Gadjah Mada University | The Design Activity and methodology 1
Study of Water Supplyin Ridge camp PT.Freeport Indonesia
LPPM UGM and PT Freeport Indonesia
2010
Gadjah Mada University
11/1/2010
8/7/2019 Study of Water Supply-PT.Freeport Indonesia
http://slidepdf.com/reader/full/study-of-water-supply-ptfreeport-indonesia 2/11
Gad jah Mada Unive
sity | The Design Activity and methodology 2
Background
Ave
age wate
consumption in Ridge Camp area PT Freeport Indonesia is currently above
800 liter per day per capita well above the normal standards which is 300 Liter per day per
capita. Load of waste water in Sewage Treatment Plant (STP) over of its hydraulic capacity.
In the other hand, water supply is declining precipitously when rainfall decreases.
Objective
Survey and study of water consumption in the Ridge Camp area of PT. Freeport Indonesia
for the three main sub-areas:
- domestic (Barrack),
- commercial (shopping HERO & Coff ee Shop KOKARFI), and
- industrial (office, shop & messhall)to investigate and calculate water consumption per capita, determine the rate of water
losses in the distribution units and gives appropriate and practical recommendations for
water savings according to standard that should be, and alternative solution in case of
decreasing the water supply in dry season
Scope
Water from the Water Treatment Plant (WTP) supplies for individual purposes at barrack
area, commercial area & industrial area through underground piping. The study is expected
show appropriate and practical recommendations for water savings according to the
conditions, infrastructure and existing resources.
8/7/2019 Study of Water Supply-PT.Freeport Indonesia
http://slidepdf.com/reader/full/study-of-water-supply-ptfreeport-indonesia 3/11
Gad jah Mada University | The Design Activity and methodology 3
Grand Scheme of Water Supply Study
in Ridge Camp Area PT. Freeport Indonesia
(LPPM UGM-PT. Freeport Indonesia)
1st Priority
Real Demand Base
Study and
retrenchment
2nd Priority
Water Losses Base
Study and
controlling
3rd Priority
Source of water
Reliability Study
and Water Balance
Analysis
Water resources
Conservation
Programme
- N¡ ¢
b£
¤ ¥
f ¥ ¦ ¦
¡ §
̈
© t
/
£
¢
̈
©
- D£
¢
̈
©
P ̈
tt£
¤ © (th£
̈
¢
¥
¡ © t¥
f
i ¦
h ̈
¤
£
i © th£
f ¡ ©
¦
ti¥
© ¥
f ti ¢
£
)-
h£
§ ¡ ¤ §
¥ £
¥
f w ̈
t£
¤ ¦ ¥
©
¡ ¢ § ti
¥
©
-
¨ ¦
iliti£
¥
w ©
£
b
£ ¨ ¦
h¥ ¦ ¦
¡ §
̈
© t
-
£ ̈
l
¨ ¦
t¥
¤
¥
f
£
¢
̈
©
§
̈
tt£
¤ ©
- U ©
¦ ¥
¡ © t
£
¥
¤
̈
t£
¤ (U
) i
̈
¢
̈
j¥
¤ ¦ ¥
¢ §
¥
©
£
© t¥
f w ̈
t£
¤
£
¢
̈
©
- It¶
¦ ¥
¢ § li¦ ̈
t£
̈
©
l¥
©
ti ¢
£
§ ¤
¥ ¦ £
with hi
h fi ©
̈
©
¦ £
̈
©
h ¡ ¢
̈
© ¤
£ ¥
¡ ¤
¦ £
-
£
q ¡ i ¤
£
̈
t ̈
: Di ¦
h ̈
¤
£
,§ ¤
£
¡ ¤
£
, § i §
£
i ̈
¢
£
t£
¤ , § i §
£
t
§
£
, § i §
£
¨ £
, w ̈
t£
¤
q ¡
̈
lit
,£
l£
v ̈
ti¥
© ,¦ ¥
¢ § l
£
t£
©
£
¥
f § i §
£
¨ ¦ ¦ £ ¥
¤ i
.¦
h£ ¦
ki ©
̈
t£
¤ ¢
£
t£
¤ ,£
t¦
- A
j¡
t£
t¥
th£
̈
v ̈
il ̈
bilit
¥
f £ ¦ ¥
©
̈
¤
̈
t¨
̈
©
f ¡ ¤
th£
¤
̈
©
̈
l
i
-
̈
t£
¤
¡ ¤ f ¨ ¦ £
¥
¤ G ¤
¥
¡ ©
w ̈
t£
¤
-
£
li ̈
bilit
¥
f q ¡
̈
lit
, q ¡
̈
© tit
̈
©
¦ ¥
© ti© ¡
it
̈
©
̈
l
i
t¥
£
t£
¤ ¢ i ©
£
th£
¦ ̈
§
¨ ¦
it
¥
f § ¤
¥
¡
¦
ti¥
© ̈
©
t ¤
£ ̈
t ¢
£
© t
-
̈
t£
¤ b ̈
l ̈
©
¦ £
̈
©
̈
l
i
t¥
£
t£
¤ ¢ i ©
£
th£
§
¥
ibilit
¥
f £
x¦ £
w ̈
t£
¤ with ̈
£
§
£
©
̈
bl£
fl¥
w w ̈
t£
¤
h£
f ¥
¤
¡ ¤ f
¨ ¦ £
w ̈
t£
¤ ¥
¡ ¤
¦ £
̈
©
th£
̈
f £
i£
l
f ¥
¤
¤
¥
¡ ©
w ̈
t£
¤ ¥
¡ ¤
¦ £
-
£
q ¡ i ¤
£
̈
t ̈
: H
¤
¥
l¥
, £ ¥
h
¤
¥
l¥
, t¥
§
¥
¤
̈
§ hi¦
¢
̈
§ ¥
f th£
l¥ ¦ ̈
ti¥
©
(
it£
), i ©
¦
l ¡
i ©
th£
̈
t£
¤
h£
C
! it"
B# $ %
E &
w%
'
%
! t f
' w#
t%
' '
% $
'
( % $
(
!
$ %
' v#
ti
! with%
& h# $
i$
! %
)
( #
ti
!
#
l v#
l
% $
:
$
i !
0
w#
t%
' %
ffi(
i%
!
( "
, '
%
f
'
% $
t#
ti
! #
!
)
i & l%
%
! t0
)
$ #
! it#
ti
! #
!
)
)
'
#
i !
# 0 %
.
Accepted
Accepted
Accepted
Accepted
It i
§
¥
ibl£
t¥
̈
v£
b
¦
h ̈
©
i ©
§
̈
tt£
¤ ©
¥
f w ̈
t£
¤
¡
£
th ¤
¥
¡
h th£
i © t£
¤ v£
© ti¥
© ¥
f th£
f ¨ ¦
t¥
¤
̈
ff £ ¦
ti ©
w ̈
t£
¤ ¦ ¥
©
¡ ¢ § ti
¥
©
It i
§
¥
ibl£
t¥
i
£
© tif
̈
©
¦ ¥
© t ¤
¥
l w ̈
t£
¤ l¥ £
b£
l¥
w 20%
C¥
© ti© ¡
it
i
¤
£
li ̈
bl£
b ¡ t ©
£ £
b¨ ¦
k¡ §
t£
¢
¥
¡ § §
¥
¤ t w ̈
t£
¤ ¤
£
q ¡ i ¤
£
¢
£
© t i ©
¤
£ ¨ ¥
©
Figure 1. Grand Scheme of Water Supply Study
in Ridge Camp Area PT. Freeport Indonesia
8/7/2019 Study of Water Supply-PT.Freeport Indonesia
http://slidepdf.com/reader/full/study-of-water-supply-ptfreeport-indonesia 4/11
Gad jah Mada University | The Design Activity and methodology 4
Scheme of Water Supply System (Typical)
Industrial (office,
shop & messhall)
Komersial (Shopping HERO
& coff ee shop KOKARFI)
Domestic
(Barrack)
Sewage Treatment
Plant(STP)
W a t e r E x t a c t i o n
Back up system
Elevated
Tank
Reuse
Water
Treatment Plant
(WTP)
8 9 10
4
7
6
5
2
A B C
11
3
1
Figure 2. Scheme of Water Supply System
8/7/2019 Study of Water Supply-PT.Freeport Indonesia
http://slidepdf.com/reader/full/study-of-water-supply-ptfreeport-indonesia 5/11
Gad jah Mada University | The Design Activity and methodology 5
Real Demand Survey
Main line activity. Its real demand study to identif y efficient volume of
water consumption and factors aff ecting demand pattern. Survey will be
conducted by interviewing, observation and collecting data relating water
consumption both in quantity and pattern/allotment. Approachment Framework of study
display in Figure 3
Secondary/primary data requirement for Priority Number two. Its optional
case ad just requirement for f urther analysis especially water losses base
study and controlling. The following is a methodology that can be applied
after obtaining a blue print of water supply system. Technical data such as map the situation and
complete scheme with the specifications of pipes, pumps, WTP, etc. and tests/measurement
used to determine the steps that may be performed according to the conditions, infrastructure
and existing resources as shown in Figure 2 and Approachment Famework of study in
APPENDIX1.
Activity for Priority Number three called source of water Reliability Study
and Water Balance Analysis also optional activity. Topographic map,
hydrological and geo-hydrological data of the location (site) include the
watershed used to determine the steps that may be performed according to the conditions,
infrastructure and existing resources as shown in Approachment Framework of study in
APPENDIX 2. Reliability of quality, quantity and continuity analysis will be conducted to
determine the capacity of production and treatments. Water balance analysis will be conducted
to determine the possibility of excess water with a dependable flow of watershed for surface
water sources and the saf e yield for groundwater sources.
AB
C
1 11
8/7/2019 Study of Water Supply-PT.Freeport Indonesia
http://slidepdf.com/reader/full/study-of-water-supply-ptfreeport-indonesia 6/11
Gad jah Mada University | The Design Activity and methodology 6
Approachment Framework
Real Demand Base Study and Retrenchment
(1st
Priority)
y decreasing the supply of water in dry season
y Load of waste water in Sewage Treatment Plant
(STP) over of its hydraulic capacity
Water Demand
Approaches
Lit1
2
3
t 4 2
1
St 4
5
6
w3
t1
2 7 8
9
@
4 A B ti
8
9 @
t3
9
5
3
2
5
3
9
5
f 3 7
t8
2
@
3
ff 1 7
ti 9
C
w3
t1
2 7 8
9
@
4 A B ti8
9
D
3 7
t8
2
@
3
ff 1 7
ti 9
C
w3
t1
2 7 8
9
@
4 A B ti
8
9 St3
9
5
3
2
5
w3
t1
2 7 8
9
@
4 A B ti
8
9
D1
A
3
9
5
P3
tt1
2 9
@
8
f 5
8
A
1 @
ti7
w3
t1
2 7 8
9
@
4 A B ti
8
9
D1
A
3
9
5
P3
tt1
2 9
@
8
f
i 9
5
4
@
t 2 i3
l w3
t1
2 7 8
9
@
4 A B ti
8
9
D1
A
3
9
5
P3
tt1
2 9
8
f
C8
A A
1
2
7
i3
l w3
t1
2 7 8
9
@
4 A B ti
8
9
E
h1
iA B
3 7
t8
f 7
h3
9
C
i 9
C
B
3
tt1
2 9
@
8
f w3
t1
2 7 8
9
@
4 A B ti8
9 (@ 3
vi 9
C @
) t8
th1
9
1 1
5
@
3
9
5
w3
t1
2 7 8
9
@ 1
2 v3
ti8
9
Ch3
2
3 7
t1
2 i@
ti7
B
3
tt1
2 9
@
8
f w3
t1
2 7 8
9
@
4 A B ti8
9 /Real demand
F
G H I
P P
G
Q
R
S
tiI
Q
T
tI
:
1. ChS
Q
U
i Q
U
V
S
ttG
W Q
T
I
f wS
tG
W X
T G
th W
I
X
U
h thG
i Q tG
W vG
Q tiI
Q I
f thG
f S H
tI
W
T
thS
t i Q fl X
G
Q
H G
2.Y
S
tG
W LI T T G T
BS T G
St X
R
̀
S
Q
R
H I
Q t W
I
lli Q
U
3. SI
X W
H G
I
f wS
tG
W F
G
liS
bilit ̀
St X
R
̀
4.Y
S
tG
W W
G T I
X W
H G T
CI
Q
T G
W vS
tiI
Q P W
I U
W
S
P P
G
a
hG
Q
G H G T T S
W
̀
f I
W H
hS
Q
U G
i Q thG
V
S
ttG
W Q I
f wS
tG
W H I
Q
T
X P V tiI
Q
Db c
id
b
thb
e
b f
l f f c
tg
e will bb
f
h
f
li
zb
d
Analysis
Figure 3. Framework of Real Demand Base Study and Retrenchment
8/7/2019 Study of Water Supply-PT.Freeport Indonesia
http://slidepdf.com/reader/full/study-of-water-supply-ptfreeport-indonesia 7/11
Gad jah Mada University | The Design Activity and methodology 7
The Design Activity and Methodology
A. Activities and Schedule
1. Pre Survey
- Preparation of Contract
- Collecting Data
- Q uestionnaire Preparation
2. Preliminary Survey (3 Days)
1st
Day
- Presentation and Introduction Team
- Learning the Operational Scheme of Water Distribution
- Orientation and Field Trial Q uestionnaire
- Evaluation Activities
2nd
Day
- Interviews in 3 Regions (Barrack, Commercial, Industrial)
- Secondary Data Collection
- Evaluation Activities
3rd
Day
- Initial Report and Presentation
- Back to Yogyakarta
3. ImplementationSurvey (5 Days)
1st
Day
Presentation of operations to be performed
2nd
Day
Interviews and observation in 3 Regions (Barrack, Commercial, Industrial)
3rd Day
Interviews and observation in 3 Regions (Barrack, Commercial, Industrial)
4th
Day
Interviews and observation in 3 Regions (Barrack, Commercial, Industrial)
Analysis Data
5th
Day
Interim Report and Presentation
Back to Yogyakarta
4. Reporting (3 Days)
1st DayAnalysis Report
2nd
Day
Analysis Report and Draft Final Report
3rd
Day
Finalization, binding and Delivery
8/7/2019 Study of Water Supply-PT.Freeport Indonesia
http://slidepdf.com/reader/full/study-of-water-supply-ptfreeport-indonesia 8/11
Gad jah Mada University | The Design Activity and methodology 8
B. Methodology
Primary Data
Point 1 -11* (Interview,
Observation and
check list data)
Collecting Data
Preparation
Study
Start
Secondary Data
Secondary Data: 1. Grand scheme of water supply
system
2. Water treatment Installation
(domestic, non domestic)
3. demand
4. Other supporting data
Analysis
Conclusions And
Recommendations
Finish* Optip
q
r
l,r
s
j t
u
tr
vr
ilr
bilitv
p
f u w x p
q
s
r
y
v
s
r
tr
r
q
s
q
w x w u u r
y
v
p
f
f t y
thw
y r
q
r
lv
u
iu
Figure 4. Methodology Study
8/7/2019 Study of Water Supply-PT.Freeport Indonesia
http://slidepdf.com/reader/full/study-of-water-supply-ptfreeport-indonesia 9/11
Gad jah Mada University | The Design Activity and methodology 9
C. Time Schedule
- Survey will be conducted in end of November 2010
Table 1. Time Schedule
No Activity Day
Coor dinator 1 2 3 4 5
A Preliminary Survey
- Presentation and Introduction Team
- Learning the Operational Scheme of
Water Supply
- Orientation and Field Trial
Q uestionnaire
- Evaluation Activities
RB
- Interviews in 3 Regions (Barrack,
Commercial, Industrial)
- Collecting Secondary Data
- Evaluation Activities
AW
- Initial Report and Presentation
- Back to Yogyakarta
LS, DP
B Implementation Survey
Presentation of operations to be
performed
Interviews and observation in 3Regions (Barrack, Commercial,
Industrial)
Interviews and observation in 3
Regions (Barrack, Commercial,
Industrial)
Interviews and observation in 3
Regions (Barrack, Commercial,
Industrial)
Interim Report and Presentation
Back to Yogyakarta
8/7/2019 Study of Water Supply-PT.Freeport Indonesia
http://slidepdf.com/reader/full/study-of-water-supply-ptfreeport-indonesia 10/11
APPENDIX 1
Approachment Framework
Water Losses Base Study and Controlling
(2nd
Priority)
y L k f v il bilit f l w t th
y
t w t lti i
xpl it ti
f x iv w t
Water Losses Approach
Primary Data and
Secondary Data Survey
Grand Scheme of distribution
system, analytical result and
technical specifications of raw
water units, production units
(WTP), distribution units and
service units
Drafting Network diagram Capacity and pressure
estimation
Analysis, observation, on site measurement
and/or virtual testing (simulation)
The level of water losses
Recommendations to encourage management
treatment of water supply consumption patterns
and physical infrastructure rehabilitation.
The critical points of water losses
Discharge, pressure, pipe
diameter, pipe type, pipe
age, water quality,
elevation, completeness of
pipe accessories, etc
Checking Watermeter
Monitoring Preparation
(zoning system)
Analysis
8/7/2019 Study of Water Supply-PT.Freeport Indonesia
http://slidepdf.com/reader/full/study-of-water-supply-ptfreeport-indonesia 11/11
APPENDIX 2
Approachment Framework
Source of Water Reliability Study
(3rd
Priority)
L k f v il bilit f f h w t th j k
Primary and
Secondary Data
H j l l D t
G -h j l l i l j t
m pographi Map
Surface Water Ground Water
- A k al z ondary data and on it t t th
reliability of qn antity, qn ality and ontinuity;
and
- water balance analysis
Production Capacity and treatmentmethod
Development and interconnection of networks and
management r ecommendations
Character istics of water soure
Analysis