application, Meibes HIU have the authoritative solution”
ENERGY EFFICIENT SOLUTIONS SUITABLE FOR CENTRALISED BOILER PLANTS
6
SERVICE
Guarantee
Pegler Yorkshire provides ultimate engineering and performance confi dence. Down time can lead to client frustration and experience is the key to a well-managed building project. Meibes HIUs combine high quality components and reliability to deliver a peace of mind proposition which prevents expensive call backs.
Service
Pegler Yorkshire is committed to providing an after service experience that allows peace of mind for contractors and facility managers. A network of service teams is available with dedicated telephone support lines providing technical advice.
guaranteeon movingparts
2year
7
ENERGY EFFICIENCY WITH IMPROVED SAP RATINGSCentralised heating systems are becoming increasingly popular for multi-residential properties as they offer a number of key advantages over decentralised systems with individual boilers in each apartment. These include:
Improved energy effi ciency
11% improvement in SAP ratings (compared to decentralised systems)
No gas installation throughout the building
No fl ues in apartments
Ease of access to heating plant for maintenance
Simple integration of low carbon and renewable heat sources.
Energy-saving features of Meibes HIUs
Meibes HIUs operate on a ‘no demand-no fl ow’ basis, so that when there is no demand for heating or DHW the unit effectively goes into standby. The arrangement minimises the demand on the main network, reduces energy consumption and ensures the apartment is not over-heated.
The performance of the units is based on primary fl ow temperatures of 65°C, enabling use with low carbon heat sources such as heat pumps. The resulting low return water temperatures also help to maximise condensing when condensing boilers are used.
To help ensure minimum heat losses from the system, all pipework is pre-insulated to save energy and reduce onsite insulation work. For further energy savings an A-rated pump aligns water fl ows with heating demand to minimise pump energy consumption.
8
Meibes HIUs deliver key benefi ts for all parties in the supply chain, from initial system design
through to everyday operation and maintenance. All backed by the expertise and support of
Pegler Yorkshire.
BENEFITS FOR SPECIFIERS AND DEVELOPERS Lower capital costs
Reduced installation time
Simpler design of heating systems
Simpler pipework systems
No hot water storage necessary
Improved energy effi ciency and SAP rating
Facilitates integration of different heat sources
All distribution at low pressure and temperature
Easier to gain planning consent.
BENEFITS FOR CONTRACTORS Ease of installation
Faster fi x times
Ability to separate fi rst and second fi x
Ease of access to components
Annual servicing requirement.
BENEFITS FOR FACILITIES/PROPERTY MANAGERS All plant in a single plant room
No need to enter apartments for routine maintenance
Reduced energy consumption
Heat metering for billing residents
Ease of renewables inclusion
Reduced carbon footprint
Reduced annual boiler servicing cost over individual boilers.
A TOTAL SUPPORT PACKAGE FORSPECIFIERS, CONTRACTORS AND FACILITIES MANAGERS
9
CHOOSING THE BEST SYSTEM FOR YOUR APPLICATION
The Meibes HIU range includes a number of different models for different applications. Use the
fl ow chart below to select the most appropriate model for your project.
No. of bathrooms
No. of bathrooms
No. of bathrooms
Heating & DHW
Heating to be connected to
the supply (direct)
orSeparatedvia a heat exchanger (indirect)?
Direct Heating & DHW
Indirect Heating & DHW
Stored DHW requirement?
DHW requirement for shower/
bath?
One
Two
+Accessories
+Accessories
+Accessories
+Accessories
Meibes HIU
A1 RX
Heat Exchanger
Type of Emitter?
Meibes HIU
A2 RX
Meibes HIU
A2 RX
Radiator
Meibes HIU
A2 UX
Meibes HIU
A2 UX
Underfloor
CylinderMeibes
HIU A1 CX
Instantaneous DHW
requirement?
DHW requirement for shower/
bath?
One
Two
DHW requirement for shower/
bath?
One
Two
DHW requirement for shower/
bath?
One
Two
No. of bathrooms
10
SYSTEM BENEFITS Reduces heat losses
Reduces pumped volume around primary circuit
Removes peak load issues
Protects against variation in fl ow and return rates between apartments
Separate heating circuit
Flexible temperature control
Low maintenance requirements.
HEAT INTERFACE
UNIT
RADIATOR/UNDERFLOOR
HEATING
CENTRAL HEAT
GENERATOR
(Primary heating separate to
apartment circuit)
Heating flowHeating returnPotable water
Primary flow
DHW flowPrimary return
Mains water
INDIRECT SYSTEM – A2 RX/A2 UXThe indirect system provides both indirect space heating and indirect DHW. The system uses twin heat exchange units to supply instantaneous DHW and space heating.
The Proportional Modulating Valve operates in the same way as a combi diverter valves. Whenever there is a call for DHW, the PM valve diverts the primary fl ow through the heat exchanger to generate DHW, using all available energy to support the DHW demand. Typically, this results in the heating circuit being closed for just a few minutes, having minimal impact on occupant comfort.
When the DHW demand has been satisfi ed the primary fl ow reverts to the space heating system.
The comprehensive Meibes HIU range ensures that these units can be used with a range of
different system confi gurations.
DIRECT SYSTEM – A1 RXThe direct confi guration delivers the primary heating direct to the apartment circuit, with indirect DHW.
SYSTEM BENEFITS Reduced cost
Less space required in apartment
Low maintenance requirements.HEAT
INTERFACE UNIT
HEAT EMITTER
(Primary heating direct to
apartment circuit)
Heating flowHeating returnPotable water
Primary flow
DHW flowPrimary return
Mains water
CENTRAL HEAT
GENERATOR
INDIRECT FOR CYLINDER SYSTEM – A1 CXWhen using a cylinder system the primary circuit is separate to the secondary circuit, so that hot water is supplied from the cylinder, ensuring hot water is always available. The system incorporates a zone valve which is controlled by standard controls such as a time clock and a room thermostat to switch off the unit when there is no demand, thereby reducing network load.
SYSTEM BENEFITS Simple design
Differential pressure control
Heat usage metered
Hot water reserve in apartment.
CENTRAL HEAT
GENERATOR
DHW CYLINDER
HEATINTERFACE
UNIT
HEAT EMITTER
(Using a cylinder system)
Heating flowHeating returnPotable water
Primary flow
DHW flowPrimary return
Mains water
CHOOSING THE BEST SYSTEM FOR YOUR APPLICATION
11
A2 RX
A1 RX
A1 CX
A2 UX
12
PRODUCT FOCUS
Strainer – protects from system debris and prolongs life
Strainer – protects from system debris and prolongs life
Blending valve
Differential Pressure Control Valve – improved control, performance and installation
Heat exchanger (IH)
Pump – A-rated pump ensures efficient performance
Proportional Modulation Valve – gives priority to heating over DHW
Heat exchanger (DHW) – provides highly efficient performance from a compact unit
Primary return
Primary flow
Cold water mains DHW
Heating flow
Heating return
A2 RX HIU
13
FEATURES Heat meter measures the
differential between fl ow and return temperatures
MID approved factory fi tted ultrasonic heat meters
Conforms to EN1434-3;1997
RHI and OMS compliant
Common Mbus output into data extraction
10 year battery life
Permanent display (shown in kWh).
HEAT METERSMeibes HIUs can be factory-fi tted with optional heat meters, allowing for accurate, measurement of heat energy use in individual apartments. Use of factory-fi tted heat meters reduces onsite work and enables optimum use of skilled labour for more complex tasks. Factory-fi tted units are pressure tested before delivery to site.
Data from the heat meters can be collected manually or via a wired or wireless network. Pre-payment can also be incorporated.
FIX RAILSFirst fi x rails allow a faster installation that can be staged to align with progress on other parts of the project. For example, the fi rst fi x may be carried out in the early stages, with the HIUs themselves being installed later in the project schedule. This reduces the risk of onsite damage to the HIUs.
The fi rst fi x rail is secured to the wall in the appropriate position allowing all plumbing connections to be made, pressure tested, fl ushed and fi lled. Depending on the nature of the contract, this may also support staged billing for work carried out and products installed.
Primary Bypass Module
First fix Rail (also available with Primary Bypass Module)
FEATURES WRAS approved ball valves
Factory sealed fl ow/return connections
Available with bypass for easy system fl ushing
Fix rail supports primary pipe work testing.
FEATURES Ability to consolidate
readings from up to 400 meters
Allows data extraction to be directly or remotely confi gured
Flexible programming allows meter readings to be time defi ned
Data can be retrieved or sent automatically via email as CSV-fi le or xml-fi le
SD card as back-up to prevent risk of data loss.
DATA EXTRACTIONThe most popular form of data extraction from heat meters is an Mbus network connection, which can be pre-fi tted to the heat meter. The data extraction unit sends a master signal to slave meters, which then report on energy consumption data. The readings can be sent via email or pulled directly from the data logger.
Where required, heat meters can be fi tted with radio-based data extraction systems.
Available May 2014
14
PRODUCT DETAILS
MEIBES HIU INDIRECT UNIT
A2 RX BLU-CLIMATE RANGE
15
MEIBES HIUA2 RX BLU-CLIMATE RANGE
The A2 RX is a higher capacity version of the A1 RX, suitable for apartments with two bathrooms.
FEATURES & BENEFITS Designed to provide instantaneous Domestic Hot Water and Indirect Heating
Compact design – 500mm wide
Available in 15 and 19 litres per minute of DHW
HIU enables secondary heating for radiators
High specifi cation Differential Pressure Control Valve
Unique trickle bypass to enable unit primed for DHW
Available with case with window for viewing heat meter
Also available without case for fi tting within an existing cabinet
First fi x rails and bypass option also available
Complete with WRAS approved ball valves
Top connections for easy contractor access.
A2 RX Blu-Climate HIU range options
HIU model With box With heat meter Code
Meibes A2 RX Blu-Climate HIU 15 IDH & HW HM Yes Yes 687900
Meibes A2 RX Blu-Climate HIU 15 IDH & HW Yes No 687901
Meibes A2 RX Blu-Climate HIU 15 IDH & HW HM B No Yes 687902
Meibes A2 RX Blu-Climate HIU 15 IDH & HW B No No 687903
Meibes A2 RX Blu-Climate HIU 19 IDH & HW HM Yes Yes 687904
Meibes A2 RX Blu-Climate HIU 19 IDH & HW Yes No 687905
Meibes A2 RX Blu-Climate HIU 19 IDH & HW HM B No Yes 687906
Meibes A2 RX Blu-Climate HIU 19 IDH & HW B No No 687907
A2 RX Blu-Climate HIU accessory options
Accessory Code
Meibes A2 RX Fix Rail 687550
Meibes A2 RX Fix Rail TP 687551
687902/687906
16
PRODUCT DETAILS
MEIBES HIU TECHNICAL & PERFORMANCE DATA& PERFORMANCE DATA& O C
A2 RX BLU-CLIMATE RANGE
A2 RX Blu-Climate HIU
Technical data
Description
TypeHeat Interface Unit for indirect heating and
instantaneous domestic hot water
Mounting Wall mounted
Size (WxDxH, height of the case) 500 x 350 x 750mm
Heating system 2 pipe flow
Construction
Pipework Fully insulated flexible stainless steel with brass fittings
Plates heat exchanger Stainless steel (heat exchanger space heating fully insulated)
Casing White powder coated sheet steel cover
Primary fluid Low pressure hot water
Secondary fluid – heating Low pressure hot water
Secondary fluid – domestic hot water Potable hot water service
Duty (primary) domestic hot water mode
Heat transfer capacity 42kW 50kW
Flow rate 0.275 l/s (990 l/h) 0.282 l/s (1,014 l/h)
Minimum flow temperature primary 65ºC 65ºC
Duty (secondary) domestic hot water
Heat transfer capacity 42kW @ 40K ΔT 50kW @ 40K ΔT
Flow rate 15 l/min (0.250 l/s) 19 l/min (0.317 l/s)
Fluid temperature in 10ºC 10ºC
Fluid temperature out 50ºC 50ºC
Blending valve 35-65ºC 35-65ºC
Duty (secondary) heating
Capacity 20kW max. @ 20K ΔT 20kW max. @ 20K ΔT
Fluid temperature flow 60ºC @ 65ºC primary flow 60ºC @ 65ºC primary flow
Fluid temperature return 40ºC 40ºC
Pressure
Maximum primary pressure 10bar 10bar
Maximum secondary pressure 3bar 3bar
Minimum supply water pressure 2bar, maximum 4bar 2bar, maximum 4bar
Connections All external connections ¾" ¾"
Fittings – primary and
secondary heating
Secondary circulation pump Wilo ‘A rated’ pump in secondary flow
Expansion vessel 8 litre fitted in secondary flow
Strainer On primary flow and secondary return
Sensor pockets Flow for heat meter
Heat meter Rossweiner ‘HeatSonic’ M-Bus heat meter with permanent display
Differential Pressure Control Valve (DPCV)
Factory set at 30kPa (maximum differential pressure 250kPa)
Primary bypass/trickle bypass Thermostatic bypass between primary flow and return
Air vents Manual
Controls Not pre-fitted – externally mounted single channel time switch + roomstat
Fittings – secondary domestic
hot water serviceControls Proportional modulation controlled
17
Dimensions and clearances
Flow performance
Hydraulic layout
500mm 350mm
750mm
M P
W
1
3
4
5
8
2
16
6
15
Return Flow Cold water mains Domestic hot/cold water DHW Flow Return
Primary side Secondary side
7
10
11
1213 14
3
9
2
Key1 First fix Rail with connection ball valves (not illustrated)2 Strainer3 Provision for test points (½" connection)4 Heat meter5 Differential Pressure Control Valve (DPCV)6 Proportional Modulation Valve (PMV)7 Plate heat exchanger, DHW8 Thermostatic blending valve9 Drain point10 Thermostatic circulation valve (trickle bypass)11 Zone valve. Primary side space heating circuit12 Plate heat exchanger. Space heating13 Pressure gauge, secondary side14 Over pressure relief valve, secondary side15 Expansion vessel16 Circulator pump, secondary side
15L of DHW @ 60ºC
15L of DHW @ 50ºC15L of DHW @ 45ºC
Primary flow rate l/h*
Pri
mar
y flo
w d
egre
es º
C
0
10
20
30
40
50
60
70
80
90
100
0 500 1000 1500 2000 2500 3000 3500
*The primary flow should not exceed 1,000 l/h
36.43kW/cold water 10ºC
41.61kW/cold water 10ºC
51.92kW/cold water 10ºC
19L of DHW @ 45ºC
19L of DHW @ 60ºC
19L of DHW @ 50ºC
0
10
20
30
40
50
60
70
80
90
100
0 500 1000 1500 2000 2500 3000 3500
*The primary flow should not exceed 1,000 l/h
46.15kW/cold water 10ºC
52.70kW/cold water 10ºC
64.76kW/cold water 10ºC
Pri
mar
y flo
w d
egre
es º
C
Primary flow rate l/h*
18
PRODUCT DETAILS
MEIBES HIU INDIRECT UNIT
A2 UX BLU-CLIMATE RANGE
19
MEIBES HIU A2 UX BLU-CLIMATE RANGE
A2 UX models have been specifi cally designed for use with underfl oor heating.
FEATURES & BENEFITS Designed to provide instantaneous Domestic Hot Water and Indirect Heating
Compact design – 500mm wide
Available in 19 litres per minute of DHW
HIU enables secondary heating for underfl oor heating
Integrated thermix module
High specifi cation Differential Pressure Control Valve
Unique trickle bypass to enable unit primed for DHW
Available with case with window for viewing heat meter
Also available without case for fi tting within an existing cabinet
Complete with fi x rails
Bypass option also available
Complete with WRAS approved ball valves
Top connections for easy contractor access.
A2 UX Blu-Climate HIU range options
HIU model With box With heat meter Code
Meibes A2 UX Blu-Climate HIU 19 IDH & HW HM Yes Yes 687930
Meibes A2 UX Blu-Climate HIU 19 IDH & HW Yes No 687931
Meibes A2 UX Blu-Climate HIU 19 IDH & HW HM B No Yes 687932
Meibes A2 UX Blu-Climate HIU 19 IDH & HW B No No 687933
A2 UX Blu-Climate HIU accessory options
Accessory Code
Meibes A2 RX Fix Rail 687550
Meibes A2 RX Fix Rail TP 687551
687932
Available May 2014
20
PRODUCT DETAILS
MEIBES HIU TECHNICAL & PERFORMANCE DATA& PERFORMANCE DATA& O C
A2 UX BLU-CLIMATE RANGE
A2 UX Blu-Climate HIU
Technical data
Description
TypeDistrict heating station for indirect heating and
instantaneous domestic hot water
Mounting Wall mounted
Size (WxDxH, height of the case) 500 x 350 x 750mm
Heating system 2 pipe flow
Construction
Pipework Fully insulated flexible stainless steel with brass fittings
Plates heat exchanger Stainless steel (heat exchanger space heating fully insulated)
Casing White powder coated sheet steel cover
Primary fluid Low pressure hot water
Secondary fluid – heating Low pressure hot water
Secondary fluid – domestic hot water Potable hot water service
Duty (primary) domestic
hot water mode
Heat transfer capacity 50kW
Flow rate 0.282 l/s (1,014 l/h)
Minimum flow temperature primary 65ºC
Duty (secondary) domestic hot water
Heat transfer capacity 50kW @ 40K ΔT
Flow rate 19 l/min (0.317 l/s)
Fluid temperature in 10ºC
Fluid temperature out 50ºC @ 65ºC primary flow temperature
Blending valve 35-65ºC
Duty (secondary)
heating
Capacity 20kW max. @ 20K ΔT
Fluid temperature flow 60ºC @ 65ºC primary flow
Fluid temperature return Max. 40ºC (depends on UFH settings)
Pressure
Maximum primary pressure 10bar
Maximum secondary pressure 3bar
Minimum supply water pressure 2bar
Maximum supply water pressure 4bar
Connections All external connections ¾"
Fittings – primary and
secondary heating
Secondary circulation pump‘Thermix’ underfloor heating module with Grundfos pump
and automatic mixer 20-80ºC
Expansion vessel 12 litre fitted in secondary flow
Strainer On primary flow and secondary return
Sensor pockets Flow for heat meter
Test points Binder style test points
Heat meter Rossweiner ‘HeatSonic’ M-Bus heat meter with permanent display
Differential Pressure Control Valve (DPCV)
Factory set at 30kPa (maximum differential pressure 250kPa)
Primary bypass/trickle bypass Thermostatic bypass between primary flow and return
Air vents Manual
Zone valveFitted with electrical actuator head,
max. differential pressure 100 kPa (kvs=1.85)
Controls Not pre-fitted – externally mounted single channel time switch + roomstat
Fittings – secondary domestic
hot water serviceControls Proportional modulation controlled
21
Dimensions and clearances
Flow performance
Hydraulic layout
500mm 350mm
750mm
M P
W
1
3
4
5
82
16
6
15
Return FlowCold water
mains
Domestic hot/cold water
DHW Flow Return
Primary side Secondary side
7
10
11
1213 14
3
9
2
Key1 First fix rail with isolating ball valves2 Strainer3 Provision for test points (½" connection)4 Heat meter5 Differential Pressure Control Valve (DPCV)6 Proportional Modulation Valve (PMV)7 Plate heat exchanger, DHW8 Thermostatic blending valve9 Drain point10 Thermostatic circulation valve (trickle bypass)11 Zone valve. Primary side space heating circuit12 Plate heat exchanger. Space heating13 Pressure gauge, secondary side14 Over pressure relief valve, secondary side15 Expansion vessel16 Underfloor heating, module secondary side (inc. pump mixer)
15L of DHW @ 60ºC
15L of DHW @ 50ºC15L of DHW @ 45ºC
Primary flow rate l/h*
Pri
mar
y flo
w d
egre
es º
C
0
10
20
30
40
50
60
70
80
90
100
0 500 1000 1500 2000 2500 3000 3500
*The primary flow should not exceed 1,000 l/h
36.43kW/cold water 10ºC
41.61kW/cold water 10ºC
51.92kW/cold water 10ºC
19L of DHW @ 45ºC
19L of DHW @ 60ºC
19L of DHW @ 50ºC
0
10
20
30
40
50
60
70
80
90
100
0 500 1000 1500 2000 2500 3000 3500
*The primary flow should not exceed 1,000 l/h
46.15kW/cold water 10ºC
52.70kW/cold water 10ºC
64.76kW/cold water 10ºC
Pri
mar
y flo
w d
egre
es º
C
Primary flow rate l/h*
22
PRODUCT DETAILS
MEIBES HIU DIRECT UNIT
A1 RX BLU-CLIMATE RANGE
23
MEIBES HIUA1 RX BLU-CLIMATE RANGE
The A1 RX unit provides direct heating and instantaneous hot water.
FEATURES & BENEFITS Designed to provide instantaneous Domestic Hot Water and Direct Heating
Compact design – 600mm wide
Available in 17 litres per minute of DHW
HIU enables differential pressure controlled primary heating for radiators
Unique trickle bypass to enable unit primed for DHW
Includes heat meter (optional)
Also available without case for fi tting within an existing cabinet
Complete with fi x rails and connectors for top connection
Complete with WRAS approved ball valves.
A1 RX Blu-Climate HIU range options
HIU model With box With heat meter Code
Meibes A1 RX Blu-Climate HIU 17 DH & HW HM Yes Yes 687950
Meibes A1 RX Blu-Climate HIU 17 DH & HW Yes No 687951
Meibes A1 RX Blu-Climate HIU 17 DH & HW HM B No Yes 687952
Meibes A1 RX Blu-Climate HIU 17 DH & HW B No No 687953
A1 RX Blu-Climate HIU accessory options
Accessory Code
Meibes A1 RX Fix Rail (for bottom connection) 687570
Meibes A1 RX Fix Rail (for top connection) 687573
Meibes A1 RX Hose Flush 687571
Meibes A1 RX Water Meter 687572
Top connection Bottom connection
24
PRODUCT DETAILS
MEIBES HIU TECHNICAL & PERFORMANCE DATA& PERFORMANCE DATA& O C
A1 RX Blu-Climate HIU
Technical data
Description
Type Apartment substation for direct and instantaneous domestic hot water
Mounting Wall mounted
Size (WxDxH, height of the case) 600 x 210 x 800mm
Heating system 2 pipe flow
Construction
Pipework Fully insulated flexible stainless steel with brass fittings
Plate heat exchanger Stainless steel heat exchanger for domestic hot water (non-insulated for fast cool down/insulated if optional sanitary circulation)
Casing White powder coated sheet steel cover
Heating fluid Low pressure hot water
Domestic hot water Potable hot water service
Duty (primary) domestic
hot water mode
Heat transfer capacity 46kW
Primary flow rate 910 l/h
Minimum flow temperature primary 65ºC
Duty (sanitary)
Flow rate 17 l/min
Flow limiter Internal choke disk at cold water inlet
Fluid temperature in 10ºC
Fluid temperature out 50ºC @ 65ºC primary flow temperature
Blending valve 35-65ºC
Duty (space heating) Capacity 10kW max. @ 20K ΔT
Pressure
Maximum primary pressure 6bar
Maximum supply water pressure 10bar
Optimal supply water pressure 2bar
Temperatures Maximum operating temperature 110ºC
Connections All external connections ¾"
Fittings – heating
Strainer (optional) In primary flow inlet and/or space heating return (not LogoComfort Basis 600 plus)
Sensor pockets Sensor pocket in primary flow for optional heat meter
Heat meter mounting 110mm spool piece in primary return flow
Heat meter (optional) Rossweiner ‘HeatSonic’ M-Bus heat meter with permanent display
Differential Pressure Control Valve (optional)
Mounted in primary flow. Factory set = 30kPa, maximum differential pressure = 250kPa
Primary bypass/trickle bypass Thermostatic bypass between primary flow and return (adjustable 45-65ºC)
Air vents Manual
Zone valve In space heating return flow for optional electric actuator head mounting kvs = 1.85
Heating control (optional) Externally mounted electronic room heating control
Fittings – domestic hot water service
Control Proportional flow control with priority switch
Water meter mounting (optional) 110mm spool piece in cold water inlet
Water meter (optional) Rossweiner water meter, M-Bus
Connection (optional) Second cold water outlet after water meter
Sanitary circulation (optional) Sanitary circulation pump Wilo Star-Z Nova (P max = 4.5W) and external time switch
A1 RX BLU-CLIMATE RANGE
25
Dimensions and clearances Hydraulic layout
600mm 210mm
800mm
Flow performance
0
10
20
30
40
50
60
70
80
90
100
0 500 1000 1500 2000 2500 3000 3500
*The primary flow should not exceed 1,000 l/h
46.6kW/cold water 10ºC
53.2kW/cold water 10ºC
65.6kW/cold water 10ºC
Pri
mar
y flo
w d
egre
es º
C
Primary flow rate l/h*
17L of DHW @ 45ºC
17L of DHW @ 50ºC
17L of DHW @ 60ºC
M
21
5
4
Heatingflow
Heatingreturn
Primaryreturn
Potablewater
DHW Coldwatermains
Primaryflow
3
4
6
7
8
9
1010
11
12
13
Key1 Stainless steel plate heat exchanger2 Proportional Modulation Valve (PMV)3 Flow restrictor disc 17 l/min4 Bleed point5 Zone valve (space heating control unit – optional)6 Balancer or Differential Pressure Control Valve (DPCV) – optional7 Thermostatic circulation bridge 45...65ºC – optional8 Spool piece for heat meter (L=110mm, 2 x ¾" outer thread)9 ½" blind plug – to be replaced by temp. sensor pocket for
flow sensor (heat meter)10 Strainer11 Isolating ball valve ¾" female connection – optional12 Male connection/thread spool piece for cold water meter
(L=110mm, 2 x ¾" outer thread) – optional13 Blending valve (thermostatic hot water mixing valve) – optional
26
PRODUCT DETAILS
MEIBES HIU INDIRECT UNIT FOR UFH AND CYLINDERSFOR UFH AND CYLINDERSO U C S
A1 CX BLU-CLIMATE RANGE
27
MEIBES HIUA1 CX BLU-CLIMATE RANGE
A1 CX units are for use with a separate hot water cylinder and have the capacity to serve
apartments with two bathrooms.
FEATURES & BENEFITS Designed to suit projects where stored water is preferred
Compatible with pre-plumbed unvented cylinders
Complete with heat meter
Available with case with window for viewing heat meter
Also available without case for fi tting within an existing cabinet
Includes high specifi cation Differential Pressure Control Valve
Top connections for easy contractor access
Flow and primary return test points included
Built-in strainer for unit.
687972 687974
A1 CX Blu-Climate HIU range options
HIU model With box With heat meter Code
Meibes A1 CX Blu-Climate HIU 20K DH & HW HM Yes Yes 687970
Meibes A1 CX Blu-Climate HIU 20K DH & HW Yes No 687971
Meibes A1 CX Blu-Climate HIU 20K DH & HW HM B No Yes 687972
Meibes A1 CX Blu-Climate HIU 20K DH & HW B No No 687974
A1 CX Blu-Climate HIU accessory options
Accessory Code
Meibes A1 CX Fix Rail 687424
Meibes A1 CX Fix Rail and Bypass 687485
28
PRODUCT DETAILS
MEIBES HIU TECHNICAL & PERFORMANCE DATA& PERFORMANCE DATA& O C
A1 CX BLU-CLIMATE RANGE
A1 CX Blu-Climate HIU
Technical data
Description
TypeDistrict heating station to be installed in conjunction
with a pre-plumbed unvented cylinder
Mounting Wall mounted with top or bottom connections
Size (WxDxH, height of the case) 400 x 180 x 500mm
Heating system 2 pipe flow
Construction
Pipework Fully insulated flexible stainless steel with brass fittings
Plate heat exchanger Fully insulated stainless steel
CasingWhite powder coated sheet steel cover with viewing window for the heat meter
Primary fluid Low pressure hot water
Secondary fluid Low pressure hot water
Duty (primary)
Heat transfer capacity 20kW max. @ 30K ΔT (500 l/h)
Fluid temperature flow 65ºC @ 70ºC primary flow
Fluid temperature return 40ºC
PressureMaximum primary pressure 10bar
Maximum secondary pressure 3bar
Connections All external connections ¾" female ball valves 4x: optional ‘First fix rail’
Fittings – primary side
Strainer On primary flow
Test points Binder style test points
Sensor pocket Primary flow temperature sensor for heat meter
Heat meter Rossweiner ‘HeatSonic’ M-Bus heat meter with permanent display
Solenoid valve (optional) Not pre-fitted – fitted via removable spool piece
Differential Pressure Control Valve (DPCV)
Factory set at 30kPa (maximum differential pressure 250kPa)
Air vents Manual
Zone valveFitted with electrical actuator head
maximum differential pressure 100kPa (kvs=1.85)
29
Dimensions and clearances Hydraulic layout
400mm 180mm
500mm
M
M W
ReturnReturn FlowFlow
Primary sideSecondary side
2
11
8888
3
94
5
76
Key1 Test points2 Strainer3 Spool piece for heat meter (L=110mm, 2 x ¾" outer thread)4 Differential Pressure Control Valve (DPCV)5 Zone valve6 Plate heat exchanger7 Bleed points8 ¾" ball valves (not illustrated)9 Solenoid valve (optional)
MEIBES HEAT INTERFACE UNITTECHNICAL GLOSSARY
30
Meibes heat interface unit
Features Benefits
Designed specifically for UK Designed to meet UK requirements to avoid installation and performance issues. Comprehensive spare stocks available in UK.
Top entry connections Top entry pipework facilitates pipework runs in ceiling voids for quicker, simpler and more cost effective connection.
First fix rail
Enables faster installation and facilitates staged installation to suit the project timetable and contractor’s schedule. Also allows earlier primary testing of the main heat network. The first fix rail allows all plumbing connections to be made, pressure tested, flushed and filled before installation of the main unit, thereby reducing risk of damage and supporting staged applications for payment where appropriate.
All pipework is pre-insulated Minimises heat loss for higher energy efficiency, while also improving end user comfort by preventing heat transfer to property during summer.
Integrated Differential Pressure Control Valve (DPCV)
Integrated DPCV make the system ‘self balancing’ and ensures each unit only draws as much energy/flow as it requires in conjunction with a Proportional Modulating Valve. Results in a simpler design with improved control and less noise.
Vertically mounted, un-insulated Domestic Hot Water heat exchanger (DHW)
Uninsulated vertical heat exchanger accelerates cooling of DHW heat exchanger through convection and thermal radiation, minimising limescale formation, maintaining high performance and extending life of units.
Proportional Modulating Valve (PMV)
Gives priority to DHW generation over space heating to ensure full DHW performance. Primary flow rates are matched to cold water input.
Carbon coated operating rod in PM valve, with ceramic disk
Carbon coating provides self lubricating operation, with ceramic disc removing limescale each time the valve operates to deliver a longer, trouble free, service life.
Indirect energy supply Separates main primary circuit from secondary circuits, ensuring issues in either do not impact on the other. Also provides clear demarcation where different contractors are used for primary and secondary circuit installation.
No demand – no flow With no demand for hot water or heating the unit is effectively on standby with no flow (see trickle bypass). Minimises demand on main network, reduces energy costs and avoids ‘overheating’ of space where unit is fitted.
‘A-rated’ pump The electronic pump is an ‘A-rated’ Wilo pump which delivers energy-savings due to only using the minimum amount of electricity.
Blending valve Controls maximum temperature of DHW from the heat exchanger at 60ºC. The blend valve allows the temperature to adjust from 60ºC down to 35ºC depending on the application requirement.
Trickle bypass (included)Ensures that the prime flow is hot when the unit is switched off, ensuring quicker response times for DHW demand and eliminating ‘cold legs’ in network where HIUs are some distance from the main network. Avoids need for bypasses on risers, thereby simplifying network design.
Performance based on lower primary flow temperatures – 65ºC
Ensures maximum performance with condensing boilers and supports use of low carbon heat sources (e.g. heat pumps) with lower primary flow temperatures.
Return temperature limited (RTL) valve
An optional RTL is available if required to allow the return temperature to be limited. This protects the boiler from excessive temperatures.
Optional factory fitted, heat meter
Allows accurate measurement of individual energy use. Pressure tested and fitted at factory, reducing on site labour and risk. Range of options to suit project requirements – ultrasonic or mechanical. M-Bus, radio, manual reading, prepayment.
Potable water circuit WRAS approved to meet UK requirements and compliant with European Drinking Water directive, in line with Pegler Yorkshire’s commitment to highest quality and safety.
Warranties 2 year warranty on the unit and moving parts such as pump (on selected units).
Designed for ease of servicing Ease of access to all components ensures annual servicing can be completed quickly and efficiently.
Reduced lifecycle costs Product quality and ease of servicing ensure minimal cost of ownership with sustained high efficiency and performance.
Flexible stainless steel pipework Reduces thermal expansion stresses for quieter operation during warm up and cool down. Easier future servicing due to flat face connections. In the unlikely event of a need for component replacement, flexible pipework makes re-connection easier.
Test points Allows confirmation of flow pressure and temperature.
Strainers on primary and secondary circuits
Help to capture debris from either circuit, thereby protecting heat exchangers and/or other components, as well as extending service life. Strainer cleaning is included in annual servicing.
Vertically mounted insulated heat exchanger for heating circuit
Ensures heating circuit heat exchanger remains at temperature without introducing ‘heat’ to the unit. Lack of cycling and appropriate water treatments ensure that limescaling is not an issue.
Simple, straightforward control wiring External control wiring is similar to a conventional combi boiler and therefore familiar to installers.
31
Indirect system A2 RX/A2 UX
Direct systemA1 RX
Indirect for cylinder systemA1 CX
32
MEIBES BLU-CLIMATE
A2 RX HIU
Indirect DHWIndirect SH
MEIBES BLU-CLIMATE
A2 UX HIU
Indirect DHWIndirect SH
MICRO CHP
BIOMASS
GAS
HEAT INTERFACE UNIT
HEAT INTERFACE UNIT
MEIBES BLU-CLIMATE
A1 RX HIU
Indirect DHWDirect SH
MEIBES BLU-CLIMATE
A1 CX HIU
Indirect DHWIndirect SH
HEAT INTERFACE UNIT
HEAT INTERFACE UNIT
DHWCYLINDER
DATAEXTRACTION
UNIT
Heating flowHeating returnPotable water
Primary flow
DHW flowPrimary return
Mains water
2
4
1
5 5
5 5
5 5
1
1
1
DISTRICT HEATING SYSTEMSCLIMATE CONTROL
Market-leading Cost effective Highly versatile
metal push-fi t
Exceptional performance press-fi t for the widest variety of applications.
Strong, reliable press-fi t with simple, heat-free installation
Connect with confi dence
1 2 3
33
DHW flow
DHW flow
DHW flow
DHW flow
UNDERFLOOR HEATING CIRCUIT
HEAT EMITTER
HEAT EMITTER
HEAT EMITTER
5 5
5 5
5 5
3
6
6
6
6
6
6
6
6
6
6
6
6
Commission and system balancing that optimises building system performance
Energy-saving radiator valves that maximise comfort
Putting you in control
4 5 6 Elegantly designed,
exceptional quality taps and showers
NOTES
34
35
UK ENQUIRIES
UK SALESFree Phone: 0800 156 0010Free Fax: 0808 156 1011Email: [email protected]
TECHNICAL HELPFree Phone: 0800 156 0050Free Fax: 0808 156 1012Email: [email protected]
BROCHURE HOTLINEFree Phone: 0800 156 0020Free Fax: 0808 156 1011Email: [email protected]
INTERNATIONAL ENQUIRIES
EXPORTTel: +44 (0) 1302 855 656Fax: +44 (0) 1302 730 513Email: [email protected]
Follow us on
Registered in England Company No. 00401507
All brand names and logo styles are registered trademarks. Maintaining a policy of continual product development, Pegler Yorkshire reservesthe right to change specifi cations, design andmaterials of products listed in this publication without prior notice
Pegler Yorkshire
HEAD OFFICE
Pegler Yorkshire Group LimitedSt. Catherine’s Avenue, Doncaster, South Yorkshire DN4 8DF, England
Tel: +44 (0) 844 243 4400Fax: +44 (0) 844 243 9870Email: [email protected]
www.pegleryorkshire.co.ukLIT.REF: 880153.03.14