Upload
stuart-jones
View
172
Download
3
Embed Size (px)
Citation preview
Stuart Jones Page 1 of 4 CV Apr 2016
Stuart Jones I. Eng. (SJ Offshore Services Ltd.) Client Representative / Offshore Manager / ROV Specialist
37 Forest Walk Home: +44 - 1244550952 Buckley Mobile: +44 - 7808914696 Flintshire N Wales United Kingdom, CH73AZ Email: [email protected] [email protected]
PERSONAL PARTICULARS
Surname Jones
Forename Stuart
Nationality Dual British/Australian
Date of Birth 04th November 1957
UK Passport x 2 current Expiry 15th Aug 2016 / 11th Oct 2021 Australian Passport Expiry 27th Oct 2025
British Seaman’s Card Expiry 06th Jan 2019
UK OPITO Offshore Medical Expiry 12th Nov 2017
UK OPITO FOET/HUET Expiry 25th Feb
CA-EBS Initial Deployment Training 13th April 2015
MIST Expiry Sept 2019
HSE COURSES/ LEADERSHIP MANAGEMENT & SAFETY QUALIFICATIONS Course Date Course Organiser Client/Contractor National Safety Group Safety Passport Expiry Sept 2018 Complete Site Safety Liverpool High Voltage Senior Competent Person to 11kv Cert S4 21 Aug 2015 Faraday Training Group Middlesbrough GWO Renewable Energy Ind. First Aid Expiry Mar 2017 Complete Site Safety Liverpool GWO Renewable Energy Ind. Fire Awareness Expiry Mar 2017 Complete Site Safety Liverpool GWO Renewable Energy Ind. Manual Handling Expiry Mar 2017 Complete Site Safety Liverpool GWO Renewable Energy Ind. Confined Space L2 Expiry Feb 2018 Complete Site Safety Liverpool GWO Renewable Energy Ind. Sea Survival Expiry Feb 2019 Complete Site Safety Liverpool GWO Renewable Energy Ind. Working at Heights & Rescue Expiry Feb 2017 Complete Site Safety Liverpool Client Representative – Offshore Renewables 24 / 25 Mar 2015 Offshore Marine Academy Client Representative – Offshore Oil & Gas 01 / 05 Dec 2014 National Hyperbaric Centre Aberdeen Intro to Offshore Survey for Non-Survey Personnel 30/31 Mar 2016 Offshore Marine Academy Understanding Sub-Sea Power Cables 19/20 Apr 2016 Offshore Marine Academy Cert of Familiarisation Nexan Euro Mould 33kv Connector 4 Mar 2016 Nexan Castleford HSE NEBOSH GC 1, 2, 3(Credit) 27 Feb 2015 Corporate Risk Systems (CRS) Dynamic Positioning Introduction 26 / 28 Jan 2015 Lowestoft Maritime College Introduction to the Offshore Wind Farm 29 Dec 2014 JEE Engineering LOLER/Mechanical Isolations/ISSOW/P&ID/COSHH 24-27 Nov 2014 Atlas Unify Senior Management & Leadership Mar 2003 Oceaneering Houston Texas I.O.S.H /PTW Coordinator Mar 1996 Atlantic Power & Gas VHF Radio 19 Apr 1996 Royal Yachting Association Restricted Coxswain (Diver Tender) 27 Sept 1994 QLD. Marine Authority Australia PROFESSIONAL /TECHNICAL COURSES & EDUCATIONAL QUALIFICATIONS Course Date Course Organiser ROV Hydraulic/Electrical Systems Mar 1997/98 Oceaneering Int. Services Ltd HNC - Nuclear Marine Prop. Long Course Jan-Jul 1985 Royal Navy OND Mechanical Marine Engineering Aug 1980/Sep 82 Royal Navy City & Guilds (Fitting & Turning) Aug 1980/Sep 82 Royal Navy Machinery Fitter/ Turner 17 Jun 1993 Queensland Australian Trades Committee Diver Med Technician/Advanced First Aid 17 Jun 1992 Royal Adelaide Hospital Australia Marine Engineer Driver (First Class) 16 Sep 1999 Australian Queensland Transport GEOGRAPHICAL WORK EXPERIENCE EUROPE United Kingdom, Norway, West Shetland Isles, Atlantic Grand Canarias, South Africa, Mauritania, Ivory Coast, Nigeria, Equatorial Guinea, Ghana, Gabon Congo, Democratic Rep. Congo, Cabinda, Angola, Namibia, Brazil. Northern Atlantic Greenland. South Pacific Peru, Australia, Papua New Guinea. Mediterranean Israel, Egypt. Black Sea/ Caspian Sea Turkey, Russia, Azerbaijan PROFESSIONAL & TECHNICAL AFFILIATIONS Institution of Technician Engineers in Mechanical Engineers, (Incorporated Engineer- I Eng.) – Since Feb 1988 Member of the Society of Underwater Technology
Stuart Jones Page 2 of 4 CV Apr 2016
2016- Wind Farm Array Cable Installation
NORDSEE ONE Location: GERMAN BIGHT – CLV Siem Aimery Site: NORDSEE ONE Operation: Inter Array Cable Installation Role: Client Representative Designated Client Representative for Inter Array Cable installation at the offshore wind park
Pre-mobilisation review of project documentation installation.
Contractor performance under an EPCI contract
New vessel performance /reliability
Cable load out to twin carousel systems
Witness cable testing (OTDR &TDR)
1st end pull -in operations -bell mouth and monopile apertures
Touch down monitoring with tight lay corridors
2nd end pull -in and Quadrant deployed lay-down
Installation of SeaProof® cable protection system, including bend restricting MIU
Pre and post lay & debris (GVI) surveys
QC of survey data & lay analysis with regard to surface slack and cable tension
SIMOPS on site monitoring
Trenching performance -twin sword jetting trencher, post lay burial operations
Post trench surveys & data processing (as -built data)
Acceptability of cable burial /requirement for remedial burial
Equipment performance & failure event analysis
Project HSE requirements including JSA, HIRA,Method Statements & reporting
Witnessing cable installation (surface lay)
2015-2016 Self-funded career development and training for crossover from oil & gas industry to off-shore renewable energy.
My career to date has allowed me to develop a diverse and wide ranging skill-set in offshore operations. From senior management in nuclear submarine operation to offshore dive support vessels. Following a 20-year career working offshore in the ROV Oil & Gas industry, working up to ROV Superintendent level and nearly 38 years in a marine engineering environment, I am now progressing opportunities as a Client Representative / Offshore Manager.
2012-14 High level deep water subsea field opera-tions and development Extensive use of ROV tooling Hydraulic control jumper installations. HFL/EFL/OFL Installation & post installation testing. Pre /Post Installation surveys Installation of concrete mattresses Flow line surveys. FPSO production riser survey. & riser clamp replacement Reclamation of FMC subsea trees TMIST Operations (Tree Manifold in Situ test-ing)
Oceaneering – BP Location: ANGOLA – MV Bourbon Ocean Team 101 Site: PSVM Field - block 18 & 31 Operation: Sub Sea Field Development. Role: ROV Superintendent / ROV Site Operations Manager
Responsible for twin ROV mobilisation and installation HIRA /HAZID /JSA/Tool Box Talk meetings ROV system acceptance sea trials. Deep Water FMC/Cameron Sub Sea Tree/Manifold/Jumper installations to 1400m
HFL & EFL installation using FMC CAT & Cameron Vertical Connector.
Tree & Manifold in Situ Testing (TMIST)
Metrology
Post installation as-laid surveys.
ROV Maintenance planning
ROV Crew Training Programme
PTW management
Management of Change implementation
Providing Subsea Operation expertise to the Client
Reliability assurance for ROV tooling fitted to the ROVs
Management of ROV personnel rotation
Reporting to onshore project management teams
2008-11 Mobile ROV Support for Lief Erikson Rig & West Capella Drillship
BOP Emergency Intervention
Transponder Beacon Installation
Environmental sea bed surveys
Oceaneering – CAIRN ENERGY Location: GREENLAND – MV Siem Aquamarine Site: PITU FIELD BAFFIN BAY Operation: BOP Intervention and field support Role: ROV Superintendent.
Responsible for single only ROV mobile field support with BOP Emergency Intervention Skid.
Responsible for installing multiple DP beacons for whole field to a depth of 400-800m.
Pre-spud sea bed surveys
Provide stable platform for environmental sea bed surveys (EIA) and obtaining deep wa-ter samples
Stuart Jones Page 3 of 4 CV Apr 2016
2006-08
ROV Support for field FPSO /West Capella drill ship.
ROV Support for USAN/AKPO field
Oceaneering – TOTAL Location: NIGERIA – MV Bourbon Diamond Site: USAN/ AKPO OIL FIELDS Operation: BOP Intervention and field support Role: ROV Superintendent.
ROV Work Class system vessel pre - mobilisation survey including HIRA meeting and re-viewing, installation & sea acceptance trials on completion
ROV back up support for both USAN & AKPO fields, tree /manifold/jumper installation Transponder DP beacon installation/retrieval Monitoring remote subsea valve operations and manual operation with ROV torque tools
(Improv)
Bi-annual field inspection (pipelines, risers and subsea structures) - GVI, CPI, CVI Operation and installation of ROV THEOCT tool for tubing hanger orientation and height
measurement. Providing use of mobile subsea stable platform for environmental seabed surveys (EIA) to
be carried out by the SERPENT organisation. Dog house insulation installation Cathodic protection survey using ROV mounted contact probe (CP Potentials)
ROV support (West Africa)
X tree Inspections Choke Change Out & SCM Replacement Tree & Jumper Installation Deepwater IRM Operations Leak Tracing Isolation Operations SCM Exchange Well Re-commissioning
Oceaneering – EXXON MOBILE Location: NIGERIA – MV Maersk Winner Site: ERHA OIL FIELD Operation: ROV Intervention & Sub Sea Field Construction Role: ROV Supervisor/Superintendent
Tree & manifold surveys GVI, CPI.
Field SCM change out using FMC running tool
Jumper/flow line installations with ROV intervention pressure testing on completion
Testing and re-commissioning wells with FPSO SIMOPS /PTW coordination
Valve isolation operations (ROV mounted Improv torque tool) Dog house jumper pipe line insulation installation
2006 Drill Support & ROV Intervention
Oceaneering – PETRO SA, CAPE DIVING LTD Location: SOUTH AFRICA – Pride South Seas Site: IBHUBESI ORANGE BASIN Operation: ROV Intervention & Drill Support Role: ROV Supervisor/Superintendent
Transponder DP beacon installation/retrieval Pre-spud seabed investigations Sub Sea BOP glycol injections using ROV hot stab X, Y, Z Tool Deployment Unit (ROV operated LMRP valve operating tool) HFL, EFL installation from LMRP to BOP
2005
ROV Intervention Field Support Suction Piles Subsea Manifolds Dimensional Control Spool Installation HFL, EFL Control Cable Hook-up
Oceaneering - Technip Location: CÔTE D'IVOIRE / GHANA – MV Maersk Winner Site: BAOBAB FIELD Operation: ROV Intervention & Field Support Role: ROV Supervisor
Installation of Seabed Umbilical connector units
Installation & Calibration Of EHF Acoustic Arrays
Installation of Subsea Foundation Piles (Suction Piles) in 1200m w.d.
Installation of Subsea Seabed Manifolds together with FMC Seabed Well Jumpers
Pre-lay HFL, EFL route surveys using ROV and geophysical instruments
Lay and Installation of hydraulic and electrical flying leads (HFL & EFL)
Remote subsea valve operations using ROV torque tools (Improv)
Installation of Jumper insulation units
Pipeline and umbilical post-lay inspection surveys
2002 – 2005 SEPLAR Anchor Installation Umbilical & Risers Inspections
Top Chain Mooring Inspections
Oceaneering – EXXON MOBILE Location: ANGOLA - MV Ulysse Site: KIZOMBA Block 15 Operation: FPSO Seplar anchor installation. Role: ROV Supervisor
Seplar anchor installation for Kizomba A FPSO
Mooring chain surveys
Inspection of mooring system and subsea assets (risers & umbilical’s)
Stuart Jones Page 4 of 4 CV Apr 2016
2000-02
Pipe route Inspection Multi Beam/TSS Survey Post Lay Trenching Free Span Rectification Seabed surveys (EIA) Emergency Intervention for damaged pipe
Sonsub – ENI SAIPEM Location: BLACK SEA - MV Polar Prince Site: BLUE STREAM PROJECT Operation: ROV Intervention /Pipe Line Survey Role: ROV Supervisor/Senior Sub Engineer
Touchdown monitoring for pipe laying barge Saipem 7000 of two 396 kilometre 610mm gas pipe lines across the Black Sea to a depth of 2200m.
Multi beam, side scan sonar & sub bottom profile analysis for pipe route planning
Emergency ROV intervention for damaged pipe removal and replacement using diamond rope pipe cutting ROV intervention tooling Sonsub W.B.R.S
Operation and maintenance of 54-ton free flying ROV Beluga for free span removal and trenching operations using water jetting and exterior hydraulically operated cutting wheels
1997-2000 Drill Support & ROV Intervention
Seabed inspections
TOTAL /ARCO /CHEVRON Location: CONGO /NIGERIA/ANGOLA/LIMA PERU - R.F BAUER WEST SHETLANDS GLOMAR HUGHES
EQUATORIAL GUINEA SEDCO ENERGY OCEAN ALLIANCE Operation: ROV Intervention /Drill Support Role: Senior Sub Engineer/Pilot Tech
Transponder DP beacon installation/retrieval Pre Spud Seabed surveys using Tritech/Meso Tech /Sonarvision ROV equipment Landing LMRP/BOP Daily BOP/ Seabed inspections for hydrates with removal using ROV dredge /trash/zip
pumps Sub Sea BOP glycol injections using ROV hot stab.
1996-1997 Ballast Controller
Atlantic Power & Gas –CONOCO Location: EAST SHETLANDS Operation: Hutton TLP Role: Ballast Controller
Fully competent in the maintenance and operation of the tension leg ballast control systems on board the 56k ton Hutton TLP Oil Rig platform
To maintain safe effective stability of the platform in the event of damage by extreme weather conditions, collision and undue deck load movements.
To be fully aware and in control of stability whilst derrick skidding, major deck cargo oper-ations, embarking fuel and bulk drilling fluids
Compile weekly deck weights and locations to calculate estimated C of G of rig and forward report to the PM.
Constant monitoring of weather conditions with daily updates
1991 -1996 M.E.D 1st Class Marine Engineer Driver Northern Queensland Australia
Day to day running, planned maintenance and defect rectification of the company’s three live aboard dive vessels. Responsibilities included maintaining a full inventory of spares and tools, within a specified budget, for continued safe efficient operation of the vessel equipment; this included diesel propulsion, diesel power generation, steering hydraulics, desalination, diving equipment maintenance, air conditioning and dive tenders.
1975-1990 Royal Navy Charge Chief Petty Officer Artificer Category B W/Kpr Nuclear Submarine
A senior watch keeping and management position on board a Royal Navy Nuclear submarine dur-ing operational deployments, and watch keeping / maintenance of the Pressure Water Reactor in a shut-down state with full responsibility for the engineering department aboard the submarine.
I/C a nuclear at sea engineering steaming watch (up to 12 personnel) and approximately 20 per-sonnel in a specific submarine marine engineering department whilst alongside.