55
P PRE RE - - Q QUALIFICATION UALIFICATION D DOCUMENT OCUMENT NCCI Head Office Bldg., Riyadh NCCI Head Office Bldg., Riyadh Scope: Electro Scope: Electro- Mechanical Mechanical Kingdom Hospital, Riyadh Kingdom Hospital, Riyadh Scope: Electro Scope: Electro- Mechanical Mechanical Saud Saud Al Al- Babtain Babtain Cardiac Center, Cardiac Center, Dammam Dammam Scope: Turn Key Scope: Turn Key Residential & Commercial Bldg., Residential & Commercial Bldg., Madinah Madinah Scope: Electro Scope: Electro- Mechanical Mechanical Al-Ta’afuf Company for Electrical Works (STS)

sts_1_of_3

Embed Size (px)

Citation preview

Page 1: sts_1_of_3

PPRERE--QQUALIFICATIONUALIFICATIONDDOCUMENTOCUMENT

NCCI Head Office Bldg., Riyadh NCCI Head Office Bldg., Riyadh Scope: ElectroScope: Electro--MechanicalMechanical

Kingdom Hospital, Riyadh Kingdom Hospital, Riyadh Scope: ElectroScope: Electro--MechanicalMechanical

SaudSaud AlAl--BabtainBabtain Cardiac Center, Cardiac Center, DammamDammamScope: Turn KeyScope: Turn Key

Residential & Commercial Bldg., Residential & Commercial Bldg., MadinahMadinahScope: ElectroScope: Electro--MechanicalMechanical

Al-Ta’afuf Company for Electrical Works (STS)

Page 2: sts_1_of_3

Table of Contents

Introduction to STS ........ .............................................. 2

Organization Chart ........................................................ 7

Team Member’s Resume ............................................ 16

STS Staff .............................................................. 21

STS Overview ............................................................... 23

Projects History ...............................................................28

STS Projects Photos ………......................................… 50

Typical Project Planning ............................................... 90

STS Field Equipment .................................................... 97Commercial Registration Certificates,Classification Certificate,Commercial Registration Certificate, Jeddah Chamber of Commerce .....................................103

Page

Table of Contents 1

Page 3: sts_1_of_3

Introduction to STS

Introduction to STS

2

Page 4: sts_1_of_3

Introduction to STS 3

The CompanyAl-Ta’afuf Company for Electrical Works (STS) has acquired its multi-disciplinary experience through the highly technical skills and dedication of its staff. Within a relatively short period of ten years, STS has grown to become one of the leading Electro-Mechanical contracting companies in Saudi Arabia, with Ambitions to expand the company’s horizon by also operating in other areas in the Middle East.

The entire management, employees and resources of Al Ta’afuf Company for Electrical Works has operated earlier under another company named Saudi Trading & Services International Co. Ltd.

Realizing the potential for growth in the construction industry and as a strategy in expanding the contracting business, two new owners having wide experience in engineering and contracting have agreed with the owners of Saudi Trading to transfer the entire management, employees, resources and offices of Saudi Trading to a newly established company registered under the name of Al Ta’afufCompany for Electrical Works. The Logo of STS was also transferred to Al Ta’afuf and officially registered at the Ministry of Trade & Industry.

This smooth transfer has made the continuation of the construction business possible, thus allowing the new company to add the past achievements to its pre-qualification.

To expand its services, STS has associated itself with reputable international firms by becoming a licensee of their products in the field of:

• Water and sewerage treatment using the advance technology of ZENON Environmental of Canada.

• Medical Gas System of Medimaster of England.• Hospital Bed-Head Units of Medimaster of Turkey.

STS has proudly achieved successful completion of major landmark projects invarious cities in Saudi Arabia. Although specialized in the Electro-Mechanical field, STS has accepted to execute projects on turnkey basis including civil, structural and architectural works.

Page 5: sts_1_of_3

Introduction to STS 4

STS also adapted itself to the needs of its clients, by providing value-engineering and re-design services that proved to accomplish substantial cost saving without compromising performance and quality.

This pre-qualification document gives an overview of the organization structure of STS and its management team and brief description and values of the projects executed by STS in the fields of:

1. Hospitals.2. Prestigious Residential High Rise Towers.3. Hotels and Recreational Centers.4. Office Buildings.5. Infrastructure and Power Plants for Housing Development Projects.6. Commercial Centers.7. Water Treatment Plants.

Hoping that this document will give you a good understanding of STS goals and achievements.

Page 6: sts_1_of_3

• Business of STS• Electro - Mechanical Contracting

• Turnkey General Contractor

• Project Management

• Management• A management team having 20 years experience.

• A commitment to achieving recognized quality standards.

• Good experience in the Saudi Market and the Middle East.

• People• STS Team consists of highly qualified experienced and

committed professionals.

• Technology• Information Technology Systems including computer

integrated construction software which enhances efficiency and on time performance

• On Line Quality Management System

• Engineering• Capability to perform value engineering.

• Sound engineering input supported by experienced engineers.

Introduction to STS 5

Page 7: sts_1_of_3

6Introduction to STS

Page 8: sts_1_of_3

Organization Charts

Organization Charts

7

Page 9: sts_1_of_3

Organization Charts 8

STS Organization Chart

Managing DirectorRAHIF IBRAHIM

Quality Management Representative

Riyadh Area Manager

Contracts Manager

Technical Manager

Finance Manager

Human Resources Manager

Executive Secretary

Construction Manager

Page 10: sts_1_of_3

Organization Chart Western Region Projects

9Organization Charts

Admin. Assistant

Western Region Projects

Construction Manager

150 Bed General Hospital, Haqel

100 Bed Hospital, Arar

5 Star Sana’a Hotel, Yemen

Page 11: sts_1_of_3

Organization Charts 10

Organization ChartRiyadh Area Projects

Riyadh Area Manager

Chawki Ibrahim

DawadmiProject

Kingdom Center

Projects

G-100 Bed Hospitals

Project

Admin. Assist.

Granada Project

Page 12: sts_1_of_3

STS Typical Project Organization ChartProject’s Management

11Organization Charts

Project Manager

Admin. Assistant

Local Purchaser/ Driver

STS – HEAD OFFICEJEDDAH

Sr. Project Engineer

Mechanical

Mech. Site Supervisors

Foreman

Elect. Site Supervisors

Foreman

Sr. Project Engineer Electrical

Mechanical Engineer

Electrical Engineer

Sr. Mech. Design

Engineer

Sr. ElectricalDesign

Engineer

CAD Operators

PlanningEngineer Storekeeper

CAD Operators

Engineering & Shop Drawings Team

Support Services

STS – RIYADH OFFICEJEDDAH

Support Services

QC / QSEngineer

SafetyEngineer

Construction Team

Operation Manager

Construction Manager

Accountant

Page 13: sts_1_of_3

Organization Chart Technical Department

12Organization Charts

Admin. AssistantHameed Hussain

Technical Manager

Maged Gamil

Tendering Department

Engineering Department

Procurement Department

Sr. Mechanical Engineer

Victor Batutay

Sr. Mechanical Engineer

Waqar Azim Khan

Electrical Engineer

Syed Khurshid

Sr. Mechanical Engineer

Bairam Khan

Mechanical Engineer

Hitham Bisharat

Mechanical Qty.Surveyor

Syed Wahiduddin

Sr. Electrical Engineer

Rashid Qureshi

Electrical Engr / Qty. SurveyorAhmed Kamel

Procurement Admin.

CoordinatorBilal Hussein

Main StoreStorekeeper

Ziad El-Dahdah

Sr. Electrical Engineer

Renato Gaa

Admin. Assistant

Malik Sohail Khan

Page 14: sts_1_of_3

Organization ChartFinance Department

Organization Charts 13

Financial Controller

Efren Rodriguez

Admin. Assistant Mohamed Nazir

AccountantMalik Ajmal

Chief Accountant

Thomas Stephen

AccountantAudie Agpalo

I.T. Department

(TBA)

Payroll Accnt. & H.R. Supvr.Samer Namour

AccountantMina Gamil Anis

Page 15: sts_1_of_3

Organization Charts 14

Organization ChartHuman Resources Department

H.R. ManagerJaber Al-Otaibi

Govt. RelationSalem Bin

Yamin

Admin. Assistants

Govt. RelationMishal Hamdan

Govt. RelationSaeed Bin

Hamid

DriverAhmad

Al-Biladi

DriverMohamed Al-Nefai

DriverAbdul Jaweed

Logistic Asst.Hussein

Bamehriz

Receptionist / Tel. OperatorCeferino Algara

Receptionist / Tel. OperatorMasaad Bin Ali

Hussein

Office ClerkBadr Hemaid

Al-Biladi

Office Tea BoyModh. Mustafa

Acct. ClerkMidhat Mohd.

Essa

Storekeeper Helper

MushababAl-Harthi

Storekeeper Helper

Abdul RahimSalim

Page 16: sts_1_of_3

Support for Projects

ProjectEngineering

Services

ProcurementServices

FinancialServices

InformationTechnology

Services

LogisticsServices

1 st Q t r 2 nd Q tr0

2 0

4 0

6 0

8 0

1 st Q t r 2 nd Q tr

1 s t Q t r 2 n d Q t r0

2 0

4 0

6 0

8 0

1 s t Q t r 2 n d Q t r

1s t Q tr 2 n d Q tr0

20

40

60

80

1s t Q tr 2 n d Q tr

1s t Q tr 2 n d Q tr0

20

40

60

80

1s t Q tr 2 n d Q tr

1 st Q t r 2 nd Q tr0

2 0

4 0

6 0

8 0

1 st Q t r 2 nd Q tr

ProjectFinancing

1 st Q t r 2 nd Q tr0

2 0

4 0

6 0

8 0

1 st Q t r 2 nd Q tr

Support is provided by Head office teams operating through a linked IT system enabling timely communication of relevant data to the job site.

Quality Assurance Services

1 s t Q t r 2 n d Q t r0

2 0

4 0

6 0

8 0

1 s t Q t r 2 n d Q t r

15Typical Project Planning

Page 17: sts_1_of_3

Team Member’s Resume’s

Team Member’s Resumes

16

Page 18: sts_1_of_3

NAME: RAHIF IBRAHIM

POSITION: Managing Director

QUALIFICATIONS: Bachelor of Science in Electrical Engineering from American University of Beirut

PROFESSIONALAFFILIATIONS:

SUMMARY OF EXPERIENCE:

Over 20 years of experience in the field of electro-mechanical construction in the gulf and Saudi Arabia.

PROJECT EXPERIENCE:

Technical Manager SAUDI BINLADEN GROUP (SAUDI ARABIA)

Project Manager SAUDI BINLADEN GROUP (SAUDI ARABIA)

Project Manager WILKINSON ENGINEERING (U.A.E.)

17Team Member’s Resume’s

Page 19: sts_1_of_3

NAME: IBRAHIM W. MAZHAR

POSITION: Customer Services & Contracts Manager

QUALIFICATIONS: B. Sc. Mathematics, University of Jordan, Amman, Jordan 1976B. Sc. Civil Engineering, (With Distinction) University of Arizona, Tucson, Arison, USA 1982

PROFESSIONAL Member of Jordanian Association of EngineersAFFILIATIONS:

SUMMARY OFEXPERIENCE:

PROJECT EXPERIENCE:

Assistant Operations Manager DAR-AL-HANDASAH CONSULTANTS, JEDDAH, K.S.A.• Diversion of Utilities Obstructing Makkah Holy Mosque

Extension and Souq Al-Saghir Underpass (53-Contracts), Makkah

• Wadi Ibrahim Sewage Relocation Trunk Main and Tunnel (2 Contracts), Makkah

• Manakha Hotel Madina• Extension of the Madina Grand Mosque (Partly)• Madina Car Park Around Grand Mosque (Partly)

Assistant/Acting Resident Engineer

DAR AL-HANDASAH CONSULTANT (SHAIR &PARTNERS), MAKKAH, K.S.A.• Diversion of utilities obstructing Makkah Holy Mosque

Extension and Souq Al-Saghir Underpass

Project Manager (Client’s Representative)

JORDAN VALLEY AUTHORITY, AMMAN, JORDAN• Middle Jordan Valley Irrigation Project

Assistant Project Manager (Client’s Representative)

JORDAN VALLEY AUTHORITY, AMMAN, JORDAN• Mujib and Southern Ghors Irrigation Project, Stage 1

Business Promotion Engineer DAR-AL-HANDASAH CONSULTANTS, JEDDAH, K.S.A.• Feasibility Study for Abdul Latif Jamil Residential

Complex in Makkah• Proposal for Residential Corniche Towers for SEDCO,

Jeddah• Proposal for Business Center in Madinah Road for SBG,

Jeddah• Proposal for s Hotel at downtown Jeddah for SBG• Coordination with IDB headquarter in Jeddah in relation

to Africa and Asia Projects

21 Years

18Team Member’s Resume’s

Page 20: sts_1_of_3

NAME: MAGED GAMIL ANIS

POSITION: Technical Manager

QUALIFICATIONS: Bachelor of Science in Electrical and Communication Engineering Faculty of Engineering, University of Alexandria, Egypt in 1990.

SUMMARY OFEXPERIENCE:

PROJECT EXPERIENCE:

Technical Manger(1999 till date)

Saudi Trading & Services Int’l. Co. Ltd.Jeddah, Saudi Arabia

11 Years

19Team Member’s Resume’s

Tender Team Leader1998 - 1999

Saudi Trading & Services Int’l. Co. Ltd.Jeddah, Saudi Arabia

Electrical & CommunicationSite Engineer

Al-Henaki Trading & Contracting Co.Jeddah, Saudi Arabia

Electrical Engineer1995 - 1998

Saudi Trading & Services Int’l. Co. Ltd.Jeddah, Saudi Arabia

Page 21: sts_1_of_3

NAME: EFREN T. RODRIGUEZ POSITION: Financial Controller QUALIFICATIONS: Certified Public Accountant

Bachelor of Science in Business Administration Major in Accounting - graduated cum laude from the University of the East, Manila, Philippines.

PROFESSIONAL AFFILIATIONS:

President - Philippines Institute of Certified Public Accountants - 1997 (member since 1984)

EXPERIENCE: 16 Years Experience: 4 Years experience in Audit & 12 Years in Finance Financial Controller ( 1992 to Present )

Saudi Trading & Services Int’l. Co. Ltd. Jeddah, Saudi Arabia

Accounting Supervisor ( 1988 to 1992 )

Saudi Tourist & Travel Bureau Ltd. Jeddah, Saudi Arabia

Accounting Manager ( 1987 )

Airspeed International Company Ltd. Manila, Philippines

Senior Auditor ( 1983 to 1986 )

SyCip, Gorres, Veloyo & Company, CPA’s Makati, Philippines

20Team Member’s Resume’s

Page 22: sts_1_of_3

STS Staff

STS Staff

21

Page 23: sts_1_of_3

Head Office StaffSenior Manager = 3Managers = 3Engineers = 5Planning Engineer = 1Quality Assurance / Quality Control = 1Quantity Surveyor = 2Finance = 5Human Resources/Logistics = 4Information Technology = 1Administrative Assistant = 3Storekeeper (Main Store) = 1Storekeeper Helper = 2Clerks = 1Drivers = 1Total = 33

Projects Staff Direct HireProject Manager = 7Senior Electrical Engineer = 2Senior Mechanical Engineer = 2Planning / Cost Engineer = 1Design Civil Engineer = 1Civil Engineer = 3Electrical Engineer = 8Junior Electrical Engineer = 1Mechanical Engineer = 12Junior Mechanical Engineer = 3Safety Engineer = 1Chief Surveyor = 1Quantity Surveyor = 3Electrical Supervisor = 5Mechanical Supervisor = 4Plumbing Supervisor = 1General Foreman = 3Electrical Foreman = 13Civil Works Foreman = 1Surveyor = 1HVAC Foreman = 1Plumbing Foreman = 6Site CAD Operators = 14Duct Foreman = 1Pipefitting Foreman = 2Administrative Assistant = 8Business Support Officers = 1Government Relations Officer = 4Electrician (Leadman) = 5Pipefitter (Leadman) = 2Clerks = 2Storekeeper = 5Timekeeper = 4Welder = 13Ductman = 1Pipefitter = 35Electrician = 71Plumber = 42Insulator = 15Painter = 1Purchaser = 2Camp Boss = 1Office Boy = 8Electrician Helper = 68Ductman Helper = 2Pipefitter Helper = 18Plumber Helper = 53Welder Helper = 2Surveyor Helper = 2Storekeeper Helper = 1Driver = 9Building Watchman = 6Laborer = 2Total = 480 513

22STS-EMS Staff

Page 24: sts_1_of_3

STS Overview

STS Overview

23

Page 25: sts_1_of_3

Client Oriented Approach

• Providing a quality product

• Delivered on time

• At the best price

We exceed our clients expectations by:

• Client Communication

• Integrated Planning and scheduling

• Engineering Know-how

• Procurement & relationship building in

the supplier chain

• Quality Management System

We accomplish this through our core value competencies which are:

24STS Overview

Page 26: sts_1_of_3

Cost of Quality Problems

TimeBeginning of Project End of Project

$

The cost of a defect, increases dramatically as it moves along

the production line

Design Hand Overx

100x

10x

1000x

x

100x

10x

1000x

Specifications

Installation

Procurement

Design

Cost toResolve

• ISO 9002 certification passed December 3, 1995

• Online Quality Management System

• Monthly Operational Audits

• HR Development Programs

• Customer Interviews

Total Quality Management Initiatives

25STS Overview

Page 27: sts_1_of_3

STS - A UNIQUE APPROACH TO QUALITY MANAGEMENT

STS has, in the space of a single year, achieved ISO 9002 certification. This was only possible through total commitment to a simple and clearly understood policy.

“TO DELIVER PRODUCTS & SERVICES TO ALL CUSTOMERS, WHICH FULLY SATISFY OR EXCEED THEIR NEEDS AND ARE PERCEIVED AS EXCELLENT VALUE”

STS controls all Commercial and Engineering operational aspects of the construction processes through a computerized on- line Quality Management System.

Every facet of front end engineering, estimating, procurement, planning, scheduling, and project preparation is subject to the standardized and systematic control of the Quality Management System.

Project execution is subject to the same systematic approach. Since every project is unique, the Quality Management System requires that each project has its own specific Quality Plans in both narrative and matrix forms. These unique Quality Plans supported by client- approved Inspection and Test Plans identify all the Witness & Hold Points of the construction processes and record the participation responsibilities for every test and inspection.

The STS Total Quality Management approach to project execution has made STS the market leader in construction quality management.

It is said that, “Imitation is the most sincere form of flattery”, perhaps this is why other organizations copy STS Quality Documentation and use it as their own.

26STS Overview

Page 28: sts_1_of_3

STATEMENT OF COMPANY SAFETY POLICY

It is management responsibility to safeguard the health & safety of all STS employees and other personnel within STS work areas.

The following points are considered to be fundamental:

• The safety of the employee is of paramount importance.

• Safety will take precedence over all other considerations during site operations.

• Saudi Arabian Standards Organization safety requirements shall be complied with.

• All Managers, Supervisors and Employees will be involved in the implementation of safety procedures.

The Management will ensure that there is adequate staff, funds and material to meet these requirements.

27STS Overview

Page 29: sts_1_of_3

PROJECT HISTORY

Project History 28

Page 30: sts_1_of_3

Madinah Mosque E & M Equipment 25 M 1991

SCECO East EHV Substations & Relay Panels 10 M 1991

RSAF - Aircraft Arrestors 17 M 1991

VIP Hospital 13.8 kv Standby Power/LV Panel & Distribution System 23 M 1992

KKNG Hospital Standby Power Plant 3 M 1993

AFHC Cardiac Center BMS & Fire Detection Systems 10 M 1994

Abrug Al- Raghama, Jeddah 12 M 1992

SCECO 132KV S/S, Riyadh 27 M 1994

Shoaiba Phase- 2 (BECHTEL) 1.4 M 1995

Projects Value Completion

Trading Projects

Project History 29

S.R.

Page 31: sts_1_of_3

Contracting Projects

Project History 30

Page 32: sts_1_of_3

Hospital Projects

SAAD Hospital Engineering Al Khobar STS SAAD 2 M Nov 1995

Dr. Soliman Fakeeh Hospital Jeddah STS Dr. Fakeeh 44 M March 1999

Kingdom Hospital Riyadh El-Seif Kingdom Holding Co. 53 M March 2000

Saud Al Babtain Dammam STS Abdul Latif S. 39.9 M March 2000Cardiac Hospital AlBabtain & Bros. Co.

King Khalid National Hospital Jeddah STS National Guard 10 M April 2000King Abdul Aziz Oncology CenterRemodeling Wards 10/11/12

Sultan Bin Abdulaziz City Riyadh Al Mabani Sultan Bin Abdulaziz 9.7 M Aug. 2001for Humanitarian Services City for HumanitarianChild Development Center Services.and Mosque

Three 100 Bed Hospitals Rahfa THINET Ministry of Health 109.5 M Nov. 2002Khafji & International

Domat Al-Jundal

Prince Abdul Aziz Bin Ar’ar Areel Ministry of Health 31 M Nov. 2003Musa’ad 100 Bed Hospital Construction

150 Bed General Hospital Haqel ASTRA Co. Ministry of Health 17.8 M Sep. 2003

200 Bed Hospital Dawadmi Al-Mobty Ministry of Health 38.9 M Mar. 2004

Project Location Gen. Cont. Owner Value Completion

Project History 31

S.R.

Page 33: sts_1_of_3

Residential High Rise Towers

Project Location Gen. Cont. Owner Value Completion

Project History 32

Al Shubaikah-1 Bldg. Makkah ICCC Dallah 7.8 M May 1995

GOSI Bldg. HVAC Madina Al Redwan GOSI 17.8 M May 1996

Residential Bldg. (155-156) Madina Al Maram Dallah 31 M June 1996

Residential Bldg. (165-166) Madina ICCC Dallah 43 M March 1997

Taiba Res. & Comm. Center Madina SAUDICO Taiba Invst. 44.5 M Jan. 1999

Al Nawras Jeddah Al-Sahat Fakeeh Group 1 M Dec. 2000

Project Management Cairo,Sun Rise Res & Comm Bldg Egypt STS

S.R.

Page 34: sts_1_of_3

Office Buildings

Tamlik Tower Jeddah ICCC Tamlik Ltd. 6.4 M March 1997

National Guard H.Q. Complex Jeddah STS National Guard 105 M Jan. 1999

NCCI Head Office Building Riyadh SAUDICO CREIC NCCI 65.5 M March 1999

Sculpture Lighting Works at Riyadh STS Kingdom 4.6 M Sept. 2001Kingdom Centre Project Holding Co.

Kingdom Centre Riyadh STS Kingdom 7.5 M Sep. 2002Audio Visual System Holding Co.

Project Location Gen. Cont. Owner Value Completion

Project History 33

S.R.

Page 35: sts_1_of_3

Infrastructure for Housing Development & Power Plants

Khalidiah Project Jeddah SBG/SBD Prince Sultan 18 M Jan. 1995

SADAF Phase III Housing Jubail A.A. Turki Sabic 6 M Jan 1996

Sabic Residential Complex Jubail Binladin Sabic 15 M July 1996

Durrat Al-Arus Package “B” Jeddah Samaco Dallah 60 M Sept. 1996(All Infrastructure & Underground Utilities)

Durrat Al-Arus - 2 Design Jeddah STS Dallah 1.3 M Jan. 1997

Durrat Al-Arus - 2 Jeddah STS Dallah 17.3 M Nov. 1997Utility Link and Golf Area Lighting

Parts Distribution Center Jeddah STS Abdul 25.2 M Jan. 2004(E&M & Finishing Works) Latif Jameel

Project Location Gen. Cont. Owner Value Completion

Project History 34

S.R.

Page 36: sts_1_of_3

Commercial Centers

Al Ta’meer Center-1 Riyadh El-Seif ArRiyadh Co. 45.5 M Dec. 1999

Al Maddah Commercial Center Jeddah STA Mr. Abdullah 4.1 M July 2001

Al-Maddah

Granada Center Riyadh SAUDICO GOSI 68.5 M March 2005

Project Location Gen. Cont. Owner Value Completion

Project History 35

S.R.

Page 37: sts_1_of_3

Hotels

Durrat Al-Arus Jeddah Al Angari Dallah 7.6 M July 1996Durrah Beach Hotel

Durrat Al-Arus Jeddah Dallah 14.5 M Sept. 1996(Villas, Marina Apartment, Al MaramEquestrian Club, Studios Al Angari& Civic Center) STS

M213 Hotel Makkah STS Abdul Latif Jameel 16 M Feb. 1999

5 Star Sana’a Hotel Sana’a STS Shk. Abdul 61.6 M August 2003Yemen Rahman Banafea

Project Location Gen. Cont. Owner Value Completion

Project History 36

S.R.

Page 38: sts_1_of_3

Schools

9 Schools for the Ministry of Ministry of Education Jeddah STS Education 41 M Feb. 2005

41 Schools for the South Areas Ministry of Ministry of Education of Saudi Arabia STS Education 366 M Dec. 2006

Project Location Gen. Cont. Owner Value Completion

Project History 37

S.R.

Page 39: sts_1_of_3

Water Treatment Plants

Durrat Al-Arus Package # 1 Jeddah STS Dallah 44 M Sept. 1996(Utilities: Power, Water, Sewage)

Durrat Al-Arus Jeddah STS Dallah 19.3 M Jan. 1998Desalination Plant

Project Location Gen. Cont. Owner Value Completion

Project History 38

S.R.

Page 40: sts_1_of_3

Location:Gen. Contractor:

Owner:Value:Start Date: Completion Date:

JeddahSaudi Binladin -Special Bldg. Div.Prince Sultan18 M01 December 199322 January 1995

Scope of Work• Supply, install, commission and test 4

units of stand-by Genset (Caterpillar Genset 13.8, 1.5 MW each, 13.8 KV, 60 HZ, 3 phase); and 10 substations with RMU’s, COM’s; Fiber Optic Cable Control

KHALIDIYAH

Location:Gen. Contractor:Owner:Value:Start Date: Completion Date:

MakkahICCCDallah7.8 M10 May 1994May 1995

Scope of Work• Supply & installation of all electro-

mechanical works: plumbing, sanitary drainage, heaters, ventilation system, air conditioning, electrical distribution boards, antenna system, closed circuit TV, electric switches, outlets/lighting points, fire fighting system, elevators and pumps.

AL SHUBAIKAH-1 BUILDING

Project History

LocationGen. ContractorOwnerValueStart Date Completion Date

JubailA.A. TurkiSADAF6M10 November 199430 September 1995

Scope of Work• Site underground utilities for a 74-Villa

housing complex, including all civil works and electro-mechanical utilities.

• 12-300 kva transformers • LV Cable 2,130m • MV - 15kv 1,655m • Potable water 2,810m • Sewer Network 1,880m • As well as street lighting, telephone and

CATV distribution.• Storm Drain

SADAF HOUSING PHASE III

39

Page 41: sts_1_of_3

40Project History

LocationGen. ContractorOwnerValueStart Date Completion Date

JeddahSTSDallah44 M11 September 199416 September 1996

Scope of Work• Supply and install Power Generation Plant

with 3 X 3612 Caterpillar Gensets, 1 X 3616 Caterpillar Genset; MV switchgear and generator control

• 2 X 700 m3 Fuel Oil Storage Tanks;• Tertiary Waste Water Treatment Plant 500

m3 /day capacity with 2 X 17m diameter chlorine contact tanks, 12m diameter sewage lift station and sludge dewatering. Concrete irrigation tanks with pump station. All underground utilities for the facility.

DURRAT AL-ARUS (PACKAGE 1)

LocationGen. ContractorOwnerValueStart Date Completion Date

MadinahAl Redwan Co.GOSI18 M10 July 19941 January 1996

Scope of Work18-floors residential building includes: • 2 underground basements, ground,

mezzanine and 14 typical floors • HVAC for all 14-stories with scope of

works including the Building Management System controlling the operation of the HVAC and systems supplied by others.

GOSI INVESTMENT BUILDING

LocationGen. ContractorOwnerValueStart Date Completion Date

MadinahSaudi MaramDallah31 M13 August 1994June 1996

Scope of Work18-floors hotel and apartment building

includes: • 2 basements, 1 ground and 1 mezzanine

floor for commercial outlets and 14 typical floors.

• All mechanical, plumbing, HVAC (central chilled water system), electrical & elevators, 2 X 240 kw gensets, fire alarm, telephone/PABX and CCTV system.

RESIDENTIAL & COMMERCIAL BUILDING (155/156)

Page 42: sts_1_of_3

Project History

LocationGen. Contractor

OwnerValueStart Date Completion Date

JubailBinladin - Special Bldg. DivisionSABIC15 M4 June 1994July 1996

Scope of WorkInfrastructure & site development, includes:• Installation of sewer mains network 5120 m• Installation of potable water mains 3190 m• Storm drain network 1800 m• Telecommunication networks telephone &

CATV distribution• Primary & LV distribution; 66-300 kva

transformers, 20,345 m of MV cable & 5870 m of LV cable

• Street lighting

SABIC RESIDENTIAL COMPLEX

LocationGen. ContractorOwnerValueStart Date Completion Date

JeddahSaudi MaramDallah7.6 M19 November 1994July 1996

Scope of Work• Supply and installation of all electro-

mechanical works for 14 bungalows and 140-room multi-storey hotel building.

DURRAT AL-ARUS (DURRAH BEACH HOTEL)

41

LocationGen. ContractorOwnerValueStart Date Completion Date

JeddahSTSNational Guard99 MOctober 1996Jan. 1999

Scope of Work

Structural, Architectural and Electro-mechanical works for phase one buildings.

NATIONAL GUARD HEAD QUARTER COMPLEX

Page 43: sts_1_of_3

Project History

Location:Gen. Contractor:Owner:Value:Start Date: Completion Date:

JeddahSamaco/BinladinDallah60 M21 May 1994September 1996

Scope of WorkIncluded all infra-structure and site development for a 2.1 million m2 beach development resort including 12 km of underground pipe laying for:•Potable Water System•Irrigation System•Storm Water Network•Drainage Sewer Network•Lift Stations •47 compact substations 500 to 1,000 kv•28,500 M-13.8 KV Ring Main Unit &

MV cable networks •49,000 M-LV (600/1,000 V) cables •125 no.- LV Panel Boards & LV Switchgear •600 no. - light poles •Telecommunication system with PABX CATV System Network

DURRAT AL-ARUS -PACKAGE B (INFRASTRUCTURE)

Location:Gen. Contractor:Owner:Value:Start Date: Completion Date:

MadinahICCCDallah43 M28 May 199415 November 1996

Scope of Work18-floor residential and commercial building

includes: • 2 underground basements, 1 ground,

1 mezzanine floor and 1 first floor for commercial outlets, 10 typical floors, 2 executive floors and 1 VIP floor.

• All mechanical, plumbing, HVAC, electrical & elevators, 1 X 1,000 KVA prime rated gensets, fire alarm, 1,000 lines telephone/ PABX and CCTV system.

RESIDENTIAL & COMMERCIAL BUILDING (165/166)

LocationGen. ContractorOwnerValueStart Date Completion Date

JeddahICCCTamlik Ltd.6.4 M15 July 1995March 1997

Scope of Work• All electrical works and equipment,

including transformers, generators, switchgears, and other related equipment. Installation of lighting / power systems, communication and CCTV system.

TAMLIK TOWER

42

Page 44: sts_1_of_3

Project History

LocationGen. ContractorOwnerValueStart Date Completion Date

JeddahSTSDr. Fakeeh44 M1 July 1995March 1999

Scope of WorkStructural work - all civil works for additional pediatric wing, Medical Fitness Center and staff residences, including:•Dewatering 2 steel bridges and 2 concrete tunnels•Electro-mechanical works: electrical, plumbing, HVAC, medical gas system, complete fire fighting system, A/C filters with 30% over capacity for chillers.

DR. SOLIMAN FAKEEH HOSPITAL

LocationGen. ContractorOwnerValueStart Date Completion Date

MadinahSAUDICOTaiba44.5 MMarch 1996Jan. 1999

Scope of Work14 Floors Over 5 Basements:Electrical and mechanical works on the project including the design review, delivery, erection, installation, testing & commissioning, maintenance of electrical distribution system, plumbing & sanitary installations, HVAC, BMS, F.A. System, Elevators, Lighting system, Television System, PABX and CCTV System.

TAIBA RESIDENTIAL & COMMERCIAL CENTER (WESTERN TOWER)

LocationGen. ContractorOwnerValueStart Date Completion Date

RiyadhSAUDICONCCI65.5 MJuly 1996March 1999

Scope of WorkSupply install, testing & commissioning of all the electrical, mechanical and HVAC systems servicing the building covers the following:Mechanical:Fire Protection System, Chillers, AHU’s, Ductworks, Insulation, Air Thermal Units, Thermal Heat Transfer Units, FCU’s and Thermal Energy Storage System (TES), etc...Electrical:Power Distribution Boards, Panel Boards, Interior & Exterior Lighting System, Flood lights & Emergency Lighting System, Emergency Power Generators, Earthing and Lightning Protection System, F.A. System, Security System, etc..

NCCI HEAD OFFICE BUILDING

43

Page 45: sts_1_of_3

Project History

LocationGen. ContractorOwnerValueStart Date Completion Date

RiyadhEl-SeifArRiyadh Devpt.45.5 MAugust 1996Dec. 1999

Scope of WorkTo execute the Electrical Works.Supply, erection, installation, testing & commissioning, and warranty maintenance of the following:

Electrical Distribution Systems incl. Transformers, Standby Generator Sets, F.A. System, Lighting Systems, Telephone Cabling, CCTV Security incl. P.A. System and Building Management System.

AL TA’MEER CENTER-1

44

Location:Contractor:Owner:Value:Start Date: Completion Date:

RiyadhEl-SeifKingdom Holding Co.53 MOctober 1997March 2000

Scope of WorkSTS is subcontracted to execute the electrical, mechanical, and medical gas works on the project in accordance with the specifications and standards as mentioned in the main contract. STS has adapted to the needs of the Client by executing in three phases Value-Engineering & re-design of the systems providing substantial cost saving without compromising performance & quality.These works include the design review, delivery, erection, installation, testing & commissioning and maintenance of the following:

• Telephone & Data System with structural cablingnetworks of fiber optic back bone.

• MV/LV Power Distribution System Network• Generator Sets• Plumbing & Sanitary Installations• HVAC• Fire Alarm, Fire Fighting & Fire Suppression System• Lighting Systems (Including Emergency)• Public Address & CATV System• Grounding & Lightning System• Medium Voltage Distribution• Medical Gas System• Storage Tanks & Storm Water Network• Nurse Call System• LPG & Fuel System• Steam Networks

KINGDOM HOSPITAL

Page 46: sts_1_of_3

Location:Contractor:Owner:Value:Start Date: Completion Date:

MakkahSTSAbdul Latif Jameel16 M16 Sept. 1997February 1999

Scope of WorkThe Hotel building consist of 17-floors typical over 3 basements, 1 ground floor and a mezzanine includes the design review, delivery, erection installation, testing & commissioning and maintenance of the following:

• Low Voltage Electrical Distribution System• Generator Set• Plumbing & Sanitary Installations• HVAC• Fire Alarm & Fire Fighting Systems• Lighting Systems (Including Emergency)• Telephone Systems• Public Address, CATV System & Nurse Call• Grounding & Lightning System

MAKKAH M-213 HOTEL PROJECT

Project History 45

Location:Contractor:Owner:Value:Start Date: Completion Date:

DammamSTSSaud Al Babtain40 M15 June 1998March 2000

Scope of WorkSTS is contracted to execute the complete civil, architectural, electrical & mechanical, works including supply of fixed medical equipment like, bed head units, operating lights & surgical column. These works includes the design review, delivery, erection, installations, testing & commissioning & maintenance of the following:

• Structural / Architectural Works• Interior and Exterior Finishing• Low Voltage Electrical Distribution System• Generator Set• Plumbing & Sanitary Installations• HVAC• Fire Alarm, Fire Fighting & Fire Suppression Sys.• Lighting Systems (Including Emergency)• Telephone & Data Systems• Public Address, CATV & Nurse Call System• Grounding & Lightning System

SAUD AL BABTAIN CARDIAC CENTER

Page 47: sts_1_of_3

Project History 46

Location:Gen. Contractor:Owner:Value:Start Date: Completion Date:

Rahfa, Khafji & Domat Al JundalTHINET InternationalMinistry of Health108 MFebruary 2000August 2002

Scope of Work

The scope of this project consist of the Electro-Mechanical works such as Plumbing, HVAC, Electrical MV / LV Networking System and Medical Gases Systems for the building facilities, as follows:

• Main Hospital & Ancillary Building• Housing Buildings • Mosque• Guardhouses

And for the external site facilities and utilities networks, including water treatment, sewage treatment plants & storm water network.

THREE 100 BED HOSPITALS

Location:Gen. Contractor:Owner:Value:Start Date: Completion Date:

RiyadhAl MabaniSultan Bin Abdulaziz9.7 MJune 2000August 2001

SULTAN BIN ABDULAZIZ CITY FOR HUMANITARIAN SERVICESBID PACKAGE 9 – CHILD DEVELOPMENT CENTER & MOSQUE

Scope of Work

The scope of this project consist of the Electro-Mechanical works such as Plumbing, HVAC, Electrical services and Low Current Systems, Building Management System & Fuel Storage Tanks

LocationGen. ContractorOwnerValueStart Date Completion Date

JeddahSTSNational Guard10 MOctober 1999April 2000

Scope of Work

Structural, Architectural and Electro-Mechanical works for Oncology CenterRemodeling Wards 10/11/12.

KING KHALID NATIONAL GUARD HOSPITAL

Page 48: sts_1_of_3

Project History 47

Location:Gen. Contractor:Owner:Value:Start Date: Completion Date:

RiyadhSTSKingdom Holding Co.13.4 MNovember 2000September 2001

Scope of Work

The Contractor shall design, engineer, source, supply, fabricate, install, test and commission the works to the complete satisfaction of the Employer. The works consist of the following:

• Design, fabrication of lighting panels & installation of the panels at the sculpture area from level 200 till 300 meters with control thru BMS including structural catwalk for maintenance purpose.• Design, installation & Testing & Commissioning A/V System for Kingdom Tower with 4 Season Hotel.• Design, installation Testing & Commissioning of 100 & 300 HP pumps for the fire fighting system & handing-over to the satisfaction of the Employer.

SCULPTURE LIGHTING, AUDIO VISUAL (A/V) & FIRE FIGHTING SYSTEM AT KINGDOM CENTRE PROJECT

Location:Gen. Contractor:Owner:Value:Start Date: Completion Date:

JeddahSTA Co.Mr. Abdullah Al Maddah4.1 MJuly 2000July 2001

AL-MADDAH COMMERCIAL CENTERScope of Work

The scope of this project consist of the Electro-Mechanical works such as Plumbing, HVAC, Electrical services and Low Current Systems.

Page 49: sts_1_of_3

Project History 48

5 Star Hotel, Sana’a - Yemen

Location:Gen. Contractor:Owner:Value:Start Date: Completion Date:

Sana’a, YemenSTSShk. Abdul Rahman Banafea61.6 MMay 2001August 2003

Scope of Work

The scope comprise electrical and mechanical works as follows:• HVAC• Plumbing• Fire Protection• Fire Alarm• Steam Works• Power Distribution (MV & LV)• Lighting• Building Management System• Security Systems• Generators• Data & Telephone Network• Kitchen Equipment• Swimming Pools

Location:Gen. Contractor:Owner:Value:Start Date: Completion Date:

Ar’ar, Saudi ArabiaAreel ConstructionMinistry of Health31 MJune 2002November 2003

Prince Abdul Aziz BinMusa’ad 100 Bed Hospital

Scope of Work

The scope of the subcontract for this project consist of the Electrical and Mechanical Works such as, Plumbing, HVAC, Electrical, Medical Gas Systems, Steam and Equipment’s for the following buildings:• Main Hospital & Ancillary Buildings• Housing Buildings• External Works

Page 50: sts_1_of_3

Project History 49

Location:Gen. Contractor:Owner:Value:Start Date: Completion Date:

Haql, Saudi ArabiaASTRA Co.Ministry of Health17.8 MSeptember 2001January 2004

Scope of Work

The scope of the subcontract for this project consist of the Electrical and Mechanical Works such as, Plumbing, HVAC, Electrical, Medical Gas Systems, etc & system’s equipment’s for the following:• Main Hospital & Ancillary Buildings• External Works

150 Bed General Hospital

Granada Center

Location:Gen. Contractor:Owner:Value:Start Date: Completion Date:

Riyadh, Saudi ArabiaSAUDICOGOSI68.5 MDecember 2002March 2005

Scope of WorkThe scope of the subcontract for this project consist of the Electro-Mechanical works such as Plumbing, HVAC, Electrical & External Works.

Page 51: sts_1_of_3

STS Projects Photos

STS Projects Photos

50

Page 52: sts_1_of_3

51STS Projects Photos

Prospective ViewGranada Center, Riyadh

Page 53: sts_1_of_3

52STS Projects Photos

Prospective ViewGranada Center, Riyadh

Page 54: sts_1_of_3

53STS Projects Photos

Prospective ViewGranada Center, Riyadh

Page 55: sts_1_of_3

Prospective ViewGranada Center, Riyadh

54STS Projects Photos