 LAD Committee Report LAD Committee Report Sulong CARPer Sulong CARPer 3 August 2009 3 August 2009

Sulong LAD Comm Report (3 Aug 2009)

  • Upload
    dungkal

  • View
    220

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Sulong LAD Comm Report (3 Aug 2009)

8/14/2019 Sulong LAD Comm Report (3 Aug 2009)

http://slidepdf.com/reader/full/sulong-lad-comm-report-3-aug-2009 1/12

 

LAD Committee ReportLAD Committee Report

Sulong CARPerSulong CARPer3 August 20093 August 2009

Page 2: Sulong LAD Comm Report (3 Aug 2009)

8/14/2019 Sulong LAD Comm Report (3 Aug 2009)

http://slidepdf.com/reader/full/sulong-lad-comm-report-3-aug-2009 2/12

 

OutlineOutline

Committee ObjectivesCommittee Objectives

Criteria for Identifying 'Contentious LandholdingsCriteria for Identifying 'Contentious Landholdingsand High Impact LAD Cases'and High Impact LAD Cases'

Initial Priority LandholdingsInitial Priority Landholdings

Proposed Initial ActivitiesProposed Initial Activities

Committee MembersCommittee Members

Page 3: Sulong LAD Comm Report (3 Aug 2009)

8/14/2019 Sulong LAD Comm Report (3 Aug 2009)

http://slidepdf.com/reader/full/sulong-lad-comm-report-3-aug-2009 3/12

 

Tasks and ObjectivesTasks and Objectives

te information on LAD among Sulong memberste information on LAD among Sulong membersrrange capability-bu

ilding efforts on LAD among Sulong membersrrange capability-building efforts on LAD among Sulong membersMMonitor and facilitate

resolution of LAD cases at national levonitor and facilitate resolution of LAD cases at national leveEEngage CARPer implement

ing agencies on LAD angage CARPer implementing agencies on LAD a

With IRR/Policy CommitteeWith IRR/Policy Committee

With ICT GroupWith ICT GroupWith SecretariatWith SecretariatWith ICT Group and SecretariatWith ICT Group and Secretariat

Page 4: Sulong LAD Comm Report (3 Aug 2009)

8/14/2019 Sulong LAD Comm Report (3 Aug 2009)

http://slidepdf.com/reader/full/sulong-lad-comm-report-3-aug-2009 4/12

 

Criteria for 'ContentiousCriteria for 'ContentiousLandholdings/High Impact LAD Cases'Landholdings/High Impact LAD Cases'

POsPOs

Willingness and active participationWillingness and active participation

Exhausted all means to resolve cases at local levelExhausted all means to resolve cases at local level

LandownersLandowners

Strong resistance/claims over CARPable landsStrong resistance/claims over CARPable lands

Politically and economically influentialPolitically and economically influential

DARDAR

Negligence/inertia/lack of (greater) political willNegligence/inertia/lack of (greater) political will

Page 5: Sulong LAD Comm Report (3 Aug 2009)

8/14/2019 Sulong LAD Comm Report (3 Aug 2009)

http://slidepdf.com/reader/full/sulong-lad-comm-report-3-aug-2009 5/12

 

Criteria for 'ContentiousCriteria for 'ContentiousLandholdings/High Impact LAD Cases'Landholdings/High Impact LAD Cases'

(2)(2)

Area/coverageArea/coverage

At least ___ (?) hectares in sizeAt least ___ (?) hectares in size

Under the priority areas of DAR and civil societyUnder the priority areas of DAR and civil society

PolicyPolicy

Linked to policy issue/sLinked to policy issue/s

Precedent-settingPrecedent-setting

UrgencyUrgency

Marked by violence (agrarian/human rights violations)Marked by violence (agrarian/human rights violations)

Page 6: Sulong LAD Comm Report (3 Aug 2009)

8/14/2019 Sulong LAD Comm Report (3 Aug 2009)

http://slidepdf.com/reader/full/sulong-lad-comm-report-3-aug-2009 6/12

 

Initial Priority ContentiousInitial Priority ContentiousLandholdings (1)Landholdings (1)

ProvinceProvince LandholdingLandholding IssueIssue StatusStatus Actions NeededActions Needed

Arroyo landsArroyo lands 407407

9,000+9,000+ At PARCAt PARC

AreaArea(in(in

Has.)Has.)

NegrosNegrosOccidentalOccidental

RedistributionRedistributionof lands of kinof lands of kinof Firstof First

GentlemanGentleman

Hda. BacanHda. Bacanunder under preliminarypreliminary

injunction; Hda.injunction; Hda.Grande under Grande under 

COD; Hda.COD; Hda.Paraiso under Paraiso under 

ASPASP

Hda. Bacan: DARHda. Bacan: DAR

to immediatelyto immediatelyorder ROD toorder ROD to

transfer title totransfer title toRP; Hda. Grande,RP; Hda. Grande,

DAR toDAR toimmediately order immediately order 

LBP to proceedLBP to proceed

with COD; Hda.with COD; Hda.

Paraiso, DAR toParaiso, DAR toproceed with CFproceed with CF

reviewreview

NegrosNegros

OccidentalOccidental

and Tarlacand Tarlac

Cojuangco,Cojuangco,

Ledesma, etLedesma, et

al (5)al (5)

Revocation of Revocation of 

SDOSDOImmediateImmediate

revocation of revocation of SDO and noticeSDO and notice

of coverageof coverage

Page 7: Sulong LAD Comm Report (3 Aug 2009)

8/14/2019 Sulong LAD Comm Report (3 Aug 2009)

http://slidepdf.com/reader/full/sulong-lad-comm-report-3-aug-2009 7/12

 

Initial Priority ContentiousInitial Priority ContentiousLandholdings (2)Landholdings (2)

ProvinceProvince LandholdingLandholding IssueIssue StatusStatus Actions NeededActions Needed

6161 FB installationFB installation

With NOCWith NOC

AreaArea(in(in

Has.)Has.)

NegrosNegros

OrientalOrientalTeves landsTeves lands Harassment of Harassment of 

farmers byfarmers by

men of Tevesmen of Teves

DAR toDAR to

immediately installimmediately install

the farmersthe farmers

BatangasBatangas HenessyHenessy

Dev't Corp.Dev't Corp.Renewal of Renewal of Application for Application for 

ConversionConversion

which waswhich wasgranted by OPgranted by OP

Proceed with CFProceed with CF

processingprocessing

BukidnonBukidnon FortichFortich ExemptionExemption

from CARPfrom CARP

Petition fromPetition from

TFM for TFM for revocation of revocation of exemptionexemption

order order 

ImmediateImmediate

revocation/revocation/modification of modification of 

exemption order exemption order 

Page 8: Sulong LAD Comm Report (3 Aug 2009)

8/14/2019 Sulong LAD Comm Report (3 Aug 2009)

http://slidepdf.com/reader/full/sulong-lad-comm-report-3-aug-2009 8/12

 

Initial Priority ContentiousInitial Priority ContentiousLandholdings (3)Landholdings (3)

ProvinceProvince LandholdingLandholding IssueIssue StatusStatus Actions NeededActions Needed

DAPECOLDAPECOL 10,00010,000 LADLAD

8,0008,000 Immediate actionImmediate action

10,00010,000 CoverageCoverage

1,8001,800 At PARCAt PARC Revoke JVARevoke JVA

110110 ExemptionExemption

AreaArea

(in(inHas.)Has.)

Davao delDavao del

NorteNorteUnder JVA withUnder JVA with

TADECOTADECOImmediateImmediate

coverage; distrib'ncoverage; distrib'n

of areaof area

SouthSouth

CotabatoCotabatoPTLFARBAPTLFARBA

(DARBCI)(DARBCI)Revocation of Revocation of 

leaseback withleaseback with

Dolephil;Dolephil;

partitionpartition

Partition casePartition case

at PARAD;at PARAD;

leaseback inleaseback in

forceforce

SaranganiSarangani AlcantaraAlcantara LeaseLeaseagreement withagreement with

DENRDENR

ImmediateImmediatecoveragecoverage

Davao delDavao del

Sur Sur CojuangcoCojuangco Lopsided JointLopsided Joint

VentureVentureAgreementAgreement

AlbayAlbay Mitra/Mitra/CojuangcoCojuangco

DARCO (Under DARCO (Under appeal)appeal)

Lift exemption/Lift exemption/immediateimmediate

coveragecoverage

Page 9: Sulong LAD Comm Report (3 Aug 2009)

8/14/2019 Sulong LAD Comm Report (3 Aug 2009)

http://slidepdf.com/reader/full/sulong-lad-comm-report-3-aug-2009 9/12

 

Proposed Initial ActivitiesProposed Initial Activities

Dialogue with DAR Officials (August 12?) with theDialogue with DAR Officials (August 12?) with thefollowing agenda:following agenda:

Issuance of NoCIssuance of NoC

Identification of high-impact priority casesIdentification of high-impact priority cases

Agreed accountability mechanismsAgreed accountability mechanisms

Campaign for DAR to issue Notice of CoverageCampaign for DAR to issue Notice of Coverage

on all CARPable landson all CARPable landsConduct of regional dialogues among DAR,Conduct of regional dialogues among DAR,

church and civil society stakeholders on LADchurch and civil society stakeholders on LADimplementationimplementation

Page 10: Sulong LAD Comm Report (3 Aug 2009)

8/14/2019 Sulong LAD Comm Report (3 Aug 2009)

http://slidepdf.com/reader/full/sulong-lad-comm-report-3-aug-2009 10/12

 

Proposed Initial Activities (2)Proposed Initial Activities (2)

Seeking list of high-impact LAD cases from allSeeking list of high-impact LAD cases from allSulong PO membersSulong PO members

Formation of Sulong CARPer network at the localFormation of Sulong CARPer network at the local

levellevelCoordination with ICT group for the creation of Coordination with ICT group for the creation of 

Sulong CARPer website which contains LAD-Sulong CARPer website which contains LAD-related informationrelated information

Page 11: Sulong LAD Comm Report (3 Aug 2009)

8/14/2019 Sulong LAD Comm Report (3 Aug 2009)

http://slidepdf.com/reader/full/sulong-lad-comm-report-3-aug-2009 11/12

 

LAD Committee MembersLAD Committee Members

NASSA (Convenor) through Edil GuyanoNASSA (Convenor) through Edil Guyano

PARRDS through Bel FormanesPARRDS through Bel Formanes

UNORKA through Ka Eking Tayo and Ka RamonUNORKA through Ka Eking Tayo and Ka RamonBelgiraBelgira

TFM through Lani FranciaTFM through Lani Francia

IDEALS through Atty. Karl CarumbaIDEALS through Atty. Karl Carumba

JPICC-AMRSP through Fr. Archie Casey, SXJPICC-AMRSP through Fr. Archie Casey, SX

PEACE through Dong CalmadaPEACE through Dong Calmada

ACCORD through Ching BejenoACCORD through Ching Bejeno

Page 12: Sulong LAD Comm Report (3 Aug 2009)

8/14/2019 Sulong LAD Comm Report (3 Aug 2009)

http://slidepdf.com/reader/full/sulong-lad-comm-report-3-aug-2009 12/12

 

LAD Committee Members (2)LAD Committee Members (2)

KABABAIHAN-Pilipinas through Ka EvaKABABAIHAN-Pilipinas through Ka EvaAlmonicar Almonicar 

Notes:

1. Representation per organization may change.2. Membership is still open.