Application + Jacket Foundations Installation SUBSEA PILE TEMPLATE (SPT) Fixing the position of the pin piles on the seabed for driving The Subsea Pile Template tool shall be used to fix the relative positions and verticality of the piles on the seabed to ensure that the jacket legs will fit into the pre-installed piles. It is also capable of providing a corrective moment to the pile to resolve any misalignment. The template will be deployed to the seabed and shall be used to guide and secure the pile during hammering and/or drilling operations.

SubSeA Pile TemPlATe (SPT) - Houlder Ltd

  • Upload
    others

  • View
    25

  • Download
    0

Embed Size (px)

Citation preview

Application

+ Jacket Foundations Installation

SubSeA Pile TemPlATe (SPT) Fixing the position of the pin piles on the seabed for driving

The Subsea Pile Template tool shall be used to fix the relative positions and verticality of the piles on the seabed to ensure that the jacket legs will fit into the pre-installed piles. It is also capable of providing a corrective moment to the pile to resolve any misalignment.The template will be deployed to the seabed and shall be used to guide and secure the pile during hammering and/or drilling operations.

• Designedfor2.5mdiameter,butcanbeusedforsmallerpilesthroughminoradjustment

• CanallowforrangeofhammersizesandastheJawscanopenfullyandafollowerisnotnecessary

• Mudmatdesigncanbeamendedtomeetwithprojectspecifics,tobeagreedduringdetaileddesignanddependingonJettingOptions

• Designkeepsvesselintegrationrequirementstoaminimum

• Asthejawscanretractthiskeepsdeckspacetoaminimum

• Thesystemhasaclampingmechanismmeaningthatitcansupport3or4pilesontheseabedatonetimeandstillmaintainonbottomstability

• Thejawshavedeeppadsincontactwiththepinpilereducingtheloadsonthepiletowithinthepile’scapacity

benefiTS

2 /

OPerATiOnAl feATureS

• Quicktodeployandrecover

• Canaccommodate5°soillevelchanges

• Canbedeployed/recoveredutilisingasingleordualpointlift

• Opendesignmeanspassingthroughwaterwillallowforeaseofflow

• Themudmatcanbesetat5°angleduringloweringthroughthesplashzonemeaninglessforcesduringthetransition

• Mudmatwillbedesignedtoalloweasyreleasefromseabed,dependinguponsoilconditionsajettingsystemcanbeaddedtoeasetherelease

• Fullyopeningjawsallowsforfullretractionavoidingriskofpilejamminginthestructure

• Fullyopeningjawsallowpilestobehammeredtoverylowstick-upheightsifrequired,asthehammercanpassthroughtheopenjaw

• Doesnotrequireafollower

• Useofalljawsallowsrelativepilepositiontobemaintained

• Canholdpileduringchangesfromvibrotohydraulichammers

• Integratedinclinometersandcamerascanbefittedtoallowtomaintainandmonitorverticalityofpile

• HasanROVinterfacepanelforinterventionifrequired

HeAlTH & SAfeTy

Throughoutthedevelopment,wehaveconsideredtheabilitytoincreasesafetybyreducingmanualintervention

relevAnT COdeS, STAndArdS & legiSlATiOn

GoodswillconformtoallrelevantdesigncodeswithinDNVOffshoreStandards.

/ 3

equiPmenT OPerATiOnAl durATiOnS

Themainactuationelementsoftheequipmentareasfollows:

CylinderFunction Time

JawOpening 4mins

JawClosing 6mins

JawLock/Unlock 1min

Pilelevellingcylinder(each) 5mins

Templatelevelingprocess 10mins

Thebelowtolerancesanddetailsaretypicalofcurrentdesignsonly.Thesecanbeextendedoradjustedtomeetproject-specificrequirements.

Pin Pile dimenSiOnS

Requirement

Outsidepilediameter 2.5m

Pilelength Upto65m

Pileweight Upto250t

Finalheightofpiletopaboveseabed Nolimits

Pile inSTAllATiOn TOlerAnCeS

Themaintolerancestobeadheredtoarepresentedbelow:

Requirement

Piletopelevationrelativetothenominalpilepositioninanydirectionmeasuredatthetopofthepile

+/-50mm

Distancebetweenanypileandthetwoadjacentpilesfromthetheoreticaldesigndistancemeasuredatthetopofthepile

+/-50mm

VerticalityofpilesrelativetotrueverticalAccuracyof+/-0.25°ispossiblebutrequiresextrajawheight

+/-0.5°

Elevationattopofpilerelativetodesignlevel

+/-100mm

Maximumdifferencebetweenthehighestandlowestpile

+/-100mm

TemPlATe POSiTiOning TOlerAnCeS

Themaintolerancestobeadheredtoarepresentedbelow:

Requirement

Templatehorizontallocationrelativetotargetposition

+/-2minanydirection

Templatebearing(heading)

+/-5°

OPerATiOnAl limiTS

Requirement

PilingOperationsseastate(Hs) 2m

Templatepositioningandlevelling 2m

Launch&Recoveryoftemplateseastate(Hs)Dependentonwaveperiod

2m

Launch&RecoveryoftemplateCurrent(Cs)

1.5m/s

Insertingandstabbingpilesseastate(Hs)Dependentonwaveperiod

2m

Windspeed(U10) 12m/s

4 /

TeCHniCAl deTAilS

/ 5

SySTem COmPOnenTS

• JettingSystem

• OutfittingwithSurveyEquipmentandMonitoring

• CameraMonitoringSystem

• FrondMatDeploymentSystem

• Deck-mountedorSubseaHPU

• ModularLegSystem

Houlderhasaversionofthedesignconfiguredwithacentralstructureand3or4removablelegsections.Thisfeatureprovidedthefollowingadditionalbenefits:

• Forfutureprojectswith4legstructures,thelegsectionscanbere-usedwithmodificationstothecentralstructureandmudmattosuit.

• Forfutureprojects,ifdifferentpositionsareneeded(i.e.>27m)spacersectionscouldbeintroducedtoextendthereach.Thiswouldbesubjecttooverallsizeandstructurallimitsofthemainbody.

• Eachlegwillbeself-containedwithallthecylindersandmeasurementsystemsmounted.Thismeansthatifrequired,onefulllegcouldbecomeaspare.

vAriATiOnS

6 /

/ 7

Houlder lImIted22 Witney WayBoldon Business ParkTyne & WearNE35 9PEUKT: +44 (0)191 536 2777

[email protected]

COnTACT uS

Houlder is an independent, innovative offshore engineering company. We build on 30 years’ offshore expertise and work closely with clients to design solutions for their technical challenges. We provide complete EPCI services with special equipment, consultancy, project management and engineering solutions for the offshore wind and wider energy sector.