Sumner County SchoolsProposedBuildingProgramPresentation November18,2014
7/25/2019 Sumner County Schools Building Program
3/82
Critical Issues Growth
PortableClassrooms
60Portable
Classrooms
in
Use
AgingInfrastructure
HVACReplacement
RoofReplacement
DoorandWindowReplacement
SiteDrainage
Issues
27177
27588
27835
28115
28508
28705
27000
27200
27400
27600
27800
28000
28200
28400
28600
28800
20092010 20102011 20112012 20122013 20132014 20142015
TotalEnrollment20092015
7/25/2019 Sumner County Schools Building Program
4/82
2012 Project List - StatusTheprojectslistedbelowwereproposedorunderwayinApril2012:
Complete AdditiontoStationCampHighSchool
Complete ReroofRucker
Stewart
Middle
Complete ReroofEllisMiddle
InConstruction AdditionandHVACrenovationtoHendersonvilleHS
InConstruction AdditiontoGallatinHighSchool
InConstruction Dr.WilliamBurrusElementarySchoolatDrakesCreek
StillProposed RenovationtoBeechHighSchool
StillProposed RenovationtoWhiteHouseHighSchool
StillProposed AdditiontoClydeRiggsElementary
StillProposed AdditiontoGuildElementary
StillProposed Addition
to
Hawkins
Middle
7/25/2019 Sumner County Schools Building Program
5/82
Current ProjectsClassroom/SecureEntranceAdditionandHVACRenovationtoHendersonvilleHS:Thetotalprojectisapproximately65%completeandonschedule.
7/25/2019 Sumner County Schools Building Program
6/82
Current ProjectsClassroomAdditiontoGallatinHighSchool:Thenewsecurevestibuleiscompleteintheexistingbuilding.
Thetotalprojectisapproximately50%completeandonschedule.
7/25/2019 Sumner County Schools Building Program
7/82
Current ProjectsNewDr.WilliamBurrusElementarySchoolatDrakesCreekSiteworkisnearlycompletewithfootingsandfloorslabunderway.
Thetotalprojectisapproximately20%completeandonschedule.
7/25/2019 Sumner County Schools Building Program
8/82
Proposed Building ProgramRenovationsandAdditions:
BeechHighSchool
White
House
High
SchoolClydeRiggsElementary
GuildElementary
HawkinsMiddle
JackAndersonElementary
StationCamp
Middle
NannieBerryElementary
WattHardisonElementary
WaltonFerryElementary
George
Whitten
ElementaryGeneBrownElementary
VenaStuartElementary
7/25/2019 Sumner County Schools Building Program
9/82
Proposed Building ProgramHVACUpgrades:
RuckerStewartMiddleSchool
Ellis
Middle
SchoolMadisonCreekElementary
BeechElementary
Reroofing:
GallatinHigh
School
IndianLakeElementary
HowardElementary
DoorandWindowUpgrades:
MadisonCreekElementary
HB
Williams
ElementaryShaferMiddleSchool
WhiteHouseMiddleSchool
BennyBillsElementary
WestmorelandHighSchool
WestmorelandMiddle
School
7/25/2019 Sumner County Schools Building Program
10/82
Beech High School GeneralInfo:Enrollment:1,285
CoreCapacity:1,600
Portables:0
OriginalConstruction:
1979
Sprinkled:Partial
Existingarea:184,200/67,508sf
Newarea:2,000sf
7/25/2019 Sumner County Schools Building Program
11/82
Beech High School ProposedScope:Newarchitecturalentranceformainbuildingwithsecuredaccess
Newsecureentrancetoannexwithsecureandaccessible
walkway
to
main
buildingNewroofformainbuilding
Renovaterestrooms
Newsciencelabcasework
Newfloor/base
Newceiling
and
lights
Newpaint
Newelevatorinmainbuilding
Renovateauditorium(lights,seats,finishes,stagefloor,curtains)
Replace
exterior
doors
in
main
building
and
annexReplaceexistingwatersourceheatpumps
Electricalupgrades
7/25/2019 Sumner County Schools Building Program
12/82
Beech High School
Secure,accessiblepedestrianbridgebetweenBeechHSandAnnexBuilding
ProposednewsecureentrancetoBeechHS
7/25/2019 Sumner County Schools Building Program
13/82
Beech High School
SchematicFloor
Plan
7/25/2019 Sumner County Schools Building Program
14/82
Beech High School
Enlargedfloor
plan
of
new
secure
entrance
and
administrative
suite
7/25/2019 Sumner County Schools Building Program
15/82
Beech High School
SchematicSite
Plan
showing
secure
entrances
and
accessible
walkways
7/25/2019 Sumner County Schools Building Program
16/82
Beech High School PreliminaryBudget:
ArchitecturalRenovation:
NewConstruction/Renovation:
HVACandElectrical:
SiteDevelopment:
PedestrianBridge:
NewRoof:
Contingency:
Preliminary
Construction
Budget:
SiteSurvey:
Geotechnical:
FMReview:
KBJMArchitects:
OLGEngineers:
CivilSite:
PreliminarySoftCosts:
TotalPreliminaryProjectBudget:
$7,372,000
$540,000
$1,400,000
$550,000$500,000
$1,500,000
$300,000
$12,162,000
$5,000
$5,000
$20,000
$442,100$140,000
$26,000
$638,100
$12,800,100
7/25/2019 Sumner County Schools Building Program
17/82
White House High School GeneralInfo:
Enrollment:893
CoreCapacity:1,100
Portables:0
OriginalConstruction:
1975
Sprinkled:Partial
Existingarea:124,015/90,171sf
Newarea:N/A
7/25/2019 Sumner County Schools Building Program
18/82
White House High SchoolScope:
ReplaceicebuildHVACsystem
Replacegymbleachers
Replacedoorsandhardware
Newsciencelabcasework
Additionalsecuritycameras(interior/exterior)
Newflooringandbase
Newceilingandlights
Newpaint
Renovaterestrooms
AddresssewersmellinLockerRoom
Electricalupgrades
HVACControls
7/25/2019 Sumner County Schools Building Program
19/82
White House High School
SchematicFloor
Plan
7/25/2019 Sumner County Schools Building Program
20/82
White House High School PreliminaryBudget:
ArchitecturalRenovation: $4,960,000
SystemsRenovation: $2,000,000
Contingency: $
200,000PreliminaryConstructionBudget: $7,160,000
FMReview: $ 20,000
KBJMArchitects: $ 188,000
OLGEngineers: $
150,000
CivilSiteDesignGroup: $ 20,000
PreliminarySoftCosts: $ 378,000
TotalPreliminary
Project
Budget: $7,538,000
7/25/2019 Sumner County Schools Building Program
21/82
Clyde Riggs Elementary School GeneralInfo:
Enrollment:236
CoreCapacity:480
ClassroomCapacity:390
Portables:3
Afterschool(YMCA)
Speech
Headstart Storage
OriginalConstruction:1952
Sprinkled:No
Existingarea:41,235sf
Newarea:
2,500sf
7/25/2019 Sumner County Schools Building Program
22/82
Clyde Riggs Elementary School Scope:
NewLibrary
Renovateoldlibraryforclassroom,speechandexpandedadmin.
RenovateCafeteria(moistureissue;floorcracks)
Addcasework
storage
to
each
classroom
Replacetilefloors
Clean/repairterazzo floorsinrestrooms
Paint
Renovaterestrooms
Replacelighting
Enclosewalkwaybetweenmainbuildingandplayroom
Abateasbestos(separateproject)
Replacetranslucentwindowunits
Add/reworkparking
Newchair
lift
at
stair
Renovatemainelectricalroom/bookstorage
Upgradeelectricalserviceifneeded
Coveredwalkfrombackhallwaytoplayroomandheadstart building
ReplaceremainingclassroomHVAC/Bard
HVACControls
7/25/2019 Sumner County Schools Building Program
23/82
Clyde Riggs Elementary School
SchematicFloor
Plan
7/25/2019 Sumner County Schools Building Program
24/82
Clyde Riggs Elementary School
Schematic
Site
Plan
7/25/2019 Sumner County Schools Building Program
25/82
Clyde Riggs Elementary School PreliminaryBudget:
NewConstruction: $ 450,000
ArchitecturalRenovation: $1,650,000
Systems
Renovation: $
380,000SiteDevelopment: $ 380,000
Contingency: $ 60,000
PreliminaryConstructionBudget: $2,920,000
SiteSurvey: $
5,000
Geotechnical: $ 5,000
FMReview: $ 5,000
KBJMArchitects: $ 90,000
OLGEngineers: $
35,000
CivilSite: $ 21,000
PreliminarySoftCosts: $ 161,000
TotalPreliminaryProjectBudget: $3,081,000
7/25/2019 Sumner County Schools Building Program
26/82
Guild Elementary School GeneralInfo:
Enrollment:670
CoreCapacity:520
ClassroomCapacity:540
Portables:9
2nd Grade
3rd Grade
Sp.Ed.
Sp.Ed.
ELL
4th Grade
Title1
Art
Music
OriginalConstruction:1955
Sprinkled:No
Existingarea:65,330sf
Newarea:20,400sf
ProposedCore:
840
ProposedClassroomCapacity:780
7/25/2019 Sumner County Schools Building Program
27/82
Guild Elementary School
Scope:
12classrooms;restrooms;storage
Standingseam
metal
roof
to
match
existing
Expandkitchen/cafeteria
Newloopdriveandsitecirculation
Newsidewalksandcanopyfrombackofexpandedcafeteria
Newsportsfloorforexistingplayroom
Electricalservice
relocation
7/25/2019 Sumner County Schools Building Program
28/82
Guild Elementary School
SchematicFloor
Plan
7/25/2019 Sumner County Schools Building Program
29/82
Guild Elementary School
SchematicSite
Plan
showing
additions,
new
site
circulation
and
loop
drive
7/25/2019 Sumner County Schools Building Program
30/82
Guild Elementary School Budget:
NewConstruction:
KitchenEquipment:
Renovation:
SiteDevelopment:
Contingency:
PreliminaryConstructionBudget:
SiteSurvey:
Geotechnical:FMReview:
KBJMArchitects:
OLGEngineers:
CivilSite:
Furniture:Technology:
PreliminarySoftCosts:
TotalPreliminaryProjectBudget:
$2,750,000
$ 500,000
$ 250,000
$1,400,000$ 150,000
$5,050,000
$ 5,000
$
5,000$ 7,500
$ 172,500
$ 45,000
$ 35,000
$
93,000$ 84,000
$ 447,000
$5,497,000
7/25/2019 Sumner County Schools Building Program
31/82
Hawkins Middle School GeneralInfo:
Enrollment:492
CoreCapacity:500
ClassroomCapacity:500
Portables:4
Chorus
Gifted
English
SocialStudies
OriginalConstruction:1988
Sprinkled:Yes
Existingarea:72,210sf
Newarea:11,000sf
ProposedCore:
800
ProposedClassroomCapacity:650
7/25/2019 Sumner County Schools Building Program
32/82
Hawkins Middle School Scope:
4newclassrooms;restrooms;storage
2newsciencelabs
Expanded
kitchenNewsidewalksandcanopyfrombackofnewclassrooms
Additionalparking(seesiteplan)
HVACControls,Replacezonecontrols
RemainingHVACtobereplaced
7/25/2019 Sumner County Schools Building Program
33/82
Hawkins Middle School
SchematicFloor
Plan
7/25/2019 Sumner County Schools Building Program
34/82
Hawkins Middle School
Schematic
Site
Plan
showing
addition,
canopies
and
new
parking
7/25/2019 Sumner County Schools Building Program
35/82
Hawkins Middle School Budget:
NewConstruction:
KitchenEquipment:
Renovation:
SiteDevelopment:
Contingency:
PreliminaryConstructionBudget:
SiteSurvey:
Geotechnical:FMReview:
KBJMArchitects:
OLGEngineers:
CivilSite:
Furniture:Technology:
PreliminarySoftCosts:
TotalPreliminaryProjectBudget:
$1,480,000
$ 500,000
$ 450,000
$
870,000$ 100,000
$3,400,000
$ 5,000
$
5,000$ 4,500
$ 86,000
$ 45,000
$ 39,000
$
46,500$ 42,000
$ 273,000
$3,673,000
7/25/2019 Sumner County Schools Building Program
36/82
Jack Anderson Elementary GeneralInfo:
Enrollment:710
CoreCapacity:875
ClassroomCapacity:685
Portables:1
PTOOffice
OriginalConstruction:1999
Sprinkled:Yes
Existingarea:71,770sf
Newarea:
6,500sf
ProposedCore:Unchanged
ProposedClassroomCapacity:865
7/25/2019 Sumner County Schools Building Program
37/82
Jack Anderson Elementary Scope:
6newclassroomswithstandingseammetalrooftomatchexisting
UpgradeexteriorHMdoors/framestoaluminum
Reworksitecirculationforbettertrafficflow
NewHeatExchanger/FluidCooler
Replaceboiler
7/25/2019 Sumner County Schools Building Program
38/82
Jack Anderson Elementary
7/25/2019 Sumner County Schools Building Program
39/82
Jack Anderson Elementary
SchematicSite
Plan
showing
addition,
expanded
canopy
and
new
site
circulation
7/25/2019 Sumner County Schools Building Program
40/82
Jack Anderson Elementary Budget:
NewConstruction:
Renovation:
SiteDevelopment:
Contingency:PreliminaryConstructionBudget:
SiteSurvey:
Geotechnical:
FMReview:
KBJMArchitects:
OLGEngineers:
CivilSite:
Furniture:
Technology:PreliminarySoftCosts:
TotalPreliminaryProjectBudget:
$ 875,000
$ 475,000
$ 600,000
$
50,000$2,000,000
$ 5,000
$ 5,000
$
3,500$ 43,000
$ 35,000
$ 22,000
$ 46,000
$
42,000$ 201,500
$2,201,500
7/25/2019 Sumner County Schools Building Program
41/82
Station Camp Middle GeneralInfo:
Enrollment:759
CoreCapacity:840
ClassroomCapacity:645
Portables:3
Math
SocialStudies
Speech/Language
OriginalConstruction:2003
Sprinkled:Partial
Existingarea:103,780sf
Newarea:
24,000sf
ProposedCore:1,000
ProposedClassroomCapacity:945
7/25/2019 Sumner County Schools Building Program
42/82
Station Camp Middle Scope:
12newclassrooms;restrooms;storage;Asst.Prin.office
Standingseammetalrooftomatchexisting
NewKitchen;expandedcafeteriaandgreaseinterceptor
Reworkdrivesandparking(seesiteplan)
Replaceexteriordoors(notclassroomdoors)
Gradeplayareabetweenmiddleandelementaryschools
Addsmallcoveredpavilionforplayarea
Rework/expandexisting
geothermal
fields
7/25/2019 Sumner County Schools Building Program
43/82
Station Camp Middle
SchematicFloor
Plan
7/25/2019 Sumner County Schools Building Program
44/82
Station Camp Middle
SchematicSite
Plan
showing
addition,
new
parking,
drives
and
play
area
7/25/2019 Sumner County Schools Building Program
45/82
Station Camp Middle Budget:
NewConstruction:
KitchenEquipment:
Renovation:
SiteDevelopment:
Contingency:
PreliminaryConstructionBudget:
SiteSurvey:
Geotechnical:FMReview:
KBJMArchitects:
OLGEngineers:
CivilSite:
Furniture:Technology:
PreliminarySoftCosts:
TotalPreliminaryProjectBudget:
$3,645,000
$ 500,000
$ 20,000
$1,200,000$ 235,000
$5,600,000
$ 5,000
$
5,000$ 9,000
$ 196,000
$ 45,000
$ 38,000
$
93,000$ 84,000
$ 475,000
$6,075,000
7/25/2019 Sumner County Schools Building Program
46/82
Nannie Berry Elementary GeneralInfo:
Enrollment:614
CoreCapacity:750
ClassroomCapacity:540
Portables:2
Guidance
Music
OriginalConstruction:1963
Sprinkled:No
Existingarea:73,098sf
Newarea:
8,000sf
ProposedCore:Unchanged
ProposedClassroomCapacity:750
7/25/2019 Sumner County Schools Building Program
47/82
Nannie Berry Elementary Scope:
6classrooms;restrooms;storagewithstandingseammetal
roof tomatchexisting
NewHVACControls
7/25/2019 Sumner County Schools Building Program
48/82
Nannie Berry Elementary
SchematicFloor
Plan
i l
7/25/2019 Sumner County Schools Building Program
49/82
Nannie Berry Elementary
SchematicSitePlanshowingnewaddition
i l
7/25/2019 Sumner County Schools Building Program
50/82
Nannie Berry Elementary Budget:
NewConstruction:
Renovation:
SiteDevelopment:
Contingency:PreliminaryConstructionBudget:
SiteSurvey:
Geotechnical:
FM
Review:KBJMArchitects:
OLGEngineers:
CivilSite:
Furniture:
Technology:PreliminarySoftCosts:
TotalPreliminaryProjectBudget:
$1,080,000
$ 100,000
$ 400,000
$
50,000$1,630,000
$ 5,000
$ 5,000
$
3,000$ 33,500
$ 20,000
$ 28,000
$ 46,500
$
42,000$ 183,000
$1,813,000
W H di El
7/25/2019 Sumner County Schools Building Program
51/82
Watt Hardison Elementary GeneralInfo:
Enrollment:492
CoreCapacity:560
ClassroomCapacity:435
Portables:4
5th Grade
Daycare
Music
SpecialEd.
OriginalConstruction:1955
Sprinkled:No
Existingarea:47,842sf
Newarea:
6,500sf
ProposedCore:Unchanged
ProposedClassroomCapacity:555
W tt H di El t
7/25/2019 Sumner County Schools Building Program
52/82
Watt Hardison Elementary Scope:
6newclassroomswithstandingseammetalroof
tomatchexisting
Newparkinginback;reworkparkinginfront
Addhot
water
to
Gymnasium/CDC
ReplacefloordrainsinKitchen
Addressexistingsitedrainageissues
RADONventMatchexistingsystem
HVACcontrols
NewHeatExchanger/FluidCooler
Electricalupgrades
BoilerReplacement
W tt H di El t
7/25/2019 Sumner County Schools Building Program
53/82
Watt Hardison Elementary
SchematicFloor
Plan
W tt H di El t
7/25/2019 Sumner County Schools Building Program
54/82
Watt Hardison Elementary
SchematicSitePlanshowingadditionandnewparking/drives.
W tt H di El t
7/25/2019 Sumner County Schools Building Program
55/82
Watt Hardison Elementary Budget:
NewConstruction:
Renovation:
SiteDevelopment:
Contingency:PreliminaryConstructionBudget:
SiteSurvey:
Geotechnical:
FM
Review:KBJMArchitects:
OLGEngineers:
CivilSite:
Furniture:
Technology:PreliminarySoftCosts:
TotalPreliminaryProjectBudget:
$ 877,500
$ 585,000
$ 650,000
$
62,500$2,175,000
$ 5,000
$ 5,000
$
3,500$ 30,000
$ 40,000
$ 39,000
$ 46,500
$
42,000$ 211,000
$2,386,000
Walton Ferry Elementary
7/25/2019 Sumner County Schools Building Program
56/82
Walton Ferry Elementary GeneralInfo:
Enrollment:463
CoreCapacity:660
ClassroomCapacity:400
Portables:7
5th Grade
5th Grade
5th Grade
5th
GradeMusic
Art
ELL/Search
OriginalConstruction:1972
Sprinkled:No
Existingarea:53,500sf
New
area:
10,000sfProposedCore:Unchanged
ProposedClassroomCapacity:530
Walton Ferry Elementary
7/25/2019 Sumner County Schools Building Program
57/82
Walton Ferry Elementary Scope:
8newclassrooms;restrooms;storage;TWAwithstanding
seam metalrooftomatchexisting
Addsidewalksandcanopiestoconnecttonewloopdrive
RenovateRestrooms
Replacegreaseinterceptor
ChillerReplacement
FanCoil&AHUReplacement
NewHVAC
Controls
ElectricalUpgrades
Walton Ferry Elementary
7/25/2019 Sumner County Schools Building Program
58/82
Walton Ferry Elementary
SchematicFloor
Plan
Walton Ferry Elementary
7/25/2019 Sumner County Schools Building Program
59/82
Walton Ferry Elementary
SchematicSitePlanshowingaddition,loopdrive
Walton Ferry Elementary
7/25/2019 Sumner County Schools Building Program
60/82
Walton Ferry Elementary Budget:
NewConstruction:
Renovation:
SiteDevelopment:
Contingency:
PreliminaryConstructionBudget:
SiteSurvey:
Geotechnical:
FMReview:
KBJMArchitects:
OLGEngineers:
CivilSite:
Furniture:
Technology:PreliminarySoftCosts:
TotalPreliminaryProjectBudget:
$1,350,000
$ 850,000
$ 700,000
$
100,000$3,000,000
$ 5,000
$ 5,000
$
6,000$ 64,000
$ 60,000
$ 26,000
$ 62,000
$
56,000$ 284,000
$3,284,000
George Whitten Elementary
7/25/2019 Sumner County Schools Building Program
61/82
George Whitten Elementary GeneralInfo:
Enrollment:435
CoreCapacity:660
ClassroomCapacity:400
Portables:6
4th Grade
5th Grade
Music
TitleI
Guidance
ELL
OriginalConstruction:1974
Sprinkled:No
Existingarea:53,500sf
New
area:
14,500sfProposedCore:Unchanged
ProposedClassroomCapacity:550
George Whitten Elementary
7/25/2019 Sumner County Schools Building Program
62/82
George Whitten Elementary Scope:
9classrooms;restrooms;storagewithstandingseammetal
roof tomatchexisting
Newloopdrivewithadditionalparking
HVACControls
FanCoil&AHUreplacement
Electricalupgrades
George Whitten Elementary
7/25/2019 Sumner County Schools Building Program
63/82
George Whitten Elementary
SchematicFloor
Plan
George Whitten Elementary
7/25/2019 Sumner County Schools Building Program
64/82
George Whitten Elementary
SchematicSitePlanshowingaddition,newdrives/parking.
George Whitten Elementary
7/25/2019 Sumner County Schools Building Program
65/82
George Whitten Elementary Budget:
NewConstruction:
Renovation:
SiteDevelopment:
Contingency:
PreliminaryConstructionBudget:
SiteSurvey:
Geotechnical:
FMReview:
KBJMArchitects:
OLGEngineers:
CivilSite:
Furniture:
Technology:
PreliminarySoftCosts:
TotalPreliminaryProjectBudget:
$1,950,000
$ 660,000
$ 450,000
$
100,000$3,160,000
$ 5,000
$ 5,000
$
6,250$ 78,000
$ 55,000
$ 25,000
$ 69,750
$
63,000$ 307,000
$3,467,000
Gene Brown Elementary
7/25/2019 Sumner County Schools Building Program
66/82
Gene Brown Elementary GeneralInfo:
Enrollment:459
CoreCapacity:600
ClassroomCapacity:450
Portables:4
SpecialEd.
ELL
MathLab
YMCA
OriginalConstruction:1955
Sprinkled:No
Existingarea:55,088sf
New
area:
5,800sfProposedCore:Unchanged
ProposedClassroomCapacity:530
Gene Brown Elementary
7/25/2019 Sumner County Schools Building Program
67/82
Gene Brown Elementary Scope:
4classrooms;restroomsandstorage
Addressdrainageissueatfrontparking
Gene Brown Elementary
7/25/2019 Sumner County Schools Building Program
68/82
Gene Brown Elementary
Schematic
Floor
Plan
Gene Brown Elementary
7/25/2019 Sumner County Schools Building Program
69/82
y Budget:
NewConstruction:
Renovation:
SiteDevelopment:
Contingency:
PreliminaryConstruction
Budget:
SiteSurvey:
Geotechnical:
FMReview:
KBJMArchitects:
OLGEngineers:
CivilSite:
Furniture:
Technology:
PreliminarySoftCosts:
TotalPreliminaryProjectBudget:
$ 783,000
$ 20,000
$ 180,000
$ 50,000
$1,033,000
$ 5,000
$ 5,000
$
4,000$ 30,000
$ 14,000
$ 8,000
$ 31,000
$
28,000$ 125,000
$1,158,000
Vena Stuart Elementary
7/25/2019 Sumner County Schools Building Program
70/82
y General
Info:
Enrollment:692
CoreCapacity:875
ClassroomCapacity:700
Portables:3
5th Grade
ELL
TitleI
OriginalConstruction:1999
Sprinkled:Yes
Existingarea:71,864sf
Newarea:4,200sf
ProposedCore:Unchanged
ProposedClassroomCapacity:800
Vena Stuart Elementary
7/25/2019 Sumner County Schools Building Program
71/82
y Scope:
4newclassroomswithstandingseammetalrooftomatchexisting
UpgradeexteriorHMdoors/framestoaluminum
ReplaceExistingHeatExchanger&Cooler
BoilerReplacement
Vena Stuart Elementary
7/25/2019 Sumner County Schools Building Program
72/82
y
Schematic
Floor
Plan
Vena Stuart Elementary
7/25/2019 Sumner County Schools Building Program
73/82
y Budget:
NewConstruction:
Renovation:
SiteDevelopment:
Contingency:
PreliminaryConstruction
Budget:
SiteSurvey:
Geotechnical:
FMReview:
KBJMArchitects:
OLGEngineers:
CivilSite:
Furniture:
Technology:
PreliminarySoft
Costs:
TotalPreliminaryProjectBudget:
$ 570,000
$ 850,000
$ 45,000
$ 50,000
$1,515,000
$ 5,000
$ 5,000
$ 2,500
$ 34,750
$ 35,000
$ 6,000
$ 31,000
$ 28,000
$ 147,250
$1,662,250
HVAC Upgrades
7/25/2019 Sumner County Schools Building Program
74/82
RuckerStewart
Middle
School:
$650,000
(Phase
I)
ReplaceChiller
EliminateIceStorage
ConvertSystemto2wayValues
ChangePumpDrivestoVFD&Controls
EllisMiddle
School:
$1,900,000
(Phase
III)
ReplaceExistingBoiler
AddGymHVAC&ElectricalUpgrade
ReplaceHVAC(2pipe)withWSHP
ReplaceexistingpneumaticHVACcontrols
MadisonCreek
Elementary:
$550,000
(Phase
III)
ReplaceExistingHeatExchanger&Cooler
BoilerReplacement
BeechElementary:$1,400,000(PhaseIII)ReplaceExistingFluidCooler
Boiler
ReplacementReplaceExistingWSHPUnits
HVACControls(CurrentlyProgrammableThermostats)
Reroofing
7/25/2019 Sumner County Schools Building Program
75/82
GallatinHighSchool:$500,000
IndianLakeElementary:$500,000
HowardElementary:$900,000
Door and Window Upgrades
MadisonCreekElementary:$350,000perschool
HBWilliams
Elementary
ShaferMiddleSchool
WhiteHouseMiddleSchool
BennyBillsElementary
Westmoreland
High
SchoolWestmorelandMiddleSchool
Building Program Summary
7/25/2019 Sumner County Schools Building Program
76/82
Theproposedbuildingprogramwillimpactatotalof26
schoolsinSumnerCountyandwilleliminate100%ofthe
portablescurrentlyinuseasaclassroom.
Totalportablesinuse:60
Eliminatedthroughclassroomadditions:51
Remainingportableswillbeeliminatedthroughreallocationof
existingspace.
Theproposedbuildingprogramwillalsoaddressall
currentcapitalmaintenanceprojects.
Building Program Budget
7/25/2019 Sumner County Schools Building Program
77/82
Renovation/Additions: $54.6M
HVACandElectricalUpgrades: $4.5M
Reroofing: $1.9M
DoorandWindowUpgrades: $2.5M
LandandInfrastructure: $6M
Total
Program
Budget: $69.5M
Proposed Phase I
7/25/2019 Sumner County Schools Building Program
78/82
RenovationtoBeechHS
RenovationtoWhiteHouseHS
AdditiontoClydeRiggsElementary
AdditiontoGuildElementary
AdditiontoHawkinsMiddle
AdditiontoJackAndersonElementary
HVAC
Upgrade
to
Rucker
Stewart
MiddleLand/Infrastructure
TotalbudgetforPhaseI: $41.4M
Proposed Phase II
7/25/2019 Sumner County Schools Building Program
79/82
AdditiontoStationCampMiddle
AdditiontoNannieBerryElementary
AdditiontoWattHardisonElementary
Additionto
Walton
Ferry
Elementary
AdditiontoGeorgeWhittenElementary
AdditiontoGeneBrownElementary
Addition
to
Vena
Stuart
Elementary
TotalbudgetforPhaseII: $19.8M
Proposed Phase III
7/25/2019 Sumner County Schools Building Program
80/82
AgingInfrastructure:
HVACandElectricalUpgrades
Reroofing
Doorand
Window
Upgrades
TotalbudgetforPhaseIII:$8.3M
Timeline
7/25/2019 Sumner County Schools Building Program
81/82
Land/Infrastructure