Engaging Early to Deliver Value

SUBSEA 7 AND GRANHERNE ALLIANCE

Appraise

AD

DED

VA

LUE

PROJECT LIFE CYCLE

Value Identification & Creation

Maximum influenceon value duringfront end phase

Poor decision &Project definition

Limited influenceon value duringexecution phase

Value opportunity

Value Maintenance & Realisation

Project Sanction andCommitment of Capital

Select Define Execute Operate

Project Value Curve

Engaging Early to Deliver Value

Operators are seeking novel and reliable concepts to overcome industry challenges such as complex reservoirs, cost, growth and schedule creep and to optimise capital expenditure of subsea projects.

Combining industry-leading design and engineering services, pipeline and riser technologies, and an extensive subsea installation track record, Granherne and Subsea 7 have formed an Alliance that is strategically positioned to collaborate on Concept, Pre-FEED and FEED Engineering for subsea oil and gas developments.

Through earlier engagement at the project definition phase, and by combining the extensive field monetisation and front-end planning capabilities of Granherne with the proven subsea solutions, technologies, and EPCI experience of Subsea 7, the Alliance can identify opportunities to reduce overall field development costs and ultimately deliver economically viable solutions, in line with client requirements.

2

Viable Solutions

Engaging Early to Deliver Value

Engaging Early to Deliver Value

The Alliance’s capabilities and expertise covers every stage of the project life cycle, from concept through to execution, and later, integrity management, field optimisation and decommissioning. The primary area that we look to create value for our clients is in the earliest stages of project planning, improving assurance of constructability of proposed subsea infrastructure solutions and mitigating risk. Early engagement of the construction and installation contractor can also significantly reduce overall project cost.

3

Adding value with Early Engagement through our Alliance:

■■ Coherent answers from one fully integrated team versus multiple contractors ■■ Introduction of impartial and proven subsea solutions to unlock projects and meet client requirements■■ More efficient and effective Front-End Loading■■ Greater level of project definition at time of authorisation■■ Advanced project planning, taking account of vessel, resource and facility availability ■■ Robust estimating and scheduling for Capital Expenditure■■ Earlier and more thorough risk identification and mitigation■■ More timely development of risk mitigation plans and assignments■■ Improved operability and maintenance analysis■■ Extensive subsea installation know-how, experience and track record

Early Engagement

Engaging Early to Deliver Value

Engaging Early to Deliver Value

One, cohesive, integrated team developing solutions for your challenges at the earliest possible stage, will reduce the number of interfaces when compared against other unaligned and/or separated engineering and project execution teams.

Our Alliance bridges Granherne’s renowned unbiased and independent perspective with the technical experience and technological capabilities of Subsea 7. The Alliance strives to be a project enabler, lowering costs and streamlining schedules with the combination of theoretical and practical experience. Both companies have been active in the development of new subsea technologies, and seeing their transition from the “drawing board” to proven and effective solutions. The complementary nature of both Granherne and Subsea 7 competencies are seen in many areas, such as more efficient engineering of the interface between floating production facilities (Granherne) and their associated risers (Subsea 7). Other cross-competencies include Granherne’s extensive Flow Assurance engineering capabilities, with Subsea 7’s Pipe-In-Pipe, Direct Electrical Heating and Pipeline Bundle solutions.

4

Seamless Execution

Engaging Early to Deliver Value

Engaging Early to Deliver Value 5

About Subsea 7: a World-Leading Seabed-to-Surface Partner

Subsea 7 is a world-leading seabed-to-surface engineering, construction and services contractor to the offshore energy industry. We provide cost-effective technical solutions to enable the delivery of complex projects in all water depths and challenging environments. Subsea 7 has a long track record of successfully identifying market needs to develop effective technologies that meet clients’ key drivers of safety, productivity, schedule and cost.

We work closely with clients, suppliers and partners to develop and apply innovative solutions, drawing on our extensive portfolio of field-proven technologies, decades of experience and technical know-how.

Our global footprint, combined with the technical expertise of our people, our technology and assets, both on and offshore, enables us to adapt these capabilities to deliver subsea engineering services worldwide.

Engaging Early to Deliver Value

About Granherne: a Leading Consultancy and Engineering Company

Granherne has helped plan, develop and execute some of the largest, most technically complex offshore projects – from full field development plans and early-phase engineering through installation. We specialise in getting difficult projects moving and helping our clients make the most of their operating assets through lateral thinking, technical problem-solving and cost-effective solutions. Specialising in all activities required to sanction a project, including feasibility and conceptual design. Granherne offers the full range of Value Engineering and Value Improvement Practices, fully complementing its Project Risk Management service which includes both cost and schedule risk analysis.

Our multidisciplinary team of talented and experienced engineers delivers truly integrated streamlined solutions for full field development plans and early-phase engineering, in the following disciplines:

■■ Subsea & Pipelines■■ Subsea Processing■■ Facilities■■ HS&E

■■ Flow Assurance■■ Marine & Riser Services ■■ Naval Architecture

Engaging Early to Deliver Value

Optimising a Large Deepwater SURF development: Nigeria

Subsea 7 performed optimisation work as part of the tender phase for a large deepwater greenfield development offshore Nigeria. The SURF scope comprised pipe-in-pipe production loops with riser base gas lift, a water injection network, a gas export line, Steel Catenary Risers for connection of flowlines to the spread-moored FPSO and umbilicals for field control. During the tender process, Subsea 7 was able to propose a global 30% reduction of the SURF cost.

This reduction was achieved by, amongst other initiatives, proposing an alternative field architecture (with merging and simplification of production loops), proposing an alternative for oil export line design, reviewing in detail the interfaces with FPSO and SPS scopes) and proposing merged end flowline structures into in-line structures. The cost optimisation process has been performed in close collaboration with the client, who reviewed the preliminary benefit evaluation of each idea, and made the selection for global field optimised architecture.

6

CASE STUDIES

Engaging Early to Deliver Value

Systems Engineering Vee Diagram

DECO

MPO

SITION

AN

D D

EFINITIO

N

PROGRAM TIMELINE

Develop system verification plans

Develop subsystemverification plan

Develop componentverification plans

Define systemsrequirements

Define systemsrequirements

Manufacture

INTE

GRA

TIO

N A

ND

VER

IFIC

ATIO

N

Allocate SystemRequirements to

Subsystems

Verify Subsystems

Perform Detailed Design

Verify Components

Engaging Early to Deliver Value

Enabling the New Frontier of Subsea Development: Gulf of Mexico

Granherne provided a substantial team of industry experts to the Integrated Project Team to assist with the engineering scope for the development a 20,000 psi-capable subsea system for oil and gas drilling and production. Granherne’s primary responsibility was to provide a Systems Engineering (SE) framework to manage and control the technology development process. Granherne also undertook in-depth study of High Integrity Pressure Protection System (HIPPS) configurations to provide the engineering sensitivities and design parameters for the program.

The process was based on proven SE principles and included:

■■ Operational scenario development■■ Requirements management■■ Technology readiness assessment■■ Technology maturation planning■■ Interface management■■ Field Architecture■■ Safety and reliability calculations (SIL)■■ System requirements

7Engaging Early to Deliver Value

■■ Regulatory requirements■■ Equipment design and limitations■■ Controls Philosophy■■ Operational Methodology■■ Leak Testing Sensitivities■■ Chokes in Series■■ Detailed Testing Methods

© Jan. 2016, KBR, Inc. All Rights Reserved.

CONTACTS

GranherneHOUSTON: Dave Barton [email protected]

LONDON (LEATHERHEAD): Alan Williams [email protected]

PERTH: Andrew Gifford [email protected]

www.granherne.com

Subsea 7ABERDEEN: Iain Watson

HOUSTON: Craig Hart

LONDON: Mark Avent

PARIS: Gregoire De-Roux

PERTH/KUALA LUMPUR: Marin Abelanet

STAVANGER: Rolf Ravn Walderland

Contact us: [email protected]

www.subsea7.com

Engaging Early to Deliver Value

SUBSEA 7 AND GRANHERNE ALLIANCE