Study Results Northwest Firmed Resource Option This slide deck contains results from the 2012 TEPPC Study Program related to the Northwest Firmed Resource Option Studies. The generation results for the associated transmission expansion projects follow immediately along with flow information for the added transmission.

Study Results Northwest Firmed Resource Option This slide deck contains results from the 2012 TEPPC Study Program related to the Northwest Firmed Resource

Embed Size (px)

Citation preview

Page 1: Study Results Northwest Firmed Resource Option This slide deck contains results from the 2012 TEPPC Study Program related to the Northwest Firmed Resource

Study Results

Northwest Firmed Resource Option

This slide deck contains results from the 2012 TEPPC Study Program related to the Northwest Firmed Resource Option Studies. The generation results for the associated transmission expansion projects follow immediately along with flow information for the added transmission.

Page 2: Study Results Northwest Firmed Resource Option This slide deck contains results from the 2012 TEPPC Study Program related to the Northwest Firmed Resource

Hydro FirmingModeling Goal

• Compare different hydro dispatches in different wind conditions given various modeling techniques

• Compare path flows and production costs

Implementation StepsStart with 2022 PC23 NW Resource Option (+12,000 GWh)

1. Increase WECC annual energy demand 8%

2. Add 12,000 GWh of renewables to NW

3. Under the purview of high wind in a particular region, investigate how a nearby region’s hydro responds based on different types of modeling

4. Investigate how the changes listed above impact path flows

Page 3: Study Results Northwest Firmed Resource Option This slide deck contains results from the 2012 TEPPC Study Program related to the Northwest Firmed Resource

Add: 12,000 GWh to meet WECC RPS

Add transmission

Renewable Options Under High Load

Firmed Cases

Increase WECC-wide load 8%

1

2

4

For these regions

3 Add: firming resource

Gas

Hydro

Pumped storage

Page 4: Study Results Northwest Firmed Resource Option This slide deck contains results from the 2012 TEPPC Study Program related to the Northwest Firmed Resource

Increase WECC-wide load 8%1

2010 2022800,000

850,000

900,000

950,000

1,000,000

1,050,000

1,100,000

Western Interconnection Annual Energy (GWh)10-Year Study Comparison

Common Case LRS

An

nu

al E

ner

gy

(GW

h)

8%

8% increase to peak and energy

10%

10% decrease to energy

Higher Load = Additional RPS Energy

Page 5: Study Results Northwest Firmed Resource Option This slide deck contains results from the 2012 TEPPC Study Program related to the Northwest Firmed Resource

Calculate ratios of planned renewables in TEPPC 2022 Common Case • Do not include existing resources• Do not include DG• IRP and LRS data

Apply ratio to study build-out of 12,000 GWh• Concept: development trends are best representation of

what could be added to each state • More resources available than what is identified in WREZ• More granular information from CPUC/CAISO

Locate resources using WREZ peer-analysis tool

Extrapolation Method

Add 12,000 GWh to meet WECC RPS 2

Page 6: Study Results Northwest Firmed Resource Option This slide deck contains results from the 2012 TEPPC Study Program related to the Northwest Firmed Resource

10-Year Study ResultsEC27a – NW Firming Study AEC27b – NW Firming Study B

Hydro

Page 7: Study Results Northwest Firmed Resource Option This slide deck contains results from the 2012 TEPPC Study Program related to the Northwest Firmed Resource

NW Firmed Resource CasesComparing Four Cases

Revelstoke

Shrum

Mica

+12,000 GWh (mostly wind)

+12,000 GWh (mostly wind)

+12,000 GWh (mostly wind)

Revelstoke

Shrum

Mica

Revelstoke

Shrum

Mica

Shrum

PC1-5High Load

PC23NW Resource Option

PC27aNW Firmed Resource

PC27bNW Firmed Resource

No added resources

Standard HTC modeling

+12,000 GWh resources +12,000 GWh resources

Fixed shape hydro from PC1-5 (no resources)

+12,000 GWh resources

Standard HTC modeling HTC modeling with price signals from a windy Northwest

Revelstoke

Mica

Compare

CompareCompare

Results1. Generation2. Hydro impact3. Path Flows

Page 8: Study Results Northwest Firmed Resource Option This slide deck contains results from the 2012 TEPPC Study Program related to the Northwest Firmed Resource

Conventional Hydro

Pumped Storage

Steam - Coal

Steam - Other

Nuclear

Combined Cycle

Combustion Turbine

Cogeneration

IC

Negative Bus Load

Biomass RPS

Geothermal

Small Hydro RPS

Solar

Wind

(600,000) (500,000) (400,000) (300,000) (200,000) (100,000) 0 100,000 200,000

Annual Energy Difference: 2022 PC23 Northwest vs. 2022 PC27a

GWh

Production cost decreased $27 M (.15%)

Dump energy increased 397 GWh (93%)

Emergency Energy decreased 6%

CO2 Emissions decreased 0%

AZ, OR, CA, WA

Page 9: Study Results Northwest Firmed Resource Option This slide deck contains results from the 2012 TEPPC Study Program related to the Northwest Firmed Resource

Alberta

Arizon

a

British

Colu

mbia

Califo

rnia

Colora

do

Idah

o

Mex

ico

Mon

tana

Nevad

a

New M

exico

Orego

n

South

Dak

ota

Texas

Utah

Was

hingt

on

Wyo

ming

-300,000

-250,000

-200,000

-150,000

-100,000

-50,000

0

50,000

100,000

150,000

Annual Energy Difference: 2022 PC23 Northwest vs. 2022 PC27a

Hydro+PS Steam - Boiler Combined Cycle Combustion Turbine

Cogeneration Renewable Other

GWh

PC23 vs. PC27aNormal hydro Fixed hydro

Page 10: Study Results Northwest Firmed Resource Option This slide deck contains results from the 2012 TEPPC Study Program related to the Northwest Firmed Resource

Conventional Hydro

Pumped Storage

Steam - Coal

Steam - Other

Nuclear

Combined Cycle

Combustion Turbine

Cogeneration

IC

Negative Bus Load

Biomass RPS

Geothermal

Small Hydro RPS

Solar

Wind

(100,000) (50,000) 0 50,000 100,000 150,000

Annual Energy Difference: 2022 PC23 Northwest vs. 2022 PC27b

GWh

Production cost decreased $6 M (.032%)

Dump energy increased 80 GWh (19%)

Emergency Energy decreased 0%

CO2 Emissions decreased 0%

AL, BC

Page 11: Study Results Northwest Firmed Resource Option This slide deck contains results from the 2012 TEPPC Study Program related to the Northwest Firmed Resource

Alberta

Arizon

a

British

Colu

mbia

Califo

rnia

Colora

do

Idah

o

Mex

ico

Mon

tana

Nevad

a

New M

exico

Orego

n

South

Dak

ota

Texas

Utah

Was

hingt

on

Wyo

ming

-200,000

-150,000

-100,000

-50,000

0

50,000

100,000

150,000

Annual Energy Difference: 2022 PC23 Northwest vs. 2022 PC27b

Hydro+PS Steam - Boiler Combined Cycle Combustion Turbine

Cogeneration Renewable Other

GWh

PC23 vs. PC27bNormal hydro NW $ Hydro

Page 12: Study Results Northwest Firmed Resource Option This slide deck contains results from the 2012 TEPPC Study Program related to the Northwest Firmed Resource

Conventional Hydro

Pumped Storage

Steam - Coal

Steam - Other

Nuclear

Combined Cycle

Combustion Turbine

Cogeneration

IC

Negative Bus Load

Biomass RPS

Geothermal

Small Hydro RPS

Solar

Wind

(200,000) (100,000) 0 100,000 200,000 300,000 400,000 500,000 600,000

Annual Energy Difference: 2022 PC27a vs. 2022 PC27b

GWh

Production cost decreased $22 M (.125%)

Dump energy increased 478 GWh (1649%)

Emergency Energy decreased 6%

CO2 Emissions decreased 0%

Page 13: Study Results Northwest Firmed Resource Option This slide deck contains results from the 2012 TEPPC Study Program related to the Northwest Firmed Resource

Alberta

Arizon

a

British

Colu

mbia

Califo

rnia

Colora

do

Idah

o

Mex

ico

Mon

tana

Nevad

a

New M

exico

Orego

n

South

Dak

ota

Texas

Utah

Was

hingt

on

Wyo

ming

-150,000

-100,000

-50,000

0

50,000

100,000

150,000

200,000

250,000

300,000

Annual Energy Difference: 2022 PC27a vs. 2022 PC27bHydro+PS Steam - Boiler Combined Cycle Combustion Turbine

Cogeneration Renewable Other

GWh

PC27a vs. PC27bFixed hydro NW $ hydro

Page 14: Study Results Northwest Firmed Resource Option This slide deck contains results from the 2012 TEPPC Study Program related to the Northwest Firmed Resource

0 292 584 876 1168 1460 1752 2044 2336 2628 2920 3212 3504 3796 4088 4380 4672 4964 5256 5548 5840 6132 6424 6716 7008 7300 7592 7884 8176 8468 87600

1000

2000

3000

4000

5000

6000

7000

8000

BC - Hydro GenerationPC27a PC27b PC23 PC27a (Year Shape) PC27b (Year Shape)

PC23 (Year Shape)

Hour of Year

Gen

erat

ion

(M

W)

Energy moved

Page 15: Study Results Northwest Firmed Resource Option This slide deck contains results from the 2012 TEPPC Study Program related to the Northwest Firmed Resource

7560 7575 7590 7605 7620 7635 7650 7665 7680 7695 7710 7725 7740 7755 7770 7785 7800 7815 7830 7845 7860 7875 7890 7905 79200

1000

2000

3000

4000

5000

6000

7000

8000

BC Hydro – 2 weeks in NovemberPC27a PC27b PC23

Hour of Year

Gen

erat

ion

(M

W)

5760 5775 5790 5805 5820 5835 5850 5865 5880 5895 5910 5925 5940 5955 5970 5985 6000 6015 6030 6045 6060 6075 6090 6105 61200

1000

2000

3000

4000

5000

6000

7000

BC Hydro – 2 weeks in AugustPC27a PC27b PC23

Hour of Year

Gen

erat

ion

(M

W)

Page 16: Study Results Northwest Firmed Resource Option This slide deck contains results from the 2012 TEPPC Study Program related to the Northwest Firmed Resource

0 292 584 876 1168 1460 1752 2044 2336 2628 2920 3212 3504 3796 4088 4380 4672 4964 5256 5548 5840 6132 6424 6716 7008 7300 7592 7884 8176 8468 8760

-4000

-3000

-2000

-1000

0

1000

2000

3000

P03 Northwest-British Columbia - FlowsPC27a PC27b PC23 PC27a (Year Shape) PC27b (Year Shape)

PC23 (Year Shape)

Hour of Year

Gen

erat

ion

(M

W)

Congestion

Less S-N flow

S-N

Page 17: Study Results Northwest Firmed Resource Option This slide deck contains results from the 2012 TEPPC Study Program related to the Northwest Firmed Resource

5760 5775 5790 5805 5820 5835 5850 5865 5880 5895 5910 5925 5940 5955 5970 5985 6000 6015 6030 6045 6060 6075 6090 6105 6120

-3500

-3000

-2500

-2000

-1500

-1000

-500

0

500

1000

1500

P03 Northwest-British Columbia – 2 weeks in AugustPC27a PC27b PC23

Hour of Year

Gen

erat

ion

(M

W)

7560 7575 7590 7605 7620 7635 7650 7665 7680 7695 7710 7725 7740 7755 7770 7785 7800 7815 7830 7845 7860 7875 7890 7905 7920

-4000

-3000

-2000

-1000

0

1000

2000

P03 Northwest-British Columbia – 2 weeks in NovemberPC27a PC27b PC23

Hour of Year

Gen

erat

ion

(M

W)

Page 18: Study Results Northwest Firmed Resource Option This slide deck contains results from the 2012 TEPPC Study Program related to the Northwest Firmed Resource

5760 5775 5790 5805 5820 5835 5850 5865 5880 5895 5910 5925 5940 5955 5970 5985 6000 6015 6030 6045 6060 6075 6090 6105 61200

1000

2000

3000

4000

5000

6000

7000

BC Hydro – 2 weeks in August

PC27a PC27b PC23 NW Wind

Hour of Year

Gen

erat

ion

(M

W)

kk

Page 19: Study Results Northwest Firmed Resource Option This slide deck contains results from the 2012 TEPPC Study Program related to the Northwest Firmed Resource

7560 7575 7590 7605 7620 7635 7650 7665 7680 7695 7710 7725 7740 7755 7770 7785 7800 7815 7830 7845 7860 7875 7890 7905 79200

1000

2000

3000

4000

5000

6000

7000

8000

BC Hydro – 2 week in November

PC27a PC27b PC23 NW Wind

Hour of Year

Gen

erat

ion

(M

W)

kk

Page 20: Study Results Northwest Firmed Resource Option This slide deck contains results from the 2012 TEPPC Study Program related to the Northwest Firmed Resource

0 292 584 876 1168 1460 1752 2044 2336 2628 2920 3212 3504 3796 4088 4380 4672 4964 5256 5548 5840 6132 6424 6716 7008 7300 7592 7884 8176 8468 87600

500

1000

1500

2000

2500

3000

Revelstoke - Entire Year w/ Year Shape Plot

PC1-5 PC27a PC27b PC23

PC1-5 (Year Shape) PC27a (Year Shape) PC27b (Year Shape) PC23 (Year Shape)

Hour of Year

Gen

erat

ion

(M

W)

Page 21: Study Results Northwest Firmed Resource Option This slide deck contains results from the 2012 TEPPC Study Program related to the Northwest Firmed Resource

0 292 584 876 1168 1460 1752 2044 2336 2628 2920 3212 3504 3796 4088 4380 4672 4964 5256 5548 5840 6132 6424 6716 7008 7300 7592 7884 8176 8468 87600

500

1000

1500

2000

2500

3000

Gordon M. Shrum - Entire Year w/ Year Shape Plot

PC1-5 PC27a PC27b PC23

PC1-5 (Year Shape) PC27a (Year Shape) PC27b (Year Shape) PC23 (Year Shape)

Hour of Year

Gen

erat

ion

(M

W)

Page 22: Study Results Northwest Firmed Resource Option This slide deck contains results from the 2012 TEPPC Study Program related to the Northwest Firmed Resource

0 292 584 876 1168 1460 1752 2044 2336 2628 2920 3212 3504 3796 4088 4380 4672 4964 5256 5548 5840 6132 6424 6716 7008 7300 7592 7884 8176 8468 87600

200

400

600

800

1000

1200

1400

1600

1800

Mica - Entire Year w/ Year Shape Plot

PC1-5 PC27a PC27b PC23

PC1-5 (Year Shape) PC27a (Year Shape) PC27b (Year Shape) PC23 (Year Shape)

Hour of Year

Gen

erat

ion

(M

W)

Page 23: Study Results Northwest Firmed Resource Option This slide deck contains results from the 2012 TEPPC Study Program related to the Northwest Firmed Resource

2352 2366 2380 2394 2408 2422 2436 2450 2464 2478 2492 2506 2520 2534 2548 2562 2576 2590 2604 2618 2632 2646 2660 2674 26880

500

1000

1500

2000

2500

Gordon M. ShrumPC1-5 PC27a PC27b PC23

Hour of Year

Gen

erat

ion

(M

W)

2-weeks in April

6720 6734 6748 6762 6776 6790 6804 6818 6832 6846 6860 6874 6888 6902 6916 6930 6944 6958 6972 6986 7000 7014 7028 7042 70560

500

1000

1500

2000

2500

Gordon M. Shrum PC1-5 PC27a PC27b PC23

Hour of Year

Gen

erat

ion

(M

W)

2-weeks in October

Page 24: Study Results Northwest Firmed Resource Option This slide deck contains results from the 2012 TEPPC Study Program related to the Northwest Firmed Resource

2352 2366 2380 2394 2408 2422 2436 2450 2464 2478 2492 2506 2520 2534 2548 2562 2576 2590 2604 2618 2632 2646 2660 2674 26880

50

100

150

200

250

300

350

400

450

Mica PC1-5 PC27a PC27b PC23

Hour of Year

Gen

erat

ion

(M

W)

6720 6734 6748 6762 6776 6790 6804 6818 6832 6846 6860 6874 6888 6902 6916 6930 6944 6958 6972 6986 7000 7014 7028 7042 70560

200

400

600

800

1000

1200

1400

1600

MicaPC1-5 PC27a PC27b PC23

Hour of Year

Gen

erat

ion

(M

W)

Page 25: Study Results Northwest Firmed Resource Option This slide deck contains results from the 2012 TEPPC Study Program related to the Northwest Firmed Resource

2352 2366 2380 2394 2408 2422 2436 2450 2464 2478 2492 2506 2520 2534 2548 2562 2576 2590 2604 2618 2632 2646 2660 2674 26880

100

200

300

400

500

600

700

RevelstokePC1-5 PC27a PC27b PC23

Hour of Year

Gen

erat

ion

(M

W)

6720 6734 6748 6762 6776 6790 6804 6818 6832 6846 6860 6874 6888 6902 6916 6930 6944 6958 6972 6986 7000 7014 7028 7042 70560

200

400

600

800

1000

1200

1400

1600

1800

2000

RevelstokePC1-5 PC27a PC27b PC23

Hour of Year

Gen

erat

ion

(M

W)

Page 26: Study Results Northwest Firmed Resource Option This slide deck contains results from the 2012 TEPPC Study Program related to the Northwest Firmed Resource

6840 6855 6870 6885 6900 6915 6930 6945 6960 6975 6990 7005 7020 7035 7050 7065 7080 7095 7110 7125 7140 7155 7170 7185 7200

-3500

-3000

-2500

-2000

-1500

-1000

-500

0

500

1000

Category " P03 Northwest-British Columbia ", 20/23 of YearPC27a PC27b PC23

Hour of Year

Gen

erat

ion

(M

W)

Page 27: Study Results Northwest Firmed Resource Option This slide deck contains results from the 2012 TEPPC Study Program related to the Northwest Firmed Resource

Questions or thoughts on this study?