12
Gadjah Mada University | The Design Activity and methodology 1 Study of Water Supply in Ridge camp PT. Freeport Indonesia LPPM UGM and PT Freeport Indonesia 2010 Gadjah Mada University 11/1/2010

Study of Water Supply-PT.Freeport Indonesia

Embed Size (px)

Citation preview

8/7/2019 Study of Water Supply-PT.Freeport Indonesia

http://slidepdf.com/reader/full/study-of-water-supply-ptfreeport-indonesia 1/11

Gadjah Mada University | The Design Activity and methodology 1

Study of Water Supplyin Ridge camp PT.Freeport Indonesia 

LPPM UGM and PT Freeport Indonesia

2010 

Gadjah Mada University

11/1/2010

8/7/2019 Study of Water Supply-PT.Freeport Indonesia

http://slidepdf.com/reader/full/study-of-water-supply-ptfreeport-indonesia 2/11

Gad jah Mada Unive  

sity | The Design Activity and methodology  2 

Background

Ave  

age wate  

  consumption in Ridge Camp area PT Freeport Indonesia is  currently above 

800 liter per day per capita well above the normal standards which is 300 Liter per day per

capita. Load of waste water in Sewage Treatment Plant (STP) over of its hydraulic capacity.

In the other hand, water supply is declining precipitously when rainfall decreases.

Objective

Survey and study of water consumption in the Ridge Camp area of PT. Freeport Indonesia

for the three main sub-areas: 

- domestic (Barrack),

- commercial (shopping HERO & Coff ee Shop KOKARFI), and

- industrial (office, shop & messhall)to investigate and calculate water consumption per capita, determine the rate of water

losses in the distribution units and gives appropriate and practical recommendations for

water savings according to standard that should be, and alternative  solution in case of 

decreasing the water supply in dry season

Scope

Water from the Water Treatment Plant (WTP) supplies for individual purposes at barrack 

area, commercial area & industrial area through underground piping. The study is expected

show appropriate and practical recommendations for water savings according to the 

conditions, infrastructure and existing resources.

8/7/2019 Study of Water Supply-PT.Freeport Indonesia

http://slidepdf.com/reader/full/study-of-water-supply-ptfreeport-indonesia 3/11

Gad jah Mada University | The Design Activity and methodology  3

Grand Scheme of Water Supply Study

in Ridge Camp Area PT. Freeport Indonesia

(LPPM UGM-PT. Freeport Indonesia)

 

1st Priority 

Real Demand Base 

Study and

retrenchment

2nd Priority 

Water Losses Base 

Study and

controlling

3rd Priority

Source of water

Reliability Study 

and Water Balance 

Analysis 

Water resources 

Conservation

Programme

- N¡ ¢  

b£  

¤   ¥  

f ¥ ¦ ¦  

¡ §  

 ̈ 

©   t  

/  

£  

¢  

 ̈ 

©  

  

 

- D£  

¢  

 ̈ 

©  

  

P ̈ 

tt£  

¤ ©   (th£  

  ̈ 

¢  

¥  

¡ ©   t¥  

f   

i ¦  

h ̈ 

¤ 

£  

i ©   th£  

f ¡ ©  

¦  

ti¥  

©    ¥  

f ti ¢  

£  

)- 

  

h£  

 § ¡ ¤ §    

¥ £  

 ¥  

f w ̈ 

t£  

¤   ¦ ¥  

©  

  

¡ ¢ §  ti

¥  

©    

-    

¨ ¦  

iliti£   

 ¥  

w ©  

£  

  

b  

 £ ¨ ¦  

h¥ ¦ ¦  

¡ §  

 ̈ 

©   t

-    

£  ̈ 

l   

¨ ¦  

t¥  

¤ 

  

 ¥  

f   

£  

¢  

 ̈ 

©  

  

  §  

 ̈ 

tt£  

¤ ©   

- U ©  

¦ ¥  

¡ ©  t

£  

  

    

¥  

¤      

 ̈ 

t£  

¤  (U   

   

) i  

  ̈ 

  ¢  

 ̈ 

 j¥  

¤   ¦ ¥  

¢ §  

¥  

©  

£  

©   t¥  

f w ̈ 

t£  

¤     

£  

¢  

 ̈ 

©  

  

 

- It¶  

 ¦ ¥  

¢ §   li¦  ̈ 

t£  

  

  ̈ 

©  

  

l¥  

©  

  

ti ¢  

£  

  § ¤ 

¥ ¦ £    

with hi  

h fi ©  

 ̈ 

©  

¦ £  

  ̈ 

©  

  

h ¡ ¢  

 ̈ 

©     ¤ 

£ ¥  

¡ ¤ 

¦ £  

 

-    

£  

q ¡   i ¤ 

£   

   

 ̈ 

t ̈ 

: Di ¦  

h ̈ 

¤ 

£  

,§ ¤ 

£   

¡ ¤ 

£  

, §   i §  

£  

   

i ̈ 

¢  

£  

t£  

¤  , §   i §  

£  

t  

§  

£  

, §   i §  

£  

 ¨ £  

, w ̈ 

t£  

¤   

q ¡  

 ̈ 

lit  

,£  

l£  

v ̈ 

ti¥  

©   ,¦ ¥  

¢ §  l

£  

t£  

©  

£   

 ¥  

f  §   i §  

£  

 ¨ ¦ ¦ £ ¥    

¤  i  

.¦  

h£ ¦  

ki ©  

  

    

 ̈ 

t£  

¤    ¢  

£  

t£  

¤  ,£  

t¦  

 

- A  

 j¡  

  

t£  

  

t¥  

th£  

  ̈ 

v ̈ 

il ̈ 

bilit  

 ¥  

f  £ ¦ ¥    

©  

  

 ̈ 

¤ 

  

   

 ̈ 

t¨   

  ̈ 

©  

  

f ¡ ¤ 

th£  

¤  

 ̈ 

©  

 ̈ 

l   

i  

 

-    

 ̈ 

t£  

¤     

¡ ¤  f ¨ ¦ £  

 ¥  

¤  G ¤ 

¥  

¡ ©  

  

w ̈ 

t£  

¤   

-    

£  

li ̈ 

bilit  

 ¥  

f q ¡  

 ̈ 

lit  

, q ¡  

 ̈ 

©   tit  

  ̈ 

©  

  

 ¦ ¥  

©   ti© ¡  

it  

  ̈ 

©  

 ̈ 

l   

i  

t¥  

   

£  

t£  

¤ ¢  i ©  

£  

th£  

 ¦  ̈ 

§  

¨ ¦  

it  

 ¥  

f § ¤ 

¥  

  

¡  

¦  

ti¥  

©     ̈ 

©  

  

t ¤ 

£  ̈ 

t ¢  

£  

©   t  

 

-    

 ̈ 

t£  

¤  b ̈ 

l ̈ 

©  

¦ £  

  ̈ 

©  

 ̈ 

l   

i  

t¥  

   

£  

t£  

¤ ¢  i ©  

£  

th£  

  §  

¥   

ibilit  

 ¥  

f £  

x¦ £    

w ̈ 

t£  

¤  with ̈ 

   

£  

§  

£  

©  

  

 ̈ 

bl£  

fl¥  

w w ̈ 

t£  

¤ 

  

h£  

  

f ¥  

¤     

¡ ¤ f 

¨ ¦ £  

w ̈ 

t£  

¤    ¥  

¡ ¤ 

¦ £   

  ̈ 

©  

  

th£  

   ̈ 

f £  

   

i£  

l  

f ¥  

¤     

¤ 

¥  

¡ ©  

  

w ̈ 

t£  

¤    ¥  

¡ ¤ 

¦ £   

 

-    

£  

q ¡   i ¤ 

£   

   

 ̈ 

t ̈ 

: H  

  

¤ 

¥  

l¥   

, £ ¥  

h  

  

¤ 

¥  

l¥   

, t¥  

§  

¥   

¤ 

 ̈ 

§   hi¦  

  ¢  

 ̈ 

§    ¥  

f th£  

l¥ ¦  ̈ 

ti¥  

©    

(  

it£  

), i ©  

¦  

l ¡  

  

i ©  

  

th£  

    

 ̈ 

t£  

¤ 

  

h£  

  

 

C  

!    it"  

B# $ %  

E &  

  

w%  

'    

%  

!   t f   

'  w#  

t%  

'    ' 

% $   

( % $  

 (   

!  

$ %  

'  v#  

ti  

!   with%  

&   h# $  

i$  

   

!    %  

)  

  

( #  

ti  

!  

#  

l v#  

l   

% $  

:   

$  

i !  

0  

w#  

t%  

'   %  

ffi(  

i%  

!  

(  "  

, ' 

%  

f   

% $  

t#  

ti  

!    #  

!  

)  

 

i &   l%  

   

%  

!   t0   

)  

 $ #  

!   it#  

ti  

!    #  

!  

)  

 )  

#  

i !  

# 0 %  

.

Accepted

Accepted

Accepted

Accepted

It i  

  §  

¥   

ibl£  

t¥  

   ̈ 

v£  

b  

 ¦  

h ̈ 

©  

  

i ©  

  

  §  

 ̈ 

tt£  

¤ ©  

  

 ¥  

f w ̈ 

t£  

¤   

¡  

£  

th ¤ 

¥  

¡  

  

h th£  

i ©   t£  

¤  v£  

©   ti¥  

©    ¥  

f th£  

f ¨ ¦  

t¥  

¤ 

  

  ̈ 

ff £ ¦  

ti ©  

  

 

w ̈ 

t£  

¤   ¦ ¥  

©  

  

¡ ¢ §  ti

¥  

©    

It i  

  §  

¥   

ibl£  

t¥  

i  

£  

©   tif   

  ̈ 

©  

  

 ¦ ¥  

©   t ¤ 

¥  

l w ̈ 

t£  

¤  l¥ £    

 

b£  

l¥  

w 20% 

C¥  

©   ti© ¡  

it  

i  

  ¤ 

£  

li ̈ 

bl£  

b ¡   t ©  

£ £  

  

  

b¨ ¦  

k¡ §  

    

t£  

¢      

¥  

   

¡ § §  

¥  

¤  t w ̈ 

t£  

¤    ¤ 

£  

q ¡   i ¤ 

£  

¢  

£  

©   t i ©      

¤ 

  

  £ ¨ ¥    

©    

Figure 1. Grand Scheme of Water Supply Study 

in Ridge Camp Area PT. Freeport Indonesia

8/7/2019 Study of Water Supply-PT.Freeport Indonesia

http://slidepdf.com/reader/full/study-of-water-supply-ptfreeport-indonesia 4/11

Gad jah Mada University | The Design Activity and methodology  4

Scheme of Water Supply System (Typical)

 

Industrial (office,

shop & messhall)

Komersial (Shopping HERO

& coff ee shop KOKARFI)

Domestic 

(Barrack)

Sewage Treatment

Plant(STP)

   W   a   t      e   r   E      x   t   a      c   t   i   o   n

Back up system

Elevated

Tank 

Reuse 

Water

Treatment Plant

(WTP)

8 9 10 

4

7

6

5

A B C

11 

3

Figure 2. Scheme of Water Supply System

8/7/2019 Study of Water Supply-PT.Freeport Indonesia

http://slidepdf.com/reader/full/study-of-water-supply-ptfreeport-indonesia 5/11

Gad jah Mada University | The Design Activity and methodology  5

Real Demand Survey

 

Main line activity. Its real demand study to identif y  efficient volume of 

water consumption and factors aff ecting demand pattern. Survey will be 

conducted by interviewing, observation and collecting data relating water

consumption both in quantity and pattern/allotment. Approachment Framework of  study 

display in Figure 3 

Secondary/primary data requirement for Priority Number two. Its optional

case ad just requirement for f urther analysis  especially water losses base 

study and controlling. The following is a methodology that can be applied

after obtaining a blue print of water supply system. Technical data such as map the situation and

complete  scheme with the  specifications of pipes, pumps, WTP, etc. and tests/measurement

used to determine the steps that may be performed according to the conditions, infrastructure 

and existing resources as  shown in Figure 2 and Approachment Famework of  study in

APPENDIX1.

Activity for Priority Number three called source of water Reliability Study 

and Water Balance Analysis also optional activity. Topographic map,

hydrological and geo-hydrological data of the location (site) include the 

watershed used to determine the  steps that may be performed according to the  conditions,

infrastructure and existing resources as  shown in Approachment Framework of  study in

APPENDIX 2. Reliability of quality, quantity and continuity analysis will be  conducted to

determine the capacity of production and treatments. Water balance analysis will be conducted

to determine the possibility of excess water with a dependable flow of watershed for surface 

water sources and the saf e yield for groundwater sources.

AB

C

1  11 

8/7/2019 Study of Water Supply-PT.Freeport Indonesia

http://slidepdf.com/reader/full/study-of-water-supply-ptfreeport-indonesia 6/11

Gad jah Mada University | The Design Activity and methodology  6

Approachment Framework

Real Demand Base Study and Retrenchment

(1st

Priority)

y  decreasing the supply of water in dry season

y  Load of waste water in Sewage Treatment Plant

(STP) over of its hydraulic capacity  

Water Demand

Approaches 

Lit1  

3  

t 4 2 

1  

St 4  

5  

6  

 

w3  

t1  

2   7 8  

9  

@  

4 A B  ti

8  

9    @  

t3  

9  

5  

3  

5  

 3  

9  

5  

f 3 7  

t8  

@  

 3  

ff 1 7  

ti 9  

C  

w3  

t1  

2   7 8  

9  

@  

4 A B   ti8  

9    

D  

3 7  

t8  

@  

 3  

ff 1 7  

ti 9  

C  

w3  

t1  

2   7 8  

9  

@  

4 A B  ti

8  

9   St3  

9  

5  

3  

5  

w3  

t1  

2   7 8  

9  

@  

4 A B  ti

8  

9    

D1  

A   

3  

9  

5  

P3  

tt1  

2 9  

@  

 8  

f 5  

8  

A   

1 @  

ti7  

w3  

t1  

2   7 8  

9  

@  

4 A B  ti

8  

9    

D1  

A   

3  

9  

5  

P3  

tt1  

2 9  

@  

 8  

i 9  

5  

4  

@  

t 2  i3  

l w3  

t1  

2   7 8  

9  

@  

4 A B  ti

8  

9    

D1  

A   

3  

9  

5  

P3  

tt1  

2 9   

8  

C8  

A A   

1  

7  

i3  

l w3  

t1  

2   7 8  

9  

@  

4 A B  ti

8  

9    

E  

h1  

iA B  

3 7  

t8  

f 7  

h3  

9  

C  

i 9  

C  

  B  

3  

tt1  

2 9  

@  

 8  

f w3  

t1  

2   7 8  

9  

@  

4 A B   ti8  

9   (@ 3  

vi 9  

C @  

) t8  

th1  

  9  

1 1  

5  

@  

 3  

9  

5  

 

w3  

t1  

2   7 8  

9  

@ 1  

2  v3  

ti8  

9    

Ch3  

3 7  

t1  

2  i@  

ti7  

  B  

3  

tt1  

2 9  

@  

 8  

f w3  

t1  

2   7 8  

9  

@  

4 A B   ti8  

9   /Real demand 

F  

G H I  

P P   

G  

Q  

R  

S  

tiI  

Q  

T  

tI  

:

1. ChS  

Q  

U  

i Q  

U  

  V  

S  

ttG  

W Q  

T  

 I  

f wS  

tG  

W    X  

T G  

th W 

I  

X  

U  

h thG  

i Q   tG  

W  vG  

Q   tiI  

Q    I  

f thG  

f S H  

tI  

T  

thS  

t i Q   fl X  

G  

Q  

H G  

 

2.Y   

S  

tG  

W  LI T T G T    

BS T G  

St X  

R  

 ̀ 

 S  

Q  

R  

 H I  

Q   t W 

I  

lli Q  

U  

 

3. SI  

X W 

H G  

 I  

f wS  

tG  

W    F  

G  

liS  

bilit ̀ 

St X  

R  

 ̀ 

 

4.Y   

S  

tG  

W    W 

G T I  

X W 

H G T  

CI  

Q  

T G  

W  vS  

tiI  

Q   P W 

I U  

S  

P P   

G  

 

a  

hG  

  Q  

G H G T T S    

 ̀ 

f I  

W   H  

hS  

Q  

U G  

i Q   thG  

  V  

S  

ttG  

W Q    I  

f wS  

tG  

W   H I  

Q  

T  

X P V   tiI  

Q    

Db c  

id  

b  

thb  

  e 

b f  

l f f c  

tg  

e  will bb  

 f  

h  

f  

li  

zb  

d  

 

Analysis 

Figure 3. Framework of Real Demand Base Study and Retrenchment

8/7/2019 Study of Water Supply-PT.Freeport Indonesia

http://slidepdf.com/reader/full/study-of-water-supply-ptfreeport-indonesia 7/11

Gad jah Mada University | The Design Activity and methodology  7

The Design Activity and Methodology

A.  Activities and Schedule

1.  Pre Survey

-  Preparation of Contract

-  Collecting Data

-  Q uestionnaire Preparation

2.  Preliminary Survey (3 Days)

1st

Day

-  Presentation and Introduction Team

-  Learning the Operational Scheme of Water Distribution

-  Orientation and Field Trial Q uestionnaire 

-  Evaluation Activities 

2nd

Day

-  Interviews in 3 Regions (Barrack, Commercial, Industrial)

-  Secondary Data Collection

-  Evaluation Activities 

3rd

Day

-  Initial Report and Presentation

-  Back to Yogyakarta

3.  ImplementationSurvey (5 Days)

1st

Day

Presentation of operations to be performed

2nd

Day

Interviews and observation in 3 Regions (Barrack, Commercial, Industrial)

3rd Day

Interviews and observation in 3 Regions (Barrack, Commercial, Industrial)

4th

Day

Interviews and observation in 3 Regions (Barrack, Commercial, Industrial)

Analysis Data

5th

Day

Interim Report and Presentation

Back to Yogyakarta

4.  Reporting (3 Days)

1st DayAnalysis Report

2nd

Day

Analysis Report and Draft Final Report

3rd

Day

Finalization, binding and Delivery 

8/7/2019 Study of Water Supply-PT.Freeport Indonesia

http://slidepdf.com/reader/full/study-of-water-supply-ptfreeport-indonesia 8/11

Gad jah Mada University | The Design Activity and methodology  8

B.  Methodology

 

Primary Data

Point 1 -11* (Interview,

Observation and

check list data)

Collecting Data

Preparation

Study 

Start

Secondary Data

Secondary Data: 1. Grand scheme of water supply 

system

2. Water treatment Installation

(domestic, non domestic)

3. demand

4. Other supporting data

Analysis 

Conclusions And

Recommendations

Finish* Optip  

q  

r  

l,r  

s  

 j t  

u  

tr  

vr  

ilr  

bilitv  

 p  

f u w x p    

q  

s  

r  

v  

 s  

r  

tr  

 r  

q  

s  

  q  

w x w u u r    

v  

 p  

f t y 

thw  

y   r  

q  

r  

lv  

u  

iu  

 

Figure 4. Methodology Study 

8/7/2019 Study of Water Supply-PT.Freeport Indonesia

http://slidepdf.com/reader/full/study-of-water-supply-ptfreeport-indonesia 9/11

Gad jah Mada University | The Design Activity and methodology  9

C.  Time Schedule

 

-  Survey will be conducted in end of November 2010 

Table 1. Time Schedule 

No  Activity Day 

Coor dinator  1  2  3  4  5 

A  Preliminary Survey 

-  Presentation and Introduction Team

-  Learning the Operational Scheme of 

Water Supply 

-  Orientation and Field Trial

Q uestionnaire 

-  Evaluation Activities 

RB

-  Interviews in 3 Regions (Barrack,

Commercial, Industrial)

-  Collecting Secondary Data

-  Evaluation Activities 

AW

-  Initial Report and Presentation

-  Back to Yogyakarta

LS, DP

B  Implementation Survey 

Presentation of operations to be 

performed

Interviews and observation in 3Regions (Barrack, Commercial,

Industrial)

Interviews and observation in 3

Regions (Barrack, Commercial,

Industrial)

Interviews and observation in 3

Regions (Barrack, Commercial,

Industrial) 

Interim Report and Presentation

Back to Yogyakarta

8/7/2019 Study of Water Supply-PT.Freeport Indonesia

http://slidepdf.com/reader/full/study-of-water-supply-ptfreeport-indonesia 10/11

 

APPENDIX 1 

Approachment Framework 

Water Losses Base Study and Controlling 

(2nd

Priority)

y L    k    f     v   il   bilit         f     l    w    t    th          

    

y     

   t    w   t         lti    i         

   xpl    it    ti   

     f     x    iv   w    t   

 

Water Losses Approach

Primary Data and

Secondary Data Survey 

Grand Scheme of distribution

system, analytical result and

technical specifications of raw

water units, production units 

(WTP), distribution units and

service units  

Drafting Network diagram Capacity and pressure 

estimation

Analysis, observation, on site measurement

and/or virtual testing (simulation)

The level of water losses 

Recommendations to encourage management 

treatment of  water supply  consumption patterns 

and physical infrastructure rehabilitation. 

The critical points of water losses 

Discharge, pressure, pipe 

diameter, pipe type, pipe 

age, water quality,

elevation, completeness of 

pipe accessories, etc 

Checking Watermeter

Monitoring Preparation

(zoning system)

Analysis 

8/7/2019 Study of Water Supply-PT.Freeport Indonesia

http://slidepdf.com/reader/full/study-of-water-supply-ptfreeport-indonesia 11/11

 

APPENDIX 2 

Approachment Framework 

Source of  Water Reliability Study 

(3rd

Priority)

L    k    f     v   il   bilit         f f     h w   t    th      j      k     

Primary and

Secondary Data

H j    l l    D    t     

G    -h j    l l   i    l j    t     

m    pographi    Map 

Surface Water Ground Water

- A k   al    z         ondary data and on     it    t    t th    

reliability of qn   antity, qn   ality and     ontinuity; 

and 

- water balance analysis 

Production Capacity and treatmentmethod 

Development and interconnection of networks and

management r ecommendations 

Character istics of water  soure 

Analysis